Loading...
HomeMy WebLinkAboutPermit EL10-0808 - SEGALE PROPERTIESSEGALE PROPERTIES APN: 0222049011 & 0943 EL1 0-0808 Parcel No.: 0222049011 Address: City0f Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite # 100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.ci.tukwila.wa.us Tenant Name: SEGALE PROPERTIES ELECTRICAL PERMIT Permit Number: EL10 -0808 Issue Date: 11/08/2010 Permit Expires On: 05/07/2011 Owner: Name: LA PIANTA LLC Address: PO BOX 88028 , TUKWILA WA 98138 Contact Person: Name: BARRY BENNETT Address: PO BOX 88028 , TUKWILA WA 98138 Contractor: Name: WILSON CONSTRUCTION COMPANY Address: PO BOX 1190 , CANBY OR 97013 Contractor License No: WILSOCC066RK Phone: 206 396 -2012 Phone: 509 374 -1455 Expiration Date: 12/12/2010 DESCRIPTION OF WORK: INSTALL TEMPORARY POWER ALONG SOUTHCENTER PARKWAY EXTENSION (OH & UG MEDIUM VOLTAGE 12.5KV 3 PHASE LINE EXTENSION). UNDERGROUND AND OVERHEAD TEMPORARY POWER WILL BE USED TO POWER PUMPS FOR TESC DRAINAGE PONDS IN THE TUKWILA SOUTH PROJECT. Value of Electrical Work: NRES: $37,500.00 RES: $0.00 Type of Fire Protection: UNKNOWN Electrical Service provided by: PUGET SOUND ENERGY Permit Center Authorized Signature: Fees Collected: $932.63 National Electrical Code Edition: 2008 Date: i k I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this electrical permit. Signature: 64-41,P4,– P Date: 11— e ^I v Print Name: 6ftQ L f11-00A This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: EL -9/09 ELI 0-0808 Printed: 11 -08 -2010 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tuk-wi la. wa. us Parcel No.: 0222049011 Address: Suite No: Tenant: SEGALE PROPERTIES PERMIT CONDITIONS Permit Number: Status: Applied Date: Issue Date: EL10 -0808 ISSUED 10/12/2010 11/08/2010 1: ** *ELECTRICAL * ** 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296 -46B WAC. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Signature: Print Name: ►�� g r`'j M0A7 Date: II— g —/o doc: Cond -Elec ELI 0-0808 Printed: 11 -08 -2010 CITY OF TUKWS Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 httn://www.dtukwila.wa.us Electrical Permit No. Project No. (For office use only) - - ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print** SITE LOCATION Jr, i Jt. 5 vDtt` St- (TGte. rn euJ Site Address: 17o/` t-1. ,f% ,933+1.- S+ Tenant Name: ijiyva AJe� Property Owners Name: Se ci t, eP` — Mailing Address: 'RD, Su +�CeV■k ?aft k Ckt) King Co Assessor's Tax No.: 043.9a09410/ 1 /0,9acanf 093 S 4I 'R,rkwo.y ceoi r Suite Number:. Nl� Floor: N1 New Tenant: ❑ Yes ®..No IE% 38 /U Kw, p� City c✓� State CONTACT PERSON - Who do we contact when your permit is ready to be issued Name: 1 1 Ser+ e 14 Mailing Address: �.J �Jic gO a $ E -Mail Address: Sae, ve n(ff SP`:;U. te_p coop c' l` f i t -. C.J ELECTRICAL CONTRACTOR INFORMATION Day Telephone: 2�._ 3% -. 00( iv kw,(a. City Fax Number e 3JL° S�-S - /&( 2 W4 i$i State Zip Company Name: I :1 S-' E(ec4 i ( .1 Mailing Address: ?J. gJX /1 ?O Contact Person: 3 n / ",liu DJJL‘ l E-Mail Address: �f) ✓AnJ d y c0 W ∎ I S3°•C.ovtS f. (JAN- Contractor Registration Number: LO IL. SQC as SPS Gk5+`ruckr3 C�e.b City `L Day Telephone: Fax Number: State i-731 .3 Zip 360 -ago - -6/ SR. SD3- a‘,3- 6 r y(n Expiration Date: 7/7/�1�. Valuation of Project (contractor's bid price): $ 31500 Scope of-Work (please � provide d detailed in forma tion): S ( Ja u` Lc P r c is a (!td a t`3eou,nJ i clod .tifck %o fY uuer pu.. ps cr T ESC . i v k uy:tr. S i -L. c a ec f. Yes AC1 it (AA :)- )r - at, 1 r_ er cl /�r� Ikea.) ove4.0,4 ! �ew.P=,r r�, per w..1( 04 NI. ; w\�e rev)15 ;._ -1- Will service be altered? ❑ No Adding more than 50 amps? ® Yes ❑ No Type of Use: Type of work: ® New ❑ Addition ❑ Service Change ❑ Low Voltage ❑ Generator ❑ Fire Alarm Property Served by: Puget Sound Energy ❑ Seattle City Light H:1ApplicatiooelFomr- Applications on Lina�2010 ApplicatlonsW -2010 - Electrical Permit Appliatioadoc bh Page 1 of 2 ❑ Remodel ❑ Tenant Improvement ❑ Telecommunication ® Temporary Service (s yrs) RESIDENTIAL • 10 NEW RESIDENTIAL SERVICE ❑_ _ New - single- family dwellings $152.85 - -(mahlding an attached garage) ❑ Garages, pools, spas and outbuildings $81.90 ea ❑ Low voltage systems (alarm, furnace thermostat) $59.85 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration $81.90 (no added/altered circuits) ❑ Service change with added/altered circuits $81.90 number of added circuits $11.55 ea ❑ Circuits added/altered without service change $54.60 (up to 5 circuits) ❑ Circuits added/altered without service change $54.60 (6 or more circuits) $7.65 ea ❑ Meter /mast repair $68.25 ❑ Low voltage systems $59.85 (alarm, funace thermostat) MULTI- FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) $63.00 ❑ Temporary service (generator) $78.75 ❑ Manufactured/mobile home service $84.00 (excluding garage or outbuilding) ❑ Carnivals $78.75 Number of concessions $10.50 ea PERMIT APPLICATION NOTES - Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR Signature: Print Name: Bar. rv1 '' 'vt /1e ti Mailing Address: P.O. &x noa k Date: 10/11 /10 Day Telephone: o • 4.9Oi c3 wR 7,V 33 / v(cw; (1, city State I Date Application Accepted: 10 t I Z (� b Date Application Expires: ail, I (Z� it J� ` I Staff Initials: ^/ 1�� H:\ApplicatiooaWonne- Applications On Line\2010 Applications\7 -2010 - Electrical Permit Appliatian.doc bh Page 2 of 2 1 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http://www.ci.tulcwila.wa.us Parcel No.: 0222049011 Address: Suite No: Applicant: SEGALE PROPERTIES RECEIPT Permit Number: Status: Applied Date: Issue Date: EL10 -0808 PENDING 10/12/2010 Receipt No.: R10 -02041 Initials: JEM User ID: 1165 Payment Amount: $923.63 Payment Date: 10/12/2010 09:23 AM Balance: $9.00 Payee: SEGALE PROPERTIES TRANSACTION LIST: Type Method Descriptio Amount Payment Check Authorization No. 62691 923.63 ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PERMIT - NONR 000.322.101.00.00 ELECTRICAL PLAN - NONRES 000.345.832.00.00 Total: $923.63 737.10 186.53 doc: Receiot -06 Printed: 10 -12 -2010 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwi la. wa. us Parcel No.: 0222049011 Address: Suite No: Applicant: SEGALE PROPERTIES RECEIPT Permit Number: EL10 -0808 Status: PENDING Applied Date: 10/12/2010 Issue Date: Receipt No.: R10 -02042 Payment Amount: $9.00 Initials: JEM Payment Date: 10/12/2010 09:58 AM User ID: 1165 Balance: $0.00 Payee: SEGALE PROPERTIES TRANSACTION LIST: Type Method Descriptio Amount Payment Check 62692 9.00 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PERMIT - NONR 000.322.101.00.00 9.00 Total: $9.00 doc: Receipt -06 Printed: 10 -12 -2010 INSPECTION RECORD Retain a copy with permit INS' -' ION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION kto -00 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 431 -2451 (206) 431 -3670 Project: ,5f4 i .4 p. Type of Inspection: �� Address: Date Called: • Special Instructions: Date Wanted: /.2/2"/ a.m. P.I,0 Requester: g:KT'\ Phone No: 376 I/ O,L Approved per applicable codes. Corrections required prior to approval. COMMENTS: oe 4 Inspector: Date: raj i l 0 n REINSPECTIO FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPE TION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 431 -2451 (206) 431 -3670 Project: c` R p Type of Inspection: ,, Address: Date Called: Special Instructions: 11 :00 ✓t. Date Wanted: /2 / y crne. Requester: Phone No: ❑ Approved per applicable codes. Corrections required prior to approval. S' COMMENTS: 6Vittk5 ePPOIAl&riOA15 kyr 60fee1 goidDidC) 'i'RWSroRki°'tr' aoln. no, A7 5 / te4 6Q1 E pc4J Foal ee Pc T Pal° JI10> Inspector: 65ideis Date: n REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. , . CITY OF TUKWILA BUILDING DIVISION ' 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 64o-684 Permit Inspection Request Line (206) 431 -2451 Projecta 3l �1 Ker. Type of Inspection: 7 69 Address: Date Called: Special Instructions: Date Wanted: a.m. p.m. Requester: Phone No: Approved per applicable codes. El Corrections required prior to approval. /s- COMMENTS: 0 ff MARO k p 1or1 _S-r„ PtuAvi Inspector: Date: 02d, to n REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. • PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: EL10 -0808 DATE: 10/12/10 PROJECT NAME: SEGALE PROPERTIES SITE ADDRESS: XXXXX SOUTHCENTER PY X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: uliding Q'vision Fire Prevention n Planning Division Public Works ❑ Structural n Permit Coordinator n DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete n DUE DATE: 10/14/10 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Building Please Route Structural Review Required n No further Review Required n REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 11/11/10 Approved Approved with Conditions Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 Contractors or Tradespeople Pfter Friendly Page Electrical Contractor A business licensed by L&I to contract electrical work within the scope of its specialty. Electrical Contractors must maintain a surety bond or assignment of savings account. They also must have a designated Electrical Administrator or Master Electrician who is a member of the firm or a full -time supervisory employee. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Business Type Parent Company WILSON CONSTRUCTION COMPANY 5032636882 1190 Nw Third Ave PO BOX 1190 Canby OR 97013 Out Of State Corporation UBI No. 409008687 Status Active License No. WILSOCC066RK License Type Electrical Contractor Effective Date 12/12/1994 Expiration Date 12/12/2012 Suspend Date Specialty 1 General Specialty 2 Unused Electrical Administrator INFORMATION License SZENDM'055LC Name SZENDRE, MONTE Status Active Business Owner Information Name Role Effective Date Expiration Date C T CORPORATION, Agent 11/15/2002 Bond Amount WILSON, DONALD M President 01/01/1980 58624396 WILSON, KIM E Secretary 01/01/1980 WILSON, STACY A Treasurer 11/22/2004 ST PAUL FIRE a MARINE INS CO WILSON, NORMA E Vice President 01/01/1980 12/07/2004 SZENDRE, MONTE R Agent 01/01/1980 11/15/2002 Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 3 WESTERN SURETY CO 58624396 12/07/2004 Until Cancelled $4,000.00 11/11/2004 2 ST PAUL FIRE a MARINE INS CO 400ST7332 12/07/2002 Until Cancelled 12/07/2004 $4,000.00 10/17/2002 Assignment of Savings Information No records found for the previous 6 year period Insurance Information No records found for the previous 6 year period Summons /Complaint Information Summons and Complaints are not filed with the department for this contractor type Warrant Information Warrants are not filed with the department for this contractor type Infractions /Citations Information Infraction / Citation Date RCW Code Type Status Violation Amount ECUNE00330 5/19/2009 19.28.101 RCW ELECTRICAL CITATION Satisfied $250.00 https: // fortress .wa.gov /lni/bbip /Print.aspx 11/08/2010 CT oo- o 0 0 (1) CD 0 0 (n z 0 I a) 0 a) 0 0 0 o " 0 C L a) 0 0 c W L() 0 0 0 (1) E Q LC) N 1 0 0 N 0o 0 U 0 Segale Properties Customer Owned Temporary OH & UG Medium Voltage 12.5kV 3 -Phase Line Extension WORKZONE 1 POLES 01 -09 & V01 & 02 SEE SHEET 3 1 1 1 ` WORKZONE 2 POLES 10 - 16 & V03 SEE SHEET 4 1 1 4-0 COMPREHENSIVE PROJECT OVERVIEW NOT TO SCALE PROJECT SCOPE OVERVIEW THIS PROJECT ENCOMPASSES THE DESIGN AND CONSTRUCTION OF A NEW 12,470 VOLT 3 -PHASE CUSTOMER OWNED MEDIUM VOLTAGE OVERHEAD AND UNDERGROUND FUSED DISTRIBUTION SYSTEM (3 -WIRE DELTA AND A GROUND CONDUCTOR) TO SERVE THE STORM WATER PUMPS FOR THE SOUTHCENTER PARKWAY EXTENSION PROJECT, LOCATED IN TUKWILA, WASHINGTON. THE NEW 3 -PHASE SYSTEM OVERHEAD DISTRIBUTION SYSTEM STARTS AT THE LOAD -SIDE OF THE UTILITY MASTER (PRIMARY) METER AND TERMINATES AT THE 600V SECONDARY TERMINAL BUS IN THE CUSTOMER OWNED TRANSFORMERS WHERE NORTH SKY'S ELECTRICAL DESIGN ENDS. SPECIFICALLY, INSTALL A NEW OUTDOOR TYPE 15KV RATED / 200 AMP 3 -PHASE OVERHEAD MASTER (PRIMARY)METERING PACKAGE AND A NEW 15KV RATED / 600 AMP GROUND OPERATED AIR -BREAK DISCONNECT SWITCH WHICH WILL BE GANG- OPERATED (THREE POLE - SINGLE THROW). THE NEW OVERHEAD PRIMARY METER IS TO BE OWNED AND OPERATED BY THE LOCAL UTILITY COMPANY, PUGET SOUND ENERGY. THE NEW 600 AMP DISCONNECT SWITCH IS TO BE OWNED, OPERATED AND MAINTAINED BY "SEGALE PROPERTIES" THE PROJECT ALSO CONSISTS OF INSTALLING 16 NEW FULLY PRESSURE TREATED WOOD POLES AND RESPECTIVE GUYING, ANCHORING AND GROUNDING. IT INCLUDES APPROX. 3,410 LINEAR FEET OF NEW #2 ACSR (ALUMINUM CONDUCTOR STEEL REINFORCED) PRIMARY OVERHEAD CONDUCTOR, AND #2 ACSR PRIMARY GROUND IN THE HORIZONTAL (PRIMARY) POSITION. ALSO INCLUDED ARE (3) NEW 200 AMP FUSED AND (1) 200 AMP SOLID BLADE DISCONNECTS FOR THE OVERHEAD TO UNDERGROUND TERMINATION ASSEMBLIES. FROM THE NEW 30 TERMINATIONS, THE NEW CUSTOMER OWNED MEDIUM VOLTAGE UNDERGROUND DISTRIBUTION SYSTEM WILL DISTRIBUTE VIA A 4" SCH40 DUCT SYSTEM WITH (3)1/0 CU. MV105 CABLES WITH A SEPARATE 600V COVERED GROUND IN THE SAME CONDUIT TO SERVE (3) NEW PAD MOUNTED 112.5kVA, 225kVA AND A 500kVA 480Y/277V PADMOUNTED TRANSFORMERS (NEMA 3R, OUTDOOR, PAD MOUNT TYPE) WHICH WILL SET ON A CONCRETE LID AS INDICATED ON THE ENCLOSED DRAWINGS. POLES AND EQUIPMENT TO BE BUILT PER THE LOCAL UTILITY (PUGET SOUND ENERGY) STANDARDS FOR EASE OF FUTURE REPLACEMENT AND MAINTENANCE UNLESS OTHERWISE NOTED LOAD DATA SCHEDULE FILE COPY Penult No Plan review a l val Is s ect%omomandondselo . ppraval of construction documents doss not &harps s violation of any adopted cod or ordinance. Receipt approved Reid Copy snd conga* edged. INSPECTOR NOTE: • CUSTOMER IS INSTALLING MOTORS THAT WILL CYCLE AND PUMP ON DEMAND ONLY AND ARE NOT CONTINUOUSLY RUNNING. TABLE OF CONTENTS No granges a ail m to the scope of work without prior p l of Tukwila Building Oiivtsialni. Revisions will require a new plan sly d may include additional plan review fees. Service Phase and Voltage Panel Size Estimated Demand Factor Estimated kW Demand Per Panel Calculation Methodology Estimated kVA Required Per Panel Calculation Methodology A NEW Proposed , Transformer Size 1f Transformer "V01" 30- 480Y/277 100A 80% 100A X 1.73 X 480 X 95% 78888 79kW 100A X 480 X 1.73 83040 84kVA a 112.5kVA _ 1000 1000 _ _ 1000 1000 - Transformer "V02" 30- 480Y/277 200A 80% 200A X 1.73 X 480 X 95% 157776 158kW 200A X 480 X 1.73 166080 167kVA 225kVA = = 1000 1000 = = 1000 1000 Transformer "V03" 30- 480Y/277 400A 80% 400A X 1.73 X 480 X 95% 315552 316kW 400A X 480 X 1.73 332160 333kVA 500kVA 1000 _ 1000 - 1000 1000 - Total Estimated kW 553kW Total Estimated kVA 584kVA INSPECTOR NOTE: • CUSTOMER IS INSTALLING MOTORS THAT WILL CYCLE AND PUMP ON DEMAND ONLY AND ARE NOT CONTINUOUSLY RUNNING. TABLE OF CONTENTS No granges a ail m to the scope of work without prior p l of Tukwila Building Oiivtsialni. Revisions will require a new plan sly d may include additional plan review fees. • SHE TABLE OF CONTENTS it COMPREHENSIVE PROJOVERVIEW PROJECT SCOPE PROJECT CONTACT LIST VICINITY MAP K f II1�y�i 1 GENERAL CONSTRUCTION NOTES ELECTRICAL SYMBOLS LEGEND ABBREVIATION KEY 2 SITE PLAN VIEW WORKZONE 1 CONSTRUCTION NOTES 3 SITE PLAN WORKZONE 2 CONSTRUCTION NOTES 4 ONE -LINE CIRCUIT SCHEMATIC ONE -LINE CONDUIT AND CABLE DIAGRAMS 5 POLE DETAILS 6 POLE DETAILS TRANSFORMER DETAILS TRENCH DETAIL CABLE TAG DETAIL 7 TECHNICAL SCHEDULES 8 CABLE TEST RECORDS ACTUAL PULLING TENSION RECORD 9 PROJECT CONTACT LIST SEGALE PROPERTIES MARIO SEGALE MARK SEGALE TODD COVEY BARRY BENNETT OWNER OWNER PROJECT MANAGER PROJECT MANAGER (206) 575 -2000 (206) 575 -2000 (206) 57,5 -2000 (206) 575 -2000 NORTH SKY ENGINEERING (PRIVATE MV ELECTRIC SYSTEM) CLINT THAYER - ENGINEER (425) 864 -0566 GUY RIDER - DESIGN TECHNICIAN (253) 507 -6243 POTELCO (UTILITY SYSTEM) SCOTT BOSTROM PROJECT MANAGER - (253) 606 -4552 170TH.` 100111 �I BYwaswismilimaralreitirmwaramwarmarsiosoim Date: 11 —�-1D City Of *DJkwIle BUILDING DIVISION "51715TST 5100.,, ST BLVD sw - ':38TH ST S 1 7TH .•ST Jy /� � cf 176TH: ST. .1 ... o r a� s .179TH 182 D S :188TH'ST' 5 .181ST .5T. DR . TRIi''ND W #3RD tsE` 1 0T' 700 sEA alRt; AN 182ND sT 182ND ST 184TH ST =188TH ST 5 .188TH 190TH ST 190TH ST S_193RD..PL' 194TH_ST.r` 191ST. PL 19 L PL 193RD PL S 194TH 5600 200TH 202ND 204TH ST 5700 VICINITY MAP NOT TO SCALE 216Th ST 12 T S;'214TH z ST 216TH fT REVIEWED FOR COMPLIANCE WITH NFPA 70 - NEC OCT 2 0 2010 City of.Tukwila BUILDING DIVISION ASRALA OCT 12 2010 PERMIT CENTER A cz UANTA SERVICES COMPANY 2224 104th Avenue East Suite 1 Edgewood, WA 98372 Office (253) 952 -2128 Fax (253) 952 -2140 13400009032 NSC Job Number: Clint Thayer Engineer: Guy Rider Drafter: Barry Eronson Checked: Wayne Hagan Approved: EXPIRES 11/19/. // Revisions No. Date Description Segale Properties Customer Owned Temporary OH & UG Medium Voltage 12.5kV 30 Line Extension From South 200th Street, North Along NEW Southcenter Parkway Cover Sheet Project Overview Project Scope Table of Contents Contact List Vicinity Map Sheet 1 of 9 0, o oo- 0 0 0 w z i' 0 I a) O 0 a) 0 0 L_ 0' 0 a) 0 0 Li] Ln 0 z 0 V) 0 I • ^ 0 0 N C 0 0 0 GENERAL CONSTRUCTION NOTES PRE - CONSTRUCTION: • AN ON -SITE PRE CONSTRUCTION MEETING IS REQUIRED PRIOR TO THE START OF CONSTRUCTION. THE PROJECT ENGINEER WILL BE SCHEDULED TO ATTEND THIS MEETING TO PROVIDE INPUT AND CLARIFICATION. • LOCATE & MARK ALL UTILITIES PRIOR TO CONSTRUCTION, UTILIZING THE LOCAL "ONE- CALL" SYSTEM AND ANY UTILITIES WHICH DO NOT PARTICIPATE OR "PRIVATE LOCATORS ". PERMIT REQUIREMENTS: • PRIOR TO CONSTRUCTION, CONTRACTOR SHALL SECURE ALL NECESSARY CONSTRUCTION PERMITS DEEMED NECESSARY . • NOTIFY LOCAL L &I AUTHORITIES 48 TO 72 HOURS OR AS REQUIRED BY PERMITTING AGENCY BEFORE STARTING WORK. QUALIFIED WORKERS: • ALL CONSTRUCTION SHALL BE PERFORMED BY QUALIFIED ELECTRICAL WORKERS. SAFETY: • EMPLOYEES SHALL ADHERE TO ALL SAFETY REQUIREMENTS AT ALL TIMES • USE PROPER VEHICLE GROUNDING AND BARRICADING PER STATE AND FEDERAL REQUIREMENTS. • SYSTEM GROUNDING REQUIREMENTS, PER STATE AND FEDERAL CODES SHALL BE USED. • PERSONAL PROTECTIVE GROUNDING REQUIREMENTS, PER STATE AND FEDERAL CODES SHALL BE USED. WORKING DRAWINGS: • LOCATIONS OF EXISTING FEATURES AND FACILITIES ARE BASED ON DRAWINGS PROVIDED BY THE OWNER. FIELD VERIFICATION SHOULD BE MADE BEFORE STARTING PROJECT. • MAINTAIN ON SITE, IN GOOD CONDITION, A COMPLETE FILE OF CONSTRUCTION DRAWINGS. • THESE DRAWINGS SHALL BE AVAILABLE AT ALL TIMES TO THE OWNER'S SITE REPRESENTATIVE, AND THE ELECTRICAL INSPECTOR. • CORRECTIONS AND CHANGES MADE DURING CONSTRUCTION SHALL BE RECORDED CONTINUOUSLY ON THESE DRAWINGS. • ANY CHANGES TO THIS DESIGN SHALL FOLLOW NOTIFICATION AND APPROVAL FROM THE OWNER OR THE DESIGN ENGINEER PRIOR TO ANY CONSTRUCTION REVISIONS. MATERIAL: • ALL MATERIALS SHALL BE UL LISTED AND RATED IN COMPLIANCE WITH NEC, NESC AND ANSI STANDARDS. • OVERHEAD PRIMARY AND SYSTEM GROUNDING CONDUCTORS SHALL CONSIST OF #2 ACSR (PHASES) AND #2 ACSR GROUND. (MULTI- GROUNDED AT EACH POLE) • UNDERGROUND MEDIUM VOLTAGE CONDUCTORS TO CONSIST OF (3) 1/0 STRANDED C.U. MV -105 EPR 15kV RATED JACKETED 133% INSULATED, AND (1) COVERED #2 STRANDED C.U. MULTI - GROUNDED 600V INSULATED COVERED (THHW) GROUND CONDUCTOR. EXCAVATION, FRAMING & INSTALLATION OF WOOD POLES: • POLE EXCAVATIONS SHALL BE MAINTAINED IN A SAFE CONDITION AT ALL TIMES TO PROTECT THE WORKERS. • OPEN EXCAVATIONS LEFT OPEN OVERNIGHT OR NON WORKING DAYS SHALL BE COVERED OR SECURED BY MEANS ACCEPTABLE TO THE OWNER. • EXCAVATION IN EARTH SHALL HAVE CLEAN LEVEL SURFACES OF UNDISTURBED MATERIAL WITH ADEQUATE BEARING CAPACITY. • POLES ARE TO BE INSTALLED OR RELOCATED AS STAKED. UNLESS OTHERWISE NOTED, ALL POLE LOCATION MEASUREMENTS ARE FROM THE CENTER OF THE POLE. • NEW POLES SET SHALL BE THE CLASS INDICATED ON THE SKETCH, OR BETTER. • POLES AND ANCHORS WILL BE STAKED PRIOR TO CONSTRUCTION. • ALL POLE TO BE SET AT 10% +2' UNLESS OTHER WISE INDICATED. • IF SOIL IS UNSUITABLE FOR BACK -FILL AROUND POLES, USE 5/8" CRUSHED ROCK. • TREAT HOLES DRILLED IN THE FIELD WITH COPPER NAPHTHENATE. • IF POSSIBLE, ORDER POLES PREDRILLED AND FULLY TREATED FROM THE MANUFACTURE. • FRAME POLES PER LOCAL UTILITY STANDARDS FOR EASE OF REPLACEMENT IN THE CASE OF EMERGENCY. SEE FRAMING DETAILS. • APPLY GRIT INHIBITOR ON ALL STIRRUP, AND DEAD -END CONNECTIONS. • ALL GROUND CONDUCTOR CONNECTIONS TO BE MADE WITH SOLID COMPRESSION CONNECTORS. CONNECT ALL POLE GROUNDS TO COMMON NEUTRAL. • ALL PRIMARY AND SYSTEM GROUND CONDUCTORS SHALL BE PULLED IN USING THE APPROPRIATE RULING SPAN AND SAG TABLES PROVIDED ON THE DESIGN. • ALL CONNECTIONS TO THE SYSTEM GROUND CONDUCTOR WIRE WILL BE COMPRESSION TYPE PRESSED CONNECTIONS FOR EFFECTIVE BONDING GUYING: • DEAD ENDING THE PRIMARY AND GROUND CONDUCTORS REQUIRES MULTIPLE 3/8" GUYS WITH A MINIMUM LEAD OF 20', UNLESS OTHERWISE NOTED. • ANCHORS TO BE TRIPLE -HELIX SCREW IN TYPE WITH A 1 1/2" ROD EXTENSIONS . • YELLOW PLASTIC GUY GUARDS TO BE ON ALL DOWN GUYS. (FROM GROUND LEVEL UP TO 8' ABOVE GRADE) EQUIPMENT, VAULTS, ETC.: • EQUIPMENT, EQUIPMENT PADS, SPLICE VAULTS, PEDESTALS, ETC. SHALL BE INSTALLED PLUMB AND TRUE, AND SHALL BE SQUARE WITH THE ADJACENT STREETS, SIDEWALKS, PROPERTY LINES, ETC. THE LOCATION OF SIMILAR ITEMS SHALL BE CONSISTENT. • EQUIPMENT, EQUIPMENT PADS, SPLICE VAULTS, PEDESTALS, ETC, BEDDING MATERIAL SHALL CONSIST OF A MINIMUM OF 3 TO 6 INCHES. USE 5/8" MINUS CRUSHED ROCK. BACKFILL SHALL BE GOOD COMPATIBLE MATERIAL WITHOUT LARGE ROCKS, CHUNKS OR STICKS. BACKFILL SHALL BE PROGRESSIVELY COMPACTED FROM THE BOTTOM TO THE TOP SURFACE, AND SHALL BE WITHOUT VOIDS. • CONDUIT AND CABLE ENTRANCES, ETC. SHALL BE SUITABLY SEALED AND /OR GROUTED TO MAINTAIN THE INTEGRITY OF THE CONDUIT SYSTEM. • ALL VAULTS SHALL BE PRECAST CONCRETE, WITH ONE -PIECE COVER, LOCKING GALVANIZED STEEL ENTRANCE HATCH, KNOCKOUTS, DRAINS, EMBEDDED CHANNELS, ETC. • MEDIUM VOLTAGE CABLE TERMINAL BLOCKS (JUNCTION BOXES) SHALL BE 15 kV, 4 POINT LOAD BREAK CONNECTORS FOR USE WITH ELBOW TYPE HOT -STICK OPERABLE DEVICES WITH TEST POINTS (SEE HIGH VOLTAGE CABLE SECTION FOR TYPE), WALL MOUNTED WITH MOUNTING BRACKETS, 2 GROUND LUGS AND A MINIMUM OF 2 PARKING STANDS. MOUNTING HARDWARE, ETC. SHALL BE STAINLESS STEEL. ELASTIMOLD 163J4R -7 STAINLESS STEEL, OR APPROVED EQUAL. • TRANSFORMER PADS SHALL BE PRE -CAST CONCRETE, MINIMUM 6" THICK, SIZE AS REQUIRED WITH CABLE ENTRANCE OPENING(S) TO MATCH EQUIPMENT. CONDUITS: • CONDUITS SHALL BE SCHEDULE 40 PVC OR BETTER, FLAME RETARDANT, SUITABLE FOR USE WITH 90 °C CABLE, SHALL NOT DISTORT FROM HEAT IT WILL NORMALLY ENCOUNTER AND SHALL BE RESISTANT TO LOW TEMPERATURE AND SUNLIGHT EFFECTS, IMPACT AND CRUSHING. FITTINGS, COUPLINGS, ETC. SHALL BE OF THE SAME MANUFACTURER AS THE CONDUIT. ELECTRICAL POWER CONDUITS TO BE ELECTRICAL GRAY IN COLOR. • CONDUITS SHALL BE INSTALLED WITH A MINIMUM 36" COVER TO FINAL GRADE UNLESS OTHERWISE NOTED IN PLANS. • JOINTS IN THE UNDERGROUND PVC CONDUIT SYSTEM SHALL BE SOLVENT WELDED TO PREVENT THE ENTRANCE OF MOISTURE. PRIOR TO APPLYING SOLVENT, CONDUITS ENDS AND CONNECTORS SHALL BE PREPPED WITH PURPLE ETCHING PRIMER. • POWER CONDUIT ELBOWS AND BENDS SHALL BE MINIMUM 36 INCH RADIUS WHEN CONTAINING 15 kV CABLES AND MINIMUM 24" RADIUS WHEN CONTAINING 600 VOLT CABLES. • ALL CONDUIT ENTRIES INTO VAULTS TO BE MORTAR GROUTED AND SMOOTHLY FINISHED. CONDUITS TO ENTER AT A PERPENDICULAR (90) ANGLE TO VAULT FACE. • ALL CONDUITS IN TRENCH TO BE INSPECTED PRIOR TO BACKFILL FOR CORRECT DEPTH, SEPARATION SAND - BEDDING AND COVER. PRIMARY POWER CABLES: • PRIMARY POWER CABLES SHALL BE 15 kV UNDERGROUND RESIDENTIAL DISTRIBUTION (URD) CABLE, MV -105, COPPER, CLASS B STRANDED (COMPACTED) WITH AN EXTRUDED ETHYLENE PROPYLENE RUBBER (EPR) SEMI - CONDUCTING STRESS CONTROL LAYER OVER THE CONDUCTOR, MINIMUM 220 MIL EPR INSULATION (133% INSULATION LEVEL), EPR SEMI - CONDUCTING INSULATION SHIELD, AND HMW BLACK POLYETHYLENE COMPOUND OUTER JACKET. • PRIMARY POWER CABLES SHALL BE SUITABLE FOR INSTALLATION IN UNDERGROUND CONDUIT AT MAXIMUM CONDUCTOR TEMPERATURES OF 105 °C FOR CONTINUOUS NORMAL OPERATION, 130 °C FOR EMERGENCY OVERLOAD CONDITIONS AND 250 °C FOR SHORT CIRCUIT CONDITIONS. • PRIMARY POWER CABLES SHALL BE FACTORY TESTED IN ACCORDANCE WITH THE REQUIREMENTS OF ICEA AND AEIC, AND INCLUDE WITH EACH SHIPMENT OF CABLE A CERTIFIED TEST REPORT IN DUPLICATE TOGETHER WITH A STATEMENT THAT THE CABLE MEETS ALL THE REQUIREMENTS OF THIS SPECIFICATION AND INDUSTRY STANDARDS. • PRIMARY POWER CABLE TERMINATIONS AT TRANSFORMERS, SPLICE VAULTS, ETC. SHALL BE MADE WITH DEAD -END SUBMERSIBLE, HOT -STICK OPERABLE 200 AMP, 8.3/14.4kV LOAD BREAK ELBOW TYPE TERMINATORS WITH TEST POINTS. TERMINATORS SHALL BE MOLDED OF EPDM RUBBER ENCLOSED IN A MOLDED SEMI - CONDUCTIVE JACKET THAT IS GROUNDED DURING OPERATION, AND PROVIDED WITH A STAINLESS STEEL REINFORCED PULLING EYE. ELASTIMOLD TYPE 166LR, OR APPROVED EQUAL; COMPLETE WITH ALL NECESSARY COMPONENTS AND /OR ACCESSORIES TO MAKE UP A COMPLETE AND OPERATIONAL SYSTEM. • CABLE PULLING LUBRICANTS SHALL BE OF THE BEST QUALITY AND SHALL HAVE NO DAMAGING EFFECT ON THE INSULATION AND CABLE JACKET. • INSTALLATION OF ALL NEW MEDIUM VOLTAGE CABLE SHALL BE MEASURED AND RECORDED WITH A CALIBRATED TENSION DEVICE AND SHALL NOT EXCEED THE MANUFACTURER'S MAXIMUM ALLOWABLE PULLING TENSION, SIDEWALL PRESSURE AND BENDING RADIUS. THE RECORDED TENSIONS CAN BE DIGITAL AND OR MANUAL. GROUNDING: • GROUND RODS TO BE 3/4 INCH DIAMETER BY 8 FEET LONG COPPER -CLAD STEEL. • THE MULTI- GROUNDED NEUTRAL CONDUCTOR SHALL BE 600V RATED CABLE, COPPER, CLASS B STRANDED (COMPACTED), WITH POLYETHYLENE COMPOUND OUTER JACKET (THHW) IN THE SAME CONDUIT AS THE PRIMARY CABLES. BLACK INSULATION WITH GREEN PHASE TAPE ON EXPOSED SECTION AT EACH END. • BEFORE GROUNDING CONNECTIONS ARE MADE, CONTACT SURFACES SHALL BE THOROUGHLY CLEANED. CONNECTIONS SHALL BE BOTH MECHANICALLY AND ELECTRICALLY SECURE. • INSTALL A GROUND MAT IN THE VICINITY OF ALL 600 AMP GANG OPERATED SWITCH HANDLES AND BOND TO GROUND LOOP. • GROUND RODS SHALL BE DRIVEN AT OPPOSITE CORNERS AT EACH VAULT AND VISIBLE FOR INSPECTION. THE SEPARATION DISTANCE BETWEEN GROUND RODS TO BE A MINIMUM 6 FEET • CONNECTIONS AT GROUND RODS SHALL BE INSTALLED PER MECHANICAL CONNECTIONS WITH A #2 CU BARE GROUND WIRE ENTERING EACH VAULT AND BONDED TO THE GROUND LOOP INSIDE. TESTING: • ALL ELECTRICAL ACCEPTANCE TESTING TO BE PERFORMED BY A VERIFIED TESTING TECHNICIAN OR TESTING ENGINEER. • ALL ELECTRICAL ACCEPTANCE TESTING OF EQUIPMENT, APPARATUS AND MATERIAL TO BE PERFORMED IN ACCORDANCE WITH THE MOST CURRENT N.E.T.A. TESTING STANDARDS, REQUIREMENTS AND PRACTICES. • ALL UL EQUIVALENCY TESTING I.E. 'FIELD CERTIFICATION' TESTING TO BE PERFORMED BY A QUALIFIED AND REGISTERED TESTING COMPANY AND TESTING ENGINEER. ELECTRIC SYMBOLS LEGEND 0 G G— A NEW 30 TRANSFORMER / PADMOUNT PSE PRIMARY METERING POINT 30 600A DISCONNECT SW G/O 15 kV RATED 'LOAD BREAK' OVERHEAD FUSE DISCONNECT SWITCH DOWN GUY & ANCHOR NEW OVERHEAD OR UNDERGROUND DISTRIBUTION SYSTEM EXISTING OH UTILITY PRIMARY SYSTEM GROUND LOOP IN VAULT, # 2 CU. BARE SOLID NEW OH TO UG TERMINATION FUSES NEW POLE EXISTING POLE WOOD POLE PUSH BRACE ABBREVIATIONS kV 30 AAC ACSR ANCH ASSY AWG CIR C/O CU DBL DE FPT G/O MOV MP OH PRI SCH. SEC SVC SW TYP TW UG XFMR 1,000 VOLTS THREE PHASE ALL ALUMINUM CONDUCTOR ALUMINUM CONDUCTOR STEEL REINFORCED - ANCHOR - ASSEMBLY - AMERICAN WIRE GAUGE - CIRCUIT CUT -OUT (FUSED) - COPPER - DOUBLE - DEAD END FULLY PRESSURE TREATED GANG- OPERATED METAL OXIDE VARISTOR METERING POINT OVERHEAD - PRIMARY 30 (12,470 VOLTS 0 TO 0 AND 7,200 VOLTS 0 TO GROUND) SCHEDULE SECONDARY / LOW VOLTAGE 480Y/277 30 LESS THAN 600 VOLTS - SERVICE SWITCH TYPICAL TREE WIRE - UNDERGROUND - TRANSFORMER I. iwo OtO REVIEWED FOR COMPLIANCE WITH NFPA 70 - NEC OCT 2 0 2010 City of .Tukwila BUILDING DIVISION RECEIVJD CITY OF TUKVVILA OCT; 12 2010 PERMIT CENTER GINEERING IN A UANTA SERVICES COMPANY 2224 104th Avenue East Suite 1 Edgewood, WA 98372 Office (253) 952 -2128 Fax (253) 952 -2140 13400009032 NSC Job Number: Clint Thayer Engineer. Guy Rlder Drafter Barry Eronson Checked: Wayne .Hagan Approved: EXPIRES 11/19/x// Revisions No. Date Description Segale Properties Customer Owned Temporary OH & UG Medium Voltage 12.5kV 30 Line Extension From South 200th Street, North Along NEW Southcenter Parkway General Notes Electrical Symbols Legend Abbreviation Key Sheet 2 of 9 0 0 0 c 0 0 w= (n 0 I 0 0 0) 0 o 0 0 01 c w 10 cn 0 z 0 0 E 0- 0 0 0 w 0 0 0 00 +691 00 +991 00 +191 00 +691 to SPECIFIC OH SITE CONSTRUCTION NOTES FOR INFORMATION CONCERNING THE LOCAL UTILITY PLAN PLEASE SEE PSE WORK SKETCH #105058818 SITE PLAN VIEW - WORKZONE 1 SCALE: 1" = 60' P01 - (Utility Owned Master Meter) - - UTILITY TO PROVIDE & INSTALL 45' CLASS 3 POLE UTILITY TO PROVIDE & INSTALL 200A PRIMARY MASTER METERING CLUSTER UTILITY TO PROVIDE & INSTALL 9' 8PIN DOUBLE LINE ARM ASSEMBLY UTILITY TO PROVIDE & INSTALL 30 #2ACSR LINE SIDE ARM MOUNTED FULL TENSION DEADENDS (NORTHEAST) CUSTOMER TO PROVIDE & INSTALL (3) #2ACSR LOAD SIDE ARM MOUNTED REDUCED TENSION DEADENDS (NORTHWEST TO "P02 ") CUSTOMER TO PROVIDE & INSTALL (1) #2ACSR LOAD SIDE ARM MOUNTED REDUCED TENSION OH GROUND CONDUCTOR DEADEND (NORTHWEST TO "P02 ") FOREMAN NOTE: ON LOAD SIDE (CUSTOMER SIDE) OF DOUBLE ARM ROLL THE OH GROUND CONDUCTOR TO THE HORIZONTAL POSITION ON THE ARM FOR ADDED CLEARANCE. P02 - (Customer Pole) - - INSTALL 45' CLASS 3 PRIMARY POLE INSTALL 10' 8 PIN DOUBLE LINE ARMS INSTALL (3) #2ACSR ARM MOUNTED REDUCED TENSION DEADENDS (NORTHEAST TO "P01 ") INSTALL (1) #2ACSR ARM MOUNTED REDUCED TENSION OH GROUND CONDUCTOR DEADEND (NORTHEAST TO "P01 ") - INSTALL (3) #2ACSR ARM MOUNTED REDUCED TENSION DEADENDS (WEST TO "P03 ") INSTALL (1) #2ACSR ARM MOUNTED REDUCED TENSION OH GROUND CONDUCTOR DEADEND (WEST TO "P03 ") INSTALL 30 15kV 600AMP RATED UNITIZED AIR -BREAK SWITCH FOREMAN NOTE: INSTALL SWITCH NUMBER SW01 - INSTALL 3'X4' GALVANIZED GROUND GRID MAT FOREMAN NOTE: HORIZONTAL CONSTRUCTION FOR ADDED CLEARANCE UNDER SWITCH OPERATOR P03 - (Customer Pole) - - INSTALL 50' CLASS 3 PRIMARY POLE INSTALL 10' 8 PIN DOUBLE LINE ARMS INSTALL (3) #2ACSR ARM MOUNTED REDUCED TENSION DEADENDS (EAST TO "P02 ") INSTALL (1) #2ACSR ARM MOUNTED REDUCED TENSION OH GROUND CONDUCTOR DEADEND (EAST TO "P02 ") INSTALL 10' 8 PIN DOUBLE LINE ARMS (IN THE BUCK POSITION) INSTALL (3) #2ACSR ARM MOUNTED FULL TENSION DEADENDS (NORTH TO "PO4 ") INSTALL (1) #2ACSR ARM MOUNTED FULL TENSION OH GROUND CONDUCTOR DEADEND (NORTH TO "PO4 ") INSTALL (2) 3/8" PRIMARY DOWN GUY ASSEMBLIES (SOUTH L =15') - INSTALL 10" TRIPLE HELIX ANCHOR (SOUTH) FOREMAN NOTE: HORIZONTAL CONSTRUCTION FOR ADDED CLEARANC E - INSTALL 10' 8 PIN DOUBLE CUTOUT ARMS - INSTALL 30 1/0 CU MV105 -EPR PRIMARY TERMINATION ASSEMBLY (TO "P09 ") - INSTALL (3) 10kV METAL OXIDE VARISTOR (MOV) - INSTALL (3) LOAD - INTERUPTER CUTOUTS AND FUSE AT 65T FOREMAN NOTE: INSTALL SWITCH NUMBER SW02 INSTALL (1) 4" PRIMARY RISER ASSEMBLY (FULL W/ NEW 30 15kV 1/0 CU MV105 -EPR CABLES) INSTALL 30 1/0 CU MV105 -EPR PRIMARY TERMINATION ASSEMBLY (TO "V01 ") INSTALL (3) 10kV METAL OXIDE VARISTOR (MOV) INSTALL (3) LOAD - INTERUPTER CUTOUTS AND FUSE AT 40T FOREMAN NOTE: INSTALL SWITCH NUMBER SW03 - INSTALL (1) 4" PRIMARY RISER ASSEMBLY (FULL W/ NEW 30 15kV 1/0 CU MV105 -EPR CABLES) PO4 - (Customer Pole) - - INSTALL 45' CLASS 3 PRIMARY POLE INSTALL 10' 8 PIN SINGLE LINE ARM INSTALL (3) 13kV RATED ARM MOUNTED PIN INSULATORS INSTALL (1) 8kV RATED ARM MOUNTED PIN INSULATOR FOR THE OH GROUND CONDUCTOR INSTALL (1) 3/8" PRIMARY DOWN GUY ASSEMBLIES (WEST L =15') INSTALL 10" TRIPLE HELIX ANCHOR (WEST) FOREMAN NOTE: HORIZONTAL CONSTRUCTION FOR ADDED CLEARANCE P05 - (Customer Pole) - - INSTALL 45' CLASS 3 PRIMARY POLE INSTALL 10' 8 PIN SINGLE LINE ARM INSTALL (3) 13kV RATED ARM MOUNTED PIN INSULATORS INSTALL (1) 8kV RATED ARM MOUNTED PIN INSULATOR FOR THE OH GROUND CONDUCTOR FOREMAN NOTE: HORIZONTAL CONSTRUCTION FOR ADDED CLEARANCE SPECIFIC OH SITE CONSTRUCTION NOTES P06 - (Customer Pole) - INSTALL 45' CLASS 3 PRIMARY POLE INSTALL 10' 8 PIN DOUBLE LINE ARMS INSTALL (3) #2ACSR ARM MOUNTED FULL TENSION DEADENDS (SOUTH TO "P05 ") INSTALL (1) #2ACSR ARM MOUNTED REDUCED TENSION OH GROUND CONDUCTOR DEADEND (SOUTH TO "P05 ") INSTALL 10' 8 PIN DOUBLE LINE ARMS (IN THE BUCK POSITION) INSTALL (3) #2ACSR ARM MOUNTED FULL TENSION DEADENDS (NORTHEAST TO "P07 ") INSTALL (1) #2ACSR ARM MOUNTED FULL TENSION OH GROUND CONDUCTOR DEADEND (NORTHEAST TO "P07 ") INSTALL (2) 3/8" PRIMARY DOWN GUY ASSEMBLIES (NORTH L =15') INSTALL 10" TRIPLE HELIX ANCHOR (NORTH) INSTALL (2) 3/8" PRIMARY DOWN GUY ASSEMBLIES (SOUTHWEST L =15') INSTALL 10" TRIPLE HELIX ANCHOR (SOUTHWEST) FOREMAN NOTE: HORIZONTAL CONSTRUCTION FOR ADDED CLEARANCE P07 - (Customer Pole) - INSTALL 45' CLASS 3 PRIMARY POLE INSTALL 10' 8 PIN SINGLE LINE ARM INSTALL (3) 13kV RATED ARM MOUNTED PIN INSULATORS INSTALL (1) 8kV RATED ARM MOUNTED PIN INSULATOR FOR THE OH GROUND CONDUCTOR FOREMAN NOTE: HORIZONTAL CONSTRUCTION FOR ADDED CLEARANCE P08 - (Customer Pole) - INSTALL 45' CLASS 3 PRIMARY POLE INSTALL 10' 8 PIN DOUBLE LINE ARMS INSTALL (3) #2ACSR ARM MOUNTED FULL TENSION DEADENDS (SOUTHWEST TO "P07 ") INSTALL (1) #2ACSR ARM MOUNTED FULL TENSION OH GROUND CONDUCTOR DEADEND (WEST TO "P07 ") INSTALL (2) 3/8" PRIMARY DOWN GUY ASSEMBLIES (EAST L =15') INSTALL 10" TRIPLE HELIX ANCHOR (EAST) FOREMAN NOTE: HORIZONTAL CONSTRUCTION FOR ADDED CLEARANCE - INSTALL 30 1/0 CU MV105 -EPR PRIMARY TERMINATION ASSEMBLY (TO "V02 ") - INSTALL (3) 10kV METAL OXIDE VARISTOR (MOV) - INSTALL (3) LOAD - INTERUPTER CUTOUTS AND FUSE AT 40T FOREMAN NOTE: INSTALL SWITCH NUMBER SW04 INSTALL (1) 4" PRIMARY RISER ASSEMBLY (FULL W/ NEW 30 15kV 1/0 CU MV105 -EPR CABLES) P09 - (Customer Pole) - INSTALL 45' CLASS 3 PRIMARY POLE INSTALL 10' 8 PIN DOUBLE LINE ARMS INSTALL (3) #2ACSR ARM MOUNTED FULL TENSION DEADENDS (SOUTHEAST TO "P10 ") INSTALL (1) #2ACSR ARM MOUNTED FULL TENSION OH GROUND CONDUCTOR DEADEND (SOUTHEAST TO "P10 ") INSTALL (2) 3/8" PRIMARY DOWN GUY ASSEMBLIES (NORTHWEST L =15') INSTALL 10" TRIPLE HELIX ANCHOR (NORTHWEST) FOREMAN NOTE: HORIZONTAL CONSTRUCTION FOR ADDED CLEARANCE - INSTALL 30 1/0 CU MV105 -EPR PRIMARY TERMINATION ASSEMBLY (TO "P03 ") - INSTALL (3) 10kV METAL OXIDE VARISTOR (MOV) - INSTALL (3) 200A SOLID BLADE KNIFE SWITCHES FOREMAN NOTE: INSTALL SWITCH NUMBER SW05 - INSTALL (1) 4" PRIMARY RISER ASSEMBLY (FULL W/ NEW 30 15kV 1/0 CU MV105 -EPR CABLES) V01 - V02 - SPECIFIC UG SITE CONSTRUCTION NOTES INSTALL 4'- 8 "X5' -6 "X6" COVER WITH 20 "X44" XFMR ACCESS HOLE INSTALL 30 112.5kVA PADMOUNTED TRANSFORMER 480Y/277 INSTALL (3) LOAD -BREAK ELBOWS INSTALL (2) 8'x3/4" DRIVEN GROUND RODS PLUMB (1) 4" SCH40 PVC 20' TO "P03" (CONDUIT FULL W/ 30 15kV 1/0 CU JACKETED CABLES) INSTALL 4'- 8 "X5' -6 "X6" COVER WITH 20 "X44" XFMR ACCESS HOLE INSTALL 30 225kVA PADMOUNTED TRANSFORMER 480Y/277 INSTALL (3) LOAD -BREAK ELBOWS INSTALL (2) 8'x3/4" DRIVEN GROUND RODS PLUMB (1) 4" SCH40 PVC 20' TO "P08" (CONDUIT FULL W/ 30 15kV 1/0 CU JACKETED CABLES) 35°L. SPECIFIC OH SPAN NOTES P01 TO P02 - - INSTALL (3) #2ACSR PRIMARY CONDUCTOR APPROX. 60' - INSTALL (1) #2ACSR OH GROUND CONDUCTOR APPROX. 60' P02 TO P03 - INSTALL (3) #2ACSR PRIMARY CONDUCTOR APPROX. 60' - INSTALL (1) #2ACSR OH GROUND CONDUCTOR APPROX. 60' P03 TO P06 - (Via PO4, P05) - INSTALL (3) #2ACSR PRIMARY CONDUCTOR APPROX. 720' - INSTALL (1) #2ACSR OH GROUND CONDUCTOR APPROX. 720' P06 TO P08 - (Via P07) - INSTALL (3) #2ACSR PRIMARY CONDUCTOR APPROX. 560' - INSTALL (1) #2ACSR OH GROUND CONDUCTOR APPROX. 560' SPECIFIC UG SPAN NOTES P03 TO V01 - - INSTALL (1) 4" SCH40 PVC CONDUIT APPROX. 20' INSTALL 30 15kV RATED 1/0 CU MV105 -EPR CABLES APPROX. 75' INSTALL 600V INSULATED #2 CU THHW GROUND CONDUCTOR APPROX. 75' - INSTALL CABLE TAGS SP001, SP002, SP003 P03 TO P09 - - INSTALL (1) 4" SCH40 PVC CONDUIT APPROX. 380' INSTALL 30 15kV RATED 1/0 CU MV105 -EPR CABLES APPROX. 490' - INSTALL 600V INSULATED #2 CU THHW GROUND CONDUCTOR APPROX. 490 ?' INSTALL CABLE TAGS SP004, SP005, SP006 P08 TO V02 - - INSTALL INSTALL INSTALL - INSTALL (1) 4" SCH40 PVC CONDUIT APPROX. 20' 30 15kV RATED 1/0 CU MV105 -EPR CABLES APPROX. 75' 600V INSULATED #2 CU THHW GROUND CONDUCTOR APPROX. 75' CABLE TAGS SP007, SP008, SP009 REIV�D CITYECOFTU LA OCT, 12 2010 PERMIT CENTER REVIEWED FOR COMPLIANCE OCT 2 0 2010 City of Tukwila BUILDING DIVISION 60 0' 60 120 MI Is SCALE IN FEET A UANTA SERVICES COMPANY 2224 104th Avenue East Suite 1 Edgewood, WA 98372 Office (253) 952 -2128 Fax (253) 952 -2140 13400009032 NSC Job Number: Clint Thayer Engineer: Guy Rlder Drafter: Barry Eronson Checked: Wayne Hagan Approved: EXPIRES 11/19/201( Revisions No. Date Description Segale Properties Customer Owned Temporary OH & UG Medium Voltage 12.5kV 30 Line Extension From South 200th Street, North Along NEW Southcenter Parkway Workzone 1 Construction Notes Sheet 3 of 9 c (1) 0 w z O I N 0 c 0 0 c 0 N 0 c w LO 0 0 z N 0 E a N r7 0 0 N c 0 O U Sal .. ................ 015) 53 °L \ SITE PLAN VIEW - WORKZONE 2 SCALE: 1" = 60' SPECIFIC OH SITE CONSTRUCTION NOTES P10 - (Customer Pole) - INSTALL 45' CLASS 3 PRIMARY POLE INSTALL 10' 8 PIN SINGLE LINE ARM INSTALL (3) 13kV RATED ARM MOUNTED PIN INSULATORS INSTALL (1) 8kV RATED ARM MOUNTED PIN INSULATOR FOR THE OH GROUND CONDUCTOR INSTALL (1) 3/8" PRIMARY DOWN GUY ASSEMBLIES (WEST L =15') INSTALL 10" TRIPLE HELIX ANCHOR (WEST) FOREMAN NOTE: HORIZONTAL CONSTRUCTION FOR ADDED CLEARANCE P11 - (Customer Pole) - INSTALL 45' CLASS 3 PRIMARY POLE INSTALL 10' 8 PIN SINGLE LINE ARM INSTALL (3) 13kV RATED ARM MOUNTED PIN INSULATORS INSTALL (1) 8kV RATED ARM MOUNTED PIN INSULATOR FOR THE OH GROUND CONDUCTOR INSTALL (1) 3/8" PRIMARY DOWN GUY ASSEMBLIES (WEST L =15') INSTALL 10" TRIPLE HELIX ANCHOR (WEST) FOREMAN NOTE: HORIZONTAL CONSTRUCTION FOR ADDED CLEARANCE P12 - (Customer Pole) - - INSTALL 45' CLASS 3 PRIMARY POLE INSTALL 10' 8 PIN SINGLE LINE ARM INSTALL (3) 13kV RATED ARM MOUNTED PIN INSULATORS INSTALL (1) 8kV RATED ARM MOUNTED PIN INSULATOR FOR THE OH GROUND CONDUCTOR FOREMAN NOTE: HORIZONTAL CONSTRUCTION FOR ADDED CLEARANCE SPECIFIC OH SITE CONSTRUCTION NOTES P13 - (Customer Pole) - INSTALL 45' CLASS 3 PRIMARY POLE INSTALL 10' 8 PIN DOUBLE LINE ARMS INSTALL (3) #2ACSR ARM MOUNTED FULL TENSION DEADENDS (NORTH TO "P12 ") INSTALL (1) #2ACSR ARM MOUNTED FULL TENSION OH GROUND CONDUCTOR DEADEND (NORTH TO "P12 ") INSTALL 10' 8 PIN DOUBLE LINE ARMS (IN THE BUCK POSITION) INSTALL (3) #2ACSR ARM MOUNTED FULL TENSION DEADENDS (EAST TO "P14 ") INSTALL (1) #2ACSR ARM MOUNTED FULL TENSION OH GROUND CONDUCTOR DEADEND (EAST TO "P14 ") INSTALL (2) 3/8" PRIMARY DOWN GUY ASSEMBLIES (SOUTH L =15') INSTALL 10" TRIPLE HELIX ANCHOR (SOUTH) INSTALL (2) 3/8" PRIMARY DOWN GUY ASSEMBLIES (WEST L =15') - INSTALL 10" TRIPLE HELIX ANCHOR (WEST) FOREMAN NOTE: HORIZONTAL CONSTRUCTION FOR ADDED CLEARANC E - INSTALL 10' 8 PIN DOUBLE CUTOUT ARMS INSTALL 30 1/0 CU MV105 -EPR PRIMARY TERMINATION ASSEMBLY (TO "V03 ") INSTALL (3) 10kV METAL OXIDE VARISTOR (MOV) INSTALL (3) LOAD - INTERUPTER CUTOUTS AND FUSE AT 40T FOREMAN NOTE: INSTALL SWITCH NUMBER SW06 - INSTALL (1) 4" PRIMARY RISER ASSEMBLY (FULL W/ NEW 30 15kV 1/0 CU MV105 -EPR CABLES) P14 - (Customer Pole) - INSTALL 45' CLASS 3 PRIMARY POLE INSTALL 10' 8 PIN SINGLE LINE ARM INSTALL (3) 13kV RATED ARM MOUNTED PIN INSULATORS - INSTALL (1) 8kV RATED ARM MOUNTED PIN INSULATOR FOR THE OH GROUND CONDUCTOR FOREMAN NOTE: HORIZONTAL CONSTRUCTION FOR ADDED CLEARANCE P15 - (Customer Pole) - INSTALL 45' CLASS 3 PRIMARY POLE INSTALL 10' 8 PIN DOUBLE LINE ARMS INSTALL (3) #2ACSR ARM MOUNTED FULL TENSION DEADENDS (WEST TO "P14 ") INSTALL (1) #2ACSR ARM MOUNTED FULL TENSION OH GROUND CONDUCTOR DEADEND (WEST TO "P14 ") INSTALL 10' 8 PIN DOUBLE LINE ARMS (IN THE BUCK POSITION) INSTALL (3) #2ACSR ARM MOUNTED FULL TENSION DEADENDS (NORTHWEST TO "P16 ") INSTALL (1) #2ACSR ARM MOUNTED FULL TENSION OH GROUND CONDUCTOR DEADEND (NORTHWEST TO "P16 ") INSTALL (2) 3/8" PRIMARY DOWN GUY ASSEMBLIES (EAST L =15') INSTALL 10" TRIPLE HELIX ANCHOR (EAST) INSTALL (2) 3/8" PRIMARY DOWN GUY ASSEMBLIES (SOUTHWEST L =15') INSTALL 10" TRIPLE HELIX ANCHOR (SOUTHWEST) FOREMAN NOTE: HORIZONTAL CONSTRUCTION FOR ADDED CLEARANC E P16 - (Customer Pole) - INSTALL 45' CLASS 3 PRIMARY POLE INSTALL 10' 8 PIN DOUBLE LINE ARMS INSTALL (3) #2ACSR ARM MOUNTED FULL TENSION DEADENDS (SOUTHEAST TO "P15 ") INSTALL (1) #2ACSR ARM MOUNTED FULL TENSION OH GROUND CONDUCTOR DEADEND (SOUTHEAST TO "P15 ") INSTALL (2) 3/8" PRIMARY DOWN GUY ASSEMBLIES (NORTHWEST L =15') INSTALL 10" TRIPLE HELIX ANCHOR (NORTHEAST) FOREMAN NOTE: HORIZONTAL CONSTRUCTION FOR ADDED CLEARANC E V03 - SPECIFIC UG SITE CONSTRUCTION NOTES INSTALL 8'- 0 "X8' -0 "X8" COVER WITH 60 "X24" XFMR ACCESS HOLE INSTALL 30 500kVA PADMOUNTED TRANSFORMER 480Y/277 INSTALL (3) LOAD -BREAK ELBOWS INSTALL (2) 8'x3/4" DRIVEN GROUND RODS PLUMB (1) 4" SCH40 PVC 20' TO "P13" (CONDUIT FULL W/ 30 15kV 1/0 CU JACKETED CABLES) l P09 TO P13 - - INSTALL - INSTALL P13TOP15- - INSTALL - INSTALL P15 TO P16 - - INSTALL - INSTALL P13TOVO3- INSTALL - INSTALL INSTALL INSTALL SPECIFIC OH SPAN NOTES (Via P10, P11, P12) (3) #2ACSR PRIMARY CONDUCTOR APPROX. 1,185' (1) #2ACSR OH GROUND CONDUCTOR APPROX. 1,185' (Via P14) (3) #2ACSR PRIMARY CONDUCTOR APPROX. 550' (1) #2ACSR OH GROUND CONDUCTOR APPROX. 550' (3) #2ACSR PRIMARY CONDUCTOR APPROX. 275' (1) #2ACSR OH GROUND CONDUCTOR APPROX. 275' SPECIFIC UG SPAN NOTES (1) 4" SCH40 PVC CONDUIT APPROX. 20' 30 15kV RATED 1/0 CU MV105 -EPR CABLES APPROX. 75' 600V INSULATED #2 CU THHW GROUND CONDUCTOR APPROX. 75' CABLE TAGS SP010, SP011, SP012 ( 0 s 60' SCALE REVIEWED FOR COMPLIANCE N A NC OCT 2 0 2010 —My of Tukwila BUILD! G DIVI - I CRWItWILA OCT. 12 2010 PERMIT CENTER 0' 60' 120' IN FEET A IQ UANTA SERVICES COMPANY 2224 104th Avenue East Suite 1 Edgewood, WA 98372 Office (253) 952 -2128 Fax (253) 952 -2140 13400009032 NSC Job Number: Clint Thayer Engineer: Guy Rider Drafter: Barry Eronson Checked: Wayne Hagan Approved: EXPIRES 11/19/20// Revisions No. Date Description Segale Properties Customer Owned Temporary OH & UG Medium Voltage 12.5kV 30 Line Extension From South 200th Street, North Along NEW Southcenter Parkway Workzone 2 Construction Notes Sheet 4 of 9 } 0 oci0 0 c 01 0 z 0 01 0 0 L 0 0 c a) a) 0 c w 0 0 z 0 q) 0 0 0 0 0 0 0 0 @ V01 SECONDARY VOLTAGE - 480Y/277V MAIN SERVICE SIZE - 100 AMP 40A (C12) 26,200A> FUSE 500kVA 12,470V 480Y/277V O -Y P13 SW06 40T V01 112.5kVA 12,470V 480Y/277V A -Y 8,200A SW05 200A S.B. (3)1 POLE 1 THROW P09 • 15A (C08) FUSE SW03 40T SW02 i 65T @ V02 SECONDARY VOLTAGE - 480Y/277V MAIN SERVICE SIZE - 200 AMP CUSTOMER OWNED AND OPERATED 102 SW01 600A 30 3 POLE 1 THROW Cv% CP01) PSE 200A, 12.5kV PRIMARY METER PUGET SOUND ENERGY Estimated Fault Current 0 to 0 - 7,500 Amps Estimated Fault Current 0 to Ground - 5,500 Amps 25A (C10) FUSE r 12,600A SW04 40T 225kVA 12,470V 480Y/277V A -Y NOTES: 1Q 15kV CABLE 1/0 AWG COPPER, STRANDED (COMPACTED) 220 MIL EPR MV -105 WITH 600V RATED COVERED GROUND CONDUCTOR, COPPER, STRANDED (COMPACTED), WITH THHW INSULATION IN THE SAME CONDUIT AS THE PRIMARY CABLE. xxxxx€ AVAILABLE 30 FAULT CURRENT (AMPS) AT SECONDARY LUGS IN TRANSFORMER. THESE VALUES ARE BASED ON WORST CONDITION - ZERO LINE AND FAULT RESISTANCE WITH INFINITE BUSS ALL TRANSFORMERS ARE EQUIPPED WITH AN INTERNAL ISOLATION LINK SERIES WITH A REMOVABLE REPLACEABLE EXPULSION (BAY -O -NET) FUSE @ V03 SECONDARY VOLTAGE - 480Y/277V MAIN SERVICE SIZE - 400 AMP UNDERGROUND CABLE (1/0 CU MV105, EPR) OVERHEAD CONDUCTOR ( #2 ACSR) OVERHEAD & UNDERGROUND ONE -LINE CIRCUIT SCHEMATIC NOT TO SCALE / AFTER CONSTRUCTION (1) -4" SP007 SP008 SP009 225kVA 12,470V 480Y/277 A -Y SW04 40T O NE -LINE CONDUIT AND CABLE DIAGRAM NOT TO SCALE / AFTER CONSTRUCTION ,[0•1 0 or S P09 SW05 200A S.B. (1) -4" SP004 SP005 SP006 500kVA 12,470V 480Y/277 A -Y (1) -4" SP010 SP011 SP012 90° L WITH 5'R SW06 40T ONE -LINE CONDUIT AND CABLE DIAGRAM NOT TO SCALE / AFTER CONSTRUCTION (1) -4" SP001 SP002 SP003 SW03 SW02 100T 112.5kVA 12,470V 480Y/277 A -Y NOTE: • ALL CONDUIT TO BE UL LISTED SCHEDULE 40 OR GRAY • CONDUIT DEFLECTION SHALL HAVE A 5' MINIMUM ONE -LINE CONDUIT AND CABLE DIAGRAM NOT TO SCALE / AFTER CONSTRUCTION REVIEWED FOR COMPLIANCE WITH NFPA70 -NEC OCT 2 0 2010 City of Tukwila BUILDING DIVISION BETTER, ELECTRICAL GRADE, BENDING RADIUS EIV� ,D. CITY REC OFTU�v�nLA OCT 12 2010 PERMIT CENTER A 4IR UANTA SERVICES COMPANY 2224 104th Avenue East Suite 1 Edgewood, WA 98372 Office (253) 952 -2128 Fax (253) 952 -2140 13400009032 NSC Job Number: Clint Thayer Engineer: Guy Rlder Drafter Barry Eronson Checked: Wayne Hagan Approved EXPIRES 11/19/20// Revisions No. Date Description Segale Properties. Customer Owned Temporary OH & UG Medium Voltage 12.5kV 30 Line Extension From South 200th Street, North Along NEW Southcenter Parkway . Diagrams One -Line Circuit Schematic One -Line Conduit and Cable Diagrams Sheet 5 of 9 0) 0 0 0 cn c a). 0 w• z 0 0 In 01 c L_ 0 0 0-) c 0 c cn c w 0 0 z 0 0 0 E 0 N 0 0 0 0 0 TANGENT POLE DETAIL AT P05, P07, P12, P14, NOT TO SCALE NOTE: FRAME POLES PER LOCAL UTILITY STANDARDS FOR EASE OF FUTURE MAINTENANCE ICJ lir SMALL ANGLE POLE DETAIL AT PO4, P10, P11 NOT TO SCALE 5 DOUBLE DOUBLE DEAD -END POLE DETAIL AT P03, P06, P13, P15 NOT TO SCALE GALVANIZED TYPE 19W4 BAR GRATING WITH 1/8 "X1" BEARING BARS DEAD END POLE DETAIL AT P08, P09, P16 NOT TO SCALE LA Ground Level V�V�VV 36" 48.. �V�VV�V��VV \,..„ \,..,\,„ \,....\__ \c„... \,,, \,,-, \__\__ \---\„(,\,\,\I-j \,-\--- \--\„(,\Iv,\Ij \...: \--s\.; \--j \,-\" \--,‘"- \'\ -\::\: \::\ -\:\:\,\,\,\:'\::\ -\::\:\:\ ,„\:\'\,\:;"\::; \;.\ -\ \.„.. \,,, \ .\ ::: :-\..) . \-- \--\-1 .1.\,-, \--: - V GROUND MAT FOR OPERATOR OF SWITCH HANDLE TO STAND -ON & TO PREVENT STEP - POTENTIAL GROUNDING HAZARD. CONNECT TO VAULT GROUND #2 SOLID BC FOR BONDING VAULT GROUND TO MAT GROUND 3/4" X 12" GROUND SPIKES (TYP. 4 PLACES) BRONZE THREADED GROUND CLAMP 9/16"0 HOLES FOR GROUND WIRE CLAMP (TYP. 4 PLACES) NOTE: INSTALL AT GROUND LEVEL INSTALL ON SIDE OF SWITCH THAT HAS OPERATING HANDLE GROUNDING MAT AT P02 NOT TO SCALE From Pole P01 #2 ACSR l To Pole P03 9" 17-1/8" PRIMARY GROUND CONDUCTOR Galvanized Steel Grounding Mat See Ground Mat Detail 0 1 #2 ACSR Unitized switch may be lowered for clearance between primary jumpers 14" Bottom mount hole to be field drilled and treated 4' -g" INSTALL SWITCHBOARD TO BE BLACK PLASTIC W/WHITE LABELS. BOARD DIMENSIONS = 24" HIGH X 6" WIDE USING 5" HIGH LETTERING MOUNT VERTICALLY AND FACING THE ROAD 12 ft min above ground Holder Clearance Tag GANG OPERATED SWITCH POLE DETAIL AT P02 NOT TO SCALE REVIEWED FORT COMPLIANCE WITH NFPA 70 - NEC OCT 2 0 2010 City otTukwila BUILDING DIVISION ��U° CITY OF OCT- 12 2010 PERMIT CENTER G!NEERING 1N A cz UANTA SERVICES COMPANY 2224 104th Avenue East Suite 1 Edgewood, WA 98372 Office (253) 952 -2128 Fax (253) 952 -2140 13400009032 NSC Job Number: Clint Thayer Engineer: Guy Rider Drafter: Barry Eronson Checked: Wayne Hagan Approved: EXPIRES 11/19/ 2,e4 Revisions No. Date Description Segale Properties Customer Owned Temporary OH & UG Medium Voltage 12.5kV 30 Line Extension From South 200th Street, North Along NEW Southcenter Parkway Pole Details Tangent Angle Dead -End Gang Operated Sheet 6 of 9 0 0 0 c 0 uJ (n z 0 0 0 0 (n 0 0 0 0 CP C 0 0 0 0 w 10 (n 0 0 z 0 0 0 0 (n ooE 0 0 0 N co- o 0 0 Single Meter Socket Final Grade 2A^ MASTER METER POLE DETAIL AT P01 NOT TO SCALE 18" Typical Excavated Dirt Pile 24" Min 36" Min to 48" Max Cover 6" Sand Cover !i, 3" Sand Bedding 4" Sch40 PVC for UG Primary Electric Conduits PRIMARY TRENCH CROSS SECTION DETAIL NOT TO SCALE T Install switchboard to be black plastic w /white labels. board dimensions = 24" high x 6" wide using 5" high lettering mount vertically and facing the road 12 ft min above ground TERMINATION POLE DETAIL AT P08, P09, P13 NOT TO SCALE DETAIL A TRANSFORMER CONCRETE PAD AT V01 AND V02 SCALE 1" = 4' TRANSFORMER CASE # 2 CU. BARE SOLID (TYP) BOND TO TRANSFORMER CASE AND BOTH GROUND RODS NOTE: Developer to provide 8" minimum of 5/8 - compacted (100 %) crushed rock under pad for transformer support. (1) EA 8' LENGTH X 3/4" DIA CU. CLAD STEEL GROUND RODS PLACE (1) ROD INSIDE SECONDARY (TYP) TRANSFORMER PAD SEE DETAIL A (V01 & V02) SEE DETAIL B (V03) 1 -4" PVC (P03 to V01) 1 -4" PVC (P08 to V02) 1 -4" PVC (P13 to V03) GROUND ROD INSTALLATION DETAIL AT V01, V02, V03 FACING VAULT DOORS NOT TO SCALE CUSTOMER SUPPLIED CONDUIT 8" SPXXX NOTE: 1. POLYETHYLENE CABLE IDENTIFICATION TAG HAS PHENOLIC 1/2" HIGH BLACK CHARACTERS ON A CONTRASTING BACKGROUND. 2. ATTACH CABLE TAG WITH NYLON CABLE TIES TO EACH END OF THE PRIMARY CABLE, ELBOW, STRAIGHT SPLICE OR TERMINATION. CABLE IDENTIFICATION TAG DETAIL NOT TO SCALE x$08 8'-0" H 60" H 24" Vie DETAIL B TRANSFORMER CONCRETE PAD AT V03 SCALE 1 " =4' 30 TRANSFORMER CASE (V01 & V02) PRIMARY CABLE DRAIN WIRES FROM CABLE SHIELDING GROUND PAD ON TRANSFORMER PRIMARY SECONDARY 8' -0" NOTE: Developer to provide 8" minimum of 5/8 - compacted (100 %) crushed rock under pad for transformer support. REVIEWED .ECM COMPLIANCE WITH NFPA 70 - NEC OCT 2 0 2010 City of Tukwila BUILDING DIVISION # 2 CU. SOFT DRAWN BARE CU. BUS (TYP) # 2 CU. COVERED IN PRIMARY CONDUIT GROUNDING / BONDING SCHEMATIC AT V01, V02, V03 NOT TO SCALE 8' LENGTH X 3/4" DIA GROUND ROD (INSIDE TRANSFORMER DOORS IN CABLE ACCESS AREA) (TYP) NOTE: APPLY GREEN PHASE TAPE WHERE COVERED GROUND EXITS THE CONDUIT RECELV CITY OF rt LA ICI 12 2010 PERMIT CENTER A ip UANTA SERVICES COMPANY 2224 104th Avenue East Suite 1 Edgewood, WA 98372 Office (253) 952 -2128 Fax (253) 952 -2140 13400009032 NSC Job Number: Clint Thayer Engineer: Guy Rider Drafter: Barry Eronson Checked: Wayne Hagan Approved: EXPIRES 11/19/ZO// Revisions No. Date Description Segale Properties Customer Owned Temporary OH & UG Medium Voltage 12.5kV 30 Line Extension From South 200th Street, North Along NEW Southcenter Parkway Details Pole Details Transformer Details Trench Detail Sheet 7 of 9 O 0 0 c a) 0 uJ v� i 0 a)I 0 cn 0 c 0 0 c 0 a) LC) c c w 0 z 0 0 0 0 oo Q r7 0 0 N 0 U 0 STRINGING SAG TABLE (P01 -P03) Stringing Sag Table using initial sag Ruling Span: 100.0 Feet conductor SPARROW # 2 AWG 6/ 1 stranding ACSR NESC Medium Load Zone Max Tension = 840 Lb Design: 840. Lb @ 15. Deg F, .25 In Ice, 4.00 Psf wind, Initial H Tens 601. 573. 544. 514. 485. 455. 425. 395. 364. 334. 305. (LBs) Temp F> 40 45. 50. 55. 60. 65. 70 75 80 85 90. Sag Feet Feet Feet Feet Feet Feet Feet Feet Feet Feet Feet Span 50.0 .05 .05 .05 .06 .06 06 .07 .07 .08 .09 .09 60.0 .07 .07 .08 .08. .08 09 .10 .10 .11 .12 .13 70.0 .09 .10 .10 .11 .11 12 .13 .14 .15 .17 .18 80.0 .12 .13 .13 .14 .15 16 .17 .18 .20 .22 .24 90.0 .15 .16 .17 .18 .19 20 .22 .23 .25 .28 .30 100.0 .19 .20 .21 .22 .23 25 .27 .29 .31 .34 .37. STRINGING SAG TABLE (P06 -P08) STRINGING SAG TABLE (P13 -P16) Stringing Sag Table using Initial sag Ruling Span: 300.0 Feet Conductor SPARROW # 2 AWG 6/ 1 Stranding ACSR NESC Medium Load Zone Max Tension = 840 Lb Design: 840. Lb @ 15. Deg F, .25 In Ice, 4.00 Psf wind, Initial H Tens 185. 180. 176. 172. 168. 165. 161. 158. 155. 152. 149. (LBs) Temp F> 40. 45. 50. 55. 60. 65. 70. 75. 80. 85. 90. Sag Feet Feet Feet Feet Feet Feet Feet Feet Feet Feet Feet Span 240.0 3.55 3.64 3.73 3.81 3.90. 3.98 4.07 4.15 4.23 4.31 4.39 250.0 3.85 3.95 4.04 4.14 4.23 4.32 4.41 4.50 4.59 4.68 4.76 260.0 4.17 4.27 4.37 4.48 4.58 4.68 4.77 4.87 4.97 5.06 5.15 270.0 4.49 4.61 4.72 4.83 4.94 5.04 5.15 5.25 5.35 5.46 5.56 280.0 4.83 4.95 5.07 5.19 5.31 5.42 5.54 5.65 5.76 5.87 5.97 290.0 5.18 5.31 5.44 5.57 5.69 5.82 5.94 6.06 6.18 6.29 6.41 300.0 5.55 5.69 5.82 5.96 6.09 6.23 6.36 •6.48 6.61 6.74 6.86 310.0 5.92 6.07 6.22 6.36 6.51 6.65 6.79 6.92 7.06 7.19 7.32 320.0 6.31 6.47 6.63 6.78 6.93 7.08 7.23 7.38 7.52 7.66 7.81 STRINGING SAG TABLE (P03 -P06) STRINGING SAG TABLE (P09 -P13) stringing Sag Table using Initial Sag Ruling Span: 275.0 Feet Conductor SPARROW # 2 AWG 6/ 1 Stranding ACSR NESC Medium Load zone Max Tension = 840 Lb Design: 840. Lb @ 15. Deg F, .25 In Ice, 4.00 Psf wind, Initial H Tens 200. 194. 188. 183. 178. 173. 168. 164. 160. 157. 153. (LBs) Temp F> 40. 45. 50. 55. 60. 65. 70. 75. 80. 85. 90. Sag Feet Feet Feet Feet Feet Feet Feet Feet Feet Feet Feet Span, 150.0 1.28 1.32 1.36 1.40 1.44 1.48 1.52 1.56 1.60 1.63 1.67 160.0 1.45 1.50 1.55 1.59 1.64 1.69 1.73 1.77 1.82 1.86 1.90 170.0 1.64 1.69 1.75 1.80 1.85 1.90 1.95 2.00 2.05 2.10 2.15 180.0 1.84 1.90 1.96 2.02 2.08 2.13 2.19 2.24 2.30 2.35 2.41 190.0 2.05 2.12 2.18 2.25 2.31 2.38 2.44 2.50 2.56 2.62 2.68 200.0 2.27 2.35 2.42 2.49 2.56 2.63 2.70 2.77 2.84 2.91 2.97 210.0 2.50 2.59 2.67 2.75 2.83 2.90 2.98 3.06 3.13 3.20 3.28 220.0 2.75 2.84 2.93 3.01 3.10 3.19 3.27 3.35 3.44 3.52 3.59 230.0 3.00 3.10 3.20 3.30 3.39 3.48 3.58 3.67 3.75 3.84 3.93 240.0 3.27 3.38 3.48 3.59 3.69 3.79 3.89 3.99 4.09 4.18 4.28 250.0 3.55 3.66 3.78 3.89 4.01 4.12 4.22 4.33 4.44 4.4 4.64 260.0 3.84 3.96 4.09 4.21 4.33 4.45 4.57 4.68 4.80 4.91 5.02 270.0 4.14 4.27 4.41 4.54 4.67 4.80 4.93 5.05 5.18 5.30 5.42 280.0 4.45 4.60 4.74 4.88 5.02 5.16 5.30 5.43 5.57 5.70 5.82 290.0 4.77 4.93 5.09 5.24 5.39 5.54 5.68 5.83 5.97 6.11 6.25 300.0 5.11 5.28 5.44 5.61 5.77 5.93 6.08 6.24 6.39 6.54 6.69 310.0 5.46 5.64 5.81 5.99 6.16 6.33 6.50 6.66 6.82 6.98 7.14 320.0 5.81 6.01 6.19 6.38 6.56 6.74 6.92 7.10 7.27 7.44 7.61 330.0 6.18 6.39 6.59 6.79 6.98 7.17 7.36 7.55 7.73 7.91 8.09 340.0 6.56 6.78 6.99 7.20 7.41 7.61 7.82 8.01 8.21 8.40 8.59 Stringing Sag Table using Initial Sag Ruling Span: 300.0 Feet Conductor SPARROW # 2 AWG 6/ 1 Stranding ACSR NESC Medium Load zone Max Tension = 840 Lb Design: 840. Lb @ 15. Deg F, .25 In Ice, 4.00 Psf Wind, Initial H Tens 185. 180. 176. 172. 168. 165. 161. 158. 155. 152. 149. (LBs) Temp F> 40. 45. 50. 55. 60. 65. 70. 75. 80. 85. 90. Sag Feet Feet Feet Feet Feet Feet Feet Feet Feet Feet Feet Span 250.0 3.85 3.95 4.04 4.14 4.23 4.32 4.41 4.50 4.59 4.68 4.76 260.0 4.17 4.27 4.37 4.48 4.58 4.68 4.77 4.87 4.97 5.06 5.15 270.0 4.49 4.61 4.72 4.83 4.94 5.04 5.15 5.25 5.35 5.46 5.56 280.0 4.83 4.95 5.07 5.19 5.31 5.42 5.54 5.65 5.76 5.87 5.97 290.0 5.18 5.31 5.44 5.57 5.69 5.82 5.94 6.06 6.18 6.29 6.41 300.0 5.55 5.69 5.82 5.96 6.09 6.23 6.36 6.48 6.61 6.74 6.86 310.0 5.92 6.07 6.22 6.36 6.51 6.65 6.79 6.92 7.06 7.19 7.32 320.0 6.31 6.47 6.63 6.78 6.93 7.08 7.23 7.38 7.52 7.66 7.81 330.0 6.71 6.88 7.05 7.21 7.37 7.53 7.69 7.85 8.00 8.15 8.30 340.0 7.13 7.31 7.48. 7.66 7.83 8.00 8.17 8.33 8.49 8.65 8.81 REVIEWED LIA CEWIRTFI LA C) Wie) t() �pA70 -NEC OCT 2 0 2010 a 4' BUILDING OVERHEAD WIRE INSTALLATION SCHEDULE VAULT AND APPARATUS SCHEDULE Site Vault Size Vault Cover Size Type & Size of Apparatus Additional Material Needed Comments vol - 5'-6""X4'-8'5(6" Transformer Pad with 44 "x20" Access Hole 112.5kVA 30 PM Xfmr 12.47kV - 480Y/277 (3) 200A 15kV Rated Load Break Elbow 60 V02 - 5- 6 "X4' -8 "x6" Transformer Pad with 44 "x20" Access Hole 225kVA 30 PM Xfmr 12.47kV - 480Y/277 (3) 200A 15kV Rated Load Break Elbow Low Voltage BIL kV V03 - 8'- 0 " "X8' -0 "x8" Transformer Pad with 60 "x24" Access Hole 500kVA 30 PM Xfmr 12.47kV - 480Y/277 (3) 200A 15kV Rated Load Break Elbow ACSR TECHNICAL TRANSFORMER SCHEDULE Span Wire Size Type Number of Phases Footage (ft) Footage (ft) Actual Remarks P01 to P02 (3) - #2 ACSR 30 60 High Voltage Feed -Thru Bushings Primary /o % Impedance (1) - #2 ACSR Low Voltage BIL kV Degree C „ Rise PCB Ground P02 to P03 (3) - #2 ACSR 30 60 Padmount (Dead- Front) Primary 60 (1) - #2 ACSR A=Y Internal Bayonet No Ground P03 to P06 (3) - #2 (1) - #2 ACSR ACSR 30 720 Less than 1 PPM Primary Ground P06 to P08 (3) - #2 ACSR 30 560 Padmount (Dead- Front) Primary 60 (1) - #2 ACSR A=Y Internal Bayonet No Ground P09 to P13 (3) - #2 ACSR 30 1,185 Less than 1 PPM Primary V03 (1) - #2 ACSR 500 30 Padmount (Dead- Front) Ground P13 to P15 (3) - #2 ACSR 30 550 No Primary Min 2.10% - 5.0% Max (1) - #2 ACSR 30 65 Less than 1 PPM Ground P15 to P16 (3) - #2 ACSR 30 275 Wood Primary See Tangent Pole Detail (1) - #2 ACSR 3 - Wood Ground Site Manufacturing Serial Number kVA Phase Type Cooling / Class HZ 30 Primary Voltage 30 Secondary Voltage Windings Fusing @ Transformer High Voltage Feed -Thru Bushings Internal High Voltage Switch /o % Impedance Tap Changer High Voltage BIL kV Low Voltage BIL kV Degree C „ Rise PCB Remarks vol • 75 112.5 30 Padmount (Dead- Front) Oil / OA 60 12470 480Y/277V A=Y Internal Bayonet No Yes Min 2.10% - ° 5.0% Max Yes - In the Primary Compartment 95 30 65 Less than 1 PPM V02 V02 1 Sch40 PVC 225 30 Padmount (Dead- Front) Oil / OA 60 12470 480Y/277V A=Y Internal Bayonet No Yes Min 2.10% - 5.0% Max Yes - In the Primary Compartment 95 30 65 Less than 1 PPM SP012 V03 P09 45 500 30 Padmount (Dead- Front) Oil / OA 60 12470 480Y/277V A-Y Internal Bayonet No Yes Min 2.10% - 5.0% Max Yes - In the Comppartment 95 30 65 Less than 1 PPM 30 Small Angle Line Pole (Greater than 4° - Less than 10 °) 3/8" Primary Down Guy Stringing Sag Table using Initial Sag Ruling Span: 275.0 Feet Conductor SPARROW # 2 AWG 6/ 1 Stranding ACSR NESC Medium Load Zone Max Tension = 840 Lb Design: 840. Lb @ 15. Deg F, .25 In Ice, 4.00 Psf wind, Initial H Tens 200. 194. 188. 183. 178. 173. 168. 164. 160. 157. 153. (LBS) Temp F> 40. 45. 50. 55. 60. 65. 70. 75. 80. 85. 90. Sag Feet Feet Feet Feet Feet Feet Feet Feet Feet Feet Feet Span 230.0 3.00 3.10 3.20 3.30 3.39 3.48 3.58 3.67 3.75 3.84 3.93 240.0 3.27 3.38 3.48 3.59 3.69 3.79 3.89 3.99 4.09 4.18 4.28 250.0 3.55 3.66 3.78 3.89 4.01 4.12 4.22 4.33 4.44 4.54 4.64 260.0 3.84 3.96 4.09 4.21 4.33 4.45 4.57 4.68 4.80 4.91 5.02 270.0 4.14 4.27 4.41 4.54 4.67 4.80 4.93 5.05 5.18 5.30 5.42 280.0 4.45 4.60 4.74 4.88 5.02 5.16 5.30 5.43 5.57 5.70 5.82 290.0 4.77 4.93 5.09 5.24 5.39 5.54 5.68 5.83 5.97 6.11 6.25 300.0 5.11 5.28 5.44 5.61 5.77 5.93 6.08 6.24 6.39 6.54 6.69 310.0 5.46 5.64 5.81 5.99 6.16 6.33 6.50 6.66 6.82 6.98 7.14 320.0 5.81 6.01 6.19 6.38 6.56 6.74 6.92 7.10 7.27 7.44 7.61 MEDIUM VOLTAGE CONDUIT AND CABLE SCHEDULE Location CONDUIT PRIMARY CABLE (15kV Rated) Remarks Size (in) Qty Typ Length (ft) Cable Size and Type Length (ft) Cable Numbers from to A B C P03 V01 4 1 Sch40 PVC 20 1/0 CU MV105 -EPR 75 SP001 SP002 SP003 30 Reduced Tension DE (To "P02 ") 30 Full Tension DE (To "PO4 ") 30 Primary Termination Install 18" Switchboard - SW02 (To "P09 ") 30 Primary Termination Install 18" Switchboard - SW03 (To "V01 ") P03 P09 4 1 Sch40 PVC 380 1/0 CU MV105 -EPR 490 SP004 SP005 SP006 - P08 V02 4 1 Sch40 PVC 20 1/0 CU MV105 -EPR 75 SP007 SP008 SP009 45 P13 V03 4 1 Sch40 PVC 20 1/0 CU MV105 -EPR 75 SP010 SP011 SP012 See Dead -End Pole Detail NOTE: THE GROUND CONDUCTOR SHALL BE 600V RATED CABLE, COPPER, CLASS B STRANDED (COMPACTED), WITH POLYETHYLENE COMPOUND OUTER JACKET (THHW) IN THE SAME CONDUIT AS THE PRIMARY CABLE., POLE SCHEDULE Site Pole Framing Remarks Height Class Year Type P01 - - - Wood PSE Primary Metering Pole See Primary Meter Pole Detail P02 45 3 - Wood 30 Reduced Tension Double DE 30 600A Gang- Operated Air -Break Disconnect Switch Install 18" Switchboard - SW01 See Gang Switch Pole Detail P03 50 3 - Wood 30 Reduced Tension DE (To "P02 ") 30 Full Tension DE (To "PO4 ") 30 Primary Termination Install 18" Switchboard - SW02 (To "P09 ") 30 Primary Termination Install 18" Switchboard - SW03 (To "V01 ") See Double - Double Dead -end Pole Detail PO4 45 3 - Wood 30 Small Angle Line Pole (Greater than 4° - Less than 10 °) 3/8" Primary Down Guy See Small Angle Pole Detail P05 45 3 - Wood 30 Tangent Line Pole (Less than 3 °) See Tangent Pole Detail P06 45 3 - Wood 30 Full Tension Double DE 3/8" Primary Down Guy See Double - Double Dead -end Pole Detail P07 45 3 - Wood 30 Tangent Line Pole (Less than 3 °) See Tangent Pole Detail P08 45 3 - Wood 30 Full Tension DE 3/8" Primary Down Guy 30 Primary Termination Install 18" Switchboard - SW04 (To "V02 ") See Dead -End Pole Detail P09 45 3 - Wood 30 Full Tension DE 3/8" Primary Down Guy _ 30 Primary Termination Install 18" Switchboard - SW05 (To "P03 ") See Dead -End Pole Detail P10 45 3 - Wood 30 Small Angle Line Pole (Greater than 4° - Less than 10 °) 3/8" Primary Down Guy See Small Angle Pole Detail P11 45 3 - Wood 30 Small Angle Line Pole (Greater than 4° - Less than 10 °) 3/8" Primary Down Guy See Small Angle Pole Detail P12 45 3 - Wood 30 Tangent Line Pole (Less than 3 °) See Tangent Pole Detail P13 45 3 - Wood 30 Full Tension DE 3/8" Primary Down Guy 30 Primary Termination Install 18" Switchboard - SW06 (To "V03 ") See Dead -End Pole Detail P14 45 3 - Wood 30 Tangent Line Pole (Less than 3 °) R EIV See Tangent Pole Detail P15 45 3 - Wood UNIRTUKWILA 30 Tangent Line Pole (Less than 3 °) OCT 12 2010 See Tangent Pole g Detail P16 45 3 - Wood 30 Full Tension Double DE PERMIT CENTER 3/8" Primary Down Guy See Double - Double Dead -end Pole Detail NOTE: FOR DETAILED FRAMING INSTRUCTIONS SEE SPECIFIC CONSTRUCTION NOTES ON RELATED WORKZONES GINEERING IN A UANTA SERVICES COMPANY 2224 104th Avenue East Suite 1 Edgewood, WA 98372 Office (253) 952 -2128 Fax (253) 952 -2140 13400009032 NSC Job Number: Clint Thayer Engineer: Guy Rider Drafter: Barry Eronson Checked: Wayne Hagan Approved: EXPIRES 11/19/.. (7 /f Revisions No. Date Description Segale Properties Customer Owned Temporary OH & UG Medium Voltage 12.5kV 30 Line Extension From South 200th Street, North Along NEW Southcenter Parkway Schedules Technical Stringing and Sag Sheet 8 of 9 0 0 0 01 0 0 w z 0 I cn a N 01 c 0 0 0 N 0 01 0 w tn T O z N 0 0 Q 0 0 N 0 U 0 NEW PRIMARY CABLE TESTING VALUES NOTES: TESTING OF NEW PRIMARY CABLES TO BE PERFORMED BY A CERTIFIED TESTING COMPANY AND THE TESTING PROCEDURES AND ACCEPTANCE VALUES TO BE IN ACCORDANCE WITH THE NEC AND MANUFACTURERS RECOMMENDED TESTING SPECIFICATIONS. BLEED OFF CURRENT = LEAK DOWN CURRENT NEW PRIMARY CABLE TESTING VALUES RECORDED ACTUAL PULLING TENSIONS Primary Cable Dielectric Test Value /Time Location Hi -Pot Value Length of Time (Minutes) Bleed Off Current (Milliamps) Date Time Foreman Initials 5kV 1 BO co P03 V01 10kV 1 SP003 15kV 1 P09 SP004 SP005 SP006 20kV 1 P08 V02 25kV 1 SP009 30kV 1 V03 SP010 SP011 SP012 35kV 1 FOREMAN NOTE: PLEASE RECORD ACTUAL PULLING TENSIONS WITH A CALIBRATED TENSION 40kV 1 45kV 1 50kV 1 55kV 1 60kV 1 65kV 15 Foreman Note Specify Cable Number and Phase: Number and Phase: Primary Cable Dielectric Test Value /Time Hi -Pot Value Length of Time (Minutes) Bleed Off Current (Milliamps) Date Time Foreman Initials 5kV 1 5kV 1 10kV 1 10kV 1 15kV 1 15kV 1 20kV 1 20kV 1 25kV 1 25kV 1 30kV 1 30kV 1 35kV 1 35kV 1 40kV 1 40kV 1 45kV 1 45kV 1 50kV 1 50kV 1 55kV 1 55kV 1 60kV 1 60kV 1 65kV 15 65kV 15 Foreman Note Specify Cable Number and Phase: Primary Cable Dielectric Test Value /Time Number and Phase: Hi -Pot Value Length of Time (Minutes) Bleed Off Current (Milliamps) Date Time Foreman Initials 5kV 1 5kV 1 5kV 1 10kV 1 10kV 1 10kV 1 15kV 1 15kV 1 15kV 1 20kV 1 20kV 1 20kV 1 25kV 1 25kV 1 25kV 1 30kV 1 30kV 1 30kV 1 35kV 1 35kV 1 35kV 1 40kV 1 40kV 1 40kV 1 45kV 1 45kV 1 45kV 1 50kV 1 50kV 1 50kV 1 55kV 1 55kV 1 55kV 1 60kV 1 60kV 1 60kV 1 65kV 15 65kV 15 65kV 15 Foreman Note Specify Cable Number and Phase: FROM PO3 TO V01 Number and Phase: CUSTOMER OWNED NEW CABLE NOTES: TESTING OF NEW PRIMARY CABLES TO BE PERFORMED BY A CERTIFIED TESTING COMPANY AND THE TESTING PROCEDURES AND ACCEPTANCE VALUES TO BE IN ACCORDANCE WITH THE NEC AND MANUFACTURERS RECOMMENDED TESTING SPECIFICATIONS. BLEED OFF CURRENT = LEAK DOWN CURRENT NEW PRIMARY CABLE TESTING VALUES NEW PRIMARY CABLE TESTING VALUES RECORDED ACTUAL PULLING TENSIONS Primary Cable Dielectric Test Value /Time Location Hi -Pot Value Length of Time (Minutes) Bleed Off Current (Milliamps) Date Time Foreman Initials 5kV 1 BO co P03 V01 10kV 1 SP003 15kV 1 P09 SP004 SP005 SP006 20kV 1 P08 V02 25kV 1 SP009 30kV 1 V03 SP010 SP011 SP012 35kV 1 FOREMAN NOTE: PLEASE RECORD ACTUAL PULLING TENSIONS WITH A CALIBRATED TENSION 40kV 1 45kV 1 50kV 1 55kV 1 60kV 1 65kV 15 Foreman Note Specify Cable Number and Phase: Primary Cable Dielectric Test Value /Time Hi -Pot Value Length of Time (Minutes) Bleed Off Current (Milliamps) Date Time Foreman Initials 5kV 1 10kV 1 15kV 1 20kV 1 25kV 1 30kV 1 35kV 1 40kV 1 45kV 1 50kV 1 55kV 1 60kV 1 65kV 15 Foreman Note Specify Cable Number and Phase: Number and Phase: Primary Cable Dielectric Test Value /Time Hi -Pot Value Length of Time (Minutes) Bleed Off Current (Milliamps) Date Time Foreman Initials 5kV 1 5kV 1 10kV 1 10kV 1 15kV 1 15kV 1 20kV 1 20kV 1 25kV 1 25kV 1 30kV 1 30kV 1 35kV 1 35kV 1 . 40kV 1 40kV 1 45kV 1 45kV 1 50kV 1 50kV 1 55kV 1 55kV 1 60kV 1 60kV 1 65kV 15 65kV 15 Foreman Note Specify Cable Number and Phase: Foreman Note Specify Cable Number and Phase: FROM P03 TO P09 CUSTOMER OWNED NEW CABLE NEW PRIMARY CABLE TESTING VALUES NEW PRIMARY CABLE TESTING VALUES RECORDED ACTUAL PULLING TENSIONS Primary Cable Dielectric Test Value /Time Location Hi -Pot Value Length of Time (Minutes) Bleed Off Current (Milliamps) Date Time Foreman Initials 5kV 1 BO co P03 V01 10kV 1 SP003 15kV 1 P09 SP004 SP005 SP006 20kV 1 P08 V02 25kV 1 SP009 30kV 1 V03 SP010 SP011 SP012 35kV 1 FOREMAN NOTE: PLEASE RECORD ACTUAL PULLING TENSIONS WITH A CALIBRATED TENSION 40kV 1 45kV 1 50kV 1 55kV 1 60kV 1 65kV 15 Foreman Note Specify Cable Number and Phase: Primary Cable Dielectric Test Value /Time Hi -Pot Value Length of Time (Minutes) Bleed Off Current (Milliamps) Date Time Foreman Initials 5kV 1 10kV 1 15kV 1 20kV 1 25kV 1 30kV 1 35kV 1 40kV 1 45kV 1 50kV 1 55kV 1 60kV 1 65kV 15 Foreman Note Specify Cable Number and Phase: Primary Cable Dielectric Test Value /Time Hi -Pot Value Length of Time (Minutes) Bleed Off Current (Milliamps) Date Time Foreman Initials 5kV 1 10kV 1 15kV 1 20kV 1 25kV 1 30kV 1 35kV 1 . 40kV 1 45kV 1 50kV 1 55kV 1 60kV 1 65kV 15 Foreman Note Specify Cable Number and Phase: FROM P08 TO V02 CUSTOMER OWNED NEW CABLE NEW PRIMARY CABLE TESTING VALUES NOTES: 1. PULLING METHOD MUST BE BY A SWIVEL/ SWEDGE DEVICE DIRECTLY ON THE CONDUCTOR. 2. CONDUIT TO BE CLEANED AND PRE -LUBED PRIOR TO PULL. NOT WITH A PULLING SOCK PULLING ON CABLE JACKET. 3. PULLING LUBRICANT TO BE CONTINUOUSLY APPLIED TO CABLE DURING THE PULL. 4. PULLING TENSION TO BE MEASURED AND RECORDED WITH A CERTIFIED AND CALIBRATED TENSION- MEASURING DEVICE FOR PULLS OVER 150' OR 270° ON BENDS. REVIEWED FOR COMPLIANCE WITH NFPA 70 - NEC OCT 2 0 2010 BUILDING A of.Tukwila DIVISION RECBV CITY OF TV LP' OCT 12 2010 PERMIT CENTER GINEERING 1NC• A UANTA SERVICES COMPANY 2224 104th Avenue East Suite 1 Edgewood, WA 98372 Office (253) 952 -2128 Fax (253) 952 -2140 13400009032 NSC Job Number: Clint Thayer Engineer: Guy Rlder Drafter. Barry Eronson Checked: Wayne Hagan Approved: EXPIRES 11/19/`0L, /i Revisions No. Date Description Segale Properties Customer Owned Temporary OH & UG Medium Voltage 12.5kV 30 Line Extension From South 200th Street, North Along NEW Southcenter Parkway Schedules Cable Test Recorded Pull Tensions Sheet 9 of 9 RECORDED ACTUAL PULLING TENSIONS Primary Cable Dielectric Test Value /Time Location Hi -Pot Value Length of Time (Minutes) Bleed Off Current (Milliamps) Date Time Foreman Initials 5kV 1 BO co P03 V01 10kV 1 SP003 15kV 1 P09 SP004 SP005 SP006 20kV 1 P08 V02 25kV 1 SP009 30kV 1 V03 SP010 SP011 SP012 35kV 1 FOREMAN NOTE: PLEASE RECORD ACTUAL PULLING TENSIONS WITH A CALIBRATED TENSION 40kV 1 45kV 1 50kV 1 55kV 1 60kV 1 65kV 15 Foreman Note Specify Cable Number and Phase: Primary Cable Dielectric Test Value /Time Hi -Pot Value Length of Time (Minutes) Bleed Off Current (Milliamps) Date Time Foreman Initials 5kV 1 10kV 1 15kV 1 20kV 1 25kV 1 30kV 1 35kV 1 40kV 1 45kV 1 50kV 1 55kV 1 60kV 1 65kV 15 Foreman Note Specify Cable Number and Phase: Primary Cable Dielectric Test Value /Time Hi -Pot Value Length of Time (Minutes) Bleed Off Current (Milliamps) Date Time Foreman Initials 5kV 1 10kV 1 15kV 1 20kV 1 25kV 1 30kV 1 35kV 1 . 40kV 1 45kV 1 50kV 1 55kV 1 60kV 1 65kV 15 Foreman Note Specify Cable Number and Phase: FROM P13 TO V03 CUSTOMER OWNED NEW CABLE NOTES: 1. PULLING METHOD MUST BE BY A SWIVEL/ SWEDGE DEVICE DIRECTLY ON THE CONDUCTOR. 2. CONDUIT TO BE CLEANED AND PRE -LUBED PRIOR TO PULL. NOT WITH A PULLING SOCK PULLING ON CABLE JACKET. 3. PULLING LUBRICANT TO BE CONTINUOUSLY APPLIED TO CABLE DURING THE PULL. 4. PULLING TENSION TO BE MEASURED AND RECORDED WITH A CERTIFIED AND CALIBRATED TENSION- MEASURING DEVICE FOR PULLS OVER 150' OR 270° ON BENDS. REVIEWED FOR COMPLIANCE WITH NFPA 70 - NEC OCT 2 0 2010 BUILDING A of.Tukwila DIVISION RECBV CITY OF TV LP' OCT 12 2010 PERMIT CENTER GINEERING 1NC• A UANTA SERVICES COMPANY 2224 104th Avenue East Suite 1 Edgewood, WA 98372 Office (253) 952 -2128 Fax (253) 952 -2140 13400009032 NSC Job Number: Clint Thayer Engineer: Guy Rlder Drafter. Barry Eronson Checked: Wayne Hagan Approved: EXPIRES 11/19/`0L, /i Revisions No. Date Description Segale Properties Customer Owned Temporary OH & UG Medium Voltage 12.5kV 30 Line Extension From South 200th Street, North Along NEW Southcenter Parkway Schedules Cable Test Recorded Pull Tensions Sheet 9 of 9 RECORDED ACTUAL PULLING TENSIONS Location Cable Numbers Actual Tension Date Time Foreman Initials from to AO BO co P03 V01 SP001 SP002 SP003 P03 P09 SP004 SP005 SP006 P08 V02 SP007 SP008 SP009 P13 V03 SP010 SP011 SP012 FOREMAN NOTE: PLEASE RECORD ACTUAL PULLING TENSIONS WITH A CALIBRATED TENSION DEVICE NOTES: 1. PULLING METHOD MUST BE BY A SWIVEL/ SWEDGE DEVICE DIRECTLY ON THE CONDUCTOR. 2. CONDUIT TO BE CLEANED AND PRE -LUBED PRIOR TO PULL. NOT WITH A PULLING SOCK PULLING ON CABLE JACKET. 3. PULLING LUBRICANT TO BE CONTINUOUSLY APPLIED TO CABLE DURING THE PULL. 4. PULLING TENSION TO BE MEASURED AND RECORDED WITH A CERTIFIED AND CALIBRATED TENSION- MEASURING DEVICE FOR PULLS OVER 150' OR 270° ON BENDS. REVIEWED FOR COMPLIANCE WITH NFPA 70 - NEC OCT 2 0 2010 BUILDING A of.Tukwila DIVISION RECBV CITY OF TV LP' OCT 12 2010 PERMIT CENTER GINEERING 1NC• A UANTA SERVICES COMPANY 2224 104th Avenue East Suite 1 Edgewood, WA 98372 Office (253) 952 -2128 Fax (253) 952 -2140 13400009032 NSC Job Number: Clint Thayer Engineer: Guy Rlder Drafter. Barry Eronson Checked: Wayne Hagan Approved: EXPIRES 11/19/`0L, /i Revisions No. Date Description Segale Properties Customer Owned Temporary OH & UG Medium Voltage 12.5kV 30 Line Extension From South 200th Street, North Along NEW Southcenter Parkway Schedules Cable Test Recorded Pull Tensions Sheet 9 of 9