Loading...
HomeMy WebLinkAboutPermit M11-101 - FORT DENT II - REGIONAL ACCEPTANCEFORT DENT II REGIONAL ACCEPTANCE 6840 FORT DENT WY M11-101 City o*Tukwila 414 Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: 2954900425 Address: 6840 FORT DENT WY TUKW Project Name: FORT DENT II - REGIONAL ACCEPTANCE Permit Number: M11 -101 Issue Date: 08/05/2011 Permit Expires On: 02/01/2012 Owner: Name: PEPPERWOOD HOLDINGS LLC Address: 2835 82ND AVE SE #300 , MERCER ISLAND WA 98040 Contact Person: Name: DARLA DOLL Address: 7717 DETROIT AV SW , SEATTLE WA 98106 Email: darla.doll @macmiller.com Contractor: Name: MACDONALD /MILLER FAC SOL INC Address: PO BOX 47983 , SEATTLE, WA 98106 Contractor License No: MACDOFS980RU Phone: 206 768 -4278 Phone: 206 - 768 -4180 Expiration Date: 12/31/2012 DESCRIPTION OF WORK: INSTALL (1) VAV BOX, (4) DIFFUSERS, AND (4) GRILLES. RELOCATE (5) DIFFUSER/GRILLES AND MISCELLANEOUS DUCTWORK. Value of Mechanical: $7,000.00 Type of Fire Protection: SPRINKLERS /AFA Electrical Service Provided by: Permit Center Authorized Signature: I hereby certify that I have read and governing this work will be complie x- with, Fees Collected: $269.31 International Mechanical Code Edition: 2009 Date: 0$1 ed this permit and know the same to be true and correct. All provisions of law and ordinances whether specified herein or not. The granting of this permit does not pr e to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this permit. Signatur (II i Se, Print Name: `" Date: /`- // This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IMC -4/10 M11-101 Printed: 08 -05 -2011 PERMIT CONDITIONS Permit No. M11-101 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431 - 3670). 4: AB permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: IMC -4/10 M11-101 Printed: 08 -05 -2011 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us Mechanical Permit Nod V 1 Project No. (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *please print ** Site Address: 6840 FORT DENT WAY TUKWILA, WA 98188 Tenant Name: FORT DENT II - REGIONAL ACCEPTANCE Property Owners Name: JC RADOVICH King Co Assessor's Tax No.: 2954900425 Suite Number: New Tenant: Mailing Address: 2000 124TH AVE NE B -103 MERCER ISLAND Floor: 1 ❑ Yes m..No WA 98040 Zip City State CONTACT PERSON — who do we contact when your permit is ready to be issued Name: DARLA DOLL Mailing Address: 7717 DETROIT AVE SW Day Telephone: (206) 768 -4278 SEATTLE WA 98106 E -Mail Address: DARLA.DOLL @MACMILLER.COM City State Fax Number: (206) 768 -4279 Zip MECHANICAL CONTRACTOR INFORMATION Company Name: MACDONALD MILLER Mailing Address: 7717 DETROIT AVE SW SEATTLE WA 98106 Contact Person: DARLA DOLL E -Mail Address: DARLA.DOLL @MACMILLER.COM Contractor Registration Number: MACDOFS980RU City State Day Telephone: (206) 768 -4278 Fax Number: (206) 768 -4279 Expiration Date: 12/31/2012 Zip ARCHITECT OF RECORD — All plans must be stamped by architect of record Company Name: N/A Mailing Address: Contact Person: E -Mail Address: City Day Telephone: Fax Number: State Zip ENGINEER OF RECORD — All plans must be stamped by engineer of record Company Name: MACDONALD MILLER Mailing Address: 7717 DETROIT AVE SW Contact Person: GEORGE GRAHAM SEATTLE WA 98106 E -Mail Address: GEORGE.GRAHAM @MACMILLER.COM H'. \Applications \Forms•Applications On Line\2010 Applications \7 -2010 - Mechanical Permit Application doc Revised. 7 -2010 bh City State Day Telephone: (206) 768 -4288 Fax Number: (206) 768 -4289 Zip Page 1 of 2 • Valuation of project (contractor's bid price): $ 7,000.00 Scope of work (please provide detailed information): INSTALL (1) NEW VAV BOX, INSTALL (4) NEW DIFFUSERS AND (4) NEW GRILLES. RELOCATE (5) DIFFUSER/GRILLES AND MISC DUCTWORK Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement Fuel Type: Electric m Gas Other: Indicate type of mechanical work being installed and the quantity below: Unit Type: Qty Unit Type: Qty Unit Type: Qty Bioler /Compressor Qty furnace <100k btu air handling unit >10,000 cfm fire damper 0 -3 hp /100,000 btu furnace >100k btu evaporator cooler diffuser 13 3 -15 hp /500,000 btu floor furnace ventilation fan connected to single duct thermostat 15 -30 hp /1,000,000 btu suspended/wall /floor mounted heater ventilation system wood/gas stove 30 -50 hp /1,750,000 btu appliance vent hood and duct emergency generator 50+ hp /1,750,000 btu repair or addition to heat/refrig/cooling system Incinerator — domestic other mechanical equipment air handling unit <10,000 cfm 1 incinerator — comm/ind PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 international building code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDIN !_.._ OR AUTHORIZE Signature: Print Name: DARLA DOLL Mailing Address: 7717 DETROIT AVE SW IDate Application Accepted: 01 t 1I' Date: 07/19/2011 Day Telephone: (206) 768 -4278 SEATTLE City Date Application Expires: 01 H:\Applications \Forms - Applications On Line\2010 Applications \7 -2010 - Mechanical Permit Application.doc Revised: 7 -2010 bh WA 98106 State Zip Staff Initials: 1 Page 2 of 2 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206-431-3665 Web site: http: / /www.TukwilaWA.gov RECEIPT Parcel No.: 2954900425 Permit Number: M11 -101 Address: 6840 FORT DENT WY TUKW Status: PENDING Suite No: Applied Date: 07/19/2011 Applicant: FORT DENT II - REGIONAL ACCEPTANCE Issue Date: Receipt No.: R11 -01506 Payment Amount: $269.31 Initials: JEM Payment Date: 07/19/2011 12:58 PM User ID: 1165 Balance: $0.00 Payee: MACDONALD- MILLER FACILITY SOLUTIONS, INC. TRANSACTION LIST: Type Method Descriptio Amount Payment Check 3015 269.31 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts MECHANICAL - NONRES PLAN CHECK - NONRES 000.322.102.00.00 215.45 000.345.830 53.86 Total: $269.31 doc: Receiot -06 Printed: 07 -19 -2011 INSPECTION RECORD Retain a copy with permit INS ON NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 it. (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 del('1Of Project: Fop RT. jxniT- Zf�o11AL Type fInspection: j� , .JXL.. A Address: (0 0 yy 4 a . -O% i Date Called: Special Instructions: Date Wanted:. _m:1 -.7 3 -- `r p.m. 1 Requester: Ph-"? LD 2s. ---3 'T Approved per applicable codes. Corrections required prior to approval. COMMENTS: rp+'�•-ti�� �� 1 �Il i L R INSPECTION FEE REQ IRED. Prior to n xt inspection. fee must 9 id at 6300 Southcenter , vd.. Suite 100. C 11 to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 MI (- (o Proect: Gem.., •)N4' q mace.P.46 Type of Inspect it_ . � - _ L) c...7— ^• (.. ASU J r ^ Address 1 fru ` v to 0-1 Date Wedme. - Special Instructions: Date Wanted., ( ( 1 t (a(f .m: Requester: *-...---•• Phone ` ,2$S4A3 J` t "proved per applicable codes. Corrections required prior to approval. COMMENTS: • InspectoI • (Date ❑ REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. i se=0 MacDonald- Miller FACILITY SOLUTIONS • rY) t o) :..::.:..:......:.:.:....:..::. For Fort Dent 11 Floor 1 Joe # 7214154 RECEIVED AU )2 2011 BUILDING DEPARTMENT Project Description: 3 perimeter VAV Parallel fan power reheat terminals, with fan inlet dampers, electric reheat duct coils, 1 interior terminal unit, Staefa II controls, velocity probe sensors. Interior Terminals: All deflections were set for appropriately Maximum and minimum cooling quantities were set and recorded Controller card addresses were checked and recorded All outlets for each box were proportioned in accordance to the design specifications All thermostats were calibrated and reset for normal operation Temperature set points were set at 71 and 73 degrees Primary air volume was calibrated & multiplier recorded Perimeter VAV Terminals: All of the above tasks were performed Heating quantities were set to obtain the design CFM quantity Heating coils were checked and verified as working Differential temperatures were taken and recorded in the heating mode Notes: Project Manager: Brock Lee Field Technician: Steve Baker Date: 8 -15 -11 Project Job Number MacDonald- Miller FACILITY SOLUTIONS Fort Dent II 7214154 Area Served VAV 103 System Air Outlet Test Report Floor 1 Outlet Design Preliminary Final Percent of Design No. 1 Type 1 Size l Ak Vel. l Flow Vel. l Flow Vel. 1 Flow Office T 1 CD 10 Hood 10 150 120 165 110% Office O 2 CD 10 Hood 10 150 125 155 103% Totals Address Inlet Size Multiplier Remarks: VAV 104 3 Max SP 28% 8 Min SP 9% 240 Mix 67 Lat 78 300 Max Flow Min Flow Fan Total 245 Design 320 107% Actual 275 280 80 80 300 320 Office O 1 CD 10 Hood 10 215 250 220 96% Office T 2 CD 10 Hood 10 230 270 230 100% Address Inlet Size Multiplier Remarks: Totals 4 Max SP 77% 8 Min SP 15% 236 Mix 68 Lat 86 Max Flow Min Flow Fan Total 520 Design 450 101% Actual 405 410 95 90 445 450 VAV 164 Open Area T 1 CD 10 Hood 355 azlp .S p Open Area O 2 CD 10 Hood 355 J2S 14-/0 Open Area 3 CD 10 Hood 320 a CO j v Address Inlet Size Multiplier Filter Size Remarks: Totals y Max SP Abe 70 Min SP I8-13 / ,A, t ( 06 g 1030 Max Flow Min Flow Fan Total Design /0 06 Actual 180 F1_5 /g0 /03c. 1 coo Test Date 8/16/2011 Readings By SB Page: 1 4=,MacDonald-Milder FACILITY SOLUTIONS Project Job Number Fort Dent II 7214154 Area Served System Air Outlet Test Report Floor 1 Outlet Design Preliminary Final Percent of Design No. I Type I Size 1 Ak Vel. 1 Flow Vel. 1 Flow Vel. I Flow VAV 166 545 Office T 1 CD 8 Hood 180 185 185 103% Open Area 2 CD 8 Hood 110 130 110 100% Open Area 0 3 CD 8 Hood 200 175 190 95% Open Area 4 CD 8 Hood 120 125 125 104% Address Inlet Size Multiplier Remarks: Totals 17 Max SP 563 8 Min SP 102 28 610 Max Flow Min Flow Fan Total 615 Design 610 100% Actual 560 545 110 115 610 610 Test Date 8/16/2011 Readings By SB Page: 2 /4. Fort Dent II - Regional Acceptance REVIEWED FOR CODE C Ip�ED CE APP AUG 0 3 211 City of Tukwila BUILDING DIVISION Location Building owner Program user Company Comments By Dataset name Calculation time TRACE® 700 version Location Latitude Longitude Time Zone Elevation Barometric pressure Air density Air specific heat Density - specific heat product Latent heat factor Enthalpy factor Summer design dry bulb Summer design wet bulb Winter design dry bulb Summer clearness number Winter clearness number Summer ground reflectance Winter ground reflectance Carbon Dioxide Level Design simulation period Cooling Toad methodology Heating Toad methodology 6840 Fort Dent Way GEORGE GRAHAM MacDonald Miller Facility Solutions MMFS C:1Documents and Settingslgraham My DocumentslTRACE 700 Projects1Fort Dent 111DENT.TRC 08:45 AM on 07/18/2011 6.2.6.5 Seattle, Washington 47.0 deg 122.0 deg 8 386 ft 29.5 in. Hg 0.0749 lb/cu ft 0.2444 Btu/Ib•°F 1.0988 Btu/h -cfm °F 4,836.9 Btu • min /h•cu ft 4.4953 lb-min /hrcu ft 83 65 24 0.95 0.95 0.20 0.20 400 °F °F °F ppm January - December CLTD -CLF (ASHRAE TFMI UATD RECEIVED CITY OF TUKWILA ,H1I 19 2011 PERMIT CENTER 7..W.71° M1t-lO1 Room Checksums By MMFS 101 Reception COOLING COIL PEAK Peaked at Time: Mo/Hr. 7 / 14 Outside Air: OADBP B/HR: 82 / 65 / 67 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret Fan Heat Duct Heat Pkup Underfir Sup Ht Pkup Supply Air Leakage Grand Total => Space Plenum Sens. + Lat Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Net Total Btu/h Percent Of Total ( %) O 0 0 O 0 0 0 0 0 O 0 0 O 0 0 O 0 0 0 0 0 0 0 0 0 0 0 O 0 0 464 116 580 19 1,350 0 1,350 43 802 0 802 26 2,616 116 2,732 88 41 -41 0 0 O 0 404 13 O 0 0 0 0 0 0 0 -21 -21 -1 0 0 0 0 0 0 0 0 0 0 O 0 0 2,657 55 3,116 100.00 CLG SPACE PEAK Mo /Hr. 7 / 20 OADB: 74 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 464 750 802 2,016 46 0 0 0 2,063 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 23 36 39 98 2 0 0 0 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total => HEATING COIL PEAK Mo/Hr. Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -19 0 0.00 O -1,274 93.25 O 0 0 O 0 0.00 10 -0.70 O 0.00 -48 3.49 O 0.00 -54 3.96 O 0.00 O 0.00 -19 -1,366 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.3 3.1 0.0 0.0 0.0 0.0 0.3 3.1 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WBIHR MBh cfm °F °F grub 2.3 94 77.5 61.9 58.9 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DBIWBIHR °F °F gr/Ib 55.0 50.0 46.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Fort Dent II - Regional Acceptance DENT.TRC AREAS Gross Total Glass ft' (%) Floor 170 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 Ext Door 0 O 0 O 0 O 0 TEMPERATURES Cooling Heating 55.0 70.2 75.8 69.7 75.8 69.7 77.5 28.8 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Retum R@tiOA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 94 94 94 94 0 0 0 28 94 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStopIRh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 94 94 28 94 25 25 0 28 28 25 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm/ton triton Btu/fir-ft' No. People Cooling 26.8 0.55 361.50 654.76 18.33 3 Heating 26.8 0.55 -8.04 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humldif Opt Vent Total -0.5 0.0 -0.9 Lvg 'F 94 65.3 70.2 0 0.0 0.0 25 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -1.4 TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011 Alternative - 1 System Checksums Report Page 1 of 10 Room Checksums By MMFS 102 Office COOLING COIL PEAK Peaked at Time: Mo /Hr. 7 / 14 Outside Air. OADB/WB/HR: 82 / 65 / 67 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total => Space Plenum Sens. + Lat Sens. + Lat Btu/h Btu/h O 0 O 0 O 0 O 0 O 0 0 0 0 0 O 0 0 O 0 Net Total Btu/h Percent Of Total ( %) O 0 O 0 O 0 O 0 O 0 0 0 O o O 0 O 0 0 0 0 0 374 94 468 25 450 0 450 24 746 0 746 40 1,570 94 1,663 89 33 -33 0 0 O 0 212 11 O 0 0 O 0 O 0 0 -11 -11 -1 O 0 0 0 0 0 0 0 0 0 0 0 0 1,603 50 1,864 100.00 CLG SPACE PEAK Mo/Hr 7 /20 OADB: 74 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 374 250 746 1,370 37 0 0 0 Percent Of Total ( %) 0 0 0 0 0 0 0 0 0 0 0 27 18 53 97 3 0 0 0 1,407 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total •> HEATING COIL PEAK Mo/Hr. Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h ( %) O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 -15 0 0.00 O -668 83.64 O 0 0 0 0 0.00 5 -0.63 O 0.00 -96 12.07 O 0.00 -39 4.91 O 0.00 O 0.00 -15 -799 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 1.9 0.0 0.0 0.0 0.0 0.2 1.9 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DBIWB/HR MBh cfm °F °F gr/lb 1.6 64 77.1 61.6 58.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DBIWB/HR °F °F gr/lb 55.0 51.3 51.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Fort Dent II - Regional Acceptance DENT.TRC AREAS Gross Total Glass Floor 137 Part 0 Int Door 0 ExFlr 0 Roof 0 Wall 0 Ext Door 0 ft' ( %) 0 0 0 0 0 0 TEMPERATURES Cooling Heating 55.0 70.2 75.8 69.7 75.8 69.7 77.1 38.2 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 64 64 64 64 0 0 0 19 64 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStoplRh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 64 64 19 64 13 13 0 19 19 13 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ftlton Btulhrfe No. People Cooling 20.6 0.47 412.14 881.77 13.61 1 Heating 20.6 0.47 -5.83 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -0.4 0.0 64 65.3 O 0.0 -0.5 13 24.0 0.0 0.0 -0.8 Lvg °F 70.2 0.0 55.0 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011 Alternative - 1 System Checksums Report Page 2 of 10 Room Checksums By MMFS 103 Open Work Area COOLING COIL PEAK Peaked at Time: Mo /Hr. 7 / 14 Outside Air. OADB/WB/HR: 82 / 65 / 67 CLG SPACE PEAK Mo/Hr. 7 / 20 OADB: 74 HEATING COIL PEAK Mo/Hr. Heating Design OADB: 24 TEMPERATURES Cooling Heating SADB 55.0 70.2 Ra Plenum 75.8 69.7 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Retum 75.8 69.7 Sens. + Lat Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ref/OA 77.1 38.0 Btu/h Btu/h Btu/h ( %) Btu/h (%) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00 Wall Cond 0 0 0 0 0 0 Wall Cond 0 0 0.00 Cooling Heating Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 193 193 Floor 0 0 0 0 0 Floor 0 0 0.00 Terminal 193 193 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 193 58 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 193 193 Sub Total = => 0 0 0 0 0 0 Sub Total =_> 0 0 0.00 Nom Vent 0 40 AHU Vent 0 40 Internal Loads Internal Loads Infil 0 0 Lights 1,156 289 1,445 26 1,156. 27 Lights 0 0 0.00 MinStop/Rh 58 58 People 1,323 0 1,323 24 735 17 People 0 0 0.00 Retum 193 58 Misc 2,228 0 2,228 40 2,228 53 Misc 0 0 0.00 Exhaust 0 40 Sub Total = => 4,708 289 4,997 89 4,120 97 Sub Total = => 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 101 -101 0 0 116 3 Ceiling Load -46 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 643 11 0 0 Ventilation Load 0 -2,028 83.90 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov /Undr Sizing 0 0 0.00 Ov /Undr Sizing 0 0 0 0 0 Exhaust Heat 15 -0.63 ENGINEERING CKS Exhaust Heat -33 -33 -1 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. -285 11.80 Cooling Heating Ret Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 20.8 20.8 Duct Heat Pkup 0 0 0 System Plenum Heat -119 4.94 cfm/ft0.46 0.46 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 412.45 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'tton 906.30 Btulhrft 13.24 -5.71 Grand Total => 4,809 155 5,607 100.00 4,236 100.00 Grand Total => -46 -2,417 100.00 No. People 3 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB/HR Leave DBIWB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/Ib ft' ( %) MBh cfm 'F °F Main Clg 0.5 5.6 4.7 192 77.1 61.6 58.2 55.0 51.3 51.1 Floor 424 Main Htg -1.1 193 65.3 70.2 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 • ux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat -1.4 40 24.0 55.0 ExFIr 0 Total 0.5 5.6 Roof 0 0 0 Humidif 0.0 0 0.0 0.0 Wall 0 0 0 Opt Vent 0.0 0 0.0 0.01 Ext Door 0 0 0 Total -2.4 Project Name: Dataset Name: Fort Dent II - Regional Acceptance DENT.TRC TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011 Altemative - 1 System Checksums Report Page 3 of 10 Room Checksums By MMFS 104 Office COOLING COIL PEAK Peaked at Time: Mo/Hr. 7 / 14 Outside Air. OADB/WB/HR: 82 / 65 / 67 CLG SPACE PEAK Mo/Hr. 7 / 20 OADB: 74 HEATING COIL PEAK Mo/Hr. Heating Design OADB: 24 TEMPERATURES Cooling Heating SADB 55.0 70.2 Ra Plenum 75.8 69.7 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Retum 75.8 69.7 Sens. + Lat Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 77.1 38.2 Btu/h Btu/h Btu/h ( %) Btu/h ( %) Btu/h Btu/h ( %) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar o 0 0 0 0 0 Glass Solar o 0 0.00 AIRFLOWS Glass/Door Cond 0 0 0 0 0 0 Glass/Door Cond 0 0 0.00 Wall Cond 0 0 0 0 0 0 Wall Cond 0 0 0.00 Cooling Heating Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 64 64 Floor 0 0 0 0 0 Floor 0 0 0.00 Terminal 64 64 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 64 19 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 64 64 Sub Total = => 0 0 0 0 0 0 Sub Total = => 0 0 0.00 Nom Vent 0 13 AHU Vent 0 13 Internal Loads Internal Loads Irrfl 0 0 Lights 374 94 468 25 374 27 Lights 0 0 0.00 MinStop/Rh 19 19 People 450 0 450 24 250 18 People 0 0 0.00 Return 64 19 Misc 746 0 746 40 746 53 Misc 0 0 0.00 Exhaust 0 13 Sub Total =_> 1,570 94 1,663 89 1,370 97 Sub Total = => 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 33 -33 0 0 37 3 Ceiling Load -15 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 212 11 0 0 Ventilation Load 0 -668 83.64 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 OvlUndr Sizing 0 0 0.00 - Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 5 -0.63 ENGINEERING CKS Exhaust Heat -11 -11 -1 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. -96 12.07 Cooling Heating Ret Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 20.6 20.6 Duct Heat Pkup 0 0 0 System Plenum Heat -39 4.91 cfm/ft' 0.47 0.47 Underflr Sup Ht Pkup 0 0 Underfl► Sup Ht Pkup 0 0.00 cfm/ton 412.14 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 futon 881.77 Btu/hrft' 13.61 -5.83 Grand Total => 1,603 50 1,864 100.00 1,407 100.00 Grand Total => -15 -799 100.00 No. People 1 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB/HR Leave DBIWBIHR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F grill) °F °F grill) ft' ( %) MBh cfm °F °F Main Clg 0.2 1.9 1.6 64 77.1 61.6 58.2 55.0 51.3 51.0 Floor 137 Main Htg -0.4 64 65.3 70.2 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat -0.5 13 24.0 55.0 ExFIr 0 Total 0.2 1.9 Roof 0 0 0 Humidif 0.0 0 0.0 0.0 Wall 0 0 0 Opt Vent 0.0 0 0.0 0.0 Ext Door 0 0 0 Total -0.8 Project Name: Dataset Name: Fort Dent II - Regional Acceptance DENT.TRC TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011 Altemative - 1 System Checksums Report Page 4 of 10 Room Checksums By MMFS 105 Office COOLING COIL PEAK Peaked at Time: Mo /Hr. 7 / 14 Outside Air. OADB/ B/HR: 82 165 / 67 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total => Space Plenum Sens. + Lat Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu/h ( %) O 0 0 O 0 0 O 0 0 O 0 0 O 0 0 O 0 0 O 0 O 0 O 0 0 O 0 O 0 0 374 94 468 25 450 0 450 24 746 0 746 40 1,570 94 1,663 89 33 -33 0 0 O 0 212 11 O 0 0 O 0 O 0 0 -11 -11 -1 O 0 O 0 0 O 0 0 O 0 O 0 0 1,603 50 1,864 100.00 CLG SPACE PEAK Mo/Hr 7 / 20 OADB: 74 Space Sensible Btu/h 0 0 0 0 0 0 0 0 0 0 0 374 250 746 1,370 37 0 0 0 1,407 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 27 18 53 97 3 0 0 0 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Intemal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat OvlUndr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total => HEATING COIL PEAK Mo/Hc. Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 -15 0 0.00 O -668 83.64 O 0 0 O 0 0.00 5 -0.63 O 0.00 -96 12.07 O 0.00 -39 4.91 0 0.00 O 0.00 -15 -799 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 1.9 0.0 0.0 0.0 0.0 0.2 1.9 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh dm °F °F gr/lb 1.6 64 77.1 61.6 58.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 55.0 51.3 51.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Fort Dent II - Regional Acceptance DENT.TRC AREAS Gross Total Glass ft' (%) Floor 137 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 Ext Door 0 O 0 O 0 O 0 TEMPERATURES Cooling Heating 55.0 70.2 75.8 69.7 75.8 69.7 77.1 38.2 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 64 64 64 64 0 0 0 19 64 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 64 64 19 64 13 13 0 19 19 13 0 0 0 0 ENGINEERING CKS OA cfm/f' cfm/ton If/ton Btu/hrft' No. People Cooling 20.6 0.47 412.14 881.77 13.61 1 Heating 20.6 0.47 -5.83 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh dm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -0.4 0.0 -0.5 Lvg °F 64 65.3 70.2 0 0.0 0.0 13 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -0.8 TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011 Altemative - 1 System Checksums Report Page 5 of 10 Room Checksums By MMFS 106 Hall COOLING COIL PEAK CLG SPACE PEAK Peaked at Time: Mo/Hr. 7 / 14 Outside Air. OADB/ B/H R: 82 / 65 / 67 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total => Space Plenum Sens. + Lat Sens. + Lat Btu/h Btu/h 0 0 0 0 0 0 0 0 0 0 0 Net Total Btu/h Percent Of Total ( %) O 0 0 0 0 0 O 0 0 O 0 0 O 0 0 O 0 0 O 0 O 0 O 0 0 O 0 O 0 0 612 153 765 57 O 0 0 0 382 0 382 28 994 153 1,147 85 53 -53 0 0 o 0 216 16 o 0 0 o o o 0 0 -11 -11 -1 o o o o 0 o o 0 o o o 0 0 1,047 88 1,351 100.00 Mo/Hr 7 / 20 OADB: 74 Space Percent Sensible Of Total Btu/h ( %) 0 0 O 0 O 0 O 0 O 0 O 0 O 0 0 0 O 0 O 0 O 0 612 58 O 0 382 36 994 94 61 6 O 0 0 0 O 0 1,055 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov/Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total => HEATING COIL PEAK Mo/Hr Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h ( %) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -24 0 0.00 O -679 92.75 O 0 0 O 0 0.00 5 -0.69 O 0.00 -16 2.12 O 0.00 -43 5.83 O 0.00 O 0.00 -24 -732 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.1 1.4 0.0 0.0 0.0 0.0 0.1 1.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DBIWB/HR MBh cfm °F °F gr/lb 1.2 48 77.6 61.9 59.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DBIWB!HR 'F °F gr/Ib 55.0 52.0 53.9 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Fort Dent II - Regional Acceptance DENT.TRC AREAS Gross Total Glass fP (%) Floor 224 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 Ext Door 0 O 0 O 0 O 0 TEMPERATURES Cooling Heating 55.0 70.5 75.8 69.7 75.8 69.7 77.6 27.1 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Retum RetIOA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 48 48 48 48 0 0 0 14 48 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent tnfii MinStop/Rh Retum Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 48 48 14 48 13 13 0 14 14 13 0 0 D 0 ENGINEERING CKS % OA cfm/ft• cfmlton ftlton Btu/hr-ft No. People Cooling 28.0 0.21 426.35 1,989.30 6.03 0 Heating 28.0 0.21 -3.27 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh dm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -0.3 0.0 -0.5 Lvg 'F 48 65.3 70.5 0 0.0 0.0 13 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -0.7 TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011 Altemative - 1 System Checksums Report Page 6 of 10 Room Checksums By MMFS 107 Perimeter Open Office COOLING COIL PEAK Peaked at Time: Mo /Hr. 6 / 19 Outside Air. OADB/WB /HR: 72 / 56 / 43 CLG SPACE PEAK Mo/Hr. 6 / 19 OADB: 72 HEATING COIL PEAK Mo/Hr. Heating Design OADB: 24 TEMPERATURES Cooling Heating SADB 55.0 79.8 Ra Plenum 75.8 69.7 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.8 69.7 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.8 61.9 Btu/h Btu/h Btu/h ( %) Btu/h ( %) Btu/h Btu/h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 0 0 0 0 0 Roof Cond 0 0 0.00 Glass Solar 11,069 0 11,069 72 11,069 75 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond Wall Cond -258 361 0 354 -258 716 -2 5 -258 361 -2 2 Glass/Door Cond Wall Cond -4,608 - 412 -4,608 -821 39.00 6.95 Cooling Heating Partition/Door 0 0 0 0 0 Partition/Door 0 0 0.00 Diffuser 668 668 Floor 0 0 0 0 0 Floor 0 0 0.00 Terminal 668 668 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 668 200 Infiltration -384 -384 -2 -85 -1 Infiltration -1,213 -1,213 10.27 Sec Fan 668 668 Sub Total = => 10,788 354 11,143 72 11,087 76 Sub Total = => -0,233 -0,642 56.23 Nom Vent 0 34 AHU Vent 0 34 Internal Loads Internal Loads Infil 24 24 Lights 983 246 1,229 8 983 7 Lights 0 0 0.00 MinStop/Rh 200 200 People 1,125 0 1,125 7 625 4 People 0 0 0.00 Return 692 224 Misc 1,894 0 1,894 12 1,894 13 Misc -900 -900 7.62 Exhaust 24 58 Sub Total =_> 4,002 246 4,248 28 3,502 24 Sub Total = => -900 -900 7.62 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 86 -86 0 0 86 1 Ceiling Load -39 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 0 0 0 0 Ventilation Load 0 -1,724 14.59 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 OvlUndr Sizing 0 0 0.00 Ov /Undr Sizing 0 0 0 0 0 Exhaust Heat 22 -0.19 ENGINEERING CKS Exhaust Heat -20 -20 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. -2,677 22.66 Cooling Heating Ret Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 0.0 5.1 Duct Heat Pkup 0 0 0 System Plenum Heat 108 -0.91 cfmlft 1.85 1.85 Underfir Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 521.32 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 fekon 281.05 Btu/hrft' 42.70 -32.81 Grand Total => 14,877 494 15,371 100.00 14,675 100.00 Grand Total => -7,172 - 11,813 100.00 No. People 3 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB/HR Leave DBIWB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F grAb °F °F grfb ft2 ( %) MBh cfm °F °F Main CIg 1.3 15.4 15.2 668 75.8 60.6 55.8 55.0 52.4 55.4 Floor 360 Main Htg -10.7 668 65.3 79.8 Aux CIg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 • ux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat -1.2 34 24.0 55.0 ExFlr 0 Total 1.3 15.4 Roof 0 0 0 Humidif 0.0 0 0.0 0.0 Wall 320 192 60 • pt Vent 0.0 0 0.0 0.0 Ext Door 0 0 0 Total -11.8 Project Name: Dataset Name: Fort Dent II - Regional Acceptance DENT.TRC TRACE® 700 v62.6.5 calculated at 08:45 AM on 07/18/2011 Alternative - 1 System Checksums Report Page 7 of 10 Room Checksums By MMFS 108 Permimeter Open Office COOLING COIL PEAK Peaked at Time: Mo /Hr. 7 / 18 Outside Air. OADB/ B/HR: 79 / 61 / 53 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret Fan Heat Duct Heat Pkup Underfir Sup Ht Pkup Supply Air Leakage Grand Total => Space Plenum Sens. + Lat Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr.7 /18 • OADB: 79 Net Percent Space Total Of Total Sensible Btu/h ( %) Btu/h O o 0 0 0 O 0 0 0 0 O 0 0 0 0 5,195 0 5,195 72 5,195 261 0 261 4 261 185 180 365 5 185 O 0 0 0 O 0 0 0 O 0 0 0 0 21 21 0 34 5,662 180 5,842 82 5,674 306 76 382 5 306 350 0 350 5 194 589 0 589 8 589 1,245 76 1,322 18 1,090 27 -27 0 0 27 O 0 15 0 0 O 0 0 0 O 0 O 0 0 0 -11 -11 0 O 0 O 0 0 O 0 0 O 0 O 0 0 Percent Of Total (%) 0 0 0 77 4 3 0 0 0 0 84 5 3 9 16 0 0 0 0 6,933 219 7,167 100.00 6,791 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat OvlUndr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underfir Sup Ht Pkup Supply Air Leakage Grand Total => HEATING COIL PEAK Mo/Hr. Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h ( %) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -3,168 -3,168 52.00 -283 -565 9.27 O 0 0.00 O 0 0.00 O 0 0.00 -377 -377 6.20 -3,828 -4,110 67.46 O 0 0.00 O 0 0.00 -280 -280 4.60 -280 -280 4.60 -12 0 0.00 O -536 8.80 O 0 0 O 0 0.00 7 -0.11 O 0.00 -1,322 21.70 O 0.00 149 -2.45 O 0.00 O 0.00 -4,121 -6,092 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.6 7.2 0.0 0.0 0.0 0.0 0.6 7.2 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DBIWB/HR MBh cfm °F °F gr/lb 7.0 309 75.8 60.6 55.8 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DBIWB/HR °F °F gr/lb 55.0 52.3 55.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Fort Dent II - Regional Acceptance DENT.TRC AREAS Gross Total Glass ft' ( %) Floor 112 Part 0 Int Door 0 ExFlr 0 Roof 0 Wall 220 Ext Door 0 0 0 132 60 0 0 TEMPERATURES Cooling Heating 55.0 82.1 75.8 69.7 75.8 69.7 75.8 64.4 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return RetIOA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 309 309 309 309 5 5 7 93 316 13 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStoplRh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 309 309 93 309 11 11 7 93 100 18 0 0 0 0 ENGINEERING CKS % OA cfmlft' cfmlton ft'Iton Btulhrft' No. People Cooling 1.7 2.76 517.35 187.52 63.99 1 Heating 3.4 2.76 -54.39 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm 'F 'F Main Htg Aux Htg Preheat Humidif Opt Vent Total -5.7 309 65.3 82.1 0.0 0 0.0 0.0 -0.4 11 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -6.1 TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011 Alternative - 1 System Checksums Report Page 8 of 10 Room Checksums By MMFS 109 Perimter Office COOLING COIL PEAK Peaked at Time: Mo /Hr. 7 / 9 Outside Air: OADB/WB /HR: 70 / 59 / 57 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total => Space Plenum Sens. + Lat Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr.6 /9 OADB: 65 Net Percent Space Percent Total Of Total Sensible Of Total Btu/h ( %) Btu/h (%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,776 0 2,776 65 3,010 74 -185 0 -185 -4 -310 -8 63 61 125 3 63 2 O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 -46 -46 -1 -98 -2 2,608 61 2,670 63 2,665 65 382 96 478 11 382 9 450 0 450 11 250 6 751 0 751 18 751 18 1,583 96 1,679 39 1,383 34 31 -31 0 0 31 1 O 0 -67 -2 0 0 O 0 0 0 0 O 0 O 0 0 0 0 -18 -18 0 O 0 O 0 0 O 0 0 O 0 O 0 0 4,223 108 4,264 100.00 4,079 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underftr Sup Ht Pkup Supply Air Leakage Grand Total => HEATING COIL PEAK Mo/Hr. Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h ( %) 0 0 0.00 0 0 0.00 0 0 0.00 O 0 0.00 -1,440 -1,440 37.60 -129 -257 6.70 O 0 0.00 O 0 0.00 O 0 0.00 - 472 -472 12.32 -2,040 -2,168 56.62 O 0 0.00 O 0 0.00 -350 -350 9.14 -350 -350 9.14 -15 0 0.00 O -677 17.69 O 0 0 O 0 0.00 9 -0.23 O 0.00 -681 17.78 O 0.00 39 -1.01 O 0.00 O 0.00 -2,406 -3,829 100.00 Main CIg Aux Clg Opt Vent Total Total Capacity ton MBh 0.4 4.3 0.0 0.0 0.0 0.0 0.4 4.3 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F grllb 4.0 183 75.3 60.4 55.9 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DBIWB/HR °F °F gr/Ib 55.0 52.1 54.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Fort Dent II - Regional Acceptance DENT.TRC AREAS Gross Total Glass ft' (%) Floor 140 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 100 60 60 Ext Door 0 O 0 O 0 TEMPERATURES Cooling Heating 55.0 81.8 75.7 69.7 75.7 69.7 75.3 58.7 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 186 186 186 186 13 13 9 56 195 23 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStoplRh Retum Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 186 186 56 186 13 13 9 56 65 23 0 0 0 0 ENGINEERING CKS % OA cfmIt' cfm/ton ft'kon Btu/hrft' No. People Cooling 7.2 1.33 522.33 393.98 30.46 1 Heating 7.2 1.33 -27.35 HEATING COIL SELECTION Capacity Coll Airflow Ent Lvg MBh cfm °F °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -3.4 186 65.3 81.8 0.0 0 0.0 0.0 -0.5 13 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -3.8 TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011 Alternative - 1 System Checksums Report Page 9 of 10 Room Checksums By MMFS 110 Perimeter Office COOLING COIL PEAK Peaked at Time: Mo /Hr. 7 / 9 Outside Air: OADB/WB /HR: 70 / 59 / 57 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total => Space Plenum Sens. + Lat Sens. + Lat Btu/h Btu/h CLG SPACE PEAK Mo/Hr. 6 / 9 OADB: 65 Net Percent Space Total Of Total Sensible Btu/h ( %) Btu/h O 0 0 0 0 O 0 0 0 0 O 0 0 0 0 2,776 0 2,776 65 3,010 -185 0 -185 -4 -310 63 61 125 3 63 O 0 0 0 O 0 0 0 O 0 0 0 0 -46 -46 -1 -98 2,608 61 2,670 63 2,665 382 96 478 11 382 450 0 450 11 250 751 0 751 18 751 1,583 96 1,679 39 1,383 31 -31 0 0 31 O 0 -67 -2 0 O 0 0 0 O 0 O 0 0 0 -18 -18 0 O 0 O 0 0 O 0 0 O 0 O 0 0 4,223 108 4,264 100.00 4,079 Percent Of Total ( %) 0 0 0 74 -8 2 0 0 0 -2 65 9 6 18 34 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat OvlUndr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 100.00 Grand Total => HEATING COIL PEAK Mo/Hr Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h ( %) O 0 0.00 O 0 0.00 O 0 0.00 O 0 0.00 -1,440 -1,440 37.60 -129 -257 6.70 O 0 0.00 O 0 0.00 O 0 0.00 -472 -472 12.32 -2,040 -2,168 56.62 O 0 0.00 O 0 0.00 -350 -350 9.14 -350 -350 9.14 -15 0 0.00 O -677 17.69 O 0 0 O 0 0.00 9 -0.23 O 0.00 -681 17.78 O 0.00 39 -1.01 0 0.00 O 0.00 -2,406 -3,829 100.00 Main CIg Aux Clg Opt Vent Total Total Capacity ton MBh 0.4 4.3 0.0 0.0 0.0 0.0 0.4 4.3 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DBIWB/HR MBh cfm °F °F grllb 4.0 183 75.3 60.4 55.9 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F grub 55.0 52.1 54.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: Fort Dent II - Regional Acceptance DENT.TRC AREAS Gross Total Glass fP ( %) Floor 140 Part 0 Int Door 0 ExFlr 0 Roof 0 Wall 100 Ext Door 0 O 0 60 60 O 0 TEMPERATURES Cooling Heating 55.0 81.8 75.7 69.7 75.7 69.7 75.3 58.7 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 186 186 186 186 13 13 9 56 195 23 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 186 186 56 186 13 13 9 56 65 23 0 0 0 0 ENGINEERING CKS % OA cfm/R' cfm/ton Minn Btu/hr-ft' No. People Cooling 7.2 1.33 522.33 393.98 30.46 1 Heating 7.2 1.33 -27.35 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -3.4 0.0 Lvg °F 186 65.3 81.8 0 0.0 0.0 -0.5 13 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -3.8 TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011 Altemative - 1 System Checksums Report Page 10 of 10 4 System Zone Room " Load / Airflow Summary By MMFS Coil Floor Cooling Area People Sensible ft' # Btu /h Coil Cooling Total Btulh Space VAV Main Coil Heating Design Air Minimum VAV Heating Fan Percent Max SA Changes SA Minimum Sensible Max SA OA cfm achlhr cfm k Btu/h cfm Clo I i . x �z a .:M Altemat>I riak: 101 Reception 103 Open Work Area Zone - 001 Zone - 001 107 Perimeter Open Office 108 Permimeter Open Office Zone - 002 Zone - 002 109 Perimter Office 110 Perimeter Office Zone - 003 Zone - 003 102 Office 104 Office 105 Office 106 Hall Zone - 004 Zone - 004 System - 001 System - 001 This report does not display heating only systems. Project Name: Dataset Name: Rm Peak Rm Peak Zn Peak Zn Block Rm Peak Rm Peak Zn Peak Zn Block Rm Peak Rm Peak Zn Peak Zn Block Rm Peak Rm Peak Rm Peak Rm Peak Zn Peak Zn Block Sys Peak Sys Block 170 424 594 594 360 112 472 472 140 140 280 280 137 137 137 224 635 635 1,981 1,981 3.0 2.9 5.9 5.9 2.5 0.8 3.3 3.3 1.0 1.0 2.0 2.0 1.0 1.0 1.0 0.0 3.0 3.0 14.2 14.2 2,316 4,702 7,018 7,018 15,169 7,034 22,191 21,914 4,044 4,044 8,089 8,089 1,560 1,560 1,560 1,245 5,925 5,925 41,657 39,993 3,116 5,607 8,723 8,723 15,371 7,167 22,526 22,334 4,264 4,264 8,528 8,528 1,864 1,864 1,864 1,351 6,945 6,945 45,157 42,443 94 193 287 287 668 309 977 977 186 186 371 371 64 64 64 48 240 240 1,875 1,875 4.14 28 30 3.41 58 30 30 30 13.91 200 30 20.69 93 30 30 30 9.94 56 30 9.94 56 30 30 30 3.51 19 30 3.51 19 30 3.51 19 30 1.61 14 30 30 30 -508 -1,050 -1,558 -1,558 - 10,651 -5,731 - 16,382 - 16,382 -3,373 -3,373 -6,746 -6,746 -349 -349 -349 -275 -1,321 -1,320 - 26,006 - 26,006 66 26.8 26.8 135 20.8 20.8 201 22.8 22.8 201 22.8 22.8 467 0.0 5.1 216 1.7 3.4 684 2.3 4.6 684 2.3 4.6 130 7.2 7.2 130 7.2 7.2 260 7.2 7.2 260 7.2 7.2 45 20.6 20.6 45 20.6 20.6 45 20.6 20.6 34 28.0 28.0 168 22.1 22.1 168 22.1 22.1 1,312 5.5 10.1 1,312 5.5 10.1 Fort Dent II - Regional Acceptance TRACE® 700 v6.2.6.5 calculated at 08:45 AM on 07/18/2011 DENT.TRC Load/Airflow Summary Report Page 1 of 1 VERMIT COORD CON PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M11 -101 DATE: 07/19/11 PROJECT NAME: FORT DENT II - REGIONAL ACCEPTANCE SITE ADDRESS: 6840 FORT DENT WY X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: ' Building Division Public Works IA 01.4/ Ire Prevention �J Structural Planning Division ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete ❑ DUE DATE: 07/21/11 Not Applicable n Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route 't;0 Structural Review Required REVIEWER'S INITIALS: No further Review Required DATE: APPROVALS OR CORRECTIONS: DUE DATE: 08 /18 /11 Approved ❑ Approved with Conditions , Not Approved (attach comments) I 1 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 Contractors or Tradespeople Per Friendly Page a Page 1 of 2 General /Specialty Contractor A business registered as a construction contractor with LEtI to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name MACDONALD /MILLER FAC SOL INC UBI No. 602254260 Phone 2067684180 Status Active Address Po Box 47983 License No. MACDOFS980RU Suite /Apt. City Seattle State WA Zip 98106 County King Business Type Corporation Parent Company License Type Construction Contractor Effective Date 12/31/2002 Expiration Date 12/31/2012 Suspend Date Specialty 1 General Specialty 2 Unused Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status DIVCOI *988RC DIVCO INCORPORATION Construction Contractor General Unused 12/3/2002 11/7/2012 Active ENCOMMS984CA ENCOMPASS MECHANICAL SERVICES Construction Contractor General Unused 2/1/2002 2/1/2004 Archived MACDOMR026RU MACDONALD MILLER RSDNTL INC Construction Contractor General Unused 12/31/1998 12/31/2001 Archived DIVCOI *031L4 DIVCO INC Construction Contractor General Unused 6/24/1997 8/1/2003 Archived MACDOMR0760P MACDONALD MILLER RESIDENTIAL L Construction Contractor General Unused 9/17/1993 12/30/1998 Archived DIVCOEC188LC DIVCO ENERGY CONTROL COMPANY Construction Contractor General Unused 6/3/1982 5/26/1997 Archived MACDOM *248J9 MACDONALD MILLER CO Construction Contractor General Unused 4/29/1976 2/1/2002 Archived LINFOAR980QG LINFORD AIR a REFRIGERTN INC Construction Contractor General Unused 11/7/2002 11/7/2004 Inactive Business Owner Information Name Role Effective Date Expiration Date GOUGH, DAVID ANTHONY Director 12/29/2010 NOEL, STEPHANIE W Member 05/14/2010 SIMONDS, DERRICK R President 05/14/2010 WEBSTER, MARK E Vice President 05/14/2010 https://fortress.wa.gov/lni/bbip/Print.aspx 08/05/2011 3:09:50 PM Monday, July 18, 2011 ROUND SHEETMETAL WRAPPED W/ INSULATION (2 ") SHEETMETAL WRAPPED W/ INSULATION (2 ") BARE ROUND SHEETMETAL EXPOSED QUALITY SHEETMETAL EXAMPLE OF NEW FLAT OVAL FLAT SHEETMETAL W/ INSULATION (2 ") DUCTBOARD (1" FIBERGLASS) EXAMPLE OF NOT IN CONTRACT (NIC) UNIT NO. MFG & MODEL NO. INLET SIZE FAN CFM VALVE CFM HEATER FAN MAX MIN KW DT CFM VOLT /PH STGS HP VOLTIPH SPD NOTES 101 ENVIROTEC CVF -EH -II 8 675 565 255 5 23.3 675 277/1 - 1/4 277/1 - i EXISTING, 2 101A ENVIROTEC CVF -EH -II 6 400 335 100 3 24 400 277/1 - 1/6 277/1 - EXISTING, 2 102 ENVIROTEC CVF -EH -1I 8 375 340 100 4.5 37.8 375 277/1 - 1/4 277/1 - EXISTING, 2 103 ENVIROTEC CVF -EH -II 8 300 275 80 3.5 36,7 300 277/1 - 1/4 277/1 EXISTING, 2, 6 104 _ ENVIROTEC CVF -EH -II 8 445 405 95 2.5 17.7 445 277/1 - 1/4 277/1 - EXISTING, 2, 6 105 ENVIROTEC CVF -EH -II 8 370 310 300 5.5 26 370 460/3 - 1/4 277/1 - EXISTING, 2, 4 106 ENVIROTEC CVF -EH -II 6 255 210 95 2.5 31 255 277/1 - 1/6 277/1 - EXISTING, 2 107 ENVIROTEC CVF -EH -II 12 1035 850 365 6.5 20 1035 460/3 - 3/4 277/1 - EXISTING, 2 108 ENVIROTEC CVF -EH -II 8 700 575 195 5 23 700 277/1 - 1/4 277/1 - EXISTING, 2 109 ENVIROTEC CVF -EH -II 10 1400 760 375 10 36 1400 460/3 - 1/2 277/1 - EXISTING, 2 110 ENVIROTEC CVF -II 8 460 415 0 - - - - 1/4 277/1 EXISTING, 1 111 ENVIROTEC CVF -II 6 410 370 115 2.5 19.2 410 277/1 1 1/6 277/1 - EXISTING, 1 111A ENVIROTEC CVF -II 12 1040 940 290 6 18.1 1040 460/3 3 1/3 277/1 - EXISTING, 1 112 ENVIROTEC CVF -II 6 415 120 0 - - - - 1/6 277/1 - EXISTING, 1 113 ENVIROTEC CVF -II 6 625 515 0 - - - - 1/6 277/1 - EXISTING, 1 151 ENVIROTEC CVF -EH -II 10 1140 1025 285 7.5 20.7 1140 460/3 - 1/2 277/1 - EXISTING, 2 152 ENVIROTEC CVF -EH -II 8 640 535 80 6 30 640 277/1 - 1/4 277/1 L - L EXISTING, 2 153 ENVIROTEC CVF -EH -II 6 470 390 40 2,5 17 470 27711 - 1/6 277/1 - EXISTING, 2 154 ENVIROTEC CVF -EH -II 10 1080 900 300 5,5 18 1080 460/3 1/2 277/1 - EXISTING, 2 155 ENVIROTEC CVF -EH -II 6 430 360 95 2,5 18 430 277/1 - 1/6 277/1 - EXISTING, 2 155A ENVIROTEC CVF -EH -II 8 800 670 200 5 20 800 277/1 - 1/4 277/1 - EXISTING, 2 156 ENVIROTEC CVF -EH -II 8 315 300 80 5 49.9 315 277/1 - 1/4 277/1 - EXISTING, 2 157 ENVIROTEC CVF -EH -II 6 300 280 80 2.5 26.2 300 277/1 - 1/6 277/1 - EXISTING, 2 158 ENVIROTEC CVF -EH -II 8 855 810 220 4,5 16.6 855 277/1 - 1/4 277/1 - EXISTING, 2 159 ENVIROTEC CVF -II 8 535 500 0 - - - - - 1/4 277/1 - ! EXISTING, 1 160 ENVIROTEC CVF -II 6 460 415 115 3,5 23.9 460 277/1 - 1/6 277/1 - EXISTING, 1 161 ENVIROTEC CVF -II 8 235 195 0 - - - - 1/4 277/1 - j EXISTING, 1 161A ENVIROTEC CVF -II 6 325 270 0 - - - - 1/6 277/1 ! EXISTING, 1 162 ENVIROTEC CVF -II 8 620 590 160 - - - - - 1/4 277/1 - " EXISTING, 1 163 ENVIROTEC CVF -EH -II 6 180 150 50 2 34 180 277/1 - 1/6 27711 - ? EXISTING, 2 164 ENVIROTEC CFR -EH -II -1218 12 1030 930 290 7,5 22.9 1030 460/3 3 277/1 - EXISTING, 2, 6 W 165 ENVIROTEC CFR- EH -II- 6 400 360 110 2.5 19.7 400 277/1 1 277/1 - EXISTING, 2 166 ENVIROTEC CFRQ0811 E 8 610 560 110 - - - - - VAR 277/1 ECM NEW, 1, 3, 6 NOTES: 1. SERIES FAN POWERED TERMINAL UNIT W/O HEAT - ENVIROTEC CVF -II, SIZE AS LISTED, PRESSURE DEPENDENT, FACTORY OPTIONS INCLUDE: - EXTENDED DAMPER 1/2" DIAM. SHAFT - NEW SERIES VAV'S TO HAVE ECM MOTORS PER 2009 WSEC: SECTION 1437 2. SERIES FAN POWERED TERMINAL UNIT WITH HEAT - ENVIROTEC CVF- EH -II, SIZE AS LISTED, PRESSURE DEPENDENT, FACTORY OPTIONS INCLUDE: - EXTENDED DAMPER 1/2" DIAM. SHAFT - HEAT STAGING & FAN CONTROL THROUGH FACTORY WIRED RELAYS - 24V TRANSFORMER, 50 VA MIN RATING - AUTO RESET 130 °F HIGH LIMIT T'STAT - INTERLOCK TO PREVENT HEATER OPERATION UNLESS FAN RELAY IS ACTIVATED - THREE SPEED FAN SWITCH AND VARIABLE SPEED FAN CONTROL - FACTORY INSTALLED 24 CONTROL WIRING PIGTAIL, 36" LENGTH, COLOR CODED FOR FAN, HEAT STAGING, AND COMMON FIELD CONNECTIONS. SEPARATE PERMIT WIRING PIGTAIL COLOR CODED AS FOLLOWS: RED 24VAC WHITE 24 VAC REQUIRED FOR: GREY COMMON GREEN FAN ORANGE HEAT ❑Mechanical 3. DISCONNECT AND POWER WIRING BY E.C. 4. ONE LEG OF 460 VOLT HEATER IS DISCONNECTED. ACTUAL DELTA T AT 370 CFM IS 22 DEG F. Electrical 5. ADD DUCT HEATER, SEE DUCT HEATER SCHEDULE, AND INTERLOCK WITH VAV BOX. Plumbing 6. AIR BALANCE 'Gas Piping 7. ADD DUCT HEATER, SEE DUCT HEATER SCHEDULE, AND INTERLOCK WITH VAV BOX. City NOTE TO ELECTRICAL: ii y of Tf rl a ila I - 460V /3PH TERMINAL UNITS REQUIRE A FOUR WIRE POWER FEED IN ORDER TO SUPPLY 277V/1 PH POWER TO 3 -. r- THE FAN MOTOR. AREA OF WORK VICINITY MAP NO SCALE 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2009 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE AND STATE AND LOCAL CODES AND ORDINANCES. 3. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH CHAPTER 6 OF THE 2009 IMC AND WITH CURRENT SMACNA STANDARDS. EARTHQUAKE BRACE ALL DUCTS 28" DIA AND LARGER WHICH ARE SUSPENDED MORE THAN 12" BELOW STRUCTURAL SYSTEM. 4. JOINTS OF MEDIUM AND HIGH VELOCITY DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT SEALANT. 5. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS, PER 2009 WSEC. - DUCT WRAP, WHERE INDICATED, SHALL BE 1 1/2" 0.75 LB /CU FT FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED REINFORCED ALUM. FOIL VAPOR BARRIER (R-4.2 MIN.). - SOUND LINING, WHERE INDICATED, SHALL BE 1" 1.5 LB /CU FT FIBERGLASS DUCT LINING COATED TO PREVENT FIBER EROSION AT VELOCITIES UP TO 6000 FPM (R-4.2 MIN.). - DUCT BOARD, WHERE INDICATED, SHALL BE 1" RIGID FRK FACED El 475 FIBERGLASS DUCT BOARD SYSTEM, UL 181 LISTED AS A CLASS 1 AIR DUCT (R-4.3 MIN.) 6. FLEX DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER, 1 1/2" FIBERGLASS INSULATION, AND NON - PERFORATED INTERIOR LINER WITH WIRE HELIX, DUCT SHALL BE A UL 181 LISTED CLASS 1 AIR DUCT. FLEX DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 12' IN LENGTH UNLESS NOTED OTHERWISE. 7. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2009 IBC. 8. PROVIDE FIRE DAMPERS, SMOKE DAMPERS AND FIRE /SMOKE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 716.5 OF THE 2009 IBC. PROVIDE CEILING FIRE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 716.6.2 OF THE 2009 IBC. INSTALL FIRE DAMPERS SMOKE DAMPERS AND FIRE /SMOKE DAMPERS IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS, THE TERMS OF THEIR LISTING, AND THE REQUIREMENTS OF THE CODE. 9. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL. 10. PROVIDE RETURN DUCT SMOKE DETECTOR AUTOMATIC SHUT DOWN OF ALL NEW HEATING, COOLING, OR VENTILATION EQUIPMENT MOVING IN EXCESS OF 2000 CFM IN ACCORDANCE WITH SECTION 606 OF THE 2009 IMC. POWER AND INTERLOCK WIRING WITH THE BUILDING FIRE ALARM SYSTEM IS BY THE ELECTRICAL CONTRACTOR. 11. HVAC EQUIPMENT, VALVES AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR. MINIMUM ACCESS DOOR SIZE FOR VALVES AND DAMPERS TO BE 18" X 18 ". 12. HEAT TRACING OF PIPING, WHERE INDICATED, SHALL BE PROVIDED AND INSTALLED BY THE HVAC CONTRACTOR. THE HVAC CONTRACTOR IS TO COORDINATE THE HEAT TRACE POWER WIRING WITH ELECTRICAL CONTRACTOR. 13. MOTORS STARTERS NOT LISTED AS BEING PROVIDED IN THE HVAC EQUIPMENT SCHEDULES ARE TO BE PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR. 14. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO BE PROVIDED TO THE BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCT AND PIPE DISTRIBUTION SYSTEM, INCLUDING SIZES, AND THE TERMINAL AIR AND WATER DESIGN FLOW RATES. 15. OPERATING AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE: SUBMITTAL DATA, NAMES AND ADDRESSES OF AT LEAST ONE SERVICE AGENCY, HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM. 16. COMMISSIONING IS REQUIRED ON THIS PROJECT IN ACCORD WITH WASHINGTON STATE ENERGY CODE (WSEC) SECTION 1416 AND WITH LEED NC -2.1 FUNDAMENTAL BUILDING SYSTEMS COMMISSIONING AND ADDITIONAL COMMISSIONING. 17. A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND FILED WITH THE OWNER REVIEWED FOR CODE COMPLIANCE APPROVED AUG 032011 City of BUILDIN APN# 295490 -0425 LEGAL DESCRIPTION: GUNDAKERS INTERURBAN ADD PARCEL 1 TGW POR OF PARCEL 2 DAF- BEG MOST WLY COR OF PARCEL 1 TH N 63 -35-49 E 237.32 FT TH S 26 -24 -11 E 227.32 FT TO COMMON COR BTW PARCELS 1 & 2 TH N 63 -35-49 E 252.25 FT TH N 26 -24 -11 W 77.65 FT TH N 56 -15 -11 W 234.09 FT TH N 31 -12-43 W 82.39 FT TO INTSN WITH SELY LN OF TRACT CONVEYED TO CITY OF TUKWILA RECORDING NO 7808230299 TH S 58 -47 -17 W 102.77 FT TH S 55 -39 -53 W 63.16 FT TH S 48 -39 -58 W 55.63 FT TH S 39 -21 -15 W 88.24 FT TH S 30 -04 -58 W 85.21 FT TO MOST WLY COR OF PARCEL 2 TH S 37 -36-40 E 20.92 FT TO POB - OF CITY OF TUKWILA SHORT PLAT NO 79 -7 -SS RECORDING NO 7908210370 SD SHORT PLAT BEING A POR OF GUNDAKERS INTERURBAN ADD IN THE SW 1/4 OF NW 1/4 OF SECTION 24 -23 -04 -- AS PER CITY OF TUKWILA BDRY LINE ADJ NO 90 -2 -BLA RECORDING NO 9008151101 TITLE PROJECT ENGINEER ACCOUNT MANAGER PRODUCTION MANAGER SHEET METAL SUPERINTENDENT AIR BALANCE FOREMAN ELECTRICAL FOREMAN FACILITIES DIRECTOR GENL PROJ MANAGER NAME GEORGE GRAHAM BROCK LEE DARYL ANDERSON MIKE REICHERT STEVE BAKER MIKE MCGIVERN KEITH CHALCRAFT JIM BAER COMPANY MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER PHONE NUMBER 206 - 768 -4288 206 -768 -3838 206 - 768 -4216 206- 423 -4807 206 -768 -3824 206- 768 -4046 206- 229 -0474 425 - 957 -2105 EMAIL GEORGE.GRAHAM @MACMILLER.COM BROCK.LEE @MACMILLER.COM DARYL.AN DERSON @MACM ILLER.COM M IKE.REICHERT @MACM I LLER.COM STEVE. BAKER @MACMILLER.COM M IKE. MCGIVERN @MACM ILLER.COM SCHEDULES - HVAC FIRST FLOOR PLAN - HVAC INTALL (1) NEW VAV BOX WITH T'STAT, AND INSTALL (4) NEW DIFFUSERS AND (4) NEW RETURN GRILLES. RELOCATE (5) DIFFUSERS /GRILLES. RELOCATE (3) T'STATS. DDC CONTROLS. MISC DUCTWORK. REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division, NOTE: Revisions will require a new p!an submittal and may inc'ude additional plan rev ew feES, FILE COPY Permit No.. M H tD Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Field Copy and conditions is acknowledged: By Date: . R461/ City Of 1Ukwila BUILDING DIVISION ECEIVED CITY R OF TIIK LA JUL 'l O11 PERMIT CENTER to a) Co O 0 V 0 cti C I I I I I I I I I I I W U z a. W 0 =U � Q Z -1 w<V8 0 zzg Owe U- ENGINEER: G GRAHAM 171 I N- O .macmiller.com WA Lic No: MACDOFS980RU W Q 0 REVISIONS: REVISIONS: z 0 F- U C/) z 0 U 0 LL 0 W co C') LAST REVISED: 07 -18 -11 CHECKED BY: DATE PLOTTED: S HARGROVE 07 -18 -1 1 CAD: ISSUE DATE: R VILLANUEVA 07 -18 -11 DRAWING NUMBER: 0- 0832 - 7214154 -00 SHEET NUMBER: TM0.01