HomeMy WebLinkAboutPermit M11-101 - FORT DENT II - REGIONAL ACCEPTANCEFORT DENT II
REGIONAL ACCEPTANCE
6840 FORT DENT WY
M11-101
City o*Tukwila 414
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206 - 431 -2451
Web site: http: / /www.TukwilaWA.gov
MECHANICAL PERMIT
Parcel No.: 2954900425
Address: 6840 FORT DENT WY TUKW
Project Name: FORT DENT II - REGIONAL ACCEPTANCE
Permit Number: M11 -101
Issue Date: 08/05/2011
Permit Expires On: 02/01/2012
Owner:
Name: PEPPERWOOD HOLDINGS LLC
Address: 2835 82ND AVE SE #300 , MERCER ISLAND WA 98040
Contact Person:
Name: DARLA DOLL
Address: 7717 DETROIT AV SW , SEATTLE WA 98106
Email: darla.doll @macmiller.com
Contractor:
Name: MACDONALD /MILLER FAC SOL INC
Address: PO BOX 47983 , SEATTLE, WA 98106
Contractor License No: MACDOFS980RU
Phone: 206 768 -4278
Phone: 206 - 768 -4180
Expiration Date: 12/31/2012
DESCRIPTION OF WORK:
INSTALL (1) VAV BOX, (4) DIFFUSERS, AND (4) GRILLES. RELOCATE (5)
DIFFUSER/GRILLES AND MISCELLANEOUS DUCTWORK.
Value of Mechanical: $7,000.00
Type of Fire Protection: SPRINKLERS /AFA
Electrical Service Provided by:
Permit Center Authorized Signature:
I hereby certify that I have read and
governing this work will be complie
x-
with,
Fees Collected: $269.31
International Mechanical Code Edition: 2009
Date: 0$1
ed this permit and know the same to be true and correct. All provisions of law and ordinances
whether specified herein or not.
The granting of this permit does not pr e to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the
back of this permit.
Signatur
(II i Se,
Print Name:
`"
Date: /`- //
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
doc: IMC -4/10
M11-101 Printed: 08 -05 -2011
PERMIT CONDITIONS
Permit No. M11-101
1: ** *BUILDING DEPARTMENT CONDITIONS * **
2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the
Building Official.
3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center
(206/431 - 3670).
4: AB permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to
start of any construction. These documents shall be maintained and made available until final inspection approval is
granted.
5: All construction shall be done in conformance with the approved plans and the requirements of the International
Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code.
6: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary
sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other
excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of
this requirement.
7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila
Building Department (206- 431 - 3670).
8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building
Department (206- 431 - 3670).
9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of,
any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits
presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila
shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the
Building Official from requiring the correction of errors in the construction documents and other data.
doc: IMC -4/10
M11-101 Printed: 08 -05 -2011
CITY OF TUKWILA
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.ci.tukwila.wa.us
Mechanical Permit Nod V 1
Project No.
(For office use only)
MECHANICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *please print **
Site Address: 6840 FORT DENT WAY TUKWILA, WA 98188
Tenant Name: FORT DENT II - REGIONAL ACCEPTANCE
Property Owners Name:
JC RADOVICH
King Co Assessor's Tax No.: 2954900425
Suite Number:
New Tenant:
Mailing Address: 2000 124TH AVE NE B -103
MERCER ISLAND
Floor: 1
❑ Yes m..No
WA 98040
Zip
City
State
CONTACT PERSON — who do we contact when your permit is ready to be issued
Name: DARLA DOLL
Mailing Address: 7717 DETROIT AVE SW
Day Telephone: (206) 768 -4278
SEATTLE WA
98106
E -Mail Address: DARLA.DOLL @MACMILLER.COM
City State
Fax Number: (206) 768 -4279
Zip
MECHANICAL CONTRACTOR INFORMATION
Company Name: MACDONALD MILLER
Mailing Address: 7717 DETROIT AVE SW
SEATTLE
WA
98106
Contact Person: DARLA DOLL
E -Mail Address: DARLA.DOLL @MACMILLER.COM
Contractor Registration Number: MACDOFS980RU
City State
Day Telephone: (206) 768 -4278
Fax Number: (206) 768 -4279
Expiration Date: 12/31/2012
Zip
ARCHITECT OF RECORD — All plans must be stamped by architect of record
Company Name: N/A
Mailing Address:
Contact Person:
E -Mail Address:
City
Day Telephone:
Fax Number:
State
Zip
ENGINEER OF RECORD — All plans must be stamped by engineer of record
Company Name: MACDONALD MILLER
Mailing Address: 7717 DETROIT AVE SW
Contact Person: GEORGE GRAHAM
SEATTLE
WA
98106
E -Mail Address: GEORGE.GRAHAM @MACMILLER.COM
H'. \Applications \Forms•Applications On Line\2010 Applications \7 -2010 - Mechanical Permit Application doc
Revised. 7 -2010
bh
City State
Day Telephone: (206) 768 -4288
Fax Number: (206) 768 -4289
Zip
Page 1 of 2
•
Valuation of project (contractor's bid price): $ 7,000.00
Scope of work (please provide detailed information): INSTALL (1) NEW VAV BOX, INSTALL (4) NEW DIFFUSERS AND
(4) NEW GRILLES. RELOCATE (5) DIFFUSER/GRILLES AND MISC DUCTWORK
Use: Residential: New ❑ Replacement ❑
Commercial: New ❑ Replacement
Fuel Type: Electric m Gas
Other:
Indicate type of mechanical work being installed and the quantity below:
Unit Type:
Qty
Unit Type:
Qty
Unit Type:
Qty
Bioler /Compressor
Qty
furnace <100k btu
air handling unit
>10,000 cfm
fire damper
0 -3 hp /100,000 btu
furnace >100k btu
evaporator cooler
diffuser
13
3 -15 hp /500,000 btu
floor furnace
ventilation fan connected
to single duct
thermostat
15 -30 hp /1,000,000
btu
suspended/wall /floor
mounted heater
ventilation system
wood/gas stove
30 -50 hp /1,750,000
btu
appliance vent
hood and duct
emergency
generator
50+ hp /1,750,000 btu
repair or addition to
heat/refrig/cooling system
Incinerator — domestic
other mechanical
equipment
air handling unit <10,000
cfm
1
incinerator — comm/ind
PERMIT APPLICATION NOTES -
Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the permit center to comply with current fee schedules.
Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing
and justifiable cause demonstrated. Section 105.3.2 international building code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDIN !_.._ OR AUTHORIZE
Signature:
Print Name: DARLA DOLL
Mailing Address:
7717 DETROIT AVE SW
IDate Application Accepted: 01 t 1I'
Date:
07/19/2011
Day Telephone: (206) 768 -4278
SEATTLE
City
Date Application Expires: 01
H:\Applications \Forms - Applications On Line\2010 Applications \7 -2010 - Mechanical Permit Application.doc
Revised: 7 -2010
bh
WA 98106
State Zip
Staff Initials: 1
Page 2 of 2
•
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206-431-3665
Web site: http: / /www.TukwilaWA.gov
RECEIPT
Parcel No.: 2954900425 Permit Number: M11 -101
Address: 6840 FORT DENT WY TUKW Status: PENDING
Suite No: Applied Date: 07/19/2011
Applicant: FORT DENT II - REGIONAL ACCEPTANCE Issue Date:
Receipt No.: R11 -01506
Payment Amount: $269.31
Initials: JEM Payment Date: 07/19/2011 12:58 PM
User ID: 1165 Balance: $0.00
Payee: MACDONALD- MILLER FACILITY SOLUTIONS, INC.
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Check 3015 269.31
Authorization No.
ACCOUNT ITEM LIST:
Description
Account Code Current Pmts
MECHANICAL - NONRES
PLAN CHECK - NONRES
000.322.102.00.00 215.45
000.345.830 53.86
Total: $269.31
doc: Receiot -06 Printed: 07 -19 -2011
INSPECTION RECORD
Retain a copy with permit
INS ON NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 it. (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
del('1Of
Project:
Fop RT. jxniT- Zf�o11AL
Type fInspection:
j� , .JXL.. A
Address: (0 0 yy 4 a . -O% i
Date Called:
Special Instructions:
Date Wanted:. _m:1
-.7 3 -- `r p.m.
1
Requester:
Ph-"? LD 2s. ---3 'T
Approved per applicable codes. Corrections required prior to approval.
COMMENTS:
rp+'�•-ti�� �� 1 �Il i L
R INSPECTION FEE REQ IRED. Prior to n xt inspection. fee must
9 id at 6300 Southcenter , vd.. Suite 100. C 11 to schedule reinspection.
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila: WA 98188 (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
MI (- (o
Proect:
Gem.., •)N4'
q mace.P.46
Type of Inspect it_
. � -
_ L) c...7— ^• (.. ASU J
r ^
Address 1 fru ` v
to 0-1
Date
Wedme.
-
Special Instructions:
Date Wanted., ( (
1 t
(a(f
.m:
Requester:
*-...---••
Phone
` ,2$S4A3 J` t
"proved per applicable codes. Corrections required prior to approval.
COMMENTS:
•
InspectoI
• (Date
❑ REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
i
se=0
MacDonald- Miller
FACILITY SOLUTIONS
•
rY) t o)
:..::.:..:......:.:.:....:..::.
For
Fort Dent 11
Floor 1
Joe # 7214154
RECEIVED
AU )2 2011
BUILDING
DEPARTMENT
Project Description: 3 perimeter VAV Parallel fan power reheat terminals,
with fan inlet dampers, electric reheat duct coils, 1 interior terminal unit, Staefa II controls, velocity probe
sensors.
Interior Terminals:
All deflections were set for appropriately
Maximum and minimum cooling quantities were set and recorded
Controller card addresses were checked and recorded
All outlets for each box were proportioned in accordance to the design specifications
All thermostats were calibrated and reset for normal operation
Temperature set points were set at 71 and 73 degrees
Primary air volume was calibrated & multiplier recorded
Perimeter VAV Terminals:
All of the above tasks were performed
Heating quantities were set to obtain the design CFM quantity
Heating coils were checked and verified as working
Differential temperatures were taken and recorded in the heating mode
Notes:
Project Manager: Brock Lee
Field Technician: Steve Baker
Date: 8 -15 -11
Project
Job Number
MacDonald- Miller
FACILITY SOLUTIONS
Fort Dent II
7214154
Area Served
VAV 103
System
Air Outlet
Test Report
Floor 1
Outlet
Design
Preliminary
Final
Percent of
Design
No. 1 Type 1 Size l Ak
Vel. l Flow
Vel. l Flow
Vel. 1 Flow
Office
T
1
CD
10
Hood
10
150
120
165
110%
Office
O
2
CD
10
Hood
10
150
125
155
103%
Totals
Address
Inlet Size
Multiplier
Remarks:
VAV 104
3 Max SP 28%
8 Min SP 9%
240 Mix 67
Lat 78
300
Max Flow
Min Flow
Fan Total
245
Design
320 107%
Actual
275
280
80
80
300
320
Office
O
1
CD
10
Hood
10
215
250
220
96%
Office
T
2
CD
10
Hood
10
230
270
230
100%
Address
Inlet Size
Multiplier
Remarks:
Totals
4 Max SP 77%
8 Min SP 15%
236 Mix 68
Lat 86
Max Flow
Min Flow
Fan Total
520
Design
450 101%
Actual
405
410
95
90
445
450
VAV 164
Open Area
T
1
CD
10
Hood
355
azlp
.S p
Open Area
O
2
CD
10
Hood
355
J2S
14-/0
Open Area
3
CD
10
Hood
320
a CO
j v
Address
Inlet Size
Multiplier
Filter Size
Remarks:
Totals
y Max SP Abe
70 Min SP I8-13
/ ,A, t ( 06 g
1030
Max Flow
Min Flow
Fan Total
Design
/0 06
Actual
180
F1_5
/g0
/03c.
1 coo
Test Date 8/16/2011 Readings By SB Page: 1
4=,MacDonald-Milder
FACILITY SOLUTIONS
Project
Job Number
Fort Dent II
7214154
Area Served
System
Air Outlet
Test Report
Floor 1
Outlet
Design
Preliminary
Final
Percent of
Design
No. I Type I Size 1 Ak
Vel. 1 Flow
Vel. 1 Flow
Vel. I Flow
VAV 166
545
Office
T
1
CD
8
Hood
180
185
185
103%
Open Area
2
CD
8
Hood
110
130
110
100%
Open Area
0
3
CD
8
Hood
200
175
190
95%
Open Area
4
CD
8
Hood
120
125
125
104%
Address
Inlet Size
Multiplier
Remarks:
Totals
17 Max SP 563
8 Min SP 102
28
610
Max Flow
Min Flow
Fan Total
615
Design
610 100%
Actual
560
545
110
115
610
610
Test Date 8/16/2011 Readings By SB Page: 2
/4.
Fort Dent II - Regional Acceptance
REVIEWED FOR
CODE C Ip�ED CE
APP
AUG 0 3 211
City of Tukwila
BUILDING DIVISION
Location
Building owner
Program user
Company
Comments
By
Dataset name
Calculation time
TRACE® 700 version
Location
Latitude
Longitude
Time Zone
Elevation
Barometric pressure
Air density
Air specific heat
Density - specific heat product
Latent heat factor
Enthalpy factor
Summer design dry bulb
Summer design wet bulb
Winter design dry bulb
Summer clearness number
Winter clearness number
Summer ground reflectance
Winter ground reflectance
Carbon Dioxide Level
Design simulation period
Cooling Toad methodology
Heating Toad methodology
6840 Fort Dent Way
GEORGE GRAHAM
MacDonald Miller Facility Solutions
MMFS
C:1Documents and Settingslgraham My
DocumentslTRACE 700 Projects1Fort Dent 111DENT.TRC
08:45 AM on 07/18/2011
6.2.6.5
Seattle, Washington
47.0 deg
122.0 deg
8
386 ft
29.5 in. Hg
0.0749 lb/cu ft
0.2444 Btu/Ib•°F
1.0988 Btu/h -cfm °F
4,836.9 Btu • min /h•cu ft
4.4953 lb-min /hrcu ft
83
65
24
0.95
0.95
0.20
0.20
400
°F
°F
°F
ppm
January - December
CLTD -CLF (ASHRAE TFMI
UATD
RECEIVED
CITY OF TUKWILA
,H1I 19 2011
PERMIT CENTER
7..W.71°
M1t-lO1
Room Checksums
By MMFS
101 Reception
COOLING COIL PEAK
Peaked at Time: Mo/Hr. 7 / 14
Outside Air: OADBP B/HR: 82 / 65 / 67
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass/Door Cond
Wall Cond
Partition/Door
Floor
Adjacent Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Adj Air Trans Heat
Dehumid. Ov Sizing
OvlUndr Sizing
Exhaust Heat
Sup. Fan Heat
Ret Fan Heat
Duct Heat Pkup
Underfir Sup Ht Pkup
Supply Air Leakage
Grand Total =>
Space Plenum
Sens. + Lat Sens. + Lat
Btu/h Btu/h
0
0
0
0
0
0
0
0
0
0
0
Net
Total
Btu/h
Percent
Of Total
( %)
O 0 0
O 0 0
0 0 0
O 0 0
O 0 0
O 0 0
0 0
0 0
0 0 0
0 0
O 0 0
464 116 580 19
1,350 0 1,350 43
802 0 802 26
2,616 116 2,732 88
41 -41 0 0
O 0 404 13
O 0 0
0 0
0 0 0
-21 -21 -1
0 0
0 0 0
0 0 0
0 0
O 0 0
2,657 55 3,116 100.00
CLG SPACE PEAK
Mo /Hr. 7 / 20
OADB: 74
Space
Sensible
Btu/h
0
0
0
0
0
0
0
0
0
0
0
464
750
802
2,016
46
0
0
0
2,063
Percent
Of Total
(%)
0
0
0
0
0
0
0
0
0
0
0
23
36
39
98
2
0
0
0
100.00
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass/Door Cond
Wall Cond
Partition/Door
Floor
Adjacent Floor
Infiltration
Sub Total =_>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Adj Air Trans Heat
Ov /Undr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
System Plenum Heat
Underflr Sup Ht Pkup
Supply Air Leakage
Grand Total =>
HEATING COIL PEAK
Mo/Hr. Heating Design
OADB: 24
Space Peak Coil Peak Percent
Space Sens Tot Sens Of Total
Btu/h Btu/h (%)
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
-19 0 0.00
O -1,274 93.25
O 0 0
O 0 0.00
10 -0.70
O 0.00
-48 3.49
O 0.00
-54 3.96
O 0.00
O 0.00
-19 -1,366 100.00
Main Clg
Aux Clg
Opt Vent
Total
Total Capacity
ton MBh
0.3 3.1
0.0 0.0
0.0 0.0
0.3 3.1
COOLING COIL SELECTION
Sens Cap. Coil Airflow Enter DB/WBIHR
MBh cfm °F °F grub
2.3 94 77.5 61.9 58.9
0.0 0 0.0 0.0 0.0
0.0 0 0.0 0.0 0.0
Leave DBIWBIHR
°F °F gr/Ib
55.0 50.0 46.6
0.0 0.0 0.0
0.0 0.0 0.0
Project Name:
Dataset Name:
Fort Dent II - Regional Acceptance
DENT.TRC
AREAS
Gross Total Glass
ft' (%)
Floor 170
Part 0
Int Door 0
ExFIr 0
Roof 0
Wall 0
Ext Door 0
O 0
O 0
O 0
TEMPERATURES
Cooling Heating
55.0 70.2
75.8 69.7
75.8 69.7
77.5 28.8
0.0 0.0
0.0 0.0
0.0 0.0
SADB
Ra Plenum
Retum
R@tiOA
Fn MtrTD
Fn BIdTD
Fn Frict
AIRFLOWS
Cooling
94
94
94
94
0
0
0
28
94
0
0
0
0
0
Diffuser
Terminal
Main Fan
Sec Fan
Nom Vent
AHU Vent
Infil
MinStopIRh
Return
Exhaust
Rm Exh
Auxiliary
Leakage Dwn
Leakage Ups
Heating
94
94
28
94
25
25
0
28
28
25
0
0
0
0
ENGINEERING CKS
OA
cfm/ft'
cfm/ton
triton
Btu/fir-ft'
No. People
Cooling
26.8
0.55
361.50
654.76
18.33
3
Heating
26.8
0.55
-8.04
HEATING COIL SELECTION
Capacity Coil Airflow Ent
MBh cfm °F
Main Htg
Aux Htg
Preheat
Humldif
Opt Vent
Total
-0.5
0.0
-0.9
Lvg
'F
94 65.3 70.2
0 0.0 0.0
25 24.0 55.0
0.0 0 0.0 0.0
0.0 0 0.0 0.0
-1.4
TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011
Alternative - 1 System Checksums Report Page 1 of 10
Room Checksums
By MMFS
102 Office
COOLING COIL PEAK
Peaked at Time: Mo /Hr. 7 / 14
Outside Air. OADB/WB/HR: 82 / 65 / 67
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass/Door Cond
Wall Cond
Partition/Door
Floor
Adjacent Floor
Infiltration
Sub Total =_>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Adj Air Trans Heat
Dehumid. Ov Sizing
Ov /Undr Sizing
Exhaust Heat
Sup. Fan Heat
Ret Fan Heat
Duct Heat Pkup
Underflr Sup Ht Pkup
Supply Air Leakage
Grand Total =>
Space Plenum
Sens. + Lat Sens. + Lat
Btu/h Btu/h
O 0
O 0
O 0
O 0
O 0
0 0
0
0
O 0
0
O 0
Net
Total
Btu/h
Percent
Of Total
( %)
O 0
O 0
O 0
O 0
O 0
0 0
O o
O 0
O 0
0 0
0 0
374 94 468 25
450 0 450 24
746 0 746 40
1,570 94 1,663 89
33 -33 0 0
O 0 212 11
O 0 0
O 0
O 0 0
-11 -11 -1
O 0
0 0 0
0 0 0
0 0
0 0 0
1,603 50 1,864 100.00
CLG SPACE PEAK
Mo/Hr 7 /20
OADB: 74
Space
Sensible
Btu/h
0
0
0
0
0
0
0
0
0
0
0
374
250
746
1,370
37
0
0
0
Percent
Of Total
( %)
0
0
0
0
0
0
0
0
0
0
0
27
18
53
97
3
0
0
0
1,407 100.00
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass/Door Cond
Wall Cond
Partition/Door
Floor
Adjacent Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Adj Air Trans Heat
Ov /Undr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
System Plenum Heat
Underflr Sup Ht Pkup
Supply Air Leakage
Grand Total •>
HEATING COIL PEAK
Mo/Hr. Heating Design
OADB: 24
Space Peak Coil Peak Percent
Space Sens Tot Sens Of Total
Btu/h Btu/h ( %)
O 0 0.00
O 0 0.00
O 0 0.00
0 0 0.00
0 0 0.00
O 0 0.00
0 0 0.00
0 0 0.00
0 0 0.00
0 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
0 0 0.00
-15 0 0.00
O -668 83.64
O 0 0
0 0 0.00
5 -0.63
O 0.00
-96 12.07
O 0.00
-39 4.91
O 0.00
O 0.00
-15 -799 100.00
Main Clg
Aux Clg
Opt Vent
Total
Total Capacity
ton MBh
0.2 1.9
0.0 0.0
0.0 0.0
0.2 1.9
COOLING COIL SELECTION
Sens Cap. Coil Airflow Enter DBIWB/HR
MBh cfm °F °F gr/lb
1.6 64 77.1 61.6 58.2
0.0 0 0.0 0.0 0.0
0.0 0 0.0 0.0 0.0
Leave DBIWB/HR
°F °F gr/lb
55.0 51.3 51.0
0.0 0.0 0.0
0.0 0.0 0.0
Project Name:
Dataset Name:
Fort Dent II - Regional Acceptance
DENT.TRC
AREAS
Gross Total Glass
Floor 137
Part 0
Int Door 0
ExFlr 0
Roof 0
Wall 0
Ext Door 0
ft' ( %)
0 0
0 0
0 0
TEMPERATURES
Cooling Heating
55.0 70.2
75.8 69.7
75.8 69.7
77.1 38.2
0.0 0.0
0.0 0.0
0.0 0.0
SADB
Ra Plenum
Return
Ret/OA
Fn MtrTD
Fn BIdTD
Fn Frict
AIRFLOWS
Cooling
64
64
64
64
0
0
0
19
64
0
0
0
0
0
Diffuser
Terminal
Main Fan
Sec Fan
Nom Vent
AHU Vent
Infil
MinStoplRh
Return
Exhaust
Rm Exh
Auxiliary
Leakage Dwn
Leakage Ups
Heating
64
64
19
64
13
13
0
19
19
13
0
0
0
0
ENGINEERING CKS
% OA
cfm/ft'
cfm/ton
ftlton
Btulhrfe
No. People
Cooling
20.6
0.47
412.14
881.77
13.61
1
Heating
20.6
0.47
-5.83
HEATING COIL SELECTION
Capacity Coil Airflow Ent
MBh cfm °F
Main Htg
Aux Htg
Preheat
Humidif
Opt Vent
Total
-0.4
0.0
64 65.3
O 0.0
-0.5 13 24.0
0.0
0.0
-0.8
Lvg
°F
70.2
0.0
55.0
O 0.0 0.0
O 0.0 0.0
TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011
Alternative - 1 System Checksums Report Page 2 of 10
Room Checksums
By MMFS
103 Open Work Area
COOLING COIL PEAK
Peaked at Time: Mo /Hr. 7 / 14
Outside Air. OADB/WB/HR: 82 / 65 / 67
CLG SPACE PEAK
Mo/Hr. 7 / 20
OADB: 74
HEATING COIL PEAK
Mo/Hr. Heating Design
OADB: 24
TEMPERATURES
Cooling Heating
SADB 55.0 70.2
Ra Plenum 75.8 69.7
Space
Plenum
Net
Percent
Space
Percent
Space Peak
Coil Peak
Percent
Retum
75.8
69.7
Sens. + Lat
Sens. + Lat
Total
Of Total
Sensible
Of Total
Space Sens
Tot Sens
Of Total
Ref/OA
77.1
38.0
Btu/h
Btu/h
Btu/h
( %)
Btu/h
(%)
Btu/h
Btu/h
(%)
Fn MtrTD
0.0
0.0
Envelope Loads
Envelope Loads
Fn BIdTD
0.0
0.0
Skylite Solar
0
0
0
0
0
0
Skylite Solar
0
0 0.00
Fn Frict
0.0
0.0
Skylite Cond
0
0
0
0
0
0
Skylite Cond
0
0 0.00
Roof Cond
0
0
0
0
0
0
Roof Cond
0
0 0.00
Glass Solar
0
0
0
0
0
0
Glass Solar
0
0 0.00
AIRFLOWS
Glass/Door Cond
0
0
0
0
0
0 Glass/Door Cond
0
0 0.00
Wall Cond
0
0
0
0
0
0 Wall Cond
0
0 0.00
Cooling Heating
Partition/Door
0
0
0
0
0
Partition/Door
0
0 0.00
Diffuser
193
193
Floor
0
0
0
0
0
Floor
0
0 0.00
Terminal
193
193
Adjacent Floor
0
0
0
0
0
0
Adjacent Floor
0
0 0.00
Main Fan
193
58
Infiltration
0
0
0
0
0
Infiltration
0
0 0.00
Sec Fan
193
193
Sub Total = =>
0
0
0
0
0
0 Sub Total =_>
0
0 0.00
Nom Vent
0
40
AHU Vent
0
40
Internal Loads
Internal Loads
Infil
0
0
Lights
1,156
289
1,445
26
1,156.
27
Lights
0
0 0.00
MinStop/Rh
58
58
People
1,323
0
1,323
24
735
17
People
0
0 0.00
Retum
193
58
Misc
2,228
0
2,228
40
2,228
53
Misc
0
0 0.00
Exhaust
0
40
Sub Total = =>
4,708
289
4,997
89
4,120
97
Sub Total = =>
0
0 0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
101
-101
0
0
116
3
Ceiling Load
-46
0 0.00
Leakage Dwn
0
0
Ventilation Load
0
0
643
11
0
0
Ventilation Load
0
-2,028
83.90
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0
0
0
Adj Air Trans Heat
0
0 0
Dehumid. Ov Sizing
0
0
Ov /Undr Sizing
0
0 0.00
Ov /Undr Sizing
0
0
0
0
0
Exhaust Heat
15
-0.63
ENGINEERING CKS
Exhaust Heat
-33
-33
-1
OA Preheat Diff.
0 0.00
Sup. Fan Heat
0
0
RA Preheat Diff.
-285
11.80
Cooling Heating
Ret Fan Heat
0
0
0
Additional Reheat
0 0.00
% OA
20.8
20.8
Duct Heat Pkup
0
0
0
System Plenum Heat
-119
4.94
cfm/ft0.46
0.46
Underflr Sup Ht Pkup
0
0
Underflr Sup Ht Pkup
0 0.00
cfm/ton
412.45
Supply Air Leakage
0
0
0
Supply Air Leakage
0 0.00
ft'tton
906.30
Btulhrft
13.24
-5.71
Grand Total =>
4,809
155
5,607
100.00
4,236
100.00 Grand Total =>
-46
-2,417
100.00
No. People
3
COOLING COIL SELECTION
AREAS
HEATING COIL SELECTION
Total Capacity
Sens Cap. Coil Airflow
Enter DBIWB/HR
Leave DBIWB/HR
Gross Total
Glass
Capacity Coil Airflow Ent
Lvg
ton
MBh
MBh cfm
°F °F
gr/lb
°F °F gr/Ib
ft' ( %)
MBh cfm 'F
°F
Main Clg 0.5
5.6
4.7
192
77.1 61.6
58.2
55.0 51.3 51.1
Floor
424
Main Htg -1.1
193 65.3
70.2
Aux Clg 0.0
0.0
0.0
0
0.0 0.0
0.0
0.0 0.0 0.0
Part
0
• ux Htg 0.0
0 0.0
0.0
Opt Vent 0.0
0.0
0.0
0
0.0 0.0
0.0
0.0 0.0 0.0
Int Door
0
Preheat -1.4
40 24.0
55.0
ExFIr
0
Total 0.5
5.6
Roof
0
0 0
Humidif 0.0
0 0.0
0.0
Wall
0
0 0
Opt Vent 0.0
0 0.0
0.01
Ext Door
0
0 0
Total -2.4
Project Name:
Dataset Name:
Fort Dent II - Regional Acceptance
DENT.TRC
TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011
Altemative - 1 System Checksums Report Page 3 of 10
Room Checksums
By MMFS
104 Office
COOLING COIL PEAK
Peaked at Time: Mo/Hr. 7 / 14
Outside Air. OADB/WB/HR: 82 / 65 / 67
CLG SPACE PEAK
Mo/Hr. 7 / 20
OADB: 74
HEATING COIL PEAK
Mo/Hr. Heating Design
OADB: 24
TEMPERATURES
Cooling Heating
SADB 55.0 70.2
Ra Plenum 75.8 69.7
Space
Plenum
Net
Percent
Space
Percent
Space Peak
Coil Peak
Percent
Retum
75.8
69.7
Sens. + Lat
Sens. + Lat
Total Of
Total
Sensible
Of Total
Space Sens
Tot Sens
Of Total
Ret/OA
77.1
38.2
Btu/h
Btu/h
Btu/h
( %)
Btu/h
( %)
Btu/h
Btu/h
( %)
Fn MtrTD
0.0
0.0
Envelope Loads
Envelope Loads
Fn BIdTD
0.0
0.0
Skylite Solar
0
0
0
0
0
0
Skylite Solar
0
0 0.00
Fn Frict
0.0
0.0
Skylite Cond
0
0
0
0
0
0
Skylite Cond
0
0 0.00
Roof Cond
0
0
0
0
0
0
Roof Cond
0
0 0.00
Glass Solar
o
0
0
0
0
0
Glass Solar
o
0 0.00
AIRFLOWS
Glass/Door Cond
0
0
0
0
0
0
Glass/Door Cond
0
0 0.00
Wall Cond
0
0
0
0
0
0
Wall Cond
0
0 0.00
Cooling Heating
Partition/Door
0
0
0
0
0
Partition/Door
0
0 0.00
Diffuser
64
64
Floor
0
0
0
0
0
Floor
0
0 0.00
Terminal
64
64
Adjacent Floor
0
0
0
0
0
0
Adjacent Floor
0
0 0.00
Main Fan
64
19
Infiltration
0
0
0
0
0
Infiltration
0
0 0.00
Sec Fan
64
64
Sub Total = =>
0
0
0
0
0
0
Sub Total = =>
0
0 0.00
Nom Vent
0
13
AHU Vent
0
13
Internal Loads
Internal Loads
Irrfl
0
0
Lights
374
94
468
25
374
27
Lights
0
0 0.00
MinStop/Rh
19
19
People
450
0
450
24
250
18
People
0
0 0.00
Return
64
19
Misc
746
0
746
40
746
53
Misc
0
0 0.00
Exhaust
0
13
Sub Total =_>
1,570
94
1,663
89
1,370
97
Sub Total = =>
0
0 0.00
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
33
-33
0
0
37
3
Ceiling Load
-15
0 0.00
Leakage Dwn
0
0
Ventilation Load
0
0
212
11
0
0
Ventilation Load
0
-668
83.64
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0
0
0
Adj Air Trans Heat
0
0 0
Dehumid. Ov Sizing
0
0
OvlUndr Sizing
0
0 0.00
-
Ov/Undr Sizing
0
0
0
0
0
Exhaust Heat
5 -0.63
ENGINEERING CKS
Exhaust Heat
-11
-11
-1
OA Preheat Diff.
0 0.00
Sup. Fan Heat
0
0
RA Preheat Diff.
-96
12.07
Cooling Heating
Ret Fan Heat
0
0
0
Additional Reheat
0 0.00
% OA
20.6
20.6
Duct Heat Pkup
0
0
0
System Plenum Heat
-39
4.91
cfm/ft'
0.47
0.47
Underflr Sup Ht Pkup
0
0
Underfl► Sup Ht Pkup
0 0.00
cfm/ton
412.14
Supply Air Leakage
0
0
0
Supply Air Leakage
0 0.00
futon
881.77
Btu/hrft'
13.61
-5.83
Grand Total =>
1,603
50
1,864
100.00
1,407
100.00 Grand Total =>
-15
-799
100.00
No. People
1
COOLING COIL SELECTION
AREAS
HEATING COIL SELECTION
Total Capacity
Sens Cap. Coil Airflow
Enter DBIWB/HR
Leave DBIWBIHR
Gross Total
Glass
Capacity Coil Airflow Ent
Lvg
ton
MBh
MBh cfm
°F °F
grill)
°F °F grill)
ft' ( %)
MBh cfm °F
°F
Main Clg 0.2
1.9
1.6
64
77.1 61.6
58.2
55.0 51.3 51.0
Floor
137
Main Htg -0.4
64 65.3
70.2
Aux Clg 0.0
0.0
0.0
0
0.0 0.0
0.0
0.0 0.0 0.0
Part
0
Aux Htg 0.0
0 0.0
0.0
Opt Vent 0.0
0.0
0.0
0
0.0 0.0
0.0
0.0 0.0 0.0
Int Door
0
Preheat -0.5
13 24.0
55.0
ExFIr
0
Total 0.2
1.9
Roof
0
0 0
Humidif 0.0
0 0.0
0.0
Wall
0
0 0
Opt Vent 0.0
0 0.0
0.0
Ext Door
0
0 0
Total -0.8
Project Name:
Dataset Name:
Fort Dent II - Regional Acceptance
DENT.TRC
TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011
Altemative - 1 System Checksums Report Page 4 of 10
Room Checksums
By MMFS
105 Office
COOLING COIL PEAK
Peaked at Time: Mo /Hr. 7 / 14
Outside Air. OADB/ B/HR: 82 165 / 67
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass/Door Cond
Wall Cond
Partition/Door
Floor
Adjacent Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Adj Air Trans Heat
Dehumid. Ov Sizing
OvlUndr Sizing
Exhaust Heat
Sup. Fan Heat
Ret Fan Heat
Duct Heat Pkup
Underflr Sup Ht Pkup
Supply Air Leakage
Grand Total =>
Space Plenum
Sens. + Lat Sens. + Lat
Btu/h Btu/h
0
0
0
0
0
0
0
0
0
0
0
Net Percent
Total Of Total
Btu/h ( %)
O 0 0
O 0 0
O 0 0
O 0 0
O 0 0
O 0 0
O 0
O 0
O 0 0
O 0
O 0 0
374 94 468 25
450 0 450 24
746 0 746 40
1,570 94 1,663 89
33 -33 0 0
O 0 212 11
O 0 0
O 0
O 0 0
-11 -11 -1
O 0
O 0 0
O 0 0
O 0
O 0 0
1,603 50 1,864 100.00
CLG SPACE PEAK
Mo/Hr 7 / 20
OADB: 74
Space
Sensible
Btu/h
0
0
0
0
0
0
0
0
0
0
0
374
250
746
1,370
37
0
0
0
1,407
Percent
Of Total
(%)
0
0
0
0
0
0
0
0
0
0
0
27
18
53
97
3
0
0
0
100.00
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass/Door Cond
Wall Cond
Partition/Door
Floor
Adjacent Floor
Infiltration
Sub Total = =>
Intemal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Adj Air Trans Heat
OvlUndr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
System Plenum Heat
Underflr Sup Ht Pkup
Supply Air Leakage
Grand Total =>
HEATING COIL PEAK
Mo/Hc. Heating Design
OADB: 24
Space Peak Coil Peak Percent
Space Sens Tot Sens Of Total
Btu/h Btu/h (%)
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
0 0 0.00
O 0 0.00
O 0 0.00
-15 0 0.00
O -668 83.64
O 0 0
O 0 0.00
5 -0.63
O 0.00
-96 12.07
O 0.00
-39 4.91
0 0.00
O 0.00
-15 -799 100.00
Main Clg
Aux Clg
Opt Vent
Total
Total Capacity
ton MBh
0.2 1.9
0.0 0.0
0.0 0.0
0.2 1.9
COOLING COIL SELECTION
Sens Cap. Coil Airflow Enter DB/WB/HR
MBh dm °F °F gr/lb
1.6 64 77.1 61.6 58.2
0.0 0 0.0 0.0 0.0
0.0 0 0.0 0.0 0.0
Leave DB/WB/HR
°F °F gr/lb
55.0 51.3 51.0
0.0 0.0 0.0
0.0 0.0 0.0
Project Name:
Dataset Name:
Fort Dent II - Regional Acceptance
DENT.TRC
AREAS
Gross Total Glass
ft' (%)
Floor 137
Part 0
Int Door 0
ExFIr 0
Roof 0
Wall 0
Ext Door 0
O 0
O 0
O 0
TEMPERATURES
Cooling Heating
55.0 70.2
75.8 69.7
75.8 69.7
77.1 38.2
0.0 0.0
0.0 0.0
0.0 0.0
SADB
Ra Plenum
Return
Ret/OA
Fn MtrTD
Fn BIdTD
Fn Frict
AIRFLOWS
Cooling
64
64
64
64
0
0
0
19
64
0
0
0
0
0
Diffuser
Terminal
Main Fan
Sec Fan
Nom Vent
AHU Vent
Infil
MinStop/Rh
Return
Exhaust
Rm Exh
Auxiliary
Leakage Dwn
Leakage Ups
Heating
64
64
19
64
13
13
0
19
19
13
0
0
0
0
ENGINEERING CKS
OA
cfm/f'
cfm/ton
If/ton
Btu/hrft'
No. People
Cooling
20.6
0.47
412.14
881.77
13.61
1
Heating
20.6
0.47
-5.83
HEATING COIL SELECTION
Capacity Coil Airflow Ent
MBh dm °F
Main Htg
Aux Htg
Preheat
Humidif
Opt Vent
Total
-0.4
0.0
-0.5
Lvg
°F
64 65.3 70.2
0 0.0 0.0
13 24.0 55.0
0.0 0 0.0 0.0
0.0 0 0.0 0.0
-0.8
TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011
Altemative - 1 System Checksums Report Page 5 of 10
Room Checksums
By MMFS
106 Hall
COOLING COIL PEAK CLG SPACE PEAK
Peaked at Time: Mo/Hr. 7 / 14
Outside Air. OADB/ B/H R: 82 / 65 / 67
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass/Door Cond
Wall Cond
Partition/Door
Floor
Adjacent Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Adj Air Trans Heat
Dehumid. Ov Sizing
OvlUndr Sizing
Exhaust Heat
Sup. Fan Heat
Ret Fan Heat
Duct Heat Pkup
Underflr Sup Ht Pkup
Supply Air Leakage
Grand Total =>
Space Plenum
Sens. + Lat Sens. + Lat
Btu/h Btu/h
0
0
0
0
0
0
0
0
0
0
0
Net
Total
Btu/h
Percent
Of Total
( %)
O 0 0
0 0 0
O 0 0
O 0 0
O 0 0
O 0 0
O 0
O 0
O 0 0
O 0
O 0 0
612 153 765 57
O 0 0 0
382 0 382 28
994 153 1,147 85
53 -53 0 0
o 0 216 16
o 0 0
o o
o 0 0
-11 -11 -1
o o
o o 0
o o 0
o o
o 0 0
1,047 88 1,351 100.00
Mo/Hr 7 / 20
OADB: 74
Space Percent
Sensible Of Total
Btu/h ( %)
0 0
O 0
O 0
O 0
O 0
O 0
O 0
0 0
O 0
O 0
O 0
612 58
O 0
382 36
994 94
61 6
O 0
0 0
O 0
1,055
100.00
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass/Door Cond
Wall Cond
Partition/Door
Floor
Adjacent Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Adj Air Trans Heat
Ov/Undr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
System Plenum Heat
Underflr Sup Ht Pkup
Supply Air Leakage
Grand Total =>
HEATING COIL PEAK
Mo/Hr Heating Design
OADB: 24
Space Peak Coil Peak Percent
Space Sens Tot Sens Of Total
Btu/h Btu/h ( %)
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
0 0 0.00
0 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
-24 0 0.00
O -679 92.75
O 0 0
O 0 0.00
5 -0.69
O 0.00
-16 2.12
O 0.00
-43 5.83
O 0.00
O 0.00
-24 -732 100.00
Main Clg
Aux Clg
Opt Vent
Total
Total Capacity
ton MBh
0.1 1.4
0.0 0.0
0.0 0.0
0.1 1.4
COOLING COIL SELECTION
Sens Cap. Coil Airflow Enter DBIWB/HR
MBh cfm °F °F gr/lb
1.2 48 77.6 61.9 59.0
0.0 0 0.0 0.0 0.0
0.0 0 0.0 0.0 0.0
Leave DBIWB!HR
'F °F gr/Ib
55.0 52.0 53.9
0.0 0.0 0.0
0.0 0.0 0.0
Project Name:
Dataset Name:
Fort Dent II - Regional Acceptance
DENT.TRC
AREAS
Gross Total Glass
fP (%)
Floor 224
Part 0
Int Door 0
ExFIr 0
Roof 0
Wall 0
Ext Door 0
O 0
O 0
O 0
TEMPERATURES
Cooling Heating
55.0 70.5
75.8 69.7
75.8 69.7
77.6 27.1
0.0 0.0
0.0 0.0
0.0 0.0
SADB
Ra Plenum
Retum
RetIOA
Fn MtrTD
Fn BIdTD
Fn Frict
AIRFLOWS
Cooling
48
48
48
48
0
0
0
14
48
0
0
0
0
0
Diffuser
Terminal
Main Fan
Sec Fan
Nom Vent
AHU Vent
tnfii
MinStop/Rh
Retum
Exhaust
Rm Exh
Auxiliary
Leakage Dwn
Leakage Ups
Heating
48
48
14
48
13
13
0
14
14
13
0
0
D
0
ENGINEERING CKS
% OA
cfm/ft•
cfmlton
ftlton
Btu/hr-ft
No. People
Cooling
28.0
0.21
426.35
1,989.30
6.03
0
Heating
28.0
0.21
-3.27
HEATING COIL SELECTION
Capacity Coil Airflow Ent
MBh dm °F
Main Htg
Aux Htg
Preheat
Humidif
Opt Vent
Total
-0.3
0.0
-0.5
Lvg
'F
48 65.3 70.5
0 0.0 0.0
13 24.0 55.0
0.0 0 0.0 0.0
0.0 0 0.0 0.0
-0.7
TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011
Altemative - 1 System Checksums Report Page 6 of 10
Room Checksums
By MMFS
107 Perimeter Open Office
COOLING COIL PEAK
Peaked at Time: Mo /Hr. 6 / 19
Outside Air. OADB/WB /HR: 72 / 56 / 43
CLG SPACE PEAK
Mo/Hr. 6 / 19
OADB: 72
HEATING COIL PEAK
Mo/Hr. Heating Design
OADB: 24
TEMPERATURES
Cooling Heating
SADB 55.0 79.8
Ra Plenum 75.8 69.7
Space
Plenum
Net
Percent
Space
Percent
Space Peak
Coil Peak
Percent
Return
75.8
69.7
Sens. + Lat.
Sens. + Lat
Total
Of Total
Sensible
Of Total
Space Sens
Tot Sens
Of Total
Ret/OA
75.8
61.9
Btu/h
Btu/h
Btu/h
( %)
Btu/h
( %)
Btu/h
Btu/h
(%)
Fn MtrTD
0.0
0.0
Envelope Loads
Envelope Loads
Fn BIdTD
0.0
0.0
Skylite Solar
0
0
0
0
0
0
Skylite Solar
0
0 0.00
Fn Frict
0.0
0.0
Skylite Cond
0
0
0
0
0
0
Skylite Cond
0
0 0.00
Roof Cond
0
0
0
0
0
0
Roof Cond
0
0 0.00
Glass Solar
11,069
0
11,069
72
11,069
75
Glass Solar
0
0 0.00
AIRFLOWS
Glass/Door Cond
Wall Cond
-258
361
0
354
-258
716
-2
5
-258
361
-2
2
Glass/Door Cond
Wall Cond
-4,608
- 412
-4,608
-821
39.00
6.95
Cooling
Heating
Partition/Door
0
0
0
0
0
Partition/Door
0
0 0.00
Diffuser
668
668
Floor
0
0
0
0
0
Floor
0
0 0.00
Terminal
668
668
Adjacent Floor
0
0
0
0
0
0
Adjacent Floor
0
0 0.00
Main Fan
668
200
Infiltration
-384
-384
-2
-85
-1
Infiltration
-1,213
-1,213
10.27
Sec Fan
668
668
Sub Total = =>
10,788
354
11,143
72
11,087
76
Sub Total = =>
-0,233
-0,642
56.23
Nom Vent
0
34
AHU Vent
0
34
Internal Loads
Internal Loads
Infil
24
24
Lights
983
246
1,229
8
983
7
Lights
0
0 0.00
MinStop/Rh
200
200
People
1,125
0
1,125
7
625
4
People
0
0 0.00
Return
692
224
Misc
1,894
0
1,894
12
1,894
13
Misc
-900
-900
7.62
Exhaust
24
58
Sub Total =_>
4,002
246
4,248
28
3,502
24
Sub Total = =>
-900
-900
7.62
Rm Exh
0
0
Auxiliary
0
0
Ceiling Load
86
-86
0
0
86
1
Ceiling Load
-39
0 0.00
Leakage Dwn
0
0
Ventilation Load
0
0
0
0
0
0
Ventilation Load
0
-1,724
14.59
Leakage Ups
0
0
Adj Air Trans Heat
0
0
0
0
0
Adj Air Trans Heat
0
0 0
Dehumid. Ov Sizing
0
0
OvlUndr Sizing
0
0 0.00
Ov /Undr Sizing
0
0
0
0
0
Exhaust Heat
22
-0.19
ENGINEERING CKS
Exhaust Heat
-20
-20
0
OA Preheat Diff.
0 0.00
Sup. Fan Heat
0
0
RA Preheat Diff.
-2,677
22.66
Cooling
Heating
Ret Fan Heat
0
0
0
Additional Reheat
0 0.00
% OA
0.0
5.1
Duct Heat Pkup
0
0
0
System Plenum Heat
108
-0.91
cfmlft
1.85
1.85
Underfir Sup Ht Pkup
0
0
Underflr Sup Ht Pkup
0 0.00
cfm/ton
521.32
Supply Air Leakage
0
0
0
Supply Air Leakage
0 0.00
fekon
281.05
Btu/hrft'
42.70
-32.81
Grand Total =>
14,877
494
15,371
100.00
14,675
100.00 Grand Total =>
-7,172
- 11,813
100.00
No. People
3
COOLING COIL SELECTION
AREAS
HEATING COIL SELECTION
Total Capacity
Sens Cap. Coil Airflow
Enter DBIWB/HR
Leave DBIWB/HR
Gross Total
Glass
Capacity Coil Airflow
Ent Lvg
ton
MBh
MBh cfm
°F °F
grAb
°F °F grfb
ft2 ( %)
MBh cfm
°F °F
Main CIg 1.3
15.4
15.2
668
75.8 60.6
55.8
55.0 52.4 55.4
Floor
360
Main Htg -10.7
668
65.3 79.8
Aux CIg 0.0
0.0
0.0
0
0.0 0.0
0.0
0.0 0.0 0.0
Part
0
• ux Htg 0.0
0
0.0 0.0
Opt Vent 0.0
0.0
0.0
0
0.0 0.0
0.0
0.0 0.0 0.0
Int Door
0
Preheat -1.2
34
24.0 55.0
ExFlr
0
Total 1.3
15.4
Roof
0
0
0
Humidif 0.0
0
0.0 0.0
Wall
320
192
60
• pt Vent 0.0
0
0.0 0.0
Ext Door
0
0
0
Total -11.8
Project Name:
Dataset Name:
Fort Dent II - Regional Acceptance
DENT.TRC
TRACE® 700 v62.6.5 calculated at 08:45 AM on 07/18/2011
Alternative - 1 System Checksums Report Page 7 of 10
Room Checksums
By MMFS
108 Permimeter Open Office
COOLING COIL PEAK
Peaked at Time: Mo /Hr. 7 / 18
Outside Air. OADB/ B/HR: 79 / 61 / 53
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass/Door Cond
Wall Cond
Partition/Door
Floor
Adjacent Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Adj Air Trans Heat
Dehumid. Ov Sizing
OvlUndr Sizing
Exhaust Heat
Sup. Fan Heat
Ret Fan Heat
Duct Heat Pkup
Underfir Sup Ht Pkup
Supply Air Leakage
Grand Total =>
Space Plenum
Sens. + Lat Sens. + Lat
Btu/h Btu/h
CLG SPACE PEAK
Mo/Hr.7 /18 •
OADB: 79
Net Percent Space
Total Of Total Sensible
Btu/h ( %) Btu/h
O o 0 0 0
O 0 0 0 0
O 0 0 0 0
5,195 0 5,195 72 5,195
261 0 261 4 261
185 180 365 5 185
O 0 0 0
O 0 0 0
O 0 0 0 0
21 21 0 34
5,662 180 5,842 82 5,674
306 76 382 5 306
350 0 350 5 194
589 0 589 8 589
1,245 76 1,322 18 1,090
27 -27 0 0 27
O 0 15 0 0
O 0 0 0
O 0
O 0 0 0
-11 -11 0
O 0
O 0 0
O 0 0
O 0
O 0 0
Percent
Of Total
(%)
0
0
0
77
4
3
0
0
0
0
84
5
3
9
16
0
0
0
0
6,933 219 7,167 100.00 6,791 100.00
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass/Door Cond
Wall Cond
Partition/Door
Floor
Adjacent Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total =_>
Ceiling Load
Ventilation Load
Adj Air Trans Heat
OvlUndr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
System Plenum Heat
Underfir Sup Ht Pkup
Supply Air Leakage
Grand Total =>
HEATING COIL PEAK
Mo/Hr. Heating Design
OADB: 24
Space Peak Coil Peak Percent
Space Sens Tot Sens Of Total
Btu/h Btu/h ( %)
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
-3,168 -3,168 52.00
-283 -565 9.27
O 0 0.00
O 0 0.00
O 0 0.00
-377 -377 6.20
-3,828 -4,110 67.46
O 0 0.00
O 0 0.00
-280 -280 4.60
-280 -280 4.60
-12 0 0.00
O -536 8.80
O 0 0
O 0 0.00
7 -0.11
O 0.00
-1,322 21.70
O 0.00
149 -2.45
O 0.00
O 0.00
-4,121 -6,092 100.00
Main Clg
Aux Clg
Opt Vent
Total
Total Capacity
ton MBh
0.6 7.2
0.0 0.0
0.0 0.0
0.6 7.2
COOLING COIL SELECTION
Sens Cap. Coil Airflow Enter DBIWB/HR
MBh cfm °F °F gr/lb
7.0 309 75.8 60.6 55.8
0.0 0 0.0 0.0 0.0
0.0 0 0.0 0.0 0.0
Leave DBIWB/HR
°F °F gr/lb
55.0 52.3 55.2
0.0 0.0 0.0
0.0 0.0 0.0
Project Name:
Dataset Name:
Fort Dent II - Regional Acceptance
DENT.TRC
AREAS
Gross Total Glass
ft' ( %)
Floor 112
Part 0
Int Door 0
ExFlr 0
Roof 0
Wall 220
Ext Door 0
0 0
132 60
0 0
TEMPERATURES
Cooling Heating
55.0 82.1
75.8 69.7
75.8 69.7
75.8 64.4
0.0 0.0
0.0 0.0
0.0 0.0
SADB
Ra Plenum
Return
RetIOA
Fn MtrTD
Fn BIdTD
Fn Frict
AIRFLOWS
Cooling
309
309
309
309
5
5
7
93
316
13
0
0
0
0
Diffuser
Terminal
Main Fan
Sec Fan
Nom Vent
AHU Vent
Infil
MinStoplRh
Return
Exhaust
Rm Exh
Auxiliary
Leakage Dwn
Leakage Ups
Heating
309
309
93
309
11
11
7
93
100
18
0
0
0
0
ENGINEERING CKS
% OA
cfmlft'
cfmlton
ft'Iton
Btulhrft'
No. People
Cooling
1.7
2.76
517.35
187.52
63.99
1
Heating
3.4
2.76
-54.39
HEATING COIL SELECTION
Capacity Coil Airflow Ent Lvg
MBh cfm 'F 'F
Main Htg
Aux Htg
Preheat
Humidif
Opt Vent
Total
-5.7 309 65.3 82.1
0.0 0 0.0 0.0
-0.4 11 24.0 55.0
0.0 0 0.0 0.0
0.0 0 0.0 0.0
-6.1
TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011
Alternative - 1 System Checksums Report Page 8 of 10
Room Checksums
By MMFS
109 Perimter Office
COOLING COIL PEAK
Peaked at Time: Mo /Hr. 7 / 9
Outside Air: OADB/WB /HR: 70 / 59 / 57
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass/Door Cond
Wall Cond
Partition/Door
Floor
Adjacent Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Adj Air Trans Heat
Dehumid. Ov Sizing
Ov /Undr Sizing
Exhaust Heat
Sup. Fan Heat
Ret Fan Heat
Duct Heat Pkup
Underflr Sup Ht Pkup
Supply Air Leakage
Grand Total =>
Space Plenum
Sens. + Lat Sens. + Lat
Btu/h Btu/h
CLG SPACE PEAK
Mo/Hr.6 /9
OADB: 65
Net Percent Space Percent
Total Of Total Sensible Of Total
Btu/h ( %) Btu/h (%)
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
2,776 0 2,776 65 3,010 74
-185 0 -185 -4 -310 -8
63 61 125 3 63 2
O 0 0 0 0
O 0 0 0 0
O 0 0 0 0 0
-46 -46 -1 -98 -2
2,608 61 2,670 63 2,665 65
382 96 478 11 382 9
450 0 450 11 250 6
751 0 751 18 751 18
1,583 96 1,679 39 1,383 34
31 -31 0 0 31 1
O 0 -67 -2 0 0
O 0 0 0 0
O 0
O 0 0 0 0
-18 -18 0
O 0
O 0 0
O 0 0
O 0
O 0 0
4,223 108 4,264 100.00 4,079 100.00
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass/Door Cond
Wall Cond
Partition/Door
Floor
Adjacent Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Adj Air Trans Heat
Ov /Undr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
System Plenum Heat
Underftr Sup Ht Pkup
Supply Air Leakage
Grand Total =>
HEATING COIL PEAK
Mo/Hr. Heating Design
OADB: 24
Space Peak Coil Peak Percent
Space Sens Tot Sens Of Total
Btu/h Btu/h ( %)
0 0 0.00
0 0 0.00
0 0 0.00
O 0 0.00
-1,440 -1,440 37.60
-129 -257 6.70
O 0 0.00
O 0 0.00
O 0 0.00
- 472 -472 12.32
-2,040 -2,168 56.62
O 0 0.00
O 0 0.00
-350 -350 9.14
-350 -350 9.14
-15 0 0.00
O -677 17.69
O 0 0
O 0 0.00
9 -0.23
O 0.00
-681 17.78
O 0.00
39 -1.01
O 0.00
O 0.00
-2,406 -3,829 100.00
Main CIg
Aux Clg
Opt Vent
Total
Total Capacity
ton MBh
0.4 4.3
0.0 0.0
0.0 0.0
0.4 4.3
COOLING COIL SELECTION
Sens Cap. Coil Airflow Enter DB/WB/HR
MBh cfm °F °F grllb
4.0 183 75.3 60.4 55.9
0.0 0 0.0 0.0 0.0
0.0 0 0.0 0.0 0.0
Leave DBIWB/HR
°F °F gr/Ib
55.0 52.1 54.2
0.0 0.0 0.0
0.0 0.0 0.0
Project Name:
Dataset Name:
Fort Dent II - Regional Acceptance
DENT.TRC
AREAS
Gross Total Glass
ft' (%)
Floor 140
Part 0
Int Door 0
ExFIr 0
Roof 0
Wall 100 60 60
Ext Door 0
O 0
O 0
TEMPERATURES
Cooling Heating
55.0 81.8
75.7 69.7
75.7 69.7
75.3 58.7
0.0 0.0
0.0 0.0
0.0 0.0
SADB
Ra Plenum
Return
Ret/OA
Fn MtrTD
Fn BIdTD
Fn Frict
AIRFLOWS
Cooling
186
186
186
186
13
13
9
56
195
23
0
0
0
0
Diffuser
Terminal
Main Fan
Sec Fan
Nom Vent
AHU Vent
Infil
MinStoplRh
Retum
Exhaust
Rm Exh
Auxiliary
Leakage Dwn
Leakage Ups
Heating
186
186
56
186
13
13
9
56
65
23
0
0
0
0
ENGINEERING CKS
% OA
cfmIt'
cfm/ton
ft'kon
Btu/hrft'
No. People
Cooling
7.2
1.33
522.33
393.98
30.46
1
Heating
7.2
1.33
-27.35
HEATING COIL SELECTION
Capacity Coll Airflow Ent Lvg
MBh cfm °F °F
Main Htg
Aux Htg
Preheat
Humidif
Opt Vent
Total
-3.4 186 65.3 81.8
0.0 0 0.0 0.0
-0.5 13 24.0 55.0
0.0 0 0.0 0.0
0.0 0 0.0 0.0
-3.8
TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011
Alternative - 1 System Checksums Report Page 9 of 10
Room Checksums
By MMFS
110 Perimeter Office
COOLING COIL PEAK
Peaked at Time: Mo /Hr. 7 / 9
Outside Air: OADB/WB /HR: 70 / 59 / 57
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass/Door Cond
Wall Cond
Partition/Door
Floor
Adjacent Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Adj Air Trans Heat
Dehumid. Ov Sizing
OvlUndr Sizing
Exhaust Heat
Sup. Fan Heat
Ret Fan Heat
Duct Heat Pkup
Underflr Sup Ht Pkup
Supply Air Leakage
Grand Total =>
Space Plenum
Sens. + Lat Sens. + Lat
Btu/h Btu/h
CLG SPACE PEAK
Mo/Hr. 6 / 9
OADB: 65
Net Percent Space
Total Of Total Sensible
Btu/h ( %) Btu/h
O 0 0 0 0
O 0 0 0 0
O 0 0 0 0
2,776 0 2,776 65 3,010
-185 0 -185 -4 -310
63 61 125 3 63
O 0 0 0
O 0 0 0
O 0 0 0 0
-46 -46 -1 -98
2,608 61 2,670 63 2,665
382 96 478 11 382
450 0 450 11 250
751 0 751 18 751
1,583 96 1,679 39 1,383
31 -31 0 0 31
O 0 -67 -2 0
O 0 0 0
O 0
O 0 0 0
-18 -18 0
O 0
O 0 0
O 0 0
O 0
O 0 0
4,223 108 4,264 100.00 4,079
Percent
Of Total
( %)
0
0
0
74
-8
2
0
0
0
-2
65
9
6
18
34
0
0
0
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass/Door Cond
Wall Cond
Partition/Door
Floor
Adjacent Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Adj Air Trans Heat
OvlUndr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
System Plenum Heat
Underflr Sup Ht Pkup
Supply Air Leakage
100.00 Grand Total =>
HEATING COIL PEAK
Mo/Hr Heating Design
OADB: 24
Space Peak Coil Peak Percent
Space Sens Tot Sens Of Total
Btu/h Btu/h ( %)
O 0 0.00
O 0 0.00
O 0 0.00
O 0 0.00
-1,440 -1,440 37.60
-129 -257 6.70
O 0 0.00
O 0 0.00
O 0 0.00
-472 -472 12.32
-2,040 -2,168 56.62
O 0 0.00
O 0 0.00
-350 -350 9.14
-350 -350 9.14
-15 0 0.00
O -677 17.69
O 0 0
O 0 0.00
9 -0.23
O 0.00
-681 17.78
O 0.00
39 -1.01
0 0.00
O 0.00
-2,406 -3,829 100.00
Main CIg
Aux Clg
Opt Vent
Total
Total Capacity
ton MBh
0.4 4.3
0.0 0.0
0.0 0.0
0.4 4.3
COOLING COIL SELECTION
Sens Cap. Coil Airflow Enter DBIWB/HR
MBh cfm °F °F grllb
4.0 183 75.3 60.4 55.9
0.0 0 0.0 0.0 0.0
0.0 0 0.0 0.0 0.0
Leave DB/WB/HR
°F °F grub
55.0 52.1 54.2
0.0 0.0 0.0
0.0 0.0 0.0
Project Name:
Dataset Name:
Fort Dent II - Regional Acceptance
DENT.TRC
AREAS
Gross Total Glass
fP ( %)
Floor 140
Part 0
Int Door 0
ExFlr 0
Roof 0
Wall 100
Ext Door 0
O 0
60 60
O 0
TEMPERATURES
Cooling Heating
55.0 81.8
75.7 69.7
75.7 69.7
75.3 58.7
0.0 0.0
0.0 0.0
0.0 0.0
SADB
Ra Plenum
Return
Ret/OA
Fn MtrTD
Fn BIdTD
Fn Frict
AIRFLOWS
Cooling
186
186
186
186
13
13
9
56
195
23
0
0
0
0
Diffuser
Terminal
Main Fan
Sec Fan
Nom Vent
AHU Vent
Infil
MinStop/Rh
Return
Exhaust
Rm Exh
Auxiliary
Leakage Dwn
Leakage Ups
Heating
186
186
56
186
13
13
9
56
65
23
0
0
0
0
ENGINEERING CKS
% OA
cfm/R'
cfm/ton
Minn
Btu/hr-ft'
No. People
Cooling
7.2
1.33
522.33
393.98
30.46
1
Heating
7.2
1.33
-27.35
HEATING COIL SELECTION
Capacity Coil Airflow Ent
MBh cfm °F
Main Htg
Aux Htg
Preheat
Humidif
Opt Vent
Total
-3.4
0.0
Lvg
°F
186 65.3 81.8
0 0.0 0.0
-0.5 13 24.0 55.0
0.0 0 0.0 0.0
0.0 0 0.0 0.0
-3.8
TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011
Altemative - 1 System Checksums Report Page 10 of 10
4
System Zone Room "
Load / Airflow Summary
By MMFS
Coil
Floor Cooling
Area People Sensible
ft' # Btu /h
Coil
Cooling
Total
Btulh
Space VAV Main Coil Heating
Design Air Minimum VAV Heating Fan Percent
Max SA Changes SA Minimum Sensible Max SA OA
cfm achlhr cfm k Btu/h cfm Clo I
i . x �z a .:M
Altemat>I riak:
101 Reception
103 Open Work Area
Zone - 001
Zone - 001
107 Perimeter Open Office
108 Permimeter Open Office
Zone - 002
Zone - 002
109 Perimter Office
110 Perimeter Office
Zone - 003
Zone - 003
102 Office
104 Office
105 Office
106 Hall
Zone - 004
Zone - 004
System - 001
System - 001
This report does not display heating only systems.
Project Name:
Dataset Name:
Rm Peak
Rm Peak
Zn Peak
Zn Block
Rm Peak
Rm Peak
Zn Peak
Zn Block
Rm Peak
Rm Peak
Zn Peak
Zn Block
Rm Peak
Rm Peak
Rm Peak
Rm Peak
Zn Peak
Zn Block
Sys Peak
Sys Block
170
424
594
594
360
112
472
472
140
140
280
280
137
137
137
224
635
635
1,981
1,981
3.0
2.9
5.9
5.9
2.5
0.8
3.3
3.3
1.0
1.0
2.0
2.0
1.0
1.0
1.0
0.0
3.0
3.0
14.2
14.2
2,316
4,702
7,018
7,018
15,169
7,034
22,191
21,914
4,044
4,044
8,089
8,089
1,560
1,560
1,560
1,245
5,925
5,925
41,657
39,993
3,116
5,607
8,723
8,723
15,371
7,167
22,526
22,334
4,264
4,264
8,528
8,528
1,864
1,864
1,864
1,351
6,945
6,945
45,157
42,443
94
193
287
287
668
309
977
977
186
186
371
371
64
64
64
48
240
240
1,875
1,875
4.14 28 30
3.41 58 30
30
30
13.91 200 30
20.69 93 30
30
30
9.94 56 30
9.94 56 30
30
30
3.51 19 30
3.51 19 30
3.51 19 30
1.61 14 30
30
30
-508
-1,050
-1,558
-1,558
- 10,651
-5,731
- 16,382
- 16,382
-3,373
-3,373
-6,746
-6,746
-349
-349
-349
-275
-1,321
-1,320
- 26,006
- 26,006
66 26.8 26.8
135 20.8 20.8
201 22.8 22.8
201 22.8 22.8
467 0.0 5.1
216 1.7 3.4
684 2.3 4.6
684 2.3 4.6
130 7.2 7.2
130 7.2 7.2
260 7.2 7.2
260 7.2 7.2
45 20.6 20.6
45 20.6 20.6
45 20.6 20.6
34 28.0 28.0
168 22.1 22.1
168 22.1 22.1
1,312 5.5 10.1
1,312 5.5 10.1
Fort Dent II - Regional Acceptance TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011
DENT.TRC
Load/Airflow Summary Report Page 1 of 1
VERMIT COORD CON
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: M11 -101
DATE: 07/19/11
PROJECT NAME: FORT DENT II - REGIONAL ACCEPTANCE
SITE ADDRESS: 6840 FORT DENT WY
X Original Plan Submittal
Response to Incomplete Letter #
Response to Correction Letter # Revision # after Permit Issued
DEPARTMENTS: '
Building Division
Public Works
IA 01.4/
Ire Prevention �J
Structural
Planning Division
❑ Permit Coordinator
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
Incomplete ❑
DUE DATE: 07/21/11
Not Applicable
n
Comments:
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES/THURS ROUTING:
Please Route 't;0
Structural Review Required
REVIEWER'S INITIALS:
No further Review Required
DATE:
APPROVALS OR CORRECTIONS:
DUE DATE: 08 /18 /11
Approved ❑ Approved with Conditions , Not Approved (attach comments) I 1
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Documents /routing slip.doc
2 -28 -02
Contractors or Tradespeople Per Friendly Page
a
Page 1 of 2
General /Specialty Contractor
A business registered as a construction contractor with LEtI to perform construction work within the scope of
its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of
account and carry general liability insurance.
Business and Licensing Information
Name MACDONALD /MILLER FAC SOL INC UBI No. 602254260
Phone 2067684180 Status Active
Address Po Box 47983 License No. MACDOFS980RU
Suite /Apt.
City Seattle
State WA
Zip 98106
County King
Business Type Corporation
Parent Company
License Type Construction Contractor
Effective Date 12/31/2002
Expiration Date 12/31/2012
Suspend Date
Specialty 1 General
Specialty 2 Unused
Other Associated Licenses
License
Name
Type
Specialty
1
Specialty
2
Effective
Date
Expiration
Date
Status
DIVCOI *988RC
DIVCO
INCORPORATION
Construction
Contractor
General
Unused
12/3/2002
11/7/2012
Active
ENCOMMS984CA
ENCOMPASS
MECHANICAL
SERVICES
Construction
Contractor
General
Unused
2/1/2002
2/1/2004
Archived
MACDOMR026RU
MACDONALD MILLER
RSDNTL INC
Construction
Contractor
General
Unused
12/31/1998
12/31/2001
Archived
DIVCOI *031L4
DIVCO INC
Construction
Contractor
General
Unused
6/24/1997
8/1/2003
Archived
MACDOMR0760P
MACDONALD MILLER
RESIDENTIAL L
Construction
Contractor
General
Unused
9/17/1993
12/30/1998
Archived
DIVCOEC188LC
DIVCO ENERGY
CONTROL COMPANY
Construction
Contractor
General
Unused
6/3/1982
5/26/1997
Archived
MACDOM *248J9
MACDONALD MILLER
CO
Construction
Contractor
General
Unused
4/29/1976
2/1/2002
Archived
LINFOAR980QG
LINFORD AIR a
REFRIGERTN INC
Construction
Contractor
General
Unused
11/7/2002
11/7/2004
Inactive
Business Owner Information
Name
Role
Effective Date
Expiration Date
GOUGH, DAVID ANTHONY
Director
12/29/2010
NOEL, STEPHANIE W
Member
05/14/2010
SIMONDS, DERRICK R
President
05/14/2010
WEBSTER, MARK E
Vice President
05/14/2010
https://fortress.wa.gov/lni/bbip/Print.aspx
08/05/2011
3:09:50 PM
Monday, July 18, 2011
ROUND SHEETMETAL WRAPPED W/ INSULATION (2 ")
SHEETMETAL WRAPPED W/ INSULATION (2 ")
BARE ROUND SHEETMETAL
EXPOSED QUALITY SHEETMETAL
EXAMPLE OF NEW
FLAT OVAL FLAT SHEETMETAL W/ INSULATION (2 ")
DUCTBOARD (1" FIBERGLASS)
EXAMPLE OF NOT IN CONTRACT (NIC)
UNIT
NO.
MFG & MODEL NO.
INLET
SIZE
FAN
CFM
VALVE
CFM
HEATER
FAN
MAX
MIN
KW
DT
CFM
VOLT /PH
STGS
HP
VOLTIPH
SPD NOTES
101
ENVIROTEC CVF -EH -II
8
675
565
255
5
23.3
675
277/1
-
1/4
277/1
- i EXISTING, 2
101A
ENVIROTEC CVF -EH -II
6
400
335
100
3
24
400
277/1
-
1/6
277/1
- EXISTING, 2
102
ENVIROTEC CVF -EH -1I
8
375
340
100
4.5
37.8
375
277/1
-
1/4
277/1
- EXISTING, 2
103
ENVIROTEC CVF -EH -II
8
300
275
80
3.5
36,7
300
277/1
-
1/4
277/1
EXISTING, 2, 6
104
_
ENVIROTEC CVF -EH -II
8
445
405
95
2.5
17.7
445
277/1
-
1/4
277/1
- EXISTING, 2, 6
105
ENVIROTEC CVF -EH -II
8
370
310
300
5.5
26
370
460/3
-
1/4
277/1
- EXISTING, 2, 4
106
ENVIROTEC CVF -EH -II
6
255
210
95
2.5
31
255
277/1
-
1/6
277/1
- EXISTING, 2
107
ENVIROTEC CVF -EH -II
12
1035
850
365
6.5
20
1035
460/3
-
3/4
277/1
- EXISTING, 2
108
ENVIROTEC CVF -EH -II
8
700
575
195
5
23
700
277/1
-
1/4
277/1
- EXISTING, 2
109
ENVIROTEC CVF -EH -II
10
1400
760
375
10
36
1400
460/3
-
1/2
277/1
- EXISTING, 2
110
ENVIROTEC CVF -II
8
460
415
0
-
-
-
-
1/4
277/1
EXISTING, 1
111
ENVIROTEC CVF -II
6
410
370
115
2.5
19.2
410
277/1
1
1/6
277/1
- EXISTING, 1
111A
ENVIROTEC CVF -II
12
1040
940
290
6
18.1
1040
460/3
3
1/3
277/1
- EXISTING, 1
112
ENVIROTEC CVF -II
6
415
120
0
-
-
-
-
1/6
277/1
- EXISTING, 1
113
ENVIROTEC CVF -II
6
625
515
0
-
-
-
-
1/6
277/1
- EXISTING, 1
151
ENVIROTEC CVF -EH -II
10
1140
1025
285
7.5
20.7
1140
460/3
-
1/2
277/1
- EXISTING, 2
152
ENVIROTEC CVF -EH -II
8
640
535
80
6
30
640
277/1
-
1/4
277/1
L - L EXISTING, 2
153
ENVIROTEC CVF -EH -II
6
470
390
40
2,5
17
470
27711
-
1/6
277/1
- EXISTING, 2
154
ENVIROTEC CVF -EH -II
10
1080
900
300
5,5
18
1080
460/3
1/2
277/1
- EXISTING, 2
155
ENVIROTEC CVF -EH -II
6
430
360
95
2,5
18
430
277/1
-
1/6
277/1
- EXISTING, 2
155A
ENVIROTEC CVF -EH -II
8
800
670
200
5
20
800
277/1
-
1/4
277/1
- EXISTING, 2
156
ENVIROTEC CVF -EH -II
8
315
300
80
5
49.9
315
277/1
-
1/4
277/1
- EXISTING, 2
157
ENVIROTEC CVF -EH -II
6
300
280
80
2.5
26.2
300
277/1
-
1/6
277/1
- EXISTING, 2
158
ENVIROTEC CVF -EH -II
8
855
810
220
4,5
16.6
855
277/1
-
1/4
277/1
- EXISTING, 2
159
ENVIROTEC CVF -II
8
535
500
0
-
-
-
-
-
1/4
277/1
- ! EXISTING, 1
160
ENVIROTEC CVF -II
6
460
415
115
3,5
23.9
460
277/1
-
1/6
277/1
- EXISTING, 1
161
ENVIROTEC CVF -II
8
235
195
0
-
-
-
-
1/4
277/1
- j EXISTING, 1
161A
ENVIROTEC CVF -II
6
325
270
0
-
-
-
-
1/6
277/1
! EXISTING, 1
162
ENVIROTEC CVF -II
8
620
590
160
-
-
-
-
-
1/4
277/1
- " EXISTING, 1
163
ENVIROTEC CVF -EH -II
6
180
150
50
2
34
180
277/1
-
1/6
27711
- ? EXISTING, 2
164
ENVIROTEC CFR -EH -II -1218
12
1030
930
290
7,5
22.9
1030
460/3
3
277/1
- EXISTING, 2, 6
W
165
ENVIROTEC CFR- EH -II-
6
400
360
110
2.5
19.7
400
277/1
1
277/1
- EXISTING, 2
166
ENVIROTEC CFRQ0811 E
8
610
560
110
-
-
-
-
-
VAR
277/1
ECM NEW, 1, 3, 6
NOTES:
1. SERIES FAN POWERED TERMINAL UNIT W/O HEAT - ENVIROTEC CVF -II, SIZE AS LISTED, PRESSURE DEPENDENT, FACTORY OPTIONS INCLUDE:
- EXTENDED DAMPER 1/2" DIAM. SHAFT
- NEW SERIES VAV'S TO HAVE ECM MOTORS PER 2009 WSEC: SECTION 1437
2. SERIES FAN POWERED TERMINAL UNIT WITH HEAT - ENVIROTEC CVF- EH -II, SIZE AS LISTED, PRESSURE DEPENDENT, FACTORY OPTIONS INCLUDE:
- EXTENDED DAMPER 1/2" DIAM. SHAFT
- HEAT STAGING & FAN CONTROL THROUGH FACTORY WIRED RELAYS
- 24V TRANSFORMER, 50 VA MIN RATING
- AUTO RESET 130 °F HIGH LIMIT T'STAT
- INTERLOCK TO PREVENT HEATER OPERATION UNLESS FAN RELAY IS ACTIVATED
- THREE SPEED FAN SWITCH AND VARIABLE SPEED FAN CONTROL
- FACTORY INSTALLED 24 CONTROL WIRING PIGTAIL, 36" LENGTH, COLOR CODED FOR
FAN, HEAT STAGING, AND COMMON FIELD CONNECTIONS. SEPARATE PERMIT
WIRING PIGTAIL COLOR CODED AS FOLLOWS: RED 24VAC WHITE 24 VAC REQUIRED FOR:
GREY COMMON GREEN FAN ORANGE HEAT ❑Mechanical
3. DISCONNECT AND POWER WIRING BY E.C.
4. ONE LEG OF 460 VOLT HEATER IS DISCONNECTED. ACTUAL DELTA T AT 370 CFM IS 22 DEG F. Electrical
5. ADD DUCT HEATER, SEE DUCT HEATER SCHEDULE, AND INTERLOCK WITH VAV BOX. Plumbing
6. AIR BALANCE 'Gas Piping
7. ADD DUCT HEATER, SEE DUCT HEATER SCHEDULE, AND INTERLOCK WITH VAV BOX.
City
NOTE TO ELECTRICAL: ii y of Tf rl a ila
I
- 460V /3PH TERMINAL UNITS REQUIRE A FOUR WIRE POWER FEED IN ORDER TO SUPPLY 277V/1 PH POWER TO 3 -. r-
THE FAN MOTOR.
AREA OF WORK
VICINITY MAP
NO SCALE
1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL
OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK.
2. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2009 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE,
INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE AND STATE AND LOCAL CODES AND ORDINANCES.
3. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH CHAPTER 6 OF THE 2009 IMC AND WITH CURRENT SMACNA STANDARDS. EARTHQUAKE BRACE ALL DUCTS 28" DIA
AND LARGER WHICH ARE SUSPENDED MORE THAN 12" BELOW STRUCTURAL SYSTEM.
4. JOINTS OF MEDIUM AND HIGH VELOCITY DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT SEALANT.
5. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS, PER 2009 WSEC.
- DUCT WRAP, WHERE INDICATED, SHALL BE 1 1/2" 0.75 LB /CU FT FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED REINFORCED ALUM. FOIL
VAPOR BARRIER (R-4.2 MIN.).
- SOUND LINING, WHERE INDICATED, SHALL BE 1" 1.5 LB /CU FT FIBERGLASS DUCT LINING COATED TO PREVENT FIBER EROSION AT VELOCITIES UP TO 6000 FPM (R-4.2 MIN.).
- DUCT BOARD, WHERE INDICATED, SHALL BE 1" RIGID FRK FACED El 475 FIBERGLASS DUCT BOARD SYSTEM, UL 181 LISTED AS A CLASS 1 AIR DUCT (R-4.3 MIN.)
6. FLEX DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER, 1 1/2" FIBERGLASS INSULATION, AND NON - PERFORATED INTERIOR LINER WITH WIRE HELIX, DUCT SHALL
BE A UL 181 LISTED CLASS 1 AIR DUCT. FLEX DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 12' IN LENGTH UNLESS NOTED OTHERWISE.
7. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2009 IBC.
8. PROVIDE FIRE DAMPERS, SMOKE DAMPERS AND FIRE /SMOKE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 716.5 OF THE 2009 IBC.
PROVIDE CEILING FIRE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 716.6.2 OF THE 2009 IBC. INSTALL FIRE DAMPERS SMOKE DAMPERS AND
FIRE /SMOKE DAMPERS IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS, THE TERMS OF THEIR LISTING, AND THE REQUIREMENTS OF THE CODE.
9. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY
AND RATING OF THE FLOOR OR WALL.
10. PROVIDE RETURN DUCT SMOKE DETECTOR AUTOMATIC SHUT DOWN OF ALL NEW HEATING, COOLING, OR VENTILATION EQUIPMENT MOVING IN EXCESS OF 2000 CFM IN
ACCORDANCE WITH SECTION 606 OF THE 2009 IMC. POWER AND INTERLOCK WIRING WITH THE BUILDING FIRE ALARM SYSTEM IS BY THE ELECTRICAL CONTRACTOR.
11. HVAC EQUIPMENT, VALVES AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS
PANELS SHALL BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR. MINIMUM ACCESS DOOR SIZE FOR VALVES AND DAMPERS TO BE 18" X 18 ".
12. HEAT TRACING OF PIPING, WHERE INDICATED, SHALL BE PROVIDED AND INSTALLED BY THE HVAC CONTRACTOR. THE HVAC CONTRACTOR IS TO COORDINATE THE HEAT
TRACE POWER WIRING WITH ELECTRICAL CONTRACTOR.
13. MOTORS STARTERS NOT LISTED AS BEING PROVIDED IN THE HVAC EQUIPMENT SCHEDULES ARE TO BE PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR.
14. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO BE PROVIDED TO THE BUILDING OWNER. RECORD
DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCT AND PIPE
DISTRIBUTION SYSTEM, INCLUDING SIZES, AND THE TERMINAL AIR AND WATER DESIGN FLOW RATES.
15. OPERATING AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE: SUBMITTAL DATA, NAMES AND ADDRESSES OF AT LEAST ONE
SERVICE AGENCY, HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM.
16. COMMISSIONING IS REQUIRED ON THIS PROJECT IN ACCORD WITH WASHINGTON STATE ENERGY CODE (WSEC) SECTION 1416 AND WITH LEED NC -2.1 FUNDAMENTAL
BUILDING SYSTEMS COMMISSIONING AND ADDITIONAL COMMISSIONING.
17. A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND FILED WITH THE OWNER
REVIEWED FOR
CODE COMPLIANCE
APPROVED
AUG 032011
City of
BUILDIN
APN# 295490 -0425
LEGAL DESCRIPTION: GUNDAKERS INTERURBAN ADD PARCEL 1 TGW POR OF PARCEL 2 DAF- BEG MOST WLY COR OF PARCEL 1 TH N 63 -35-49 E 237.32 FT TH S 26 -24 -11 E 227.32 FT TO COMMON COR BTW PARCELS 1 & 2
TH N 63 -35-49 E 252.25 FT TH N 26 -24 -11 W 77.65 FT TH N 56 -15 -11 W 234.09 FT TH N 31 -12-43 W 82.39 FT TO INTSN WITH SELY LN OF TRACT CONVEYED TO CITY OF TUKWILA RECORDING NO 7808230299 TH S 58 -47 -17 W
102.77 FT TH S 55 -39 -53 W 63.16 FT TH S 48 -39 -58 W 55.63 FT TH S 39 -21 -15 W 88.24 FT TH S 30 -04 -58 W 85.21 FT TO MOST WLY COR OF PARCEL 2 TH S 37 -36-40 E 20.92 FT TO POB - OF CITY OF TUKWILA SHORT PLAT NO
79 -7 -SS RECORDING NO 7908210370 SD SHORT PLAT BEING A POR OF GUNDAKERS INTERURBAN ADD IN THE SW 1/4 OF NW 1/4 OF SECTION 24 -23 -04 -- AS PER CITY OF TUKWILA BDRY LINE ADJ NO 90 -2 -BLA RECORDING
NO 9008151101
TITLE
PROJECT ENGINEER
ACCOUNT MANAGER
PRODUCTION MANAGER
SHEET METAL SUPERINTENDENT
AIR BALANCE FOREMAN
ELECTRICAL FOREMAN
FACILITIES DIRECTOR
GENL PROJ MANAGER
NAME
GEORGE GRAHAM
BROCK LEE
DARYL ANDERSON
MIKE REICHERT
STEVE BAKER
MIKE MCGIVERN
KEITH CHALCRAFT
JIM BAER
COMPANY
MACDONALD MILLER
MACDONALD MILLER
MACDONALD MILLER
MACDONALD MILLER
MACDONALD MILLER
MACDONALD MILLER
PHONE NUMBER
206 - 768 -4288
206 -768 -3838
206 - 768 -4216
206- 423 -4807
206 -768 -3824
206- 768 -4046
206- 229 -0474
425 - 957 -2105
EMAIL
GEORGE.GRAHAM @MACMILLER.COM
BROCK.LEE @MACMILLER.COM
DARYL.AN DERSON @MACM ILLER.COM
M IKE.REICHERT @MACM I LLER.COM
STEVE. BAKER @MACMILLER.COM
M IKE. MCGIVERN @MACM ILLER.COM
SCHEDULES - HVAC
FIRST FLOOR PLAN - HVAC
INTALL (1) NEW VAV BOX WITH T'STAT, AND INSTALL (4) NEW DIFFUSERS AND (4) NEW RETURN GRILLES. RELOCATE (5) DIFFUSERS /GRILLES. RELOCATE (3) T'STATS. DDC CONTROLS. MISC DUCTWORK.
REVISIONS
No changes shall be made to the scope
of work without prior approval of
Tukwila Building Division,
NOTE: Revisions will require a new p!an submittal
and may inc'ude additional plan rev ew feES,
FILE COPY
Permit No.. M H tD
Plan review approval is subject to errors and omissions.
Approval of construction documents does not authorize
the violation of any adopted code or ordinance. Receipt
of approved Field Copy and conditions is acknowledged:
By
Date: . R461/
City Of 1Ukwila
BUILDING DIVISION
ECEIVED
CITY R OF TIIK LA
JUL 'l O11
PERMIT CENTER
to
a)
Co
O
0
V 0
cti
C
I I I I I I I I
I I I
W
U
z
a.
W
0
=U
� Q
Z -1
w<V8
0 zzg
Owe
U-
ENGINEER:
G GRAHAM
171
I
N-
O
.macmiller.com
WA Lic No: MACDOFS980RU
W
Q
0
REVISIONS:
REVISIONS:
z
0
F-
U
C/)
z
0
U
0
LL
0
W
co
C')
LAST REVISED:
07 -18 -11
CHECKED BY: DATE PLOTTED:
S HARGROVE 07 -18 -1 1
CAD: ISSUE DATE:
R VILLANUEVA 07 -18 -11
DRAWING NUMBER:
0- 0832 - 7214154 -00
SHEET NUMBER:
TM0.01