HomeMy WebLinkAboutPermit PG10-089 - SABEY DATA CENTERSABEY DATA CENTER 3355 S 120 PL PG1 0-089 City oFI'ukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.ci.tukwila.wa.us Parcel No.: 1023049082 Address: 3355 S 120 PL TUKW Project Name: SABEY DATA CENTER PLUMBING /GAS PIPING PERMIT Permit Number: Issue Date: Permit Expires On: PG 10 -089 08/24/2010 02/20/2011 Owner: Name: SABEY CORPORATION Address: 12201 TUKWILA INTL BLVD , 4TH FLOOR 98168 Contact Person: Name: Address: Email: Contractor: Name: Address: EASA NOUROUZEE 5005 3RD AV S , SEATTLE WA 98134 EASAN @MCKINSTRY.COM MCKINSTRY CO LLC PO BOX 24567 , SEATTLE WA 98134 Contractor License No: MCKINCL942DW Phone: 206 - 391 -6926 Phone: 206 762 -3311 Expiration Date: 03/16/2012 DESCRIPTION OF WORK: INSTALL (2) FLOOR DRAINS AND (2) FLOOR SINKS ON 3RD FLOOR OF SABEY DATA CENTER PLANT FUEL SCOPE: TIE INTO EXISTING FUEL TAPS AND RUN TO (2) NEW FUEL DAY TANKS. RUN FUEL OIL PIPE TO (2) NEW GENERATORS. Value of Plumbing /Gas Piping: Fees Collected: $14,800.00 $171.94 Permit Center Authorized Signature: I hereby certify that I have read and exa governing this work will be complied wi e w Uniform Plumbing Code Edition: 2009 International Fuel Gas Code Edition: 2009. Date: 01A 7i`I.1. 4 this permit and know the same to be true and correct. All provisions of law and ordinances ether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or Ske;performance of work. I am authorized to sign and obtain this plumbing /gas piping permit. l P / Date: .g/i /l Signature: Print Name: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: UPC -4/10 PG 10 -089 Printed: 08 -24 -2010 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us Parcel No.: 1023049082 Address: Suite No: Tenant: 3355 S 120 PL TUICW SABEY DATA CENTER PERMIT CONDITIONS Permit Number: Status: Applied Date: Issue Date: PG 10 -089 ISSUED 07/23/2010 08/24/2010 1: ** *PLUMBING AND GAS PIPING * ** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R -3. 8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 guage. 9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 10: All pipes penetrating floor /ceiling assemblies and fire - resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. * *continued on next page ** doc: Cond -10/06 PG10 -089 Printed: 08 -24 -2010 • wq� City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Signature: Print Name: Date: doc: Cond -10/06 PG 10 -089 Printed: 08 -24 -2010 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.citukwila.wa.us Plumbing /Gas Permit No. Project No.. (For office use only) PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION King Co Assessor's Tax No.: 1023049082 Site Address: 3355 S 120th PL. Tukwila, WA 98168 Suite Number: Floor: Tenant Name: Sabey Data Center New Tenant: ❑ Yes Property Owners Name: Sabey Corporation Mailing Address: 12201 Tukwila Intl. Blvd. 4th floor Tukwila WA City State 3rd ..No 98168 Zip CONTACT PERSON -Who do we contact when your permit is ready to be issued'` Name: Easa Nourouzee Mailing Address: 5005 3rd Ave S E -Mail Address: easan @mckinstry.com Day Telephone: (206) 391 -6926 Seattle City WA State 98134 Fax Number: (206) 716 -3424 Zip PLUMBING / GAS PIPING CONTRACTOR INFORMATION Company Name: McKinstry Co. Mailing Address: 5005 3rd Ave S Contact Person: Easa Nourouzee E -Mail Address: easan @mckinstry.com Contractor Registration Number: MCKINCL942DW Seattle WA City State Day Telephone: (206) 391 -6926 Fax Number: (206) 716 -3424 Expiration Date: 03/16/2012 98134 Zip ARCHITECT OF RECORD — All plans must be stamped by Architect of Record. Company Name: Mailing Address: Contact Person: E -Mail Address: City Day Telephone: Fax Number: State Zip ENGINEER OF RECORD — All plans must be stamped by Engineer of Record Company Name: McKinstry Mailing Address: Same as above Contact Person: Tony Marino E -Mail Address: tonym @mckinstry.com City State Zip Day Telephone: (206) 832 -8462 Fax Number: H:\Applrcauons\Forms- Applicauons On Line \2010 Applications \7 -2010 - Plumbing -Gas Piping Permit Application.doc Revised: 7 -2010 bh Page 1 of 2 . • Valuation of Project (contractor's bid price): $ 14,800 Scope of Work (please provide detailed information): Install (2) floor drains and (2) floor sinks on 3rd floor of Sabey Data Center Central Plant Building Use (per Int'1 Building Code): Occupancy (per Intl Building Code): Utility Purveyor: Water: Sewer: Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: Fixture Type: Qty Fixture Type: Qty Fixture Type: Qty Fixture Type: Qty Bathtub or combination bath/shower Bidet Clothes washer, domestic Dental unit, cuspidor Dishwasher, domestic, with independent drain Drinking fountain or water cooler (per head) Food -waste grinder, commercial Floor Drain of Shower, single head trap Lavatory Wash fountain Receptor, indirect waste Sinks Urinals Water Closet Building sewer and each trailer park sewer Rain water system — per drain (inside building) Water heater and/or vent Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity) Grease interceptor for commercial kitchen ( >750 gallon capacity) Repair or alteration of water piping and/or water treatment equipment Repair or alteration of drainage or vent piping Medical gas piping system serving 1 -5 inlets /outlets for a specific gas Each additional medical gas inlets /outlets greater than 5 Backflow protective device other than atmospheric -type vacuum breakers 2 inch (51 mm) diameter or smaller Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter Each lawn sprinkler system on any one meter including backflow protection devices Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1 -5) Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Gas piping outlets PERMIT APPLICATION NOTES Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Signature: Date: 7/23/10 Print Name: Easa Nourouzee Day Telephone: 206- 391 -6926 Mailing Address: 5005 3rd Ave S Seattle WA 98134 City Date Application Accepted: 01/d31/ U Date Application Expires: U / /93//1 State Staff Initials: Zip H:\Applications\Fonns- Applications On Line \20I0 Applications \7 -2010 - Plumbing -Gas Piping Permit Application.doc Revised: 7 -2010 bh Page 2 of 2 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: hqx/Iwww.ci.tukwila.wa.us Parcel No.: 1023049082 Address: 3355 S 120 PL TUKW Suite No: Applicant: SABEY DATA CENTER RECEIPT Permit Number: PG10 -089 Status: APPROVED Applied Date: 07/23/2010 Issue Date: Receipt No.: R10 -01663 Initials: User ID: JEM 1165 Payment Amount: $137.55 Payment Date: 08/24/2010 12:26 PM Balance: $0.00 Payee: MCKINSTRY CO. SERVICE ACCOUNT TRANSACTION LIST: Type Method Descriptio Amount Payment Check 11083 137.55 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts PLUMBING - NONRES 000.322.103.00.00 137.55 Total: $137.55 PAYMENT RF('PI\FFfl doc: Receiot -06 Printed: 08 -24 -2010 • wq� City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tulcwila.wa.us RECEIPT Parcel No.: 1023049082 Permit Number: PG 10 -089 Address: 3355 S 120 PL TUKW Status: PENDING Suite No: Applied Date: 07/23/2010 Applicant: SABEY DATA CENTER Issue Date: Receipt No.: R10 -01393 Initials: User ID: Payee: LAW 1632 Payment Amount: $34.39 Payment Date: 07/23/2010 10:20 AM Balance: $137.55 MCKINSTRY CO TRANSACTION LIST: Type Method Descriptio Amount Payment Check 11028 34.39 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts PLAN CHECK - NONRES 000.345.830 34.39 Total: $34.39 PAYMENT RECEIVED doc: Receipt -06 Printed: 07 -23 -2010 INSPECTION RECORD Retain a copy with permit INSPECTtO NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 1r- FGro -oe9 Project: 5AbH D 774 Type of I�ection: 1 / -',V& Address: 33c< S izo''Z.- Date Called: Special tnsiructions: Date Wanted: (►:- 02 m2- - 1I ��{ Requester: e 154 - 35/ -6) SL Phone No: _ 762- 33 1 Approved per applicable codes. Corrections required prior to-approval. COMMENTS: PP/`m ¢- Co-n4 p 1 f.' //-7 /Am-/ N Date: aZ -2 -// I pector . f (1114.47 1 L( /a 1.4 R NSPECTION FEE REQ RED. Prio( to next inspection. fee must be pid at 6300 Southcenterblvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit ?6(0 -O INSPECTION N0. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: �� o.''� Ce21' Type of Inspectio l �... [)L4-V A dress: �; Date Called: Special Instructions: 2- s ( -� _ i Date Wanted: a.n Requester: Phone No: -4/23 — 3 9 7 prov .er •pplicable c COMMENTS: Corrections required prior to approval. PA/'i "1,44 A-1) rd cl i o J- 1 �d S rl D4 F Date: c, _ & J n REINSPECTION FEE REQUIRED. I rior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit ot-o8 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Project: �� �y�f 1 Q , "n Cb' tom+' i li�V Typ of IIns�pection':• �t/w"1�— ITV Address: ` \'x..20 t S \20 ? L- Date Called: Special Instructions: llv , W Date Ing 1 to a.m . i (J p.m. - Requester: � 3r' — (07 1"7 "l Phone No: av G 1423 -C si`z Approved per applicable codes. El Corrections required prior to approval. C01►4 ENTS: ,?oti(n -',,.1 - . ICAO I►i.,r%1s kl ic to O' . € ' . Ql csa .,.iJ vS 4- V ate\ ®%:'A.3 G, ,(9vim ik.,�`O ?9 J 'M r-' 1 nspecto Date: 1.1111wrisas,i4rid1 ❑ $61.00 EINSPECTION FEE R QUIRED. Pri p• id a 6300 Southcenter Blvd., uite 100. Recei•t o.: r to inspection, fee must be all to schedule reinspection. Date: .,._..�,-- �.�- t,.a�.s.��. + v-1.-. � ,,�.a.xs....���tb..- ...�..h,,.. � �.. _ axz .e.,...�......ti_�,•.o-.,.�,F.. City of Tukwila Jim Haggerton, Mayor r v Department of Community Development Jack Pace, Director 02 -01 -2011 EASA NOUROUZEE 5005 3RD AV S SEATTLE WA 98134 RE: Permit No. PG10 -089 3355 S 120 PL TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 03/07/2011. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, , provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and /or receive an extension prior to 03/07/2011, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, '1-dk Bill Rambo Permit Technician File: Permit File No. PG10 -089 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 PERMIT C C�. PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: PG10 -089 DATE: 08/12/10 PROJECT NAME: SABEY DATA CENTER SITE ADDRESS: 3355 S 120 PL Original Plan Submittal X Response to Correction Letter # 1 Response to Incomplete Letter # Revision # after Permit Issued DEPARTMENTS: u ► ing ivision 017`iii Public Works Fire Prevention n Planning Division ❑ Structural ❑ Permit Coordinator n DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete U DUE DATE: 08/17/10 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES /THURS ROUTING: Building Please Route VI Structural Review Required _ No further Review Required n REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 09/14/10 Approved ❑ Approved with Conditions Not Approved (attach comments) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2-28-02 OPE`j sir Y: PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: PG10 -089 PROJECT NAME: SABEY DATA CENTER SITE ADDRESS: 3355 S 120 PL X Original Plan Submittal Response to Incomplete Letter # DATE: 07 -23 -10 Response to Correction Letter # Revision # After Permit Issued DEPARTMENT :tD uilding o 01' i islon Pu lic W s . Fire Prevention Structural Planning Division Permit Coordinator n DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete n DUE DATE: 07 -27 -10 Not Applicable n Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES /THURS ROUTING: Please Route txt Structural Review Required No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 08-24 -10 Approved n Approved with Conditions n Not Approved (attach comments) K Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ►! Fire ❑ Ping ❑ PW ❑ Staff Initials: I/1/JK Documents /routing slip.doc 2 -28 -02 • City of Tukwila Steven M Mullet, Mayor Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us Steve Lancaster, Director Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date:" 'CZ — S=s LD Plan Check/Permit Number: PG 10-009 ❑ Response to Incomplete Letter # • Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner RECEIVED CITY OF TUKWILA 'AUG 1.2 2010 °f:P.AA'T riET i T 9 Project Name: Sabey Data Center Project Address: 3355 S 120 P1 � j( -t .�� Phone Number: 2-521'C' `\-� `p Contact Person• Summary of Revision: P `?“Ai J�U vv� c:: c- Fig P, S p e -j '� t t it % Pk; r S` 14-1 vt 5 &L A-cys a'v et v‘ tb (z) rn CA,-) �,,� Q acu1 -fir . �.c.�.�. �t� o i ( t -rn (Z.) (Jaw rS . Sheet Number(s): P 3 . _� 3 • 4 r(_o "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit CCenter by: VEntered in Permits Plus on UOP-//d �4) \applications\forms - applications on line\revision submittal Created: 8 -13 -2004 Revised: 1610 -089 La King County Department of Natural Resources and Parks Wastewater Treatment Division Non - Residential Sewer Use Certification • To be completed for all new sewer connections, reconnections or change of use of existing connections. • This form does not apply to repairs or replacements of existing sewer connections within five years of disconnect. Please Print or Type 3 3 S` Property Street Address 4_40i /& City Ca- bet,' Owner's Name S" PL. td4 /1/ e ZIP For King County Use Only Account # No. of RCEs Monthly Rate Property Tax ID # Party to _e Billed (if different from owner) I C h(tl fir-- Cu . c.,c) y 0 fath e-y) ;'bo c 3 r kit 0 S' �eCC f -/-(e w A- iv / 3 City or Sewer District Date of Connection Side Sewer Permit # Please report any demolitions of pre - existing building on this property. ( 2.1) �' ) 3W `/ %.S Credit for a demolition may be given under some circumstances. Demolition of pre- existing building? ❑ Yes ❑ No ( ) Was building on Sanitary Sewer? ❑ Yes ❑ No Property Contact Phone Number (with Area Code) Was Sewer connected before 2/1/90? ❑ Yes ❑ No Owner's Mailing Address /.2- 7-0 c t !< zv t r ` Jet �w�` I ' d , /h /— . Sewer disconnect date: (I� Type of building demolished? (C�.l L...) I 5I l /bef' Request to apply demolition credit to multiple buildings? ❑ Yes ❑ No State Subdivision Name Lot # Subdiv. # 1 Block # Building Name Ca he (if applicable) Owner's Phone Number (with Area Code) A. Fixture Units Fixture Units x Number of Fixtures = Total Fixture Units Kind of Fixture Fixture Units No. of Fixtures Total Fixture Units Public Private Public Private Bathtub and Shower 4 4 Shower, per head 2 2 Dishwasher 2 2 Drinking fountain (each head) 1 .5 Hose bibb (interior) 2.5 2.5 Clotheswasher or laundry tub 4 2 Sink, bar or lavatory 2 1 Sink, Clinic flushing 8 8 Sink, kitchen 3 2 Sink, other (service) 3 1.5 Z Sink, wash fountain, circle spray 4 3 Urinal, flush valve, 1 GPF 5 2 Urinal, flush valve, >1 GPF 6 2 Urinal, waterless 0 0 Water closet, tank or valve, 1.6 GPF 6 3 Water closet, tank or valve, >1.6 GPF 8 4 Total Fixture Units Residential Customer Equivalent (RCE) 20 fixture units equal 1.0 RCE Total No. of Fixture Units 20 .. 30 RCE B. Other Wastewater Flow (in addition to Fixture Units identified in Section A) Type of Facility /Process: Estimated Wastewater Discharge: Gallons /days Residential Customer Equivalents (RCE): 187 gallons per day equals 1.0 RCE Total Discharge (gal /day) = 187 C. Total Residential Customer Equivalents: (add A & B) A B . 20 RCE RCE RECEIVED JUL 232010 PERM T CENTER Pursuant to King County Code 28.84, all sewer customers who establish a new service which uses metropolitan sewage facilities shall be subject to a capacity charge. The amount of the charge is established annually by the King County Council at a rate per month per residential customer or residential customer equivalent for a period of fifteen years. The purpose of the charge is to recover costs of providing sewage treatment capacity for new sewer customers. All future billings can be prepaid at a discounted amount. All future billings can be prepaid at a discounted amount. Questions regarding the capacity charge or this form should be referred to King County's Wastewater Treatment Division at 206 - 684 -1740. I certify that the information given is correct. I understand that the capacity charge levied will be based on this information and any deviation will require resubmission of corrected data fdetermination of a revised capacity charge. _a_ — — /,i7 Contractors or Tradespeople Peer Friendly Page General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name MCKINSTRY CO LLC UBI No. 602569922 Phone 2067623311 Status Active Address Po Box 24567 License No. MCKINCL942DW Suite /Apt. License Type Construction Contractor City Seattle Effective Date 3/16/2006 State WA Expiration Date 3/16/2012 Zip 98134 Suspend Date County King Specialty 1 General Business Type Limited Liability Company Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status LYDIGML901JLLYDIG+ MCKINSTRY LLC Construction Contractor General Unused 4/13/2010 4/13/2012 Active WESTVI *121RF WESTVENT INC Construction Contractor General Unused 12/6/1988 9/1/1994 Archived MCKIN "372ND MCKINSTRY CO Construction Contractor General Unused 8/20/1963 1/2/2008 Relicensed Business Owner Information Name Role Effective Date Expiration Date PEDERSEN, JAMIE D Agent 03/16/2006 Amount ALLEN, DEAN CHARLES Partner /Member 03/16/2006 CP0399990301 MOORE, DOUGLAS JAMES Partner /Member 03/16/2006 ALLEN, DAVID EDWARD Partner /Member 03/16/2006 ZURICH AMERICAN INS CO TEPLICKY, JOSEPH WILLIAM Partner /Member 03/16/2006 Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 1 TRAVELERS CAS 8 SURETY CO 104702039 01/03/2006 Until Cancelled $12,000.00 03/16/2006 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 3 ZURICH AMERICAN INS CO CP0399990301 01/31/2009 01/31/2011 $2,000,000.0012 /07/2009 2 ZURICH AMERICAN INS CO CP03999903 01/31/2008 01/31/2009 $2,000,000.00 01/31/2008 1 CHARTER OAK FIRE INS CO DTC052D7193C0F07 01/31/2006 01/31/2009 $1,000,000.00 01/08/2008 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period https://fortress.wa.gov/lni/bbip/Print.aspx 08/24/2010 12x12 SL 12x12 2 "SL - ABBREVIATIONS GENERAL AD ACCESS DOOR ADJ ADJUSTABLE AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE AG ABOVE GROUND AMP AMPERE ARCH ARCHITECT; ARCHITECTURAL AUTO AUTOMATIC AUX AUXILIARY BD BHP BLDG BOP BOT BS BTU BTUH CA CAB COND C/L CLG CFM CLG CO CO2 COL CONC COND CONN CONSTR CONTR CTL DET DIA DIAL DIM DISCH DIV DN DS DWDI DWG DVN (EE) EC EL ELEC ELEV EP EQUIP ESP EXH EXIST (F) FA FC0 FDC FDN FIG FIN AO FLEX FIR FO FP FT FPM FTG FURN GA GALV GC GEN GPM GWB 11 HP HR HS HTG HTR ID BOARD BRAKE HORSEPOWER BUILDING BOTTOM OF PIPE BOTTOM BIRD SCREEN BRITISH THERMAL UNIT BRITISH THERMAL UNITS PER HOUR COMPRESSED AIR CABINET CONDENSATE CENTER UNE CEIUNG CUBIC FEET PER MINUTE CEIUNG CARBON MONOXIDE CARBON DIOXIDE COLUMN CONCRETE CONDENSER; CONDENSATE CONNECT; CONNECTION CONSTRUCTION CONTRACTOR CONTROL DETAIL DIAMETER DIAGONAL DIMENSION DISCHARGE DMSION DOWN DISCONNECT SWITCH; DOOR SWITCH DOUBLE WIDTH, DOUBLE INLET DRAWING DRAIN, WASTE, VENT EXISTING EACH ELECTRICAL CONTACTOR; END CAP ELEVATION ELECTRICAL ELEVATION ELECTRICAL PANEL; END PLUG EQUIPMENT EXTERNAL STATIC PRESSURE EXHAUST EXISTING FUTURE FAHRENHEIT ARE ALARM FLOOR CLEANOUT FIRE DEPARTMENT CONNECTION FOUNDATION FIGURE FINISH FURNISHED AND INSTALLED BY OWNER FLEXIBLE FLANGE FLOOR FUEL OIL ARE PROTECTION FEET PER MINUTE FOOT; FEET FOOTING FURNISH GAGE GALVANIZED GENERAL CONTRACTOR GENERATOR GALLONS PER MINUTE GYPSUM WALL BOARD HIGH HORSEPOWER; HIGH PRESSURE HEATING RETURN HEATING SUPPLY HEATING HEATER INSIDE DIAMETER /DIMENSION LAB LABORATORY LE LINEAL FOOT MAU MAX MBH MED NEZ MFR MH MIN MISC MID N/A NC NEG NEC NO NOM NTS OA OC OD OVHD .POC PRELIM PSI PSIG QTY R RAD REQD RPM SECT SF SIM SPEC SQ STD STRUC MAKE -UP AIR UNIT MAXIMUM 1000 BRITISH THERMAL UNITS PER HOUR MEDIUM MEZZANINE MANUFACTURER MANHOLE MINIMUM; MINUTE(S) MISCELLANEOUS MOUNTED NOT APPLICABLE NORMALLY CLOSED NEGATIVE NOT IN CONTRACT NORMALLY OPEN; NUMBER NOMINAL NOT TO SCALE OVERALL ON CENTER OUTSIDE DIAMETER OVERHEAD POINT OF CONNECTION PREUMINARY POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH GAUGE QUANTITY RELOCATED RADIUS REQUIRED REVOLUTIONS PER MINUTE SECTION SQUARE FOOT SIMILAR. SPECIFICATION SQUARE STANDARD STRUCTURAL TBD TOC TOS TYP UG UNO VAV VD VER VET VSD W/ W/0 HVAC AC ACT AHU BDD ROD CC CRU CT CV DB DIFF DMPR EA EAT ECG EF FCU FD FM FP FTU TO BE DETERMINED TENANT IMPROVEMENTS TOP OF CONCRETE TOP OF STEEL TYPICAL UNDERGROUND UNLESS NOTED OTHERWISE VARIABLE AIR VOLUME VOLUME DAMPER VERIFY VARIABLE FREQUENCY DRIVE VARIABLE SPEED DRIVE WITH WITHOUT AIR CONDITIONING ACOUSTICAL CEILING TILE AIR HANDUNG UNIT BACKDRAFT DAMPER BOTTOM OF DUCT COOLING COIL COMPUTER ROOM UNIT COOLING TOWER CONSTANT VOLUME DRY BULB DIFFUSER DAMPER EXHAUST AIR ENTERING AIR TEMPERATURE EGGCRATE GRILLE EXHAUST FAN FAN COIL UNIT ARE DAMPER FREQUENCY MODULATION FIRE PROTECTION; FAN POWERED FAN TERMINAL UNIT GRD GRILLE, REGISTER, DIFFUSER HC HR HVAC HEATING COIL HEATING RETURN HEATING, VENTILATION AND AIR CONDITIONING LAT LEAVING AIR TEMPERATURE LD LINEAR DIFFUSER MC MECHANICAL CONTRACTOR MECH MECHANICAL MOD MOTOR OPERATED DAMPER; MODULATING MUA MAKE UP AIR OA OVERALL; OUTSIDE AIR OBD OPPOSED BLADE DAMPER RA RAT RCP RTU sa SAT SD SF S /FD SL SLSM SM SP TDH TG TOD TSP UH WB WC WG RETURN AIR RETURN AIR TEMPERATURE REFLECTED CEIUNG PLAN ROOF TOP UNIT' SUPPLY AIR SUPPLY AIR TEMPERATURE SMOKE DAMPER SUPPLY FAN SMOKE FIRE DAMPER SOUND UNED SOUND LINED SHEET METAL SHEET METAL STATIC PRESSURE TOTAL DYNAMIC HEAD TRANSFER GRILLE TOP OF DUCT TOTAL STATIC PRESSURE UNIT HEATER WET BULB WATER COLUMN WATER GAUGE PLUMBING AD AREA DRAIN CO CLEAN OUT; CARBON MONOXIDE DCW DOMESTIC COLD WATER DHW DOMESTIC HOT WATER DHWC DOMESTIC HOT WATER RECIRCULATION DSP DRY STANDPIPE EWC ELECTRICAL WATER COOLER FD FLOOR DRAIN IE INVERT ELEVATION IN WC INCHES WATER COLUMN IW IONIZED WATER; INDIRECT WASTE NPCW NON POTABLE COLD WATER ORL OVERFLOW RAINWATER LEADER PD PLANTER DRAIN; PRESSURE DROP PERF PERFORATED PLBG PLUMBING PRV PRESSURE REDUCING VALVE RPBP REDUCED PRESSURE BACKFLOW PREVENTER SD STORM DRAIN SS SANITARY SEWER VTR VENT THROUGH ROOF W WASTE We WATER CLOSET WH WATER HEATER WSP WET STANDPIPE PIPING BP BACKFLOW PREVENTOR CD CONDENSATE DRAIN CHW CHILLED WATER CHR CHILLED WRIER RETURN CHS CHILLED WATER SUPPLY CT CONICAL TEE EWT FHV LWT TOP ENTERING WATER TEMPERATURE FIRE HOSE VALVE LEAVING WATER TEMPERATURE TOP OF PIPE PIPING IDENTIFICATION HVAC A COND -CDR - CDS CHS -CHR - G -HR- HS RL RS PLUMBING ST GRW GAW ID IRR NP ORL rW PSD ,RRWL — SD SS --UD- -V- W FIRE PROTECTION DSP FDC FP FW WSP A COND CDR CDS CHS CHR HR HS RL RS ST CW GRW GAW HW HWC ID IRR NPCW ORL PW PSD RWL RWL SD SS UD V W COMPRESSED AIR PIPE CONDENSATE DRAIN PIPE CONDENSER WATER RETURN PIPE CONDENSER WATER SUPPLY PIPE CHILLED WATER SUPPLY PIPE CHILLED WATER RETURN PIPE NATURAL GAS PIPE HEATING WATER RETURN PIPE HEATING WATER SUPPLY PIPE REFRIGERANT UQUID PIPE REFRIGERANT SUCTION PIPE STEAM SUPPLY COLD WATER PIPE (POTABLE) GREASE WASTE GARAGE WASTE HOT WATER PIPE (POTABLE) HOT WATER CIRCULATING (POTABLE) INDIRECT DRAIN IRRIGATION WATER PIPE NON- POTABLE CW PIPE OVERFLOW RAINWATER LEADER PUMPED WASTE PUMPED STORM DRAIN RAINWATER LEADER BELOW GRADE RAINWATER LEADER STORM DRAIN PIPE SANITARY SEWER PIPE (SITE) UNDERDRAIN PIPE VENT PIPE (SANITARY) WASTE PIPE WASTE PIPE BELOW GROUND DUCTWORK ACCESSORIES E=11*N- ERIE PIPING FITTINGS it! wtt 0 D 11 1+ {$I 1 +I VALVES A 16 i 1'N D4 PIPING ACCESSORIES ,w 4" 41w Q 0 1F WATTS /LF --1 RPBP 1 Y 0 0 DSP FDC FP WSP DRY STAND PIPE FIRE DEPT. CONNECTION PIPE FIRE SPRINKLER PIPE FlRE PROTECTION WATER PIPE FIRE PROTECTION WASTE PIPE WET STAND PIPE TEE W/PIPE UP TEE DOWN W /ELBOW TEE UP W/ ELBOW TEE UP TEE DOWN 90' ELBOW UP 90' ELBOW DN CAP UNION FLANGE FLEX HOSE CONNECTION DOUBLE BELLOWS FLEX CONNECTION SINGLE BELLOWS FLEX CONNECTION FLOW ARROW CONCENTRIC REDUCER ECCENTRIC REDUCER SLOPE SYMBOL BREAK OR CONTNUATION SYMBOL DOWN SPOUT NOZZLE CLEANOUT 45' ELBOW 45' ELBOW 90' ELBOW 90' ELBOW CROSS TEE WYE TAP HOSE CONNECTION MOTORIZED 2 -WAY VALVE MOTORIZED 3 -WAY VALVE PRESSURE REDUCING VALVE CONTROL VALVE RELIEF VALVE BALL VALVE 3 -WAY GATE VALVE BUTTERFLY VALVE DIAPHRAGM VAVVE CHECK VALVE NEEDLE VALVE GLOBE VALVE GLOBE VALVE ANGLE GLOBE VALVE 3 -WAY GATE PLUG VALVE BALANCING VALVE HOSE BIBB PUMP MANUAL AIR VENT AUTOMATIC AIR VENT HIGH CAPACITY AIR VENT SHOCK ARRESTOR FLOW SWITCH VACUUM BREAKER PRESSURE GAUGE TEMPERATURE SENSOR TEMPERATURE INDICATOR AUTO FLOW VALVE FLOW METER Y STRAINER Y STRAINER W/ BALL VALVE PIPE SLEEVE STEAM TRAP PETES PLUG HEAT TRACING SUCTION DIFFUSER W/ STRAINER REDUCED PRESSURE BACKFLOW PREVENTOR FUNNEL DRAIN FLOOR DRAIN ROOF DRAIN ROOF OVERFLOW DRAIN FLOOR SINK } AD AD R DUCTWORK f RECTANGULAR DUCT X RECTANGULAR DUCT RECTANGULAR DUCT RECTANGULAR DUCT BIRDSCREEN OR SCREENED OPENING SUPPLY GRILLE RETURN OR EXHAUST GRILLE VOLUME DAMPER MOTOR OPERATED DAMPER AIRFLOW MONITOR REMOTELY OPERATED VOLUME DAMPER (YOUNG REGULATOR OR APPROVED) BACK DRAFT DAMPER COORDINATE WITH CEILING APPURTENANCES. FLEX CONNECTION FIRE DAMPER THROUGH WALL FIRE DAMPER THROUGH FLOOR F1RE/SMOKE DAMPER THROUGH WALL ARE/SMOKE DAMPER THROUGH FLOOR ACCESS DOORS 1" ACOUSTICALLY LINED DUCT 2" ACOUSTICALLY UNED DUCT CHANGE OF ELEVATION RISE(R) DROP(D) TRANSITION TURNING VANES SMOKE DETECTOR RETURN / EXHAUST / OUTSIDE AIR SUPPLY / TRANSFER AIR TERMINAL UNITS - SEE SCHEDULE FOR TYPE SUPPLY AIR DUCT TURNING UP OR TOWARD SUPPLY AIR DUCT TURNING DOWN OR AWAY EXHAUST OR RETURN AIR DUCT TURNING UP OR TOWARD EXHAUST OR RETURN AIR DUCT TURNING DOWN OR AWAY ROUND DUCT TURNING UP OR TOWARD ROUND DUCT TURNING DOWN OR AWAY OVAL DUCT TURNING UP OR TOWARD OVAL DUCT TURNING DOWN OR AWAY FLEXIBLE DUCT INSTRUMENTATION AND CONTROLS THERMOSTAT SENSOR CARBON MONOXIDE SENSOR VISUAL ALARM LIGHT - WALL MOUNTED GRILLE /REGISTER/DIFFUSER DOUBLE LINE X t CEIUNG SUPPLY AIR DIFFUSER -► CEILING SUPPLY AIR DIFFUSER (SHOWN WITH THROW ARROWS) { CEIUNG RETURN, EXHAUST OR TRANSFER AIR GRILLE UNEAR DIFFUSER (CEILING) LINEAR DIFFUSER (WALL) LOUVER PLAN VIEW LOUVER (ELEVATION VIEW) HVAC - ANNOTATION VAV BOX TAG 1 -23 S C8 09 -A 000 000 S- C8 -09 -A I DUCT WORK, FLOOR 1 - DISCRETE BOX # SEE BELOW PRIMARY CFM FAN CFM ACOUSTICAL ACCESSORIES OF REQ'D) KW OF AUX. HEAT. VAV BOX SIZE; SEE SCHED. SERIES FAN POWERED BOX (S) PARAIIEL FAN POWERED BOX (P) 0 ROUND DUCT SYMBOL $ FLAT OVAL DUCT SYMBOL EQUIPMENT TAG EF -2 -1 -- CONSECUTIVE EQUIP. # FLOOR OF EQUIP. LOCATION EQUIPMENT DESIGNATION GRILLE, REGISTER, OR DIFFUSER TAG DT5 -6t8 CFM EACH l i SIZE TYPE CODE EQUIPMENT TAG LD5 /3 -300 CFM EACH UNEAR DIFFUSER GRILLE 1 �--- -- ACTIVE LENGTH IN FT. TOTAL LENGTH IN FT. TYPE CODE LOUVER TAG 81 -1 LOUVER TAG i-- CONSECUTIVE LOUVER #. FLOOR LOCATED FACADE DESIGNATION LEGAL DESCRIPTION GENERAL INFORMATION SYMBOLS xxxxxXXXXXXX X X NEW MECHANICAL WORK FUTURE 11 SCOPE & NEW WORK OTHER THAN MECHANICAL DEMO MECHANICAL WORK DETAIL OR DIAGRAM NUMBER SHEET NUMBER WHERE DETAIL /DIAGRAM SHOWN SECTION LETTER SHEET NUMBER WHERE SECTION SHOWN PLAN NUMBER SHEET NUMBER WHERE, PLAN SHOWN SEPARATE PERMIT REQUIRED FOR: Mechanical 1 Electrical ❑ Plumbing Gas Piping City of Tukwila ,Iii. D-iNG DIVISION NE 1/4 OF THE SE 1/4 AND SE 1/4 OF THE SE 1/4 OF SECTION 9 AND GOVT LOT 15 AND SW 1/4 OF THE SW 1/4 OF SECTION 10, T23N., R4E., W.M. CITY OF TUKWILA, KING COUNTY, WASHINGTON. REVISIONS No changes shall e made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. LOCATION / S REVISION NUMBER - DENOTES NUMBER AND DATE WHEN REVISION OR ISSUE OCCURED REVISION CLOUD - DENOTES AREA OF CHANGE DETAIL REFERENCE OUTUNE WITH NUMBER AND SHEET LOCATION MATCHUNE PLUMBING FIXTURE CALL -OUT (SEE PLUMBING SCHEDULES) KEY NOTE POINT OF CONNECTION POINT OF DEMOLITION CENTERUNE STRUCTURAL BEAM PENETRATION /c0DECOMPL(ANQE IEwE SDC 52 CENTRAL APPROVED "U�4 2'° PLANT PHASE 11 BUIL�p�NG VISION (SEE M503) For Th instry ife Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1- 800 - 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503 -331 -0234 www.mckinstry.com PROJECT: SABEY DATA CENTER STRUCTURAL BEAM HAUNCH (SEE M503) MOTOR GENERAL NOTES 1. VERIFY LOCATIONS AND DIMENSIONS OF ALL EQUIPMENT AND COORDINATE ALL WORK PRIOR TO START OF CONSTRUCTION. 2. OBTAIN APPROVAL OF STRUCTURAL ENGINEER ' PRIOR TO INSTALLATION OF PENETRATIONS NOT PREVIOUSLY COORDINATED OR AGREED ;;UPON, LE: ANCHOR BOLT DEPTHS, ETC. 3. CONCRETE EQUIPMENT CURBS, PIPING RAT , S ABS, SUMP BASINS, AND HOUSEKEEPING PADS ARE SHOWN FOR APPROXIMATE LOCATION N&SIZE AND ARE TO BE PROVIDED BY THE GENERAL CONTRACTOR. WHERE PROVIDED, REFER ft -STRUCTURAL INFO FOR ADDITIONAL DETAILS. 4. COMPLETION AND COMMISSIONING FOR 'MECHANICAL SYSTEMS: A. PROVIDE RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO THE OWNER (PER 2006 WASHINGTON STATE ENERGY CODE S 'ECTION 1416.2.4.3) B. PROVIDE TO THE OWNER ALL NECESSARY SYSTEM OPERATION AND MAINTENANCE MANUALS (PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.4.2) C. BALANCE ALL HVAC SYSTEMS AND PROVIDE TO THE OWNER A WRITTEN BALANCING REPORT (PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.2.1) D. EQUIPMENT /SYSTEMS TESTING SMALL BE PERFORMED IN ACCORDANCE WITH APPROVED PLANS (PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.3.1). E. TEST, CAUBRATE AND ADJUST ALL HVAC CONTROLS AND SEQUENCES OF OPERATION IN ACCORDANCE WITH THE APPROVED PLANS (PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.3.2), NECESSARY TESTS ARE IDENTIFIED IN 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.3.1; PREPARE A PREUMINARY COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS PRIOR TO ISSUANCE OF A FINAL CERTIFICATE OF OCCUPANCY (PER 2006 WASHINGTON STATE FINAL COMMISSIONING REPORT OF ENERGY 1 TEST PROCEDURES AND RESULTS (PER R TO THE OWNER A 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.5.2). 5. PERFORMANCE OF ALL NEW BUILDING MECHANICAL SYSTEMS WILL COMPLY WITH OR EXCEED THE MINIMUM REQUIREMENTS AS SET FORTH IN THE 2006 WASHINGTON STATE ENERGY CODE SECTION 1410 - GENERAL REQUIREMENTS. 6. MINIMUM VENTILATION QUAN1U1ES WILL COMPLY WITH OR EXCEED THE 2006 INTERNATIONAL MECHANICAL CODE. 7. ALL MOTORS WILL COMPLY WITH CHAPTER 15 OF THE 2006 WASHINGTON STATE ENERGY CODE. FOR ADDITIONAL DETAILS, SEE EQUIPMENT SCHEDULES CONTAINED WITHIN THIS DRAWING SET. 8. ALL SYSTEMS WILL BE INSULATED AS PRESCRIBED IN CHAPTER 14, TABLE 14 -5 OF THE 2006 WASHINGTON STATE ENERGY CODE. FOR ADDITIONAL DETAILS, SEE DUCTWORK AND PIPING SPECIFICATION MATRICES CONTAINED WITHIN THIS DRAWING SET. 9. VERIFY THAT ALL NECESSARY INFORMATION HAS BEEN PROVIDED PRIOR TO CONNECTION OF EQUIPMENT FURNISHED BY THE OWNER OR OTHERS. 10. FOR ADDITIONAL SYSTEM AND EQUIPMENT SEISMIC REQUIREMENTS, REFER TO STRUCTURAL INFORMATION (WHERE PROVIDED) AND PROJECT SPECIFIC SEISMIC DESIGN INFORMATION SHEET CONTAINED WITHIN THIS DRAWING SET. OR AS ATTACHED. DRAWING INDEX SHEET NUMBER SHEET TITLE P0.0 DRAWING INDEX, SYMBOLS AND ABBREVIATIONS P2.1 PLUMBING 1ST FLOOR PLAN P2.2 PLUMBING 2ND FLOOR PLAN P2.3 PLUMBING 3RD FLOOR PLAN P3.1 PLUMBING ENLARGED 1ST FLOOR PLAN P3.2 PLUMBING ENLARGED 2ND FLOOR PLAN P3.3 PLUMBING ENLARGED 3RD FLOOR PLAN P6.0 PLUMBING DIAGRAMS AND DETAILS P7.0 PLUMBING SCHEDULES 3355 S 120th Place Tukwila, WA 98168 woommosommemommosommi REGISTRATION: REVISIONS: 04/02/10 PERMIT SET FILE COPY Perm Plan review approval is subject to errors and omissions. kpproval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved-Red Copy and conditions is acknowledged: RECEIVED JUL 232010 PERMIT CENTER City Orfb- cl is NO. B LDINCbR R MON McKINSTRY DIVISION: DESIGNED BY: DRAWN BY: CHECKED BY: JOB NUMBER: DATE: SCALE: SHEET TITLE: ENGINEERING TONY MARINO EVA TATOSOVA BILL DAGGETT 35922 03/26/10 AS SHOWN DRAWINGS INDEX, SYMBOLS AND ABBREVIATIONS SHEET NUMBER: GIOO8 Po.o 2 n 0 0— 12 (13 X 0000 Ear (6) 0 "nnt egg' 19:' IMMIX El j r stafaszczatiagil llll /1/ r°•' tr w itlt T ,� al !`1., ., r _i 1 _.._.. r . .. , r' ,yam,,,..- .�.G id i x; II f II�I�fn�tHll "to mp -. .:,.{.4 ii ME.31 nix IMO 11 V • -1— Mr N. J m.- YJtl3 !:TY StC4t 5 ?o S. NC CT iiPJ,[E Y I F- OR - - -- 1 -1/2" FOS /FOR n 0- PHA, E2 00 PLUMBING 1ST FLOOR PLAN SCALE: 1/32" = 1' -0" 4) 5 __ ____j► 10 KEY NOTES 0 ISOLATE AND TEST EXISTING DOUBLE WALLED PIPE BETWEEN TANK AND POC. 20 INSTALL FUEL OIL PUMP FROM BUILDING STORAGE. CONNECT TO EXISTING FUEL 01L SUPPLY PIPE. CONNECT FUEL OIL RETURN PIPE TO TANK. ® CONNECT NEW FUEL OIL SUPPLY AND RETURN PIPE TO EXISTING. 40 TWO FOS AND TWO FOR PIPES IN EXISTING TRENCH TO DAYTANK. 0 EXISTING LEAK DETECTION AT LOW POINT IN TRENCH. SHEET NOTES 1. ALL FUEL OIL PIPING LOW POINTS SHALL HAVE SUMP WITH LEAK DETECTOR. 2. COORDINATE ALL WORK WITH PRE — PURCHASED EMERGENCY GENERATOR. 3. DAY TANK SHALL BE INSTALLED BY CONTRACTOR FOR EACH GENERATOR. CONTRACTOR SHALL PROVIDE ALL NECESSARY COMPONENTS INCLUDING VALVES, GAGES, FLEX CONNECTIONS AND FITTINGS AS INDICATED, SHOWN, OR REQUIRED. 4. AU. CONTROL AND POWER WIRING SHALL BE IN RIGID CONDUIT. � EVIEWEp Fair APPROVED AUG 2 4 2010 City of Tukwila BUILDING DIVISION N ?&1O oS'1 RECEIVED JUL 232010 PERMIT CENTER PROJECT: instry fe Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1- 800 - 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503 - 331 -0234 www.mckinstry.com SABEY DATA CENTER SDC 52 CENTRAL PLANT PHASE 11 3355 S 120th Place Tukwila, WA 98168. REGISTRATION: REVISIONS: 04/02/10 PERMIT SET N0. DATE McKINSTRY DIVISION: DESIGNED BY: DRAWN BY: CHECKED BY: JOB NUMBER: DATE: SCALE: SHEET TITLE: DESCRIPTION ENGINEERING TONY MARINO EVA TATOSOVA BILL DAGGEIT 35922 03/26/10 AS SHOWN PLUMBING 1ST FLOOR PLAN SHEET NUMBER: P2.1 0 0 0 0" OC) ) (\i/D • 1 ® Os Fr — — �l O J CJ 0 LF d r tri 4 — C9) 4 7- ARM I nifL 1 Hlm !IIIEI IT o 03 1 C)®®E:0® PLUMBING 2ND FLOOR PLAN SCALE: 1/32" = 11 -0" b b CODEIEWED FOR COMPLIANCE APPROVED COVED AUG 2 4 2010 Cityof Tukwila BUILDING DIVISION p6ioo89 RECEIVED JUL 2 3 2010 PERMIT CENTER PROJECT: instry fe Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1- 800 - 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503- 331 -0234 www.mckinstry.com SABEY DATA CENTER SDC 52 CENTRAL PLANT PHASE 11 3355 s 120th Place Tukwila, WA 98168 REGISTRATION: REVISIONS: 04/02/10 PERMIT SET NO. DATE DESCRIPTION McKINSTRY DIVISION: DESIGNED BY: DRAWN BY: CHECKED BY: JOB NUMBER: DATE: SCALE: SHEET TITLE: ENGINEERING TONY MARINO EVA TATOSOVA BILL DAGGEIT 35922 03/26/10 AS SHOWN PLUMBING 2ND FLOOR PLAN SHEET NUMBER: P2.2 i4 8 ii1_.._[ill MI:�. :ZL tini;UHHNN • • 11.11.11111IIIIIP' 0 0 E ) 1 PLUMBING 3RD FLOOR PLAN SCALE: 1/32' = 11 -0' 000 REVIEWED FOR COMPLIANCE APPROVED AUG 2 4 2010 Gilyorukwrila BUILDING moon, &tOO8? RECEIVED JUL 23 2010 PERMIT CENTER PROJECT: instry fe Of Your BuiNlfng SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1- 800 - 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503 -331 -0234 www.mckinstry.com SABEY DATA CENTER SDC 52 CENTRAL PLANT PHASE 11 3355 S 120th Place Tukwila, WA 98168 REGISTRATION:: REVISIONS: 04/02/10 PERMIT SET NO. DATE DESCRIPTION McKINSTRY DIVISION: DESIGNED BY: DRAWN BY: CHECKED BY: JOB NUMBER: DATE: SCALE: SHEET TITLE: ENGINEERING TONY MARINO EVA TATOSOVA BILL DAGGETT 35922 03/26/10 AS SHOWN PLUMBING 3RD FLOOR PLAN SHEET NUMBER: P2.3 FF 1r 1 POC TO EXISTING 3/4" HB -3 3 /4 "CW —DROP 3 /4 "CW tl 3 /4"CW P 4r AF'4111221111A 2" _M EM EM 1 AHU -52B2 AHU -52A3 SEE MECHANICAL DRAWINGS ABOVE BELOW FT- /1 L_ AHU -52D3 AHU -52C3 SEE MECHANICAL DRAWINGS ..;•. •.r.•. • ••.••.•ee. .e •.•.•.• .AMI Ti • MwelVP.;;•Alre• ;T. 41.•`6x'r • ,�• v : • • r i i • : • i • iii • 1 • i • • s • • 1 + t 1 •� y •4 III BELOW ;__•;•....:.;__...•t rr;.�.;f;.;_ '� SLAB N4 4 I t 4 °� •`r ►' .11 1 0: t: 3/4 "NPCW J LOCATE & CONNECT TO EXISTING VENT RISER (.1 (2 EACH) HEAT TRACE 2"1/ DN PROVIDE MOISTURE SENSOR CABLE AROUND SUMP PUMP BASIN MO ABOVE BELOW ElEAT TRACE GABLE ID I CUT, PATCH & MATCH EXISTING FLOOR, TYPICAL HEAT TRACE CONTROLLER CAP El 1 TING CW E. i• • r. • t. « t. t' t. 2 "P HEAT TRA CABLE Y + " + " + " + -i ".f ••:��- - - - .�..- .....rw .�w.v �t .rte. ��- a��+..�,.�,..�..��.xa i i i'�' 4_4 i; 446 ■a:e•_ : :i i:a Will ?�:i:i:.:a:i :a sti : ATIVI:�:t` M:�:a'.+:tis a: %Z• 46 4b� R42! r ••.4.4 - re.,rri E U . 1.4•4"14144 Ell rptt Ali V, ;::11:14: an 4 : i +'++4t+ ,4..4�t r +4t +i4,, 44�t #+��► r +4 +4 + ;4� r +i• +4 +44 ►#i +44.4 r. +444 i .. ... i ++ +444 •v.�ra� 4 raT•• .w r •r /44 .r. T.. 464 r .� I ;1.4� r .r.�.. - ► +.►« . p.. . ..4 f w"t'v +v'T'w'v+►•wei vin i int R"+R'�iwo r'w"+1. +'� *'+'t . ,t w n, , V .INN ,. + +... V + . V. +4 + +4.1 +41 + +4 ++„ 1 +, ► 4 + 4 � 1 { 4 4 4 w ++ 4 ++ ► # 1 i + 4 + 4 +i f+ 4 ^ ►W t i i + i ++ • 14 4 ++ +4 ,f + ++ Vo f+ win, 444 44 ". V 4. V 4•�f ilIVA i iCV.M..T.v ^Ti4+,TIA V.AAVA. *a►.+�0:40.0"YVAM..TA i►ALV I ► �� •VA ;.. -VA�ir..V.1�+ 1,X41 j :41MAAA#:iw1ai L.10 2.r�1f 0 41:W �'nr *WaLl40J%416L LJ41.4 1+ j {+ i; 1 •111111 Ell RUN FUEL OIL PIPE EXPOSED AT FLOOR FROM TRENCH TO GENERATOR P.O.C. GENER,ATO -R-- ROOM 1 108 1 APPROX 160 FT HEAT TRACING 5 W /FT, 1200 WATTS SEE 2/P6.0 FUEL TANK PIPING DIAGRAM E F 1 -1/2" FOSyFOR r.Y.�rr PLUMBING ENLARGED 1ST FLOOR PLAN SCALE: 1/811 = 1' -0" 0 4' 8' 16' 1 PW ._ ;.r*.s.w.•� Mr.I;V;w.•;*, 1■ •;•.•;•.IV•.v a .•e.rs;OM•ero• •.•;n ereMOMIIIVIrefererrillb. e;v.w.•;•r•.•.•�� �;rrPe•ell■ • • •r• SWITCH GEAR 1 155 1 PW O REVIEWED FOR CODE COMPLIANCE APPROVED AUG 2 4 2010 City of Tukwila BUILDING DIVISIf1N �G( RECEIVED JUL 2 3 2010 PERMIT CENTER instry le Of Year Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1 -800- 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503- 331 -0234 www.mckinstry.com PROJECT: SABEY DATA CENTER SDC 52 CENTRAL PLANT PHASE 11 3355 s 120th Place Tukwila, WA 98168 REGISTRATION: REVISIONS: 04/02/10 PERMIT SET NO. DATE DESCRIPTION McKINSTRY DIVISION: DESIGNED BY: DRAWN BY: CHECKED BY: JOB NUMBER: DATE: SCALE: SHEET TITLE: ENGINEERING TONY MARINO EVA TATOSOVA BILL DAGGETT 35922 03/26/10 AS SHOWN PLUMBING ENLARGED 1ST FLOOR PLAN SHEET NUMBER: P3.1 — — N -3/4 "NPCW FOR FUTURE SP -01 1 SEE P HEAT TRACE CONTROLLER CAP El 1 TING CW E. i• • r. • t. « t. t' t. 2 "P HEAT TRA CABLE Y + " + " + " + -i ".f ••:��- - - - .�..- .....rw .�w.v �t .rte. ��- a��+..�,.�,..�..��.xa i i i'�' 4_4 i; 446 ■a:e•_ : :i i:a Will ?�:i:i:.:a:i :a sti : ATIVI:�:t` M:�:a'.+:tis a: %Z• 46 4b� R42! r ••.4.4 - re.,rri E U . 1.4•4"14144 Ell rptt Ali V, ;::11:14: an 4 : i +'++4t+ ,4..4�t r +4t +i4,, 44�t #+��► r +4 +4 + ;4� r +i• +4 +44 ►#i +44.4 r. +444 i .. ... i ++ +444 •v.�ra� 4 raT•• .w r •r /44 .r. T.. 464 r .� I ;1.4� r .r.�.. - ► +.►« . p.. . ..4 f w"t'v +v'T'w'v+►•wei vin i int R"+R'�iwo r'w"+1. +'� *'+'t . ,t w n, , V .INN ,. + +... V + . V. +4 + +4.1 +41 + +4 ++„ 1 +, ► 4 + 4 � 1 { 4 4 4 w ++ 4 ++ ► # 1 i + 4 + 4 +i f+ 4 ^ ►W t i i + i ++ • 14 4 ++ +4 ,f + ++ Vo f+ win, 444 44 ". V 4. V 4•�f ilIVA i iCV.M..T.v ^Ti4+,TIA V.AAVA. *a►.+�0:40.0"YVAM..TA i►ALV I ► �� •VA ;.. -VA�ir..V.1�+ 1,X41 j :41MAAA#:iw1ai L.10 2.r�1f 0 41:W �'nr *WaLl40J%416L LJ41.4 1+ j {+ i; 1 •111111 Ell RUN FUEL OIL PIPE EXPOSED AT FLOOR FROM TRENCH TO GENERATOR P.O.C. GENER,ATO -R-- ROOM 1 108 1 APPROX 160 FT HEAT TRACING 5 W /FT, 1200 WATTS SEE 2/P6.0 FUEL TANK PIPING DIAGRAM E F 1 -1/2" FOSyFOR r.Y.�rr PLUMBING ENLARGED 1ST FLOOR PLAN SCALE: 1/811 = 1' -0" 0 4' 8' 16' 1 PW ._ ;.r*.s.w.•� Mr.I;V;w.•;*, 1■ •;•.•;•.IV•.v a .•e.rs;OM•ero• •.•;n ereMOMIIIVIrefererrillb. e;v.w.•;•r•.•.•�� �;rrPe•ell■ • • •r• SWITCH GEAR 1 155 1 PW O REVIEWED FOR CODE COMPLIANCE APPROVED AUG 2 4 2010 City of Tukwila BUILDING DIVISIf1N �G( RECEIVED JUL 2 3 2010 PERMIT CENTER instry le Of Year Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1 -800- 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503- 331 -0234 www.mckinstry.com PROJECT: SABEY DATA CENTER SDC 52 CENTRAL PLANT PHASE 11 3355 s 120th Place Tukwila, WA 98168 REGISTRATION: REVISIONS: 04/02/10 PERMIT SET NO. DATE DESCRIPTION McKINSTRY DIVISION: DESIGNED BY: DRAWN BY: CHECKED BY: JOB NUMBER: DATE: SCALE: SHEET TITLE: ENGINEERING TONY MARINO EVA TATOSOVA BILL DAGGETT 35922 03/26/10 AS SHOWN PLUMBING ENLARGED 1ST FLOOR PLAN SHEET NUMBER: P3.1 t DATA CENTER DAL.] 3/4 "NPCW UP & DN OFFICE 212 7'T 77.7 f.7 7.7.71.7T7 "7 7.7.1. `T I "/ I ! 77-7'77'77— 7...7-T--r7/'_ --i'7777-7-777-77T77-77-77-77-77-77'77-777-77_7_77-Z7'',2— t :i "7-77-77-777-7-7-77-77-7777-0- 1- - _„' -777 - ELEC. CLOSET �cJ ( DATA CENTER 260 COMMAND CENTER 253 STORAGE BUILD ROOM 256 1 "NPCW DN 111•1■111\ OFFICE 111 FE 9 VESTIBULE 251 FE 9 OFFICE 252 NN - fill• -I 7-77-77-7777 ...:.... ... . --- -- - - -- -- --- -- --- --- - --- --- --- --- - -- -- -- --- --- - — rr: : �r"r7; rr77" Trr' r�r�rrTrfrr> rrirF '����r�rrrririr— r-7r7 -777-777-777-777-77777-77-7 77-77-77—/-77 fri• /�i FD 7 4"W UP TO FS, FD TO BE LOCATED AT LOW POINT IN FLOOR 4"W UP TO FS, FD TO BE LOCATED AT LOW POINT IN FLOOR PLUMBING ENLARGED 2ND FLOOR PLAN GID SCALE: 1/8" = 1' -0" 0 4' 8' 16' FD W FD J L4 "W UP TO FS 4 "W UP TO FS REVIEWED FOR CODE COMPLIANCE AU b 2 4 2010 City of Tukwila BUILDING DIVISION P(71008(1 CORRECTION LTR - #. 0-0S1 PROJECT: For Tip instry fe Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1 -800- 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503 - 331 -0234 www.mckinstry.com SABEY DATA CENTER SDC 52 CENTRAL PLANT PHASE 11 3355 S 120th Place Tukwila, WA 98168 REGISTRATION: REVISIONS: 04/02/10 PERMIT SET 06/03/10 CD REVIEW SET 08/12/10 PERMIT CORRECTION 1 NO. DATE McKINSTRY DIVISION: DESIGNED BY: DRAWN BY: CHECKED BY: JOB NUMBER: DATE: SCALE: SHEET TITLE: DESCRIPTION ENGINEERING TONY MARINO EVA TATOSOVA BILL DAGGETT 35922 03/26/10 AS SHOWN PLUMBING ENLARGED 2ND FLOOR PLAN CITYOF RECEIVED LA AUG 2 vl)il) PERMIT CENTER SHEET NUMBER: P3.2 \i/ L.1\ 1 -1/4" COIL CONDENSATE DRAIN (TYP 4 PER SIDE) 1 -1 /4" DEC DRAI 1 -1/4" OVERFLOW DRAIN 3/4" MAKEUP WAT R TYP 1 PER SIDE PLUMBING ENLARGED 3RD FLOOR PLAN ar SCALE: 1 /r = 1' -0" 0 4' 8' 16' 0 SUPPLY DUCT (E) AHU -52A2 411 JiIiIH 'IIIN UP TO CHILLER PIPING CHILLED WATER MAKE —UP WATER ASSEMBLY (E) AHU -52A1 a1i WOMEN'S ROa 213 /. 0 PF -1 1 1/4" COIL CONDENSATE DRAIN (TYP 4 PER SIDE) 1 1/4" DEC DR 1-1/4" OVERFL( 3/4" MAKEUP TYP 1 PER SIDE IN W DRAIN TER REVIEWED FOR CODE COMPLIANCE APPROVED AL% 242010 City otTukwila BUILDING DIVIRION 212 r. 2 "UP TO ROOF (4) 2 "V DN 3 "V UP TO VTR ELEV #3 SECURITY EQUIP 331 1 LJ ?&ioo 89 RECEIVED CITY OF TUKWILA AUG' 12 2010 PERMIT CENTER PROJECT: For Th instry ile Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1 -800- 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503 - 331 -0234 www.mckinstry.com SABEY DATA CENTER SDC 52 CENTRAL PLANT PHASE 11 3355 S 120th Place Tukwila, WA 98168 REGISTRATION: REVISIONS: 04/02/10 PERMIT SET 06/03/10 CD REVIEW SET 08/12/10 PERMIT CORRECTION 1 NO. DATE McKINSTRY DIVISION: DESIGNED BY: DRAWN BY: CHECKED BY: JOB NUMBER: DATE: SCALE: SHEET TITLE: DESCRIPTION ENGINEERING TONY MARINO EVA TATOSOVA BILL DAGGETT 35922 03/26/10 AS SHOWN PLUMBING ENLARGED 3RD FLOOR PLAN SHEET NUMBER: P3.3 DAY TANK WILL INCLUDE: 1-71 FOR INTERCONNECTED DAY TANK PIPING ARRANGEMENTS. SEE FUEL OIL SYSTEM OPERATION NOTES: • LEAK DETECTION SENSOR FOR CONTAINMENT • FLOAT SWITCH - TWO 4 -LEVEL FLOAT SWITCH WITH BRASS STEM AND LOCKING RINGS. • LOW LEVEL - 45X FULL • SUPPLY PUMP ON - 507E FULL • SUPPLY PUMP OFF - 85X FULL • HIGH LEVEL ALARM / RETURN PUMP ON - 95% FULL • FUEL LEVEL GUUGE - FRACTIONAL LEVEL INDICATION. • CONTROL PANEL (SHIPPED LOOSE PROVIDED BY TANK MFR) SYSTEM REQUIREMENTS: 208 / 1 PH, 60 HZ. AS FUEL IS CONSUMED FROM THE DAY TANK, THE "SUPPLY PUMP ON" FLOAT WILL MAKE ON DROP, AUTOMATICALLY ENGAGING A SUPPLY PUMP. THE SUPPLY PUMP WILL REMAIN ENGAGED, FIUNG THE DAY TANK UNTIL THE "PUMPS OFF' FLOAT BRAKES ON RISE. SUPPLY PUMPS WILL AUTOMATICALLY ALTERNATE EACH TIME THE TANK CALLS FOR FUEL IF THE PRIMARY SUPPLY PUMP FAILS TO START ON A CALL FOR FUEL, THE LAG PUMP WILL COME ON AND THE SYSTEM WILL DISPLAY A "SUPPLY PUMP FAILURE" ALARM CONDITION. IF THE FUEL SHOULD EVER REACH A LOW CONDITION, THE LOW LEVEL FLOAT SWITCH WILL MAKE ON DROP. THE SYSTEM WILL DISPLAY A "LOW LEVEL" ALARM CONDT1ON AND SOUND THE PANEL MOUNTED ALARM BUZZER. IF THE FUEL SHOULD EVER EMPTY INTO A "FULL" TANK BEYOND THE PUMP OFF FLOAT, NE HIGH LEVEL FLOAT SWITCH WILL MAKE ON RISE. THE SYSTEM WILL DISPLAY A "HIGH LEVEL" ALARM CONDITION, SOUND THE PANEL MOUNTED ALARM BUZZER AND THE RETURN PUMP WILL ENGAGE. THE RETURN PUMP WILL REMAIN ENGAGED UNTIL THE "PUMP OFF' FLOAT MAKES ON DROP. IF LEAK DETECTOR SENSOR SWITCH MAKES, THE SYSTEM WILL DISPLAY A "DAYTANK BASIN LEAK DETECTED" ALARM CONDITION AND SOUND THE PANEL MOUNTED ALARM BUZZER. THE SUPPLY PUMPS WILL BE LOCKED OUT IF THE SYSTEM RECENES A LEAK DETECTED, OR A HIGH LEVEL OR LOW LEVEL SIGNAL UNTIL THE ALARM IS CLEARED AND THE SYSTEM IS RESET. 1 — REVIEWED FOR CODECOMPLIANQE APPROVED AUG 2 4 2010 Ci Tukwila BUILDING BUILDING DIVISION UP H--''q inittNGA fig. + I. a °; • • . Fs• Fs. P&Io 08 9 tib PLUMBING ISOMETRIC DIAGRAM NOT TO SCALE ,s"v . ruoF it OVERSIZE CORE DRILL SLAB TO FIT DRAIN CLAMPING RING W/ SPACE FOR SEAL & GROUT INSULATE FIRST (5) FEET OF DRAIN PIPING NON- SHRINK GROUT FLOOR SEALANT CORE DRILL SLAB TO FIT DRAIN BODY J. SHEET METAL PAN W/ 2" TURNUP SEALED EDGES CDFLOOR DRAIN DETAIL SCALE: NOT m SCALE SCALE: NOT TO SCALE NORMAL FLOW EACH GENERATOR IS SERVED BY ITS DEDICATED DAY TANK. r -I dos' Lcf- 4 Lam_ -FOR ---I r - -- j NC I NC _J I DT- 1 GEN. 1 o GEN. 2 EMERGENCY FLOW DT -2 EITHER DAY TANK CAN PROVIDE FUEL FOR EITHER (0R BOTH) GENERATOR(S). FAILURE OF DAY TANK 11 SHOWN. INTERCONNECTED DAY TANK PIPING DIAGRAM NOT TO SCALE CONNECT TO EXPANSION TANK PIPING FILL STATION ON WALL OF ROOM EMERGENCY FlLL SOLENOID VALVE NORMAL FILL SOLENOID VALVE NO$ NO a4-'4211i 14.1 1 " Fos —�--Ib NC II Cn o: 0 0 0 0 SET TO 15 PSI BYPASS VALVE FAST FILL UNE L J SYSTEM FILL ASSEMBLY DIAGRAM - FOR REFERENCE ONLY MOISTURE SENSING CABLE COORDINATE W/ CONTROLS ..-: SUBCONTRACTOR SCALE: NOT TO SCALE CONTROLLER MTD ON STRUT FRAME SECURED TO THE FLOOR DISCHARGE PIPE WIRING TO CONTROL PANEL (BY ELEC. CONTRACTOR) GAZE VALVE, 1YP. CHECK VALVE, 1YP. COATED STEEL COVER GROUT WATER TIGHT • DISCHARGE SUMP PUMP 0 MINIMUM 4" COMPACTED SUB -BASE, SEE MANUF. REQIUREMENTS. 0 MINIMUM 4" BACKFILL MATERIAL SEE MANUF. REQIUREMENTS. O PUMP CYCLE DEPTH VARIES. Q BASIN DEPTH 48' X 36" DIAMETER. isaNC DUPLEX SUBMERSIBLE SUMP PUMPS DETAIL- FOR REFERENCE ONLY SCALE NOT TO SCALE TO FUEL OIL RETURN FLOW SWITCH NO NO, w I ILI 1 FOS NC 1 "BYPASS ' I 1 -1/2" NO FUEL OIL SUPPLY LEAK DETECTOR FUEL 011_ OVERFLOW LEVEL CONTROLLER PRIMARY TANK EMERGENCY VENT r L NORMAL VENT 12 CV FUEL OIL OVERFLOW PUMP (SEE NOTE) PRESSURE RELIEF VALVE SECONDARY TANK EMERGENCY VENT 11 41FUEL PUMP OFF I &FUEL PUMP ON q3 LOW LEVEL ALARM - r r HIGH LEVEL ALARM 1 OVERFLOW PUMP ON 11 —GENERATOR FUEL SUPPLY JL 11 11 11 11 11 11 ANTISIPHON VALVE FIRE SAFETY IIVALVE I HO _— FOR —fib LG FO 1 FUEL PURIFIER (TYP) LEVEL GAUGE NOTE: ONE RETURN PUMP PER DAYTANK. SEE SCHEDULE, SHEET P7.0 (FOP 5202 -A & FOP 5202 -B) J. II 11 11 11 11 11 11 11 ■ 1 J GEN. SET RUPTURE BASIN DIP TUBE (1YP) DOUBLE POPPET FOOT VALVE (TYP) DAY TANK PIPING DIAGRAM (TYP. EACH GEN. SET) NOT TO SCALE PROJECT: For Th instry ife Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1 -800- 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503- 331 -0234 www.mckinatry.com SABEY DATA CENTER SDC 52 CENTRAL PLANT PHASE 11 3355 S 120th Place Tukwila, WA 98168 REGISTRATION: REVISIONS: 04/02/10 PERMIT SET 06/03/10 CD REVIEW SET 08/12/10 PERMIT CORRECTION 1 NO. DATE McKINSTRY DIVISION: DESIGNED BY: DRAWN BY: CHECKED BY: JOB NUMBER: DATE: SCALE: DESCRIPTION ENGINEERING TONY MARINO EVA TATOSOVA BILL DAGGETT 35922 03/26/10 AS SHOWN SHEET TITLE: PLUMBING DIAGRAMS AND DETAILS SHEET NUMBER: CITY C CF TUKWILA Alt 12 2010 PERMIT CENTER P6.0 DAY TANK SCHEDULE TAG DT -52 -1 (EXISTING) DT -52 -2 (EXISTING) DT -52 -3 DT -52 -4 QUANTITY 1 1 1 1 BASIS OF DESIGN ACE TANK ACE TANK ACE TANK ACE TANK MODEL NUMBER AC00280U2R1 AC00280U2R2 AC00280U2R2 AC00280U2R2 SERVICE FUEL OIL FUEL OIL FUEL OIL FUEL OIL LOCATION GENERATOR ROOM GENERATOR ROOM GENERATOR ROOM GENERATOR ROOM CAPACITY 280 GALLONS 280 GALLONS 280 GALLONS 280 GALLONS WEIGHT (EMPTY) 625 LBS 625 LBS 625 LBS 625 LBS FUEL OIL PUMP SCHEDULE TAG FOP- 52 -A1, FOP -52 -B1 (EXISTING) FOP- 52 -C1, FOP -52 -D1 QUANTITY 2 2 BASIS OF DESIGN RED JACKET RED JACKET MODEL NUMBER P75S1 P75S1 SERVICE FUEL OIL FUEL OIL LOCATION MAIN FUEL OIL TANK MAIN FUEL OIL TANK FLOW 40 GPM 40 GPM FT. TOTAL HEAD 60 60 MAX FLUID PRESSURE PSIG YES (NOT UPS) E —POWER GPM X GLYCOL IN FLUID NONE NONE MOTOR HP 3/4 3/4 MOTOR BRAKE HP NA NA MOTOR TYPE NA NA VOLTAGE /PHASE 208/230 1PH 208/230 1PH MOTOR EFFICIENCY PER WSEC PER WSEC VFD NO NO STARTER, DISCONNECT BY ELEC BY ELEC NOTE: MAIN FUEL OIL TANK PUMPS ARE EXISTING IN BUILDING STORES; DAYTANK PUMPS ARE NEW. SUMP PUMP (FOR REFERENCE ONLY) TAG # SP -52 -1 (EXISTING) LOCATION UPS ROOM MANUFACTURER WEIL MODEL 1413 STYLE DUPLEX ALTERNATING — SUMP SERVICE SANITARY SUMP GPM 25 GPM HEAD PRESSURE (FT. HD) 30 FT HD DISCHARGE 2" MOTOR HP 1 HP RPM 1,750 RPM VOLTAGE / PHASE 460V / 3 PH GENERATOR POWER YES (NOT UPS) E —POWER GPM 175 GPM E —POWER BHP 15 HP STARTER BY MFR DISCONNECT BY MFR MOTOR EFFICIENCY PER SEC CONTROL MOISTURE SENSOR & TEMP LIMITER SUMP COVER COATED STEEL WEIGHT 85 LBS PLUMBING FIXTURE SCHEDULE ITEM MODEL CONNECTION cw HW W V RWL ORL FD -1 FLOOR DRAIN MECHANICAL ROOM EXPANSION JOINTS FIXTURE: TRAP PRIMER: ZURN —ZN- 415 —(SIZE PER PLAN) NL -7I, TYPE T STRAINSER WfTH RAISED LID AS REQUIRED BY CODE 1/2 ** — SEE PLAN 2 — — RPBP -52 -1 REDUCED PRESSURE BACKFLOW PREVENTOR FIXTURE: I WILKENS 1" MODEL NO. 375 SERIES SEE PLAN MINIMUM RESSURE MAXIMUM TEST PRESSURE MINIMUM DURATION FIBERGLASS 0.5 PRV -1 PRESSURE REDUCING VALVE AT CHILLED WATER FILL ASSBLY THE ABOVE DATA SHALL NOT BE USED FOR ELECTRICAL,STRUC OR ARCHITECTURAL COORDINATION. USE ONLY APPROVED MANUFACTURER'S SUBMITTAL DATA ONLY. * MINIMUM AS INDICATED ** TRAP PRIMER ONLY C P .. ANce t ti 4.06,1 BUILDINGpI p 1)610 -D $9 PIPE & EQUIPMENT INSULATION SCHEDULE PIPING SYSTEM HVAC PIPING SPECIFICATIONS SERVICE ID SERVICE DESCRIPTION OCATION /AREA DESIGN PRESSURE (PSIG) SIZE MATERIAL CONNECTION TYPE & FITTINGS FLANGES, UNIONS & CPLGS FLEX CONNECTIONS EXPANSION JOINTS ISOLATION VALVE TYPE ISOLATION VALVE ACTUAL MFR & MODEL CHECK VALVE ACTUAL MFR & MODEL BALANCE VALVE MFR & MODEL STRAINERS ACTUAL MODEL PRESSURE GAUGES ACTUAL MODEL TEMPERATURE GAUGES ACTUAL MODEL TEST PROCEDURE NOTE: ISOLATE ALL EQUIPMENT PRIOR TO TESTING TEST PRESSURE (PSIG) [3] INSULATION CATEGORY . SEISMIC BRACING IMPORTANCE FACTOR REMARKS MEDIA MINIMUM RESSURE MAXIMUM TEST PRESSURE MINIMUM DURATION FIBERGLASS 0.5 0.5 25 2* 2 AND SMALLER. CARBON STEEL PIPE A53B ERW STANDARD WEIGHT SOCKETWELD WHERE CONCEALED OR INACCESSIBLE, THREADED ELSEWHERE M.I. UNION Anvil Fig. 463 Class 150 300 psi WOG INCLUDED IN FUEL PACKAGE SUBMITTAL ALL 0.23 -0.27 75 FIBERGLASS 0.5 0.5 0.5 0.5 WATER OR AIR WATER: 150% OF MAX.OPER. PRESSURE AIR: 110% OF MAX. OPER. PRESSURE, NOT LESS THAN 5 PSIG 1 PRESSURE ANY COMPONENT OR 90% OF YIELD TO DELESS N PRESSURE FOR MINUTES, 4 HOURS AND PERFORM A VISUAL INSPECTION WITH NO LEAKS 1.5 FOV FUEL OIL VENT' ALL 2 -1/2" AND LARGER BUTTWELD 1501 WELD NECK FLANGE FOS & R FUEL OIL SUPPLY & RETURN ALL 125 2" AND SMALLER PVDF DOUBLE WALL PIPE SOCKETWELD WHERE CONCEALED OR INACCESSIBLE, THREADED ELSEWHERE M.I. UNION Anvil Fig. 463 Class 150 300 psi WOG INCLUDED IN FUEL PACKAGE SUBMITTAL WATER OR AIR WATER: 150X OF MAX.OPER. PRESSURE AIR: 110X OF MAX. OPER. PRESSURE, NOT LESS THAN 5 PSIG MAX. ALLOWABLE TEST PRESSURE ANY COMPONENT OR 90% OF YIELD NOT LESS THAN 10 MINUTES, LOWER TO DESIGN PRESSURE FOR. 24 HOURS AND PERFORM A VISUAL INSPECTION WITH NO LEAKS 1.5 2 -1/2" AND LARGER BUTTWELD 150f WELD NECK FLANGE GEX GENERATOR EXHAUST ALL 150 ALL CARBON STEEL PIPE A53B ERW STANDARD WEIGHT B LD 150 WELD NECK FLANGE PROVIDED BY OTHERS UNISOURCE SERIES Cr N/A N/A N/A N/A GENERATOR EXHAUST In 1100 1.5 PIPE & EQUIPMENT INSULATION SCHEDULE PIPING SYSTEM TEMP RANGE THERMAL COND. MEAN RAT. TEMP. INSULATION MATERIAL INSULATION THICKNESS BY PIPE SIZE INSUL. C HANGERS RUNOUTS TO 2" (2) 1' AND LESS 1 1147 TO 2' 2 1/2" TO 4" 5" TO 6" OVER 6" NON— POTABLE COLD ALL 0.23 -0.27 75 FIBERGLASS 0.5 0,5 0.5 0.5 0.5 0.5 ( NOTES 4. 5 vCHILLED WATER 40 -55 0.23 -0.27 75 FIBERGLASS 0.5 0.5 0.75 1.0 1.0 1.0 NOTES 4, 5 ICOIL CONDENSATE ALL 0.23 -0.27 75 FIBERGLASS 0.5 0.5 0.5 0.5 0.5 0.5 NOTES 4, 5 NOTES 1 HOT AND COLD PIPES LARGER THAN 2 ": RIGID INSERTS. INSULATION CONTINUOUS THROUGH THE HANGER. SHEETMETAL SHIELD. 2 COLD PIPES 2" AND SMALLER: RIGID INSERTS. INSULATION CONTINUOUS THROUGH THE HANGER. SHEETMETAL SHIELD. 3 JACKETING: METAL JACKET (SEALED WEATHER TIGHT) WILL BE USED AT ALL EXTERIOR INSULATION EXPOSED TO WEATHER (I.E.ROOFTOP PIPING). PVC JACKET WITH RIGID RIGID CALCIUM SILICATE INSULATION WILL BE USED ON ALL HORIZONTAL PIPING AT OR NEAR THE FLOOR SUBJECT TO POTENTIAL FOOT TRAFFIC. PVC JACKET WILL BE UTILIZED ON ALL EXPOSED INSULATION WITHIN 6 FEET OF THE FLOOR ELEVATION (LE. MECHANICAL ROOMS AND GARAGE HOSE BIBBS). PVC IS RECOMMENDED INSTEAD OF METAL IN EXPOSED AREAS DUE TO ITS RESILIENCY —METAL JACKETS DENT. RECEIVED JUL 2 3 2010 PERMIT CENTER PROJECT: For Th instry fe Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1 -800- 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503 -331 -0234 www.mckinstry.com SABEY DATA CENTER SDC 52 CENTRAL PLANT PHASE 11 3355 S 120th Place Tukwila, WA 98168 REGISTRATION: REVISIONS: 04/02/10 PERMIT SET NO. DATE DESCRIPTION McKINSTRY DIVISION: DESIGNED BY: DRAWN BY: CHECKED BY: JOB NUMBER: DATE: SCALE: ENGINEERING TONY MARINO EVA TATOSOVA BILL DAGGETT 35922 03/26/10 AS SHOWN SHEET TITLE: PLUMBING SCHEDULES SHEET NUMBER: P7.