Loading...
HomeMy WebLinkAboutPermit M11-179 - WESTFIELD SOUTHCENTER MALL - VANSVANS 811 S OUThCENTER MALL EXPIRED 09 -12 -12 Mi 1 -179 City olkukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206431 -3670 Inspection Request Line: 206- 431 -2451 Web site: http: / /www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: 9202470010 Address: 811 SOUTHCENTER MALL TUKW Project Name: VANS Permit Number: M11 -179 Issue Date: 02/21/2012 Permit Expires On: 08/19/2012 Owner: Name: WESTFIELD PROPERTY TAX DEPT Address: PO BOX 130940 , CARLSBAD CA 92013 Contact Person: Name: JOHN HENRY IV Address: 15640 N 7 ST, SUITE B9 , PHOENIX AZ 85022 Email: JOHN @PLEGERHENRY.COM Contractor: Name: ALTERNATIVE MECHANICAL LLC Address: 22129 NE 114TH ST , REDMOND WA 98053 Contractor License No: ALTERML901KQ Phone: 602 - 293 -3300 Phone: (425)221 -1163 Expiration Date: 05/18/2012 DESCRIPTION OF WORK: TENANT IMPROVEMENT: DUCTWORK, NEW DIFFUSERS, NEW THERMOSTAT FOR TENANT FIT -OUT Value of Mechanical: $15,000.00 Type of Fire Protection: UNKNOWN Electrical Service Provided by: Permit Center Authorized Signature: Fees Collected: $367.31 International Mechanical Code Edition: 2009 Date: ())-7 I I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this permit. Signatur Print Name: .-_ This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Date: doc: IMC -4/10 M11-179 Printed: 02 -21 -2012 • • PERMIT CONDITIONS Permit No. M11-179 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431 - 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: Readily accessible access to roof mounted equipment is required. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 8: Manufacturers installation instructions shall be available on the job site at the time of inspection. 9: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 10: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 11: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 12: ** *FIRE DEPARTMENT CONDITIONS * ** 13: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 14: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 15: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 16: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 17: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) 18: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 19: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 20: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and doc: IMC -4/10 M11 -179 Printed: 02 -21 -2012 #2051) 21: Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 22: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: IMC -4/10 M11 -179 Printed: 02 -21 -2012 ,s- CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 http: / /www.TukwilaW A,gov MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. *please print ** 1,- King Co Assessor's Tax No.: Site Address: 2560 �2 Q4'k�1c-P WO( 454+ Suite Number: Floor: V Tenant Name: New Tenant: Yes ❑ ..No :e ONT4GT N t'e` tt1�� `1 g ail prgjd b I[@Ei tt . 4 �FUt s a tiI sk.:�. .�. ird r 1 Name: O N ` S , V jN) Address: `Wil e G•1 a lik 72. Name' Vv eS'k -cle 1 COIVO rr td4 Address:z 4 j) P ]„ AA 4 tt City: 5p A, State: W Zip: q to vi :e ONT4GT N t'e` tt1�� `1 g ail prgjd b I[@Ei tt . 4 �FUt s a tiI sk.:�. .�. ird r 1 Name: O N ` S , V jN) Address: `Wil e G•1 a lik 72. City: rk v�'C11 State: Zip: 1,(_1(02 - Phnne: (oOZ 2c1;. ,L/6ax: (�pt 7nq 43! I L Email: V _ 1. Q / \' OIL Y� vm.I. Cd,,,t Valuation of project (contractor's bid price): $ 151000 li Company Name: .(L! Sekt� Address: � City: Phone: Contr Reg No.: Tukwila Business License No.: State: Zip: Fax: Describe the scope of work in detail: Qu. ) Ci;' ?4''S3 i7 - tl.eA.,.los-t-73 ror -tea FP -0(,)- Uset Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement Exp Date: Fuel Type; Electric..... Gas ❑ Other: MApplieffiionsWorms•Applications On LineVA11 Applicatio w'Mecianical permit Applicsiion Revised 8.9-11 door Revised. Aot$uat 2011 bh Page 1 of 2 • Indicate type of mechanical work being installed and the quantity below: Unit Type. Qty Furnace <100k btu 2 Furnace >100k btu 14 Floor furnace Thermostat Suspended/wall/floor mounted heater Wood/gas stove Appliance vent Emergency generator Repair or addition to heat/refrig/cooling system Other mechanical equipment Air handling unit <10,000 cfm 2 Unit Type Qty Air handling unit >10,000 cfm 2 Evaporator cooler 14 Ventilation fan connected to single duct Thermostat Ventilation system Wood/gas stove Hood and duct Emergency generator Incinerator— domestic Other mechanical equipment Incinerator — comm/industrial O Unit Type ' : Qty Fire damper 2 Diffuser 14 Thermostat 2, Wood/gas stove Emergency generator Other mechanical equipment Boiler /Cogtpreasor Qty 0-3 hp /100,000 btu 3 -15 hp /500,000 btu 15 -30 hp /1,000,000 btu 30 -50 hp /1,750,000 btu 50+ hp/1,750,000 btu Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR TIES PERMIT. BUILDING OWNR OR AUTHORIZED AG Signature: Date: /2-/c14 (_t7C C,4 Print Name: /' 0( 3 Day Telephone: 3I fY �O iQ - p7 Q % 6X/70 MailingAddress:d•7/, Pa C/ G aoriltay pPepa- tarntlp OA 90 City State Z HAAppliWionAFocaa- Applications On Line12011 Applicniuns\Mectanicai Pcrnat Application Rased 54.11.doal Revised: August 2011 6h Page 2 of 2 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206-431-3665 Web site: http: / /www.TukwilaWA.gov RECEIPT Parcel No.: 9202470010 Permit Number: M11 -179 Address: 811 SOUTHCENTER MALL TUKW Status: APPROVED Suite No: Applied Date: 12/20/2011 Applicant: VANS Issue Date: Receipt No.: R12 -00704 Payment Amount: $293.85 Initials: WER Payment Date: 02/17/2012 01:04 PM User ID: 1655 Balance: $0.00 Payee: ALTERNATIVE MECHANICAL LLC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 2437 293.85 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts MECHANICAL - NONRES 000.322.102.00.00 293.85 Total: $293.85 doc: Receipt -06 Printed: 02 -17 -2012 SET RECEIPT RECEIPT NO: R11 -02762 Initials: Payment Date: 12/20/2011 User ID: 1655 Total Payment: 1,514.70 Payee: PERMITS DIRECT SET ID: 122011 SET NAME: VANS SET TRANSACTIONS: Set Member Amount D11 -401 1,332.11 EL11 -1130 109.13 M11 -179 73.46 TOTAL: 1,332.11 TRANSACTION LIST: Type Method Description Amount Payment Check 2154 1,514.70 TOTAL: 1,514.70 ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PLAN - NONRES 000.345.832.00.0 PLAN CHECK - NONRES 000.345.830 TOTAL: 109.13 1,405.57 1,514.70 ,..; INSPECTION RECORD Retain a copy with permit 44//-1 79 . INSPECTION.NO. • PERMIT NO. 4,t) • . • • ' • • -:"CITY OF TUKWILA BUILDING DIVISION • Project: . . • . Type of Inspection: ;_s^ /new E S.Vz./7-0(RAIA/ Address f - . . . ..8.t/..../p1,9// Date Called: Special Instructions: _ . , • • • • . Date Wanted:. 4Lm. 'rl'. Requester: Phone No: Ocs—‘ OZ — cg/OO Approved per applicable codes. OCorrections required prior to approval. COMMENTS: . _ 67-5,ovi.o AO- .sw 77T aleilit 7- 4i rolv, LI REI SP CTION FEE REQUIRE. Prio,f to next inspection, fee must be ..7 pat aJ6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. : • • • INSPECTION RECORD Retain a copyfwith permit INSPECTION NO. PERMIT N0. CITY OF TUKWILA ;BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 1Z (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 ro I I T17, Projec • Ty a of I ection: , AreSs: - _I -I yt/1 4 I t Date Called: Special Instructions: • . Date Wanted:. G.— 1 a p.m. Requester: Phone No: proved per applicable codes. DCorrections required prior to approval. / COMM 5: - h5pecto INSPECTION FEE RE UIRED. Prior tg iext inspection, fee must be. paid at 6300 Southcenter Blvd.. Suite 1. O. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit ,"i / /-/ 7 9 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 _ (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: 1/4' 5 Type of Inspection: �- ?d?r6hi— -r-A,/ Address: c9// Se C''/ /i)/1 I / Date Called: Special Instructions: y Date Wanted:. a.m. Requester: Phone No: .20 6 - 4 e 2 cg /F.1 e Approved per applicable codes. D Corrections required prior to approval. Z COMMENTS: PECTION FEE REQUI ED. Prior to next . spection, fee must be at 6300 Southcenter B vd., Suite 100. Calljo schedule reinspection. I P 12- 28 -'11 11:40 FROM- publicworks /dcd 2064313665 T-337 P002/005 F -519 • Mechanical Summary MECH -SUM 2009 Washington State Energy Code Compliance Forms for Nenrealdentlal and MuItlfamlry Residential Revised December 2010 Project Info OP C —._— Project Addres6 Date /z,,25..1 t Sace S T?Le SE4AName: Z&w ,$DuTFICe,JT6 - WA � � l8 ' /NAP.(„ For Building Sari- Dept. Use REVIEW CODE CON W[ Ae-P RC „ Applicant �AN'S AppltcanlAddress: Applicant Phone: 7P" /' with commissioning requirements, � ggitect Description Briefly describe mechanical system type and features. en Plans •sP41T -SvS ,l1 HgA Include documentation requiring compliance JAN 0 5 �+ y,' 14?8it of TL SIOMNIMPOIMINI Compliance Option VSImple System Q Complex System Q Systems Analysis (See Decision Flowchart (over) for qualifications, Use separate MECH•SUM for simple Mk - i & complex Equipment Schedules The following Information is required to be incorporated with the mechanical equipment schedules on the plane. For projects without plans, fill in the required information below. Cooling Equipment Schedule • Equip. ID Equip Type Brand Name' Model No.1 Capecity2 Stulh OSA CFM or Econo? SEER or EER IPLV3 Econmizer Option or Exception° Heat Recovery YIN A110-I %I_AT -0.03Z We octo ... iso : - ...... w-I NP Te.AWE - TwAOctD _/o coo -.` I/.0 p! /A _ -- NI Heating Equipment Schedule _ Heat Recovery YIN Equip. ID Equip Type Brand Name' Model No' Capacity2 Btulh OSA cfm or Econo? Input Btuh Output Btuh Efficiency, k� P p� NJ 'R406 T o!6 aT° 7So r _. CO-I tic .-ram ram ago fg2C0i, N/A N%A 3.7? N — Fan E • ui . ment Schedule Equip. o Equip ip Type Model Na. No.1 CFM SP 1 HP /BHP Flow Controls Location of Service MIMI ail .1.111111111111 1111111111111111 11111. 1111111111 1111111111111111111 11f available. 2 As tested according to Table 14 -IA through 14.1G. s If requi ed. ° COP, HSPF, Combustion Efficiency, or AFUE, es applicable. 6 Flow control types: variable air volume(VAV), constant volume (CV) or variable speed (VS). a Exception numbe VED DAR PLIANCE VED 2012 INCOMPLETE x111 - I�R DEC 30 2011 PERMIT CENTER • 12- 28 -'11 11 :40 FROM- publicworks /dcd 2064313665 T -337 P003/005 F -519 • - •• -••' as - - -- -- .,•f••IM...+- • ....,•Y IY, 1-MIII 1IU1,iM11NM1 St IM I•I•I%,I•IItJIi I WYIMV /It$QI Mechanical Permit Plans Checklist MECH -CHK 2009 Washington State Energy Code Compliance Forms for Monroe dentlal and Multifamily Res . enlist Roisted December 2010 Project Address .5 flex S _ - �, , ge.—. 44 Mk- Data ! _ .. 11 The following Information is necessary to check a mechanical permit application for compliance with the mechanical requirements In the Weshin ton State Nonresidential Energy Code. Applicability (yes, no, na Code Section Component information Required Location an Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401.1424) EMI lip1om WA Ea= Bqul • ment Performance 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency All Combustion hig, Indicate Intermittent ignition, flue /draft damper & jacket toss -� 1411.1 Air.cooled chiller Provide total air and weter chiller capacity -- iNA1 1411.2.1 Water - cooled chiller Full -load and NPLV valuess adjusted for any nonstandard conditions Y 1411.4 Pkg. elec. htg.& cig. List heat pumps on schedule 1411.5 Untnoiosed Heat Indicate radiant heat system and occupancy controls -- 11110.1111M16=1223 NMI N k IMINICZI 1 41 2 1412.2 HVAC Controls -� Deadband control Indicate locations on plane hi 1 indicate 8 degree deadband minimum Z. 1412.3 1412.4.1 Humidity control Indicate humidlatat —. Setback and Shutoff Indicate thermostat with 7 day program capability 6 required setback M Dampers Indicate damper location, leakage rate, control type, & max. leakage f A , 1412,4.2 Optimum Start Indicate optimum start controls ,- 1412.5 Heal pump oontrol indicate heat pump thermostant & outdoor lockout an schedule 112 1412.6 Combustion heating Indicate modulating or staged control -- 1412.7 Balancing Indicate balancing features on plans M 1 N A 1412.8 Ventilation Control indicate demand control ventilation for high - occupancy areas -•- N ii 1412 g Loading Dock & Garage Ventilation Indicate enclosed loading dock & parking garage ventilation system activation and control method. —. p 1422 Thermostat interlock indicate thermostat Interlock on plans A 1432,2,1 Temperature Reset indicate temperature reset method -' ECOEIIII Air / Water Economizers _ man wai 1413.1 Single zone systems Indicate multiple cooling stage control capability. Air Scone Operation indicate 100°,6 capability on schedule N1.2. tJ /ti 1413.1 Wtr Econo Operation Indicate 10091 capacity at 45 degF db & 40 deg F wb ..... 1111 1413.2 W&r Sono Document Indicate max. O8A condition for design clg load $equipment erformance date. _ y OEM1413,4 1413.3 Integrated operation Indicate capability for partial cooling Humidification Indicate direct evap or fog atomization WI air economizer — - imilwrans { 1414.1 punting $ terns ' buct sealing Indicate duct design pressures, sealing, and testing requirements . M2 Y 1414.1.2 Low press. duct test indicate applicable low pressure duct systems shall be leak tested *1'L r! 1414.1.3 Hlgh press, duct test Indicate high pressure duct systems shall be teak tested, and identify the IA location of this ductwork on plans —+ `{ 1414.2 Duct Insulation Indicate R -value of insulation on duct 2. 1415 _ -_--_- Piping Systems V m NA 1415.1 Piping Insulation 'Indicate R -value of Insulation on piping —+ omp : on V oqu roman • �— 1416.3.2 System Balancing Indicate air and water system balancing requirements 1100. amFunctional 1416.3.4 Testing Provide sequence of operations and test procedures. I Documentation Indicate O &M manuals, record drawings. staff training tilt 2- . 1J k 1416.3.5 Comm. Report Indicate requirements for final commissioning report N • 1416.4 Compliance Mist Submit to building ofcial upon Substantial completion. Mechanical Summary Form ma Completed and attached, Equipment echeduie with types, input/output, efficlen , h. economizer 12- 28 -'11 11:40 FROM- publicworks /dcd 2064313665 T -337 P004/005 F -519 Mf1t:.la atlical Summary (back) MECH -SUM 2009 Washington State Energy Coda Compliance Forms for Nonresidential and Multifamily Residential Revised December 2010 System Description See Section 1421 for full desoription of Simple System qualifications. All Systems: g No humidification? ErNo Reheat? If Heating /Cooling or Cooling Only ❑ Constant vol? [✓] 8pfit system? ❑< =84,000 Btuh? (a Economizer E] Air r,nnlart? ❑ P ir•.kneed avn? ❑ < =1:1A Mn Muhl included'! 0 Coelho Coo < =15 Btuhift2? ❑ Heating Cap, > 0 & < =10 Btuhn12? If Heating Only: a cinnn € fm') ❑ <30% outside air? ❑ Heating Cap. < =10 Btuh/tt'? Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, etcher the Complex System or Systems Analysis Options must be used, Yes Humidificatlo or Reheat? -Cap <,c15 Heat/Cool Eq. wl Cap <'10 ill, or ft ? Yes System Type Healin, /Coolie. or Coo Ing Only Heating Only Reference L Section 1421 Yes f Total \ CFM Serving Single Roo No— a ackage Unit ap 4= 135,000 Btuh Yes Yes Econo ncluded Yes Simple System Allowed (section 1420) ti • aiifies Economizer Exception ion t e Yes T Use Complex Systems (section 1430) Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance In determining Which Complex Systems requirements ere applicable to this project. 12- 28 -'11 11 :40 FROM- publicworks /dcd 2064313665 T -337 P005/005 F -519 7 ec zanica 'ermit ' ass - 7th i - i u 201q 2009 Weahtnpton Mete Energy Code complienpe Forme for Nonrauldentiei and Multifamily Residentlal Rev aed December Project Address *jAio nC � ow- 2660 a 444,0_, information Is necessary to check a mechanical permit application for compliance with the mechanical requiremen Nonrealdentlei Energy Code. pate s in the The following Washington State Applicability (Yes no`na) 1 Code Section Component Infomlatlo Required Location on Plana Building Department Notes SERVICE WATER HEATING AND HEATED POOLS (Sections 1440.1454)_ - %4 1440 Service water htg. 1441 Elec. water heater • Indicate R -10 insulation under tank _ 1442 Shut-off controls Indicate automatic shut-off of circulators or heat trace 1443 Pipe Insulation Indicate R•value of insulation on piping 1444 Pump Energy Indicate method of pump energy management (Sec 1438) 1445 Heat Recovery Indicate preheat capacity as % of peak service water demand. 1460 • Heated Poole 1452 Heat Pump COP Indicate minimum COP of 4.0 1452 Heater Efficiency Indicate pool heater efficiency 1453 Pool heater controls Indicate switch and $5 degree control _..W 1454 Pool covers indicate vapor retardant cover 1454 Poole 50+ degrees Indicate R -12 pool cover 1455 Heat Recovery Indicate method and capacity of exhaust air temperature reduction COLD STORAGE Sections 1460 -1465) 13 A ' 1460 Cold Storage - 1463 Evaporators Indicate motor type and speed control 1464 Condeneors Indicate condenser cooling type, design wb temp and control 1465 rCompressors Indicate design minimum conderieing temp and control, If "no" is indicated for any Item in Sections 1401.1424 or 14404465 , provide explanation; 0 WANE' Weights if/EEt th.' /T e' , UNur SSRPRCO23 -EN RNs &&sW w 5.0v7P e t Table 51. TWA Unit & Corner Weights — Ibs (60 Hz) P'' Tons Model No. Shipping Max (Ibs) Net Max (Ibs) Corner Weights 1 2 3 4 6 TWA073D 382 328 113 83 56 76 ---j. 7.5 TWA090D 394 340 117 86 58 79 10 438 TWA120D 509 127 121 72 118 4. 15 TWA180E 898 765 202 192 181 190 20 TWA240E 981 848 254 266 147 181 Figure 34. TWA073, 090, 120 Service Access W i 02 •1" ssit 43 Figure 35. TWA180, 240 01 SeMee Aeems f in #1 REVIEWED FOR CODE COMPLIANCE APPROVED JAN 0 5 2012 City of Tukwila BUILDING DIVISION INCOMP ETE '_TR #.� x111 -179 03 RECEIVED DEC 30 2011 PERMIT CENTER 97 /Far t/NIT (9W upir V A1,5 we57-69m2 sooNceevitic •TRANE. Weights Table 52. TWE Unit and Corner Weights - Ibs - 60 Hz Tons Model No. Shipping Max (Ibs) Net Max (Ibs) Corner Weights - Vertical Corner Weights - Horizontal 1 2 3 4 A B C D 5 TWEO61D /E 263 232 55 71 51 55 54 67 50 61 .,.71h TWE090D /E 360 323 67 99 75 82 56 92 87 88 10 TWE120D /E 429 393 77 121 110 85 79 118 77 119 121h TWE150E 730 676 168 192 181 135 196 164 145 171 4.15 TWE180E 729 675 167 192 181 135 196 163 145 171 20 TWE240E 891 818 258 168 161 231 256 181 146 235 Figure 36. Vertical - TWE061, 090, 120 #1 Control Box Access .\n • #4 Top View Figure 38. Horizontal - TWE061, 090,120 A Top View B I D I Ad Flow IC Control Box Access U3 Figure 37. Vertical - TWE150, 180, 240 Control Box Access 01 #2 04 Top View Figure 39. Horizontal - TWE150,180, 240 A Top View B L J t Jr A Flow I/c Control Box Access 03 98 SSP- PRCO23 -EN ,.. VICINITY mAp : 14 KEY PLAN V COA "4- I ti t-.,, e • 2 k...ta,i 13 i'. S 12(10^, St t. -., ,1, •• ' (2) ()I ••,, •0, k4 .t-,,, ...J.., ' > , ',... .e" .0,...,4... ' fa ' it • • Sth St 0 W ... croio , . • ..6 . t 7--- . c.. 7, m "kki la* ; Vs ; .14.21`14 S! rt Ta 7,'; `11 ., ivy Tuk co • .- tp k' l• 0 ti V, w t I . if 8 uetk St al te C.- al 1,,P F. 22' t- i',•, z• •• .. ,1—* ii .. .b i g i g:mtd gt .4404. s 1 t.... :it% 4., IF CD ',-,,, '''''''. - - ,— i" V;. "i'•: - , —..,, ,..„10k.Y-:',-, v .:,-.. ' : ' .'.:' .--...:.:,:.(-- - a : ,. ,• 2, ,i, . , . . g .a. C11.. - 4 i".. . - ., ..- ,.. SeaTa : ..0.- , . vao . :,,, ,,..," ,, klefulic ken _.4 51, i -- ; , . Heights ••kt a -.,.."' '1V. 11 -*' ir, .414 s 1 nth st ,.._ • . ""•-: ".:f ', - c3 §' Sr y, ,:' -, ,- „ ; -; Vaiiey , ..,,c ..;. 4, . Roe Park '915th St t: It 0 S 184.1tt Si .., .....,, ,... - .,. . 1. > IttAti rt. P /-' Angle Lake . '.iii,:6"" i 8 ,`" . ..._... WESTFIELD SOUTHCENTER THIS PROJECT IS IN A . . ANS ..PACE NO. 544 @ COVERED MALL BUILDING EXTERIOR MALL STREET LOCATION ' REVIEWED FOR CODE COMPLIAN• APPROVED . _ .. ‹, ' 1 Rentpn r;) rut unicipai coe c'c Airpoti , 4: I: d St g. 333d S 5 ‘.t• r t 0, .12. C) Renton Downtown '.., fi '3r. Renton ..,e. S .1> 4‘,. Suttee% 1714 0) ii . 1 , . ar SW rES St ito, 4". , isi ". . r•, at ReMoriNAllave , ..o It, tt gitQtiz . _ S hot* rtg C efse. C6m,ple* ,, t t ' r F 0 VVes'tte,h1 \'.., Southwentet 5! 0 , Co . CP g' 3 X ' I 3:- • ,..• ` '''' , =. k a !"2 : n ; 6 F., ,, 4 ,0 . ,os Cs, ‹ 3W 41w, ;:is , _ 1 , , , ‘, _ , s Cell 9, St ' S 1 k`V" S 1Eigth St ..5.4,'‘' 430 51 !:1 ri . . ,k. € 1 ! t '' ›- ., .. co ,, ;T., k $ 1 f' co .r- - ' 6: ct , , 5 :4 SI 1' ,-; 1 :,i s 19So St o. ,o, NORTH .. . , JAN 05 2012 I o kwiia BUILDING IVISION . . . . — 7P. . 1 11! Li 1-1 Ir , i* macys ig,,_. • 0 0 C3 175)--4 ao•Na'arC3 0 C3 0 a o a - 0 te- t..... A.' .1 .., k,s,„ .........,.__ 3 ii__ -1.--, .1 II- 1.....■.11% I — _r_i I - 1_1 mf __n_gt. 11J . .1 1.I i.i° T T il H I g ■ • EARS DRINKING FOUNTAINS C.----v-- I r,.,.1i:3‘ P RECEIVED 1 DEC 30 2011 NORTH SEA LE WASHINGTON 98188 , "-N. •1; WESTFIELD SOUTHCENTER PERMITCENTER io.s.e'N 44 LEVEL 1 OF 3 LINCOMPLETE I z, TR#_ M 1 I .i... 1 7 9 08 -01 -2012 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director JOHN HENRY IV 15640 N 7 ST, SUITE B9 PHOENIX AZ 85022 RE: Permit No. M11 -179 VANS 811 SOUTHCENTER MALL TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a fmal inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 09/12/2012. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 -431 -2451 to schedule for the next or fmal inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 09/12/2012, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. File: Permit File No. M11 -179 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431 -3670 • Fax 206-431 -3665 • • • NP MECHANICAL, INC. CONSULTING ENGINEERS 6 (il 1717 W. Northern Ave. • Suite 116 • Phoenix, AZ 85021 • Phone (602) 249 -6311 • Fax (602) 249 -6354 RESPONSE TO CITY COMMENTS Date: December 28, 2011 To: Dave Larson, Senior Plans Examiner From: Art Romero Company: City of Tukwila Building Division Re: Van's — 811 Westfield Southcenter Mall Mechanical Permit Application No.: M11 -179 Below is the written response to the Building Department review comment's for the project referenced above. Item #1: See attached form. Item #2: See attached new sheet M2. Item #3: The new HVAC units are of the same type as the replaced units however they are of different tonnage. The new units weigh considerably less than the existing. Refer to the attached cut sheets indicating the weights of the old vs. the new. Item #4: Comply. Refer to the attached 11x17. Item #5: The return air path from the sales area to the stock room is via the open vestibule, in front of the fitting rooms. The pathway from the sales to the stock is open and unobstructed. There are no doors on the entries. Item #6: The new HVAC units are to be located in the same location as the existing units. INCOMPLETE LTR #�_ ti iECEIVI�D DEC 30 2011 PERMIT CENTER Filename: 11253 - Vans Southcenter -City Comments written response.doc • • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director December 22, 2011 John Henry IV Pleger/Henry Architecture 15640 N 7th St, Suite B9 Phoenix, AZ 85022 RE: Incomplete Letter #1 Mechanical Permit Application M11 -179 Vans — 811 Southcenter Mall Dear Mr. Henry, This letter is to inform you that your permit application received at the City of Tukwila Permit Center on December 20, 2011 is determined to be incomplete. Before your application can continue the plan review process the attached/following items from the following department(s) need(s) to be addressed: Building Department: Dave Larson at 206 431 -3678 if you have any questions concerning the attached comments. Please address the comment above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at the Permit Center at (206) 431 -3670. Sincerely, 7,JLe Bill Rambo Permit Technician Enclosures File: M11 -179 W:\Permit Center\lncomplete Letters\2011\111 -179 Incomplete Ltr # 1.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Tukwila Building Division Dave Larson, Senior Plan Examiner Determination of Completeness Memo Date: December 22, 2011 Project Name: Vans Permit #: M11 -179 Plan Review: Dave Larson, Senior Plans Examiner The Building Division has deemed the subject permit application incomplete. To assist the applicant in expediting the Department plan review process, please forward the following comments. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. Please provide a completed Washington State Energy Code Mechanical Summary Form. I have included one with this memo. 2. Page M2 appears to be for a different project than page M1 as the equipment schedules do not match the equipment. AHU 1 and CUI are shown on Ml. M2 has HP 1 listed in the schedule. 3. Are the new units replacing old units of the same type? If so, are they equal to or less in weight than the old units. 4. Please provide a mall plan showing where this tenant space is located. 5. How does the return air from the front retail portion of the store get back to the return air intake? 6. Provide a roof plan for proposed rooftop equipment. Should there be questions concerning the above requirements, contact the Building Division at 206 -431- 3670. No further comments at this time. • I PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M11 -179 DATE: 12 -30 -11 PROJECT NAME: VANS SITE ADDRESS: 811 SOUTHCENTER MALL Original Plan Submittal X Response to Incomplete Letter # 1 Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: 14.0C..11 Building` Division IN Public Works ❑ Fire Prevention Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 01-03-12 Complete Incomplete Not Applicable ❑ Comments: :Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required n No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Notation: n DUE DATE: 01-31-12 Not Approved (attach comments) n REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 PLA • IEW /ROUTING SLIP L ACTIVITY NUMBER: M11 -179 DATE: 12 -20 -11 PROJECT NAME: VANS SITE ADDRESS: 811 SOUTHCENTER MALL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPAR MENT : iu li ding ''vision Public Works ❑ dk \W-3--A\ ire Prevention Structural Planning Division El ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 12-22-11 Complete ❑ Incomplete Not Applicable n Comments: 'Permit Center Use Only ' INCOMPLETE LETTER MAILED: I ~1" LETTER OF COMPLETENESS ILED: Departments determined incomplete: Bldg t Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route ❑ Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions ri Notation: REVIEWER'S INITIALS: DUE DATE: 01 -19-12 Not Approved (attach comments) DATE: • 'permit Center. Use Only . ' •. CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28-02 S S City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: l 2 - # cg - I l Plan Check/Permit Number: 1• 11 -179 ® Response to Incomplete Letter # 1 ❑ Response to Correction Letter # ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner RECEIVED CITY OF TUKIMIA !DEC 3 0 2011 PERMIT ' Project Name: Vans Project Address: 811 Southcenter Mall 7 Contact Person: 011„ .4 V ( I 1 Phone Number: 41a 2d-17 17 00 Summary of Revision: se e + A-C1l e ci Sheet Number(s): MI l M2- "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: A�" V- Entered in Permits Plus on O17b1 \applications \forms- applications on line\revision submittal Created: 8 -13 -2004 Contractors or Tradespeople Peer Friendly Page • General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name ALTERNATIVE MECHANICAL LLC UBI No. 602991807 Phone 4252211163 Status Active Address 22129 Ne 114Th St License No. ALTERML901 KQ Suite /Apt. License Type Construction Contractor City Redmond Effective Date 5/18/2010 State WA Expiration Date 5/18/2012 Zip 98053 Suspend Date County King Specialty 1 General Business Type Limited Liability Company Specialty 2 Unused Parent Company Business Owner Information Name Role Effective Date Expiration Date GORDON, ROBERT E Partner /Member 05/18/2010 Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date RLI INS CO LSM0193777 05/06/2010 Until Cancelled $12,000.00 05/18/2010 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 3 Western National Assur Co CPP 104113500 05/06/2011 05/06/2012 $1,000,000.00 07/27/2011 2 First National Ins Co 25CC30033420 05/06/2011 05/06/2012 $1,000,000.00 05/06/2011 1 FIRST NATIONAL INSURANCE COMPA 25CC30033410 05/06/2010 05/06/2011 $1,000,000.00 05/18/2010 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period https: // fortress .wa.gov /lni/bbip/Print.aspx 02/21/2012 1414 Ducting Systems 1414.1 Duct Sealing and Testing: Duct work and plenums shall be sealed in accordance with Section 1414.1.1. Additionally, ducts shall be tested in accordance with Sections 1414.1.2 and 1414.1.3 as required. 1414.1.1 Sealing: Duct work which is designed to operate at pressures above'' /: inch water column static pressure shall be sealed as follows: 1. Static pressure '' /z inch to 3 inches: Seal all transverse joints and longitudinal seams. Spiral lock seams in round and flat oval duct work do not require sealing; however, other seams shall be sealed. 2. Static pressure above 3 inches: Seal all transverse joints, longitudinal seams and duct wall penetrations. All low pressure supply and return air systems not located entirely within the conditioned space, including the unconditioned side of enclosed stud bays or joist cavities /spaces used to transport air, shall be securely fastened and sealed. Duct work shall be sealed using welds, gaskets, mastic, or mastic -plus- embedded -fabric tape. Enclosed stud bays or joist cavities /spaces used to transport air shall be sealed using mastic -plus- embedded -fabric tape, or when drywall is used to enclose the air system, drywall mud and tape. Duct tape is not permitted as a sealant on any ducts. EXCEPTION: Fibrous glass duct systems installed in accordance with Standard UL 181A and flexible duct systems installed in accordance with Standard UL 18IB may use tapes listed for these systems. 1414.1.2 Low Pressure Duct Leak Test: All duct systems shall be sealed to a leakage rate not to exceed 6 percent of the fan flow if the duct system: 1. Is connected to a constant volume, single zone, air conditioner, heat pump or furnace; and 2. Serves less than 5,000 square feet of floor area; and 3. Has more than 25 percent duct surface area located in any unconditioned space. The leakage rate shall be confirmed through field verification and diagnostic testing, in accordance with SMACNA Duct Leakage Test Procedures - 1985. 1414.1.3 High Pressure Duct Leak Test: Duct work that is designed to operate at sta press ' - . ess of 3 inches water column shall be leak- tested in accordance MACNA Duct Leakage Test . • res - 1985. Representative sections totalin l . - ss than 25 percent of the total installed duct area for signated pressure class s.• . e tested. Duct systems with pressure ratings in excess of 3 in. w.c. s . . e ide ' . on the drawings. The maximum permitted duct leakage shall be: Lmax = CLP0.65 Where: Lmax CL CL . imum permitted leakage in cfm/100 ft2 duct surface a Duct leakage class, cfm/100 ft2 at 1 in. w.c. 6 for rectangular sheet metal, rectangular fibrous, and round flexible ducts. = 3 for round/flat oval sheet metal or fibrous glass ducts. = Test pressure, which shall be equal to the design duct pressure class rating in w.c. • DUCTWORK SYMBOLS SINGLE DOUBLE ABBR. DESCRIPTION r RECTANGULAR DUCT C (.) P • ROUND DUCT • CURVED ELBOW -MIN. RADIUS R: 1.5 WIDTH -J_ - • 90 DEG. ELBOW WITH SINGLE RADIUS TURNING VANES a • FLEXIBLE DUCT CONNECTION + f Jr BD BALANCING DAMPER (USE O.B.D. UNLESS NOTED OTHERWISE) NEW TO EXISTING CONNECTION 4 • SPIN -IN FLEX DUCT TAKE -OFF W /DAMPER • SA SUPPLY AIR • EXH • z RA • REL • OSA EXHAUST AIR RETURN AIR RELIEF AIR OUTSIDE AIR • TOX INONSIMMINNINEMMINESMEMEREIVIUMINO THERMOSTAT X: UNIT OR ZONE NUMBER 0 KEYED MECHANICAL NOTES ® W Z I v, 1.......,..» .,..w.» »„.,.1 12 "0 1 300 t-1 0 300 0 MECHANICAL PLAN SCALE: 1/4" = I' -O" 1. 18x8, 16x6 NECK SR -1. BALANCE TO CFM NOTED. 2. 12x12, 6"0 NECK CD -1. BALANCE TO CFM NOTED. 3. DUCT SMOKE DETECTOR TO SHUT DOWN UNIT UPON DETECTION OF SMOKE. 4. PROVIDE FLEXIBLE CONNECTION. 5. 3/4" PRIMARY CONDENSATE DRAIN LINE DOWN IN WALL AND OUT TO DISCHARGE INTO MOP SINK. PIPE SHALL TURN IN A DOWNWARD POSITION AND TERMINATE 2" ABOVE MOP SINK RIM. PROVIDE WITH LABEL. SEPARATE PERMIT REQUIRED FOR: ❑ Mechanical Electrical t' Plumbing tirGas Piping City of Tukwila BUILDING DIVISION 6. 3/4" SECONDARY CONDENSATE DRAIN LINE DOWN IN WALL AND OUT TO DISCHARGE INTO MOP SINK. PIPE SHALL TURN IN A DOWNWARD POSITION AND TERMINATE 2" ABOVE MOP SINK RIM. PROVIDE WITH LABEL. REVIEWED FOR CODE COMPLIANCE APPROVED JAN 0 5 2012 C of u Wifa BUILDIity NG VISION FILE COPY Permit No ..,wr ` ✓ LI Pan review approval is subject to errors end awr fors. 1 Approval of construction documents does not authete Ale violation of any adopted code or ordinance. Receipt of approved Flak! Copy and cone= is ec knowled0d: ia 7. 26x20 OUTSIDE AIR DUCT TO CONNECT TO EXISTING 26x20 (MIN.) OUTSIDE AIR DUCT SERVING REMOVED AIR HANDLING UNIT. FIELD VERIFY EXACT POINT OF CONNECTION. . 26x20 RETURN AIR DUCT OPEN TO SPACE. PROVIDE WITH INTAKE SCREEN. r 1: 1 10200 City Of itdcwiIa BUILDING DIVISION 9. MOTORIZED LOW- LEAKAGE, OPPOSED BLADE OUTSIDE AIR DAMPER. PROVIDE WITH NO MA LY CL'SEI, 4V. A TUATO'. MIN. S TTING TO :E AS NOTED 10. 16 GAUGE GALVANIZED SECONDARY DRAIN PAN. PROVIDE WITH 3/4" OUTLET. 11. EXISTING EXHAUST FAN TO BE REUSED. REBALANCE EXHAUST AIR TO 75 CFM 0.125" E.S.P. FIELD VERIFY. 12. THERMOSTAT. MOUNT AT 48" A.F.F. COORDINATE EXACT LOCATION WITH ARCHITECTURAL DRAWINGS. PROVIDE WITH CLEAR PLASTIC LOCKING COVER. 1 r ___________________ !_. [r 6 „0 '4. (NEW) i J 6 "0 13. MOTORIZED LOW- LEAKAGE, OPPOSED BLADE, RETURN AIR DAMPER. PROVIDE WITH NORMALLY OPEN, 24V. ACTUATOR. X14. EXISTING OUTSIDE AIR DUCT (26X20 MIN.) TO BE REUSED. FIELD VERIFY. PROVIDE NEW DUCT & INTAKE CAP AS REQUIRE IS EXISTING DUCT IS LESS THAN 26X20. 1 24 "0 - 250 22 "0 1 250 1■1 GENERAL NOTES NOTE: PRIOR TO CONSTRUCTION/ BID THE CONTRACTOR SHALL VISIT THIS SITE AND FIELD VERIFY THE EXISTING LOCATIONS AND SIZES OF ANY LANDLORD PROVIDED, OR EXISTING, OUTSIDE AIR INTAKES THROUGH ROOF, LANDLORD PROVIDED CHILLED /HOT WATER PIPING MAINS, TOILET EXHAUST MAINS, OUTSIDE AIR DUCTWORK, CONDENSATE LINE MAINS, ETC. THE CONTRACTOR SHALL FIELD VERIFY ANY/ CONDITIONS WHICH MAY CONFLICT WITH THE DESIGN SHOWN ON THESE PLANS. NOTIFY ARCHITECT IMMEDIATELY. LANDLORD NOTES ALL EQUIPMENT, DUCTWORK, CONTROLS ETC. NOT BEING REUSED SHALL BE REMOVED. DO NOT JUST ABANDON. ALL ROOF WORK SHALL BE PERFORMED BY THE LANDLORD'S DESIGNATED ROOFER. ALL WORK SHALL BE SCHEDULED WITH LANDLORD'S FIELD REPRESENTATIVE. 0 250 18 "0 250 SEP .I'2Z013 INCOMPLETE NEW HVAC UNITS TO BE IN THE SAME LOCATION AS THE EXISTING UNITS. (NEW) AEVlSIONS No changes shalt bo made to the scan of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. Q C13 0 ■ la _ =N E � u w CO C LL C ot o� w' oa 1 00 00 L cn 4D � C cu -c C .0 VI 7r, SO -� o 5 _ z vi c/1 N Lfl REVISIONS: MPE I2 -28 -II PER CITY OF TUKWILLA RECEIVED DEC 302011 PERMIT CENTER M(1I7? MECHANICAL PLAN (Cont.) SCALE: 1/4" = I'-O" NP MECHANICAL, INC. CONSULTING ENGINEERS 1717 W. NORTHERN AVE. - SUITE 116 PHOENIX, ARIZONA 85021 (602) 249 -6311 PROJECT NO PLOT DATE: 11253 12 -29 -11 EXPIRES 08/12/12 DATE: 12 -13 -11 DRAWN BY: MPE FILE NAME: PH 11 -095 -M 1 PROJECT NUMBER: PH11 -095 2 GALVANIZED STEEL STRAP FASTENED TO STRUCTURE LOAD RATED FASTENER WITH WASHER SPIRAL DUCT DUCT BAND OF SAME SIZE AS HANGER STRAP SPIRAL DUCT INSTALLATION DETAIL SUPPLY DUCT BALANCING DAMPER SPIRAL BRANCH DUCT. SUPPORT WITH GALVANIZED STEEL STRAPS BEADED SLEEVE JOINT (TYPICAL) 90' 1.5 SPIRAL ELBOW BALANCING HANDLE. LOCK INTO POSITION AND MARK PERMANENTLY. SQUARE TO ROUND ADAPTOR (IF REQUIRED) LAY -IN CEILING SUPPLY AIR DIFFUSER WITH LAY -IN FRAME (SURFACE MOUNT SIMILAR) SPIRAL DUCT INSTALLATION DETAIL "CUSTOM CURBS" MODEL CES -1 SUPPORT CURB. RIGID INSULATION l DOUBLE NEOPRENE WAFFLE ISOLATOR BUILT -UP ROOFING ROOF CONSTRUCTION SUPPORT FRAMING AS OCCURS - SEE STRUCTURAL DRAWINGS. SPIRAL DUCT INSTALLATION DETAIL NTS ve FOR ANCHOR TO STRUCTURE -SEE DETAIL. VIBRATION ISOLATOR (TYPICAL -SEE SPECS.) SEAL PAN WATER TIGHT 2 "X2 "X3 /8 "L ANGLE MIN. OF TWO REQ'D. 1/2" ALL - THREAD AT EACH CORNER 16 GA. GALV. SECONDARY CONDENSATE DRAIN PAN. DOUBLE NUT ALL CONNECTIONS. AIR HANDLING UNIT. AHU MOUNTING DETAIL NTS • SPLIT SYSTEM HEAT PUMP UNIT INDOOR UNIT OUTDOOR UNIT MARK MODEL CFM E.S.P. WP HP OSA AU HEAT ( (KW) MARK MODEL COOLING CAPACITY (MBH) HEATING CAP. (MBH) EER V/95 EGH W (ILB) T SENSIBLE TOTAL ENT. AIR ('F) DB W9 AHU -1 TWE090 3000 0.5" 1.5 750 15.0 CU -1 TWA090 74.3 96.7 80 67 51.5 11.0 208/3 340 E ii-VE 0 FOR NOTES: 1. UNITS SHALL BE AS MANUFACTURED BY: TRANE. 2. UNITS ARE SIZED FOR 85 'F SUMMER AMBIENT TEMPERATURE, 23 'F WINTER TEMPERATURE. 3. COOLING CAPACITY, MINIMUM HEAT CAPACITY AND CFM ARE MINIMUM OUTPUT REQUIRED. ALL UNITS SHALL HAVE NO LESS THAN 98% OF THESE CAPACITIES. COOLING CAPACITY IS CODE COMPLIANCE APPROVED JAN 0 5 2012 Clay Of Tukwila BUILDING DIVISION GROSS COIL CAPACITY REQUIRED (FAN HEAT NOT DEDUCTED). 4. PROVIDE FAN COIL UNIT WITH FILTERS AND FILTER RACK SIZED AT 500 FPM VELOCITY. e 5. PROVIDE WITH PROGRAMMABLE HEATPUMP THERMOSTAT -7- DAY W /SETBACK AND 5 DEG. DEADBAND. P:0 I W •A ' „:I T •P -. 0► •. •F 7. REFER TO SEQUENCE OF OPERATION FOR 100% ECONOMIZER. NOTE: ALL DX SPLIT SYSTEM FAN COIL WITH REMOTE CONDENSING UNIT WITH REFRIG. LINES EXTENDING OVER "50" FT. IN LENGTH TO HAVE HARD START KIT, CRANK CASE HEATER, TIME GUARD, AND LIQUID SOLENOID VALVE AT CONDENSER. INSTALL AND ADJUST REFRIG. AND OIL CHARGE PER MFR'S RECOMMENDATIONS. WY- 0 GRILLE, REGISTER, AND DIFFUSER SCHEDULE MARK DESCRIPTION MANUFACTURER MODEL MATERIAL MODULE FRAME FRONT BLADES DAMPER FINISH CD -1 CEILING DIFFUSER TITUS TM S STEEL 12x12 FLANGE 4 -WAY YES SR -1 SUPPLY REGISTER TITUS S300FS STEEL 18x8 FLANGE SHORT YES * NOTES: 1. FIELD PAINT ALL DIFFUSERS AND GRILLES. COLOR BY ARCHITECT. 2. PROVIDE CD -1 WITH "TITUS" TRM, RAPID MOUNT FRAME. • HVAC NOTES 1. ALL WORK TO BE AS PER THE L.L. SPECS, ALL LOCAL CODES, RULES AND REGULATIONS. ALL WORK TO BE AS PER ASHRAE AND SMACNA GUIDELINES. 2. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE. ALL DUCTS TO BE SHEET METAL DUCTS AS PER ASHRAE AND SMACNA GUIDELINES. 3. PROVIDE NECESSARY TURNING VANES, SPLITTER DAMPERS, VOLUME EXTRACTORS AND OTHER FEATURES NEEDED FOR A SMOOTH AND CONTROLLED FLOW OF AIR. 4. LOCATIONS SHOWN OF HVAC EQUIPMENT AND DUCTS ARE SCHEMATIC ONLY. VERIFY STRUCTURAL DETAILS AND OTHER DETAILS THAT WILL AFFECT ROUTING AND PLACEMENT OFTHESE COMPONENTS. IF MORE SUPPORTS ARE NEEDED FOR HVAC EQUIPMENT, COORDINATE WITH THE ARCHITECT. 5. PROVIDE PROPER DUCT TRANSITIONS FOR ACTUAL HVAC UNITS INSTALLED. ROOF PENETRATIONS, IF ANY, TO BE MADE AS PER LANDLORD SPECS. VERIFY DETAILS WITH LANDLORD. 6. PROVIDE AND INSTALL THERMOSTATS AT LOCATIONS AS DIRECTED BY THE ARCHITECT. 7. COORDINATE ACTUAL LOCATIONS OF DIFFUSERS, REGISTERS AND GRILLES WITH CEILING DETAILS AND OTHER FEATURES SUCH AS LIGHTING FIXTURES ETC. THAT MAY AFFECT PLACEMENT OF THE HVAC SYSTEM COMPONENTS. 8. PROVIDE APPROVED FIRE DAMPERS WITH ACCESS PANELS AT ALL PENETRATIONS OF FIRE RATED PARTITIONS, WALLS AND CEILINGS AS REQUIRED BY CODE. 9. INSULATE NECK, THROATS AND COLLARS OF SUPPLY OUTLETS ABOVE CEILING. 10. ALL ROOF PENETRATIONS MADE BY THE TENANT'S GENERAL CONTRACTOR MUST CONFORM TO LANDLORD'S STANDARD CRITERIA AND SHALL BE SUBJECT TO LANDLORD'S APPROVAL AS TO LOCATION AND CONSTRUCTION DETAILS. WEATHERPROOFING OF ANY INSTALLATION BY TENANT MUST BE PERFORMED BY LANDLORD'S APPROVED ROOFING CONTRACTOR, AND TENANT'S GENERAL CONTRACTOR SHALL PAY ALL SUCH COSTS. 11. TENANT'S GENERAL CONTRACTOR WILL BE REQUIRED TO PROVIDE TEMPORARY WEATHERPROOFING FOR ALL ROOF PENETRATIONS, UNTIL LANDLORD'S ROOFING CONTRACTOR HAS MADE THE FINAL PATCH. MII -I��I lir=r IP I0I MN 1 I KIN -LINE txp#BCST -5/8 SWIVEL 85AM R 5,P,I%ZO1Z ' is ROD CONNECTION DETAIL -STEEL NTS SEQUENCE OF CONTROL 1. SELECTOR SWITCH IN "ON" POSITION, SYSTEM IS RUNNING. A. OUTSIDE AIR TEMPERATURE ABOVE 60 DEG. B. 1. OUTSIDE AIR DAMPER TO BE AT MINIMUM POSITION (BALANCE TO 750 CFM FOR AHU -1) 2. RETURN AIR DAMPER FULLY OPEN. 3. ROOM THERMOSTAT MODULATES COOLING CYCLE (HEAT PUMP) TO MAINTAIN 75 DEG. F. OUTSIDE AIR TEMPERATURE BELOW 60 DEG. F. 1. COOLING CYCLE (HEAT PUMP) DE- ENERGIZED. 2. OUTSIDE AIR DAMPER FULLY OPEN. 3. RETURN AIR DAMPER FULLY CLOSED. 4. ROOM THERMOSTAT CYCLE SUPPLY FAN TO MAINTAIN 75 DEG. F. 5. WHEN OUTSIDE AIR DAMPER IS AT MINIMUM POSITION RETURN AIR DAMPER FULLY OPEN AND ROOM TEMPERATURE FALLS BELOW 70 'F, THERMOSTAT SHALL ACTIVATE HEATING CYCLE (HEAT PUMP) TO MAINTAIN ROOM TEMPERATURE OF 70 F. C. SMOKE IS DETECTED. 1. A/C SYSTEM DE- ENERGIZED. 2. OUTSIDE AIR DAMPER FULLY CLOSED. RECEIVED DEC 3 0 2011 PERMIT CENTER MECHANICAL GENERAL NOTES 1. ALL WORK SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES, LAWS, ACTS AND ALL AUTHORITIES HAVING JURISDICTION, AND LANDLORD'S CRITERIA. 2. THE COMPLETED INSTALLATION SHALL BE IN ACCORDANCE WITH ALL APPLICABLE INDUSTRY STANDARDS OF GOOD PRACTICE AND SAFETY; AND THE MANUFACTURER'S STRICTEST RECOMMENDATIONS FOR EQUIPMENT AND PRODUCT APPLICATION AND INSTALLATION. 3. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, LICENSES, DOCUMENTS AND SERVICES RELATED TO INSTALLATION OF THE WORK. 4. PRIOR TO SUBMITTING A PROPOSAL, THE CONTRACTOR SHALL VISIT THE SITE AND THOROUGHLY INSPECT ALL EXISTING CONDITIONS TO INSURE THAT THE WORK REPRESENTED ON THE DRAWINGS AND IN THESE SPECIFICATIONS CAN BE INSTALLED AS INDICATED. 5. DUCTWORK SHALL BE FABRICATED AND ERECTED IN ACCORDANCE WITH ASHRAE AND LATEST SMACNA STANDARDS. PROVIDE TURNING VANES IN ALL ELBOWS; AND MANUAL VOLUME DAMPERS IN ALL BRANCHES, SPLITTER DAMPERS, AIR EQUALIZERS, EXTRACTORS, AND SIMILAR DEVICES WHEREVER NECESSARY TO PROPERLY BALANCE THE SYSTEM AND PRODUCE A QUIET AND DRAFTLESS OPERATION. 6. SHEETMETAL DUCTWORK: PROVIDE SHEETMETAL DUCTWORK FABRICATED AND INSTALLED IN ACCORDANCE WITH ASHRAE AND SMACNA STANDARDS, FOR 1" W.C. PRESSURE CLASS, SEAL CLASS "A" SHEETMETAL SHALL BE GALVANIZED SHEET STEEL OF LOCK FORMING QUALITY, WITH G90 ZINC COATING. SHEET STEEL SHALL COMPLY WITH ASTM A653 STANDARD SPECIFICATION FOR STEEL SHEETMETAL. ZINC COATED (GALVANIZED) OR ZINC -IRON ALLOY- COATED (GALVANIZED) BY THE HOT DIP PROCESS, AND A924 STANDARD SPECIFICATION FOR GENERAL REQUIREMENTS FOR SHEET, METALLIC - COATED BY THE HOT DIP PROCESS. ALL ANGLE IRON USED FOR SUPPORT SHALL BE GALVANIZED. CONNECTIONS TO WALLS OR FLOOR SHALL BE AIR TIGHT WITH ANGLE IRON AND CAULKING. SEAL ALL DUCT SEAMS, TRANSVERSE AND LONGITUDINAL AIR TIGHT. PROVIDE TURNING VANES AL ALL 90'ELBOWS. 7. ROUND SHEETMETAL DUCT: PROVIDE SPIRAL SEAM (ALL SIZES) OR SNAP LOCK (DUCT SIZES UP TO 10 ") GALVANIZED STEEL COMPLYING WITH SMACNA STANDARDS. SPIRAL SEAM DUCTWORK SHALL HAVE SMACNA SEAM RL -1. 8. EXPOSED DUCTWORK: EXPOSED DUCTWORK SHALL BE CLEANED OF DEBRIS AND OIL, THEN WIPED DOWN WITH VINEGAR OR OTHER SURFACE PREPARING CHEMICAL TO PREPARE DUCT FOR PAINT. 9. DUCT SEALANT: PROVIDE POLYMERIC RUBBER TYPE SEALANT FOR USE ON BOTH INTERIOR LOCATED DUCTWORK AND DUCTWORK EXPOSED TO OUTDOOR CONDITIONS. SEALER SHALL HAVE HIGH BONDING STRENGTH FOR SURE. FIRST ITEM SEALING SYSTEM OF JOINTS IN LOW, MEDIUM AND HIGH PRESSURE DUCT SYSTEMS. SEALER SHALL BE HIGH SOLID CONTENT. PROVIDE A TWO PART TAPE SEALING SYSTEM, CONSISTING OF WOVEN FIBER TAPE IMPREGNATED WITH A GYPSUM MINERAL COMPOUND, AND A MODIFIED ACRYLIC/ SILICONE ACTIVATOR THAT REACTS EXOTHERMIC ALLY WITH THE TAPE. TWO PART TAPE SEALING SYSTEM MUST BE RATED FOR BOTH INDOOR AND OUTDOOR APPLICATION. TAPE SHALL NOT CONTAIN ASBESTOS. 10. DUCT LINER (ALL RECTANGULAR RETURN DUCT AND SUPPLY PLENUM): PROVIDE MINIMUM 1" THICK, 3 PCF DENSITY, NEOPRENE COATED, LONG TEXTILE FIBER TYPE DUCT LINER, WITH COATING ON THE AIR STREAM SIDE CONFORMING TO NFPA 90A, DUCT LINER ADHESIVE SHALL BE AS RECOMMENDED BY DUCT LINER MANUFACTURER, AND SHALL COMPLY WITH ASTM C -916. DUCT LINER FASTENERS SHALL COMPLY WITH SMACNA "HVAC DUCT CONSTRUCTION STANDARDS ", LATEST EDITION. THERMAL CONDUCTIVITY SHALL BE EQUAL TO OR LESS THAN 0.26 AT 75 %. 11. ROUND VOLUME DAMPERS: PROVIDE MINIMUM 20 GAUGE GALVANIZED STEEL FRAME AND BLADES, MINIMUM 3/8" SQUARE STEEL AXLE, MOLDED SYNTHETIC BEARING, WITH LOCKING POSITION REGULATOR. REGULATOR SHALL BE POSITIONED WITH SHEETMETAL BRACKET BEYOND DUCT COVERING. WHERE POSITIONING REGULATOR IS NOT ACCESSIBLE, PROVIDE COUPLING AND EXTENSION ROD WITH REGULATOR FOR CEILING OR WALL INSTALLATION, AS REQUIRED. 12. RECTANGULAR VOLUME DAMPERS: PROVIDE MINIMUM 16 GAUGE GALVANIZED STEEL CHANNEL FRAME, 16 GAUGE GALVANIZED STEEL BLADES, MINIMUM 1/2" HEXAGON AXLE, BOLDED SYNTHETIC BEARINGS, WITH 3/8" SQUARE PLATED STEEL CONTROL SHAFT. LINKAGES SHALL BE CONCEALED IN THE FRAME. OPERATING SHAFT SHALL EXTEND BEYOND FRAME AND DUCT TO A LOCKING QUADRANT WITH ADJUSTABLE LEVER, MAXIMUM BLADE WITH SHALL NOT EXCEED 6 ". 13. DUCT TURNING VANES: PROVIDE FABRICATED TURNING VANES AND VANE RUNNERS, CONSTRUCTED IN ACCORDANCE WITH SMACNA "HVAC DUCT CONSTRUCTION STANDARDS ". PROVIDE TURNING VANES CONSTRUCTED OF CURVED BLADES, SUPPORTED WITH BARS PERPENDICULAR TO BLADES, AND SET INTO SIDE STRIPS SUITABLE FOR MOUNTING IN DUCTWORK. FOLLOW SMACNA GUIDELINES FOR SPACING SUPPORT, AND CONSTRUCTION. ALL BLADES SHALL BE DOUBLE THICKNESS AIRFOIL TYPE. 14. FLEXIBLE DUCT CONNECTOR TO EQUIPMENT: PROVIDE UL LABELED 30 OUNCE NEOPRENE COATED FIBERGLASS FABRIC DUCT CONNECTORS AT THE DUCT CONNECTIONS TO ALL VIBRATING EQUIPMENT. 15. FLEXIBLE DUCTWORK SHALL BE THERMAFLEX "M -KE" WITH ONE INCH EXTERNAL INSULATION FINISHED WITH A VAPOR BARRIER, U.L. AND 90A LISTED, SHALL BE EQUIPPED WITH DAMPER - EXTRACTOR AT THE SHEETMETAL DUCT AND CIRCULAR COLLAR AT 'THE' DIFFUSER, MECHANICALLY SECURED. 16. FLEXIBLE DUCTWORK SHALL NOT EXCEED 5 FEET IN LENGTH; BENDS SHALL NOT. RESTRICT THE INSIDE CROSS- SECTIONAL AREA OF THE DUCT; ANDCONNECTION SHALL BE MADE AS DIRECT AS POSSIBLE TO THE MAIN SUPPLY. 17. ALL WORK SHALL BE LOCATED TO AVOID CONFLICTS WITH OTHER TRADES PROVIDE ADEQUATE CLEARANCE FOR ARCHITECTURAL DESIGN, PROPER OPERATION AND SERVICE OF EQUIPMENT. 18. PROVIDE A READY -TO -USE SYSTEM WITH ALL WORK GUARANTEED IN WRITING AGAINST DEFECTIVE WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE YEAR FROM TURN OVER TO OWNER. 19. CONDENSATE DRAINS: TYPE "M" HARD DRAWN COPPER FOR LINES 1" AND SMALLER, "DWV" HARD DRAWN COPPER FOR 1 -1/4" AND LARGER, CONFORMING TO ASTM B88 -72. WROUGHT COPPER FITTINGS, DRAINAGE TYPE FOR LINES 1 -1/4" AND LARGER. SOLDER WITH 50/50 SOLDER. 20. DUCTWORK SHALL BE "FACTORY MADE" CLASS 1 OR GALVANIZED SHEET METAL WITH IRON SUPPORTS SECURED TO OVERHEAD MEMBERS AT 5' -0" DUCTWORK MATERIALS SHALL BE PER INTERNATIONAL MECHANICAL CODE, 2009. 21. PROVIDE AS PART OF THE MECHANICAL CONTRACT SERVICES OF THE LANDLORD'S APPROVED CERTIFIED AIR /WATER BALANCING CONTRACTOR: WIINAIRE, INC. (714)827 -9880 SUBMIT 3 COPIES OF THE BALANCE REPORT TO ARCHITECT /OWNER, ONE COPY TO THE LANDLORD FOR APPROVAL AND ONE COPY TO THE ON -SITE CONTRACTOR WITHIN 15 DAYS AFTER STORE OPENING. TEST AND ADJUST ALL MECHANICAL SYSTEMS AND EQUIPMENT TO ASSURE PROPER BALANCE AND OPERATION. PERFORM TESTS IN ACCORDANCE WITH THE MOST CURRENT NEBB OR AABC AND ASHRAE STANDARDS. ELIMINATE OBJECTIONABLE NOISE AND VIBRATION, AND ASSURE PROPER FUNCTION OR CONTROLS. BALANCING CONTRACTOR SHALL BE AN INDEPENDENT CERTIFIED TEST AND BALANCE CONTRACTOR, WITH NEBB OR AABC CERTIFICATION. SUBMIT COMPLETED AND CERTIFIED TEST AND BALANCE REPORT TO OWNER'S REPRESENTATIVE. BALANCE ALL SYSTEMS TO WITHIN 5% OF AIR FLOWS INDICATED ON THE DRAWINGS, AND REPORT ALL DISCREPANCIES TO HVAC INSTALLER FOR CORRECTION. MARK FINAL BALANCE POSITIONING ON DAMPERS WITH PERMANENT MARKER. 22. PROVIDE DUCT SMOKE DETECTORS IN RA DUCTS, TO OVER RIDE UNIT AND PROVIDE U I0 P• C • •F .•K 23. CONTRACTOR SHALL PROVIDE 0 & M MANUALS, RECORD DRAWINGS AND STAFF TRAINING UPON COMPLETION OF CONSTRUCTION. iLliI NP MECHANICAL, INC. • CONSULTING ENGINEERS 1717 W. NORTHERN AVE. - SUITE 116 PHOENIX, ARIZONA 85021 • (602) 249 -6311 PROJECT NO PLOT DATE 11253 12 -29 -11 C13 a) O m m ch dJ N N to LL Q GLJ OC W �j ^t 0 O s M l7 o S Z N SON 1- I- w x V) J 0 LU • • • • • u • a a 1 57 Co CO L C � � C V0 ct +-P cD La -0 o�5 z o C 0 CD N cu REVISIONS: MPE I2 -28 -II PER CITY OF TUKWILLA EXPIRES 08/12/12 DATE: 12 -13 -11 DRAWN BY: MPE FILE NAME: 1= 2 PH11- 095 -M2 PROJECT NUMBER: PH 11 -095 NJ