Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit D11-270 - ACE TANK AND FUELING EQUIPMENT - STORAGE RACKS
ACE TANK AND FUELING 18340 ANDOVER PK W EXPIRED 06-11-13 Di 1-270 City A'Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431 -3670 Inspection Request Line: 206- 431 -2451 Web site: http: / /www.TukwilaWA.gov DEVELOPMENT PERMIT Parcel No.: 3523049018 Address: 18340 ANDOVER PK W TUKW Suite No: Project Name: ACE TANK AND FUELING EQUIPMENT Permit Number: D11 -270 Issue Date: 12/23/2011 Permit Expires On: 06/20/2012 Owner: Name: SEGALE PROPERTIES LLC Address: PO BOX 88028 , TUKWILA WA 98138 Contact Person: Name: BILL DURKIN Address: 18340 ANDOVER PK W , TUKWILA WA 98188 Contractor: Name: ACE TANK & FUELING EQUIPMT LLC Address: 6703 EAST MARGINAL WY S , SEATTLE WA 98108 Contractor License No: ACETATF911RS Phone: 800 426 -2880 X 1034 Phone: 800 - 426 -2880 Expiration Date: 12/16/2013 DESCRIPTION OF WORK: DESIGN AND LAG DOWN RACKING Value of Construction: $0.00 Fees Collected: $177.75 Type of Fire Protection: SPRINKLERS International Building Code Edition: 2009 Type of Construction: Occupancy per IBC: 0025 Electrical Service Provided by: PUGET SOUND ENERGY * *continued on next page ** doc: IBC -7/10 D11-270 Printed: 12 -23 -2011 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: Hauling: N Start Time: End Time: Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: Start Time: End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non - Profit: N Water Main Extension: Private: Public: Water Meter: N Permit Center Authorized Signature: Date: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the erfo. - of , ork. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. , 2 0 ? ( // l / Signature: Print Name: W 111 Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: When special inspection is required, either the owner or the registered design professional in responsible charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to the first building inspection. The special inspector shall furnish inspection reports to the Building Official in a timely manner. 5: A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted to the Building Official. The final inspection report shall be prepared by the approved special inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection approval. doc: IBC -7/10 D11 -270 Printed: 12 -23 -2011 6: All construction shall be done in confo with the approved plans and the requiremm of the International Building Code or International Residential International Mechanical Code, Washingt ate Energy Code. 7: Manufacturers installation instructions shall be available on the job site at the time of inspection. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: ** *FIRE DEPARTMENT CONDITIONS * ** 10: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 11: Per the plans and submittal information; group A plastics including the fiberglass pipe shall be stored no higher than 5 ft. All other storage to be no higher than 12 ft. 12: The critical storage height for high -piled combustible stock in closely packed piles is 12 feet. (IFC 2302) Storage above 12 feet may necessitate increasing the sprinkler density to extra hazard and adding smoke removal capabilities. (IFC Chapter 23) (NFPA 13) 13: Flue spaces shall be provided in accordance with International Fire Code Table 2308.3. Required flue spaces shall be maintained. 14: Clearance between ignition sources, such as light fixtures, heaters and flame - producing devices, and combustible materials shall be maintained in an approved manner. (IFC 305.1) 15: Storage shall be maintained 2 feet or more below the ceiling in nonsprinldered areas of buildings or a minimum of 18 inches below sprinlder head deflectors in sprinldered areas of buildings. (IFC 315.2.1) 16: Maintain fire alarm system audible /visual notification. Addition/relocation of walls or partitions may require relocation and/or addition of audible /visual notification devices. (City Ordinance #2051) 17: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 18: The total number of fire extinguishers required for an ordinary hazard occupancy with Class A fire hazards is calculated at one extinguisher for each 1,500 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (2A, 20B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (IFC 906.3) (NFPA 10, 3 -2.1) 19: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand -held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 min) above the floor. The clearance between the floor and the bottom of the installed hand -held extinguishers shall not be less than 4 inches (102 mm). (IFC 906.7 and IFC 906.9) 20: Fire extinguishers shall not be obstructed or obscured from view. In rooms or areas in which visual obstruction cannot be completely avoided, means shall be provided to indicate the locations of the extinguishers. (IFC 906.6) 21: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (IFC 906.5) 22: Fire extinguishers require monthly and yearly inspections. They must have a tag or label securely attached that indicates the month and year that the inspection was performed and shall identify the company or person performing the service. Every six years stored pressure extinguishers shall be emptied and subjected to the applicable recharge procedures. If the required monthly and yearly inspections of the fire extinguisher(s) are not accomplished or the inspection tag is not completed, a reputable fire extinguisher service company will be required to conduct these required surveys. (NFPA 10, 4 -3, 4 -4) 23: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) doc: IBC -7/10 D11 -270 Printed: 12 -23 -2011 24: Any overlooked hazardous condition an n such condition or violation. 25: These plans were reviewed by Inspector 511 (206)575 -4407. violation of the adopted Fire or Building Co4 does not imply approval of . If you have any questions, please call Tukwila Fire Prevention Bureau at doc: IBC -7/10 D11-270 Printed: 12 -23 -2011 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 htto://www.TukwilaWA.00v Building Permit No. /7 210 Mechanical Permit No. Plumbing/Gas Permit No. Public Works Permit No. Project No. (For office use only) Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION Site Address: King Co Assessor's Tax No.: 2� o " 1, 0 . Z /83v0 / r.JOOVVZ PARK WEST Tenant Name: 4C( TflNk iVEUNIG EQ.'PMENT Property Owners Name: J rcCACk PRO Pirl S Mailing Address: PLO Suite Number: New Tenant: Floor: Yes ❑ ..No 7UK.n4 ((A City wA State Vi38 Zip CONTACT PERSON — who do we contact when your permit is ready to be issued Name: 8/LC OW< IN Mailing Address: / 8 / Y() ANboV. I& l /( wESr E -Mail Address: Ayr k t) °e aCed.nkcoivi Day Telephone: YOO ya6 - 2 ?Y0 X /bay libtvi .A WA 9888 City State Zip Fax Number: dye `t/ 7J - /C/ /' GENERAL CONTRACTOR INFORMATION — (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: A G. TAN/{ $ f eO U I PJ`(Q.k1 r Mailing Address: /N3 vo ANOWC/'- MO WEST Contact Person: �'A-- VC. k ‘+J E -Mail Address: tx# V—`F -%+4 C____ , `'X • C 0 "^ Contractor Registration Number: f (E E TA TF ? HRS.- rveuAlA 0.14 981?S City Day Telephone: g°°"010 "� Rg t7 Fax Number: Regg - s- No? 8 State Zip Expiration Date: /2 ` / " / ( ARCHITECT OF RECORD — All plans must be stamped by Architect of Record Company Name: Mailing Address: Contact Person: E -Mail Address: City Day Telephone: Fax Number: State Zip ENGINEER OF RECORD — All plans must be stamped by Engineer of Record Company Name: Mailing Address: Contact Person: E -Mail Address: H:\Applications\Forms- Applications On Line \2010 Applications \7 -2010 - Permit Application.doc Revised: 7.2010 bh City State Zip Day Telephone: Fax Number: Page 1 of 6 • • BUILDING PERMIT INFORMATION — 206 -431 -3670 Valuation of Project (contractor's bid price): $ [j Sl=t3 Existing Building Valuation: $ Scope of Work (please provide detailed information): +& N t, (A 9�-+ I �� c 1< l tJ G - Will there be new rack storage? IA Yes ❑ .. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Will there be a change in use? ❑ Yes Compact: Handicap: ❑ No If `yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: p(J Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? [f Yes ❑ No If 'yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:Wpplications\Fonns- Applications On Line\2010 Applications \7 -2010 - Permit Application.doc Revised: 7-2010 bh Page 2 of 6 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1d Floor // /S3 (ACE. 2nd Floor 3'd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Will there be a change in use? ❑ Yes Compact: Handicap: ❑ No If `yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: p(J Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? [f Yes ❑ No If 'yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:Wpplications\Fonns- Applications On Line\2010 Applications \7 -2010 - Permit Application.doc Revised: 7-2010 bh Page 2 of 6 PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE L OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNE Signature: 1 Print Name: ED AGENT: tk�N Mailing Address: l O ° AN t1.04€ e At Date Application Accepted: oil oil �� Date: Vt1/1 Day Telephone: City Date Application Expires: State Staff Initials: H:VApplications\For ms- Applications On Line\2010 Applications \7 -2010 - Permit Application.doc Revised: 7 -2010 bh YO Zip Page 6 a6 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.gov RECEIPT Parcel No.: 3523049018 Permit Number: D11 -270 Address: 18340 ANDOVER PK W TUKW Status: PENDING Suite No: Applied Date: 08/04/2011 Applicant: ACE TANK AND FUELING EQUIPMENT Issue Date: Receipt No.: R11 -01682 Initials: User ID: JEM 1165 Payment Amount: $177.75 Payment Date: 08/04/2011 02:28 PM Balance: $0.00 Payee: WILLIAM P DURKIN TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 02580C ACCOUNT ITEM LIST: Description 177.75 Account Code Current Pmts BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE 000.322.100 000.345.830 640.237.114 Total: $177.75 105.00 68.25 4.50 doc: Receiot -06 Printed: 08 -04 -2011 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 jg, (206) 431 -367 Permit Inspection Request Line (206) 431 -2451 [Dit-2.70 Project: .. A(e 1A rtj �� n Type o Inspectio Al AA, a.):VO;AG Address: d 40 AAL40J f 1 ate Called: Special Instructions: Date Wanted: . 1 2.-14 -1 z, a.m. .m. Requester: Phone No 7 ( —Sv °d or- r -� Approved per applicable codes. Corrections required prior to approval. COMMENTS: A /� �/� /� ` '^ f c ( � Kiel _sUL.•(t � �Jdew'{rw\J (id m 1 fa ~v' rr o M 1-Ths pe7 i)/N ,14_6 LA ci C' -o Flee , ^ - , a,$2, O s7 Cat --G t e l all 6,ttif- or- r -� t, ! 1\. Inspe Date: 3 _1_0 y ri REINSPECTION FEE REQUIRED"Pri r to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 00. Call to schedule reinspection. FILE COPY Permit No., LEASE AGREEMENT THISEASF_AGREEMENT (this "Lease " -)is- made and entered into this / I 4 —day of February, 2011 ( "Effective Date "), by and between Segale Properties LLC, a Washington limited liability company, d /b /a Segale- Properties ( "Landlord "), and Ace Tank & Fueling Equipment, LLC, a Washington limited liability company ( "Tenant "). Capitalized terms in this Lease shall have the meanings given them in Section 1 unless provided elsewhere in this Lease. RECITALS A. Lan dlord owns or has full power and authority to develop the land and improvements within the business park commonly known as Segale Business Park located in the City of Tukwila, Washington, including, but not limited to, Building 734 located on certain real property known as the Building Site and more particularly described on Exhibit-A and depicted on Exhibit B. „ Segale Business Park" shall mean the area generally bounded by South- 180th - Street to the norththereen-Riverto the east, the south boundary of Parcel No. 3523049116, and Southcenter Parkway to the west. B. Landlord desires to lease the Premises (as that term is defined below) to Tenant, and Tenant desires to take and lease the Premises from Landlord, on the terms and conditions set forth in this Lease. AGREEMENT NOW THEREFORE, for and in consideration of the rents reserved and the terms and conditions set forth in this Lease, Landlord rents, demises and leases the Premises to Tenant, and Tenant takes and leases the Premises from Landlord, on the following terms and conditions: 1. Specific Lease Terms In the event of any inconsistency in the provisions of this Section 1 and more specific provisions set forth elsewhere in this Lease, the more specific provision shall control. 1.1 Real Property Definitions 1.1.1 Premises "Premises " hall mean approximately 12,891 square feet of Building footprint. With square foot of Building footprint, there are an approximately 1,738 square feet of existing air office area. The mailing and physical address of the Premises is 18340 Andover Park West Washington, 98188. REVIEWED FOR CODE COMPLIANCE APPROVED DEC 072011 i.the 12,891 conditioned TukvCaty of Tukwila BUILDING DIVISION — —1:13 Building Site "Building Site" shall mean the lot upon which the Building is located. The Building -Site is legally described on Exhibit A and depicted on the site plan attached as Exhibit B. RECEIV 1T2 —Lease -i erm 1.2.1 Commencement Date "Commencement Date" shall mean May 1, 2011. Expiration Date AUG 0 4 2011 PERMIT CEN Job Title ,ACE 7 #* /FitELIak. cOole-ribrim413y $TK Date 7- 2011 Subject $1(5L 5c.c.ec 't !E ¢ e,44 ft VLC RA Cet '6,041-lair Checked Job No. 11032 Sheet / of �+ Gr) S -r et.- SEtt c r gA ara / FILE COPY Use 1ft wol zISC sec 2zoisi 2oUS /Lr,r wit No. , PAY) $6c 15. s. 3 0P 4scE 7-0s p ,tl ,oactidt,r W ae TAff I61 14e : = 0.67 cs rp Js l � Akitir S p r 1.0 - &Sri& c rc ' .04.476 - JU d pP8LIC ,gsLa d l . �".s 2 5Ga-4R * /a %3 }(fa+(Ss }�R �s s 1.3% FOR T t t vet ,A®DAtas . 1.o r-0a SIre C . R e 4.0 7/24.4)w. (Agaceo) 74. VI- 4.1551 iJa G.0 LoruGsr 4,0040 •• VL = D./o35L ids 643 : D. 47• PLC x A + pc + . ZS Lc- / £114t6 LL = -9- /;�,o� keigGdc ZO 4 /461,11./ to.e./t of 13e4rsJ C'l) 440,4 wiry 144 y ;WA/ S 4,Q00 LAJ kocc urr �1) .114Q Pa G/4f' $t 94' 5,94d1J : 2,0D0 1i s, M 4o731 Dt4Ecr19,1J , L136 150 Les / Levet Fog AtA CiC DL REVIEWS CODE COMPLIA C APPROVED DEC 07 2011 City of Tukwila BUILDING DIVISION (' RECEIVED LA TYPE 1€40 %, J1 •J 9.1551 k3 590 A4 a 2o7,'5 tr 46rcR = 02k- M r..1 GLds a 0. 4.111` k/ z a 440d x D. b7 f 106 a 2780 (td/CE✓&c.. 2, 't go _ 1.214 k- @ a 40 - 3 = 3 `( 1. v a 0, 45 k 1 Co t_ . A-l6 ton-p P` _ •Z5 (5.64+ 6.b) J.. a-ti G 464 2 (0.15 t _ S . � k: p ('eve - VV-' 0.4,34 k e 204" af •1- = 1.44.k-3 V_ 0.32 1 -Lot_ t4 !2Ac6 .s a 9.1.557x. 4 K 2.110 s I .'125 kc2 1440.2" 0+2011 SEOS M z 252.2,o k" a , 40-3 » 3-1 " PERMIT CENT . , a aaho i2. s s. x� k T s I.2G'` , V . 0.84s k f c.,L, MAF- Goasis Q A $ .20k- ,tAA)f• telk.(s Pc s .1r0.124-8.0)+.26 a 1 I.32 k Lolw oa -ro p Levu. suit., 4" 0,to36k a 204.4 et T i 1.4401` ) ✓ a .1 2. 1A-1l..rt , 2-Y4-14.. 4 S imp Soa StRB,.sG &az 2 la &oda A■1 CAVLS (3'tm$6e) ?L -G -o DIPGbAeu.si Pet fuse pore : -r-, s 23'IS (As reit ICC Csa. - ?D 7 0 erg Spetc/ac. - 1.1 s{�l:cr10,1 , VA a 18 90 � k,10,2 3 ) he4 2 2/z.' h,: 5 `' s 534.4 ' Gam= 124 , 1 TIT, - V /V, 7 0 .R9 LNtAw) 9k G 1.20 till- 2:10 Job True Subject By b 6,40a 6 % AAAv. tIT !. 725 - 1)aaLr. R m 43.$1.. p = 5.24' , -7 0,75 P 2.43k �u Mustc-s Ante I1 /2 , k Vz 41- C- 5Ec -rtax.13 Ae s o. 30Z mL AA •J r o.4$6lp" M4 g. (.k.L.1,-) = 131.13 Ck. s. 1, o) fR 1, 21 , Pas AaaF: 7.4-itic .-is LtdL 6i45 E ¶ t.M &Se Stk1 k So IL ,4 4)114. LeAla Pc • 11,12 ruse pLksts Pm? S : 31¢" . ,a efi ?tc-7-1 NAT S I # P s 34. So ++.z - a 0,328 kS4 mac L1 A� fp w.3 fc Q O9ocks: �j. pLe-r s M m 0.321t .C1.956)1/2 s 0474 14'1' ,, Fla Q .15 ry v 7 i eon .° t s v.3'12" o K . horvA L t u.3/1 S t/a" 'TZ IQL. GeN c i,6re stall 14 .4 -Fc 3, Obc P 51 k w -Et s S 4 6 ( . 4 ` � , s l ) a i l l 126 S ubt AAA a ®. o. S / r z . 50.$60 19.56o = p(aYtZ blind iatuta p 2.0 iacf c a _ 6.gsb 510'. 604 laG Ab s C2ik 5.5 + S'.d)(2x4+ 5.5 + a.9)/144. " 4,00 loll" pa , Date '7- ZO I 1 Job No. i U 3 2. Checked Sheet 2 of Vt. Ab A kaw to s 12. Dbx alt 7 At,a -u. Cerw.p P. , Toe ,0 (t 4 c k_r larit.E ato sr C-2tT 1 t. C. D. 034— 3- 2.780/z. s D. 43/ � mot• at F s . t a $ t 4 . 1 Pi a o. i4,44,1` 7 r tb3 14. 1b `a) 61.841 I,a: GO S09+4 tia'o spaI 6eiritts Proz t4- (CD T* vZi/14 0.30 ci S1.03" A 515/1 r ` cE �° l3r�(e&rs kau)s .z: 1,0 4.4: 1L/2. tleo, ty. • 4.as4 4 aVet1 11,0°/ (J) Sk s I, Sill 14,3 0. !! r< tti%�w �� e S1,014 `3� WG-t81 Mil s IS . d q.' LaA47Lst,s 6 p acres Ma s i5,98 k 404. 14.V. 14 ss M • (4I01 K 1d4/' IL 341 19 0 w `' tiAA V s /Ai L /a :57. 1A O evA r+( FPIL 6/1411 rig/ Loll QS tAo M a 9.15(11.o1+ 0.1x"3.) + .15+D to 12, SO IG" elk [. MA M = 31.1 t0" -Cj,x a. II .14 1rr-;. 13th G 1 , = .10 ry = 3o Ai. : m. 41 " Dtc- 4 Lltgo ' 0.804 Job Tide By tr 1 Date 1 -201( Job No. t t 032 Subject Checked Sheet of Goc.um )1.3 J. 13 6,6 C- S' c-c -Lo.JS L 3 4„ (2.6-fr t.R....j 1..4-(I 7 Sq w, ;de J .13 $ 1 a 0. q 1'j = 2.861 ,�.L S D134 as 0. Sr* 44‘.1 3 .Do 2341 rz a. 1.2ui" V"..t a 1.0%6y r s.3s = I.1 1.v..s 57.01" (kLjr)x v. 78. Si Ccu.Xrids �. = I s4" ) so 4‘.1t r 0.i Pc ra, I2.34 tom; olsx 6.o + D. 1s 4, G5 L $ a (p.13 k4. M, r o •'iS,c 12, L5 ! .22. k .ci.x : 12..56, , } .6 Fry z 3o t.s; Petx 0. 35, LS ofg O Snx • 8( GsQs ®.Sod- ®.47 o.97 4i4e-c44 rit.ANad. . 1c. r-o,.. p Pc - 8.81 t- 4a. m ape,' /Pm 0 v'93 at' < 1. o oz I.D Job Title Subject By 67-1‘ Date 7- ?A; I Job No. 1103E Checked Sheet 4- of Cr) ST TULC' tAiLk L STe, e.An 1 g.2 St. 111 £ 24411 C13 �. 2245 AlkID sa< 15.5.3 et ASCE 7 -05- FDA 444-14141" 1.14-7741 'Cl� is cs Aar) me'f o o J Ir. 0,16 C3 Lei ) W Le ozzliticrEvo fa(L&t 130 p(lBl tt At w_01,3 sO , z CZA) Cre,xcs) /11_ ) (Set p. I ) 4-. 0 1D• (DT 1A 1)(41.w-104,3s ' V - O.11024 J 0s 2. I D .1 it PL 4- 'AL F1< lam 0 67.1 Au. , ttl4.S I.D. pL +- L F a- 1 o ohl Tbp ft oAC # MALL Ate► Lioro 21 Z, Soo t8s wSt; ids ill tot> LAS / pp,v, t it 4104- Deis 0 Lars 0 . D. 61 R Z, Soo + L D O t7 7 S chi /AAA.. 5 4 x 1.7 Lu. - 6.8 t AL+) 5,�, 3. o 4- d /A+ z s. 1.0 ,44$. ,All.a+ )s 2.6o 64 /1.) 42.40 �u -ix ZD. S S Gam; tr. . j 2.,000 C.b * '1 t . 4.o ; (Gb c 1.15) • • 44° ) W L3 /sLI = ®. Zd" cr& < 214,g° _ 0. S3" C6 cu C.ath-tc ° /.n• TD CCLUM ; 4 - 3/4..441 32-S 13 iA Cr T:PE. Pfoc•s 4" S PAc . 4 2 . MA K V = 2,bo'' rcl� Pam ') z O.65 L -ry s 1, c1.7 dG5; . It ¢¢ ko; 61A T = (4.2.4c)(1 /2-)C 1/¢.0) 7,8o'Ipot_r s 11.64. t.: Pk- < ft UPA.I447T tAWhias 1A 8-ha( a = Z1.6.o his= S.15 �^ t ok ?-fi.i. Tbt-La *1L. n" LEUEu bJs 3x V V. e' BlvZ c 5tzt► At t 3a.33 k." PL M = 3A 2. Sow (4 + 8.2 ) / 2 u. 3.O.1o. (4. ' }- Z.20/2 015 (SE M pL M) + Di AA m c4 'io.� S.32S� 2 td.DS 8.44 k-" 211. Z3 tc. '. . Co.)i &ou Job Tide Subject By P ' r EL Date 7 - 2 t 1 Job No. 110 3 Z Checked Sheet 5 of CoUdm AA a 6 . ib — (13/g.). D, 40 4-. tha �Al P 0,75 x 3,r 2.St 4- 3. D, !o 5.93L 4,- -Fri I r . 9 c 2.10 146= aD - 8.28/2. : 175. Jab 1,0 ..241 411' Fa. is LI.D61 k4; l2,D0oC& =Z�.lo�• Ct,.= 1•1C) t, ID 4g fb 21.60 VS; Pay, T. 1 S8 , D?I k 4 44 ub 6As6-s C ) y a 1.22•• 10 5. t2- rao C.t 8.10 d /,gfi s3.r�3;;� ®. 3 CA,si- 0. it csg 0,11 4- 0.4. 9 0.80 svk .c (.3 tti -9 es IL M m 211, 23 k• -�, z t 4:9c 1vs; Flo = tz,000 Cy dla-f Cb : 1.0 Q .. 414 r d : 3,13 ;„. i ri, a 21. (ao tcs i drAiE 7 ,� C 4iCfc CB,S►eccio.S 9AsES iD VFP 6 Coui/IOS' (o_ 44uch A 2ZC &t tos ‘ -rtpe &itfl Iwo (Loos e 2 34$ C,A 4 2 (- 04146C41o, MAY. V s S,9 pet- emI -f V C .160- l eObi -1 f o rr rA : 161.44- 6C- T ll. 82t Ta s 4, la ar = 2(7-r Zt T) ?o.9ok c = z r K 0/2-K60(040)(5-27) 4? < fit, D, q = 32.4o k$: 444 r 2( Ti .5.10 #- Tx. 3.to + T3.1. /0) 4- C x(24)0.40) 323. 33 k " ck > zestd.J 4.4.9,•eir . ft/ = 2.24 L 4, rt = 44 I:; AAA & , t Atc V r 0. g4.7 4 A410,'. Z er64 V = 6'447 47 r 3/2 1i 301 k Job Title By &774 Date 7-24" Job No. //03 2. Subject Checked Sheet f of Cr s!-SR .. $ Bolo T= 1-42- k 4 t .7S i- !. 2z X-8024eced 4724 sl,t rq JA 34 goos T = Cs-8/3) X P.3048 5.93' 404. > .1S-7 Gosw 6cr Jo14 / �l¢� J8 325 Aar (fs rye ) = 2/,49. 8 1-2Fk Pk 7.7ST 7 «- £) Wd Adcel DAs S cog sac k 2 PC = 7.504 Z 4.30* 44414 V 0. ca(o k 4 Noo.Z ° d,[ a />a9.33 to. C{. 4ir - !, s + 8.28/z ss►. ��.-' S6•! /1 = 2,75 14 T 0.38' 4414 Quo /Q s S. K (2L51 /4) = 2,37" I V= if. fia Vei0 6740 r>sA� (Pt) !l 7. S ®.. (2g.1¢1Q) 4.174 Aug FL. v.?s (2.7s 12 1 s yr 30 (28'.14 /4 s P. 4.0) + . ►7 5.34c too 0.0 V)? CtAxy I/Tj 0.4 -24ke 200" 7= 8. SSA` J Vs 0.21k/eii 6740 106. h i t spec i f 2 - 72 :0 A 4)4' s„oyosew sotega: /kir 14E29 t AilCeMRS (3" tn•i8ea) d FAdkur GSJo op Anse 4 Cct.tJJ z asp /ware tDJUs . o€z oNLy ®AJE 4.1c_ mot ?b 4 'or-cod E 7 z 1225 Lis pea_ - est.- 3o37 8,3" SPELL/ t- TAOSPbc- 4'101 Vr0 / $2S as ill 3+' I h z 2.44 Il� T Y2, 4 } l s 12 rr 'low 1-`T,e -4- VA/4 z 8. Scf 444.0 G /, 20 AAA fc cow? f : 5-,36.4t &Li b.F S.27 Usra& .4►% ri-SRI t.Gseen 2 -6.F 49,40 3k `. &L 5ice. er .Qs •st hotQ- ffur FS Lfs'- ftiere s 5.2,1%e 2.40° 5t.n-6 AAA z 9. i roo k'l <tA-P, a = 7.'go" Srze e • sort etaAA,m4 ,s (20.4+ S.S +Z.,4) Lt-a + 5r5.- 5.21)f/ 5,iV! Fr'- ?a = (h)(Au.e p) = tn.32 k odc 7 AAS< Laoula I't • FT.I.Z COPY PC!rr> . PROTECTION OF PLASTIC AND RUBBER COMMODITIES 13-135 Chapter 15 Protection of Plasdc and Rubber Commodities That Are Stored Palletized, Solid Piled, Bin Boxes, Shelf Storage, or Back-to-Back Shelf Storage 15.1 General. This chapter shall apply to plastic and rubber commodities that are stored palletized, solid piled, bin boxes, shelf storage, or back-to-back shelf storage. The requirements of Chapter 12 shall apply unless modified by this chapter. 15.1.1 The minimum water supply requirements for a hy- draulically designed occupancy hazard fire control sprinkler system shall be determined by adding the hose stream allow- ance from Table 15.1.1 to the water supply for sprinklers. This supply shall be available for the minimum duration specified in Table 15.1.1. (See Section C8.) 15.1.2* Storage Conditions. The design of the sprinkler sys- tem shall be based on those conditions that routinely or peri- odically exist in a building and create the greatest water mand, which include the following: (1) Pile height (2) Clearance (3) Pile stability (4) Array 15.2* Control Mode Density /Area Sprinkler Protection Crite- ria for Palletized, Solid-Plied, Bin Bar:, Shelf Storage, or Bad:- to-Back Shelf Storage of Plasdc and Rubber Commodities. 15.2.1 For the storage of Group A plastics stored 5 ft (1.5 m) or less in height; the sprinkler design criteria for miscella- neous storage specified in Chapter 13 shall be used. The pro- tection criteria in Chapter 13 shall be acceptable for storage of Group A plastic commodities up to and induding 5 ft (1.5 m) in h igh , ( 13. 2. 1forspeciicG roup A plastic protection 15.2.2' Protection for plastic and rubber commodities shall be in accordance with Section 15.2. The derision tree shown in Figure 15.2.2 shall be used to determine the protection in each specific situation, subject to the following limitations: (1) Commodities that are stored palletized, solid piled, or in bin boxes up to 25 ft (7.62 m) in height (2) Commodities that are stored in shelf storage up to 15 ft (4.6 m) in height (3) For back -to -back shelf storage up to 15 ft (4.6 m) in height, the minimum aisle width shall be 60 in. (1524 mm). The design criteria shall be in accordance with Table 15.2.2. The back-to -back shelf shall have a full height solid vertical trans- verse barrier of % in. (9.5 mm) plywood or particleboard, 22 ga. sheet metal, or equivalent from face of aisle to face of aisle, spaced at a maximum 45 ft (13.7 m) intervaL 15.2.3* Factors affecting protection requirements such as dosed /open array, clearance between storage and sprinklers, and stable /unstable piles shall be applicable only to storage of Group A plastics. This derision wee also shall be used to deter- mine protection for commodities that are not wholly Group A plastics but contain such quantities and arrangements of the same that they are deemed more hazardous than Class IV com- modities. • 15.2.4 Group B plastics and free-flowing Group A plastics shall be protected in the same manner as a Class IV commod- ity. (See Chapter 14 far protection of the storage commodities with sprny apnnkkrs) 15.2.5 Group C plastics shall be protected in the same man- ner as a Class 111 commodity. (See twat I4 far protadrnn of these storage commodities wadi limy sprinklers.) 15.2.6* Design areas and densities for the appropriate stor- age configuration shall be selected from Table 15.2.6(a) or Table 15.2.6(b) as appropriate. Millie 15.1.1 Hose Stream Allowance and {Hater Supply Duration Requirements Commodity Classification Group A plastic Storage Height Inside Hose Total Combined Inside and Outside Hose ft Over 5 up to20 m ! L/min SPm Over 1.5 upto6.1 0,50,or100 0,190, or 380 500 Over 20 up to 25 Over 6.1 up to 7.6 0,50,or100 0, 190, or 880 500 Table 15.2.2 Back-to-Back Shelf Storage of Co toned Unespanded Group A Plastics Duration (minutes) REVIEWED FOR ODMOMPLIANCE APPROVED DEC 0 7 2011 Storage Height Gelling Height ft m ft m Over 5 up to 8 Upto12 _ ...I1p-td 12 v ,Upto15 1.5/2.4 3.7 3.7 4.6 Up to 14 Upto15 Up to 30 Up to 30 4.3 4.6 9.1 9.1 Protection City of Tukwila Ordinary Hazard , , . pUILDING DIVISION 0.45 gpm/ft5 over 2500 ft2 18.3 t ► " m 0.6 gpm/ft2 over 2500 ftl 24.5 mm/min/232 mr 0.7 gpm/ft2 over 2500 ft2 28.5 mm/min /282 m2 INCOMPLETE rR #�_ bk1-270 RECEIVEDEfrb- NOV 29 2011 PERMIT CENTER • CLASS I TO CLASS N COMMODITIES STORED PALLETIZED, SOLID PILED, BIN BOXES, OR SHELF STORAGE 13.:129 2.0 5000 I 4000 I 3000 '8 2500 I 1500 0 05 4.1 81 Density () 8.1 102 12.2 14.3 16.3 ■ ■■■!■■ ■■!■■ls•s■•s■! ■si■ ■ss■■ WHINE ■■■■■■■■■■■■■■■■■! ■■■ ■iii■■ ■! •■! ■ •■ ■ ■ ■ ■■ ■ ■ ■ ■ ■ ■■ ■ ■■ ■! / ■■i ■ ■■■ /■■■■■■■■■ ■■■ ■■■i ■■ ■ ■■■■■i■■ ■ ■■ ■ ■■■■ ■H■■■ ■■■ ■■■■ ■■i■■■■i■■■ ■■i■ ■■■■ •■ ■s ■!•■■■■• ■■/■ ■ ■■ /.■ ■ ■ ■ ■ ■ ■■■■■ ■!■ ■ ■i■ ■ ■ ■ ■ ■■ ■■ ■■■■ ■ ■■!■ ■ ■■■■ ■■■■ ■ /■■ ■■ /i■ ■■■■■■i■ ■■■■■■■ ■■■s■ ■■i■!!!■■■■■■!■■■■■ ■■ ■ ■i■ ■!!,■MIL •a ■ ■ ■i ■ ■■ .�■ ■ ■■■■■ •■ ■■■■■•UI ■■l►, ■■ ■ ■■■■,°. �■/■i■ii' • ••■■■ Mi■iiiN■■■■■■■■■1■■■■■■■■ ■ ■■ ■■■■ ■■■■r! ■•■r■■■■■■■■■■■■■■■■ ■■s■■ ■■■■■■ ■■ ■.\ ■ ■ ■!.\■si■ ■i■■■■■■■!■■■■■■ ■■■■■■ ■■■ \1■■ ■ ■11■!■■■i■■■i■■ ■■■■ ■■ ■■ - 0.10 0.15 0.20 0.25 Density (6P ,,2) 0.30 0.35 485 372 279 232 188 139 0.40 � e g-/do, 0 a n _ FIGURE 18.2.1 Miscellaneous Storage 12 ft (3.7 m) or Less in Height - Design Carves (see 'liable 18.2.1). Chapter Chapter 14 Protection of Class I to Class IV Commodities That Are Stored Palletized, Solid Piled, Bin Boxes, Shelf Storage, or Back-to -Back Shelf Storage 14.1 General.. 14.1.1 This chapter shall apply to a broad range of combus- tibles that are stored palletized, solid piled, bin boxes, shelf storage, or back -to -back shelf storage. 14.1.2 The requirements of Chapter 12 shall apply unless modified by this chapter. 14.1.8° The minimum water supply requirements for a hy- draulically designed occupancy hazard fire control sprinkler system shall be determined by adding the hose stream allow- ance from Table 14.1.3 to the water supply for sprinklers. 14.1.4 This supply shall be available for the minimum dura- tion specified in Table 14.1.3. (See Section G 8. ) 14.2' Control Mode Density /Area Sprinkler Protection Criteria for Palletised, Solid Piled, Bin Boa, Shelf Storage, or Back&to- Bach Shelf Storage of Class 1' luuugh Class IV Commodities. 14.2.1 Protection for Class I through Class IV commodities in the following configurations shall be provided in accordance with this chapter (1) Nonencapsulated commodities that are solid piled, pallet, ized, or bin box storage up to 80 ft (9.1 m) in height (2) Nonencapsulated commodities on shelf storage up to 15 ft (4.6 m) in height (3)•Encapsulated commodities that are solid piled, palletized, bin box, or shelf storage up to 15 ft -(4.6 m) in height (4) Back-to-back shelf storage up to 15 ft (4.6 m) in height 14.2.2 The area and density for the hydraulically remote area and the neater supply shall be determined as specified in 14.2.3 for storage up to and including 12 ft (3.7 m) and 14.2.4 for storage over 12 ft (3.7 m). Table 14.1.8 Hose Stream Allowance and Water Supply Duration Requ is Commodity Ciassiflwtion • Storage Height Inside Hose Total Combined brills and Outside Hose Duration (minutes) ft m gpm . L/min gpm L/min Class 1, TI, and DT Over 12 up to 20 Over 3.7 up to 6.1 0, 50, or 100 0, 190, or 380 500 1900 90 Over 20 up to 30 Over 6.1 up to 9.1 0, 50, or 100 0, 190, or 880 500 1900 120 Class 1V '" Over 12 up to 20 Over 3.7 up to 6.1 0, 50, or 100 0,190, or 380 500 1900 120 Over 20 upto30 Over 6.1 up to 9.1 0, 50, or 100 0,190, or 380 500 . 1900 150 • 2010 eation • MISCELLANEOUS STORAGE -i3 -127 lhble 13.2.1 Discharge Criteria for Miscellaneous Storage 12 ft (3.7 m) or less m Height Commodity Type of Storage Storage Height Mmd®m Cg Height Design Curve Figure 18.2.1 Nate Inside Hose Total Combined Inside and Outside Hose Duration (minutes) ft I in ft 1 m gpm I lwmfn gpm 1 Linda Ciao Ito Clans N Class I 512 53.7 — — 0111 0112 0, 50, 0, 189, 250 946 90 90 >5 to 510 >1.5 to 59.05 15 4.6 E111 0,50, 100 100 979 1893 ]• >5 to 510 Class II 20 510 53.05 — — 0131 500 0, 50, 0, 189, 250 946 90 >10 to >3.05 17 5.2 EI32 0, 50, 0, 189, 100 379 120 Palletized, bin (lass II >10 to >3.05 — — 0132 100 0, 50, 0,189, 250 946 90 box, shelf, and rack and 512 to 100 379 Cottoned Unexpanded and back-to-back shelf storage 59.7 Class III 512 53.7 — — 0112 5.2 0, 50, 0, 189, 250 946 90 946 90 512 to 100 379 100 379 Chas IV 510 53.05 — — 0112 0, 50. 0,189, 250 946 90 Palletized, bin >10 to >3.05 100 379 012 0, 50, Class IV Palletized. bin >10 to >3.05 32 — 0112 512 0, 50, 0,189, 250 946 90 100 box, and shelf 512 to back-to-back shelf storage 100 379 53.7 Rack >10 to >3,05 32 — 0112 Rack >10 to >3.05 32 — EH1 0, 50, 0,189, 500 1893 120 back-to-back 512 to 379 100 379 53.7 shelf storage 53.7 Camp A Plastrc Storage (continues) 2010 Edition Palletized, box, shelf and rack and 55 51.5 — — 0112 0, 50, I00 0.189, 379 250 946 90 >5 to 510 >1.5 to 59.05 15 4.6 E111 0,50, 100 0,189, 379 500 1893 ]• >5 to 510 >1.5 to53.05 20 6.1 EH2 0, 50, 100 0,189, 579 500 1893 120 back'ao.back >10 to >3.05 17 5.2 EI32 0, 50, 0, 189, 500 1893 120 shelf storage 512 to 100 379 59.7 Cottoned Unexpanded and ecpanded >10 to >3.05 92 5.2 0112 + 1 0, 50, 0, 189, 250 946 90 512 to level 100 379 58.7 of in-rack Palletized, bin >10 to >3.05 32 8.2 012 0, 50, 0, 189, 500 1893 120 box, shelf, and 512 to 100 379 back-to-back shelf storage 59.7 Rack >10 to >3,05 32 — 0112 + 1 0, 50, 0, 189, 250 946 90 512 ' to level 100 379 53.7 of • iarrack (continues) 2010 Edition MATERIAL SAFETY DATA SHEET FILE COPY DS 7000 SERIES PART B Permit No.. 1. 24 -HOUR EMERGENCY CONTACT INFORMATION CHEM -TEL United States 800 - 255 -3924 International 813- 248 -0585 II. HAZARDOUS INGREDIENTS / IDENTITY INFORMATION Component Identification 1 CASRN OSHA PEL ACGIH TLV % (by weight) 100 Amine Mixture I Proprietary None Established These materials are substantially incorporated into the mixture and exposure via inhalation is not likely to occur. Product Description AMINE III. PHYSICAL / CHEMICAL CHARACTERISTICS Boiling Point > 482 °F (250°C) Melting Point Not Determined Vapor Pressure < 1 mmHg @ 68 °F (20 °C) Vapor Density (Air = 1) 7.6 Specific Gravity (Water = 1) - 1 Evaporation Rate (butyl acetate = 1) Not Determined pH Not Determined, Corrosive Appearance and Odor Red Transparent Liquid, Amine Odor Odor Threshold Not Determined IV. FIRE and EXPLOSION HAZARDS Flash Point - 261 °F (127 °C), Pensky- Martens Closed Cup Autoignition Temperature Not Determined LEL / UEL Not Determined Extinguishing Media Dry Chemical, 002, Water Fog, Alcohol Foam NFPA Ratings Health (3) - Flammability (1) - Reactivity (1) Special Firefisahtina Procedures: Do not direct a solid stream of water into hot buming polls, this may cause frothing and Increase fire intensity. Use self- contained breathing apparatus and protective clothing. Fire and Explosion Hazards: During a fire, oxides of nitrogen may be produced. V. REACTIVITY DATA Stability Stable Hazardous Polymerization Will Not Occur Conditions to Avoid Do not mix with nitrates or other nitrosating agents Incompatibilities Oxidizing Materials Hazardous Decomposition Products N1:%, CO, and CO2 www.fgspipe.com REVIEWED FOR CODE COMPLIANCE APPROVED DEC 0 7 2011 City of Tukwila BUILDING DIVISION RE�EIV CITY O TU LA AUG 04 2011 PERMIT CENT 2700 W. 65th St. Little Rock, AR 72209 USA Phone: 501 - 568 -4010 Fax: 501- 568 -4465 25 S. Main St. Sand Springs, OK 74063 USA Phone: 918-245-6651 Fax: 918 -245 -7566 FierGIassSystems PU-21O VI. HEALTH HAZARD DATA Route(s) of Entry: 2 Inhalation Yes Skin Yes Ingestion Not Expected Acute (Short-Term) Health Effects: This material is corrosive and irritating to the eyes, throat, and skin. Eye exposure may cause severe irritation with comeal Injury that may result in permanent impairment, even blindness. Short-term skin exposure may cause severe bums and /or allergic skin reaction. Prolonged or widespread skin contact could result in the material being absorbed in harmful amounts. Inhalation of vapors may be irritating to the nose, throat, and chest causing runny nose and stuffiness, cough, and possibly difficulty breathing. Chronic (Long -Term) Health Effects: Repeated or prolonged contact with the skin may cause dermatitis and skin sensitization. Carcinogenicity: None of the chemicals in this product are classified as known of potential human carcinogens by the National Toxicology Program (NTP), the International Agency for Research on Cancer (IARC), or OSHA. Signs and Symptoms of Exposure: Signs and symptoms following exposure may include irritation and burning sensation to eyes, skin, and respiratory tract (if inhaled). Medical Conditions Generally Aaaravated by Exposure: Excessive exposure may aggravate preexisting asthma and dermatitis. Emergency and First Aid Procedures: Inhalation: Skin Contact Eye Contact Ingest /on Remove to fresh air if exposure symptoms develop and seek medical attention. Gently wash all affected skin areas thoroughly with water soap and water while removing contaminated clothing. If irritation persists or burning sensation is evident, seek medical attention. Flush eyes with water for 20 to 30 minutes. Obtain prompt medical attention, preferably from an ophthalmologist. Not expected under normal use conditions. However, if ingestion does occur, do not induce vomiting. Give large amounts of water or milk and seek medical attention. HMIS Ratings Health (3) - Flammability (1) - Reactivity (1) VII. PRECAUTIONS FOR SAFE HANDLING and USE Steps to be Taken in Case Material is Released or Spill: Due to the relatively small end -use container sizes, significant spills are unlikely. However, if a spill does occur, collect and place into a suitable container for disposal. Do not allow spilled materials to enter storm sewers, sanitary sewers, or impact ground water. Waste Disposal Method: Disposal must be in accordance with applicable laws. Precautions to be Taken in Handling and Storage: Copper and copper alloys should not be used for storage as the product may quickly corrode them. VIII. CONTROL MEASURES Respiratory Protectiop: None typically required for normal use. Self- contained breathing apparatus may be needed if product is used in a confined or poorly ventilated area. Ventilation: A system of local and /or general exhaust is recommended. Hand Protection: Gloves impervious to this material should be worn. Eve Protection: ANSI - approved safety glasses with side shields or chemical goggles. Other: Such clothing as to minimize or eliminate skin contact. 3 IX. REGULATORY INFORMATION (Not meant to be all - Inclusive) Hazardous Materials Transportation Act (HMTA) This material should be classified as follows: Proper Shipping Name Amines, Liquid, Corrosive, n.o.s., Mixture (3,3'- (Oxybis (2,1- Ethanediyloxy)) Bis- 1- Propanamine) Hazard Class 8 Identification Number UN2735 Packaging Group II Label Required Corrosive Comprehensive Environmental Response. Compensation, and Liability Act (CERCLA) This produce contains the following CERCLA Section 102(a) hazardous substance(s) as listed In 40 CFR 302.4: Identity CASRN ( % (by weight) Reportable Quantity (RQ) None Supertund Amendment and Reauthorization Act (SARA) This product contains the following SARA Title III Section 302 extremely hazardous substance(s) as listed In 40 CFR Part 355: Identify CASRN % (by weight) None SARA Title 111 Section 311/312 hazardous categorization: This product has been reviewed according to the EPA hazard categories promulgated under SARA Tile III Section 311 and 312 and is considered to meet the following hazard categories: • An immediate (acute) health hazard • A delayed (chronic) health hazard This product contains the following SARA Title III Section 313 toxic substance(s) as listed in 40 CFR Part 372: Identify CASRN % (by weight) None Toxic Substances Control Act (TSCA) All Ingredients are on the TSCA inventory or are not required to be on the inventory. CATALYST / HARDENER INDEX The material described in this MSDS is intended for use with the following: DS 7000 SERIES PART A Review literature supplied with product or contact NOV Fiber Glass Systems for proper mixing ratios. National Oilwell Varco has produced this brochure for general information only, and it is not intended for design purposes. Although every effort has been made to maintain the accuracy and reliability of its contents, National Oilwell Varco in no way assumes responsibility for liability for any loss, damage or injury resulting from the use of information and data herein nor is any warranty expressed or implied. Always cross-reference the bulletin date with the most current version listed at the web site noted in this literature. www.fgspipe.com 2700 W. 65th St 25 S. Main St. Little Rock, AR 72209 Sand Springs, OK 74063 USA USA Phone: 501-568-4010 Phone: 918-245-6651 Fax: 501- 568 -4465 Fax: 918 -245 -7566 irkr FiberGlassftstems © 2009 NATIONAL OILWELL VARCO M7000B - March 2009 Material Safety Data Sheet Material Name: PSX 34 Adhesive Resin ID: AMER -020 * * * Section 1 - Chemical Product and Company Identification * * * Part Number: NA Chemical Name: Filled Epoxy Resin Product Use: Resin for Adhesive kit Synonyms: NA Manufacturer Information Ameron International Fiberglass Div - The Americas 1004 Ameron Road P. O. Box 878 Burkburnett, TX 76354 Phone #: (940) 569 -1471 Fax #: (940) 569 -2764 Emergency #: (940) 569 -1471 Chemtrec 24 Hours - 800 -424 -9300 * * * Section 2 - Composition / Information on Ingredients * * * CAS# Components Percent #28064 -14 -4 Epoxy Resin (Epch ** (A). <5 ppm) 65 414808-60-7 Silica (Crystalline * *)* Fed OSHA: N NTP: Y ACGIH: N IARC: 2A * Cancer or cancer suspect agent 15 413983 -17 -0 Calcium Silicate 11 467762 -90 -7 Colloidal Silica (Amorphous) 4 Proprietary Proprietary (Methanol, hydrolysis generated, 250 ppm ceiling) 5 REGULATORY: ** CALIF. TITTLE 26:22 -12000 (Prop 65). Waning! This product contains a chemical known to the State of California to cause cancer. All ingredients are on TSCA inventory or are exempt. (SARA, CERCLA, HAPs) toxic chemical subject to reporting requirements of SARA and CERCLA (40 CFR 302, 355, 372) or HAPs (40 CFR 63) Component Information /Information on Non - Hazardous Components This product is considered hazardous under 29 CFR 1910.1200 (Hazard Communication). * * * Section 3 - Hazards Identification * * * Emergency Overview: Vapor or spray nest or spattered material can be harmful. Irritating to eyes, skin, and if inhaled; to nose and throat. Excessive or prolonged inhalation can cause headache, nausea or dizziness. Repeated and prolonged occupational overexposure to solvents is associated with permanent brain and nervous system damage. Intentional abuse, misuse or other massive exposure to solvents may cause multiple organ damage and /or death. Hazard Statements: Warning! May cause allergic skin and respiratory sensitization reactions with prolonged or repeated contact. May be irritating to eyes, skin and respiratory system. When adhesive resin is combined with adhesive hardener, vapors and a moderate amount of heat may be released. The Crystalline Silica (Quartz) in the dust form is considered a Cancer or Cancer suspect agent when it is breathed, in this kit the sand is completely incorporated into the resin mix and will only pose a health problem if the cured adhesive is subjected to mechanical grinding. Potential Health Effects: Eyes This product may cause irritation to the eyes, including redness, swelling, pain, tearing. Potential Health Effects: Skin This product may cause skin irritation, including redness, inflairunation, and dermatitis. Prolonged of repeated skin contact may cause allergic skin sensitization reactions, resulting in rash, swelling, itching, and possibly blistering of skin. Potential Health Effects: Ingestion Can cause gastrointestinal irritation, nausea, vomiting, and diarrhea. Page I of 5 Issue Date: 13 July 2005 Revision: 2 Print Date: 13 July 2005 Material Safety Data Sheet Material Name: PSX 34 Adhesive Resin ID: AMER -020 Potential Health Effects: Inhalation: Heating this product may release harmful vapors. Prolonged or repeated inhalation may cause allergic sensitization reactions, resulting in asthma-like symptoms. The Crystalline Silica (Quartz) in the dust form is considered a Cancer or Cancer suspect agent when it is breathed, in this kit the sand is completely incorporated into the resin ]nix and will only pose a health problem if the cured adhesive is subjected to mechanical grinding. HMIS RATINGS: Health: 2 Fire: 1 Reactivity: 0 Pers. Prot. gloves: Hazard Scale: 0 = Minimal 1= Slight 2= Moderate 3= Serious 4 = Severe * = Chronic hazard r * * * Section 4 - First Aid Measures * * * First Aid: Eyes: Immediately flush eyes with plenty of water for at least 15 minutes. Get medical attention or advice. First Aid: Skin For skin contact, Nvash immediately with soap and water. Get medical attention if irritation persists or develops. First Aid: Ingestion If the material is swallowed, get immediate medical attention or advice -- Do not induce vomiting unless instructed to do so by medical personnel. First Aid: Inhalation: If inhaled, immediately remove to fresh air. Provide artificial respiration if necessary. If symptoms develop or persist, get immediate medical attention. First Aid: Notes to Physician Provide general supportive measures and treat symptomatically. * * * Section 5 - Fire Fighting Measures * * * Flash Point: 200EF Method Used: SETA Upper Flammable Limit (UFL): NA Lower Flammable Limit (LFL): NA Auto Ignition: NA Flammability Classification: OSHA: Combustible - Class IIIB General Fire Hazards: Irritating and toxic gases or fumes may be released during a fire. Extinguishing Media: Foam, carbon dioxide, and dry chemical Fire Fighting Equipment/Instructions: Closed containers may explode when exposed to extreme heat and pressure buildup. May produce a floating fire hazard. Isolate from electrical equipment, sparks, heat and open flame. Vapors may spread long distances, cause flash fire or ignite explosively. Firemen should wear full protective equipment, self- contained breathing apparatus. Water may be used to cool closed containers to prevent pressure build -up or explosion when exposed to extreme heat. NFPA Ratings: Health: 2 Fire: 1 Hazard Scale: 0 = Minimal 1= Slight 2= Moderate Reactivity: 0 3= Serious 4 = Severe Other 0 * * * Section 6 - Accidental Release Measures * * * Containment Procedures: Remove all sources of ignition. Avoid breathing vapors. Ventilate area. Use absorbent, inert cleanup materials. (DO NOT USE SAWDUST) Clean -Up Procedures: Remove absorbent material with non- sparking tools. Place in separate container. Keep out of sewers and waterways. If entry is threatened or occurs, notify local authorities. Evacuation Procedures: Isolate area. Keep unnecessary personnel away. Special Procedures: None Page 2 of 5 Issue Date: 13 July 2005 Revision: 2 Print Dale: 13 July 2005 Material Safety Data Sheet Material Name: PSX 34 Adhesive Resin ID: AMER -020 * * * Section 7 - Handling and Storage * * * Handling Procedures Do not get this material in your eyes, on your skin, or on your clothing. Use this product with adequate ventilation. Avoid breathing fumes if this product is used at high temperatures. When adhesive resin is combined with adhesive hardener, vapors and a moderate amount of heat may be released. Avoid breathing these vapors. Keep this product from heat, sparks, or open flame. Wash thoroughly after handling. Remove contaminated clothing and launder before reuse. Storage Procedures Keep the container tightly closed and store in a shady, well- ventilated place less than 100EF. * * * Section 8 - Exposure Controls / Personal Protection * * * Exposure Guidelines: Calcium Silicate ACGIH TLV -TWA 5.00 Mg/M3; Osha PEL -TWA 5.00 Mg/M3: Colloidal Silica ACGIH TLV -TWA 5.00 Mg/M3; OSHA PEL -TWA 5.00 Mg/M3 Engineering Controls: Good general ventilation required. Use local exhaust if necessary. PERSONAL PROTECTIVE EQUIPMENT Personal Protective Equipment: Eyes/Face: Wear chemical goggles. Personal Protective Equipment: Skin: Use impervious gloves. Use of protective coveralls and long sleeves is recommended. Personal Protective Equipment: Respiratory: If ventilation is not sufficient to effectively remove vapors and fumes, appropriate NIOSH/MSIIA respiratory protection must be provided. Personal Protective Equipment: General: Use good industrial hygiene practices in handling this material. * * * Section 9 - Physical & Chemical Properties * * * Appearance: Reddish orange paste Physical State: Thick paste Vapor Pressure: NA Boiling Point: NA Solubility (H2O): No Freezing Point: NA Softening Point: NA Viscosity: 200,000 cps + Percent Volatile: 0.35 Physical Properties: Additional Information: None Odor: Slight pH: NA Vapor Density: Is heavier than air Melting Point: NA Weight per gallon: 12 Particle Size: NA Evaporation Rate: Is slower than Butyl Acetate Bulls Density: NA Molecular Weight: * * * Section 10 - Chemical Stability & Reactivity Information * * * Chemical Stability: Stable Chemical Stability: Conditions to Avoid: Keep container tightly closed. Keep away from incompatible materials. This product may react with oxidizing agents and strong acids. Incompatibility: Strong oxidizers, acids and alkalies. Hazardous Decomposition: Carbon monoxide, ammonia, and aldehydes. Hazardous Polymerization: When mixed with a hardener, an irreversible, exothermic polymerization reaction occurs, liberating vapors and a moderate amount of heat. Page 3 of 5 issue Date: 13 July 2005 Revision: 2 Print Date: 13 July 2005 Material Safety Data Sheet Material Name: PSX 34 Adhesive Resin ID: AMER -020 * * * Section 11 - Toxicological Information * * * Acute Toxicity A: General Product Information: No data available for product. Epoxy resins, in general, are irritating to eyes, skin, mucous membranes, and respiratory system, and may produce allergic respiratory and skin sensitization reactions. Allergic skin sensitization reactions may result in rash, swelling, itching, and possibly blistering of skin. Allergic respiratory sensitization reactions produce an asthma -like condition. The Crystalline Silica (Quartz) in the dust form is considered a Cancer or Cancer suspect agent when it is breathed, in this kit the sand is completely incorporated into the resin mix and will only pose a health problem if the cured adhesive is subjected to mechanical grinding. B: Component LD50 /LC50 Epoxy resin LCso 6,000 ppm Carcinogenicity A: General Product Information: No data available for product. B: Component Carcinogenicity: The Crystalline Silica (Quartz) in the dust form is considered a Cancer or Cancer suspect agent when it is breathed. In this kit the sand is completely incorporated into the resin mix and will only pose a health problem if the cured adhesive is subjected to mechanical grinding. Epidemiology: No data available for product. Neurotoxicity: No data available for product. Mutagenicity: No data available for product. Teratogenicity: No data available for product. Other Toxicological Information: No data available for product. * * * Section 12 - Ecological Information * * * Ecotoxicity: No data available for product. Environmental Fate: No data is available concerning environmental fate, biodegradation, or bioconcentration for this product. * * * Section 13 - Disposal Considerations * * * US EPA Waste Number & Descriptions A: General Product Information: EPA waste No: D018 B: Component Waste Numbers: NA Disposal instructions: Place in separate, appropriate, closed container in accordance with all applicable local, state, and federal regulations. This material has not been tested by Toxicity Characteristic Leaching Procedure (TLCP). Page 4 of 5 Issue Date: 13 July 2005 Revision: 2 Print Date: 13 July 2005 Material Safey Data Sheet Material Name: PSX 34 Adhesive Resin ID: AMER -020 * * * Section 14 - Transportation information * * * US DOT Information Shipping Name: Not Regulated Hazard Class: NA UN /NA #: NA Packing Group: NA Required Label(s): NA Additional Info.: NA International Transportation regulations: NA * * * Section 15 - Regulatory Information * * * US Federal Regulations A: General Product Information: C)SHA: Hazardous by definition of Hazard Communication Standard (29 CFR 1910.1200) B: Component Information: NA State Regulations A: General Product Information: No additional information. B: Component Information: No additional information. Other Regulations A: General Product Information: Components of this product have been checked against the non - confidential TSCA inventory by CAS registry number. Components not identified on this non - confidential inventory are exempt from listing (i.e. polymers) or are listed on the confidential inventory as declared by the supplier. B: Component Information: No components are listed in the WHMIS IDL. All identified ingredients are on the Canadian Domestic Substances List. * * * Section 16 - Other Information * * * Other Information: Reasonable care has been taken in the preparation of this information, but the manufacturer makes no Avarranty of merchantability or any other warranty, expressed or implied, xvith respect to this information. The manufacturer makes no representations and assumes no liability for any direct, incidental or consequential damages resulting from its use. Key /Legend: EPA = Environmental Protection Agency; TSCA = Toxic Substance Control Act; ACGIII = American Conference of Governmental Industrial Hygienists, IARC = International Agency for Research on Cancer: NIOSI I = National Institute for Occupational Safety and I- Iealth; NTP = National Toxicology Program; OSHA = Occupational Safety and Health Administration. Contact Person: Laura Barham Contact Phone: 940 -569 -1471 This is the end of MSDS # AMER -020 Page 5 of 5 Issue 1)ate: 13 July 2005 Revision: 2 Print Date: 13 July 2005 Material Safety Data Sheet Material Name: Cherncurc Pack (all sizes) ID: Amer-006 * * * Section 1 - Chemical Product and Company Identification * * * Part Number: NA Chemical Name: Water activated chemical heater Product Use: Heat source for curing adhesives Synonyms: Manufacturer Information Ameron International Fiberglass Div 1004 Arneron Road P. O. Box 878 13urkburnett, TX 76354 Phone #: (940) 569-1471 Fax #: (940) 569 -2764 Emergency #: (940) 569 -1471 * * * Section 2 - Composition / Information on Ingredients * * * CAS# Components Percent #1305-78-8 Calcium Oxide <60 #l44-62-7 Oxalic Acid <30 #7664 -93 -9 Sulfarnic Acid <20 Component Information /Information on Non - Hazardous Components This product is considered hazardous under 29 CFR 1910.1200 (Hazard Communication). * * * Section 3 - Hazards Identification * * * Emergency Overview Product is a mixture of white and purple powders, non- llarnmable. When water activated toxic fumes and gases may be released. Contact may cause irritation or burns to eyes and skin. Hazard Statements Warning! Material reacts with water producing steam and acid fumes. Reaction can be violent producing a great deal of heat. Potential Health Effects: Eyes This product may cause possible severe corrosion damage. Potential Health Effects: Skin This product may cause skin irritation, including redness, and possible severe corrosion damage. Reaction with water can cause burns. Potential Health Effects: Ingestion Ingestion can cause gastrointestinal injury, nausea, vomiting, cramps, shock and possible death. Potential Health Effects: Inhalation Reacting of this product may release harmful vapors. Can cause coughing, sneezing, and irritation of mucous membranes. HMIS RATINGS: Health: 3 Fire:l Reactivity:2 Pers. Prot.: impervious gloves, chemical goggles Hazard Scale: 0 = Minimal 1= Slight 2= Moderate 3= Serious d = Severe * = Chronic hazard * * * Section 4 - First Aid Measures * * * First Aid: Eves Inunediatel■ flush eyes with plenty of water for at least 15 minutes. Get medical attention or advice. First Aid: Skin For skin contact, wash irnrnediately with soap and water. Get medical attention if irritation persists or develops. First Aid: Ingestion Page 1 of 5 Issue Date: 17 November, 2004 Revision: 3 Print Date: 17 November. 2004 Material Safety Data Sheet Material Name: Chemcure Pack (all sizes) If the material is swallowed, and if conscious give large amounts of milk or water. advice -- Do not induce vomiting unless instructed to do so by medical personnel. First Aid: Inhalation If inhaled, immediately remove to fresh air. Provide artificial respiration if necessary. If symptoms develop or persist, get immediate medical attention. First Aid: Notes to Physician Provide general supportive measures and treat svrnptornatically. ID: Amer -006 Get immediate medical attention or * * * Section 5 - Fire Fighting Measures * * * Flash Point: NA Upper Flammable Limit (UFL): NA Auto Ignition: NA General Fire Hazards Method Used: NA Lower Flammable Limit (LFL): NA Flammability Classification: Non - flammable Irritating and toxic gases or fumes may be released during a fire. Extinguishing Media Large amounts of water, foam, carbon dioxide, and dry chemical Fire Fighting Equipment/Instructions Firefighters should wear hull protective clothing including self- contained breathing apparatus. NFPA Ratings: I- Iealth: 3 Fire: 1 Reactivity:2 Other Hazard Scale: 0 = Minimal 1= Slight 2= Moderate 3— Serious 4 = Severe * * * Section 6 - Accidental Release Measures * * * Containment Procedures Contain discharged material. Clean -Up Procedures Shovel the material into waste container and seal. Do not allow the spilled product to enter public drainage system or open water courses. Wear appropriate protective equipment and clothing during clean -up. Ventilate the contaminated area. Thoroughly wash the area with water after a spill clean -up. Evacuation Procedures Isolate area. Keep unnecessary personnel away. Special Procedures If water is used then large amounts are needed to quench developed heat. * * * Section 7 - Handling and Storage * * * Handling Procedures Do not get this material in your eyes, on your skin, or on your clothing. Use this product with adequate ventilation. Avoid breathing fumes if this product gets wet. Keep this product away from water, until ready to use. Wash thoroughly after handling. Remove contaminated clothing and launder before reuse. Storage Procedures Keep the container tightly closed and store in a cool, dry, well- ventilated place. * * * Section 8 - Exposure Controls / Personal Protection * * * Exposure Guidelines Calcium Oxide (CAS# 1305 -78 -8) OSHA PEL 5 mg /m3, ACGIII TLV: 2 mg /m3 Oxalic Acid (CAS# 144 -62 -7) OSHA PEL 1 mg /m3. 2 mg /m3 STEL, ACGIH TLV 1 mg /m3, 2 mg/m3 STET, Engineering Controls Good general ventilation required. Use local exhaust if necessary. PERSONAL PROTECTIVE EQUIPMENT Personal Protective Equipment: Eyes /Face Wear chemical goggles. Page 2 of 5 Issue Date: 17 November, 2004 Revision: 3 Print Date: 17 November, 2004 Material Safety Data Sheet Material Name: Cherncure Pack (all sizes) Personal Protective Equipment: Skin Use impervious gloves. Use of protective coveralls and long sleeves is recommended. ID: Amer -006 Personal Protective Equipment: Respiratory If ventilation is not sufficient to effectively remove vapors and fumes, appropriate N1OSH/MSHA respiratory protection must be provided. Personal Protective Equipment: General Use good industrial hygiene practices m handling this material. * * * Section 9 - Physical & Chemical Properties * * * Appearance: White & purple Physical State: Powder Vapor Pressure: NA Boiling Point: NA Solubility (H2O): Reacts violently with water Freezing Point: NA Softening Point: NA Viscosity: NA Percent Volatile: NA Physical Properties: Additional Information None Odor: Slight or none pH: Very acid Vapor Density: NA Melting Point: NA Specific Gravity: 1.1 to 1.2 Particle Size: NA Evaporation Rate: NA Bulk Density: NA Molecular Weight: mixture * * * Section 10 - Chemical Stability & Reactivity Information * * * Chemical Stability Stable Chemical Stability: Conditions to Avoid Keep container tightly closed. Keep away from moisture or water. This product may react with oxidizing agents and strong acids, alkalies, silver compounds and fiufuryl alcohol.. Hazardous Decomposition Thermal decomposition may produce carbon monoxide, carbon dioxide, nitrogen oxides, ammonia and Fonnic acid. Hazardous Polymerization Will not occur. * * * Section 11 - Toxicological Information * * * Acute Toxicity A: General Product Information No data available for product. B: Component LD50/LC50 Oxalic Acid (CAS #144 -62 -7) LD50: Oral, Rat: 375 mg/kg DRML, RBT: 20 g/kg Carcinogenicity A: General Product Information No data available for product. B: Component Carcinogenicity No Epidemiology No data available for product. Neurotoxicity Page 3 of 5 Issue Date: 17 November, 2004 Revision: 3 Print Date: 17 November. 2004 Material Safety Data Sheet Material Name: Cherncure Pack (all sizes) No data available for product. Mutagenicity No data available for product. Teratogenicity No data available for product. Other Toxicological Information None. ID: Amer -006 * * * Section 12 - Ecological Information * * * Ecotoxicity No data available for this product. Environmental Fate No data is available concerning environmental fate, biodegradation, or bioconcentration for this product. * * * Section 13 - Disposal Considerations * * * US EPA Waste Number & Descriptions A: General Product Information As shipped, product is not regulated as a hazardous waste. B: Component Waste Numbers No EPA Waste Numbers are applicable for this product's components. Disposal instructions Dispose of waste material according to Local, State, Federal, and Provincial Environmental Regulations. * * * Section 14 - Transportation information * * * US DOT Information Shipping Name: (Oxalic Acid /Sulfamic Acid) corrosive, solid, acidic, organic, N.O.S. Hazard Class: 8 UN/NA #: 3261 Packing Group: III Required Label(s): Corrosive Additional Info.: None International Transportation regulations No additional information. * * * Section 15 - Regulatory Information * * * US Federal Regulations A: General Product Information No additional infornlation. B: Component Information None of this product components are listed under SARA Section 302 (40 CFR 355 Appendix A), SARA Section 313 (40 CFR 372.65), or CERCLA (40 CFR 302.4). All Identified ingredients are on the TSCA Inventory. State Regulations A: General Product Information No additional information. B: Component Information None of this product's components are listed on the state lists from CA, FL, MA, MN, NJ, or PA. Other Regulations A: General Product Information Components of this product have been checked against the non - confidential TSCA inventory by CAS registry number. Components not identified on this non - confidential inventory are exempt from listing (i.e. polymers) or are listed on the confidential inventory as declared by the supplier. Page 4 of 5 Issue Date: 17 November, 2004 Revision: 3 Print Date: 17 November, 2004 Material Safety Data Sheet Material Name: Chemcure Pack (all sizes) B: Component Information (Canada) No components are listed in the WHMIS IDL All identified ingredients are on the Canadian Domestic Substances List. ID: Amer -006 * * * Section 16 - Other Information * * * Other Information Reasonable care has been taken in the preparation of this information, but the manufacturer makes no warranty of merchantability or any other warranty, expressed or implied, with respect to this inforn-iation. The manufacturer makes no representations and assumes no liability for any direct, incidental or consequential damages resulting from its use. Key/Legend EPA = Environmental Protection Agency; TSCA = Toxic Substance Control Act; ACGIH = American Conference of Occupational Safety and Health: NTP = National Toxicology Program; OSHA = Occupational Safety and Health Administration. Contact Person: Laura Barham Contact Phone: (940) 569 -1471 This is the end of MSDS /! AMER -006 Page 5 of 5 Issue Date: 17 November. 2004 Revision: 3 Print Date: 17 November, 2004 Governn: 05 -01 -2013 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director BILL DURKIN 18340 ANDOVER PK W TUKWILA WA 98188 RE: Permit No. D11 -270 ACE TANK AND FUELING EQUIPMENT 18340 ANDOVER PK W TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 06/11/2013. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 06/11/2013, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, File: er Marshall t Technician Permit File No. D I 1 -270 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 -431 -3670 • Fax 206 -431 -3665 11 -01 -2012 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director BILL DURKIN 18340 ANDOVER PK W TUKWILA WA 98188 RE: Permit No. D11 -270 ACE TANK AND FUELING EQUIPMENT 18340 ANDOVER PK W TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 12/17/2012. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 12/17/2012, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, ViR,)L Bill Rambo Permit Technician File: Permit File No. DI 1 -270 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 - 431 -3670 • Fax 206 - 431 -3665 June 6, 2012 city of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director Bill Durkin Ace Tank & Fueling Equipment 18340 Andover Pk W Tukwila, WA 98188 RE: Request for Extension Development Permit No. D11 -270 Ace Tank & Fueling Equip —18340 Andover Pk W Dear Mr. Durkin, This letter is in response to your written request for an extension to Permit Number DI 1 -270. The Building Official has reviewed your letter and considered your request to extend the above referenced permit. The City of Tukwila Building Division will be extending your permit an additional 180 days from the date of expiration, through December 17, 2012. If you should have any questions, please contact our office at (206) 431 -3670. Sincerely, File: Permit No. D I 1 -270 W:\Permit Center \Extension Letters\Permits\2011'D11 -270 Permit Extension.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 tiatiT 8MEG WPM Innovative Solutions... Extraordinary Results. 06 -04 -2012 Bill Rambo — Permit Technician 6300 Southcenter Boulevard, Suite #100 Tukwila, WA 98188 RE: Permit No. D11 -270 Ace Tank & Fueling Equipment 18340 Andover Pk W TUKW Dear Mr. Rambo, RECEIVED JUN 0 5 2012 OEVE�LOPMENT 18340 Andover Park West Tukwila, WA 98188 (206) 281 -5000 (800) 426 -2880 Fax (800) 279 -7885 www.acetank.com Currently our permit is due to expire on 06/20/2012 and I would like to request a 180 day extension please. Spring and Summer is our peak business time and I would greatly appreciate an extension to get the items finished that we need in order for our inspection. Thank you for your consideration. Bill Durkin Sales Manager 4gg �/zafz �1 i21n 112 05 -01 -2012 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director BILL DURKIN 18340 ANDOVER PK W TUKWILA WA 98188 RE: Permit No. D11 -270 ACE TANK AND FUELING EQUIPMENT 18340 ANDOVER PK W TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 06/20/2012. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 -431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 06/20/2012, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D11 -270 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 -431 -3670 • Fax 206 -431 -3665 12 -01 -2011 • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director BILL DURKIN 18340 ANDOVER PK W TUKWILA WA 98188 RE: Permit Application No. D11 -270 ACE TANK AND FUELING EQUIPMENT 18340 ANDOVER PK W TUKW Dear Permit Applicant: In reviewing our current application files, it appears that your permit applied for on 08/04/2011, has not been issued by the City of Tukwila Permit Center. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or National Electrical Code every permit application not issued within 180 days from the date of application shall expire and become null and void. Your permit application will expire on 01/31/2012. If you still plan to pursue your project, a written request for extension of your application must be submitted to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit application. If it is determined that an extension is granted, your application will be extended for an addtional 90 days from the expiration date and you will be notified by mail. In the event that we do not receive your written request for extension or request was denied, your permit application will expire, become null and void and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, c Bill Rambo Permit Technician File: Permit File No. D11 -270 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 1 Gity of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director November 1, 2011 October 18, 2011 Bill Durkin 18340 Andover Pk W Tukwila, WA 98188 RE: Incomplete Letter #2 Development Permit Application D11 -270 Ace Tank & Fueling Equipment —18340 Andover Pk W Dear Mr. Durkin, ** Updated ** (see page 3) This letter is to inform you that your permit application received at the City of Tukwila Permit Center on October 14, 2011 is determined to be incomplete. Before your application can continue the plan review process the attached/following items from the following department(s) need(s) to be addressed: Building Department: Allen Johannessen at 206 433 -7163 if you have questions concerning the attached comments. Fire Department: Alan Metzler at 206 971 -8718 if you have questions concerning the attached comments. Please address the comment above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that four (4) sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at the Permit Center at (206) 431 -3670. Sincerely, Jenn'fer Marshall Permt Technician Enclosures File: D11 -270 W:\Permit Center \Incomplete Letters \2011 \D11 -270 Incomplete Ltr #2b.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206- 431 -3665 • Tukwila Building Division Allen Johannessen, Plan Examiner Determination of Completeness Memo Date: October 18, 2011 Project Name: Ace Tank & Fueling Equipment Permit #: D11 -270 Plan Review: Allen Johannessen, Plans Examiner The Building Division has deemed the subject permit application incomplete. To assist the applicant in expediting the Department plan review process, please forward the following comments. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. Previous memo requested "Please provide an egress plan. Provide dimensions for the paths of egress. Speck all exit doors. Identify existing emergency lighting." For paths of egress we look at the length of travel to the required designated emergency exits more so than the width. The minimum width is typically 36 inches to 42 inches depending on the egress path requirements and was not the concern in this case. Also roll up doors are not allowed as a legal means of egress exit and cannot be counted for the travel distance to an emergency exit. Since the plans are indicated as "not to scale" we cannot scale the travel distance. Therefore please provide dimensions from the most remote point of the warehouse that lead to approved egress exit doors. The length of a common path of egress travel in Group B, F and S occupancies shall not be more than 100 feet, provided that the building is equipped throughout with an automatic sprinkler system. Where a tenant space in Group B, S and U occupancies has an occupant load of not more than 30, the length of a common path of egress travel shall not be more than 100 feet. All egress paths that you show shall provide emergency illuminations per IBC section 1006. (IBC 1006 & 1014.3 Exceptions 1 & 2) Should there be questions concerning the above requirements, contact the Building Division at 206 -431- 3670. No further comments at this time. Tukwila Fire Prevention Bureau Al Metzler, Fire Project Coordinator Fire Prevention Bureau Review Memo Date: October 31, 2011 Project Name: Ace Tank And Fueling Equipment Address: 18340 Andover Pk W Permit #: D11 -270 Plan Reviewer: Al Metzler, Fire Project Coordinator The Fire Prevention Bureau conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and /or other applicable documentation. Based on the information provided concerning types of materials being stored and ceiling height, the following requirements apply: 1. Per NFPA 13, Table 15.1.1, a 500 gallon hose stream allowance is required. 2. Per NFPA 13, Table 15.2.6 (a), the fire sprinkler system density is required to be 0.7 gpm. The current density is .37 gpm. 3. Per International Fire Code (IFC), Table 2306.2, smoke vents are required throughout the storage area. If smoke vents are existing, please show them, to scale, on the drawing. Should there be questions concerning the above requirements, contact the Fire Prevention Bureau at 206- 971 -8718. No further comments at this time. s Gity of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director October 18, 2011 Bill Durkin 18340 Andover Pk W Tukwila, WA 98188 RE: Incomplete Letter #2 Development Permit Application DI1 -270 Ace Tank & Fueling Equipment —18340 Andover Pk W Dear Mr. Durkin, This letter is to inform you that your permit application received at the City of Tukwila Permit Center on October 14, 2011 is determined to be incomplete. Before your application can continue the plan review process the attached /following items from the following department(s) need(s) to be addressed: Building Department: Allen Johannessen at 206 433 -7163 if you have questions concerning the attached comments. Please address the comment above in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that four (4) sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at the Permit Center at (206) 431 -3670. Sincerely, Bill Rambo Permit Technician Enclosures File: D11 -270 W:\Permit Center \Incomplete Letters \2011\D11 -270 Incomplete Ltr #2.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Tukwila Building Division Allen Johannessen, Plan Examiner Determination of Completeness Memo Date: October 18, 2011 Project Name: Ace Tank & Fueling Equipment Permit #: D11 -270 Plan Review: Allen Johannessen, Plans Examiner The Building Division has deemed the subject permit application incomplete. To assist the applicant in expediting the Department plan review process, please forward the following comments. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. Previous memo requested "Please provide an egress plan. Provide dimensions for the paths of egress. Speck all exit doors. Identify existing emergency lighting." For paths of egress we look at the length of travel to the required designated emergency exits more so than the width. The minimum width is typically 36 inches to 42 inches depending on the egress path requirements and was not the concern in this case. Also roll up doors are not allowed as a legal means of egress exit and cannot be counted for the travel distance to an emergency exit. Since the plans are indicated as "not to scale" we cannot scale the travel distance. Therefore please provide dimensions from the most remote point of the warehouse that lead to approved egress exit doors. The length of a common path of egress travel in Group B, F and S occupancies shall not be more than 100 feet, provided that the building is equipped throughout with an automatic sprinkler system. Where a tenant space in Group B, S and U occupancies has an occupant load of not more than 30, the length of a common path of egress travel shall not be more than 100 feet. All egress paths that you show shall provide emergency illuminations per IBC section 1006. (IBC 1006 & 1014.3 Exceptions 1 & 2) Should there be questions concerning the above requirements, contact the Building Division at 206 -431- 3670. No further comments at this time. .111 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director August 10, 2011 Bi11 Durkin, 18340 Andover Pk W Tukwila, WA 98188 RE: Incomplete Letter #1 Development Permit Application D11 -270 Ace Tank & Fueling Equipment —18340 Andover Pk W Dear Mr. Durkin, This letter is to inform you that your permit application received at the City of Tukwila Permit Center on August 4, 2011 is determined to be incomplete. Before your application can continue the plan review process the attached/following items from the following department(s) need(s) to be addressed: Building Department: Allen Johannessen at 206 433 -7163 if you have questions concerning the attached comments. Fire Department: Alan Metzler at 206 971 -8718 if you have questions regarding the following comment: 1. Provide details of products being stored including quantities and hazard classification (flammable, combustible, corrosive, oxidizes, etc). 2. Provide total storage height, ceiling height, and existing sprinkler density. Please address the comment above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that four (4) sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at the Permit Center at (206) 431 -3670. Sincerely, er Marshall t Technician Enclosures File: D11 -270 W:Tennit Center'Jncomplete Letters \2011\D11-270 Incomplete Ltr #1.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Tukwila Building Division Allen Johannessen, Plan Examiner Determination of Completeness Memo Date: August 9, 2011 Project Name: Ace Tank & Fueling Equipment Permit #: D11 -270 Plan Review: Allen Johannessen, Plans Examiner The Building Division has deemed the subject permit application incomplete. To assist the applicant in expediting the Department plan review process, please forward the following comments. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. Please provide an egress plan. Provide dimensions for the paths of egress. Specify all exit doors. Identify existing emergency lighting. 2. Provide building specifics on the plan, i.e. warehouse square footage, sprinkled and buildings type of construction. Should there be questions concerning the above requirements, contact the Building Division at 206 -431- 3670. No further comments at this time. • • PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D11 -270 DATE: 11 -29 -11 PROJECT NAME: ACE TANK AND FUELING EQUIPMENT SITE ADDRESS: 18340 ANDOVER PK W Original Plan Submittal X Response to Incomplete Letter # 2 Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: ik—t Blt�ding ivlslon Public Works /-141 /c D'2 —S4( Fire Prevention IN Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 12-01-11 Complete Incomplete ❑ Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route tis Structural Review Required No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 12 -29-11 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) IF, Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 1113ERNIIT COORD COOP PLAN REVIEW /ROUTIN'G SLIP ACTIVITY NUMBER: D11 -270 DATE: 10/14/11 PROJECT NAME: ACE TANK AND FUELING EQUIPMENT SITE ADDRESS: 18340 ANDOVER PK W Original Plan Submittal X Response to Incomplete Letter # 1 Response to Correction Letter # Revision # after Permit Issued EPA MEN S: uilding ivisio Public Works Pire I\ Prevention oLva Structural • Planning Division Permit Coordinator n DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete DUE DATE: 10 /18 /11 Not Applicable Comments: Permit Center. Use Only. . . (Q INCOMPLETE LETTER MAILED: I D- ` U� ( , t LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ' Fire ❑ Ping ❑ PW ❑ Staff Initials: IN►� TUES/THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: No further Review Required DATE: APPROVALS OR CORRECTIONS: DUE DATE: 11 /15 /11 Approved ❑ Approved with Conditions Not Approved (attach comments) Notation: REVIEWER'S INITIALS: DATE: permit Center Use Only ' CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 OPERMIT COORD COR1. PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D11 -270 DATE: 08/04/11 PROJECT NAME: ACE TANK & FUELING EQUIPMENT SITE ADDRESS: 18340 ANDOVER PK W X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: ��� Wok gild ms Ilia Building Division IrF a Prevention Public Works ❑ Structural ll Planning Division Permit Coordinator ri DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete ri Incomplete DUE DATE: 08/09/11 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: �( LO(11 Departments determined incomplete: Bldg la LETTER OF COMPLETENESS MAILED: Fire til Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required n No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Notation: REVIEWER'S INITIALS: DUE DATE: 09/06/11 Not Approved (attach comments) n DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Web site: http: / /www.TukwilaWA.gov REVISION SUBNIITTAL Revision submittals must be submitted in person at the Permit Center.. Revisions will not be accepted through the mail, fax, etc. Date: 11/28/2011 Plan Check/Permit Number: D11 -270 Response to Incomplete Letter # 2 Response to Correction Letter # Revision # after Permit is Issued Revision requested by a City Building Inspector or Plans Examiner Project Name: Ace Tank and Fueling Equipment Project Address: 18340 Andover Park W Contact Person: Amanda Grindle, Permit Coordinator Phone Number: (253) 882 4546 Summary of Revision: Plans have been revised per comments provided in "Determination of Completeness Memo" dated October 18, 2011, including the following: Plan has been revised to scale (1/8" = 1'). As shown on the revised plan, the distance from the furthest point of the warehouse to the closest egress door is 128.5'. This is 28.5' more than Group B, S, and U occupancies allowance, however, the Applicant would like to note that this application has not changed the racking plan from the previous tenant. This application was submitted with the intent of receiving City approval for the warehouse storage of the new tenant. In response to the "Fire Prevention Bureau Review Memo" dated October 31, 2011, the Applicant provides the following response: All fiberglass pipe will be stored in stacks less than 5' in height. In accordance with Chapter 15 of the NFPA® 13 Standard for the Installation of Sprinkler Systems 2010 Edition (excerpt attached), Group A plastics stored 5' or less in height requires a sprinkler system density of .37 gpm, which the existing system currently provides. Sheet Number(s): 1 p�� �9 2011 fenk "Cloud" or highlight all areas of revision including date o rev ion / 1 ./ Received at the City of Tukwila Permit Center by: Entered in Permits Plus on l/" H:\ApplicationsWornts- Applications On Line\2010 Applications \7 -2010 - Revision SubmittaLdoc Revised: May 2011 r City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Web site: http: / /www.TukwilaWA.gov REVISION SUBNIITTAL, RECEIVED CITY OF TUKWILA OCT II- 2011 PERMIT CENTER Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 10/14/2011 ,/ Response to Incomplete Letter # Plan Check/Permit Number: 1 D11 -270 Response to Correction Letter # Revision # after Permit is Issued Revision requested by a City Building Inspector or Plans Examiner Project Name: Ace Tank and Fueling Equipment Project Address: 18340 Andover Park W Contact Person: Amanda Grindle, Permit Coordinator Phone Number: (253) 882 4546 Summary of Revision: Plans have been revised to include additional building information, including the following: - Warehouse square footage - Building type of construction - Total storage height - Ceiling height - Existing sprinkler density - Egress plan with path dimensions Finally, the attached letter provides details of the products being stored at this facility, including quantities and hazard classifications (flammable, combustible, corrosive, oxidizers, etc.). Sheet Number(s): 1 "Cloud" or highlight all areas of revision including date o revisi Received at the City of Tukwila Permit Center by: % Entered in Permits Plus on H:\Applicatioi Wornis- Applications On Line \2010 Applications \7 -2010 - Revision Submittal.doc Revised: May 2011 Contractors or Tradespeople Poer Friendly Page • General /Specialty Contractor A business registered as a construction contractor with LEI to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name ACE TANK ft FUELING EQUIPMT LLC UBI No. 602889760 Phone 8004262880 Status Active Address 18340 Andover Park West License No. ACETATF911RS Suite /Apt. License Type Construction Contractor City Seattle Effective Date 12/10/2009 State WA Expiration Date 12/16/2013 Zip 98188 Suspend Date County King Specialty 1 General Business Type Limited Liability Company Specialty 2 Unused Parent Company Business Owner Information Name Role Effective Date Expiration Date DURKIN, WILLIAM P Partner /Member 12/10/2009 CORKILL, GLEN W Partner /Member 12/10/2009 Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 1 OHIO CAS INS CO 3926524 11/24/2009 Until Cancelled $12,000.00 12/10/2009 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 1 Lexington American Ins Co EG13089161 11/01/2009 11/01/2012 $1,000,000.00 10/31/2011 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period https: // fortress .wa.gov /lni/bbip /Print.aspx 12/23/2011 12' Pallet Rack A Pallet Rack E 6" 6" AS NOTED otf Pallet Rack B 7' -10" Pallet Rack F \--BEAM SECTION 14GA THK. ASTM A570 GR50 Interlake 689 All 144" Load Beams BRACKET ASSY. AS NOTED - 1/2 " -8 TYP. \--BEAM SECTION 14GA THK. ASTM A570 GR50 LBF354 All 94" and 96" Load Beams 1/2 " -8 TYP. 3/8" THK 7'10" or Pallet Rack G - -H j-- -1/2 ►� 4 1/4" MPFINNW STRUCTURAL NOTES: RACKS A,B,D,E,F,G 2 r 1. RACKS ARE MANUFACTURED BY LODI METAL TECH INTERLAKE OF LODI, CA OR ' '3' -8" I ( , 12' EQUAL. 2. MINIMUM YIELD (Fy) AND ULTIMATE (Fu) STEEL STRENGTHS SHALL BE AS c FOLLOWS: 1 \_ A) BEAMS AND COLUMNS Fy =50ksi FU�5ksi. B) BRACING STRUTS Fy =36ksi Fu=58ksi. C) BASE PLATES FY =36ksi Fu= 58ksi. i 3. MAXIMUM RACK LOAD PER LEVEL PER PAIR OF BEAMS SHALL BE (A.) ALL RACK TYPES WITH 144" BEAMS: 4000 LBS (B.) ALL RACK TYPES WITH 94" OR 96" BEAMS: 2000LBS 4. CONCRETE SLAB IS GIVEN AS 5 1" THICK WITH fc'= 3000 psi. 5. ALLOWABLE SOIL BEARING PRESSURE IS GIVEN AS 2000 psf FOR GRAVITY LOADS. 6. TIE -DOWN ANCHORS SHALL BE SIMPSON STRONG BOLT 2 WEDGE ANCHORS OR EQUIV. (A.) FOR THE 5" X 7 3/4" BASE PLATES: USE 2 - 1/2"0 X 4-1/4" ANCHORS WITH 3 "EMBEDMENT PER BASE PLATE. PLACE ANCHORS DIAGONALLY FOR Ir ANY BASE PLATES WITH 4 HOLES. 1 — = — I 1 co C Q� LJ O W SPECIAL INSPECTION IS REQUIRED. _ Pallet Rack D N 73'-4"/' Pallet Rack H PO-Tio FLOOR ANCHOR DETAIL SEE NOTES FOR SPECS 5/8" DIA. 2 3/8 4 HOLES '� 3/8" THK. It � \3/16" V 1/2" -- ' w 3/16 "��2 3/4" : ;� ---- --\\ - - --- - -1 I 1_-__ I - 5 3/4 " �.- 7 7 3/4 "- -- •� i 3/16" /1 1/2" BASE PLATE DETAIL 5" 1 1/2" COLUMN STRUT 1/8" 2" TYP. - � - ----, AS NOTED -) . 13GA THK. 1/4" REF. 7. POST LOAD SIGNS NOT LESS THAN 50 SQUARE INCHES IN AREA DEPICTING THE DESIGN CAPACITY AT CONSPICUOUS LOCATIONS. 8. IF ANY DISCREPANCY OCCURS, CONTACT THE ENGINEER FOR CLARIFICATION. 9. ANALYSIS & DESIGN OF RACK CONFORMS TO THE 2009 IBC SECTION 2208 THE 2008 RMI CODE AND SEC 15.5.3 OF ASCE 7.05 USING THE ASD METHOD: V=0.67 Cs x Ip x Ws WHERE: Ip = - RESTRICTED AREA - (NO PUBLIC ALLOWED) Cs =2.5Ca /R - - _ Ca = 0.3723 FOR THE GIVEN ADDRESS AND SITE CLASS D R = 4.0 TRANSVERSE DIR.- BRACED FRAMES R = 6.0 LONGITUDINAL DIR. - MOMENT FRAMES EXITING NOTES: 1. EXTERIOR DOORS ARE 3' SWING TYPE WITH LOCKING KNOB WHICH REQUIRES NO SPECIAL KNOWLEDGE OR EFFORT TO OPEN. FELE CAP Permit No. review approval is subject to errors and omissions. of :ons<ruction documents dos rot zothc 1 e 1:: '3nr� r' " ,y' do�� a code or ordinance. Rec'cipt Lpprovac i;ic - r d conditions is acknowledg d: PI� Date: 1; l 11 City Of Tukwila BUILDING DIVISION REI�ISIONS --, f%!ra client:es shall ho C :' "` It without t 'ide to the scope .,� is prior approval of iIa Building Division. 7 :: l7cv ;liens will require a new ord may Include additional plan re ew fees. 'ttal '6\0) tiztl) 00( (3 .531 SQUARE 7/8" 3" BRACING CONNECTION DETAIL -R1 /8" 3/4" TYP. COLUMN DETAIL INTERLAKE 75 12GA ASTM A570 GR50 'T L".-2 f�'E��/ll RED FOR: tJ lechaniniccal Mt:ectrical E"'iumbing 1 as Piping of Tukwila DIVISION REVIEWED OR CODE P�� APPROVED DE a DEC 0 '7 2011 kity of Tukwila BUILDING DIVISION CITY EDFETUKtMLA AUG 042011 PERMIT CENTER CONTRACTORS LICENSE DRAWINGS PREPARED FOR 4! 6 ry 2718 2� 2 VA 13/8- 11UNG2A211RSAD \Ly 1 c 11/16 DIA 1/4 TIM A36 FIAT BAIL SA DIA A36 ROUND BAR HORIZONTAL X BRACE ROD AND BRACKET ,1J VERTSPACING 4!► O 01 • c \ H a � � o oh CANTILEVER RACK C OC-1.5 11/16DIA - 2 3/4" 0C-7 �� 4" 1 2 HOLM 21/2 1 1/2 ./ ; l u 1 -.-I 1" I-- 013/16" _' 8" HORIZONTAL X BRACE ADMU3. BRACKET 34 THL A34 FIAT BAR 7 '_3" 11/4"-- - f { __ - 3".:- 112"- 1 3/16" THK. SIDE I_ 013/16" TOP HORIZONTAL SPACER DETAIL OCSPACINO 3/8" I_. 71 5/8" 2 3/4" ". 4" 9" 1 5/16" r' 25 3/16" 5" VERTSPACING 7/1"0 HOLE POR. 3I4'H ORS DOLT (4EOL7'S1tQaD.PER CONN.) 12" m. AS NOTED - 4" STRUCTURAL ARM (54X7.7) 13/16" DIAM. HOLE (TYP.) () C OVERALLHEIGHT 23/4" -� 2 1/4" h 1 3/8" 0 2" 8 1/4" 2" 1 lti 0 12 51/4 " —.- BASE END PLATE DETAIL 13/16" 0 HOLES \ 2 3/4" 1 3/8" 41r 0 8 1/4" rte" =Li — _L._L_ ■ k--- 51/4" -i BASE PLATE DETAIL 212 "� 8 1/4" [3/8" STIFFENER PLATE DETAIL 3' -2" 10" 2 3/4" 1--- 13/8" -?' - - J - f. - -1/4" 1 /8" 3" 1__-_ 1 -} 13/16"0 HOLE - r� �� _s I- t1 -t_-1 -r n r 1 -'-i STRUC. CANT. UPRIGHT W8x21 J__. ii f H TAB DETAIL 2 "TYP. 2" 0 0 I-i 4" O.C. TYP. 2' -82" STRUCTURAL NOTES: CANTILEVER RACKS C 1. RACKS ARE MANUFACTURED BY LODI METAL TECH INTERLAKE OF LODI, CA OR EQUAL. 2. MINIMUM YIELD (Fy) AND ULTIMATE (Fu) STEEL STRENGTHS SHALL BE AS FOLLOWS: A) ARMS AND COLUMNS Fy =36ksi FU= 58ksi. B) BRACING STRUTS Fy =36ksi Fu=58ksi. 3. MAXIMUM RACK LOAD PER ARM SHALL BE: 2500 LBS 4. CONCRETE SLAB IS GIVEN AS 5 2" THICK WITH fc'= 3000 psi. 5. ALLOWABLE SOIL BEARING PRESSURE IS GIVEN AS 2000 psf FOR GRAVITY LOADS. 6. TIE -DOWN ANCHORS SHALL BE SIMPSON STRONG BOLT 2 WEDGE ANCHORS OR EQUIV. USE (2) 1" X 41" ANCHORS WITH A 3" EMBEDMENT AT FRONT END OF BASE AND IN THE UPRIGHTS COLUMN BASE PLATE. SPECIAL INSPECTION IS REQUIRED. 7. POST LOAD SIGNS NOT LESS THAN 50 SQUARE INCHES IN AREA DEPICTING THE DESIGN CAPACITY AT CONSPICUOUS LOCATIONS. 8. IF ANY DISCREPANCY OCCURS, CONTACT THE ENGINEER FOR CLARIFICATION. 9. ANALYSIS & DESIGN OF RACK CONFORMS TO THE 2009 IBC SECTION 2208 AND SEC 15.5.3 OF ASCE 7.05 USING THE ASD METHOD: V:4.70 Cs x Ip x Ws WHERE: Ip = 1.0 - RESTRICTED AREA - (NO PUBLIC ALLOWED) Cs= 2.5Ca /R Ca = 0.3723 FOR THE GIVEN ADDRESS AND SITE CLASS D R = 4.0 FOR BOTH DIRECTIONS — EXITING NOTES: 1. EXTERIOR DOORS ARE 3' SWING TYPE WITH LOCKING KNOB WHICH REQUIRES NO SPECIAL KNOWLEDGE OR EFFORT TO OPEN. 2--10 5/8"0 HOLES BOT. FLANGE ONLY REVIEWED FOR CODE COMPLIANCE APPROVED p ,C 0'7 2011 City of Tukwila UILDING DIVISION 51 4 ':. 1:- .-_1 7/ INSIDE 1/4"1' \ ONLY 7/8" 0 HOLE FOR 3/4" 0 GR8 BOLT (6 BOLTS REQUIRED PER CONNECTION) 3' -11 1/2" 11 7„ 8 5,, STRUC. CANT. BASE 8 W8x21 RECEIV�Dp CITYOFTUKW A AUG 0 4 2011 PERMIT CENTER cfp DESCRIPTION co cc 0 Z7,5 toe -aj Z W U L7 LJW W, t� H 0 ` I W N"" F- ` Q qD -- Z Z c=1 d J H " W Ld Z '� ¢- d' W 1-H C t:i" z¢ L 0-¢ 3 7 z p,- Z ¢ Ll W *I C.) Z , /i -_ - LJ (Y it r- (_7 C -I D Lil W SW _l 7 7 4- F- CD F - CJ HSN912CC CONTRACTOR'S LICENSE W 0. DRAWINGS PREPARED FOR BCD -- -- �} ga- m') N C0 CJ CO ) < .- DRAWN BY: S SCALE N0 0 DATE: 1 �— U —1 DRAWING NO: CHECKED BY: SHEET NO. 3 9;) 7r1 0 n 24' -54" • c 44" X 144" 40" X 144" 40" X 144 ''' 44" X 144 ". 8' -6116 8' -3" - 40" X 1 A 40" X 144" l A 40" X 144 "! 40" X 144" :B 36" X 96" B 36" X F 36" X 94" k" 36 "X94" 36" X 96"11 36" X 94" G48" X 94" 0 128.58 ft GI 48" X 144" .- D'44" X 144' inIV _■ G 48" X 144" C) 16-5136" lJ r 4 4 H 4 '✓ o i 0 H H 4 rN H t4 44" X 144" 0 INCOMPLETE tt127O REV1I VvED FOR CODE COMPLIANCE APPROVED DEC 07 2011 City of Tukwila BUILDING DIVISION RECEIVED NOV 29 2011 PERMIT CENTER (l) cy a 0 1i1 (f) 18340 Andover Pork West INDUSTRIAL " COMMERCIAL * AGRICULTURAL " NATURAL RESOURCES II PROJECT NUMBER: X O 3 CO .4 0' Ob cro NI N. (V Q a0 J ,0 O cO N X Q * IL Q O _J LU r1N -- a cO a_ O O UJ co --I W co co b W O (1) r m w O o uJ • i n l- WWW.SEGALEPROPERTIES.COM 0 N u7 N A CD DRAWING NUMBER: 5NEET:1 X I OF: 1