Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit EL11-0275 - CITY OF TUKWILA - GENERATOR
CITY OF TUKWILA GENERATOR 6300 SOUTHCENTER BL EL1 1 -0275 Parcel No.: Address: Tenant Name: Cityqf Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.ci.tukwila.wa.us ELECTRICAL PERMIT 0003200005 6300 SOUTHCENTER BL TUKW CITY OF TUKWILA - GENERATOR Permit Number: Issue Date: Permit Expires On: EL11 -0275 04/28/2011 10/25/2011 Owner: Name: Address: Contact Person: Name: Address: TUKWILA CITY OF 6200 SOUTHCENTER BLVD , TUKWILA WA 98188 RIC FEGURGUR 6402 S 144 ST , TUKWILA WA 98168 Contractor: Name: URBAN ELECTRIC Address: PO BOX 58328 , SEATTLE WA 98138 Contractor License No: URBANE *900RS Phone: 206 - 686 -8722 Phone: 206 - 686 -8722 Expiration Date: 12/17/2012 DESCRIPTION OF WORK: ELECTRICAL INSTALLATION FOR STAND BY GENERATOR. GENERATOR PROVIDED BY OWNER Value of Electrical Work: NRES: $90,581.00 RES: $0.00 Type of Fire Protection: UNKNOWN Electrical Service Provided by: PUGET SOUND ENERGY Permit Center Authorized Signature: Fees Collected: $1,837.50 National Electrical Code Edition: 2008 Date: D�Iti�tl I hereby certify that I have read and ed this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complie • whether specified herein or not. The granting of this permit does not p e to give authority to violate or cancel the provisions of any other state or local laws regulating construction or t - • ance of wor authorized to sign and obtain this electrical permit and agree to the conditions on the back of this pe Signature: Print Name: Date: /` o zof( This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: EL -9/09 EL 11 -0275 Printed: 04 -28 -2011 • • PERMIT CONDITIONS Permit No. EL11 -0275 * *ELECTRICAL ** 1: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 2: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 3: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296 -46B WAC. 4: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 5: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 6: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. doc: EL -9/09 EL11 -0275 Printed: 04 -28 -2011 CITY OF TUKAA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us Electrical Permit No. ELI I' 0)-? Project No. (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION /� King Co Assessor's Tax No.: Oaf 3)-d — 0005— Site Address: 6 Soo .S colt, C -t. 3L Suite Number: MO Floor: Tenant Name: C 1i y OO "iU,4 vJ L.A Property Owners Name: C. 1i-\/ Osr -1-uv .0 \L_ A Mailing Address: New Tenant: ❑ Yes . No City State Zip CONTACT PERSON — Who do we contact when your permit is ready to be issued Name: e?---\C_ c." \U C \Ui Mailing Address: ip &-(02 5 • 1 LI LI tit—S. Day Telephone: (1.-040)c. 1p � - g 7 zZ -TO 14,01 v1/4) 9gitP nn L city State Zip E -Mail Address: ■ C -I\eT Fax Number: (4(o - g7Z9 ELECTRICAL CONTRACTOR INFORMATION Company Name: (,-t -3 INC. C711ne VE13Nt --■ GI�ZiR -lam Mailing Address: SAM L AS l\-$0 1115 Contact Person: til c eIn L)r E -Mail Address: r4 &r a., ( fie t P c*v ■ tom-. (w± Contractor Registration Number: i)g-Z NW: c.00&S City � n State Zip Day Telephone. , , -%go - 27Z Z Fax Number:(.2-D O (o g(v - 81Z'l Expiration Date: Valuation of Project (contractor's bid price): $ , 59 1 Scope of Work (please provide detailed information): .S7 Arsi7 "by ��b�l:I�{TO . ELCC- IZ if A-L I Ms Ta L L � C'� e (JP- I`ttTO &- P20✓ i Dt:iD 4/ /C of Will service be altered? ja! Yes Type of Use: Type of work: ❑ New ❑ Addition ❑ Service Change ❑ Low VoltagGenerator ❑ Fire Alarm ❑ No Adding more than 50 amps? ❑ Yes 'Itkp Property Served by: ❑ Puget Sound Energy 7 ❑ Seattle City Light H:\Applications\Forn s- Applications On Line\2010 Applications \7.2010 - Electrical Permit Application.doc bh Page 1 of 2 ❑ Remodel ❑ Tenant Improvement ❑ Telecommunication ❑ Temporary Service vi4( I RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings $152.85 (including an attached garage) ❑ Garages, pools, spas and outbuildings $81.90 ea ❑ Low voltage systems (alarm, furnace thermostat) $59.85 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration $81.90 (no added/altered circuits) ❑ Service change with added/altered circuits $81.90 number of added circuits $11.55 ea ❑ Circuits added/altered without service change $54.60 (up to 5 circuits) ❑ Circuits added/altered without service change $54.60 (6 or more circuits) $7.65 ea ❑ Meter /mast repair $68.25 ❑ Low voltage systems $59.85 (alarm, furnace thermostat) MULTI - FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) $63.00 ❑ Temporary service (generator) $78.75 ❑ Manufactured/mobile home service $84.00 (excluding garage or outbuilding) ❑ Carnivals $78.75 Number of concessions $10.50 ea PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING E CTRICAL CONTRACTOR: mow • Ativriles. Signature: Print Name: /-\ v 17 M I orc A- Date: /2-3 Day Telephone: (cc, 6a0- 8722_ Mailing Address: 0402- �u % �%1-/ �� . &ATe 11 t"JiL. - lJr1 et5A, State Zip City IDate Application Accepted: y-)j �q Date Application Expires: 9,114_, `I Staff Initials: H:Wpplications\Forms- Applications On Line\2010 Applications \7 -2010 - Electrical Permit Application.doc bh Page 2 of 2 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206-431-3665 Web site: http: / /www.TukwilaWA.gov Parcel No.: 0003200005 Address: 6300 SOUTHCENTER BL TUICW Suite No: Applicant: CITY OF TUI{WILA - GENERATOR RECEIPT Permit Number: Status: Applied Date: Issue Date: EL11 -0275 ISSUED 03/24/2011 04/28/2011 Receipt No.: R11 -01250 Initials: TLS User ID: 1670 Payee: Payment Amount: Payment Date: Balance: $378.00 06/17/2011 03:02 PM $0.00 GENESIS 3 INC DBA URBAN ELECTRIC TRANSACTION LIST: Type Method Descriptio Amount Payment Check Authorization No. ACCOUNT ITEM LIST: Description 3352 378.00 Account Code Current Pmts ELECTRICAL PERMIT - NONR 000.322.101.00.00 Total: $378.00 378.00 doc: Receipt-06 Printed: 06 -17 -2011 0 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http: //www.ci.tukwila.wa.us RECEIPT Parcel No.: 0003200005 Permit Number: EL11 -0275 Address: 6300 SOUTHCENTER BL TUKW Status: APPROVED Suite No: Applied Date: 03/24/2011 Applicant: CITY OF TUKWILA - GENERATOR Issue Date: Receipt No.: R11 -00850 Initials: User ID: Payee: JEM 1165 Payment Amount: $1,470.00 Payment Date: 04/28/2011 04:04 PM Balance: $0.00 GENESIS 3 INC. TRANSACTION LIST: Type Method Descriptio Amount Payment Check 3212 1,470.00 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PERMIT - NONR 000.322.101.00.00 1,470.00 Total: $1,470.00 doc: Receiot -06 Printed: 04 -28 -2011 • City of Tukwila De P artment of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http: //www.ci.tukwila.wa.us RECEIPT Parcel No.: 0003200005 Permit Number: EL 11-0275 Address: 6300 SOUTHCENTER BL TUKW Status: PENDING Suite No: Applied Date: 03/24/2011 Applicant: CITY OF TUKWILA - GENERATOR Issue Date: Receipt No.: R11 -00576 Payment Amount: $367.50 Initials: WER Payment Date: 03/24/2011 11:18 AM User ID: 1655 Balance: $1,470.00 Payee: URBAN ELECTRIC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 3149 367.50 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PLAN - NONRES 000.345.832.00.00 367.50 Total: $367.50 doc: Receiot -06 Printed: 03 -24 -2011 INSPECTION RECORD /-cz751 Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF' TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 bb (206) 431 -3670 Permit Inspection/ Request Line (206) 431 - 2451 1"" Project: 1"4 4r/ Ithi- Address: (03oo 5 . sZ , Special Instructions: Type of Inspection: 2/'00 Date Called: Date Wanted: . Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. Aisks OMMENTS: o r44, Inspector: �% J I1te 1 ri REINSPECTION FEE REQUIRED. Prior to next inspecti n. fe must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit a P RMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 . (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: kilk. 6E4. Type of Inspection: Address: ...S.C. et.. Date Called: ..... Special Instructions: Date Wanted:. a.m p.m. Requester: Phone No: Approved per applicable codes. 1 Corrections required prior to approval. COMMENTS: Inspector: 1Date: c' REINSPECTION FEE REQUIRE. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspectioh. INSPECTION NO. INSPECTION RECORD Retain a copy with permit (i4-o2 ?1 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 F., (206) 431 -367 Permit Inspection Request Line (206) 431 -2451 Project TJ(� 1+4 / tett Type of Inspection: 7.10 Address: Date Called: Special Instructions: Date Wanted:. J � 7 :4:6.‘7. Requester: Phone No: ElApproved per applicable codes. Corrections required prior to approval. COMMENTS: .(5c4A11)Ja calk. g(2-C Date: )121/ , ❑ REINSPECTION FEE REQUIR D. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. fief-AA +.: '`?f'u•c:1: w. T;E.� iv .. ar: -.s; •{„ - --� INSPECTION. RECORD PY P Retain a copy with permit C4 - INSPECTION NO. PERMIT Na CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 - Permit Inspection Request Line (206) 431 -2451 Project: ful • 664 Type of Inspection: 7 + Date Called: Special Instructions: Date Wanted: / p.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: OK 6-7\14( 6ERa/Ic, Inspector: Albs, • • • • r'h: • Date: a 0 1 • aj 1. .. ri REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be •` paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection...• . 4 .4 3 INSPECTION RECORD Retain a copy with permit i /'Ul41 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 . (206) 431 -367 Permit Inspection Request Line (206) 431 -2451 Project: 71 }K- 6���, „ _A V `, Type of Inspection: 702...... Address: 0300 .s-�- • 61. Date Called: Special Instructions: Date Wanted: / Phone No: 11 Approved per applicable codes. O Corrections required prior to approval. 7 COMMENTS: mfili/Kfogoixii4 Date: a c 4 n REINSPECTION FEE REQUIR D. Prior to next inspectio . fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. Inspector: INSPECTION RECORD Retain a copy with permit 611-oinct INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION / 2 _ 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -36 Permit Inspection Request Line (206) 431 -2451 Project: link- lA . Type of Inspection: 706 Address: Date Called: Special Instructions: Date Wanted: t I1 p.m. Requester: Phone No: Approved per applicable codes. a Corrections required prior to approval. COMMENTS: 91 *we Aftg5X4p Date: 0( i r7 REINSPECTION FEE REQUIR • . Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. Inspector: '1° z. g -ems .:'" "... 77";-1V7qht :41t24 Zc":67 ..'. r.'°` ".r INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -36 Permit Inspection Request Line (206) 431 -2451 Project: j/ 7Vic0' Type of Inspection: ©a, Address: 3 Date Called: Special Instructions: Date Wanted: 9 p.m. Requester: �!' Phone No: Approved per applicable codes. a Corrections required prior to approval. COMMENTS: Q0Jitp eikwri) Date: 004/1/ 1-7 REINSPECTIO FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Inspector: _ - °'4.1hrv?assasAVVe_+ 9fdS4y a'"` • -7d4.- m .40_ .A4...naa!wi+.A. IieMBURSEMENT AUTHAtIZATION AND APPROVAL TO CONDUCT INSPECTION ACTIVITIES DURING OFF HOURS Date: (0(6/20 l Requested by: Firm/Company: 6 '3 t C7IYt Permit No. v v t Project Name: Ce 3c0 `3uacl - er Project Address /Location: Co 3 (X) S c ik C.r t,4-er 3 It) 774 hAiCtskectflik Time of Off -Hours Construction Activity – From: 7 r�ir (pm To: 3 ani Requested Date of Inspection: (0//P heir / Requested Time: Z 101^-L am/(g) Contact Name: Nkckc( ut( Phone No. 2000—"1 ?`? 3 /2/ Special Conditions for Consideration: 7 ** Contractor will be charged a minimum of four (4) hours inspection time for any off -hours inspection work at $94.50 per hour. This is to be paid at time of request. ** The undersigned, as an authorized representative of the above firm, hereby agrees to reimburse the City for its overtime inspections on the above referenced project. A separate invoice will be issued for all inspection time in excess of four (4) hours. Signature: Print Name: .C., Reviewed by: Approved: Remarks: /z Disapproved: RECEIVED 8I11!IOF TUKNRI A JUN 17 2011 ARIMINCENTER W:\Permit Center\Templates\Forms\After Hour Inspection Request.doc • 2pe�'e✓ ice *1_ � Our energy working for you. ^I Power Generation Quotation Cummins Northwest, LLC 811 SW Grady Way Renton WA 98057 -2944 United States Direct: 425 - 277 -5346 December 3, 2010 Project Name: Copy of Tukwila 6300 Building Quotation: 1662000000225815 FILE COPY Permit No., Thank you for your inquiry. We are pleased to quote as follows: Item 150DSGAC A331 -2 L090 -2 L158 -2 L169 -2 F232 -2 R002 -2 B268-2 H702 -2 B184 -2 A366 -2 H536 -2 H609 -2 H606 -2 K631 -2 KA08 -2 KS53 -2 KP79 -2 KT79 -2 F206 -2 F229 -2 F179 -2 C127 -2 A422 -2 A333 -2 E125 -2 H389 -2 E089 -2 H036 -2 D036 -2 Description Diesel Genset: 60Hz -150kW Genset- Diese1,60Hz,150kW Duty Rating - Standby Power Listing -UL 2200 Cert-Seism ic, I BC2000,2003,2006, SS= 2.90g, Rooftop EmissionCert,EPA,Tier 3,NSPS CI Stationary Emergency Enclosure- Steel,Sound Att,Level 3,w /Exhaust System Voltage- 277/480,3 Phase,Wye,4 Wire Altemator- 60Hz,12 Ld,Broad Rng,Full 1 Ph Outp,105C GENSET CONTROL - POWERCOMMAND 2.2 REVIEWED FOR, Exciter /Regulator -Pmg, 3 Phase Sensor Engine Govemor - Electronic, Isochronous Only COMPLIANCE WITH Display Language - English NFPA 70 NEC 1 Control Mounting -Left Facing 1 Meters -AC Output,Analog APR 1 4 2011 1 Relays - Genset Status, User Configured 1 Alarm - Audible, Engine Shutdown 1 Signals - Auxiliary, 8 Inputs /8 Outputs City of•Tukwila 1 Circuit Breaker Or Entrance Box -Left Side Only BUILDING DIVISION CircuitBreaker- 225A,Left,3P,600/525V,TM,80% UL/IE Wind Rating -150 MPH,Steel Housing 1 Brackets - Genset Overhead Lift, Two Point,Removable 1 Skidbase- Housing Ready 1 Separator- FueI/Water 1 Engine Starter :12 VDC Motor p RECEIVED Battery Charging Alternator - Normal Output Engine Cooling -High Ambient Air Temperature MAR 2 4 2011 1 Shutdown -Low Coolant Level 1 Extension - Engine Coolant Drain RPRMITCENTER 1 Coolant Heater -120 Volt Ac, Single Phase 1 Engine Air Cleaner -Heavy Duty 1 Qty 1 1 1 1 1 1 1 1 ELLNOZ75 • • L030 -2 Genset Warranty- Standby Basic Extended, 5 Years / 1,500 Hours 1 A322 -2 Packing -Skid, Poly Bag 1 F065 -2 Rack -Battery 1 H268 -2 Extension -Oil Drain 1 CP01 -2 Common Parts Listing 1 SPEC -F Product Revision - F 1 0300 - 5929 -02 Annunciator - (RS485) 1 Transfer Switch - Electronic Contro1:600A OTEC600 Transfer Switch- Electronic Contro1,600Amp 1 A028 -7 Poles -3 1 A046 -7 Listing -UL 1008 /CSA Certification 1 A044 -7 Frequency -60 Hertz 1 A042 -7 System -3 Phase,3 Wire Or 4 Wire 1 R026 -7 Voltage -480 Vac 1 B001-7 Cabinet -Type 1 1 L202 -7 Auxiliary Relay- Switch In Emergency Position -12VDC 1 L203 -7 Auxiliary Relay- Switch In Normal Position -12VDC 1 M033 -7 Genset Starting Battery-12VDC 1 CO27 -7 Cover - Switch Control, Security 1 J030 -7 Clock- Exercise, Extemal 1 M003 -7 Terminal Block -30 Points 1 G006 -7 Transfer Switch Warranty-5 Yr Basic 1 CP01 -7 Common Parts Listing 1 SPEC -A Product Revision - A 1 Commercial Accessories A034F054 Over Fill Prevention Valve,w /14.57" Down Tube 1 A034F063 Spill Fill Box, 5.3 gallon (2 "npt) 1 A034F095 High Fuel Switch, 41.1" 1 A034F242 Critical Low Fuel Switch - 20.9" 1 A034F282 Fuel gauge Sender & Float Assembly, 22.1" 1 A034F377 Normal Vent, 108" 2 "npt 1 A030Y666 Fuel Tank, Dual Wall Sub-base-683ga1 (QSB5G3) 1 Battery Engine Starting Battery 1 Charger Battery Charger 1 O &Ms Operation & Maintenance Manuals, 3 Sets 3 Upfit Shop Upfit, Mount Fuel Tank, Battery Charger 1 Delivery Delivery to Job Site, Off Loading Not Included 1 Startup Startup & System Testing, Includes 2 Hour Load Bank Test 1 Total $54,245.00 Grand Total Including 9.5% Sales Tax for City of Tukwila: $59,398.28 • • NOTES: 1. THIS QUOTATION IS SUBJECT TO CUMMINS NORTHWEST, LLC STANDARD TERMS & CONDITIONS - SEE ATTACHMENT 2. REGARDING SELECTIVE COORDINATION FOR NEC ARTICLE 700 AND 701 LOADS. CUMMINS GENERATORS ARE EQUIPPED WITH THE MANUFACTURERS RECOMMENDED THERMAL MAGNETIC CIRCUIT BREAKER. INFORMATION REGARDING THIS DEVICE CAN BE SUPPLIED UPON REQUEST. THIS QUOTATION IS NOT VALID IF ANY CHANGES TO THIS CIRCUIT BREAKER(S) IS REQUIRED TO COORDINATE WITH OTHER DEVICES IN THE ELECTRICAL DISTRIBUTION SYSTEM. IF CHANGES ARE REQUIRED, THE CUSTOMER MUST PROVIDE A COPY OF THE COORDINATION STUDY LISTING THE MANUFACTURERS PART NUMBER OF THE DISCONNECT DEVICE TO BE SUPPLIED WITH THE GENERATOR AND A REVISED QUOTATION WILL BE ISSUED. 3. A MAINTENANCE AGREEMENT IS NOT INCLUDED IN THIS QUOTATION, AVAILABLE FOR AN ADDITIONAL PRICE. Submitted by Jeff Delauney , Generator Sales Jeff.Delauney @cummins.com • • Cummins Northwest, LLC Exhaust System: Fuel System: Cooling System: Electrical: Mounting: Miscellaneous: Documentation: Taxes and Permits: Attachment to Quotation - Exclusions- All off - engine piping, hangers, flanges, gaskets, bolts, insulation, and other materials associated with exhaust system installation. All off - engine fuel piping, valves, coolers, filters, pumps, fittings, fuel storage tank & senders, fuel for testing and initial fill of fuel. Intake louvers, exhaust louvers, air dampers, sheet metal ducting, flex adapters, sound attenuators /baffles, coolant fill for remote radiators & piping All off - engine wiring, field terminations of wiring, and lugs other than those detailed in our submittal. Generator mounting bolts and anchors. Vibration isolators (if included) for the generator will be shipped loose for installation at the jobsite by others. Third party electrical testing and certification, seismic calculations, coordination studies, stamped engineering calculations, emissions testing, all other services and material not specifically listed in the preceding quotation. Unless stated otherwise, three sets of 0 & M manuals are available upon request. Electronic documentation may be available at an additional cost Any applicable sales tax, permits, licenses. All items listed are excluded and will only be supplied bv Cummins Northwest, LLC if agreed upon, in writing. bv a sales representative for Cummins Northwest, LLC. -Terms and Conditions- • This offer and quotation incorporates and is contingent upon acceptance of the terms and conditions in the standard Sales Order of Cummins Northwest, LLC. Purchase Orders or other documents with terms and conditions that are inconsistent with the CNW standard Sales Order will not be accepted unless agreed to in writing by an officer of Cummins Northwest, LLC. • Prices are valid for 30 days • If included in the quotation, all on -site startup, testing and training assumes weekdays, during standard CNW business hours. Additional charges may be added for work requested to be done on overtime. weekends. and holidays. • F.O.B. factory. freight allowed to iobsite. off- loading is not included • Factory direct shipments require credit approval prior to shipment • Terms are C.O.D. or net 30 days upon approval of credit • Equipment held for longer than 30 days may be charged a monthly storage fee • Cancellation charges are 25% minimum after release of order 120204 rev. 2/07 C 0 A B 6 4 3 2 1 1 .f, 1 10 1 , 1 .. IC0- 111161 1 09U1)9 NOYIN 25 (IIFTIII5 Ma G1T no 5910 00.019 C F B - A 50 (35.51 96 13.61 Pas 11-1 /4• PT Fsa.l.1 Ip.r. 11.1/1• PT IIPI.r. Baal. 6.I1a SFCT ION A -A 444, IC PT F...l. I)l2• PT F.rl.1 Sully 1114• PT 2...).) .Ia. 1114• IOT F.s1.1 495 n F..I bilk 11.1/1• PT Fools/ hrs.! Y..1 119.51 114 (4.51 (I..Irl..I 01.b -14 Arse 611.r. 13/0' PT fsNl.) 12• PI F.NI.1 ...1 SRI M.N11.q C ..... I Frr n. hat (a l ..42 Nn) 9 r 14• PT F..I./ (4• PT F48.Is1 NOTES: 1. TANKS ARE UL-142 / ULC-Si01-51 LISTED, SECONDARY CONTAINMENT GENERATOR BASE TANI. REFER TO TANI LABELS AND LOCAL CODE TO DETERMINE VENTING REOUIRCYENTS FOR BOTH COMPARTMENTS. 39 2. SUBBASE FUEL TANK MOUNTING. EXCESSIVE TWISTING OF THE FUEL TANK. WHEN FASTENING IT TO A FOUNDATION, MAY RESULT IV STRUCTURAL FAILURE OF THE TAMN. TO INSURE THE INSTALLATION DOES NOT EXCESSIVELY TWIST THE FUEL TANK. THE FOLLOWING PROCEDURE MUST BE OBSERVED: !' _ ■ �,���-`��0 0 0] 1 160.51 112 135.111 j j j� ....r��s� 1050 141.31 4.0 ISi 3N 6)4.61 3141 -Up Arms Pm! 9 ` ` 2.1 REFER TO CUMMINS POKER GENERATION APPLICATION MANUAL 2030 FOR GENERAL MOUNTING 1 127 126.61 H - 2091 314•-16 WaaI1.1 1b s1 (8t 41 SET GUIDELINES. Z.2 AFTER PLACING GET CM FOUNDATION. VERIFY ALL MOUNTING PADS CONTACT FOUNDATION. $a. IP PT F.8.1.1 F..I Fill 2.3 TIGHTEN TALI HOLD DOWN 40041)50 FASTENERS. 12' Pl Fulls) [62.41 31111 [ IO.I1 3. INDICATES PIPE SIZE OF INTERFACE PORT DI (011 TANI 6p.rs (2' PT F.NI.1 .s1 W.S. FOR FEATURE OR OPTION INDICATED. 3632 1143.01 A 4. DIMENSIONS IN ( 1 ARE IN INCHES. 5. LOW FUEL LEVEL SWITCH PROVIDES AN ELECTRICAL CONTACT CLOSURE WHEN APPROXIMATELY 503 OF USABLE FUEL - -- 1020 110.21 I I i3,356 - ♦ - - _ �� REMAIN IM THE TAMN, 6. RUPTURE BASIN SWITCH PROVIDES AN ELECTRICAL CONTACT CLOSURE WHEN FLUID 15 PRESENT IN THE RUPTURE BASIN. 7. TAMN VOLUME - 3.619 LITERS 1956 GAL) NOMINAL LITERS 1001 GAL) MAXIMUM USABLE 8. TANN DAY WEIGHT - 1,133 kg 13,60D Ibs) 9. THIS PART IS MANUFACTURER SOURCE CONTROLLED. • • • fir NON N -N A 1193 )--1 [47.0 3D11 1661 (65.51 10. ALL DIYEg510NS ARE REFERENCE (151.4] s u izm 6. TNWAS //j�I VC �1 MUM PoBr Gaea= i1 1. 9.9 «•4)4-+0:1: .:..• -I. o.. 4.ILy1l .aa.15 4.4uw.11 • ' 5 cum, - .. Y gSON TANN, FUEL -S. AYDE1001 .� "° 2300410 MIN ,IPGF e4 SLL r .n: ..d...n m eI�DS DO p' 0030(661 1.:11W B I B I 4 t 3 1 2 i 1 Drawing Name: A0340081 Revision: A Part Name: A030Y667 Revision: B Sheet 1 of 2 .Umm.tra I II tepri.3. Nate II Part A030Y667 B Dereiprion TAN&.FUEL Lena Neese A030Y667 &mental Retaliations Nam 4ppReation Slaw Anterw m Ooy Release Phase (bile Mechanical Security <1ad0uum Proprietary Part Specifications :A030Y667 B Num A030a336 Description II A0343011 SPECD7CATIONMATERIAL DRANNOFNGINEERING CES 109113 A03430111 Drawing Name: A034S081 Revision: A Part Name: A030Y887 Revision: B Sheet 2 of 2 ROCK WALL, PLANTINGS, OR OTHER SURFACE OBSTRUCTIONS 6 PLAN 4' MIN. ■ MIN. AREA OF LEVEL GROUND SURFACE GUARD POST ELEVATION NOTES: 1. GUARD POST SHALL BE EITHER CONCRETE FILLED STEEL PIPE (MIN. 4" DIA.) OR CONCRETE POST (MIN. 8" DIA.). 2. POSTS SHALL BE AT LEAST 3 FEET FROM THE CENTER OF THE HYDRANT AND SHALL NOT BE IN DIRECT LINE WITH ANY DISCHARGE PORTS. 3. POSTS SHALL BE 6 FEET LONG; 3 -1/2 FEET SHALL BE BURIED. 4. PAINTED FINISH SHALL BE FARWEST CASE YELLOW #3472. NOT TO SCALE oag�L• ��+ City of z J aye. �,�e�y Tukwila FIRE HYDRANT GUARD POST SHEET: WS -14 REVISION #1: 08.03 APPROVAL: B. SHELTON • • Dual wall sub -base fuel tanks 35 -230 kW DSFAA/B/C/D/E (QSB5G3), DSGAA/B/C (QSB7G3), DSHAA/B /C/D (QSL9G2) Description Cummins Power Generation diesel fuel tanks are constructed of heavy gauge steel (7 and 11 gauge) and include an internally reinforced baffle structure for generator support. This design has fewer exposed seams and welds for increased corrosion resistance, and has been tested to withstand greater than 18,000 pounds of load bearing. All tanks are pressure washed with an iron phosphate solution and then coated with a medium texture finish TGIC Polyester powder paint. This paint has superior UV and chemical resistance with best -in -class adhesion, flexibility, and durability to resist chipping and substrate corrosion. The interior is coated with a solvent -based rust preventative. Tanks are UL and ULC Listed as Secondary Containment Generator Base Tanks. Inner and outer containments are pressurized at 3 psi and leak checked per UL and ULC testing procedures to ensure integrity of weld seams. Cummins Power Generation fuel tanks are designed in various capacities to satisfy hours-of- operation installation requirements with or without an overfill protection valve (OFPV). These tanks are also designed to be field upgradeable to meet local code and application specifications. Features UL 142/ULC- S601 -7 Listed - Secondary containment generator sub -base tank meets UL requirements. NFPA 30/37/110 A IFC 2003 /2006 /2009 Compliant - Secondary containment sub -base tanks meet both NFPA and IFC requirements. Emergency pressure relief vent cap - Meets or exceeds UL requirements. Insures adequate venting and pressure relief for inner and outer tank under extreme temperature and emergency conditions. Low fuel level switch - Activates at 50% remaining usable fuel. Secondary containment basin switch - Activates with primary containment failure. Atmospheric vent cap - Accommodates normal venting (oversized 2° vent is raised above the fuel fill). Raised fuel fill - Includes lockable flip top to prevent tampering and/or fuel contamination. May be installed inside or outside generator set skid rails. Fuel level gauge - Provides direct reading, top mounted. Available with electronic sending. Modular tank design - Generator set support and mounting design accepts multiple Cummins Power Generation generator sets within engine platforms. Enclosure compatible - Accepts drop -over weather protective and sound attenuated enclosures. Tank to foundation ground clearance - Allows for visual secondary containment leak detection. Tank top mounting bracket - Provides mounting for (optional) pump and control for day tank operation. Lifting rings - Eliminates the need for spreader bars. Fork lift positioning slots. Redundant fuel f111 port — Can relocate Inside enclosure. Spare ports — Can add extra switches or senders etc. Optional Features — Spill fill box, over fill prevention valves, high fuel switches, high fuel alarm panel, critical low fuel switch, fill down tube, fuel gauge with sender, normal and emergency vent extensions, pump, motor, and control. 02010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. Our energy working for you.' Is a trademark of Cummins Power Generation. Specifications are subject to change without notice. AC -185a (8/10) Page 1 of 8 Genset Models to Fuel Tank Part Numbers and Specifications QSB5G3 Fuel Tank P/N A030Y654 A030Y655 A030Y657 A030Y660 A030Y661 Total Capacity 168 gal 252 gal 340 gal 428 gal 559 gal LxWxH 108.4 x 65.5 x 15.7 126.4 x 65.5 x 16.7 126.4x65.5x20.7 126.4 x 65.5 x 24.7 126.4x65.5x30.7 Notes 3 & 10 w/ OFPV w/o OFPV w/ OFPV w/o OFPV w/ OFPV w/o OFPV w/ OFPV w/o OFPV w/ OFPV w/o OFPV Useable Fuel 135 148 193 224 281 305 369 390 500 515 Genset Model KW Rating ® 60 Hz (standby) Fuel Consumption at Full Load (GaVHour) Hours of Operation 0 Full Load Rating Hours of Operation @ Full Load Rating Hours of Operation 0 Full Load Rating Hours of Operation 0 Full Load Rating Hours of Operation 0 Full Load Rating DSFAA 35 3.8 36 39 51 59 74 80 97 103 132 136 DSFAB 40 4.5 30 33 43 50 62 68 82 87 111 114 DSFAC 50 5.1 26 29 38 44 55 60 72 76 98 101 DSFAD 60 5.7 24 26 34 39 49 54 65 68 88 90 DSFAE 80 6.9 20 21 28 32 41 44 53 57 72 75 QSB7G3 Fuel Tank P/N A030Y663 A030Y665 A030Y666 A030Y667 Total Capacity 369 gal 560 gal 683 gal 956 gal LxWxH 151.4x65.5x18.7 151.4x65.5x25.7 151.4x65.5x302 151.4x65.5x402 Notes 3 & 10 w/ OFPV w/o OFPV w/ OFPV w/o OFPV w/ OFPV w/o OFPV w/ OFPV w/o OFPV Useable Fuel 307 330 505 511 628 628 887 887 Genset Model KW Rating 0 60 Hz (standby) Fuel Consumption at Full Load (Gal/Hour) Hours of Operation 0 Full Load Rating Hours of Operation 0 Full Load Rating Hours of Operation 0 Full Load Rating Hours of Operation - • Full Load Rating DSGAA 100 8.45 36 39 60 60 74 74 105 105 DSGAB 125 10 31 33 51 51 63 63 89 89 DSGAC 150 12.25 25 27 41 42 51 51 72 72 QSL9G2 Fuel Tank P/N A030Y669 A030Y671 A030Y672 A030Y676 Total Capacity 330 gal 526 gal 966 gal 1398 gal LxWxH 163.4 x 65.5 x 15.7 163.4x65.5x22.0 163.4x65.5x36.0 163.4x65.5x49.7 Notes 3 & 10 w/ OFPV w/o OFPV w/ OFPV w/o OFPV w/ OFPV w/o OFPV w/ OFPV w/o OFPV Useable Fuel 246 290 450 477 882 895 1310 1310 Genset Model KW Rating 0 60 Hz (standby) Fuel Consumption at Full Load (GaVHour) Hours of Operation 0 Full Load Rating Hours of Operation ® Full Load Rating Hours of Operation 0 Full Load Rating Hours of Operation ® Full Load Rating DSHAB 175 14.9 17 19 30 32 59 60 88 88 DSHAC 200 16.4 15 18 27 29 54 55 80 80 DSHAD 230 18.2 14 16 25 26 48 49 72 72 Note 1: OFPV Includes downtube and 2' Cam Lock Connector Note 2: Activation point is based on total fuel tank capacity Note 3: Useable capacity accounts for Over Fill Prevention Valve (OFPV) activation and unusable fuel below the suction tube Note 4: Emergency Vent Extension Kit Includes support brackets pipes for both Primary and Secondary Containment E Vents Note 5: Vent extension kits meet IFC Code 2009 of 12' above grade. Includes coupler and support bracket. Note 6: Critical Low Fuel Switch provides signal at 10% useable fuel remaining Note 7: Fill downtube terminates within 6' of primary tank bottom Note 8: Requires a High Fuel Switch Kit Note 9: Vent kits differ by model and diameter of E vent Note 10: Useable capacity accounts for 5% expansion space in top of tank and unusable fuel below the suction tube ©2010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. 'Our energy worldng for you." is a trademark of Cummins Power Generation. Specifications are subject to change without notice. AC -185a (8/10) Page 2 of 6 • Fuel Tank Part Numbers to Feature Part Numbers Fuel Tank Part Number Spill Box (5 Gal) OFPV 95% Activation (Note 1,2) (Note 3,10) OFPV 90% Activation (Note 1,2) (Note 3,10) High Fuel Switch 90% (Note 2) High Fuel Switch 85% (Note 2) High Fuel Alarm Panel NEMA 3R,4 (Note 8) Critical Low Fuel Switch (Note 8) Fill Down Tube (Note 7) Fuel Gauge w/ Sender Normal Vent Extension (Note 5,9) Emergency Vent Extension (Note 4,6,9) Pump, Control, Motor, & Switch Kit 5 Float Switch Depth 8' A030Y654 A034F063 A034F051 A034F051 A034F093 A034F095 A034F224 A034F227 A034F004 A034F268 A034F378 A034F395 0415- 0828 -01 A030Y655 A034F063 A034F051 A034F051 A034F094 A034F116 A034F224 A034F232 A034F004 A034F273 A034F379 A034F396 0415-0828-01 8' A030Y657 A034F063 A034F051 A034F051 A034F094 A034F102 A034F224 A034F234 A034F004 A034F276 A034F379 A034F396 0415 -0828 -01 8' A030Y660 A034F063 A034F052 N/A A034F093 A034F116 A034F224 A034F236 A034F005 A034F279 A034F379 A034F396 0415-0828 -02 15.75' A030Y661 A034F063 A034F054 N/A A034F095 A034F140 A034F224 A034F239 A034F006 A034F282 A034F370 A034F388 0415 -0828 -02 15.75' A030Y663 A034F063 A034F051 A034F051 A034F093 A034F116 A034F224 A034F240 A034F004 A034F275 A034F380 A034F399 0415 -0828-01 8' A030Y665 A034F063 A034F052 N/A A034F093 A034F102 A034F224 A034F241 A034F005 A034F281 A034F380 A034F389 0415-0828 -02 15.75' A030Y666 A034F063 A034F054 N/A A034F095 A034F140 A034F224 A034F242 A034F006 A034F282 A034F377 A034F389 0415 -0828 -02 15.75' A030Y667 A034F063 A034F055 N/A A034F105 A034F217 A034F224 A034F243 A034F007 A034F289 A034F366 A034F389 0415-0828-05 15.75' A030Y669 A034F063 A034F051 A034F051 A034F093 A034F095 A034F224 A034F227 A034F004 A034F268 A034F379 A034F403 0415- 0828-03 9.5' A030Y671 A034F063 A034F052 A034F052 A034F095 A034F218 A034F224 A034F244 A034F005 A034F277 A034F379 A034F392 0415 -0828 -04 14.75' A030Y672 A034F063 A034F055 N/A A034F102 A034F108 A034F224 A034F246 A034F007 A034F283 A034F370 A034F392 0415 -0828 -05 14.75' A030Y676 A034F063 A034F056 N/A A034F108 A034F219 A034F224 A034F247 A034F008 A034F290 A034F367 A034F394 0415-0828 -05 28' Note 1: OFPV includes downtube and 2" Cam Lock Connector Note 2: Activation point is based on total fuel tank capacity Note 3: Useable capacity accounts for Over Fill Prevention Valve (OFPV) activation and unusable fuel below the suction tube Note 4: Emergency Vent Extension Kit includes support brackets pipes for both Primary and Secondary Containment E Vents Note 5: Vent extension kits meet IFC Code 2009 of 12' above grade. Includes coupler and support bracket. Note 6: Critical Low Fuel Switch provides signal at 10% useable fuel remaining Note 7: Fill downtube terminates within 6' of primary tank bottom Note 8: Requires a High Fuel Switch Kit Note 9: Vent kits differ by model and diameter of E vent Note 10: Useable capacity accounts for 5% expansion space in top of tank and unusable fuel below the suction tube Our energy working for you: www.cumminspower.com 02010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. 'Our energy working for you.' is a trademark of Cummins Power Generation. Specifications are subject to change without notice. AC -185a (8/10) Page 3 of 8 Power Generation Local Code Requirements Note 1 - FDEP approved rupture basin switch required Note 2 - In most states the E Vents only need to be located outside the enclosure not necessarily extended Note 3 - Depending on distance from building. Tanks should be designed with OFPV in mind. Note 4: Vent opening must be 12' above grade. Per UL 2008/2009 all openings must be equal or above top cover 02010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. Our energy working for you.' Is a trademark of Cummins Power Generation. Specifications are subject to change without notice. AC -185a (8/10) Page 4 of 6 Base Design Michigan Ohio Florida California (exc SF) UL -142 Sec Containment X X X X X Rupture Basin Switch X X X X (1) X Low Fuel Switch 50% X X X X High Fuel Switch 90% 90% 90% 90% High Fuel Switch w/ Fill Alarm w/ Aud & Vis Alarms w/ Aud & Vis Alarms w/ Aud & Vis Alarms w/ Aud & Vis Alarms Spill Containment Include fuel lines 5 Gal - Ext 5 Gal - Ext 5 Gal 5 Gal Over Fill Protection Valve (OFPV) 95% (3) 95% 95% 95% Fill Down Tube <6" from bottom <6' from bottom Fire Proof Fuel Lines X X Rupture Basin Drain None Risers under Tank for Visual Inspection 2' High Risers 2' High Risers 2' High Risers 2' High Risers 2' High Risers Extended Vents (2, 4) All All All Ail Additional Design Criteria 110% Basin 275 Gal max FDEP for >549 qai Note 1 - FDEP approved rupture basin switch required Note 2 - In most states the E Vents only need to be located outside the enclosure not necessarily extended Note 3 - Depending on distance from building. Tanks should be designed with OFPV in mind. Note 4: Vent opening must be 12' above grade. Per UL 2008/2009 all openings must be equal or above top cover 02010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. Our energy working for you.' Is a trademark of Cummins Power Generation. Specifications are subject to change without notice. AC -185a (8/10) Page 4 of 6 San Francisco Chicago New York City Nassau Co. Suffolk Co. UL -142 Sec Containment X X X Open Top Dike X Rupture Basin Switch X X X X X Low Fuel Switch X X X X X High Fuel Switch 90% 90% High Fuel Switch w/ Fill Alarm w/ Aud & Vis Alarms w/ Aud & Vis Alarms Spill Containment Include fuel lines 5 Gal - Ext 5 Gal - Ext Over Fill Protection Valve (OFPV) 95% 95% Fill Down Tube <6" from bottom Fire Proof Fuel Lines Rupture Basin Drain Risers under Tank for Visual Inspection 2' High Risers 2' High Risers 2" High Risers Extended Vents (2, 4) All All Additional Design Criteria 275 Gal max Note 1 - FDEP approved rupture basin switch required Note 2 - In most states the E Vents only need to be located outside the enclosure not necessarily extended Note 3 - Depending on distance from building. Tanks should be designed with OFPV in mind. Note 4: Vent opening must be 12' above grade. Per UL 2008/2009 all openings must be equal or above top cover 02010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. Our energy working for you.' Is a trademark of Cummins Power Generation. Specifications are subject to change without notice. AC -185a (8/10) Page 4 of 6 Local Code Requirements (continued) Note 1 - FDEP approved rupture basin switch required Note 2 - In most states the E Vents only need to be located outside the enclosure not necessarily extended Note 3 - Depending on distance from building. Tanks should be designed with OFPV in mind. Note 4: Vent opening must be 12' above grade. Per UL 2008/2009 all openings must be equal or above top cover 02010 Cummins Power Generation Inc. Ali rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. Our energy working for you.' is a trademark of Cummins Power Generation. Specifications are subject to change without notice. AC -185a (8/10) Page 5 of 6 Georgia (GEFA) Co. (less Denverl Denver Wa State (exc Seattle) Seattle/King County X UL -142 Sec Containment X X X X Rupture Basin Switch X X X X x Low Fuel Switch X X X X X High Fuel Switch 90% 90% 85% 90% 90% High Fuel Switch w/ Fill Alarm w/ Aud & Vis Alarms w/ Aud & Vis Alarms w/ Aud & Vis Alarms w/ Aud & Vis Alarms >1,300 gallon tanks Spill Containment 5 Gal - Ext 5 Gal 5 Gal 5 Gal 5 Gal Over Fill Protection Valve (OFPV) 95% 95% 90% 95 %, >1,300 gal tanks 95 %, >1,300 gal tanks Fill Down Tube Fill Down Tube <6' from bottom <6' from bottom <6' from bottom Fire Proof Fuel Lines Fire Proof Fuel Lines X Rupture Basin Drain Rupture Basin Drain Risers under Tank for Visual Inspection 2' High Risers 2' High Risers 2' High Risers Extended Vents (2, 4) All All All Normal ONLY Normal ONLY Additional Design Criteria NA for <120 gal tanks Note 1 - FDEP approved rupture basin switch required Note 2 - In most states the E Vents only need to be located outside the enclosure not necessarily extended Note 3 - Depending on distance from building. Tanks should be designed with OFPV in mind. Note 4: Vent opening must be 12' above grade. Per UL 2008/2009 all openings must be equal or above top cover 02010 Cummins Power Generation Inc. Ali rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. Our energy working for you.' is a trademark of Cummins Power Generation. Specifications are subject to change without notice. AC -185a (8/10) Page 5 of 6 Dallas Phoenix (AZ) Industrial Bldg Code IFC 2003 IFC 2008 & IFC 2009 UL -142 Sec Containment X X X X X Rupture Basin Switch X X X X X Low Fuel Switch X X X X X High Fuel Switch 90% 90% 90% 90% 90% High Fuel Switch w/ Fill Alarm w /Aud & Vis Alarms w/ Audible Alarm at fill >1,300 gal tanks >1,300 gal tanks Spill Containment 5 Gal 5 Gal - Ext 10 Gal 5 Gal 5 Gal Over Fill Protection Valve (OFPV) 95% 95 %, >499 gal tanks 95 %, all tanks 95 %, >1,300 gal tanks Fill Down Tube <6' from bottom <6' from bottom <6' from bottom <6' from bottom Fire Proof Fuel Lines X Rupture Basin Drain Risers under Tank for Visual Inspection Extended Vents (2, 4) Normal ONLY Norval ONLY All Normal ONLY Normal ONLY Additional Design Criteria Note 1 - FDEP approved rupture basin switch required Note 2 - In most states the E Vents only need to be located outside the enclosure not necessarily extended Note 3 - Depending on distance from building. Tanks should be designed with OFPV in mind. Note 4: Vent opening must be 12' above grade. Per UL 2008/2009 all openings must be equal or above top cover 02010 Cummins Power Generation Inc. Ali rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. Our energy working for you.' is a trademark of Cummins Power Generation. Specifications are subject to change without notice. AC -185a (8/10) Page 5 of 6 • • Certifications /standards /codes UL 142 Listed - Cummins Power Generation dual wall sub -base tanks are UL Listed (File MH17470) and constructed In accordance with Underwriters Laboratories Standard UL 142 "steel aboveground tanks for flammable and combustible liquids ", as a "secondary containment generator base tank" NFPA - Cummins Power Generation tanks are built in accordance with all applicable NFPA codes: - NFPA 30 - Flammable and Combustible Liquids code - NFPA 37 - Standard for Installation and use of Stationary Combustible Engine and Gas Turbines - NFPA 110 - Standard for Emergency and Standby Power Systems IS09001 - This product was designed and manufactured in facilities certified to IS09001. ULC - Cummins Power Generation tanks are built in accordance with all applicable ULC codes Americas 1400 73rd Avenue N.E. Minneapolis, MN 55432 USA Phone: 763 574 5000 Fax: 763 574 5298 Europe, CIS, Middle East and Africa Manston Park Columbus Ave. Manston Ramsgate Kent CT 12 5BF United Kingdom Phone 44 1843 255000 Fax 44 1843 255902 Asia Pacific 10 Toh Guan Road #07 -01 TT International Tradepark Singapore 608838 Phone 65 6417 2388 Fax 65 6417 2399 Warning: Back feed to a utility system can cause electrocution and/or property damage. Do not connect generator sets to any building electrical system except through an approved device or after building main switch is open. Warning: For professional use only. Must be installed by a qualified service technician. Improper Installation presents hazards of electrical shock and improper operation, resulting in severe personal injury and/or property damage. ®2010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. Our energy working for you.' is trademark of Cummins Power Generation. Specifications are subject to change without notice. AC -185a (8/10) Page 8 of 8 Diesel generator set QSB7 series engine specification sheet 00 kW 150 kW':60 Hz Hera Description Cummins Power Generation commercial generator sets are fully integrated power generation systems providing optimum performance, reliability and versatility for stationary standby and prime power applications. Codes may not be available with all model configurations - consult factory for availability. This generator set is designed in facilities certified to ISO 9001 and manufactured in facilities certified to ISO 9001 or ISO 9002. ISO 9001 _- The Prototype Test Support (PTS) program verifies the performance integrity of the generator set design. Cummins Power Generation products bearing the PTS symbol meet the prototype test requirements of NFPA 110 for Level 1 systems. All low voltage models are CSA certified to product class 4215 -01. The generator set is available listed to UL 2200, Stationary Engine Generator Assemblies for all 60 Hz low voltage models. U.S. EPA Engine certified to Stationary Emergency U.S. EPA New Source Performance Standards, 40 CFR 60 subpart III1 Tier 3 exhaust emission levels. U.S. applications must be applied per this EPA regulation. International The generator set package is available certified Building for seismic application in accordance with the Code following International Building Code: IBC2000, IBC2003, IBC2006 and IBC2009. Features Cummins® heavy -duty engine - Rugged 4- cycle, industrial diesel delivers reliable power, low emissions and fast response to Toad changes. Alternator - Several alternator sizes offer selectable motor starting capability with low reactance 2/3 pitch windings, low waveform distortion with non - linear loads and fault clearing short- circuit capability. Control system - The PowerCommand® 1.1 electronic control is standard equipment and provides total genset system integration including automatic remote starting /stopping, precise frequency and voltage regulation, alarm and status message display, output metering, auto - shutdown at fault detection and NFPA 110 Level 1 compliance. The optional PowerCommand 2.2 control is UL 508 Listed and provides AmpSentry- protection. Cooling system - Standard integral set - mounted radiator system, designed and tested for rated ambient temperatures, simplifies facility design requirements for rejected heat. Enclosures - Optional weather protective and sound attenuated enclosures are available. NFPA - The genset accepts full rated load in a single step in accordance with NFPA 110 for Level 1 systems. Warranty and service - Backed by a comprehensive warranty and worldwide distributor network. 02010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. PowerCommand, AmpSentry and "Our energy working for you." are trademarks of Cummins Power Generation. Other company, product or service names may be trademarks or service marks of others. Specifications are subject to change without notice. S -1544h (9/10) Standby rating Prime rating Continuous rating Data sheets Model 60 Hz kW (kVA1 50 Hz kW IkVAI 60 Hz kW (kVAI 50 Hz kW IkVA1 60 Hz kW IkVAI 50 Hz kW IkV41 60 Hz 50 Hz DSGAA 100 (125) 90 (113) D -3349 DSGAB 125 (156) 113 (141) 0-3350 DSGAC 150 (188) 135 (169) D -3351 02010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. PowerCommand, AmpSentry and "Our energy working for you." are trademarks of Cummins Power Generation. Other company, product or service names may be trademarks or service marks of others. Specifications are subject to change without notice. S -1544h (9/10) Generator set specifications Govemor regulation class ISO 8528 Part 1 Class G3 Voltage regulation, no load to full load t 1% Random voltage variation t 0.5% Frequency regulation Isochronous Random frequency variation t 0.25% Radio frequency emissions compliance Meets requirements of most industrial and commercial applications. Engine specifications Bore 107 mm (4.21 in) Stroke 124.0 mm (4.88 in) Displacement 6.69 L (408 in') Configuration Cast iron, in -line, 6 cylinder Battery capacity 1100 amps minimum at ambient temperature of -18 °C to 0 °C (0 °F to 32 °F) Battery charging altemator 100 amps Starting voltage 12 volt, negative ground Fuel system Direct injection: number 2 diesel fuel, fuel filter, automatic electric fuel shutoff Fuel filter Single element, 10 micron filtration, spin -on fuel filter with water separator Air cleaner type Dry replaceable element Luba oil filter type(s) Spin -on, full flow Standard cooling system High ambient radiator Alternator specifications Design Brushless, 4 ole, dri p proof revolving P field Stator 2/3 pitch Rotor Single bearing, flexible discs Insulation system Class H Standard temperature rise 150 °C standby at 40 °C ambient Exciter type . Torque match (shunt) standard, PMG optional Phase rotation A (U), B (V), C (W) Alternator cooling Direct drive centrifugal blower fan AC waveform total harmonic distortion < 5% no Toad to full linear load, < 3% for any single harmonic Telephone influence factor (TIF) < 50 per NEMA MG1 -22.43 Telephone harmonic factor (THF) < 3 Available voltages 60 Hz Three phase line - neutral/line -line • 110/190 • 115 /230 Delta • 127/220 • 110/220 • 120/208 • 139/240 • 115/200 • 120/240 Delta • 220/380 • 230/400 60 Hz Single phase line - neutral /line -line • 240/416 • 255/440 • 277/480 • 347/600 • 110/220 • 115/230 • 120/240 Note: Consult factory for other voltages. Generator set options and accessories Engine ❑ 120 V 150 W Tube oil heater ❑ 120/240 V 1500 W coolant heater Fuel System ❑ 24 hour sub -base tank (dual wall) Alternator ❑ 105 °C rise ❑ 125 °C rise ❑ 120 V 100 W anti- condensation heater ❑ PMG excitation ❑ Single phase Exhaust system ❑ Heavy duty exhaust elbow ❑ Slip on exhaust connection Generator set ❑ Battery ❑ Battery charger ❑ Enclosure: aluminum, steel, weather protective or sound attenuated ❑ Main line circuit breaker ' Note: Some options may not be available on all models - consult factory for availability. Our energy working for you.TM www.cumminspower.com 02010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. PowerCommand, AmpSentry and Our energy working for you." are trademarks of Cummins Power Generation. Other company, product or service names may be trademarks or service marks of others. Specifications are subject to change without notice. S -1544h (9/10) ❑ PowerCommand Network Communications Module (NCM) ❑ Remote annunciator panel ❑ Spring isolators ❑ UL 2200 Listed ❑ 2 year prime power warranty ❑ 2 year standby power warranty ❑ 5 year basic power warranty P wer Generation Control system PCC 1302 PowerCommand control is an integrated generator set control system providing voltage regulation, engine protection, operator interface and isochronous governing (optional). Major features include: - Battery monitoring and testing features and smart starting control system. - Standard PCCNet interface to devices such as remote annunciator for NFPA 110 applications. - Control boards potted for environmental protection. - Control suitable for operation in ambient temperatures from -40 °C to +70 °C ( -40 °F to +158 °F) and altitudes to 5000 meters (13,000 feet). - Prototype tested; UL, CSA, and CE compliant. - InPower PC -based service tool available for detailed diagnostics. Operator /display panel - Manual off switch - Alpha- numeric display with pushbutton access for viewing engine and altemator data and providing setup, controls and adjustments (English or international symbols) - LED lamps indicating genset running, not in auto, common waming, common shutdown, manual run mode and remote start - Suitable for operation in ambient temperatures from -20 °C to +70 °C - Bargraph display (optional) AC protection - Over current waming and shutdown - Over and under voltage shutdown - Over and under frequency shutdown - Over excitation (loss of sensing) fault - Field overload Engine protection - Overspeed shutdown - Low oil pressure warning and shutdown - High coolant temperature waming and shutdown - Low coolant level warning or shutdown - Low coolant temperature warning - High, low and weak battery voltage waming - Fail to start (overcrank) shutdown - Fail to crank shutdown - Redundant start disconnect - Cranking lockout - Sensor failure indication - Low fuel level waming or shutdown - Fuel -in- rupture -basin waming or shutdown • Alternator data - Line -to -line and Line -to- neutral AC volts - 3 -phase AC current - Frequency - Total kVa Engine data - DC voltage - Lube oil pressure - Coolant temperature - Engine speed Other data - Genset model data - Start attempts, starts, running hours - Fault history - RS485 Modbus® interface - Data logging and fault simulation (requires InPower service tool) Digital governing (optional) - Integrated digital electronic isochronous governor - Temperature dynamic governing Digital voltage regulation - Integrated digital electronic voltage regulator - 2 -phase line -to -line sensing - Configurable torque matching Control functions - Time delay start and cooldown - Cycle cranking - PCCNet interface - (2) Configurable inputs - (2) Configurable outputs - Remote emergency stop - Glow plug control (some models) Options ❑ Auxiliary output relays (2) ❑ 120/240 V, 100 W anti - condensation heater ❑ Remote annunciator with (3) configurable inputs and (4) configurable outputs ❑ PMG altemator excitation ❑ PowerCommand iWatch web server for remote monitoring and alarm notification (loose) ❑ Auxiliary, configurable signal inputs (8) and configurable relay outputs (8) ❑ Digital goveming ❑ AC output analog meters (bargraph) - Color -coded graphical display of: - 3 -phase AC voltage - 3 -phase current - Frequency - kVa ❑ Remote operator panel ❑ PowerCommand 2.2 control with AmpSentry protection For further detail see document S -1531. Our energy working for YOU.TM www.cumminsoower.com ©2010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. PowerCommand, AmpSentry and Our energy working for you are trademarks of Cummins Power Generation. Other company, product or service names may be trademarks or service marks of others. Specifications are subject to change without notice. S -1544h (9/10) Power Generation Ratings definitions Emergency standby power (ESP): Applicable for supplying power to varying electrical Toad for the duration of power interruption of a reliable utility source. Emergency Standby Power (ESP) is in accordance with ISO 8528. Fuel Stop power in accordance with ISO 3046, AS 2789, DIN 6271 and BS 5514. Limited -time running power (LTP): Applicable for supplying power to a constant electrical load for limited hours. Limited Time Running Power (LTP) is in accordance with ISO 8528. Prime power (PRP): Applicable for supplying power to varying electrical load for unlimited hours. Prime Power (PRP) is in accordance with ISO 8528. Ten percent overload capability is available in accordance with ISO 3046, AS 2789, DIN 6271 and BS 5514. Base load (continuous) power (COP): Applicable for supplying power continuously to a constant electrical Toad for unlimited hours. Continuous Power (COP) in accordance with ISO 8528, ISO 3046, AS 2789, DIN 6271 and BS 5514. IIT L,1••I,1 ��li� 11mni This outline drawing Is for reference only. See respective model data sheet for specific model outline drawing number. Do not use for installation desl_an Model Dim "A" mm (in.) Dim "B" mm (in.) Dim "C" mm (in.) Set Weight* dry kg (Ibs) Set Weight* wet kg (Ms) DSGAA 2656 (104.6) 1100 (43.3) 1549 (61) 1180 (2602) DSGAB 2656 (104.6) 1100 (43.3) 1549 (61) 1225 (2700) DSGAC 2656 (104.6) 1100 (43.3) 1549 (61) 1263 (2784) ote: Weights represent a set with standard features. See outline drawings for weights of other configurations. Cummins Power Generation 1400 73'° Avenue N.E. Minneapolis, MN 55432 USA • Telephone: 763 574 5000 Fax: 763 574 5298 Warning: Back feed to a utility system can cause electrocution and /or property damage. Do not connect to any building's electrical system except through an approved device or after building main switch is open. Our energy working for you.TM www. c u m m i n spower. com 02010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. PowerCommand, AmpSentry and 'Our energy working for you." are trademarks of Cummins Power Generation. Other company, product or service names may be trademarks or service marks of others. Specifications are subject to change without notice. S -1544h (9/10) P ewer Generation Model: DSGAC Frequency: 60 Fuel type: Diesel KW rating: 150 standby 135 prime Emissions level: EPA NSPS Stationary Emergency Tier 3 Exhaust emission data sheet: EDS -1085 Exhaust emission compliance sheet: EPA -1119 Sound performance data sheet: MSP -1057 Cooling performance data sheet: MCP -172 Prototype test summary data sheet: PTS -285 Standard set - mounted radiator cooling outline: 500 -4659 Optional set- mounted radiator cooling outline: 1/2 3/4 F Optional heat exchanger cooling outline: 1/4 1 Optional remote radiator cooling outline: 3/4 F Fuel consumption k Standby P Prime C Continuous kW (kVA) k kW (kVA) k kW (kVA) Ratings 1 150 188) 1 135 (169) Load 1 1/4 1 1/2 3/4 F Full 1 1/4 1 1/2 3 3/4 F Full F Full US gph 3 3.80 6 6.62 9.15 1 12.25 3 3.52 6 6.06 8 8.31 1 10.56 L/hr 1 14.4 2 25.1 34.7 4 46.4 1 13.3 2 22.9 3 31.5 4 40.0 Standby I rat ng Continuous rating Engine manufacturer Cummins -. Engine model QSB7 -G3 NR3 Configuration Cast iron, in -line, 6 cylinder Aspiration Turbocharged and air -to -air aftercooled Gross engine power output, kWm (bhp) 186 (250) 162 (217) BMEP at set rated load, kPa (psi) 1703 (247) 1532 (222) Bore, mm (in) 107 (4.21) Stroke, mm (in) 124 (4.88) Rated speed, rpm 1800 . - Piston speed, m/s (ft/min) 7.4 (1464) . Compression ratio 17.3 :1 Lube oil capacity, L (qt) 17.5 (18.5) . Overspeed limit, rpm 2100 Regenerative power, kW 20,4 Fuel flow Maximum fuel flow, L/hr (US gph) 106 (28) Maximum fuel flow with C174, L/hr (US gph) - Maximum fuel inlet restriction with clean filter, mm Hg (in Hg) 127 (5) Maximum return restriction, mm Hg (in Hg) 152 (6) . . 02010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. ''Our energy working for you' is a trademark of Cummins Power Generation. Specifications are subject to change without notice. D -3351d (9/10) Fuel flow Maximum fuel flow, L/hr (US gph) 106 (28) Maximum fuel flow with C174, L/hr (US gph) - Maximum fuel inlet restriction with clean filter, mm Hg (in Hg) 127 (5) Maximum return restriction, mm Hg (in Hg) 152 (6) . . 02010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. ''Our energy working for you' is a trademark of Cummins Power Generation. Specifications are subject to change without notice. D -3351d (9/10) 02010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. ''Our energy working for you' is a trademark of Cummins Power Generation. Specifications are subject to change without notice. D -3351d (9/10) Air Combustion air, m3 /min (scfm) Maximum air cleaner restriction with clean filter, kPa (in H2O) Altemator cooling air, m3 /min (cfm) Standby •Prime rating rating 14.4 (510) Continuous rating 13.9 (490) 3.7 (15) 41.3 (1460) Exhaust Exhaust flow at set rated load, m3 /min (cfm) 35.6 (1256) 33.3 (1175) Fan load, kW., (HP) Exhaust temperature, ° C (° F) 496 (924) 474 (885) Coolant capacity (with radiator), L (US Gal) Maximum back pressure, kPa (in H2O) 10 (40) 10 (40) Cooling system air flow, m3 /min (scfm) Standard set - mounted radiator cooling Ambient design, ° C (° F) 50 (122) Fan load, kW., (HP) 6.5 (8.7) 6.5 (8.7) Coolant capacity (with radiator), L (US Gal.) Coolant capacity (with radiator), L (US Gal) 23 (6.1) 23 (6.1) Cooling system air flow, m3 /min (scfm) 324 (11450) 324 (11450) Total heat radiated to room, MJ /min (Btu /min) Total heat rejection, MJ /min (Btu/min) 8.52 (8071) 7.72 (7318) Maximum cooling air flow static restriction, kPa (in H,0) 0.12 (0.5) Optional set - mounted radiator cooling Ambient design, °C ( °F) Fan load, kWm (HP) Coolant capacity (with radiator), L (US Gal.) Heat rejected, aftercooler circuit, MJ /min ( Btu/min) Cooling system air flow, m3 /min (scfm) Heat rejected, fuel circuit, MJ /min ( Btu/min) Total heat rejection, MJ /min (Btu /min) Total heat radiated to room, MJ /min (Btu /min) Maximum cooling air flow static restriction, kPa (in. H20) Maximum raw water pressure, jacket water circuit, kPa (psi) Optional heat exchanger cooling Set coolant capacity, L (US Gal.) Heat rejected, jacket water circuit, MJ /min ( Btu/min) Heat rejected, aftercooler circuit, MJ /min ( Btu/min) Heat rejected, fuel circuit, MJ /min ( Btu/min) Total heat radiated to room, MJ /min (Btu /min) Maximum raw water pressure, jacket water circuit, kPa (psi) Maximum raw water pressure, aftercooler circuit, kPa (psi) Maximum raw water pressure, fuel circuit, kPa (psi) Maximum raw water flow, jacket water circuit, Umin (US Gal /min) Maximum raw water flow, aftercooler circuit, Umin (US Gal /min) Maximum raw water flow, fuel circuit, Umin (US Gal /min) Minimum raw water flow at 27 °C (80 °F) inlet temp, jacket water circuit, Umin (US GaVmin) Minimum raw water flow at 27 °C (80 °F) inlet temp, aftercooler circuit, Umin (US GaVmin) Minimum raw water flow at 27 °C (80 °F) inlet temp, fuel circuit, Umin (US Gal /min) Raw water delta P at min flow, jacket water circuit, kPa (psi) Raw water delta P at min flow, aftercooler circuit, kPa (psi) Raw water delta P at min flow, fuel circuit, kPa (psi) Maximum jacket water outlet temp, °C ( °F) Maximum aftercooler inlet temp, °C ( °F) Maximum aftercooler inlet temp at 25 °C (77 °F) ambient, °C ( °F) Our energy working for you.TM www.cumminspower.com 02010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. Our energy working for you." is a trademark of Cummins Power Generation. Specifications are subject to change without notice. D-3351d (9/10) Power Generation Optional remote radiator cooling' Standby rating Prime rating Continuous rating Set coolant capacity, L (US gal) Applicable for supplying power Max flow rate at max friction head, jacket water circuit, Umin (US gal /min) Applicable for supplying power Max flow rate at max friction head, aftercooler circuit, Umin (US al /min to a constant electrical load for Heat rejected, jacket water circuit, MJ /min (Btu/min) continuously to a constant duration of power interruption of a limited hours. Limited Time Heat rejected, aftercooler circuit, MJ /min (Btu/min) electrical load for unlimited reliable utility source. Emergency Running Power (LTP) is in Heat rejected, fuel circuit, MJ /min (Btu/min) hours. Continuous Power (COP) Total heat radiated to room, MJ /min (Btu/min) accordance with ISO 8528. Maximum friction head, jacket water circuit, kPa (psi) is in accordance with ISO 8528, ISO 3046, AS 2789, DIN 6271 Maximum friction head, aftercooler circuit, kPa (psi) Maximum static head, jacket water circuit, m (ft) and BS 5514. Maximum static head, aftercooler circuit, m (ft) Maximum jacket water outlet temp, °C ( °F) Maximum aftercooler inlet temp at 25 °C (77 °F) ambient, °C ( °F) Maximum aftercooler inlet temp, °C ( °F) Maximum fuel flow, L/hr (US gph) Maximum fuel retum line restriction, kPa (in Hg) Weights2 Unit dry weight kgs (Ibs.) Unit wet weight kgs (lbs.) 1263 (2784) Notes: 'For non - standard remote installations contact your local Cummins Power Generation representative. ' Weights represent a set with standard features. See outline drawing for weights of other configurations. Derating factors Standby Prime Engine power available up to 2621 m (8600 ft) at ambient temperature up to 40° C (104° F) and 1981 m (6500 ft) at 50° C (122° F). Consult your Cummins Power Generation distributor for temperature and ambient requirements outside these parameters. Engine power available up to 2255 m (7400 ft) at ambient temperature up to 40° C (104° F) and 1707 m (5600 ft) at 50° C (122° F). Consult your Cummins Power Generation distributor for temperature and ambient requirements outside these parameters. Continuous Ratings definitions Emergency standby power (ESP): Limited -time running power (LTP): Prime power (PRP): Base load (continuous) power (COP): Applicable for supplying power to Applicable for supplying power Applicable for supplying power Applicable for supplying power varying electrical load for the to a constant electrical load for to varying electrical load for continuously to a constant duration of power interruption of a limited hours. Limited Time unlimited hours. Prime Power electrical load for unlimited reliable utility source. Emergency Running Power (LTP) is in (PRP) is in accordance with ISO hours. Continuous Power (COP) Standby Power (ESP) is in accordance with ISO 8528. Fuel accordance with ISO 8528. 8528. Ten percent overload capability is available in is in accordance with ISO 8528, ISO 3046, AS 2789, DIN 6271 Stop power in accordance with ISO 3046, AS 2789, DIN 6271 and accordance with ISO 3046, AS 2789, DIN 6271 and BS 5514. and BS 5514. BS 5514. Our energy working for you: m www, cu m m i nspower.cor n 02010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. Our energy working for you.' Is a trademark of Cummins Power Generation. Specifications are subject to change without notice. D -3351d (9/10) Power Generation Alternator data Three Phase Table' 105' C 105' C 105' C 125' C 125' C 125' C 125' C 125' C 150' C 150' C 150' C Feature Code B418 8415 B304 B417 B414 B267 8246 8303 B416 B413 B419 Alternator Data Sheet 210 210 209 210 210 212 209 209 210 209 208 Number 120/2402 120/240' 120/240' 120/240' 120/240' 120/240' Voltage Ranges 110/190 120/208 347/600 110/190 120/208 120/208 139/240 347/600 110/190 120/208 347/600 Motor Starting kVA (at 90% sustained voltage) Shunt Thru Thru 330 Thru Thru Thru 277/480 Thru Thru PMG 120/208 139/240 385 120/208 139/240 139/240 120/208 139/240 220/380 240/416 220/380 240/416 240/416 220/380 240/416 Thru Thru Thru Thru Thru Thru Thru 240/416 277/480 240/416 277/480 277/480 240/416 277/480 Surge kW 165 165 166 165 165 167 166 166 165 164 164 Motor Starting kVA (at Shunt 563 563 516 563 563 770 516 516 563 516 422 90% sustained voltage) PMG 663 663 607 663 663 920 607 607 663 607 497 Full Load Current - Amps at Standby Rating 120/208 127/220 139/240 220/38Q 240/416 254/440 277/480 347/600 521 493 452 285 261 248 226 181 Single Phase Table 105' C 105' C 125' C 125' C 125' C 150' C Feature Code 8418 B415 B417 B414 B267 B413 Altemator Data Sheet Number 210 210 210 210 212 209 Voltage Ranges 120/2402 120/240' 120/240' 120/240' 120/240' 120/240' Surge kW 152 152 152 152 164 152 Motor Starting kVA (at 90% sustained voltage) Shunt 330 330 330 330 420 305 PMG 385 385 385 385 500 360 Full Load Current - Amps at Standby Rating 120/240' 120/240' 417 625 Single phase power can be taken from a three phase generator set at up to 2/3 set rated 3 -phase kW at 1.0 power factor. Also see Note 3 below. ' The broad range alternators can supply single phase output up to 2/3 set rated 3 -phase kW at 1.0 power factor. 3 The extended stack (full single phase output) and 4 lead alternators can supply single phase output up to full set rated 3 -phase kW at 1.0 power factor. Formulas for calculating full load currents: Three phase output Single phase output kW x 1000 kW x Single Phase Factor x 1000 Voltage x 1.73 x 0.8 Voltage Cummins Power Generation 1400 73id Avenue N.E. Minneapolis, MN 55432 USA Telephone: 763 574 5000 Fax: 763 574 5298 Warning: Back feed to a utility system can cause electrocution and /or property damage. Do not connect to any building's electrical system except through an approved device or after building main switch is open. Our energy working for you: m www.cumminsoower.corri 02010 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. "Our energy working for you.' is a trademark of Cummins Power Generation. Specifications are subject to change without notice. D -3351d (9/10) Power Generation • Enclosures and tanks 35 -230 kW gensets Enclosure features 14- gauge, low carbon, hot - rolled ASTM A569 steel construction (panels) 12- gauge, low carbon, hot - rolled ASTM A569 steel construction (posts) - Stainless steel hardware - Compact footprint - Zinc phosphate pretreatment, e-coat primer and super durable powder topcoat paint minimize corrosion and color fade Package listed to UL 2200 Fuel and electrical stub -up area within enclosure perimeter Two or three recessed doors per side, depending on generator set dimensions, for service access Doors key and padlockable for added security Weather protective seals around all doors on sound - attenuated enclosures Enclosed exhaust silencer improves safety and protects against rust Critical sound level exhaust silencers in sound - attenuated enclosures Rain collar and rain cap Non - hydroscopic sound - attenuating material Easy access lifting points for spreader bars or forklift, depending on model Compatible with most under -set fuel tanks Enclosure attaches directly to generator set skid base or fuel tank, depending on model Designed for ambient temperatures up to 50 °C (122 °F) Refer to genset model cooling system data sheets for specific capabilities Enclosures are designed for outdoor use only Options Two levels of sound attenuation, and weather protective enclosure, steel and aluminum (most models). Super durable powder coat painted aluminum construction minimizes corrosion and color fade, panels and posts .1" thick, ASTM B209, 5052 H32. Aluminum wind rated to 150 mph (per ASCE 7 -05 exposure D, category 1 importance factor) (also available on some steel enclosures). Window for control viewing. Kits to up fit existing gensets or to upgrade existing enclosures with additional sound attenuation. Exterior oil and coolant drains with interior valves for ease of service. Overhead 2 -point lifting brackets (some models). ©2009 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. Our energy working for you." is a trademark of Cummins Power Generation. Specifications are subject to change without notice. S-1012y (11/09) Fuel tank features - Rectangular, heavy gauge, welded steel construction - UL 142 Listed - ULC- S601 -07 Listed - NFPA 37 compliant - Double wall with a sealed, separately vented, integral fuel containment basin - Reinforced steel box channels for generator support - Full height gussets provided at genset mounting holes - Interior coated with a solvent -based rust preventative - Emergency pressure relief vent cap - Port for normal vent - Top- mounted fuel gauge - Fuel supply and return tubes - Raised fuel fill - Mounting brackets for optional pump and control - Ground clearance to minimize bottom rusting - Integral lifting points - Tanks are Teak- checked to ensure integrity of weld seams prior to shipment Options - Fuel pump and control - Low fuel level switch - Leak detection rupture basin switch - Fuel level control float valve (some models) - Accessory kits for U.S. regional codes (some models) Dual wall sub -base fuel tanks - usable operating hours Genset model Gallons /hour at full Toad 70 gallon tank 109 gallon tank 140 gallon tank 173 gallon tank 309 gallon tank 336 gallon tank Gallons fuel after low level switch 35 DGBB 2.9 24 48 4.96 35 DGGD 2.9 24 48 4.96 35 DSFAA 3.8 18 37 4.96 40 DOBC 3.4 21 41 4.96 40 DGHD 3.1 23 45 4.96 40 DSFAB 4.5 16 31 4.96 50 DGCA 4.2 17 33 4.96 50 DGHE 3.9 18 36 4.96 50 DSFAC 5.1 14 27 • 4.96 60 DGCB 4.7 15 30 4.96 60 DSFAD 5.9 12 ' 24 4.96 80 DGCG 6.3 11 22 4.96 80 DSFAE 6.9 10 20 4.96 100 DGDB 7.5 15 23 45 6.42 100 DSGAA 8.5 36 125 DGDK 9.5 11 18 35 6.42 125 DSGAB 10.0 30 150 DGFA 13.1 8 13 26 6.42 150 DSOAC 12.2 25 175 DGFB 14.6 8 12 23 6.42 175 DSHAB 14.9 8 12 23 6.42 200 DGFC 16.2 7 10 21 6.42 200 DSHAC 16.4 7 10 21 6.42 230 DGFS 18.1 6 10 19 230 DSHAD 18.2 6 10 18 Operating hours are measured at 60Hz, standby rating. Our energy working for YOU.TM www.cumminspower.com 02009 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. "our energy working for you." is a trademark of Cummins Power Generation. Specifications are subject to change without notice. S -1012y (11 /09) Power Gener tic 1 • Enclosure package sound pressure levels @ 7 meters dE(A) Genset model Weather protective enclosure steel: F182 aluminum: F216* Level 1 sound attenuated enclosure steel: F172 aluminum: F231* Level 2 sound attenuated enclosure steel: Fi73 aluminum: F217* Level 3 sound attenuated enclosure steel: F232 aluminum: F233* Natural Gas 35 GGFD 80 73 65 N/A 42/47 GGFE 83 73 66 N/A 60 GGHE 86 77 68 N/A 70/75 GGHF 87 77 69 N/A 85 GGHG 80 76 70 N/A 100 GGHH 80 76 71 N/A 125 GGLA 83 81 72 N/A 150 GGLB 84 81 • 73 N/A Diesel N/A 35 DGBB 82 71 63 N/A 35 DGGD 81 72 66 N/A 35 DSFAA 87 78 70 N/A 40 DGBC 82 72 63 N/A 40 DGHD 79 71 64 N/A 40 DSFAB 87 79 70 N/A 50 DGCA 83 72 66 N/A 50 DGHE 79 70 65 N/A 50 DSFAC 87 79 70 N/A 60 DGCB 84 73 67 N/A 60 DSFAD 87 79 71 N/A 80 DGCG 84 76 67 N/A 80 DSFAE 87 82 72 N/A 100 DGDB 86 77 70 N/A 100 DSGAA 87 N/A 73 68 125 DGDK 86 80 71 N/A 125 DSGAB 87 N/A 74 69 150 DGFA 89 77 72 N/A 150 DSGAC 88 N/A 75 70 175 DGFB 90 78 72 N/A 175 DSHAB 95 88 78 N/A 200 DGFC 91 80 74 N/A 200 DSHAC 95 88 78 N/A 230 DGFS* 91 81 75 N/A 230 DSHAD 96 89 78 N/A Where two natural gas ratings are shown above, the first is the natural gas rating and the second Is the propane rating. Data is a measured average of 8 positions, and is 60Hz, full load standby rating, steel enclosures only. Sound levels on aluminum enclosures are approximately2 dB(A) higher than steel as measured above. Aluminum not available on model, 230 DGFS. Our energy working for YOU.TM www.cumminspower.com ®2009 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. Our energy working for you.' is a trademark of Cummins Power Generation. Specifications are subject to change without notice. S -1012y (11/09) Power Generation • Diesel package dimensions of enclosure, exhaust system and UL tank Weather protective Kilowatt rating Tank size Length (In) Width (in) Height (in) Weight (Ibs) 35 - 80 kW 70 gallon tank 83 40 65 810 steel, 729 aluminum 140 gallon tank 83 40 73 960 steel, 879 aluminum 100 -230 kW 109 gallon tank 105 40 69 1010 steel, 888 aluminum 173 gallon tank 105 40 74 1136 steel, 1014 aluminum 309 gallon tank 105 44 87 4838 steel, 4416 aluminum 336 gallon tank 105 40 88 1369 steel, 1247 aluminum Level 1 sound attenuated Kilowatt rating Tank size Length (in) Width (in) Height (in) Weight pbs) 35 - 80 kW 70 gallon tank 83 40 83 1246 steel 140 gallon tank 83 40 91 1396 steel 100 -230 kW . 109 gallon tank 108 40 87 1510 steel 173 gallon tank 108 40 92 1636 steel 336 gallon tank 108 40 106 1869 steel Level 2 sound attenuated Kilowatt rating Tank size Length (in) Width (in) Height (in) Weight (Ibs) 35 - 80 kW 70 gallon tank 102 40 83 1443 steel, 1186 aluminum 140 gallon tank 102 40 91 1593 steel, 1336 aluminum 100 -230 kW 109 gallon tank 142 40 87 1904 steel, 1538 aluminum* 173 gallon tank 142 40 92 2030 steel, 1664 aluminum' 309 gallon tank 145 43 97 5852 steel, 4780 aluminum 336 gallon tank 142 40 106 2263 steel, 1897 aluminum' Level 3 sound attenuated Kilowatt rating Tank size Length (in) Width (in) Height (in) Weight (ibs) 100 - 150 kW 309 gallon tank 158 43 97 6052 steel, 4852 aluminum Aluminum not available on models 230 DGFS Our energy working for YOU.TM www.cumminspower.com 02009 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. Our energy working for you.' is a trademark of Cummins Power Generation. Specifications are subject to change without notice. S -1012y (11/09) Power Geroeratio Spark ignited package dimensions of enclosure and exhaust system l� 9 i9 9 Weather protective Genset Model Length (in) Width (In) Height (In) Weight (Ms) Weather protective enclosure package 35 GGFD 83 in. 40 in. 54 in. 310 lbs. steel, 229 lbs. aluminum 45 GGFE 83 in. 40 in. 54 in. 310 lbs. steel, 229 lbs. aluminum 60 GGHE 83 in. 40 in. 54 in. 310 lbs. steel, 229 lbs. aluminum 70 GGHF 83 in. 40 in. 54 in. 310 lbs. steel, 229 lbs. aluminum 85 GGHG 105 in. 40 in. 70 in. 520 lbs. steel, 275 lbs. aluminum 100 GGHH 105 in. 40 in. 70 in. 520 lbs. steel, 275 lbs. aluminum 125 GGLA 105 in. 40 in. 70 in. 560 lbs. steel, 275 lbs. aluminum 150 GGLB 105 in. 40 in. 70 in. 560 lbs. steel, 275 lbs. aluminum Level 1 sound attenuated Genset Model Length (in) Width (In) Height (in) Weight pbs) Sound attenuated Level 1 enclosure package 35 GGFD 83 in. 40 in. 72 in. 746 lbs. steel 45 GGFE 83 in. 40 in. 72 in. 746 lbs. steel 60 GGHE 83 in. 40 in. 72 in. 746 lbs. steel 70 GGHF 83 in. 40 in. 72 in. 746 lbs. steel 85 GGHG 105 in. 60 in. 70 in. 710 lbs. steel 100 GGHH 105 in. 60 in. 70 in. 710 lbs. steel 125 GGLA 105 in. 60 in. 70 in. 750 lbs. steel 150 GGLB 105 in. 60 in. 70 in. 750 lbs. steel Level 2 sound attenuated Genset Model Length (In) Width (In) Helght (in) Weight (Ms) Sound attenuated Level 2 enclosure package 35 GGFD 83 in. 40 in. 72 in. 943 lbs. steel, 686 Ibs. aluminum 45 GGFE 83 in. 40 in. 72 in. 943 lbs. steel, 686 lbs. aluminum 60 GGHE 83 in. 40 in. 72 in. 943 lbs. steel, 686 Ibs. aluminum 70 GGHF 83 in. 40 in. 72 in. 943 lbs. steel, 686 Ibs. aluminum 85 GGHG 142 in. 60 in. 70 in. 790 lbs. steel, 475 lbs. aluminum 100 GGHH 142 in. 60 in. 70 in. 790 lbs. steel, 475 lbs. aluminum 125 GGLA 142 in. 60 in. 70 in. 830 lbs. steel, 475 lbs. aluminum 150 GGLB 142 in. 60 in. 70 in. 830 lbs. steel, 475 lbs. aluminum Unless otherwise noted above, dimensions are equal for aluminum and steel enclosure packages. The weight does not include the generator set. Consult your local Cummins Power Generation distributor or the appropriate generator specification sheet. See your distributor for more information Cummins Power Generation Americas 1400 73rd Avenue N.E. Minneapolis, MN 55432 USA Phone: 763 574 5000 Fax: 763 574 5298 Our energy working for you.TM www.cumminspower.com Europe, CIS, Middle East and Africa Manston Park Columbus Ave. Manston Ramsgate Kent CT 12 5BF United Kingdom Phone 44 1843 255000 Fax 44 1843 255902 02009 Cummins Power Generation Inc. All rights reserved. Cummins Power Generation and Cummins are registered trademarks of Cummins Inc. °Our energy working for you.' is a trademark of Cummins Power Generation. Specifications are subject to change without notice. S -1012y (11/09) Asia Pacific 10 Toh Guan Road #07 -01 TT International Tradepark Singapore 608838 Phone 65 6417 2388 Fax 65 6417 2399 Power Ge, ,aeration •. • Slleet 4 of 7 _ 8 5 Pre6EIIGINE011 8 6 4 •4/ 3 1 2 _J 10 rt0 iN _ 3. 110645 ON 68200 o - C t- 8 _ A 3917.5 (151.11 CCo- 14021 44 I 6 00010 0.QUA1( 1l/olAi100 L _ I ltl 65IA Wile 010'11• DIN •0• MAI El MGR / t Mt MI 011 816117 l MD I6ClOSWL 1111(1.1 11 IS 6[85[1 RI RMO l NU 1.116 WI 816111 5 300110 EACLOSORt 13151110/01 51 le • e • • • • • • • • • • • • • • . • • • • • • • • • • 206 1452 151.111 155 136 133 3565 150531 75(1 114531 • IIJII♦1l ♦II ♦11 1111009411 • 211 1112151.111 174131 131 2617157561 2033 (45561 200 1412 151.741 111 115.531 2051 150511 2100 116511 • 1114 %/f.ii.ete I1010i uIt I ♦I111.1iJ♦II1♦I j� • • 213 1512 (31.531 513 131.311 tae 151331 2141 141341 211 1535 (40.411 111 00.111 2141 160521 2117 14052) 311 155) 161.111 141 03141 215/ 161341 2243 141541 • 11,I II :I►'i II. • /♦1111 1111111111111 •111II11I1I (.! .•'.II /!11111 ..�51,.'i11 viss1 ♦I ♦I III • • • • ' • 213»13 1564 162 361 7100 131 331 2087 141611 3330 151631 • • • • • • • • .. o • i • • • • • 1 ONTROL ACCESS ` 1 DOOR � • DOOR LATCHES ARE CENTER LIFT 882 DOOR StIX6 14 DOORS[ ONTROL DOOR 5(8608 DLOCNABIE SECTION KEY IPA � 1082 142.6! E .4 711 . e ! • • • • 1 • • • ow III lo in ww : .= ow - am NI _ my • im im ow - .= _ NE - ow N4 _ IN NI (E4 I ow ow 41 0 • . • • • ow • u NE ow = RN I= _ im 215 (96 : •. •• .7 I1 ® - B .• . . O . 1 Diu 0,,10> 122 128131 66.9 (2.631 t l L.._. J 663.5 I T T -1 F232 SOUND HOUSING (STEEL) W /MUFFLER F233 SOUND HOUSING (ALUMINUM) W /MUFFLER 516 -1 126.12 (34.51 Dill A 1959.6 616.2 (17.11 (31.51 Tr N21.m •1�i1i7n nuu,.i4 .• 1340 -6111 In T. DAVIS Cu6m Fbm OeENIITIfIe m..Sul... i� Vi s 2 NOGCS OUTLINE.GENSET Intl IAd • 02511 .' 10 41•.1 •.51 3.10. 055 , :....0.6.231-6.17 11.14 24.0 6 51 .17 ••n 2. NM In•„g"„°•,,' 11 ^n 025EP09 mg cop .ra 6517%:• ..I 5at5: 1181 2...........01... ' 666.0..6.8 PGF 511 *02952S1 II:eI 8 1 5 I 4 /I` 3 I 2 I 1 Slleet 4 of 7 r- GC, PNL P21 PAIL P2 120/208 120/208 Sec. 1 Sec. 2 3p 4w 3p 4w 200A 200A A- 3.83kw A- 1.34kw 8- 4.67kw B- 1.77kw C- 790kw C- 2.30kw • PNL P2 PAIL P4 PAL H 120/208 120/208 120/208 Sec. 3 2p 3w 3p 4w 3p 4w 60A 100A 100A A- 3083kw A -. 452kw A- 1.466kw 8- 4.67kw 8- .186kw B- .469kw C- 790kw C- .765kw Gutter SEVOAV FLOOR MIL 3A 120/208 3p 4w 60A A -. 2088k w B -. 2262k w C -. 313k w AC-1 Sec. 1 Sec. 2 277/480 277/480 400A 400A JO 4w j0 4w AC -2 Sec. 1 Sec. 2 277/480 277/480 400A 400A JO 4w .10 4w Sec. 1 277/480 400A 3p 4w Sec. 2 277/480 400A 3p 4w PtLL2 277/480 400A 3p 4w A- 3.62kw B- 5.02kw C-7 42k w P1ML P3 120/208 3p 4w 200A A- 2.97kw B- 5.10kw C- 3.80k w PfNL P"f 120/208 3p 4w 100A A- .175kw B -1.64k w C -. 043k w FILE COPY Pit Na FIRST FLOOR PNL P 3p 4w 120/208 200A A -. 858kw 8- 1.674k w C- 2.320kw C 75KVA 480/277 GT CAX fi AO PM Al 120/208 3p 4w 125A A- 1.821kw B -. 624k w C- 1.014kw PNLP2 DISCONNECT 200A 120/208 A -2. 18kw B-1.38kw C- 1.21kw 75KVA 480/277 PI12L 277/480 3p 4w 200A A- 75.66kw B- 6.59kw C- 6.23kw PNL HA Sec. 1 277/480 3p 4w 400A Sec. 2 277/480 3p 4w 400A 75KVA 480/277 PNL P3 DISCONNECT 200A 120/208 1600A 3p 4w 277/480 0 4S- k vA UTILITY 1RAN3IER E IdOA t2.DILDr REVIEWED .FUri COMPLIANCE N PA �C APR 14 2011 City of Tukwila ILDING DIVISION 5 RECEIVED MAR 2 4 2011 PERMIT CENTER DAR: !0/ 1 /IO JOB NO: DRAWN •l APPROVED BY: p { PANEL AC- SEC 1 Volts 277/480 - - Amps 400 Phase 3 3 Wire 4 Main lug Man lug 01 Description Bkr Kw Bkr Kw Bkr Description 01 1 CU -1 20/3 4.8 A 6.06 20/3 CU-2 2 3 CU -1 20/3 4.8 B 6.06 20/3 CU-2 4 5 CU -1 20/3 4.8 C 6.06 20/3 CU-2 6 7 CU3 20/3 6.06 A 6.06 20/3 CU-4 8 9 CU-3 20/3 6.06 6 6.06 20/3 CU-4 10 11 CU-3 20/3 6.06 C 6.06 20/3 C114 12 13 Cl1-5 20/3 6.06 A 6.06 20/3 CU-6 14 15 CU-5 20/3 6.06 0 6.06 20/3 011.6 16 17 CU-5 20/3 6.06 C 6.06 20/3 CU-6 18 19 CU-7 20/3 6.06 A 6.06 20/3 CU-8 20 21 CU-7 20/3 6.06 B 6.06 20/3 CUB 22 23 CU-7 20/3 6.06 C 6.06 20/3 CU-8 24 25 0119 20/3 5.06 A 7.14 A 29 26 27 CU-9 20/3 5.06 B 7.14 B 28 29 CU-9 20/3 5.06 C 7.14 C 30 31 30 31 34 A A 32 33 32 33 37 B B A 34 35 34 35 C C 36 37 36 37 A C A 38 39 38 39 B B B 40 40 41 40 C C 42 42 PANEL AC -2 /SEC 2 Volts 277/480 - - Amps 400 Phase 3 3 Wire 4 Main Lug Man lug Crt Description Bkr Kw Bkr Kw Bkr Description Crt 1 HP -11 20/3 8.8 A 9.6 20/3 HP -10 2 3 HP -11 20/3 8.8 B 9.6 20/3 HP -10 4 5 HP -11 20/3 8.8 C 9.6 20/3 HP -10 6 7 HP -13 20/3 9.6 A 8.8 20/3 HP -12 8 9 HP -13 20/3 9.6 8 8.8 20/3 HP -12 10 11 HP -13 20/3 9.6 C 8.8 20/3 HP -12 12 13 HP -15 20/3 9.6 A 9.6 20/3 HP -14 14 15 HP -15 20/3 9.6 B 9.6 20/3 HP -14 16 17 HP -15 20/3 9.6 203 9.6 20/3 HP -14 18 19 18 19 HEATER _C A 7.14 A 7.14 20 21 20 21 HEATER B 7.14 B 7.14 22 23 22 23 HEATER c 7.14 C 7.14 24 25 24 25 HEATER A 7.14 A 29 26 27 26 27 HEATER B 7.14 B 28 29 28 29 HEATER C 7.14 C 30 31 30 31 34 A A 32 33 32 33 37 B B A 34 35 34 35 C C 36 37 36 37 A C A 38 39 38 39 B B 40 41 40 C 42 HA / SEC 1 Volts 277/480 Amps 400 Phase 3 Wire 4 Main Lug 01 Description Bkr Kw 1 3 HEATER HEATER 203 7.14 A Kw Bkr Description 01 7.14 203 203 7.14 B 7.14 203 HEATER HEATER 5 7 9 11 13 15 17 19 HEATER HEATER HEATER HEATER HEATER HEATER HEATER HEATER 203 203 20/3 20/3 20/3 20/3 20/3 203 7.14 7.14 7.14 7.14 7.14 7.14 7.14 7.14 C A 8 C A B C A 7.14 7.14 7.14 7.14 7.14 7.14 7.14 7.14 20/3 20/3 20/3 20/3 20/3 20/3 20/3 20/3 HEATER HEATER HEATER HEATER HEATER HEATER HEATER HEATER 6 8 10 12 14 16 18 20 21 HEATER 23 HEATER 25 HEATER 27 HEATER 29 HEATER 31 33 20/3 20/3 20/3 20/3 203 7.14 7.14 7.14 7.14 7.14 B C A B C A B 7.14 7.14 20/3 HEATER 20/3 HEATER 22 24 26 28 30 32 34 35 C 36 37 39 A B 38 40 41 C 42 PANEL AC -1 i SEC 2 Volts 27/480 - - Amps 400 Phase 3 Wire 4 Man lug Crt Description Bkr Kw Bkr Kw Bkr Description 01 1 CU-11 20/3 6.06 A 6.06 20/3 CU-10 2 3 CU-11 203 6.06 B 6.06 20/3 01110 4 5 CU-11 20/3 6.06 C' 6.06 203 Ct110 6 7 0.1-13 20/3 6.06 A 6.06 203 C11-12 8 9 C11-13 203 6.06 B 6.06 26/3 0.1-12 10 11 CU-13 2013 6.06 C 6.06 2013 CU-12 12 13 011-15 203 6.06 A 6.06 20/3 CU-14 14 15 CU-15 20/3 6.06 B 6.06 20/3 CU-14 16 17 CU-15 203 6.06 C 6.06 20/3 CU-14 18 19 HEATER 203 7.14 A 7.14 203 HEATER 20 21 HEATER 20/3 7.14 B 7.14 203 HEATER 22 23 HEATER 203 7.14 C 7.14 203 HEATER 24 25 HEATER 203 7.14 A 29 HP-9 23/3 26 27 HEATER 203 7.14 B 28 29 HEATER 23(3 7.14 C B 30 31 34 35 A C 32 33 37 B A 34 35 C 40 36 37 C A 42 38 39 B 40 41 C 42 HB / SEC 1 Volts 277 /480 - - Aps 400 Phase 3 Wire 4 Main lug Crt Description Bkr Kw Bkr Kw Bkr Descrlptian Crt 1 HEATER 203 7.14 A 7.14 2013 HEATER 2 3 HEATER 20/3 7.14 8 714 20'3 HEATER 4 5 HEATER 2013 7.14 C 7.14 2013 HEATER 6 7 HEATER 203 7.14 A 7.14 203 HEATER 8 9 HEATER 203 7.14 8 7.14 20/3 HEATER 10 11 HEATER 203 7.14 C 7.14 203 HEATER 12 13 HEATER 203 7.14 A 7.14 203 HEATER 14 15 HEATER 203 7.14 6 7.14 203 HEATER 16 17 HEATER 20/3 7.14 C 7.14 203 HEATER 18 19 HEATER 203 7.14 A 7.14 203 HEATER 20 21 HEATER 20/3 7.14 B 7.14 203 HEATER 22 23 HEATER 203 7.14 C 7.14 203 HEATER 24 25 HEATER 203 7.14 A 29 HP-9 23/3 26 27 HEATER 203 7.14 B 28 29 HEATER 23(3 7.14 C B 30 31 34 35 A C 32 33 37 B A 34 35 C 40 36 37 C A 42 38 39 B 40 41 C 42 HA / SEC 2 Volts 277/480 Amps 400 Phase 3 Wire 4 Main Lug Crt Description Bkr Kw Kw Bkr Description HEATER HEATER 20/3 7.14 A 7.14 20/3 7.14 B 7.14 20/3 20/3 HEATER HEATER 7 9 11 13 HEATER HEATER HEATER HEATER HEATER 203 20/3 20/3 20/3 20/3 7.14 7.14 7.14 7.14 7.14 C A B C A 7.14 7.14 7.14 7.14 7.14 203' 20/3 203 20/3 20/3 HEATER HEATER HEATER HEATER HEATER 6 8 10 12 14 15 17 19 HEATER HEATER 20/3 7.14 B 7.14 20/3 20/3 7.14 C 7.14 20/3 HEATER HEATER A 16 18 20 21 B 22 23 C 24 25 27 29 31 33 35 37 39 A B C A B C A B 26 28 30 32 34 36 38 40 41 42 EC 1 Volts 277/480 - - Amps 400 I :Phase 3 WNe 4 Main Lug Crt Description Crt Description Bkr Kw Kw Bkr Description Crt 1 HP -1 203 9.6 A 9.6 203 HP-2 2 3 HP -1 20/3 9.6 B 9.6 2013 HP-2 4 5 HP -1 203 9.6 C 9.6 203 I-P-2 6 7 14P3 203 9.6 A 8.8 203 1112-4 8 9 FP-3 2013 9.6 6 8.8 203 HP-4 10 11 1-P3 203 9.6 C 8.8 20/3 14P-4 12 13 HP-5 203 8.8 A 9.6 20/3 HP-6 14 15 FP-5 203 8.8 8 9.6 203 1-P-6 16 17 FP-5 203 8.8 C 9.6 203 HP-6 18 19 HP -7 203 8.8 A 9.6 2013 FP-8 20 21 1112-7 2313 8.8 B 9.6 an HP-8 22 23 HP -7 23/3 8.8 C 9.6 203 HP-8 24 25 HP-9 20/3 8.8 A C 26 27 1P-9 20/3 8.8 B 28 29 HP-9 23/3 8.8 C 30 31 A 29 32 33 C B 30 31 34 35 A C 32 36 37 B A 38 39 B 40 41 37 C A 42 HB /SEC2 Volts 27/480 Amps 400 Phase 3 WHe 4 Man lug Crt Description Bkr Kw Kw Bkr Description Crt 1 HEATER 21/3 7.14 A 7.14 20/3 HEATER 2 3 HEATER 203 7.14 B 7.14 203 HEATER 4 5 HEATER 203 7.14 C 7.14 20/3 HEATER 6 7 HEATER 203 7.14 A 7.14 20,3 HEATER 8 9 HEATER 2013 7.14 B 7.14 20,3 HEATER 10 11 HEATER 20/3 7.14 C 7.14 203 HEATER 12 13 HEATER 203 7.14 A 14 15 HEATER an 7.14 5 16 17 HEATER 203 7.14 C 18 19 A 20 21 B 22 23 C 24 25 A 26 27 6 28 29 C 30 31 A 32 33 B 34 35 C 36 37 A 38 39 6 40 41 C 42 REVIEWED FOR COMPLIANCE WITH NFPA70 m NEC APR 1 4 2011 City of Tukwila BUILDING DIVISION BATE. 19/11/10 Jos IVO 18 -020 BRAWN HY: rip APPI PYFB BY up SHEET 2 • • Card Access Doors 6300 Southcenter Blvd. Building (Minolta Building) First Floor #2 4:1 Z 1 #8 1 Suite 115 Human Services Server Suite 112 Personnel #24 Sv ✓t G //4(r' / Sy�o #8 Suite 100 PW / DCD #7 Doors on this floor (qty 10): #21 # 1 - Main Double Glass (Exterior) #25 - Ste 100 PW Lobby Side Door # 2 - Ste 100 PW West Side (Exterior) # 8 - Ste 100 PW Interior Hallway # 6 - Ste 100 Permit/Planning Double Doors #23 - Ste 100 DCD Single Door #21 - Ste 100 DCD Double Doors # 7 - Ste 112 Personnel Department #24 - Ste 112 Personnel Interior Side Door # 5 - Ste 115 Human Services —REVIEWED FOR COMPLIANCE WITH NFPA70_NEC APR 14 2011 City of Tukwila BUILDING DIVISION • Card Access Doors 6300 Southcenter Blvd. Building (Minolta Building) Second Floor 0 0 Suite 209 Tenant (Engineering Solutions) Suite 210 Tenant (In use by Ste 209 Tenant) Suite 211 Tenant (TALX) Suite 212 PW Project Management #17 #26 m ID f) Suite 200 PD Detectives Conference Room #6 #20 #18 #9 #10 #11 #12 #22 Suite 202 IT Office Suite 203 PD Traffic Suite 204 City Attorney IT Storage Conference Room #5 #16 Suite 206 Tenant (Suburban Cities Assoc.) Suite 205 PD Admin 4,,...cr, Z 1 Doors on this floor (qty 14): #17 - Ste 200 PD Detectives #26 - Conference Room #6 # 9 - Ste 202 IT Office #10 - Ste 203A PD Traffic - 1 #11 - Ste 203 PD Traffic - 2 #12 - Ste 204 City Attorney #22 - IT Storage #13 - Conference Room #5 #14 - Ste 205 PD Admin #16 - Ste 206 Tenant (Suburban Cities Assoc) #15 - Ste 212 PW Project Management #18 - Ste 211 Tenant (TALX) #19 (Future) - Ste 210 Tenant (Ste 209) #20 - Ste 209 Tenant (Engineering Solutions) REVIEWED FOR CON PA OC N TH EC APR 14 2011 City of Tukwila BUILDING DIVISION A • • Card Access Doors 6300 Southcenter Blvd. Building (Minolta Building) Basement • 9 9 0 9 9 .. �.T'��� 1514' <'��'yr e: S.•�:.� rii��... -Y.rd" 9 9 9 Parking Garage 9 Storage 9 8 #a �.;,.,. vs: - .�--�. Y -:. -,s•,� •:ki:.�;a '- ;r;�!�:v: -�' �= �w:' 4��;:+ ���'?f �; e` �4. �. W'° i- �. t�. zc.`;` k�r3'.> cu" ueg+. �` �'+ 1�c>' �> iri�J�; s' �u- r:_ 3' .,;.- a.�.�'....;.'FF.R__Q'.4�.a .K:es:.�= t- •?�..,..s.�e `': Doors on this floor (qty 2): # 3 - Garage (Glass) (Exterior) # 4 - Garage South Stairway (Exterior) rthVIEWtL rurt COMPLIANCE WITH NFPA 70 a NEC APR 14 2011 City of Tukwila BUILDING DIVISION • • Customer 6300 BUILDING Refereh ce Page 1 of 3 STATEMENT SUMMARY AS OF OCT 26, 2009 Balance as of last billing Thank you for your payment(s) Balance Forward Current Charges CURRENT TOTAL AS OF OCT 26, 2009 Account No. 888 - 584-103 -4 Account Balance $4,454.94 $4,454.94CR $.00 $4,155.76 $4,155.76 Statement Due Date Nov 13, 2009 AMOUNT DUE THIS STATEMENT $4,15576 Your bill this month reflects a Washington Utilities and Transportation Commission approved Oct. 1 slight increase in the monthly charge PSE customers pay into an energy - assistance fund for low- income households. FILE C®PY EL1 0275 REVIEWED FOR COMPLIANCE WITH NFPA 70 - NEC APR 14 2011 City of Tukwila BUILDING DIVISION RECEIVED MAR 2 4 2011 PERMIT CENTER For Information, emergencies, to report an outage or for changes to your account, please call 1- 888 - 225 -5773. When paying In person, please present both portions. When mailing remittance, please mail to Puget Sound Energy. BOT -01H, P.O. Box 91269, Bellevue, WA 98009 -9269 Please detach here T and return this portion with your payment 6300 SOUTHCENTER BLVD, TUKWILA Current 8111 Due Date e PUGET SOUND ENERGY Account 888 - 584 -103-4 TO. E n e r g y D. 6&I M/VS Nov 13, 2009 Yes, I want to glve $ Total Amount Due $4,155.76 Please make checks payable to to the Warm Home Fund. Puget Sound Energy * *B004 6300 BUILDING B C. 0 REAL ESTATE INC PO BOX 16332 SEATTLEWA 98116 -0332 Puget Sound Energy BOT -01H P.O. Box 91269 Bellevue, WA 98009 -9269 888582924 0001 01 00008885841034 000000415576 000000415576 •Customer 6300 BUILDING • Electric Detail: Page 2 of 3 Account No. 888 - 584-103 -4 6300 SOU 25E -C -KV Z007103923 25E -C-KV Z007103923 02163 25E -C -KV Z007103923 03967 09/25/09 09/30/09 Basic Charge 09/25/09 09/30/09 Energy Charge 09/25/09 09/30/09 Energy Charge 09/25/09 09/30/09 Demand Charge 09/25/09 09/30/09 Demand Charge 09/25/09 09/30/09 Reactive Power Charge 09/25/09 09/30/09 Electric Conservation Program Charge 09/25/09 09/30/09 Power Cost Adjustment 09/25/09 09/30/09 Wind Power Production Credit 09/25/09 09/30/09 Merger Credit 09/25/09 09/30/09 Effect Of Tukwila City Tax 10/22 300 02093 10/22 09/24 300 03833 10/22 09/24 300 40200 10/01/09 10/23/09 Basic Charge 10/01/09 10/23/09 Energy Charge 10/01/09 10/23/09 Energy Charge 10/01/09 10/23/09 Demand Charge 10/01/09 10/23/09 Demand Charge 10/01/09 10/23/09 Reactive Power Charge 10/01/0910/23/09 Electric Conservation Program Charge 10/01/09 10/23/09 Power Cost Adjustment 10/01/09 10/23/09 Wind Power Production Credit 10/01/09 10/23/09 Merger Credit 10/01/09 10/23/09 Effect Of Tukwila City Tax Current Electricity Charges On .October 01, 2009, a rate change became effective. Your usage charges for the periods before and after this date were calculated separately and are shown in separate sections, since these periods were billed at different rates. 111 ACTL 21000 ACTL ACTL 4,138 KWHS © $.080891 Per KWH 4,179.38 KWHS @ $.064078 Per KWH 50 KW @ $.00 Per KW 61 KW @$5.81 Per KW 4,344.9 KVRH @ $.00274 Per KVRH 8,317.38 KWHS @ $.002397 Per KWH 8,317.38 KWHS @ $.00 Per KWH 8,317.38 KWHS @ $.001505CR Per KWH 8,317.38 KWHS @ $.000226CR Per KWH $703.67 @ $.0667 Per Dollar Charge Total 15,862 KWHS © $.088822 Per KWH 16,020.62 KWHS @ $.064135 Per KWH 50 KW @ $.00 Per KW 61 KW @$8.72 Per KW 16,655.1 KVRH @ $.00274 Per KVRH 31,882.62 KWHS @ $.002397 Per KWH 31,882.62 KWHS @ $.00 Per KWH 31,882.62 KWHS @ $.001505CR Per KWH 31,882.62 KWHS @ $.000226CR Per KWH $2,964.76 @ $.0667 Per Dollar Charge Total $10.35 $334.73 $267.81 $.00 $73.33 $11.91 $19.94 $.00 $12.52CR $1.88CR $46.93 $750.60 $39.66 $1,40889 $1,027.48 $.00 $421.87 $45.63 $76.42 $.00 $47.98CR $7.21CR $197.75 $3,162.51 $3,913.11 1Copies of the rate schedules are available upon request. A late fee of 1% will apply to overdue charges, if any. Please see the reverse side for details on late payment charges. A 3.873% state utility tax is included in electric rates charged. A 2500 G 2000 K H 1500 1000 R D 500 A Y 0 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 2008 Months 2009 ENERGY USAGE COMPARISON For Bill Period No. KWH use Avg. KWH use per day Avg. ternp. per day This Year Last Year Change 29 40200 1386.2 52F 29 40800 1406.9 52F 0 -600 -20.7 OF For information, emergencies, to report an outage or for changes to your account, please call 1- 888 -225 -5773. Rate/ Dates Meter Number Pres Read Prev Read Pres Date Prev Date Mult KWH I (Usage) Bill Demand KVAR Hours COde Amount 25E -C -KV Z007103923 25E -C-KV Z007103923 02163 25E -C -KV Z007103923 03967 09/25/09 09/30/09 Basic Charge 09/25/09 09/30/09 Energy Charge 09/25/09 09/30/09 Energy Charge 09/25/09 09/30/09 Demand Charge 09/25/09 09/30/09 Demand Charge 09/25/09 09/30/09 Reactive Power Charge 09/25/09 09/30/09 Electric Conservation Program Charge 09/25/09 09/30/09 Power Cost Adjustment 09/25/09 09/30/09 Wind Power Production Credit 09/25/09 09/30/09 Merger Credit 09/25/09 09/30/09 Effect Of Tukwila City Tax 10/22 300 02093 10/22 09/24 300 03833 10/22 09/24 300 40200 10/01/09 10/23/09 Basic Charge 10/01/09 10/23/09 Energy Charge 10/01/09 10/23/09 Energy Charge 10/01/09 10/23/09 Demand Charge 10/01/09 10/23/09 Demand Charge 10/01/09 10/23/09 Reactive Power Charge 10/01/0910/23/09 Electric Conservation Program Charge 10/01/09 10/23/09 Power Cost Adjustment 10/01/09 10/23/09 Wind Power Production Credit 10/01/09 10/23/09 Merger Credit 10/01/09 10/23/09 Effect Of Tukwila City Tax Current Electricity Charges On .October 01, 2009, a rate change became effective. Your usage charges for the periods before and after this date were calculated separately and are shown in separate sections, since these periods were billed at different rates. 111 ACTL 21000 ACTL ACTL 4,138 KWHS © $.080891 Per KWH 4,179.38 KWHS @ $.064078 Per KWH 50 KW @ $.00 Per KW 61 KW @$5.81 Per KW 4,344.9 KVRH @ $.00274 Per KVRH 8,317.38 KWHS @ $.002397 Per KWH 8,317.38 KWHS @ $.00 Per KWH 8,317.38 KWHS @ $.001505CR Per KWH 8,317.38 KWHS @ $.000226CR Per KWH $703.67 @ $.0667 Per Dollar Charge Total 15,862 KWHS © $.088822 Per KWH 16,020.62 KWHS @ $.064135 Per KWH 50 KW @ $.00 Per KW 61 KW @$8.72 Per KW 16,655.1 KVRH @ $.00274 Per KVRH 31,882.62 KWHS @ $.002397 Per KWH 31,882.62 KWHS @ $.00 Per KWH 31,882.62 KWHS @ $.001505CR Per KWH 31,882.62 KWHS @ $.000226CR Per KWH $2,964.76 @ $.0667 Per Dollar Charge Total $10.35 $334.73 $267.81 $.00 $73.33 $11.91 $19.94 $.00 $12.52CR $1.88CR $46.93 $750.60 $39.66 $1,40889 $1,027.48 $.00 $421.87 $45.63 $76.42 $.00 $47.98CR $7.21CR $197.75 $3,162.51 $3,913.11 1Copies of the rate schedules are available upon request. A late fee of 1% will apply to overdue charges, if any. Please see the reverse side for details on late payment charges. A 3.873% state utility tax is included in electric rates charged. A 2500 G 2000 K H 1500 1000 R D 500 A Y 0 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct 2008 Months 2009 ENERGY USAGE COMPARISON For Bill Period No. KWH use Avg. KWH use per day Avg. ternp. per day This Year Last Year Change 29 40200 1386.2 52F 29 40800 1406.9 52F 0 -600 -20.7 OF For information, emergencies, to report an outage or for changes to your account, please call 1- 888 -225 -5773. Customer 6300 BUILDING • Page 3 of 3 Account No. 888- 584-103 -4 Electric Detail: 6300 SOUTHCENTER BLVD, TUKWILA Rate/ Dates Meter Number. Pres Read Prev Read Pres I Prev I Mult Date Date KWH (Usage) Bill Demand KVAR I Code Hours Amount 24E -C Z020486410 16164 13844 10/23 09/24 09/25/09 09/30/09 Basic Charge 09/25/09 09/30/09 Energy Charge 09/25/09 09/30/09 Electric Conservation Program Charge 09/25/09 09/30/09 Power Cost Adjustment 09/25/09 09/30/09 Wind Power Production Credit 09/25/09 09/30/09 Merger Credit 09/25/09 09/30/09 Effect Of Tukwila City Tax 10/01/09 10/23/09 Basic Charge 10/01/09 10/23/09 Energy Charge 10/01/0910/23/09 Electric Conservation Program Charge 10/01/09 10/23/09 Power Cost Adjustment 10/01/09 10/23/09 Wind Power Production Credit 10/01/09 10/23/09 Merger Credit 10/01/09 10/23/09 Effect Of Tukwila City Tax 1 2320 ACTL 480.01 KWHS ® $.085013 Per KWH 480.01 KWHS @ $.002417 Per KWH 480.01 KWHS (g/ $.00 Per KWH 480.01 KWHS ® $.001534CR Per KWH 480.01 KWHS ® $.000342CR Per KWH $45.93 ® $.0667 Per Dollar Charge Total 1,839.99 KWHS © $.087994 Per KWH 1,839.99 KWHS ® $.002417 Per KWH 1,839.99 KWHS @ $.00 Per KWH 1,839.99 KWHS Q $.001534CR Per KWH 1,839.99 KWHS (3.3 $.000342CR Per KWH $181.55 © $.0667 Per Dollar Charge Total $4.86 $40.81 ' $1.16 $.00 $.74CR $.16CR $3.06 $48.99 $18.64 $161.91 $4.45 $.00 $2.82CR $.63CR $12.11 $193.66 Current Electricity Charges $242.65 On October 01, 2009, a rate change became effective. Your usage charges for the periods before and after this date were calculated separately and are shown in separate sections, since these periods were billed at different rates. Copies of the rate schedules are available upon request. A late fee of 1% will apply to overdue charges, if any. Please see the reverse side for details on late payment charges. A 3.873% state utility tax is included in electric rates charged. A 120 V G 100 W 80 H P BO 4o AD 20 Y 0 Oct Nov Dec Jan Feb Mar Apr May 2008 Months 111111111 11111111111111-11111 111111111111111 111111111111111111111 Jun Jul Aug Sep Oct 2009 ENERGY USAGE COMPARISON For Bill Period This Year Last Year Change Sep-Oct 29 29 KWH use 2320 2079 Avg. KWH use per day 80 71.7 Avg. temp. per day 52F 52F 0 241 8.3 OF For information, emergencies, to report an outage or for changes to your account, please call 1- 888 -225 -5773. $9,456.50 I Customer 6300 BUILDING • STATEMENT SUMMARY AS OF NOV 24, 2009 Balance as of last billing Balance Forward Current Charges CURRENT TOTAL AS OF NOV 24, 2009 Page 1 of 2 Account No. 888 - 584-1034 Account Balance $4,155.76 $4,155.76 $5,300.74 $9,456.50 Statement Due Date Dec 16, 2009 I AMOUNT DUE THIS STATEMENT Previous balances, if any, are past due. Electric Detail: Rate/ Dates Meter Number 6300 SOUTHCENTER BLVD, TUKWILA Pres Read Prev Read Pres Prev Date Date Muff I KWH (Usage) Bill Demand KVAR Hours Code Amount 25E -C-KV Z007103923 11/20 25E -C-KV Z007103923 02251 02163 11/23 10/22 25E -C-KV Z007103923 04139 03967 11/23 10/22 10/24/09 11/23/09 Basic Charge 10/24/09 11/23/09 Energy Charge 10/24/09 11/23/09 Energy Charge 10/24/09 11/23/09 Demand Charge 10/24/09 11/23/09 Demand Charge 10/24/09 11/23/09 Reactive Power Charge 10/24/0911/23/09 Electric Conservation Program Charge 10/24/0911/23/09 Power Cost Adjustment 10/24/0911/23/09 Wind Power Production Credit 10/24/09 11/23/09 Merger Credit 10/24/09 11/23/09 Effect Of Tukwila City Tax Current Electricity Charges A late fee of 1% will apply to overdue charges, if a late payment charges. 300 300 300 51600 135.9 ACTL 26400 PRRT PRRT 20,000 KWHS @ $.088822 Per KWH 31,600 KWHS © $.064135 Per KWH 50 KW@ $.00 Per KW 85.9 KIN ®$8.72 Per KW 26,400 KVRH ® $.00274 Per KVRH 51,600 KWHS ® $.002397 Per KWH 51,600 KWHS ® $.00 Per KWH 51,600 KWHS @ $.001505CR Per KWH 51,600 KWHS (d $.000226CR Per KWH $4,708.87 @ $.0667 Per Dollar ny. Please see the reverse side for A 3.873% state utility tax is included in electric rates charged. A v 6 K w H P E R D A 2500 2000 1500 1000 500 0 $50.00 $1,776.44 $2,02667 $.00 $74305 $72.34 $12369 $.00 $77.66CR $11.66CR $314.08 $5,022.95 details on Nov Dec an Feb Mar Apr May Jun Jul Aug Sep Oct Nov 2008 Months 2009 For information, emergencies, to report an outage or for changes to your account, please call 1-888 -225 -5773. When paying In person, please present both portions. When mailing remittance, please malt to Puget Sound Energy, BOT•01H, P.O. Box 91269, Bellevue, WA 98009 -9269 Please detach here T and return this portion with your payment 6300 SOUTHCENTER BLVD, TUKWILA 4* PUGET SOUND ENERGY Currer1 Bill Due Date rbe �, MD* Account: 888 - 584 -103 -4 Dec 16, 2009 Yes, 1 want to give $ to the Warm Home Fund. * *B004 IulIII„IIlIl,lrrrll,Il „II lIIIIlls„IIII,II,I,ilIuIlul 6300 BUILDING B C 0 REAL ESTATE INC PO BOX 16332 SEATTLE WA 98116-0332 Total Amount Due $9,456.50 Please make checks payable to Puget Sound Energy Previous balances, If any, are past due. Puget Sound Energy BOT-01 H P.O. Box 91269 Bellevue, WA 98009 -9269 888589914 0001 01 00008885841034 000000530074 000000945650 IIIMIIIVIII ENERGY USAGE COMPARISON For Bill Period This Year Last Year Change Oct -Nov 1 No. uses 51600 43200 8400 Avg. t p. p erdaayday 1664.5 1 9F 22-4F I. 1!! 1! 1 1 1 , 1 ', 1 1 1 1 Nov Dec an Feb Mar Apr May Jun Jul Aug Sep Oct Nov 2008 Months 2009 For information, emergencies, to report an outage or for changes to your account, please call 1-888 -225 -5773. When paying In person, please present both portions. When mailing remittance, please malt to Puget Sound Energy, BOT•01H, P.O. Box 91269, Bellevue, WA 98009 -9269 Please detach here T and return this portion with your payment 6300 SOUTHCENTER BLVD, TUKWILA 4* PUGET SOUND ENERGY Currer1 Bill Due Date rbe �, MD* Account: 888 - 584 -103 -4 Dec 16, 2009 Yes, 1 want to give $ to the Warm Home Fund. * *B004 IulIII„IIlIl,lrrrll,Il „II lIIIIlls„IIII,II,I,ilIuIlul 6300 BUILDING B C 0 REAL ESTATE INC PO BOX 16332 SEATTLE WA 98116-0332 Total Amount Due $9,456.50 Please make checks payable to Puget Sound Energy Previous balances, If any, are past due. Puget Sound Energy BOT-01 H P.O. Box 91269 Bellevue, WA 98009 -9269 888589914 0001 01 00008885841034 000000530074 000000945650 Customer 6300 BUILDING • Page 2 of 2 Account No. 888 - 584-103 -4 Electric Detail: Rate/ Dates Meter Number 6300 SOUTHCENTER BLVD, TUKWILA Pres Read Prev Read Pres I Prev Date Date Mult KWH (Usage) 8111 Demand KVAR Hours Code Amount 24E-C Z020486410 18840 16164 11/23 10/23 10/24/09 11/23/09 Basic Charge 10/24/09 11/23/09 Energy Charge 10/24/0911/23/09 Electric Conservation Program Charge 10/24/09 11/23/09 Power Cost Adjustment 10/24/09 11/23/09 Wind Power Production Credit 10/24/09 11/23/09 Merger Credit 10/24/09 11/23/09 Effect Of Tukwila City Tax 1 2676 ACTL 2,676 KWHS Q $.087994 Per KWH 2,676 KWHS ® $.002417 Per KWH 2,676 KWHS ® $.00 Per KWH 2,676 KWHS ® $.001534CR Per KWH 2,676 KWHS ® $.000342CR Per KWH $260.42 (d) $.0667 Per Dollar Current Electricity Charges A late fee of 1% will apply to overdue charges, if any. Please see the reverse late payment charges. A 3.873% state utility tax is included in electric rates charged. A V G K w H P R D A Y 120 100 80 60 40 20 0 Nov Dec 2008 1111111111111111111 1■■■1111111■.1 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov .Months 2009 $23.50 $23547 $6.47 $.00 $4.10CR $.92CR $17.37 $277.79 side for details on ENERGY USAGE COMPARISON For Bill Period This Year Last Year Oct -Nov No. of days KWH use Avg. KWH use per day Avg. temp. per day 31 2676 86.3 45F 30 2222 74.1 49F Change 1 454 12.2 -4F For information, emergencies, to report an outage or for changes to your account, please call 1- 888 -225 -5773. $6,703.76 I Customer 6300 BUILDING • STATEMENT SUMMARY AS OF DEC 24, 2009 Balance as of last billing Thank you for your payment(s) Balance Forward Current Charges CURRENT TOTAL AS OF DEC 24, 2009 Page 1 of 2 Account No. 888 - 584-1034 Account Balance $9,456.50 $9,456.50CR $.00 $6,703.76 $6,703.76 Statement Due Date Jan 15, 2010 I AMOUNT DUE THIS STATEMENT Electric Detail: 6300 SOUTHCENTER BLVD, TUKWILA Rate/ Dates Meter Number Pres Read Prev Read Pres Date • Prev Date 25E -C -KV Z007103923 25E -C -KV Z007103923 02352 25E -C -KV Z007103923 04331 11/24/0912/23/09 Basic Charge 11/24/09 12/23/09 Energy Charge 11/24/0912/23/09 Energy Charge 11/24/09 12/23/09 Demand Charge 11/24/09 12/23/09 Demand Charge 11/24/09 12/23/09 Reactive Power Charge 11/24/0912/23/09 Electric Conservation Program Charge 11/24/09 12/23/09 Power Cost Adjustment 11/24/09 12/23/09 Wind Power Production Credit 11/24/09 12/23/09 Merger Credit 11/24/09 12/23/09 Effect Of Tukwila City Tax Current Electricity Charges 12/22 02251 12/22 11/23 04139 12/22 11/23 Mutt KWH Bill (Usage) I Demand 300 300 300 57600 KVAR Hours Code Amount 234 ACTL 30300 ACTL ACTL 20,000 KWHS ® $.088822 Per KWH 37,600 KWHS © $.064135 Per KWH 50 KW @ $.00 Per KW 184 KW ®$8.72 Per KW 30,300 KVRH © $.00274 Per KVRH 57,600 KWHS ® $.002397 Per KWH 57,600 KWHS @ $.00 Per KWH 57,600 KWHS @ $.001505CR Per KWH 57,600 KWHS @ $.000226CR Per KWH $5,963.78 ® $.0667 Per Dollar A late fee of 1% will apply to overdue charges, if any. Please see the reverse side for details on late payment charges. A 3.873% state utility tax is included in electric rates charged. A 2500r G K H 1500 E 1000 R D A $50.00 $1,776.44 $2,411.48 $.00 $1,60448 $83.02 $13507 $.00 $86.69CR $13.02CR $397.78 $6,361.56 2000 500 0 Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2008 Months 111F111 I-Iiiliiliili. 2009 ENERGY USAGE COMPARISON For Bill Period This Year Last Year Nov -Dec , No. of days 30 KWH use 57600 Avg. KWH use per day 1920 Avg. temp. per day 38F 32 62100 1940.6 38F Change -2 -4500 -20.6 OF For information, emergencies, to report an outage or for changes to your account, please call 1-888- 225 -5773. When paying In person, please present both portions. When mailing remittance, please mall to Puget Sound Energy, BOT-01H, P.O. Box 91269, Bellevue, WA 98009.9269 Please detach here T and return thls portion with your payment 6300 SOUTHCENTER BLVD, TUKWILA PUGET SOUND ENERGY Account 888 - 5841034 m.errormo0on. Thine, • Yes, I want to give $ Current BIII Due Date Jan 15, 2010 to the Warm Home Fund. * *B004 1111111111111111111111111111 1I..,II...I,I..II,..1.1 „I.I 6300 BUILDING B .0 0 REAL ESTATE INC PO BOX 16332 SEATTLE WA 98116-0332 Total Amount Due $6,703.76 Please make checks payable to Puget Sound Energy Puget Sound Energy BOT -01 H P.O. Box 91269 Bellevue, WA 98009 -9269 888586249 0001 01 00008885841034 000000670376 000000670376 Customer 6300 BUILDING • Electric Detail: Rate/ Dates Page 2 of 2 Account No. 888 -584 -103 -4 Meter Number 6300 SOUTHCENTER BLVD, TUKWILA IRead I Read Date I Date I Mult I (Usage) I Demand I Hours I Code I 24E-C Z020486410 22198 18840 12/23 11/23 11/24/09 12/23/09. Basic Charge 11/24/09 12/23/09 Energy Charge 11/24/0912/23/09 Electric Conservation Program Charge 11/24/0912/23/09 Power Cost Adjustment 11/24/0912/23/09 Wind Power Production Credit 11/24/0912/23/09 Merger Credit 11/24/0912/23/09 Effect Of Tukwila City Tax Current Electricity Charges A late fee of 1% will apply to overdue charges, if any. Please see the reverse late payment charges. A 3.873% state utility tax is included in electric rates charged. A 120 v C' 100 1 3358 ACTL 3,358 KWHS @ $.087994 Per KWH 3,358 KWHS 5.002417 Per KWH 3,358 KWHS ® 5.00 Per KWH 3,358 KWHS @ $.001534CR Per KWH 3,358 KWHS ® $.000342CR Per KWH $320.80 @ $.0667 Per Dollar H 80 P 60 R 40 A 20 Y 0 1 111111111111111111111 11111111111111111111111 I■I■i11■■■■■I ■I Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2008 Months 2009 Amount $23.50 $29548 58.12 $.00 $5.15CR $1.15CR $21.40 $342.20 side for details on ENERGY USAGE COMPARISON For BM Period This Year Nov -Dec No. of days 30 KWH use 3358 Avg. KWH use per day 111.9 Avg. temp. per day 38F Last Year Change 32 2253 70.4 38F -2 1105 41.5 OF For information, emergencies, to report an outage or for changes to your account, please call 1- 888 -225 -5773. 1 $6,350.11 J Customer 6300 BUILDING • STATEMENT SUMMARY AS OF JAN 26, 2010 Balance as of last billing Thank you for your payment(s) Balance Forward Current Charges CURRENT TOTAL AS OF JAN 26, 2010 Page 1 of 3 Account No. 888-584-1034 Account Balance $6,70376 $6,703.76CR $.00 $6,350.11 $6,350.11 Statement Due Date Feb 16, 2010 AMOUNT DUE THIS STATEMENT Your bill reflects a change in the merger credit that went into effect Jan. 1, 2010. For Information, emergencies, to report an outage or for - changes to your account, please call 1- 888.225 -5773. When paying in person, please present both portions. When mailing remittance, please mall to Puget Sound Energy, BOT-01H, P.O. Box 91269, Bellevue, WA 980094269 Please detach here T and return this portion with your payment 6300 SOUTHCENTER BLVD, TUKWILA PUGET SOUND ENERGY Account: 888. 584-103 -4 Me Energy To De MutMi, s Feb 16, 2010 Current Bill Due Date Yes, I want to give $ * *B004 I,t,,I,,I,r,,ll,�dLll,,il Ilrrrllr�rlrlrrllrrrirl�rl,l 6300 BUILDING B C 0 REAL ESTATE INC PO BOX 16332 SEATTLEWA 98116-0332 Total Amount Due $6,350.11 to the Warm Home Fund. Please Energy payable to Puget Sound Energy BOT -01H P.O. Box 91269 Bellevue, WA 98009 -9269 888588189 0001 01 00008885841034 000000635011 000000635011 Customer 6300 BUILDING• Electric Detail: IRate/ I Dates Page 2 of 3 Account No. 888 - 584 -103 -4 Meter Number 6300 SOUTHCENTER BLVD, TUKWILA I Read I Read I Date I Date I Muit I (Usage) I Demand I KVAR Hours I COdB I 25E -C -KV Z007103923 25E -C -KV Z007103923 02455 25E -C-KV Z007103923 04528 12/24/09 12/31/09 Basic Charge 12/24/09 12/31/09 Energy Charge 12/24/09 12/31 /09 Energy Charge 12/24/0912/31/09 Demand Charge 12/24/0912/31/09 Demand Charge 12/24/0912/31/09 Reactive Power Charge 12/24/0912/31/09 Electric Conservation Program Charge 12/24/0912/31/09 Power Cost Adjustment 12/24/0912/31/09 Wind Power Production Credit 12/24/0912/31/09 Merger Credit 12/24/0912/31/09 Effect Of Tukwila City Tax 02352 04331 01/22 01/25 12/22 01/25 12/22 01/01/10 01/25/10 Basic Charge 01/01/10 01/25/10 Energy Charge 01/01/10 01/25/10 Energy Charge 01/01/10 01/25/10 Demand Charge 01/01/10 01/25/10 Demand Charge 01/01/10 01/25/10 Reactive Power Charge 01/01/10 01/25/10 Electric Conservation Program Charge 01/01/10 01/25/10 Power Cost Adjustment 01/01/10 01/25/10 Wind Power Production Credit 01/01/10 01/25/10 Merger Credit 01/01/10 01/25/10 Effect Of Tukwila City Tax Current Electricity Charges 300 300 300 59100 179.1 ACTL 30900 PRRT PRRT Amount 4,848.4 KWHS © $.088822 Per KWH 4214 9,478.62 KWHS @ $.064135 Per KWH $6037.94 50 KW @ $.00 Per KW $607.91 $0 129.1 KW @ $8.72 Per KW $27290 7,490:78 KVRH-@ °$.00274 Per KVRH $22292 14,327.02 KWHS $.002397 Per KWH $34.34 © $34.34 14,327.02 KWHS @ $.00 Per KWH $.00 14,327.02 KWHS @ $.001505CR Per KWH $21.56CR 14,327.02 KWHS @ $.000226CR Per KWH $3.24CR $1,353.63 (41$.0667 Per Dollar $90.29 Charge Total $1,443.92 15,151.6 KWHS (41$.088822 Per KWH $37.88 29,621.38 KWHS @ $.064135 Per KWH $1; 99.77 50 KW @ $.O0 Per KW $.00 129.1 KW @ $8.72 Per KW $85285 23,409.22 KVRH © $.00274 Per KVRH $64.14 44,772.98 KWHS @ $.002397 Per KWH $107.32 44,772.98 KWHS @ $.00 Per KWH $.00 44,772.98 KWHS @ $.001505CR Per KWH $67.38CR 44,772.98 KWHS @ $.000192CR Per KWH $8.60CR $4,231.78 @ $.0667 Per Dollar $28226 Charge Total $4,51404 On January ':01, 2010, a rate change became effective. Your usage charges for the periods before and after this date were calculated separately and are shown in separate sections, since these periods were billed at different rates. (Copies of the rate schedules are available upon request. A late fee of 1% will apply to overdue charges, if any. Please see the reverse side for details on late payment charges. A 3.873% state utility tax is included in electric rates charged. A 2500 G K H 1500 E 1000 R D A Y 2000 500 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 2009 Months 2010 ENERGY USAGE COMPARISON For Bill Period This Year Last Year Dec -Jan No. of days KWH use Avg. KWH use per day Avg. temp. per day 33 59100 1790.9 43F 31 62400 2012.9 38F Change 2 -3300 -222 5F For information, emergencies, to report an outage or for changes to your account, please call 1- 888 -225 -5773. Customer 6300 BUILDING. Electric Detail: Rate/ Dates • Page 3 of 3 Account No. 888-584-103-4 Meter Number 6300 SOUTHCENTER BLVD, TUKWILA Pres I Prev Read I Read Pres I Prev Data I Date Mult 12/24/09 12/24/09 12/24/09 12/24/09 12/24/09 12/24/09 12/24/09 10204862110 26083 22198 01/25 12/23 12/31/09 Basic Charge 12/31/09 Energy Charge 12/31/09 Electric Conservation Program Charge 12/31/09 Power Cost Adjustment 12/31/09 Wind Power Production Credit 12/31/09 Merger Credit 12/31/09 Effect Of Tukwila City Tax 01/01/10 01/25/10 01/01/10 01/25/10 01/01/10 01/25/10 01/01/10 01/25/10 01/01/10 01 /25/10 01/01/10 01/25/10 01/01/10 01/25/10 Basic Charge Energy Charge Electric Conservation Program Charge Power Cost Adjustment Wind Power Production Credit Merger Credit Effect Of Tukwila City Tax Current Electricity Charges On January 01, 2010, a rate change became effective. Your usage charges for the periods before • and after this date were calculated separately and are shown in separate sections, since these periods were billed at different rates. KWH B8 (Usage) Demand KVAR Hours Code Amount i 3885 ACTL 941.8 KWHS © $.087994 Per KWH 941.8 KWHS @ $.002417 Per KWH 941.8 KWHS ® $.00 Per KWH 941.8 KWHS © $.001534CR Per KWH 941.8 KWHS (a) $.000342CR Per KWH $89.09 (a) $.0667 Per Dollar Charge Total 2,943.2 KWHS (a3 $.087994 Per KWH 2,943.2 KWHS @ $.002417 Per KWH 2,943.2 KWHS © $.00 Per KWH 2,943.2 KWHS $.001534CR Per KWH 2,943.2 KWHS @ $.000285CR Per KWH $278.54 @ $.0667 Per Dollar Charge Total $5.70 $8287 $2.28 $.00 $1.44CR $.32CR $5.94 $95.03 $17.80 $258,98 $7.11 $.00 $4.51CR $.84CR $1&58 $297.12 $392.15 (Copies of the rate schedules are available upon request. A late fee of 1% will apply to overdue charges, if any. Please see the reverse late payment charges. A 3.873% state utility tax is included in electric rates charged. 120 100 80 so 40 20 A v G w H P R D A Y 0 rimmu IIU,1i 11111111111111111 11111111111111111111 111111111111111111 Jan Feb Mar Apr May Jun Jul 2009 Months Aug Sep Oct Nov Dec Jan 2010 side for details on ENERGY USAGE COMPARISON For Bill Period Thls Year Last Year Change Dec -Jan No. of days KWH use Avg. KWH use per day Avg. temp. per day 33 3885 117.7 - 43F 31 2187 70.5 38F 2 1698 47.2 5F For information, emergencies, to report an outage or for changes to your account, please call 1- 888 -225 -5773. $5,321.73 I Customer 6300 BUILDING 1 STATEMENT SUMMARY AS OF FEB 25, 2010 Balance as of last billing Thank you for your payment(s) Balance Forward — Curxent-Charges CURRENT TOTAL AS OF FEB 25, 2010 Page 1 of 2 Account No. 888-584-103-4 Account Balance $6,350.11 $6,350.11 CR $.00 — $5;32'73 $5,321.73 Statement Due Date Mar 17, 2010 Electric Detail: Rate/ Dates • Meter Number AMOUNT DUE THIS STATEMENT 6300 SOUTHCENTER BLVD, TUKWILA Pres Read Prev Read Pres Date Prev Date Mutt 25E -C -KV Z007103923 25E -C-KV Z007103923 02535 02455 25E -C -KV Z007103923 04683 04528 01/26/10 02/24/10 Basic Charge 01/26/10 02/24/10 Energy Charge 01/26/10 02/24/10 Energy Charge 01/26/10 02/24/10 Demand Charge 01/26/10 02/24/10 Demand Charge 01/26/10 02/24/10 Reactive Power Charge 01/26/10 02/24/10 Electric Conservation Program Charge 01/26/10 02/24/10 Power Cost Adjustment 01/26/10 02/24/10 Wind Power Production Credit 01/26/10 02/24/10 Merger Credit 01/26/10 02/24/10 Effect Of Tukwila City Tax 02/23 02/23 01/25 02/23 01/25 Current Electricity Charges A late fee of 1% will apply to overdue charges, if any. Please see the reverse late payment charges. A 3.873% state utility tax Is included in electric rates charged. V 2000 G K H P E R D A Y KWH I 6111 (Usage) Demand 300 300 300 46500 KVAR Hours Code Amount 170.1 ACTL 24000 ACTL ACTL 20,000 KWHS ® $.088822 Per KWH 26,500 KWHS (41$.064135 Per KWH 50 KW © $.00 Per KW 120.1 KW @$8.72 Per KW 24,000 KVRH © $.00274 Per KVRH 46,500 KWHS (41$.002397 Per KWH 46,500 KWHS ® $.00 Per KWH 46,500 KWHS © $.001505CR Per KWH 46,500 KWHS ® $.000192CR Per KWH $4,671.60 ® $.0667 Per Dollar 1500 1000 500 0 IIII1IIII1IIii Feb Mar Apr May Jun Jul- Aug Sep Oct Nov Dec Jan Feb 2009 Months 2010 $50.00 $1,776.44 $1,69a58 $.00 $1,047.27 $65.76 $111.46 $.00 $69.98CR $8.93CR $311.60 $4,983.20 side for details on ENERGY USAGE COMPARISON For Bill Period This Year Jan -Feb No. of days 30 KWH use 46500 Avg. KWH use per day 1550 Avg. temp. per day 44F Last Year Change 32 59700 1865.6 39F -2 -13200 -315.6 5F For Information, emergencies, to report an outage or for changes to your account, please call 1- 888.225 -5773. When paying In person, please present both portions. When mailing remittance, please ma8 to Puget Sound Energy, BOT.01H, P.O. Box 91269, Bellevue, WA 98009-9269 Please detach here T and return this portion with your payment 6300 SOUTHCENTER BLVD, TUKWILA PUGET SOUND ENERGY Account: 888-584-103-4 Tim Enemy mm Gm, rMIMS Yes, I want to give $ Current Bill Due Date Mar 17, 2010 to the Warm Home Fund. * *B004 11...1I„rl,ll,11...1,I,II,l 6300 BUILDING B C 0 REAL ESTATE INC PO BOX 16332 SEATTLEWA 98116-0332 Total Amount Due $5,321.73 Please make checks payable to Puget Sound Energy Puget Sound Energy BOT -01H P.O. Box 91269 Bellevue, WA 98009 -9269 888586095 0001 01 00008885841034 000000532173 000000532173 Customer 6300 BUILDING • Electric Detail: Page 2 of 2 Account No. 888 - 584103 -4 6300 SOUTHC 24E C 2020486410 29400 26083 02/24 01/25 01/26/10 02/24/10 Basic Charge 01/26/10 02/24/10 Energy Charge 01/26/10 02/24/10 Electric Conservation Program Charge 01/26/10 02/24/10 Power Cost Adjustment 01/26/10 02/24 /10 Wind Power Production Credit 01/26/10 02/24/10 Merger Credit 01/26/10 02/24/10 Effect Of Tukwila City Tax Current Electricity Charges A late fee of 1% will apply to overdue charges, if any. Please see the reverse side for details on late payment charges. A 3.873% state utility tax is included in electric rates charged. 1 3317 ACTL 3,317 KWHS © $.087994 Per KWH 3,317 KWHS ® $.002417 Per KWH 3,317 KWHS (03 $.00 Per KWH 3,317 KWHS $.001534CR Per KWH 3,317 KWHS ® $.000285CR Per KWH $317.36 © $.0667 Per Dollar $23.50 $291.88 $&02 $.00 $5.09CR $.95CR $21.17 $338.53 A V G K w H P E R D A Y 120 100 80 so 40 20 0 rimurummum 1111111111111111 111111111111111 1■■■I■l■■■ ■■■1 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb 2009 Months 2010 ENERGY USAGE COMPARISON For BM Period This Year Last Year Change Jan -Feb No. of days 30 32 KWH use 3317 2424 Avg. KWH use per day 110.6 75.8 Avg. temp. per day 44F 39F -2 893 34.8 5F For information, emergencies, to report an outage or for changes to your account, please call 1-888- 225 -5773. IDates I Number I R ad I R ad I Date I Date I MuR I (Usage) I Demand 1 Hours I Code I Amount I 24E C 2020486410 29400 26083 02/24 01/25 01/26/10 02/24/10 Basic Charge 01/26/10 02/24/10 Energy Charge 01/26/10 02/24/10 Electric Conservation Program Charge 01/26/10 02/24/10 Power Cost Adjustment 01/26/10 02/24 /10 Wind Power Production Credit 01/26/10 02/24/10 Merger Credit 01/26/10 02/24/10 Effect Of Tukwila City Tax Current Electricity Charges A late fee of 1% will apply to overdue charges, if any. Please see the reverse side for details on late payment charges. A 3.873% state utility tax is included in electric rates charged. 1 3317 ACTL 3,317 KWHS © $.087994 Per KWH 3,317 KWHS ® $.002417 Per KWH 3,317 KWHS (03 $.00 Per KWH 3,317 KWHS $.001534CR Per KWH 3,317 KWHS ® $.000285CR Per KWH $317.36 © $.0667 Per Dollar $23.50 $291.88 $&02 $.00 $5.09CR $.95CR $21.17 $338.53 A V G K w H P E R D A Y 120 100 80 so 40 20 0 rimurummum 1111111111111111 111111111111111 1■■■I■l■■■ ■■■1 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb 2009 Months 2010 ENERGY USAGE COMPARISON For BM Period This Year Last Year Change Jan -Feb No. of days 30 32 KWH use 3317 2424 Avg. KWH use per day 110.6 75.8 Avg. temp. per day 44F 39F -2 893 34.8 5F For information, emergencies, to report an outage or for changes to your account, please call 1-888- 225 -5773. $5,257.52 I Customer 6300 BUILDING STATEMENT SUMMARY AS OF MAR 26, 2010 Balance as of last billing Thank you for your payment(s) Balance Forward Current Charges CURRENT TOTAL AS OF MAR 26, 2010 Account No. Page 1 of 2 888-584-103-4 Account Balance $5,321.73 $5,321.73CR $.00 $5,257.52 $5,257.52 Statement Due Date Apr 15, 2010 Electric Detail: Rate/ Dates Meter Number AMOUNT DUE THIS STATEMENT 6300 SOUTHCENTER BLVD, TUKWILA Pres Read Prev Read Pres Date Prev Date Mult ” KWH (Usage) 25E -C-KV Z007103923 25E -C-KV Z007103923 02612 25E -C-KV Z007103923 04835 02/25/10 03/25/10 Basic Charge 02/25/10 03/25/10 Energy Charge 02/25/10 03/25/10 Energy Charge 02/25/10 03/25/10 Demand Charge 02/25110 03/25/10 Demand Charge 02/25110 03/25/10 Reactive Power Charge 02/25110 03/25/10 Electric Conservation Program Charge 02/25/10 03/25/10 Power Cost Adjustment 02/25/10 03/25/10 Wind Power Production Credit 02/25/10 03/25/10 Merger Credit 02/25/10 03/25/10 Effect Of Tukwila City Tax 03/24 02535 03/24 02/23 04683 03/24 02/23 Current Electricity Charges A late fee of 1% will apply to overdue charges, late payment charges. A 3.873% state utility tax is included in electric rates charged. A • 2000 G K 1500 w H P E R D A • 0 300 300 300 45600 Bill I KVAR Code Demand Hours 171.3 ACTL 23100 ACTL ACTL 20,000 KWHS © $.088822 Per KWH 25,600 KWHS @ $.064135 Per KWH 50 KW ®$.00 Per KW 121.3 KW ®$8.72 Per KW 23,100 KVRH @ $.00274 Per KVRH 45,600 KWHS © 5.002397 Per KWH 45,600 KWHS © $.00 Per KWH 45,600 KWHS ® $.001505CR Per KWH 45,600 KWHS ® $.000192CR Per KWH $4,621.24 ® $.0667 Per Dollar if any . Please see the 1000 500 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 2009 Months 2010 reverse side for Amount $50.00 $1,776.44 51,641.86 $.00 $1,057.74 $6a29 $10330 $.00 $68.63CR $8.76CR $30824 $4,929.48 details on ENERGY USAGE COMPARISON For Bill Period This Year Feb -Mar No. of days 29 KWH use 45600 Avg. KWH use per day 1572.4 Avg. temp. per day 45F Last Year Change 29 56100 1934.5 40F 0 -10500 -362.1 5F For Information, emergencles, to report an outage or for changes to your account, please call 1-888- 225.5773. When paying In person, please present both portions. When mailing remittance, please man to Puget Sound Energy, BOT-01H, P.O. Box 91269, Bellevue, WA 96009-0289 Please detach here T and return this portion with your payment • PUGET SOUND ENERGY rn.aiwar>bDow.rMOWS 6300 SOUTHCENTER BLVD, TUKWILA Current Bill Due Date Apr 15, 2010 Account: 888-584-103-4 Yes, I want to give $ * *B004 I,111.11 1I,,11111111i I 111111 111111 I,,, L „11, „I, „I, I 6300 BUILDING B C 0 REAL ESTATE INC PO BOX 16332 SEATTLEWA 98116-0332 Total Amount Due $5,257.52 to the Warm Home Fund. Please Energy payable to Puget Sound Energy BOT 01 H P.O. Box 91269 Bellevue, WA 98009 -9269 888586359 0001 01 00008885841034 000000525752 000000525752 Customer 6300 BUILDING Electric Detail: Rate/ Dates Page 2* of 2 Account No. 888-584-103-4 Meter Number 6300 SOUTHCENTER BLVD, TUKWILA IR Pres ead I R Prey ead I Date I Date I Mult i sage) I Demand I Hours I Code I 24E -C Z020486410 32606 29400 03/25 02/24 02/25/10 03/25/10 Basic Charge 02/25/10 03/25/10 Energy Charge 02/25/10 03/25/10 Electric Conservation Program Charge 02/25/10 03/25/10 Power Cost Adjustment 02/25/10 03/25/10 Wind Power Production Credit 02/25/10 03/25/10 Merger Credit 02/25/10 03/25/10 Effect Of Tukwila City Tax Current Electricity Charges A la late A 3. A 120 C' 100 K H P E R A 20 Y 1 3206 ACTL 3,206 KWHS (a) $.087994 Per KWH 3,206 KWHS (0 $.002417 Per KWH 3,206 KWHS Q $.00 Per KWH 3,206 KWHS $.001534CR Per KWH 3,206 KWHS ® $.000285CR Per KWH $307.53 © $.0667 Per Dollar Amount to fee of 1% will apply to overdue charges, if any. Please see the reverse side for details on payment charges. 873% state utility tax is included in electric rates charged. $23.50 $28211 $7.75 $.00 $4.92CR $.91CR $20.51 $328.04 80 60 40 0 mirse■mi 111111111111111111 1■I■IIIIIlUIi1 1lI■II■IU■■ii1 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 2009 Months 2010 ENERGY USAGE COMPARISON For 9111 Perlod This Year Last Year Change Feb -Mar No. of days 29 29 KWH use 3206 2114 Avg. KWH use per day 110.6 72.9 Avg. temp. per day 45F 40F 0 1092 37.7 5F For information, emergencies, to report an outage or for changes to your account, please call 1- 888 -225 -5773. $5,044.31 I Customer 6300 BUILDING. STATEMENT SUMMARY AS OF APR 27, 2010 Account No. Balance as of last billing Thank you for your payment(s) Balance Forward Current Charges CURRENT TOTAL AS OF APR 27, 2010 Page 1 of 3 888. 584-1034 Account Balance $5,257.52 $5,257.52CR $.00 $5,044.31 $5,044.31 Statement Due Date May 17, 2010 I AMOUNT DUE THIS STATEMENT For information, emergencies, to report an outage or for changes to your account, please call 1-888- 225 -5773. When paying In person, please present both portions. Whon malting remittance, please ma8 to Puget Sound Energy, BOT -01H, P.O. Box 91269, Bellevue, WA 980094289 Please detach here T and return this portion with your payment 6300 SOUTHCENTER BLVD, TUKWILA • PUGET SOUND ENERGY Account: 888 - 584103.4 Current Bill Due Date 7.E.fo'1bpecuwi"g May 17, 2010 Yes, I want to give $ to the Warm Home Fund. * *B004 I,I,ILd,,,dL,,II•II,JI 6300 BUILDING B C 0 REAL ESTATE INC PO BOX 16332 SEATTLEWA 98116-0332 Total Amount Due $5,044.31 Please make checks payable to Puget Sound Energy Puget Sound Energy BOT 01H P.O. Box 91269 Bellevue, WA 98009 -9269 888583538 0001 01 00008885841034 000000504431 000000504431 Customer 6300 BUILDING • Electric Detail: IRate'I Dates Page 2 of 3 Account No. 888 - 584-103 -4 6300 SOUTHCENTER BLVD, TUKWILA Meter Pres Prev Pres Prev Number I Read I Read 1 Date I Date 25E -C -KV Z007103923 04/22 25E-C-KV Z007103923 02698 02612 04/26 03/24 25E -C-KV Z007103923 05002 04835 04/26 03/24 03/26/10 03/31/10 Basic Charge 03/26/10 03/31/10 Energy Charge 03/26/10 03/31/10 Energy Charge 03/26/10 03/31/10 Demand Charge 03/26/10 03/31/10 Demand Charge 03/26/10 03/31/10 Reactive Power Charge 03/26/10 03/31/10 Electric Conservation Program Charge 03/26/10 03/31/10 Power Cost Adjustment 03/26/10 03/31 /10 Wind Power Production Credit 03/26/10 03/31/10 Merger Credit 03/26/10 03/31/10 Effect Of Tukwila City Tax IMult I (Usage) I Demand I Hours I Code I 04/01/10 04/07/10 Basic Charge 04/01/10 04/07/10 Energy Charge 04/01/10 04/07/10 Energy Charge 04/01/10 04/07/10 Demand Charge 04/01/10 04/07/10 Demand Charge 04/01/10 04/07/10 Reactive Power Charge 04/01/10 04/07/10 Electric Conservation Program Charge 04/01/10 04/07/10 Power Cost Adjustment 04/01/10 04/07/10 Wind Power Production Credit 04/01/10 04/07/10 Merger Credit 04/01/10 04/07/10 Effect Of Tukwila City Tax 04/08/10 04/26/10 Basic Charge 04/08/10 04/26/1D Energy Charge 04/08/10 04/26/10 Energy Charge 04/08/10 04/26/10 Demand Charge 04/08/10 04/26/10 Demand Charge 04/08/10 04/26/10 Reactive Power Charge 04/08/10 04/26/10 Electric Conservation Program Charge 04/08/10 04/26/10 Power Cost Adjustment 04/08/10 04/26/10 Wind Power Production Credit 04/08/10 04/26/10 Merger Credit 04/08/10 04/26/10 Effect Of Tukwila City Tax 300 300 300 50100 132.6 ACTL 25800 PRRT PRRT 3,750 KWHS @ 0.088822 Per KWH 5,643.75 KWHS @ $.064135 Per KWH 50 KW @ 0.00 Per KW 82.6 KW @ $8.72 Per KW 4,837.5 KVRH @ $.00274 Per KVRH 9,393.75 KWHS @ $.002397 Per KWH 9,393.75 KWHS @ $.00 Per KWH 9,393.75 KWHS @ $.001505CR Per KWH 9,393.75 KWHS @ $.000192CR Per KWH $859.30 @ $.0667 Per Dollar Charge Total 4,375 KWHS @ $.080948 Per KWH 6,584.38 KWHS @ $.064135 Per KWH 50 KIN @$.00Per KW 82.6 KW @ $5.81 Per KW 5,643.75 KVRH @ $.00274 Per KVRH 10,959.38 KWHS @ $.003972 Per KWH 10,959.38 KWHS @ 0.00 Per KWH 10,959.38 KWHS @ $.001505CR Per KWH 10,959.38 KWHS @ $.000192CR Per KWH $932.76 @ $.0667 Per Dollar Charge Total 11,875 KWHS @ $.083376 Per KWH 17,871.88 KWHS @ $.066424 Per KWH 50 KW @ $.00 Per KW 82.6 KW @ $5.86 Per KW 15,318.75 KVRH @ $.00276 Per KVRH 29,746.88 KWHS @ $.003972 Per KWH 29,746.88 KWHS @ $.00 Per KWH 29,746.88 KWHS @ $.001505CR Per KWH 29,746.88 KWHS @ $.000192CR Per KWH $2,604.49 @ $.0667 Per Dollar Charge Total Amount Current Electricity Charges $4,689.81 On April 08, 2010, a rate change became effective. Your usage charges for the periods before and after this date were calculated separately and are shown in separate sections, since these periods were billed at different rates. $9.38 $33308 $361.96 0.00 $13505 $13.25 $2252 $.00 $14.14CR $1.80CR $57.32 $916.62 $10.94 $35415 $42229 0.00 $10498 $15.46 $43.53 0.00 $16.49CR $210CR $62.22 $994.98 $29.93 $99009 $1;187.12 $.00 $287.40 $42.28 $118.15 $.00 $44.77CR $5.71CR $17372 $2,778.21 (Copies of the rate schedules are available upon request. A late fee of 1% will apply to overdue charges, if any. Please see the reverse side for details on late payment charges. A 3.873% state utility tax is included in electric rates charged. A 2000 G K 1500 w H P E R 'D A lobo 500 0 inumnum IIIIIII.IIIIiii Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2009 Months 2010 ENERGY USAGE COMPARISON For B81 Period This Year Last Year Change Mar-Apr No. ofda s 32 29 KWH use 50100 47400 Avg. KWH use per day 1565.6 1634.5 Avg. temp. per day 47F 46F 3 2700 -68.9 1F For information, emergencies, to report an outage or for changes to your account, please call 1-888- 225 -5773. Custorner 6300 BUILDING • • Electric Detail: Rate/ Dates Page 3 of 3 Account No. 888 - 584103 -4 Meter Number 6300 SOUTHCENTER BLVD, TUKWILA IR Pres Prey ead Read I Date I Date I Mult I swage) I Demand I Hours I Code I 24E-C Z020486410 36055 32606 04/26 03/25 03/26/10 03/31/10 Basic Charge 03/26/10 03/31/10 Energy Charge 03/26/10 03/31/10 Electric Conservation Program Charge 03/26/10 03/31/10 Power Cost Adjustment 03/26/10 03/31/10 Wind Power Production Credit 03/26/10 03/31/10 Merger Credit 03/26/10 03/31/10 Effect Of Tukwila City Tax 04/01/10 04/07/10 04/01/10 04/07/10 04/01/10 04/07/10 04/01/10 04/07/10 04/01/10 04/07/10 04/01/10 04/07/10 04/01/10 04/07/10 04/08/10 04/26/10 04/08/10 04/26/10 04/06/10 04/26/10 04/08/10 04/26/10 04/08/10 04/26/10 04/08/10 04 /26/10 04/08/10 04 /26/10 Basic Charge Energy Charge Electric Conservation Program Charge Power Cost Adjustment Wind Power Production Credit Merger Credit Effect Of Tukwila City Tax Basic Charge Energy Charge Electric Conservation Program Charge Power Cost Adjustment Wind Power Production Credit Merger Credit Effect Of Tukwila City Tax Current Electricity Charges On April 08, 2010, a rate change became effective. after this date were calculated separately and are were billed at different rates. 1 3449 PRRT 648.69 KWHS @ $.087994 Per KWH 646.69 KWHS @ $.002417 Per KWH 646.69 KWHS © $.00 Per KWH 646.69 KWHS @ $.001534CR Per KWH 646.69 KWHS @ $.000285CR Per KWH $61.70 @ $.0667 Per Dollar Charge Total 754.47 KWHS @ $.085029 Per KWH 754.47 KWHS @ $.003981 Per KWH 754.47 KWHS © $.00 Per KWH 754.47 KWHS @ $.001534CR Per KWH 754.47 KWHS @ $.000285CR Per KWH $70.91 @ $.0667 Per Dollar Charge Total 2,047.84 KWHS © $.088475 Per KWH 2,047.84 KWHS @ $.003981 Per KWH 2,047.84 KWHS © $.00 Per KWH 2,047.84 KWHS @ $.001534CR Per KWH 2,047.84 KWHS @ $.000285CR Per KWH $199.72 @ $.0667 Per Dollar Charge Total Amount $4.41 $56.90 $1.56 $.00 $.99CR $.18CR $4.12 $65.82 $5.14 $64.15 $3.00 $.00 $1.16CR $.22CR $4.73 $75.64 $14.11 $181.18 $&15 $.00 $3.14CR $.58CR $13.32 $213.04 $35450 Your usage charges for the periods before and shown in separate sections, since these periods (Copies of the rate schedules are available upon request. A late fee of 1% will apply to overdue charges, if any. Please see the reverse side for details on late payment charges. A 3.873% state utility tax Is included in electric rates charged. A V G K w H E R D A Y 120 100 80 80 40 20 0 Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2009 Months 2010 111 1111111 11111111 i■I■IIIUIIIii1 1■IUI■■■■■I■i1 ENERGY USAGE COMPARISON For BM Period This Year Last Year Change Mar -Apr No. of days KWH use Avg. KWH use per day Avg. temp. per day 32 3449 107.8 47F 29 2310 79.7 46F 3 1139 28.1 IF For information, emergencies, to report an outage or for changes to your account, please call 1- 888 -225 -5773. $4,164.86 1 1 1 Customer 6300 BUILDING STATEMENT SUMMARY AS OF MAY 26, 2010 Account No. Balance as of last billing Thank you for your payment(s) Balance Forward Current Charges CURRENT TOTAL AS OF MAY 26, 2010 Page 1 of 3 888. 584103 -4 Account Balance $5,044.31 $5,044.31 CR $.00 $4,164.86 $4,164.86 Statement Due Date Jun 16, 2010 AMOUNT DUE THIS STATEMENT Your electric bill, effective May 1, includes a new line item, Regulatory Asset Tracker, related to charges associated with a generating plant previously included in the Energy Charge. This transfer does not affect the total rate you pay for electricity For Information, emergencies, to report an outage or for changes to your account, please call 1- 888 -225 -5773. When paying In person, please present both portions. When mailing remittance, please mall to Puget Sound Energy, BOT -01H, P.O. Box 91269, Bellevue, WA 98009-0269 Please detach here T and return this portion with your payment PUGET SOUND ENERGY Account: 888 - 584103 -4 Te. Enemy lbDo Gnu Things 6300 SOUTHCENTER BLVD, TUKWILA Current Bill Due Date Jun 16, 2010 Yes, I want to give $ to the Warm Home Fund. * *B004 111111 111111111111111111111 11111111111 11111111111111111 6300 BUILDING B C 0 REAL ESTATE INC PO BOX 16332 SEATTLEWA 98116-0332 Total Amount Due $4,164.86 Please make checks payable to Puget Sound Energy Puget Sound Energy BOT 01 H P.O. Box 91269 Bellevue, WA 98009 -9269 888587343 0001 01 00008885841034 000000416486 000000416486 Customer 6300 BUILDING • Page 2 of 3 Account No. 888 - 584103 -4 Electric Detail: Rate/ Dates • Meter Number 6300 SOUTHCENTER BLVD, TUKWILA Pres Read Prev Read Pres I Prev Date Date Mult KWH (Usage) BUI Demand KVAR Hours Code Amount 25E -C-KV 2007103923 05/25 300 127.2 ACTL 25E -C -KV Z007103923 02766 02698 05/25 04/26 300 20400 ACTL 25E -C-KV Z007103923 05134 05002 05/25 04/26 300 39600 ACTL 04/27/10 04/30/10 Basic Charge $6.95 80.00 04/27/10 04/30/10 Energy Charge 2,758.6 KWHS @ $.083376 Per KWH $23 04/27/10 04/30/10 Energy Charge 2,703.43 KWHS @ $.066424 Per KWH $1757 04/27/10 04/30/10 Demand Charge 50 KW @ $.00 Per KW $.00 04/27/10 04/30/10 Demand Charge 77.2 KW @ $5.86 Per KW $62.40 04/27/10 04/30/10 Reactive Power Charge 2,813.77 KVRH @ $.00276 Per KVRH $7,77 04/27/10 04/30/10 Electric Conservation Program Charge 5,462.03 KWHS @ $.003972 Per KWH 5,462.03 KWHS @ $.00 Per KWH $2$.00 1,70 04/27/10 04/30/10 Power Cost Adjustment 04/27/10 04/30/10 Wind Power Production Credit 5,462.03 KWHS @ $.001505CR Per KWH $8.22CR 04/27/10 04/30/10 Merger Credit 5,462.03 KWHS @ $.000192CR Per KWH $1.05CR 04/27/10 04/30/10 Effect Of Tukwila City Tax $499.12 @ $.0667 Per Dollar $33.29 Charge Total $532.41 05/01/10 05/25/10 Basic Charge $43.46 05/01/10 05/25/10 Energy Charge 17,241.4 KWHS @ $.081614 Per KWH $1,407.14 05/01/10 05/25/10 Energy Charge 16,896.57 KWHS @ $.064662 Per KWH $1,09257 05/01/10 05/25/10 Demand Charge 50 KW @ $.00 Per KW $.00 05/01/10 05/25/10 Demand Charge 77.2 KW @ $5.86 Per KW $38399 05/01/10 05/25/10 Reactive Power Charge 17,586.23 KVRH @ $.00276 Per KVRH 05/01/10 05/25/10 Electric Conservation Program $48.54 05/01/10 05/25/10 Power Cost Adjustmentrogram Charge 34,137.97 KWHS @ $.00 Per Per KWH $13 .00 05/01/10 05/25/10 Wind Power Production Credit 34,137.97 KWHS @ $.00 505 R Per KWH $.38 05/01/10 05/25/10 Merger Credit 34,137.97 KWHS @ $.000192CR Per KWH $51.38CR 05/01/10 05/25/10 Regulatory Asset Tracker 34,137.97 KWHS @ $.001762 Per KWH $60.15 R 05/01/10 05/25/10 Effect Of Tukwila City Tax $3,119.52 © $.0667 Per Dollar $20&07 Charge Total $3,327.59 Current Electricity Charges $3,860.00 On May 01, 2010, a change to your bill became effective. Your usage charges for the periods before and after this date were calculated separately and are shown in separate sections, since these periods were billed differently. (Copies of the rate schedules are available upon request. A late fee of 1% will apply to overdue charges, if any. Please see the reverse side for details on late payment charges. A 3.873% state utility tax is included in electric rates charged. 2000 A v G K w H P R D A Y 1500 1000 500 0 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2009 Months 2010 ENERGY USAGE COMPARISON For Bill Period This Year Last Year Change r -May o. of days 29 33 -4 KWH use 39600 45600 -6000 Avg. KWH use per day 1365.5 1381.8 -16.3 Avg. temp. per day 51F 53F -2F For information, emergencies, to report an outage or for changes to your account, please call 1- 888 -225 -5773. Customer 6300 BUILDING • Page 3 of 3 Account No. 888 - 584-103 -4 Electric Detail: 6300 SOUTHCENTER BLVD, TUKWILA Rate/ Dates Meter Number Pres I Prev Read I Read Pres Date Prev Date Mult KWH I BM (Usage) Demand KVAR Hours Code Amount 24E-C Z020486410 38946 36055 05/25 04/26 1 2891 ACTL 04/27/10 04/30/10 Basic Charge $3 28 04/27/10 04/30/10 Energy Charge 398.76 KWHS © $.088475 Per KWH $35.28 04/27/10 04/30/10 Electric Conservation Program Charge 398.76 KWHS © $.003981.Per KWH $1.59 04/27/10 04/30/10 Power Cost Adjustment 398.76 KWHS © $.00 Per KWH $.00 04/27/10 04/30/10 Wind Power Production Credit 398.76 KWHS © $.001534CR Per KWH $.61CR 04/27/10 04/30/10 Merger Credit 398.76 KWHS © $.000285CR Per KWH $.11CR 04/27/10 04/30/10 Effect Of Tukwila City Tax $39.43 © $.0667 Per Dollar $2.63 Charge Total $42.06 05/01/10 05/25/10 Basic Charge $20.48 05/01/10 05/25/10 Energy Charge 2,492.24 KWHS @ $.085963 Per KWH $214.24 05/01/10 05/25/10 Electric Conservation Program Charge 2,492.24 KWHS @ $.003981 Per KWH $9.92 05/01/10 05/25/10 Power Cost Adjustment 2,492.24 KWHS ® $.00 Per KWH $.00 05/01/10 05/25/10 Wind Power Production Credit 2,492.24 KWHS ® $.001534CR Per KWH $3.82CR 05/01/10 05/25/10 Merger Credit 2,492.24 KWHS © $.000285CR Per KWH $.71CR 05/01/10 05/25/10 Regulatory Asset Tracker 2,492.24 KWHS © $.002512 Per KWH $6.26 05/01/10 05/25/10 Effect Of Tukwila City Tax $246.37 $.0667 Per Dollar $16.43 Charge Total $262.80 Current Electricity Charges $304.86 On May 01, 2010, a change to your bill became effective. Your usage charges for the periods before and after this date were calculated separately and are shown in separate sections, since these periods were billed differently. 'Copies of the rate schedules are available upon request. A'Iate fee of 1% will apply to overdue charges, if any. Please see the reverse side for details on late payment charges. A'3.873% state utility tax is Included in electric rates charged. A 120 V C' 100 H 80 P 80 40 R D 20 Y 0 111111111111111111 111111111111111111111 1■IIu1111101iu11 1■i■U11u■1i11ui1 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2009 Months 2010 ENERGY USAGE COMPARISON For BM Period This Year Last Year Change Apr-May No. of days 29 33 -4 KWH use 2891 3318 -427 Avg. KWH use per day 99.7 100.5 -.8 Avg. temp. per day 51F 53F -2F For information, emergencies, to report an outage or for changes to your account, please call 1- 888- 225 -5773. Customer 6300 BUILDING• STATEMENT SUMMARY AS OF JUN 25, 2010 Balance as of last billing Thank you for your payment(s) Balance Forward Current Charges CURRENT TOTAL AS OF JUN 25, 2010 Account No. Page 1 of 2 888 - 584 -103 -4 Account Balance $4,164.86 $4,164.86CR $.00 $4,210.90 $4,210.90 Statement Due Date Jul 16, 2010 Electric Detail: IRate/ I Meter Dates Number AMOUNT DUE THIS STATEMENT $4,210.90 6300 SOUTHCENTER BLVD, TUKWILA IRead I Read I Date I Date I Mutt I swage) I Demand I Hours I Code 25E -C-KV Z007103923 25E -C-KV Z007103923 02836 25E -C-KV Z007103923 05268 05/26/10 06/24/10 Basic Charge 05/26/10 06/24/10 Energy Charge 05/26/10 06/24/10 Energy Charge 05/26/10 06/24/10 Demand Charge 05/26/10 06/24/10 Demand Charge 05/26/10 06/24/10 Reactive Power Charge 05/26/10 06/24/10 Electric Conservation Program Charge 05/26/10 06/24/10 Power Cost Adjustment 05/26/10 06/24/10 Wind Power Production Credit 05/26/10 06/24/10 Merger Credit 05/26/10 06/24/10 Regulatory Asset Tracker 05/26/10 06/24/0 Effect Of Tukwila City Tax Current Electricity Charges A late fee of 1% will apply to overdue charges, if a late payment charges. A 3.873% state utility tax is included in electric rates c A 2000 v G K '1500 H 06/23 02766 06/23 05/25 05134 06/23 05/25 P 1000 R 500 D A Y 0 Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 2009 Months 2010 300 300 300 40200 131.4 ACTL 21000 ACTL ACTL Amount 20,000 KWHS © $.081614 Per KWH $1,632263 20,200 KWHS @ $.064662 Per KWH 27 8 50 KW @$.00Per KW $1,30fi00 81.4 KW @ $5.86 Per KW 7.00 21,000 KVRH © $.00276 Per KVRH $$57.96 40,200 KWHS @ $.003972 Per KWH $57.67 40,200 KWHS @ $.00 Per KWH $15 $.00 40,200 KWHS @ $.001505CR Per KWH $.00 40,200 KWHS © $.000192CR Per KWH $$7.72CR 40,200 KWHS © $.001762 Per KWH $7.72CR $70.83 $3,686.10 @ $.0667 Per Dollar $24586 $3,93t96 ny. Please see the reverse side for details on harged. ENERGY USAGE COMPARISON For Bill Period This Year Last Year May -Jun No. of days 30 KWH use 40200 Avg. KWH use per day 1340 Avg. temp. per day 55F Change 29 1 44100 -3900 1520.7 -180.7 64F -9F For Information, emergencies, to report an outage or for changes to your account, please call 1-888- 225 -5773. When paying In person, please present both portions. When matting remittance, please mall to Puget Sound Energy, BOT-01H, P.O. Box 91269, Bellevue, WA 09009 -9269. Please detach here T and return this portion with your payment 6300 SOUTHCENTER BLVD, TUKWILA • PUGET SOUND ENERGY Account: 888 - 584 -103 -4 ID. Env, rb Do Gnat nwm Current BM Due Date Jul 16, 2010 Yes, I want to give $ to the Warm Home Fund. * *B004 1111111111111111111111111111 Ilrrrlirrrlrirrllrrrl,lrrl�l 6300 BUILDING B C 0 REAL ESTATE INC PO BOX 16332 SEATTLE WA 98116-0332 Total Amount Due $4,210.90 Please make checks payable to Puget Sound Energy Puget Sound Energy BOT -01H P.O. Box 91269 Bellevue, WA 98009 -9269 888586877 0001 01 00008885841034 000000421090 000000421090 Customer 6300 BUILDING • Electric Detail: I Rate/ Dates Page 2 of 2 Account No. 888 - 584-103 -4 . Meter Number 6300 SOUTHCENTER BLVD, TUKWILA Pres I Prev Read Read Pres Date Prev Date MuIt KWH (Usage) Bit Demand KVAR Hours Code Amount 24E-C 2020486410 41569 38946 06/23 05/25 05/26/10 06/24/10 Basic Charge 05/26/10 06/24/10 Energy Charge 05/26/10 06/24/10 Electric Conservation Program Charge 05/26/10 06/24/10 Power Cost Adjustment 05/26/10 06/24/10 Wind Power Production Credit 05/26/10 06/24/10 Merger Credit 05/26/10 06/24/10 Regulatory Asset Tracker 05/26/10 06/24/10 Effect Of Tukwila City Tax Current Electricity Charges 1 2623 ACTL 2,623 KWHS Q $.085963 Per KWH 2,623 KWHS © $.003981 Per KWH 2,623 KWHS © $.00 Per KWH 2,623 KWHS $.001534CR Per KWH 2,623 KWHS ( $.000285CR Per KWH 2,623 KWHS $.002512 Per KWH $261.50 $.0667 Per Dollar A late fee of 1% will apply to overdue charges, if any. Please see the reverse side for details on late payment charges. A 3.873% state utility tax Is included in electric rates charged. 120 100 80 60 40 20 $23.76 $22548 $10.44 $.00 $4.02CR $.75CR $6.59 $17.44 $278.94 A v G K w H E R D A Y . 0 Jun JUI Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 2009 Months 2010 [11111■■■■■■■ ■1 1■.IiiI ■■-i�■IIi1 11111111111111111111111111 1■I■iRIrIiI■ ■1 ENERGY USAGE COMPARISON For BM Period Th Is Year Last Year Change May -Jun No. of days 30 KWH use 2623 Avg. KWH use per day 87.4 Avg. temp. per day 55F 29 1 2282 341 78.7 8.7 64F -9F For information, emergencies, to report an outage or for changes to your account, please call 1-888- 225 -5773. i $5,326.54 I Customer 6300 BUILDING• • STATEMENT SUMMARY AS OF JUL 27, 2010 Balance as of last billing Thank you for your payment(s) Balance Forward Current Charges CURRENT TOTAL AS OF JUL 27, 2010 Page 1 of 3 Account No. 888 - 584-103 -4 Account Balance $4,210.90 $4,210.90CR $.00 $5,326.54 $5,326.54 Statement Due Date Aug 16, 2010 AMOUNT DUE THIS STATEMENT Due to the setting of the 'Wind Power Production Credit" to zero, your electric bill this month reflects an increase averaging 1.65 percent, effective July 1. For Information, emergencies, to report an outage or for changes to your account, please call 1-888- 225 -5773. When paying In person, please present both portions. When mailing remittance, please map to Puget Sound Energy, BOT-01H, P.O. Box 91269, Bellevue, WA 98008.9269 Please detach here T and return this portion with your payment • 6300 SOUTHCENTER BLVD, TUKWILA Current Bill Due Date Aug 16, 2010 PUGET SOUND ENERGY Account: 888 - 584103.4 The Emory lb Do ono minas Yes, I want to give $ * *B004 I, 111 1 111,111 I I I, 1 111 I I Ili I III„ 1111 III 111111 1111 111111 6300 BUILDING B C O REAL ESTATE INC PO BOX 16332 SEATTLE WA 98116-0332 Total Amount Due $5,326.54 to the Warm Home Fund. Please checks to Puget Sound Energy BOT -01 H P.O. Box 91269 Bellevue, WA 98009 -9269 888582768 0001 01 00008885841034 000000532654 000000532654 Customer 6300 BUILDING • • Page 2 of 3 Account No. 888- 584103 -4 Electric Detail: Rate/ Dates 6300 SOUTHCENTER BLVD, TUKWILA Meter Number Pres Read Prev Read Pres Date Prev Date Mutt I KWH (Usage) BM Demand 25E -C-KV Z007103923 07/23 25E -C-KV Z007103923 02926 02836 07/26 06/23 25E -C-KV Z007103923 05438 05268 07/26 06/23 06/25/10 06/30/10 Basic Charge. 06/25/10 06/30/10 Energy Charge 06/25/10 06/30/10 Energy Charge 06/25/10 06/30/10 Demand Charge 06/25/10 06/30/10 Demand Charge 06/25/10 06/30/10 Reactive Power Charge 06/25/10 06/30/10 Electric Conservation Program Charge 06/25/10 06/30/10 Power Cost Adjustment 06/25/10 06/30/10 Wind Power Production Credit 06/25/10 06/30/10 Merger Credit 06/25/10 06/30/10 Regulatory Asset Tracker 06/25/10 06/30/10 Effect Of Tukwila City Tax 07/01/10 07/26/10 Basic Charge 07/01/10 07/26/10 Energy Charge 07/01/10 07/26/10 Energy Charge 07/01/10 07/26/10 Demand Charge 07/01/10 07/26/10 Demand Charge 07/01/10 07/26/10 Reactive Power Charge 07/01/10 07/26/10 Electric Conservation Program Charge 07/01/10 07/26/10 Power Cost Adjustment 07/01/10 07/26/10 Wind Power Production Credit 07/01/10 07/26/10 Merger Credit 07/01/10 07/26/10 Regulatory Asset Tracker 07/01/10 07/26/10 Effect Of Tukwila City Tax 300 300 300 51000 KVAR I Code I Hours 168 ACTL 27000 PRRT PRRT 3.750 KWHS @ $.081614 Per KWH 5,812.5 KWHS @ $.064662 Per KWH 50 KW @$.00 Per KW 118 KW @$5.86 Per KW 5,062.5 KVRH @ $.00276 Per KVRH 9,562.5 KWHS @ $.003972 Per KWH 9,562.5 KWHS @ $.00 Per KWH 9,562.5 KWHS @ $.001505CR Per KWH 9,562.5 KWHS @ $.000192CR Per KWH 9,562.5 KWHS @ $.001762 Per KWH $873.57 @ $.0667 Per Dollar Charge Total 16,250 KWHS @ $.081614 Per KWH 25,187.5 KWHS @ $.064662 Per KWH 50 KW @ $.00 Per KW 118 KW @$5.86 Per KW 21,937.5 KVRH @ $.00276 Per KVRH 41,437.5 KWHS @ $.003972 Per KWH 41,437.5 KWHS @ $.00 Per KWH 41,437.5 KWHS @ $.00 Per KWH 41,437.5 KWHS @ $.000192CR Per KWH 41,437.5 KWHS @ $.001762 Per KWH $3,847.88 @ $.0667 Per Dollar Charge Total Amount $9.45 $30605 $37585 $.00 $12965 $13.97 $37.98 $.00 $14.39CR $1.84CR $16.85 $58.27 $931.84 $40.96 $1,32623 $1,62667 $.00 $561.83 $60.55 $16459 $.00 $.00 $7.96CR $73.01 $25 &65 $4,10453 . Current Electricity Charges $5,036.37 On July 01, 2010, a change to your bill became effective. Your usage charges for the periods before and after this date were calculated separately and are shown in separate sections, since these periods were .billed differently. tCopies of the rate schedules are-available upon request. A late fee of 1% will apply to overdue charges, if any. Please see the reverse side for details on late payment charges. A 3.873% state utility tax is included in electric rates charged. A v G K w H P R D A Y 0 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul 2009 • Months 2010 ENERGY USAGE COMPARISON For Bill Period This Year Last Year Change Jun -Jul No. of days 32 30 KWH use 51000 47100 Avg. KWH use per day 1593.8 1570 Avg. temp. per day 62F 65F 2 3900 23.8 -3F For information, emergencies, to report an outage or for changes to your account, please call 1-888- 225 -5773. 1. Customer 6300 BUILDING • • Page 3 of 3 Account No. 888 - 584-103 -4 Electric Detail: Rate/ Dates 6300 SOUTHCENTER BLVD, TUKWILA Meter Number Pres I Prev Read Read Pres Date Prev Date MuIt I KWH (Usage) BIII Demand KVAR Hours Code Amount 24E-C Z020486410 44271 41569 07/26 06/23 06/25/10 06/30/10 Basic Charge 06/25/10 06/30/10 Energy Charge 06/25/10 06/30/10 Electric Conservation Program Charge 06/25/10 06/30/10 Power Cost Adjustment 06/25/10 06/30/10 Wind Power Production Credit 06/25/10 06/30/10 Merger Credit 06/25/10 06/30/10 Regulatory Asset Tracker 06/25/10 06/30/10 Effect Of Tukwila City Tax 07/01/10 07/26/10 07/01/10 07/26/10 07/01/10 07/26/10 07/01/10 07 /26/10 07/01/10 07 /26/10 07/01/10 07/26/10 07/01/10 07 /26/10 07/01/10 07 /26/10 Basic Charge Energy Charge Electric Conservation Program Charge Power Cost Adjustment Wind Power Production Credit Merger Credit Regulatory Asset Tracker Effect Of Tukwila City Tax Current Electricity Charges On July 01, 2010, a change to your bill became effective. Your usage charges for the periods before and after this date were calculated separately and are shown in separate sections, since these periods were billed differently. 1 2702 PRRT 506.63 KWHS a© $.085963 Per KWH 506.63 KWHS (a3 $.003981 Per KWH 506.63 KWHS © $.00 Per KWH 506.63 KWHS (a3 $.001534CR Per KWH 506.63 KWHS ® $.000285CR Per KWH 506.63 KWHS © $.002512 Per KWH $50.38 © $.0667 Per Dollar Charge Total 2,195.38 KWHS © $.085963 Per KWH 2,195.38 KWHS (d) $.003981 Per KWH 2,195.38 KWHS © $.00 Per KWH 2,195.38 KWHS a0. $.00 Per KWH 2,195.38 KWHS ® $.000285CR Per KWH 2,195.38 KWHS ® $.002512 Per KWH $221.65 © $.0667 Per Dollar Charge Total $4.46 $43.55 $2.02 $.00 $.78CR $.14CR $1.27 $3.36 $53.74 $19.31 $188,72 $&74 $.00 $.00 $.63CR $5.51 $14.78 $23 &43 $290.17 (Copies of the rate schedules are available upon request. A late fee of 9% will apply to overdue charges, if any. Please see the reverse side for details on late payment charges. A 3.873% state utility tax is included in electric rates charged. A v G K w H P E R D A Y 120 100 80 eo 40 20 0 11111111911111 1u,.I,,..,„„1 11111111111111111111111 ' . 11111111111111111111 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul 2009 Months 2010 ENERGY USAGE COMPARISON For Bill Period Jun -Jul No. of days KWH use Avg. KWH use per day Avg. temp. per day This Year Last Year Change 32 2702 84.4 62F 30 2370 79 65F 2 332 5.4 -3F For information, emergencies, to report an outage or for changes to your account, please call 1- 888 -225 -5773. $4,726.99 I Customer 6300 BUILDING STATEMENT SUMMARY AS OF AUG 26, 2010 Balance as of last billing Thank you for your payment(s) Balance Forward Current Charges CURRENT TOTAL AS OF AUG 26, 2010 • Account No. Page 1 of 2 888-584-103-4 Account Balance $5,32654 $5,326.54CR $.00 $4,726.99 $4,726.99 Statement Due Date Sep 16, 2010 Electric Detail: Rate/ Dates I Meter Number I AMOUNT DUE THIS STATEMENT 6300 SOUTHCENTER BLVD, TUKWILA IRead I R Prev ad I Date I Date Mult I sag) I Demand I Hours Code I 25E -C-KV Z007103923 25E -C-KV Z007103923 03008 02926 25E -C-KV Z007103923 05587 05438 07/27/10 08/25/10 Basic Charge 07/27/10 08/25/10 Energy Charge 07/27/10 08/25/10 Energy Charge 07/27/10 08/25/10 Demand Charge 07/27/10 08/25/10 Demand Charge 07/27/10 08/25/10 Reactive Power Charge 07/27/10 08/25/10 Electric Conservation Program Charge 07/27/10 08/25/10 Power Cost Adjustment 07/27/10 08/25/10 Wind Power Production Credit 07/27/10 08/25/10 Merger Credit 07/27/10 08/25/10 Regulatory Asset Tracker 07/27/10 08/25/10 Effect Of Tukwila City Tax 08/24 08/24 07/26 08/24 07/26 Current Electricity Charges A late fee of 1% will apply to overdue charges, if any. late payment charges. A 3.873% state utility tax is included in electric rates charged. A 2000 ._ ....._ _. ..... - _ _..._.. -- G x 1500 W H P R D A Y 300 300 300 44700 153.6 ACTL 24600 ACTL ACTL 20,000 KWHS ® $.081614 Per KWH 24,700 KWHS ® $.064662 Per KWH 50 KW © $.00 Per KW 103.6 KW © $5.86 Per KW 24,600 KVRH @ $.00276 Per KVRH 44,700 KWHS © $.003972 Per KWH 44,700 KWHS (fp $.00 Per KWH 44,700 KWHS ® $.00 Per KWH 44,700 KWHS ® $.000192CR Per KWH 44,700 KWHS © $.001762 Per KWH $4,20257 $.0667 Per Dollar Amount $50.41 $1,63228 $1,597.15 $.00 $607.10 $67.90 $177.55 $.00 $.00 $8.58CR $78,76 $28031 $4,482.88 Please see the reverse side for details on 1000 500 0 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2009 Months 2010 ENERGY USAGE COMPARISON For Bill Period This Year Last Year Jul-Aug No. of days 30 KWH use 44700 Avg. KWH use per day 1490 Avg. temp. per day 64F 32 52200 1631.3 67F Change -2 -7500 -141.3 -3F For Information, emergencies, to report an outage or for changes to your account, please call 1-888- 225 -5773. When paying in person, please present both portions. When mailing remittance, please mail to Puget Sound Energy, BOT -01H, P.O. Box 91269, Bellevue, WA 98009-9269 Please detach here T and return this portion with your payment 6300 SOUTHCENTER BLVD, TUKWILA Current BIII Due Date Sep 16, 2010 • PUGET SOUND ENERGY Account: 888 - 584-103 -4 n»awr m Go Gnat nh,9, Yes,1 want to give $ to the Warm Home Fund. * *B004 hI „I„ I,,,,II,,,II,II„ II IL„II,,,I,I„ II,,,I,I„LI 6300 BUILDING B C O. REAL ESTATE INC PO BOX 16332 SEATTLE WA 98116-0332 Total Amount Due $4,726.99 Please make checks payable to Puget Sound Energy . Puget Sound Energy BOT -01 H P.O. Box 91269 Bellevue, WA 98009 -9269 888582927 0001 01 00008885841034 000000472699 000000472699 Customer 6300 BUILDING Page 2 of 2 Account No. 888-584-103-4 Electric Detail: Rate/ Dates Meter Number 6300 SOUTHCENTER BLVD, Pres Read TUKWILA Prev Read ' Pres Date Prev Date Mutt KWH (Usage) Bill Demand KVAR Hours Code Amount 24E -C 2020486410 46496 44271 08/24 07/26 07/27/10 08/25/10 Basic Charge 07/27/10 08/25/10 Energy Charge 07/27/10 08/25/10 Electric Conservation Program Charge 07/27/10 08/25/10 Power Cost Adjustment 07/27/10 08/25/10 Wind Power Production Credit 07/27/10 08/25/10 Merger Credit 07/27/10 08/25/10 Regulatory Asset Tracker 07/27/10 08/25/10 Effect Of Tukwila City Tax Current Electricity Charges A late fee of 1% will apply to overdue charges, if any. late payment charges. A 3.873% state utility tax is included in electric rates charged. 1 2225 ACTL $23.76 2,225 KWHS © $.085963 Per KWH $191.27 2,225 KWHS © $.003981 Per KWH $8.86 2,225 KWHS ® $.00 Per KWH $.00 2,225 KWHS ® $.00 Per KWH $.00 2,225 KWHS ® $.000285CR Per INVH $.63CR 2,225 KWHS © $.002512 Per KWH $5.59 $228.85 @ $.0667 Per Dollar $15.26 $244.11 Please see the reverse side for details on A v G K w H P E R D A Y 120 100 80 60 40 20 0 uni uRIuI■.■n 111111111111111111 Aug Sep Oct•Nov Dec Jan Feb Mar Apr May Jun Jul Aug 2009 Months 2010 ENERGY USAGE COMPARISON For Bill Period This Year Last Year Change Jul-Aug No. of days 30 32 KWH use 2225 2554 Avg. KWH use per day 74.2 79.8 Avg. temp. per day 64F 67F -2 -329 -5.6 -3F For information, emergencies, to report an outage or for changes to your account, please call 1- 888 - 225 -5773. $4,638.95 I Customer 6300 BUILDING STATEMENT SUMMARY AS OF SEP 27, 2010 Balance as of last billing Thank you for your payment(s) Balance Forward Current Charges CURRENT TOTAL AS OF SEP 27, 2010 Account No. Page 1 of 2 888-584-103-4 Account Balance $4,726.99 $4,726.99CR $.00 $4,638.95 $4,638.95 Statement Due Date Oct 15, 2010 I AMOUNT DUE THIS STATEMENT Electric Detail: Rate/ Dates Meter Number 6300 SOUTHCENTER BLVD, TUKWILA Pres Read Prev Read Pres Prev Date Date Mult 25E -C -KV Z007103923 25E -C-KV Z007103923 03091 25E -C -KV Z007103923 05734 08/26/10 09/24/10 Basic Charge 08/26/10 09/24 /10 Energy Charge 08/26/10 09/24/10 Energy Charge -* 08/26/10 09/24/10 Demand Charge 08/26/10 09/24/10 Demand Charge 08/26/10 09/24/10 Reactive Power Charge 08/26/10 09/24/10 Electric Conservation Program Charge 08/26/10 09/24/10 Power Cost Adjustment 08/26/10 09/24/10 Wind Power Production Credit 08/26/10 09/24/10 Merger Credit 08/26/10 09/24/10 Regulatory Asset Tracker 08/26/10 09/24/10 Effect Of Tukwila City Tax 09/23 03008 09/23 08/24 05587 09/23 08/24 KWH I B81 (Usage) Demand 300 300 300 44100 144.6 KVAR I Code Hours ACTL 24900 ACTL ACTL Amount $50.41 20,000 KWHS @ $.081614 Per KWH $1,63228 24,100 KWHS @ 5.064662 Per KWH $1,55835 50 KW @ $.O0 Per KW $.00 94.6 KW @$5.86 Per KW 24,900 KVRH © $.00276 Per KVRH 44,100 KWHS @ $.003972 Per KWH 44,100 KWHS © $.00 Per KWH 44,100 KWHS @ 5.00 Per KWH 44,100 KWHS @ $.000192CR Per KWH 44,100 KWHS @ $.001762 Per KWH $4,108.52 @ $.0667 Per Dollar Current Electricity Charges A late fee of 1% will apply to overdue charges, if any. Please late payment charges. A 3.873% state utility tax is included in electric rates charged. A 2000 G K 1500 w H P E R D A 1000 500 0 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 2009 Months 2010 iiii imumin immumm 555436 $6&72 $17517 $.00 $.00 $8.47CR 577.70 5274.04 $4,382.56 see the reverse side for details on ENERGY USAGE COMPARISON For Bill Period This Year Last Year Aug -Sep No. of days 30 KWH use 44100 Avg. KWH use per day 1470 Avg. temp. per day 58F 30 45600 1520 61F Change 0 -1500 -50 -3F For Inforrnation,emergencies,to report an outage or for changes to your account, please call 1.888- 225 -5773. When paying In person, please present both portions. When mailing remittance, please mall to Puget Sound Energy, BOT •1H, P.O. Box 91269, Bellevue, WA 980094289 Please detach here T and return this portion with your payment 6300 SOUTHCENTER BLVD, TUKWILA • PUGET SOUND ENERGY Account: 888- 584103.4 m Enemy To Do onto? Mims Yes, I want to give $ Current Bill Due Date Oct 15, 2010 to the Warm Home Fund. * *B004 6300 BUILDING B C 0 REAL ESTATE INC PO BOX 16332 SEATTLEWA 98116-0332 Total Amount Due $4,638.95 Please make checks payable to Puget Sound Energy Puget Sound Energy BOT -01H P.O. Box 91269 Bellevue, WA 98009 -9269 888580799 0001 01 00008885841034 000000463895 000000463895 • Customer 6300 BUILDING Page 2 of 2 Account No. 888-584-103-4 Electric Detail: Rate/ Dates Meter Number 6300 SOUTHCENTER BLVD, TUKWILA Pres I Prev Read I Read Pres Date Prev Date Mult KWH (Usage) BUI Demand 24E-C Z020486410 48846 46496 09/24 08/24 08/26/10 09/24/10 Basic Charge 08/26/10 09/24/10 Energy Charge 08/26/10 09/24/10 Electric Conservation Program Charge 08/26/10 09/24/10 Power Cost Adjustment 08/26/10 09/24/10 Wind Power Production Credit 08/26/10 09/24/10 Merger Credit 08/26/10 09/24/10 Regulatory Asset Tracker 08/26/10 09/24/10 Effect Of Tukwila City Tax Current Electricity Charges KVAR Code Hours Amount 1 2350 ACTL 2,350 KWHS ® $.085963 Per KWH 2,350 KWHS ® $.003981. Per KWH 2,350 KWHS (a $.00 Per KWH 2,350 KWHS ® $.00 Per KWH 2,350 KWHS ® $.000285CR Per KWH 2,350 KWHS (0 $.002512 Per KWH $240.36 © $.0667 Per Dollar A late fee of 1% will apply to overdue charges, if any. Please see the reverse side for details on late payment charges. A 3.873% state utility tax is included in electric rates charged. $23.76 $20201 $9.36 $.00 $.00 $.67CR $5.90 $16.03 $256.39 A V G H P E R D A Y 120 100 80 60 40 20 0 NMI ■■ ■uI 1■I■■■■■■uIm 111111111111111111 1■I■II■■UIIIi1 i■I■I ■I■UII■ ■1 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 2009 Months 2010 ENERGY USAGE COMPARISON For Bill Period This Year Last Year Change Aug -Sep No. of days 30 30 KWH use 2350 2398 Avg. KWH use per day 78.3 79.9 Avg. temp. per day 58F 61F 0 -48 -1.6 -3F For information, emergencies, to report an outage or for changes to your account, please call 1-888-225-5773. • • PE T PLAN REVIEW /R s TING SLIP ACTIVITY NUMBER: EL11 -0275 DATE: 03 -24 -11 PROJECT NAME: CITY OF TUKWILA - GENERATOR SITE ADDRESS: 6300 SOUTHCENTER BL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: Building Division Public Works ❑ Fire Prevention Structural Planning Division ❑ Permit Coordinator n DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: [xi Incomplete DUE DATE: 03 -29-1 1 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES/THURS ROUTING: Please Route Structural Review Required No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Notation: REVIEWER'S INITIALS: DUE DATE: 04-26-11 Not Approved (attach comments) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 Contractors or Tradespeople liter Friendly Page • Electrical Contractor A business licensed by L &I to contract electrical work within the scope of its specialty. Electrical Contractors must maintain a surety bond or assignment of savings account. They also must have a designated Electrical Administrator or Master Electrician who is a member of the firm or a full -time supervisory employee. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Business Type URBAN ELECTRIC 2066868722 Po Box 58328 Seattle WA 98138 King Corporation Parent Company GENESIS 3 INC UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Specialty 1 Specialty 2 603068122 Active URBANE *900RS Electrical Contractor 12/17/2010 12/17/2012 General Unused Business Owner Information Name Role Effective Date Expiration Date WEAVER, MICHAEL A Agent 12/17/2010 WEAVER, MICHAEL W President 12/10/2010 Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 2 American States Insurance Company 6743716 12/10/2010 Until Cancelled $4,000.00 12/17/2010 Assignment of Savings Information No records found for the previous 6 year period Insurance Information No records found for the previous 6 year period Summons /Complaint Information Summons and Complaints are not filed with the department for this contractor type Warrant Information Warrants are not filed with the department for this contractor type https: // fortress .wa.gov /lni /bbip /Print.aspx 04/28/2011 •0 6 csi 1 SYSTE 3ESIG \AT10N5 3V34 -1 V- 6A/7,9,11 3/4 "C,3 #8 � HASH v1ARKS INDICATE THE QUANTA' OF CONDUCTORS ( #12 WIRE UNLESS OTHERWISE NOTED). IF U \MARKED INSTALL 2 #12 IN 1/2 CONDUIT PHASE CONDUCTORS NEUTRAL CONDUCTOR(IF REQUIRED) GROUND CONDUCTOR(IF REQUIRED) PANEL HOME -RUN PANEL /CIRCUIT CONDUIT /CONDUCTORS CONDUIT RUN EXPOSED, ALL CONDUITS 1/2" UNLESS OTHERWISE REQUIRED OR NOTED CONDUIT RUN CONCEALED IN WALLS, ABOVE CEILING, IN FLOOR SLAB OR UNDERGROUND s GENERATOR STANDBY WIRI \G COPPER GROUND WIRE, SIZE AS NOTED CONDUIT TURNED UP CONDUIT TURNED DOWN rW FLEXIBLE CONDUIT, 1/2" UNLESS NOTED OTHERWISE x x CO \DUIT TO BE REMOVED EQUIPMENT TO BE REMOVED (EG. PANELBOARD) EXISTING EQUIPME \T DISTRIBUTION PANEL AS NOTED T TRA \SFORMER, SIZE AND TYPE AS NOTED EQUIPN ENT /DEVICES A 30/20 1 PB JB C RECEPTACLES ONE LI\ E —1111-04— —Q p— DISCON \ECT SWITCH, FUSED, 30= SWITCH RATING, 20 =FUSE RATING DISCONNECT SWITCH, NON- FUSED, 30A UNLESS NOTED OTHERWISE JUNCTION BOX, FIELD SIZED OR AS NOTED GROU \DING PIGTAIL PULLBOX, FIELD SIZED OR AS NOTED EQUIPMENT CONNECTION JU \CTION BOX, SPECIAL. FIELD SIZED OR AS NOTED GE \ERATOR, ALTERNATING CURRENT (VOLTAGE, KW, FREQUENCY AS NOTED) GROUND ROD, SIZE AS SPECIFIED OR NOTED CO \TACTOR, TYPE AS NOTED DUPLEX,20A,120V,1 0,2P,3W, PARALLEL BLADE GROUNDED. FOUR PLEX -2 DUPLEX 20A,10,2P,3W PARALLEL BLADE GROUNDED. DUPLEX, 20A, 120V, 10, 2P, 3W, STRAIGHT B GROUND FAULT CIRCUIT INTERRUPTING. �I 17 'w I irk-; 6.1-11Z11•11 .. Ir ''145r'r''` UTILITY v ETER AVALABLE FAULT CURRENT _ADE, ABBREVIATIONS AC A.F.F. AWG Av1P APPROX ARCH ATS AUTO AUX BOT BLDG CAT CB CLG CTR CKT COL C C.O. CONT CU CT DED DEG D ET DIAM DISC DN DWG EA ELECT EMT ENGR EQUIP EXIST EXTR FDR FIXT FLEX FLR FOIC I-I FURN GEN GRN GND H GT HZ HORIZ HP ALTERNATING CURRENT ABOVE FINISHED FLOOR AMERICAN WIRE GAUGE AMPERE APPROXIMATE ARCHITECT OR ARCHITECTURAL AUTOMATIC TRANSFER SWITCH AUTO v1ATI C AUXILIARY BOTTOM BUILDING CATALOG CIRCUIT BREAKER CEILING CENTER CIRCUIT COLUv1N CONDUIT CONDUIT ONLY CONTINUE COPPER CURRENT TRANSFORMER DEDICATED CIRCUIT DEGREE DETAIL DIAMETER DISCONNECT DOWN DRAWING EAC H ELECTRIC ELECTRICAL METALLIC TUBING ENGINEER EQUIPMENT EXISTING EXTERIOR FEEDER FIXTURE FLEXIBLE FLOOR FURNISHED BY OWNER, INSTALLED BY CONTRACTOR FOOT FURNISH GENERATOR GREEN GROUND HEIGHT HERTZ HORIZONTAL HORSEPOWER PEAK ND CALC INFO JB KW KWH KV LOTH MAINT MFG MAX IV IN MISC MTD NEC NC NIC NO NTS No. OR # OC OD PNL PERP 0 OR PH PVC PWR PF PR QTY RECP REF REQ'D REV RGS RM SECT SHT SPDT SPST SPEC SW SWBD SYS TEL XFMR -YP UG WP W W/ W/0 rioN ORK WORKSHEET T 4/20' Recorded Pe it De Date: Power ;Factor NEC ;I cfjl s m n : Factor Adjusts d Peak Demand Other d Total d 30 Day Peak New Calculated Load Added ect demand sed At Vol New 480 tailed is and Adjtia cots for Q d ay 41Mall ccan 74 oo 105.1 3.72 INFORMATION JUNCTION BOX KI LOWATT KILOWATT HOUR KILOVOLT LENGTH v1AI NTENANCE MANUFACTURER MAXIMUM MINIMUM MISCELANEOUS MOUNTED NATIONAL ELECTRIC CODE NORMALLY CLOSED NOT IN CONTRACT NORMALLY OPEN NOT TO SCALE NUv1BER ON CENTER OUTSIDE DIAMETER PANEL PERCENT PERPENDICU_AR PHASE POLYVINYL CHLORIDE POWER POWER FACTOR PAI R QUANTITY RECEPTACLE REFERENCE REQUIRED REVISION RIGID GALVANIZED STEEL ROOM SECTION SHEET SINGLE POLE DOUBLE THROW SINGLE POLE SINGLE THROW SPECIFICATION SWITCH SWITCHBOARD SYSTEM TELEPHONE TRANSFORMER - YPICAL UNDERGROUND WEATHERPROOF WATT WITH WITH OUT Nt2 KVA KVA KVA KVA KVA Not kVA ►I 4 00V, 3pft a I °Ins:. KVA AMPS Nom l :.,ia c r No e in t See Power onttor rig Repo pr t vide d for goners City throe SEPARATE PERMIT REQUIRED FOR: FA' satanical Dt�rectric•I Q tubing Ulnas Piping City of Tukwila DIVISICIN TO UTILITY TRANSFORMER ^ <17,200 SECONDARY OF TRANSFORMER o� 600/3 O TO REMOTE ANNUNCIATOR PANEL 1 1/2 "C UTILITY METERING N • • G FLAG \OTPS: EQUIPMENT IS FOIL. PROVIDE NEW INCOMING SECTION IN EXISTING SWITCHBOARD WITH NEW 600A /3P MAIN DISCONNECTING MEANS. SERVICE ENTRANCE RATED, 24KAIC v1INIMUM INTERRUPTING RATING. PROVIDE ALL REQUIRED TERMINATION LUGS PER SWITCHBOARD'S MANUFACTURER'S RECOMMENDATION IN ORDER TO ACCOMMODATE WIRING TERMINATION FROM AUTOMATIC TRANSFER SWITCH. / EXISTING INCOMING UTILITY FEEDER IS (4) SETS OF 750Kcmil ALUMINUM. DISCONNECT (2) SETS AND EXTEND THE REMAINING (2) SETS TO NEW SERVICE ENTRANCE BREAKER NOTED IN F_AG NOTE 2. COORDINATE WITH UTILITY FOR REMOVING UNUSED CONDUCTORS BACK TO UTILITY TRANSFORMER. STAND BY GENERATOR RATING AS NOTED. SEE PEA<C DEMAND METERING CALCU_ATION. SUPPLIED GENERATOR CIRCUIT BREAKER RATED AT 35KAIC INTERRUPTING RATING. (2) SETS OF 3 "C, 4 #350 KCMIL + 1 #2 CU. GND. 600A, 3 POLE ATS, 65KAIC N� WATER PIPE BUILDING STEEL EXISTING 480Y/277V, 30, 4W 1600A SWBD /(2) SETS OF 3 "C, 4 #350 KCMIL + 1 #2 CU GND. 225/3 •• �• • G (1) SET OF 3 "C SPARE WITH PULL STRING, (1) SET OF 3 "C, 4 #4/0 KCMIL + #4 CU GND. STAND BY GENERATOR 150 Kw/188 KVA, 60HZ 48OY/277V. 30, 4W FILE C P F sf No., W.3 %' OX-1 Plan review approval Is Ito env and omission. Approval of constriction documents does not authorize 1h violation of any adopted code or ordinance. Receipt of approved and conditions ISacknowledged: By Date: City Of lUkwtla BUILDING DIVISION PART AL SCALE: NTS REVISIONS No changes shall be made to the scopit of work without prior approval of Tukwila Building Division. NOTI: Revisions will require a new plan submittal and may include additional plan review fees. TO EXISTING BUILDING LOADS 0\ -L D REVIEWED FOR COMPLIANCE WITH NFPA 70 - NEC APR 14 2011 City of Tukwila BUILDING DIVISION AG Pa, ELlIO275 RECEIVED MAR 2 4 2011 PERMIT CENTER JB2E ENCINEERING,LLC'. STANDBY GENERATOR ADDITION REV DATE DESCRIPTION PROJECT MANAGER EA ARCHITECT/ ENGINEER EA DRAWN BY AG DATE 03.21.2011 CHECKED BY EA DATE 03.21.2011 DRAWING TITLE GENERAL NOTES, ABBREVIATIONS AND PARTIAL ONE LINE DIAGRAM DRAWING NO E0.0 JOB NUMBER 1102 DATE 03.21.2011 ) 30'-0” :31'...o" :•• •• 11 1 I I EQUIPMENT STORAGE & REPAIR - 5" NEW ATS NEW REMOTE - ANNUNCIATOR PANEL PLYWOOD BASEBOARD TELEPHONE) ELEVATOR EOUIPMENT,-- ( • ) 27' -0" PULL BOX PNL E- METER PNL P2 ii DISC. SWITCH PNL Al •\, . PNL P3 DISCONNECT SWITCH (MOUNTED IN UNISTRUT) 75KVA TRANSFORMER MI 100A DISC. SWITCH 480Y/277V,30,4W SWITCHBOARD ,30'- 0" 25'.- 0" 6 ) LANDSCAPE: ARE:A ELECTRICAL & MECI-111 SYSTEMS PNL rp PNL "P" 200A DISC. SWITCH 60A DISC. SWITCH PNL HA SECT2 PNL HA SECT1 1 PBI MECHANICAL/SPRINKLER PIPING STORAGE LIGHTING CONTACTOR FOR GARAGE LIGHTS AND POLE PARKING LOT, PARKING GARAGE STORAGE - 0" C Lj P FEEDER TO ATS, AND CONTROL TO GENERATOR REMOTE ANNUNCIATOR PANEL IN ELECTRICAL ROOM BATTERY CHARGER ENGINE JACKET HEATER BASEV=\T PLA\ - PARTIAL EEC-FR CAL SCALE: 1/8"---1'-0" ERAL OTES WP WP GFCI GFCI 150 Kw GENERATOR CIRCUIT BREAKER EL11---0175 1 SEE ONE LINE DIAGRAM FOR WIRING AND CONDUIT SIZE REQUIREMENTS. FLAG \ OTES MOUNT RECEPTACLE ON UNI-STRUT SUPPORT AT +16' AFF. LOCATE UNI-STRUT ON NEW CONCRETE PAD. COORDINATE LOCATION. REVIEWED Foil COMPLIANCE WITH NFPA 70 - NEC APR 1 4 2011 City of Tukwila BUILDING DIVISION MOUNT TIGHT TO PARKING LOT CEILING STRUCTURE. SEE ONE LINE ON SHEET E0.0 FOR RACEWAY AND WIRING REQUIREMENTS. TO ATS AND REMOTE ANNUNCIATOR PANEL. PROVIDE 20A DEDICATED CIRCUIT. PROVIDE DEDICATED CIRCUIT. RECEIVED MAR 24 2011 PERMIT CENTER JB2E ENCINEERING,IIC STANDBY GENERATOR ADDITION REV DATE DESCRIPTION PROJECT MANAGER EA ARCHITECT/ ENGINEER EA DRAWN BY AG DATE 03.21.2011 CHECKED BY EA DATE 03.21.2011 DRAWING TITLE BASEMENT PLAN - PARTIAL ELECTRICAL DRAVANG NO JOB NUMBER 1102 DATE 03.21.2011