Loading...
HomeMy WebLinkAboutPermit D06-361 - Geninco Insurance Trust - 13911 Building Demolition13911 DEMOLITION 13911 TUKWILA INTERNATIONAL BL D06 -361 City t Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: ci.tukwila.wa.us DEVELOPMENT PERMIT Steven M. Mullet, Mayor Steve Lancaster, Director Parcel No.: 8864000985 Permit Number: D06 -361 Address' 13911 TUKWILA INTERNATIONAL BL TUKW Issue Date: 10/24/2006 Suite No: Permit Expires On: 04/22/2007 Tenant: Name: 13911 DEMOLITION Address' 13911 TUKWILA INTERNATIONAL BL, TUKWILA WA Owner: Name: GENINCO INSURANCE TRUST Address' 11556 6TH NW, SEATTLE WA, 98177 Phone: Contact Person: Name: TOM JOHNSON Address: 1001 WESTLAKE NORTH, SEATTLE WA, 98109 Phone: 206 930 -4636 Contractor: Name: OWNER AFFIDAVIT ON FILE - TOM JOHNSON Address: Phone: Contractor License No: DESCRIPTION OF WORK: DEMOLITION OF EXISTING 1176 SF BUILDING AND SLAB. Project onVal Vue Sewer and Water District #125 water. Public Works activity include erosion and sediment control. Value of Construction: Type of Fire Protection: Type of Construction: doc: IBC - PERMIT $11,400.00 **continued on next page** Expiration Date: Fees Collected: $742.35 International Building Code Edition: 2003 Occupancy per IBC: D06 -361 Pdnted: 10 -24 -2006 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: Flood Control Zone: Hauling: Land Altering: Landscape Irrigation: Moving Oversize Load: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Permit Center Authorized Signature I hereby certify that I have read and ordinances governing this work will b doc: IBC- PERMIT City frail Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: ci.tukwila.wa.us N N Y N Number: 0 Size (Inches): 0 Start Time: End Time: Volumes: Cut 0 c.y. Fill 0 c.y. Start Time: End Time: Private: Public: Profit: N Non - Profit: N Private: Public: Steven M. Mullet, Mayor Steve Lancaster, Director Permit Number D06 -361 Issue Date: 10/24/2006 Permit Expires On: 04/22/2007 Date: 1Dt2.4t(6 permit and know the same to be true and correct. All provisions of law and ith, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit. Signature: itc� e.. Date: Io /z 9/66 Print Name: tom, TA a ne e This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. 006 -361 Printed: 10-24 -2006 1: ***BUILDING DEPARTMENT CONDITIONS "` doc: Conditions City i Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: ci.tukwila.wa.us PERMIT CONDITIONS "continued on next page" Steven M. Mullet, Mayor Steve Lancaster, Director Parcel No.: 8864000985 Permit Number: D06 -361 Address: 13911 TUKWILA INTERNATIONAL BL TUKW Status: ISSUED Suite No: Applied Date: 09/28/2006 Tenant: 13911 DEMOLITION Issue Date: 10/24/2006 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction These documents shall be maintained and made available until final inspection approval is granted. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be Inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 6: All electrical work shall be inspected and approved under a separate permit issued by the Washington State Department of Labor and Industries (206/248- 6630). 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. D06 -361 Printed: 10-24 -2006 Signature: Print Name: (m („, TO L n604,0 doc: Conditions City Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: et.tukwila.wa.us Steven M. Mullet, Mayor Steve Lancaster, Director I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances goveming this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Date: //572 1 l/6ts4 D06-361 Printed: 10 -24 -2006 CITY OF TUKWI Community Development apartment Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 htto://www.ci.tukwila.wa.us SITE LOCATION Site Address: 1 l9 \ \ TV (Ai A 0 rni no.'rcona\ 9 %'4.Suite Number: Floor: Tenant Name: Vete c.r - r Etuilcling PenlwvNo;' Mechanical Pei i tN4 Piuinbing/Qtas `Pprint Public Works Permit No Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** Property Owners Name: &enILo Mr%s.,Co -nrc Tr.)s+ King Co Assessor's Tax No.: $38‘ $ G2 Mailing Address: 1ISSfa. SIX /tvr.n NI u,l Se0, v../Pc City New Tenant: ❑ .... Yes 0..No 9617 - 7 State Zip I CONTACT PERSON Name: T„n "r r Day Telephone: (7 n to) 9 : .1 % C) G.3 C Mailing Address: \00 wes41okr tUnr - tt■ S tAIA 9P109 City State Zip E -Mail Address: In rn - - X01^ n S 6+ 1 e \fa. % o. Con Fax Number: ( O C 2.$15 F3, S 4 GENERAL CONTRACTOR INFORMATION (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg S) ) Company Name: Mailing Address: State Zip City Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: [ARCHITECT _OF`fECORD - Ail plans must be wet stamped by Architect of Record Company Name: Mailing Address: City Contact Person: Day Telephone: E -Mail Address: Fax Number: ENGINEER OF RECORD -All plans must be wet stamped by Engineer of Record Company Name: Mailing Address: Contact Person: E -Mail Address: QAApplic.tion\Forms- Application. On Line\ -2006 - Permit Appliation doc Revised. 4-2006 bh State State Zip Zip City Day Telephone: Fax Number: Page 1 of 6 Valuation of Project (contractor's bid price): $ 11, 00 Existing Building Valuation: $ I,(X)o Scope of Work (please provide detailed { sv � information): 1lr rnrr. e- XIS *YIr i7V \\C1YV - r s` o Will there be new rack storage? ❑ ..Yes p.. No (If yes, a separate permit and plan submittal will be required) Provide All Building Areas in Square Footage Below la Floor re Floor Ye Floor Floors (Basement Accessory. Structure* Attached Garage Detached Garage Attacker! .Carport : Detached Carport - covered Peck Uncovered Deck Existing � Interior Remodel A to Existing Structure construction Type of Occupancy per PLANNING DIVISION: Single - family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area for accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ ....Yes ❑ ..No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: 0.. Sprinklers ❑..Automatic Fire Alarm ❑..None ❑ . Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑..Yes ❑..No If"yes", attach list of materials and storage locations on a separate 8 -1/2 x 11 paper indicating quantities and Material Safety Data Sheets. SEPTIC SYSTEM: On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Q: Appliationsworms- Applications On Line 3 -2006 - Permit Apptcation.doc Reviled. 4-2006 bh Page 2 of 6 Fixture Type: . Qty Fixture Typ Qty Fixtur ype: Qty Fixture Type: Qty Bathtub or combination bath/shower Drinking fountai`,tr water cooler (per head) Was untain Gas piping outlets Bidet Food -waste grinder, commercial ceptor, indirect este Clothes washer, domestic Floor drain Sinks Dental unit, cuspidor Shower, single head trap Urinals Dishwasher, domestic, with independent drain Lavatory ^ Water Closet Building sewer or trailer park sewer Rain water system — per drain (inside building) - Water heater and/or vent Industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors Repair or alteration of " ater piping and/or water ating equipment ' epair or alteration drainage or vent pi, 1g Medical gas piping system serving one to five inlets/outlets for specific gas Additional dical gas inlets/outl — six or more PLUMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: Mailing Address: City State Zip Day Telephone: Fax Number: Contractor Registration Number: Expiration Date: Contact Person: E -Mail Address: Valuation of Project ontractor's bid price): $ Scope of Work (please p vide detailed information): Indicate type of plumbing fixtures and/or g piping outlets being installed and quantity below: Q'MApplicstionsWomu- Applications On LineU -2006 - Permit Application.doc Revised: 4-2006 bh Page 5of6 PERMIT APPLICATION NOT- Applicable to all permits in this a:ication ; Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OW R OR THORIZED AGENT: Signature: Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing code (current edition). Print Name: Tm I Date Application Accepted: InwSe.e) Q 1Applicetion.Wonne- Applic tioiu On LineV -2006 • Permit Application.doc Revised: 42006 bb Date: Day Telephone4h c) 930 -Lk.3(, Mailing Address: /40/ CJes + Icakc Nof + 4. Se:ocervc W\ X181O9 State Zip City Date Application Expires: 0 %In(o- Page 6 of 6 ACCOUNT ITEM LIST: Description Current Pmts City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 8864000985 Permit Number: D06 -361 Address: 13911 TUKWILA INTERNATIONAL BL TUKW Status: APPROVED Suite No: Applied Date: 09/28/2006 Applicant: 13911 DEMOLITION Issue Date: Receipt No.: R06 -01706 Payment Amount: 310.00 Initials: JEM Payment Date: 10/24/2006 02:14 PM User ID: 1165 Balance: $0.00 Payee: TOM D. JOHNSON TRANSACTION LIST: Type Method Description Amount Payment Check 3777 310.00 PW BASE APPLICATION FEE PW PERMIT /INSPECTION FEE PW PLAN REVIEW Account Code 000/322.100 000/342.400 000/345.830 RECEIPT 250.00 30.00 30.00 Total: 310.00 1086 10/24 9716 TOTAL 310.00 doc: Receipt Printed: 10- 242006 City of Tukwila 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 8864000985 Permit Number: D06 -361 Address: 13911 TUKWILA INTERNATIONAL BL TUKW Status: PENDING Suite No: Applied Date: 09/28/2006 Applicant: 13911 DEMOLITION Issue Date: Receipt No.: R06 -01526 Payment Amount: 432.35 Initials: JEM Payment Date: 09/281200611:17 AM User ID: 1165 Balance: 90.00 Payee: TOM JOHNSON TRANSACTION LIST: Type Method Description Amount Payment Cash 432.35 ACCOUNT ITEM LIST: Description Current Pmts BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE 000/322.100 000/345.830 000/386.904 RECEIPT Account Code 259.30 168.55 4.50 Total: 432.35 0200 09/28 9710 TOTAL 432.35 doc: Receipt Printed: 09- 28-2006 Project: /3 Q / Of/110 Type of Inspection: E" " / V Address: / 3 C// 77 63 Date Called: --- SpecialInstructions: Date Wanted: 2 - O 7 /a.m. • v .tf. Requester: Phone No: -2d —c 30 c/6 36, INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 r'r r r r� r� r•� p /F -/ j / v.1 / Insp +•r: Dat L4. Eceipt No.: 'Date: Approved per applicable codes. 0 Corrections required prior to approval. ( COMMENTS: .00 REINSPECTION FE: REQU - I. Prior o inspection, fee must be aid at 6300 Southcenter : vd., Suite 100. Cal the schedule reinspection. Project i�F✓nb /d L)A S6y,) of Inspection: NJ t'� (l o i - cA - Address: 1 y1l 'f"T C3 Date Called: Special Instructions: Date Wanted: 7 - 24 ° (a -m; P -m. Requester: ro Phone No: r — 3 y &3 / l INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 pproved per applicable codes. COMMENTS: Corrections tequired prior to approval. El ;woo REINS ON FEE REQUIRED. Prior o inspection. fee must be paid at 6300 uthcenter Blvd.. Suite 100. Call the schedule reinspection. 'Receipt No.: 'Date: Project: 1 Q . 4»t Type of Inspection: (� 1,� Address: 1ic it (3 Date Called: e dI ��l Special Instructions: Date Wanted: Dv /1107 a.m. p.m. Requester: j*4 S s(J Phone No: 7 4-16 ql() 4L 'Z6 3 .) 0 Approved per applicable codes. COMMENTS: (5 0) INSPECTION RECORD Retain a copy with permit Del, - PERMIT NO. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 El Corrections required prior to approval. �fL /n uAiv- `alt -jci) ruc4 r toe., Inspector: i Date: 0 $58.00 REINSPECTION FEE REQUIRED. Prior o inspection, fee must be paid at 6300 Southcenter Btvd., Suite 100. Call the schedule reinspection. Receipt No.: (Date: Proj, ct� I } ( y Type of Inspection: Addrpsss: r Date Called: Special Instructions: Date Wanted: (' / B/11 a.m. p.m. Requester: Phone No: PLo PG Approved per applicable codes. 1 lnspector: INSPECTION RECORD Retain a copy with permit bolo-36 t PERMIT NO. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Corrections required prior to approval. COMMENTS: 6N- - ' Date: 19 $58.00 REINSPECTION FEE REQUIRED. Prior o inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. 'Receipt No.: 'Date: Project: R7/ ac . Type of Inspection: 'w /�,ct G„i Ad re »: /, T� ^ /q ,f Date Called: 'zl/4 7 / Special Instructions: Date Wanted: /r IF a.m. p.m. Requester: Phone No: /2 INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. INSPECTION RECORD Retain a copy with permit pob - 3 6 PERMIT NO. El Corrections required prior to approval. COMMENTS: ( i4 7/z3 /r PAP o•1 6 (Area - nl — /GI h.-LA-N. 5 rad - d f x }��7 u,- ✓u Inspector: 64 J (Dat 1 1 ? $58.00 REINSPECTION FEE REQUIRED. Prior o inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call the schedule reinspection. 'Receipt No.: 'Date: � a .y a MCI T c Lo m �. •s o p rim° w• - aga) t _� in o � c �'= �' �► z m z B O ti p • C c0 $ O LIED b s-8 > it 0Q Ffl- � 1r�er r ' r r r r p N U b `•�.: CO, All Vo Nr- 324 :/-rl c� •�„ �. ,..lei ('I�I.'��o l H b g 'IJ p t."°'°' .o I ,, „� �i •-• Q b rn v� �' i f: if ci I Bout na 00 VX U. .r `S J' r r 6 ' T, a r O , raC n 0 Q w cn C. - oMMo 1.1.• W IIIII�III�II�III II�i�Ijl�lijl� ill Ijt Inch 1H8 1I 2I `W r.STCO'IT� 5 j <i I3I'�,� L511`I:I "I hI I I- I- �- �i- � -�61�. 4� ti.,��+ 9 9 ti E Z wo . i�il ►iliilili lIIII yin IIIII�► i�iilll► III�I�iIIIiII�I�IIIi�iI�I��IIIi�����I�I�III��ILII 1 d ,J 0 2 �r RECEIVED CITY nFTI IKWILP ou, 2 0 7006 PERMIT CENTER 0 r- 0 D W LL •c v V) -FJ C �X 0 CL Q cc � O � c �s E�a� C � t� M _�;ORRECTION I..TR# T�)dv GEOTEXIK.E FABRIC ADAPTER SKIRT (FOR A PERFECT HT) #3003 SEDIMENT ONLY SEDIMENT ACCUMULATION PROVIDE CATCH BASIN SEDIMENT PROTECTION WITH STREAMGUARD BASIN INSERT 13003, FROM FOSS ENVIRONMENTAL 7440 W. MARGINAL WAY S. SEATTLE, WA 98108-4141 PHONE: 1- 800 - 909 -3677 RETRIEVAL STRAP OVERFLOW (TO BYPASS PEAK STORM VOLUMES) 24' EXISTING CATCH BASIN CATCH BASIN SEDIMENT BARRIER NOT TO SCALE ANCHC MINIMU OR 256 TVPICA H ANCHOR INSTALLE OF NO LE THE IOTA SURVEY AND FLA 4. THE ON THE 5. EN S TU P ECTION AREAS. THE AL Al CLEARING SE 1. PR 2. L DIRECTI PRESERV 3. APPLIC PRDTECTI UENCE THE Oil FE ING NOT De S FINES REAS. PRO CTION F ADIN PLAN. PLICANT'S ORES E PROPER ILA'S URBAN IRE ACEMENT AND INS L 1)1 T11T TC XX Tana? C T1LrnT CITY (1FTI OCT 2 0 7OO•i PERMIT CENTER CORRECTION 1 Project: 13911 Demolition Permit No: D06 -361 RE: Correction Letter REVISION SUBMITTAL la: No record of sewer hook up with Val Vue Sewer District. I will contact Jeff their inspector when sewer line is exposed. He would like to send a camera down line. A private locator has followed the line just outside the north garage door. lb: Russ the superintendent for water district 125 met with me oct. 18 and showed me the shut off for our site and two other neighboring buildings shared meter. Russ said that it is not necessary to cap or shut down the water. We have our own shut off on south east corner of property as shown on site plan. 2. The 20 by 24 inch catch basin in the south east comer of the property will be protected with a Streamguard Basin insert #3003 as requested. 3. After the building and slab are removed we plan to bring in fill dirt if necessary and then 15+ yards of bark to prevent erosion. With regards to the buildings prior use as a gas station in the summer of 1999 Global Environmental removed all six UST's. In October 1999 the Department Of Ecology gave us a "No Further Action" determination. 4. Estimate included for removal and disposal of gas station and asphalt paving. The building is a simple metal structure that will be scraped. The foundation appears to be minimal so very little fill will be needed. Owners will cap sewer and water supply will be shut oft Owners will spread bark after minimal amount of backfill is brought in. CITY TIIKWILP OCT 2 0 mpg; PERMITCENTER CORRECTION LTR# 1 Sep 25 06 01:59p p.2 CONTRACTING PARTY: JIM MERLINO / ATTN: TOM JOHNSON / #930-4636 FAX: #283 -8326 TYPE OF WORK: DEMOLITION LOCATION OF WORK: 13911 TUKWILA INT'L BLVD. / TUKWILA, WA DEMOLITION, REMOVAL AND DISPOSAL OF EXISTING GAS STATION, INCLUDING ASPHALT PAVING, AS DISCUSSED. SITE' t,rcgetc MERIDIAN EXCAVATING & WRECKING, INC. Accepted 911 North 141st Seattle, Washington 98133 Phone: 364-4750 Fax: 361 -0114 Oaotatloas sabiect to Mann or csneeibdon after 30 days. THIS WILL CONFIRM OUR QUOTATION TO YOU FOR THE FOLLOWING. /20o The teens are: CASH UPON COMPLETION OF JOB. SEPTEMBER 25, 2006 PRICE: 511,400.00 NOTE: Price does not include applicable permits, hazardous material removal, erosion control measures and/or earthwork. We cannot be responsible for subprade Eagara. State Sales Tax to be added where anplcable. Your signature will nuke this s legal contract for the performance of the above work. Accepted Date . SIMI. w 0 i 0 y Ma+ STATE OF WASHINGTON DEPARTMENT OF ECOLOGY Northwest Regional Office, 3190 - 160th Ave S.E. • Bellevue, Washington 98008 -5452 • (425) 649 -7000 October 11, 1999 Gene Merlino 1001 Westlake Ave North Seattle, Washington 98109 Dear Mr. Merlino Re: Independent Remedial Action United Motors, 13911 Pacific Highway South, Tukwila, WA Thank you for submitting the results of your independent remedial action(s) for review by the State of Washington Department of Ecology (Ecology) Ecology appreciates your initiative in pursuing this administrative option under the Model Toxics Control Act (MTCA). Ecology's Toxics Cleanup Program has reviewed the following information regarding the United Motors facility located at 13911 Pacific Highway South, Tukwila, WA: 1. Underground Storage Tank Closure Report - Former Gas Station - 13911 Pacific Highway South - Tukwila, WA, 98168: Global Diving and Salvage, Environmental Division; September 28, 1999. The report listed above will be kept in the Central Files of the Northwest Regional Office (NWRO) of Ecology for review by appointment only. Appointments can be made by calling Central Records at the NWRO at (425) 649 -7190 or -7239. Based upon the information in the reports listed above, Ecology has determined that, at this time, the release of petroleum hydrocarbons into the soil and shallow unconfined groundwater no longer poses a threat to human health or the environment. Therefore, Ecology is issuing this determination that no further remedial action is necessary at this site under MTCA, chapter 70.105D RCW. However, please note that because your actions were not conducted under a consent decree with Ecology, this letter is written pursuant to RCW 70.105D.030(1)(i) and does not constitute a settlement by the state under RCW 70.105D.040(4) and is not binding on Ecology. Ecology's no further action determination is made only with respect to the release identified in the report(s) listed above. This no further action determination applies only to the area of the property affected by the release identified in the report at 13911 Pacific Highway South, Tukwila, WA. It does not apply to any other release or potential release at the property, any other areas on the property, nor any other properties owned or operated by Gene Merlino. 0 GLOBAL ENVIRONMENTAL A Drvivon of Gloiol Diving & Salvage, Imorporared July 13, 1999 Gene Merlin c/o American Meter and Appliance 1001 West Lake N. Seattle, WA 98109 Re: Closure by removal of six Underground Storage Tanks Former Gas Station 13911 Pacific Highway South Seattle, WA Global Proposal Number 9860 (revised) Mr. Merlino: Global Diving and Salvage, Inc., Environmental Division, is pleased to provide this revised proposal for the above referenced project. Our original proposal was dated August 11, 1998. That proposal was based on the information available to us, at that time. Mr. Saltarelli has fumished additional information and requested that we provide a proposal for the closure by removal of six underground storage tanks (USTs). Based on information available to us now, we understand the scope of work to include the following: Closure by removal of the following USTs: #1 2,500 gallons previously containing gasoline or diesel #2 4,000 gallons " a #3 3,000 gallons " " ' #4 3,000 gallons " " #5 500 gallons previously containing heatinglwaste of #6 500 gallons " ' Scope of Work The scope of work will include the following tasks' • prepare and submit required 30 Day Notification form to the Dept. of Ecology • obtain City of Tukwila tank removal permits • obtain underground alert for underground utilities • remove concrete /asphalt as necessary to access the USTs • remove soil over the tanks • Association of Diving Contractors 3840 -West Marginal Way S.W. Seattle,Washington 98106 24 hours a day - 206- 623 -0621 E - Mail: gdiving@aol.com aol.com FAX: 206 - 932 - 9036 THE AMERICAN WATERWAYS OPERATORS Gene Merlino October 11, 1999 Page 2 Ecology will update its Leaking Underground Storage Tank database to reflect this "No Further Action" determination. Your site will not appear in future publications of the LUST database. The state, Ecology, and its officers and employees are immune from all liability and no cause of action of any nature may arise from any act or omission in providing this determination. If you have any questions, please contact me at 425- 649 -4446. 5o m" L illie Toxics Cleanup Program JTL:jtl cc: Gary Peters Global Diving and Salvage 12 -11 -2007 TOM JOHNSON 1001 WESTLAKE NORTH SEATTLE WA 98109 RE: Permit No. D06 -361 13911 TUKWILA INTERNATIONAL BL TUKW Dear Permit Holder: In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 01/29 /2008, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, xc: Permit File No. 006 -361 Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206- 431 -3665 April 27, 2007 Tom Johnson 1001 Westlake North Seattle WA 98109 RE: Request for Extension Development Permit No. D06 -361 13911 Demolition— 13911 Tukwila International BI Dear Mr. Johnson: This letter is in response to your written request for an extension to Permit No. D06 -361. The Building Official has reviewed your letter and considered your request to extend the above referenced permit. The City of Tukwila Building Division will be extending the expiration date of your permit an additional 180 days, through October 19, 2007. If you should have any questions, please contact our office at (206) 431 -3670. Department of Community Development Steve Lancaster, Director File: Permit No. D06 -361 City of Tukwila Steven M. Mullet, Mayor P:Vcm ifetExtension I.etten\Pemiis\2006006.361 Permit Extension.doc Page 1 of 1 jem 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206- 431 -3665 City of Tukwila Department of Community Development RE: Permit No. D06 -361 13911 Tukwila International BL TUKL cnv APR 0 9 2007 PEP: .:.. We are writing this letter to request an extension on a permit to demo a building on pacific highway south. The owners were very busy on other projects this winter. We decided to delay the demo until we had better suited weather for this project. Now that spring is here this project is a priority. Thank You, Tom Johnson ;1 W � Please call with any questions: 206 - 930 -4636 jip b .k e (o((1 /6a- 03 -01 -2007 TOM JOHNSON 1001 WESTLAKE NORTH SEATTLE WA 98109 RE: Permit No. D06 -361 13911 TUKWILA INTERNATIONAL BL TUKW Dear Permit Holder: In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each. Extension requests must be in writfnz and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 04 /22/2007 , your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, xe: Permit File No. D06-361 City of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206-431-3670 • Fax: 206 - 431 -3665 October 17, 2006 Tom Johnson 1001 Westlake North Seattle, WA 98109 RE: CORRECTION LETTER #1 Development Permit Application Number D06 -361 13911 Demolition —13911 Tukwila International Bl Dear Mr. Johnson: This letter is to inform you of corrections that must be addressed before your development permit(s) can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Public Works Department. At this time the Building, Fire, and Planning Departments have no comments. Public Works Department: Joanna Spencer, at 206 431 -2440, if you have questions regarding the following comment. Please address the attached comments in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that four (4) complete sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206) 433 -7165. encl File No. D06 -361 City of Tukwila Pnlennifer\Conection Letters 2006A300-361 Correction Ltr M1 DOC jem Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206- 431 -3670 • Fax: 206- 431 -3665 P: Joanna/D06 -361 PUBLIC WORKS DEPARTMENT COMMENTS www.ci.tukwila.wa.us Development Guidelines and Design and Construction Standards DATE: October 4, 2006 PROJECT: 13911 DEMOLITION 13911 Tukwila International Blvd REVIEW #: 1 PERMIT NO: D06 -361 PLAN REVIEWER: Contact Joanna Spencer (206) 431 -2440 if you have any questions regarding the following comments. 1) The property is located in Tukwila, however, water and sewer services to the building are provided by separate utility districts. Therefore, applicant needs to show on the site plan: a) Location of the existing sanitary side sewer line, proposed capping location and obtain a sewer capping permit from Val Vue Sewer District at (206) 242 -3236 and submit permit copy to Public Works b) Location of the water service including water meter location and obtain a water capping permit from Water District #125 at (206) 242 -9547 and submit permit copy to Public Works. 2) Show location of existing catch basin at the SW property corner and how it will be protected during demolition activities. 3) Please address erosion prevention and sediment control after building and slab demolition (see attached PW Development bulletin C3). Please note that several years ago the subject site used to be a gas station, so there is a possibility of contaminated soil on site. Applicant shall contact Public Works if contaminated soil is encountered during demolition process. 4) Submit a construction cost estimate for site work associated with this demolition (mobilization, sewer, water capping, temporary erosion/sediment control, filling in the hold after foundation slab is removed), see attached Public Works Bulletin A2. QUANTITY IN CUBIC YARDS RATE Up to 50 CY Free 51 — 100 $23.50 101 -1,000 $37.00 1,001 — 10,000 $49.25 10,001 — 100,000 $49.25 for I 10,000, PLUS $24.50 for each additional 10,000 or fraction thereof. 100,001 — 200,000 $269.75 for I 100,000, PLUS $13.25 for each additional 10,000 or fraction thereof. 200,001 or more $402.25 for I 200,000, PLUS $7.25 for each additional 10,000 or fraction thereof. BULLETIN A2 TYPE C PERMIT FEE ESTIMATE PLAN REVIEW AND APPROVAL FEES DUE WITH APPLICATION tt�� PW may adjust estimated fees PROJECT NAME S it De44442U4% -t- PERMIT # D 06-36( If you do not provide contractor bids or an engineer's estimate with your permit application, Public Works will review the cost estimates for reasonableness and may adjust estimates. 1. APPLICATION BASE FEE $250 (1) 2. Enter total construction cost for each improvement category: Mobilization Erosion prevention /2 On Water /Sewer /Surface Water Road/Parking/Access A. Total Improvements 3. Calculate improvement -based fees: B. 2.5% of first $100,000 of A. C. 2.0% of amount over $100,000, but less than $200,000 of A. D. 1.5% of amount over $200,000 of A. 4. TOTAL PLAN REVIEW FEE (B +C +D) $ (4) 5. Enter total excavation volume Enter total fill volume Use the following table to estimate the grading plan review and permit fee. Use the greater of the excavation and fill volumes. cubic yards cubic yards GRADING Plan Review and Permit Fees $ (5) TOTAL PLAN REVIEW AND APPROVAL FEE DUE WITH PERMIT APPLICATION (1 +4 +5) $ The Plan Review and Approval fees cover TWO reviews: 1) the first review associated with the submission of the application/plan and 2) a follow -up review associated with a correction letter. Each additional review, which is attributable to the Applicant's action or inaction shall be charged 25% of the Total Plan Review Fee. Approved 09.25.02 Last Revised Jan. 2006 1 RECEIED CITY cirri invIl P OCT 2 0 2nNN PERMIT CENTER CORRECTION TR# PVQ QUANTITY IN CUBIC YARDS RATE 50 or less $23.50 51 -100 $37.00 101— 1,000 $37.00 for l 100 CY plus $17.50 for each additional 100 or fraction thereof. 1,001 - 10,000 $194.50 for l 1000 CY plus $14.50 for each additional 1,000 or fraction thereof. 10,001 — 100,000 $325.00 for the 1 10,000 CY plus $66.00 for each additional 10,000 or fraction thereof 100,001 or more $919.00 for l 100,000 CY plus $36.50 for each additional 10,000 or fraction thereof. Approx. Remaining Years Pavement Overlay and Repair Rate (per SF of lane width) 20 -15 (100 %) $10.00 15 -10 (75 %) $7.50 10 -7 (50 %) $5.00 7 -5 (33 %) $3.30 5 -2 (25 %) $2.50 2 -1 (10 %) $1.00 0 -1 $0.00 BULLETIN A2 TYPE C PERMIT FEE ESTIMATE PLAN REVIEW AND APPROVAL FEES DUE WITH APPLICATION PW may adjust estimated fees 6. Permit Issuance/Inspection Fee (B +C +D) 7. Pavement Mitigation Fee $ (7) The pavement mitigation fee compensates the City for the reduced life span due to removal of roadway surfaces. The fee is based on the total square feet of impacted pavement per lane and on the condition of the existing pavement. Use the following table and Bulletin 1B to estimate . the p. 8. GRADING Permit Review Fee Grading Permit Fees are calculated using the following table. Use the greater of the excavation and fill volumes from Item 5. Approved 09.25.02 Last Revised Jan. 2006 ' ,- \,. ' 2 $ (6) $ (8) : PERMIT COORV COPY ‘' PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D06 -361 PROJECT NAME: 13911 DEMOLITION DATE: 10 -20 -06 SITE ADDRESS: 13911 TUKWILA INTERNATIONAL BL Original Plan Submittal Response to Incomplete Letter #_ X Response to Correction Letter # Revision # before Permit Issued DEPARTMENTS: Building Division ❑ Fire Prevention PukliWorks a Structural ❑ Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete ❑ Planning Division DUE DATE: 10-24 -06 Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS RING: Please Route Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 11 -21 -06 Approved ❑ Approved with Conditions Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Doamenls/roulinp slip.tloc 2 -28-02 PERMIT COORD COPY �.., PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D06 -361 DATE: 09 -28 -06 PROJECT NAME: 13911 DEMOLITION SITE ADDRESS: 13911 TUKWILA INTERNATIONAL BL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: 4q c fr °e Building Division Complete Comments: TUES/THURS ROUTING: Please Route Approved ❑ Notation: Documenls/rouling slip.doc 3 -38.01 REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: REVIEWER'S INITIALS: 511 Fire Prevention IK Public Works Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete ❑ Structural Review Required 1°-� � Planning Division Permit Coordinator ❑ DUE DATE: 10-03-06 Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: No further Review Required DATE: DUE DATE: 10-31-06 Approved with Conditions Not Approved (attach comments)d DATE: Permit Center Use Only qt CORRECTION LETTER MAILED: SDI MR/ Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PWIA Staff Initials: M� Date: I /24 06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206431 -3670 Fax: 206431 -3665 Web site: http: / /www.ci.tukwila.wa.us Steve Lancaster, Director Plan ChecWPermit Number: ,n (/ 6- 36/ Steven M Mullet, Mayor Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. ❑ , Response to Incomplete Letter # Response to Correction Letter # / ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector r t or Plans Examiner Project Name: I 91l T tesol no Project Address: 1 39 11 / / R Contact Person: 7✓vl `SellAsei7n Phone Number: 204 936 - y63 � Summary of Revision: PtJ c ontvr,ef-t.t / �-fter C RECEIVED OF TUKWRA OCT 2 0 2006 PERMIT CENTER Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: Entered in Permits Plus on 10I20[aP \ applications \forms-applications on Iinetrevision submittal Created: 8 -13 -2004 Revised: CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 Permit Center /Building Division: 206 -431 -3670 Public Works Department: 206 - 433 -0179 Planning Division: 206-431 -3670 STATE OF WASHINGTON) ) ss. COUNTY OF KING ) M AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION [please print] PERMIT NO.: L 1 1. I have made application for a building permit from the City of Tukwila, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit. I have read or am familiar with RCW 18.27.090. understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work. 3. I understand that prior to issuance of a building permit for work which is to be done by any contractor, the City of Tukwila must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18 27 090 applies. 4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration req irement of RCW 18.27.090, I consider the work authorized under this building permit to be exempt under No. 6 � and will therefore not be performed by a registered contractor. states as follows: I %%% tE A. psi .,.,i //� %U N'y G G - i 1.O r '' '29. .J = G .&O 'Sit 11 N ``�� Residing at r f /Swi �JJGI__ , County. Name as commissioned: ,G!14 \applicationst8-2004 affidavit in lieu of contractor registration Signed and swom to before me this 7 1 4 day of Or - + - NO Y BLIC in and for the State of Washington, My commission expires: O.S -/ o 20�Q 18.27.090 Exemptions. This chapter shall not apply to: 1. 2. An authorized representative of the United States Govemment, the State of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district or other municipal or political corporation or subdivision of this state; 3. Officers of the court when they are acting within the scope of their office; 4. Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 5. Any construction, repair or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 6. The sale or installation of any finished products, materials, or articles of merchandise which are not actually fabricated into and do not become a permanent fixed part of the structure; 7. Any construction, alteration, improvement or repair of personal property, except this chapter shall apply to all mobile, manufactured housing. A mobile /manufactured home may be installed, set up, or repaired by the registered or legal owner, by a contractor licensed under this chapter, or by a mobile /manufactured home retail dealer or manufacturer licensed under chapter 46.70 RCW; 8. Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 9. Any person who only furnished materials, supplies, or equipment without fabricating them into; or consuming them in the performance of, the work of the contractor; 10. Any work or operation on one undertaking or project by one or more contractors, the aggregate contract price of which for labor and materials and all other items is less than $500.00, such work, or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in all instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division of the operation is made into ■applicationst&2004 affidavit in lieu of contractor registration contracts of amounts less than $500.00 for the purpose of the evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he is a contractor, or that he is qualified to engage in the business of contractor; 11. Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except then any of the above work is performed by a registered contractor; 12. An owner who contracts for a project with a registered owner; 13. Any person working on his own property, whether occupied by him or not, and any person working on his residence, whether owned by him or not but his exemption shall not apply to any person otherwise covered by this chapter who constructs an improvement on his own property with the intention and for the purpose of selling the improved property; Owners of commercial properties who use their own employees to do maintenance, repair, and alteration work in or upon their own properties; 15. A licensed architect or civil or professional engineer acting solely in his professional capacity, an electrician licensed under the laws of the state of Washington, or a plumber licensed under the laws of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the licensee is operating within the scope of his license; 16. Any person ,who'; engages in the activities herein regulated ;,es? ; fit ejn'pkilyee - Vf a registered contractor agtt as°his sole compensation; 4 17. Contractors on highway projects who have been prequalified as requited by chapter 13 of the Laws of 1961, Rcw ,4748.079,4 ' ith the department of transportation - t 1 ;p0form",ridhway construction, reconstruction, or work.