Loading...
HomeMy WebLinkAboutPermit D11-241 - VILLAGES AT SOUTH STATION - BUILDING A - ROCKERY AND REPAIRVILLAGE AT SO1JTh STATION - BLDG A 15430 38 TR S Di 1-241 City Oftukwila III- Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov DEVELOPMENT PERMIT Parcel No.: 0043000365 Address: 15430 38 TR S TUKW Suite No: Project Name: VILLAGE AT SOUTH STATION - BLDG A Permit Number: D11 -241 Issue Date: 09/09/2011 Permit Expires On: 03/07/2012 Owner: Name: SP SOUTHWICKE LLC Address: 1201 3RD AVE #5400 , SEATTLE WA 98101 Contact Person: Name: BECKY WARTENA Address: 14141 204 AV SE , RENTON WA 98059 Contractor: Name: RHINO EXCAVATING & TRKNG INC Address: PO BOX 1289 , NORTH BEND WA 98045 Contractor License No: RHINOET044CW Phone: 425 830 -9172 Phone: 360 886 -8937 Expiration Date: 02/21/2012 DESCRIPTION OF WORK: RE- INSTALL FAILED ROCKERY AND REPAIR ASSOCIATED AREAS AS FOLLOWS: REPAIR DOWNSPOUT DRAIN LINE FROM THE CORNER OF BUILDING A UNIT 102 WHERE THE FAILURE OCCURED, REINSTALL UNDAMAGED FENCE SECTIONS WHEN WORK IS COMPLETE, PREPARE LANDSCAPE AREA FOR NEW LANDSCAPING, AND REPAIR/RESTORE LANDSCAPE DAMAGED FROM ROCKERY FAILURE. PUBLIC WORKS ACTIVITIES INCLUDE: TESC AND STORM DRAINAGE. Value of Construction: $27,000.00 Fees Collected: $1,018.34 Type of Fire Protection: International Building Code Edition: 2009 Type of Construction: Occupancy per IBC: U Electrical Service Provided by: SEATTLE CITY LIGHT * *continued on next page ** doc: IBC -7/10 D11-241 Printed: 09 -09 -2011 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N • Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: N Hauling: N Start Time: End Time: Land Altering: N Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: N Moving Oversize Load: N Start Time: End Time: Sanitary Side Sewer: N Sewer Main Extension: N Private: Storm Drainage: Y Street Use: N Profit: N Water Main Extension: N Private: Water Meter: N Permit Center Authorized Signature: I hereby certify that I have read and e governing this work will be complied Public: Non - Profit: N Public: Date: 0 d this permit and know the same to be true and correct. All provisions of law and ordinances hether specified herein or not. The granting of this permit does not pres to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. (� Signature: v - Print Name: (/� (104.1 Date:"([[ l �f This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: When special inspection is required, either the owner or the registered design professional in responsible charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to the first building inspection. The special inspector shall furnish inspection reports to the Building Official in a timely manner. 5: A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted to the Building Official. The final inspection report shall be prepared by the approved special inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection approval. doc: IBC -7/10 D11 -241 Printed: 09 -09 -2011 6: Subgrade preparation including draina cavation, compaction, and fill requirement .111 conform strictly with the recommendations given in the soils reportial inspection is required. 7: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 8: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 9: All construction noise to be in compliance with Chapter 8.22 of the City of Tukwila Municipal Code. A copy can be obtained at City Hall in the office of the City Clerk. 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 11: ** *PUBLIC WORKS DEPARTMENT CONDITIONS * ** 12: Contractor shall notify Public Works Project Inspector Mr. Dave Stuckle at (206)433 -0179 of commencement and completion of work at least 24 hours in advance. 13: Temporary erosion control measures shall be implemented as the first order of business to prevent sedimentation off -site or into existing drainage facilities. 14: The site shall have permanent erosion control measures in place as soon as possible after final grading has been completed and prior to the Final Inspection. 15: Rockery repair work shall comply with Geotechnical Engineering recommendations per the Engineering Study by Associated Earth Sciences, Inc., dated July 19,2011 and all subsequent reports /evalutions. 16: ** *PLANNING DEPARTMENT CONDITIONS * ** 17: The Special Permission Director approval (L11 -043) received 09/09/11 has a two week appeal /comment period. Any work which proceeds prior to that date is at the risk of the applicant. 18: Staff from the Department of Community Development shall be contacted prior to final building permit approval to determine which areas shall be planted, if soil amendments are needed, and the species and quantity of plants to be installed. A second final inspection shall be conducted prior to final approval to ensure the mitigation planting has been completed. doc: IBC -7/10 D11 -241 Printed: 09 -09 -2011 CITY OF TUOILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.waus — Building Permit No. 2_L Mechanical Permit No. Plumbing /Gas Permit No. Public Works Permit No. Project No. (For office use only) Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION le9-No 1312 King Co Assessor's Tax No.: 004300036508 Site Address: , Tukwila, WA 98188 Tenant Name: Building A, Unit 102 Suite Number: Floor: New Tenant: ❑ Yes ❑ ..No Property Owners Name: SP Southwicke LLC Mailing Address: 1201 Third Avenue, Suite 5400 Seattle, WA City State 98101 Zip CONTACT PERSON — who do we contact when your permit is ready to be issued Name: Becky Wartena Mailing Address: 14141 204th Ave SE E -Mail Address: dbwllc @hotmail.com Day Telephone: (425) 830 -9172 Renton, WA 98059 City Fax Number: State Zip GENERAL CONTRACTOR INFORMATION — (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: Rhino Excavating & Trucking Inc. Mailing Address: PO Box 1289 Contact Person: Tim Krupp E -Mail Address: rhinoexcavating @wildblue.net Contractor Registration Number: RH I NOET044CW North Bend, WA City State Zip Day Telephone: (253) 350 -3769 Fax Number: Expiration Date: 02/21/2012 98059 ARCHITECT OF RECORD — All plans must be stamped by Architect of Record Company Name: Mailing Address: Contact Person: E -Mail Address: City Day Telephone: Fax Number: State Zip ENGINEER OF RECORD — All plans must be stamped by Engineer of Record Company Name: Associated Earth Sciences, Inc. Mailing Address: 911 - 5th Ave, Suite 100 Contact Person: Kurt Merriman Kirkland, WA 98033 E -Mail Address: kmerriman @aesgeo.com \Applications\Fonns- Applications On line \2010 Applications \7 -2010 - Remit Application.doc Revised: 7 -2010 bh City State Zip Day Telephone: (425) 827 -7701 Fax Number: (425) 827 -5424 Page 1 of 6 BUILDING PERMIT INFORMATIII — 206 -431 -3670 Valuation of Project (contractor's bid price): $ 27,000.00 Existing Building Valuation: $ Scope of Work (please provide detailed information): Re- install failed rockery and repair associated areas as follows: repair downspout drain line from the corner of the Bldg A, Unit 102 where the failure occurred; re- install undamaged fence sections when work is complete; prep landscape area for new landscaping; repair and restore landscape damage from rockery failure. Will there be new rack storage? ❑ Yes ❑.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor arca of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If 'yes', attach list of materials and storage locations on a separate 8 -1/2 " x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System For on -site septic system, provide 2 copies of a current septic design appmvcd by King County Health Department. H \Apphcations\Forms- Applications On Line\2010 Applications \7-2010 - Permit Application.doc Revised: 7 -2010 bh Page 2 of 6 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1a Floor 2nd Floor 3`d Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor arca of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If 'yes', attach list of materials and storage locations on a separate 8 -1/2 " x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System For on -site septic system, provide 2 copies of a current septic design appmvcd by King County Health Department. H \Apphcations\Forms- Applications On Line\2010 Applications \7-2010 - Permit Application.doc Revised: 7 -2010 bh Page 2 of 6 Staff Initials: f•-;/1"...., I PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY TIIAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. Print Name: David Wartena Mailing Address: 14141 204th Ave SE Date: 7/19/2011 Day Telephone: 425 - 591 -7289 Renton WA 98059 IDate Application Accepted: 0117A City State Zip Date Application Expires: D l ( Zl 111 H:\Applications\Fonns- Applications On line \2010 Applications \7 -2010 - Permit Application.doe Revised: 7 -2010 bh Page 6 of 6 of Tukwila, Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206-431-3665 Web site: http: //www.ci.tukwila.wa.us SET RECEIPT RECEIPT NO: R11 -01535 Initials: Payment Date: 07/21/2011 User ID: 1165 Total Payment: 2,453.34 Payee: REBECCA A WARTENA SET ID: S000001533 SET NAME: Tmp set/Initialized Activities SET TRANSACTIONS: Set Member Amount D11 -241 1,018.34 L11 -043 1,435.00 TOTAL: 1,018.34 TRANSACTION LIST: Type Method Description Amount Payment Credit C VISA 2,453.34 TOTAL: 2,453.34 ACCOUNT ITEM LIST: Description Account Code Current Pmts BUILDING - NONRES 000.322.100 614.45 PLAN CHECK - NONRES 000.345.830 399.39 STATE BUILDING SURCHARGE 640.237.114 4.50 ZONING /SUBDIVISION 000.345.810 1,435.00 TOTAL: 2,453.34 INSPECTION RECORD Retain a copy with permit INSPECTION`N0. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 431 -2451 (206) 431 -36 Project: f .o Type Q� Ins do : U : 1 ID ; n Address: 5?O 3 8 �-}., Date Called: Special Instructions: `` 1 U 1 -. r 6, 'A �t l Date Wanted:. ! 2-- 2 -9 ' ..a.,ax P.m. Requester 4je. Phone No: Approved per applicable codes. D Corrections required prior to approval. / COMMENTS: 119( (_,) 1tnspectcr: Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. • L. INSPECTION NO: CITY" OF TUKWILA BUILDING DIVISION • 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 • Permit•Inspection Request Line (206) 431 -2451 INSPECTION RECORD Retain a copy with permit '1t- MI PERMIT NO. Project:. . .• • Wolaff4, 0 Co-4 \ Type of Inspection: PIJ Tip M, Addr V ^ `� I Date Called: II DI (1 �•�'� Special Instructions: Idv F4 P� 1 N j AJ� �/` ' ' '' " Date Wanted:. 0._ i 0� (a.�s t "gym. Requester: 1// ` y W illitI` A Phone No: 1 —1131 Approved per applicable codes. Corrections required prior to approval. COMMENTS: k 4 VIr e -�IaieaE Inspector: C Date: ri REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit 291 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: V; l iaars 201.61 i :r . Type of Inspection: • Ctintis r le) / P1644" Il Address: l 15303Sle< ' Date Called: 1112.1zotI Special Instructions: r' , Date Wanted.. 11 ol7ot l CID p.m. Requester: i3 IC II ,, ,, a4lei? tt���"� I'G J Wtit Phone No: Approved per.applicable codes. E Corrections required prior to approval. ,„t COMMENTS: r Inspector: - 1� #4— Date: f i -41141a �4 11 �n Zot I REI (- PECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Associated E Scie ces, Ill�co Ce(eJrafihi Over ZJearsof Service July 19, 2011 Project No. KE110140A Security Properties, Inc. 1201 Third Avenue, Suite 5400 Seattle, Washington 98101 -3031 Attention: Mr. Kevin Crossman P'- FILE COPY penal. Subject: Geotechnical Engineering Observations and Repair Recommendati Rockery Failure The Village at South Station 15434 38th Terrace South, Unit 102 Tukwila, Washington Dear Mr. Crossman: REVIEWED FOR CODE COMPLIANCE APPROVED SEP092011 gIJILp�jNGT��ila DIVISION As requested, Associated Earth Sciences, Inc. (AESI) has completed a limited geotechnical engineering study of the failed rockery. This letter - report summarizes our observations, and provides our geotechnical engineering recommendations related to repairing the rockery. This letter- report has been completed in accordance with local standards of practice in the field of geotechnical engineering for specific application to this project by Security Properties, Inc. and its agents. No other warranty, express or implied, is made. Our work was completed in general accordance with our scope of work and cost proposal dated May 6, 2011. We were verbally authorized to proceed. SITE DESCRIPTION The Village at South Station complex is crossed by a drainage feature that flows generally from the northwest to the southeast. We understand that this drainage feature is considered by the City to be a critical area, with attendant limitations on construction activity in adjacent areas. The drainage feature has a native growth buffer that is heavily overgrown with blackberries. Buildings of the complex near the rockery failure are at the edge of the buffer for the drainage feature. The buildings near the rockery failure are up to approximately 8 feet higher than the adjacent drainage feature, and the grade separation is achieved with rockeries. The rockeries appear to be typical construction with sound rock materials. During a heavy rain event in about April of this year, a portion of the rockery immediately adjacent to the northeast corner of Building A of the Village at South Station complex fai The failure affected about 20 lineal feet of the rockery centered on the northeast cor Kirkland 425 - 827 -7701 Everett 425- 259 -0522 www.aesgeo.com Tacoma 253- 722 -2992 LA ,IUL 217011 PERMIT CENTER P 1 I 114 The Village at South Station Geotechnical Engineering Observations and Repair Recommendations Tukwila, Washington Rocket)) Failure building. The rockery rocks in the affected area had displaced into the native growth buffer along with some of the soil they had retained. The failure has encroached on the building foundation at the corner of the building exposing about 12 to 18 inches of the stem wall for a distance of about 6 feet west of the northeast building corner. The remaining soils exposed in the failed area were wet and oversteepened. The grounds person had covered the area in sheet plastic after the failure was discovered. Some of the rocks on the margins of the failure area were undermined and loosened. The failure was likely related to the downspout at the northeast corner of the building. The remnants of the subgrade portion of the downspout tightline were observed to be broken and deteriorated. It is likely that heavy rain flow was directed to the leaky, deteriorated downspout drain, saturating the soils behind the rockery and causing the failure. Very little of the foundation and stem wall of the building were exposed by the failure. We did not observe any indication that the rockery failure was increasing in size or that the building foundation was in immediate risk of undermining. The failed area had been covered in plastic to reduce the potential for further soil erosion. We completed a sketch of the failed rockery area, which is included with this report as Figure 1. No subsurface explorations were completed as part of this study. The rockery failure resulted in exposure of soils in the failure face or "scarp ". The exposed soils appeared to consist of loose to medium dense fill material that was likely placed at the time the adjacent building was constructed. We were able to observe soils at footing elevation of Building A adjacent to the rockery failure by using a hand probe, and found the soils immediately adjacent to the footing to be medium dense, and consistent with compacted structural fill based on evaluation with the hand probe. PROJECT DESCRIPTION The failed section of the rockery has exposed a portion of the foundation of Building A, as well as steeply sloping remaining soils within the support zone of the footing. It is important to repair the failed portion of the rockery to reduce the potential for further degradation of the soils that support the building foundations. Access to restore the failed section of rockery is limited by the adjacent drainage course and its buffer, and by sloping, wooded terrain. Because of the site access constraints, the owner and contractor have selected a project approach that calls for rebuilding the rockery using the existing rockery rocks, backfilling the rockery with crushed quarry spalls and ballast, and restoring a working roof downspout drain to the northeast corner of Building A. GEOTECHNICAL ENGINEERING RECOMMENDATIONS We recommend that the existing rockery rocks be retrieved to allow access for preparing the subgrade below the new rockery facing. Any existing rockery rocks that have not already been displaced but which are undermined should also be removed. The bearing surface for the July 19, 2011 ASSOCIATED EARTH SCIENCES. INC. BWG /ih - KEU0140A3 - Projects1201101401KEIWP Page 2 The Village at South Station Geoterhnical Engineering Observations and Repair Recommendations Tukwila, Washington Rocket)) Failure rockery rocks should be cleaned of wet, loose, and displaced soils to expose suitable bearing materials. If the exposed materials are soft, removal of soft soils might be limited by concerns for the adjacent drainage course. To the extent that any loose soils can be removed, we recommend that course of action. Where removal of soft soils is not possible, we recommend improving the subgrade below the new rockery facing by placing and compacting Quarry Spalls (WSDOT Standard Specifications 9 -13.6) to establish a firm and unyielding subgrade capable of supporting the plamied rockery facing. The rockery should be provided with a functional drain consisting of a 4 -inch minimum diameter rigid perforated pipe placed at the base of the lowest course of rockery rocks. The drainpipe should be connected with drainpipes that are assumed to exist behind portions of the existing intact rockery that will remain. The rockery should be backfilled with Quarry Spalls or 2 -inch "Railroad Ballast" (2 -inch crushed rock with minimal fines) tamped into place with the excavator bucket between the existing soil face and the back of the rockery rocks. We do not recommend the use of compacted soil "structural fill" behind the rockery. All fill placed to restore grades should consist of Quarry Spalls or railroad ballast. The Quarry Spalls or railroad ballast may be capped with a woven geotextile fabric such as Mirafi 500x and up to 1 foot of topsoil to allow landscaping of the finished repair, if desired. The rockery should be constructed in a manner consistent with locally accepted standards of practice for rock wall construction. One example of local standards of practice is the Associated Rockery Contractors (ARC) Rock Wall Construction Guidelines, August 15, 2000. DRAINAGE CONSIDERATIONS The downspout at the northeast corner of Building A should be provided with a working discharge pipe. We recommend that the drain line for the downspout not be combined with other drains, and that the new discharge pipe be laid out such that it is in an area protected from likely sources of damage. The pipe should be provided with cleanouts at 50 -foot intervals. Inspection and clean out of the discharge line should be a routine part of the grounds maintenance activities. It seems likely that failure of the discharge line for the northeast downspout of Building A was a primary cause of the existing rockery failure, and if the discharge line becomes damaged or plugged in the future the conditions that caused the existing rockery failure may re- occur. In addition to the downspout discharge line, establishing effective drainage of the repaired rockery is also important. We anticipate that the existing rockery was constructed with a drain line, and we recommend that the existing drain line be examined and cleaned or repaired as needed to function as it was originally intended. The repaired rockery section should be provided with a new drain that connects to the existing systems on either side of the repair area after they are brought into working order. July 19, 2011 3WG /rb - KE110140A3 - Projecrc1201101401KEIWP ASSOCIATED EARTH SCIENCES, INC. Page 3 The Village at South Station Tukwila, Washington Geotechnical Engineering Observations and Repair Recommendations Rockery Failure CONSTRUCTION SERVICES This letter - report is based on limited evaluation of surface conditions exposed at the time of our site work. The proposed construction project will expose bearing soils for the repair to the rockery facing, and may also expose additional support soils for the existing building foundations. We recommend that we be allowed to observe completion of the rockery repair. By observing completion of the repair, we can verify that the subsurface conditions that are encountered are consistent with our earlier observations, and with the conditions we assumed in preparing our recommendations. If any unexpected conditions are encountered, we would be available to help identify them and assist in formulating plans to address them in a timely manner. Observation of construction of the rockery repair is not included in our currently authorized scope of work. We are available to provide a scope of work and cost estimate for construction phase services on request. CLOSURE We appreciate the opportunity to be of service. If you have any questions, please do not hesitate to call. Sincerely, ASSOCIATED EARTH SCIENCES, INC. Kirkland, Washington ///, Br{I e W. Guenzler, L.E.G. Project Geologist Attachment: Figure 1 - Site Sketch - Existing Conditions cc: Mr. David Wartena 14141 204th Avenue SE Renton, Washington 98390 Rhino Excavating rhinoexcavating @wildblue.net Kurt D. Merriman, P.E. Principal Engineer July 19, 2011 BWG /tb - KE110140A3 - Ptojects1201101401KE1WP ASSOCIATED EARTH SCIENCES, INC. Page 4 �PERM!T COORD CORD PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D11 -241 DATE: 07/21/11 PROJECT NAME: VILLAGE AT SOUTH STATION, BLDG A SITE ADDRESS: 15430 38 TR S X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued �DEPARTMENTS: Building Drivision A � � 1)ublic Works I' 4i AA— it' L 1 34- Alrai 01' 'Fire Preven ion Planning Division Structural Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete 73 Incomplete DUE DATE: 07/26/11 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route 41 Structural Review Required No further Review Required n REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Notation: REVIEWER'S INITIALS: Approved with Conditions DUE DATE: 08/23/11 Not Approved (attach comments) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 Contractors or Tradespeople }ter Friendly Page 4 General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name RHINO EXCAVATING & TRKNG INC UBI No. 601674189 Phone 3608868937 Status Active Address Po Box 1289 License No. RHINOET044CW Suite /Apt. License Type Construction Contractor City North Bend Effective Date 2/16/1996 State WA Expiration Date 2/21/2012 Zip 98045 Suspend Date County King Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Business Owner Information Name Role Effective Date Expiration Date KRUPP, YVONNE LOUISE President 02/16/1996 Bond Amount KRUPP, TIMOTHY CLAIR Vice President 02/16/1996 511532 Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 7 CBIC 511532 12/09/2009 Until Cancelled $12,000.0012/16 /2009 6 CBIC 511532 02/13/2009 12/09/2009 $6,000.0001/15/2009 01/13/2010 5 NATIONWIDE MUTUAL FMTX005207 02/13/2007 02/13/2009 $6,000.0001/22/2007 /13/2010 4 MERCHANTS BONDING CO (MUTUAL) WA12862 02/13/2005 Until Cancelled 02/13/2007 $6,000.0001/13/2005 08/11/2008 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 17 FIRST MERCURY INS CO FMTX008484 01/15/2011 01/15/2012 $1,000,000.00 01/14/2011 16 FIRST MERCURY INS CO FMTX006847 01/15/2010 01/15/2011 $1,000,000.00 01/13/2010 15 FIRST MERCURY INS CO FMTX005207 01/15/2009 01/15/2011 $1,000,000.0001 /13/2010 14 FIRST NATIONAL INS CO OF AMER 01CG63172350 09/01/2006 09/01/2009 $1,000,000.00 08/11/2008 13 FIRST NATIONAL INS CO OF AMER 01CG63172330 09/01/2006 09/01/2007 $1,000,000.00 07/13/2007 12 AMERICAN STATE INS CO 01CG63172320 07/21/2006 07/21/2007 $1,000,000.00 06/27/2006 11 UNDERWRITERS AT LLOYDS PFK024216 07/21/2005 07/21/2006 $1,000,000.00 07/20/2005 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period https://fortress.wa.gov/lni/bbip/Print.aspx 09/09/2011 PLANNING APPROVED • No plans changes Can apptoval be rraclet�t the WIut s.1 Approved By: i71 a 9 S SIDEWALK ( LAilese plans have been STAIRy UP '-Forks Department for BUILDING A UNIT 1101 eviewed by the Public onformance with current C cs s snbjeUt to ehois au(. missions which do not authorize violations of dopted standards or ordinances. The responsibilil1LOINGA MT 0102 br the adequacy of the decigrt recto totally with the designer. Additions, deletions or revisions to these drawings after this date will void this acceptance and will require a resubmittal of revised drawings for subsequent approval. Final acceptance is subject to field inspection by the Public Works utilities inspector. Date: By: $% 2 /11 C )icyy1 (ce° ^ rcol•ka etkof tsr.( C-op.' -r L) O REVIEWED FOR CODF CnMPLIANCE APPROVED SEP 0 9 2011 City of kwila BUILDING (VISION O ROCKERY FAILURE AREA raiz COPY No. VIA - " . 4744 4' Plan is sub)* to wrors and omissions. Approval doom& not assize the vi any aodO or fie. RB�t f "_;1,111. �; of ; f,f:.f, .: Field COPY and ., , is dged: City Of lidavila BUILDING DIVISION 0 zs FEET Associated Earth Sciences, Inc. SITE SKETCH - EXISTING CONDITIONS THE VILLAGE AT SOUTH STATION TUKWILLA, WASHINGTON FIGURE 1 DATE 5/11 PROJ, NO. KE110140A criORtA JUL 21 2011 171 I � ii4 PERMIT CENTER 5 a c.°J it If- E3 z •MIT CEN So 3 0090 284.40 N88-10-480 300.34 0 20100120001053-5V'BLA 402,_ 30.25 F "Reta,n=. ..tt 151.0 2 12 COI X0 0330 3 GD' footing es. 6 123 00.303 0200 18 123 17 696550 0200 :23 03.33 COO 16 257140 0195 97748 0125' TO C043CO 3112 194340 7 15 0182 C04300 0197 103004 0197 HOME 61 7 ‘7, 19 63,0310 N8824 35^W L47 18 5.34 AC 2327350 0300 43'0,2 044 -1`084. 8 17 217734V6 9 16 CO4303 0134 153754 0184 mom 158560a 7171706 1348706 136996e 13 0170 326.4 14 C.8 L T-178.60 g _ 4 10 365.1 TRACTS 11 397.8 12 382.7 VOL 15-17 1391106 4.r! 0168 Z,1 / maw owe ,44 7781 30 30 I X 30 / 30 . 0 I 0335 -IIK3C0 0336 13 0365 367 C5Trie..) 1452226s 14 J50.7 SR 518 15 0/3 1 65040 ,2 0223 4 022 1260006 004.0 0224 0224 1395086 ADA 2979stis 0227 1 VO 5747 KC SP 9, LOT 1 1060046 0266 C04303 case 2177406 0260 90.58 KC SP LOT 1 11,7. 0250 828540 mom 1_2 0240 2 1621646 60.85 113866 024 8^42,67..W 317 5 1185.21'58 0020 LOT 2 969246 w22 0262 Road B2 N9 4' VAC S 1 5 4TH LN 00 5747 2 0216 C01.303 02111 0238 960086 9048 30 j -1T--7376-.74 231.71 R.25 36.48(6U8) 4 1°' coo 02 LOT I 3508e KC SP 1181016 0220 ;"' 7 2 74,10463 0221,— 000 N LOT 3 c,(2, 7440461r) 10314 co.* 404 82 307050 LOT 3 ''o26192's 61 .1 384013 LOT 2 0252 4; 124320 Esmt 1 .4 8503VA1 18 95198116 6 go4 LOT 4 756186 0264 '55 LOT 3 139080s :24 6 027 0218- 744086 024 034303 0270 7 0270 155616 30 o•J scc 714369.' • -15/ 9078 459120s 9041 UNPLATTED mo OMB. 0712 0762 159106e 1110103 COSI