DEVELOPMENT PERMIT
Parcel No.: 1332500000
Address: 15138 65 AV S TUKW
Suite No:
Project Name: CANYON ESTATES, UNITS 101 & 103
Permit Number: D11 -399
Issue Date: 12/19/2011
Permit Expires On: 06/16/2012
Owner:
Name: CANYON ESTATES CONDO COMPL
Address: PO BOX 80764 , SEATTLE WA 98108
Contact Person:
Name: BRAD PRICE
Address: 980 S HARNEY ST , SEATTLE WA 98108
Contractor:
Name: CHARTER CONST INC
Address: 980 S HARNEY ST , SEATTLE WA 98108
Contractor License No: CHARTCI171PM
Phone: 206 - 498 -8170
Phone: 206 - 382 -1900
Expiration Date: 10/23/2012
DESCRIPTION OF WORK:
REPAIR WATER DAMAGED UNITS - REPLACE ALL INSULATION AND DRYWALL THAT WAS REMOVED AFTER PIPE BREAK.
REPLACE ALL ENGINEERED WOOD FLOORING AND CABINETS. NO ELECTRICAL NEEDED, WATER ONLY REACHED 2" MAX.
NO PLUMBING CHANGES
Value of Construction: $65,000.00 Fees Collected: $1,116.40
Type of Fire Protection: NONE International Building Code Edition: 2009
Type of Construction: V -B Occupancy per IBC: 0021
Electrical Service Provided by: PUGET SOUND ENERGY
* *continued on next page **
doc: IBC -7/10
D11 -399 Printed: 12 -19 -2011
Public Works Activities:
Channelization / Striping: N
Curb Cut / Access / Sidewalk / CSS: N
Fire Loop Hydrant:
Flood Control Zone:
Hauling:
Land Altering:
Landscape Irrigation:
Moving Oversize Load:
N Number: 0
N
Start Time:
Volumes: Cut 0 c.y.
Start Time:
Size (Inches): 0
End Time:
Fill 0 c.y.
End Time:
Sanitary Side Sewer:
Sewer Main Extension: Private: Public:
Storm Drainage:
Street Use: Profit: N Non - Profit: N
Water Main Extension: Private: Public:
Water Meter: N
Permit Center Authorized Signature:
Date:
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached
to this permit.
Signature: / � �� — Date: / 2// 94
Print Name:
t 9-O %G
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: ** *BUILDING DEPARTMENT CONDITIONS * **
2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the
Building Official.
3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center
(206/431- 3670).
4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to
start of any construction. These documents shall be maintained and made available until final inspection approval is
granted.
5: All construction shall be done in conformance with the approved plans and the requirements of the International
Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code.
6: All construction noise to be in compliance with Chapter 8.22 of the City of Tukwila Municipal Code. A copy can be
obtained at City Hall in the office of the City Clerk.
doc: IBC -7/10
011 -399 Printed: 12 -19 -2011
7: All electrical work shall be inspected andiroved under a separate permit issued by tl ty of Tukwila Building
Department (206- 431 - 3670).
8: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila
Building Department (206- 431- 3670).
9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of,
any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits
presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila
shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the
Building Official from requiring the correction of errors in the construction documents and other data.
doc: IBC -7/10
D11 -399 Printed: 12 -19 -2011
CITY OF TUKWILA
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http: / /www.TukwilaWA.gov
Building Permit No. D', 3 q 1
Project No.
Date Application Accepted:
Date Application Expires:
(For office use only)
CONSTRUCTION PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *Please Print **
SITE LOCATION
King Co Assessor's Tax No.:
Site Address: 15138 65TH AVE S. #101 &103,TUKWILA,9818f Suite Number: Floor:
New Tenant: ❑ Yes ❑ ..No
Tenant Name: CANYON ESTATES HOA
PROPERTY OWNER
Name: BRAD PRICE
Name: CANYON ESTATES HOA
City: SEATTLE State: WA Zip: 98108
Address: 15138 65TH AVE S. UNIT 101 &
103
City: TUKWILA State: WA Zip: 98188
CONTACT PERSON — person receiving all project
communication
Name: BRAD PRICE
Address: 980 S HARNEY ST
City: SEATTLE State: WA Zip: 98108
Phone: (206) 498 -8170 Fax:
Email: BRADP@
GENERAL CONTRACTOR INFORMATION
Company Name: CHARTER CONSTRUCTION
Address: 980 S. HARNEY ST.
City: SEATTLE State: WA Zip: 98108
Phone: (206) 382 -1900 Fax:
Contr Reg No.: 600 479 166 Exp Date: 12/31/2011
Tukwila Business License No.:
H:\ Applications \Forms- Applications On Line \2011 Applications \Permit Application Revised - 8 -9 -1 I.docx
Revised: August 201 I
bh
ARCHITECT OF RECORD
Name:
Address:
Company Name:
Architect Name:
Address:
City:
State:
Zip:
Phone:
Fax:
Email:
ENGINEER OF RECORD
Name:
Address:
Company Name:
Engineer Name:
Address:
City:
State:
Zip:
Phone:
Fax:
Email:
LENDER/BOND ISSUED (required for projects $5,000 or
greater per RCW 19.27.095)
Name:
Address:
City: State: Zip:
Page 1 of 4
BUILDING PERMIT INFORMATION — 206 - 431 -3670
Valuation of Project (contractor's bid price): $ 65,000
Describe the scope of work (please provide detailed information):
REPAIR WATER DAMAGED UNITS
REPLACE ALL INSULATION AND DRYWALL THAT WAS REMOVED AFTER PIPE BREAK. REPLACE ALL
ENGINEERED WOOD FLOORING AND CABINETS.
Existing Building Valuation: $
NO ELECTRICAL NEEDED, WATER ONLY REACHED 2" MAX. NO PLUMBING CHANGES.
Will there be new rack storage? ❑ Yes
�.. No If yes, a separate permit and plan submittal will be required.
Provide All Building Areas in Square Footage Below
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard:
Will there be a change in use?
El Yes
Compact: Handicap:
No If "yes ", explain:
FIRE PROTECTION /HAZARDOUS MATERIALS:
El Sprinklers ❑ Automatic Fire Alarm None ❑ Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No
If `yes', attach list of materials and storage locations on a separate 8 -1 /2 "x 11" paper including quantities and Material Safety Data Sheets.
SEPTIC SYSTEM
El On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
H: \Applications`.Forms- Applications On Line \2011 Applications Permit Application Revised - 8 -9 -1 I.docx
Revised: August 2011
bh
Page 2 of 4
Existing
Interior Remodel
Addition to
Existing
Structure
New
Type of
Construction per
IBC
Type of
Occupancy per
IBC
1St Floor
2' Floor
3`d Floor
Floors thru
Basement
Accessory Structure*
Attached Garage
Detached Garage
Attached Carport
Detached Carport
Covered Deck
Uncovered Deck
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard:
Will there be a change in use?
El Yes
Compact: Handicap:
No If "yes ", explain:
FIRE PROTECTION /HAZARDOUS MATERIALS:
El Sprinklers ❑ Automatic Fire Alarm None ❑ Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No
If `yes', attach list of materials and storage locations on a separate 8 -1 /2 "x 11" paper including quantities and Material Safety Data Sheets.
SEPTIC SYSTEM
El On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
H: \Applications`.Forms- Applications On Line \2011 Applications Permit Application Revised - 8 -9 -1 I.docx
Revised: August 2011
bh
Page 2 of 4
PERMIT APPLICATION NOTES — - : .
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OW " • OR AUTHO ZED AGENT:
Signature /���
Print Name: 257€11
Mailing Address: 7 'O `J, 1-714#1",€ J -57-
Date: /-Z/ q/
Day Telephone: -206 s' 9/ 7-a
H:\Applications \Forms - Applications On Line \2011 Applications \ Permit Application Revised - 8 -9 -1 I.docx
Revised: August 2011
bh
City State Zip
Page 4 of 4
r •
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206-431-3665
Web site: http: / /www.TukwilaWA.gov
RECEIPT
Parcel No.: 1332500000 Permit Number: D11 -399
Address: 15138 65 AV S TUKW Status: PENDING
Suite No: Applied Date: 12/19/2011
Applicant: CANYON ESTATES, UNITS 101 & 103 Issue Date:
Receipt No.: R11 -02754
Payment Amount: $1,116.40
Initials: WER Payment Date: 12/19/2011 02:29 PM
User ID: 1655 Balance: $0.00
Payee: CHARTER CONSTRUCTION INC
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Check 25232 1,116.40
Authorization No.
ACCOUNT ITEM LIST:
Description
Account Code Current Pmts
BUILDING - RES 000.322.100
STATE BUILDING SURCHARGE 640.237.114
Total: $1,116.40
1,111.90
4.50
doc: Receiot -06 Printed: 12 -19 -2011
•
liZ-
INSPECTION RECORD
Retain a copy with permit
• INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
Project:
Type Inspecti n: , : \
�. xi k 430 • to ,'/14,\\
(#A./ nN i
_
4TkS
Address: • 3
•15i W• 0,5
Ave.
Date Called:
Special_Instructons:
0 /A 7..5 I t) ( '
.
/ 0
3
Date Want ca,m,
e, d:_ G _ (� p.m.
Requester:
Phone No:
l ic — (05 2 - 0 8-75
Approved per applicable codes. a•Corrections required prior to approval.
,COMMENTS:
2lM,vY •A.10 (�
�
af b-IN
a i'--() 6/4-6(11",>rJ
N,ti-fA � n c1 arP „JvI
❑ REINSPECTION FEE REQU RED. Prior to next inspection. fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
On -39q
Project: i
Type of Inspection:
ASd-dre_ss: v t
Date Called:
Special Instructions:
jA-ri 3 149 r A (O 3
Date Wanted
/
p.m.
Requester:
Phone No:
Approved per applicable codes. Corrections required prior to approval.
COMMENTS:
G,-, JE r
'Inspect'
(Date:
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
N .411
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
DIt 31 ,
Project: -
Type of Inspection:
Address:
1 I i
�t
LAS A-v
Date Called:
Special Instructions:
Date Wanted:.
i 2- —2
1-
/ a�,�gt.
% p.m.
Requester:
Phone No:
J Approved per applicable codes.
Corrections required prior to approval.
COMMENTS:
Insp tor: A
•
Date: I 2
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
NMCharter Construction, Inc.
C H Ji R T E R 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
Client:
Property:
Canyon Estates
15138 65th Ave S
Tukwila, WA 98036
Operator Info:
Operator: BOHRAMSE
Estimator:
Position:
Company:
Business:
Boh Ramsey
Senior Project Manager
Charter Construction
980 South Harney Street
Seattle, WA 98108
Type of Estimate: Water Damage
Date Entered: 11/12/2011
Price List:
Labor Efficiency:
Estimate:
WASE7X_NOV I1
Restoration/Service /Remodel
CANYON_ESTATES
12) 1
Date Assigned:
Home: (206) 660 -6100
Business: (206) 473 -9094
E -mail: BRamsey @chartercon.com
RECEIVED
DEC 19 2011
PERMITCENTER
• •
Charter Construction, Inc.
CHARTER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
Missing Wall
DESCRIPTION
CANYON_ESTATES
Main Level
Hallway Height: 8'
1782.67 SF Walls
2304.42 SF Walls & Ceiling
57.97 SY Flooring
222.83 LF Ceil. Perimeter
521.75 SF Ceiling
521.75 SF Floor
222.83 LF Floor Perimeter
Subroom 1: HALLWAY1 Height: 8'
850.67 SF Walls
1096.29 SF Walls & Ceiling
27.29 SY Flooring
106.33 LF Ceil. Perimeter
245.63 SF Ceiling
245.63 SF Floor
106.33 LF Floor Perimeter
4' 10" X 8' Opens into HALLWAY
QNTY
R &R Drywall replacement per LF - up to 2' tall 197.50 LF
R &R Batt insulation - 6" - R21 395.00 SF
Texture drywall - machine 1316.67 SF
Sandblasting 395.00 SF
This is to remove the peeling wall coverings on the concrete wall. A less abrasive method can be used if we find it comes off
easily.
Paint the walls - two coats 2633.33 SF
Stair stringer - softwood 36.00 LF
Stair riser - up to 4' 12.00 EA
Stair tread - up to 4' 12.00 EA
Carpet pad 767.38 SF
Carpet 882.48 SF
15 % waste added for Carpet.
Step charge for "waterfall" carpet installation 12.00 EA
Handrail - round / oval - softwood - wall mounted 18.00 LF
Paint handrail - wall mounted 18.00 LF
Baseboard - 2 1/4" 329.17 LF
CANYON_ESTATES
12/19/2011 Page:2
KMCharter Construction, Inc.
• •
CHARTER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
DESCRIPTION
CONTINUED - Hallway
Paint baseboard - two coats
Final cleaning - construction - Residential
Dryout, remediation and cleaning to be performed by Servpro.
QNTY
329.17 LF
767.38 SF
NOTES:
Unit 103
DESCRIPTION QNTY
* * ** *THE FOLLOWING LINE ITEMS PERTAIN TO ISSUES IN UNIT 103 * * * **
Megohmmeter check electrical circuits - average residence 1.00 EA
Checking all electrical circuits to ensure the lines are not impacted.
Single axle dump truck - per load - including dump fees 1.00 EA
Dehumidifier (per 24 hour period) - XLarge - No monitoring 1.00 EA
Dryout, remediation and cleaning to be performed by Servpro.
Air mover (per 24 hour period) - No monitoring 1.00 EA
Dryout, remediation and cleaning to be performed by Servpro.
Apply anti - microbial agent 0.00 SF
Dryout, remediation and cleaning to be performed by Servpro.
Final cleaning - construction - Residential 0.00 SF
Dryout, remediation and cleaning to be performed by Servpro.
NOTES:
CANYON_ESTATES 12/19/2011 Page: 3
UMCharter Construction, Inc.
• •
CHARTER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
Missing Wall
Missing Wall
DESCRIPTION
Living Room Height: 8'
444.67 SF Walls
693.89 SF Walls & Ceiling
27.69 SY Flooring
55.58 LF Ceil. Perimeter
7'3 "X8'
3' X 8'
249.22 SF Ceiling
249.22 SF Floor
55.58 LF Floor Perimeter
Opens into DINING_ROOM
Opens into ROOM2
R &R Vapor barrier - visqueen - 6mi1
R &R Laminate - simulated wood flooring
R &R Baseboard - 4 1/4"
Paint baseboard, oversized - two coats
Mask and prep for paint - plastic, paper, tape (per LF)
R &R 10 -0 6 -8 vinyl sliding patio door
Siding - Minimum charge
Minimum charge to detach and reset vinyl siding around sliding glass door.
Flashing - Sill pan flashing - plastic - greater than 4.5'
Flashing - Sill flashing - moldable tape
R &R Drywall replacement per LF - up to 2' tall
R &R Batt insulation - 6" - R21
Texture drywall - machine
Seal/prime the surface area - one coat
Paint the walls - two coats - 2 colors
R &R Baseboard electric heater - 10'
R &R Outlet or switch cover
QNTY
249.22 SF
249.22 SF
55.58 LF
55.58 LF
55.58 LF
1.00 EA
1.00 EA
1.00 EA
24.00 LF
55.58 LF
111.17 SF
222.34 SF
222.34 SF
444.67 SF
1.00 EA
8.00 EA
NOTES:
CANYON_ESTATES 12/19/2011 Page: 4
• •
MECharter Construction, Inc.
C HA R T E R 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
2'1d'1 -3' -4710"
1- 3 2" J -
Dining Er E Room
9'2"
1
Dear
Missing Wall - Goes to Floor
Missing Wall
DESCRIPTION
Dining Room Height: 8'
223.33 SF Walls
311.21 SF Walls & Ceiling
9.76 SY Flooring
30.42 LF Ceil. Perimeter
3'X6'8"
7'3 "X8'
87.87 SF Ceiling
87.87 SF Floor
27.42 LF Floor Perimeter
Opens into KITCHEN
Opens into LIVING_ROOM
R &R Baseboard - 4 1/4"
Paint baseboard, oversized - two coats
Mask and prep for paint - plastic, paper, tape (per LF)
Window blind - horizontal or vertical - Detach & reset
R &R Drywall replacement per LF - up to 2' tall
R &R Batt insulation - 6" - R21
Texture drywall - machine
Seal/prime the surface area - one coat
Paint the walls - two coats - 2 colors
R &R Baseboard electric heater - 8'
R &R Outlet or switch cover
QNTY
27.42 LF
27.42 LF
27.42 LF
2.00 EA
27.42 LF
54.83 SF
109.67 SF
109.67 SF
223.33 SF
1.00 EA
3.00 EA
NOTES:
3' 1 " +-3' -t- 3' 1" -1 "` Kitchen Height: 8'
Missing Wall - Goes to Floor
Missing Wall - Goes to Floor
CANYON_ESTATES
226.67 SF Walls
296.00 SF Walls & Ceiling
5.70 SY Flooring
33.33 LF Ceil. Perimeter
3'X6'8"
3'X6'8"
69.33 SF Ceiling
51.33 SF Floor
27.33 LF Floor Perimeter
Opens into DINING_ROOM
Opens into ROOM2
12/19/2011
Page: 5
• •
EMI Charter Construction, Inc.
CHARTER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
DESCRIPTION
1/4" Cement board
R &R Marble or Granite floor tile 12" x 12"
R &R Baseboard - 4 1/4"
Paint baseboard, oversized - two coats
R &R Baseboard - 2 1/4" stain grade
Stain & finish baseboard
R &R Cabinetry - lower (base) units - High grade
R &R Cabinetry - upper (wall) units - High grade
Add for frosted/etched or beveled glass, per cabinet door
Add for crown molding per LF
R &R Dishwasher - High grade
R &R Range - freestanding - electric - High grade
R &R Refrigerator - top freezer - 18 to 22 cf - High grade
Garbage disposer - Detach & reset
Sink - double - Detach & reset
Sink faucet - Detach & reset
Detach & Reset P -trap assembly - ABS (plastic)
Range hood - Detach & reset
R &R Angle stop
R &R Countertop subdeck - plywood
R &R Countertop - Granite or Marble
Backsplash - solid surface - Coved (seamless - permanent)
R &R Drywall replacement per LF - up to 2' tall
Texture drywall - machine
Seal/prime the surface area - one coat
Paint the walls - two coats - 2 colors
QNTY
5133 SF
56.47 SF
4.00 LF
4.00 LF
9.00 LF
9.00 LF
9.00 LF
16.00 LF
2.00 EA
16.00 LF
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
3.00 EA
18.00 SF
18.00 SF
17.00 LF
27.33 LF
222.34 SF
222.34 SF
226.67 SF
NOTES:
CANYON_ESTATES 12/19/2011 Page: 6
• •
KMCharter Construction, Inc.
CHARTER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
X
Missing Wall
Missing Wall - Goes to Floor
I-- 5' 8' -I
DESCRIPTION
Hallway Height: 8'
390.67 SF Walls
462.67 SF Walls & Ceiling
8.00 SY Flooring
51.33 LF Ceil. Perimeter
3' X 8'
3'X6'8"
72.00 SF Ceiling
72.00 SF Floor
48.33 LF Floor Perimeter
Opens into LIVING_ROOM
Opens into KITCHEN
Subroom 1: STORAGE Height: 8'
294.67 SF Walls
379.17 SF Walls & Ceiling
9.39 SY Flooring
36.83 LF Ceil. Perimeter
84.50 SF Ceiling
84.50 SF Floor
36.83 LF Floor Perimeter
Subroom 2: STAIRWAY Height: 8'
158.67 SF Walls
183.25 SF Walls & Ceiling
2.73 SY Flooring
19.83 LF Ceil. Perimeter
24.58 SF Ceiling
24.58 SF Floor
19.83 LF Floor Perimeter
QNTY
1/4" Cement board
R &R Marble or Granite floor tile 12" x 12"
R &R Baseboard - 4 1/4"
Paint baseboard, oversized - two coats
Mask and prep for paint - plastic, paper, tape (per LF)
R &R Drywall replacement per LF - up to 2' tall
Texture drywall - machine
Seal/prime more than the floor perimeter - one coat
Paint the walls - two coats - 2 colors
R &R Outlet or switch cover
R &R Door opening (jamb & casing) - 32 "to36 "wide - paint grade
Paint door or window opening - Large - 2 coats (per side)
181.08 SF
199.19 SF
105.00 LF
105.00 LF
105.00 LF
105.00 LF
420.00 SF
420.00 SF
844.00 SF
2.00 EA
5.00 EA
5.00 EA
CANYON_ESTATES 12/19/2011 Page: 7
• •
Charter Construction, Inc.
CHARTER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382-0450
CONTINUED - Hallway
DESCRIPTION
QNTY
Paint door slab only - 2 coats (per side) 3.00 EA
NOTES:
121P -1
.. a e 7R.
DESCRIPTION
Hall Closet/Laundry Height: 8'
322.67 SF Walls
353.50 SF Walls & Ceiling
3.43 SY Flooring
40.33 LF Ceil. Perimeter
30.83 SF Ceiling
30.83 SF Floor
40.33 LF Floor Perimeter
QNTY
R &R Carpet pad
Remove Carpet
Carpet
15 % waste added for Carpet.
R &R Baseboard - 4 1/4"
Paint baseboard, oversized - two coats
Mask and prep for paint - plastic, paper, tape (per LF)
R &R Drywall replacement per LF - up to 2' tall
Texture drywall - machine
Seal/prime more than the floor perimeter - one coat
Paint the walls - two coats - 2 colors
R &R Bypass mirrored door set
R &R Closet shelf and rod package
Detach & Reset Water heater - 40 gallon - Electric - 9 yr
Stackable washer and dryer - Remove & reset
CANYON_ESTATES
12/19/2011
30.83 SF
30.83 SF
35.46 SF
40.33 LF
40.33 LF
40.33 LF
40.33 LF
161.33 SF
161.33 SF
322.67 SF
3.00 EA
12.00 LF
1.00 EA
1.00 EA
Page: 8
• •
EMICharter Construction, Inc.
CHARTER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
DESCRIPTION
CONTINUED - Hall Closet/Laundry
QNTY
NOTES:
8' 4" 1 Bathroom Height: 8'
DESCRIPTION
208.00 SF Walls
248.00 SF Walls & Ceiling
4.44 SY Flooring
26.00 LF Ceil. Perimeter
40.00 SF Ceiling
40.00 SF Floor
26.00 LF Floor Perimeter
Ceramic tile base
R &R Drywall replacement per LF - up to 2' tall
R &R Vanity
R &R Countertop - Granite or Marble
Backsplash - solid surface - Coved (seamless - permanent)
Sink - single - Detach & reset
Detach & Reset Sink faucet - Bathroom
Detach & Reset P -trap assembly - ABS (plastic)
R &R Angle stop
Toilet - Detach & reset
Texture drywall - machine
Seal/prime more than the floor perimeter - one coat
Paint the walls - two coats - 2 colors
R &R Door opening (jamb & casing) - 32 "to36 "wide - paint grade
Paint door or window opening - Large - 2 coats (per side)
R &R Interior door unit
CANYON_ESTATES
12/19/2011
QNTY
16.00 LF
16.00 LF
2.50 LF
2.50 SF
4.50 LF
1.00 EA
1.00 EA
1.00 EA
3.00 EA
1.00 EA
104.00 SF
104.00 SF
208.00 SF
1.00 EA
1.00 EA
1.00 EA
Page: 9
• •
Charter Construction, Inc.
CHARTER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
CONTINUED - Bathroom
DESCRIPTION
Door lockset - Detach & reset
Paint door slab only - 2 coats (per side)
QNTY
1.00 EA
1.00 EA
NOTES:
r —,
DESCRIPTION
Master Bedroom Height: 8'
484.00 SF Walls
681.64 SF Walls & Ceiling
21.96 SY Flooring
60.50 LF Ceil. Perimeter
197.64 SF Ceiling
197.64 SF Floor
60.50 LF Floor Perimeter
Subroom 1: CLOSET Height: 8'
162.67 SF Walls
180.00 SF Walls & Ceiling
1.93 SY Flooring
20.33 LF Ceil. Perimeter
17.33 SF Ceiling
17.33 SF Floor
20.33 LF Floor Perimeter
QNTY
R &R Carpet pad
Remove Carpet
Carpet
15 % waste added for Carpet.
R &R Baseboard - 4 1/4"
Paint baseboard, oversized - two coats
CANYON_ESTATES
214.97 SF
214.97 SF
247.22 SF
80.83 LF
80.83 LF
12/19/2011 Page: 10
• •
Charter Construction, Inc.
CHARTER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382-0450
CONTINUED - Master Bedroom
DESCRIPTION
Mask and prep for paint - plastic, paper, tape (per LF)
R &R Drywall replacement per LF - up to 2' tall
R &R Batt insulation - 6" - R21
Texture drywall - machine
Seal/prime more than the floor perimeter - one coat
Paint the walls - two coats - 2 colors
R &R Outlet or switch cover
R &R Baseboard electric heater - 8'
R &R Interior door unit
Door lockset - Detach & reset
R &R Door opening (jamb & casing) - 32 "to36 "wide - paint grade
R &R Door opening (jamb & casing) - 36 "to60 "wide - paint grade
Paint door or window opening - Large - 2 coats (per side)
Paint door or window opening - 2 coats (per side)
R &R Bypass mirrored door set
QNTY
80.83 LF
80.83 LF
40.42 SF
323.33 SF
323.33 SF
646.67 SF
3.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
2.00 EA
2.00 EA
1.00 EA
NOTES:
1- 'Y
CANYON_ESTATES
Bedroom2 Height: 8'
468.00 SF Walls
648.56 SF Walls & Ceiling
20.06 SY Flooring
58.50 LF Ceil. Perimeter
180.56 SF Ceiling
180.56 SF Floor
58.50 LF Floor Perimeter
12/19/2011 Page: 11
• •
Charter Construction, Inc.
CHARTER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382-0450
Hallway
7'10"
DESCRIPTION
Subroom 1: CLOSET Height: 8'
154.67 SF Walls
170.92 SF Walls & Ceiling
1.81 SY Flooring
19.33 LF Ceil. Perimeter
16.25 SF Ceiling
16.25 SF Floor
19.33 LF Floor Perimeter
R &R Carpet pad
Remove Carpet
Carpet
15 % waste added for Carpet.
R &R Baseboard - 4 1/4"
Paint baseboard, oversized - two coats
Mask and prep for paint - plastic, paper, tape (per LF)
R &R Drywall replacement per LF - up to 2' tall
R &R Batt insulation - 6" - R21
Texture drywall - machine
Seal/prime more than the floor perimeter - one coat
Paint the walls - two coats - 2 colors
R &R Outlet or switch cover
R &R Baseboard electric heater - 8'
R &R Interior door unit
Door lockset - Detach & reset
R &R Door opening (jamb & casing) - 32 "to36 "wide - paint grade
R &R Door opening (jamb & casing) - 36 "to60 "wide - paint grade
Paint door or window opening - Large - 2 coats (per side)
Paint door or window opening - 2 coats (per side)
R &R Bypass mirrored door set
QNTY
196.81 SF
196.81 SF
226.33 SF
77.83 LF
77.83 LF
77.83 LF
77.83 LF
38.92 SF
311.33 SF
311.33 SF
622.67 SF
3.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
2.00 EA
2.00 EA
1.00 EA
NOTES:
CANYON_ESTATES 12/19/2011 Page: 12
• •
lai. Charter Construction, Inc.
CHARTER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
Unit 101
DESCRIPTION
QNTY
* * ** *THE FOLLOWING LINE ITEMS PERTAIN TO ISSUES IN UNIT 101 * * * **
Megohmmeter check electrical circuits - average residence 1.00 EA
Checking all electrical circuits to ensure the lines are not impacted.
Single axle dump truck - per load - including dump fees 1.00 EA
Dehumidifier (per 24 hour period) - XLarge - No monitoring 1.00 EA
Dryout, remediation and cleaning to be performed by Servpro.
Air mover (per 24 hour period) - No monitoring 1.00 EA
Dryout, remediation and cleaning to be performed by Servpro.
Apply anti - microbial agent 0.00 SF
Dryout, remediation and cleaning to be performed by Servpro.
Final cleaning - construction - Residential 0.00 SF
Dryout, remediation and cleaning to be performed by Servpro.
NOTES:
$Q.
Missing Wall
Missing Wall
DESCRIPTION
Living Room Height: 8'
444.67 SF Walls
693.89 SF Walls & Ceiling
27.69 SY Flooring
55.58 LF Ceil. Perimeter
7'3 "X8'
3' X 8'
249.22 SF Ceiling
249.22 SF Floor
55.58 LF Floor Perimeter
Opens into ROOM13
Opens into ROOM14
QNTY
R &R Vapor barrier - visqueen - 6mil
R &R Laminate - simulated wood flooring
R &R Baseboard - 4 1/4"
CANYON_ESTATES
249.22 SF
249.22 SF
55.58 LF
12/19/2011 Page: 13
• •
Charter Construction, Inc.
C H-A R T E R 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
CONTINUED - Living Room
DESCRIPTION
Paint baseboard, oversized - two coats
Mask and prep for paint - plastic, paper, tape (per LF)
R &R Drywall replacement per LF - up to 2' tall
R &R Batt insulation - 6" - R21
Texture drywall - machine
Seal/prime the surface area - one coat
Paint the walls - two coats
Wood Fireplace - Detach & reset
R &R Wall heater
R &R T & G paneling - v-joint paneling (unfinished)
Stain & finish paneling
R &R Outlet or switch cover
QNTY
55.58 LF
55.58 LF
55.58 LF
111.17 SF
222.34 SF
222.34 SF
444.67 SF
1.00 EA
1.00 EA
111.17 SF
111.17 SF
6.00 EA
NOTES:
57
Missing Wall - Goes to Floor
Missing Wall
DESCRIPTION
Dining Room Height: 8'
223.33 SF Walls
311.21 SF Walls & Ceiling
9.76 SY Flooring
30.42 LF Ceil. Perimeter
3'X6'8"
7'3 "X8'
87.87 SF Ceiling
87.87 SF Floor
27.42 LF Floor Perimeter
Opens into ROOM15
Opens into ROOM19
QNTY
R &R Vapor barrier - visqueen - 6mil
R &R Laminate - simulated wood flooring
CANYON_ESTATES
87.87 SF
87.87 SF
12/19/2011 Page: 14
• •
Ell Charter Construction, Inc.
C H -A R T E R 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
DESCRIPTION
CONTINUED - Dining Room
R &R Baseboard - 4 1/4"
Paint baseboard, oversized - two coats
Mask and prep for paint - plastic, paper, tape (per LF)
R &R Drywall replacement per LF - up to 2' tall
R &R Batt insulation - 6" - R21
Texture drywall - machine
Seal/prime the surface area - one coat
Paint the walls - two coats
R &R T & G paneling - v -joint paneling (unfinished)
Stain & finish paneling
R &R Outlet or switch cover
QNTY
27.42 LF
27.42 LF
27.42 LF
27.42 LF
54.83 SF
222.34 SF
222.34 SF
223.33 SF
24.00 SF
24.00 SF
2.00 EA
NOTES:
Missing Wall
Missing Wall - Goes to Floor
DESCRIPTION
Hallway Height: 8'
390.67 SF Walls
462.67 SF Walls & Ceiling
8.00 SY Flooring
51.33 LF Ceil. Perimeter
3' X 8'
3'X6'8"
72.00 SF Ceiling
72.00 SF Floor
48.33 LF Floor Perimeter
Opens into ROOM19
Opens into ROOM15
QNTY
R &R Vapor barrier - visqueen - 6mil
Laminate - simulated wood flooring
R &R Baseboard - 4 1/4"
CANYON_ESTATES
12/19/2011
72.00 SF
72.00 SF
48.33 LF
Page: 15
• •
EMI Charter Construction, Inc.
CHARTER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
DESCRIPTION
CONTINUED - Hallway
Paint baseboard, oversized - two coats
Mask and prep for paint - plastic, paper, tape (per LF)
R &R Drywall replacement per LF - up to 2' tall
Texture drywall - machine
Seal/prime more than the floor perimeter - one coat
Paint the walls - two coats - 2 colors
R &R Outlet or switch cover
R &R Door opening (jamb & casing) - 32 "to36 "wide - paint grade
Paint door or window opening - Large - 2 coats (per side)
Paint door slab only - 2 coats (per side)
QNTY
48.33 LF
48.33 LF
48.33 LF
193.33 SF
193.33 SF
390.67 SF
2.00 EA
5.00 EA
5.00 EA
3.00 EA
NOTES:
1
I-3' +3' —1 Kitchen Height: 8'
210" 2'1
1 32'x___
a
Missing Wall - Goes to Floor
Missing Wall - Goes to Floor
226.67 SF Walls
296.00 SF Walls & Ceiling
7.70 SY Flooring
33.33 LF Ceil. Perimeter
3'X6'8"
3'X6'8"
69.33 SF Ceiling
69.33 SF Floor
27.33 LF Floor Perimeter
Opens into ROOM13
Opens into ROOM14
DESCRIPTION QNTY
Ceramic tile
R &R Baseboard - 4 1/4"
Paint baseboard, oversized - two coats
R &R Cabinetry - lower (base) units
CANYON_ESTATES
69.33 SF
22.00 LF
22.00 LF
9.00 LF
12/19/2011 Page: 16
• •
Charter Construction, Inc.
CHARTER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
CONTINUED - Kitchen
DESCRIPTION
Seal & paint cabinetry - lower - inside and out
R &R Cabinetry - upper (wall) units
Seal & paint cabinetry - upper - inside and out
Cabinet knobs or pulls - Detach & reset
R &R Dishwasher
R &R Range - freestanding - electric
R &R Refrigerator - top freezer - 18 to 22 cf
Garbage disposer - Detach & reset
Sink - double - Detach & reset
Sink faucet - Detach & reset
Detach & Reset P -trap assembly - ABS (plastic)
Detach & Reset Microwave oven - over range w/built -in hood
R &R Angle stop
Countertop subdeck - plywood
R &R Countertop - post formed plastic laminate
Backsplash - solid surface - Coved (seamless - permanent)
R &R Backsplash - Tile
R &R Drywall replacement per LF - up to 2' tall
Texture drywall - machine
Seal/prime the surface area - one coat
Paint the walls - two coats - 2 colors
QNTY
9.00 LF
16.00 LF
16.00 LF
24.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
3.00 EA
18.00 SF
18.00 LF
17.00 LF
6.00 SF
27.33 LF
222.34 SF
222.34 SF
226.67 SF
NOTES:
CANYON_ESTATES 12/19/2011 Page: 17
• •
Charter Construction, Inc.
CHARTER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
8' 4" Bathroom Height: 8'
DESCRIPTION
208.00 SF Walls
248.00 SF Walls & Ceiling
4.44 SY Flooring
26.00 LF Ceil. Perimeter
40.00 SF Ceiling
40.00 SF Floor
26.00 LF Floor Perimeter
Baseboard - 2 1/4"
Paint baseboard - two coats
Mask and prep for paint - plastic, paper, tape (per LF)
R &R Drywall replacement per LF - up to 2' tall
Detach & Reset Vanity
Detach & Reset Countertop - Flat laid plastic laminate
Sink - single - Detach & reset
Detach & Reset Sink faucet - Bathroom
Detach & Reset P -trap assembly - ABS (plastic)
R &R Angle stop
Toilet - Detach & reset
Texture drywall - machine
Seal/prime more than the floor perimeter - one coat
Paint the walls - two coats - 2 colors
R &R Door opening (jamb & casing) - 32 "to36 "wide - paint grade
Paint door or window opening - Large - 2 coats (per side)
R &R Interior door unit
Door lockset - Detach & reset
Paint door slab only - 2 coats (per side)
QNTY
16.00 LF
16.00 LF
16.00 LF
16.00 LF
2.50 LF
2.50 LF
1.00 EA
1.00 EA
1.00 EA
3.00 EA
1.00 EA
104.00 SF
104.00 SF
208.00 SF
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
NOTES:
CANYON_ESTATES
12/19/2011 Page: 18
ILSE
• •
Charter Construction, Inc.
CHARTER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
DESCRIPTION
Bedroom2 Height: 8'
468.00 SF Walls
648.56 SF Walls & Ceiling
20.06 SY Flooring
58.50 LF Ceil. Perimeter
180.56 SF Ceiling
180.56 SF Floor
58.50 LF Floor Perimeter
Subroom 1: CLOSET Height: 8'
154.67 SF Walls
170.92 SF Walls & Ceiling
1.81 SY Flooring
19.33 LF Ceil. Perimeter
16.25 SF Ceiling
16.25 SF Floor
19.33 LF Floor Perimeter
QNTY
R &R Carpet pad
Remove Carpet
Carpet
15 % waste added for Carpet.
R &R Baseboard - 4 1/4"
Paint baseboard, oversized - two coats
Mask and prep for paint - plastic, paper, tape (per LF)
R &R Drywall replacement per LF - up to 2' tall
R &R Batt insulation - 6" - R21
Texture drywall - machine
Seal/prime more than the floor perimeter - one coat
Paint the walls - two coats - 2 colors
R &R Outlet or switch cover
R &R Wa11 heater
R &R Interior door unit
Door lockset - Detach & reset
R &R Door opening (jamb & casing) - 32 "to36 "wide - paint grade
R &R Door opening (jamb & casing) - 36 "to60 "wide - paint grade
Paint door or window opening - Large - 2 coats (per side)
Paint door or window opening - 2 coats (per side)
R &R Bypass mirrored door set
196.81 SF
196.81 SF
226.33 SF
77.83 LF
77.83 LF
77.83 LF
77.83 LF
38.92 SF
311.33 SF
311.33 SF
622.67 SF
3.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
2.00 EA
2.00 EA
1.00 EA
CANYON_ESTATES 12/19/2011 Page: 19
• •
El. Charter Construction, Inc.
C H-A R TER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382-0450
DESCRIPTION
CONTINUED - Bedroom2
QNTY
NOTES:
DESCRIPTION
Master Bedroom Height: 8'
484.00 SF Walls
681.64 SF Walls & Ceiling
21.96 SY Flooring
60.50 LF Ceil. Perimeter
197.64 SF Ceiling
197.64 SF Floor
60.50 LF Floor Perimeter
Subroom 1: CLOSET Height: 8'
162.67 SF Walls
180.00 SF Walls & Ceiling
1.93 SY Flooring
20.33 LF Ceil. Perimeter
17.33 SF Ceiling
17.33 SF Floor
20.33 LF Floor Perimeter
QNTY
R &R Carpet pad
Remove Carpet
Carpet
15 % waste added for Carpet.
R &R Baseboard - 4 1/4"
Paint baseboard, oversized - two coats
Mask and prep for paint - plastic, paper, tape (per LF)
R &R Drywall replacement per LF - up to 2' tall
R &R Batt insulation - 6" - R21
CANYON_ESTATES
214.97 SF
214.97 SF
247.22 SF
80.83 LF
80.83 LF
80.83 LF
80.83 LF
40.42 SF
12/19/2011 Page: 20
MECharter Construction, Inc.
CHARTER
C 0 I S T 11 U C 1 1 0 1 1
980 South Harney St.
Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
DESCRIPTION
CONTINUED - Master Bedroom
Texture drywall - machine
Seal/prime more than the floor perimeter - one coat
Paint the walls - two coats - 2 colors
R &R Outlet or switch cover
R &R Wall heater
R &R Interior door unit
Door lockset - Detach & reset
R &R Door opening (jamb & casing) - 32 "to36 "wide - paint grade
R &R Door opening (jamb & casing) - 36 "to60 "wide - paint grade
Paint door or window opening - Large - 2 coats (per side)
Paint door or window opening - 2 coats (per side)
R &R Bypass mirrored door set
QNTY
323.33 SF
323.33 SF
646.67 SF
3.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
2.00 EA
2.00 EA
1.00 EA
NOTES:
DESCRIPTION
Hall Closet/Laundry
Height: 8'
322.67 SF Walls
353.50 SF Walls & Ceiling
3.43 SY Flooring
40.33 LF Ceil. Perimeter
30.83 SF Ceiling
30.83 SF Floor
40.33 LF Floor Perimeter
QNTY
R &R Carpet pad
Remove Carpet
Carpet
15 % waste added for Carpet.
CANYON_ESTATES
30.83 SF
30.83 SF
35.46 SF
12/19/2011 Page: 21
• •
Charter Construction, Inc.
C H-A R T E R 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382-0450
CONTINUED - Hall Closet/Laundry
DESCRIPTION
R &R Baseboard - 4 1/4"
Paint baseboard, oversized - two coats
Mask and prep for paint - plastic, paper, tape (per LF)
R &R Drywall replacement per LF - up to 2' tall
Texture drywall - machine
Seal/prime more than the floor perimeter - one coat
Paint the walls - two coats - 2 colors
R &R Bypass mirrored door set
R &R Closet shelf and rod package
Detach & Reset Water heater - 40 gallon - Electric - 9 yr
Stackable washer and dryer - Remove & reset
QNTY
40.33 LF
40.33 LF
40.33 LF
40.33 LF
161.33 SF
161.33 SF
322.67 SF
3.00 EA
12.00 LF
1.00 EA
1.00 EA
NOTES:
General
DESCRIPTION QNTY
Asbestos test fee - full service asbestos survey
Lead test fee - full service lead survey
Taxes, insurance, permits & fees (Bid item)
Final cleaning - construction - Residential
1.00 EA
1.00 EA
1.00 EA
2780.00 SF
NOTES:
CANYON_ESTATES 12/19/2011 Page: 22
• •
FMCharter Construction, Inc.
CHARTER 980 South Harney St.
CONSTRUCTION Seattle, WA 98108
Phone: (206) 382 -1900
Fax: (206) 382 -0450
Grand Total Areas:
9,257.33 SF Walls
2,780.54 SF Floor
0.00 SF Long Wall
2,780.54 Floor Area
4,054.50 Exterior Wall Area
0.00 Surface Area
2,798.54 SF Ceiling
308.95 SY Flooring
0.00 SF Short Wall
3,053.82 Total Area
450.50 Exterior Perimeter of
Walls
12,055.87 SF Walls and Ceiling
1,153.17 LF Floor Perimeter
1,177.17 LF Ceil. Perimeter
9,257.33 Interior Wall Area
0.00 Number of Squares 0.00 Total Perimeter Length
0.00 Total Ridge Length 0.00 Total Hip Length
CANYON_ESTATES 12/19/2011 Page: 23
Main Level
CANYON_ESTATES
•
20 Ir
rrr.
Irr
rIr
u-
Pr
Irr 1 17
rr
sr
Dhlhla Roam �
IT r
ITT
12/19/2011
R9
Main Level
Page: 24
Contractors or Tradespeople Peer Friendly Page
o
General /Specialty Contractor
A business registered as a construction contractor with LEI to perform construction work within the scope of
its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of
account and carry general liability insurance.
Business and Licensing Information
Name CHARTER CONST INC UBI No. 600479166
Phone 2063821900 Status Active
Address 980 5 Harney Street License No. CHARTCI171PM
Suite /Apt. License Type Construction Contractor
City Seattle Effective Date 10/14/1983
State WA Expiration Date 10/23/2012
Zip 981082744 Suspend Date
County King Specialty 1 General
Business Type Corporation Specialty 2 Unused
Parent Company
Other Associated Licenses
License
Name
Type
Specialty
1
Specialty
2
Effective
Date
Expiration
Date
Status
TELESGI179JD
TELESIS GROUP
INC, THE
Construction
Contractor
General
Unused
4/4/1983
4/4/1984
Archived
Business Owner Information
Name
Role
Effective Date
Expiration Date
SALADINO, PETER CARROLL
President
02/17/2011
Amount
COSENTINO, PATRICK
Vice President
02/17/2011
SLPGGL0121000
JACKSON, ERIC
Vice President
02/17/2011
FIRMANI, FRANK
President
10/14/1983
02/17/2011
SALADINO, PETER C
Vice President
10/14/1983
02/17/2011
Bond Information
Page 1 of 2
Bond
Bond Company Name
Bond Account Number
Effective Date
Expiration Date
Cancel Date
Impaired Date
Bond Amount
Received Date
6
TRAVELERS CAS E
SURETY CO
081S103572915BCM
07/22/2001
Until Cancelled
$12,000.00
10/18/2001
Assignment of Savings Information No records found for the previous 6 year period
Insurance Information
Insurance
Company Name
Policy Number
Effective Date
Expiration Date
Cancel Date
Impaired Date
Amount
Received Date
28
Starr Surplus
Lines Insurance
SLPGGL0121000
11/01/2011
11/01/2012
$1,000,000.00
11/01/2011
27
Starr Surplus
Lines Insurance
SR98011279455
11/01/2011
11/01/2012
11/01/2011
$1,000,000.00
10/31/2011
26
TOEADFASTINS
GPL982931400
11/01/2010
11/01/2011
$1,000,000.00
10/29/2010
25
FIRST MERCURY
INS CO
FMWA0004122
11/01/2009
11/01/2010
$1,000,000.00
10/30/2009
24
FIRST MERCURY
INS CO
fmwa000412
11/01/2008
11/01/2009
$1,000,000.00
10/31/2008
23
FIRST MERCURY
INS CO
FMFL003259
11/01/2007
11/01/2008
$1,000,000.00
10/30/2007
22
INS ST MERCURY
FMFL002201
11/01/2006
11/01/2007
$1,000,000.00
11/01/2006
21
INTERSTATE
FIRE Et CAS
SGL1000005
11/01/2005
11/01/2006
$1,000,000.00
11/01/2005
https://fortress.wa.gov/lni/bbip/Print.aspx
12/19/2011