Loading...
HomeMy WebLinkAboutPermit D11-399 - CANYON ESTATES CONDOMINIUMS - UNITS 101 & 10 - WATER DAMAGE REPAIRCANYON ESTATES UNITS 101 & 103 15138 65 AV S Di 1-399 City ofkukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov DEVELOPMENT PERMIT Parcel No.: 1332500000 Address: 15138 65 AV S TUKW Suite No: Project Name: CANYON ESTATES, UNITS 101 & 103 Permit Number: D11 -399 Issue Date: 12/19/2011 Permit Expires On: 06/16/2012 Owner: Name: CANYON ESTATES CONDO COMPL Address: PO BOX 80764 , SEATTLE WA 98108 Contact Person: Name: BRAD PRICE Address: 980 S HARNEY ST , SEATTLE WA 98108 Contractor: Name: CHARTER CONST INC Address: 980 S HARNEY ST , SEATTLE WA 98108 Contractor License No: CHARTCI171PM Phone: 206 - 498 -8170 Phone: 206 - 382 -1900 Expiration Date: 10/23/2012 DESCRIPTION OF WORK: REPAIR WATER DAMAGED UNITS - REPLACE ALL INSULATION AND DRYWALL THAT WAS REMOVED AFTER PIPE BREAK. REPLACE ALL ENGINEERED WOOD FLOORING AND CABINETS. NO ELECTRICAL NEEDED, WATER ONLY REACHED 2" MAX. NO PLUMBING CHANGES Value of Construction: $65,000.00 Fees Collected: $1,116.40 Type of Fire Protection: NONE International Building Code Edition: 2009 Type of Construction: V -B Occupancy per IBC: 0021 Electrical Service Provided by: PUGET SOUND ENERGY * *continued on next page ** doc: IBC -7/10 D11 -399 Printed: 12 -19 -2011 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: Flood Control Zone: Hauling: Land Altering: Landscape Irrigation: Moving Oversize Load: N Number: 0 N Start Time: Volumes: Cut 0 c.y. Start Time: Size (Inches): 0 End Time: Fill 0 c.y. End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non - Profit: N Water Main Extension: Private: Public: Water Meter: N Permit Center Authorized Signature: Date: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: / � �� — Date: / 2// 94 Print Name: t 9-O %G This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: All construction noise to be in compliance with Chapter 8.22 of the City of Tukwila Municipal Code. A copy can be obtained at City Hall in the office of the City Clerk. doc: IBC -7/10 011 -399 Printed: 12 -19 -2011 7: All electrical work shall be inspected andiroved under a separate permit issued by tl ty of Tukwila Building Department (206- 431 - 3670). 8: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: IBC -7/10 D11 -399 Printed: 12 -19 -2011 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http: / /www.TukwilaWA.gov Building Permit No. D', 3 q 1 Project No. Date Application Accepted: Date Application Expires: (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION King Co Assessor's Tax No.: Site Address: 15138 65TH AVE S. #101 &103,TUKWILA,9818f Suite Number: Floor: New Tenant: ❑ Yes ❑ ..No Tenant Name: CANYON ESTATES HOA PROPERTY OWNER Name: BRAD PRICE Name: CANYON ESTATES HOA City: SEATTLE State: WA Zip: 98108 Address: 15138 65TH AVE S. UNIT 101 & 103 City: TUKWILA State: WA Zip: 98188 CONTACT PERSON — person receiving all project communication Name: BRAD PRICE Address: 980 S HARNEY ST City: SEATTLE State: WA Zip: 98108 Phone: (206) 498 -8170 Fax: Email: BRADP@ GENERAL CONTRACTOR INFORMATION Company Name: CHARTER CONSTRUCTION Address: 980 S. HARNEY ST. City: SEATTLE State: WA Zip: 98108 Phone: (206) 382 -1900 Fax: Contr Reg No.: 600 479 166 Exp Date: 12/31/2011 Tukwila Business License No.: H:\ Applications \Forms- Applications On Line \2011 Applications \Permit Application Revised - 8 -9 -1 I.docx Revised: August 201 I bh ARCHITECT OF RECORD Name: Address: Company Name: Architect Name: Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Name: Address: Company Name: Engineer Name: Address: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: Address: City: State: Zip: Page 1 of 4 BUILDING PERMIT INFORMATION — 206 - 431 -3670 Valuation of Project (contractor's bid price): $ 65,000 Describe the scope of work (please provide detailed information): REPAIR WATER DAMAGED UNITS REPLACE ALL INSULATION AND DRYWALL THAT WAS REMOVED AFTER PIPE BREAK. REPLACE ALL ENGINEERED WOOD FLOORING AND CABINETS. Existing Building Valuation: $ NO ELECTRICAL NEEDED, WATER ONLY REACHED 2" MAX. NO PLUMBING CHANGES. Will there be new rack storage? ❑ Yes �.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Will there be a change in use? El Yes Compact: Handicap: No If "yes ", explain: FIRE PROTECTION /HAZARDOUS MATERIALS: El Sprinklers ❑ Automatic Fire Alarm None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8 -1 /2 "x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM El On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H: \Applications`.Forms- Applications On Line \2011 Applications Permit Application Revised - 8 -9 -1 I.docx Revised: August 2011 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1St Floor 2' Floor 3`d Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Will there be a change in use? El Yes Compact: Handicap: No If "yes ", explain: FIRE PROTECTION /HAZARDOUS MATERIALS: El Sprinklers ❑ Automatic Fire Alarm None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8 -1 /2 "x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM El On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H: \Applications`.Forms- Applications On Line \2011 Applications Permit Application Revised - 8 -9 -1 I.docx Revised: August 2011 bh Page 2 of 4 PERMIT APPLICATION NOTES — - : . Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OW " • OR AUTHO ZED AGENT: Signature /��� Print Name: 257€11 Mailing Address: 7 'O `J, 1-714#1",€ J -57- Date: /-Z/ q/ Day Telephone: -206 s' 9/ 7-a H:\Applications \Forms - Applications On Line \2011 Applications \ Permit Application Revised - 8 -9 -1 I.docx Revised: August 2011 bh City State Zip Page 4 of 4 r • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206-431-3665 Web site: http: / /www.TukwilaWA.gov RECEIPT Parcel No.: 1332500000 Permit Number: D11 -399 Address: 15138 65 AV S TUKW Status: PENDING Suite No: Applied Date: 12/19/2011 Applicant: CANYON ESTATES, UNITS 101 & 103 Issue Date: Receipt No.: R11 -02754 Payment Amount: $1,116.40 Initials: WER Payment Date: 12/19/2011 02:29 PM User ID: 1655 Balance: $0.00 Payee: CHARTER CONSTRUCTION INC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 25232 1,116.40 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts BUILDING - RES 000.322.100 STATE BUILDING SURCHARGE 640.237.114 Total: $1,116.40 1,111.90 4.50 doc: Receiot -06 Printed: 12 -19 -2011 • liZ- INSPECTION RECORD Retain a copy with permit • INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: Type Inspecti n: , : \ �. xi k 430 • to ,'/14,\\ (#A./ nN i _ 4TkS Address: • 3 •15i W• 0,5 Ave. Date Called: Special_Instructons: 0 /A 7..5 I t) ( ' . / 0 3 Date Want ca,m, e, d:_ G _ (� p.m. Requester: Phone No: l ic — (05 2 - 0 8-75 Approved per applicable codes. a•Corrections required prior to approval. ,COMMENTS: 2lM,vY •A.10 (� � af b-IN a i'--() 6/4-6(11",>rJ N,ti-fA � n c1 arP „JvI ❑ REINSPECTION FEE REQU RED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 On -39q Project: i Type of Inspection: ASd-dre_ss: v t Date Called: Special Instructions: jA-ri 3 149 r A (O 3 Date Wanted / p.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: G,-, JE r 'Inspect' (Date: REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. N .411 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 DIt 31 , Project: - Type of Inspection: Address: 1 I i �t LAS A-v Date Called: Special Instructions: Date Wanted:. i 2- —2 1- / a�,�gt. % p.m. Requester: Phone No: J Approved per applicable codes. Corrections required prior to approval. COMMENTS: Insp tor: A • Date: I 2 REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. NMCharter Construction, Inc. C H Ji R T E R 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 Client: Property: Canyon Estates 15138 65th Ave S Tukwila, WA 98036 Operator Info: Operator: BOHRAMSE Estimator: Position: Company: Business: Boh Ramsey Senior Project Manager Charter Construction 980 South Harney Street Seattle, WA 98108 Type of Estimate: Water Damage Date Entered: 11/12/2011 Price List: Labor Efficiency: Estimate: WASE7X_NOV I1 Restoration/Service /Remodel CANYON_ESTATES 12) 1 Date Assigned: Home: (206) 660 -6100 Business: (206) 473 -9094 E -mail: BRamsey @chartercon.com RECEIVED DEC 19 2011 PERMITCENTER • • Charter Construction, Inc. CHARTER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 Missing Wall DESCRIPTION CANYON_ESTATES Main Level Hallway Height: 8' 1782.67 SF Walls 2304.42 SF Walls & Ceiling 57.97 SY Flooring 222.83 LF Ceil. Perimeter 521.75 SF Ceiling 521.75 SF Floor 222.83 LF Floor Perimeter Subroom 1: HALLWAY1 Height: 8' 850.67 SF Walls 1096.29 SF Walls & Ceiling 27.29 SY Flooring 106.33 LF Ceil. Perimeter 245.63 SF Ceiling 245.63 SF Floor 106.33 LF Floor Perimeter 4' 10" X 8' Opens into HALLWAY QNTY R &R Drywall replacement per LF - up to 2' tall 197.50 LF R &R Batt insulation - 6" - R21 395.00 SF Texture drywall - machine 1316.67 SF Sandblasting 395.00 SF This is to remove the peeling wall coverings on the concrete wall. A less abrasive method can be used if we find it comes off easily. Paint the walls - two coats 2633.33 SF Stair stringer - softwood 36.00 LF Stair riser - up to 4' 12.00 EA Stair tread - up to 4' 12.00 EA Carpet pad 767.38 SF Carpet 882.48 SF 15 % waste added for Carpet. Step charge for "waterfall" carpet installation 12.00 EA Handrail - round / oval - softwood - wall mounted 18.00 LF Paint handrail - wall mounted 18.00 LF Baseboard - 2 1/4" 329.17 LF CANYON_ESTATES 12/19/2011 Page:2 KMCharter Construction, Inc. • • CHARTER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 DESCRIPTION CONTINUED - Hallway Paint baseboard - two coats Final cleaning - construction - Residential Dryout, remediation and cleaning to be performed by Servpro. QNTY 329.17 LF 767.38 SF NOTES: Unit 103 DESCRIPTION QNTY * * ** *THE FOLLOWING LINE ITEMS PERTAIN TO ISSUES IN UNIT 103 * * * ** Megohmmeter check electrical circuits - average residence 1.00 EA Checking all electrical circuits to ensure the lines are not impacted. Single axle dump truck - per load - including dump fees 1.00 EA Dehumidifier (per 24 hour period) - XLarge - No monitoring 1.00 EA Dryout, remediation and cleaning to be performed by Servpro. Air mover (per 24 hour period) - No monitoring 1.00 EA Dryout, remediation and cleaning to be performed by Servpro. Apply anti - microbial agent 0.00 SF Dryout, remediation and cleaning to be performed by Servpro. Final cleaning - construction - Residential 0.00 SF Dryout, remediation and cleaning to be performed by Servpro. NOTES: CANYON_ESTATES 12/19/2011 Page: 3 UMCharter Construction, Inc. • • CHARTER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 Missing Wall Missing Wall DESCRIPTION Living Room Height: 8' 444.67 SF Walls 693.89 SF Walls & Ceiling 27.69 SY Flooring 55.58 LF Ceil. Perimeter 7'3 "X8' 3' X 8' 249.22 SF Ceiling 249.22 SF Floor 55.58 LF Floor Perimeter Opens into DINING_ROOM Opens into ROOM2 R &R Vapor barrier - visqueen - 6mi1 R &R Laminate - simulated wood flooring R &R Baseboard - 4 1/4" Paint baseboard, oversized - two coats Mask and prep for paint - plastic, paper, tape (per LF) R &R 10 -0 6 -8 vinyl sliding patio door Siding - Minimum charge Minimum charge to detach and reset vinyl siding around sliding glass door. Flashing - Sill pan flashing - plastic - greater than 4.5' Flashing - Sill flashing - moldable tape R &R Drywall replacement per LF - up to 2' tall R &R Batt insulation - 6" - R21 Texture drywall - machine Seal/prime the surface area - one coat Paint the walls - two coats - 2 colors R &R Baseboard electric heater - 10' R &R Outlet or switch cover QNTY 249.22 SF 249.22 SF 55.58 LF 55.58 LF 55.58 LF 1.00 EA 1.00 EA 1.00 EA 24.00 LF 55.58 LF 111.17 SF 222.34 SF 222.34 SF 444.67 SF 1.00 EA 8.00 EA NOTES: CANYON_ESTATES 12/19/2011 Page: 4 • • MECharter Construction, Inc. C HA R T E R 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 2'1d'1 -3' -4710" 1- 3 2" J - Dining Er E Room 9'2" 1 Dear Missing Wall - Goes to Floor Missing Wall DESCRIPTION Dining Room Height: 8' 223.33 SF Walls 311.21 SF Walls & Ceiling 9.76 SY Flooring 30.42 LF Ceil. Perimeter 3'X6'8" 7'3 "X8' 87.87 SF Ceiling 87.87 SF Floor 27.42 LF Floor Perimeter Opens into KITCHEN Opens into LIVING_ROOM R &R Baseboard - 4 1/4" Paint baseboard, oversized - two coats Mask and prep for paint - plastic, paper, tape (per LF) Window blind - horizontal or vertical - Detach & reset R &R Drywall replacement per LF - up to 2' tall R &R Batt insulation - 6" - R21 Texture drywall - machine Seal/prime the surface area - one coat Paint the walls - two coats - 2 colors R &R Baseboard electric heater - 8' R &R Outlet or switch cover QNTY 27.42 LF 27.42 LF 27.42 LF 2.00 EA 27.42 LF 54.83 SF 109.67 SF 109.67 SF 223.33 SF 1.00 EA 3.00 EA NOTES: 3' 1 " +-3' -t- 3' 1" -1 "` Kitchen Height: 8' Missing Wall - Goes to Floor Missing Wall - Goes to Floor CANYON_ESTATES 226.67 SF Walls 296.00 SF Walls & Ceiling 5.70 SY Flooring 33.33 LF Ceil. Perimeter 3'X6'8" 3'X6'8" 69.33 SF Ceiling 51.33 SF Floor 27.33 LF Floor Perimeter Opens into DINING_ROOM Opens into ROOM2 12/19/2011 Page: 5 • • EMI Charter Construction, Inc. CHARTER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 DESCRIPTION 1/4" Cement board R &R Marble or Granite floor tile 12" x 12" R &R Baseboard - 4 1/4" Paint baseboard, oversized - two coats R &R Baseboard - 2 1/4" stain grade Stain & finish baseboard R &R Cabinetry - lower (base) units - High grade R &R Cabinetry - upper (wall) units - High grade Add for frosted/etched or beveled glass, per cabinet door Add for crown molding per LF R &R Dishwasher - High grade R &R Range - freestanding - electric - High grade R &R Refrigerator - top freezer - 18 to 22 cf - High grade Garbage disposer - Detach & reset Sink - double - Detach & reset Sink faucet - Detach & reset Detach & Reset P -trap assembly - ABS (plastic) Range hood - Detach & reset R &R Angle stop R &R Countertop subdeck - plywood R &R Countertop - Granite or Marble Backsplash - solid surface - Coved (seamless - permanent) R &R Drywall replacement per LF - up to 2' tall Texture drywall - machine Seal/prime the surface area - one coat Paint the walls - two coats - 2 colors QNTY 5133 SF 56.47 SF 4.00 LF 4.00 LF 9.00 LF 9.00 LF 9.00 LF 16.00 LF 2.00 EA 16.00 LF 1.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 3.00 EA 18.00 SF 18.00 SF 17.00 LF 27.33 LF 222.34 SF 222.34 SF 226.67 SF NOTES: CANYON_ESTATES 12/19/2011 Page: 6 • • KMCharter Construction, Inc. CHARTER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 X Missing Wall Missing Wall - Goes to Floor I-- 5' 8' -I DESCRIPTION Hallway Height: 8' 390.67 SF Walls 462.67 SF Walls & Ceiling 8.00 SY Flooring 51.33 LF Ceil. Perimeter 3' X 8' 3'X6'8" 72.00 SF Ceiling 72.00 SF Floor 48.33 LF Floor Perimeter Opens into LIVING_ROOM Opens into KITCHEN Subroom 1: STORAGE Height: 8' 294.67 SF Walls 379.17 SF Walls & Ceiling 9.39 SY Flooring 36.83 LF Ceil. Perimeter 84.50 SF Ceiling 84.50 SF Floor 36.83 LF Floor Perimeter Subroom 2: STAIRWAY Height: 8' 158.67 SF Walls 183.25 SF Walls & Ceiling 2.73 SY Flooring 19.83 LF Ceil. Perimeter 24.58 SF Ceiling 24.58 SF Floor 19.83 LF Floor Perimeter QNTY 1/4" Cement board R &R Marble or Granite floor tile 12" x 12" R &R Baseboard - 4 1/4" Paint baseboard, oversized - two coats Mask and prep for paint - plastic, paper, tape (per LF) R &R Drywall replacement per LF - up to 2' tall Texture drywall - machine Seal/prime more than the floor perimeter - one coat Paint the walls - two coats - 2 colors R &R Outlet or switch cover R &R Door opening (jamb & casing) - 32 "to36 "wide - paint grade Paint door or window opening - Large - 2 coats (per side) 181.08 SF 199.19 SF 105.00 LF 105.00 LF 105.00 LF 105.00 LF 420.00 SF 420.00 SF 844.00 SF 2.00 EA 5.00 EA 5.00 EA CANYON_ESTATES 12/19/2011 Page: 7 • • Charter Construction, Inc. CHARTER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382-0450 CONTINUED - Hallway DESCRIPTION QNTY Paint door slab only - 2 coats (per side) 3.00 EA NOTES: 121P -1 .. a e 7R. DESCRIPTION Hall Closet/Laundry Height: 8' 322.67 SF Walls 353.50 SF Walls & Ceiling 3.43 SY Flooring 40.33 LF Ceil. Perimeter 30.83 SF Ceiling 30.83 SF Floor 40.33 LF Floor Perimeter QNTY R &R Carpet pad Remove Carpet Carpet 15 % waste added for Carpet. R &R Baseboard - 4 1/4" Paint baseboard, oversized - two coats Mask and prep for paint - plastic, paper, tape (per LF) R &R Drywall replacement per LF - up to 2' tall Texture drywall - machine Seal/prime more than the floor perimeter - one coat Paint the walls - two coats - 2 colors R &R Bypass mirrored door set R &R Closet shelf and rod package Detach & Reset Water heater - 40 gallon - Electric - 9 yr Stackable washer and dryer - Remove & reset CANYON_ESTATES 12/19/2011 30.83 SF 30.83 SF 35.46 SF 40.33 LF 40.33 LF 40.33 LF 40.33 LF 161.33 SF 161.33 SF 322.67 SF 3.00 EA 12.00 LF 1.00 EA 1.00 EA Page: 8 • • EMICharter Construction, Inc. CHARTER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 DESCRIPTION CONTINUED - Hall Closet/Laundry QNTY NOTES: 8' 4" 1 Bathroom Height: 8' DESCRIPTION 208.00 SF Walls 248.00 SF Walls & Ceiling 4.44 SY Flooring 26.00 LF Ceil. Perimeter 40.00 SF Ceiling 40.00 SF Floor 26.00 LF Floor Perimeter Ceramic tile base R &R Drywall replacement per LF - up to 2' tall R &R Vanity R &R Countertop - Granite or Marble Backsplash - solid surface - Coved (seamless - permanent) Sink - single - Detach & reset Detach & Reset Sink faucet - Bathroom Detach & Reset P -trap assembly - ABS (plastic) R &R Angle stop Toilet - Detach & reset Texture drywall - machine Seal/prime more than the floor perimeter - one coat Paint the walls - two coats - 2 colors R &R Door opening (jamb & casing) - 32 "to36 "wide - paint grade Paint door or window opening - Large - 2 coats (per side) R &R Interior door unit CANYON_ESTATES 12/19/2011 QNTY 16.00 LF 16.00 LF 2.50 LF 2.50 SF 4.50 LF 1.00 EA 1.00 EA 1.00 EA 3.00 EA 1.00 EA 104.00 SF 104.00 SF 208.00 SF 1.00 EA 1.00 EA 1.00 EA Page: 9 • • Charter Construction, Inc. CHARTER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 CONTINUED - Bathroom DESCRIPTION Door lockset - Detach & reset Paint door slab only - 2 coats (per side) QNTY 1.00 EA 1.00 EA NOTES: r —, DESCRIPTION Master Bedroom Height: 8' 484.00 SF Walls 681.64 SF Walls & Ceiling 21.96 SY Flooring 60.50 LF Ceil. Perimeter 197.64 SF Ceiling 197.64 SF Floor 60.50 LF Floor Perimeter Subroom 1: CLOSET Height: 8' 162.67 SF Walls 180.00 SF Walls & Ceiling 1.93 SY Flooring 20.33 LF Ceil. Perimeter 17.33 SF Ceiling 17.33 SF Floor 20.33 LF Floor Perimeter QNTY R &R Carpet pad Remove Carpet Carpet 15 % waste added for Carpet. R &R Baseboard - 4 1/4" Paint baseboard, oversized - two coats CANYON_ESTATES 214.97 SF 214.97 SF 247.22 SF 80.83 LF 80.83 LF 12/19/2011 Page: 10 • • Charter Construction, Inc. CHARTER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382-0450 CONTINUED - Master Bedroom DESCRIPTION Mask and prep for paint - plastic, paper, tape (per LF) R &R Drywall replacement per LF - up to 2' tall R &R Batt insulation - 6" - R21 Texture drywall - machine Seal/prime more than the floor perimeter - one coat Paint the walls - two coats - 2 colors R &R Outlet or switch cover R &R Baseboard electric heater - 8' R &R Interior door unit Door lockset - Detach & reset R &R Door opening (jamb & casing) - 32 "to36 "wide - paint grade R &R Door opening (jamb & casing) - 36 "to60 "wide - paint grade Paint door or window opening - Large - 2 coats (per side) Paint door or window opening - 2 coats (per side) R &R Bypass mirrored door set QNTY 80.83 LF 80.83 LF 40.42 SF 323.33 SF 323.33 SF 646.67 SF 3.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 2.00 EA 2.00 EA 1.00 EA NOTES: 1- 'Y CANYON_ESTATES Bedroom2 Height: 8' 468.00 SF Walls 648.56 SF Walls & Ceiling 20.06 SY Flooring 58.50 LF Ceil. Perimeter 180.56 SF Ceiling 180.56 SF Floor 58.50 LF Floor Perimeter 12/19/2011 Page: 11 • • Charter Construction, Inc. CHARTER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382-0450 Hallway 7'10" DESCRIPTION Subroom 1: CLOSET Height: 8' 154.67 SF Walls 170.92 SF Walls & Ceiling 1.81 SY Flooring 19.33 LF Ceil. Perimeter 16.25 SF Ceiling 16.25 SF Floor 19.33 LF Floor Perimeter R &R Carpet pad Remove Carpet Carpet 15 % waste added for Carpet. R &R Baseboard - 4 1/4" Paint baseboard, oversized - two coats Mask and prep for paint - plastic, paper, tape (per LF) R &R Drywall replacement per LF - up to 2' tall R &R Batt insulation - 6" - R21 Texture drywall - machine Seal/prime more than the floor perimeter - one coat Paint the walls - two coats - 2 colors R &R Outlet or switch cover R &R Baseboard electric heater - 8' R &R Interior door unit Door lockset - Detach & reset R &R Door opening (jamb & casing) - 32 "to36 "wide - paint grade R &R Door opening (jamb & casing) - 36 "to60 "wide - paint grade Paint door or window opening - Large - 2 coats (per side) Paint door or window opening - 2 coats (per side) R &R Bypass mirrored door set QNTY 196.81 SF 196.81 SF 226.33 SF 77.83 LF 77.83 LF 77.83 LF 77.83 LF 38.92 SF 311.33 SF 311.33 SF 622.67 SF 3.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 2.00 EA 2.00 EA 1.00 EA NOTES: CANYON_ESTATES 12/19/2011 Page: 12 • • lai. Charter Construction, Inc. CHARTER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 Unit 101 DESCRIPTION QNTY * * ** *THE FOLLOWING LINE ITEMS PERTAIN TO ISSUES IN UNIT 101 * * * ** Megohmmeter check electrical circuits - average residence 1.00 EA Checking all electrical circuits to ensure the lines are not impacted. Single axle dump truck - per load - including dump fees 1.00 EA Dehumidifier (per 24 hour period) - XLarge - No monitoring 1.00 EA Dryout, remediation and cleaning to be performed by Servpro. Air mover (per 24 hour period) - No monitoring 1.00 EA Dryout, remediation and cleaning to be performed by Servpro. Apply anti - microbial agent 0.00 SF Dryout, remediation and cleaning to be performed by Servpro. Final cleaning - construction - Residential 0.00 SF Dryout, remediation and cleaning to be performed by Servpro. NOTES: $Q. Missing Wall Missing Wall DESCRIPTION Living Room Height: 8' 444.67 SF Walls 693.89 SF Walls & Ceiling 27.69 SY Flooring 55.58 LF Ceil. Perimeter 7'3 "X8' 3' X 8' 249.22 SF Ceiling 249.22 SF Floor 55.58 LF Floor Perimeter Opens into ROOM13 Opens into ROOM14 QNTY R &R Vapor barrier - visqueen - 6mil R &R Laminate - simulated wood flooring R &R Baseboard - 4 1/4" CANYON_ESTATES 249.22 SF 249.22 SF 55.58 LF 12/19/2011 Page: 13 • • Charter Construction, Inc. C H-A R T E R 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 CONTINUED - Living Room DESCRIPTION Paint baseboard, oversized - two coats Mask and prep for paint - plastic, paper, tape (per LF) R &R Drywall replacement per LF - up to 2' tall R &R Batt insulation - 6" - R21 Texture drywall - machine Seal/prime the surface area - one coat Paint the walls - two coats Wood Fireplace - Detach & reset R &R Wall heater R &R T & G paneling - v-joint paneling (unfinished) Stain & finish paneling R &R Outlet or switch cover QNTY 55.58 LF 55.58 LF 55.58 LF 111.17 SF 222.34 SF 222.34 SF 444.67 SF 1.00 EA 1.00 EA 111.17 SF 111.17 SF 6.00 EA NOTES: 57 Missing Wall - Goes to Floor Missing Wall DESCRIPTION Dining Room Height: 8' 223.33 SF Walls 311.21 SF Walls & Ceiling 9.76 SY Flooring 30.42 LF Ceil. Perimeter 3'X6'8" 7'3 "X8' 87.87 SF Ceiling 87.87 SF Floor 27.42 LF Floor Perimeter Opens into ROOM15 Opens into ROOM19 QNTY R &R Vapor barrier - visqueen - 6mil R &R Laminate - simulated wood flooring CANYON_ESTATES 87.87 SF 87.87 SF 12/19/2011 Page: 14 • • Ell Charter Construction, Inc. C H -A R T E R 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 DESCRIPTION CONTINUED - Dining Room R &R Baseboard - 4 1/4" Paint baseboard, oversized - two coats Mask and prep for paint - plastic, paper, tape (per LF) R &R Drywall replacement per LF - up to 2' tall R &R Batt insulation - 6" - R21 Texture drywall - machine Seal/prime the surface area - one coat Paint the walls - two coats R &R T & G paneling - v -joint paneling (unfinished) Stain & finish paneling R &R Outlet or switch cover QNTY 27.42 LF 27.42 LF 27.42 LF 27.42 LF 54.83 SF 222.34 SF 222.34 SF 223.33 SF 24.00 SF 24.00 SF 2.00 EA NOTES: Missing Wall Missing Wall - Goes to Floor DESCRIPTION Hallway Height: 8' 390.67 SF Walls 462.67 SF Walls & Ceiling 8.00 SY Flooring 51.33 LF Ceil. Perimeter 3' X 8' 3'X6'8" 72.00 SF Ceiling 72.00 SF Floor 48.33 LF Floor Perimeter Opens into ROOM19 Opens into ROOM15 QNTY R &R Vapor barrier - visqueen - 6mil Laminate - simulated wood flooring R &R Baseboard - 4 1/4" CANYON_ESTATES 12/19/2011 72.00 SF 72.00 SF 48.33 LF Page: 15 • • EMI Charter Construction, Inc. CHARTER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 DESCRIPTION CONTINUED - Hallway Paint baseboard, oversized - two coats Mask and prep for paint - plastic, paper, tape (per LF) R &R Drywall replacement per LF - up to 2' tall Texture drywall - machine Seal/prime more than the floor perimeter - one coat Paint the walls - two coats - 2 colors R &R Outlet or switch cover R &R Door opening (jamb & casing) - 32 "to36 "wide - paint grade Paint door or window opening - Large - 2 coats (per side) Paint door slab only - 2 coats (per side) QNTY 48.33 LF 48.33 LF 48.33 LF 193.33 SF 193.33 SF 390.67 SF 2.00 EA 5.00 EA 5.00 EA 3.00 EA NOTES: 1 I-3' +3' —1 Kitchen Height: 8' 210" 2'1 1 32'x___ a Missing Wall - Goes to Floor Missing Wall - Goes to Floor 226.67 SF Walls 296.00 SF Walls & Ceiling 7.70 SY Flooring 33.33 LF Ceil. Perimeter 3'X6'8" 3'X6'8" 69.33 SF Ceiling 69.33 SF Floor 27.33 LF Floor Perimeter Opens into ROOM13 Opens into ROOM14 DESCRIPTION QNTY Ceramic tile R &R Baseboard - 4 1/4" Paint baseboard, oversized - two coats R &R Cabinetry - lower (base) units CANYON_ESTATES 69.33 SF 22.00 LF 22.00 LF 9.00 LF 12/19/2011 Page: 16 • • Charter Construction, Inc. CHARTER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 CONTINUED - Kitchen DESCRIPTION Seal & paint cabinetry - lower - inside and out R &R Cabinetry - upper (wall) units Seal & paint cabinetry - upper - inside and out Cabinet knobs or pulls - Detach & reset R &R Dishwasher R &R Range - freestanding - electric R &R Refrigerator - top freezer - 18 to 22 cf Garbage disposer - Detach & reset Sink - double - Detach & reset Sink faucet - Detach & reset Detach & Reset P -trap assembly - ABS (plastic) Detach & Reset Microwave oven - over range w/built -in hood R &R Angle stop Countertop subdeck - plywood R &R Countertop - post formed plastic laminate Backsplash - solid surface - Coved (seamless - permanent) R &R Backsplash - Tile R &R Drywall replacement per LF - up to 2' tall Texture drywall - machine Seal/prime the surface area - one coat Paint the walls - two coats - 2 colors QNTY 9.00 LF 16.00 LF 16.00 LF 24.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 3.00 EA 18.00 SF 18.00 LF 17.00 LF 6.00 SF 27.33 LF 222.34 SF 222.34 SF 226.67 SF NOTES: CANYON_ESTATES 12/19/2011 Page: 17 • • Charter Construction, Inc. CHARTER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 8' 4" Bathroom Height: 8' DESCRIPTION 208.00 SF Walls 248.00 SF Walls & Ceiling 4.44 SY Flooring 26.00 LF Ceil. Perimeter 40.00 SF Ceiling 40.00 SF Floor 26.00 LF Floor Perimeter Baseboard - 2 1/4" Paint baseboard - two coats Mask and prep for paint - plastic, paper, tape (per LF) R &R Drywall replacement per LF - up to 2' tall Detach & Reset Vanity Detach & Reset Countertop - Flat laid plastic laminate Sink - single - Detach & reset Detach & Reset Sink faucet - Bathroom Detach & Reset P -trap assembly - ABS (plastic) R &R Angle stop Toilet - Detach & reset Texture drywall - machine Seal/prime more than the floor perimeter - one coat Paint the walls - two coats - 2 colors R &R Door opening (jamb & casing) - 32 "to36 "wide - paint grade Paint door or window opening - Large - 2 coats (per side) R &R Interior door unit Door lockset - Detach & reset Paint door slab only - 2 coats (per side) QNTY 16.00 LF 16.00 LF 16.00 LF 16.00 LF 2.50 LF 2.50 LF 1.00 EA 1.00 EA 1.00 EA 3.00 EA 1.00 EA 104.00 SF 104.00 SF 208.00 SF 1.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA NOTES: CANYON_ESTATES 12/19/2011 Page: 18 ILSE • • Charter Construction, Inc. CHARTER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 DESCRIPTION Bedroom2 Height: 8' 468.00 SF Walls 648.56 SF Walls & Ceiling 20.06 SY Flooring 58.50 LF Ceil. Perimeter 180.56 SF Ceiling 180.56 SF Floor 58.50 LF Floor Perimeter Subroom 1: CLOSET Height: 8' 154.67 SF Walls 170.92 SF Walls & Ceiling 1.81 SY Flooring 19.33 LF Ceil. Perimeter 16.25 SF Ceiling 16.25 SF Floor 19.33 LF Floor Perimeter QNTY R &R Carpet pad Remove Carpet Carpet 15 % waste added for Carpet. R &R Baseboard - 4 1/4" Paint baseboard, oversized - two coats Mask and prep for paint - plastic, paper, tape (per LF) R &R Drywall replacement per LF - up to 2' tall R &R Batt insulation - 6" - R21 Texture drywall - machine Seal/prime more than the floor perimeter - one coat Paint the walls - two coats - 2 colors R &R Outlet or switch cover R &R Wa11 heater R &R Interior door unit Door lockset - Detach & reset R &R Door opening (jamb & casing) - 32 "to36 "wide - paint grade R &R Door opening (jamb & casing) - 36 "to60 "wide - paint grade Paint door or window opening - Large - 2 coats (per side) Paint door or window opening - 2 coats (per side) R &R Bypass mirrored door set 196.81 SF 196.81 SF 226.33 SF 77.83 LF 77.83 LF 77.83 LF 77.83 LF 38.92 SF 311.33 SF 311.33 SF 622.67 SF 3.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 2.00 EA 2.00 EA 1.00 EA CANYON_ESTATES 12/19/2011 Page: 19 • • El. Charter Construction, Inc. C H-A R TER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382-0450 DESCRIPTION CONTINUED - Bedroom2 QNTY NOTES: DESCRIPTION Master Bedroom Height: 8' 484.00 SF Walls 681.64 SF Walls & Ceiling 21.96 SY Flooring 60.50 LF Ceil. Perimeter 197.64 SF Ceiling 197.64 SF Floor 60.50 LF Floor Perimeter Subroom 1: CLOSET Height: 8' 162.67 SF Walls 180.00 SF Walls & Ceiling 1.93 SY Flooring 20.33 LF Ceil. Perimeter 17.33 SF Ceiling 17.33 SF Floor 20.33 LF Floor Perimeter QNTY R &R Carpet pad Remove Carpet Carpet 15 % waste added for Carpet. R &R Baseboard - 4 1/4" Paint baseboard, oversized - two coats Mask and prep for paint - plastic, paper, tape (per LF) R &R Drywall replacement per LF - up to 2' tall R &R Batt insulation - 6" - R21 CANYON_ESTATES 214.97 SF 214.97 SF 247.22 SF 80.83 LF 80.83 LF 80.83 LF 80.83 LF 40.42 SF 12/19/2011 Page: 20 MECharter Construction, Inc. CHARTER C 0 I S T 11 U C 1 1 0 1 1 980 South Harney St. Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 DESCRIPTION CONTINUED - Master Bedroom Texture drywall - machine Seal/prime more than the floor perimeter - one coat Paint the walls - two coats - 2 colors R &R Outlet or switch cover R &R Wall heater R &R Interior door unit Door lockset - Detach & reset R &R Door opening (jamb & casing) - 32 "to36 "wide - paint grade R &R Door opening (jamb & casing) - 36 "to60 "wide - paint grade Paint door or window opening - Large - 2 coats (per side) Paint door or window opening - 2 coats (per side) R &R Bypass mirrored door set QNTY 323.33 SF 323.33 SF 646.67 SF 3.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 1.00 EA 2.00 EA 2.00 EA 1.00 EA NOTES: DESCRIPTION Hall Closet/Laundry Height: 8' 322.67 SF Walls 353.50 SF Walls & Ceiling 3.43 SY Flooring 40.33 LF Ceil. Perimeter 30.83 SF Ceiling 30.83 SF Floor 40.33 LF Floor Perimeter QNTY R &R Carpet pad Remove Carpet Carpet 15 % waste added for Carpet. CANYON_ESTATES 30.83 SF 30.83 SF 35.46 SF 12/19/2011 Page: 21 • • Charter Construction, Inc. C H-A R T E R 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382-0450 CONTINUED - Hall Closet/Laundry DESCRIPTION R &R Baseboard - 4 1/4" Paint baseboard, oversized - two coats Mask and prep for paint - plastic, paper, tape (per LF) R &R Drywall replacement per LF - up to 2' tall Texture drywall - machine Seal/prime more than the floor perimeter - one coat Paint the walls - two coats - 2 colors R &R Bypass mirrored door set R &R Closet shelf and rod package Detach & Reset Water heater - 40 gallon - Electric - 9 yr Stackable washer and dryer - Remove & reset QNTY 40.33 LF 40.33 LF 40.33 LF 40.33 LF 161.33 SF 161.33 SF 322.67 SF 3.00 EA 12.00 LF 1.00 EA 1.00 EA NOTES: General DESCRIPTION QNTY Asbestos test fee - full service asbestos survey Lead test fee - full service lead survey Taxes, insurance, permits & fees (Bid item) Final cleaning - construction - Residential 1.00 EA 1.00 EA 1.00 EA 2780.00 SF NOTES: CANYON_ESTATES 12/19/2011 Page: 22 • • FMCharter Construction, Inc. CHARTER 980 South Harney St. CONSTRUCTION Seattle, WA 98108 Phone: (206) 382 -1900 Fax: (206) 382 -0450 Grand Total Areas: 9,257.33 SF Walls 2,780.54 SF Floor 0.00 SF Long Wall 2,780.54 Floor Area 4,054.50 Exterior Wall Area 0.00 Surface Area 2,798.54 SF Ceiling 308.95 SY Flooring 0.00 SF Short Wall 3,053.82 Total Area 450.50 Exterior Perimeter of Walls 12,055.87 SF Walls and Ceiling 1,153.17 LF Floor Perimeter 1,177.17 LF Ceil. Perimeter 9,257.33 Interior Wall Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 Total Hip Length CANYON_ESTATES 12/19/2011 Page: 23 Main Level CANYON_ESTATES • 20 Ir rrr. Irr rIr u- Pr Irr 1 17 rr sr Dhlhla Roam � IT r ITT 12/19/2011 R9 Main Level Page: 24 Contractors or Tradespeople Peer Friendly Page o General /Specialty Contractor A business registered as a construction contractor with LEI to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name CHARTER CONST INC UBI No. 600479166 Phone 2063821900 Status Active Address 980 5 Harney Street License No. CHARTCI171PM Suite /Apt. License Type Construction Contractor City Seattle Effective Date 10/14/1983 State WA Expiration Date 10/23/2012 Zip 981082744 Suspend Date County King Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status TELESGI179JD TELESIS GROUP INC, THE Construction Contractor General Unused 4/4/1983 4/4/1984 Archived Business Owner Information Name Role Effective Date Expiration Date SALADINO, PETER CARROLL President 02/17/2011 Amount COSENTINO, PATRICK Vice President 02/17/2011 SLPGGL0121000 JACKSON, ERIC Vice President 02/17/2011 FIRMANI, FRANK President 10/14/1983 02/17/2011 SALADINO, PETER C Vice President 10/14/1983 02/17/2011 Bond Information Page 1 of 2 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 6 TRAVELERS CAS E SURETY CO 081S103572915BCM 07/22/2001 Until Cancelled $12,000.00 10/18/2001 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 28 Starr Surplus Lines Insurance SLPGGL0121000 11/01/2011 11/01/2012 $1,000,000.00 11/01/2011 27 Starr Surplus Lines Insurance SR98011279455 11/01/2011 11/01/2012 11/01/2011 $1,000,000.00 10/31/2011 26 TOEADFASTINS GPL982931400 11/01/2010 11/01/2011 $1,000,000.00 10/29/2010 25 FIRST MERCURY INS CO FMWA0004122 11/01/2009 11/01/2010 $1,000,000.00 10/30/2009 24 FIRST MERCURY INS CO fmwa000412 11/01/2008 11/01/2009 $1,000,000.00 10/31/2008 23 FIRST MERCURY INS CO FMFL003259 11/01/2007 11/01/2008 $1,000,000.00 10/30/2007 22 INS ST MERCURY FMFL002201 11/01/2006 11/01/2007 $1,000,000.00 11/01/2006 21 INTERSTATE FIRE Et CAS SGL1000005 11/01/2005 11/01/2006 $1,000,000.00 11/01/2005 https://fortress.wa.gov/lni/bbip/Print.aspx 12/19/2011