Loading...
HomeMy WebLinkAboutPermit PG10-056 - SOUND TRANSIT - LIGHT LINK RAILSOUND TRANSIT LIGHT LINK RAIL 3651 SOUTHCENTER BL PG10 -056 City cif Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite # 100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Inspection Request Line: 206- 431 -2451 Web site: http: / /www.ci.tukwila.wa.us PLUMBING /GAS PIPING PERMIT Parcel No.: 0043000300 Address: 3651 SOUTHCENTER BL TUKW Project Name: SOUND TRANSIT - LIGHT LINK RAIL Permit Number: Issue Date: Permit Expires On: PG 10 -056 05/17/2010 11/13/2010 Owner: Name: CPSRTA (SOUND TRANSIT) Address: 401 S JACKSON ST , SEATTLE WA 98104 Contact Person: Name: Address: Email: JOHN EIMER 18802 80 AV S , KENT WA 98032 JOHNK @SHINNMECH.COM Contractor: Name: SHINN MECHANICAL Address: 13301 SE 26 ST , BELLEVUE WA 98005 Contractor License No: SHINNMIO60QP Phone: 425 204 -3942 Phone: 425 - 373 -9800 Expiration Date: 11/19/2011 DESCRIPTION OF WORK: INSTALL DRAIN LINES FROM ESCALATOR AND ELEVATOR PITS. DRAIN INTO (2) NEW OIL INTERCEPTORS VIA GRAVITY OR PUMP AND THEN INTO SEWER. Value of Plumbing /Gas Piping: $54,877.00 Uniform Plumbing Code Edition: 2006 Fees Collected: $118.75 International Fuel Gas Code Edition: 2006 Permit Center Authorized Signature: I hereby certify that I have read and governing this work will be complie The granting of this p = 't does not pre construction o , e , rforman of work. Signature: _ l- Print ame: — c K��/ n F., vizor Date: ttcC L'l k t ed this permit and know the same to be true and correct. All provisions of law and ordinances whether specified herein or not. e to give authority to violate or cancel the provisions of any other state or local laws regulating I am authorized to sign and obtain this plumbing /gas piping permit. Date: -V/ %f 261 O This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: UPC -4/10 PG10 -056 Printed: 05 -17 -2010 • • City of Tukwila Department of Cotnnzunity Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Parcel No.: 0043000300 Address: Suite No: Tenant: 3651 SOUTHCENTER BL TUKW SOUND TRANSIT - LIGHT LINK RAIL Permit Number: Status: Applied Date: Issue Date: PG 10 -056 ISSUED 05/05/2010 05/17/2010 1: ** *PLUMBING AND GAS PIPING * ** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems' shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R -3. 8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 guage. 9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 10: All pipes penetrating floor /ceiling assemblies and fire - resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 12: Manufacturers installation instructions shall be available on the job site at the time of inspection. 13: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 14: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. * *continued on next page ** doc: Cond -10/06 PG10 -056 Printed: 05 -17 -2010 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the perfo mance of work. Signature: / Print Name d ✓/ r' : e6 Date: doc: Cond -10/06 PG10 -056 Printed: 05 -17 -2010 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://wwwcttukwila.wa.us Plumbing /Gas Permit No. ? &Ll) L Project No. (For office use only) PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION ` - WAA King Co Assessor's Tax No.: Site Address: Suite Number: New Tenant: colt; W —r JD Tenant Name: Sound Transit - Light Link Rail Property Owners Name: Sound Transit Mailing Address: 401 S. Jackson St Floor: ❑ Yes ®.. No Seattle WA 98104 City State Zip CONTACT PERSON -Who do we contact when your permits ready ? to be issued Name: John Eimer Mailing Address: 18802 80th Ave S. E-Mail Address: johnk @shinnmech.com Day Telephone: Kent (425) 204 -3942 WA 98032 City Fax Number: State (425) 203 -9801 Zip PLUMBING / GAS PIPING CONTRACTOR INFORMATION Company Name: Shinn Mechanical Mailing Address: 18802 80th Ave S. Kent WA 98032 Contact Person: John Eimer E -Mail Address: johnk @shinnmech.com Contractor Registration Number: SHINNM1060QP City Day Telephone: Fax Number: Expiration Date: State (425) 204 -3942 (425) 203 -9801 11/19/2011 Zip ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record Company Name: Mailing Address: Contact Person: E -Mail Address: City Day Telephone: Fax Number: State Zip ENGINEER OF RECORD -Alt plans must be wet stamped by Engineer of Record Company Name: Hatch Mott MacDonald Mailing Address: 6 Nickerson Street Contact Person: Paul Smith Seattle WA E -Mail Address: H:' pplications\Porms- Applications On Une\2009 Applications \1-2009 - Plumbing -Gas Piping Permit Application.doc Revised: 1.2009 bh City State Zip Day Telephone: (206) 838 -2886 Fax Number: Page 1 of 2 • • Valuation of Project (contractor's bid price): $ 54,877 Scope of Work (please provide detailed information): Install drain lines from escalator and elevator pits. Drain into 2 new Oil Interceptors via gravity or pump and then to sewer. Building Use (per Int'I Building Code): Transportation Occupancy (per Int'I Building Code): Utility Purveyor: Water: Sewer: Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: Fixture Type: Qty Fixture Type: Qty Fixture Type: Qty Fixture Type: Qty Bathtub or combination bath/shower Bidet Clothes washer,do mestic Dental unit, cuspidor Dishwasher, domestic, with independent drain Drinking fountain or water cooler (per head) Food -waste grinder, commercial Floor Drain Shower, single head trap Lavatory Wash fountain Receptor, indirect waste Sinks Urinals Water Closet Building sewer and each trailer park sewer Rain water system — per drain (inside building) Water heater and /or vent Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity) Grease interceptor for commercial kitchen ( >750 gallon capacity) Repair or alteration of water piping and/or water treatment equipment Repair or alteration of drainage or vent piping Medical gas piping system serving 1 -5 inlets /outlets for a specific gas Each additional medical gas inlets /outlets greater than 5 Backflow protective device other than atmospheric -type vacuum breakers 2 inch (51 mm) diameter or smaller Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter Each lawn sprinkler system on any one meter including backflow protection devices Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1 -5) Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Gas piping outlets Drain piping from escalator drain pits, install 2 oil interceptor PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY T T 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJU ' BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING O� ) I A S RILED AGENT: Signature: I / Date:5 / 5/ o Print John Eimer Mailing Address: 18802 80th Ave S Date Application Accepted: Day Telephone: (425) 203 -3942 Kent WA 98032 City State Zip Date Application Expires: Staff Initials: H:\Applications\Forms- Applications On Line Applications \I -2009 - Plumbing -Gas Piping Permit Application.doc Revised: 1.2009 bh • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT Parcel No.: 0043000300 Permit Number: PG 10 -056 Address: 3651 SOUTHCENTER BL TUKW Status: PENDING Suite No: Applied Date: 05/05/2010 Applicant: SOUND TRANSIT - LIGHT LINK RAIL Issue Date: Receipt No.: R10 -00778 Initials: User ID: JEM 1165 Payment Amount: $118.75 Payment Date: 05/05/2010 02:48 PM Balance: $0.00 Payee: SHINN MECHANICAL, INC. TRANSACTION LIST: Type Method Descriptio Amount Payment Check 032635 118.75 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts PLAN CHECK - NONRES PLUMBING - NONRES 000.345.830 23.75 000.322.103.00.00 95.00 Total: $118.75 PAYMENT RFCEIVED doc: Receiot -06 Printed: 05 -05 -2010 INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPECTION RECORD Retain a copy with permit. CA( PERMIT NO. (206)431 -3670 Pro'ect: Type of,Inspec ion: Addr(03 /. / - ( J C ( rv� Date Called: _-- -. Special Instructions: Date Wanted: � 13 -i U , a.m.., p.m. Requester: Phone No:. 7.6(<0- (07'2 ( Approved per applicable codes. Corrections required prior to approval. COMMENTS: 2f D Inspector: fl Date: (3- LI $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: "�- .":^= ..'r,3, tn...+,.- nn._" R-. t. y., y:.. LS ,e�.,�y,,�,✓!.... ^[rw.�'�.?"1.• __.`+�_.....'1.! �: °C.*::mf?� ■ INSPECTION NO. INSPECTION RECORD Retain a copy with permit P -as CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 6 PERMIT NO. (206)431 -3670 PrS Oct: � �(j� J./�A 1 r a A S, ► r Type of Inspection: Z f u'. "T:A p(..k.ki-,( Address: 3 (0$ ( 56 3 I0�. Date Called: Special Instructions: COJi '�� VA lS /l . r:. "A' t PA -(1 -S Date Wanted: �`Z %'l0 a.m. wpm Requester: t,,JeS l Phone �:o ` .5I D `n (oZ_ v Approved per applicable codes. Corrections required prior to approval. COMMENTS: U�` t b — v� peAL /laeo pef,(47(---- "y- . o ri 1.-Lr 12 v 0 . - P f .e..e l, Ai-CZ-7,2 A P 20 v 1-J ig- /4"6-P.A4 S-/-4, :r cz %eS J/N So✓l.C(1h 'S,Ip t,,JeS l 1 ti, n {. Of. A A -cyesS -TA) P -3 wP--- .S-1\--1-7) r 0- mf -1-----b ► Ay -e-a 0 e_.Thr A` 1, 3" 5 0 An ( w !/J 1M .mac i rt_-Q P. C . Z.J'i (�, /t11( A-<16 /,: n-F ,� ,,�; 0 / �- ;✓ / I l_ ;) „ f r l\-. U A i ),,J J. In tector: oLk- $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date, 4 — t D Receipt No.: Date: G �'. SaS_= �. -v'. Sn` Spy"- .fA']'.^.:....f.1''S. ;' `Y..°3^c: i,;ts'x _�„-� ..q ;_ ...J�, .f :`ix• ;�rku'r's�'^:lir'Y_J`N.�?� "`s y+- .x,.,a ..._r�:.�._^+,r.., 70 /re/ Puma Descriution PG t esr, Sump Pump Test Form /Checklist TUKWILA STATION roa 7.3(0 # Item Information 1 Location ` L Pert Es CAL -ale Supt$ _ c,irt 7 c e_ v C,. , t-e\1 ivI n 2 Design Designation # -p-1 -r u kw I L 4 5-174170A) 3 Type (submersible /self priming) sU131467 /B E 3 Manufacturer (6-0CD 4 Model 5 Serial Number 51660lvrZ 6 Design Flow (gpm) 35 7 Motor Power /Speed (hp /rpm) 345:o ietM 8 Voltage/Phase /Frequency (V /(1)/Hz) `1, 4� /�J g L�' 9 FLA (Amps) / f/���� r �� % Physical Checks # Check ST Rep. Sign/Date 1 Pump Free from physical damage 23fie) 2 Unit tags affixed and legible A 11 3 Adequate clearance for service 9/ 4 All fasteners are tight ©/ 5 Unit adequately secured 6 All valves /gages /etc accessible and operable d/L t ( 7 Oil sensor and level floats adequately secured 8 Electrical disconnect switch accessible and operable Permits # Item ST Rep. Sign/Date 1 Plumbing permit and associated testing approved? ---6 2 Electrical permit and associated testing approved? .teej 1 of 2 tukwial station sump pump Testing * Pass Value Contractor Sign /Date ST Rep. Sign /Date 1 Float Switch Test Pump automatically activate at low level float? (Pass /Fail) ak' 6/./13- / a'heriel Pump automatically stops? (Pass /Fail) 0� k , ;AA,- P�U 44,47 2 High Water Alarm Test High level visual alarm activates? g /Fail) 6) K /9 -/0 �(Pass �U /54`7 Audible alarm loud enough? (Pass /Fail) Q2 0, h �/ ` �0 _ q -/O ✓n,,, ✓ elk 3 Pump Overload Test Record Actual Voltage (V) K u� rvi7►,/ / Record Actual Current ( A ) euki A-r e 7" o s r 1 i. -11.9 /2 n11"../ el* 636' -9 Pig--9 Within 10% of Name Plate (Pass /Fail) ,,� 0V ���" yh Y/ //& 4 Draw Down Test Water to fill sump (Gal) I416`5681 l D n9 Time to pump sump down (sec) 7 ./1•t, l:&! ,. ' viler /O� /3-14/A9 , ,/B.i Gallons per minute (GPM) 23.5tt-61: /� -w '���Vo 5 Oil Smart Alarm Test (if installed) Oil Alarm Activate (Pass /Fail) , LI / rt- Water light Activate (Pass /Fail) 6 Oil Smart Switch Test (if installed) Pump wilLnot pump oil (Pass /Fail) ., *Attach Sump Test procedure to this form upon submittal. *Testing procedures shall be performed with the Resident Engineer before L &I inspections 2 of 2 1 V Physical Checks 10 Oil Water Separator (North) Test Form /Checklist TUKWILA STATION Pump Descriation # Item Information 1 Location 1 NoEf2{ 574/,e wi [_L 2 Design Designation # 01-1 o f L 1 t.tT` -Voe b12. 3 Type (submersible /self priming) NI /A 3 Manufacturer ©,, , , 4 Model ) 197-6900.1'. 3 "I p 5 Serial Number 845 6 5 V 8 I` A 6 Design Flow (gpm) 2S & P Ii,m 7 Motor Power /Speed (hp /rpm) /<//4 '410 44 ora Z 8 Voltage /Phase /Frequency (V /(130/Hz) Ai /13_ 9 FLA (Amps) A /4. I # Check ST Rep. Sign /Date 1 'PFree from physical damage DVS l'oliq 2 Unit tagsixed and legible - 3 Adequate clearance for service O „ 4 All fasteners are tight ©,, , , 5 Unit adequately secured O�� 1 6 All valves /gages /etc accessible and operable 7 Oil sensor and level floats adequately secured 04 k t 8 Electrical disconnect switch accessible and o perable Qlki Permits # Item ST Rep. Sign /Date 1 Plumbing permit and associated testing approved? `f t A-�� 9 2 Electrical permit and associated testing approved? ye 4 1 of 2 Testing * 'd oe rt7/ # Test Pass /Fail/NA or Value Contractor Sign /Date ST Rep. Sign /Date 1 Float Switch Test Pump automatically activate at low level float? (Pass /Fail) ,� / ! �/ /� Pump automatically stops? (Pass /Fail) J � Iv 2 High Water Alarm Test High level v sua ::.I activates? (Pass /Fail) ► -�� I h-' A udible alarm loud enou (Pass /Fail) 74 , v 3 Pump Overload Test Record Actua V) Record Actual Current (A) Within 10% me Plate (Pa 1 ) Draw Down Test Wate to . - .1 9 Gal) Time to pump sump down (sec) - .. - Gallons . • c PM) 5 Oil Smart Alarm Test (if installed) rIE;`r^✓ //w�o �,,/� �O l - ° .(C Oil Alarm Activate (Pass /Fail) Ye-5 Water light Activate (Pass /Fail) KFS o"'..� / /') -8'/0 11 6 Oil Smart Switch Test (if installed) Pump will not pump oil (Pass /Fail) 4///1_ *Attach Sump Test procedure to this form upon submittal. *Testing procedures shall be performed with the Resident Engineer before L &I inspections 2 of 2 Oil Water Separator (South) Test Form /Checklist TUKWILA STATION Pump Description # Item Information 1 Location Soy-► b-1 STA /e W 6L L 2 Design Designation # pi, - 2, O 1. L tN.TC,u pTd2 3 Type (submersible /self priming) 1 C/A_ N 3 Manufacturer .-V121J 4 Model 11960-- (o oo -3" cL' f 5 Serial Number 6+5605781-13 6 Design Flow (gpm) 25 a FM RAMP 7 Motor Power /Speed (hp /rpm) 4/ 8 Voltage /Phase/Frequency (V /0/Hz) 4 itA4 9 FLA (Amps) Physical Checks # Check ST Rep. Sign /Date 1 Free from physical damage /iv nriee6P1b7 01 I< ■ 2 Unit tags affixed and legible .16," d O o" q" % / 3 Adequate clearance for service 4 All fasteners are tight Q w, 5 Unit adequately secured Q e 6 All valves /gages /etc accessible and operable o i , 7 Oil sensor and level floats adequately secured 0,1-{, 8 Electrical disconnect switch accessible and operable A I Permits # Item ST Rep. Sign/Date 41/AF-q-/o ��5 1 Plumbing permit and associated testing approved? 2 Electrical permit and associated testing approved? 1 of2 Tukwi LA 51zO O 430\)f174- KA-r5teeNprOr. Testing * # Test Pass /Fail/NA or Value Contractor Sign /Date ST Rep. Sign /Date Float Switch Test ' mp automatically activate at low lev- float? (Pass /Fail) Pump . tomatically stops? (Pass /Fai 2 High Water Alarm Test High level visua larm activates? (Pass /Fail) Audible alarm loud en. gh? (Pass /Fail) 3 'um ' Overload Tes Record Actual Voltage (V) ik Record Actual Current ( Within 10% of Nam - 'late (Pass /Fail) 4 Draw Down Test Water to sump (Gal) Tim - o pump sump down (sec) ' allons per minute (GPM) 5 Oil Smart Alarm Test (if installed) Oil Alarm Activate (Pass /Fail) YES rga7 WU /,61/%1/.°1° U €44,,i-, /*Ye Water light Activate (Pass /Fail) 1 G' '"A, vo, 6 Oil Smart Switch Test (if installed) Pump will not pump oil (Pass /Fail/ /.. *Attach Sump Test procedure to this form upon submittal. *Testing procedures shall be performed with the Resident Engineer before L &I inspections 2 of 2 Sump Pump Test Form/Checklist MT BAKER STATION (EAST) Pump Description # Item Information 1 Location ESC- AGA-We- S V M FAA -r- 2 Design Designation # 'P— 1 3 Type (submersible /self priming) SEL f- F121 44/146 3 Manufacturer Os k 4 Model C41-a A93 A-O 6 5 Serial Number b 5 0 1 0 Em 6 Design Flow (gpm) 15.5 As P Sul3M rrrALS 7 Motor Power /Speed (hp /rpm) i7 1-1,?, 3450 R PM 8 Voltage/Phase /Frequency (V /0 /Hz) li ' 5 v • 10 60 I43-, 9 FLA (Amps) 10,6 Veg. LA-6LE Physical Checks # Check ST Rep. Sign /Date 1 Pump Free from physical damage O. K 2 Unit tags affixed and legible O. ko 3 Adequate clearance for service O,k, e- q 10 4 All fasteners are tight Os k 5 Unit adequately secured 6 All valves /gages /etc accessible and operable oiki 7 Oil sensor and level floats adequately secured 0 V , V 1 8 Electrical disconnect switch accessible and operable 0 , �� r Permits # Item ST Rep. Sign /Date 1 Plumbing permit and associated testing approved? . 'I? G �!` �i4't7�i 2 Electrical permit and associated testing approved? YES l �'''`/- Alni- 1 of 2 464.94 4-3 64,10)05— MIT 15Akelz -AST - Testing * 1')G 2 # Test Pass /Fail /NA or Value Contractor Sign /Date ST Rep. Sign /Date 1 Float Switch Test Pump automatically activate at low level float? (Pass /Fail) iES //?� 7 r4 0 fi /0 Pump automatically stops? (Pass /Fail) ( t-. 1 /n/A"./ 670 /114/5.- i'° 2 High Water Alarm Test High level visual alarm activates? (Pass /Fail) 9)55 gS i' */�2 D� .,. ft Audible alarm loud enough? (Pass /Fail) ��5� f'"` WO q 3 Pump Overload Test Record Actual Voltage (V) S ra�T RI�Q ✓" �' Record Actual Current (A) 1. -7 ,� P i) / # // / 4 /a o Within 10 /o of Name Plate (Pass /Fail) O. k n %v 7P G •/' /'° 4 _ Draw Down Test Water to fill sump (Gal) 8 d GAL i'" � 1-to Time to pump sump down ( sec ) 2 ,w, ,/ 01• / 0 Gallons per minute (GPM) P 3 8, (p,vl i''�! �q lv ; , A* (0 5 Oil Smart Alarm Test (if installed) Oil Alarm Activate (Pass /Fail) 0 1 K � p %,,c,) 6,�---fr`9 %/0 2���.- Water light Activate (Pass /Fail) 0, , fr' 6 Oil Smart Switch Test (if installed) Pump will not pump oil (Pass /Fail) ^' At, oh (ix„,,,A--.1../0 *Attach Sump Test procedure to this form upon submittal. *Testing procedures shall be performed with the Resident Engineer before L &I inspections 2 of 2 Puma Description Sump Pump Test Form /Checklist MT BAKER STATION (WEST) # Item Information 1 Location Mr. $AK WEST/ 5-sc4L g. 2 Design Designation # P -2. 3 Type (submersible /self priming) f Fe M 1►4, 6 3 Manufacturer dVL P 4 Model L 4 23.I3 9 3 A 0 G 5 Serial Number 0 g 0 iv F M 6 Design Flow (gpm) 15 • 5 A-s 5u8il.t r7-FRI) 7 Motor Power /Speed (hp /rpm) h 14 C' 345 o Rfm 8 Voltage/Phase/Frequency (V /'/Hz) 1, 5 \j,10 ) 7 0 q z. 9 FLA (Amps) 1 O. S Physical Checks # Check ST Rep. Sign/Date 1 Pump Free from physical damage 0 2 Unit tags affixed and legible 0 , r, � 3 Adequate clearance for service at ( 4 All fasteners are tight 5 Unit adequately secured ��/n� //�� V r G\, r 6 All valves /gages /etc accessible and operable //// �L C� I 1 7 Oil sensor and level floats adequately secured �t� 8 Electrical disconnect switch accessible and operable G 1 K Permits # Item ST Rep. Sign/Date 1 Plumbing permit and associated testing approved? YEs 2 Electrical permit and associated testing approved? .— /0�. �'� 1 of 2 Testing * MI"( - 4 WET # Test Pass /Fail/NA or Value Contractor Sign /Date ST Rep. Sign /Date 1 - Float Switch Test Pump automatically activate at low level float? (Pass /Fail) o 'l , 9 inA 01 Pump automatically stops? (Pass /Fail) �4;,_ 76- /"/r e feel 2 High Water Alarm Test High level visual alarm activates? Pass /Fail l fr 0 �,_ O� r' ^✓ r/00 ® Audible alarm loud enough? (Pass /Fail) D K , 1"J^'v vw 9 3 Pump Overload Test Record Actual Voltage (V) Arun )3' 122 �4 1t (0 'J. `Y 1//U - 1 Record Actual Current (A) /f�,g xco, �' k9` 2 /"✓ f % /'U /� /-9 Within 10% of Name Plate (Pass /Fail) Qom, g/ ei0,^- 00 319 4 Draw Down Test Water to fill sump (Gal)gg , .I 7 lob t""''' 1 Time to pump sump down (sec) 2 ��141 ��) Mv(1, q��c- M� 9v ? • 9 Gallons per minute (GPM) 44 ,1 V- 0//0 ',` 9 5 Oil Smart Alarm Test (if installed) Oil Alarm Activate (Pass /Fail) 0,K. /WA- ''"•`'7,, 9/U �5 9 Water light Activate (Pass /Fail) "" �✓ i ,(/ 6 Oil Smart Switch Test (if installed) A,/ 9 Pump will not pump oil (Pass/Fail) 0.k. j m7,,,.,. d// *Attach Sump Test procedure to this form upon submittal. *Testing procedures shall be performed with the Resident Engineer before L &I inspections 2 of 2 • PERMIT COORD COPY* PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: PG10 -056 DATE: 05/05/10 PROJECT NAME: SOUND TRANSIT - LIGHT LINK RAIL SITE ADDRESS: 3651 SOUTHCENTER BL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued DE RTMENTS: ui ing Division nbr c Wor s sift° b I Fire Prevention Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete n DUE DATE: 05/06/10 Not Applicable El Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Building Please Route Structural Review Required I 1 No further Review Required n REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Notation: REVIEWER'S INITIALS: DUE DATE: 06/03/10 Not Approved (attach comments) ❑ DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents routing slip.doc 2-28-02 Contractors or Tradespeople Peter Friendly Page • General /Specialty Contractor A business registered as a construction contractor with LW to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Business Type Parent Company Shinn Mechanical Inc 4252039800 18802 80 Th Ave South Kent Wa 98032 King Corporation UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Specialty 1 Specialty 2 601585839 Active SHINNMI060QP Construction Contractor 11/17/1994 11/19/2011 General Unused Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status AYATCCL905C3 Ayat Construction Llc Construction Contractor General Unused 2/23/2010 2/23/2012 Active JEMC01.984CF Jem Contractors Inc Construction Contractor General Unused 2/6/2002 2/11/2012 Active Business Owner Information Name Role Effective Date Expiration Date Shinn, Mike D i3Nbsp; 01/01/1980 Bond Amount Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 6 HARTFORD CAS INS 52BSBDN1736 11/17/2005 Until Cancelled $12,000.0011/03 /2005 5 UNITED STATES FIRE INS CO 6102406953 11/17/2003 Until Cancelled 11/28/2005 $12,000.0011 /13 /2003 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 2 PHOENIX INS CO DTC08070M469P1-1X0911/21/2009 11/21/2010 $1,000,000.00 11/17/2009 1 ALASKA NATIONAL INS CO 08KLS31184 11/21/2008 11/21/2009 $1,000,000.00 12/01/2008 Summons /Complaint Information Cause Complaint Judgment Status Payment Paid By 09 -2- 32209 -1SEA PARAMOUNT SUPPLY CO InterPlead: No Date: 09/02/2009 Amount: $5,934.00 Bond(s): Date: Amount: $0.00 Dismissed Date: Amount: Warrant Information No unsatisfied warrants on file within prior 6 year period https: // fortress .wa.gov /lni/bbip/Print.aspx 05/17/2010 Resolved SINGLE BRAIDED STAINLESS STEEL HOSE METRAFLEX OR APPROVED EQUAL TYPE I SEISMIC ISOLATION JOINT SCALE NOT TO SCALE FLEXCRAFT FLEXIBLE COUPLING OR APPROVED EQUAL (TYP) 2 --(� A n---, COMPRESS ION AVA1 LABLE) _ . -- — 5 - ,--1--- TYPE 2 SEISMIC ISOLATION JOINT SCALE NOT TO SCALE 4" AVAILABLE REVIEWED FOR CODE COMPLIANCE APPROVED MAT 14 2010 City ofTukwkla BUILDING oIVIRInN cmROFASLn MAY ;052010 PER IT CENTER HALF; Designed By. P. SMITH Drown ey- M: EACKER. Checked Sy. J. CALDWELL 0 01/25/10 ISSUED FOR BID No. Date Dsn. Chk. App. Revisions 'Approved By. P. SMITH 1 -2S -t0 Ham tt MacDonaMold SOUNDTRANSR Scde: AS NOTED Filename S55J4764MP 15.dwg Contract No.: C 725E Submitted: Date: P. SMITH I 01/25/10 'Approved: Data R. KEMPKES I 01/25/10 Dote 01/25/10 LINK LIGHT RAIL PROJECT SOUTH CORRIDOR TUKWILA STATION PLUMBING ISOLATION JOINT DETAILS Drawing No.: N764MP 15 Sheet -No.: 34 0 Rev.: REV -ACS pRONG OUTLET ENLARGED PLAN SCALE: P4 "= I' -0' 1 I /4 "0 HEAT TRACE de INSULATE GATE VALVE CHECK VALVE HL ALARM INSTALL CONTROL PANEL BEHIND LOCKABLE ACCESS PANEL, NOTE 2 I I M. D,I SCHARGE LINE. HEAT TRACE AND INSULATE 18 "x I8 "x4" DEEP SUMP ADDED TO EXIST ESCALATOR PIT N764MP14 N764MP02 PL 4P CONTRA LEVEL SETTING START 6" ABOVE SUMP BTM STOP 4" ABOVE SUMP $TM HIGH ALARM 10" ABOVE SUMP BIM SECTION SCALE: I "s. I' -0" N764 P 14 EXIST DR&TN- W/ NEW COVER ! I ! I i 1 • I I : t l�J ( 1_-F -�; 1 I I I I I I 1 4 WON— tea FC=- "YATFERGEI?TOR - 01 -.I SLOPE— f i I ENLARGED PLAN SCALE I /2 " =1' -O' N764MP14 N764MP02 3 °0 DRAIN LINE; a I I /4'OIPU D SCHA GE N70-11P13 EXIST DRAIN SUMP W/ NEW COVER I' J SECTION - - - SCALE: 1 /2 "= I' -0' ALARM EL LEVEL INDICATOR TRACE & INSUL) OIL INTERCEPTOR HEAT HOUSEKEEPING.PAD N7 NOTES: I. INSTALL GROUT TO PROVIDE SLOPE OF 1 /8'/FT TOWARD SUMP. 2. ACCESS PANEL TO BE SIZED TO APPROPRIATELY HOUSE CONTROL PANEL. MATERIALS TO MATCH EXISTING ARCHITECTURAL FINISHES. EQUIPMENT TO BE APPROVED BY- RES I DENT ENG I NEER. 3. REQUIRES DEMOLITION. REVIEWED FOR CODE COMPLIANCE APPROVED vim 14 2010 City of Tukwila BUILDIN( nniictnw crrirStf&A MAY .052010 PERMIT CENTER �y1NT HALF \\SCALE 0 No. 01/25/10 Dote Den. Chk. App. ISSUED FOR BID Revisions Designed By: P. SMITH Drawn wn By M. EACKER Checked By. J. CALDWELL Approved 8% P. SMITH 1- is -to MacDonald SOUNDTRANSR Stole: AS NOTED Rename: S55J•1764MP 1 4.dwg Contract No.: C 725E Submitted: P. SMITH Date: Approved 01/25/10 R. KEMPKES l 01/25/10 Date:. 01/25/10 LINK LIGHT RAIL PROJECT SOUTH CORRIDOR TUKWILA STATION PLUMBING SECTIONS AND DETAILS Drawing. No.: N764MPI4 Sheet No.: Rev.: 33 0 Ibac M•0• s mLAw-A 1.+ 5 Ia j0 Uo NOTES: SUMP COVER TO BE WATER TIGHT UP TO EXPOSED FUNNEL 1 NLET. 2. VERIFY ALL PIPING (NEW AND EXISTING) PRIOR TO FABRICATION OF SUMP COVER. 3. 6" INTERVALS, 1" EDGE D I STANCE, 1/4" D 1 AMETERS, 1 -3/4" EMBEDMENT. 4. COORDINATE WITH EXI IN PIPING. 5. EXISTING PIPING TO R1OUTED TO FUNNEL ASSEMBLIES. 1 i 6. PROV IDE GARLOCK MUL ' -SWEI L (STYLE 3760) OR APPROVED EQUAL. ESCALATOR PAN PAN OPEN DRAIN TROUGH, PAINTED STEEL (TYP) c NG, TYr SLOPE -- 1/2 "0 VENT EXIST FP DRAIN 1 I/4 "0 SUMP PUMP 0 (NORTH SUMP ONLY) I "WIDE PERIMETER GASKET, NOTE 6 3 "0 SECTION SCALE 1/2 ° =1' -0" -6 1 /2" TYP LINE(S)� ISCHARGE_ ia EXIST METAL PANEL SOFFIT r I La n N76` P13 N764MP03 HEAT TRACE & INSUL 3 "0 OIL INTERCEPTOR DISCHARGE 36 "X36 "X36" EXIST SUMIi� ,tea -I2 _34° TO SANITARY (EXIST) -42" DETAIL SCALE 1 —1' -0" 30° MAX 1/4" FE CONST (TYP) ALUMINUM (SUMP COVER) NOTE I & 2 STAINLESS STEEL EXPANSION ANCHOR (TYP) NOTE 3 2 °0' VENT- `J 3 "m ALUM 1 NUM (21 N464MPI4 HEAT TRACE & INSUL 1 �n l — tfO /r9P DEEP SEAL TRAP DRAIN TROUGH PAINTED CARBON STEEL SECTION SCALE: NOT TO SCALE EXIST DRAIN SUMP W/ NEW COVERT 3 °0 DRAIN II III// SLOPE -- ' L 2F0 UP 1` OIL I 01 -2 TERCEPI0OR. 1 I 1 i "0 DN 1 I i I 1` --- _ ENLARGED PLAN (3-.) SCALE I /2 " =I'-0" N76` P 3 N764MP02 LI REVIEWED FOR CODECOMPLIANCE AN ) kt. 14 2010 1 l- LEVEL IND1' T R 1 onsukvaa L !DING DIVISIC! N 2 °0 VENTS r -- 1 I FLOW CONTROL EXIST DRAIN SUMP W/ NEW COVER- SECTION SCALE: I /2 "= I' -O° r-' OIL INTERCEP TRACE & INS HOUSEKEEP I NO PAD COY OF MILA MAY .05.2010 IT CENTER N7 Designed By. P. SMITH Drawn By. M. EACKER 0 01/25/10 ISSUED FOR BID No. Date D chk. Apo. Revisions Checked Br. J. CALDWELL Approved Br. P. SMITH 1- SS.10 FM Hid SOUNDThANSIT Scale: AS NOTED Filename: S55_N764MP I3.dwg Contract No.: C 725E Submitted: Date: P. SMITH 01/25/10 'Approved: Date: R. KEMPKES I 01/25/10 Date: 01/25/10 LINK LIGHT RAIL PROJECT SOUTH CORRIDOR TUKWILA STATION PLUMBING SECTIONS AND DETAILS Drawing No.: N764MP 13 Sheet No.: Rev.: 32 0 A • • • • • • • i reschwe crsuc¢ • 1-1 2 • 3 • 4 • COLUMNS INSULATED AND HEAT TRACED HOSE BIB, TY H8 CO INSULATED E8 AND HEAT TRACED -MIHB PLATFORM 3/4 "o 3/4 "0 I "0 INSULATED AND HEAT TRACED 81B FROM0NORTH PLAZA 3/4"0 EXIST ESQALATOR #3 &/4 IT A>MHBi TER INATE VENT 10' ABOVE /MEZ NINE LEVEL. ROUTE INSIDE1ENCLOSURE PANELS H8 NORTH HEAT TRACE & INSUL ,,FROM MEZZANINE / / / / / / / / / / / / / / / / /7 /�,'i /// // —00 INSULATED AND 0 -1 HEAT TRACED CO C PLUMBING. DOMESTIC WATER. IAND SANITARY DRAIN RISER DIAGRAM - SOUTH SCALE: NTS 3/4 "0 1 "0 O z 0 _n ri 11 o I W///////1////3( I I "0 X �b I/2"0 -I /2 "Ci C FD I FD Ln\ �f 1 I/2 "0 HBI 1/8" SLOPE 3 "0— II / II 1"o I NSULV4 11 HEAT TRAM FROM 8PRINKLERQI -2 RQ' EL VARIES MEZZANINE EL 358.17'— RUN INSIDE CHASE —2"0 2 "0 /SAN 2 "0 INSULATED AND HEAT TRACED RISER ABOVE GRADE REVIEW EOFOR p CODE COMPLIA ' E APPROVED MAY 14 2010 PLAZA EL VARIES HEAT TRACE & 1NSUL INTERCEPTOR EXIST DRAIN SUMP of Tukwila ING DivigI 1N TO NORTH PLAZA cnyRF6MItn MAY 0 5 2010 PERMIT CENTER Designed By P. SMITH Crown 8y. M. EACKER Checked By J. CALDWELL 0 01/25/10 ISSUED FOR BID 110. Date Den. Chk. App. Revisions Approved By. P. SMITH MacDonald SOUNDThimuT Scale: NTS Fllename: S55..N764MP 10.dwg Contract No.: C 725E Submitted: Approved: Date: Dote: P. SM I TH I 1 01 /25/ 10. R. KEMPKES I 01/25/I0 Date: 01/25/10_ LINK LIGHT RAIL PROJECT SOUTH CORRIDOR TUKWILA STATION PLUMBING DOMESTIC WATER AND SANITARY DRAIN -SOUTH RISER DIAGRAM Drawing No.: N764MPI0 Sheet No.: Rev.: 31 0 RmOnd Zg -nain tJaveor.re L rums • e.e A • B • C • D • • F • G • 2 • 3 • 4 • COLUMNS 3/4 °0 I "0 E6 INSULATED AND HEAT TRACED HOSE B1 B. TYP-- 118 1 "0 INSULATED AND HEAT TRACED ?QjHB - P4-IHB PLATFORM I0 -3/4 °d I -I/2 °0 TERMINATE VENT 10' ABQg ci■ MEZZANINE LEVEL. Re' E INSIDE ENCLOSURE P ELS EXIST ESCALATOR #1 & #2 PIT • INSULATED AND HEAT TRACED HOSE BIB 3/4 "0 —q TO SOUTH PLAZA STAIR 3/4 "0 --p H EXIST ESCALATOR #5 & $6 PIT INSULATED AND HEAT TRACED HOSE BIB 3/4"0 CO H8 FD SINK' FD X3/4 "0 2"0-1 -1 /2"511 1/2"1 WH -2_\ DHW -711/2"0 VTR 1 3 „0 .--- 2 0 o � 42°0 1 HB VX)* JAN SINK 04_I) I 0 INSULATED AND HEAT TRACED 3/4 "o 1 "0 I 4 °0 I HEAT TRACE & 1NSUL I 2 n n 818 INSULATED AND ///// /////////////71 27,2//, W//////77///7//// 3/4 °0 w 300 WH -I DOMESTIC HOT WATER HEATER, TYP DHW /// co_ / / / / / / /// 300 P INSULATED AND HEAT TRACED i HOSE BIB - -1 N8 I dXI-IHB ll LAV I LAV I -1/2 °0 0 /2 "0 I1 -t/23 2 0-t, -1/2"0-- I - I /2 "o- FD I FD 1 INSULATED AND INSULATED AND HEAT TRACED HEAT TRACED HOSE B18 C7 1°0 HOSE 8I8 v 3/400 \ \ JAN WC SINK 400 TOILET ROOMS AND JANITORS CLOSET H6I SAN U EL VARIES 1 ( MEZZANINE EL 358.17' SLOPE I /8'" 2 °0 INSULATED HEAT TRACED RISER PLUMBING. DOMESTIC WATER. AND SANITARY DRAIN RISER DIAGRAM — NORTH SCALE: NTS REVIEWVFOR 1 CW 3-1 CODE COIPLI ANCE 2 APPROVED MAY 14 2010 City of Tu BUILDING Diu RUN INSIDE CHASE OI - I PLAZA EL VARIES HEAT TRACE & INSUL INTERCEPTOR AND EXIST DRAIN SUMP EL 330.67' APPROX - VARIES cmRO nu► MAY 0 5 2010 PERMIT CENTER -Designed 8y P. SMITH 0 01/25/10 ISSUED FOR BID No. Dote Dsn. Chk. App. Revisions Drown By. M. EACKER Checked 8y. J. CALDWELL Approved By. P. SMITH Hatch Mott MacDonald Scale: NTS Fiename: S55_N764MP09.dwg sown:gum Contract No.: C 725E Dote: P. SMITH 01/25/10 'Approved: Dote: Date R. KEMPKES 01/25/10 01/25/10 LINK LIGHT RAIL PROJECT SOUTH CORRIDOR TUKWILA STATION PLUMBING DOMESTIC WATER AND SANITARY DRAIN —NORTH RISER DIAGRAM ()rowing No.: N764MP09 Sheet No.: Rev.: 30 0 DASHED LINES INDICATE LINE OF PLATFORM ABOVE - III Sill 111011111111111111111111101 DRAINS /Se I UNDERSIDES ESCALATORS ANN wit r , IS'bL"4ATTONM RISERS T TYPE 2 INSULATED AND HEAT TRACED CW 8 "0 SS STORM `"''-� PLAT �- DRPA 12 RISER, I ; ELEV !,l a IF „ lze���iIIIIIIIIi titi.[e :MN nail �L. N76 -A043 ACCESS N76 -AQ43 CONTINUATION FROM N764MP02 SLOPE 1 00 INSULATED AND HEAT TRACED SUPERVISOR'S ROOM COMMUNICATIONS EQUIPMENT ROOM WH -2 HOT WATER HEATER. WALL MOUNTE 0 SS STORM RAIN RISE' ESCALATORS /STAIRS TO PLATFORM PLAZA ELEVATOR}/ F 11111111IA !l!! 1101111111111111111111111 01 1111111111111 1111111 0/1 diths HEAT TRACED AND INSULATED SANITARY DRAIN MECHANICAL ROOM 3 "0 SANITARY DRAIN CC ISOL*T1k1N CW'— O JAETZIOSET AF16_ — —. L_HOSE .gIBS, SEE DETAIL #14, N76 -AD75 FOR CHASE am j INSULATED AND HEAT TRACED 1 "0 CW RISER 764MP13 DRAINS /SCUPPERS INST UNDERSIDE OF MEZZANI ESCALATORS (24 NOTE 340 STORM RISERS REVIEWE CODE ♦ • APPP .s NOTES: WALLS SEPARATING MEZZANINE INTERIOR SPACES FROM EXTERIOR ARE 2 HOUR FIRE RATED. PIPING PENETRATIONS SHALL BE FIRE STOPPED ACCORDINGLY. MEZZANINE WEST,— PLUMBING PLAN SCALE: I /8 " =1' -0" FOR ANCE D MAY 14 2010 SCALE IN FEET 2. SEE DWG NO. N76 -MPO9 FOR FLOOR DRAIN vENT PIPING SCHEMATIC - ROUTING BY CONTRACTOR. 3. REMOVE AND REINSTALL METAL PANEL SOFFIT AS REQUIRED. 0 01/25/10 ISSUED FOR BID Revisions Designed By. P. SMITH Drown By. M. EACKER Checked By J. CALDWELL Approved By. P. SM 1 TH Submitted: 01/25/10 Scats: Filename: S55_ N764MP03.dwg Contract No.: C 725E Date: 01/25/10 cm�oMERAu+ MAY :052010 PERMIT CENTER LINK LIGHT RAIL PROJECT SOUTH CORRIDOR TUKW ILA STATION PLUMBING MEZZANINE WEST PLAN Drawing No.: N764MP03 Sheet No.: B • C • D • • • G • H ARE FS Rewired M q REQ -Fcs &&M> sssl$x StliS-AMIJAAJ - 22.74 LT SCALE t -t ti t 1111111 ,onswevEsEEB9stali. ' i re.11111U111 CW ❑ / i FOR CONTINUATION SEE N764MP03 SEISMIC ISOLATION JOINT -TYPE --I- 11/4 HEAT TRACE AND INSULA ALONG UNDERSIDE OF ESCALATOR ABOVE METAL PANEL SOFFIT, NOTE I ED ACED P NOTES: CANOPY GUTT I. REMOVE AND RE INSTALL METAL PANEL SOFFIT AS REQUIRED. CW TOILET ROOMS Z to J ntak V4i," miuilliiiliiiii'1 I14:AU111111111 • Ill f r�Ganiii� 14 STAIR #1 IT z a rn FIRE CO ROOM ❑ L —ELEV MACH ROOM 0 REVIEWED FOR CODE COMPLIANCE APPROVED MAY 1 City Tukwi 1 BUILDING DivtgIntl DINT ,= HALF \SCALE t = CRYO�FKNAW MAY 0 5 2010 IT CENTER 8 4 0 8 SCALE IN FEET 16 Designed By. P. SMITH Drawn By. M. EACKER Checked By. J. CALDWELL 0 01/25/10 ISSUED FOR BID No. Dote Dsn. Chk APP. Revisions Approved By P. SMITH 1-15-so Hatch Mott MacDonald SOUNDTRANSIT Submitted: Dote P. SMITH 1 01/25/10 Approved: R. KEMPKES Dote: 01/25/10 Scale: 1/8 " =I' -0" Filename: S55_N784MP02.dwg Contract No.: C 725E Dote: 01/25/10 LINK LICIT RAIL PROJECT SOUTH CORRIDOR TUKWILA STATION PLUMBING ESCALATOR PIT PUMP PLAN Drowing No.: N764K4P02 Sheet No.: Rev.: 28 0 Rewhod Ss• 7� ss ci 215-117111-AU 5551476-01 Sw1n.ro Sss.R.a_C1 ram LMnorred 97Sre ramp . Si.arermago LrSGLS 1.1 2 • 3 • 4 5 E 0 §O Ue • • 1 NOTES: CONTRACTOR MAY UTILIZE ONLY THE AREAS DESIGNATED ON THIS DRAWING FOR PARKING AND STORAGE, 2. CONTRACTOR SHALL NOT PARK IN OR OTHERWISE BLOCK BUS'LANE, PARA TRANSIT DROP OFF OR EMERGENCY ACCESS ROUTE. 3. CONTRACTOR SHALL USE THE EMERGENCY ACCESS GATE FOR'CONDENSER INSTALLATION IN THIS LOCATION. —0 DIRECTION OF TRAVEL - -- WORK LIMITS CONTRACTOR PARKING AREA CONTRACTOR STORAGE AREA STAIRS CONDENSER SEE NOTE 3 WALL • REVIEWED FOR CODE COMPLIANCE EMERGENCY APPROVED GA -MAY 14 2010 CITY OK�WILA MAY :O5,2010 ERMIT CENTER 30 15 0 30 SCALE IN FEET 60 Designed By A. MARWAHA Drawn By. M. EACKER 0 01/25/10 ISSUED FOR BID No. Dote Dan. Chk. APP. Revisions Checked By. V. ECKLAND Approved By A. MARWAHA PSIC SOUNDTRANSR Scale; AS NOTED Filename: S55_N764CS50.dwg Contract No.: C 725E Submitted: A. MARWAHA Dote: Approved: 01/25/10 pate: R. KEMPKES' 01/25/10 Date: 01/25/10 LINK LIGHT RAIL PROJECT SOUTH CORRIDOR TUKWILA STATION CONSTRUCTION ACCESS AND STAGING PLAN Drawing No.: N764CS50 Sheet No.: Rev.: 21 0 SOUNDTRANSIT SOUND TRANSIT CONSULTANTS: Hatch Mott MacDonald Jacobs Engineering LTK Engineering Services Puget Sound Transit Consultants REVIEWED FOR CODE COMPLIANCE APPPOVED MAY 14 2010 "7 C' of Tukwila BUILDING r)lRilclnti FILE COPY permit No. PCB l0 • Q&h' Flan re riew approval is subject to errors and omissions. l".p roval of construction documents does not authorize v;obtion of any as t pted code or ordinance. Receipt appnved F Id y and conditions is acknowledged: ey Date: 5-47 /2° / o City Of Tukwila BUILDING DIVISION �l: ii.i11!!! 1 sill:: p. ......::g yrlpT Ca �tllin �..tiu■ i �sou'IU111` f, }uana� ►�� !►,11,1 T BAKER "'I�Illlllr 11�I �r1111111: ;;;m ��'sitiC1 UMW Illl. Wt n■ '�_. 11 Illy ii;:, - -- w ._ o`I� ItIL�.1 l_L�.�"lIel1 mj1\1 111_ ., 1►,,�-1a\i � II 111111111- II RAI'ERI t�, v i BAKER STAT10N �4li■iiC: RAI IER LAKE WASHINGTON nla� I !It 1111 r .11 1► N i .1 ►nn1 'mining �` IIOI..,1II111I1111!!�r►. !e� flomitairmult 1 wtw _c _ g IJAW nrimpt MIN Ti i ulbi /NIFII AI I: t 1 ►� Pgrtatiam = iiMl 410 IA I"•r Ng um 'iViI 5,+4 i= -zi.:dii iiA1 1I'1 PROJECT LOCATION MAP CENTRAL PUGET SOUND REGIONAL TRANSIT AUTHORITY REVISIONS changes shall be made to the scope of work without prior approval of Tukwila Building Division. r I NOTE: Revisions will require a new i and may include additional plan rev ew fees. ISSUED FOR BID PLANS FOR CONSTRUCTION OF CENTRAL LINK LIGHT RAIL ELEVATOR AND ESCALATOR RETROF I T PACKAGE s sTEby the Public ormance with current h subject to errors and sathorize vio ladous of ces. The sii tar— for the adequacy of the design rests totally with the designer. Addition, deletions or revisions to t_es_ drawings after this date trill void this aooeptlotot and will require a resubmittal of revised - - for subsequent approvaL Final acceptance is subject to field the Public Works utilities inspector. Date: 1! 2 // RECEIVED IIAY 0 6 1010 TUKWILA PUBLIC WORKS CITY iUKWWLA MAY. 052010 SOUNDTRANSIT PERMIT CENTER CENTRAL PUG T S UND REGIONAL TRANSIT AUTHORITY Dote: // Z /zU /O Engineer onager Approved: C. THE PREPARATION OF THIS DOCUMENT HAS BEEN FINANCED IN PART THROUGH A GRANT FROM THE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL TRANSIT ADMINISTRATION UNDER THE URBAN MASS TRANSPORTATION ACT OF 1964. AS AMENDED. AND IN PART BY THE CENTRAL PUGET SOUND REGIONAL TRANSIT AUTHORITY DISTRICT OF WASHINGTON. AND THE STATE OF WASHINGTON Contract No.: Sheet No.: C 725E