HomeMy WebLinkAboutPermit M11-092 - SPEC EASTSPEC EAST
12628 INTERURBAN AV S
M11-092
City oli'ukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Inspection Request Line: 206 - 431 -2451
Web site: http: / /www.TukwilaWA.Rov
MECHANICAL PERMIT
Parcel No.: 0004800003
Address: 12628 INTERURBAN AV S TUKW
Project Name: SPEC EAST
Permit Number: M11 -092
Issue Date: 07/15/2011
Permit Expires On: 01/11/2012
Owner:
Name: GATEWAY OLYMPIA INC
Address: PO BOX 4900 #207 , SCOTTSDALE AZ 85261
Contact Person:
Name: MIKE NELSON
Address: 899 WEST MAIN , AUBURN WA 98001
Email: MIKEN @SEATTLEMECHANICAL.COM
Contractor:
Name: IECS INC.
Address: P.O. BOX 19252 , SEATTLE, WA 98109
Contractor License No: IECS * * *044QL
Phone: 253 - 939 -9495
Phone: 206 939 -9495
Expiration Date: 11/20/2012
DESCRIPTION OF WORK:
PROVIDE AND INSTALL NEW 3 TON ROOF TOP UNIT AND 2 NEW RESTROOM EXHAUST FANS
Value of Mechanical: $14,000.00
Type of Fire Protection: UNKNOWN
Electrical Service Provided by:
Permit Center Authorized Signature:
/A -% /
I hereby certify that I have read and examined this pe
and know same to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether sp. ified herein or not.
Fees Collected:
$355.06
International Mechanical Code Edition: 2009
Date' 1
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or erforman e of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the
back of this pit.
Signature:
Print Name: 1 r \
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
Date: `7 /IS ///
doc: IMC -4/10
M11-092 Printed: 07 -15 -2011
• •
PERMIT CONDITIONS
Permit No. M11 -092
1: ** *BUILDING DEPARTMENT CONDITIONS * **
2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the
Building Official.
3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center
(206/431- 3670).
4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to
start of any construction. These documents shall be maintained and made available until final inspection approval is
granted.
5: Readily accessible access to roof mounted equipment is required.
6: All construction shall be done in conformance with the approved plans and the requirements of the International
Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code.
7: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary
sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other
excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of
this requirement.
8: Manufacturers installation instructions shall be available on the job site at the time of inspection.
9: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila
Building Department (206- 431- 3670).
10: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building
Department (206- 431 - 3670).
11: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of,
any violation of arty of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits
presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila
shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the
Building Official from requiring the correction of errors in the construction documents and other data.
doc: IMC -4/10
M11-092 Printed: 07 -15 -2011
CITY OF TUKWILA
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.ci.tukwila.wa.us
Building Permit No.
Mechanical Permit No. M 1 Oq)..
Plumbing/Gas Permit No. 136 a .g _
Public Works Permit No.
\—O (•1
Project No.
(For office use only)
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *Please Print **
SITE LOCATION
King Co Assessor's Tax No.: 000480003
Site Address: rr21544' INTERURBAN AVE.
Tenant Name: spec space
Property Owners Name: RREEF PROPERTY MGMT.
Mailing Address: 12720 GATEWAY DRIVE, SUITE 200 TUKWILA WA. 98168
City
Suite Number:
New Tenant:
Floor:
❑ Yes ❑..No
State
Zip
CONTACT PERSON - who do we contact when your permit is ready to be issued
Name: MIKE NELSEN
Mailing Address: 899 west main Auburn wa.
Day Telephone: 2 5 3 9 3 9 9 4 9 5
E -Mail Address: MIKEN@SEATTLEMECHANICAL.COM
City
Fax Number:
State
253- 939 -9260
Zip
GENERAL CONTRACTOR INFORMATION =
(Contractor Inform -Won for Mechanical (pg 4) for Plmiabing and Gas :Piping (pg 5))
Company Name:
Mailing Address:
Contact Person:
E -Mail Address:
Contractor Registration Number:
City
Day Telephone:
Fax Number:
Expiration Date:
State
Zip
ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record
Company Name:
Mailing Address:
Contact Person:
E -Mail Address:
City
Day Telephone:
Fax Number:
State
Zip
ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Record
Company Name: CT Engineering inc .
Mailing Address: 181 Nickerson st. Suite 302
City State Zip
Day Telephone: 206- 285 -4512
E -Mail Address: Fax Number: 206-285-0618
Contact Person: Rick Hudson
Q:\Applications\Fonns- Applications On Line\3 -2006 - Permit Application.doc
Revised: 9 -2006
bh
Page 1 of 6
MECHANICAL CONTRACTOR INFORMATION
Company Name: IECS INC
Mailing Address: 899 WEST MAIN AUBURN WA. 98001
City State Zip
Day Telephone: 253- 939 -9495
E -Mail Address: SEATTLE MEHCANICAL Fax Number: 253- 939 -9260
Contractor Registration Number: IECS * * * 044 QL Expiration Date: 11 / 20/ 2 011
Contact Person: MIKE NELSEN
Valuation of Mechanical work (contractor's bid price): $ 14000
Scope of Work (please provide detailed information): PROVIDE AND INSTALL NEW 3 TON ROOF TOP UNIT . 2 NEW RR EXHAUST
FANS .
Use: Residential: New .... ❑ Replacement .... ❑
Commercial: New .... ® Replacement .... ❑
Fuel Type: Electric ❑ Gas....® Other:
Indicate type of mechanical work being installed and the quantity below:
Unit Type: I
Qty
Unit Type:
Qty
Unit Type:
Qty 1
Boiler /Compressor:
Qty
Furnace<100K BTU
Air Handling Unit >10,000
CFM
Fire Damper
0 -3 HP /100,000 BTU
Furnace>100K BTU
Evaporator Cooler
Diffuser
3 -15 HP /500,000 BTU
Floor Furnace
Ventilation Fan Connected
to Single Duct
2
Thermostat
15 -30 HP /1,000,000 BTU
Suspended/Wall/Floor
Mounted Heater
Ventilation System
Wood/Gas Stove
30 -50 HP /1,750,000 BTU
Appliance Vent
Hood and Duct
Emergency
Generator
50+ HP /1,750,000 BTU
Repair or Addition to
Heat/Refrig/Cooling
System
Incinerator - Domestic
Other Mechanical
Equipment
Air Handling Unit
<10,000 CFM
1
Incinerator — Comm/Ind
Q:\Applications'Foans- Applications On Line\3 -2006 - Permit Application.doc
Revised: 9-2006
bh
Page 4 of 6
PERMITAPPIICATIONNOTESappl>< ableto a11Mper utsintWs application
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
Building and Mechanical Permit
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
Plumbing Permit
The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested
in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDIN ?RIZED_ ER AU AGENT:
Signature:
Print Name: MIKE NELSEN
Mailing Address: 899 WEST MAIN AUBURN WA . 98001
Date: 7 -7 -2011
Day Telephone: 253-939-9495
City
State
Zip
Date Application Accepted: .....-7` 4 I
Date Application Expires: b.._ _./
y
Staff Initials: l
Q:WpplicationsTonns- Applications On Line\3 -2006 - Permit Application.doc
Revised: 9 -2006
bh
Page 6 of 6
of Tukwila,
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188 •
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: hup://www.ci.tukwila.wa.us
SET RECEIPT
RECEIPT NO: R11 -01389
Initials: WER
Payment Date: 07/07/2011
User ID: 1655 Total Payment: 475.81
Payee: IECS INC
SET ID: 070711 SET NAME: SPEC EAST
SET TRANSACTIONS:
Set Member Amount
M11 -092 355.06
PG11 -094 120.75
TOTAL: 355.06
TRANSACTION LIST:
Type Method Description Amount
Payment Check 49154 475.81
TOTAL: 475.81
ACCOUNT ITEM LIST:
Description
Account Code Current Pmts
GAS - NONRES
MECHANICAL - NONRES
PLAN CHECK - NONRES
000.322.103.00.0
000.322.102.00.0
000.345.830
96.60
284.05
95.16
TOTAL: 475.81
-
INSPECTION RECORD
Retain a copy with permit
3
INSPECTIOWNO.
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 12. (206) 431-367
Permit Inspection Request Line (206) 431-2451
Project:
.s,-)M P/757-
Type of Inspection:
Address:
/2 6,2,1 .,,sile'iit
i idtvt,,,,,
Date Called:
Special Instructions:
Date Wanted:
q,..rnidn.
Requester:
Phone No:
liaApproved per applicable codes. Corrections required prior to approval.
COMMENTS:
Date:
7'-/2-1
)
SPECTION FEE REWIRED. P or to next inspection. fee must be
‘id at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
'
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 op.. (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
Project Pe 5(
Type nA) AL •
t
Address:�v r ` 4.
I�PV? to
ate Called:
Special Instructions:
- ,-
Date Wanted: / ,
- q•-- ( ( p.m.
1
Requester:
Ph a No
V, -39Co,- rs30
Approved per applicable codes.
corrections required prior to approval. 7
COMMENTS:
INJ p vAJ _ O'\
S f'
Li i r R — & Q A
o�►/�pi-A4"(
) A -s ,f 1 C �- t
�� tn(
- SC..J � � ICJ\ u \Q
n
0
Inspector:
Date: j /T
ri ❑ REINSPECTION FEE REQUI D. Prior to next inspection. fee must be
paid at 6300 Southcenter B4 d.. Suite 100. Call to schedule reinspection.
M't(:- dgi2...y
�.; - . - " ..
•
INSPECTION RECORD
• Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISIONR'c----
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 4313670
Permit Inspection Request Line (206) 431 -2451
Project;. p eASr_
Typ of Inspection:
J
Address: _
i 2 6 28 = Atre.J✓1 _4A-if
Date Called:1
Special Instructions:
v/ 5 ('7 2 �i of
Date Wanted: ---
% - 7-7 - If p.m.
Requester:
Phone Nob - !i 5 S - 0 045
Approved per applicable codes. D Corrections required prior to approval.
COMMENTS:
t7 r` to ' '`6 1)Jejr
Inspector:
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
;
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit 717 /'-52
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 431-2451
Project:
4r)ig efiC67 -
Type of Inspection: .
1-4)0/4h -.A /
Address:
1,.? ( e --,--Airi2>43/)
Date Called:
Ai ..
Special Instructions:
Date Wanted:
Requester:
Phone No:
e-Q 4 --,-,2
5-5
-791S
....14'Approved per applicable codes.
ElCorrections required prior to approval.
COMMENTS:
Inspecto
Date:
CTION FEE REQUI D. Prior to n t inspection. fe must be •
300 Southcenter Blvd.. Suite 100. raLt to schedule reinspection.
•
Load Express: Load Calculation Software
FILE COPY
Version 2.2
Title Page
Load Express: Load Calculation Software
By: Mike Nelsen
General Job
Job Description:
Building Owner:
Program User:
Comments:
Tukwila Comm Park C 105
CBR Richard Ellis
Mike Nelsen
Program was Run: 7/ 6/2011 at 7:53:58 AM
Dataset Name: C: \CDS \LOADEXP \DATA \TCP105.LE
Alternative 1 AIt1
Geographical Data
Location: Tukwila
Weather File: Seattle, Washington
Latitude: 47 deg
Elevation: 386 ft
Design Data
Summer Dsn Dry Bult
Summer Dsn Wet Bul
Winter Design Dry Bu
Density-Sp Heat Prod
Design Simulation per
80.0 deg F
64.0 deg F
26.0 deg F
1.0988 Btu - min /(hr -ft3 -F)
Apr To Nov
t,'t(L' 0q2
Building Peak Data
Month /Hour: Jul / 14
Cooling Capacity: 32.1 Mbh
Cooling Sensible: 26.9 Mbh
Sensible Heat Ratio (.SH 0.875
Heating Capacity -40.2 Mbh
REVIEWED FOR
CODE COMPLIANCE
APPROVED
!JUL 14 2011
•
City of Tukwila
BUILDING DIVISION
RECEIVED
JUL 07 2011
PERMITCENTEf
. Load Express: Load Calculation Software Version 2.2
Zone /Air Handler Descriptions
Zone /Air Handler Descriptions
Alternative - 1 AIt1
Air Handler Type Description
1 CONSTANT AHU1
Zone Type Description
1 Commercial Retail Zone1
Load Express: Load Calculation Software
Alternative 1 Alt1
1 -2 Story Office
Version 2.2
Zone Input Data '
General Job Data
Weather Location: Seattle, Washington
Weather Region: Northwest
CIg Simulation Start Month: Apr
CIg Simulation End Month: Nov
Zone Data
Alternative Number: 1
Zone Number: 1
Floor Width: 44 ft
Floor Length: 27 ft
Ceiling Height: 9 ft
Flr- to -Flr Height: 14 ft
No. of Dup Zones: 1
Ceiling U- Factor: 0.03 Btu /(hr -F -ft2)
Floor Calculation Type: Slab -On -Grade
Floor Loss Coefficient: 0.70 Btu /(hr -F -ft)
Floor Perimeter Length142.00 ft
W H
ft ft
Type
Building Opening Time:
Building Closing Time:
Building Direction:
CIg Sensible SF:
Cooling Dry Bulb:
Relative Humidity:
Heating Dry Bulb:
People Density:
People Activity:
People Sensible Load:
People Latent Load:
Misc. Equip. Type:
8 am Clg Latent SF: 0
6 pm Htg Sensible SF: 5
0 People Diversity: 100 %
5.00 Bldg Simulation Type: Cooling and Heating
73 deg F
50 %
70 deg F
10 people
General Office Space
210 Btuh /pers
255 Btuh /pers
Std appliances
Misc. Equip. Sensible Load 0.50 Watt/ft2
Misc. Equip. Latent Load: 0.00 Watt/ft2
Misc. Equip. Sensible to RV 0 Btuh
Lighting Intensity: 2.00 Watt/ft2
Lighting Type: ecessed fluorescent, not vented
Ballast Factor: 1.00
% Percent Light to RA: 0 %
Vent Type: General Office Space
Vent Cool Design: 20.00 cfm /pers
Vent Heat Design: 20.00 cfm /pers
Supply Cool Design: 0 cfm
Supply Heat Design: 0 cfm
Infiltration Type: Pressurized, Average Construction
Infilt. Cooling Desigi
Infilt. Heating Desigi
Room Exhaust:
0.30
0.30
160.00
ach /hr
ach /hr
cfm
U- Factor Color Percent ( %) Direction Susp Ceil Tilt Cool Adj Heat Adj Dimension % Glass Shading Coeff
Spc Temp Spc Temp
degF deg F
WALL 1 44 x
GLASS 1 29 x
WALL 2 27 x
GLASS 1 12 x
ROOF 1 44 x
PART 1 44 x
PART 2 27 x
9 Face Brick, 6" L.W. Concrete, 6" Ins
7 Double Clear 1/8 in.
9 8" L.W. Concrete Blk, 6" Ins
9 Double Clear 1/8 in.
27 4" Wood deck, 4" Ins
9 Frame, 0.75" gypsum board
9 Frame, 0.75" gypsum board
0.06 Light North
0.60 0 Plenum
0.04 Light East
0.60 0 Plenum
0.04 Light 100 RA North
0.39
0.39
0 0
0 0
0 0
0 0
Yes 0 0
0 85
0 85
0
0 Area
0
0 Area
0
55
55
0.00
0.88
0.00
0.88
0.00
0.00
0.00
Shading
Extemal
Extemal
Load Express: Load Calculation Software Version 2.2
Air Handler Input
Air Handler Input
Alternative 1
Air Handler 1
Fan Configuration:
Fan & Motor Efficiency:
Cooling Supply Air Temp:
Heating Supply Air Temp:
Minimum Relative Humidity:
Supply Fan Static Pressure:
Return Fan Static Pressure:
CONSTANT AHU1
Draw
77.00 %
55.00 deg F
0.00 deg F
45 %
1.00 in H2O
0.00 in H2O
Supply Duct Location:
Supply Duct Insulation:
Supply Duct Temp Rise:
Return Duct Insulation:
Return Duct Temp Rise:
Terminal Type:
Total Cool Airflow:
Total Heat Airflow:
Zone(s) Connected:
Retum Air
R4 Duct Insulation
0.3 deg F TD
R4 Duct Insulation
0.3 deg F TD
CONSTANT
0 cfm
0 cfm
1
Load Express: Load Calculation Software versio2.2
Peak Load Information
Altemative 1
Design Heating:
Airflow (cfm) Space Total Heating Coil
Total Outside % O.A. Sensible Sensible Entering Leaving Humidification
Air Handler #!Type Btuh Btuh DB DB Btuh
BLDG BLOCK - 21,034.90 - 40,162.20 - 6,422.9
BLDG PEAK - 21,034.90 - 40,162.20 - 6,422.9
1 CONSTANT 1,283.07 200.00 15.59 - 21,034.90 - 40,162.20 61.37 84.92 - 6,422.9
Design Cooling:
Airflow (cfm) Cooling Cooling Coil
Total Outside % O.A. Total Sensible S.H.R. Entering Leaving
Air Handler it/Type Btuh Btuh DB WB DB WB
BLDG BLOCK 32,128.70 28,291.50 0.88
BLDG PEAK 32,128.70 28,291.50 0.88
1 CONSTANT 1,283.07 200.00 15.59 32,128.70 28,291.50 0.88 74.28 61.00 54.23 52.25
ft2lton cfm/ton cfm/ft2 Total
tons
443.72 2.7
443.72 2.7
443.72 479.2 1.1 2.7
Building Peak Load Components
Cooling (Btuh) Heating (Btuh)
Mo1Hr: Solar Cond Internal OA +Inf Misc Total Cond OA +Inf Misc Total
Bldg 7/14 8,634.3 4,017.8 13,647.6 3,069.6 1,412.1 30,781.4 - 19,748.5 - 12,254.3 - 6,246.9 - 38,249.7
Air Hand 1 7/14 8,634.3 4,017.8 13,647.6 3,069.6 1,412.1 30,781.4 - 19,748.5 - 12,254.3 - 6,246.9 - 38,249.7
Zone 1 7/14 8,634.3 4,017.8 13,647.6 3,069.6 1,412.1 30,781.4 - 19,748.5 - 12,254.3 - 6,246.9 - 38,249.7
• Load Express: Load Calculation Software
Psychrometric State Points - Alternative 1 AIt1
Zone 1 Dry Bulb Wet Bulb Temp Diff.
Zonel ( deg F ) ( deg F ) ( deg F )
Space 73.0 60.3
Zone
Retum Air Heat Pickup
Return Fan
Return Air 73.3 60.4
Outdoor Air 79.4 64.3
Retum /Outdoor Air Mix 74.3 61.0
Blow Through Fan
Entering Coil 74.3 61.0
Leaving Coil 54.2 52.3
Draw Through Fan
Supply Duct Heat Gain
Supply Air 55.0 52.6
Percent Outside Air
Space Sensible Heat Ratio (SHR)
Coil Airflow
16.37 %
0.904
1,222 cfm
0.3
0.0
0.0
0.5
0.3
Version 2.2
Psychrometrics
Load Express: Load Calculation Software Version 2.2
Sensible Load Profile
Sensible Load Profile (Mbh)- Alternative 1 AIt1
Hour
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Air Hand 1 3 2 2 1 1 2 5 16 19 21 23 25 26 27 27 26 25 24 12 8 7 5 4 4
Bldg 3 2 2 1 1 2 5 16 19 21 23 25 26 27 27 26 25 24 12 8 7 5 4 4
Zone 1 3 2 2 1 1 2 5 16 19 21 23 25 26 27 27 26 25 24 12 8 7 5 4 4
Load Express: Load Calculation Software Version 2.2
Peak Load Summary
Peak Load Summary - Alternative 1
Air Hand 1 AHU1
Areas ( ft2 )
Floor: 1,188.0
SlabOnG /ExFIr: 142.0
Roof: 1,188.0
Skylight: 0.0
Wall: 328.0
Wall Glass: 311.0
Partition: 639.0
AIt1
Space Sens Load
Spc Sens Ld W /Sfty Fctr
Cool Airflow
Cool Airflw W /Sfty Fctor
Cooling Check
Cool Check W /Sfty Fctr
Heat Airflow
Heat Airflw W /Sfty Fctr
24,169.1 Btuh
25,377.6 Btuh
1,222 cfm
1,283 cfm
1.03 cfm /ft2
1.08 cfm /ft2
1,222 cfm
1,283 cfm
Heating Coil Peak
Outside Air: OADB: 26
Cooling Coil Peak
Peaked at Time: Mo /Hr: 7 / 14
Outside Air: OADB: 79
WB: 64
RELHUM: 44.2%
Cooling Coil Peak
Heating Coil Peak
Total Load
Sens Load
Percnt of Tot
Peak Tot Sens
Percnt of Tot
( Btuh)
( Btuh )
( %)
( Btuh)
( %)
ENVELOPE LOADS
Solar
Skylight Solar
0.00
0.00
0.00
Glass Solar
8,634.31
8,634.31
0.00
Sub Total
8,634.31
8,634.31
28.05
0.00
0.00
Conducted
Skylight
0.00
0.00
0.00
Roof
-47.68
-47.68
- 2,299.97
Glass
1,108.65
1,108.65
- 8,641.57
Wall
-3.02
-3.02
- 733.52
Partition
2,959.85
2,959.85
- 3,699.81
SlabOnG /ExFIr
0.00
0.00
- 4,373.60
Sub Total
4,017.80
4,017.80
13.05
- 19,748.50
51.63
INTERNAL LOADS
Lights
7,150.60
7,150.60
0.00
People
4,558.27
2,008.27
0.00
Misc
1,938.77
1,938.77
0.00
Sub Total
13,647.60
11,097.60
44.34
0.00
0.00
MISC LOADS
Outside Air
2,422.14
1,406.49
- 9,669.63
Humidification
0.00
0.00
- 6,422.86
Infiltration
647.44
375.96
- 2,584.69
Sup. Fan Heat
634.79
634.79
0.00
Ret. Fan Heat
0.00
0.00
0.00
Duct Heat Pkup
805.64
805.64
0.00
Exhaust Heat
-28.32
-28.32
175.91
Sub Total
4,481.69
3,194.55
14.56
- 18,501.30
48.37
OV /UNDR Sizing
0.00
0.00
0.00
Grand Total
30,781.40
26,944.30
- 38,249.70
W /Safety Factor
32,128.70
28,291.50
- 40,162.20
Loab Express: Load Calculation Software Version 2.2
Peak Load Summary
Peak Load Summary - Alternative 1 AIt1
Bldg 1
Areas ( ft2 )
Floor: 1,188.0
SlabOnG /ExFIr: 142.0
Roof: 1,188.0
Skylight: 0.0
Wall: 328.0
Wall Glass: 311.0
Partition: 639.0
Heating Coil Peak
Outside Air: OADB: 26
Cooling Coil Peak
Peaked at Time: Mo /Hr: 7 / 14
Outside Air: OADB: 79
WB: 64
RELHUM: 44.2%
Cooling Coil Peak
Heating Coil Peak
Total Load
Sens Load
Percnt of Tot
Peak Tot Sens
Percnt of Tot
( Btuh)
( Btuh )
( %)
( Btuh)
( %)
ENVELOPE LOADS
Solar
Skylight Solar
0.00
0.00
0.00
Glass Solar
8,634.31
8,634.31
0.00
Sub Total
8,634.31
8,634.31
28.05
0.00
0.00
Conducted
Skylight
0.00
0.00
0.00
Roof
- 47.68
-47.68
- 2,299.97
Glass
1,108.65
1,108.65
- 8,641.57
Wall
-3.02
-3.02
- 733.52
Partition
2,959.85
2,959.85
- 3,699.81
SlabOnG /ExFIr
0.00
0.00
- 4,373.60
Sub Total
4,017.80
4,017.80
13.05
- 19,748.50
51.63
INTERNAL LOADS
Lights
7,150.60
7,150.60
0.00
People
4,558.27
2,008.27
0.00
Misc
1,938.77
1,938.77
0.00
Sub Total
13,647.60
11,097.60
44.34
0.00
0.00
MISC LOADS
Outside Air
2,422.14
1,406.49
- 9,669.63
Humidification
0.00
0.00
- 6,422.86
Infiltration
647.44
375.96
- 2,584.69
Sup. Fan Heat
634.79
634.79
0.00
Ret. Fan Heat
0.00
0.00
0.00
Duct Heat Pkup
805.64
805.64
0.00
Exhaust Heat
-28.32
-28.32
175.91
Sub Total
4,481.69
3,194.55
14.56
- 18,501.30
48.37
OV /UNDR Sizing
0.00
0.00
0.00
Grand Total
30,781.40
26,944.30
- 38,249.70
W /Safety Factor
32,128.70
28,291.50
- 40,162.20
, Load`Express: Load Calculation Software Version 2.2
Peak Load Summary
Peak Load Summary - Alternative 1
Zone 1 Zone1
Areas ( ft2 )
Floor:
SlabOnG /ExFIr:
Roof:
Skylight:
Wall:
Wall Glass:
Partition:
1,188.0
142.0
1,188.0
0.0
328.0
311.0
639.0
AIt1
Space Sens Load
Spc Sens Ld W /Sfty Fctr
Cool Airflow
Cool Airflw W /Sfty Fctor
Cooling Check
Cool Check W /Sfty Fctr
Heat Airflow
Heat Airflw W /Sfty Fctr
24,169.1
25,377.6
1,222
1,283
1.03
1.08
1,222
1,283
Btuh
Btuh
cfm
cfm
cfm /ft2
cfm /ft2
cfm
cfm
Heating Coil Peak
Outside Air: OADB: 26
Cooling Coil Peak
Peaked at Time: Mo /Hr:
Outside Air: OADB:
WB:
RELHUM:
7 / 14
79
64
44.2%
Cooling Coil Peak
Heating Coil Peak
Total Load
Sens Load
Percnt of Tot
Peak Tot Sens
Percnt of Tot
( Btuh)
( Btuh )
( %)
( Btuh)
( %)
ENVELOPE LOADS
Solar
Skylight Solar
0.00
0.00
0.00
Glass Solar
8,634.31
8,634.31
0.00
Sub Total
8,634.31
8,634.31
28.05
0.00
0.00
Conducted
Skylight
0.00
0.00
0.00
Roof
- 47.68
-47.68
- 2,299.97
Glass
1,108.65
1,108.65
- 8,641.57
Wall
-3.02
-3.02
- 733.52
Partition
2,959.85
2,959.85
- 3,699.81
SlabOnG /ExFIr
0.00
0.00
- 4,373.60
Sub Total
4,017.80
4,017.80
13.05
- 19,748.50
51.63
INTERNAL LOADS
Lights
7,150.60
7,150.60
0.00
People
4,558.27
2,008.27
0.00
Misc
1,938.77
1,938.77
0.00
Sub Total
13,647.60
11,097.60
44.34
0.00
0.00
MISC LOADS
.
Outside Air
2,422.14
1,406.49
- 9,669.63
Humidification
0.00
0.00
- 6,422.86
Infiltration
647.44
375.96
- 2,584.69
Sup. Fan Heat
634.79
634.79
0.00
Ret. Fan Heat
0.00
0.00
0.00
Duct Heat Pkup
805.64
805.64
0.00
Exhaust Heat
-28.32
-28.32
175.91
Sub Total
4,481.69
3,194.55
14.56
- 18,501.30
48.37
OV /UNDR Sizing
0.00
0.00
0.00
Grand Total
30,781.40
26,944.30
- 38,249.70
W /Safety Factor
32,128.70
28,291.50
- 40,162.20
7 / 14
79
64
44.2%
Cooling Coil
Cooling Coil
Cooling Coil
I Internal
44%
Other
15%
Internal
44% Other
48%
Alternative -1 Zone1
Alternative -1 AHU1
Heating Coil
Heating Coil
Other
48%
$ Other
15%
Alternative -1 Building
I Internal
44%
I Other
15%
Heating Coil
$ Other
48%
30
25
20
15
10
5
0
1
Alternative -1 Zone1
Sensible Load Profile (Mbh)
30 -
25 -
20 -
15
10
5
0
8
1
+
p i
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time (Hours)
Alternative -1 AHU1
Sensible Load Profile (Mbh)
1
1
t
f
30 -
25 -
20 -
15-
10-
5-
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Time (Hours)
Alternative -1 Building
Sensible Load Profile (Mbh)
0ill1111---711—'11-1
1 2 3 4 5 6 7 8
1
4 9 X10 X11 12 13 X14 X15 X16 117 X18 X19 20 21 22 23 20
Time (Hours)
a
CT
E N G I N E E R I N G
Structural Engineers
INC
FILE COPY
Permit No.
STRUCTURAL CALCULATIONS
NEW ROOF TOP UNIT AT
TUKWILA COMMERCE PARK C105
TUKWILA WA
GENERAL CONTRACTOR
PRECISION BUILDERS INC.
MECHANICAL CONTRACTOR
SEATTLE MECHANICAL
180 Nickerson St.
Suite 302
Seattle, WA
98109
(206) 285-4512(V)
(206) 285-0618(F)
REVIEWED FOR
CODE COMPLIANCE
APPROVED
JUL 14 2011
City of Tukwila
BUILDING DIVISION
RECEIVE
JUL 071011
PERMIT CENTER
6
19Al2-K-L - 120 LTDI c
4rr4-0 g-00F Tor u t k.-`f %) 2-011
50'
7
aagwnH and
c
70
7V
m
z
0
m
0
re
0
C T
E N G I N E E R I N G
1� ,� , "� M I NNjC.
Project: Tuk.W %Lk cW�i]�' I�J144E - G . 1 oCj
Client: P +J-
Date: -7 )1 [Z4311
Page Number:
180 Nickerson St.
Suite 302
Seattle, WA
98109
(206) 28S-4512
FAX:
(206) 285 -0618
Structural Engineers
•
C T
E N G I N E E R I N G
I N C.
Project: Tv MLw I L A COWVNEj
Client: 19' `r.
- G t0S
Date: j ( f Zcil
Page Number: ✓ 3
180 Nickerson St.
Suite 302
Seattle, WA
98109
(206) 285 -4512
FAX:
(206) 285-0618
t12 k S 05
erel9t: �-VNIr
To 60E6.
emu) 14- V P1•G W.1 Cc W1
PS CA Off` Vint Pct.
2x4
Stvn�S�N A aft
a-pr, 510£
f XiM 1 NC, WOOP
ST I., RE FOR-C.( N
SEc,T1 -A-
Jo
-7c oIQ a>
Structural Engineers
C T
E N G I N E E R I N G
nINC.
Project: "TVkWI COUVIYp , y.A. Pekrlt., C � l rj
Client: r r t r ..L .
Date:
Page Number:
180 Nickerson St.
Suite 302
Seattle, WA
98109
(206) 285 -4512
FAX:
(206) 285 -0618
Structural Engineers
48TC
Gas Heat /Electric Cooling Packaged Rooftop
3 to 12.5 Nominal Tons
Product Data
Turn to the Experts.
FILE COPY
r.,..,...,•� R 1
WeatherMaker'
(Unit shown with optional economizer.)
This product has been designed and manufactured to
meet Energy Starib criteria for energy efficiency.
However, proper refrigerant charge and proper elr flow
are critical to achieve rated capechy and efficiency.
Installation of this product should follow all
manufacturer's refrigerant charging and air lbw
instructions. Failure to confirm proper charge and
eh flow may reduce energy efficiency and Morten
equipment 1110.
MU
Puron
s,..m0cnnuash sand r.bl,wN
92
C08514
REVIEWED FOR
CODE COMPLIANCE
APPROVED
'JUL 14 2011
City of Tukwila
BUILDING DIVISION
ECEOVED
JUL 07 2011
PERMIT CENTER
U
H oo
MODEL NUMBER NOMENCLATURE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
4
8
T
C
D
A
0
4
A
1
A
5
A
0
A
0
Unit Heat Type
48 = Cooling /Gas Heat RTU
Tier / Model
TC = Entry tier (with Puron refrigerant)
Heat Size
D = Low heat
E = Medium heat
F = High heat
L = Low NOx, low heat
M = Low NOx, medium heat
N = Low NOx, high heat
S = Stainless steel, low heat
R = Stainless steel, medium heat
T = Stainless steel, high heat
Refrig. System Options
A = Standard 1 -stage cooling
B = Standard 1 -stage cooling w /Humidi -MiZer
D = 2 -stg. cooling comp. w /NOVATION'" coil
Cooling Tons
04 = 3 Ton
05 = 4 Ton
06 = 5 Ton
07 = 6 Ton
08 = 7.5 Ton
09 = 8.5 Ton
12 =10Ton
14 = 12.5 Ton
Sensor Options
A = None
B = RA smoke detector
C = SA smoke detector
D = RA & SA smoke detector
E = CO2 sensor
F = RA smoke detector & CO2
G = SA smoke detector & CO2
H = RA & SA smoke detector & CO2
Indoor Fan Options
1 = Standard static option
2 = Medium static option
3 = High static option
4
Brand / Packaging
0 = Standard
1 = LTL
Electrical Options
A = None
C = Non -fused disc
D = Thru the base
F = Non -fused & thru the base
Service Options
0 = None
1 = Unpowered convenience outlet
2 = Powered convenience outlet
Intake / Exhaust Options
A = None
B = Temp econo w/ baro relief
F = Enthalpy econo w/ baro relief
K = 2- Position damper
Base Unit Controls
0 = Electromechanical
1 = PremierLink DDC controller
2 = RTU -MP multi protocol controller
Design Rev
Factory assigned
Voltage
1 = 575/3/60
3 = 208 - 230/1/60
5 = 208 - 230/3/60
6 = 460/3/60
1 -Stage Cooling Coil Options (Outdoor - Indoor)
A = Al /Cu - Al /Cu
B = Precoat Al /Cu - AI /Cu
C = E coat Al /Cu - AI /Cu
D = E coat Al /Cu - E coat Al /Cu
E = Cu /Cu - Al /Cu
F = Cu /Cu - Cu /Cu
M = Al /Cu -Al /Cu - Louvered Hail Guards
N = Precoat Al /Cu - Al /Cu - Louvered Hail Guards
P = E coat Al /Cu - Al /Cu - Louvered Hail Guards
O = E coat Al /Cu - E coat Al /Cu - Louvered Hail Guards
R = Cu /Cu - Al /Cu - Louvered Hail Guards
S = Cu /Cu - Cu /Cu - Louvered Hail Guards
2 -Stage Cooling Coil Options (Outdoor - Indoor)
G = AI /AI - Al /Cu
H = Al /AI - Cu /Cu
J = Al /AI - E -coat Al /Cu
K = E -coat AI /AI - Al /Cu
L = E -coat AI /AI - E -coat Al /Cu
T = AI /AI - Al /Cu - Louvered Hail Guards
U = Al /AI - Cu /Cu - Louvered Hail Guards
V = AI /AI - E -coat Al /Cu - Louvered Hail Guards
W = E -coat Al /AI - Al /Cu - Louvered Hail Guards
X = E -coat AI /AI - E -coat Al /Cu - Louvered Hail Guards
U
co
TABLE 2 - ARI COOLING RATING TABLE 1 -STAGE COOLING
UNIT
COOLING
STAGES
NOM.
CAPACITY
(TONS)
NET
COOLING
CAPACITY
(MBH)
TOTAL
POWER (KW)
SEER
EER
IPLV
A04
1
3
34.6
3.1
13.00
11.00
N/A
A05
7
1
4
45.0
4.0
13.00
11.00
N/A
A06
1
5
59.0
5.5
13.00
10.75
N/A
A07
1
6
70.0
6.4
N/A
11.00
N/A
A08
1
7.5
88.0
8.0
N/A
11.00
N/A
A09
1
8.5
97.0
8.8
N/A
11.00
N/A
Al2
1
10
117.0
10.6
N/A
11.00
N/A
TABLE 3 - ARI COOLING RATING TABLE 2 -STAGE COOLING
UNIT
COOLING
STAGES
NOM.
CAPACITY
(TONS)
NET
COOLING
CAPACITY
(MBH)
TOTAL
POWER (KW)
SEER
EER
IPLV
D08
D12
D14
2
2
2
7.5
10
12.5
83.0
114.0
140.0
7.5
10.3
12.9
N/A
N/A
N/A
11.00
11.10
10.80
12.0
12.2
11.4
LEGEND
ARI
- Air Conditioning, Heating and Refrigeration
Institute Test Standard
ASHRAE - American Society of Heating, Refrigerating
and Air Conditioning, Inc.
EER - Energy Efficiency Ratio
IPLV - Integrated Part Load Value
SEER - Seasonal Energy Efficiency Ratio
ARI Standard
210/240 UAC
US
ARI Standard
340/360
�pSHR �
i3.
COMPLIA�NTf
This product has been designed and manufactured to
meet Energy Star ethane for energy efficiency.
However. proper refrigerant charge and proper air flow
are critical to achieve rated capacity and efficiency.
Installation of this product should follow all
manufacturers refrigerant charging and air 11010
instructions. Fagure to confirm proper charge and
air flow may reduce energy efficiency and Morten
equipment IMa.
8
NOTES:
1. Rated and certified under ARI Standard 210/240 -06 or
340/360 -07, as appropriate.
2. Ratings are based on:
Cooling Standard: 80 °F (27 °C) db, 67 °F (19 °C) wb
indoor air temp and 95 °F (35 °C) db outdoor air temp.
IPLV Standard: 80 °F (27 °C) db, 67 °F (19 °C) wb
indoor air temp and 80 °F (27 °C) db outdoor air temp.
3. All 48TC units comply with ASHRAE 90.1 2001, 2004
Energy Standard for minimum SEER and EER
requirements.
4. 48TC units comply with US Energy Policy Act (2005).
To evaluate code compliance requirements, refer to
state and local codes or visit the following website:
http://bcap-energy.org.
TABLE 4 - HEATING RATING TABLE - NATURAL GAS & PROPANE
Units
Gas Heat
AL/SS HEAT EXCHANGER
TEMP RISE
(DEG F)
THERMAL
EFFICIENCY
06)
AFUE
( %)
INPUT / OUTPUT
STAGE 1 (MBH)
INPUT / OUTPUT
STAGE 2 (MBH)
LOW
-
72 / 59
25 - 55
82%
81%
04
MED
-
115 / 93
55 - 85
80%
80%
HIGH
-
-
-
-
-
LOW
-
72 / 59
25 - 55
82%
81%
e P
05
MED
-
115 / 93
35 - 65
81%
80%
HIGH
-
150 / 120
50 - 80
80%
80%
LOW
-
72 / 59
20 - 55
82%
81%
06
MED
-
115 / 93
30 - 65
81%
80%
HIGH
-
150 / 120
40 - 80
80%
80%
Three Phase V
LOW
-
72 / 59
25 - 55
82%
N/A
04
MED
82 / 66
115 / 93
55 - 85
80%
N/A
HIGH
-
-
-
-
-
LOW
-
72 / 59
25 - 55
82%
N/A
05
MED
-
115 / 93
35 - 65
81%
N/A
HIGH
120 / 96
150 / 120
50 - 80
80%
N/A
LOW
-
72 / 59
20 - 55
82%
N/A
06
MED
-
115 / 93
30 - 65
81%
N/A
HIGH
120 / 96
150 / 120
40 - 80
80%
N/A
LOW
-
72 / 59
15 - 55
82%
N/A
07
MED
-
115 / 93
25 - 65
81%
N/A
HIGH
120 / 96
150 / 120
35 - 80
80%
N/A
LOW
-
125 / 103
20 - 50
82%
N/A
08
MED
120 / 98
180 / 148
35 - 65
82%
N/A
HIGH
180 / 147
224 / 184
45 - 75
82%
N/A
LOW
-
125 / 103
20 - 50
82%
N/A
09
MED
120 / 98
180 / 148
30 - 65
82%
N/A
HIGH
180 / 147
224 / 184
40 - 75
82%
N/A
LOW
120 / 98
180 / 148
25 - 65
82%
N/A
12
MED
180 / 147
224 / 184
30 - 65
82%
N/A
HIGH
200 / 160
250 / 205
35 - 70
80%
N/A
LOW
120 / 98
180 / 148
20 - 65
82%
N/A
14
MED
180 / 147
224 / 184
25 - 65
82%
N/A
HIGH
200 / 160
250 / 205
25 - 70
80%
N/A
11t,:
Heat ratings are for natural gas heat exchangers operated at or below 2000 ft (610 m). For information on Propane or alti-
tudes above 2000 ft (610 m), see the Application Data section of this book. Accessory Propane /High Altitude kits are also
available.
In the USA the input rating for altitudes above 2000 ft (610m) must be derated by 4% for each 1000 ft (305 m) above sea
level. In Canada, the input rating must be derated by 10% for altitudes of 2000 ft (610 m) to 4500 ft (1372 m) above sea level.
9
U
H
v
TABLE 5 - HEATING RATING TABLE - LOW NOx'
UNIT
GAS HEAT
LOW NOx HEAT EXCHANGER
TEMP RISE
(DEG F)
THERMAL
EFFICIENCY
(96)
AFUE
(%)
INPUT / OUTPUT
STAGE 1 (MBH)
INPUT / OUTPUT
STAGE 2 (MBH)
1000
2000
LOW
-
60 / 50
20 - 50
81%
80%
80
04
MED
-
90 / 74
30 - 60
81%
81%
63.9
A05
HIGH
-
-
-
-
-
76.5
71.1
LOW
-
60 / 50
20 - 50
81%
80%
le F
05
MED
-
90/74
30 -60
81%
81%
1
78
HIGH
-
120 / 101
40 - 70
81%
80%
66.3
62.7
LOW
-
60 / 50
15 - 50
81%
80%
79.4
06
MED
-
90 / 74
25 - 60
80%
81%
85.8
84.3
HIGH
-
120 / 101
35 - 70
80%
81%
Three Phase
1
7 LOW
-
60 / 50
20 - 50
81%
80%
04
MED
-
90 / 74
30 - 60
81%
81%
85.0
HIGH
-
-
-
-
-
D12
LOW
-
60 / 50
20 - 50
81 %
80%
05
MED
-
90/74
30 -60
81%
81%
87.0
HIGH
-
120 / 101
40 - 70
81%
80%
72.9
LOW
-
60 / 50
15 - 50
81 %
80%
06
MED
-
90 / 74
25 - 60
80%
81%
HIGH
-
120 / 101
35 - 70
80%
81%
NOTE:
1. Units meet California's South Coast Air Quality Management District (SCAQMD) Low -NOx emissions requirement of 40
nanograms per joule or less.
TABLE 6 - SOUND PERFORMANCE TABLE
UNIT
COOLING
OUTDOOR SOUND (dB)
A- WEIGHTED
63
125
250
500
1000
2000
4000
8000
STAGES
A04
1
80
90.6
80.9
80.2
76
74.6
71.3
68.5
63.9
A05
1
81
90.9
84.6
79.5
77.9
76.5
71.1
66.9
62.5
A06
1
78
84.0
82.2
76.3
74.8
72.5
68.8
65.6
61.8
A07
1
78
88.8
81.8
76.9
74.4
73.3
69.8
66.3
62.7
A08
1
82
90.1
82.6
81.0
79.4
77.0
73.0
70.4
66.7
D08
2
82
85.8
84.3
80.5
78.7
76.4
72.7
68.3
65.1
A09
1
83
91.2
86.4
81.9
81.0
78.3
73.9
71.4
67.3
Al2
1
82
88.6
85.0
81.6
79.5
77.4
74.1
71.0
66.3
D12
2
82
89.0
83.1
80.5
78.5
75.5
71.6
69.6
69.3
D14
2
87
87.0
85.2
84.6
84.9
82.2
78.4
75.3
72.9
LEGEND
dB - Decibel
NOTES:
1. Outdoor sound data is measure in accordance with
ARI standard 270 -2008.
2. Measurements are expressed in terms of sound power.
Do not compare these values to sound pressure values
because sound pressure depends on specific environ-
mental factors which normally do not match individual
applications. Sound power values are independent of
the environment and therefore more accurate.
3. A- weighted sound ratings filter out very high and very
low frequencies, to better approximate the response of
"average" human ear. A- weighted measurements for
Carrier units are taken in accordance with ARI standard
270 -2008.
10
TABLE 7 - MINIMUM - MAXIMUM AIRFLOW RATINGS - NATURAL GAS & PROPANE
U
UNIT
HEAT LEVEL
COOLING
HEATING
MINIMUM
MAXIMUM
MINIMUM
MAXIMUM
LOW
990
2190
48TC * *04
MED
900
1500
1000
1550
7
HIGH
-
-
LOW
990
2190
48TC * *05
MED
1200
2000
1330
2460
HIGH
1390
2220
LOW
990
2730
48TC * *06
MED
1500
2500
1330
2880
HIGH
1390
2780
LOW
990
3640
48TC * *07
MED
1800
3000
1330
3450
HIGH
1390
3170
LOW
1900
4750
48TC * *08
MED
2250
3750
2100
3900
HIGH
2270
3780
LOW
1900
4750
48TC * *09
MED
2550
4250
2100
4560
HIGH
2270
4250
LOW
2100
5470
48TC * *12
MED
3000
5000
2620
5670
HIGH
2650
5290
LOW
2100
6830
48TC * *14
MED
3600
6000
2620
6800
HIGH
2650
7410
11
U
1-
co
TABLE 8 - PHYSICAL DATA
(COOLING)
3 - 6 TONS
Refrigeration System
# Circuits / # Comp. / Type
Purone refrig. (R -410A) charge per circuit A/B (Ibs -oz)
Operating charge (Ibs -oz) - Humidi -MiZer Unit
Metering Device
High - press. Trip / Reset (psig)
Low - press. Trip / Reset (psig)
48TC *A04
48TC *A05
48TC *A06
48TC *A07
1 / 1 / Scroll
5 -10 / -
8 -12
Acutrol
630 / 505
54 / 117
1 / 1 / Scroll
8 -8 / -
14 -13
Acutrol
630 / 505
54 / 117
1 / 1 / Scroll
10 -11 / -
16 -0
Acutrol
630 / 505
54 / 117
1 / 1 / Scroll
14 -2 / -
22 -4
Acutrol
630 / 505
54 / 117
Evap. Coll
Material
Coil type
Rows /FPI
Total Face Area (ft2)
Condensate Drain Conn. Size
Cu / Al
3/8" RTPF
2/15
5.5
3/4"
Cu / Al
3/8" RTPF
2/15
5.5
3/4"
Cu / Al
3/8" RTPF
4/15
5.5
3/4"
Cu / Al
3/8" RTPF
4/15
7.3
3/4"
Evap.
Fan and
Motor
Motor Qty / Drive Type
Max BHP
RPM Range
Motor Frame Size
Fan Qty / Type
Fan Diameter (in)
Motor Qty / Drive Type
Max BHP
RPM Range
Motor Frame Size
Fan Qty / Type
Fan Diameter (in)
Motor Qty / Drive Type
Max BHP
RPM Range
Motor Frame Size
Fan Qty / Type
Fan Diameter (in)
Motor Qty / Drive Type
Max BHP
RPM Range
Motor Frame Size
Fan Qty / Type
Fan Diameter (in)
Motor Qty / Drive Type
Max BHP
RPM Range
Motor Frame Size
Fan Oty / Type
Fan Diameter (in)
1 / Belt
1.2
560 -854
48
1 / Centrifugal
10 x 10
1 / Belt
1.2
770 -1175
48
1 / Centrifugal
10 x 10
1 / Belt
1.2
560 -854
48
1 / Centrifugal
10 x 10
1 / Belt
1.2
770 -1175
48
1 / Centrifugal
10 x 10
1 / Belt
2.4
1035 -1466
56
1 / Centrifugal
10 x 10
1 / Belt
1.2
560 -854
48
1 / Centrifugal
10 x 10
1 / Belt
1.2
770 -1175
48
1 / Centrifugal
10 x 10
1 / Belt
1.2
560 -854
48
1 / Centrifugal
10 x 10
1 / Belt
1.2
770 -1175
48
1 / Centrifugal
10 x 10
1 / Belt
2.4
1035 -1466
56
1 / Centrifugal
10x 10
1 / Belt
1.2
770 -1175
48
1 / Centrifugal
10 x 10
1 / Belt
1.5
1035 -1466
56
1 / Centrifugal
10 x 10
1 / Belt
1.5
770 -1175
48
1 / Centrifugal
10x 10
1 / Belt
2.4
1035 -1466
56
1 / Centrifugal
10 x 10
1 / Belt
2.9
1303 -1687
56
1 / Centrifugal
10 x 10
-
-
-
-
-
-
-
-
-
-
-
-
1 / Belt
2.4
1073 -1457
56
1 / Centrifugal
10 x 10
1 / Belt
2.9*
1173 -1518
56
1 / Centrifugal
10 x 10
1 / Belt
3.7
1474 -1788
56
1 / Centrifugal
10x 10
Standard Static
1 phase
Medium Static
1 phase
Standard Static
3 phase
Medium Static
3 phase
High Static
3 phase
Cond. Coil
Material
Coil type
Rows /FPI
Total Face Area (ft2)
Cu / Al
3/8" RTPF
1/17
14.6
Cu / Al
3/8' RTPF
2/17
16.5
Cu / Al
3/8" RTPF
2/17
16.5
Cu / Al
3/8" RTPF
2/17
21.3
Humidi - MiZer Coil
Material
Rows..Fins /in.
Total Face Area (ft2)
Cu / Al
1 / 17
3.9
Cu / Al
2 / 17
3.9
Cu / Al
2 / 17
3.9
Cu / Al
2 / 17
5.2
Cond. fan / motor
Qty / Motor Drive Type
Motor HP / RPM
Fan diameter (in)
1/ Direct
1/4 / 1100
22
1/ Direct
1/4 / 1100
22
1/ Direct
1/4 / 1100
22
1/ Direct
1/4 / 1100
22
Filters
RA Filter # / Size (in)
OA inlet screen # / Size (in)
2/16x25x2
1/20x24x1
2/16x25x2
1/20x24x1
2/16x25x2
1/20x24x1
4/16x16x2
1/20x24x1
* 575V motor utilizes 3.7 BHP.
12
TABLE 9 - PHYSICAL DATA
(HEATING)
3 - 6 TONS
Gas Connection
# of Gas Valves
Nat. gas supply line press (in. w.g.) /(PSIG)
Propane supply line press (in. w.g.) /(PSIG)
Heat Anticipator Setting (Amps)
1st stage
2nd stage
48TC * *04
48TC * *05
48TC * *06
48TC * *07
1
4 -13 / 0.18 - 0.47
11 -13 / 0.40 - 0.47
0.14
0.14
1
4 -13 / 0.18 - 0.47
11 -13 / 0.40 - 0.47
0.14
0.14
1
4 -13 / 0.18 - 0.47
11 -13 / 0.40 - 0.47
0.14
0.14
1
4 -13 / 0.18 - 0.47
11 -13 / 0.40 - 0.47
0.14
0.14
Natural
0
J
0
I
_
0
=
Gas, Propane Heat
# of stages / # of burners (total)
Connection size
Rollout switch opens / closes
Temperature rise range (F)
# of stages / # of burners (total)
Connection size
Rollout switch opens / closes
Temperature rise range (F)
Connection size
# of stages / # of burners (total)
Rollout switch opens / closes
Temperature rise range (F)
1 / 2
1/2" NPT
195 / 115
25 - 55
1 or 2 / 3
1/2" NPT
195 / 115
55 - 85
-
-
-
-
1 / 2
1/2" NPT
195 / 115
25 - 55
1 / 3
1/2" NPT
195 / 115
35 - 65
1 or 2 / 3
1/2" NPT
195 / 115
50 - 80
1 / 2
1/2" NPT
195 / 115
20 - 55
1 / 3
1/2" NPT
195 / 115
30 - 65
1 or 2 / 3
1/2" NPT
195 / 115
40 - 80
1 / 2
1/2" NPT
195 / 115
15 - 55
1 / 3
1/2" NPT
195 / 115
25 - 65
1 or 2 / 3
1/2" NPT
195 / 115
35 - 80
Low
O
CI
W
=
0
=
NO Gas Heat
# of stages / # of burners (total)
Connection size
Rollout switch opens / closes
Temperature rise range (F)
# of stages / # of burners (total)
Connection size
Rollout switch opens / closes
Temperature rise range (F)
# of stages / # of burners (total)
Connection size
Rollout switch opens / closes
Temperature rise range (F)
1 / 2
1/2" NPT
195 / 115
20 - 50
1 / 3
1/2" NPT
195 / 115
30 - 60
-
-
-
-
1 / 2
1/2" NPT
195 / 115
20 - 50
1 / 3
1/2" NPT
195 / 115
30 - 60
1 / 3
1/2" NPT
195 / 115
40 - 70
1 / 2
1/2" NPT
195 / 115
15 - 50
1 / 3
1/2" NPT
195 / 115
25 - 60
1 / 3
1/2" NPT
195 / 115
35 - 70
-
-
-
-
-
-
-
-
-
-
-
-
13
CURBS & WEIGHTS DIMENSIONS - CHASSIS 1
NOTES:
1. DIMENSIONS ARE IN INCHES DIMENSIONS
IN ( ) ARE IN MILLIMETERS.
2. S CENTER OF GRAVITY
3.
DIRECTION OF AIR FLOW
44
321/4
[8181
33 3/8
[6481
18/81 1 }
[459]
1 [3631
(
16-1/8 14-1/4
(312]4
[41111
1
-*10-1/2.-
1265]
T
11-3 /81
12891
6-1/8
11551
E STD. —
CONDENSATE
DRAIN
16 -3/4
1427)
SUPPLY AIR
25-1/8
16381
RETURN
AIR
1 -1/4
1321
SEE THRU THE
BASE CHART
ECONOMIZER HOOD
(OPTIONAL)
16
[4061
25-5/8
[652]
RETURN AIR
10 -7/8
[277]
E ALT.
CONDENSATE
DRAIN OPENIN6
IN BASEPAN
17 -3/4
[4511
SUPPLY
AIR
6 -1/4
[151
1 — 6 -5/8
!1681
8. 1
26 3/4
16811
1177]
SUPPLY 4
AIR
31 1//
1793)
*RIGH
1.
6
[152]
BAROMETRIC
RELIEF
FLOW
RETURN
AIR
1-5/8
11181
IECTRICAL
DISCONNECT
LOCATION
OPTIONAL
FACTORY
INSTALLED
CONVENIENCE
OUTLET
19 -1/2
6-5/8
[1681
3 -3/4
195)
16 3/4
FT
25
16361
OPTIONAL
FACTORY
INSTALLED
DISCONNECT
` --FLUE
[1001 HOOD
TOP
RETURN
AIR
26-1/2 29 -3/8
[6731 [1171
- 3 -3/8
12 -1/8
[ 307 ]
18 1/2
[4101
[85)
SUPPLY
AIR
HANDLE
30 1/8
17611
4 3/8
18881
FRONT
8 -3/8
(213]
FILTER ACCESS PANEL
(TOOL -LESS)
•
CONNECTION SIZES
A
1 3/8' DIA (35] FIELD POWER SUPPLY HOLE
B
2' [50) DIA POWER SUPPLY KNOCKOUT
C
1 3/4' DIA [51] GAUGE ACCESS PLUG
D
1/8" DIA [22] FIELD CONTROL WIRING HOLE
E
3/4 " -14 NPT CONDENSATE DRAIN
F
1/2 "-14 NPT GAS CONNECTION
6
2 1/2 ' DIA [64] POWER SUPPLY KNOCK -OUT
25
16361
OPTIONAL
FACTORY
INSTALLED
DISCONNECT
` --FLUE
[1001 HOOD
TOP
RETURN
AIR
26-1/2 29 -3/8
[6731 [1171
- 3 -3/8
12 -1/8
[ 307 ]
18 1/2
[4101
[85)
SUPPLY
AIR
HANDLE
30 1/8
17611
4 3/8
18881
FRONT
8 -3/8
(213]
FILTER ACCESS PANEL
(TOOL -LESS)
•
•
COMP.
• ACCESS
PANEL '
a -
CONDENSER
INDOOR COIL
ACCESS PANEL
1
1/2'
ACC.
7/8" (22.2)
X
THRU-THE-BASE CHART
THESE HOLES REOUIRED FOR USE
CRBTMPWR001A01, 003A01
J
THREADED
CONDUIT SIZE
WIRE
USE
REVD HOLE
SIZES (MAX.)
W
1/2'
ACC.
7/8" (22.2)
X
1/2'
24V
1/8' (22.2)
Y 4
3/4' (001,003)
POWER
1 1/8' (28.4)
200
(003) 1/2' FPT
GAS
1 3/16" (30.0)
FOR 'THRU- THE - BASEPAN' FACTORY OPTION,
FITTINGS FOR ONLY X,Y, 6 Z ARE PROVIDED
4
SELECT EITHER 3/4" OR 1/2"
FOR POWER, DEPENDING ON WIRE SIZE
f4
(001) PROVIDES 3/4" FPT THRU CURB
FLANGE 6 FITTING.
Fig. 1 - Dimensions 48TC 04 -07
16
BACK
2 -5/8
[671
TYP
CURB
WIDTH
UNIT
J
K
48TC 404
33 3/8
[841]
18 5/8
[412]
48TC 405
33 3/8
[847]
14 7/8
[311]
48TC 406
33 3/8
[841]
14 7/8
[317]
48TC 401
41 3/8
[1051]
14 7/8
[377]
C08517
CURBS & WEIGHTS DIMENSIONS - CHASSIS 1 (cont.)
UNIT
STD. UNIT
WEIGHT
CORNER
WEIGHT (Al
CORNER
WEIGHT (B)
CORNER
WEIGHT (C1
CORNER
WEIGHT ID)
13
C.G.
Surface behind servicer is grounded (e.g., metal, masonry wall)
Surface behind servicer is electrically non - conductive (e.g., wood, fiberglass)
Check for sources of flue products within 10 -ft of unit fresh air intake hood
HEIGHT
LBS.
KG.
LBS.
KG.
LBS.
KG.
LBS.
KG.
LBS.
KG.
X
Y
Z
48TC -A04
483
219
111
50
125
57
131
59
116
53
39
[991]
23
[584)
16 3/8 [416]
48TC-A05
531
244
124
56
139
63
145
66
129
59
39
[991]
23
[584]
17 [432)
48TC-A06
569
258
131
59
141
67
154
10
137
62
39
[991]
23
[584)
17 1/4 [438)
48TC -A07
652
296
150
68
169
76
176
80
157
11
39
[991]
23
[584]
20 1/8 [511)
0' -3"
[76]
TOP
0'_3"
[763
dl
(11]
(BOLT HEADS)
SUPPLY AIR
OPENING
RETURN AI
OPENING
0' -0 7/16"
[11]
(BOLT HEADS)
11' -7 13V16" 1 /6"
[504) [3343
0' -3 "�
[76)
3' -D"
[914]
Fig. 3 - Curb Dimensions
CORNER B
11{
«10 0
CORNER C
0
`t. .1
: 00r
J
FRONT
C08593
Fig. 2 - Dimensions 48TC 04 -07
2 " -7 5/8"
[8033
0' -0 7/16"
(11]
(BOLT HEADS)
0' -0 7/16"
[113
(BOLT HEADS)
C07458
GASKET
SUPPLIED WITH CURB)
NAIL
COUNTER FLASHING
FIELD SUPPLIED)
/ROOFING FELT
(FIELD SUPPLIED)
CANT STRIP
Ar FIELD SUPPLIED)
ROOFING FELT
(FIELD SUPPLIED)
C07457
Fig. 4 - Curb Installation Detail (Typical)
Fig. 5 - Service Clearance
C08337
LOC
DIMENSION
CONDITION
A
48" (1219 mm)
18" (457 mm)
18" (457 mm)
12" (305 mm)
Unit disconnect is mounted on panel
No disconnect, convenience outlet option
Recommended service clearance
Minimum clearance
13
42" (1067 mm)
36" (914 mm)
Special
Surface behind servicer is grounded (e.g., metal, masonry wall)
Surface behind servicer is electrically non - conductive (e.g., wood, fiberglass)
Check for sources of flue products within 10 -ft of unit fresh air intake hood
C
36" (914 mm)
18" (457 mm)
Side condensate drain is used
Minimum clearance
D
48" (1219 mm)
42" (1067 mm)
36" (914 mm)
Special
No flue discharge accessory installed, surface is combustible material
Surface behind servicer is grounded (e.g., metal, masonry wall, another unit)
Surface behind servicer is electrically non - conductive (e.g., wood, fiberglass)
Check for adjacent units or building fresh air intakes within 10 -ft of this unit's flue outlet
17
U
1-
TABLE 12 - COOLING CAPACITIES
1 -STAGE COOLING
3 TONS
48TC•A04
AMBIENT TEMPERATURE
85
95
105
115
EAT (db)
EAT (db)
EAT (db)
EAT (db)
75
80
85
75
80
85
75
80
85
75
80
85
TC
28.1
28.1
31.7
26.3
26.3
29.8
24.5
24.5
27.7
22.6
22.6
25.5
58
SHC
24.4
28.1
31.7
22.9
26.3
29.8
21.3
24.5
27.7
19.6
22.6
25.5
TC
30.3
30.3
31.0
27.8
27.8
29.8
25.1
25.1
28.4
22.6
22.6
26.5
62
SHC
22.6
26.8
31.0
21.5
25.7
29.8
20.2
24.3
28.4
18.7
22.6
26.5
TC
35.5
35.5
35.5
33.1
33.1
33.1
30.5
30.5
30.5
27.5
27.5
27.5
)00
AT
67
SHC
19.5
23.7
27.9
18.5
22.7
26.9
17.4
21.6
25.8
16.2
20.4
24.6
TC
39.0
39.0
39.0
37.1
37.1
37.1
35.1
35.1
35.1
32.7
32.7
32.7
72
SHC
15.3
19.5
23.7
14.5
18.8
23.0
13.7
17.9
22.2
12.9
17.1
21.3
TC
-
41.4
41.4
-
39.6
39.6
-
37.6
37.6
-
35.4
35.4
76
SHC
-
16.0
21.0
-
15.4
20.2
-
14.6
19.3
-
13.8
18.3
TC
30.2
30.2
34.2
28.4
28.4
32.2
26.5
26.5
30.0
24.5
24.5
27.7
58
SHC
26.3
30.2
34.2
24.7
28.4
32.2
23.1
26.5
30.0
21.3
24.5
27.7
TC
31.9
31.9
34.2
29.4
29.4
32.8
26.7
26.7
31.2
24.5
24.5
28.8
62
SHC
24.6
29.4
34.2
23.4
28.1
32.8
22.0
26.6
31.2
20.3
24.5
28.8
TC
36.7
36.7
36.7
34.8
34.8
34.8
32.2
32.2
32.2
29.1
29.1
29.1
050
ATE
67
SHC
20.6
25.4
30.2
19.8
24.6
29.4
18.8
23.6
28.4
17.6
22.4
27.2
TC
40.1
40.1
40.1
38.2
38.2
38.2
36.1
36.1
36.1
33.7
33.7
33.7
72
SHC
15.7
20.5
25.3
15.0
19.8
24.6
14.2
19.0
23.8
13.4
18.2
23.0
TC
-
42.4
42.4
-
40.6
40.6
-
38.5
38.5
-
36.2
36.2
76
SHC
-
16.6
22.2
-
15.9
21.3
-
15.2
20.4
-
14.4
19.5
TC
32.2
32.2
36.4
30.4
30.4
34.3
28.4
28.4
32.1
26.3
26.3
29.7
58
SHC
28.0
32.2
36.4
26.4
30.4
34.3
24.7
28.4
32.1
22.8
26.3
29.7
TC
33.3
33.3
37.0
30.8
30.8
35.5
28.4
28.4
33.4
26.3
26.3
30.9
62
SHC
26.4
31.7
37.0
25.1
30.3
35.5
23.4
28.4
33.4
21.7
26.3
30.9
TC
37.7
37.7
37.7
35.6
35.6
35.6
33.4
33.4
33.4
30.4
30.4
30.4
200
AT
67
SHC
21.7
27.0
32.4
20.9
26.3
31.6
20.0
25.4
30.8
18.8
24.2
29.6
TC
40.9
40.9
40.9
39.0
39.0
39.0
36.9
36.9
36.9
34.4
34.4
34.4
72
SHC
16.1
21.5
26.8
15.4
20.8
26.1
14.7
20.0
25.4
13.8
19.2
24.5
TC
-
43.1
43.1
-
41.3
41.3
-
39.1
39.1
-
36.8
36.8
76
SHC
-
17.1
23.1
-
16.4
22.3
-
15.7
21.4
-
14.9
20.5
TC
-
-
-
32.1
32.1
36.3
30.0
30.0
34.0
27.9
27.9
31.5
58
SHC
-
-
-
27.9
32.1
36.3
26.1
30.0
34.0
24.2
27.9
31.5
TC
28.4
28.4
30.5
32.2
32.2
37.8
30.1
30.1
35.3
27.9
27.9
32.8
62
SHC
17.6
24.1
30.5
26.6
32.2
37.8
24.8
30.1
35.3
23.0
27.9
32.8
TC
33.2
33.2
33.2
36.4
36.4
36.4
34.1
34.1
34.1
31.5
31.5
32.0
350
AT
67
SHC
15.0
21.4
27.9
21.9
27.8
33.7
21.0
26.9
32.9
20.0
26.0
32.0
TC
37.5
37.5
37.5
39.7
39.7
39.7
37.5
37.5
37.5
35.0
35.0
35.0
72
SHC
11.8
18.3
24.8
15.8
21.7
27.5
15.0
20.9
26.8
14.2
20.1
26.0
TC
-
40.1
40.1
-
41.8
41.8
-
39.6
39.6
-
37.3
37.3
76
SHC
-
15.3
22.7
-
16.8
23.2
-
16.1
22.3
-
15.3
21.5
EAT (wb)
TC
28.1
28.1
34.2
33.7
33.7
38.1
31.6
31.6
35.7
29.3
29.3
33.2
58
SHC
21.9
28.1
34.2
29.3
33.7
38.1
27.4
31.6
35.7
25.5
29.3
33.2
TC
30.3
30.3
33.8
33.7
33.7
39.6
31.6
31.6
37.1
29.4
29.4
34.5
62
SHC
19.8
26.8
33.8
27.8
33.7
39.6
26.1
31.6
37.1
24.2
29.4
34.5
TC
35.5
35.5
35.5
36.9
36.9
36.9
34.6
34.6
34.9
32.0
32.0
34.0
500
67
SHC
16.7
23.7
30.7
22.8
29.2
35.7
21.9
28.4
34.9
21.0
27.5
34.0
TC
39.0
39.0
39.0
40.2
40.2
40.2
38.0
38.0
38.0
35.5
35.5
35.5
72
SHC
12.4
19.5
26.6
16.1
22.5
28.8
15.4
21.7
28.1
14.6
21.0
27.4
TC
-
41.4
41.4
-
42.2
42.2
-
40.0
40.0
-
-
-
76
SHC
-
16.0
24.3
-
17.2
24.0
-
16.5
23.2
-
-
-
LEGEND:
- Do not operate
Cfm - Cubic feet per minute (supply air)
EAT(db) - Entering air temperature (dry bulb)
EAT(wb) - Entering air temperature (wet bulb)
SHC - Sensible heat capacity
TC - Total capacity
25
U
H
o
TABLE 25 - 48TC * *04
FAN PERFORMANCE (cont.)
3 PHASE
3 TON HORIZONTAL SUPPLY
CFM
AVAILABLE EXTERNAL STATIC PRESSURE (in. wg)
0.2
0.2
0.4
0.6
1.6 1.8
0.8
2.0
1.0
RPM
RPM
BHP
RPM
BHP
RPM
BHP
RPM
BHP
RPM
BHP
Field- Supplied Drive'
Medium Static Option
Standard Static Option
High Static Option
900
Medium Static Option
1019
900
553
0.14
681
0.22
782
0.32
870
0.42
948
0.53
975
575
0.16
700
0.25
801
0.35
888
0.46
965
0.57
1050
597
0.18
720
0.28
820
0.38
906
0.49
983
0.61
1125
620
0.21
741
0.31
839
0.42
925
0.54
1001
0.66
1200
643
0.23
762
0.34
859
0.46
944
0.58
1020
0.71
1275
667
0.27
783
0.38
879
0.50
963
0.63
1038
0.76
1350
691
0.30
805
0.42
900
0.55
983
0.68
1057
0.82
1425
715
0.34
827
0.47
920
0.60
1002
0.74
1076
0.88
1500
740
0.38
849
0.52
941
0.66
1023
0.80
1096
0.95
CFM
AVAILABLE EXTERNAL STATIC PRESSURE (in. wg)
1.2
0.2
1.4
0.4
1.6 1.8
2.0
1.0
RPM
BHP
RPM
BHP
RPM
BHP
RPM
BHP
RPM
BHP
Field - Supplied Drivel
Medium Static Option
Medium Static Option
High Static Option
900
900
1019
0.64
1084
0.76
1146
0.89
1203
1.02
1258
1.16
975
1036
0.69
1101
0.81
1162
0.94
1219
1.08
1274
1.22
1050
1053
0.74
1118
0.86
1179
1.00
1236
1.14
1290
1.28
1125
1071
0.79
1135
0.92
1196
1.06
1253
1.20
1307
1.35
1200
1089
0.84
1153
0.98
1213
1.12
1270
1.27
1324
1.42
1275
1107
0.90
1171
1.04
1231
1.19
1287
1.34
1341
1.50
1350
1126
0.96
1189
1.11
1249
1.26
1305
1.42
1358
1.58
1425
1144
1.03
1208
1.18
1267
1.34
1323
1.50
1376
1.66
1500
1163
1.10
1226
1.25
1285
1.41
1341
1.58
1394
1.75
NOTE: For more information, see General Fan Performance Notes on page 35.
1. Recommend using field - supplied drive (part no. KR11AG006) and belt (part no. KR3OAE039)
TABLE 26 - 48TC * *04
3 PHASE
3 TON VERTICAL SUPPLY
CFM
AVAILABLE EXTERNAL STATIC PRESSURE (In. wg)
0.2
0.4
0.6 0.8
1.0
RPM
BHP
RPM BHP
RPM BHP RPM
BHP
RPM
BHP
Field - Supplied Drivel
Standard Static Option
Medium Static Option
900
567
0.15
688 0.22 786 0.30 871
0.37
947
0.44
975
591
0.17
710 0.26 807 0.34 891
0.42
966
0.49
1050
615
0.20
732 0.29 828 0.38 911
0.47
985
0.55
1125
641
0.23
755 0.33
849 0.42 931
0.52
1005
0.61
1200
666
0.26
778 0.37
871 0.47 952
0.57
1025
0.67
1275
693
0.29
802 0.41 893 0.53 974
0.63
1046
0.74
1350
719
0.33
826 0.46 916 0.58 995
0.70
1067
0.81
1425
746
0.38
850 0.51
939 0.64 1017
0.76
1088
0.89
1500
773
0.42
875 0.57
963 0.70 1040
0.84
1110
0.96
AVAILABLE EXTERNAL STATIC PRESSURE (in. wg)
CFM
1.2
1.4
1.8
1.8
2.0
RPM
BHP
RPM BHP
RPM BHP
RPM
BHP
RPM
BHP
Medium Static Option
High Static Option
900
1016
0.51
1080 0.57
1139 0.64
1195
0.71
1249
0.77
975
1034
0.57
1098 0.64
1157 0.72
1213
0.79
1266
0.86
1050
1053
0.63
1116 0.71
1176 0.79
1231
0.87
1284
0.95
1125
1073
0.70
1135 0.79
1194 0.87
1250
0.96
1302
1.04
1200
1093
0.77
1155 0.87
1213 0.96
1268
1.05
1321
1.14
1275
1113
0.85
1174 0.95
1232 1.05
1287
1.15
1339
1.25
1350
1133
0.92
1194 1.03
1252 1.14
1307
1.25
1358
1.35
1425
1154
1.01
1215 1.12
1272 1.24
1326
1.35
1378
1.46
1500
1175
1.09
1235 1.22
1292 1.34
1346
1.46
1397
1.58
NOTE: For more information, see General Fan Performance Notes on page 35.
Boldface indicates field - supplied drive is required.
1. Recommend using field - supplied fan pulley (part no. KR11AG006) and belt (part no. KR30AE039).
41
TABLE 46 - 48TC *A04
ELECTRICAL INFORMATION
1 -STAGE COOLING
3 TONS
V -Ph -Hz
VOLTAGE
RANGE
COMP (ea)
OFM (ea)
IFM
RLA
LRA
WATTS
FLA
TYPE
Max
WATTS
Max
AMP Draw
EFF at Full Load
FLA
MIN
MAX
208 -1 -60
187
253
16.6
79
325
1.5
Std Static
1000
5.1
70%
4.9
208-1-60
187
253
21.8
117
325
1.5
Med Static
1000
5.1
70%
4.9
230 -1 -60
187
253
21.8
117
325
1.5
Std Static
1000
5.1
70%
4.9
230 -1 -60
187
253
16.6
79
325
1.5
Med Static
1000
5.1
70%
4.9
Std Static
1000
5.1
70%
4.9
208 -3 -60
187
253
10.4
73
325
1.5
Med Static
1000
5.1
70%
4.9
High Static
2120
5.5
80%
5.2
Std Static
1000
5.1
70%
4.9
230 -3 -60
187
253
10.4
73
325
1.5
Med Static
1000
5.1
70%
4.9
High Static
2120
5.5
80%
5.2
Std Static
1000
2.2
70%
2.1
460 -3 -60
414
506
5.8
38
325
0.8
Med Static
1000
2.2
70%
2.1
High Static
2120
2.7
80%
2.6
Std Static
1000
2.0
71%
1.9
575 -3 -60
518
633
3.8
37
325
0.6
Med Static
1000
2.0
71%
1.9
High Static
2120
2.1
80%
2.0
TABLE 47 - 48TC *A05
1 -STAGE COOLING
4 TONS
V -Ph -Hz
VOLTAGE
RANGE
COMP (ea)
OFM (ea)
IFM
RLA
LRA
WATTS
FLA
TYPE
Max
WATTS
Max
AMP Draw
EFF at Full Load
FLA
MIN
MAX
208 -1 -60
187
253
26.2
134
325
1.5
Std Static
1000
5.1
70%
4.9
208-1-60
187
253
21.8
117
325
1.5
Med Static
1850
7.4
78%
7.0
230 -1 -60
187
253
21.8
117
325
1.5
Std Static
1000
5.1
70%
4.9
230 -1 -60
187
253
26.2
134
325
1.5
Med Static
1850
7.4
78%
7.0
Std Static
1000
5.1
70%
4.9
208 -3 -60
187
253
13.7
83
325
1.5
Med Static
1000
5.1
70%
4.9
High Static
2120
5.5
80%
5.2
Std Static
1000
5.1
70%
4.9
230 -3 -60
187
253
13.7
83
325
1.5
Med Static
1000
5.1
70%
4.9
High Static
2120
5.5
80%
5.2
Std Static
1000
2.2
70%
2.1
460 -3 -60
414
506
6.2
41
325
0.8
Med Static
1000
2.2
70%
2.1
High Static
2120
2.7
80%
2.6
Std Static
1000
2.0
71%
1.9
575 -3 -60
518
633
4.8
37
325
0.6
Med Static
1000
2.2
71%
2.1
High Static
2120
2.1
80%
2.0
TABLE 48 - 48TC *A06
1 -STAGE COOLING
5 TONS
V -Ph -Hz
VOLTAGE
RANGE
COMP (ea)
OFM (ea)
IFM
RLA
LRA
WATTS
FLA
TYPE
Max
WATTS
Max
AMP Draw
EFF at Full Load
FLA
MIN
MAX
208 -1 -60
187
253
26.2
134
325
1.5
Std Static
1000
5.1
70%
4.9
Med Static
1850
7.4
78%
7.0
Std Static
1000
5.1
70%
4.9
230 -1 -60
187
253
26.2
134
325
1.5
Med Static
1850
7.4
78%
7.0
Std Static
1000
5.1
70%
4.9
208 -3 -60
187
253
15.6
110
325
1.5
Med Static
2120
5.5
80%
5.2
High Static
2615
7.9
81%
7.5
Std Static
1000
5.1
70%
4.9
230 -3 -60
187
253
15.6
110
325
1.5
Med Static
2120
5.5
80%
5.2
High Static
2615
7.9
81%
7.5
Std Static
1000
2.2
70%
2.1
460 -3 -60
414
506
7.7
52
325
0.8
Med Static
2120
2.7
80%
2.6
High Static
2615
3.6
81%
3.4
Std Static
1000
2.0
71%
1.9
575 -3 -60
518
633
5.8
39
325
0.6
Med Static
1390
2.1
81%
2.0
High Static
3775
2.9
81%
2.8
53
. TABLE 56 - MCA/MOCP DETERMINATION NO C.O. OR UNPWRD C.O.
1-
n
NOM.
V -Ph -Hz
IFM
TYPE
COMBUSTION
FAN MOTOR
FLA
POWER
EXHAUST
FLA
NO C.O. or UNPWRD C.O.
NO P.E.
w/ P.E. (pwrd fr/ unit)
MCA
MOCP
DISC. SIZE
MCA
MOCP
DISC. SIZE
FLA
LRA
FLA
LRA
STD
27.2
40.0
26
95
29.1
45.0
29
97
208/230 -1 -60
MED
0.48
1.9
27.2
40.0
26
95
29.1
45.0
29
97
STD
19.4
25.0
19
89
21.3
30.0
22
91
208/230 -3 -60
MED
0.48
1.9
19.4
25.0
19
89
21.3
30.0
22
91
HIGH
19.7
30.0
20
107
21.6
30.0
22
109
rc*
STD
10.2
15.0
10
46
11.2
15.0
11
47
460 -3 -60
MED
0.25
1.0
10.2
15.0
10
46
11.2
15.0
11
47
HIGH
10.7
15.0
11
55
11.7
15.0
12
56
STD
7.3
15.0
7
44
9.2
15.0
9
46
575 -3 -60
MED
0.24
1.9
7.3
15.0
7
44
9.2
15.0
9
46
HIGH
7.4
15.0
7
50
9.3
15.0
10
52
STD
33.7
50.0
32
133
35.6
50.0
35
135
208/230 -1 -60
MED
0.48
1.9
33.7
50.0
32
133
35.6
50.0
35
135
STD
23.5
30.0
23
99
25.4
30.0
25
101
208/230 -3 -60
MED
0.48
1.9
23.5
30.0
23
99
25.4
30.0
25
101
HIGH
23.8
30.0
23
117
25.7
30.0
25
119
rc*
STD
10.7
15.0
10
49
11.7
15.0
12
50
460 -3 -60
MED
0.25
1.0
10.7
15.0
10
49
11.7
15.0
12
50
HIGH
11.2
15.0
11
58
12.2
15.0
12
59
STD
8.5
15.0
8
44
10.4
15.0
11
46
575 -3 -60
MED
0.24
1.9
8.5
15.0
8
44
10.4
15.0
11
46
HIGH
8.6
15.0
9
50
10.5
15.0
11
52
208/230
STD
39.2
60.0
37
150
41.1
60.0
40
152
-1 -60
MED
0.48
1.9
41.3
60.0
40
175
43.2
60.0
42
177
STD
25.9
30.0
25
126
27.8
40.0
27
128
m
208/230 -3 -60
MED
0.48
1.9
26.2
40.0
26
144
28.1
40.0
28
146
Q
HIGH
28.5
40.0
29
170
30.4
45.0
30
172
V
STD
12.5
20.0
12
60
13.5
20.0
13
61
o
460 -3 -60
MED
0.25
1.0
13.0
20.0
13
69
14.0
20.0
14
70
HIGH
13.8
20.0
14
82
14.8
20.0
15
83
STD
9.8
15.0
10
46
11.7
15.0
12
48
575 -3 -60
MED
0.24
1.9
9.9
15.0
10
52
11.8
15.0
13
54
HIGH
10.7
15.0
11
63
12.6
15.0
13
65
STD
30.5
45
30
157
32.4
50
32
159
208/230 -3 -60
MED
0.48
1.9
32.8
50
32
183
34.7
50
34
185
HIGH
32.8
50
32
183
34.7
50
34
185
STD
15.5
25
15
79
16.5
25
16
80
rc*
460 -3 -60
MED
0.25
1.0
16.3
25
16
92
17.3
25
17
93
HIGH
17.3
25
17
101
18.3
25
18
102
STD
11.9
15
12
63
13.8
20
14
65
575 -3 -60
MED
0.24
1.9
12.7
20
12
74
14.6
20
15
76
HIGH
12.7
20
12
74
14.6
20
15
76
48TC *A08
STD
39.5
60
38
191
43.3
60
43
195
208/230 -3 -60
MED
0.48
3.8
41.8
60
41
228
45.6
60
45
232
HIGH
49.3
60
49
254
53.1
60
54
258
STD
19.5
30
19
113
21.3
30
21
115
460 -3 -60
MED
0.25
1.8
20.3
30
20
132
22.1
30
22
134
HIGH
24.3
30
24
145
26.1
30
26
147
STD
14.9
20
14
89
18.7
25
19
93
575 -3 -60
MED
0.24
3.8
15.3
20
15
104
19.1
25
19
108
HIGH
18.1
25
18
118
21.9
30
23
122
See notes on next page.
57
U
co
• •
PER
PLAN REVIEW /ROUTING SLIP
. ,•
ACTIVITY NUMBER: M11 -092
PROJECT NAME: SPEC EAST
SITE ADDRESS: 12628 INTERURBAN AV S
X Original Plan Submittal
Response to Correction Letter #
DATE: 07 -07 -11
Response to Incomplete Letter #
Revision # After Permit Issued
DEPARTMENTS:
A3-- Al 7- r
Building Division
Public Works ❑
Aw\ N /A— Vl'L
Fire Prevention
Structural
Planning Division
Permit Coordinator
El
1
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
Comments:
Incomplete
n
DUE DATE: 07-12-11
Not Applicable
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES /THURS ROUTING:
Please Route
Structural Review Required
❑ No further Review Required
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
DUE DATE: 08-09 -11
Approved ❑ Approved with Conditions W Not Approved (attach comments) n
Notation:
REVIEWER'S INITIALS: DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Documents /routing slip.doc
2 -28 -02
Contractors or Tradespeople Priiter Friendly Page
•
General /Specialty Contractor
A business registered as a construction contractor with L&l to perform construction work within the scope of
its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of
account and carry general liability insurance.
Business and Licensing Information
Name
Phone
Address
Suite /Apt.
City
State
Zip
County
Business Type
Parent Company
IECS INC
2069399495
Po Box 19252
Seattle
WA
981091252
King
Corporation
UBI No. 601639846
Status Active
License No. IECS * * *044QL
License Type Construction Contractor
Effective Date 11/13/1996
Expiration Date 11/20/2012
Suspend Date
Specialty 1
Specialty 2 Unused
Heating /Vent /Air - Conditioning And Refrig (Hvac /R)
Other Associated Licenses
License
Name
Type
Specialty 1
Specialty
2
Effective
Date
Expiration
Date
Status
SEATTMI038NR
SEATTLE
MECHANICAL INC
Construction
Contractor
Metal
Fabrication
Unused
8/19/1997
11 /4/2001
Archived
Business Owner Information
Name
Role
Effective Date
Expiration Date
HUMPHREY, GEORGE
01/01/1980
Bond Information No records found for the previous 6 year period
Assignment of Savings Information
Page 1 of 1
Savings
Assignment of Savings Account Number
Effective Date
Release Date
Assignment Type
Impaired Date
Amount
Received Date
2
21221204
11/20/2001
Until
Released
Bond
56,000.00
11/20/2001
1
20736965
10/10/1996
3/4/2009
Bond
08/01/2010
$4,000.00
Insurance Information
Insurance
Company Name
Policy Number
Effective Date
Expiration Date
Cancel Date
Impaired Date
Amount
Received Date
WEST
12
AMERICAN INS
BKW1153913555
08/01/2010
08/01/2011
$1,000,000.00
07/28/2010
CO
LIBERTY
11
NORTHWEST
BKW1053913555
08/01/2009
08/01/2010
$1,000,000.00
07/21/2009
INS CORP
10
FEDERAL
MUTUAL INS CO
9821065
08/01/2007
08/01/2009
$1,000,000.00
06/26/2008
9
FEDERATED
MUTUAL INS CO
5090561
08/01/2006
08/01/2007
$1,000,000.00
07/31/2006
8
OREGON AUTO
INS CO
C031557907
08/01/2005
08/01/2006
51,000,000.00
07/29/2005
7
AUTO
NS
C01161842
C01161842
11 /04/2004
11/04/2005
$1,000,000.00
11 /03/2004
Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period
Warrant Information No unsatisfied warrants on file within prior 6 year period
https://fortress.wa.gov/lni/bbip/Print.aspx
07/15/2011
LEGAL DESCRIPTION
MP Ott r .'.
aio. siaaoasoai.
t
. vo fe . ao:7 Aallih. : Ott . ,
111021 33101; .
Al
P09±1011 OF c.c., tai: MUM* •#pip►. ; 3 lisctioil. to,
loingB82P' 23 *Ms, 13151st 1r.![. , R1mCdRD1 or IMO
am���my�.,�,�y1AT k/�i�! SC* -• M •e• ,'eeo • A
MCI or 02'20. 1s FOWL K y ; ' po �3/�,4,�,.�tens BEI t5!1 � T I ' '2 •sat *AIVIS6 W. . i:Amnia
▪ . '3 #. t1041t 1Br i, .
.Th C& 'NORTH 4, f 4 ON :1 • :fir• MVO? •!1(011 AND
IA A LaL WITH THE t>a DANAlitni IKR M
ClI NCTION ROB 1 Ca or'O ' :k Pp1111 cI1 3ETI#!S
9�t w 44R ja' :A O• Mail met MO* A • • • • 1101MSENT PAS, ' so Dtnaiditog louvy • a; XD : .61 BUMS' MP
A 't ROX TELY 1200- AID 440 or Mt 244
cataa . s n eacrrhnr • u 00 14 .
nCa • I 4s' *4 ► nsr lk =MAIM 07 -25311 '
-Hr, E 0 00•31, mat t ` A DISD*XCZ 0 O� TO .'198 'ALOE
POINT 0r.HiG2911I Qit • • •
TWINCI .9Dt]rY 82'"40 +9V.8 , •ice at t
.TEIOI.= NORM Was r1O0 • >Ik � 'lam 642..15.1"Blir#
moos NoRril bi•lti ■.�l#' ! 4r 341 r.1E'P•,,• • E:
LE $1 To 'TEE. #ifl!: Or It•.D aI LOOTS DOIt>4 tB •
Ouse use ��Y Y or C: C. T3
s
1I T1LY. LING 01 ' G'T 81 11 :A ib=
'1'1!lt�lC! Svrirpi Oa *3a• WT A 'DT CR 0? 3.92 FT, NIR= !
I,ESS, 70 :IC Purer OF �t • . • . .
jt au ut CXTY t�E� • nri>w► i oAr..12ta i, • evairs Or
SEPARATE PERMIT
REQUIRED FOR:
❑ Mechanical
ErEtectrical
T numbing
t?as Piping
City of Tukwila 3..PiNG DIVISION
REVISIONS
No changes shall be made to the scope
of work without prior approval of
Tukwila Building Division.
NOTE: R visions will require a new plan submittal
and may include additional plan review fees, I
SITE ' AND BUILDING St4fICS
BUILDING CODE: 2009 IBC W/ WA STATE AMENDMENTS
ZONING: M -2
BUILDING AREA: 20,625 SF
SITE AREA: 10.1 ACRES
ASSESSOR PARCEL NUMBER: 0004800003
TENANT SPACE:
OVERALL AREA: 5669 SF
WAREHOUSE: 4,423 SP
OFFICE (NE): 1,246 SF
AREA OF WORK: 1,246 S.F.
TYPE OF CONSTRUCTION: v -B SPRNCLERED
OCCUPANCY: 5, 8 -1
AREA CALCULATION'.
3 SIDES OVER 20'
5 =9000 SF.
61 =9000
REVIEWED FOR
CODE COMPLIANCE
APPROVED
JUL 14 2011
AT
City of Tukwila a
BUILDING DIVISION
BUILDING IS HAS OVER 60' COMMON YARD ON
ALL SIDES, THEREFORE BUILDING IS UNLIMITED
IN AREA PER SECTION 501
SCOPE 0P WORK
TO CONSTRUCT NEW SINGLE STO RY OPOICE t0
INCLUDE NON - SEARING UJ,4LLS, NEW SUSP. CEILING,
NEW RESTROOMS, NEW EXTERIOR WINDOWS
REPLACING EXISTING.
FILE COPY
Permit No., Hl O g .
Ploy review approval is subject to errors and omissions.
of construction documents does not authorize
:D ton of any adopted code or ordinance. Receipt
of approved Fief , ►y and cans is acknowledged:
By
Date: 7 (psi,/
City Of Tilkwila
BUILDING DIVISION
•
RECEIVED
JUL 07 2011
PERMIT CENTER
M(1O92
Z: \CAD \2002 \0225 RREEF\Tukwlla Commerce Park \Building C\TI EAST 02- 15- 11 \SD1.dwg, 2
RTU -1 NEW 3TON ROOF TOP UNIT
RREERTukwila Commerce Park\Buildina C \TI EAST 02- 15- 11 \TBOX.DWG
6 "0 UP THRU
ROOF
HVAC OFFICE PLAN
SCALE:1 /46=1' -01
AREAS: GROSS OVERALL = 5,669 S.F
OFFICE = 1,246 S.F.
/SIZE
110X10 \TYP( °iES
285 F 4
tFm
DIFFUSER
LEGEND
�-`- New
rooftop
unit
Two 16 ga. dips per
New roof cure
1
It —BEAM PER PLAN
RTU CURB DETAIL
NTS
NEW ROOF TOP UNIT
side.. 4-010 screws per clip
1/
44i
ELEVATION VIEW NORTH
NTS
SYSTEM DESCRIPTION
PROVIDE NEW 3TON GAS /ELECTRIC ROOF TOP UNIT
WITH NEW WITH DUCTWORK AND DIFFUSERS FOR NEW
OFFICE SPACE. TWO NEW REST ROOM EXHAUST FANS.
INSTALL GAS PIPING FROM EXISTING GAS LINE TO NEW
ROOF TOP HVAC UNIT.
REVIEWED FOR
CODE COMPLIANCE
APPROVED
JUL 14 2011
City of Tukwila
BUILDING DIVISION
Equipment Schedule (new)
Tag
Make
Model
CFM
Cooling
Heating
OA CFM
V /Ph
SOUND RATTING
UNIT
EER
Net
BTU'S
AFUE
db's
WEIGHT
RTU -1
CARRIER
48TCD004
1200
11
34,600
72,000
82.O%
200
460/3
80
483
EF -1,2
BROAN
QTRN 80
80
115/1
1.5 SONES
12
Supply RTU -1 with economiser
Se.en day programmable thermostat w /night setback
M�I�Rz
RECEIVE:
JUL 0 w r
PERMIT GENTS