Loading...
HomeMy WebLinkAboutPermit D06-479 - 3418 Apartments - Reroof3418 APARTMENT 3418S 146 ST D06 -479 Parcel No.: 0040000071 Address: 3418 S 146 ST TUHW Suite No: Tenant: Name: 3418 APARTMENTS Address: 3418 S 146 ST , TUKWILA WA Contact Person: Name: SAMUEL JOYA Address: 3425 S 146 ST , TUKWILA WA 98168 Phone: 206 786 -2252 Contractor: Name: ROOFCORP OF OREGON INC Address: PO BOX 69315 , SEATTLE WA 98168 Phone: 206 439 -9991 Contractor License No: ROOFCOI966KK City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206- 431 -3670 Fax: 206 -431 -3665 Web site: httn: //www.ci.tukwila.wa.us Owner: Name: BOUALAPHA INPENG +PHELY ET A Address: 1644 E ALDER ST , WALLA WALLA WA 99362 Phone: DEVELOPMENT PERMIT * *continued on next page ** Permit Number: D06 - 479 Issue Date: 12/26/2006 Permit Expires On: 06/24/2007 Expiration Date: 05/12/2008 Steven M. Mullet, Mayor Steve Lancaster, Director • • DESCRIPTION OF WORK: REMOVE EXISTING 1800 SF ROOF, REPAIR ANY DRY ROT PLYWOOD AND INSTALL A NEW TORCH DOWN ROOF. UPGRADE DRAINAGE INSTALLING (2) NEW DRAINS AND IMPROVE VENTING BY ADDING (2) NEW TURBINE VENTS. Value of Construction: $7,162.00 Fees Collected: $194.36 Type of Fire Protection: International Building Code Edition: 2003 Type of Construction: VB Occupancy per IBC: 0021 • • doc: IBC -10/06 D06-479 Printed: 12 -26 -2006 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Water Main Extension: Private: Public: Water Meter: N Permit Center Authorized Signature: I hereby certify that I have read and governing this work will be complie Signature: Print Name: . Y.-A ,An CI C.i doe: IBC -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: httn: / /www.ci.tukwila.wa.us Permit Number: D06 -479 Issue Date: 12/26/2006 Permit Expires On: 06/24/2007 Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: Hauling: N Start Time: End Time: Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: Start Time: End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Stone Drainage: Street Use: Profit: N Non - Profit: N Date: 12-1211,161( Date: / Steven M. Mullet, Mayor Steve Lancaster, Director • • • permit and know the same to be true and correct. All provisions of law and ordinances er specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or perforpttln a of rk. I am authorized to sign and obtain this development permit. • This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. • D06-479 Printed: 12 -26 -2006 Parcel No.: 0040000071 Address: 3418 3 146 ST TUKW Suite No: Tenant: 3418 APARTMENTS 1: ** *BUILDING DEPARTMENT CONDmONS* ** City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: Status: Applied Date: Issue Date: D06 -479 ISSUED 12/26/2006 12/26/2006 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: Prior to final inspection a written statement from the roofing contractor shall be required. The statement shall confirm the fire classification of the roof assembly that was installed. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. • • 6: All construction noise to be in compliance with Chapter 8.22 of the City of Tukwila Municipal Code. A copy can be obtained at City Hall in the office of the City Clerk. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. * *continued on next page ** • • doc: Cond -10/06 006-479 Printed: 12 -26 -2006 I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. * City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: httn: / /www.ci.tukwila.wa.us Date: /2 / /o • • • • doe: Cond -10/06 D06 -479 Printed: 12 -26 -2006 Project name Address Authorization by, TBD36 /96 -form 12 City U Tukwila Permit Center 6300 Southcenter Boulevard, Suite, 100 Tukwila, WA 98188 (206 431 -3670) ALTERNATE PLAN SUBMITTAL AUTHORIZATION FOR LIMITED SCOPE OF WORK I.B.C.& I.R.C. Section 104.1 ? 1(a Pear4-. .e*As (4((I Description of work ` I 44- Q f ron-C (9T r c ��Zkit el a/ W Related reference number The above project permit applicant, due to the limited scope of work is authorized to submit reduced plan requirements described below. 1. Complete permit application required: (Note, all application must include; 1) property assessor number, 2) copy of contractors license or completed owner waiver form.) Building X Mechanical Other re —t^ 2. Minimum plan and/or specification requirement: Site plan Floor plan Elevations Foundation Cross sections Roof plan W.S.E.C. Compliance Narrative Structural calculations (stamped by Washington State licensed engineer ) Specific required information O� 4erittr`D (E) 4,,,k ±r -Pee( r rs(Wf -Thy As4p 3. Other special instructions: LYav i 4i Application # 17U0 rcp O rPVnev\- (ottrew_to Date l'Z(2(3 (Authorization void 30 days after the date issued.) CITY OF TUKWI Community Development epartment Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 hap://www.c1 tukwila. wa. us Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print' { SITE LOCATION Site Address: .341 6 t 4 4 S 4. Tenant Name: Property Owners Name: Vc H4 ry Mailing Address: P. 0. 40 x i'IC ethyl e✓ l8 U/�u /ILq cit CONTACT PERSON- who do we contact when your permit is ready to be isailed Building Perhttiblb. Mechanical Permit No:. Plumbing/Gas Permit No. Public Works Permit No. Project No. (For use On Y) King Co Assessor's Tax No.: MN WO Suite Number. New Tenant: Floor: ❑ .... Yes D..No Jtate (!1 /G 8 Zip Name: Cj c svt u e f OLJ Ct Mailing Address: 3425 5 146 « E -Mail Address: GENERAL CONTRACTOR INFORMATION — . (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 6)y Company Name: Roo part, I viC • Mailing Address: pO box- G S3 Contact Person: e i4 N( O ft- L�� y 0 E -Mail Address: 3Q ,AA O. a fC0 r CO ' l Contractor Registration Number: 200F COI cibt, 6 (V._ RECORD - MI plans must be'wet stamped by Architect of Record ARCHITECT O Company Name: Mailing Address: Contact Person: E -Mail Address: ENGINEER OF RECORD -A11 plans must be wet stamped by Engineer of Record Company Name: Mailing Address: Contact Person: E -Mail Address: Q: On Line3-2006 - Pennit Appliaiiondoc Revised: 9 -2006 bb Day Telephone: (206 7R 1, - 2ZS2- - rotavi / 7 (6R. City State Zip Fax Number: geSi (.c w B� 4 g �(� 8 Ci ry State Zip Day Telephone: (.206) 786 - 22 52- Fax Number: (206) 457-119C' Expiration Date: 0.5y3 g07 City Day Telephone: Fax Number: City Day Telephone: Fax Number: State State Zip Zip Page 1 of 6 Valuation of Project (contractor's bid price): $ 7 ( Z Scope of Work (please provide detailed information): EciAtiou e- nv t ro Fla. t !A S•ns A Will there be new rack storage? ❑ - -.. Yes Q ApplicaiionsWonm- Applications On Line '3 -2006 - Permit Application doe Revised' 9 -2006 bh Number of Parking Stalls Provided: Standard: Will there be a change in use? ❑ Yes 0 No Existing Building Valuation: $ &x rs A tuo i a IAAe -t-1i tur f r�7e* tr atay (cc rck Haw If yes, a separate permit and plan submittal will be required. PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq fl): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Compact: Handicap: If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If' yes', attach list of materials and storage locations on a separate 8 -1/2" x 11 "paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Page 2 of 6 Fixture Type: Qty Fixture Type: Qty Fixture Type: Qty . Fixture Type: Qty Bathtub or combination bath/shower Drinking fountain or water cooler (per head) Wash fountain Gas piping outlets Bidet Food -waste grinder, commercial Receptor, indirect waste Clothes washer, domestic Floor drain Sinks Dental unit, cuspidor Shower, single head trap Urinals Dishwasher, domestic, with independent drain Lavatory Water Closet Building sewer or trailer park sewer Rain water system — per drain (inside building) Water heater and/or vent Additional medical gas inlets/outlets — six or more Industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors Repair or alteration of water piping and/or water treating equipment Repair or alteration of drainage or vent piping Medical gas piping system serving one to five inlets/outlets for specific gas PLUMBING AND GAS PIPINC%„ INFORMATION - 206- 43ivo70 PLUMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Plumbing work (contractor's bid price): $ Valuation of Gas Piping work (contractor's bid price): $ Scope of Work (please provide detailed information): Building Use (per Int'1 Building Code): Occupancy (per Int'I Building Code): Utility Purveyor: Water: Sewer: Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: Q:Application,Wonm- Applications On Liee13-2006 -Permit Applicatioadoc Revised: 9-2006 bit Page 5 of 6 PERMIT CAmio NOTE Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING 0 ii R OR Signature: Date Application Accepted: t2H- 1 al D AGENT: Print Name: nvt1i)v$ 1fl9ct Mailing Addres : [7 - D Q.Upplications\Fonns- Applications On LinM3 -2006 - Permit Applicationdoc Revised: 9.2006 bh B ®x 69:3/s Cgc 71t Date: /2/Z 4/0A Day Telephone: (20 6 786 - 22 r wot aS f6 City State Zip Date Application Expires: dt r 101-- Staff Initials: Page 6 of 6 Parcel No.: 0040000071 Address: 3418 5 146 ST TUKW Suite No: Applicant: 3418 APARTMENTS Receipt No.: R06 -02012 Payee: ROOFCORP OF OREGON, INC. ACCOUNT ITEM LIST: Description BUILDING - RES STATE BUILDING SURCHARGE City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: //www.ci.tukwila.wa.us RECEIPT Initials: JEM Payment Date: 12/26 /2006 08:54 AM User ID: 1165 Balance: $0.00 TRANSACTION LIST: Type Method Description Amount Payment Check 03711 194.36 Account Code Current Pmts 000/322.100 189.86 000/386.904 4.50 Total: $194.36 • Permit Number: D06 -479 Status: APPROVED • Applied Date: 12/26/2006 Issue Date: Payment Amount: $194.36 • • • 3!_06 12/26 9716 TOTAL. 194.36 doc: Receiot -06 Printed: 12- 26.2006 Project: g' «/P ,pngiMcyT" Type of / I 7 nspectioJ� : Nj izcwi r sAen /Arpn/j' Address: ?Yi S /yb,, - / Date Called: // Special Ins ructions: Date Wanted: / — 0 —7 a.m. P.m. Requester: Phone No: 2 OG - ?S‘ - 22- 5— 2 INSPECT ITNO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 Approved per applicable codes. El Corrections required prior to approval. COMMENTS: / /m: (lor4 / /f /t 0' .00 REINSPECTION E REQUIRED. • or to inspection, fee must be aid at 6300 Southcenter Blvd., Suite 00. Call to sechedule reinspection. Receipt No.: Date: INSPECTION RECORD Retain a copy with permit COMMENTS: P ,/ . Type of Inspection: .. 401 V.4 4eAk' Address �s R 9-tTfSk.P,-f4 ArC -` Ite lap -117 S Iyl� tic -10 hto ,Pc,Atr._'_`t_-'�'� iT15L4% 4 ;iv,... .+0 = >=x 1 4'' rt;S;LA J °I -..e" - )kA j - os 4_..c- -% ), f(fl r. 4S ,C0-..e" Requester: Samti-ck J ED & MQ riacc i k...ti.. 1 ry c4 t/ AS r tI5awsc.4 \ {{ Z r.KuC.4 - I' LL a,4�4JS -S v � A \ _•. YJ•2 LtM 1 S V 4 . 1 4 i t . w ■ 1 Vt t4 - , • 1 Protect: A � 79-119 ^ "s Type of Inspection: .. 401 V.4 4eAk' Address �s Date Called: a Ite lap -117 S Iyl� Special Instructions: Date Wanted: , a.m. Requester: Samti-ck Phone No: �( 2 in *go 27c,2. ►1 PERMIT , CITY OF TUKWILA BUILDING DIVISION j p• P' j 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (2 t .)4 INSPECTION NO. El Approved per applicable codes. Receipt No.: 1 INSPECTION RECORD Retain a copy with permit G El Corrections required prior to approval. $8.Q0 REINSPECTION EE REQUItD. Prior to inspection, fee must be aid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. 'Date: 11-- 2'7 'Date: CLIENT: 01263 Kathryn Mcalister 3418 S 146th st. Tukwila, WA 98168 ` Proposal ROOFCORP P.O. Box 69315 Seattle, WA 98168 (206) 439 -9991 Fax (206) 439 -9995 CONTACT: Kathryn Mcalister PHONE: (425) 785 -3786 FAX: Work Specifications PROPOSAL: 003899 DATE: 12/24/06 3418 Aparments 1. Remove existing cap metal flashing in preparation for new after roofing system is in place 2. Tear off the existing roof coverings down to the wood substrate. Set all protruding fasteners and sweep roof clean and dry as required. During the removal process, the substrate is to be inspected for structural soundness. It is understood that the owner or their approved representative will be available during the roofing removal and demolition. This is required in order to avoid any delay while the roof is uncovered and exposed to weather. Any extra labor connected with repair work will be billed on a time ($72.50 per hour) and material (plus 20% mark up) basis. 3. Install new cant strip at the roof perimeter in order to provide a transition for the roofing membrane. PROJECT: 003625 3418 Aparments 3418 S 146th st. Tukwila, WA 98168 REOEIVED crry 01Y TUKWILR DEC 2 6 2006 PERMIT CENTER 4. Apply a 28 Ib. fiberglass reinforced base sheet with 2 "- side laps and 6 "end laps directly to the substrate and extend up all cantstrips at least 2" mechanically secure 9" of center at sidelaps and 18" on center in two lines 12" from each edge. (Staggered) Mechanical fasteners used for securement shall be square head simplex nails of sufficient length to penetrate at least 7/8" in to substrate. 5. Install per manufacturer's specifications, a modified POLYGLASS granulated 4.5mm bitumen membrane. Warranty: 12 -year on all labor and material according to the manufacturer's written warranty. 6. Install per manufacturer's specifications, a modified POLYGLASS granulated 4.5mm bitumen membrane up and over all perimeter edge and walls. 7. ROOFING SYSTEM GUARANTEE: 12 YEARS "POLYGLASS guarantees that POLYGLASS roofing membrane will be free from defects in materials and that the roof or other surface over which the membrane is installed will retain its watertight integrity from the date of the membrane installation for the period of Twelve years." The Owner may assign warranty to a successive party. No Dollar Limit Life expectancy 20 years 8. All existing down drop scuppers will be removed and discarded. New STAINLESS STEEL downdrop scuppers will be installed according to manufacturer's specifications. Proposal Page 2 Work Specifications 9. All cants, curbs, and sharp angles will have extra flashing materials installed per manufacturer's installation instructions. 10. Flash all vents, boxes and similar roof penetrations, following the manufacturer's flashing details for using a modified bitumen torch -on membrane. 11. Seal and flash around all pipes, conduits, poles, and other roof penetrations using modified bitumen standard flashing techniques according to the manufacturer's specifications. 12. Install new lead pipe vents and flash according to the manufacture's standard specifications. 13. All roof flashings (roof vents), will be removed, cleaned, inspected and reinstalled when possible. If new flashing are required they can be installed subject to and additional charge. 14. TV ANTENNA OR DISH. In order to do work set forth in these specifications the existing TV Antenna or dish must be reinstalled. This work is not part of this contract and should be done by others. 15. EXCLUSIONS: Mechanical Work, Electrical Work, Wood Work and WSST. 16. During the course of this work, ROOFCORP shall use all means necessary to maintain the work area in a clean safe, and in an orderly manner. All waste material shall be contained in one area as much as possible and removed from job site when all work is completed. 17. Payment to be made as follows: i. 40% upon delivery of materials to job site ii. 60% upon completion of work TOTAL BID $7,162 Page 1 oft TERMS AND CONDITIONS All work performed by ROOFCORP of OR., Inc. ( "ROOFCORP ") is subject to the following terms and conditions ACCEPTANCE Until accepted by Customer and countersigned by ROOFCORP, this Proposal is subject to change or withdrawal without prior notice and is automatically withdrawn unless accepted within thirty (30) days of issue. PROPOSAL This proposal constitutes the entire understanding of the Customer and ROOFCORP. No promise, representation or warranty is binding on ROOFCORP unless included in this Proposal and agreed to in writing signed by ROOFCORP. CHANGES TO THE WORK This proposal shall be appropriately adjusted, including an adjustment for profit and overhead, if changes to the Specifications or Work which cause an increase to ROOFCORP's cost of or time required to perform any part of the Work. The Proposal shall be appropriately adjusted, including an adjustment for profit and overhead, if there are subsurface latent conditions not shown on the Specifications, or conditions of an unusual nature which increase ROOFCORP's cost or time required to perform any part of the Work. DIFFERING SITE CONDITION Unless otherwise agreed to in writing, ROOFCORP shall not be responsible for the replacement of any lumber, sheathing, trim, rotted wood or electrical and mechanical work. It is agreed that any such Work shall be extra work for which ROOFCORP will be paid on a time and material basis, including profit and overhead. PROJECT SEOUENCING ROOFCORP is responsible for establishing scheduling and sequencing of the Work to be performed. ROOFCORP shall not be held responsible for the delay, non- delivery, discontinuance, default in shipment by a supplier in whole or in part, loss in transit, strikes, lockout or other conditions beyond the control of ROOFCORP. WARRANTIES ROOFCORP warrants that all work shall be performed in a good and workmanlike manner according to the Specifications. Any applicable manufacturer's warranties will be transferred to the Customer upon payment in full for Work performed. Upon request by Customer, manufacturer's warranties are available for review by Customer. THIS WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING ANY WARRANTIES OF MERCHANTABILITY OR FITNESS FOR PARTICULAR PURPOSE. WARRANTY CLAIMS AND LIMITATION ON DAMAGE Customer will confirm in writing to ROOFCORP's headquarters any Warranty claims within ten (10) days of discovering the basis for a warranty claim. ROOFCORP's liability for a breach of warranty is limited to repair and/or replacement of defective Work. ROOFCORP will not be responsible for lost profits, special, indirect, incidental or consequential damages. Manufacturer's warranties are subject to any and all restrictions and limitations contained therein. NATURAL CONDITIONS It is understood and agreed that during the construction Work included in this Proposal or any change orders that damage may occur to interior finishes, walls and ceilings such as: nail pops, cracks, breaks, tears, including painted surfaces, and to other building components such as wiring, fixtures, and trim. Inadvertent damage may occur to personal property items that are displayed, hung, stored, shelved or attached to the structure. Also, minor disturbances to shrubbery and lawn and small divots in the P.O. Box 69315 3425 S. 146 St. Seattle, WA 98168 Seattle, WA 98168 driveway from heavy equipment such as roll -off trash containers and dump trucks. Customer is responsible for the security and safety of all personal property and the insurance thereof. ROOFCORP will use care and caution in demolition, repair and construction work to avoid and minimize damage to property. The debris generated from this process and related procedures may cause inconvenience or discomfort which is normal construction wear and tear conditions and not ROOFCORP's negligence. However, should accidental damage occur, the cost to correct such damage is not included in this Proposal. NATURAL PONDING Visible evidence of latent Ponding caused by structural roof deck deflection often will not be apparent until after the existing roof membrane has been removed and the re- roofing completed. Customer understands and agrees that should roof Ponding.become evident or occur as a result of the existing roof membrane removal, and if Ponding is of sufficient quantity or depth to violate the manufacturer's guidelines for warranty issuance, then any corrective work required to assure issuance or validation of the warranty will be done based upon a contract change order and will be at an additional cost to the base contract. Typical methods used to correct significant Ponding conditions may include gutters, troughs, saddles, crickets, sloped sections, drain revisions, and roof leveling procedures. ASBESTOS In the event that ROOFCORP encounters materials that may contain asbestos, it shall immediately stop Work All responsibility and cost, including delays, associated with evaluating suspected asbestos, removing asbestos, or otherwise complying with federal, state or other laws and regulations relating to removal or treatment of asbestos, shall be bome by the customer. VENTING ROOFCORP shall not be liable for damage caused by inadequate venting of roof sheathing and framing should condensation related damage occur during the warranty time allowed in this Proposal. MOISTURE Moisture that has entered into the building prior to our installation or repair of the roofing system may result in mold growth. We disclaim any and all responsibility for damages to persons or property arising from or relating to the presence of mold in the building. By executing the contract to which this Notice is affixed, Owner ])releases us from any and all claims Owner and Owner's (a) family members, (b) employees, (c) tenants or (d) any other building occupants may have as a result of such mold growth and 2) agrees to . defend, indemnify and hold us harmless from any and all penalties, actions, liabilities, costs, expenses and damages arising from or relating to the presence of mold in Owner's building. PERMIT/INSPECTION FEES Customer shall pay all building permit and/or inspection fees required plus issuance costs. INSPECTOR If an inspector or consultant is brought to the job for any reason by ROOFCORP or any other person, this inspector or consultant must be mutually agreed upon by the Customer and ROOFCORP. OWNERSHIP Title to material and/or Work furnished under this Proposal shall remain the property of ROOFCORP or its assignees until all payments have been made. It is also agreed that ROOFCORP will have a security interest in any real property of the Customer, and Phone: (206) 439 -9991 OR Contractor License Fax: (206) 439 -9995 ROOFCOI966KK the customer will not dispose of the property until the work has been paid in full. SUBSTANTIAL COMPLETION Payment is due as set forth in the Proposal. If the Proposal does not contain payment terms, 95% of the price is due upon substantial completion of the Work. FINAL WALKTBROUGH Upon substantial completion of the Work, Customer and ROOFCORP will conduct a WALKTHROUGH inspection of the Work during which Customer will prepare a written list ( "punch list ") of any items to be completed prior to final acceptance of the Work as completed and to make payment in full after completion of any items listed on the punch list. CONTRACTOR REGISTRATION ROOFCORP of OR, Inc., is registered with the State of Oregon, registration number ROOFCOI966KK, as a specialty contractor and has posted with the State a bond of cash deposit of $4,000.00 for the purposes of satisfying such claims against ROOFCORP for negligent or improper breach of contract in the conduct of ROOFCORP's business. This bond or cash deposit may not be sufficient to cover a claim, which ACCEPTANCE OF PROPOSAL: The above Terms and Conditions are satisfactory and are hereby accepted. You are authorized to do the work specified. Payment will be made as provided above. Date: Name: Signature: Street: Phone: OWNER/CUSTOMER ILLENG INFORMATION Company: %al id .0. Ada Attn.: a/i �[�C 'T4, r City, St., Zip: � / t U.�J i f/�f /� / g . P.O. Box 69315 3425 S. 146 St. Seattle, WA 98168 Seattle, WA 98168 Page 2 of 2' might arise from Work done under your Proposal. If the supplier of materials used in your construction project or any employee of ROOFCORP or subcontractor is not paid by ROOFCORP or subcontractor on your job, your property may be lined to force payment. If you wish additional protection, you may request ROOFCORP to provide you with the original lien release" documents from each supplier or subcontractor from your Project. ROOFCORP is required to provide you with further information about lien release documents if you request it. General information is also available from the Department of Labor & Industries. PAYMENT Payment is due upon receipt of billing. Customer agrees to pay a finance charge equal to 1.5% per month of the outstanding balance on all past due accounts. Should it become necessary to initiate collection of past due balances, including finance charges, or to resolve disputes arising out of or relating to ROOFCORP's work, Customer agrees to pay all. attorney's fees, collection fees, lien fees, court costs, and any other related expenses. All suits related to this Proposal shall be decided in King County Superior Court. Dated: Estimator's Signature: ROOFCORP OF OR., INC. Authorized Signature: ROOFCORP countersignature required to create binding proposal Phone: (206) 439 -9991 OR Contractor License Fax: (206) 439 - 9995 ROOFCOI966KK License Information License ROOFCOI966KK Licensee Name ROOFCORP OF OREGON INC Licensee Type CONSTRUCTION CONTRACTOR UBI 602394508 Ind. Ins. Account Id #I Business Type CORPORATION Address 1 PO BOX 69315 Address 2 City SEATTLE County KING State WA Zip 98168 Phone 2064399991 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 5/12/2004 Expiration Date 5/12/2008 Suspend Date Separation Date Parent Company Previous License ROOFCWI007Q1 Next License Associated License Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date #I FIRST NATIONAL INS CO 6235355 05/01/2004 Until Cancelled 512,000.00 05/12/2004 Business Owner Information Name Role Effective Date Expiration Date JOYA, JORGE PRESIDENT 05/12/2004 Look Up a Contractor, Electrician or Plumber License Detail Page 1 of 2 Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. • • • • https: / /fortress .wa.gov /Ini/bbip /printer.aspx ?License= ROOFCOI966KK 12/26/2006