HomeMy WebLinkAboutPermit D06-479 - 3418 Apartments - Reroof3418 APARTMENT
3418S 146 ST
D06 -479
Parcel No.: 0040000071
Address: 3418 S 146 ST TUHW
Suite No:
Tenant:
Name: 3418 APARTMENTS
Address: 3418 S 146 ST , TUKWILA WA
Contact Person:
Name: SAMUEL JOYA
Address: 3425 S 146 ST , TUKWILA WA 98168
Phone: 206 786 -2252
Contractor:
Name: ROOFCORP OF OREGON INC
Address: PO BOX 69315 , SEATTLE WA 98168
Phone: 206 439 -9991
Contractor License No: ROOFCOI966KK
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206- 431 -3670
Fax: 206 -431 -3665
Web site: httn: //www.ci.tukwila.wa.us
Owner:
Name: BOUALAPHA INPENG +PHELY ET A
Address: 1644 E ALDER ST , WALLA WALLA WA 99362
Phone:
DEVELOPMENT PERMIT
* *continued on next page **
Permit Number: D06 - 479
Issue Date: 12/26/2006
Permit Expires On: 06/24/2007
Expiration Date: 05/12/2008
Steven M. Mullet, Mayor
Steve Lancaster, Director
•
•
DESCRIPTION OF WORK:
REMOVE EXISTING 1800 SF ROOF, REPAIR ANY DRY ROT PLYWOOD AND INSTALL A NEW TORCH DOWN ROOF. UPGRADE
DRAINAGE INSTALLING (2) NEW DRAINS AND IMPROVE VENTING BY ADDING (2) NEW TURBINE VENTS.
Value of Construction: $7,162.00 Fees Collected: $194.36
Type of Fire Protection: International Building Code Edition: 2003
Type of Construction: VB Occupancy per IBC: 0021
•
•
doc: IBC -10/06 D06-479 Printed: 12 -26 -2006
Public Works Activities:
Channelization / Striping: N
Curb Cut / Access / Sidewalk / CSS: N
Water Main Extension: Private: Public:
Water Meter: N
Permit Center Authorized Signature:
I hereby certify that I have read and
governing this work will be complie
Signature:
Print Name: . Y.-A ,An CI C.i
doe: IBC -10/06
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Fax: 206 -431 -3665
Web site: httn: / /www.ci.tukwila.wa.us
Permit Number: D06 -479
Issue Date: 12/26/2006
Permit Expires On: 06/24/2007
Fire Loop Hydrant: N Number: 0 Size (Inches): 0
Flood Control Zone:
Hauling: N Start Time: End Time:
Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y.
Landscape Irrigation:
Moving Oversize Load: Start Time: End Time:
Sanitary Side Sewer:
Sewer Main Extension: Private: Public:
Stone Drainage:
Street Use: Profit: N Non - Profit: N
Date: 12-1211,161(
Date: /
Steven M. Mullet, Mayor
Steve Lancaster, Director
•
•
•
permit and know the same to be true and correct. All provisions of law and ordinances
er specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or perforpttln a of rk. I am authorized to sign and obtain this development permit.
•
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
•
D06-479 Printed: 12 -26 -2006
Parcel No.: 0040000071
Address: 3418 3 146 ST TUKW
Suite No:
Tenant: 3418 APARTMENTS
1: ** *BUILDING DEPARTMENT CONDmONS* **
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206431 -3670
Fax: 206 -431 -3665
Web site: http: / /www.ci.tukwila.wa.us
PERMIT CONDITIONS
Permit Number:
Status:
Applied Date:
Issue Date:
D06 -479
ISSUED
12/26/2006
12/26/2006
2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the
Building Official.
3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to
start of any construction. These documents shall be maintained and made available until final inspection approval is
granted.
4: Prior to final inspection a written statement from the roofing contractor shall be required. The statement shall
confirm the fire classification of the roof assembly that was installed.
5: All construction shall be done in conformance with the approved plans and the requirements of the International
Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code.
•
•
6: All construction noise to be in compliance with Chapter 8.22 of the City of Tukwila Municipal Code. A copy can be
obtained at City Hall in the office of the City Clerk.
7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of,
any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits
presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila
shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the
Building Official from requiring the correction of errors in the construction documents and other data.
* *continued on next page **
•
•
doc: Cond -10/06 006-479 Printed: 12 -26 -2006
I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing
this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating
construction or the performance of work.
*
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Fax: 206 -431 -3665
Web site: httn: / /www.ci.tukwila.wa.us
Date:
/2 / /o
•
•
•
•
doe: Cond -10/06 D06 -479 Printed: 12 -26 -2006
Project name
Address
Authorization by,
TBD36 /96 -form 12
City U Tukwila
Permit Center
6300 Southcenter Boulevard, Suite, 100
Tukwila, WA 98188
(206 431 -3670)
ALTERNATE PLAN SUBMITTAL AUTHORIZATION
FOR LIMITED SCOPE OF WORK
I.B.C.& I.R.C. Section 104.1
? 1(a Pear4-. .e*As
(4((I
Description of work ` I 44- Q f ron-C
(9T r c ��Zkit el a/ W
Related reference number
The above project permit applicant, due to the limited scope of work is authorized to submit reduced
plan requirements described below.
1. Complete permit application required: (Note, all application must include; 1) property assessor
number, 2) copy of contractors license or completed owner waiver form.)
Building X Mechanical Other re —t^
2. Minimum plan and/or specification requirement:
Site plan Floor plan Elevations Foundation
Cross sections Roof plan W.S.E.C. Compliance Narrative
Structural calculations (stamped by Washington State licensed engineer )
Specific required information
O� 4erittr`D
(E) 4,,,k ±r -Pee(
r rs(Wf -Thy
As4p
3. Other special instructions: LYav i 4i
Application # 17U0
rcp O rPVnev\- (ottrew_to
Date l'Z(2(3
(Authorization void 30 days after the date issued.)
CITY OF TUKWI
Community Development epartment
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
hap://www.c1 tukwila. wa. us
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**Please Print'
{
SITE LOCATION
Site Address: .341 6 t 4 4 S 4.
Tenant Name:
Property Owners Name: Vc H4 ry
Mailing Address: P. 0. 40 x
i'IC ethyl e✓
l8 U/�u /ILq
cit
CONTACT PERSON- who do we contact when your permit is ready to be isailed
Building Perhttiblb.
Mechanical Permit No:.
Plumbing/Gas Permit No.
Public Works Permit No.
Project No.
(For use On Y)
King Co Assessor's Tax No.: MN WO
Suite Number.
New Tenant:
Floor:
❑ .... Yes D..No
Jtate
(!1 /G 8
Zip
Name: Cj c svt u e f OLJ Ct
Mailing Address: 3425 5 146 «
E -Mail Address:
GENERAL CONTRACTOR INFORMATION — .
(Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 6)y
Company Name: Roo part, I viC •
Mailing Address: pO box- G S3
Contact Person: e i4 N( O ft- L�� y 0
E -Mail Address: 3Q ,AA O. a fC0 r CO ' l
Contractor Registration Number: 200F COI cibt, 6 (V._
RECORD - MI plans must be'wet stamped by Architect of Record
ARCHITECT O
Company Name:
Mailing Address:
Contact Person:
E -Mail Address:
ENGINEER OF RECORD -A11 plans must be wet stamped by Engineer of Record
Company Name:
Mailing Address:
Contact Person:
E -Mail Address:
Q: On Line3-2006 - Pennit Appliaiiondoc
Revised: 9 -2006
bb
Day Telephone: (206 7R 1, - 2ZS2-
- rotavi / 7 (6R.
City State Zip
Fax Number:
geSi (.c w B� 4 g �(� 8
Ci ry State Zip
Day Telephone: (.206) 786 - 22 52-
Fax Number: (206) 457-119C'
Expiration Date: 0.5y3 g07
City
Day Telephone:
Fax Number:
City
Day Telephone:
Fax Number:
State
State
Zip
Zip
Page 1 of 6
Valuation of Project (contractor's bid price): $ 7 ( Z
Scope of Work (please provide detailed information): EciAtiou e-
nv t ro Fla. t !A S•ns A
Will there be new rack storage? ❑ - -.. Yes
Q ApplicaiionsWonm- Applications On Line '3 -2006 - Permit Application doe
Revised' 9 -2006
bh
Number of Parking Stalls Provided: Standard:
Will there be a change in use? ❑ Yes
0
No
Existing Building Valuation: $
&x rs A tuo
i
a IAAe -t-1i
tur f r�7e* tr atay
(cc rck Haw
If yes, a separate permit and plan submittal will be required.
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq fl): Floor area of principal dwelling: Floor area of accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Compact: Handicap:
If "yes ", explain:
FIRE PROTECTION/HAZARDOUS MATERIALS:
❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No
If' yes', attach list of materials and storage locations on a separate 8 -1/2" x 11 "paper including quantities and Material Safety Data Sheets.
SEPTIC SYSTEM
❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
Page 2 of 6
Fixture Type:
Qty
Fixture Type:
Qty
Fixture Type:
Qty .
Fixture Type:
Qty
Bathtub or combination
bath/shower
Drinking fountain or water
cooler (per head)
Wash fountain
Gas piping outlets
Bidet
Food -waste grinder,
commercial
Receptor, indirect
waste
Clothes washer, domestic
Floor drain
Sinks
Dental unit, cuspidor
Shower, single head trap
Urinals
Dishwasher, domestic,
with independent drain
Lavatory
Water Closet
Building sewer or trailer
park sewer
Rain water system — per
drain (inside building)
Water heater and/or
vent
Additional medical gas
inlets/outlets — six or more
Industrial waste
pretreatment interceptor,
including its trap and vent,
except for kitchen type
grease interceptors
Repair or alteration of water
piping and/or water treating
equipment
Repair or alteration
of drainage or vent
piping
Medical gas piping system
serving one to five
inlets/outlets for specific gas
PLUMBING AND GAS PIPINC%„ INFORMATION - 206- 43ivo70
PLUMBING AND GAS PIPING CONTRACTOR INFORMATION
Company Name:
Mailing Address:
City State Zip
Contact Person: Day Telephone:
E -Mail Address: Fax Number:
Contractor Registration Number: Expiration Date:
Valuation of Plumbing work (contractor's bid price): $
Valuation of Gas Piping work (contractor's bid price): $
Scope of Work (please provide detailed information):
Building Use (per Int'1 Building Code):
Occupancy (per Int'I Building Code):
Utility Purveyor: Water: Sewer:
Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below:
Q:Application,Wonm- Applications On Liee13-2006 -Permit Applicatioadoc
Revised: 9-2006
bit
Page 5 of 6
PERMIT CAmio NOTE
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
Building and Mechanical Permit
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
Plumbing Permit
The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested
in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING 0 ii R OR
Signature:
Date Application Accepted: t2H- 1 al
D AGENT:
Print Name: nvt1i)v$ 1fl9ct
Mailing Addres : [7 - D
Q.Upplications\Fonns- Applications On LinM3 -2006 - Permit Applicationdoc
Revised: 9.2006
bh
B ®x 69:3/s Cgc 71t
Date: /2/Z 4/0A
Day Telephone: (20 6 786 - 22 r
wot aS f6
City State Zip
Date Application Expires: dt r 101--
Staff Initials:
Page 6 of 6
Parcel No.: 0040000071
Address: 3418 5 146 ST TUKW
Suite No:
Applicant: 3418 APARTMENTS
Receipt No.: R06 -02012
Payee: ROOFCORP OF OREGON, INC.
ACCOUNT ITEM LIST:
Description
BUILDING - RES
STATE BUILDING SURCHARGE
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Fax: 206 -431 -3665
Web site: http: //www.ci.tukwila.wa.us
RECEIPT
Initials: JEM Payment Date: 12/26 /2006 08:54 AM
User ID: 1165 Balance: $0.00
TRANSACTION LIST:
Type Method Description Amount
Payment Check 03711 194.36
Account Code Current Pmts
000/322.100 189.86
000/386.904 4.50
Total: $194.36
•
Permit Number: D06 -479
Status: APPROVED •
Applied Date: 12/26/2006
Issue Date:
Payment Amount: $194.36
•
•
•
3!_06 12/26 9716 TOTAL. 194.36
doc: Receiot -06 Printed: 12- 26.2006
Project:
g' «/P ,pngiMcyT"
Type of / I 7 nspectioJ� : Nj
izcwi r sAen /Arpn/j'
Address:
?Yi S
/yb,, - /
Date Called:
//
Special Ins ructions:
Date Wanted:
/ — 0 —7
a.m.
P.m.
Requester:
Phone No:
2 OG - ?S‘ - 22- 5—
2
INSPECT ITNO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431
Approved per applicable codes. El Corrections required prior to approval.
COMMENTS:
/ /m: (lor4 / /f /t
0' .00 REINSPECTION E REQUIRED. • or to inspection, fee must be
aid at 6300 Southcenter Blvd., Suite 00. Call to sechedule reinspection.
Receipt No.:
Date:
INSPECTION RECORD
Retain a copy with permit
COMMENTS: P ,/ .
Type of Inspection: ..
401 V.4 4eAk'
Address
�s
R 9-tTfSk.P,-f4 ArC -`
Ite lap
-117 S Iyl�
tic -10 hto ,Pc,Atr._'_`t_-'�'�
iT15L4%
4 ;iv,... .+0 = >=x 1 4'' rt;S;LA
J °I
-..e"
- )kA j - os 4_..c- -% ), f(fl r. 4S ,C0-..e"
Requester:
Samti-ck
J
ED & MQ riacc i k...ti.. 1 ry c4 t/
AS r tI5awsc.4
\ {{ Z r.KuC.4 - I' LL a,4�4JS -S v
� A \
_•. YJ•2 LtM 1 S V 4 . 1 4 i t . w ■ 1 Vt t4 - ,
•
1
Protect: A �
79-119 ^ "s
Type of Inspection: ..
401 V.4 4eAk'
Address
�s
Date Called:
a
Ite lap
-117 S Iyl�
Special Instructions:
Date Wanted: ,
a.m.
Requester:
Samti-ck
Phone No: �(
2 in *go 27c,2.
►1
PERMIT ,
CITY OF TUKWILA BUILDING DIVISION j p• P' j
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (2 t .)4
INSPECTION NO.
El Approved per applicable codes.
Receipt No.:
1
INSPECTION RECORD
Retain a copy with permit
G
El Corrections required prior to approval.
$8.Q0 REINSPECTION EE REQUItD. Prior to inspection, fee must be
aid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection.
'Date:
11-- 2'7
'Date:
CLIENT: 01263
Kathryn Mcalister
3418 S 146th st.
Tukwila, WA 98168
` Proposal
ROOFCORP
P.O. Box 69315
Seattle, WA 98168
(206) 439 -9991 Fax (206) 439 -9995
CONTACT: Kathryn Mcalister
PHONE: (425) 785 -3786
FAX:
Work Specifications
PROPOSAL: 003899 DATE: 12/24/06
3418 Aparments
1. Remove existing cap metal flashing in preparation for new after roofing system is in place
2. Tear off the existing roof coverings down to the wood substrate. Set all protruding fasteners and sweep roof clean and dry as
required. During the removal process, the substrate is to be inspected for structural soundness. It is understood that the owner or
their approved representative will be available during the roofing removal and demolition. This is required in order to avoid any
delay while the roof is uncovered and exposed to weather. Any extra labor connected with repair work will be billed on a time
($72.50 per hour) and material (plus 20% mark up) basis.
3. Install new cant strip at the roof perimeter in order to provide a transition for the roofing membrane.
PROJECT: 003625
3418 Aparments
3418 S 146th st.
Tukwila, WA 98168
REOEIVED
crry 01Y TUKWILR
DEC 2 6 2006
PERMIT CENTER
4. Apply a 28 Ib. fiberglass reinforced base sheet with 2 "- side laps and 6 "end laps directly to the substrate and extend up all
cantstrips at least 2" mechanically secure 9" of center at sidelaps and 18" on center in two lines 12" from each edge. (Staggered)
Mechanical fasteners used for securement shall be square head simplex nails of sufficient length to penetrate at least 7/8" in to
substrate.
5. Install per manufacturer's specifications, a modified POLYGLASS granulated 4.5mm bitumen membrane. Warranty: 12 -year
on all labor and material according to the manufacturer's written warranty.
6. Install per manufacturer's specifications, a modified POLYGLASS granulated 4.5mm bitumen membrane up and over all
perimeter edge and walls.
7. ROOFING SYSTEM GUARANTEE: 12 YEARS
"POLYGLASS guarantees that POLYGLASS roofing membrane will be free from defects in materials and that the roof or other
surface over which the membrane is installed will retain its watertight integrity from the date of the membrane installation for the
period of Twelve years."
The Owner may assign warranty to a successive party.
No Dollar Limit
Life expectancy 20 years
8. All existing down drop scuppers will be removed and discarded. New STAINLESS STEEL downdrop scuppers will be installed
according to manufacturer's specifications.
Proposal Page 2
Work Specifications
9. All cants, curbs, and sharp angles will have extra flashing materials installed per manufacturer's installation instructions.
10. Flash all vents, boxes and similar roof penetrations, following the manufacturer's flashing details for using a modified bitumen
torch -on membrane.
11. Seal and flash around all pipes, conduits, poles, and other roof penetrations using modified bitumen standard flashing
techniques according to the manufacturer's specifications.
12. Install new lead pipe vents and flash according to the manufacture's standard specifications.
13. All roof flashings (roof vents), will be removed, cleaned, inspected and reinstalled when possible. If new flashing are required
they can be installed subject to and additional charge.
14. TV ANTENNA OR DISH. In order to do work set forth in these specifications the existing TV Antenna or dish must be
reinstalled. This work is not part of this contract and should be done by others.
15. EXCLUSIONS: Mechanical Work, Electrical Work, Wood Work and WSST.
16. During the course of this work, ROOFCORP shall use all means necessary to maintain the work area in a clean safe, and in
an orderly manner. All waste material shall be contained in one area as much as possible and removed from job site when all
work is completed.
17. Payment to be made as follows:
i. 40% upon delivery of materials to job site
ii. 60% upon completion of work
TOTAL BID
$7,162
Page 1 oft
TERMS AND CONDITIONS
All work performed by ROOFCORP of OR., Inc. ( "ROOFCORP ") is subject to the following terms and conditions
ACCEPTANCE Until accepted by Customer and countersigned by
ROOFCORP, this Proposal is subject to change or withdrawal
without prior notice and is automatically withdrawn unless accepted
within thirty (30) days of issue.
PROPOSAL This proposal constitutes the entire understanding of
the Customer and ROOFCORP. No promise, representation or
warranty is binding on ROOFCORP unless included in this Proposal
and agreed to in writing signed by ROOFCORP.
CHANGES TO THE WORK This proposal shall be appropriately
adjusted, including an adjustment for profit and overhead, if changes
to the Specifications or Work which cause an increase to
ROOFCORP's cost of or time required to perform any part of the
Work. The Proposal shall be appropriately adjusted, including an
adjustment for profit and overhead, if there are subsurface latent
conditions not shown on the Specifications, or conditions of an
unusual nature which increase ROOFCORP's cost or time required to
perform any part of the Work.
DIFFERING SITE CONDITION Unless otherwise agreed to in
writing, ROOFCORP shall not be responsible for the replacement of
any lumber, sheathing, trim, rotted wood or electrical and mechanical
work. It is agreed that any such Work shall be extra work for which
ROOFCORP will be paid on a time and material basis, including
profit and overhead.
PROJECT SEOUENCING ROOFCORP is responsible for
establishing scheduling and sequencing of the Work to be performed.
ROOFCORP shall not be held responsible for the delay, non-
delivery, discontinuance, default in shipment by a supplier in whole
or in part, loss in transit, strikes, lockout or other conditions beyond
the control of ROOFCORP.
WARRANTIES ROOFCORP warrants that all work shall be
performed in a good and workmanlike manner according to the
Specifications. Any applicable manufacturer's warranties will be
transferred to the Customer upon payment in full for Work
performed. Upon request by Customer, manufacturer's warranties
are available for review by Customer. THIS WARRANTY IS IN
LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED,
INCLUDING ANY WARRANTIES OF MERCHANTABILITY OR
FITNESS FOR PARTICULAR PURPOSE.
WARRANTY CLAIMS AND LIMITATION ON DAMAGE
Customer will confirm in writing to ROOFCORP's headquarters any
Warranty claims within ten (10) days of discovering the basis for a
warranty claim. ROOFCORP's liability for a breach of warranty is
limited to repair and/or replacement of defective Work. ROOFCORP
will not be responsible for lost profits, special, indirect, incidental or
consequential damages. Manufacturer's warranties are subject to any
and all restrictions and limitations contained therein.
NATURAL CONDITIONS It is understood and agreed that during
the construction Work included in this Proposal or any change orders
that damage may occur to interior finishes, walls and ceilings such as:
nail pops, cracks, breaks, tears, including painted surfaces, and to
other building components such as wiring, fixtures, and trim.
Inadvertent damage may occur to personal property items that are
displayed, hung, stored, shelved or attached to the structure. Also,
minor disturbances to shrubbery and lawn and small divots in the
P.O. Box 69315 3425 S. 146 St.
Seattle, WA 98168 Seattle, WA 98168
driveway from heavy equipment such as roll -off trash containers and
dump trucks. Customer is responsible for the security and safety of
all personal property and the insurance thereof. ROOFCORP will use
care and caution in demolition, repair and construction work to avoid
and minimize damage to property. The debris generated from this
process and related procedures may cause inconvenience or
discomfort which is normal construction wear and tear conditions and
not ROOFCORP's negligence. However, should accidental damage
occur, the cost to correct such damage is not included in this
Proposal.
NATURAL PONDING Visible evidence of latent Ponding caused
by structural roof deck deflection often will not be apparent until
after the existing roof membrane has been removed and the re-
roofing completed. Customer understands and agrees that should
roof Ponding.become evident or occur as a result of the existing roof
membrane removal, and if Ponding is of sufficient quantity or depth
to violate the manufacturer's guidelines for warranty issuance, then
any corrective work required to assure issuance or validation of the
warranty will be done based upon a contract change order and will be
at an additional cost to the base contract. Typical methods used to
correct significant Ponding conditions may include gutters, troughs,
saddles, crickets, sloped sections, drain revisions, and roof leveling
procedures.
ASBESTOS In the event that ROOFCORP encounters materials that
may contain asbestos, it shall immediately stop Work All
responsibility and cost, including delays, associated with evaluating
suspected asbestos, removing asbestos, or otherwise complying with
federal, state or other laws and regulations relating to removal or
treatment of asbestos, shall be bome by the customer.
VENTING ROOFCORP shall not be liable for damage caused by
inadequate venting of roof sheathing and framing should
condensation related damage occur during the warranty time allowed
in this Proposal.
MOISTURE Moisture that has entered into the building prior to our
installation or repair of the roofing system may result in mold growth.
We disclaim any and all responsibility for damages to persons or
property arising from or relating to the presence of mold in the
building. By executing the contract to which this Notice is affixed,
Owner ])releases us from any and all claims Owner and Owner's (a)
family members, (b) employees, (c) tenants or (d) any other building
occupants may have as a result of such mold growth and 2) agrees to .
defend, indemnify and hold us harmless from any and all penalties,
actions, liabilities, costs, expenses and damages arising from or
relating to the presence of mold in Owner's building.
PERMIT/INSPECTION FEES Customer shall pay all building
permit and/or inspection fees required plus issuance costs.
INSPECTOR If an inspector or consultant is brought to the job for
any reason by ROOFCORP or any other person, this inspector or
consultant must be mutually agreed upon by the Customer and
ROOFCORP.
OWNERSHIP Title to material and/or Work furnished under this
Proposal shall remain the property of ROOFCORP or its assignees
until all payments have been made. It is also agreed that ROOFCORP
will have a security interest in any real property of the Customer, and
Phone: (206) 439 -9991 OR Contractor License
Fax: (206) 439 -9995 ROOFCOI966KK
the customer will not dispose of the property until the work has been
paid in full.
SUBSTANTIAL COMPLETION Payment is due as set forth in the
Proposal. If the Proposal does not contain payment terms, 95% of the
price is due upon substantial completion of the Work.
FINAL WALKTBROUGH Upon substantial completion of the
Work, Customer and ROOFCORP will conduct a WALKTHROUGH
inspection of the Work during which Customer will prepare a written
list ( "punch list ") of any items to be completed prior to final
acceptance of the Work as completed and to make payment in full
after completion of any items listed on the punch list.
CONTRACTOR REGISTRATION ROOFCORP of OR, Inc., is
registered with the State of Oregon, registration number
ROOFCOI966KK, as a specialty contractor and has posted with the
State a bond of cash deposit of $4,000.00 for the purposes of
satisfying such claims against ROOFCORP for negligent or improper
breach of contract in the conduct of ROOFCORP's business. This
bond or cash deposit may not be sufficient to cover a claim, which
ACCEPTANCE OF PROPOSAL: The above Terms and
Conditions are satisfactory and are hereby accepted. You are
authorized to do the work specified. Payment will be made as
provided above.
Date:
Name:
Signature:
Street:
Phone:
OWNER/CUSTOMER
ILLENG INFORMATION
Company: %al id .0. Ada
Attn.: a/i �[�C 'T4,
r
City, St., Zip: � / t U.�J i f/�f /� / g .
P.O. Box 69315
3425 S. 146 St.
Seattle, WA 98168 Seattle, WA 98168
Page 2 of 2'
might arise from Work done under your Proposal. If the supplier of
materials used in your construction project or any employee of
ROOFCORP or subcontractor is not paid by ROOFCORP or
subcontractor on your job, your property may be lined to force
payment. If you wish additional protection, you may request
ROOFCORP to provide you with the original lien release"
documents from each supplier or subcontractor from your Project.
ROOFCORP is required to provide you with further information
about lien release documents if you request it. General information is
also available from the Department of Labor & Industries.
PAYMENT Payment is due upon receipt of billing. Customer
agrees to pay a finance charge equal to 1.5% per month of the
outstanding balance on all past due accounts. Should it become
necessary to initiate collection of past due balances, including finance
charges, or to resolve disputes arising out of or relating to
ROOFCORP's work, Customer agrees to pay all. attorney's fees,
collection fees, lien fees, court costs, and any other related expenses.
All suits related to this Proposal shall be decided in King County
Superior Court.
Dated:
Estimator's
Signature:
ROOFCORP OF OR., INC.
Authorized
Signature:
ROOFCORP countersignature required to create binding proposal
Phone: (206) 439 -9991 OR Contractor License
Fax: (206) 439 - 9995 ROOFCOI966KK
License Information
License
ROOFCOI966KK
Licensee Name
ROOFCORP OF OREGON INC
Licensee Type
CONSTRUCTION CONTRACTOR
UBI
602394508
Ind. Ins. Account Id
#I
Business Type
CORPORATION
Address 1
PO BOX 69315
Address 2
City
SEATTLE
County
KING
State
WA
Zip
98168
Phone
2064399991
Status
ACTIVE
Specialty 1
GENERAL
Specialty 2
UNUSED
Effective Date
5/12/2004
Expiration Date
5/12/2008
Suspend Date
Separation Date
Parent Company
Previous License
ROOFCWI007Q1
Next License
Associated License
Bond Information
Bond
Bond
Company
Name
Bond
Account
Number
Effective
Date
Expiration
Date
Cancel
Date
Impaired
Date
Bond
Amount
Received
Date
#I
FIRST
NATIONAL
INS CO
6235355
05/01/2004
Until
Cancelled
512,000.00
05/12/2004
Business Owner Information
Name
Role
Effective Date
Expiration Date
JOYA, JORGE
PRESIDENT
05/12/2004
Look Up a Contractor, Electrician or Plumber License Detail Page 1 of 2
Washington State Department of Labor and Industries
General/Specialty Contractor
A business registered as a construction contractor with L &I to perform
construction work within the scope of its specialty. A General or Specialty
construction Contractor must maintain a surety bond or assignment of
account and carry general liability insurance.
•
•
•
•
https: / /fortress .wa.gov /Ini/bbip /printer.aspx ?License= ROOFCOI966KK 12/26/2006