Loading...
HomeMy WebLinkAboutPermit M11-078 - FOSTER HIGH SCHOOLFOSTER HIGH SCHOOL 4242 S 144 ST M11-078 Parcel No.: Address: Project Name: City (0'ukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Inspection Request Line: 206- 431 -2451 Web site: http: / /www.TukwilaWA.gov 1523049108 4242 S 144 ST TUKW FOSTER HIGH SCHOOL MECHANICAL PERMIT Permit Number: Issue Date: Permit Expires On: M11 -078 07 /01/2011 12/28/2011 Owner: Name: Address: Contact Person: Name: Address: Email: TUKWILA SCHOOL DISTRICT 4640 S 144TH ST , TUKWILA WA 98168 NORMAN FOSTER 5005 3RD AV S , SEATTLE WA 98124 NORMANF @MC KINSTRY. C O M Contractor: Name: MCKINSTRY ESSENTION INC Address: 5002 SECOND AV S , SEATTLE WA 98134 Contractor License No: MCKINEI942JQ Phone: 206 - 832 -8181 Phone: 206 - 268 -9800 Expiration Date: 12/09/2011 DESCRIPTION OF WORK: DEMOLISH EXISTING BOILER AND REPLACE WITH COMBINED BOILER #1 AND BOILER #2 FLUE WITH TWO, NEW FLUES, REPLACEMENT OF EXISTING HOT WATER PUMP WITH A NEW HOT WATER PUMP, AND PROVIDING A NEW GAS REGULATOR ON THE NEW BOILER. INCLUDES PIPING, VALVES, TEMPERATURE AND PRESSURE GUAGES, SAFETY DEVICES AND OTHER APPURTENANCES FOR A COMPLETE AND CODE COMPLIANT BOILER INSTALLATION. Value of Mechanical: 112,612.00 Type of Fire Protection: UNKNOWN Electrical Service Provided by: Permit Center Authorized Signature: Fees Collected: $1,442.81 International Mechanical Code Edition: 2009 L/L/ I hereby certify that I have read and examined this permi and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this pe Date: 7 Signature: Print Name: /V or mat C°. .5'74e r. Date: 7/V l This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IMC -4/10 M11-078 Printed: 07 -01 -2011 PERMIT CONDITIONS Permit No. M11 -078 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: Manufacturers installation instructions shall be available on the job site at the time of inspection. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: IMC -4/10 M11-078 Printed: 07 -01 -2011 CITY OF T UK IA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.citukwila.wa.us Project No. MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION Site Address: 4242 South 144th Street Tukwila, WA 98168 Tenant 1 i Foster High School property owners Name: Tukwila School District Mailing Address: 4640 South 144th Street King Co Assessor's Tax No.: l 5Z J0 9 ` q (D s Suite Number: Floor. New Tenant: ❑ Yes id ..No Tukwila WA 98168 City State Zip CONTACT PERSON - who do we contact when your permit is ready to be issued Name: Norman Foster mailing Address: 5005 3rd Ave S Day Telephone: (206) 832 -8181 Seattle WA 98124 E -Mail Address: NormanF @McKinstry.com City State Fax Number: (206) 762 -2624 Zip MECHANICAL CONIRACPORINIE�CC RMATICIN Company Name: McKinstry Essention Mailing Address: 5005 3rd Ave S Seattle Coact per: Norman Foster WA 98124 E-mail Address: NormanF @McKinstry.com Contractor Registration Number: MCKINEI942JQ City State Day Telephone: (206) 832 -8181 Fax Number: (206) 762 -2624 Expiration Date: 12/09/2011 Zip ARtIITECT OF RECORD - All plans must be stamped by architect of record Con aay Name: Mailing Address: State Zip Contact Person: E -Mail Address: City Day Telephone: Fax Number ENGINEER OF RECORD - All plans must be stamped by engineer ofd Company Name: McKinstry Essention mailing Address: 5005 3rd Ave S Seattle WA 98134 Corltactpeson: Kristina Sing E-mail Address: KristinaS @McKinstry.com H: Appliwtlats\Fans- Applicatlas On I.ine\2010 Applications \7 -2310 - Mechanical Permit Applkatioi.rbc Revised: 7 -2010 hh City State Day Telephone: (206) 832 -8054 Fax Number: (206) 762 -2624 Zip Page 1 of 2 Valuation of project (contractor's bid price) : $ 112, 612.00 Scope ofwork (please provide detailed information): Demolish existing boiler and replace with existing combined Boiler #1 and Boiler #2 flue with two, new flues, replacement of existing hot water pump with a new hot water pump, and providing a new gas regulator on the new boiler. Includes piping, valves, temperature and pressure gauges, safety devices and other appurtenances for a complete and code compliant boiler installation. Use: Residential: New ❑ Replaoeit Commercial: New ❑ Replacement Fuel Type: Electric ❑ Gas f2 0 Other: Indicate type of mechanical work being installed and the quantity below: Unit Types Qty Unit Type; Qty lit Type: Qty RiollerliCompinessor Qty furnace <100k btu air handling unit >10,000 cfm fhe damper 0-3 fp/100,000 btu furnace >100k btu evaporator cooler dill tser 3 -15 hp/500,000 btu floor furnace ventilation fan connected to single duct thermostat 15 -30 f p/1,000,000 btu suspended/walVfloor nmo r ted heater ventilation system wood/gas stove 30-50 f p/1,750,000 btu appliance vent hood and duct agenc em generator 50+ hp/1,750,000 btu 1 repair or addition to heat/nefrig/cooling system Incinerator - domestic other mechanical equiPment air handling unit <10,C00 cfm incinerator - conrn/ind PERMIT APPLICATION NOTES - Values canstr rtion - in all cases, a value of constmction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit cuter to comply with a.arent fee schedules. Eagrivation1fplan review - applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each The extension shall be requested in writing and justifiable case dated. Section 105.3.2 irternational building code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING Signature. J Print Name: L I 'k Mailing Address: Yt �/0 SU,.tA AGENT: 77SA Day Telephone: ew, /a City Date: C/ y/, t od - -etc -too3 State wd°'w6,j2 Zip IDate Application Accepted: (0 ` I LI,. 11 Date Application Expires: ['��` L I Staff Initials: H:Wpplicatiais\Fants- Amlicatias On l.ine\2010 Applications \7-2010 - Mechanical Permit Appiicatian.doc Revised: 7 -2010 bh Page 2 of 2 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.TukwilaWA.zov RECEIPT Parcel No.: 1523049108 Permit Number: M11 -078 Address: 4242 S 144 ST TUKW Status: PENDING Suite No: Applied Date: 06/14/2011 Applicant: FOSTER HIGH SCHOOL Issue Date: Receipt No.: R11 -01196 Payment Amount: $1,442.81 Initials: WER Payment Date: 06/14/2011 10:35 AM User ID: 1655 Balance: $0.00 Payee: MCKINSTRY TRANSACTION LIST: Type Method Descriptio Amount Payment Check 041416 1,442.81 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts MECHANICAL - NONRES 000.322.102.00.00 PLAN CHECK - NONRES 000.345.830 Total: $1,442.81 1,154.25 288.56 doc: Receiot -06 Printed: 06 -14 -2011 - . 'INSPECTION)40. INSPECTION RECORD Retain a copy with permit -a ?e PERMIT NO. . CITY OF TUKWILA BUILDING DIVISION • 6300 Southcehter BIvd., #100, Tukwila. WA 98188 n (206) 431 -367 4Permit.lfspection Request Line (206) 431 -2451 Project:- ' _ 'Z %.14Fia- R.16, i4 Type of Inspection: r�N3At_ ' v'i L Address: •• . 1... -4142 ,LK Date Called: f'" Re,/ A - - 19,'pr Special instructions: Date Wanted:. c.m9 Requester: Phone No: I-125 -7340- `-1318 Approved per applicable codes. OGorrections required prior to approval. ,1 COMMENTS: ' v'i L ,VZz7 5- / /!.L/ �� 4 ,o,47 f'" Re,/ A - - 19,'pr c/ 'Pe r "PI,•f (10,014y04-4- ./v "9/ N, 1 • rISPECTION FEE REQUIRED. Prior t'o next inspection, fee must be at.6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Gity of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director NORMAN FOSTER 5005 3RD AV S SEATTLE WA 98124 RE: Permit No. M11 -078 FOSTER HIGH SCHOOL 4242 S 144 ST TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 12/28/2011. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and /or receive an extension prior to 12/28/2011, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. M11 -078 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 • 0 PE' y � f PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M11 -078 DATE: 06 -14 -11 PROJECT NAME: FOSTER HIGH SCHOOL SITE ADDRESS: 4242 S 144 ST X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS:: Y 'ff U Public Works ❑ AANA ��►i Fire Prevention Structural Planning Division ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete ❑ Comments: DUE DATE: 06 -16 -11 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route it Structural Review Required REVIEWER'S INITIALS: No further Review Required n DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions DUE DATE: 07-14 -11 Not Approved (attach comments) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 DEPARTMBNT OF LABOR AND INRUSTRIES REGISTERED AS PROVi *D BY LAW AS CONSTCONTR GENERAL MCIEINSTRY BSSENTION INC 5002 SECOND AVE 5 S13AT7'LE WA 98134 -2432 Detach And Display Certificate REGISTERED AS PROVIDED BY LAW AS CON%ST..CONTR GENERAL.: REGIS. F. # . EXP. ATE MCKINE1942JQ 12/9/2011. EDATE • 4/18/2006 MCKINSTRY ESSENTION ItsIC 5002 SECOND AVBS: SEATTLE WA 98134 -2432 Signature Issued by DEPARTMENT OE LABOR AND INDUSTRIES 1,625-052-000 48197) Please Remove And Sign Identification Card Before Placing In Billfold Contractors or Tradespeople Pryer Friendly Page 1 General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name MCKINSTRY ESSENTION INC UBI No. 602039273 Phone 2062689800 Status Active Address 5002 Second Ave S License No. MCKINEI942JQ Suite /Apt. License Type Construction Contractor City Seattle Effective Date 4/18/2006 State WA Expiration Date 12/9/2011 Zip 981342432 Suspend Date County King Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status ESSENI.954RZ ESSENTION INC Construction Contractor General Unused 12/9/2005 12/9/2007 Inactive Business Owner Information Name Role Effective Date Expiration Date ALLEN, DEAN C President 04/18/2006 Bond Amount TEPLICKY, J WILLIAM Secretary 04/18/2006 929515364 Bond Information Page 1 of 2 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 2 WESTERN SURETY CO 929515364 12/01/2010 Until Cancelled $12,000.00 12/02/2010 1 TRAVELERS CAS & SURETY CO 104627088 12/01/2005 Until Cancelled 12/01/2010 $12,000.0012/09 /2005 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 6 ZURICH AMERICAN INS CO GLA3999903 01/31/2011 01/31/2012 $1,000,000.0012 /20/2010 5 ZURICH AMERICAN INS CO CP039999031 01/31/2009 01/31/2011 $2,000,000.0012 /07/2009 4 ZURICH AMERICAN INS CO CP03999903 01/31/2008 01/31/2009 $20,000,000.00 02/01/2008 3 CHARTER OAK FIRE INS DTC0526D7193C0F0701/31/2007 01/31/2009 $1,000,000.00 12/12/2007 2 CHARTER OAK FIRE INS DTC0526D7193C0F06 01/31/2006 01/31/2008 $1,000,000.00 01/24/2007 1 CHARTER OAK FIRE INS CO DTC0526D7193C0F05 01/31/2006 01/31/2007 $1,000,000.0001 /25/2006 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period https://fortress.wa.gov/lni/bbip/Print.aspx 07/01/2011 12x12 2 "SL - ABBREVIATIONS PIPING IDENTIFICATION GENERAL AD ADJ AFF AFG AG AMP ARCH AUTO AUX BD BHP BLDG BOP BOT BS BTU BTUH CA CAB COND C/L CLG CFM CLG CO CO2 COL CONC COND CONN CONSTR CONTR CTL DET DIA DIAG DIM DISCH DIV DN DS DWDI DWG DWV (EA EC EL ELEC ELEV EP EQUIP ESP EXH EXIST (F) FA FCO FDC FDN FIG FIN FIO FLEX FLG FLR FO FP FPM FT FIG FURN GA GALV GC GEN GPM GWB ACCESS DOOR ADJUSTABLE ABOVE FINISHED FLOOR ABOVE FINISHED GRADE ABOVE GROUND AMPERE ARCHITECT; ARCHITECTURAL AUTOMATIC AUXILIARY BOARD BRAKE HORSEPOWER BUILDING BOTTOM OF PIPE BOTTOM BIRD SCREEN BRITISH THERMAL UNIT BRITISH THERMAL UNITS PER HOUR COMPRESSED AIR CABINET CONDENSATE CENTER LINE CEILING CUBIC FEET PER MINUTE CEILING CARBON MONOXIDE CARBON DIOXIDE COLUMN CONCRETE CONDENSER; CONDENSATE CONNECT; CONNECTION CONSTRUCTION CONTRACTOR CONTROL DETAIL DIAMETER DIAGONAL DIMENSION DISCHARGE DIVISION DOWN DISCONNECT SWITCH; DOOR SWITCH DOUBLE WIDTH, DOUBLE INLET DRAWING DRAIN, WASTE, VENT EXISTING EACH ELECTRICAL CONTACTOR; END CAP ELEVATION ELECTRICAL ELEVATION ELECTRICAL PANEL; END PLUG EQUIPMENT EXTERNAL STATIC PRESSURE EXHAUST EXISTING FUTURE FAHRENHEIT FIRE ALARM. FLOOR CLEANOUT FIRE DEPARTMENT CONNECTION FOUNDATION FIGURE FINISH FURNISHED AND INSTALLED BY OWNER FLEXIBLE FLANGE FLOOR FUEL OIL FIRE PROTECTION FEET PER MINUTE FOOT; FEET FOOTING FURNISH GAGE GALVANIZED GENERAL CONTRACTOR GENERATOR GALLONS PER MINUTE GYPSUM WALL BOARD H HIGH HP HORSEPOWER; HIGH PRESSURE HR HEATING RETURN HS HEATING SUPPLY HTG HEATING HTR HEATER ID INSIDE DIAMETER /DIMENSION LAB LABORATORY LF LINEAL FOOT MAU MAX MBH MED MEZZ MFR MH MIN MISC MTD N/A NC NEG NIC NO NOM NTS OA OC OD OVHD POC PRELIM PSI PSIG QTY R RAD REQD RPM SECT SF SIM SPEC SQ STD STRUC MAKE —UP AIR UNIT MAXIMUM 1000 BRITISH THERMAL UNITS MEDIUM MEZZANINE MANUFACTURER MANHOLE MINIMUM; MINUTE(S) MISCELLANEOUS MOUNTED NOT APPUCABLE NORMALLY CLOSED NEGATIVE NOT IN CONTRACT NORMALLY OPEN; NUMBER NOMINAL NOT TO SCALE OVERALL ON CENTER OUTSIDE DIAMETER OVERHEAD TBD TOC TOS TYP UG UNO VAV VD VER VFD VSD W/ W/O HVAC AC ACT AHU BDD BOD CC CRU CT CV DB DIFF DMPR EA EAT ECG EF TO BE DETERMINED TENANT IMPROVEMENTS TOP OF CONCRETE TOP OF STEEL TYPICAL UNDERGROUND UNLESS NOTED OTHERWISE VARIABLE AIR VOLUME VOLUME DAMPER VERIFY VARIABLE FREQUENCY DRIVE VARIABLE SPEED DRIVE WITH WITHOUT AIR CONDITIONING ACOUSTICAL CEILING TILE AIR HANDLING UNIT BACKDRAFT DAMPER BOTTOM OF DUCT COOLING COIL COMPUTER ROOM UNIT COOLING TOWER CONSTANT VOLUME DRY BULB DIFFUSER DAMPER EXHAUST AIR ENTERING AIR TEMPERATURE EGGCRATE GRILLE EXHAUST FAN FCU FAN COIL UNIT FD FIRE DAMPER FM FREQUENCY MODULATION FP FIRE PROTECTION; FAN POWERED FTU FAN TERMINAL UNIT GRD GRILLE, REGISTER, DIFFUSER HC HR HVAC LAT LD MC MECH MOD MUA HEATING COIL HEATING RETURN HEATING, VENTILATION AND AIR CONDITIONING LEAVING AIR TEMPERATURE LINEAR DIFFUSER MECHANICAL CONTRACTOR MECHANICAL MOTOR OPERATED DAMPER; MODULATING MAKE UP AIR OA OVERALL; OUTSIDE AIR OBD OPPOSED BLADE DAMPER RA RAT RCP RTU SA SAT SD SF S /FD SL SLSM SM SP TDH TG TOD TSP UH WB WC WG PLUMBING AD CO DCW DHW DHWC DSP EWC PER HOUR FCO FD POINT OF CONNECTION PRELIMINARY POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH GAUGE QUANTITY RELOCATED RADIUS REQUIRED REVOLUTIONS PER MINUTE SECTION SQUARE FOOT SIMILAR SPECIFICATION SQUARE STANDARD STRUCTURAL IE IN WC IW RETURN AIR RETURN AIR TEMPERATURE REFLECTED CEILING PLAN ROOF TOP UNIT SUPPLY AIR SUPPLY AIR TEMPERATURE SMOKE DAMPER SUPPLY FAN SMOKE FIRE DAMPER SOUND LINED SOUND LINED SHEET METAL SHEET METAL STATIC PRESSURE TOTAL DYNAMIC HEAD TRANSFER GRILLE TOP OF DUCT TOTAL STATIC PRESSURE UNIT HEATER WET BULB WATER COLUMN WATER GAUGE AREA DRAIN CLEAN OUT; CARBON MONOXIDE DOMESTIC COLD WATER DOMESTIC HOT WATER DOMESTIC HOT WATER RECIRCULATION DRY STANDPIPE ELECTRICAL WATER COOLER FLOOR CLEAN OUT FLOOR DRAIN INVERT ELEVATION INCHES WATER COLUMN IONIZED WATER; INDIRECT WASTE NPCW NON POTABLE COLD WATER ORL OVERFLOW RAINWATER LEADER PD PLANTER DRAIN; PRESSURE DROP PERF PERFORATED PLBG PLUMBING PRV PRESSURE REDUCING VALVE RPBP REDUCED PRESSURE BACKFLOW PREVENTER SD STORM DRAIN SS SANITARY SEWER VTR VENT THROUGH ROOF WC WH WSP PIPING BP CD CHW CHR CHS CT EWT FHV LWT TOP WASTE WATER CLOSET WATER HEATER WET STANDPIPE BACKFLOW PREVENTER CONDENSATE DRAIN CHILLED WATER CHILLED WATER RETURN CHILLED WATER SUPPLY CONICAL TEE ENTERING WATER TEMPERATURE FIRE HOSE VALVE LEAVING WATER TEMPERATURE TOP OF PIPE HVAC PLUMBING A COND — CDR - CDS CWS — CWR- G — HWR- HWS RL RS ST GRW GAW ID IRR NP ORL PW PSD RWL RWL SD - SS - UD —V- W - W FIRE PROTECTION DSP FDC F FP FW WSP PIPING FITTINGS I ++OI IOI 101 0 D • I+ I$I I-FI It' VALVES Ib PW IQ PIPING ACCESSORIES 4'W 4AV 4w►V 4 15 Q 4 4 RPBP 1 Y 0 WATTS /LF A COND CDR CDS CHS CHR G HR HS RL RS ST CW GRW GAW HW HWC ID IRR NPCW ORL PW PSD RWL RWL SD SS UD V W W DSP FDC F FP FW WSP COMPRESSED AIR PIPE CONDENSATE DRAIN PIPE CONDENSER WATER RETURN PIPE CONDENSER WATER SUPPLY PIPE CHILLED WATER SUPPLY PIPE CHILLED WATER RETURN PIPE NATURAL GAS PIPE HEATING WATER RETURN PIPE HEATING WATER SUPPLY PIPE REFRIGERANT LIQUID PIPE REFRIGERANT SUCTION PIPE STEAM SUPPLY COLD WATER PIPE (POTABLE) GREASE WASTE GARAGE WASTE HOT WATER PIPE (POTABLE) HOT WATER CIRCULATING (POTABLE) INDIRECT DRAIN IRRIGATION WATER PIPE NON — POTABLE CW PIPE OVERFLOW RAINWATER LEADER PUMPED WASTE PUMPED STORM DRAIN RAINWATER LEADER BELOW GRADE RAINWATER LEADER STORM DRAIN PIPE SANITARY SEWER PIPE (SITE) UNDERDRAIN PIPE VENT PIPE (SANITARY) WASTE PIPE WASTE PIPE BELOW GROUND DRY STAND PIPE FIRE DEPT. CONNECTION PIPE FIRE SPRINKLER PIPE FIRE PROTECTION WATER PIPE FIRE PROTECTION WASTE PIPE WET STAND PIPE TEE W /PIPE UP TEE DOWN W /ELBOW TEE UP W/ ELBOW TEE UP TEE DOWN 90' ELBOW UP 90' ELBOW DN CAP UNION FLANGE FLEX HOSE CONNECTION DOUBLE BELLOWS FLEX CONNECTION SINGLE BELLOWS FLEX CONNECTION FLOW ARROW CONCENTRIC REDUCER ECCENTRIC REDUCER SLOPE SYMBOL BREAK OR CONTNUATION SYMBOL DOWN SPOUT NOZZLE CLEANOUT 45' ELBOW 45' ELBOW 90' ELBOW 90' ELBOW CROSS TEE WYE TAP HOSE CONNECTION MOTORIZED 2 —WAY VALVE MOTORIZED 3 —WAY VALVE PRESSURE REDUCING VALVE CONTROL VALVE RELIEF VALVE BALL VALVE 3 —WAY GATE VALVE BUTTERFLY VALVE DIAPHRAGM VAVLE CHECK VALVE NEEDLE VALVE GAS COCK GLOBE VALVE GLOBE VALVE ANGLE GLOBE VALVE 3 —WAY GATE BALANCING VALVE BALANCING & MEASURING VALVE HOSE BIBB PUMP MANUAL AIR VENT AUTOMATIC AIR VENT HIGH CAPACITY AIR VENT SHOCK ARRESTOR FLOW SWITCH VACUUM BREAKER PRESSURE GAUGE TEMPERATURE SENSOR TEMPERATURE INDICATOR AUTO FLOW VALVE FLOW METER Y STRAINER Y STRAINER W/ BALL VALVE PIPE SLEEVE STEAM TRAP PETES PLUG HEAT TRACING SUCTION DIFFUSER W/ STRAINER REDUCED PRESSURE BACKFLOW PREVENTOR FUNNEL DRAIN FLOOR DRAIN ROOF DRAIN ROOF OVERFLOW DRAIN FLOOR SINK DUCTWORK ACCESSORIES J I BIRDSCREEN OR SCREENED OPENING 1-› L DJ AD - 12x12 SL R 0 DUCTWORK RECTANGULAR DUCT x RECTANGULAR DUCT RECTANGULAR DUCT RECTANGULAR DUCT P P /� SUPPLY GRILLE RETURN OR EXHAUST GRILLE VOLUME DAMPER MOTOR OPERATED DAMPER AIRFLOW MONITOR REMOTELY OPERATED VOLUME DAMPER (YOUNG REGULATOR OR APPROVED) BACK DRAFT DAMPER FLEX CONNECTION F RERBAI ERWTHROUGHNWALLPURTENANCES. FIRE DAMPER THROUGH FLOOR FIRE /SMOKE DAMPER THROUGH WALL FIRE /SMOKE DAMPER THROUGH FLOOR ACCESS DOORS 1" ACOUSTICALLY LINED DUCT (SIZE IS INSIDE NET DIMENSION). 2" ACOUSTICALLY LINED DUCT (SIZE IS INSIDE NET DIMENSION). TRANSITION TURNING VANES SMOKE DETECTOR RETURN / EXHAUST / OUTSIDE AIR SUPPLY / TRANSFER AIR SUPPLY AIR DUCT TURNING UP OR TOWARD SUPPLY AIR DUCT TURNING DOWN OR AWAY EXHAUST OR RETURN AIR DUCT TURNING UP OR TOWARD EXHAUST OR RETURN AIR DUCT TURNING DOWN OR AWAY ROUND DUCT TURNING UP OR TOWARD ROUND DUCT TURNING DOWN OR AWAY OVAL DUCT TURNING UP OR TOWARD OVAL DUCT TURNING DOWN OR AWAY FLEXIBLE DUCT GRILLE /REGISTER/DIFFUSER DOUBLE LINE 4— x 1 X 1 1 CEILING SUPPLY AIR DIFFUSER CEILING SUPPLY AIR DIFFUSER (SHOWN WITH THROW ARROWS) CEILING RETURN, EXHAUST OR TRANSFER AIR GRILLE LINEAR DIFFUSER (CEILING) LINEAR DIFFUSER (WALL) LOUVER PLAN ViEW LOUVER (ELEVATION VIEW) HVAC - ANNOTATION DUCT WORK 0 ROUND DUCT SYMBOL $ FLAT OVAL DUCT SYMBOL EQUIPMENT TAG EF —A -1 CONSECUTIVE EQUIP. BUILDING OF EQUIP. LOCATION EQUIPMENT DESIGNATION EQUIPMENT TAG GRILLE, REGISTER, OR DIFFUSER TAG DT5 -618 CFM EACH 1 L— SIZE TYPE CODE LD5 /3 -300 LINEAR DIFFUSER GRILLE i ---CFM EACH ACTIVE LENGTH IN FT. TOTAL LENGTH IN FT. TYPE CODE GENERAL INFORMATION SYMBOLS X X NEW MECHANICAL WORK EXISTING MECHANICAL WORK DEMO MECHANICAL WORK DETAIL OR DIAGRAM NUMBER SHEET NUMBER WHERE DETAIL /DIAGRAM SHOWN SECTION LETTER SHEET NUMBER WHERE SECTION SHOWN CONTROLS LEGEND DEVICE /POINT NUMBER PLAN NUMBER SHEET NUMBER WHERE, PLAN SHOWN DETAIL REFERENCE OUTLINE WITH NUMBER AND SHEET LOCATION SCOPE OF WORK PLUMBING FIXTURE CALL —OUT (SEE PLUMBING SCHEDULES) DRAWING NOTE REFERENCE POINT OF CONNECTION POINT OF DEMOLITION A ALARM ADS AIR DIRT SEPARATOR AMS AIR FLOW MEASURING STATION AIR TERMINAL BOX CARBON DIOXIDE SENSOR CO2 CARBON DIOXIDE ATB CO CARBON MONOXIDE CPA CONTROL POINT ADJUSTMENT CS CURRENT SENSING RELAY ® DDC CONTROL RELAY DIFFERENTIAL PRESSURE SENSOR DPS DIFFERENTIAL PRESSURE SENSOR DS DOOR SENSOR SD DUCT SMOKE DETECTOR DSD DUCT SMOKE DETECTOR EC ELECTRIC HEATING COIL EA EXHAUST AIR EAV EXHAUST AIR VALVE EF EXHAUST FAN E/P ELECTRONIC TO PNEUMATIC SIGNAL CONVERSION. a FAN OR PUMP FF FINAL ALTER FZ FREEZE STAT FHV FUME HOOD VALVE e HUMIDITY SENSOR H HUMIDITY SENSOR HL HIGH LIMIT LL LOW LIMIT MA MIXED AIR MOD MODULATING SIGNAL OR o/\/\ p� MOTOR OPERATED CONTROL VALVE MOTOR STARTER NC NORMALLY CLOSED NO NORMALLY OPEN OS OCCUPANCY SENSOR OA OUTSIDE AIR OR Q /\/\ MOTOR OPERATED DAMPER D�4 PA PF PS RA S SA SAV SS SP CD TS VFD VFD PNEUMATIC OPERATED DAMPER PNEUMATIC OPERATED CONTROL VALVE. PRIMARY AIR PRE FILTER PRESSURE SENSOR PUMP RETURN AIR STATUS SUPPLY AIR SUPPLY AIR VALVE START /STOP SASH POSITION SENSOR TEMPERATURE SENSOR TEMPERATURE SENOR VARIABLE FREQUENCY DRIVE VARIABLE FREQUENCY DRIVE PROJECT LOCATION VICINITY MAP REVISIONS No changes shall be made to the scope of work withot prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. SEPARATE PERMIT REQUIRED FOR: Mechanical Electrical Plumbing Gas Piping City of Tukwila BUILs !"° G DV #1 LEGAL DESCRIPTION PARCEL # 1523049108 W 500 FT OF S 629.84 FT OF SE 1/4 OF SE 1/4 & S 1/2 OF SW 1/4 OF SE 1/4 LESS W 190 FT OF E 565 FT OF S 320 FT LESS CO RDS DRAWING INDEX SHEET NUMBER SHEET TITLE MO.O INDEX AND LEGENDS MO.1 GENERAL NOTES AND BASIS OF DESIGN M2.0 MECHANICAL BOILER ROOM PLAN M5.0 MECHANICAL DETAILS M6.0 MECHANICAL DIAGRAMS AND SEQUENCE OF OPERATIONS M6.1 MECHANICAL FLOW DIAGRAMS M7.0 MECHANICAL SCHEDULES BID ALTERNATE 1. PROVIDE TWO (2) 15 HP INVERTER DUTY RATED MOTORS FOR EXISTING PUMPS A -4 AND A -5. 2. PROVIDE VFD's FOR PUMPS A -4 AND A -5. 3. PROVIDE DIFFERENTIAL PRESSURE SENSOR ASSEMBLY AND BY —PASS LINE IN BOILER ROOM SEE PIPING DIAGRAMS. 4. CLOSE OFF EXISTING END OF LINE CIRCUIT SETTERS. SEE DIAGRAM ON SHEET M6.1. REVIEWED FOR CODE COMPLIANCE APPROVED JUN 2 8 2011 t7L City of T '1a BUILDING ISION FILE COPY Permit No.. M -on Plan review approval is subject errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of eppirrall�ed 7 + CopyBrrdaalncI ionsrS � - ► gd; Bye ' c:? Oahe:. (�� City Of libkwita BUILDING DIVISION MtlO78 RECEIVED JUN 14 2011 PERMIT CENTER instry fe Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1 -800- 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503 - 331 -0234 www.mckinstry.com FOSTER HIGH SCHOOL TUKWILA SD 4242 SOUTH 144TH STREET TUKWILA, WA 98168 REGISTRATION: REVISIONS: NO DAVE 5/13/11 6/15/11 DESCRIPTION 50% OWNER REVIEW ISSUE FOR PERMIT McKINSTRY DIVISION: DESIGNED BY: DRAWN BY: CHECKED BY: JOB NUMBER: DATE: SCALE: SHEET TIRE: ENGINEERING JESSICA SANDERS DOREL PURAVET KRISHNA SING C10196 04 -15 -11 AS SHOWN INDEX AND LEGENDL SHEET NUMBER: M0.0 GENERAL NOTES: 1. THE CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE AND DETERMINE THE EXACT EXTENT OF WORK, COORDINATION, DEMOLITION, TEMPORARY CONSTRUCTION, TEMPORARY FACILITIES, ETC., NECESSARY TO COMPLETE THE PROJECT AS INDICATED IN THE CONTRACT DOCUMENTS. 2. INTERRUPTIONS OF SERVICES (POWER, WATER, HVAC, ETC.) AND WORK IN OCCUPIED TENANT SPACES MUST BE SCHEDULED THRU THE BUILDING MANAGER A MINIMUM OF 24 HOURS IN ADVANCE. ANY INTERRUPTIONS OR CONSTRUCTION WHICH WILL AFFECT NORMAL OPERATION OF THE BUILDING OR TENANTS MUST BE SCHEDULED, WITH THE BUILDING MANAGER'S APPROVAL, ON AN AFTER -HOURS BASIS. 3. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR TEMPORARY HEAT DURING CONSTRUCTION. PERMANENT MECHANICAL EQUIPMENT SHALL NOT BE USED FOR TEMPORARY HEAT WITHOUT PROTECTION FROM DUST ACCUMULATION, WRITTEN ACCEPTANCE OF DUST RELATED WARRANTY COSTS AND PRIOR APPROVAL BY THE MECHANICAL ENGINEER. 4. FURNISH LABOR, MATERIALS, EQUIPMENT, APPARATUS AND APPURTENANCES REQUIRED FOR A COMPLETE WORKING AND COORDINATED SYSTEM. MATERIALS, EQUIPMENT, APPARATUS, AND APPURTENANCES SHALL MATCH EXISTING BUILDING STANDARDS IN QUALITY, TYPE AND FINISH, UNLESS OTHERWISE NOTED. 5. VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT. COORDINATE THE EXACT LOCATIONS OF NEW MECHANICAL AND PLUMBING EQUIPMENT WITH THE LOCATIONS OF LIGHTING FIXTURES, PIPING, AND OTHER CONSTRUCTION, TO ALLOW FOR PROPER ACCESS TO SERVICE AND MAINTAIN EQUIPMENT PRIOR TO START OF CONSTRUCTION. 6. COORDINATE THE LOCATION OF DUCTWORK AND PIPING WITH OTHER TRADES. PROVIDE OFFSETS IN DUCTWORK AND PIPING AS REQUIRED AT NO ADDITIONAL COST TO OWNER. 7. TRADES TO LEAVE 36" CLEARANCE IN FRONT OF MECHANICAL EQUIPMENT ACCESS PANELS FOR SERVICING. 8. INSTALL PIPING TO ALLOW MINIMUM ACCESS OF 6" ABOVE AND TO THE SIDE OF THE ELECTRICAL CABLE TRAYS. 9. SUPPORT CONDUIT, AND PIPING, INDEPENDENTLY. SUPPORTS ARE INDEPENDENT OF PARTITION AND CEILING SYSTEM SUPPORTS. 10. IN NO INSTANCE SHALL OTHER TRADES HANG OR SUPPORT EQUIPMENT, CEILING WIRES, LIGHT FIXTURE HANGERS, ETC., FROM HVAC EQUIPMENT OR PIPING. 11. CUTTING, FRAMING, PATCHING, AND PAINTING OF WALL, CEILING, AND FLOOR OPENINGS SHALL BE BY GENERAL CONTRACTOR. THIS INCLUDES OPENINGS THROUGH AREA SEPARATION WALLS 12. OBTAIN WRITTEN APPROVAL OF STRUCTURAL ENGINEER PRIOR TO INSTALLATION OF PENETRATIONS IF NOT SHOWN ON DRAWINGS. 13. REFER TO STRUCTURAL DRAWINGS FOR EQUIPMENT SUPPORTS. REFER TO THE SPECIFICATIONS MATRIX FOR ADDITIONAL SEISMIC INFORMATION. 14. UNIT WEIGHTS AND LOCATIONS HAVE BEEN COORDINATED TO DETERMINE BUILDING STRUCTURAL ADEQUACY. IF IT IS NECESSARY TO RELOCATE A UNIT, NOTIFY MCKINSTRY ENGINEERING DEPARTMENT FOR RE- COORDINATION. 15. PROVIDE SEISMIC RESTRAINTS AND ANCHORAGE PER SMACNA AND THE INTERNATIONAL BUILDING CODE FOR PIPING AND EQUIPMENT. 16. CONCRETE EQUIPMENT CURBS, FLASHING, SLEEPERS, CONCRETE STATIONS, EMBED PLATES, PIPING, RAT SLABS, SUMP BASINS AND HOUSEKEEPING PADS ARE SHOWN FOR APPROXIMATE LOCATION AND SIZE AND WILL BE PROVIDED BY THE GENERAL CONTRACTOR. 17. CUTTING AND PATCHING OF ROOF OPENINGS SHALL BE BY THE GENERAL CONTRACTOR. 18. SLEEPERS, HOUSEKEEPING PADS, EMBED PLATES, AND CANT STRIPS SHALL BE BUILT AND FASTENED TO THE ROOF BY THE GENERAL CONTRACTOR. TOP OF THE CURB MUST BE FLAT TO PROVIDE AN ACCEPTABLE SEAUNG SURFACE. MAXIMUM ALLOWABLE DEVIATION FROM LEVEL SHALL BE X IN 10'. ROOF CURBS AND SLEEPERS MUST BE SECURELY FASTENED TO STRUCTURAL SUPPORT MEMBERS. 19. ALL CRANE LIFTING AND SETTING OF EQUIPMENT, PIPING, DUCTWORK, ETC. IS TO BE PERFORMED BY GENERAL CONTRACTOR. EQUIPMENT REQUIRES SPECIFIC RIGGING TO PREVENT DAMAGE. SEE EQUIPMENT SUBMITTALS FOR LIFTING INSTRUCTIONS. 20. BEFORE MAKING CONNECTIONS TO THE EQUIPMENT FURNISHED BY THE OWNER OR OTHERS, VERIFY THAT EXACT INFORMATION IS PROVIDED. 21. PROVIDE ACCESS DOORS IN WALLS AND CEILINGS WHERE ACCESS IS REQUIRED TO CONCEALED MECHANICAL OR PLUMBING EQUIPMENT, VALVES, CONTROLS, AND OTHER DEVICES. 22. PROVIDE PIPE, EQUIPMENT, AND VALVE LABELING FOR IDENTIFICATION. MATCH OWNERS EXISTING LABELING SCHEME IF APPLICABLE. 23. SEAL CONNECTIONS TO AIR SHAFTS AIRTIGHT. PROVIDE AIRTIGHT SEAL AROUND PENETRATIONS IN AIR PLENUMS. 24. LIGHT FIXTURE CLEARANCE: COORDINATE LOCATIONS OF MECHANICAL WORK TO PROVIDE CLEARANCES OVER LIGHTING FIXTURES FOR REMOVAL AND REPLACEMENT. 25. PROVIDE MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM FOR ALL REMODEL AREAS. 26. PROVIDE FIRE PROOFING FOR PENETRATIONS OF FIRE RATED CONSTRUCTION. ELECTRICAL COORDINATION NOTES: 1. WHERE INDICATED ON THE EQUIPMENT SCHEDULES, THE EQUIPMENT COMES COMPLETE FROM THE FACTORY WITH MOTOR CONTROLS AS REQUIRED. ELECTRICIAN SHALL PROVIDE SERVICE AND A DISCONNECT PER CODE, AND DO POWER WIRING, INCLUDING CONNECTING TO EQUIPMENT. 2. WHERE INDICATED ON EQUIPMENT SCHEDULES, THE EQUIPMENT REQUIRES FIELD INSTALLED MOTOR STARTERS. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL MOTOR STARTERS (OR CONTACTORS WHERE INDICATED). PROVIDE SERVICE AND DISCONNECT PER CODE, AND DO POWER WIRING, INCLUDING CONNECTING TO EQUIPMENT. HOLDING COIL CIRCUIT SHALL BE POWERED BY ELECTRICAL CONTACTOR (120V UNLESS INDICATED OTHERWISE). STARTERS SHALL BE PROVIDED WITH H -O -A SWITCH. 3. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS OF THE MECHANICAL EQUIPMENT, UNLESS OTHERWISE NOTED. DEMOLITION NOTES: 1. DEMOLITION DRAWINGS ARE INCLUDED TO GIVE A COMMON BASIS FOR BIDDING AND MAY NOT SHOW EVERY ITEM TO BE DEMOLISHED. VISIT SITE TO DETERMINE AND COORDINATE THE EXACT EXTENT OF DEMOLMON TO FACILITATE WORK INDICATED BY THE CONTRACT DOCUMENTS. REWORK EXISTING TERMINATIONS, CONNECTIONS, ETC., TO ACCEPT NEW WORK. PRIOR TO START OF ANY DEMO WORK, VERIFY EXISTING CONDITIONS AND NOTIFY ENGINEER OF ANY DISCREPANCIES FOR RESOLUTION. 2. REMOVE EXISTING HVAC EQUIPMENT AS INDICATED, INCLUDING ASSOCIATED PIPING, CONTROL SYSTEMS, AND APPURTENANCES. 5. REMOVE EXISTING PIPING SERVING ITEMS TO BE REMOVED. CAP OR PLUG BRANCH LINES NOT BEING REUSED. 6. GIVE OWNER THE OPPORTUNITY TO RETAIN ANY REMOVED ITEMS THAT ARE NOT BEING REUSED. DISPOSE OF OTHER ITEMS LEGALLY AND RESPONSIBLY. 7. CLEAN AND REFURBISH ITEMS INDICATED TO BE REMOVED AND REUSED PRIOR TO REUSE. PIPING NOTES: 1. THE PIPING CONTRACTOR SHALL PROVIDE FULL SUBMITTALS OF PIPING AND DEVICES FOR APPROVAL PRIOR TO PURCHASE AND INSTALLATION. 2. BACKFLOW DEVICES, CROSS CONTROL DEVICES, VACUUM BREAKER AND DOUBLE CHECK VALVES TO BE A TYPE APPROVED BY THE STATE OF WASHINGTON HEALTH SERVICES DMSION. 3. INSTALL AIR VENTS AT HIGH POINTS IN HYDRONIC PIPING. INSTALL DRAIN VALVES AT LOW POINTS IN HYDRONIC PIPING. 4. PROVIDE FLANGES OR UNIONS AT PIPING CONNECTIONS TO EQUIPMENT, COILS, TRAPS, CONTROL VALVES, AND OTHER COMPONENTS TO ALLOW FOR MAINTENANCE. 5. PROVIDE REDUCERS AS REQUIRED FROM LINE PIPE SIZE TO EQUIPMENT, TRAP, COIL, AND CONTROL VALVE CONNECTION SIZES. 6. PROVIDE OFFSETS FOR BRANCH LINES TO EQUIPMENT TO ALLOW FOR SERVICE AND MAINTENANCE OF EQUIPMENT. 7. PROVIDE DIELECTRIC UNIONS AT CONNECTIONS OF DISSIMILAR PIPE MATERIALS. 8. PROVIDE PRESSURE AND TEMPERATURE TEST PORTS AT SUPPLY AND RETURN PIPING CONNECTIONS TO EQUIPMENT. 9. SIZE BALANCING /MEASURING VALVES IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. DO NOT PROVIDE VALVES LARGER THAN LINE SIZE. 10. SYSTEM FILL : a. AFTER COMPLETION OF PIPING SYSTEM INSTALLATION AND PRESSURE TESTING, AND BEFORE MAKING CONNECTIONS TO EQUIPMENT, REMOVE TRACES OF DIRT, OIL, PIPE JOINT COMPOUND, ETC. BY FLUSHING PIPE SYSTEM WITH MCKINSTRY APPROVED CLEANER AND RUNNING CIRCULATION PUMPS. DRAIN, RE -FILL, AND RE -FLUSH SYSTEM IN ORDER TO REMOVE ALL TRACES OF CHEMICAL CLEANER. b. AFTER SYSTEM HAS BEEN THOROUGHLY CLEANED AND PRESSURE TESTED, FILL WITH WATER WITH APPROPRIATE CORROSION INHIBITORS. SUBMIT WATER TO MANUFACTURER'S LABORATORY FOR ANALYSIS. ADD INHIBITOR AS DIRECTED BY LAB REPORT. SUBMIT FINAL LAB REPORT TO MCKINSTRY ENGINEERING DEPARTMENT. c. RUN PUMPS TO CIRCULATE UNTIL THOROUGHLY MIXED AND AIR HAS BEEN PURGED FROM SYSTEM. THEN, DRAW A SAMPLE OF WATER AND SEND TO MANUFACTURER'S LABORATORY FOR ANALYSIS. ADD INHIBITOR AS DIRECTED BY LAB REPORT. SUBMIT FINAL LAB REPORT TO MCKINSTRY ENGINEERING DEPARTMENT. d. PRESSURIZE SYSTEM ACCORDING TO THE FOLLOWING SCHEDULE AND LEAVE ALL VALVE CLOSED: HEATING WATER SYSTEM FILL PRESSURE: 15 PSI HEATING WATER SYSTEM RELIEF VALVE SETTING: 75 PSI WASHINGTON STATE ENERGY CODE NOTES: 1. PROVIDE COMMISSIONING PLAN IN ACCORDANCE WITH 2009 WASHINGTON STATE ENERGY CODE SECTION 1416.3.1. 2. PROVIDE SYSTEMS TESTING AND BALANCING IN ACCORDANCE WITH 2009 WASHINGTON STATE ENERGY CODE SECTION 1416.3.2. 3. PROVIDE SYSTEMS, EQUIPMENT, AND CONTROLS FUNCTIONAL TESTING IN ACCORDANCE WITH 2009 WASHINGTON STATE ENERGY CODE SECTION 1416.3.3. 4. PROVIDE SUPPORTING DOCUMENTATION IN ACCORDANCE WITH 2009 WASHINGTON STATE ENERGY CODE 1416.3.4 INCLUDING OPERATION AND MAINTENANCE MANUALS, HVAC CONTROL SYSTEM MAINTENANCE AND CALIBRATION INFORMATION, HVAC CONTROL SEQUENCE OF OPERATIONS, COMMISSIONING REPORT, AND RECORD DRAWINGS. 5. PROVIDE OWNER SYSTEMS OPERATION TRAINING IN ACCORDANCE WITH 2009 WASHINGTON STATE ENERGY CODE SECTION 1416.3.4.3. 6. PROVIDE COMMISSIONING COMPLIANCE FORM IN ACCORDANCE WITH 2009 WASHINGTON STATE ENERGY CODE SECTION 1416.4. 7. MOTORS SHALL COMPLY WITH CHAPTER 15 OF THE 2009 WASHINGTON STATE ENERGY CODE. FOR ADDITIONAL DETAILS, SEE EQUIPMENT SCHEDULES CONTAINED WITHIN THIS DRAWING SET. 8. SYSTEMS SHALL BE INSULATED AS PRESCRIBED IN CHAPTER 14, TABLE 14 -5 OF THE 2009 WASHINGTON STATE ENERGY CODE. FOR ADDITIONAL DETAILS, SEE DUCTWORK AND PIPING SPECIFICATION MATRICES CONTAINED WITHIN THIS DRAWING SET. REVIEWED FOR CODE COMPLIANCE APPROVED JUN 2 8 2011 City of Tukwila BUILDING DIVISION FOSTER HIGH SCHOOL BOILER REPLACEMENT - BASIS OF DESIGN ITEM # SYSTEM CRITERIA CRITERIA SOURCE CODE BASIS FOR PROJECT 1 -1 CODE 2009 INTERNATIONAL BUILDING CODE CITY OF TUKWILA 1 -2 CODE 2009 INTERNATIONAL MECHANICAL CODE CITY OF TUKWILA 1 -3 CODE 2009 INTERNATIONAL FUEL GAS CODE CITY OF TUKWILA 1 -4 CODE 2009 UNIFORM PLUMBING CODE CITY OF TUKWILA 1 -5 CODE 2009 WASHINGTON STATE ENERGY CODE STATE OF WASHINGTON 1 -6 CODE 2009 WASHINGTON STATE BOILERS AND UNFIRED PRESSURE VESSELS LAW STATE OF WASHINGTON BASIS FOR HEATING WATER SYSTEM 2 -1 OUTSIDE AIR DESIGN WEATHER OUTSIDE DESIGN 0.6% = 24T DB OUTDOOR DESIGN TEMPERATURES - PUGET SOUND CHAPTER - ASHRAE 2 -2 INDOOR HEATING SET POINT INDOOR DESIGN HEATING POINT = 70'F DB DESIGN APPROACH 2 -3 ROOF ROOF R- VALUES AND U- VALUES BASED ON EXISTING DRAWINGS (1990); INSULATION DEFINED BY THICKNESS, NOT BY R- VALUE. ALL INSULATION R- VALUES ASSUMED. THERMAL PERFORMANCE OF ALL OTHER MATERIALS BASED ON 2005 ASHRAE FUNDAMENTALS, CHAPTER 25 ROOF. R VALUE =24, U =0.041 EXISTING CONDITIONS 2 -4 WALL WALL R- VALUES AND U- VALUES BASED ON EXISTING DRAWINGS (1993); INSULATION DEFINED BY THICKNESS, NOT BY R- VALUE. ALL INSULATION R- VALUES ASSUMED. THERMAL PERFORMANCE OF ALL OTHER MATERIALS BASED ON 2005 ASHRAE FUNDAMENTALS, CHAPTER 25 R VALUE = 8.2, U =0.122 EXISTING CONDITIONS 2 -5 WINDOWS EXISTING DOUBLE PANE METAL FRAME W/THERMAL BREAK WINDOWS. USED SINGLE PANE GLAZING AT ENTRY WAYS. DOUBLE PANE GLAZING U -VALUE = 1 EXISTING CONDITIONS 2 -6 INFILTRATION INFILTRATION ASSUMED TO BE 1.0 AIR CHANGES PER HOUR FOR FIRST 12 LINEAL FEET FROM THE PERIMETER WALL. ENGINEERING ESTIMATE EXISTING CONDITIONS 2 -1 EXISTING GAS SYSTEM GAS SERVICE MAXIMUM CAPACITY = 10 000 MBH GAS REGULATOR OUTLET PRESSURE = 2 LBS CONFIRMED ON SITE 2 -2 EXISTING HEATING WATER SYSTEM TWO DUAL FUEL OIL -GAS BOILERS (2929 MBH GAS INPUT EACH) DELIVER 130% OF REQUIRED CAPACITY HEATING WATER TEMPERATURE 180"F - 160T AIR HANDLING AND FAN COIL UNITS HEATING COILS DESIGN DELTA T = 20T. TWO (2) 1 1/2 HP PRIMARY PUMPS SERVING BOILERS, TWO (2) 15HP SECONDARY PUMPS SERVING HOT WATER SYSTEM LOOP. 1990 DRAWINGS 2 -3 EXISTING BOILER CONTROLS JOHNSON CONTROLS - METASYS. VERSION 4.0.0.3400 2003 -2008 SIGNAL FROM EXISTING DDC CONTROL PANEL TO ENABLE /DISABLE EACH BOILER AND SYSTEM PUMPS. CONFIRMED ON SITE PROJECT SCOPE OF WORK: HEATING WATER SYSTEM BASIS OF DESIGN 3- 1 BOILER PLANT SIZING BOILER PLANT SIZED TO INCLUDE WHOLE SCHOOL CAMPUS DESIGN APPROACH 3 -2 BOILER PLANT REDUNDANT CAPACITY BOILER PLANT INCLUDING ONE(1) CONDENSING BOILER AND ONE (1) EXISTING NON CONDENSING BOILER IS SIZED TO REPLACE CURRENT HEATING CAPACITY. SEE 2 -2 FOR DETAILS. DESIGN APPROACH 3 -3 HEATING MEDIA HEATING WATER SYSTEM DESIGN TO SUPPLY 180'F HWS AND 100'F HWR. FOR EXACT SET POINTS AND INTENT OF SYSTEM OPERATION SEE DESIGN INTENT ON SHEET M6.0. DESIGN APPROACH 3 -4 BOILER ROOM SCOPE OF WORK REPLACE ONE (1) OF THE EXISTING BOILERS WITH A HIGH EFFICIENCY CONDENSING BOILER, REPLACE RESPECTIVE BOILER PRIMARY PUMP. PROVIDE INDEPENDENT BOILER FLUE DISCHARGES. T DESIGN APPROACH RESPONSIBILITY MATRIX EQUIPMENT FURNISH RECEIVE INSTALL WIRE CONTROLS START -UP DEMO OF EXISTING BOLIER MC MC MC - - - DEMO OF EXISTING FLUE MC MC MC - - - DEMO OF EXISTING LINE VOLTAGE CONDUIT /BOXES - - - - EC DEMO OF INSULATING PIPING AND EQUIPMENT MC MC MC - - - BOILER McK MC MC EC BOILER CONTROLS AND EXISTING BOILER ENABLE DISABLE - FACTORY / BMS INTERFACE - CC FACTORY BOILER APPURTENANCES (GAS REGULATOR, NEUTRAUZATION TANK, FLOW SWITCH, HEADER TEMPERATURE SENSOR) McK MC MC EC CC FACTORY BOILER VENT INSTALLATIONS MC(2) MC(2) MC(2) - - - BOILER CONTROL SYSTEM DDC INTERFACE McK (3) MC CC EC CC CC HEATING WATER PUMP McK MC MC EC CC MC PIPING AND EQUIPMENT INSULATION MC MC MC - - - HEATING WATER CONTROL VALVES INCLUDING ACTUATORS CC MC MC EC (1) CC CC HEATING WATER CONTROL SENSOR WELLS CC CC MC (1) - - - SYSTEM FLUSH AND INITIAL CHEMICAL TREATMENT MC MC - - - MC COMMISSIONING/TESTING /BALANCING COMMISSIONING AGENT NOTES: 1. EC UNDER DIRECTION OF CC 2. AL29 -4C FOR EXISTING AND NEW BOILERS 3. FURNISHED WITH BOILER 4. BASED ON DIRECTION FROM MC 5. FIRE PANEL INTERFACE TO BE PROVIDED BY FIRE ALARM CONTRACTOR McK - McKINSTRY CA - COMMISSIONING AGENT MC - MECHANICAL CONTRACTOR CC - CONTROLS CONTRACTOR 1'1, 1, 1--0 7 $ RECEIVED JUN 14 2011 PERMITCENTER For Th instry fe Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1 -800- 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503 - 331 -0234 www.mckinstry.com FOSTER HIGH SCHOOL TUKWILA SD 4242 SOUTH 144TH STREET TUKWILA, WA 98168 REGISTRATION: REVISIONS: NO DATE DESCRIPTION 5/13/11 50% OWNER REVIEW 6/15/11 ISSUE FOR PERMIT McKINSTRY DIVISION: ENGINEERING DESIGNED BY: DRAWN BY: CHECKED BY: JOB NUMBER: DATE SCALE JESSICA SANDERS DOREL PURAVET KRISI1NA SING C10196 04 -15 -11 AS SHOWN SHEET 1TTLE: GENERAL NOTES AND BASIS OF DESIGN SHEET NUMBER: M0.1 SOFFIT LEVEL OVER LOADING DOCK 12 "0 B -1 B -2 MECHANICAL ROOM DEMOLITION SECTION - / SCALE: 1/4 " =1' -0" 0 2' 4' 8' SOFFIT LEVEL OVER LOADING DOCK 7® 8 "0 FLUE , ■ /— 14 10 FLUE 0 - L c MECHANICAL ROOM SECTION SCALE: 1 /4 " =1' -0" 0 2' 4' 8' / ROOF WALL 24 "o THIMBLE SOFFIT LEVEL OVER LOADING DOCK PARAPET BEYOND WEATHER CAP GALVANIZED ANGLE SUPPORT e MECHANICAL ROOM DEMOLITION SECTION SCALE: 1/4 " =1' -0" 0 2' 4' 8' ROOF PARAPET BEYOND 3' MIN 8 "0 FLUE 1S 14 "0 FLUE SOFFIT LEVEL OVER LOADING DOCK ak \ 00000 CDMECHANICAL ROOM SECTION SCALE: , /a•�r —o• SCALE: 1 /4 " =1' -0" a' 4' 0 0 2' 8' REVIEWED FOR CODE COMPLIANCE APPROVED JUN 2 8 2011 City of Tukwila BUILDING DIVISION PSE GAS METER 2# SERVICE 1 -1/2" 2., 4 "HWS AND 4 "HWR TO ACADEMIC WING AND AUDITORIUM 1 "G 2 "HWS AND 2 "HWR UP Wh H VALVES TO MECH PLATFORM ABOVE, SERVING COMMONS 4" CIRCUIT SETTER 4" 12 "0 FLUE 6" AIR HWS (TYP 2) SEPARATOR KEY NOTES O DEMOLISH 24" FLUE FROM BOILER ROOM TO DISCHARGE. O DEMOLISH GAS RISER, REGULATOR AND GAS TRAIN. ® RE —USE EXISTING OPENINGS. PROVIDE BLANK —OFF PLATE AT EACH PENETRATION. ® PROVIDE BLANK —OFF PLATE AND WALL THIMBLE FOR THE FLUE LINES. SEAL WEATHER TIGHT. ® INSTALL PER MANUFACTURER RECOMMENDATIONS. ® PROVIDE ANGLE SUPPORTS. O CONTRACTOR TO VERIFY FLUE LENGTH BEFORE PURCHASING FLUE. ® FOR BOILER AND PUMP PIPING SEE 1/M5.0 AND 2/M5.0. ® SEE 3/M5.0 AND 4/M5.0 FOR DETAILS. 10 GAS METER BY CONTROL CONTRACTOR WIRED BY CONTROL CONTRACTOR, SAGE METERING — MODEL SRE -400 OR APPROVED EQUAL. O WATER METER PROVIDED BY MECHANICAL, WIRED BY CONTROL CONTRACTOR. 12 FOR BID ALTERNATE ONLY ONLY -- HWR - -- B -1 3" CIRCUIT SEIIER 6'x4' LOUVER HIGH LOW B -2 WATER HEATER #7,---4" HOUSEKEEPING PAD FLOOR DRAIN 3 "HWS AND 3 "HWR TO GYM G PSE GAS METER 2# SERVICE FLOOR DRAIN 1 1 -1/4" 1' 4" HOUSEKEEPING PAD 1 -1/2" J BOILER ROOM DEMOLITION PLAN SCALE: 1 /4 " =1' -0" 0 2' 4' 8' 4 "HWS AND 4 "HWR TO ACADEMIC WING AND AUDITORIUM 2 "HWS AND 2 "HWR UP WITH VALVES TO MECH PLATFORM ABOVE, SERVING COMMONS 3/4" MAKE —UP LINE rFOR EPO SWITCH, SEE ELEC DWGS DIFFERENTIAL PRESS* \\ SENSOR SEE 6/M5.015\ p VFD's ' 0 A-4 & 4" CIRCUIT SETTER- FOR EPO SWITCH, SEE ELEC DWGS 3" CIRCUIT SETTER 6'x4' LOUVER HIGH LOW HWS —HWR SIR SEPARATOR 1 —J 1 -1/4" FLOOR DRAIN 4" HOUSEKEEPING PAD 1 -1/2" 3" BOILER ROOM PLAN SCALE: 1/4 " =1' -0" 0 2' 4' 3/4" MAKE —UP LINE 1 -1/4" GAS TO LOCKERS WATER HEATER AND CLOTH DRYER EXPANSION TANK WATER HEATER 4" HOUSEKEEPING PAD FLOOR DRAIN 3 "HWS AND 3 "HWR TO GYM 1 -1 /4" GAS TO LOCKERS WATER HEATER AND CLOTH DRYER EXPANSION TANK 8 M 11-07 8 RECEIVED JUN 14 2011 PERMIT CENTER For Th instry fe Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1- 800 - 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503 - 331 -0234 www.mckinstry.com PROJECT: FOSTER HIGH SCHOOL TUKWILA SD 4242 SOUTH 144TH STREET TUKWILA, WA 98168 REGIS1RA11ON: REVISIONS: NO DATE DESCRIPTION 5/13/11 50% OWNER REVIEW 6/15/11 ISSUE FOR PERMIT MdaNSTRY DIVISION: ENGINEERING DESIGNED BY: JESSICA SANDERS DRAWN BY: DOREL PURAVET CHECKED BY: KRISHNA SING JOB NUMBER: C10196 DATE: 04 -15 -11 SCALE: AS SHOWN SHEET TI1LE: MECHANICAL BOILER ROOM PLAN SHEET NUMBER: M2.0 H AV > HWR )---- HWR - - - -- 4 6H 1/2" INSTRUMENT PIPING REDUCER SPOOL (TYP) FLOOR REFERENCE PIPING DIAGRAM FOR PIPE SIZES AV pp 0 -200'F L_'L1 _tZ� 0 -200T BOILER ID PRV SET AT 75 PSIG NEUTRALIZATION TANK 3/4" DRAIN VALVE WITH HOSE END AND CAP NOTES: 1. ROUTE INDIRECT DRAINS TO NEAREST AVAILABLE FLOOR DRAIN. 2. REFERENCE BOILER ROOM PIPING DIAGRAM ON M6.0 FOR PIPE SIZES. 3. REFERENCE MANUFACTURER LITERATURE FOR EQUIPMENT CONNECTION DETAILS AND SEISMIC CALCULATIONS. 4. REFERENCE SHEET MO.0 FOR PIPING SYMBOLS AND ABBREVIATIONS. 5. INSTALL A SECTION OF STRAIGHT PIPE BETWEEN THE SUCTION SIDE OF THE PUMP AND THE FIRST ELBOW. THE LENGTH OF THIS PIPE SHALL BE EQUAL TO FIVE TIMES THE DIAMETER OF THE SUCTION PIPE SIZE. 6. MOUNT BOILER TO HOUSE KEEPING PAD WITH Xi" KWIK BOLT 17 (CARBON STEEL). EMBED BOLT $V" INTO HOUSEKEEPING PAD. INSTALL PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. 4" HOUSEKEEPING PAD VARIABLE VOLUME CONDENSING HEATING 1) WATER BOILER INSTALLATION DETAIL NOT TO SCALE FUEL GAS PIPING, SEE FLOOR PLAN FOR SIZE SHUTOFF COCK OR BALL VALVE WITHIN 6' —O" OF EQUIPMENT GAS REGULATOR VENT PIPED TO EXTERIOR INCREASER AS REQUIRED 1 -1/2" 1 -1/2 "G DIRT LEG GAS PRESSURE REGULATOR W/VENT, PER BOILER MANUFACTURER, REGULATOR TO BE INSTALLED AT LEAST 10 PIPE DIAMETERS FROM BOILER MAIN GAS VALVE REDUCER AS REQUIRED NATURAL GAS REGULATING VALVE DETAIL / NOT TO SCALE HYDROTHERM KN -30 BOILER SEISMIC ANCHORAGE (ASCE 745) Slab on Grade Applications Only E J�ir9r�'lent'P.aran eterS: we ; SOS G FE Er�:r S Seismic D iSmic Force: L ers: 58 ap Ip = 2.500 1.000 1.798 1.199 n Cate ory F l 4* .*Su lUpper Limit Fra I" 1.E*' [Lower Bound: FFr,:imra 113* c, in_ ASCE 7:;05 Fi u (ASCE 7-05 Tab l 13 -1 ) (ASCE Table 11.6 -1,, Seismic Use Group = II = l 9 (Default value for Anchorage rerASCE T. (ASCIE 7 -05 Table 11..4 -1) (ASCE 7 -05 Eqn. 11.4 -1 ) (ASCE 7-05 Eqn. 11.1 -3) Fp, r;ESsa . ASCE 7 Eqn_ 13.3 -1) LBS. (ASCE 7 45 Eqn 132-2 . (ASCE 705 En. 13.3 -3) NON COMBUSTIBLE OUTSIDE WALL WEATHER TIGHT FINISH BIRD SCREEN NOTES: 8" 1 SLOPE HORIZONTAL VENT SECTION DOWN TOWARDS BOILER WITH A MINIMUM 1/4" PER FOOT SLOPE. SUPPORT EVERY 3 FT MIN. A. HORIZONTAL VENT SYSTEM SHALL TERMINATE AT LEAST 4 FT BELOW 4 FT HORIZONTALLY AND 1 FT ABOVE ANY DOOR, WINDOW OR GRAVITY AIR INLET INTO ANY BUILDING, AND NO LESS THAN 7 FT FROM PUBLIC WALKWAY. B. REFER TO MANUFACTURERS INSTRUCTIONS AND IFGC 503.6.4 "VENT TERMINATION" FOR ADDITIONAL REQUIREMENTS. C. VENT TO BE BY FLEX, HEAT —FAB, PROTECH SYSTEMS OR APPROVED EQUAL CONDENSING BOILER B -1 HORIZONTAL VENT DETAIL � NOT TO SCALE / NOT TO SCALE NOTE: 1. FOR BOLT SIZE SEE NOTE 6 ON DETAIL1 /M5.0. REVIEWED FOR CODE COMPLIANCE APPROVED JUN 2 8 2011 City of Tukwila BUILDING DIVISION KYPROT`HERM (N: . .IE.ER SEISMIC_ANCHORAGE..(ASCE 7 5) ion Arm h ra a Force: Horizontal Shear Force Per Anchor: EF = F14: _ Over:urr!ira Resistance About Point A: 314„7 }T trc MAE _ = Wp. X 2 3340. 3654.8 'Vertical Acceleration: assurm EV = I'Fp + O.2 "SD, W rfl'ETIJF "x))-r:.► Jri4.7 +QEvt,0 omi on nt, rrage: iIir4IE T RVNETUP Arpohors Ernbad ir€ Concre 1 3 * �F -� ,: -� Ro-irdEr .3. p :,,NE:rUp C-5- BOILER B -1 SEISMIC ATTACHMENT DETAIL —/ NOT TO SCALE X = less -FT. 1 BB, FT. OMB, 0.0 or . (ASCE Seotioi°m 13,a 1;) LRS. No Uplfrt LES. LE S. in.. WALL THIMBLE 14" PARAPET BEYOND WEATHER CAP GALVANIZED ANGLE SUPPORT ,C BOILER B -2 HORIZONTAL VENT DETAIL NOT TO SCALE FOR BID ALTERNATE ONLY DIFFERENTIAL PRESSURE SENSOR (PROVIDED AND WIRED BY CONTROLS CONTRACTOR) NOTES: TIE INTO SUPPLY LINE 1/2" (TYP) P/T PORT 1/4" MxF NEEDLE VALVE PRESSURE GAUGE 0 -100 PSIG 11E INTO RETURN LINE 1. LOCATE GAUGE SUCH THAT THE PRESSURE READING MAY BE OBSERVED WITHOUT OBSTRUCTION. 2. REFERENCE HEATING WATER PIPING DIAGRAM 1/M6.3 FOR PIPE SIZES. DIFFERENTIAL PRESSURE SENSOR ASSEMBLY DETAIL SCALE: NOT TO SCALE t4wcY7a RECEIVED JUN 14 2011 PPRMQTCENTER instry fe Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1- 800 - 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503 - 331 -0234 www.mckinstry.com FOSTER HIGH SCHOOL TUKWILA SD 4242 SOUTH 144TH STREET TUKWILA, WA 98168 REGISTRATION: REVISIONS: NO DATE DESCRIPTION 5/13/11 50% OWNER REVIEW 6/15/11 ISSUE FOR PERMIT McKINSTRY DIVISION: ENGINEERING DESIGNED BY: DRAWN BY: CHECKED BY JOB NUMBER: DATE: SCALE: JESSICA SANDERS DOREL PURAVET KRISHNA SING C10196 04 -15 -11 AS SHOWN SHEET ME: MECHANICAL DETAILS SHEET NUMBER: M5.0 „ CIRCUIT SETTER (TYP) CHECK VALVE (TYP) GATE VALVE (TYP) 4" HWS ► HWS BACKFLOW 3" PREVENTER e— CW AUTOMATIC AIR VENT (TYP) GLOBE VALVE 1 -1/2" 3 "J I AUTOFEED ASSEMBLY A -9 AIR ELIMINATOR PURGER CHEMICAL FEED TANK WITH FUNNEL 4" A -5 6" UNION (TYP) / T as A -6 4" HWR - - -- HWR-- - - - - -� LOOP SUPPLY WELL AND SENSOR THERMOMETER (TYP) 6" 6" 6" / THREE WAY CONTROL VALVE (TYP) 6" xI A -2 „ BOILER FEED WELL AND SENSOR A -1 BOILER B -1 RELIEF VALVE 4" BOILER B -2 SUCTION DIFFUSER (TYP) 2 "G (3 LF) 2 "G (10 LF) (7,222 MBH) EXPANSION TANK 4" HOUSEKEEPING PAD El) BOILER ROOM PIPING DEMO DIAGRAM NOT TO SCALE 1 "G (399 MBH) 1 -1/2 "G (10 LF) (3,000 MBH) L 1 -1/2 "G (9 LF) B -1 B -2 GAS PIPING DIAGRAM NOT TO SCALE 1 -1/4 "G (894 MBH) 1 -1/2 "G (2,929 MBH) CIRCUIT SLIIER (TYP) CHECK VALVE (TYP) GATE VALVE (TYP) TUKWILA HIGH SCHOOL HEATING WATER SYSTEM DESIGN INTENT HEATING WATER SYSTEM 6" 4" HWS HWS 1" BACKFLOW 3" PREVENTER , CW AUTOMATIC AIR VENT (TYP) GLOBE VALVE AUTOFEED ASSEMBLY A -9 AIR ELIMINATOR PURGER CHEMICAL FEED TANK WITH FUNNEL 4" VFD A -5 3 SET 65 GPM MAX 0 GPM MI 1 -1/2" 6" 4" HWR--- � - - -- HWR---- .' - - - --1 DIFFERENTIAL PRESSURE SENSOR SEE 6/M5.0 TO VFD's 0 A -4 & A -5 ® f3"® LOOP SUPPLY WELL AND SENSOR THERMOMETER (TYP) 4 " -7 UNION (TYP) / A A -6 N 6" 6" I I /—PUMP \—'46N P -1 LOOP RETURN WELL AND SENSOR THREE WAY CONTROL VALVE (TYP) BOILER FEED WELL AND SENSOR A -1 J " _ IRELIEF VALVE BOILER B -1 4" BOILER B -2 THE PURPOSE OF THIS DOCUMENT IS TO DESCRIBE THE SEQUENCE OF OPERATIONS FOR THE CONTROL SYSTEM. THE CONTROLS CONTRACTOR SHALL PROVIDE CONTROL DEVICES, WIRING, PROGRAMMING AND APPURTENANCES NECESSARY TO PROVIDE A CONTROL SYSTEM TO EXECUTE THE INTENT DESCRIBED. THE SEQUENCE OF OPERATIONS IS NOT A PROGRAMMING GUIDE. THE CONTROLS CONTRACTOR IS RESPONSIBLE FOR THE FUNCTION OF THE SYSTEMS AND PROGRAMMING REQUIRED IN ORDER TO ACHIEVE FULLY FUNCTIONAL OPTIMIZED SYSTEMS. THE FRONT END CONTROLS TERMINAL SHALL BE PROGRAMMED TO SHOW MONITORED CONTROL POINTS ASSOCIATED WITH THE HEATING WATER SYSTEM. 1. GENERAL 1.1. THE HEATNET BOILER CONTROL PANEL ASSOCIATED WITH THE MASTER BOILER SHALL CONTROL AND MONITOR THE BOILER OPERATION AND ASSOCIATED PRIMARY BOILER PUMP. REFERENCE MANUFACTURER LITERATURE FOR DETAILS OF OPERATION AND INSTALLATION. 1.2. THE BUILDING AUTOMATED SYSTEM (BAS) ENABLES AND MONITORS THE BOILER CONTROL PANEL, CONTROLS AND MONITORS THE HEATING WATER DISTRIBUTION SYSTEM PUMPS AND THE HEATING WATER DISTRIBUTION SYSTEM CONTROL VALVES. 1.3. SETPOINTS INDICATED SHALL BE ADJUSTABLE VIA THE OPERATOR WORKSTATION. 1.4. PROVIDE TUNING AS REQUIRED TO OPTIMIZE SYSTEM PERFORMANCE. 1.5. THE CONTROLS CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING: 1.5.1. GENERATING THE SEQUENCE OF OPERATION. 1.5.2. GENERATING THE CONTROL DIAGRAM COMPLETE WITH SYSTEM CONTROLS COMPONENTS. 1.5.3. TESTING AND VERIFICATION OF THE SEQUENCE OF OPERATION BEFORE FUNCTIONAL TESTING WITH THE COMMISSIONING AGENT. 1.5.4. PERFORMING FUNCTIONAL PERFORMANCE TESTING WITH THE COMMISSIONING AGENT. 1.6. CONTROLS SYSTEM SHALL BE FULLY COMPATIBLE WITH JOHNSON CONTROLS VERSION 4.0.0.3400 AS EXISTING AT TUKWILA HIGH SCHOOL 1.7. THE HEATNET CONTROL PANEL IS FURNISHED WITH A BACNET INTERFACE CARD. THE CONTROLS CONTRACTOR SHALL PROVIDE BAS CONNECTION TO THIS INTERFACE CARD. 1.8. CONTROLS CONTRACTOR TO SUBMIT DRAWINGS AND SEQUENCE OF OPERATION TO COMMISSIONING AGENT FOR APPROVAL PRIOR TO INSTALLATION AND PROGRAMMING. 2. CONDENSING BOILER B -1 CONTROL PANEL 2.1. ENABLE AND DISABLE BOILER CONTROL PANEL THROUGH THE BAS SYSTEM. 2.2. THE BOILER CONTROL PANEL SHALL MODULATE FIRING RATE TO MEET HEATING WATER SUPPLY SETPOINT AND MAXIMIZE EFFICIENCY. 2.2.1. THE HEATING WATER SUPPLY TEMPERATURE SETPOINT SHALL- - BE RECEIVED FROM THE BAS. UPON LOSS OF COMMUNICATION THE BOILER CONTROL PANEL SHALL DEFAULT TO A HEATING WATER SUPPLY TEMPERATURE SET POINT OF 180 DEGREES. 2.3. BOILER FLOW SWITCH. 2.3.1. THE BOILER CONTROL PANEL SHALL RECEIVE SIGNAL FROM FLOW SWITCH PRIOR TO ENABLING. 2.3.2. PRIOR TO ENABLING THE FIRING OF A BOILER THE PRIMARY PUMP ASSOCIATED WITH THE BOILER SHALL BE COMMANDED AND PROVEN ENABLED. 2.4. PROVIDE OFFSETS, DEAD BANDS, TIME DELAYS AND SAFETIES FOR FULLY FUNCTIONAL AND OPTIMIZED SYSTEM THAT LIMITS SHORT CYCLING. 2.5. THE BOILER CONTROL PANEL SHALL NOT ALTERNATE THE LEAD BOILER DESIGNATION BASED ON RUNTIME. CONDENSING BOILER B -1 SHALL BE THE LEAD BOILER. CONDENSING BOILER B -1 SHOULD COMMAND ENABLE — DISABLE BOILER B -2. 2.6. 3. HEATING 3.1. WATER SYSTEM THE HEATING WATER SYSTEM COMPONENTS SHALL BE ENABLED IF THE OUTSIDE AIR TEMPERATURE IS BELOW 60 DEGREES AND ON A CALL FOR HEATING. 3.2. WHEN THE HEATING WATER SYSTEM IS ENABLED THE BOILER SHALL OPERATE TO MAINTAIN HEATING WATER SUPPLY SET POINT, THE BOILER PUMP AND DUTY PUMP SHALL OPERATE TO MAINTAIN HEATING WATER VALVES SHALL MODULATE TO MAINTAIN SPACE TEMPERATURE SETPOINTS. 3.3. ENABLE PUMPS BEFORE BOILER FIRES. 4. HEATING WATER SUPPLY TEMPERATURE RESET 4.1. HEATING WATER SUPPLY TEMPERATURE SETPOINT UPON DAILY START SHALL BE 120 DEGREES. MAXIMUM SUPPLY TEMPERATURE SET POINT SHALL BE 180 DEGREES. 4.2. RESET THE SUPPLY WATER TEMPERATURE BASED ON DEMAND. 4.3. A SUMMARY OF THE HEATING WATER VALVE POSITIONS SHALL BE GENERATED BY THE BAS EVERY 5 MINUTES. UPON DAILY START THE VALVE POSITION WILL NOT BE POLLED UNTIL THE FIRST 15 MINUTES OF OPERATION HAS BEEN COMPLETED. 4.4. WHEN THE MOST OPEN VALVE IS GREATER THAN 90% OPEN RAISE THE SUPPLY HEATING WATER SETPOINT FOUR DEGREES. 4.5. WHEN THE MOST OPEN VALVE IS LESS THAN 75% OPEN LOWER THE SUPPLY HEATING WATER SETPOINT TWO DEGREES. 4.6. THE CEILING VALUE OF THE HEATING WATER SUPPLY TEMPERATURE RESET SHALL BE 180F. 4.7. THE FLOOR VALUE OF THE HEATING WATER SUPPLY TEMPERATURE RESET SHALL BE 100F. 4.8. WHEN THE RETURN WATER TEMPERATURE IS BELOW 130T, EXISTING DUAL FUEL BOILER SHALL REMAIN DISABLED TO PREVENT BOILER FROM CONDENSING. 4.9. ENABLE EXISTING DUAL —FUEL BOILER B -2, ONLY WHEN SUPPLY WATER TEMPERATURE IS AT 180 °F, RETURN WATER TEMPERATURE IS 130 °F AND SPACE TEMPERATURE DEMAND IS NOT MET, OR WHEN NATURAL GAS IS NOT AVAILABLE (EMERGENCY ONLY). 4.10. MODULATE EXISTING THREE —WAY VALVE TO ALLOW BOILER B -2 WORM —UP, CLOSE BY —PASS WHEN WATER TEMPERATURE THRU BOILER REACHED 130 °F. 4.11. BOILER B -2 SHALL BE DISABLED WHEN RETURN WATER TEMPERATURE IS BELOW 140 °F. ASSOCIATED BOILER PUMP SHALL REMAIN ENABLED; MODULATE THREE —WAY VALVE TO DISSIPATE HEAT FROM BOILER. SUCTION DIFFUSER (TYP) EXPANSION TANK 4" HOUSEKEEPING PAD BOILER ROOM PIPING DIAGRAM NOT TO SCALE 4.12. PROVIDE HEATING WATER SUPPLY TEMPERATURE SET POINT TO BOILER CONTROL SYSTEM. 5. EXISTING HEATING WATER DISTRIBUTION PUMPS 5.1. FOLLOW EXISTING PROTOCOL. IF EXISTING PROTOCOL IS NOT AVAILABLE PROGRAM AS FOLLOW. 5.2. AUTOMATICALLY SWITCH DUTY AND STANDBY PUMP DESIGNATION BASED ON RUNTIME. 5.3. IF THE DUTY PUMP IS COMMANDED ON BUT FAILS TO OPERATE, SWITCH DUTY /STANDBY PUMP DESIGNATIONS AND ENABLE NEW DUTY PUMP. 5.4. SYSTEM PUMPS ON WHEN ANY BOILER IS ON, SYSTEM PUMPS OFF WHEN RETURN WATER TEMPERATURE IS BELOW 80T AND BOILERS ARE OFF OR PER BOILER MANUFACTURERS REQUIREMENT, WHICHEVER IS GREATER. 6. HEATING WATER DISTRIBUTION PUMPS — BID ALTERNATE 6.1. AUTOMATICALLY SWITCH DUTY AND STANDBY PUMP DESIGNATION BASED ON RUNTIME. 6.2. MODULATE THE SPEED OF THE DUTY PUMP THROUGH ITS RESPECTIVE VARIABLE FREQUENCY DRIVE TO MAINTAIN SYSTEM DIFFERENTIAL PRESSURE SETPOINT. 6.3. IF THE DUTY PUMP IS COMMANDED ON BUT FAILS TO OPERATE, SWITCH DUTY /STANDBY PUMP DESIGNATIONS AND ENABLE NEW DUTY PUMP. 6.4. SYSTEM PUMPS ON WHEN ANY BOILER IS ON, SYSTEM PUMPS OFF WHEN RETURN WATER TEMPERATURE IS BELOW 80 F AND BOILERS ARE OFF OR PER MANUFACTURERS REQUIREMENT, WHICHEVER IS GREATER. 7. BAS INTERFACE WITH THE HEATING WATER SYSTEM 7.1. Provide hardware and software REQUIRED to allow the BAS system to interface with the boiler controlS. Coordinate requirements with the boiler manufacturer for the interface. the BAS system shall specifically MONITOR OR PROVIDE the following for each boiler. 7.1.1. BOILER ENTERING AND LEAVING WATER TEMPERATURES 7.1.2. PRIMARY LOOP SUPPLY WATER TEMPERATURE 7.1.3. BOILER START /STOP COMMAND 7.1.4. MONITOR BOILER FIRING RATE 7.1.5. HEATING WATER SUPPLY TEMPERATURE SETPOINT 7.1.6. MONITOR BOILER STATUS 7.1.7. MONITOR BOILER ALARM STATUS 7.1.8. NUMBER OF STARTS 7.1.9. BOILER RUNTIME 7.1.10. BOILER ENABLE /DISABLE 7.2. THE BAS SHALL ALSO MONITOR THE FOLLOWING COMPONENTS ASSOCIATED WITH THE HEATING WATER SYSTEM: 7.2.1. DIFFERENTIAL PRESSURE ACTUAL 7.2.2. DIFFERENTIAL PRESSURE SET POINT 7.2.3. HEATING WATER SUPPLY SET POINT 7.2.4. WATER METER FLOW RATE 7.2.5. WATER METER TOTALIZED FLOW 7.2.6. GAS METER TOTALIZED FLOW 7.2.7. OUTSIDE AIR TEMPERATURE 7.2.8. BOILER ROOM TEMPERATURE, FAN STATUS AND DAMPER POSITION 8. BAS INTERFACE WITH THE HEATING WATER SYSTEM — BID ALTERNATE 8.1. Provide hardware and software REQUIRED to allow the BAS system to interface with the boiler controlS. Coordinate requirements with the boiler manufacturer for the interface. the BAS system shall specifically MONITOR OR PROVIDE the following for each boiler. 8.1.1. BOILER ENTERING AND LEAVING WATER TEMPERATURES 8.1.2. PRIMARY LOOP SUPPLY WATER TEMPERATURE 8.1.3. BOILER START /STOP COMMAND 8.1.4. MONITOR BOILER FIRING RATE 8.1.5. HEATING WATER SUPPLY TEMPERATURE SET POINT 8.1.6. MONITOR BOILER STATUS 8.1.7. MONITOR BOILER ALARM STATUS 8.1.8. NUMBER OF STARTS 8.1.9. BOILER RUNTIME 8.1.10. BOILER ENABLE /DISABLE 8.2. the pump VFD's shall communicate to the BAS through a BACNET INTERFACE. operational information provided by the VFD's shall be available for the operator monitoring. the BAS system shall specifically monitor THE FOLLOWING FOR EACH PUMP/VFD: 8.2.1. VFD START /STOP COMMAND 6.2.2. VFD STATUS 8.2.3. VFD SPEED (PERCENT AND HZ) 8.2.4. VFD RUN FAULT 8.3. THE BAS SHALL ALSO MONITOR THE FOLLOWING COMPONENTS ASSOCIATED WITH THE HEATING WATER SYSTEM: 8.3.1. DIFFERENTIAL PRESSURE ACTUAL 8.3.2. DIFFERENTIAL PRESSURE SETPOINT 8.3.3. HEATING WATER SUPPLY SETPOINT 8.3.4. WATER METER FLOW RATE 8.3.5. WATER METER TOTALIZED FLOW 8.3.6. GAS METER TOTALIZED FLOW 8.3.7. OUTSIDE AIR TEMPERATURE 8.3.8. BOILER ROOM TEMPERATURE, FAN STATUS AND DAMPER POSITION SHEET NOTES 1. FOR SYSTEM FLOW DIAGRAM SEE M6.1. KEY NOTES O CAP AND SEAL. ® SEE 1/k45.0 FOR DETAILS. ® PSE GAS METER 10,000 CFH CAPACITY. 2 LBS SERVICE PRESSURE. ® GAS METER PROVIDED BY CONTROL CONTRACTOR, WIRED BY CONTROL CONTRACTOR. ® GAS REGULATOR, FOR DETAILS SEE DETAIL 2/M5.0. © FOR BID ALTERNATE ONLY REVIEWED FOR CODE COMPLIANCE APPROVED JUN 2 8 2011 City of Tukwila BUILDING DIVISION 9. ALARMING 9.1. ALARMS SHALL BE ROUTED AS PER CURRENT PROTOCOL 9.2. EMAIL ALARMS SHALL CONTAIN "FOSTER HIGH SCHOOL CRITICAL ALARM" IN THE SUBJECT LINE. ALARM MESSAGE BODIES SHALL SPECIFICALLY IDENTIFY THE PIECE OF EQUIPMENT ASSOCIATED WITH THE GENERATED ALARM. 9.3. ALARMS SHALL BE ADDED TO THE EXISTING ALARMS GRAPHICS SUMMARY PAGE(S) IN THE BAS. 9.4. "boiler short cycling': generate an alarm when any boiler is commanded to stop and start more than five times over a time period of one hour. 9.5. "boiler failure': generate an alarm when the boiler command does not match the boiler status. a time delay shall be observed after a change in command to allow equipment start —up or shut down. 9.6. "PUMP failure ": generate an alarm when the PUMP command does not match the PUMP status. a time delay shall be observed after a change in command to allow equipment start —up or shut down. 9.7. "SYSTEM LEAK DETECTED ": GENERATE AN ALARM WHEN THE OUTPUT OF THE WATER METER REGISTERS A FLOW OF ONE GALLON OVER ANY ONE MINUTE TIME INTERVAL. 9.8. "HEATING WATER SUPPLY TEMPERATURE OUTSIDE OF SETPOINT": GENERATE AN ALARM WHEN THE HEATING WATER SUPPLY TEMPERATURE IS NOt WITHIN 20 DEGREES OF SETPOINT. A TIME DELAY SHALL BE OBSERVED AFTER A CHANGE IN COMMAND TO AVOID NUISANCE ALARMS. THIS ALARM SHALL BE DISABLED DURING MORNING WARM —UP. 10. TRENDS 10.1. THE BAS SYSTEM SHALL PRODUCE TRENDS FOR THE FOLLOWING CONTROL POINTS: 10.1.1. BOILER ENTERING AND LEAVING WATER TEMPERATURES 10.1.2. HEATING WATER SUPPLY TEMPERATURE SETPOINT 10.1.3. BOILER FIRING RATE 10.1.4. OUTSIDE AIR TEMPERATURE 10.1.5. HEATING WATER VALVE POSITION 10.1.6. BOILER ENABLE /DISABLE 10.1.7. TREND DATA SHALL BE RECORDED OVER 15 MINUTE TIME INTERVALS AND SHALL BE COMPILED IN A SINGLE TREND STUDY. 10.2. THE MOST RECENT THREE MONTHS OF TRENDS SHALL BE REMOTELY ACCESSIBLE. OLDER DATA SHALL BE MADE AVAILABLE UPON REQUEST. 11. SAFETY PROTOCOL 11.1. boiler safety operations shall be integral to the operation of the boiler. There shall be no BAS safety interaction required. 11.2. Provide hardwired emergency shut off switch at boiler room exit door wired to disable the boilers upon switch activation. 12. REMOTE ACCESS TO BAS SYSTEM 12.1. BAS SETPOINTS, SCHEDULES AND TIMERS SHALL BE CAPABLE OF BEING REMOTELY ADJUSTED AND /OR OVERRIDDEN. M RECEIVED JUN 14 2011 PERMITCENTER For Th instry fe Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1- 800 - 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503 - 331 -0234 www.mckinstry.com PROJECT: FOSTER HIGH SCHOOL TUKWILA SD 4242 SOUTH 144TH STREET TUKWILA, WA 98168 REGISTRATION: REV SIONS: NO DATE DESCRIPTION 5/13/11 50% OWNER REVIEW 6/15/11 ISSUE FOR PERMIT McKINSTRY DIVISION: ENGINEERING DESIGNED BY: DRAWN BY: CHECKED BY: JOB NUMBER: DATE: SCALE: SHEET TITLE: JESSICA SANDERS DOREL PURAVET KRIS[iINA SING C10196 04 -15 -11 AS SHOWN MECHANICAL DIAGRAMS AND SEQUENCE OF OPERATIONS SHEET NUMBER: M6.0 3" TO GYM, 7 COILS 70 GPM, SEE DET 1 ABOVE 4" 4" ti A -5 A -4 "4".-\ — B -1 B -2 4" 4" TO AUDITORIUM AND ACADEMIC, 49 COILS 210 GPM, SEE DET 1 ABOVE 2" TO COMMONS, 2 COILS 19 GPM, SEE DET 1 ABOVE 4" 3" BOILER ROOM HEATING WATER FLOW DEMO DIAGRAM NOT TO SCALE 2" CIRCUIT SETTER 1 -1/4" CIRCUIT SETTER 1-1/4" CIRCUIT SETTER TOTAL OF 6 FC SERVING 1ST FLOOR EAST 1 -1/4" i TOTAL OF 10 FC SERVING 1ST FLOOR EAST — ►— — — -r ii tiEfi L TOTAL OF 25 FC SERVING ACADEMIC WING WEST HWS 1 1 —HWR- 2 -1/2" UP TO 2ND FLOOR TOTAL OF 2 FC, 1 HV -28 8 GPM AC -1 3" UP TO ATTIC TOTAL OF 8 FC SEE M5.0 AND M6.0 FOR WORK IN THIS AREA 4" BOILER ROOM 3" HWS HV -37 r 48 GPM iR EDHOT WATER FLOW DIAGRAM NOT TO SCALE 3" TO GYM, 7 COILS 70 GPM, SEE DET 1 ABOVE 1 2" HWS HWR 2" SHEET NOTES 1. FOR BOILER ROOM PIPING DIAGRAM SEE M6.0. KEY NOTES Q1 TO ACADEMIC WING EAST. 2® TO ACADEMIC WING WEST. ® TO AUDITORIUM. ® TO GYM. ® TO COMMONS. ® TO ACADEMIC WING. 70 REMOVE CIRCUIT SETTER AND CAP PIPES — FOR BID ALTERNATE ONLY. • BY —PASS FOR BID ALTERNATE ONLY. TOTAL OF 7 FC TOTAL OF 7 FC REVIEWED FOR CODE COMPLIANCE APPROVED JUN 2 8 2011 City of Tukwila BUILDING DIVISION VFD f3 "® 12" I MAX 1 Il 4" 1 1 ® V VFD © 3 A -5 A -4 LJ 1 A -2 4" B -2 4" vol 4" TO AUDITORIUM AND ACADEMIC, 49 COILS 210 GPM, SEE DET 1 ABOVE 2" TO COMMONS, 2 COILS 19 GPM, SEE DET 1 ABOVE 4" 3" P -1 B -1 4" BOILER ROOM HEATING WATER FLOW DIAGRAM NOT TO SCALE M 114/7s RECEIVED JUN 14 2011 PERMITCENTER For Th instry fe Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1 -800- 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503 - 331 -0234 www.mckinstry.com FOSTER HIGH SCHOOL TUKWILA SD 4242 SOUTH 144TH STREET TUKWILA, WA 98168 REGISTRATION: REVISIONS: NO DATE DESCRIPTION 5/13/11 50% OWNER REVIEW 6/15/11 ISSUE FOR PERMIT MdONSTRY DIVISION: ENGINEERING DESIGNED BY: DRAWN BY: CHECKED BY: JOB NUMBER: DATE: SCALE: ESSICA► SANDERS DOREL PURAVET KRISHNA SING C10196 04 -15 -11 AS SHOWN SHEET TITLE: MECHANICAL FLOW DIAGRAMS SHEET NUMBER: M6.1 MECHANICAL PIPING MATRIX ID CATEGORY SERVICE DESCRIPTION MANUFACTURER, PRODUCT OR EQUAL PRESSURE TEST PROCEDURE SEISMIC INSULATION MEDIA TEST PRESSURE DURATION CODE IMPORTANCE IP HWS & R HEATING HOT WATER HVAC HEATING 220 WATER 1.5 TIMES 4 HOURS 2009 IMC, SECTION 1208 1.0 PER W.S.E.0 SEE INSULATION SCHEDULE INSERTS AT HANGERS AS APPLICABLE NORMAL OPERATING PRESS & TEMP: UP TO 100 PSI; 140 F TO 200 F; SET RELIEF TO 30 PSI 2.31 - MAX FLUID PRESSURE PSIG 100 PIPE MATERIAL SIZES THRU 2" COPPER TUBE TYPE L ASTM B88 PER SUBMITTAL JOINTS SWT; THREADED AT SPECIALTIES AS APPLICABLE PER SUBMITTAL FITTINGS WROT COPPER /BRONZE SWT JOINT PER SUBMITTAL FLANGES, UNIONS, & COUPLINGS CAST BRASS / WROT COPPER; CLASS 150 PER SUBMITTAL WYE STRAINERS BRONZE BODY KFR.KI FY F15n (SWT) / F1 5n (FPT) EXPANSION JOINTS COMPENSATION FITTING AND /OR PIPING LOOP METRALOOP; DME; GLOBAL CM / CMS VALVES - ISOLATION 2 -PC BALL - FPT MILWAUKEE BA -400, NIBCO T- 585 -70 VALVES - ISOLATION 2 -PC BALL - SWT MILWAUKEE BA -450, NIBCO S- 585 -70 VALVES - CHECK HORIZONTAL SWING, BRONZE BODY - THREADED MILWAUKEE -510 / - 1510 -T, NIBCO -433 -Y VALVES - BALANCE CIRCUIT SETTER WITH TEST PORTS ARMSTRONG CBV; B&G CB VALVES - AUTO- BALANCE AUTO -FLOW CONTROL FDI / AUTOFLOW / GRISWOLD VALVES - DRAINING 2 -PC BALL - HOSE END WITH CAP & CHAIN MILWAUKEE BA- 100HTA / BA- 150HTH FLEX CONNECTIONS - PUMPS 1 AHUs BRAIDED FLEX PER SUBMITTAL FLEX CONNECTIONS - TERMINAL UNITS HOSE KIT - BRAIDED FLEX, STRAINER, VALVES, PT PLUGS PER SUBMITTAL PRESSURE GAUGES SYSTEM PRFSSIIRFS STD n -15n PSI (nil -FIT 1 Fn AT PUMPS) TRERICE 600 CB, 4.5" THERMOMETERS SYSTEM TEMPERATURE STD 0 -100 F TRERICE BX -1 WITH THERMO WELL - DISCONNECT j BY ELECTRICAL PIPE MATERIAL 2 -1/2" AND UP CARBON STEEL PIPE ASTM A53B ERW SCH STD ASME 16.5 PER SUBMITTAL JOINTS GROOVED PER SUBMITTAL JOINTS BUTT WELD ASME B16.3 PER SUBMITTAL FITTINGS CARBON STEEL STD WT BUTT WELD / GROOVED , PER SUBMITTAL FLANGES CARBON STEEL; CLASS 150 PER SUBMITTAL COUPLINGS ZERO -FLEX GROOVED PER SUBMITTAL WYE STRAINER CAST IRON; CLASS 125 KECKLEY STYLE A EXPANSION JOINTS COMPENSATION FITTING AND /OR PIPING LOOP METRALOOP; DME; GLOBAL CM / CMS VALVES - ISOLATION BUTTERFLY CLASS 150 LUG BODY MILWAUKEE CL -223E / CL -323E VALVES - ISOLATION BUTTERFLY - GROOVED ANVIL AN -7721 / AN -7722 VALVES - CHECK SWING / SPRING MII WAIIKFF F- 9974(M), SII FNT CHECK 1Rnn VALVES - PLUG CAST IRON: CI ASS 195 (AT PUMP DISCHARGF WHFN NO vvn) RESUN 1431 VALVES - BALANCE CIRCUIT SETTER WITH TEST PORTS ARMSTRONG CBV; B&G CB VALVES - AUTO - BALANCE AUTO -FLOW CONTROL FDI / AUTOFLOW / GRISWOLD ALTERNATE UP THRU 2" PIPE MATE RIAL CARBON STEEL PIPE ASTM A53B ERW STD 16.5 PER SUBMITTAL JOINTS THREADED PER SUBMITTAL FITTINGS BMI; CLASS 150 PER SUBMITTAL UNIONS & COUPLINGS BMI; CLASS 150 PER SUBMITTAL ALTERNATE UP THRU 2" JOINTS ALTERNATE PRESS -FIT MECHANICAL COMPRESSION VIF(A PROPRESS; FPnM SFAI (RI ACK) FITTINGS ALTERNATE PRESS -FIT MECHANICAL COMPRESSION VIF(A PROPRESS FPnU SFAI (RI ACK) VALVES - ISOLATION BALL TYPE VIEGA PROPRESS -220XX ALTERNATE 2 -1/2' THRU 4" JOINTS ALTERNATE PRESS -FIT MECHANICAL COMPRESSION VIFCA PROPRESS-x1 rti FPOM SFAI (RI ACK) FITTINGS ALTERNATE PRESS -FIT MECHANICAL COMPRESSION VIEGA PROPRESS-)I rti FPDM SFAI (RI ACK) VALVES - ISOLATION BALL TYPE VIEGA PROPRESS-220XX LPG, MPG LOW PRESSURE NATURAL GAS MEDIUM PRESSURE NATURAL GAS FUEL GAS DISTRIBUTION NA AIR 150 OF WORKING PRESSURE BUT NOT LESS THAN 3 PSIG 1/2 HOUR PER 500 CUBIC FEET OF PIPE VOLUME, NOT MORE THAN 24 HOURS 2009 IFGC, SECTION 406 1.5 NA NORMAL OPERATING PRESSURE: 0 TO 5 PSI PIPE MATERIAL SIZES THRU 2" CARBON STEEL PIPE A53B ERW SCH STD ASME 16.5 PER SUBMITTAL JOINTS THREADED AND COUPLED, PIPE SEALANT PER SUBMITTAL FITTINGS, UNIONS, & COUPLINGS MALLEABLE IRON, UNION CLASS 150 ASME B16.3 PER SUBMITTAL FLEX CONNECTIONS AGA APPROVED GLOBAL FLEX UN SERIES VALVES - ISOLATION BALL MILWAUKEE BB2 -100 OR NIBCO T- 585 -70 -UL VALVES - ISOLATION PLUG RESUN R -1430; NORDSTROM EQUAL ALTERNATE SIZES THRU 2" PIPE MATERIAL ASTM A240 TYPE 300 CORRUGATED SS TUBING GASTITE JOINTS ALTERNATE PROPRIETARY FLARED FITTINGS CASTE FITTINGS ALTERNATE PROPRIETARY FLARED FITTINGS GASTITE ALTERNATE SIZES 2 -1/2" AND UP PIPE MATERIAL CARBON STEEL PIPE A53B ERW SCH STD ASME 16.5 PER SUBMITTAL JOINTS BUTT WELD PER SUBMITTAL FIRINGS BUTT WELD ASME 816.9 PER SUBMITTAL FLANGES, UNIONS, & COUPLINGS CLASS 150; FORGED STEEL PER SUBMITTAL FLEX CONNECTIONS AGA APPROVED GLOBAL FLEX UN SERIES VALVES - ISOLATION PLUG RESUN R -1431; NORDSTROM EQUAL ALTERNATE SIZES 1 /2' THRU 2" PIPE MATERIAL COPPER TUBE TYPE L ASTM B88 PER SUBMITTAL JOINTS ALTERNATE PRESS -FIT MECHANICAL COMPRESSION MEGA PROPRESS-f HNRR SFAI (YFI I OW) FITTINGS ALTERNATE PRESS -FIT MECHANICAL COMPRESSION vlEna pRQp r HNBR SEAL (YFLLOw) VALVES - ISOLATION RAI 1 (nag-pawn SFAI ) VIEGA PROPRESS -196XX VALVES - ISOLATION PLUG RESUN R -1430; NORDSTROM EQUAL DEFINITIONS N/A N/A N/A N/A N/A N/A ABS ACRYI ONITRII F RLJTADIFNF STYRFNF (PI AST1(' PIPF) N/A ACR AIR- CnNnninNING k RFFRIGFRATION (CI FAN & CAPPFn) N/A ASME AMERICAN SOCIETY MECHANICAL ENGINEERS N/A ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS N/A BMI BLACK MALLEABLE IRON N/A ERW ELECTRIC RESISTANCE WELD N/A F FAHRFNHFIT (TFMPFRATIIRF) N/A FT HD FFFT OF HFAI (PRFSSIJRF) N/A FPT FEMALE PIPE THREAD N/A HG INCHES MFRCIIRY (PRE _111/A N/A IFGC INTERNATIONAL FUEL GAS CODE IMC INTERNATIONAL MECHANICAL CODE N/A MED MEDICAL N/A N/A NOT APPLICABLE N/A NHCI NO -HUB CAST IRON N/A NPT NATIONAL PIPE THREAD N/A PSI POLINDS PFR SQIIARF INCH (PRFSSIJRF) N/A PVC POLYVINYL CHLORIDE N/A PVDF POI YVINYI IDFNF Fl IIORIDF (PI ASTIC PIPF) N/A SCH SCHFnIII F (PIPF WAI I THICKNESS) N/A SCH STD SCHEDULE STANDARD N/A STD WT STANDARD WEIGHT N/A SWT SWFAT (Snl nFRFn .KIINTS) N/A UL UNDERWRITERS LABORATORY N/A UPC UNIFORM PLUMBING CODE N/A WSEC WASHINGTON STATE ENERGY CODE N/A BOILER SCHEDULE TAG 11 B -1 B -2 (EXISTING) LOCATION BOILER ROOM BOILER ROOM SERVICE HEATING WATER HEATING WATER BASIS OF DESIGN MANUFACTURER MODEL NUMBER HYDROTHERM BURNHAM KN -30 E -70 DESIGN GPM 220 220 MINIMUM FLOW GPM 30 220 CV 1 PSI - ACTUAL PRESSURE DROP FT HD 2.31 - MAX FLUID PRESSURE PSIG 100 - % PROPYLENE GLYCOL 0% - ENTERING WATER TEMPERATURE 140 160 LEAVING WATER TEMPERATURE 180 180 NATURAL GAS /ELECTRIC NG NG /OIL MINIMUM GAS PRESSURE REQUIRED 3" WC - MAXIMUM GAS PRESSURE ALLOWED 14" WC - INPUT, MBH 3,000 2,929 OUTPUT, MBH 2780 0 DESIGN 2038 0 DESIGN CODE MIN EFFICIENCY 80% - EFFICIENCY 0 100% OPERATION AND 140F HWR 85% - FLUE SIZE, IN. DIAMETER 8 12 COMBUSTION AIR SIZE, IN. DIAMETER 8 - BOILER FLOW SWITCH YES - INTEGRAL BOILER CONTROL PANEL YES - TYPE OF FACTORY MOUNTED COMMUNICATION CARD BACnet - ELECTRICAL - BLOWER, AND PUMP CIRCUIT (VOLT /PH /AMP) 240/3/6.5 - DISCONNECT j BY ELECTRICAL BY ELECTRICAL FIRING MODE MOTORIZED MODULATING CONSTANT TURNDOWN 1 5:1 NO HYDRONIC CONNECTION SIZE 4" EXISTING GAS CONNECTION SIZE 1 -1/2" EXISTING DRAIN CONNECTION SIZE 3/4' EXISTING LENGTH X WIDTH X HEIGHT 87x34x75 EXISTING MIN. CLEARANCE, IN. (REAR /LEFT /RIGHT/TOP) 24/18/18/24 EXISTING MIN. CLEARANCE, IN. (FRONT) 36 EXISTING SOUND POWER LEVEL Dba HI /MID /LOW FIRE 75/65/63 EXISTING SHIPPING WEIGHT (LBS) 3,384 EXISTING OPERATING WEIGHT (LBS) 3,500 EXISTING NOTES: 1 THRU 9 10 NOTES: 1. REFERENCE DESIGN INTENT M6.0 FOR FEATURES OF BOILER CONTROL PANEL. 2. FURNISH NEUTRALIZATION KIT WITH BOILER FOR TREATMENT OF BOILER CONDENSATE, JJM MODEL JM -10 (SHIPPED LOOSE). 3. FURNISH WITH CSD -1 SAFETY CONTROLS. 4. FURNISH WITH RM7800 IGNITION SYSTEM DISPLAY MODULE. 5. FURNISH WITH GAS REGULATOR (SHIPPED LOOSE) - NOTE: SITE GAS PRESSURE = 2LB (1.1PSI). 6. BOILER PUMP TO HAVE SEPARATE POWER CONNECTION 7. FURNISH WITH OSA SENSOR. FIELD MOUNTED AND WIRED BY ELECTRICAL. 8. FURNISH WITH SYSTEM HEADER TEMPERATURE SENSOR AND IMMERSION WELL. FIELD MOUNTED AND WIRED BY ELECTRICAL. 9. PROVIDE FACTORY TRAINED AND AUTHORIZED START -UP SERVICE. 10. EXISTING DUAL FUEL BOILER SCHEDULED FOR INFORMATION ONLY REVIEWED FOR CODE COMPLIANCE APPROVED JUN 2 8 2011 City of Tukwila BUILDING DIVISION PUMP SCHEDULE TAG # P -1 A -2 (EXISTING) A -4 (EXISTING) A -5 (EXISTING) AREA BOILER MECH RM BOILER MECH RM BOILER MECH RM BOILER MECH RM BASIS OF DESIGN ARMSTRONG ARMSTRONG ARMSTRONG ARMSTRONG MODEL NUMBER SERIES 4380 4x4x6 SERIES 4380 4x4x8 SERIES 4380 4x4x10 SERIES 4380 4x4x10 SERVICE BOILER PUMP BOILER PUMP SYSTEM PUMP SYSTEM PUMP LOCATION EXT. MECH RM EXT. MECH RM ER. MECH RM EXT. MECH RM GPM 220 GPM 220 GPM 440 GPM 440 GPM FT. TOTAL HEAD 10 FT 15 FT 60 FT 60 FT FT. NPSH 4.64 FT - - - MAX FLUID PRESSURE PSIG 175 PSIG - - - MOTOR HP 3/4 1.5 15 15 MOTOR BRAKE HP 0.69 - - - VOLTAGE/PHASE 460/3 460/3 460/3 460/3 MOTOR EFFICIENCY 81.03% - - - RPM 1,200 1,200 1,800 1,800 VFD NO NO NO NO VFD BYPASS NO NO NO NO EMERGENCY POWER NO NO NO NO E -POWER GPM - - - - E-POWER BHP - - - - ELECTRICAL CONNECTION BY ELECT - - - WEIGHT (LBS.) <250 - - - NOTES 1 1, 2 1, 2 NOTES: 1. EXISTING TO REMAIN SCHEDULED FOR INFORMATION ONLY 2. FOR BID ALTERNATE PROVIDE INVERTER DUTY RATED MOTOR AND VFD W/ BACnet CONTROL INTERFACE. PIPE & EQUIPMENT INSULATION SCHEDULE PIPING SYSTEM TEMP RANGE THERMAL COND. MEAN RATING TEMPERATURE INSULATION MATERIAL INSULATION THICKNESS BY PIPE SIZE INSUL. RUNOUTS TO 2' (2) 1' AND LESS 1 1/4° TO 2" 2 1/2" TO 4" 5" TO 6" OVER 6" HANGERS HEATING WATER 141 -200 0.25 -0.29 125 FIBERGLASS 0.5 1.5 1.5 1.5 1.5 1.5 NOTES 1, 2, & 3 NOTES: 1. HOT PIPING 2. HOT PIPING 3. JACKETING: PVC JACKET INSTEAD OF LARGER THAN 2 ", UTILIZE RIGID INSERTS. INSULATION CONTINUOUS THROUGH THE HANGER. SHEETMETAL SHIELD. 2" AND SMALLER, UTILIZE RIGID INSERTS. INSULATION CONTINUOUS THROUGH THE HANGER. SHEETMETAL SHIELD. PVC JACKET WITH RIGID RIGID CALCIUM SILICATE. INSULATION WILL BE USED ON ALL HORIZONTAL PIPING AT OR NEAR THE FLOOR SUBJECT TO POTENTIAL FOOT TRAFFIC. WILL BE UTILIZED ON ALL EXPOSED INSULATION WITHIN 6 FEET OF THE FLOOR ELEVATION (I.E. MECHANICAL ROOMS AND GARAGE HOSE BIBBS). PVC IS RECOMMENDED METAL IN EXPOSED AREAS DUE TO ITS RESILIENCY - METAL JACKETS DENT. tAlt--.079 RECEIVED JUN 14 2011 PERMIT CENTER For Th ir�stry fe Of rear Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1 -800- 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503 - 331 -0234 www.mckinstry.com FOSTER HIGH SCHOOL TUKWILA SD 4242 SOUTH 144TH STREET TUKWILA, WA 98168 REGISTRATION: REVISIONS: NO DATE DESCR PT10N 5/13/11 50% OWNER REVIEW 6/15/11 ISSUE FOR PERMIT MdgNSTRY DMSION: ENGINEERING DESIGNED BY: DRAWN BY: CHECKED BY: JOB NUMBER: DATE SCALE. SHEET TITLE: JESSICA SANDERS DOREL PURAVET KRISHNA SING C10196 04 -15-11 AS SHOWN MECHANICAL SCHEDULES SHEET NUMBER: M7.0