Loading...
HomeMy WebLinkAboutPermit M11-124 - COSTCOCOSTCO WHOLESALE 400 COSTCO DR Mi 1 -124 City AI'ukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: 2523049063 Address: 400 COSTCO DR TUKW Project Name: COSTCO WHOLESALE Permit Number: M11 -124 Issue Date: 09/16/2011 Permit Expires On: 03/14/2012 Owner: Name: COSTCO WHOLESALE CORPORATIO Address: PROPERTY TAX DEPT 006 , 999 LAKE DR 98027 Contact Person: Name: BILL ZORNES Address: 19430 68 AV S, STE B , KENT WA 98032 Email: Contractor: Name: HEY MECH CO OF WASHINGTON Address: 19430 68 AV S, SUITE B , KENT WA 98032 Contractor License No: KEYMEW *240NZ Phone: 253 872 -7392 Phone: 253 - 872 -7392 Expiration Date: 04/01/2013 DESCRIPTION OF WORK: INSTALLATION OF NEW REFRIGERATION SYSTEMS TO WALL FREEZER, OVERSTOCK FREEZER, SHOP -IN DELI COOLER, REFRIGERATION COMPRESSORS, AND CONDENSERS. REPLACEMENT OF EXISTING DELI CASES WITH NEW IN SAME LOCATION. Value of Mechanical: 221,000.00 Type of Fire Protection: SPRINKLERS /AFA Electrical Service Provided by: Permit Center Authorized Signature: Fees Collected: $2,549.81 International Mechanical Code Edition: 2009 L Date: q— I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this permit. Signature: lid" <— — Date: 9-- /ri-- // Print Name: 4//9),....,:-*- 7--- �,.. c t L This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IMC -4/10 M11 -124 Printed: 09 -16 -2011 • • PERMIT CONDITIONS Permit No. M11-124 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431 - 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 7: Manufacturers installation instructions shall be available on the job site at the time of inspection. 8: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 9: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 11: ** *FIRE DEPARTMENT CONDITIONS * ** 12: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 13: Maintain sprinkler coverage per N.F.P.A. 13. Addition/relocation of walls, closets or partitions may require relocating and/or adding sprinkler heads. (IFC 901.4)(EXTEND SPRINKLER PROTECTION TO ALL COOLERS /FREEZERS AND DELI CASES.) 14: Sprinklers shall be installed under fixed obstructions over 4 feet (1.2 m) wide such as ducts, decks, open grate flooring, cutting tables, shelves and overhead doors. (NFPA 13- 8.6.5.3.3) 15: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of Factory Mutual or any fire protection engineer licensed by the State of Washington and approved by the Fire Marshal prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance No. 2050). 16: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 17: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 18: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: IMC -4/10 M11-124 Printed: 09 -16 -2011 CITY OF TUKI/IA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us Building Perm__ No. Pti Mechanical Permit No. `. Plumbing/Gas Permit No. ("it— 1` l Public T or1€s Permit No. Project No. or of ce use only) Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION Site Address: 400 Costco Drive Tenant Name: Costco Wholesale Inc Property Owners Name:Cos t co Wholesale Inc Mailing Address: 999 Lake Drive King Co Assessor's Tax No.: Suite Number: 150 Floor: New Tenant: ❑ Yes Issaquah City Wa. State L i .No 98188 Zip CONTACT PERS do:we contact when your permit is rcady to be issue Name: Bill Zornes Mailing Address: 19430 68th Ave South "Suite B" E -Mail Address: BZornes@KeyMechanical.com Day Telephone: 253 . 8 7 2. 7 3 9 2 Wa. 98032 State Zip 253.872.7392 Kent City Fax Number: GENERAL CONTRACTORIN)';ORMATION (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5) Company Name: Key Mechanical Company of Washington Mailing Address: 19430 68th Ave South Contact Person: B ill Zornes E -Mail Address: BZornes@KeyMechanical.com Contractor Registration Number: KEY *MEW24 ONZ Kent City Wa. State 98032 Day Telephone: 253 . 8 7 2. 7 3 9 2 Fax Number: 253.872.7398 Expiration Date: 4.2013 Zip ARCIRITE+ All plans must be wet statnpedby Architect o Company Name: Mulvanny G2 Mailing Address: 1110 112th Ave NE Suite #500 Bellevue Wa. 98004 Contact Person: Ken Wong E -Mail Address: Ken.Wong@MulvannyG2.com City State Day Telephone: 425.463.1408 Fax Number: 425.463.2002 Zip ENGINEER. O plans must be wet stamped by Engineer of Record }' Company Name: T . E . I . Mailing Address: 830 North Riverside Drive Contact Person: Paal Ryan E -Mail Address: PRyan@tei-engineering.com Q:Wpplications\Ponns- Applications On Line\3 -2006 - Permit Application.doc Revised: 9 -2006 bh Renton City Day Telephone: 425 . 9 7 0. 3 7 5 3 Fax Number: 425.970.3756 Wa. State 98057 Zip Page 1 of 6 BUILDING PERMIT INFO: Valuation of Project (contractor's bid price): $ 2 94 , 0 0 0 . 0 0 Existing Building Valuation: $ ? Scope of Work (please provide detailed information): Installation of new refrigeration wall freezer, new shop -in deli cooler, new overstock freezer, replacement of existing deli island with new. new refrigeration compressor system and roof top condenser. Will there be new rack storage? ® Yes ❑.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage-Below 1 at Floor 2ntl Interior Remodel Addition to Existing Structure Type of instruction per ABC' Type of Occupancy per IBC oor Floors Basement Accessory Structure *` 'Attached Garag Detached Garage Attached Cat Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION /HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8 -1/2 "x II" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Q:\Applications\Forms- Applications On Line\ -2006 - Permit Application.doc Revised: 9 -2006 bh Page 2 of 6 MECHANICAL PERMIT INIP." i'"MATION - 206 -431 -3670 MECHANICAL CONTRACTOR INFORMATION / Refrigeration Contractor CompanyName: Key Mechanical Company of Washington MailingAddress: 19430 68th Ave South "Suite B" Kent Wa. 98032 City State Zip Contact Person: Bill Zorne s Day Telephone: 253 . 8 7 2. 7 3 9 2 E -Mail Address: BZornes @KeyMechanical.com Fax Number: 253.872.7398 Contractor Registration Number: KEYMEW* 24 ONZ Expiration Date: 4.2013 Valuation of Mechanical work (contractor's bid price): $ 221,000.00 Scope of Work (please provide detailed information): Installation of new refrigeration systems to wall freezer, overstock freezer, shop -in deli cooler. refrigeration compressors and condenser. Replacement of existing deli cases with new in same location. Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New .... ® Replacement ....® [Both new and replacement] Fuel Type: Electric ❑ Gas .... Other: Indicate type of mechanical work being installed and the quantity below: Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: Qty Furnace <100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace>100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU 9 Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended/Wall /Floor Mounted Heater Ventilation System Wood /Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat /Refrig /Cooling System Incinerator - Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM Incinerator — Comm /Ind Q:Wpplications\Fonns- Applications On Line \3-2006 - Permit Application.doc Revised: 9 -2006 bh Page 4 of 6 elm"' '6114i PERMIT APPLICATION NOt,.S — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TOPPLY FOR THIS PERMIT. BUILDIN . ROR, . HORIZED AGENT: Signature./s` Print Mailing Address: jars'' 6, s ,sit,-* Date: V2/24" Day Telephone: 6-J f%.2 • 73 / de - City Goa 1 B2 State Zip IDate Application Accepted: V \, 091 t' Date Application Expires: 02 1 0 12- Staff Initials: Q:\Applications\Fortns- Applications On Line 3 -2006 - Permit Application.doc Revised: 9 -2006 bh Page 6 of 6 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.Qov RECEIPT Parcel No.: 2523049063 Permit Number: M11 -124 Address: 400 COSTCO DR TUKW Status: APPROVED Suite No: Applied Date: 09/02/2011 Applicant: COSTCO WHOLESALE Issue Date: Receipt No.: R11 -02033 Payment Amount: $2,039.85 Initials: WER Payment Date: 09/16/2011 10:37 AM User ID: 1655 Balance: $0.00 Payee: KEY MECHANICAL TRANSACTION LIST: Type Method Descriptio Amount Payment Check 34306 2,039.85 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts MECHANICAL - NONRES 000.322.102.00.00 2,039.85 Total: $2,039.85 doc: Receipt -06 Printed: 09 -16 -2011 Off of Tukwila, w Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206-431-3665 Web site: http: //www. ci. tukwila. wa. us SET RECEIPT RECEIPT NO: R11 -01930 Initials: JEM Payment Date: 09/02/2011 User ID: 1165 Total Payment: 2,548.23 Payee: KEY MECHANICAL CO. OF WASHINGTON SET ID: S000001570 SET NAME: Tmp set/Initialized Activities SET TRANSACTIONS: Set Member Amount D11 -302 1,997.06 M11 -124 509.96 PG11 -131 41.21 TOTAL: 1,997.06 TRANSACTION LIST: Type Method Description Amount Payment Check 2356 ACCOUNT ITEM LIST: Description TOTAL: 2,548.23 2,548.23 Account Code Current Pmts PLAN CHECK - NONRES 000.345.830 2,548.23 TOTAL: 2,548.23 ?/" INSPECTION NO. INSPECTION RECORD Retain a copy with permit /a 24 6300 Southcenter Blvd., #100, Tukwila. WA 98188 M„ (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION Project: Type of Inspectio 14,1 pm. 4-- 06-A4 p 14, le 1- , '�, Address: x400 GJSrz Date Called: Special Instructions: Date Wanted (- —(( m.. a. ,`" Requester: Phone No: oved per applicable codes. E Corrections required prior to approval. COMMENTS: 14,1 pm. 4-- 06-A4 p 14, le 1- , '�, f - - ; N.fat ( 1 ,,,,4I i 6./ Viers.? ei-i n n NSPEJT.ION FEE REQUIZED. Prior r to next inspection. fee must be Id att1 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. _ n. r INSPECTION RECORD e� . e i .7 a copy with permit INSPECTION NO. rnit-/ay PERMIT NO. . CITY OF' TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 • Permit Inspection Request Line (206) 431 -2451 Project: fita5W10 _ a.4/C21.4544 Type of Inspection: • /'FFi266eA3 4T /OrJ 7- S- - Address: 4'49O 'CC.57 h1' 0 .9 Date Called: Special Instructions: ' - Date Wanted: . Requester: Phone No: . ' Approved per applicable codes. COMMENTS: - ECorrections required prior to approval. / Inspe Date: RE PECTION FEE REQUIRI D. Prior tonext inspection, fee must be id at 6300 Southcenter Blvd. Suite 100. Call to schedule reinspection. a INSPECTION NO. INSPECTION RECORD Retain a copy with permit Mil -( 241 PERMIT NO. I CITY.QF TUKWILA BUILDING DIVISION (iv. 6300 Southcenter SIvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Projett: —,—.60. (.4• 4. E. -WI% a les AitE Type of Inspection: is-Al A•te64 Address: .•.1, 00 ?„--0.11-1-4) _D .e.... Date alle - • t ............—..... Special instructions: -. . . • . • • Date Wanted :AN 41 — 5- It ",....a,m, P.m. Requester: . Phorece)74:9 3 q 42 -2o 473 Approved per applicable codes. Corrections required prior to approval. CPMMENTS: . Nifxd LJ 3-3 LA-1413 Sky CC ‘)1 -7-16.fr p () e-ek 141,c P f rate9 / Insp ctor V LREINtPEDTION FEE REQUIRED. Prior to next inspection. fee must be r / INSPECTION NUMBER .ter yeti.•.. r -��y•r rv.r�Y- ..Yarv`W^^'+�•s�•�.Mw, _ti �•+ • �i v.r gay. a- •�r-.: 5 • .. .q••.+y.. -.... =if, .a,r. rst. w • INSPECTION RECORD JP/ Retain a copy with permit PI /1 — 1 f _' PERMIT NUMBERS • CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206 - 575 -4407 Project: Go Prei.2 _ Type of Inspection: Fire._ ,� Tr 4,4 I Address: WO C Os�-fo Suite #: A'. Contact Person: 00w I/ Special Instructions: Permits: Phone No.: Z 'C 3y' 3,t,4 3 Approved per applicable codes. Corrections required prior to approval. COMMENTS: Cook.2 p•'►Q [ . Needs Shift Inspection: 7.. Sprinklers;: Fire Alarm: A $ Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: Inspector: /2")'''. 3 Date: /1/1 'Ji Hrs.: A $ r $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Callrto schedule a reinspection. • trAl Billing Address Attn: 1 Company Name: Address: City: State: Word /Inspection Record Form.Doc 6/11/10 Zip: T.F.D. Form F.P. 113 • • • ri .1 • + &: ' -'S • • • HERMIT COORD COPS PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M11 -124 PROJECT NAME: COSTCO WHOLESALE DATE: 09/02/11 SITE ADDRESS: 400 COSTCO DR X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: ((,,''L BtiiTding uivision Public Works ,ht 9 r5-1I ire Prevention Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete DUE DATE: 09/06/11 Not Applicable Permit Center Use. Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: No further Review Required DATE: APPROVALS OR CORRECTIONS: DUE DATE: 10/04/11 Approved ❑ Approved with Conditions 2 Not Approved (attach comments) Notation: REVIEWER'S INITIALS: DATE: Permit Center. Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 Contractors or Tradespeople Pr ter Friendly Page • General /Specialty Contractor A business registered as a construction contractor with LEI to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name KEY MECH CO OF WASHINGTON UBI No. 600196154 Phone 2538727392 Status Active Address 19430 68Th Ave S Ste B License No. KEYMEW'240NZ Suite /Apt. License Type Construction Contractor City Kent Effective Date 8/9/1976 State WA Expiration Date 4/1/2013 Zip 98032 Suspend Date County King Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Business Owner Information Name Role Effective Date Expiration Date HEISLER, ROBERT L Cancel Date 01/01/1980 Bond Amount LEONARD, FRANK W 10 01/01/1980 023011682 SANDAHL, LEE F Until Cancelled 01/01/1980 Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 10 CIOBERTY MUTUAL INS 023011682 04/01/2009 Until Cancelled $12,000.00 03/23 /2009 9 INSURANCE CO OF THE WEST 1886384 04/01/2003 04/01/2009 $12,000.0003/31 /2003 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 23 OLD REPUBLIC GENREAL INS A1CG00081100 03/31/2011 03/31/2012 $1,000,000.0003 /31/2011 22 TRAVELERS PROPERTY CAS INS CO DTCO526D7003TIL10 03/31/2009 03/31/2011 $1,000,000.0004 /02/2010 21 TRAVELERS INDEMNITY CO OF AME DTCO526D70031ND08 03/31/2008 03/31/2009 $1,000,000.00 03 /18/2008 20 TRAVELERS INDEMNITY CO DTEC0526D7003INDO7 03/31/2007 03/31/2008 $1,000,000.0003 /28/2007 19 TRANSPORTATION INS CO G224885996 03/31/2006 03/31/2007 $1,000,000.00 03/08/2006 18 CONTINENTAL CAS CO C2024885996 03/31/2005 03/31/2006 $1,000,000.00 03/31/2005 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period https: / /fortress.wa. gov /lni/bbip/Print. aspx 09/16/2011 400 COSTCO DRIVE. TUKWILA WA 98188 999 LAKE DRIVE` . ISSAQUAH, WA 98027. T:: 425.31.3.8100 www.costco.com TS 1..01 TITLE SHEET GENERAL NOTES 30' PERMANENT IRREVOCABL NON - EXCLUSIVE EASEMENT JURISDICTION OWNER ARCHITECT DEPARTMENT OF COMMUNITY DEVELOPMENT 6300 SOUTHCENTER BLVD. TUKWILA, WA 98188 t 206.4313670 EXI T N, E� WNVATER. METER W I- R:'CgNT 0 B II j 1 1 STRUCTURAL ENGINEER EXIST. TIRE INSTALLATION COSTCO WHOLESALE 999 LAKE DRIVE . ISSAQUAH, WA 98027 t 425313:8100 ARCHITECTURAL G1.01 EXISTING FLOOR PLAN A1.01 FLOOR PLAN A2.01 : INTERIOR DETAILS, ROOM FINISH SCHEDULE & NOTES STRUCTURAL S1 FREEZER PIT PLAN ;'SECTIONS, & GENERAL NOTES MULVANNY :G2'ARCHITECTURE 1110 112TH AVE. NE SUITE 500 BELLEVUE:WA 98004 t 425.463.1408 f: 425A63.2002 PROJECT MANAGER: KEN WONG ENGINEERS NORTHWEST 6869 WOODLAWN AVE. NE 98115 t: 206:525.7560 f: 206.522.6698 . PLUMBING/ ELECTRICAL ENGINEER' T.E. ;.INC. 830 N. RIVERSIDE. DRIVE SUITE 200 RENTON, WA 98055 t: 425.970.3753 f: 425.970.3756 PLUMBING & ELECTRICAL M -1 PARTIAL FLOOR PLAN, P.O.S. COOLER & FREEZER WASTE & VENT PLANS, E -1 DETAILS SCHEDULE, NOTES AND LEGEND PARTIAL FLOOR PLAN- PARTIAL ONE LINE DIAGRAM PANEL SCHEDULES LIGHTING FIXTURE SCHEDULE;' LIGHTING CONTROL SCHEDULES, DETAIL, NOTES & LOGEND FIRE PROTECTION SECTION 13910 FIRE SPRINKLER UNDER SEPARATE COVER MECHANICAL & REFRIGERATION (FOR REFERENCE ONLY, SEE DEFERRED SUBMITTAL) R -1 POINT OF-SALES & FRESH AREA PLAN R -2 ELECTRICAL. PLAN R -3A REFRIGERATION. .SCHEDULE R -3B 'MT POINTS & BOARD SCHEDULE R-4 PLUMBING' PLAN • R -5. SUCTION LINES PLAN R -6 , LIQUID LINES PLAN • R -7 MEZZANINE EQUIP. LAYOUT.& DETAILS 54' EASEMENT TO CHICAG( MILWAUKEE, ST. PAUL& PACIFIC RAILROAD. CO. MECHANICAL/ REFRIGERATION ENGINEER TELGIAN FILE COPY 1.101 ANDOVER PARK WEST, STE. 100 21 SEATTLE, WA 98188 No. �� t: 206.439.7080 f: 206.439.7089 rview app subject roval of =Mean documents does not authorize _Ilion of any adopkid code or atliiiemce. Recekt Q.. Lpproved SW Copyist conditions is acknowledged: KYSOR PANEL SYSTEMS 3831 S BULLARD AVENUE a---- GOODYEAR, AZ 85338: t 623332.9690 Date: 7- /6 l� EXISTING BUILDING: PROJECT CONSISTS OF CONSTRUCTION N O OF FREEZERS - 0 NEW OVERSTOCK F E ZERS ANQ SHOP IN COOLER AND REPLACE REFRIGERATION; CASES. THE WORK INCLUDES, BUT NOT LIMITED TO DEMOLITION, PLUMBING, ELECTRICAL, AND LIGHTING SYSTEMS. WORK IS LIMITED TO THE SPECIFIED MAIN SALES AREA ONLY. SAXON DRIVE DIJALLAUMILI L1YiatVi! EXISTING REGIONAL OPTICAL FACILITY 441 COSTCO DRIVE TUKWILA PKWY ALTERATION SHALL COMPLY WITH THE FOLLOWING: INTERNATIONAL BUILDING CODE CHAPTER .11 ACCESSIBILITY AS APPLICABLE TO THIS PROJECT: 1.: ACCESSIBLE ROUTE .:_ A. MINIMUM CLEARANCE WIDTH SHALL. BE 3' -0" CLEAR (EXCEPT AS ALLOWED AT DOORS). IF ANY ACCESSIBLE ROUTE IS LESS THAN 5' -0" WIDE, PASSING SPACES ARE REQUIRED AT MAXIMUM 200' INTERVALS; PASSING SPACE MAY BE EITHER A 5'x5' SPACE, OR A T- INTERSECTION OF TWO WALKS OR CORRIDORS. B. MINIMUM HEAD ROOM CLEARANCE SHALL BE 6' -8" CLEAR. C. CHANGES IN LEVEL GREATER THAN 1/2" SHALL BE REQUIRED EDGE BE BEVELED WITH A SLOPE NO GREATER THAN 1:2 D. OBJECTS PROTRUDING FROM WALLS AND OTHER VERTICAL SURFACES WITH THEIR LEADING EDGES BETWEEN 2' -3" AND 6' -8" ABOVE THE FINISHED FLOOR SHALL PROTRUDE NO MORE THAN 4" INTO WALKWAYS OR CORRIDORS. 2. MERCHANS1DER DISPLAYPOINT OF SALE CLEAR FLOOR SPACE AT. LEAST 2'$ "X4' -0" THAT ALLOWS EITHER A FORWARD OF PARALLEL APPROACH BY A PERSON USING A WHEELCHAIR SHALL BE PROVIDED. SITE PLAN NOTE: ALL EXISTING PROPERTY LINES, PARKING;' EASEMENTS AND BUILDINGS ARE SHOWN ON THIS SITE PLAN SAXON DR. THE PROJECT IS A TENANT. IMPROVEMENT TO EXISTING GROCERY SALES. 1. THESEGENERAL NOTES APPLY TO THE. ENTIRE PROJECT AND APPLY TO ALL TRADES. 2. DRAWINGS HAVE BEEN NPREPA. PREPARED ON AN ORIGINAL SHEET SIZE OF 30X42-INCHES. 3. CONSULT DRAWINGS OTHER THAN ARCHITECTURAL DRAWINGS FOR ADDITIONAL GENERAL NOTES, ABBREVIATIONS AND SYMBOLS. 4. CONDITIONS 5 AND DIMENSIONS H S OWN ON SIT E PLANS ARE FROM A SURVEY PREPARED BY OTHERS OR FROM AVAILABLE RECORDS.: THE. ARCHITECT BEARS NO. RESPONSIBILITY FOR THE ACCURACY OF INFORMATION SHOWN.. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING INFORMATION SHOWN PRIOR TO STARTING THE WORK. a. THE CONTRACTOR SHALL VERIFY THE SIZE AND LOCATION OF ALL EXISTING UNDERGROUND AND ABOVE GROUND UTILITIES. b. VERIFY ALL INVERT ELEVATIONS AT POINTS OF. CONNECTIONS OF NEW WORK PRIOR TO STARTING ANY WORK c. EXISTING UTILITIES SHOWN HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND. ARE SHOWN FOR .CONVENIENCE ONLY d.` IF NECESSARY TO COMPLETE THE WORK; THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ANY ADDITIONAL UTILITY LOCATIONS AND SIZES NOT SHOWN. 5. THE CONTRACTOR SHALL TAKE ALL. POSSIBLE CARE TO AVOID DAMAGE OR DISTURBANCE TO EXISTING UTILITIES AND SHALL BE RESPONSIBLE FOR REPAIRING ANY CONTRACTOR- CAUSED DAMAGE TO THE UTILITIES. SUCH REPAIRS SHALL BE.DONE:AT THE CONTRACTOR'S EXPENSE AND IN SUCH A MANNER AS TO BE LEAST - DISRUPTIVE AS. POSSIBLE TO THE OWNER'S OPERATIONS. 6. DO.NOT SCALE THE DRAWINGS TO OBTAIN' DIMENSIONS. WRITTEN: DIMENSIONS GOVERN. USEACTUAL FIELD MEASUREMENTS. 7.. DIMENSIONS ARE TO /FROM THE a. CENTERLINE OF INTERIOR COLUMNS. b: GRID LINES ADJACENT TO THE EXTERIOR WALL (FACE OF THE.COLUMN CLOSEST TO THE EXTERIOR WALL IS THE GRID LINE) c: EDGE OR CENTERLINE OF OPENINGS AS INDICATED. d. FACE OF STUDS. e. FACE OF CONCRETE OR MASONRY (NOMINAL) f. ALL HEIGHTS ARE DIMENSIONED. FROM THE TOP OF THE SLAB (ALSO NOTED AS FINISHED FLOOR. OR INDICATED. BY THE ° DATUM° SYMBOL) UNLESS NOTED OTHERWISE. g. ALL DIMENSIONS NOTED "CLEAR" SHALL BEMAINTAINED AND SHALL ALLOW FOR THE THICKNESS OF ALL FINISHES INCLUDINGCARPETING; TILE, WAINSCOT AND TRIM. h. ALL: DOORS NOT LOCATED BY DIMENSIONS ON PLANS OR DETAILS SHALL BE LOCATED SO THE EDGEOF THE DOOR OPENING IS 6- INCHES AWAY-FROM THE FACE OF ANYADJOINING INTERSECTING WALL. 8. VERIFY ALL DIMENSIONS OF EXISTING CONDITIONS NEITHER THE ARCHITECT NOR HIS CONSULTANTS. ARE RESPONSIBLE FOR THEACCURACY OF. THESE DIMENSIONS. IF. EXISTING CONDITIONS OR DIMENSIONS. ARE NOT AS SHOWN, IMMEDIATELY NOTIFY THE ARCHITECT' OF ANY DISCREPANCIES. .9. VERIFY ALL ROUGH -IN DIMENSIONS FOR EQUIPMENT FURNISHED AND /OR INSTALLED BY THE CONTRACTOR SUBCONTRACTORS; OWNER OR OTHERS. 10. THE CONTRACTOR SHALL CONSULT DRAWINGS OF ALL TRADES FOR OPENINGS THROUGH SLABS, WALLS, CEILINGS AND. ROOFS FOR. DUCTS, PIPES, CONDUIT, CABINETS, EQUIPMENT, ETC: AND SHALL VERIFY THE SIZES AND LOCATIONS WITH SUBCONTRACTORS. 11: PLACE NO OBSTRUCTIONS,.INCLUDINGMAINS, PIPING, CONDUIT,` ETC. OF ANY KIND SO AS TO IMPAIR GIVEN CEILING HEIGHTS. AND CLEARANCES. RUN PIPING, CONDUITS, ETC. IN JOIST DEPTH. DO NOT RUN BELOW SKYLIGHTS. 12. ALL CONDUITS,: PIPING, ETC. SHALL RUN PARALLEL OR PERPENDICULAR TO WALLS; DO NOT RUN AT AN ANGLE TO THE WALLS. 13. : 'IN .ROOMS OR SPACES SCHEDULED TO RECEIVE WALL AND /OR CEILING - FINISHES, DO NOT RUN EXPOSED CONDUITS,: PIPING, ETC. ON WALLS OR CEILINGS. 14.. ALL WORK IS TO BE PLUMB LEVEL TRUE TO LINE - AND H TRAI 5 GT. 15.: ALL JOINTS ARE TO BE TIGHT, STRAIGHT, EVEN; AND SMOOTH. 16. ALL MATERIAL IS NEW UNLESS NOTED OTHERWISE. 17. PROVIDE ALL FASTENERS AND CONNECTIONS (WHETHER INDICATED OR NOT) NECESSARY TO ASSEMBLE THE WORK. 18. PROVIDE SOLID. BLOCKING/BACKING.FOR ALL WALL MOUNTED FIXTURES AND EQUIPMENT INCLUDING,. BUT NOT LIMITED TO SINKS, WALL BRACKETS AND WALL-HUNG ITEMS. 19: PREPARE SURFACE AND REMOVE SURFACE FINISHES TO PROVIDE FOR PROPER INSTALLATION ON NEW WORK AND FINISHES, COMPLY WITH MANUFACTURER'S INSTALLATION REQUIREMENTS. 20. REPAIR, PATCH,; OR REPLACE PORTIONS OF WORK THAT ARE DAMAGED,. LIFTED, DISCOLORED; OR SHOWING OTHER IMPERFECTIONS. 21.. PENETRATIONS OF RATED ASSEMBLIES SHALL BE SEALED WITH AN APPROVED MATERIAL AS APPROVED BY THE JURISDICTION.' 1110 112TH AVE. NE .I ; SUITE 500 BELLEVUE, WA .I 98004. MulvannyG2com 22. CONSTRUCTION ACTIVITIES SHALL NOT AFFECT THE OWNER'S OPERATIONS: LOUD ACTIVITIES (JACK - HAMMERING,, SAW-CUTTING, ETC.) AND ANY WORK REQUIRING INTERRUPTIONS OF UTILITIES ( WATER, ELECTRICITY; GAS; FIRE SPRINKLERS/ ALARM,: SEWER; ETC:) SHALL BE PERFORMED DURING NON - BUSINESS HOURS AS APPROVED BY THE OWNER. ENSURE UNINTERRUPTED SECURITY AND PHONE SYSTEMS. OPERATION. . 23. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR JOBSITE SAFETY AND SHALL PROVIDE ALL NECESSARY BARRICADES, . SIGNS REFLECTORS LIGHTS : ETC: TO PROPERLY O ERLY IDENTIFY AREAS CLOSED TO THE PUBLIC AND FOR PROVIDING SAFETY ALERTS DURING CONSTRUCTION. GOVERNING AUTHORITY REQUIREMENTS: 24. CITY OF TUKWILA ADOPTED CODE INTERNATIONAL BUILDING CODE, 2006 EDITION 25. OCCUPANCY CLASSIFICATION: GROUP "M" (MERCANTILE) 26. EXISTING BUILDING CLASSIFICATION: V -B FULLY SPRINKLERED 27. CONTRACTOR SHALL SUBMIT FIRE SPRINKLER PLANS TO CITY FOR REVIEW AND APPROVAL. PRIOR TO INSTALLATION. FIRE SPRINKLER WORKS SHALL BE DESIGNED AND BUILT BY CONTRACTOR FIRE SPRINKLER WORKS SHALL. MEET CURRENT CODES: a. AUTOMATIC FIRE SPRINKLER SYSTEM SHALL BE EXTENDED INTO NEW FREEZER OR COOLER AREAS WITH APPROPRIATE SPRINKLER HEADS INSTALLED. b. SPRINKLER SYSTEM SHALL BE INSTALLED AS PER NFPA :STANDARD. 28: SPECIAL INSPECTION REQUIRED FOR THE FOLLOWING CONCRETE CONSTRUCTION PER. CODES:. a LOCATION OF REINFORCEMENT; CONNECTORS, PRE - STRESSING TENDONS AND ANCHORAGES. b.' EPDXY BOND STRENGTH APPLICATION. 29. SPECIAL INSPECTION REQUIRED.FOR THE FOLLOWING STEEL CONSTRUCTION PER CODES a HIGH- STRENGTH BOLTING b.' WELDING c.. STORAGE STEEL RACK 8 FEET OR GREATER IN HEIGHT 30. CONTRACTOR SHALL SUBMIT PLANS TO ENVIRONMENTAL HEALTH DIVISION FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. CONTACT BUILDING. DEPARTMENT FOR PERMIT APPLICATION REQUIREMENT. 31. CONTRACTOR SHALL SUBMIT. SEPARATE STEEL RACK FABRICATION DRAWINGS. AND STRUCTURAL CALCULATION TO BUILDING & SAFETY DIVISION FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION 32: OWNER AND CONTRACTOR RESPONSIBLE FOR THE FOLLOWING SUPPLEMENTAL PERMITS AS APPLICABLE: MITCHELL C. SMITH, ARCHITECT SEE OTHER DESIGN DISCIPLINE FOR ADDITIONAL ABBREVIATIONS: ACOUS. ACOUSTICAL ADJ ADJUSTABLE, ADJACENT A.F.F. ABOVE. FINISHED FLOOR (SLAB) ALUM ALUMINUM ANOD. ANODIZED APPROX. APPROXIMATE BD. :'BOARD BLDG. BUILDING BL K. K. . BLOCK BLK'G. BLOCKING BM. BEAM BOT. BOTTOM BTWN.- BETWEEN CB CATCH BASIN . . C.G. RIVER : `CO GUARD C.I. l' IRON C S ON.- C.I.P. :. : CAST IN PLACE C.L. CENTER LINE, CL. . CLEAR CLG. CEILING CMU .CONCRETE. MASONRY UNIT COL. COLUMN CONC. CONCRETE CONT. CONTINUOUS CONSTR. CONSTRUCTION CONTR. CONTRACTOR C.T. DBL DIM. DTL. D.F. D.S. DWG. E.D.P. E.F.S. ELEV. ELEC. ENCL. EQ. CERAMIC TILE DOUBLE DIMENSION DETAIL DRINKING FOUNTAIN .. DOWNSPOUT DRAWING EACH ELECTRONIC DATA PROCESSING EXTERIOR FINISH SYSTEM ELEVATION, ELEVATOR ELECTRICAL ENCLOSURE EQUAL EXH. : EXHAUST, EXIST. EXISTING EXP. EXPANSION EXT. `;:EXTERIOR F.D. FLOOR DRAIN FDN. FOUNDATION FF FACTORY FINISH FHS FLAT HEAD SCREW FL. FLOOR F.LO. FURNISHED & INSTALLED BY OWNER R. FIN. FINISH H F.R:P.P. FIBER REINFORCED PLASTIC PANEL(S) FIRE RETARDANT FOOTING GAUGE GALVANIZED GENERAL CONTRACTOR GYPSUM WALLBOARD GYPSUM BOARD H.B. H OSE IB B B H.C. HANDICAPPED H.M. HOLLOW METAL HORIZ. HORIZONTAL HT. HEIGHT HTR. HEATER INSUL. INSULATION INT. INTERIOR JT. /JTS. JOINT,JOINTS L. LONG, LENGTH LAN'D. LANDING L.F. LINEAR FOOT, LINEAL FOOT LIQ. LIQUID LT.WT. LIGHT WEIGHT MAS. MASONRY. MAX. MAXIMUM M.B.S. METAL BUILDING SUPPLIER MECH. MECHANICAL MEZZ. MEZZANINE MTL. METAL MFG. MANUFACTURING MFR. MANUFACTURER FRT. FTG. GA. GALV. G.C. GWB M.H. MIN. MISC. M.O. M.R. MULL. MTD. MTG. N.I.C. NOM. N.T.S. O.A. O.C.` O.H. OP'G. OPP.: PTN. PERP. PL. PLYWD. r PLBG. PNL. PREP. PROJ. PRV R.D. R.L. .: REC'D. REFRIG. REINF. REL'D. REQ'D. R.O. SCHED. MANHOLE MINIMUM MISCELLANEOUS MASONRY OPENING MOISTURE RESISTANT S ANT MULLION MOUNTED MOUNTING NOT IN CONTRACT NOMINAL L NOT TO AL SC E OVERALL ON CENTER OVERHEAD OPENING OPPOSITE PARTITION PERPENDICULAR PLATE, PROPERTY LINE PLASTIC LAMINATE PLYWOOD PLUMBING PANEL, PANELING PREPARATION PROJECT PRESSUREREDUCING VALVE POINT. QUARRY TILE QUARTER RADIUS REFLECTED CEILING PLAN ROOF DRAIN RAIN LEADER RECEIVED REFRIGERATION REINFORCING RELOCATED REQUIRED ROUGH OPENING SCHEDULE `. S.C. SHT. SIM. S:LO.. S.I.V. S.O.I.C. SPEC'D. SQ. S.S. SST S STD. SOLID CORE SHEET SIMILAR SUPPLIED & INSTALLED BY OWNER SUPPLIED & INSTALLED BY VENDOR SUPPLIED BY OWNER INSTALLED BY CONTRACTOR SPECIFIED SQUARE SERVICE SINK, SANITARY SEWER STAINLESS STEEL STANDARD STL. STEEL STRUCT. STRUCTURE, STRUCTURAL SUSP. SUSPENDED SYS. T T.O.J. T.O.M. T.O.P-: T.O.S.. T.O.W. T &B TEL. TEMP° T &G T.G. TYP. UTIL. U.B.C. U.N.O. VERT. V.I.F. W/ W/0 WD. SYSTEM TREAD, TOP OF JO . I T S. TOP OF MASONRY - TOP OF PARAPET STEEL TOP OF T TOP OF WALL TOP 0 BOTTOM O TELEPHONE TEMPERED TONGUE & GROOVE TEMPERED GLASS, TYPICAL UTILITY UNIFORM BUILDING CODE .. UNLESS NOTED OTHERWISE VINYL COMPOSITION TILE VERTICAL VERIFY IN FIELD WITH WITHOUT WOOD WDW. WINDOW DETAIL IDENTIFICATION CUT. LINE -. DEFINES THE DETAILED ELEMENT _ NORTH ARROW PROJECT NORTH ARROW NEW CONSTRUCTION - SHOWN SOLID ix ::sxEa6**Av...s: ;66X 3666ftiR6^ .. SUSPENDED CEILING GRID SYSTEM VV/ LAY IN PANELS 4': S X 2' U.N.O. SHEET WHERE E DRAWN WALL SECTION DETAIL IDENTIFICATION CUT LINE - DEFINES THE DETAILED ELEMENT DRAWN BUILDING SECTION DETAIL IDENTIFICATION, A3.01 SHEET WHEREDRAWN EXTERIOR ELEVATION DETAIL IDENTIFICATION .3.02 SHEET WHERE DRAWN INTERIOR ELEVATION DETAIL IDENTIFICATION TRUE NORTH INDICATOR DOOR MARK DOOR CODE - REFER TO 2580'. SCHEDULE U E %50' -0" A.F.F. WORK, CONTROL OR DATUM POINT WINDOW, R ELITE R 0 LOUVER MARK WINDOW .` O NUMBER - REFER TO SCHEDULE EQUIPMENT MARK. EQUIPMENT NUMBER - REFER TO SCHEDULE SLOPE DOWN 1/8" PER FOOT SLOPE DIRECTION WITH :DATUM MARK EXISTING ; N CO STRUCTION TO' REMAIN : SHOWN LIGHT BACKGROUND SPRINKLER MAIN EXISTING CONSTRUCTION TO BE REMOVED - SHOWN. DASHED lllll1111f NEW FREEZER/ COOLER WALL BY REFRIGERATION COLUMN GRIDS EARTH GRAVEL CMU OR BRICK PLYWOOD. RIGID INSULATION BATT INSULATION WOOD MEMBER D 00 BLOCKING FINISHED WOOD ACOUSTICAL TILE. STEEL ALUMINUM E.LF.S. SOUND INSULATION SHADED AREA DENOTE S METAL L SECURITY DECK ABOVE OVE FIRE RATED CEILING TILE SPRINKLER P R D 0 DROP CORD (SEE ELECT) ( EC ) . AIR HOSE WATER DROP EXHAUST VENT OR RETURN AIR GRILLE Submittal Documents for Deferred Submittal items shall be submitted to the Building Official by `General Contractor with Ith a notation indicating atn that the 9 Y g Deferred Submittal Documents have been reviewed Gee a sewed and that they have been found to b e In general conformance e desi n of the building. 9 .. The Deferred Submittal Items shall a not be installed ed un #if the Building Official a has approved the submittal documents. The following are Deferred Submittals: YES NO - - Eti 0 Fire Sprinkler er S stem by General Contractor Fire Alarm System tam b Y Owner as applicable ❑ �i. Smoke Alarm System by Owner a s a pp licable Fr eezerlC ooler Fabrication Drawings by General a Contractor Elf Refrigeration Systems 9 by General Contractor ® MulvannyG2 Architectures All rights reserved. No part of this document may be reproduced in any form or by any means without permission in writing from MulvannyG2 Architecture. DATE 8 -25-11 DESCRIPTION RELEASE FOR PERMIT SUBMITTAL #93- 0440 -26 PM: KEN WONG DRAWN: HVAC DIFFUSER WATERPROOF WATER RESISTANT WEIGHT WELDED WIRE FABRIC YARD :DRAIN _ SHEET WHERE DRAWN REVISIONS :110. shsdl be :nad@ to the scope of worst without prior approval of Tukwila Building Division. NOTE: Revisions will moire a new Plana1 and may include addti i nal plan review fee . I FLUORESCENT LIGHTING FIXTURE REVIEWED FOR CODE COMPLIANCE ANCE APPROVED SEP i 4 2011 TITLE SHEET FLUORESCENT LIGHTING FIXTURE INCANDESCENT: OR H.I.D. LIGHTING FIXTURES ALL EXISTING WASTE IN. THIS AREA TO RE VERIFY EXISTING FL• HALF EXPOSED AFTE INSTALLATION :OF :N RELOCATE AS NECES FINISH FLOOR CONCRETE SAND DRAIN ' PLU �„ 'uuuuunw FOR WORK IN THIS " REA SEE "P.O.S. ' COOLER & FRFF7FR WASTE & ENT_ PLAN WEST" ON THIS :SHEET. FOR WORK IN THIS REA SEE "P.OS. COOLER & _ & T PLAN EAST" ON THIS "SHEET. Ad_I4IAAI_A14 -44 AA AAA A- AAA AAAA AA AAA AAA AAA -AAA AAA •AAA AAA AAA AAA AAd AAA AAA AAA AAA AAA AAA AAA _AAA TRAP -& ARM Pr ai UIIIIIIIIIIIII■ IllillIIIIIi'll PLUG DRAIN AND FILL FLOOR SINK TO MATCH`' SURROUNDING. COUNTER FLASHING SLEEVE (E)FCO (E)FCQ: FLASHING SLEEVE. ROOF FLASHING (BY GC) 18" MIN SALES ER SALES ER ROOF CONNECT NEW 3" SS TO. EXISTING 4" SS HERE. FIELD VERIFY SIZE, LOCATION AND I.E. PRIOR TO WORK. VENT THRU ROOF VENT THRU ROOF . SCALE: NONE CONNECT. NEW :3" SS TO —� EXISTING :4 ": SS HERE. FIELD VERIFY .SIZE, LOCATION AND I. E. PRIOR TO 'WORK. A.F.F. B.F.F. CONT. FCO G.0 M.C, TYP. VTR SS. W. COMBINATION WASTE & VENT DEMO VENT. ABOVE, FINISH FLOOR 'BELOW FINISH CONTINUATION FLOOR CLEAN OUT GENERAL CONTRACTOR MECHANICAL CONTRACTOR TYPICAL VENT THRU ROOF SANITARY SEWER WASTE FLOOR FCO REFRIGERATION : :CONTRACTOR TO MAKE FINAL CONNECTION AIR GAP FITTING VENT. ALL •CAST :.IRON VENT PIPE TO BE PAINTED WHITE CAST IRON STAND PIPE UP THROUGH CURB SEE DETAIL (TYP OF 3) CONNECT NEW 3" SS TO EXISTING 4" SS HERE: FIELD VERIFY SIZE, LOCATION AND I.E. PRIOR TO WORK. CONC. CURB ALL WASTE AND CONDENSATE PIPING TO BE SLOPED AT 2% MINIMUM. UNLESS OTHERWISE NOTED. SEE FIXTURE `:SCHEDULE FOR MINIMUM TRAP ARM :'SIZE AND VENT SIZE. ALL ' DIMENSIONS TO COLUMN LINES. MAINTAIN MINIMUM OF 15' BETWEEN PLUMBING VENT. AND AC /AIR . SCOPE' EXISTING 4" SS LINE TO VERIFY OPERATIONAL CONDITION AND CONNECTION TO BUILDING SEWER. HANDLING. UNITS. SURFACE MOUNTED :;.PIPING' WILL NOT BE . ACCEPTABLE IN FINISHED. ROOMS OR COOLERS. PIPING AND CONDUIT OF ALL TYPES SHALL BE CONCEALED WITHIN WALLS, FLOORS AND/OR CEILINGS. INSULATE ALL INTERIOR - PIPING. . APPLICABLE PLUMBING CODE 2009 UPC E)FCO (E)4„ .1 3z zw . a � o 0l z �cn oz 00 w cn z mow. m3 2: 0 zn.; W W 0 H,: o'er; cn 0 of F.- EL Z 0 IX zo PLUMBING FIXTURE SCHEDULE CONTRACTOR PROVIDED SYMBOL DESCRIPTION FIXED AIR GAP 'FITTING WASTE (13) NATIONAL PURCHASE AGREEMENT _ IN PLACE WITH SPECIFICATIONS DETAIL' SERVES ALL PLAIN BRONZE BODY ' WITH . 1 -1/2" SUP .JOINT: INLET AND 2 "', NO -HUB OUTLET STAINLESSDRAINS.COM. CONTACT SHELIA "HELLER OR JENNIFER SNIDER AT (888) 785- 2345` P.O.S.. COOLER P.O.S. FREEZER 0 • •42 • v38 400 42 • ''' �� #u. II O - -�� -Ail / A ll_I e ®II elelelAA/ ®/IAAIIel�aI TYP �elel eielel LEI Ie�el �/I' II ®I/�I !I RU LISP -L a =!■1 =1 = =1 =1 NEW PANEL P15 & TRANSFORMER T15 EXISTIN C PANELS P1, PP1 `& TRANSFORMER T1 ELECTRICAL PLAN NOTES: 15 P15 O1 E.C. TO REMOVE ELECTRICAL DEVICES, LIGHTS, CONDUITS, WIRES IN DEMO AREA (SEE ARCHITECTURAL PLAN) TO SOURCE. PROVIDE "SPARE" LABEL AND TURN BREAKERS TO "OFF" POSITION, IF "APPLICABLE. EXTEND EXISTING FEEDERS FOR CONTINUITY AS .REQUIRED: M.D.P. -2 E.C. TO PROVIDE (3) 20A/1 P BREAKERS IN EXISTING PANEL L FOR NEW LIGHTS. FIELD VERIFY SPACE /SPARE. NOTIFY ENGINEER IF IT IS CONFLICT. E.C. TO PROVIDE (1) 20A/1P BREAKERS IN EXISTING PANEL A FOR UNDER MEZZANINE LIGHTS. FIELD VERIFY SPACE/SPARE. NOTIFY ENGINEER IF IT IS CONFLICT. PARTIAL FLOOR PLAN LIGHTING FIXTURE SCHEDULE ALL LIGHT FIXTURES SHALL HAVE FACTORY INSTALLED DISCONNECTED MEANS PER LATEST NEC CODE TYPE MANUFACTURER NUMBER LAMPS MOUNT WATT REMARKS HOLOPHANE* RE35LPP272RSFW C6 COSTCO VENTURE 382 BOTTOM OF FIXTURE +23' A.F.F. AO MP 350W /BU CHAIN E.C. TO PROVIDE SAFETY HOOKS, UVS /FS FLEXIBLE WIRING SYSTEM & WIRING ACCESSORIES AS REQUIRED HOLOPHANE* RE35LPP272RSFW C6 EM COSTCO VENTURE 382 SEE DETAIL / THIS SHEET. MP 350W /BU Al UVS /PS &: 1 -250W QUARTZ LOITRHONIA AW- 4- 32- MVOLT- GEBIOIS 4-32W T ' SURFACE 118 PROVIDE ENERGY SAVING LAMPS HE WILLIAMS AND ELECTRONIC BALLASTS. EL . PROVIDE 100% FULL OUTPUT EMERGENCY BATTERY, PACK' OPTION WHERE INDICATED ON PLANS. INCLUDE ALL RELAY TEST SWITCH AND 1 LAMP OPERATION FIXTURE SWITCHED. BA O IS SWITC TTERY PACK IS UNSWITCHED. PROVIDE SELF DIAGNOSTIC TESTING SYSTEM. NO SUBSTITUTIONS ALLOWED. EXISTING MDP EXISTING FEEDER. ELECTRICAL DEMOLITION GENERAL NOTES ELECTRICAL CONTRACTOR SHALL REFER TO THE ARCHITECTURAL DEMOLITION PLANS FOR THE SCOPE OF CORRESPONDING ELECTRICAL DEMOLITION WORK. TRUSS FIELD VERIFY `EXISTING CONDITIONS ' PRIOR TO BID AND TO WORK. ` RELOCATE /REROUTE EXISTING ELECTRICAL DEVICES, FEEDERS THAT ARE NOT AFFECTED BY THE ':REMODEL AS REQUIRED. REMOVAL OF EXISTING ITEMS SHALL INCLUDE DISCONNECTING AND REMOVING OF THE EXISTING CONDUITS AND WIRING BACK TO THE NEXT ACTIVE OUTLET OR SOURCE. PROVIDE MATCHING BLANK COVER PLATE AS REQUIRED. REMOVE OR ABANDON ALL UNUSED UNDERGROUND, UNDER FLOOR RACEWAYS. SURFACE RACEWAYS. INSULATION BEAM CLAMP (UNISTRUT #PFLO37T OR EQUAL) ROOF INSULATION STEEL TRUSSES 5' ON CENTER VERIFY W /ROOF SHOP DRAWINGS. #6 CU TO BLDG MAIN COLD WATER PIPE /BUILDING STEEL RELOCATE EXISTING ITEMS SHALL INCLUDE DISCONNECTING AND EXTENDING EXISTING CONDUITS AND WIRING TO NEW LOCATION, `PROVIDE NEW CONNECTION AS REQUIRED. PROVIDE CUTTING, PATCHING, TRENCHING AND BACK FILL FOR ALL RELATED ELECTRICAL WORK AS REQUIRED. ALL REMODEL WORK SHALL BE PERFORMED NOT TO INTERFERE WITH WAREHOUSE'S NORMAL OPERATION, COORDINATE AND SCHEDULE WITH WAREHOUSE, ARCHITECT FOR WORK ` SCHEDULE. PERFORM WORK DURING OFF BUSINESS HOURS AS REQUIRED. COORDINATE AND SCHEDULE WITH WAREHOUSE FOR ANY EXISTING ELECTRICAL SERVICE SHUT DOWN, PROVIDE TEMPORARY POWER TO MAINTAIN EXISTING ELECTRICAL SYSTEM FOR WAREHOUSE'S NORMAL OPERATION AS REQUIRED. Pow- LEGEND FIXTURE TYPE EXISTING LIGHTING FIXTURE H.I.D. LIGHT FIXTURE H.I.D. LIGHT FIXTURE W /QUARTZ STRIKE LAMP FLUORESCENT LIGHT FIXTURE ENLARGED VIEW LOCKED HOOKS (SEE -' LIGHTING FIXTURE SCHEDULE) SAFETY CHAIN UNISTRUT #P3300 (1 -5/8" X 7/8 ") WITH UNISTRUT BEAM CLAMPS #PFLO37T OR EQUAL TO TRUSS - 2 PLACES. FLEXIBLE WIRING SYSTEM PANEL P15 PANEL H9 480 / 277 VOLTS 3 PHASE 4 WIRE 1200 A CU BUS M.L.O. A.I:C. MIN. EXISTING TOP FEED SURFACE MOUNT PHASE (KVA) CKT.CKT. PHASE (KVA) CIRCUIT USE A B C BKR. NO. NO. BKR. ' A B C CIRCUIT USE 106.32 1 2 31.17 COMPRESSOR RACK A 106.32 450/3 3 4 175/3 31.17 COMPRESSOR RACK A 106.32 5 6 31.17 SPACE 7 8 67.50 SPACE 9 10 300/3 67.50 COMPRESSOR RACK D* SPACE 11 12 67.50 SPACE 13 14 SPACE SPACE 15 16 35.00 SPACE 17 18 200/3 35.00 H10 SPACE 19 20 35.00 TOTAL PHASE A (KVA) 106.32 239.99 KVA 133.67 TOTAL PHASE B (KVA) 106.32 239.99 KVA 133.67 TOTAL PHASE C (KVA) 106.32 239.99 KVA 133.67 TOTAL CONNECTED LOAD 719.97 KVA 865 A -- INLYV LUAU. rINVVIUC NLYY 150A/3P MAIN BKR tSKtAKtK AS SHOWN SAFETY ' CHAIN EL FIXTURE ON BACK PACK BRANCH PANEL E.C. - ELECTRICAL CONTRACTOR CONDUIT IN CEILING OR WALL, 1/2" MIN. CONDUIT UNDERGROUND OR FLOOR, 3/4" MIN. HOME RUN TO PANEL WITH CIRCUIT NUMBER, SLASHES INDICATE NUMBER OF CONDUCTORS INDICATES WIRES AND CONDUIT OTHER THAN #12,1/2 "C C METALLIC ` CONDUIT, PVC PLASTIC CONDUIT ISOLATED GROUND OR GROUND CONDUCTOR FLEXIBLE CONDUIT CONNECTION AS REQUIRED TRANSFORMER MAIN LUGS ONLY DUPLEX RECEPTACLE, +18" MIN. OR AS NOTED FOURPLEX RECEPTACLE, +18" MIN. OR AS NOTED :. NOTES: IF ANY CONFLICTS OCCUR WITH TRUSSES, COORDINATE FIXTURE RELOCATION WITH ARCHITECT /ENGINEER. ELECTRICAL CONTRACTOR SHALL PROVIDE ALL MOUNTING ACCESSORIES AS REQUIRED, INCLUDING SAFETY HOOKS, CHAIN, UNISTRUT, ETC. FOR FIXTURE MOUNTING. PROVIDE STAINLESS STEEL STRANDED SAFETY CHAIN. SECURE `BETWEEN FIXTURE /BALLAST BODY AND THE NEAREST BUILDING STRUCTURE MEMBER. TYPICAL ALL H.L.D.'S BOTTOM OF FIXTURE +23' A.F.F. TYPICAL. ADJUSTABLE CHAIN HANGER TO MEET 23' FIXTURE CLEARANCE HEIGHT. H.I.D. FIXTURE MOUNTING DETAIL NO SCALE EMERGENCY LIGHT CIRCUIT W /BATTERY PANEL P1 208 / 120 VOLTS 3 PHASE 4 WIRE 100 A CU BUS W/100A/3P MAIN BREAKER A.I.C. MIN. EXISTING TOP FEED SURFACE MOUNT PHASE (KVA) CKT.CKT. PHASE (KVA) CIRCUIT USE A B C BKR. N0. NO. ' BKR. A B` C CIRCUIT USE JAND & CARBON TOWER 1.00 20/1 1 2 20/1 1.00 PAI REG CONTROL ROUND C 0.20 20/1 3 4 20/1 0.90 OZOMONIC R0 ULTRAVIOLET 1.00 20/1 5 6 20/1 0.20 PLC 7 8 1.00 SPARE 20/3 9 10 30/3 1.00 EXISTING LOAD 11 12 1.00 13 14 20/1 1.85 SHOP IN DAIRY LIGHTS * SPARE 30/3 15 16 20/1 1.85 SHOP IN DAIRY LIGHTS 17 18 20/1 1.85 SHOP IN DAIRY LIGHTS DAIRY > DOOR HEATER (M2)* 1.20 20/1 19 20 SPACE OZONE GENERATOR 0.50 20/1 2122 SPACE SPACE 23 24 20/1 1.34 SHOP IN COOLER /DELI (D54)* 1.03 25 26 20/1 1.34 SHOP IN COOLER /DELI (D54 SHOP -IN DAIRY AIR DOOR (M12)* 1.03 20/3 27 28 20/1 1.34 SHOP IN COOLER /DELI (D55 1.03 29 30 20/1 1.34 SHOP IN COOLER /DELI (055 TOTAL PHASE A (KVA) 3.23 8.42 KVA 5.19 TOTAL PHASE B (KVA) 1.73 6.82 KVA 5.09 TOTAL PHASE C (KVA) 2.03 7.76 KVA 5.73 TOTAL CONNECTED LOAD 23 KVA 63 A IVLVY LUAU. I'KUVIUt. NtW tSKtAKtK' AS SHOWN LIGHTING CONTROL SCHEDULE LRP -L (EXISTING) COSTCO - TUKWILA, WA FUNCTION FUNCTION SALES AREA SALES AREA 2ND GROUP ON /OFF 3RD GROUP ON /OFF CIRCUITS #'s; CIRCUITS #'S FUNCTION SALES AREA 1ST GROUP ON /OFF CIRCUITS #'S LIGHTING CONTROL SCHEDULE P15 COSTCO TIJKWILLA, WA FUNCTION FUNCTION FREEZER LIGHTS 0 COOLER LIGHTS . 0 CIRCUITS #'S CIRCUITS #'S P15/6 P15/2 P15/8 P15/4 P15/10 SPARE SPARE SPARE w z 0 L/1 L/11 L/15 L/19 L/37 L/38* A/33* L/3 L/7 L/17 L/21 L/39 L /40* L/5 L/9 L/13 L/23 L/41 L/42* -- L/16 L/20 L/29 L /30 L/33 L/34 L/18 L/22 L/25 L/26 L/35 L/36 L/14 L/24 L/27 L/28 L/31 L/32 z H- z 0 u_ L/2 L/12 L/4 L/6 -L /8 L /10 LIGHT UNDER MEZZANINE CIRCUITS #'S A/33* * PROVIDE NEW RELAY AS REQUIRED DOOR LIGHTS ON AT .10:00. AM - OFF AT 10:00 PM PANEL: P15 208 / 120 VOLTS 3 PHASE 4 WIRE 225 A CU BUS W150/3P MAIN BREAKER 22000 A.I.C. MIN. NEW TOP FEED SURFACE MOUNT SQ -D NQOD -PL CIRCUIT USE PHASE A (KVA) - B C BKR. CKT.CKT. NO. NO. BKR, PHASE A (KVA) B C CIRCUIT USE POS OVERSTOCK DOOR HTR (M32) 1:45 - 20/1 / 1 2 20 1 / 1.05 MLN LIGHTS OVERSTOCK * POS OVERSTOCK DOOR HTR R (M32) 1.45 20/1 / 3 4 20 1 / 1.05 MLN LIGHT S OVERSTOCK (M31) * POS OVERSTOCK DOOR HTR (M32) 1.45 20/1 / 5 6 20 -1 / 6 1. 6 - * MLN LTS WALL FRZR (M33) WALL FREEZER : DOOR HTR (M34) 0.46 20/1 / 7 8 20 _1 ' / 1.66 _ * MLN LTS WALL FRZR (M33) WALL FREEZER DOOR HTR (M34) ( ) 1.30 20/1 / 9 10 20/1 . 1.66 - MLN LTS WALL FRZR (M33) . WALL FREEZER DOOR HTR (M34) ( ) 1.30.. ..20/1. 11 1 12 20/1 SPARE WALL FREEZER DOOR HTR (M34) 1.30 20/1 13 14 20/1 1.58 OVERSTOCK FREEZER LIGHTS WALL FREEZER DOOR HTR (M34) 1.30 20/1 15 16 20/1 SPARE WALL FREEZER DOOR HTR (M34) 1.30 20/1 17 18 20/1 SPARE WALL FREEZER DOOR HTR M34) 1.30 20/1 19 20 20/1 1.92 HEAT TAPE M3 ( ) WALL FREEZER DOOR HTR M34 1.30 ' 20/1 21 22 20/1 1.92 HEAT TAPE (M3) WALL FREEZER DOOR HTR (M34) 1.30 20/1 23 24 20/1 1.92 HEAT TAPE (M3) WALL FREEZER DOOR HTR (M34) 0.92 20/1 25 26 20/1 0.86 WALL FREEZER DOOR HTR (D48) SPARE 20/1 27 28 20/1 0.86. WALL FREEZER DOOR HTR (D49) OVERSTOCK FREEZER FAN /HTR (044) 1.34 20/1 29 30 20/1 0.86 WALL FREEZER DOOR HTR (D50) OVERSTOCK FREEZER FAN /HTR (D45) 1.34 20/1 31 32 20/1. 0.86 WALL FREEZER DOOR HTR (D51) OVERSTOCK ' FREEZER FAN /HTR (D46) 1.34 20/1 33 34 20/1 0.86 WALL FREEZER DOOR HTR (D52) OVERSTOCK FREEZER FAN /HTR (D47) 1.34 20/1 35 36 20/1 SPARE SPARE 20/1 37 38 20/1 SPARE SPARE 20/1 39 40 20/1 SPARE SPARE 20/1 41 42 20/1 SPARE TOTAL PHASE A (KVA) TOTAL PHASE B (KVA) TOTAL PHASE C (KVA) ' 6.77 6.69 8.03 14.7 KVA 13.04 KVA 12.47 KVA 7.93 6.35 4.44 TOTAL CONNECTED LOAD 40.21 KVA 111 A vLRWI I1LL oRLAnLR JILL) YYI I ri rrCLLLLRosUULtK LAM I KAL.I UK tStl'UKt -INS IALLAI ION * POWER LINK BREAKER; SEE LIGHTING CONTROL SCHEDULE FOR CONTROL SEQUENCE. PANEL: PP1 EXISTING 480 / 277 VOLTS 400 A CU BUS M.L.O. TOP FEED CIRCUIT USE PHASE (KVA) B BKR. 3 PHASE 4 WIRE A.I.C. SURFACE MOUNT CKT. NO. CKT. NO. 2 BKR. PHASE (KVA) B CIRCUIT USE SPARE 20/3 20/3_ SPARE SPARE 20/3 SPARE 20/3 10.00 XFMR T1 10.00 60/3 10.00 SPARE 20/3 SPARE 20/3 15.00 SUBFEED T15 45KVA * 15.00 15.00 70/3 TOTAL PHASE A (KVA) TOTAL PHASE .B (KVA) TOTAL PHASE C (KVA) 25.00 25.00 25.00 TOTAL CONNECTED LOAD 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 10 12 14 16 18. 20 22 24 26 28 30 20/3 SPARE 20/3 SPARE 32 34 36 38 40 42 SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE w 1 0 z • z 0 w LL 0.. oZ w. O Z 0 W U (1)w w CO o za w Mw: UI'' 0 I-- o�- ti) 0 -± LL 0 fx.. oc: zo 11.40 50/3 36.4 KVA 36.4 KVA 36.4 KVA 109.2 KVA 11.40 RACK D CONDENSOR 11.40 11.40 11.40 * NEW LOAD. PROVIDE NEW BREAKERS AS SHOWN 11:40 131 A M 11 �2y SEPARATE PERMIT AND APPROVAL REQUIRED RECEiVty CITY OF TIJIM A SEP OC 'oil PERMIT CENTEF GENERAL NOTES: REFRIGERATION CONTRACTOR TO FURNISH STEEL BUMPERS. BUMPERS TO BE INSTALLED IN FRONT AND /OR NEXT TO ALL CASES EXCEPT FOR BAKERY CASES. SEE DRAWING DETAILS. SEE ARCHITECTURAL DRAWINGS FOR CURBS IN. AND /OR AROUND REFRIGERATED BOXES. COLUMNS TO ' BE WRAPPED WITH STAINLESS STEEL FROM FLOOR TO CEILING. FURNISHED BY PANEL MANUFACTURER, INSTALLED BY REFRIGERATION CONTRACTOR. SEE PANEL DRAWINGS FOR ADDITIONAL DETAILS /REQUIREMENTS. ALL WALK-IN COOLER AND FREEZER EVAPORATIVE COILS LOCATED AS SHOWN ON PLANS. ALL 2' -0 CLEARANCE ABOVE NOTED INTERIOR COOLER HEIGHT FOR STRUCTURAL STEEL. CLOSURES /FILLERS FOR ANTHONY WINDOWS TO BE AUTO BRIGHT. PROVIDED AND INSTALLED BY REFRIGERATION CONTRACTOR. SALES FREEZER #1 TO HAVE POWEREDAIRE AIR DOOR, MODEL: ETD 2 -84. FURNISHED BY KYSOR/ /WARREN AND INSTALLED BY REFRIGERATION CONTRACTOR. SHOP -IN PRODUCE TO HAVE HCR AIR CURTAIN, MODEL: HCR AC -CS. FURNISHED BY PANEL MANUFACTURER AND INSTALLED BY REFRIGERATION CONTRACTOR. SEE COSTCO SPECIFICATION FOR REQUIRED MATERIALS AND METHODOLOGY FOR SANITATION COMPLIANCE IN PREP AREA. DIAMOND PLATE /STAINLESS STEEL LEGEND ALL DIAMOND PLATE FOR POINT OF SALES AND PREP AREAS ARE SUPPLIED BY PANEL MANUFACTURER. INSTALLED BY REFRIGERATION CONTRACTOR. DIAMOND PLATE 3' x LENGTH OF BOX END WALL SEE PANEL DRAWINGS FOR EXACT LOCATION. II 3' TALL DIAMOND PLATE CORNER GUARD SUPPLIED BY PANEL MANUFACTURER AND FIELD INSTALLED BY PANEL REFRIGERATION CONTRACTOR.: III DIAMOND PLATE 4 H. x LENGTH OF WALL SEE PANEL DRAWINGS FOR EXACT LOCATION. IV STAINLESS STEEL BEHIND SKEWERS (SEE MEAT MANAGER). FIELD VERIFY SIZES. STAINLESS STEEL PANEL SKIN ON EXPOSED PANELS ON ROTISSERIE /MEAT PREP BY PANEL MANUFACTURER. VI 4' TALL DIAMOND PLATE CORNER GUARD SUPPLIED BY PANEL MANUFACTURER AND FIELD _ INSTALLED BY REFRIGERATION CONTRACTOR. ANTHONY PREP WINDOWS "REFRIGERATION INSTALLATION CONTRACTOR TO COORDINATE THE PREP AREA HEADER SUPPORT POST INSTALLATION WITH THE G.C. SEE SHEET R7B FOR DETAIL." 10 72" x 45)2" / 96" x 45Y2 HEATED PREP WINDOWS (REFER TO PANEL MANUFACTURER DRAWINGS FOR EXACT LOCATION). 72" x 35Y2" / 96" x 35Y2" HEATED PREP WINDOWS (REFER TO PANEL MANUFACTURER DRAWINGS FOR EXACT LOCATION). G HEADER OPENING HEIGHT FOR CASES AND WINDOWS IS 6' -11 3/4 ". • TOP OF HEADER PANEL TO BE 10' -5 3/4" A.F.F. SIDE VIEW w Q: 0 CLOSE -OFF PANEL TO BE FIELD NOTCHED FOR STORE COLUMN AS ' REQUIRED. w SIZES VARY PLAN VIEW SHEET METAL TO MATCH CASE. PROVIDED BY MANUFACTURER. ISLAND CLOSE—OFF PANEL SCALE NONE * *EXACT LOCATION TO BE DETERMINED BY STRUCTURAL ENGINEER (N) ROOF- TOP CONDENSER " MODEL: BNH— D12 —A106 WEIGHT: 4230 LBS. SIZE: 88" x 324" x 55" 1 1 1 IN= M 'N (N)ANTI– SWEAT PANEL 12 ": AFF 1 27' -0" (N) CONDENSER (N) 1' ` x 2' OPENING IN ROOF FOR PIPING TO ROOF TOP CONDENSER WITH CURB ALL AROUND. NM M = - M M N (E)ANTI -SWEAT PAN 12" AFF -MT WALL UNIT 1' L 10' -0" 1 L ELECTRICAL PANEL ON RACKS & COMPRESSORS TO BE FACING IN TOWARDS CENTER AISLE RACK D 232" x.38" x 78" H. 9,000 LBS. 19' -4" IN 1 1 { ELECTRICAL PANELS COMPRESSOR RACKS WITH DRIP PANS, TYP.,21,000 LBS 1 1 1 1 1 0 :_ENE aim - - - -- — NNE -- - =pi =IN - -ism ELECTRICAL MEZZANINE PLAN AREA OF WORK SCALE: 1/8" = 1-0 AREA OF WORK OMNI 111= e 1 { 1. 1 1 AREA OF WORK 1 1 1 1 1 1 1 1 N 50'-0' MEZZANINE ABOVE 50: —0' 164' -6" 4- ---- -- t;3 AREA OF WORK w 0 10 1 J co 0 1` 1. I • • .. II I AsNi (_ti. i 6 f 7\1\-\-- s „NNE .M NMI MN 8' -3X" ' DX6LN M/D DELI CB96 CB96 8' -3 X" DX6LN M/D DELI `m — 0 N co m U" N W MN .a MI= w 0 0 z J CD X 0 • • u M. 11 ' -3i " DX6LN M/D DELI CB96 EXISTING FREEZER SUB -ZERO SALES — N :I_ ,_ DD CB96 8' -3 Y2" DX6LN M/D DELI co m` U MEI 1111111•111•11111111* 1 9 ' „1 -6: —" DX6LN M/D DELI CB96 co m U. w 0 0 z J 0 m U co o) m U CB96. 8' -3 ) ", DX6LN M/D :DELI IMIN - - M = E. - 1 M -'- ti FRESH AREA PLAN SCALE: 1/8" =1' -0" { noon NEI min 1 1 1 1 --1r -1 �17` 1 -1 II £ 4., 13 11 0 f 31 = = _ = { 1 1 1 1 I. 1 1 j _ • _ MIN 6' -0" 6' -0" (N) WKG270. a T — – (54) : 32" 'x 63" ANTHONY REACH —IN DOORS •1:.r 1 (N) WKG270 (N) WKG270 (N) WKG270 (N) WKG270 (N) WALL FREEZER WITH FLOOR Imm INN sm mum am imm ENE Ems mil NNE NNE NNE MME 7 D (N) WKG270 (N) WKG270 (N) WKG270 (N) WKG270 (N) WKG270 E -- M III= IN= . I M M III MIN N M N PARTIAL FLOOR PLAN A SCALE: 1/8" = 1mi mmi aim mom mom momm mu mil Imo mom mom mil IN= Emi Nom Nom mow mow mom mm mom =mi Num :.)Usw -07 (13) 32" x 63" ANTHONY REACH -IN DOORS FREEZER PIT TO OFFSET EXTERIOR OF FREEZER BY 1-1/2" (9) 32" x 63" ANTHONY REACH -IN DOORS re 20' -0" (N) 10'x10' OPENING W/ HCR AIR CURTAIN (5) 32" x 63" ANTHONY REACH -IN DOORS fJ T DD .W.s {: R ?f ;z - n--n n—n _n--n :,T-,. - - n— n-n _n-n n--n BMG520 j 1 BMG520 (N) OVERS OCK FREEZER 1,260 SF x 18' H. 10' DEGREE BOX BMG520 I,: 1 BMG520 .. .. -,. .. - .. .. U M f:. 7' =0" 0 0 0 13' -0" 0 m 0 CV m f\ N 1 1 1 1 IfOM (N) SHOP -IN DELI COOLER 1,512 SF x 18' H. +34' DEGREE BOX 1 • I - — — _ 1 { • -O" 0 m 0 N r0 c0 m 13' -O" 1 1 1 1 { III (E) PRODUCE COOLER 36' -7 `im .l - -- PIT DIMENSION 36' -0" 63' -0" 100' -3" D £ { 1 M M'- - MI N - - - III= MI MN Imo. III - M M - - N M N = PARTIAL FLOOR PLAN B SCALE: 1/8" = 1' -0" 1 1 1 1 1 1 1 1 1 M 12•Li CITY OF TUKWILA PERMIT CENTER #006 TUKWILA, WA 400 COSTCO DR. SUITE 500 TUKWILA, WA. PH: 206.575.9191 COSTCO WHOLESALE CORPORATIO\ 999 LAKE DRIVE ISSAQUAH, WA 98027 T: 425.313.8100 www.costco.com 5201 TRANSPORT BLVD. COLUMBUS, GA 31907 Tel: (706)568-1514 Fax: (706)565-1723 HEATCRAFT WORLDWIDE REFRIGERATION COMMITMENT TO STAKEHOLDERS, AND PASSION FOR EXCELLENCE CONTACT INFORMATIO REGIONAL SALES MANAGER DAVE WALKER - 817.233.9664 SYSTEMS PROJECT ENGINEER SUPERVISOR JAY MELANCON C - 706.536.9477 WALL/OVERSTOCK FREEZER, DELI COOLER RENODEL Ali rights resented. No part of this document may be reproduced in any form or by any means 'without the expressed written.consent of KyserANarren. DATE DESCRIPTION 8.26.11 REMODEL EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS- BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND E X I S T I N G C O N D I T I O N S EACH CONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELVES WITH THIS KNOWLEDGE DOES NOT RELIEVE THEIR RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS K NOW LEDGE AUG 26, 2011 DRAWN BY: F. COOK POINT OF SALES (Sc FRESH AREA PLAN R 1 NOTES: ALL JUNCTION BOXES FOR REACH -IN DOOR LIGHTS TO BE LOCATED ON MULLIONS. SEE DETAIL THIS SHEET. OVERHEAD ELECTRICAL CONDUIT TO BE RUN INSIDE OF TRUSS WORK AS HIGH AS POSSIBLE AVOIDING SKY LIGHTS AND STORE LIGHTING. ALL FLUORESCENT SWITCH LIGHTING PROVIDED AND INSTALLED BY REFRIGERATION ELECTRICAL CONTRACTOR. SURFACE . MOUNT ALL CONDUIT FOR MEAT /DELI /PRODUCE REFRIGERATED WALK —IN BOXES ON THE EXTERIOR ROOF OF THE WALK-1N BOXES. MOISTURE PROOF SEALANT AT PENETRATION AND INSIDE CONDUIT. SEE. SHEET R -3 FOR ELECTRICAL LEGEND ALL SLIDER DOORS TO ` HAVE DOOR CLOSE MONITOR /ALARM BY MT CONTROL SYSTEM. ALL SWITCH LIGHTING FOR WALK -INS PROVIDED AND INSTALLED BY REFRIGERATION ELECTRICAL CONTRACTOR. LIGHT SWITCH LEGEND 3—WAY SWITCH $P PILOT LIGHT SWITCH 3 -WAY PILOT LIGHT SWITCH '3 ELECTRICAL LEGEND ELECTRICAL CALL —OUT, SEE REFRIGERATION SCHEDULE MISCELLANEOUS ELECTRICAL FOR DESCRIPTION. REFRIGERATION SYSTEM NUMBER, SEE REFRIGERATION SCHEDULE FOR REFERENCE. p ELECTRICAL CONNECTION POINT O JUNCTION BOX SOLENOID 4P DEFROST TERMINATION SENSOR 2 CONDUCTOR BELDEN #8761 TO ASSIGNED MT INPUT. SEE R -3 FOR DETAILS MT TEMPERATURE PROBE CURRENT SENSING PROOF 2 CONDUCTOR BELDEN #8761 TO ASSIGNED MT INPUT DIFFERENTIAL PRESSURE SWITCH 2 CONDUCTOR BELDEN #8761 TO ASSIGNED MT INPUT MAGNETIC SWITCH 2 CONDUCTOR BELDEN #8761 CABLE TO ASSIGNED MT INPUT WEATHER PROOF SWITCH, DISCONNECT MEANS NON - FUSED 4 POLE FAN DISCONNECT. 4TH POLE USED TO BREAK SOLENOID POWER FOR THAT SYSTEM. 8' x 8' WATER TIGHT FLUORESCENT FIXTURE. PROVIDED AND INSTALLED BY REFRIGERATION. ELECTRICAL CONTRACTOR (LITHONIA DH2 96T8 HO 120 CW OR EQUAL). EMERGENCY LIGHTING. EM i BATTERY BACK -UP PROVIDED AND INSTALLED BY REFRIGERATION ELECTRICAL CONTRACTOR. MODEL: #B50 COLD -PAK SERIES, WATTAGE RANGE 17W -215W. G ERGONOMIC LINEAR QUAD LAMP ELS HO -101A. INSTALLED BY REFRIGERATION ELECTRICAL CONTRACTOR. CONVENIENCE OUTLET WITH GROUND FAULT INTERRUPTER ISLAND CONVENIENCE OUTLETS. PROVIDED BY CASE MANUFACTURER AND INSTALLED BY REFRIGERATION ELECTRICAL ` CONTRACTOR. SEE LOCATION DETAILS THIS SHEET. THERMO- SIMPLE DISPLAY `>UNIT CONNECT TO TRANSFORMERS. THERMO - SIMPLE TRANSFORMERS FIELD INSTALLED ON TOP OF PRODUCE COOLER, POS BOXES, BAKERY COOLER, AND FOOD SERVICE. THERMO— SIMPLE PROBE - MOUNT ADJACENT TO MT PROBES. DOORFRAME NOTE J -BOX ABOVE P.O.S. ROOF PANEL 1- J -BOX TO BE MOUNTED ABOVE P.O.S. ROOF PANEL THROUGH OUT. FLEX TO l JUNCTION : BOX X //7 SURFACE MOUNT ' \ RIGID CONDUIT jj /FACTORY WIRI HARNESS, �- • SCALE t A 4 .. z • 0 O ELECTRICAL MEZZANINE PLAN SCALE: 1/8" = 1' -0" 5C; —O,: 'J of 1 Sti NOTE: (TYP.) SEE DETAIL .1 D46 D44 1 , Al III .m. NOTE: (TYP.) SEE DETAIL 1 III 0 D45 012. D47 4 (0 Ia D48 1 SP Alf e ❑� IeI GFl TO BE WIRED IN SERIES, TIE TO DI POINT. SEE BOARD POINT SHEET £ FOR FINAL CONNECTION sI LOCATION. 503. REF ELECTRICAL CONTRACTOR TO MOUNT (1) HUMIDITY SENSOR 6' A.F.F. ON BUILDING COLUMN. CONNECT TO MT BOARD IN ANTI - SWEAT PANEL 1 m 3£ LIGHT TO BE MOUNTED TO HCR AIR CURTAIN CD Q5 D54 41B PARTIAL FLOOR PLAN B SCALE: 1/8" = 1' -0" 1 £ III D49 4z) a sx ...._...mzl ££ co ElqPilr:0111.111111111D1 IRA Wig 1 41D III Al D50 -1 1 f PARTIAL FLOOR PLAN A SCALE: 1/8 ",= 1' -0" ,;t9 F ' � A°` t3 I 055 £ 3 1 1 I I I r TOI BE WIRED IN SERIES, TIE TO DI POINT. {s SEE BOARD POINT SHEET FOR FINAL CONNECTION LOCATION_ £ 1 II■ 4 TSD . £ sv I1 el I I 1 1 'Np GFl / I / 1 1 1 1 1 I1 GET FRESH AREA PLAN SCALE: 1/8" = 1' -0" L. TO BE WIRED IN SERIES, TIE TO DI POINT. SEE BOARD POINT SHEET FOR FINAL CONNECTION LOCATION. III it III D52 II 0 5 £ istm ma. „wag esms A M(1l1 n hsizt S ; £ CITY OF SEP 02'2011 PERMIT CENTER X006 Li TUKWILA WA 400 COSTCO DR. SUITE 500. TUKWILA, WA. PH: 206.575.9191 COSTCO WHOLESALE CORPORATION 999 LAKE DRIVE ISSAQUAH, WA 98027 T: 425.313.8100 www..COStco.00m KYS M /111R111RE11 5201 TRANSPORT BLVD. COLUMBUS, GA 31907 Tel: (706)568-1514 Fax (706)565 -1723. HEATCRAFT WORLDWIDE REFRIGERATION INTEGRITY, COMMITMENT TO STAKEHOLDERS, AND PASSION FOR EXCELLENCE CONTACT INFORMATION REGIONAL SALES MANAGER DAVE WALKER 817.233.9664 SYSTEMS PROJECT ENGINEER SUPERVISOR JAY MELANCON WALL/OVERSTOCK FREEZER, DELI COOLER IS_A\D REMODEL Ail rights reserved. No part of this document may be reproduced in any form or by any means without the expressed written consent of Kysor/VVarren. DATE 8.24.11 DESCRIPTION REMODEL EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS- BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES A N D E X I S T I N G C O N D I T I O N S EACH CONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELVES WITH THIS KNOWLEDGE DOES NOT RELIEVE THEIR RESPONSIBILITY OF PERFORMING THE WORK PROPERLY: NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH T H I S K N O W L E D G E AUG 24, 2011 DRAWN BY: F. COOK ELECTRICAL PLAN I 1 • SCALE t A 4 .. z • 0 O ELECTRICAL MEZZANINE PLAN SCALE: 1/8" = 1' -0" 5C; —O,: 'J of 1 Sti NOTE: (TYP.) SEE DETAIL .1 D46 D44 1 , Al III .m. NOTE: (TYP.) SEE DETAIL 1 III 0 D45 012. D47 4 (0 Ia D48 1 SP Alf e ❑� IeI GFl TO BE WIRED IN SERIES, TIE TO DI POINT. SEE BOARD POINT SHEET £ FOR FINAL CONNECTION sI LOCATION. 503. REF ELECTRICAL CONTRACTOR TO MOUNT (1) HUMIDITY SENSOR 6' A.F.F. ON BUILDING COLUMN. CONNECT TO MT BOARD IN ANTI - SWEAT PANEL 1 m 3£ LIGHT TO BE MOUNTED TO HCR AIR CURTAIN CD Q5 D54 41B PARTIAL FLOOR PLAN B SCALE: 1/8" = 1' -0" 1 £ III D49 4z) a sx ...._...mzl ££ co ElqPilr:0111.111111111D1 IRA Wig 1 41D III Al D50 -1 1 f PARTIAL FLOOR PLAN A SCALE: 1/8 ",= 1' -0" ,;t9 F ' � A°` t3 I 055 £ 3 1 1 I I I r TOI BE WIRED IN SERIES, TIE TO DI POINT. {s SEE BOARD POINT SHEET FOR FINAL CONNECTION LOCATION_ £ 1 II■ 4 TSD . £ sv I1 el I I 1 1 'Np GFl / I / 1 1 1 1 1 I1 GET FRESH AREA PLAN SCALE: 1/8" = 1' -0" L. TO BE WIRED IN SERIES, TIE TO DI POINT. SEE BOARD POINT SHEET FOR FINAL CONNECTION LOCATION. III it III D52 II 0 5 £ istm ma. „wag esms A M(1l1 n hsizt S ; £ CITY OF SEP 02'2011 PERMIT CENTER X006 Li TUKWILA WA 400 COSTCO DR. SUITE 500. TUKWILA, WA. PH: 206.575.9191 COSTCO WHOLESALE CORPORATION 999 LAKE DRIVE ISSAQUAH, WA 98027 T: 425.313.8100 www..COStco.00m KYS M /111R111RE11 5201 TRANSPORT BLVD. COLUMBUS, GA 31907 Tel: (706)568-1514 Fax (706)565 -1723. HEATCRAFT WORLDWIDE REFRIGERATION INTEGRITY, COMMITMENT TO STAKEHOLDERS, AND PASSION FOR EXCELLENCE CONTACT INFORMATION REGIONAL SALES MANAGER DAVE WALKER 817.233.9664 SYSTEMS PROJECT ENGINEER SUPERVISOR JAY MELANCON WALL/OVERSTOCK FREEZER, DELI COOLER IS_A\D REMODEL Ail rights reserved. No part of this document may be reproduced in any form or by any means without the expressed written consent of Kysor/VVarren. DATE 8.24.11 DESCRIPTION REMODEL EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS- BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES A N D E X I S T I N G C O N D I T I O N S EACH CONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELVES WITH THIS KNOWLEDGE DOES NOT RELIEVE THEIR RESPONSIBILITY OF PERFORMING THE WORK PROPERLY: NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH T H I S K N O W L E D G E AUG 24, 2011 DRAWN BY: F. COOK ELECTRICAL PLAN REV. E DATE: 811912011 WAREHOUSE 006 • CITY/STATE1PRICOUNTRY: DESCRIPTION SOUTHCENTER, WA SCOPE: NEW DELI SHOP-IN COOLER, OVERSTOCK FREEZER, WALL FREEZER, REPLACE DELI ISLANDS 1201 V/ 2.2 UNIT LETTER REF REFRIGERATORS FREEZER DOOR HEATER DS REQUIRED CAPACITY 10.0 REF REFRIGERATOR/WALK-IN COIL CIRCUITS REF REFRIGERATOR/WALK-IN COIL ELECTRIC DEFROST TEMPERATURE/DEFROST CONTROU MONITOR SUCTION BRANCH KITS LINE SIZING (EIGHTHS OF AN INCH) REF SYS NUM REMARKS M4 SYS NUM SYSTEM DESCRIPTION MODEL & MANUFACTURER EXPANSION VALVES CASE LENGTH QUANTITY CASE TOTAL LENGTH DISCH B.T.U.H. EVAP TEMP. GPM TOTAL MAX COIL P/D EACH COMPRESSOR MODEL SYSTEM CAPACITY LOAD RATIO SYS NUM UNIT • VOLTAGE FANS1CONSTANT HEATERS PER UNIT) LIGHTS (PER UNIT) DRAIN HEATERS PER (UNIT) SYS NUM DEFROST VOLTAGE FIXTURES @ 0.65 AMPS EACH MAIN 3ph INDIVIDUAL DEFROST TEMP. PROBE CONTROL NUMBERS SUCTION PRESSURE CONTROL - LIQ. SQL FIELD OFF TIME KOOL GAS ESTIMATED RUN LENGTH LICL SUCT. RISER DEFROST 3ph • AMPS TOTAL , MCA MOPD AIR TEMP. SYSTEM PER FT. TOTAL LOAD FAN/H1R 872DR/3DR FAN/HTR 1274DR/5DR LIGHTS 872DR/3DR LIGHTS 1274DR/5DR LOAD QTY BRKR INSTALLED @ EVAP. TIM E • TIME 10.5 E SPARE E M11 COLD ZONE AIR CURTAIN (P03 FREEZER) POWERED AIRE ETD-2-84 46013 2.7 / 10 E MCA 1 MOP PROVIDED BY PANEL MFG. INOTALLED BY REFRIGERATION CONTRACTOR M12 SHOP-IN AIR DOOR (PRODUCE, DAIRY, DELI) HCR AC-CS 208V/3 8.6 (N) MCA / MOP PROVIDED BY PANEL MFG. INSTALLED BY REFRIGERATION CONTRACTOR DX DX POS FRZ/CLR WOR ISLAND END CAP 120V/1 16 EACH E PROVIDED AND INSTALLED BY REFRIGERATION ELECTRICAL CONTRACTOR M14 HOT CASE 4DK-2500 REC. REF. LOSS ALARM (E) E BY OTHERS, TYPICAL, VERIFY PER PROJECT M15 POS CLR. & FRZ. BAKERY FRZ LIGHTS ERGONOMIC ELS HO-101A 120V/1 1.5 EACH E 24" x 24" - 1.47 AMPS EACH, PROVIDED BY WALK-IN MANUFACTURER, INSTALLED BY REFRIG. ELEC. CONTRACTOR. M16 ANTI-SWEAT PANELS SVVEATMISER SM16 &SM24 120V/1 49YE E 7 17 13 120V/1 (E) E MCA/MOPD M18 SPARE ANTHONY 1500 SLIDERS 120V/1 27.3 E (7) SECTION @ 3.9 AMPS EACH M19 THERMO-SIMPLE DISPLAY UNIT INNOVATIONS 5V-DC5V-DC (E) E POWERED VIA CAT-5 CABLE RUN TO TRANSFORMER (WIRED IN SERIES) M20 THERMO-SIMPLE PROBE INNOVATIONS DX DX • TO BE MOUNTED 8' AFF M21 2 INNOVATIONS 120V/1 (E) E TO BE MOUNTED ON TOP OF POS COOLER & FREEZERS, AND PRODUCE COOLER. M22 HEATED PRESSURE RELIEF PORT KASON 120V11 (E) CARLYLE PROVIDED BY PANEL MANUFACTURER F23 MT INPUT & ALARM PANEL (BELL & STROBE) MT INPUT W/ ALARM 120V/1 16.0 E REFRIGERATION ELECTRICAL CONTRACTOR TO PROVIDE POWER TO MT INPUT ALARM PANEL, INCL. KVM TERMINAL OUTLET. IV24 POS FREEZER FAN PANEL POS FREEZER FAN PANEL N/A NOTES REF. ELE. CONTRACTOR TO PROVIDE POWER TO POS FREEZER FAN PANEL ALSO RUN WIRING TO COILS & SQL. AS NECESSARY. m25 MEZZANINE FAN PANEL MEZZANINE FAN PANEL 1/4 POS FREEZER #1 19 x 64 x 18 E SM15-556 KGE KRACK E SVE-4 Z E SUCTION DL ( -23) YES 1 SEE LEGEND AND/OR EQUIPMENT FOR VOLTAGE & AMPERE. M27 -5 VENT-ANA 47,200 -14 DX DX 3 460V/3 2.0 M29 PUMP STATION 2.8 3 KOOLGAS M30 CONDENSER/POWER-CONDENSER CONTROL INSTALLING CONTRACTOR TO PROVIDE ANY AND ALL MATERIALS FOR PROPER INSTALLATION & OPERATION (N) ALSO SEE REMOTE CONDENSER SECTION ON THIS LEGEND (A) A16 GA. TWISTED PAIR NONE SHIELDED CABLE (NETWORK) (TO RACKS) (B) A 22 GA. 3 CONDUCTORS CABLE FROM THE DROP LEG PRESS. TRANSDUCER TO INPUT U3 (AT CONDENSERS) (C) A 22 GA. 2 CONDUCTORS CABLE FROM THE DROP LEG TEMPERATURE SENSOR TO INPUT U4 (AT CONDENSERS) (D) A 10K OHM ©77DF TYPE 2 SENSORS. SHOULD BE UNDER THE FIRST FAN ON THE HEADER SIDE ON INPUT U5 (OUTSIDE AIR) 69VP - • MULLION LIGHTS OVERSTOCK FREEZER & DELI 07YC E 7 17 13 FIXTURES @ ass AMPS EACH M32 MULLION LIGHTS OVERSTOCK FREEZER & DELI ANTHONY CUSTOM 32' 120V/1 36.3 1/4 POS FREEZER #2 19 x 64 x 18 E LI-IG6-550 LARKIN E (E) E 4t6 N 1 FIXTURES @ 0.65 AMPS EACH M34 -15 ANTHONY CUSTOM 37 53,040 -25 DX DX 3DF-0900 34,457 460V/3 2.6 Z7 (460V/1) 4 KOOLGAS C7 ME-42 S.S. 40 30 ME-19 E 7 17 13 2.43 3.70 3.70 6.39 10.11 10.11 1/4 POS FREEZER #2 19 x 64 x 18 E LHG6-550 LARKIN E (E) E 1.64 3.70 1 15.02 15.02 -15 8.55 53,040 -25 DX DX 4DP-1500 52,438 R-22 5 460V/3 2.6 R-22 R-22 R-22 2.7 (460V/1) 5 KOOLGAS R-22 R-22 R-22 R-22 R-22 R-22 R-22 C7 ME-42 S.S. R-22 R-22 ME-19 E 7 17 13 SUCTION TEMPERATURE -28 -28 -28 -28 +19 SPARE E -18 -18 -18 +22 +22 +22 +22 -28 -28 -28 ISPLIT SUCTION SIC / +22 +22 +22 DX DX 4DP-1500 52438 CONDENSING TEMPERATURE 105 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 07YC 110 7 17 • 13 110 CAPACITY MBH W/O SUBCOOLING (EACH) S1A 29,201 REMOTE PARALLEL COMPRESSOR 44,439 76,623 121,282 121,282 62,157 73,673 73673 129,431 3DA-0600 23,234 81,955 19,690 44,439 54,530 180,230 180,230 211,551 102,623 59,600 150,443 150,443 WATTS MBH (EACH) 4,490 6,540 10,410 10,410 7,860 12,720 12,720 12,030 14;140 14140 12,990 12,990 SiA 8,010 4,490 10,410 AL 17,690 -28 LOW TEMP. SUCTION GROUP 21,410 10,135 12,528 TOTAL 153,280 -28 REJECTION MBH (EACH) 162,567 94.3% 79,962 79,962 103342 164, 706 164,706 103,212 121,919 121919 173769 173,769 173,769 109,293 35,028 79,962 96,943 240,596 240,596 584,613 133,745 93,796 202,303 202,303 REJECTION MBH (TOTAL) 112 MEAT COOLER 34 x 40 x 10 E MK26-206 KGE KRACK E 977,650 +28 33,500 +21 DX DX SUBCOOLING CREDIT % 7 120V/1 6.4 1.18% 7.0 7 KOOLGAS 1.18% 1.20% t20% • 1.20% 20 69VP 42VS 1.42% 13 11 COMPRESSOR RLA (EACH) 15.0 16.0 24.0 24.0 M/D DELI E N6DHPM TYLER E 30.0 26.0 8 12 1 1 20 +28 1100 22,000 +25 DX DX 25.6 25.6 8 120V/1 t6 2.4 0.95 1.4 8 OFFTIME . 182.0 SPORT 9-9 216.4 246.3 UNIT MCA BAKERY COOLER 20 x 20 x 10 E GL36-135A KRACK E 2 189.5 +34 24,000 +24 DX DX 227.7 9 120V/1 4.8 UNIT MOPD 9 OFFTIME 175(E) SPORT 7-7 E 250(E) 300(N) 10 BAKERY COOLER 20 x 20 x 10 E HC6A-166AB HUSSMANN +34 24,000 +24 DX DX 10 120V/1 6.3 1.53 10 12 69VP 32VS E 4 9 9 10 RACK 11 1/2 POS COOLER 19 x 64 x 18 E SM26-746A KRACK E SVE-4 C E +34 77,500 +24 DX DX 11 460V/3 4.0 1.53 11 20 69VP 36VS E 5 17 13 11 12 MEAT PREP - 1,791 SQ FT LFA-190 LARKIN E SBFVE-C C E 3 +50 70,000 1-35 DX DX 3DA3-0750 76,623 i 12 120V/1 6.4 N12 N13 N40 12 NOTES 15 69VP 34VS E 5 11 11 12 13 M/D DELI D5E HUSSMANN E 8 12 1 1 20 +31 1355 27100 . +24 DX DX 3DS-1500 121,282 13 120V/1 1.4 2.1 3.6 5.4 13 12 32VS E 5 9 7 13 14 SUBCOOLER RACK A E +50LIQ 24,798 +35 DX DX 3DS-1500 121,282 14 • 14 15 12VV/61VJ E 14 AH +19 MED. TEMP. SUCTION GROUP TOTAL 302,898 .+19 319,187 94.9% . . ' AH 15 BAKERY FREEZER -527 SQ FT x 10 E MK24-210 KGE KRACK E 2 -5 41,500 -15 DX DX 15 120V/1 6.4 7.0 15 KOOLGAS 20 69VP 42VS E 5 13 11 15 16 1/4 POS FREEZER #1 19 x 64 x 18 E SM15-556 KGE KRACK E SVE-4 Z E 1 -5 47,200 -14 DX DX 4DP-1500 73,345 16 460V/3 2M 2.8 16 KOOLGAS 69VP 07YC E 7 17 13 16 17 1/4 POS FREEZER #1 19 x 64 x 18 E SM15-556 KGE KRACK E SVE-4 Z E 1 -5 47,200 -14 DX DX 4D5-2200 86,934 17 460V/3 2.0 2.8 17 KOOLGAS 69VP 07YC E 7 17 13 17 19 1/4 POS FREEZER #1 19 x 64 x 18 E SM15-556 KGE KRACK E SVE-4 Z E 1 -5 47,200 -14 DX DX 4DS-2200 86,934 19 120V/1 9.6 12.2 19 KOOLGAS 69VP 07YC E 7 17 13 19 BL -18 LOW TEMP. SUCTION GROUP TOTAL 183,100 -18 247,214 74.1% , BL 18 1/2 PRODUCE COOLER 36 x 44 x 20 E EFA-340 TYLER E SBFVE-C C E 3 +40 94,000 +30 DX DX 18 120V/1 9.6 18 OFFTIME SPORT 17-17 E 7 17 13 18 20 BAKERY CAKE CASE E NDFLHP TYLER E +28 24,000 4-22 DX DX 20 120V/1 4.8 20 69VP E 5 11 11 20 21 SID DELI E NHMGHP TYLER E 8 12 2 40 +29 425 17,000 +24 DX DX 21 120V11 t08 1.56 21 OFF-TIME SPORT 9-9 E 5 9 9 21 COMBO REFRIGERATION LINE E DX DX 22 22 20 E 7 17 13 224 1/6 DAIRY COOLER 24 x 37 x 20 E GH56-340A KRACK E SBFVE-C C E 1 +36 34,000 +25 DX DX 22A 120V/1 9.6 22A OFFTIME ME-25 S.S. E 5 9 9 22A 22B 1/6 DAIRY COOLER 24 x 37 x 20 E GH56-340A KRACK E SBFVE-C C E 1 +36 34,000 +25 DX DX 22B 120V/1 9.6 22B OFFTIME ME-25 S.S. E 5 9 9 22B 22C 1/6 DAIRY COOLER 24x 37 x 20 E GH56-270A KRACK E SBFVE-C C E 1 +36 30,500 +25 DX DX 22C 120V/1 9.6 22C OFFTIME ME-25 S.S. E 5 9 9 22C 23 1/2 MEAT COOLER 34 x 40 x 10 E MK26-206 KGE KRACK E +28 • 33,500 +20 DX DX 23 120V/1 6.4 7.0 23 KOOLGAS SPORT 1 1-1 1 EPR E 5 11 11 23 24 112 POS COOLER 19 x 64 x 18 E SM26-746A KRACK E SVE-4 C E +34 77,500 +55 DX DX 3DT-1500 129,431 24 460V13 4.0 24 20 69VP 36VS E 5 17 13 24 25 MECHANICAL HOUSE 19 x 25 x 10 E SK28-104A KRACK E +75 25,000 +35 DX DX 3DS-1500 129,431 25 120V/1 3.2 25 12 10VV/61VJ E 25 26 SUBCOOLER RACK B E +50LIQ 37,711 +35 DX DX 3DS-1500 129,431 26 26 15 12VV/61VJ E 26 S 1BH SATELLITE COMPRESSOR 3DA-0750 81,955 S1BH BH 4-22 MED. TEMP. SUCTION GROUP TOTAL 407,211 +22 470,248 86.6% . BH 29 DUAL-TEMP ISLAND (FUTURE) E NFNG TYLER E 8 12 4 2 56 -10 425 , 23,800 -25 DX DX 3DA-0600 23,628 29 120V/1 4.98 7.52 29 KOOLGAS C8 ME-34 S.S. ME-19 E 5 13 11 29 30 1/4 POS FREEZER #2 19 x 64 x 18 E LHG6-550 • LARKIN E • (E) -15 53,040 -25 DX DX 4DP-1500 53,327 • 30 460V/3 2.6 23 (460V/1) 30 KOOLGAS C7 ME-34 S.S. • ME-19 E 7 17 13 30 31 1/4 POS FREEZER #2 19 x 64 x 18 E LHG6-550 LARKIN E (E) E 1 -15 53 040 , -25 DX DX 4DS-2200 65,436 31 460V/3 2.6 2.7 (460V/1) 31 KOOLGAS C7 ME-34 S.S. ME-19 E 7 17 13 31 C1 -28 LOW TEMP. SUCTION GROUP TOTAL 129,880 -28 142,391 91.2% , . C1 32 DELI PREP - 320 SQ FT E LFA-190 LARKIN E SBFVE-C C E 2 +50 49,265 +35 DX DX 32 120V/1 2.8 32 OFFTIME SPORT 9-9 E 5 9 9 32 33 ROTISSERIE PREP E LFA-087 LARKIN E SBFVE-A C E 2 +50 16,975 +35 DX DX 33 120V/1 2.8 33 OFFTIME SPORT 9-9 E 5 9 9 33 SID MEAT E NHMGHP TYLER E 8 12 1 68 +27 425 28,900 +24 DX DX 34 120V/1 1.08 1.56 34 OFFTIME SPORT 9-9 E 5 9 9 34 35 COMBO REFRIGERATION LINE DX DX 35 35 SPORT 17-17 E 7 17 13 35 35A 1/6 DAIRY COOLER 24 x 37 x 20 E GH56-340A KRACK E SBFVE-C C E 1 +36 34,000 +25 DX DX 35A 120V/1 9.6 35A OFFTIME ME-25 S.S. E 5 9 9 35A 35B 1/6 DAIRY COOLER 24 x 37 x 20 E GH56-340A KRACK E SBFVE-C C E 1 +36 34,000 +25 DX DX 35B 120V/1 9.6 35B OFFTIME ME-25 S.S. E 5 9 9 35B 35C 1/6 DAIRY COOLER 24 x 37 x 20 E GH56-270A KRACK E SBFVE-C C E 1 +36 30,500 +25 DX DX • 35C 120V11 9.6 35C OFFTIME ME-25 S.S. E 5 9 9 35C 36 1/2 PRODUCE COOLER 36x 44x 20 E EFA-340 TYLER E SBFVE-C C E 3 +40 94,000 +30 DX DX 36 120V/1 9.6 36 OFFTIME SPORT 13-13 13 • 13 36 37 DELI ISLAND EM DX6LN K/W N 8 12 4 2 56 +33 1166 65,296 +28 DX DX 37 120V/1 0.2 0.4 0.5 0.81 37 OFFTIME 6 (N) SPORT 11-11(N) (N) (N) E 5 (E) 13 (E) 11 (E) 37 N16, N20, N21, N32, N34, N40, N42, N52 38 DELI ISLAND EM DX6LN K/W N 8 12 56 +33 1166 65,296 +28 DX DX 38 120V/1 0.2 0.4 0.5 0.81 38 OFFTIME 6 (N) SPORT 11-11(N) (N) (N) E 5 (E) 13 (E) 11 (E) 38 N16, N20, N21, N32, N34, N40, N42, N52 39 DELI ISLAND EM DX6LN K/W N 8 12 4 2 56 +33 1166 65,296 +28 DX DX 39 120V/1 0 , .2 0.4 0.5 0.81 39 OFFTIME 6 (N) SPORT 11-11(N) (N) (N) E 5 (E) 13 (N) 11 (N) 39 N16, N20, N21, N32, N34, N40, N42, N52 40 MEAT ISLAND E NHMGHP TYLER E 8 12 4 2 56 +28 425 23,800 +25 DX DX 40 120V11 1.08 40 OFFTIME SPORT 9-9 E 5 9 9 40 41 DELI COOLER 16x 36x 20 E ITG24-325 RUSSELL E SBFVE-C C E 2 +34 56,000 +24 DX DX 4DK-2500 180,230 41 120V11 14.2 41 OFFTIME SPORT 13-13 E 5 13 11 41 42 MECHANICAL HOUSE 19 x 25 x 10 E SK38-164A KRACK E +75 25,000 +35 DX DX 4DH-2500 180,230 42 120V/1 3.2 42 42 43 SUBCOOLER RACK C E +50LIQ * 23,732 +35 DX DX 4DJ-3000 211,551 43 43 43 S1C REMOTE PARALLEL COMPRESSOR 4C1761PL (N) 102,623 SIC +22 MED. TEMP. SUCTION GROUP TOTAL 612,060 +22 674,634 90.7% , C2 44 1/4 OVERSTOCK FREEZER 45 x 28 x 18 N BMG520 BONN N SPE-3 Z N 1 -10 42,622 -20 DX DX 44 120V/1 11.2 M3 44 KOOLGAS 1 (N) ,C7P3 C4, CDST-9 (N) X 200 5 (N) 17 (N) 13 (N) 44 N22, N32, N33, N34, N35, N40, N42, N50, N52 45 114 OVERSTOCK FREEZER 45 x 28 x 18 N BMG520 BOHN N SPE-3 Z -10 42,622 -20 DX DX 45 120V/1 11.2 M3 45 • KOOLGAS 1 (N) CDST-9 (N) X 200 5 (N) 17 (N) 13 (N) 45 N22, N32, N33, N34, N35, N40, N42, N50, N52 46 1/4 OVERSTOCK FREEZER 45 x 28 x 18 N BMG520 BOHN N SPE-3 Z -10 4Z622 -20 DX DX 46 120V/1 11.2 M3 46 KOOLGAS 1 (N) CDST-9 (N) X 200 5 (N) 17 (N) 13 (N) 46 N22, N32, N33, N34, N35, N40, N42, N50, N52 47 1/4 OVERSTOCK FREEZER 45 x 28 x 18 N BMG520 BOHN N SPE-3 Z N 1 -10 42,622 -20 DX DX • 47 120V/1 11.2 M3 47 KOOLGAS 1 (N) CDST-9 (N) X 200 5 (N) 17 (N) 13 (N) 47 N22, N32, N33, N34, N35, N40, N42, N50, N52 48 1/5 WALL FREEZER 147 x 5 x 10 N WKG270 BONN N EGPE-1-1/2 Z N 2 -10 45,080 -20 DX DX 06ER450 (N) 84,632 20.0% 48 120V/1 3.6 M3 48 KOOLGAS 1 (N) C4,C10 CDST-9 (N) x 160 5 (N) 17 (N) 13 (N) 48 N22, N32, N33, N34, N35, N40, N42, N50, N52 49 115 WALL FREEZER 147 x 5 x 10 N WKG270 BOHN N EGPE-1-1/2 Z N 2 -10 45,080 -20 DX DX 06ER450 (N) 84,632 20.0% 49 120V/1 3.6 M3 49 KOOLGAS 1 (N) CDST-9 (N) X 160 5 (N) 17 (N) 13 (N) 49 N22, N32, N33, N34, N35, N40, N42, N50, N52 50 1/5 WALL FREEZER 147 x 5 x 10 N WKG270 BOHN EGPE-1-1/2 Z N 2 -10 45,080 -20 DX DX 06ER450 (N) 84,632 20.0% 50 120V/1 3.6 M3 50 KOOLGAS 1 (N) CDST-9 (N) X 160 5 (N) 17 (N) 13 (N) 50 N22, N32, N33, N34, N35, N40, N42, N50, N52 51 1/5 WALL FREEZER 147 x 5 x 10 N WKG270 BOHN N EGPE-1-1/2 Z N 2 -10 45,080 -20 DX DX 06ER450 (N) 84,632 20.0% 51 120V/1 3.6 M3 51 KOOLGAS 1 (N) CDST-9 (N) X 160 5 (N) 17 (N) 13 (N) 51 N22, N32, N33, N34, N35, N40, N42, N50, N52 52 1/5 WALL FREEZER 147 x 5 x 10 N WKG270 BONN N EGPE-1-1/2 Z N 2 -10 45,080 -20 DX DX 06ER450 (N) 84,632 20.0% 52 120V/1 3.6 M3 52 KOOLGAS 1 (N) CDST-9 (N) X 160 5 (N) 17 (N) 13 (N) 52 N22, N32, N33, N34, N35, N40, N42, N50, N52 53 SPARE N 53 53 KOOLGAS X 5 (N) 11 (N) 53 SPARE DL -23 LOW TEMP. SUCTION GROUP TOTAL 395,888 -23 423,160 93.6% DL 54 1/2 DELI SHOP-IN COOLER 54 x 28 x 18 N BMG520 BOHN N SPE-3 C N 2 +34 115,698 +24 DX DX 54 120V/1 11.2 M3 54 KOOLGAS 2 (N) C4C7,P 2 , CDST-17 (N) 240 7 (N) 17 (N) 13 (N) 54 N22, N32, N33, N34, N35, N40, N42, N50, N52 55 1/2 DELI SHOP-IN COOLER 54 x 28 x 18 BMG520 BOHN SPE-3 C 2 +34 115,698 +24 DX DX 55 120V/1 1 t 2 M3 55 KOOLGAS 2 (N) CDST-17 (N) x 240 7 (N) 17 (Ni) 13 (N) -55 N22, N32, N33, N34, N35, N40, N42, N50, N52 SUBCOOLER RACK D1 & D2 N AC70-118MY R49 N SE-30 N +50LIQ 126,595 +35 DX DX 06DR541 (N) 150,443 33.3% 56 56 2 (N) CDST-9 (N) RACK 5 (N) 13 (N) 56 SUBCOOLER TO RACK Di & D2 57 SPARE N N N DX DX 06DR541 (N) 150,443 33.3% 57 57 KOOLGAS 1-3/8 BV 5 (N) 13 (N) 57 SPARE 58 DELI SHOP-IN DOOR N CUSTOM RUSSELL N SPE-3 C N 1 +50 50,000 +36 DX DX 06DR541 (N) 150,443 33.3% 58 58 1 (N) CDST-9 (N) 240 5 (N) 11 (N) 9 (N) 58 N22, N32, N33, N34, N35, N40, N42, N50, N52 DM +22 MED. TEMP. SUCTION GROUP TOTAL 407,991 +22 451,329 90.4% DM RACK (D) 232 x 38" x 78"H. EST.WT: 8000 LBS MISCELLANEOUS ELECTRICAL MISCELLANEOUS ELECTRICAL C1 DESCRIPTION MODEL • VOLTAGE AMPS WATTS DESCRIPTION M1 FLUORESCENT LIGHTS S 1201 V/ 2.2 E VAPOR PROOF FLUORESCENT LIGHT FIXTURES PROVIDED AND INSTALLED BY REFRIGERATION ELECTRICAL CONTRACTOR. M2 FREEZER DOOR HEATER DS 120V/1 10.0 E RUN TO SYSTEM CONTROL PANEL M3 HEAT TAPE DT 120V/1 16.0 E PROVIDED AND INSTALLED BY REFRIGERATION ELECTRICAL CONTRACTOR M4 MULLION LIGHTS POS COOLER ANTHONY CUSTOM 32" • 120V/1 41.6 E 64 FIXRJRES @ 0.65 AMPS EACH M5 DR FRAME HEATERS POS COOLER ANTHONY CUSTOM 32" 120V/1 14.2 E 0 2DR FRAME @ 0.59 AMPS 1 16 I3DR FRAME @ 0.89 AMPS 0 4DR FRAME @ 1.18 AMPS M6 MULLION LIGHTS POS FREEZER #1 ANTHONY CUSTOM 37 120V/1 41.6 POWER FOR SOLENOID FROM COIL WIRE THROUGH AUXILIARY CONTACTS ON KILL SWITCH CONNECTED IN FIELD. 64 FIXTURES @ 0.65 AMPS EACH M7 DR FRAME HEATERS POS FREEZER #1 ANTHONY CUSTOM 32 120V11 86.4 E 0 2DR FRAME @ 3.87 AMPS 16 130R FRAME @ 5.40 AMPS 0 4DR FRAME @ 7.66 AMPS M8 MULLION LIGHTS POS FREEZER #2 ANTHONY CUSTOM 37 120V/1 41.6 E 64 FIXTURES @ 0.65 AMPS EACH M9 DR FRAME HEATERS POS- FREEZER #2 ANTHONY CUSTOM 32" 120V/1 86.4 E 0 2DR FRAME @ 3.87 AMPS 16 3DR FRAME @ 5.40 AMPS 0 14DR FRAME @ 7.66 AMPS . M10 DUAL TEMP/MEAT ISLAND LIGHTS HOLOPHANE 120V/1 10.5 E 14 FIXTURES @ 0.75 AMPS EACH, PER ISLAND 4 FIXTURE (STANDARD COSTCO SPEC) SUPPLIED & INSTALLED BY GC. M11 COLD ZONE AIR CURTAIN (P03 FREEZER) POWERED AIRE ETD-2-84 46013 2.7 / 10 E MCA 1 MOP PROVIDED BY PANEL MFG. INOTALLED BY REFRIGERATION CONTRACTOR M12 SHOP-IN AIR DOOR (PRODUCE, DAIRY, DELI) HCR AC-CS 208V/3 8.6 (N) MCA / MOP PROVIDED BY PANEL MFG. INSTALLED BY REFRIGERATION CONTRACTOR M13 CONVENIENCE OUTLET POS FRZ/CLR WOR ISLAND END CAP 120V/1 16 EACH E PROVIDED AND INSTALLED BY REFRIGERATION ELECTRICAL CONTRACTOR M14 HOT CASE 4DK-2500 REC. REF. LOSS ALARM (E) E BY OTHERS, TYPICAL, VERIFY PER PROJECT M15 POS CLR. & FRZ. BAKERY FRZ LIGHTS ERGONOMIC ELS HO-101A 120V/1 1.5 EACH E 24" x 24" - 1.47 AMPS EACH, PROVIDED BY WALK-IN MANUFACTURER, INSTALLED BY REFRIG. ELEC. CONTRACTOR. M16 ANTI-SWEAT PANELS SVVEATMISER SM16 &SM24 120V/1 16.0 E REF. ELE. CONTRACTOR To PROVIDE POWER TO (2)ASP PANEL AND WIRE ALL GLASS DOOR NS CIRCUITS THROUGH CONTACTS. M17 DEFROST PANEL 120V/1 (E) E MCA/MOPD M18 HEATED SLIDING VVINDOWS ANTHONY 1500 SLIDERS 120V/1 27.3 E (7) SECTION @ 3.9 AMPS EACH M19 THERMO-SIMPLE DISPLAY UNIT INNOVATIONS 5V-DC5V-DC (E) E POWERED VIA CAT-5 CABLE RUN TO TRANSFORMER (WIRED IN SERIES) M20 THERMO-SIMPLE PROBE INNOVATIONS (E) E TO BE MOUNTED 8' AFF M21 TI-IERMO-SIMPLE TRANSFORMER INNOVATIONS 120V/1 (E) E TO BE MOUNTED ON TOP OF POS COOLER & FREEZERS, AND PRODUCE COOLER. M22 HEATED PRESSURE RELIEF PORT KASON 120V11 (E) CARLYLE PROVIDED BY PANEL MANUFACTURER F23 MT INPUT & ALARM PANEL (BELL & STROBE) MT INPUT W/ ALARM 120V/1 16.0 E REFRIGERATION ELECTRICAL CONTRACTOR TO PROVIDE POWER TO MT INPUT ALARM PANEL, INCL. KVM TERMINAL OUTLET. IV24 POS FREEZER FAN PANEL POS FREEZER FAN PANEL N/A NOTES REF. ELE. CONTRACTOR TO PROVIDE POWER TO POS FREEZER FAN PANEL ALSO RUN WIRING TO COILS & SQL. AS NECESSARY. m25 MEZZANINE FAN PANEL MEZZANINE FAN PANEL N/A REF. ELE. CONTRACTOR TO PROVIDE POWER TO FAN PANEL ALSO RUN WIRING TO COILS & SOL. AS NECESSARY. M26 EQUIPMENT POWER EQUIPMENT POWER SEE NOTE SUCTION DL ( -23) YES REF. ELE. CONTRACTOR TO PROVIDE POWER TO ALL EQUIPMENT AS CALLED OUT BY THIS NOTE AS NECESSARY. SEE LEGEND AND/OR EQUIPMENT FOR VOLTAGE & AMPERE. M27 MACHINE ROOM EXHAUST VENT-ANA 120V11 t2 E M29 PUMP STATION N/A SUCTION C1 ( -28) M30 CONDENSER/POWER-CONDENSER CONTROL INSTALLING CONTRACTOR TO PROVIDE ANY AND ALL MATERIALS FOR PROPER INSTALLATION & OPERATION (N) ALSO SEE REMOTE CONDENSER SECTION ON THIS LEGEND (A) A16 GA. TWISTED PAIR NONE SHIELDED CABLE (NETWORK) (TO RACKS) (B) A 22 GA. 3 CONDUCTORS CABLE FROM THE DROP LEG PRESS. TRANSDUCER TO INPUT U3 (AT CONDENSERS) (C) A 22 GA. 2 CONDUCTORS CABLE FROM THE DROP LEG TEMPERATURE SENSOR TO INPUT U4 (AT CONDENSERS) (D) A 10K OHM ©77DF TYPE 2 SENSORS. SHOULD BE UNDER THE FIRST FAN ON THE HEADER SIDE ON INPUT U5 (OUTSIDE AIR) M31 MULLION LIGHTS OVERSTOCK FREEZER & DELI ANTHONY CUSTOM 32" 120V/1 17.6 N 27 FIXTURES @ ass AMPS EACH M32 MULLION LIGHTS OVERSTOCK FREEZER & DELI ANTHONY CUSTOM 32' 120V/1 36.3 N 1 2DR FRAME @ 3.87 AMPS 1 6 13DR FRAME @ 5.40 AMPS 1 0 140R FRAME .@ 7.66 AMPS M33 MULLION LIGHTS WALL FREEZER (NEW) ANTHONY CUSTOM 32" 120V/1 4t6 N 64 FIXTURES @ 0.65 AMPS EACH M34 MULLION LIGHTS WALL FREEZER (NEW) ANTHONY CUSTOM 37 120V/1 86.4 N 0 2DR FRAME @ 3.87 AMPS 1 16 13DR FRAME @ 5.40 AMPS 0 14DR FRAME @ 7.66 AMPS . MISCELLANEOUS ELECTRICAL C1 REFRIGERATION THERMOSTAT TS • 120V/1 MT (N) REFURBISHED RUN TO CONDENSING UNIT CONTROL PANEL C2 TEMPERATURE SENSOR & SOLENOID S 120V/1 FUTURE RACK SPRINGS RUN 4 SENSOR WIRES TO RACK SYSTEM CONTROL PANEL (2) FOR SOLENOID (2) FOR COMPRESSOR CONTRACTOR. C3 DEFROST SOLENOID DS 120V/1 COMPRESSOR E RUN TO SYSTEM CONTROL PANEL P3 DEFROST TERMINATION SENSOR DT SUCTION TRANSDUCER E E FAN DELAY VVITH SEPARATE DEFROST TERMINATION KLIXON DEFROST TERMINATION KLIXONS/SENSORS WIRING TO BE RAN IN SERIES WHERE INDICATED ON DRAWING. RUN BACK TO Mt C5 DOOR SWITCH SOLENOID SENTROL #115-17Y-06K 24V E E WIRE IN SERIES WITH FAN POWER CIRCUIT. MAGNETIC DOOR SWITCH TO BE FIELD SUPPLIED. UNLOADER C6 EMERGENCY REFRIGERANT STOP E 120V11 (N) N23 WIRE TO MT INPUT BOARD. C7 FAN STOP/LIQUID LINE SOLENOID E 120V/1 N30 RECEIVER CAP. @ 80% FULL POWER FOR SOLENOID FROM COIL WIRE THROUGH AUXILIARY CONTACTS ON KILL SWITCH CONNECTED IN FIELD. C8 DUAL TEMP & DEF. TERM. SOL CONTROL (N) . 120V11 DROP LEG TEMP E (2) #14 FROM RACK TO EACH DUAL TEMP FIXT. FOR T/S2, (2) #14 PER ILS. FOR DEF. TERM SQL. PWR IN SERIES W/ CASE KOONS. .C9 TEMPERATURE SENSOR & LIQ. SOLENOID 1 EA. LEAK DETECTION SYSTEM E E WIRE TEMP. PROBE TO THE MT I/0 BOARD FOR TEMP CONTROL WITH OUTPUT TO CLOSE LL SOLENOID VALUE. C10 DUAL TEMP KEY SWITCH LEAK DETECTION PROBES E E E RACK MOUNTED & WIRED DPDT KEY swn-cH MT TO SWITCH TEMP. ALARM SET POINTS FOR MED & LOW TEMP. BASED ON DT. TEMPERATURE SENSORS COMPRESSOR SUMMARY AND ACCESSORIES UNIT MODIFICATIONS AND ACCESSORIES UNIT LETTER REFRIGERATOR TEMPERATURE SENSOR EPC RMCC MT (N) REFURBISHED VVIRE TO CONTROLLER INPUT PANEL, SEE DETAIL SHEET FOR LOCATION OF PANELS. P1 PROOF INPUT - AIR CURTAIN POS FREEZER (N) FUTURE RACK SPRINGS WIRE TO CONTROLLER INPUT PANEL, SEE DETAIL SHEET FOR LOCATION OF PANELS. P2 PROOF INPUT - AIR DOOR SHOP-INS (DP) 1 3/8" COMPRESSOR E WIRE TO CONTROLLER INPUT PANEL, SEE DETAIL SHEET FOR LOCATION OF PANELS. P3 PROOF INPUT SLIDER OR SWING CLOSED MS SUCTION TRANSDUCER E E WIRE TO CONTROLLER INPUT PANEL SEE DETAIL SHEET FOR LOCATION OF PANELS. (N) DL DISCHARGE TRANSDUCER E E E (N) UNLOADER DROP LEG TRANSDUCER E E E (N) N23 COMPRESSOR SUMMARY AND ACCESSORIES UNIT MODIFICATIONS AND ACCESSORIES UNIT LETTER EPC EPC RMCC MT (N) REFURBISHED RACK ASSEMBLY E E E (N) FUTURE RACK SPRINGS E E E YES 1 3/8" COMPRESSOR E E E CARLYLE 2 1/8" SUCTION TRANSDUCER E E E (N) DL DISCHARGE TRANSDUCER E E E (N) UNLOADER DROP LEG TRANSDUCER E E E (N) N23 VERT. RECEIVER SIZE E E E 18 x 67 N30 RECEIVER CAP. @ 80% FULL E E E (N) N33 RACK CONTROLS / ELECTRICAL MAIN CONTROLLER EPC EPC RMCC MT (N) REFURBISHED OUTPUT BOARD E E E (N) FUTURE MT MONITORING PACKAGE E E E (N) 1 3/8" TRANSFORMER E E E (N) 2 1/8" SUCTION TRANSDUCER E E E (N) DL DISCHARGE TRANSDUCER E E E (N) UNLOADER DROP LEG TRANSDUCER E E E (N) N23 SUCTION TEMP. E E E (N) N30 DISCHARGE TEMP E E E (N) N33 DROP LEG TEMP E E E (N) 1 EA. LEAK DETECTION SYSTEM E E E (N) 1 LEAK DETECTION PROBES E E E (N) i SINGLE PHASE PROTECT. E E E (N) 1 DUAL PRESSURE CONTROL N/A NIA N/A N/A 1 LOW PRESSURE CONTROL E E E (N) COMPRESSOR MODEL HIGH PRESSURE CONTROL E E E (N) 3DS-1500 OIL FAILURE CONTROL E E E (N) 3DS-1500 BASIC ALARM E E E (N) 4DK-2500 REC. REF. LOSS ALARM E E E (N) 06DR541 (N) HIGH SUCTION ALARM E E E (N) LIQUID LINE (2) 1-5/8 (2) 1-5/8 2-1/8 (2) 2-1/8 (N) VOLTAGE MCA/MOP 42.9 / 50 CONDENSER CONTROLS COMPRESSOR MANUFACTURER BITZER CARLYLE CARLYLE ALARM BELL E COMPRESSOR FAN SATELLITES/BOOSTER REMOTE RACK MOUNTED SATELLITE DISCH CHECK VALVE SAT OIL MODIFIER ONE/TWO-TIER RACK EQUIPMENT LEGEND LINE SIZE LEGEND NEW 3/8" EXISTING 1/8" x 4 = REFURBISHED E/M EXISTING MODIFIED E/R ENSTING RELOCATED F FUTURE OIL SEPARATOR (HELICAL) 1/8" x 9 = 1 1/8" 11 1/8 x 11 = 1 3/8" 13 1/8" x 13 = 1 5/8' 17 LINE SIZE LEGEND RACK PIPING ACCESSORIES UNIT LETTER 1/8 X 3 = 3/8" RACK C 1/8" x 4 = 1/2" MISC RACK PARTS 1/8 x 5 = 5/8" 7 1/8" x 7 = 7/8" OIL SEPARATOR (HELICAL) 1/8" x 9 = 1 1/8" 11 1/8 x 11 = 1 3/8" 13 1/8" x 13 = 1 5/8' 17 1/8" x 17 = 2 1/8" 21 1/8" x 21 = 2 5/8" SIC 10 DL HOT WATER TANK/TEMP CONTROL DM DM RACK PIPING ACCESSORIES UNIT LETTER RACK A RACK B RACK C RACK D AL MISC RACK PARTS AH AH AN BOHN (N) BL OIL SEPARATOR (HELICAL) HLCV-V8410M HLCV-V8412M HLCV-Z412M S-5023 (N) BH OIL RESERVOIR REVISE DELI PREP COILS C1 C1 0R6-3A (N) NEW SHOP-IN COOLER, OVERSTOCK FREEZER, WALL FREEZER, REPLACE DELI ISLANDS HEAT RECLAIM LOCKOUT C2 C2 SIC 10 DL HOT WATER TANK/TEMP CONTROL DM DM RESPECTIVE RXTuRE/CIRCUIT TO BE RELOCATED AND/OR RE-PIPED BY INSTALLING CONTRACTOR TO THE RESPECTIVE SYSTEM SHOWN ON THE REFRIGERATION SCHEDULE. UNLOADER spur CONDENSER 65,700 65,700 98,700 103,479 N23 COND BALL VALVES TO/FROM N24 INSTALLING CONTRACTOR TO VERIFY EXISTING DISCHARGE AND DRAIN LINE SIZES TO CONDENSER AND MODIFY AND/OR CHANGE TO MATCH INFO SHOWN ON REFRIGERATION LEGEND ONLY IF NECESSARY. N25 (N) N30 HEAT RECLAIM BALL VALVE 65,700 65,700 98,700 (N) N33 LIQUID DRIER ASSEMBLY 679,221 977,650 1,411,483 (N) 1 EA. MAIN LIQUID LINE SOLENOID 10.34 14.88 14.30 (N) 1 WINTER CONTROLJPRESSURE REG. • 1,075,415 1,55Z 631 (N) i SUBCOOLING ASSEMBLY 11.37 16.37 15.73 (N) 1 SPLIT SUCTION MODIFICATION 1 1 1 (N) 1 SUCTION/LIQUID MANIF INSULATION 166" • 166 • 328 (N) COMPRESSOR MODEL SUCTION ACCUMULATOR 96" 96" 96" (N) 3DS-1500 SUCTION FILTERS 55" 55" 55" (N) 3DS-1500 WEIGHT 2800 LBS 2880 LBS 5800 LBS 4230 LBS 4DK-2500 WARM FLUID H/E AND CONTROL 4DJ-3000 4C1761PL (N) 06ER450 (N) 06DR541 (N) 06DR541 (N) REMOTE DEFROST PANELS 460V/DEFROST PANEL MAIN BREAKER SUB-BREAKER CONTACTORS FAN BREAKER/CONTACTORS REMOTE CONDENSERS UNIT LETFER RACK A RACK B RACK C RACK D AL MFG. AH AH AN BOHN (N) BL MODEL HLCV-V8410M HLCV-V8412M HLCV-Z412M BNH-D12-A106 BH FANS • REVISE DELI PREP COILS C1 C1 12 NEW SHOP-IN COOLER, OVERSTOCK FREEZER, WALL FREEZER, REPLACE DELI ISLANDS FPI C2 C2 SIC 10 DL CIR. AVAIL. /USED CIR. (00000 PER CIR) DM DM RESPECTIVE RXTuRE/CIRCUIT TO BE RELOCATED AND/OR RE-PIPED BY INSTALLING CONTRACTOR TO THE RESPECTIVE SYSTEM SHOWN ON THE REFRIGERATION SCHEDULE. UNLOADER COND. CAPACITY @1 DEGREE ID 65,700 65,700 98,700 103,479 N23 ALTITUDE CORRECTION FACTOR N24 INSTALLING CONTRACTOR TO VERIFY EXISTING DISCHARGE AND DRAIN LINE SIZES TO CONDENSER AND MODIFY AND/OR CHANGE TO MATCH INFO SHOWN ON REFRIGERATION LEGEND ONLY IF NECESSARY. N25 INSTALLING CONTRACTOR TO SETA/N, RUN DUCTWORK, SUPPLY & INSTALL GRILLS, PROVIDE ANY & ALL MATERIAL TO INSURE PROPER OPERATION. GC. TO SUPPLY PLATFORM. N30 ADJUSTED COND. CAPACITY 65,700 65,700 98,700 103,479 N33 REJECTION MBH OF RACK @ DESIGN 679,221 977,650 1,411,483 1,075,889 1 EA. TEMPERATURE DIFFERENCE ATD 10.34 14.88 14.30 10.40 1 REJ. MBH OF RACK @ 10% SAFETY 747,143 1,075,415 1,55Z 631 1,183,478 i ATD W/10% SAFETY 11.37 16.37 15.73 11.44 1 1 1 1 1 1 1 LENGTH 166" • 166 • 328 324" COMPRESSOR MODEL WIDTH 96" 96" 96" 88" 3DS-1500 HEIGHT 55" 55" 55" 55" 3DS-1500 WEIGHT 2800 LBS 2880 LBS 5800 LBS 4230 LBS 4DK-2500 4DH-2500 4DJ-3000 4C1761PL (N) 06ER450 (N) 06DR541 (N) 06DR541 (N) DISCHARGE LINE (2) 1-5/8 (2) 1-5/8 2-1/8 (2) 2-118 (N) LIQUID LINE (2) 1-5/8 (2) 1-5/8 2-1/8 (2) 2-1/8 (N) VOLTAGE MCA/MOP 42.9 / 50 CONDENSER CONTROLS COMPRESSOR MANUFACTURER BITZER CARLYLE CARLYLE CARLYLE COMPRESSOR FAN NOTES N1, N41, N51 UNIT LETTER )N S1A / AL (-28) S1A AL AL • AL SPLIT SUCTION AH ( +19) AH AH AN RJO BL BL BL ISPLIT SUCTION S1BH / BH (+22) I BH BR BH S1BH REVISE DELI PREP COILS C1 C1 C1 NEW SHOP-IN COOLER, OVERSTOCK FREEZER, WALL FREEZER, REPLACE DELI ISLANDS C2 C2 C2 SIC N 15 DL N16 DM DM RESPECTIVE RXTuRE/CIRCUIT TO BE RELOCATED AND/OR RE-PIPED BY INSTALLING CONTRACTOR TO THE RESPECTIVE SYSTEM SHOWN ON THE REFRIGERATION SCHEDULE. UNLOADER EXISTING CIRCUIT TO BE FIELD VERIFIED BY INSTALLING CONTRACTOR TO CONFIRM ANY DISCREPANCIES ON THE REFRIGERATION SCHEDULE. N21 INSTALLING CONTRACTOR TO VERIFY EXISTING SUCTION AND LIQUID LINE SIZES TO CASES, COOLERS, FREEZER, AND ANY OTHER EQUIPMENT LISTED ON THE REFRIGERATION SCHEDULE AND MODIFY AND/OR CHANGE AS NECESSARY. N22 INSTALLING CONTRACTOR TO RUN NEW LINE SET TO RESPECTIVE FIXTURE. N23 DEMO OF CIRCUIT, CASE, COOLER, AND/OR FREEZER, CUT LOOSE IN THE OVER OR AT CONNECTION IN PIT. CAP OFF WITI-I CAPS (DO NOT PINCH LINES). TURN OFF BALL VALVES AT RACK. TAG CONTROL PANEL SPARE AND TAG BALL VALVES AS SPARES. N24 INSTALLING CONTRACTOR TO VERIFY EXISTING DISCHARGE AND DRAIN LINE SIZES TO CONDENSER AND MODIFY AND/OR CHANGE TO MATCH INFO SHOWN ON REFRIGERATION LEGEND ONLY IF NECESSARY. N25 INSTALLING CONTRACTOR TO SETA/N, RUN DUCTWORK, SUPPLY & INSTALL GRILLS, PROVIDE ANY & ALL MATERIAL TO INSURE PROPER OPERATION. GC. TO SUPPLY PLATFORM. N30 EPR, LL SOLENOID, AND/OR SUCT. STOP, HEAT RECLAIM VALVE & OTHER EQUIPMENT/MATERIALS SHOWN TO BE SUPPLIED AND INSTALLED BY REFRIGERATION CONTRACTOR. N31 EXPANSION VALVES AND/OR DISTRIBUTOR/ORIFICE/NOZZLE PROVIDED AND INSTALLED BY REFRIGERATION CONTRACTOR. N32 INSTALLING CONTRACTOR TO PROVIDE EPR OR CONTROL VALVE AS NECESSARY. N33 INSTALLING CONTRACTOR TO SUPPLY NECESSARY VALVING TO PIPE CIRCUIT OR NEW STUB TO RESPECTIVE RACKS. N34 INSTALLING CONTRACTOR TO SUPPLY NECESSARY DEFROST COMPONENTS AND INSTALL AS NECESSARY. 1 EA. 2 1 EA. INSTALLING CONTRACTOR TO RE-LABEL ALL RACKS, CASE, COOLER/FREEZERS PER NEW REFRIGERATION SCHEDULE. N41 COMPRESSOR QUANTITY 1 1 1 1 1 1 1 1 i i i i 1 1 1 1 1 1 1 1 1 5 1 2 COMPRESSOR MODEL 3DA-0600 3DF-0900 4DP-1500 4DP-1500 3DA3-0750 3DS-1500 3DS-1500 4DP1500 4DS2200 4DS2200 3DT-1500 3DS-1500 3D5-1500 3DA-0750 3DA-0600 4DP-1500 4D6-2200 4DK-2500 4DH-2500 4DJ-3000 4C1761PL (N) 06ER450 (N) 06DR541 (N) 06DR541 (N) COMPRESSOR ASSEMBLY SUCTION BL ( -18) RETORFIT COMPRESSOR MANUFACTURER BITZER CARLYLE CARLYLE CARLYLE COMPRESSOR FAN NO SUCTION DL ( -23) YES ISPLIT SUCTION DM ( +22) NO NO OIL LEVEL REGULATOR SUCTION C1 ( -28) S-9090DE S-9090DE S-9090DE S-9090DE DISCHARGE MUFFLER COMPRESSOR CONTRACTOR . 30 40 30 30 HORSEPOWER PER (EACH) 1.64 2.43 3.70 3.70 6.39 10.11 10.11 5.18 6.14 6.14 10.79 10.79 10.79 6.83 1.64 3.70 4.54 15.02 15.02 17.63 8.55 4.97 12.54 12.54 REFRIGERANT R-22 R-22 R-22 R-22 R-22 R-22 R-22 R-22 R-22 R-22 R-22 R-22 R-22 R-22 R-22 R-22 R-22 R-22 R-22 R-22 R-22 R-507 R-507 R-507 SUCTION TEMPERATURE -28 -28 -28 -28 +19 +19 +19 -18 -18 -18 +22 +22 +22 +22 -28 -28 -28 ISPLIT SUCTION SIC / +22 +22 +22 +22 -23 +22 +22 CONDENSING TEMPERATURE 105 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 110 • 110 110 110 CAPACITY MBH W/O SUBCOOLING (EACH) 19,690 29,201 44,439 44,439 76,623 121,282 121,282 62,157 73,673 73673 129,431 129,431 129,431 81,955 19,690 44,439 54,530 180,230 180,230 211,551 102,623 59,600 150,443 150,443 WATTS MBH (EACH) 4,490 6,540 10,410 10,410 7,860 12,720 12,720 12,030 14;140 14140 12,990 12,990 12990 8,010 4,490 10,410 12430 17,690 17,690 21,410 10,135 12,528 16,888 16,888 REJECTION MBH (EACH) 35,028 51,515 79,962 79,962 103342 164, 706 164,706 103,212 121,919 121919 173769 173,769 173,769 109,293 35,028 79,962 96,943 240,596 240,596 584,613 133,745 93,796 202,303 202,303 REJECTION MBH (TOTAL) 679,221 977,650 1,411,483 1,075,889 SUBCOOLING CREDIT % 1.18% 1.18% 1.18% 1.18% 1.18% 1.18% 1.18% 1.20% t20% • 1.20% 1.42% COMPRESSOR RLA (EACH) 15.0 16.0 24.0 24.0 18.0 26.0 26.0 24.0 30.0 30.0 26.0 26.0 26.0 20.0 15.0 24.0 30.0 40.6 40.6 45.0 21.2 33.9 25.6 25.6 UNIT RLA 149.0 182.0 216.4 246.3 UNIT MCA 155.5 189.5 227.7 254.8 • UNIT MOPD 175(E) 200(E) 250(E) 300(N) 120V CONTROL CIRCUIT MCA / MOPD 25 RACK MOUNTED N7 N8 N9 N10 Ni N40 N42 N51 N12 N13 N40 NOTES N42 N51 M REVIEWED FOR CODE COMPLIANCE APPROVED SEP 1 4 2011 City of Tukwila BUILDING DIVISION REVISIONS REV DATE BY: DESCRIPTION TOTAL WAREHOUSE VOLUME IS 3,149,300 CUBIC FEET OD DISBURSABLE AREA. IMC 2003 TABLE 1103.1 ALLOWS 5.5 LBS. PER CU.FT., OR 17321 LBS. 7/8/2008 MJP NEW POS FREEZER RAISED TO 216 INT. H. D2 = 37.62 7/14/2008 RJO NEW FLOWER BOX N7 1017/2008 MRM DELI - ROTISSERIE EXPANSION N9 11/612008 MRM REVISE DELI PREP COILS N11 8/18/2011 DL NEW SHOP-IN COOLER, OVERSTOCK FREEZER, WALL FREEZER, REPLACE DELI ISLANDS REFRIGERATION SYSTEM NOTES GENERAL NOTES Ni TOTAL REFRIGERATION SYSTEMS COMBINED WILL CONTAIN LESS THAN 4,000 LBS OF R-22 (GROUP A-1 CLASSIFIED BY IMC 2006). N2 BOOSTER AND/OR SATELLITE UNIT TO BE SUPPLIED BY KYSOR/WARREN - BREAKER & CONTACTOR WILL BE PRE-INSTALLED IN UNIT CONTROL PANEL TOTAL WAREHOUSE VOLUME IS 3,149,300 CUBIC FEET OD DISBURSABLE AREA. IMC 2003 TABLE 1103.1 ALLOWS 5.5 LBS. PER CU.FT., OR 17321 LBS. CONTRACTOR TO VERIFY PROPER LOCATION FOR BOOSTER UNIT IN EXISTING COMPRESSOR ROOM AND INSTALL AS CLOSE TO RACK AS POSSIBLE FOR PROPER CLEARANCE. N4 UMC 2006 HORSE POWER RATINGS: AL = 11.47 AH = 26.61 BL = 17.46 BH = 39.20 C1 = 9.88 C2 = 56.22 D1 = 24.85 D2 = 37.62 INSTALLING CONTRACTOR TO MODIFY SATELLITE COMPRESSOR PIPING TO CONVERT TO BOOSTER FOR MAIN SUCTION GROUP COMPRESSOR. BASED ON APPLICABLE REQUIREMENTS IN CHAPTER-11 OF THE imc 2006, THE SYSTEMS ARE-BELOW THE -REFRIGERATE QUANTITY AND/OR 100 HP REQUIREMENTS. THEREFORE A REFRIGERATION MACHINERY ROOM IS NOT REQUIRED. INSTALLING CONTRACTOR TO RUN CONTROL WIRING FROM BOOSTER/SATELLITE TO RACK. VERIFY RO, Di/Ai POINTS, SUPPLY NECESSARY BOARDS IF NEEDED. N7 PER THE UMC 2000 TABLE 11-11, IT ALLOWS 9.4 LBS PER 1000 CU. FT. OR 29603 LBS. N8 GENERAL NOTES Ni NEW RACK/RACKS AND/OR CONDENSERS SUPPLIED BY KYSOR/WARREN. N2 BOOSTER AND/OR SATELLITE UNIT TO BE SUPPLIED BY KYSOR/WARREN - BREAKER & CONTACTOR WILL BE PRE-INSTALLED IN UNIT CONTROL PANEL N3 CONTRACTOR TO VERIFY PROPER LOCATION FOR BOOSTER UNIT IN EXISTING COMPRESSOR ROOM AND INSTALL AS CLOSE TO RACK AS POSSIBLE FOR PROPER CLEARANCE. N4 INSTALLING CONTRACTOR TO PIPE NEW BOOSTER TO MAIN SUCTION GROUP AND PROVIDE ANY NECESSARY MATERIAL SUCH AS BALL & HAND VALVE, ETC. SEE DETAIL SHEET FOR DETAILS. N5 INSTALLING CONTRACTOR TO MODIFY SATELLITE COMPRESSOR PIPING TO CONVERT TO BOOSTER FOR MAIN SUCTION GROUP COMPRESSOR. N6 INSTALLING CONTRACTOR TO RUN CONTROL WIRING FROM BOOSTER/SATELLITE TO RACK. VERIFY RO, Di/Ai POINTS, SUPPLY NECESSARY BOARDS IF NEEDED. N7 INSTALLING CONTRACTOR TO REMOVE EXISTING COMPRESSOR & INSTALL NEW COMPRESSOR. PROVIDE ALL NECESSARY MATERIAL TO COMPLETE INSTALLATION. N8 INSTALLING CONTRACTOR TO INSTALL NEW BREAKER & CONTACTOR FOR NEW COMPRESSOR. SUPPLIED BY KYSORNVARREN. N9 COMPRESSOR BODY AND ACCESSORIES PROVIDED BY & INSTALLED BY REFRIGERATION CONTRACTOR. N10 INSTALLING CONTRACTOR TO PROVIDE AND INSTALL BITZER COMPRESSOR ACCESSORIES, MOUNTING HARDWARE, OIL FLOATS, LIQUID INJECTION, ETC. N11 LIQUID INJECTION LINES REQUIRE A SOLENOID WIRED TO COMPRESSOR AUXILIARY CONTACTS (ONLY ACTIVE WHEN COMPRESSOR IS RUNNING). N12 INSTALLING R/C TO FOLLOW ALL BITZER INSTALLATION GUIDE LINES. N13 INSTALLING R/C TO VERIFY EXISTING MODEL NUMBERS, SPACING AVAILABLE & QUANTITY OF EASTING AND NEW COMPRESSORS. N14 INSTALLING R/C TO INSTALL NEW OIL SYSTEM ON RACK, OIL SEPARATOR AND RESERVOIR SUPPLIED BY K/W. ALL OTHER MATERIAL SUPPLIED BY R/C. N 15 R/C TO VERIFY THAT EXISTING OIL SEPARATOR & RESERVOIR WILL MEET NEW RACK LOAD. IF EXISTING EQUIPMENT DOES NOT MEET RACK LOAD, THE R/C IS TO PROVIDE A MODEL S-XXX SEPARATOR AND/OR A RESERVOIR (MIN. 3 GAL CAPACITY) AS NECESSARY. N16 INSTALLING CONTRACTOR TO REMOVE ENSTING EQUIPMENT AS NECESSARY. N17 RESPECTIVE RXTuRE/CIRCUIT TO BE RELOCATED AND/OR RE-PIPED BY INSTALLING CONTRACTOR TO THE RESPECTIVE SYSTEM SHOWN ON THE REFRIGERATION SCHEDULE. N20 EXISTING CIRCUIT TO BE FIELD VERIFIED BY INSTALLING CONTRACTOR TO CONFIRM ANY DISCREPANCIES ON THE REFRIGERATION SCHEDULE. N21 INSTALLING CONTRACTOR TO VERIFY EXISTING SUCTION AND LIQUID LINE SIZES TO CASES, COOLERS, FREEZER, AND ANY OTHER EQUIPMENT LISTED ON THE REFRIGERATION SCHEDULE AND MODIFY AND/OR CHANGE AS NECESSARY. N22 INSTALLING CONTRACTOR TO RUN NEW LINE SET TO RESPECTIVE FIXTURE. N23 DEMO OF CIRCUIT, CASE, COOLER, AND/OR FREEZER, CUT LOOSE IN THE OVER OR AT CONNECTION IN PIT. CAP OFF WITI-I CAPS (DO NOT PINCH LINES). TURN OFF BALL VALVES AT RACK. TAG CONTROL PANEL SPARE AND TAG BALL VALVES AS SPARES. N24 INSTALLING CONTRACTOR TO VERIFY EXISTING DISCHARGE AND DRAIN LINE SIZES TO CONDENSER AND MODIFY AND/OR CHANGE TO MATCH INFO SHOWN ON REFRIGERATION LEGEND ONLY IF NECESSARY. N25 INSTALLING CONTRACTOR TO SETA/N, RUN DUCTWORK, SUPPLY & INSTALL GRILLS, PROVIDE ANY & ALL MATERIAL TO INSURE PROPER OPERATION. GC. TO SUPPLY PLATFORM. N30 EPR, LL SOLENOID, AND/OR SUCT. STOP, HEAT RECLAIM VALVE & OTHER EQUIPMENT/MATERIALS SHOWN TO BE SUPPLIED AND INSTALLED BY REFRIGERATION CONTRACTOR. N31 EXPANSION VALVES AND/OR DISTRIBUTOR/ORIFICE/NOZZLE PROVIDED AND INSTALLED BY REFRIGERATION CONTRACTOR. N32 INSTALLING CONTRACTOR TO PROVIDE EPR OR CONTROL VALVE AS NECESSARY. N33 INSTALLING CONTRACTOR TO SUPPLY NECESSARY VALVING TO PIPE CIRCUIT OR NEW STUB TO RESPECTIVE RACKS. N34 INSTALLING CONTRACTOR TO SUPPLY NECESSARY DEFROST COMPONENTS AND INSTALL AS NECESSARY. N35 LL SOLENOID AND BYPASS CHECK VALVES TO BE SUPPLIED BY COIL MANUFACTURER AND MOUNTED BY R/C. COMPLETE WIRING OF SOL, FANS, AND DEFROST THERM. TEMP SENSORS TO POS FAN PANEL FOR PROPER OPERATION BY REFRIGERATION CONTRACTOR. N40 INSTALLING CONTRACTOR TO RE-LABEL ALL RACKS, CASE, COOLER/FREEZERS PER NEW REFRIGERATION SCHEDULE. N41 INSTALLING CONTRACTOR TO MODIFY, CHANGE, OR ADD CONDENSER PLATFORM AND/OR SUPPORT STEEL AS NEEDED PER STRUCTURAL ENGINEER ON RECORD. N42 INSTALLING CONTRACTOR TO SUPPLY & INSTALL ANY EMS AND OTHER CONTROL EQUIPMENT TO INSURE PROPER OPERATION OF EQUIPMENT SUPPLIED BY .K/W. N50 EVAPORATOR FANS AND DRAIN PANS ARE NON-CONCURRENT LOADS. N51 ELECTRICAL CONTRACTOR TO VERIFY ELECTRICAL SERVICE IS AMPLE TO SUPPLY POWER TO UNIT AND/OR RACK AND CONDENSERS - MODIFY AS NEEDED. N52 ELECTRICAL CONTRACTOR TO VERIFY ELECTRICAL SERVICE IS AMPLE TO SUPPLY POWER TO CASES, COILS, LIGHTS, OUTLETS, ETC. - MODIFY AS NEEDED. N53 ELECTRICAL CONTRACTOR TO SUPPLY NEW POWER SOURCE NOT FROM RACK POWER. ELECTRICAL NOTES #006 Cosico =WHOLESALE TUKWILA, WA ELECTRICAL CONTRACTOR SHALL: USE MATERIALS AND METHODS THAT CONFORM TO ALL APPLICABLE CODES AND ORDINANCES. USE NO ALUMINUM WIRE TO CONNECT ANY REFRIGERATION MANUFACTURED EQUIPMENT. 75F DRY BULB VERIFY LOCATIONS OF ELECTRICAL STUB-UPS FOR REFRIGERATED CASES WITH REFRIGERATION CONTRACTOR PRIOR TO INSTALLATION. RI SURFACE MOUNT ALL CONDUIT FOR MEAT/DELI & PRODUCE REFRIGERATED WALK-IN BOXES ON THE EX1EF21OR OF THE WALK-IN BOXES. SEAL ALL PERFORATIONS WITH PERMAGUM OR EQUAL OUTSIDE DESIGN TEMP: CONNECT ALL POINT OF SALES (POS) BLOWER COIL FAN MOTORS TO ACCESSIBLE DISCONNECT. DISCONNECT MUST DE-ENERGIZE REFRIGERANT SOLENOID VALVE TO STOP FLOW ALL NECESSARY RELAYS FURNISHED BY ELECTRICAL CONTRACTOR. 68F WET BULB FURNISH AND INSTALL CONDUIT, WIRE, OUTLETS, ETC. FOR REFRIGERATION FIXTURES AND CONNECT COMPLETE AND READY TO OPERATE AS DIRECTED BY 'THE REFRIGERATION CONTRACTOR ELECTRICAL CONTRACTOR SHALL ALSO FURNISH AND INSTALL ANY NECESSARY DISCONNECTS AND CONTACTORS. REVIEW THE ELECTRICAL PLANS AND DIAGRAMS PRIOR TO CONSTRUCTION, CONTACT REFRIGERATION MANUFACTURER IF CLARIFICATION IS NEEDED UPON COMPLETION OF WIRING, THIS CONTRACTOR SHALL PERFORM A SATISFACTORY OPERATIONAL CONTROL SEQUENCE, CHECK WITH THE R/C. AIR COOLED MOUNT AND/OR CONNECT ALL THERMOSTATS, SOLENOIDS, AND OTHER ELECTRICAL CONTROLS FURNISHED BY THE REFRIGERATION CONTRACTOR. CONNECT ALL MOTORS, CONTROLS, AND OTHER COMPONENTS FURNISHED BY THIS CONTRACTOR. FURNISH AND INSTALL CONDUIT, WIRE, OUTLETS, ETC., FOR ALL LIGHTS, HEATERS, WALK-IN BOXES, AND/OR REACH-IN DOOR ASSEMBLIES AND ALL OTHER FIXTURES AS REQUIRED THESE FIXTURES ARE PROVIDED BY REFRIGERATION CONTRACTOR AND INSTALLED BY THE ELECTRICAL CONTRACTOR 10 INSTALL ALARM BELL, FURNISHED BY REFRIGERATION CONTRACTOR AND INSTALLED BY THE ELECTRICAL CONTRACTORS. 11 FURNISH AND INSTALL ALL FUSED DISCONNECTS AND/OR MOTOR STARTERS NOT SPECIFICALLY SUPPLIED BY REFRIGERATION MANUFACTURER. 12 CONNECT ALL COOLER AND FREEZER DOOR LIGHTS TO ENERGY MANAGEMENT SYSTEM PROVIDED BY OWNER. 13 RUN CONDUIT INSIDE THE OVERHEAD TRUSS WORK. 14 PROVIDE AS-BUILT PANEL SCHEDULES FOR ALL ELECTRICAL LOADS SHOWN ON REFRIGERATION MANUFACTURERS SCHEDULES. DESIGN CONDITIONS FOR COSTCO #006 SOUTHCENTER, WA. INSIDE DESIGN TEMP: 75F DRY BULB 55% RELATIVE HUMIDITY RI ENGINEER: DL OUTSIDE DESIGN TEMP: 95F DRY BULB 68F WET BULB CITY CONDENSER TYPE: AIR COOLED R-221R-404A SUPER PLUS/PROTO-AIRE , VOLTAGE / HERTZ/ PHASE: 460 / 60 / 3 SE 400 COSTCO DR. SUITE 500 TUKWILA, WA. PH: 206.575.9191 999 LAKE DRIVE ISSAQUAH, WA 98027 T: 425.313.8100 WWW.COStCO.COM 5201 TRANSPORT BLVD. COLUMBUS, GA 31907 Tel: (706)568-1514 Fax: (706)565-1723 HEATCRAFT WORLDWIDE REFRIGERATION INTEGRITY, COMMITMENT TO STAKEHOLDERS, AND PASSION FOR EXCELLENCE CONTACT INFORMATION REGIONAL SALES MANAGER DAVE WALKER - 817.233.9664 SYSTEMS PROJECT ENGINEER SUPERVISOR JAY Iv1ELANCON C - 706.536.9477 WALL/OVERSTOCK FREEZER, DELI COOLER & IS_AND REIvODEL KYSORNARREN: All rights re5erVed. No part of this document may be reproduced in any form or by any means without the expressed written consent of r,ysor/VVarren. DATE DESCRIPTION 8.24.11 REMODEL M IRKA P 022011 PERMIT CENTER EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS-BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS EACH CONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELVES WITH THIS KNOWLEDGE DOES NOT RELIEVE THEIR RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH THIS K N OW L ED GE AUG 24, 2011 DRAWN BY: F. COOK REFRIGERATION SCHEDULE MT- 512 -1 Condenser Controller Mounted In Condenser BOARD INPUT DESCRIPTION INPUT TYPE OUTPUT .DESCRIPTION OUTPUT TYPE 1 -1 N/A Press Condenser Stage 1 RO 1 -2 N/A Press Condenser Stage 2 RO 1 -3 Drop Leg Pressure Press Condenser Stage 3 RO 1 -4 Drop Leg Temp. Temp Condenser Stage 4 RO 1 -5 Ambient Temp. Temp Condenser Stage 5 RO 1 -6 N/A N/A Condenser Stage 6 RO 1 -7 N/A N/A Condenser Stage 7 RO 1 -8 N/A N/A Condenser Stage 8 RO 1 -9 N/A N/A Condenser Stage 9 RO 1 -10 N/A N/A 10 Condenser Stage 10 RO 1 -11. N/A N/A 11 Condenser'` Stage 11 RO 1 -12 N/A N/A 12 Condenser Stage 12 RO 1 -1 N/A Digital N/A. Analog 1 -2 N/A Digital N/A Analog 1 -3 N/A Digital N/A Analog 1 -4 N/A Digital N/A Analog MT- 504 -1 Suction Group 1 Controller BOARD INPUT DESCRIPTION INPUT TYPE OUTPUT DESCRIPTION OUTPUT TYPE 1 -1 Discharge Pres. Xdcr Press N/A RO 1 -2 Suction Pres. Xdcr. Press Split Cond. Valve RO 1 -3 N/A Press Main Defrost Valve RO 1 -4 N/A Digital N/A RO 1 -5 N/A Digital N/A Analog 1 -6 Phase Loss Digital N/A Analog 1 -7 Refrigerant Level Analog /DI N/A Analog 1 -8 MT -504 -2 N/A N/A N/A Analog MT -500 -1 Suction Group 2 Controller BOARD INPUT DESCRIPTION INPUT TYPE 1 -1 N/A N/A 1 -2 SuctionPres. 2 Press 1 -3 N/A N/A 1 -4 N/A N/A 1 -5 N/A N/A 1 -6 N/A` N/A 1 -7 N/A N/A 1 -8 N/A'. N/A Subcooling / Surge Fill Control BOARD INPUT DESCRIPTION INPUT TYPE OUTPUT DESCRIPTION OUTPUT TYPE 1 -1 SC Inlet Temp. (D1 &D2) Temp N/A RO 1 -2 SC Outlet Temp. (D1 &D2) NWB Surge Tank Fill Vlv RO 1 -3 N/A N/A Subclr Stage 1 RO 1 -4 N/A N /A. N/A RO 1 -5 N/A N/A N/A Analog 1 -6 N/A N/A N/A 1 -7 N/A N /A. N/A Analog Analog 1-8 N/A N/A: N/A Analog MT- 504 -3 MPC BOARD INPUT DESCRIPTION INPUT TYPE Ckt 44 # OUTPUT DESCRIPTION OUTPUT TYPE 1 -1 Surge Tank Pressure Press EEPR -9 1 Surge Tank Bleed Vlv RO 1 -2 N/A N/A 1 -6 2 Surge Tank Vent Vlv RO 1 -3 N/A N/A 1 -8 3 Surge Tank Press Vlv RO 1 -4 Defrost Header Temp N/A DEFROST 4 Desuperheater Vlv RO 1 -5 . N/A N/A 1 N/A : Analog 1 -6 N/A N/A 2 N/A Analog 1 -7 N/A N/A 3 N/A Analog 1 -8 N/A N/A 4 N/A Analog MT -EEPR #1 1 BOARD INPUT DESCRIPTION DUTPUT TYPE 1 -1 Ckt 44 EEPR -9 1 -2 Ckt 45 EEPR -9 1 -3 . Ckt 46 EEPR -9 • 1 -4 Ckt 47 EEPR -9 1 -5 Ckt 48 EEPR -9 1 -6 Ckt 49 EEPR -9 MT -EEPR #3 BOARD INPUT DESCRIPTION DUTPUT TYPE 1 -1 Ckt 56 EEPR -17 1 -2 Ckt 57 (SPARE) SPARE 1 -3 Ckt 58 EEPR -9 1 -4 N/A N/A 1 -5 N/A N/A 1 -6 N/A N/A MT- EEPR #2 BOARD INPUT DESCRIPTION OUTPUT TYPE 1 -1 Ckt 50 EEPR -9 1 -2 Ckt 51: EEPR -9 1 -3 Ckt 52 EEPR -9 1 -4 Ckt 53 (SPARE) SPARE 1 -5 Ckt 54 EEPR -17 1-6 Ckt 55 EEPR -17 MT- 500 -2 Universal Sensor Node BOARD '` INPUT DESCRIPTION INPUT TYPE 1 -1 SG 1 Suction Temp Temp 1 -2 SG 2 Suction Temp Temp 1 -3 Discharge Temp Temp 1 -4 : Leak Detection Analog 1 -5 SC Outlet Temp. Temp 1 -6 N/A N/A 1 -7 Outside Humidity Analog 1 -8 Power Monitor Analog MT- CIRCUIT #1 for SG1 BOARD INPUT DESCRIPTION OUTPUT TYPE 1 -1 Ref Ckt 44 REFRIG 1 -2 Def Ckt 44 DEFROST 2 -1 Ref Ckt 45 REFRIG 2 -2 Def Ckt 45 DEFROST 3 -1 Ref Ckt 46 REFRIG 3 -2 Def Ckt 46 DEFROST 4 -1 Ref Ckt 47 REFRIG 4 -2 Def Ckt 47 DEFROST 5 -1 Ref Ckt 48 REFRIG 5 -2 Def Ckt 48 DEFROST MT-CIRCUIT #2 for SG1 BOARD INPUT DESCRIPTION OUTPUT TYPE 1 -1 Ref Ckt 49 REFRIG 1 -2 Def Ckt 49 DEFROST 2 -1 Ref Ckt 50 REFRIG 2 -2 Def Ckt 50 DEFROST 3 -1 Ref Ckt 51 REFRIG 3 -2 Def Ckt 51 DEFROST 4 -1 Ref Ckt 52 REFRIG 4 -2 Def Ckt 52 DEFROST 5 -1 Ref Ckt 53 (Spare) REFRIG 5 -2 Def Ckt 53 (Spare) DEFROST MT- CIRCUIT #3 for SG2 BOARD INPUT DESCRIPTION OUTPUT TYPE 1 -1 Ref Ckt 54 REFRIG 1 -2 Def Ckt 54 : DEFROST 2 -1 Ref Ckt 55 REFRIG 2 -2 Def Ckt 55 DEFROST 3 -1 Ref Ckt 56 REFRIG 3 -2 Def Ckt 56 DEFROST 4 -1 Ref Ckt 57 (Spare) REFRIG 4 -2 Def Ckt 5'7 (Spare) DEFROST 5 -1 Ref Ckt 58 REFRIG 5 -2 Def Ckt 58 DEFROST MT- 500 -1 Universal Sensor Node BOARD : INPUT DESCRIPTION INPUT TYPE 1 -1 D44 Temp Temp 1 -2 D46 Temp Temp 1 -3 D47 Temp Temp 1 -4 D48 Temp Temp 1.5 : D49 Temp Temp 1 -6 D50 Temp Temp 1 -7 D51 Temp . Temp 1 -8 D52 Temp Temp MT-500-3 Universal Sensor Node BOARD INPUT DESCRIPTION INPUT TYPE 1 -1 D44 Def. Therm. Digital 1 -2 D46 Def. Therm. Digital 1 -3 D47 Def. Therm. Digital 1 -4 D48 Def. Therm. Digital 1 -5 D49 Def. Therm. Digital 1 -6 D50 Def. Therm. Digital 1-7 D51 Def. Therm. Digital 1 -8 D52 Def: Therm: Digital MT- 500 -5 Universal Sensor Node BOARD INPUT DESCRIPTION INPUT TYPE 1 -1 Outside Temp Temp 1 -2 Outside Humidity Analog 1 -3 N/A N/A 1 -4 D48 -52 Dual Temp. Key Sin N/A 1 -5 N/A N/A 1 -6 N/A ; N/A 1 -7 D44 Slid Door Proof Digital 1 -8 ; D54 Air Door Proof Digital MT- 500 -2 Universal Sensor Node BOARD INPUT DESCRIPTION INPUT TYPE 1 -1 D53 Temp (SPARE) Temp 1 -2 D54A Temp Temp 1 -3 D54B Temp Temp 1-4 D55ATemp Temp 1 -5 D55B Temp Temp 1 -6 D58 S/A Temp Temp 1 -7 D58 R/ATemp Temp 1 -8 D59 Temp (SPARE) Temp MT- 500-4 Universal Sensor Node BOARD : INPUT DESCRIPTION INPUT TYPE 1 -1 D53 Def. Therm. (SPARE) Digital 1 -2 D54 Def. Therm. Digital 1 -3 D55 Def. Therm. Digital 1.4 D59 Def. Therm. (SPARE) Digital 1 -5 N/A 1 -6 1 -6 N/A 1 -7 1 -8 INPUT BOARDS TO BE MOUNTED ON RACK MT- EEPR #4 BOARD INPUT DESCRIPTION OUTPUT TYPE 1 -1 Ckt 58 EEPR -4 1-2 ' N/A N/A 1 -3 N/A N/A 1 -4 N/A N/A 1 -5 N/A N/A 1 -6 N/A N/A M 1 -izti REVIEWED FOR CODE COMPLIANCE APPROVED SEP 1 4 2011 City of Tukwila BUILDING . DIVISION � O�TUKIMU SEP 02 2011 PERMIT CENTER #006 aIVIIOil.!'fALi TUKWILA, WA 400 COSTCO DR. SUITE 500 TUKWILA, WA PH: 206.575.9191 COSTCO WHOLESALE CORPORATION 999 LAKE DRIVE ISSAQUAH, WA 98027 T: 425.313.8100 www.costco.com KY* /IIIIIRREA 5201 TRANSPORT BLVD. COLUMBUS, GA 31907 Tel: (706)568 -1514 Fax: (706)565 -1723 HEATCRAFT WORLDWIDE REFRIGERATION INTEGRITY, COMMITMENT TO STAKEHOLDERS, AND PASSION FOR EXCELLENCE CONTACT INFORMATIO REGIONAL SALES MANAGER DAVE WALKER — 817.233.9664 SYSTEMS PROJECT ENGINEER SUPERVISOR JAY MELANCON C 706.536.9477 WALL /OVERSTOCK FREEZER, DELI COOLER & ISA\D REMODEL O KYSORMfARREN: All rights reserved. No part of this document may be reproduced in any form or y any means without the expressed written consent of KysorNVarren. A DATE DESCRIPTION 8.24.11 REMODEL. AUG 24, 2011 DRAWN BY: F. COOK MT POINTS & BOARD SCHEDULE R3B FREEZER WALL =WM PERFORATED CAP CONCRETE CURB. 400 COSTCO DR. SUITE 500 TUKWILA, WA. PH: 206.575.9191 Nt.. • . . ..ZETF.?c) TRANSITION TO 4" VENT PIPE BELOW SLAB FREEZER VENT ELEVATION SCALE 999 LAKE DRIVE ISSAQUAH, WA 98027 T: 425.313.8100 wwvv.costco.corn ;".;•:•-:.••• • • BOLLARD, TYPICAL- 1 /4" PRE—MOLDED JOINT FILLER—TYP. FREEZER WALL 5201 TRANSPORT BLVD. COLUMBUS, GA 31907 Tel (706)568-1514 Fax: (706)565-1723 HEATCRAFT WORLDWIDE REFRIGERATION FIELD VERIFY FOR EXACT DRAIN LOCATION INTEGRITY, COMMITMENT TO STAKEHOLDERS, AND PASSION FOR EXCELLENCE PERFORATED CAP VENT LINE CONCRETE CURB EQ.EQ. CONCRETE CURB ELECTRICAL MEZZANINE PLAN SCALE: 1/8" = 1-0" Dr).-...:..-.:-.-......:......_, . -...............•-...()•.x7•,—\ • .„,-i -..-...,...-..........._ : .... • •1 ....„......l.„().•.), -,...61.......N . ..............•••... ..................,...,,.:-.......,..„...„:.:,ii,'....1.,„i),,.......;:,....L„.,...._ .....i . .. ......... );'-`1-1 H. • .-.'. • • • • • : : • • .' :: • •• . • .' ::\.4-.: /0 . • .1"...;';1 : :. • . .. - - .:.".•.! ' . • • •..-, .. SCALE FRESH AREA PLAN SCALE: 10 = 1'-0" FINISHED FLOOR NTS CLEANOUT COVER REQUIRED TO BE HEAVY DUTY CAST IRON WITH NICKEL VENEER TOP J CAST IRON EXTENSION yl SAME SIZE AS SEWER UP TO 3" DIAMETER _ BUILDING DRAINS SIZE PER PLANS 3" TRAP— TRAP & ARM SCALE DRAIN LEGEND REF. DRAIN SIZE D-3 V-2" A D-4 O'-4" D-7 O'-2" D-3 O'-3" B D-4 O'-4" D-7 O'-3" FINISH SINK CONTACT REGIONAL SALES MANAGER PARTIAL FLOOR PLAN A DAVE WALKER — 817.233.9664 FINISH FLOOR NOTE: SEE TEI DRAWING SET (M1) FOR PLUMBING DETAILS 24" M N FOR DRAINS REQUIRING BLOCK OUT, SEE PLAN FOR LOCATION \RIM SET FLUSH PROVIDE OFFSET AS REQUIRED TO LOCATE DRAIN EXPOSED. — COORDINATE WflH REFRIGERATION CONTRACTOR FOR FINAL LOCATION SYSTEMS PROJECT ENGINEER SUPERVISOR 0P-0' 5 JAY MELANCON C — 706.536.9477 DISPLAY CASE OUTLET SIZE ® PLUMBING SCHEDULE COIL WASTE STUB—UP. SEE ARCHITECTURAL DRAWINGS AND MECHANICAL SHEET FOR DETAILS. 12" x 12" FLOOR SINK. F21 SEE ARCHITECTURAL DRAWINGS AND MECHANICAL SHEET FOR DETAILS. SCALE FUTURE FLOOR DRAIN. SEE ARCHITECTURAL DRAWINGS AND MECHANICAL SHEET FOR DETAILS. VENT & DRAIN AT POS FREEZER P41 SEE ARCHITECTURAL DRAWINGS AND MECHANICAL SHEET FOR DETAILS. APPROVED AIR GAP FITTING CONC SLAB ,OR CURB PLIMBING LEGEND PLUMBING CALL—OUT PLUMBING STUB—UP WALL/OVERSTOCK FREEZER, DELI COOLER ISLA\D REV1ODEL PVC PIPE WRAP. ALL PREP AREAS WITH CONDENSATE DRAIN LINES TO RECEIVE PROTECTIVE WRAP OR OTHER COSTCO APPROVED WRAP. MOUNTED WITH STAINLESS STEEL HANGERS/UNISTRUTS/CLAMPS. .C."; DEMO/BACK FILL FLOOR SINK COIL/CASE CONNECTION II 1)f3" COPPER CONDENSATE LINE NOTES: 1. ADD P—TRAP AS DRAIN LINE LEAVES FREEZER/COOLER, INSULATE P—TRAP. 2. SEE ARCHITECTURAL DRAWINGS AND PLUMBING SHEET FOR EXACT LOCATION. 3. ALL PLUMBING AND DRAIN LINES, FIXTURES, VALVE AND MISCELLANEOUS EQUIPMENT ARE PROVIDED AND INSTALLED BY GENERAL CONITRACTOR. 4. ALL ABOVE GRADE CONDENSATE LINES BY REFRIGERATION CONTRACTORS. KY5OR/WARREN: All rights reserved. No part of this document may be ' reproduced n any form or by any means without the expressed written consent of Kysor/Warren. A 8.24.11 DESCRIPTION REMODEL DEMO/BACK FILL 12" X 12" FLOOR SINK. SEE ARCHITECTURAL DRAWINGS AND MECHANICAL SHEET FOR DETAILS. M1112' AUG 24, 2011 DRAWN BY: F. COOK TRAP TRAP. & ARM FLOOR DRAIN DETAIL SCALE NTS EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS—BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND ISTING CONDITI EACH CONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELVES WITH THIS KNOWLEDGE DOES NOT RELIEVE THEIR RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH T 14 1 vninvt/ 1 FrInF PLUMBING PLAN NOTES: 1. TEST OUTSIDE ALARM MONITORING SYSTEM. 2. LIQUID LINE BALL VALVES PROVIDED AND INSTALLED BY REFRIGERATION CONTRACTOR. 3. KEEP REFRIGERATION PIPING RUNS ' AS HIGH AS POSSIBLE AVOIDING SKY LIGHTS AND STORE LIGHTING. 4.. ALL REFRIGERATION PIPING JOINTS SHALL BE MADE WITH USE OF A BRAZING ALLOY CONTAINING A MINIMUM OF 15% SILVER. JOINTS SHALL BE THOROUGHLY CLEANED. BRAZING AND DRY NITROGEN SHALL BE FLOWING AT 3 CUBIC FEET PER HOUR THROUGH TUBING WHILE JOINTS ARE BEING BRAZED TO AVOID INTERNAL SCALE. BRASS TO COPPER JOINTS SHALL BE MADE WITH A BRAZING ALLOY CONTAINING A MINIMUM OF 45% SILVER. LEGEND REFRIGERATION SYSTEM OVERHEAD SUCTION LINE OVERHEAD SUCTION LOOP LINE UNIT CONNECTION LINE SIZE CALL —OUT HAND VALVE SOLENOID 50' 999 LAKE DRIVE ISSAQUAH, WA 98027 T: 425.313.8100 www.costco.com 5201 TRANSPORT BLVD. COLUMBUS, GA 31.907 Tel: (706)568-1514 Fax: (706)565 -1723 HEATCRAFT WORLDWIDE REFRIGERATION INTEGRITY, COMMITMENT TO STAKEHOLDERS, AND PASSION FOR EXCELLENCE ELECTRICAL MEZZANINE PLAN ELI C38 FRESH AREA PLAN SCALE: 1/8 "= 1' -0 ": CONNECT NEW LINE SET TO EXISTING RACK "C ".. SEE NOTES ON RS. Ys" x 9 = 1Y8>, Y8 x 1 1 = 13/8„ Y8 x 13 _ 15/8,, Y8 x 21 = 2%" .040 ALUM BK. WHT PVC JACKETED METAL LINE COVER ONTACT INFORMATIO REGIONAL SALES MANAGER CONNECT TO NEW LINE SET AS NECESSARY. SEE NOTES ON RS. DAVE WALKER - 817.233.9664 CONDUITS PARTIAL FLOOR PLAN A SCALE: 1/8" = 1' -0" JAY MELANCON C - 706.536.9477 5n 0 k: SCALE KYSORN✓ARREN: All rights reserved. No part of this document may be reproduced in any form or by any means without the - expressed written consent of Kysor/Warren 8.24.11 DESCRIPTION REMODEL TYPICAL REFRIGERANT PIPING LINE ARMAFLEX PIPE INSULATION THREAD ROD AUG 24, 2011 DRAWN BY: F. COOK PVC PIPE SADDLES FROM LCC CONTACT STEVE LEE AT 951- 529 -6063 TO PURCHASE UNISTRUT HANGERS (ALL PIPING & REFRIGERATION ELECTRICAL IS TO FOLLOW PLUMBING & HEATING UNES WHEN POSSIBLE). SCALE PARTIAL FLOOR PLAN B SCALE: 1/8 = 1' -0" EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS— BUILT" CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND S T I N G C O N D I T I O N S EACH CONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELVES WITH THIS KNOWLEDGE DOES NOT RELIEVE THEIR RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. NO ADDITIONAL COMPENSATION SHALL BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR DUE TO FAILURE TO FAMILIARIZE WORKERS WITH T H I S K N - 0 W L E D GE SUCTION LINES PLAN NOTES: TEST OUTSIDE ALARM MONITORING SYSTEM. LIQUID LINE BALL VALVES PROVIDED AND INSTALLED BY REFRIGERATION CONTRACTOR. KEEP REFRIGERATION PIPING RUNS AS HIGH AS POSSIBLE AVOIDING SKY ; LIGHTS AND STORE LIGHTING. ALL REFRIGERATION : PIPING JOINTS SHALL BE MADE WITH USE OF A BRAZING ALLOY CONTAINING A MINIMUM OF 15% SILVER. JOINTS SHALL BE THOROUGHLY CLEANED. BRAZING AND DRY NITROGEN SHALL BE FLOWING AT 3 _ CUBIC ` FEET PER HOUR THROUGH TUBING WHILE JOINTS ARE BEING BRAZED. TO AVOID INTERNAL SCALE. BRASS TO COPPER JOINTS SHALL BE MADE WITH A BRAZING ALLOY CONTAINING A MINIMUM ` OF 45% SILVER. LEGEND REFRIGERATION SYSTEM OVERHEAD SUCTION LINE OVERHEAD SUCTION LOOP LINE UNIT CONNECTION LINE SIZE CALL -OUT HAND VALVE SOLENOID 400 COSTCO .DR. SUITE 500 TUKWILA, WA. PH: 206.575.9191 = 999 LAKE DRIVE ISSAQUAH, WA 98027 T: 425.313.8100 www.costco.com 5201 TRANSPORT BLVD. COLUMBUS, GA 31907 Tel: (706)568- 1514 Fax: (706)565 -1723 HEATCRAFT WORLDWIDE REFRIGERATION INTEGRITY, COMMITMENT TO STAKEHOLDERS, AND PASSION FOR EXCELLENCE ELECTRICAL MEZZANINE PLAN I I a { ;C39 LINE SIZE LEGEND FRESH AREA PLAN SCALE: 1/8 1-0" CONNECT NEW LINE SET TO EXISTING RACK "C ". SEE NOTES ON RS. . u .040 ALUM BK. WHT' PVC_ JACKETED METAL LINE COVER. REGIONAL SALES MANAGER CONNECT TO NEW LINE SET AS NECESSARY. SEE NOTES ON RS. DAVE WALKER 817.233.9664 CONDUITS SCALE: 1/8" = 1' -0" SYSTEMS PROJECT ENGINEER SUPERVISOR JAY MELANCON C: 706.536.9477 REFRIGERATION PIPES SCALE ® KY5OR/WARREN: All rights reserved:. No part of this document may be reproduced in any form .or by any means •without the expressed written consent of Kysor/Warren. • DATE 8.24.11 DESCRIPTION REMODEL TYPICAL REFRIGERANT PIPING LINE. ARMAFLEX PIPE INSULATION REVIEWED FOR CODE COMPLIANCE APPROVED SEP 1 4 2011 AUG 24, 2011 DRAWN BY: F. COOK PVC PIPE SADDLES FROM LCC CONTACT STEVE LEE AT 951- 529 -6063 TO PURCHASE UNISTRUT .HANGERS - (ALL PIPING & REFRIGERATION ELECTRICAL IS TO FOLLOW PLUMBING & HEATING UNES WHEN POSSIBLE). SCALE NONE PARTIAL FLOOR PLAN B SCALE: 1/8" =1' -0" EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND MAY NOT REFLECT EXACT "AS—BUILT" CONDITIONS.` CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS.. CONTRACTOR SHALL CAREFULLY COORDINATE NEW WORK AND. DEMOLITION WITH ALL OTHER DISCIPLINES AND E X I S T I N G C O N D I T I O N S EACH ` CONTRACTOR IS RESPONSIBLE FOR HAVING A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND SPECIFICATIONS IN THEIR RELATED FIELD. THE FAILURE TO ACQUAINT THEMSELVES WITH THIS KNOWLEDGE DOES NOT • RELIEVE THEIR RESPONSIBILITY OF PERFORMING THE WORK PROPERLY. .NO ADDITIONAL COMPENSATION SHALL - BE ALLOWED BECAUSE OF CONDITIONS THAT OCCUR. DUE TO FAILURE TO FAMILIARIZE WORKERS WITH T H I S K N O W L E D G E c * *EXACT LOCATION TO BE DETERMINED BY STRUCTURAL ENGINEER (N) ROOF —TOP CONDENSER "D" MODEL BNH- D12 -A106 WEIGHT 4230 LBS.; SIZE: 88" x 324" x 55" TUKWIL 400 COSTCO D TUKWILA PH: 206.5 COS WHOLE COR °0 999 LAK: ISSAQUAH, T: 425.3 www.cos ELECTRICAL PANELS 5201 TRANS COLUMBUS, Tel (706)x. Fax: (706; H EATC RAFT \ REFRIGE.' ELECTRICAL PANEL ON RACKS & COMPRESSORS TO BE FACING IN TOWARDS CENTER AISLE COMPRESSOR RACKS WITH DRIP PANS, TYP.,21,000 LBS SCALE CASE SPEC SCALE SCALE NTS 1 8-7/8 28 13/16" AIR -n FLOW NOTE: FLOOR ` BOLTS TO BE GROUND ANCHORED INTO CONCRETE WITH THE HEAD OF BOLT ON TOP OF THE FLOOR PLATE. INTEGF COMMITMENT TO ANC PASSION FOR t ism DISCHARGE NOZZLE BLADES HCR AIR CURTAIN TO BE INSTALLED AND CALIBRATED TO SPEC BY REFRIGERATION INSTALLER VIEW 14' -4" 123- 5/16 119 1/2" OUTLET--4■1L CONNECTION - • REFRIGERANT CONNECTION END ELECTRICAL CONNECTION END INLET' CONNECTION SUCTION CONK-' ELEVATION SIDE VIEW SCALE SCALE 3/16 " =1 -0" SCALE NTS SCALE NTS FREEZER PIT DIMENSI SLIDING WINDOW SUPERSTRUCTURE FRAME TO SIT ATOP THE MEAT CASE IN LINE WITH CASE JOINT. GAPS REMAINING AT END OF THE LINE -UP ARE TO BE, FLASHED WITH MATERIAL IN COMPLIANCE WITH ALL APPLICABLE CODES. INSTALL (1) BAG HOLDER PER MEAT CASE. AT DELI COOLER THERMA -STOR PIPING PENETRATION WITH FOAM CAULKING BY • REFRIGERATION CONTRACTOR. HEADER PANEL c FINISH FLOOR = O' -0" CONCRETE SLAD REMOVABLE CURB UTILITY CAP BY G.C. FLASH WINDOW SURROUND WITH #3 POLISHED STAINLESS STEEL. (TYPICAL) ELEVATION MT TEMP. SENSOR TO APPROPRIATE RACK NOTE: ALL REFRIGERATION VALVES, PIPING AND THERMOSTATS PROVIDED AND INSTALLED BY REFRIGERATION CONTRACTOR. ALL WATER LINES, VALVES AND CONNECTIONS PROVIDED AND INSTALLED BY G.C. PLUMBING CONTRACTOR. /L.= (2) 4" LAYERS FREEZER SLAB INSULATION WITH STAGGERED JOIN BOTH DIRECTIONS VAPOR RETARDER, TURN UP TO FINISH FLOOR AT PIT 12" AWD BA WALL PANEL DOOR PANEL FLASH REMAINING GAP WITH #3 POLISHED STAINLESS STEEL SLIDING WINDOW SUPERSTUCTURE AND FRAME. CROSS SECTION CONTACT IN REGIONAL SALE DAVE W - 817.2 L TO STORE HOT WATER TANK MEAT CASE END CAF.., MEAT CA SYSTEMS E ENGINEER Sl. 1 1/8" CLEARANCE BETWEEN END CAP AND WALL PANEL. FLASH REMAINING GAP WITH #3 POLISHED STAINLESS ` STEEL. JAY MEL C 706.5 SCALE SCALE NTS NTS TYPICAL CURB PENETRATION DETAIL SCALE MEAT CASE SUPERSTRUCTURE SCALE WALL OVP, FREEZER, DE ' & ISAND S.S. L 3x4x 1 /4 x 6" W/ (2) -3/8 X 2" S.S. LAG BOLTS NOTE: ALL ROOFTOP REFRIGERATION LINES WILL BE PAINTED WITH 'SILVER SEAL' OR APPROVED EQUAL. - ALL CONDENSERS MUST BE MOUNTED LEVEL AND TRUE IN BOTH DIRECTIONS. CONDENSERS MUST BE BOLTED TO ROOF ' CURBS. GRID ® RY5OR/WARREN: All rights reserved. No part of 1 c reproduced in any form or by an t t expressed written consent of K: 7/16 "O ; HOLE DATE 8.24.11 DESCRIPTIC REMODEL S.S. PL 1/2x3x6 W/ (2) -3/8" S.S. HILTI K.B. II ANCHORS, EMBED 2i ", MIN., TYP. HEADER END VIEW DOUBLE WIDTH UNITS T- :-I zCONN. P1 `— r ' SCALE N T.S. 7/16 "0 'HOLE. P. 339 PIPING PENETRATION WITH FOAM CAULKING BY REFRIGERATION CONTRACTOR. REMOVABLE CURB' UTILITY CAP BY G.C. PURGE VALV MOUNT CONDENSERS TO OUTSIDE OF SUPPORT PLATFORM. MIDDLE SPACE FOR FUTURE EXPANSION.` REFRIGERATION CONDENSER M.B.S. TO VERIFY WEIGHT WITH REFRIGERATION CONTRACTOR. PURGE VALVE AIR COOLED CONDENSER S.S. CUSTOM C- SHAPE AS SHOWN W/(2) -3/8 X 2" S.S. LAG BOLTS ROOF LINE 40,__0- CONDENSER PLATFORM FLEXIBLE FLASHING BY M.B.S. SLOPED MTL. ROO ' ECK 1 IF _r411111yMr- MIIrUMILY■r=1r1INIVAIWrIMrINIMINIrMI1r/1111rM1Y■rMrERIMILrIORr/M1 rIIIIrMMrMOI/MrMrMIrorMILIMILYM1Y/11111rINIr■rAIIIIIrANIrIIMrMMINI iur1111Mr MIr AMY MILT MI CURB PIPING PENETRATION (BY G.C.) REFRIGERATION LINES RUN BELOW TOP OF I -BEAM SUPPORT TO ALLOW FOR FUTURE DE -SUPER HEATING UNIT TO BE INSTALLED. HYDRAZORB CLAMP TO UNISTRUT SUPPORT ATA I L' LTA fAll CAM AUG 24, 2011 DRAWN BY: F. COC. CONDENSER SUPPORT BEAM BY M.B.S. MEZZANIN, EQUIP. LA DETAILS SCALE NTS BOHN BNH -D12 A106 SCALE SCALE CONDENSER MOUNTING DETAIL SCALE