Loading...
HomeMy WebLinkAboutPermit M11-064 - BOEING #9-101 - WATERJET RELOCATIONBOEING #9 -101 9725 EAST MARGINAL wys EXPIRED 01 -02 -12 M11-064 City ',Tukwila Department of Communi ' Develo P ment 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: 0003400018 Address: 9725 EAST MARGINAL WY S TUKW Project Name: BOEING #9 -101 - WATERJET RELOCATION Permit Number: M11 -064 Issue Date: 05/24/2011 Permit Expires On: 11/20/2011 Owner: Name: BOEING COMPANY THE Address: PROPERTY TAX DEPT , PO BOX 3707 M/C 20 -00 98124 Contact Person: Name: ALECSIS SMITH Address: 4600 S 134TH PL , SEATTLE WA 98168 Email: alecsiss @holadayparks.com Contractor: Name: HOLADAY PARKS, INC. Address: PO BOX 69208 , SEATTLE, WA 98188 Contractor License No: HOLADPI379NO Phone: 206 - 835 -8287 Phone: 206 248 -9700 Expiration Date: 09/03/2011 DESCRIPTION OF WORK: PIPING UTILITIES FOR RELOCATION OF WATERJET MACHINE IN FACTORY. NEW CHILLED WATER PIPING, COMPRESSED AIR, INSTALLATION OF WATER FILTERS, PUMP .AND CONDENSATE DRAIN PIPING PER PLANS. Value of Mechanical: $44,000.00 Type of Fire Protection: UNKNOWN Electrical Service Provided by: Permit Center Authorized Signature: Fees Collected: $722.56 International Mechanical Code Edition: 2009 LYA Date: C-.)-4--71/1 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this permit. Signature: 1 Date: S-1-<-41 1 Q Print Name: T r' \ 1(.t Q (11 X I This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IMC -4/10 M11-064 Printed: 05 -24 -2011 • • PERMIT CONDITIONS Permit No. M11-064 1: ** *BUILDING DEPARTMENT CONDPITONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements' of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City 'la Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: IMC -4/10 M11 -064 Printed: 05 -24 -2011 CITY OF TUK A Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us Mechanical Permit'No. :ProjectNo. (For officeuse only) " MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *please print ** SITE 'LOCATION King Co Assessor's Tax No.: Site Address: 9725 East Marginal Way S Tenant Name: Boeing 9 -101 Advanced Developmental Composites Property Owners Name: The Boeing Company Mailing Address: PO BOX 3707 Suite Number: New Tenant: Floor: ❑ Yes ..No Seattle WA 98124 City State Zip ,CONTACT PERSON,- -Who•do we contact whenyour:permit is readyito,.be.issued Name: Alecsis Smith Mailing Address: 4600 S. 134th Place Day Telephone: (206) 835 -8287 Seattle WA 98168 E -Mail Address: alecsiss @holadayparks.com City State Fax Number: (206) 248 -8700 Zip MECHANICALtC ©NTRACTOR`JNFORMATION Company Name: HOLADAY- PARKS, Inc. Mailing Address: 4600 S. 134th Place - Seattle, WA 98168 Contact Person: Alecsis Smith E -Mail Address: alecsiss @holadayparks.com Contractor Registration Number: HOLADPI1379NO City State Day Telephone: (206) 835 -8287 Fax Number: (206) 248 -8700 Expiration Date: 09/30/2011 Zip ARCHITECTtOFRECORD' ='All plans•must :be stamped by architect of record Company Name: Mailing Address: City Contact Person: Day Telephone: E -Mail Address: Fax Number: State Zip iENGINEERtOF'RECORD — Allplans must=be,stamped by engineer of record Company Name: Mailing Address: Contact Person: E -Mail Address: H:\Applications\Fonns- Applications On Line\2010 Applications \7 -2010 - Mechanical Permit Application.doc Revised: 7 -2010 bh City Day Telephone: Fax Number: State Zip Page 1 of 2 • 0 Valuation of project (contractor's bid price): $ 44000.00 Scope of work (please provide detailed information): Piping utilities for relocation of Waterjet machine in factory. new chilled water piping, compressed air, installation of water filters, pump and condensate drain piping per plans Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement Fuel Type: Electric ❑ Gas ❑ Other: 3 Indicate type of mechanical work being installed and the quant'ty below: Unit Type:. Qty Unit Type: Qty Unit Type: Qty Bioler /Compressor Qty furnace <100k btu air handling unit >10,000 cfm fire damper 0 -3 hp /100,000 btu furnace >100k btu evaporator cooler diffuser 3 -15 hp /500,000 btu floor furnace ventilation fan connected to single duct thermostat 15 -30 hp /1,000,000 btu suspended/wall /floor mounted heater ventilation system wood/gas stove 30 -50 hp /1,750,000 btu appliance vent hood and duct emergency _generator 50+ hp /1,750,000 btu repair or addition to heat/refrig /cooling system 1 Incinerator — domestic other mechanical equipment 3 air handling unit <10,000 cfm incinerator — comm /ind .PERMIT APPLICATION NOTES Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 international building code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. /2 BUILDING OWNER OR AUTHORIZED AGENT: /%1L, Signature: Date: 05/13/2011 Print Name: Kurt Stefanson Day Telephone: (206) 650 -3884 Mailing Address: 4600 S. 134th Place Seattle WA 98168 City State Zip Date Application Accepted: /9 43/0 Date Application Expires: // //3/// Staff Initials: ( j H:\Applications \Forms - Applications On Line \2010 Applications \7 -2010 - Mechanical Permit Application.doc Revised: 7-2010 bh Page 2 of 2 • C City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.Tukwila WA .gov RECEIPT Parcel No.: 0003400018 Permit Number: M11 -064 Address: 9725 EAST MARGINAL WY S TUKW Status: APPROVED Suite No: Applied Date: 05/13/2011 Applicant: BOEING #9 -101 - WATERJET RELOCATION Issue Date: Receipt No.: R11 -01054 Initials: WER User ID: 1655 Payment Amount: $578.05 Payment Date: 05/24/2011 11:49 AM Balance: $0.00 Payee: HOLADAY PARKS INC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 183300 578.05 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts MECHANICAL - NONRES 000.322.102.00.00 578.05 Total: $578.05 doc: Receiot -06 Printed: 05 -24 -2011 • 411 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206-431-3665 Web site: http: / /www.TukwilaWA.ov RECEIPT Parcel No.: 0003400018 Permit Number: M11 -064 Address: 9725 EAST MARGINAL WY S TUKW Status: PENDING Suite No: Applied Date: 05/13/2011 Applicant: BOEING 9 -101 BLDG Issue Date: Receipt No.: R11 -00980 Initials: User ID: LAW 1632 Payment Amount: $144.51 Payment Date: 05/13/2011 04:19 PM Balance: $578.05 Payee: HOLADAY -PARKS INC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 183275 144.51 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts PLAN CHECK - NONRES 000.345.830 144.51 Total: $144.51 doc: Receiot -06 Printed: 05 -13 -2011 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 p.- (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Pr ct: go e: AC, 5 - 16 1 Type of Inspection: (La u G it 3"-N ate �,�.. Add acs: 972S C. Date Called: Special Instructions: Date Wanted: (0 -II '"r`a p.m. Requester: ---Cr.,----:— PhongN3: r J s/ 1 I Approved per applicable codes. Corrections required prior to approval. COMMENTS: —WS' a 1. ". )•"■‘. ‘(a I ) : ('-' ----7 (7) ---Cr.,----:— 5-z . , SJ { ` r ?� u .- r 15,-1 4) oe) .., ....c., '/ 4/- .fr„ e 7,/i-ey , )i< Inspect` r: ❑ REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. , • INSPECTION RECORD Retain a copy with permit PERMIT NO. INSPECTION NO. MIt' -OA CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 ' • Permit Inspection Request Line (206) 431 -2451 V- • Project: 60-e.d A ( 1'/ (.3 ( Type of Inspection: fen,) / 4 .`7.4 • AAe.-f Addddress: l � q —t'7 2 _ f "'SO�'t Date Called: Special Instructions: �..% IAx'C� p e±, (. A./,‘V n Date Wanted: —..1 ( ��a.m p.m. Requester: Phone No: ott:K. :. ❑ Approved per applicable codes. a Corrections required prior to approval. COMMENTS: AO ". (tee/ td Alre.,- P,' p `"-- . 4, ? �J s � \ -_ W 4 4Ye c rc *--- ,37-- 10(---i \ N-1 — r,i)..0-1 u° J ( C *, 4 t'L..!-e• . 1,fl \\ ( P ` S L f.-&(.4 e I ott:K. :. Inspector: ciALA Date: t r ( ! . • • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director ALECSIS SMITH 4600 S 134TH PL SEATTLE WA 98168 RE: Permit No. M11 -064 BOEING #9-101 - WATERJET RELOCATION 9725 EAST MARGINAL WY S TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 01/02/2012. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 01/02/2012, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. M11-064 R_J._ 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 • a PE if PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M11 -064 DATE: 05 -13 -11 PROJECT NAME: BOEING #9 -101 - WATERJET RELOCATE SITE ADDRESS: 9725 EAST MARGINAL WY S X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: Vu ding iD vision Public Works Aio N /,9- s -■-?-41 Fire Prevention re Structural ❑ Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 05-17-11 Complete Incomplete ❑ Comments: Not Applicable n Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 06-14 -11 Approved Approved with Conditions tal Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 Contractors or Tradespeople Pinter Friendly Page • General /Specialty Contractor A business registered as a construction contractor with LEN to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name HOLADAY PARKS INC UBI No. 578004089 Phone 2062489700 Status Active Address 4600 S 134Th Pl License No. HOLADPI379NO Suite /Apt. License Type Construction Contractor City Seattle Effective Date 1/21/1983 State WA Expiration Date 9/3/2011 Zip 98168 Suspend Date County King Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status HOLADI *00105 HOLADAY PARKS INC Electrical Contractor Hvac /Rfrg Ltd Energy Unused 9/25/2000 4/21/2013 Active HOLADPF376NO HOLADAY PARKS FABRCTRS INC Construction Contractor General Unused 8/20/1963 1/1/1983 Archived Business Owner Information Name Role Effective Date Expiration Date PARKS, GERALD T JR Chief Executive Officer 01/21/1983 Amount BECK, DAVID CLARENCE Vice President 01/21/1983 AlCG96431001 OCONNOR, BONNY K Vice President 01/21/1983 NAILON, JUNE ANNETTE Vice President 01/21/1983 OLD REPUBLIC GENERAL INS VAN DER VEEN, ERIC M Vice President 11/04/2010 NELSON, MICHAEL Secretary 01/01/1980 11/04/2010 PARKS, DAVID L Treasurer 01/01/1980 11/04/2010 TALBOT, PAUL Treasurer 01/01/1980 11/04/2010 Bond Information Page 1 of 2 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 7 LIBERTY MUTUAL INS CO 23000452 09/01/2002 Until Cancelled $12,000.00 08/23/2002 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 23 OLD REPUBLIC GENERAL INS AlCG96431001 11/01/2010 11/01/2011 $1,000,000.00 10/28/2010 22 OLD REPUBLIC GENERAL INS A1CG96430900 11/01/2009 11/01/2010 $1,000,000.00 10/29/2009 21 NATIONAL FIRE INS CO OF HARTFO 2077698833 09/01/2008 11/01/2009 $1,000,000.00 08/26/2009 20 NATIONAL FIRE INS CO OF HAR C2077698833 09/01/2005 09/01/2008 $1,000,000.00 09/02/2005 19 NATIONAL FIRE INS CO OF HART C2077698833 09/01/2004 09/01/2005 $1,000,000.0008 /25/2004 https://fortress.wa.gov/lni/bbip/Print.aspx 05/24/2011 VC\ TY V AP PROJECT SITE FROM DOWNTOWN SEATTLE 900 99 EXIT 158 EXIT 157 EXIT 157 99 EAST MARGINAL WAY CORPORATE PARK FROM SEATTLE — TACOMA AIRPORT 3 -v LOP v 599 TUKWILA \TAL CE \T= R FROM KENT & AUBURN NO SCALE 900 BOEING DEFENSE & SPACE GROUP BUILDING 9 -101 RELOCATE WATERJET BOEING DEVELOPMENTAL CENTER 9725 EAST MARGINAL WAY SOUTH TUKWILA, WASHINGTON 981 - Y PEP ,MIT E,:,EQU RED FOR: 0 Mechanical FEiectrical Ptumbing ttGas Piping City of Tukwila BUILDING DIVISION REVISIONS No changes shall b e made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submitte1 and may inc'ude additional plan revio FILE COPY Permit No., Kt14-0411-1 Plan review approval Is subject to errors and omissions. Approval of construction documents does not authorize tic violation of any adopted code or ordinance. Receipt of approved Field Copy and conditions is acicnowiedged: BY Date.. 111 City C %Awns BUILDING DIVISION AREA V AP G - \ -RAL \OT B LD NC ADDRESS: 9725 -AST VAR' \AL WAY SO T, KW LA, WAS - \GT3\ CONSTRUCTION SET OF DOCUMENTS, REVIEWED AND STAMPED BY CITY OF TUKWILA MUST BE ON SITE DURING CONSTRUCTION. DO NOT PROCEED WITH CONSTRUCTION WITHOUT ABOVE MENTIONED SET OF DOCUMENTS. 1. VERIFY ALL DIMENSIONS AND CONNECTIONS BEFORE ANY WORK. 2. NOTIFY FACILITY ENGINEERS SHOULD EXISTING CONDITIONS REQUIRE DESIGN REVISIONS. 3. COORDINATE WORK WITH OTHER CRAFTS. 4. RETURN THIS SAME SET TO JOHN MURDOCH AT BUILDING 9 -51.2 COLUMN L /1, AFTER COMPLETION OF THIS CONSTRUCTION. PROJECT SITE 9 -78 9 -35 9-52 0 PROJ -CT CHEC KL ST CHECK BOX ■ THESE DRAWINGS CONFORM TO THE 2009 I.B.C., I.F.C., I.P.C., I.M.C., U.P.C. AND THE WAC 51 -20 AS ADAPTED OR AMENDED BY LOCAL ORDINANCES AND COMPLIANCE WITH CITY OF TUKWILA ZONING. • ROOMS _ABELED PER OCCUPANCY PER I.B.C. ❑ BUILDING FLOOR NUMBER ON PRINT FOR AREA OF CONSTRUCTION. ❑ NUMBER OF PRINTS REQUIRED FOR PERNIT PACKAGE: ❑ 1. GENERAL PERMIT (SHELL & CORE) ❑ 4 SETS OF STRUCTUAL REPLACEMENT DRAWINGS ❑ 2. TENANT IMPROVEMENT (NON— STRUCTURAL): ❑ 3. TENANT IMPROVEMENT (REVISION), 2 SETS. ❑ 4. MECHANICAL, 4 COMPLETE SETS. DRAW \G \D-X DRAWING NUMBER SHEET REV DATE TITLE 9- 101 —Al Al A • 08.09.06 TITLE SHEET DATE 4745 E,H a ® ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED ��'�� MOOR �' 09- AUG -06 SUBTITLE TITLE SHEET CURRENT REVISION 11305358 SYMBOL DATE 03.18.1 1 CHECKED CHECKED 9- 101 -1M61 1M61 D 03.17.11 HVAC PIPING — PARTIAL PLAN 9- 101 -1M62 1M62 B 03.17.11 HVAC PIPING — PARTIAL PLAN 9-101-1M112 1M112 N 03.17.11 FIRST FLOOR PLUMBING PLAN i 9- 101- 1M112X 1M112X X 03.17.11 FIRST FLOOR PLUMBING PLAN 9- 101 -1M311 1M311 D 03.17.11 WATER JET PIPING DIAGRAM 9- 101 —M593 M593 C 03.17.11 SECTIONS AND DETAILS WATERJET 9- 101— UGM112 UGM112 A 03.17.11 PLUMBING UNDERGROUND PLAN APPROVED BY DEPT. DATE 9- 101 —S593 S593 — 03.18.11 PARTIAL PLAN AND DETAIL 9- 101 —S594 S594 — 03.18,11 AHU PLATFORM ACCESS LADDER 9- 101 —S595 S595 — 03.18.11 PALLET RACK SCHEDULE AND DETAILS 9-101-1E116 1E116 — 03.16.11 480Y/277 VOLT POWER 9 -101 -1 E112R 1E112R - 03.16.11 277/48V POWER PLAN 277/408V POWER PLAN 208Y/120V POWER PLAN LIGHTING 9-101-1E112 1E112 — 03.16.11 9-101-1E62 1E62 — 03.16.11 9-101-1E12 1E12 — 03.16.11 ■ BRIEF PROJECT NARRATIVE: RELOCATE THE WATERJET AND ASSOCIATED UTILITIES. CORE DRILL ON THE WALL FOR WATERJET AND A.H.U. ACCESS LADDER INSTALLATION. RELOCATE TWO (2) 14-FT WIDE PALLET RACKS. LAND USE CODE BUILDING CODES OCCUPANCY GROUP CONSTRUCTION TYPE FLOOR AREAS: BUILDING FOOTPRINT BUILDING GROSS TUNNEL FIRST FLOOR MEZZANINE AFFECTED AREA BUILDING HEIGHT STORIES OCCUPANT LOAD: HANDICAPPED REQUIREMENTS FIRE PROTECTION SEISMIC ZONE COD Svv v A R" TUKWILA 2009 I.B.C., I.F.C., I.P.C., I.M.C., U.P.C. AND THE WAC 51 -20 AS ADAPTED OR AMENDED BY LOCAL ORDINANCES, AND COMPLIANCE WITH CITY OF TUKWILA ZONING. GROUP B AND GROUP F, DIVISION 1 (OFFICE AND FACTORY) TYPE II, NON— COMBUSTIBLE SEPARATION 60 FEET (MINIMUM ALL SIDES) 713,829 1,116,306 REVIEWED FOR c 50,910 CODE COMPLIANG 713,829 t. APPROVED 55,689 MAY 2 3 2011 295,878 �/� ' "" 111 FT. MAXIMUM City of Tukwila 2 BUILDING DIVISIMI OVERALL (NO CHANGES) - BARRIER FREE FULLY AUTOMATIC, F/S CLASS 1 SPRINKLERS THROUGHOUT 3 NO SCALE AT 1 O \ RECEIVED CIWOMmu MAY il32011 PEROT COOtER SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE 4745 E,H a ® ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED ��'�� MOOR �' 09- AUG -06 SUBTITLE TITLE SHEET CURRENT REVISION 11305358 SYMBOL DATE 03.18.1 1 CHECKED CHECKED A INSTALL PAINT EQUIPMENT 11305358 M.WONG RWS 03.18.11 SHEET Al ENGINEER TITLE ARCHITECTURAL MASTER BUILDING 9 -101 D.C. B RELOCATE WATERJET 8291 -28 S. CHO RWS 03.22.11 APPROVED BY DEPT. DATE CHECKED JOB NO. 566282 -01 COMP N0. APPROVED APPROVED DWG No. 9- 101 —A1 —IUI —Ala z 1" PUMPED CONDENSATE FROM 9 -103 PIPING TO PENETRATE WALL TO 9 -103 BUILDING THROUGH CLOSED OFF WINDOWS. CONTINUED ON 9- 103 -1M60 1" HPS TO 9 -103 BUILDING. -1/2" HWS &R TO 9 -103 AHU HWR HWS HPS P COND HWR 2 1 2" PLUG o —Fcr— +c4 HWR 2 1/2" HWS ■ HPS HPC 3" HPS ISOLATED FROM SYSTEM AND ABANDONED IN PLACE C2 CHROMOLUX M594 13" HOS &R ZONE -2 1 " HO r ■ 3/4" HPC FROM DRIP TRAP AT DRIP LEG CHWS CHWR P.O.C. V) 0 1i" SCH -80 BLACK STEEL PIPE W/ 2" THICK FIBER GLASS INSULATION 1 1/2" COND 24 "X24" 2" COPPER T BING W/ 1" THICK FIBE GLASS INSULATION 00 == N &) 00 == 0 0_ 2 1i" HOS &R ZONE -2 14" HOS &R ZONE -1 HPS COND CHWS CHWR HWR HWS 1 1/2" X 2" C 1" CC1 HPS CHWS COND /4 3" 150# 4" CHWR P COND HWS 4" '1 CC1 2 1 /2' HPS HWR 24 "X24 HWR -2" 150# 2 1/2" 3'12 4 CO2 If HWS 1M61 4528 -M3 1M61 4528 -M3 P COND STM 3" 1M61 4527M3 LEG E \ D HPC HPS CONDENSATE STEAM (HIGH PRESSURE) STEAM SUPPLY (HIGH PRESSURE 125, 250 PSIG) STM STEAM SUPPLY - HWS - HWR CHWR--- CHWS COND P COND- GE\ ERAL HEATING WATER SUPPLY HEATING WATER RETURN CHILLED WATER RETURN CHILLED WATER SUPPLY CONDENSATE PUMPED CONDENSATE \ OTES CO \STRUCTION OTES RETURN REDLINED PRINT BACK TO ENGINEERING WITH ANY CHANGES FROM THE DESIGN. MOON WONG, 206 - 947 -4897, M/S 46 -87 PURCHASE & INSTALL 1Y" CHILLED WATER SUPPLY & RETURN FROM THE COL. F/2.5 TO THE COOLING WATER SYSTEM AT COL. K /1. USE TYPE -L COPPER TUBING WITH 1" THICK FIBERGLASS INSULATION. THE MAXIMUM PIPE HANGER SPACING SHALL BE 10 FEET. 2. INSTALL PIPE LABEL ON THE INSULATION. MtIO&1 FIRST FLOOR PLA\ SCALE: 1/8"= 1' -0" REFERE\ REVIOWED FOR �B .•ODE COMPLIANCE 4 APPROVED MAY 2 3 2011 City of Tukwila BUILDINGfIVIsIGN CE DRAWI \GS s?"( O ® O O 1M60 1M66 1M67 1M62 1M63 1M64 1M65 1M68 1M69 1M70 1M71 1M72 1M73 1M74 1M75 1M76 1M77 1M78 1M79 1M80 1 M82 1 M83 1M84 1 M85 1M87 1 M88 1M89 1 M90 1M90 1M92 1M93 1494 i KEY PLAN 1M95 1M96 SCALE: NONE RECEIVED CITY OFTU A MAY ''ii3 2011 SYM REVISION REDRAWN BY KB /CH APPROVED DATE SYM REVISION BY APPROVED DATE A B C D LGE- AUBURN LAB ON -LOADS J #130198 -00 M.WONG RWS 09.30.03 INSTALL CLEANROOM 140795 -01 RWS RWS 06.28.05 REMOVE CHROMOLOX HX SYSTEM 8310290 RWS RWS 01.21.09 EPME DESIGN WATERJET RELOCATION 11622250 M.WONG RWS 03.17.11 g)LAWArE74V G' ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DRAWN DATE CHECKED SUBTITLE HVAC PIPING - PARTIAL PLAN CURRENT REVISION 11622250 SYMBOL DATE 03.17.11 APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER BUILDI \G 9 -101.1 COL. E -J/1 -6 D.0 SHEET 1V 61 JOB NO. COMP NO. DWG NO. 9- 101 -1M61 3/4 "HPC 1M62 4528-M2 1M62 4528 -M2 I 0 U PACE A -18 5800 CFM- 1 1/4" COND 1 1 /2 "HWS &R HWR HWS HPS 3" PORTABLE EYEWASH STATION HWR COND RECEIVER CVEN z �w �O Z1 6 mm C O ✓ BAC DRAFT BEN H O V 0 2 1/2" 3 "CHWS &R 4" CHWS &R 4" CHWS &R 8 "CHWS &R THRU CEILING V V 1" CHWS BACKDRAFT BENCH HWS CHWR - 0 HWS HPS U TRANE SIZE 12 5HP 6360 CFM 1 1/2" CHWS CH WR AHU 83 KING DOOR HTR MODEL 510 -14 460V, 30 - 1/2" 150# 1 1/4" COND 2 1/2" 150# HPS I+ 1 r EXIT n Il SOL IV STRAINER 1 1 /2 "HWS -1 1 /2 "HWR �i HWp WITH AIR VENT P COND HWR COND <AHU> �— COND CHWS 1M 7 -M3 HUMIDIFIER 3" 1 1/4" FUNNEL DRAIN CMCS TEM CEILING SENSOR 2" Imo- HWR --1-0 2" 3" , HWR HWS „ . `� STM P COND fl 2" 1 1/4" 000H AM HWS D�8 2 1/2" 0 I It CL 67-1 1/4" HWR 2" 2 1/2" IP EXIT - x x x� HWR O V 0 cV • -COND 1/2" 1M 4528 -M3 1M62 ?4528 -M3 P COND N 2" *-2 1/2" 150# 4" Cf) 0 HWS EL' U v) 1- ICI CHWR HWS 2" x HWS 1/2" HWS 3 HWR " HWS i r. 0 U _ U N = 0 0 V CU x x x x x x x x 1 /2 "COPPER COND 0 O U 5 LEGE \D HPC CONDENSATE STEAM (HIGH PRESSURE) HPS STEAM SUPPLY (HIGH PRESSURE 125, 250 PSIG) STM STEAM SUPPLY HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN CHWR— CHILLED WATER RETURN CHWS CHILLED WATER SUPPLY COND CONDENSATE — P COND— PUMPED CONDENSATE GE \ERAL \OTES FIRST FLOOR PLA\ SCALE: 1/8"=1'-0" /2" COND TO SERVICE SINK, I SEE 4535 M2 6 C0 \STRUCTIO\ NOTES RETURN REDLINED PRINT BACK TO ENGINEERING WITH ANY CHANGES FROM THE DESIGN. MOON WONG, 206 - 947 -4897, M/S 46 -87 PURCHASE & INSTALL 1)/2" CHILLED WATER SUPPLY & RETURN FROM THE COL. F/2.5 TO THE COOLING WATER SYSTEM AT COL. K /1. USE TYPE -L COPPER TUBING WITH 1" THICK FIBERGLASS INSULATION. THE MAXIMUM PIPE HANGER SPACING SHALL BE 10 FEET. 2. INSTALL PIPE LABEL ON THE INSULATION. 11"'01014 UaCso REVIEWED FOR CODE COMPLIANC E t APPROVED MAY232011 City of Tukwila BUILDINR flIVIRIflN 1M60 1M61 1M62 1M63 1M64 1M65 1M66 1M67 1M68 1M69 1M70 1M71 1M72 1M73 1M74 1M75 1 M76 1M77 1M78 1M79 1M80 1M81 1 M82 1M83 11M84 1M85 1 M 86 1M87 1M88 <8 1M89 1M90 1M91 1M92 1M93 9 -101.1 KEY PLAN 1 94 1M95 1M96 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE REDRAWN KB CH /EJC 11.11.97 A PUR /INSTALL MODULAR CLEAN ROOM J #546610 -01 C. HARRAH RWS 10.01.04 B EPME DESIGN WATERJET RELOCATION 11622250 M.WONG RWS 03.17.11 FROM FREEZER DRAIN PUMP 1L/IFISrEAIAW® ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DRAWN K.BUN DATE APPROVED BY DEPT. DATE CHECKED C.HARRAH SUBTITLE PIPING FIRST FLOOR PLAN CURRENT REVISION 11622250 SYMBOL DATE 03.17.11 2z RECEIVED anioFTwomkA 23MAYl32011 pahounstagym ENGINEER CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER BUILDING 9 -101.1 COL. 6- 11 /J -N D.C. SHEET v 62 JOB NO. 546610 -01 COMP NO. DWG NO. 9- 101 -1M 62 CON '-4Ii" AIR TO MECH. REG. +41-0" AIR TO FILTER --IR H i" AIR HOPPER #2 Z Le- 1T, 1" CW (COPPER) T TRAP _}-1 PRIMER RPBP WATTS 009 -1" SN #50330 L H-74-.. I BFP FLOW METER PRESSURE 85K002363 REGULATOR ►'. 4" HOSE BIBB 1" PW (COPPER) )"COPPER W/ 2 "0 FLOOR SINK PIPE TAPE WRAP 12X 12X8 WADE UNDERGROUND) 9142- NH -6 -27 • J_ v 10 %" DRAINS TO FD FINISH FLOOR 4 "x4" CONCRETE CURB AROUND FLOOR DRAIN w CO JET EDGE INTENSIFIER 50 HP Y" FILTERED WATER (PVC SCH -80) IH1) POST FILTER Y "NPT, FILTERED WATER IN Y "NPT, DRAIN Y "NPT, COOLANT WATER OUT Y "NPT, COOLANT WATER IN 3/6" HIGH PRESSURE COUPLING Yz "ID HOSE, FILTERED WATER IN 3/4" COPPER DW Yz "ID HOSE, COOLANT WATER OUT Y "ID HOSE, COOLANT WATER IN 3410.D. x "I.D, 316 STAINLESS STEEL TUBING (NOTE: ALL HOSES SHALL BE PARKER 801 -8) — Y" COOLING WATER SUPPLY & RETURN SEE DWG. 1 M62 FOR THE CHILLED WATER PIPING CONTINUATION ce _ _ U C.� 65'F SET POINT Q Q \ � Q 1 ,6`� ,-14" C/" • G & L NPE 1x1.25 -6, 316SS, 5.75" IMPELLER, CAT. #1STAF5B4, 1.5 HP, 3500 RPM, 30, 20 GPM @ 120' HD (INTERLOCKED W/ INTENSIFIER) -� EXTROL 15, W/ AIR PURGER 445, AUTO VENT 700C ty I i1T, SOLENOID VALVE, N.C. S3 a 1Y" TSET THE PUMP DISCHARGE PRESSURE @ 60# iS -CB B &G CIRCUIT SETTER, Q SET @ 8 GPM 11 3" COPPE CO 1Y" Y" COOLING WATER FILL LINE Q _l_it T 1Y" COPPER, COOLING WATER LOOP WATER JET (JET EDGE SCALE NONE PIP \G DIAGRAv 1M534 1M311 J LEGEND 3/4" SELF - CONTAINED TEMPERATURE REGULATOR, SINGLE SEAT STAINLESS TRIM, COOLING, COPPER BULB & CAPILLARY, 8' CAPILLARY, FIXED UNION BULB, INDICATING, 45T TO 105E RANGE, POWERS #11 REGULATOR 595 - 075- ST- CCO8DI02. SET THE TEMPERATURE TO 65'F. ALFA LAVAL PLATE HEAT EXCHANGER, M3 -VG, 149,600 BTUH, HOT SIDE: 20 GPM, 80T EWT, 65F LWT, 4.99# DROP, COLD SIDE: 16.97 GPM, 45T EWT, 62.5'F LWT, 3.71# DROP, AISI 316 PLATE, 23 PLATES, NBRP CLIP -ON GASKET MATERIAL, DESIGN PRESSURE AND TEMPERATURE OF 100 PSI © 150'F. 1)/4" SOLENOID VALVE, NORMALLY CLOSE, 120V, BRASS, ASCO 8210055. INTERLOCK WITH THE INTENSIFIER TO "OPEN" ONLY WHEN THE INTENSIFIER IS "ON ". CO \STRUCTIO\ OTES SEE DRAWING M593 FOR THE CONSTRUCTION NOTES. p-R Hi" AIR HOPPER #1 WILKERSON M32-08- FOO PRESSED AIR V SCALE: NONE " COPPER A \IFOLD � 1M534I�M311 M 1lo&L( CCODE FOR DE COMPLIANC ADDROVED MAY 2 3 2011 City of Tukwila BUILDINA rinnsinM RECEIVED CM OFTUIIWIR,A MAY 1 3 201 PERmorceitsvp SYM A B C D REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE CHANGE OUT WATERJET -JET EDGE RELOCATE WATER JET REPLACE WATER JET EPME DESIGN WATERJET RELOCATION 526545 -06 130185 -02 585560 -01 11622250 M.WONG M.WONG M.WONG M.WONG RWS RWS RWS RWS 02.12.03 05.15.03 10.27.08 03.17.11 QBOE /NG' ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DRAWN M.WONG CHECKED DATE 02.06.03 SUBTITLE WATER JET PIPING DIAGRAM CURRENT REVISION 11622250 SYMBOL D DATE 03.17.11 DATE ENGINEER M.WONG 02.06.03 CHECKED APPROVED R.SQUIRES 05.15.03 APPROVED TITLE MECHANICAL MASTER BUILDING 9 -101.1 DEV. CENTER, WA SHEET 1M311 JOB NO. 526545-00 COMP NO. DWG NO. 9- 101 -1M311 WONGK: 03/18/11 12:06 J 1Jc) EW WATERJET LOCATO\ % 4 "CWS &R EXPANSION TANK I, TEMPERATURE SENSING BULB 20GPM CO 120', G &L NPE, 1.5HP INTERLOCK W/ INTENSIFIER 1Y" CHWS & R UP SEE DWGS. 1M61 & 1M62 SEE DWG. 1M311 FOR PIPING DIAGRAM ABRASIVE` OPPER WOOD PALLET ABRASIVE HOPPERS STORAGE 42X48 ABRASIV HOPPER POST FILTER (RELOCATE) "CWS &R Y2 COPPER TYPE —L % "DUPLEX (EXIST) P.O.C. 1 ALVE ON RISER HIG WAT "ID, S.S. RESS. LINE PRIMER " UP »PWZr1 (COPPER) "DUPLEX PARKER PBS - 501 -8MP Alk SEE K9101MK) Ligt - I % "DUPLEX J'= (EXIST) Ligf� r 2 1"A UP SEE DWG. 1M112 \Ji EXST \G WATERJET LOCATIO Abresiv oppers 2" SAN. DRAIN MANIFOLD, PVC SCH -80 1" PW, COPPER POST FILTER (PROVIDED BY SIEMENS) INTENSIFIER PUMP 50 HP " PW HOSE BIBB .' ent nk 1 "DRAIN FITTING DL PW 1" FILTERED WATER PVC SCH -80 BRINE TANK SIEMENS SOFTENER, KFZSS012FXZFAX AIR FILTE' 1 "UP, WICKER ! AT 5' -6" —F00 SEE DWG. 1 16 , SEE DWG. I-OR CON'T 116 FOR CON'T TEMPERATURE SENSING BULB 20GPM © 120', G &L NPE, 1.5HP VALVE F.F. 3/4" A 5' -0" A.F.F. P.O.C. 14.5"0, MU MEDIA FILTER FLOW METER ON THE VERTICAL SECTION 1" PW, PVC SCH -80 WATER JET PIP SCALE 1/4"=1'-0" \G P LA \ P.O.C. 1M311, 1M112 M593 WILKERSON FILTER M32 -08 -000 4 X 3/4"CWS&R 1" CW UP SEE DWG. 1M66 COOLANT SUMP 4 "CWS &R 2" SAN. DRAIN MANIFOLD, PVC SCH -80 I-13" CHWS & R UP SEE DWG. 1M66 "> PURCHASE & INSTALL 1Y2" CHILLED WATER SUPPLY AND RETURN FROM COL. F/2.5 TO THE COOLING SYSTEM AT COL. K /1. SEE DWG. 1M61 & 1M62 FOR THE PIPING PLAN. EXTEND THE COOLANT WATER SUPPLY & RETURN FROM THE HEAT EXCHANGER TO THE INTENSIFIER USING TYPE -L COPPER TUBING. INSULATE THE PIPING USING Y" THICK ARMAFLEX INSULATION. RE- INSTALL A FLEXIBLE HOSE FROM THE SEDIMENT TANK DRAIN VALVE TO THE NEW FLOOR DRAIN. 22. ALL PIPING FABRICATION AND INSTALLATION SHALL CONFORM TO THE UNIFORM PLUMBING CODE. 23. PURCHASE & INSTALL PIPING LABELS ON ALL NEW PIPING PER BOEING STANDARD. 24. PERFORM THE OPERATIONAL TESTS ON ALL THE SYSTEM INSTALLED AND VERIFY THAT THE SYSTEM ARE WORKING PROPERLY. REMOVE THE DRAIN LINE ON THE WALL. REMOVE THE COOLING WATER PIPING ON THE WALL. REMOVE THE WATER PIPING ON THE WALL. REPAIR ALL PIPE PENETRATIONS ON THE WALL. LEGEN D 3/4" SELF - CONTAINED TEMPERATURE REGULATOR, SINGLE SEAT STAINLESS TRIM, COOLING, COPPER BULB & CAPILLARY, 8' CAPILLARY, FIXED UNION BULB, INDICATING, 45'F TO 105T RANGE, POWERS #11 REGULATOR 595 - 075- ST- CCO8D102 ALFA LAVAL PLATE HEAT EXCHANGER, M3 -VG, 149,600 BTUH, HOT SIDE: 20 GPM, 80'F EWT, 65T LWT, 4.99# DROP, COLD SIDE: 16.97 GPM, 45T EWT, 62.5'F LWT, 3.71# DROP, AISI 316 PLATE, 23 PLATES, NBRP CLIP -ON GASKET MATERIAL, DESIGN PRESSURE AND TEMPERATURE OF 100 PSI © 150T. CO \STRUCTIO \ OT ES RETURN REDLINED PRINT BACK TO ENGINEER WITH ANY CHANGES FROM THE DESIGN. MOON WONG, 655 -8428, M/S 46 -87 SCOPE: THIS JOB IS TO RELOCATE THE WATER JET, THE INTENSIFIER, WATER SOFTENER, COOLING WATER SYSTEM AND PROVIDE THE UTILITIES TO SUPPORT THE ABOVE ITEMS. THE CONTRACTOR SHALL OBTAIN ANY PERMITS NECESSARY. REVIEWED FOR ODE COMPLIANCE APPROVED MAY 2 3 2011 City of Tukwila BUILDIN( fntipin 1 REMOVE ONLY THE 1" COMPRESSED AIR LINE TO THE WATERJET BUT LEAVE THE REST OF THE COMPRESSED AIR PIPING IN PLACE. (DON'T REMOVE) SYM A B C REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RELOCATE WATER JET REPLACE WATER JET EPME DESIGN WATERJET RELOCATION J #130185 -02 J #585560 -01 11622250 M.WONG M.WONG M.WONG RWS RWS RWS 05.15.03 10.27.08 03.17.11 Q�BOE /NG° ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN M.WONG CHECKED DATE 05.05.03 ENGINEER M.WONG SUBTITLE SECTIONS AND DETAILS WATER JET (JET EDGE) RELOCATE THE WATERJET AND ASSOCIATED EQUIPMENTS. RELOCATE THE ABRASIVE HOPPERS, FILTER AND SEDIMENT TANK AT THE LOCATION SHOWN. RE- CONNECT THE COMPRESSED AIR AND DRAIN. RELOCATE THE JETEDGE INTENSIFIER. REPLACE 1 "0 COMPRESSED AIR LINE FROM THE 90' ELBOW ON THE CEILING DOWN STREAM OF THE ISOLATION VALVE, DOWN THE COLUMN K/2 AND UP TO THE LOCATION SHOWN ON THE FENCE. SEE DWG. 1 M 112X FOR THE REMOVAL AND DWG. 1M112 FOR THE COMPRESSED AIR SUPPLY CONNECTION. PURCHASE & INSTALL 1 " 0 COMPRESSED AIR LINE TO THE WATERJET. PURCHASE & INSTALL A NEW COMPRESSED AIR FILTER ON THE COL. K /2. RE- CONNECT THE EXISTING TWO DUPLEX AIR DROPS ON THE FENCE. PURCHASE & INSTALL A NEW Y" DUPLEX AIR DROP ON THE FENCE PER SKETCH K9101 MJ. (WEST SIDE OF THE FENCE) RE- CONNECT THE MEDIA FILTER, WATER SOFTENER & BRINE TANK USING THE FLEXIBLE HOSES SIMILAR TO EXISTING. RUN THE DRAINS FROM THE MEDIA FILTER & WATER SOFTENER TO THE FLOOR DRAIN. PURCHASE & INSTALL A NEW 1"O CITY WATER FROM THE 2"0 ISOLATION VALVE ON THE CEILING DOWN TO THE COL. K /2. USE TYPE -L COPPER TUBING. INSULATE THE CITY WATER WITH 34" ARMAFLEX PIPE INSULATION UP TO THE MEDIA FILTER. RELOCATE THE BACK FLOW PREVENTER W/ REGULATOR TO NEW LOCATION AND CONNECT 1" CITY WATER SUPPLY TO IT. RECERTIFY THE BACK FLOW PREVENTER. PURCHASE & INSTALL A TRAP PRIMMER ON THE COL. K/2 AND RUN Y" UNDERGROUND LINE W/ PIPE TAPE WRAP TO THE FLOOR DRAIN. SEE DWG. UGM112 FOR THE NEW FLOOR DRAIN INSTALLATION. PURCHASE & INSTALL A PROCESS WATER LINE FROM THE BACK FLOW PREVENTER TO THE MEDIA FILTER. USE TYPE -L COPPER TUBING. INSTALL A %4" HOSE BIBB FOR THE WATERJET. PRUCHASE & INSTALL THE WATER LINE FROM THE SOFTENER TO THE INTERSIFIER. RE- INSTALL THE BLUE FILTER DOWN STREAM OF THE SOFTENER. PURCHASE & INSTALL THE HIGH PRESSURE WATER LINE RATED FOR 60,000 PSI (% "0.D.x "I.D. 316 STAINLESS STEEL TUBING) FROM THE INTENSIFIER TO THE WATERJET WITH MINIMUM TURNS. BEND THE TUBING FOR THE 90' TURNS WHERE POSSIBLE WITH MINIMUM BENDING RADIUS OF 1.75 INCHES. INSTALL THE FLEXIBLE STEEL CONDUIT - SLEEVE OVER THE TUBING FOR PROTECTION IN CASE OF A LINE BREAK. CLAMP THE UHP TUBING TO THE UNISTRUT OR OVERHEAD BRACING FOR STABILITY EVERY 5 FEET. (HAGEN INTERNATIONAL & ASSOCIATES, INC. 1510 BOUNDARY BLVD, #100, AUBURN, WA 98001 253 - 872 -4893 SHALL BE THE SUB - CONTRACTOR FOR THE HIGH PRESSURE PIPING.) RE- LOCATE THE COOLING WATER SYSTEM TO THE NEW LOCATION SHOWN. THE COOLING WATER SYSTEM INCLUDES A PUMP, A HEAT EXCHANGER, AN EXPANSION TANK, A CONTROL VALVE & A SOLENOID VALVE. REPAIR THE DAMAGED PIPE INSULATION. (NOTE: THE PUMP & THE SOLENOID VALVE ARE INTERLOCKED THE WATERJET SO THAT THEY ARE "ON /OPEN" WHEN THE WATERJET IS "ON ".) ,loit CURRENT REVISION 11622250 SYMBOL WIT RECEW OF T i MAY i1 3. ABRiliffir DATE 03.17.11 05.05.03 CHECKED APPROVED R.SQUIRES 05.15.03 APPROVED TITLE MECHANICAL MASTER BUILDING 9 -101 COL . x -x /x -x DC SHEET M593 JOB NO. 130185 -02 COMP NO. DWG NO. 9- 101 -M593 20 WO N G K: 03/18/11 12:05 id