Loading...
HomeMy WebLinkAboutPermit D11-309 - VASQUEZ RESIDENCE - PORCHVASQUEZ RESIDENCE 16216 47 AV S Di 1-309 Parcel No.: Address: Suite No: Project Name: City olkukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206- 431 -2451 Web site: http: / /www.TukwilaWA.gov 5379800482 16216 47 AV S TUKW VASQUEZ RESIDENCE DEVELOPMENT PERMIT Permit Number: Issue Date: Permit Expires On: D11 -309 11/16/2011 05/14/2012 Owner: Name: VASQUEZ FIDENCIO +ALICIA MOR Address: 16216 47TH AVE S , TUKWILA WA 98188 Contact Person: Name: RODRIGO VASQUEZ Address: 16216 47 AV S , TUKWILA WA 98188 Phone: 206 - 371 -0933 Contractor: Name: OWNER AFFIDAVIT - FIDENCIO VASQUEZ Phone: Address: Contractor License No: Expiration Date: DESCRIPTION OF WORK: CONSTRUCT PORCH Value of Construction: $1,500.00 Type of Fire Protection: Type of Construction: V -B Electrical Service Provided by: PUGET SOUND ENERGY Fees Collected: International Building Code Edition: Occupancy per IBC: $177.75 2009 0022 * *continued on next page ** doc: IBC -7/10 D11 -309 Printed: 11 -16 -2011 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: Flood Control Zone: Hauling: Land Altering: Landscape Irrigation: Moving Oversize Load: N Number: 0 N Start Time: Volumes: Cut 0 c.y. Size (Inches): 0 End Time: Fill 0 c.y. Start Time: End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non - Profit: N Water Main Extension: Private: Public: Water Meter: N Permit Center Authorized Signature: Date: 11' L I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: /11 `�� � Date: // Print Name: � /t°/J 5/D This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 6: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of doc: IBC -7/10 D11 -309 Printed: 11 -16 -2011 this requirement. • 7: All construction noise to be m compliance Chapter 8.22 of the City of Tukwila Municipal Code. A copy can be obtained at City Hall in the office of the City Clerk. 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: IBC -7/10 D11 -309 Printed: 11 -16 -2011 CITY OF TUKV'W.A Community DevelaWent Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Pe. No. ? ` ?01 Mechanical Permit No. Plumbing/Gas Permit No. Public Works Permit No. Project No. (For office use only) Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION / King Co Assessor's Tax No.: Site Address: /621CO C/7 t'i4 hitt S 1 oh t-114ez non Suite Number: Floor: New Tenant: ❑ Yes Tenant Name: v_Iw Property Owners Name: r / Cl vQ,6 a,(,i'e.2, Mailing Address: /��. / (p q/ T 14 tie IS -z. tlJ1cli t City State ❑..No Zip CONTACT PERSON — who do we contact when your permit is ready to be issued r Name: Mailing Address:,/ % f) 4 Pi c oe E -Mail Address: Day Telephone: ,t2. 0 �O J .371- 0 ?53 City State Zip Fax Number: GENERAL CONTRACTOR INFORMATION — (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: Mailing Address: City Day Telephone: Fax Number: Expiration Date: Contact Person: E -Mail Address: Contractor Registration Number: State Zip ARCHITECT OF RECORD — All plans must be stamped by Architect of Record Company Name: Mailing Address: City Contact Person: Day Telephone: Fax Number: E -Mail Address: State Zip ENGINEER OF RECORD — All plans must be stamped by Engineer of Record Company Name: Mailing Address: City Contact Person: Day Telephone: E -Mail Address: Fax Number: H: \Applications\FortnsApplications On Line\2010 Applications \7-2010 - Permit Application.doc Revised: May 2011 bh State Zip Page 1 of 6 BUILDING PERMIT INFORMATION — 206 - 431 -3670 blMaluation of Project (contractor's bid pW: $ S-00 ',Awe of W i ork,(please provide detailed information): �Q t`GGI Existingiilding Valuation: $ Will there be new rack storage? ❑ ....Yes ❑ ..No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: fiFIRE 1 ROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If "yes', attach list of materials and storage locations on a separate 8 -1/2" .x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:1Applications\Forms- Applications On Line12010 Applications17 -2010 - Permit Application.doc Revised: May 2011 bh Page 2 of 6 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1" Floor 2°d Floor rd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: fiFIRE 1 ROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If "yes', attach list of materials and storage locations on a separate 8 -1/2" .x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:1Applications\Forms- Applications On Line12010 Applications17 -2010 - Permit Application.doc Revised: May 2011 bh Page 2 of 6 PERMIT APPLICATION NOTES — Aleicable to all permits in this application • Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWN R OR AUTHORIZED AGENT: ^� G Signature: f/ den �. t o V Ct ,) e . C Print Name: JC/ de14C C 0 V a 5 de 2. t3 Mailing Address: Date: 9 - ` 1 1 ( Day Telephone. (2 a 6) {p y City IDate Application Accepted: G . ( Date Application Expires: H:\Applications\Forms- Applications On Line\2010 Applications \7 -2010 - Permit Application.doc Revised: May 2011 bh Staff Initials) ,( 1 Page 6 of 6 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206-431-3665 Web site: http: / /www.TukwilaWA.00v Parcel No.: 5379800482 Address: 16216 47 AV S TUKW Suite No: Applicant: VASQUEZ RESIDENCE RECEIPT Permit Number: D11 -309 Status: PENDING Applied Date: 09/12/2011 Issue Date: Receipt No.: R11 -01993 Initials: User ID: Payee: WER 1655 Payment Amount: $177.75 Payment Date: 09/12/2011 04:00 PM Balance: $0.00 FIDENCIO VASQUEZ TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 155914 ACCOUNT ITEM LIST: Description 177.75 Account Code Current Pmts BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE 000.322.100 000.345.830 640.237.114 Total: $177.75 105.00 68.25 4.50 doc: Receipt -06 Printed: 09 -12 -2011 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. DtL 3 CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Proj ct: AS q Jf----2 -- £ J c> Type Inspecti n: - !kJ /M,� .g.1. I,� \ �0 A G Address: rc21Co 111‘ A-ai, Date Called: Special Instructions: Date Wanted:. — — i m.t p.m Requester: Phone No: 21, 0 -3'7(— (31 13 Approved per applicable codes. El Corrections required prior to approval. COMMENTS: � M r Ltpt eb 1mn5PeZ: Date: I L _ T7 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. • 2 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 X11 -3v� -� Project: VASoof-7. �rS . Type of Inspection: F- (I eAl' J C. Address: • ' 1-I -7 A t 1 1 i� I l.4. S Date Called: ' �' - 19 ' Special Instructions: . r) St. 5L8 -r)( _etwI. Date Wa ted:. I ' 2 _ - 2 3 - / i rfr. p.m. Requester: Phone No: _220-6,37 - /c'� Approved per applicable codes. a Corrections required prior to approval. COMMENTS: fr IDate:/ z REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. • INSPECTION RECORD Retain a copy with permit . INSPECTION NO. PERMIT NO. CITY OF' TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 31t.-301 Pro t� { Ins ec Type o ' Address. ` V'11 Date Called: i Special Instructions: 0 5g---ti -0( A Date Wanted:. I. I a.m. _Z1 (1 Requester: (_'r_ Phone ( -- 39 J' IOG. Approved per applicable codes. Corrections required prior to approval. COMMENTS: . D1(-- (Inspector: Date: REIN SPECT�ON FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. • r• 5,1331-1 5' 4 0 !t -8o 40 :T ►/c;31-1)�5 d(1(1 s 36-ti �l - 4`3*V 3zf) Sava 9 9� -tt'f I rn 91 -C 91 o PLANNING APPROVED fp changes can be made. to these > plans without approval from the t Planning Division of DCD roved By:,g;_ D 2e: —L • v, 2 REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. rs,vlslcns will require a new plan submittal and may include additional plan review fees. -31111 • 3 �F. ,P,`VIE PERMIT fL.'QU RED FOR: i_ echanical D Electrical C rpiumbing Las Piping of Tukwila L Z.JI► `MNO DIVISION Q JAI 3acred 6 O H w ee 0 J PILE COPY is O.DLt -,Vq P ; approval is subject to errors and =Wire. 1-:; 'g3f construction documents does not authOrils _t any 'dopted code or ordinance. Receipt ro Field Copy and conditions is acknowledg d: Crftrift• C.) rn i -it- c?1 City Of 1Uk�aita BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED NOV 15 2011 City of Tukwila BUILDING DIVISION 4-C VT IN33 Zallb °VP V_Infv\A 0,1 1/11/ 4. 9)791 iffigetZ14 I ' C11310133N ■ (5-1-in 0 'art -64Crd 3140\4 tx14,11.51)43 -t1 N r lEgoitLiliagi x )(2. KAfTERS ZN" C -C. P A -v Mood. sr RRss. _ 31.1 = j Q" >~X`5'0Nra vo55 I-1- W Sows N2 -3- 0 2 N I E$Cit i"QLU, 5 To BE. Mv■ 12 /i6 Olt g_ (6D NR\LS posr cop T YI iP(Cr4L FRSCI4 Co / 40(9 3 NAILS sic 131 f+dT P1P C7akv411.15 �D oP 1L. PTM oaT*1L SIDE IF ITC RRL. e, (Ur r zn.6 r<--t-Al 1-5 3 w 01_3 3'xI31. WT Die C L&.$a/5(D Oft-. .g.. I.- PTW 0netHF 51PC £X51 fCi WALL. C X 1 St I wt7 i v T-r.4,5Ses rd J-Joc.kzS de3atk5 Poc-5 o N pwitTES FP'FTc te- petcr 6 /' Cwt. ( 'h'!ii - TO P LiAlk FLRSH ou 1O? rd Le 41% 4-6e€ hcI es P-ao f LIT( PL1w. _ _ MtC 09-0?-11 191 Tli 4IJ S YUI�wILA W140 9g1 g P4 C1 3 RECEIVED OCT 212011 CE • Gity of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director Rodrigo Vasquez 16216 47 Av S Tukwila, WA 98168 RE: Correction Letter #1 Development Permit Application Number D11 -309 Vasquez Residence —16216 47 Av S Dear Mr Vasquez, This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building and Planning Departments. At this time the Fire and Public Works Departments have no comments. Building Department: Allen Johannessen at 206 433 -7163 if you have questions regarding the attached comments. Planning Department: Jaimie Reavis at 206 - 431 -3659 if you have questions regarding the attached comments. Please address the attached comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that four (4) sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206) 431 -3670. Sincerely, Bill Rambo Permit Technician encl File No. D11 -309 W:\Permit Center \Correction Letters \2011\D11 -309 Correction Letter #1.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Tukwila Building Division Allen Johannessen, Plan Examiner Building Division Review Memo Date: September 16, 2011 Project Name: Vasquez Residence Permit #: D11 -309 Plan Review: Allen Johannessen, Plans Examiner The Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and/or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. Plan shows notching the outside rafters for the outlook boards. Code specifies "Notches in solid lumber joists, rafters, blocking and beams shall not exceed one -sixth of the depth of the member, shall not be longer than one -third of the depth of the member and shall not be located in the middle one -third of the span." Therefore the method proposed shall not meet code. Propose another method of supporting the outer rafter. On method would be to extend the beam out to the overhang. Provide dimensions for the overhang width. (2009 RC R802.7.1) 2. Provide a method of lateral bracing of the front of the porch at the beam and post. Typically one way would be to provide diagonal cross bracing of a minimum 24 inches with a minimum size 2x4 or a 4x4 from post to beam. Provide details for lateral bracing. 3. Show slope of roof and specify type of roofing. Shingle roofing shall not meet code for roof slopping less than a 2/12 pitch. 4. Provide dimensions for the elevation of the porch roof to the concrete pad below to show head room meets minimum clearance. 5. Where the rafters extend into the existing roof, the 2x8 rafter will set higher than the roof truss top cord. Provide a detail for that section and show blocking provided with attic ventilation holes drilled in each block. Bird blocks shall be provided with bird screening over the drilled holes. Typically three holes at 2 inches are drilled in each block. Should there be questions concerning the above requirements, contact the Building Division at 206- 431 -3670. No further comments at this time. • • PLANNING DIVISION COMMENTS DATE: October 3, 2011 APPLICANT: Rodrigo Vasquez RE: D11-309 ADDRESS: 16216 47th Ave S (parcel #537980 -0482) Please review the following comments listed below and submit your revisions accordingly. 1) The required side yard setback from the north property line is 5 feet, and the proposed porch addition is set back from the north property line 4 feet 3 inches (4'3 "). Please revise the plans and design of the porch addition to either (1) set back the porch the required 5 feet from the north property line, or (2) reduce the length of the porch from 15 feet to a maximum of 14 feet and 1 inch (14'1"), per Tukwila Municipal Code section 18.70.050 (6) Nonconforming Structures: Single family structures in single-family zoning districts, which have legally nonconforming building setbacks, shall be allowed to expand the ground floor only along the existing building line, so long as the existing distance from the nearest point of the structure to the property line is not reduced, and the square footage of the new intrusion into the setback does not exceed 50% of the square footage of the current intrusion. If you have any questions related to the comments above, Jaimie Reavis is the planner assigned to the file and can be reached at 206 - 431 -3659. • • PLANE! EVIEW /ROUTING SLIP ACTIVITY NUMBER: D11 -309 DATE: 10 -21 -11 PROJECT NAME: VASQUEZ RESIDENCE SITE ADDRESS: 16216 47 AV S Original Plan Submittal Response to Incomplete Letter # X Response to Correction Letter # 1 Revision # After Permit Issued DEPARTMENTS: " ulding Division Public Works ❑ Fire Prevention Structural n Planning Division Permit Coordinator It -ts -t( DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 10 -25-11 Complete Incomplete n Not Applicable Comments: Permit Center Use Only . . • INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route M Structural Review Required REVIEWER'S INITIALS: No further Review Required DATE: APPROVALS OR CORRECTIONS: Approved Notation: Approved with Conditions 1\i DUE DATE: 11-22-11 Not Approved (attach comments) REVIEWER'S INITIALS: DATE: Permit Center. Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 PE PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: 011 -309 PROJECT NAME: VASQUEZ RESIDENCE SITE ADDRESS: 16216 47 AV S X Original Plan Submittal Response to Correction Letter # DATE: 09 -12 -11 Response to Incomplete Letter # Revision # After Permit Issued EPAR MEN S: Building ivision �ublic rks 61-43'4 ire Prevention IN Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete DUE DATE: 09-13-11 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: No further Review Required DATE: APPROVALS OR CORRECTIONS: Approved Approved with Conditions Notation: REVIEWER'S INITIALS: DUE DATE: 10-11-11 Not Approved (attach comments) ;g, DATE: Permit Center Use Only CORRECTION LETTER MAILED: 10-8— t Departments issued corrections: Bldg Fire EJ Ping PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 i� • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 1 C3 -2 1 i ❑ Response to Incomplete Letter # Plan Check/Permit Number: D11-309 • Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: Vasquez Residence Project Address: 16216 47 Av S Contact Person: ZICket y Phone Numb : Summary of Revision: ec� S1 �P p\�.n o c\s\r caC enc\ Qk AECENED PERMIT CENTER Sheet Number(s): 2 "Cloud" or highlight all areas of revision including date of revi. ' n Received at the City of Tukwila Permit Center by: Entered in Permits Plus on to \applications \forms- applications on line\revision submittal Created: 8 -13 -2004 Revised: CITY OF TUKWILA Department qf Community Development 630o Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 FAX (206) 931 -3665 E -mail: tukplanCa)ci.tukwila.wa.us Permit Center /Building Division 206 431 -3670 Public Works Department 206 433 -0179 Planning Division 206 431 -3670 AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION STATE OF WASHINGTON) ) ss. COUNTY OF KING , states as follows: PERMIT NO: l t I 1. 1 have made application for a permit from the City of Tukwila, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit. I have read or am familiar with RCW 18.27.090. 3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the City of Tulcwila must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this permit to be exempt under number /Z , and will therefore not be performed by a registered contractor. 5. I understand that the licensing provision of RCW 19.28.161 through 19.28.271 shall not apply to persons making electrical installations on their own property or to regularly employed employees working on the premises of their employer. The proposed electrical work is not for the construction of a new building for rent, sale or lease. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work. owlr /Owneei "Agent* Signed and sworn to before me this to day of ,20 \\ NOTARY PUBLIC in and for the State of Washington C , County Name as commissioned: \ &Ck,f My commission expires: c\ 1 LI Residing at 18.27.090 Exemptions. The registration provisions of this i. An authorized representative of nited States government, the state of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district, or other municipal or political corporation or subdivision of this state; 2. Officers of a court when they are acting within the scope of their office; 3. Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 4. Any construction, repair, or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 5. The sale of any finished products, materials, or articles of merchandise that are not fabricated into and do not become a part of a structure under the common law of fixtures; 6. Any construction, alteration, improvement, or repair of personal property performed by the registered or legal owner, or by a mobile /manufactured home retail dealer or manufacturer licensed under chapter 46.70 RCW who shall warranty service and repairs under chapter 46.70 RCW; 7. Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 8. Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of, the work of the contractor; g. Any work or operation on one undertaking or project by one or more contracts, the aggregate contract price of which for labor and materials and all other items is less than five hundred dollars, such work or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in any instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division of the operation is made into contracts of amounts less than five hundred dollars for the purpose of evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he or she is a contractor, or that he or she is qualified to engage in the business of contractor; 10. Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed chapter do not applo rector; by a registered 11. An owner* who contracts for a project with a registered contractor, except that this exemption shall not deprive the owner of the protections of this chapter against registered and unregistered contractors. The exemption prescribed in this subsection does not apply to a person who performs the activities of a contractor for the purpose of leasing or selling improved property he or she has owned for less than twelve months; i2.* Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person who performs the activities of a contractor on his or her own property for the purpose of selling, demolishing, or leasing the property; 13. An owner* who performs maintenance, repair, and alteration work in or upon his or her own properties, or who uses his or her own employees to do such work; 14. A licensed architect or civil or professional engineer acting solely in his or her professional capacity, an electrician certified under the laws of the state of Washington, or a plumber certified under the laws of the state of Washington or licensed by a political subdivision of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the person certified is operating within the scope of his or her certification; 15. Any person who engages in the activities herein regulated as an employee of a registered contractor with wages as his or her sole compensation or as an employee with wages as his or her sole compensation; 16. Contractors on highway projects who have been prequalified as required by RCW 47.28.070, with the department of transportation to perform highway construction, reconstruction, or maintenance work; 17. A mobile /manufactured home dealer or manufacturer who subcontracts the installation, set -up, or repair work to actively registered contractors. This exemption only applies to the installation, set -up, or repair of the mobile /manufactured homes that were manufactured or sold by the mobile /manufactured home dealer or manufacturer; i8. An entity who holds a valid electrical contractor's license under chapter 19.28 RCW that employs a certified journeyman electrician, a certified residential specialty electrician, or an electrical trainee meetini the ` requirements of chapter 19.28 RCW to pt£p plumbing work that is incidentally, directly; spa , ;mugediately appropriate to the like -in -kind rbplkrktnenj,of Chousehold appliance or other small household 1pll atj`ar1equipment that requires limited electric power old limited waste and /or water connections. An elftirical trainee must be supervised by a certified electricia114ile performing plumbing work. • Per Washington State Department of Labor and industries, lessee has been interpreted to be equivalent to owner for the purpose of these exemption&