HomeMy WebLinkAboutPermit PG10-089 - SABEY DATA CENTERSABEY DATA CENTER
3355 S 120 PL
PG1 0-089
City oFI'ukwila
•
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Inspection Request Line: 206 - 431 -2451
Web site: http: / /www.ci.tukwila.wa.us
Parcel No.: 1023049082
Address: 3355 S 120 PL TUKW
Project Name: SABEY DATA CENTER
PLUMBING /GAS PIPING PERMIT
Permit Number:
Issue Date:
Permit Expires On:
PG 10 -089
08/24/2010
02/20/2011
Owner:
Name: SABEY CORPORATION
Address: 12201 TUKWILA INTL BLVD , 4TH FLOOR 98168
Contact Person:
Name:
Address:
Email:
Contractor:
Name:
Address:
EASA NOUROUZEE
5005 3RD AV S , SEATTLE WA 98134
EASAN @MCKINSTRY.COM
MCKINSTRY CO LLC
PO BOX 24567 , SEATTLE WA 98134
Contractor License No: MCKINCL942DW
Phone: 206 - 391 -6926
Phone: 206 762 -3311
Expiration Date: 03/16/2012
DESCRIPTION OF WORK:
INSTALL (2) FLOOR DRAINS AND (2) FLOOR SINKS ON 3RD FLOOR OF SABEY DATA CENTER
PLANT
FUEL SCOPE: TIE INTO EXISTING FUEL TAPS AND RUN TO (2) NEW FUEL DAY TANKS. RUN
FUEL OIL PIPE TO (2) NEW GENERATORS.
Value of Plumbing /Gas Piping:
Fees Collected:
$14,800.00
$171.94
Permit Center Authorized Signature:
I hereby certify that I have read and exa
governing this work will be complied wi
e
w
Uniform Plumbing Code Edition: 2009
International Fuel Gas Code Edition: 2009.
Date: 01A 7i`I.1. 4
this permit and know the same to be true and correct. All provisions of law and ordinances
ether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or Ske;performance of work. I am authorized to sign and obtain this plumbing /gas piping permit. l P /
Date: .g/i /l
Signature:
Print Name:
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
doc: UPC -4/10
PG 10 -089
Printed: 08 -24 -2010
•
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206 - 431 -3665
Web site: http://www.ci.tukwila.wa.us
Parcel No.: 1023049082
Address:
Suite No:
Tenant:
3355 S 120 PL TUICW
SABEY DATA CENTER
PERMIT CONDITIONS
Permit Number:
Status:
Applied Date:
Issue Date:
PG 10 -089
ISSUED
07/23/2010
08/24/2010
1: ** *PLUMBING AND GAS PIPING * **
2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila
Building Division.
3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing
inspector.
4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas
Code.
5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved.
6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code.
Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to
make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection.
7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless,
adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the
conditioned space shall be insulated to minimum R -3.
8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be
protected by steel nail plates not less than 18 guage.
9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing
piping shall be directly embedded in concrete or masonry.
10: All pipes penetrating floor /ceiling assemblies and fire - resistance rated walls or partitions shall be protected in
accordance with the requirements of the building code.
11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to
twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill,
frozen earth, or construction debris.
12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the
jurisdiction.
* *continued on next page **
doc: Cond -10/06
PG10 -089 Printed: 08 -24 -2010
•
wq� City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing
this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating
construction or the performance of work.
Signature:
Print Name:
Date:
doc: Cond -10/06
PG 10 -089 Printed: 08 -24 -2010
CITY OF TUKWILA
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.citukwila.wa.us
Plumbing /Gas Permit No.
Project No..
(For office use only)
PLUMBING / GAS PIPING PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *Please Print **
SITE LOCATION
King Co Assessor's Tax No.: 1023049082
Site Address: 3355 S 120th PL. Tukwila, WA 98168
Suite Number: Floor:
Tenant Name: Sabey Data Center New Tenant: ❑ Yes
Property Owners Name: Sabey Corporation
Mailing Address: 12201 Tukwila Intl. Blvd. 4th floor
Tukwila
WA
City
State
3rd
..No
98168
Zip
CONTACT PERSON -Who do we contact when your permit is ready to be issued'`
Name: Easa Nourouzee
Mailing Address: 5005 3rd Ave S
E -Mail Address: easan @mckinstry.com
Day Telephone: (206) 391 -6926
Seattle
City
WA
State
98134
Fax Number: (206) 716 -3424
Zip
PLUMBING / GAS PIPING CONTRACTOR INFORMATION
Company Name: McKinstry Co.
Mailing Address: 5005 3rd Ave S
Contact Person: Easa Nourouzee
E -Mail Address: easan @mckinstry.com
Contractor Registration Number: MCKINCL942DW
Seattle WA
City State
Day Telephone: (206) 391 -6926
Fax Number: (206) 716 -3424
Expiration Date: 03/16/2012
98134
Zip
ARCHITECT OF RECORD — All plans must be stamped by Architect of Record.
Company Name:
Mailing Address:
Contact Person:
E -Mail Address:
City
Day Telephone:
Fax Number:
State
Zip
ENGINEER OF RECORD — All plans must be stamped by Engineer of Record
Company Name: McKinstry
Mailing Address: Same as above
Contact Person: Tony Marino
E -Mail Address: tonym @mckinstry.com
City State Zip
Day Telephone: (206) 832 -8462
Fax Number:
H:\Applrcauons\Forms- Applicauons On Line \2010 Applications \7 -2010 - Plumbing -Gas Piping Permit Application.doc
Revised: 7 -2010
bh
Page 1 of 2
. •
Valuation of Project (contractor's bid price): $ 14,800
Scope of Work (please provide detailed information): Install (2) floor drains and (2) floor sinks on 3rd floor of Sabey
Data Center Central Plant
Building Use (per Int'1 Building Code):
Occupancy (per Intl Building Code):
Utility Purveyor: Water: Sewer:
Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below:
Fixture Type:
Qty
Fixture Type:
Qty
Fixture Type:
Qty
Fixture Type:
Qty
Bathtub or combination
bath/shower
Bidet
Clothes washer, domestic
Dental unit, cuspidor
Dishwasher, domestic,
with independent drain
Drinking fountain or
water cooler (per head)
Food -waste grinder,
commercial
Floor Drain
of
Shower, single head trap
Lavatory
Wash fountain
Receptor, indirect waste
Sinks
Urinals
Water Closet
Building sewer and each
trailer park sewer
Rain water system — per
drain (inside building)
Water heater and/or vent
Industrial waste treatment
interceptor, including trap
and vent, except for kitchen
type grease interceptors
Each grease trap
(connected to not more
than 4 fixtures - <750
gallon capacity)
Grease interceptor for
commercial kitchen ( >750
gallon capacity)
Repair or alteration of
water piping and/or water
treatment equipment
Repair or alteration of
drainage or vent piping
Medical gas piping
system serving 1 -5
inlets /outlets for a
specific gas
Each additional medical
gas inlets /outlets greater
than 5
Backflow protective
device other than
atmospheric -type vacuum
breakers 2 inch (51 mm)
diameter or smaller
Backflow protective device
other than atmospheric -type
vacuum breakers over 2
inch (51 mm) diameter
Each lawn sprinkler
system on any one meter
including backflow
protection devices
Atmospheric -type vacuum
breakers not included in
lawn sprinkler backflow
protections (1 -5)
Atmospheric -type
vacuum breakers not
included in lawn
sprinkler backflow
protections over 5
Gas piping outlets
PERMIT APPLICATION NOTES
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing
and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER OR AUTHORIZED AGENT:
Signature:
Date:
7/23/10
Print Name: Easa Nourouzee Day Telephone: 206- 391 -6926
Mailing Address: 5005 3rd Ave S Seattle WA 98134
City
Date Application Accepted: 01/d31/ U
Date Application Expires: U / /93//1
State
Staff Initials:
Zip
H:\Applications\Fonns- Applications On Line \20I0 Applications \7 -2010 - Plumbing -Gas Piping Permit Application.doc
Revised: 7 -2010
bh
Page 2 of 2
•
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206 - 431 -3665
Web site: hqx/Iwww.ci.tukwila.wa.us
Parcel No.: 1023049082
Address: 3355 S 120 PL TUKW
Suite No:
Applicant: SABEY DATA CENTER
RECEIPT
Permit Number: PG10 -089
Status: APPROVED
Applied Date: 07/23/2010
Issue Date:
Receipt No.: R10 -01663
Initials:
User ID:
JEM
1165
Payment Amount: $137.55
Payment Date: 08/24/2010 12:26 PM
Balance: $0.00
Payee: MCKINSTRY CO. SERVICE ACCOUNT
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Check 11083 137.55
Authorization No.
ACCOUNT ITEM LIST:
Description
Account Code Current Pmts
PLUMBING - NONRES
000.322.103.00.00 137.55
Total: $137.55
PAYMENT
RF('PI\FFfl
doc: Receiot -06 Printed: 08 -24 -2010
•
wq� City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206 - 431 -3665
Web site: http://www.ci.tulcwila.wa.us
RECEIPT
Parcel No.: 1023049082 Permit Number: PG 10 -089
Address: 3355 S 120 PL TUKW Status: PENDING
Suite No: Applied Date: 07/23/2010
Applicant: SABEY DATA CENTER Issue Date:
Receipt No.: R10 -01393
Initials:
User ID:
Payee:
LAW
1632
Payment Amount: $34.39
Payment Date: 07/23/2010 10:20 AM
Balance: $137.55
MCKINSTRY CO
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Check 11028 34.39
Authorization No.
ACCOUNT ITEM LIST:
Description
Account Code Current Pmts
PLAN CHECK - NONRES
000.345.830 34.39
Total: $34.39
PAYMENT
RECEIVED
doc: Receipt -06 Printed: 07 -23 -2010
INSPECTION RECORD
Retain a copy with permit
INSPECTtO NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451 1r-
FGro -oe9
Project:
5AbH D 774
Type of I�ection: 1
/ -',V&
Address:
33c< S
izo''Z.-
Date Called:
Special tnsiructions:
Date Wanted: (►:-
02 m2- - 1I ��{
Requester:
e 154 - 35/ -6) SL
Phone No:
_ 762- 33 1
Approved per applicable codes.
Corrections required prior to-approval.
COMMENTS:
PP/`m ¢- Co-n4 p 1 f.' //-7 /Am-/
N
Date:
aZ -2 -//
I pector .
f (1114.47 1 L( /a 1.4
R NSPECTION FEE REQ RED. Prio( to next inspection. fee must be
pid at 6300 Southcenterblvd., Suite 100. Call to schedule reinspection.
INSPECTION RECORD
Retain a copy with permit
?6(0 -O
INSPECTION N0. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
Project:
�� o.''� Ce21'
Type of Inspectio
l �...
[)L4-V
A dress: �;
Date Called:
Special Instructions:
2-
s
( -�
_ i
Date Wanted:
a.n
Requester:
Phone No:
-4/23
— 3 9 7
prov .er •pplicable c
COMMENTS:
Corrections required prior to approval.
PA/'i "1,44 A-1) rd cl
i o J- 1 �d S rl D4
F
Date: c, _ & J
n REINSPECTION FEE REQUIRED. I rior to next inspection. fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
INSPECTION RECORD
Retain a copy with permit ot-o8
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670
Project: �� �y�f 1 Q ,
"n Cb' tom+' i li�V
Typ of IIns�pection':•
�t/w"1�— ITV
Address: `
\'x..20 t S \20 ? L-
Date Called:
Special Instructions:
llv ,
W
Date Ing 1 to a.m
. i (J p.m.
- Requester: � 3r' — (07 1"7
"l
Phone No:
av G 1423 -C si`z
Approved per applicable codes. El Corrections required prior to approval.
C01►4 ENTS:
,?oti(n -',,.1 - . ICAO I►i.,r%1s kl
ic
to O' .
€ '
. Ql csa .,.iJ vS 4- V
ate\
®%:'A.3 G, ,(9vim ik.,�`O
?9 J 'M r-' 1
nspecto
Date:
1.1111wrisas,i4rid1
❑ $61.00 EINSPECTION FEE R QUIRED. Pri
p• id a 6300 Southcenter Blvd., uite 100.
Recei•t o.:
r to inspection, fee must be
all to schedule reinspection.
Date:
.,._..�,-- �.�- t,.a�.s.��. + v-1.-. � ,,�.a.xs....���tb..- ...�..h,,.. � �.. _ axz .e.,...�......ti_�,•.o-.,.�,F..
City of Tukwila
Jim Haggerton, Mayor
r v Department of Community Development Jack Pace, Director
02 -01 -2011
EASA NOUROUZEE
5005 3RD AV S
SEATTLE WA 98134
RE: Permit No. PG10 -089
3355 S 120 PL TUKW
Dear Permit Holder:
In reviewing our current records, the above noted permit has not received a final inspection by the City of
Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform
Plumbing Code and /or the National Electric Code, every permit issued by the Building Division under the
provisions of these codes shall expire by limitation and become null and void if the building or work authorized
by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work
authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180
days. Your permit will expire on 03/07/2011.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final
inspection. Each inspection creates a new 180 day period, , provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is
due to expire. Address your extension request to the Building Official and state your reason(s) for
the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is
determined that your extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and /or receive an extension prior to 03/07/2011, your permit will
become null and void and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
'1-dk
Bill Rambo
Permit Technician
File: Permit File No. PG10 -089
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665
PERMIT C C�.
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: PG10 -089 DATE: 08/12/10
PROJECT NAME: SABEY DATA CENTER
SITE ADDRESS: 3355 S 120 PL
Original Plan Submittal
X Response to Correction Letter # 1
Response to Incomplete Letter #
Revision # after Permit Issued
DEPARTMENTS:
u ► ing ivision 017`iii
Public Works
Fire Prevention
n
Planning Division
❑ Structural ❑ Permit Coordinator n
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
Comments:
Incomplete U
DUE DATE: 08/17/10
Not Applicable
Permit Center Use Only
INCOMPLETE LETTER MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
LETTER OF COMPLETENESS MAILED:
TUES /THURS ROUTING:
Building
Please Route VI Structural Review Required _ No further Review Required n
REVIEWER'S INITIALS:
DATE:
APPROVALS OR CORRECTIONS:
DUE DATE: 09/14/10
Approved ❑ Approved with Conditions Not Approved (attach comments)
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Documents/routing slip.doc
2-28-02
OPE`j sir Y:
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: PG10 -089
PROJECT NAME: SABEY DATA CENTER
SITE ADDRESS: 3355 S 120 PL
X Original Plan Submittal Response to Incomplete Letter #
DATE: 07 -23 -10
Response to Correction Letter #
Revision # After Permit Issued
DEPARTMENT :tD
uilding
o 01' i islon
Pu lic W s .
Fire Prevention
Structural
Planning Division
Permit Coordinator
n
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
Incomplete
n
DUE DATE: 07 -27 -10
Not Applicable
n
Comments:
Permit Center Use Only
INCOMPLETE LETTER MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
LETTER OF COMPLETENESS MAILED:
TUES /THURS ROUTING:
Please Route
txt
Structural Review Required
No further Review Required
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
DUE DATE: 08-24 -10
Approved n Approved with Conditions n Not Approved (attach comments) K
Notation:
REVIEWER'S INITIALS: DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ►! Fire ❑ Ping ❑ PW ❑ Staff Initials: I/1/JK
Documents /routing slip.doc
2 -28 -02
•
City of Tukwila
Steven M Mullet, Mayor
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
Steve Lancaster, Director
Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through
the mail, fax, etc.
Date:" 'CZ — S=s LD
Plan Check/Permit Number: PG 10-009
❑ Response to Incomplete Letter #
• Response to Correction Letter # 1
❑ Revision # after Permit is Issued
❑ Revision requested by a City Building Inspector or Plans Examiner
RECEIVED
CITY OF TUKWILA
'AUG 1.2 2010
°f:P.AA'T riET i T 9
Project Name: Sabey Data Center
Project Address: 3355 S 120 P1
�
j( -t .�� Phone Number: 2-521'C' `\-� `p
Contact Person•
Summary of Revision:
P `?“Ai
J�U vv� c:: c-
Fig P, S p e -j '� t t it % Pk; r S` 14-1 vt 5 &L A-cys a'v et v‘
tb (z) rn CA,-) �,,� Q acu1 -fir . �.c.�.�. �t� o i ( t -rn (Z.)
(Jaw rS .
Sheet Number(s): P 3 . _� 3 • 4 r(_o
"Cloud" or highlight all areas of revision including date of revision
Received at the City of Tukwila Permit CCenter by:
VEntered in Permits Plus on UOP-//d
�4)
\applications\forms - applications on line\revision submittal
Created: 8 -13 -2004
Revised:
1610 -089
La King County
Department of Natural Resources and Parks
Wastewater Treatment Division
Non - Residential
Sewer Use Certification
• To be completed for all new sewer connections, reconnections or
change of use of existing connections.
• This form does not apply to repairs or replacements of existing
sewer connections within five years of disconnect.
Please Print or Type
3 3 S`
Property Street Address
4_40i /&
City
Ca- bet,'
Owner's Name
S" PL.
td4
/1/ e
ZIP
For King County Use Only
Account #
No. of RCEs
Monthly Rate
Property Tax ID #
Party to _e Billed (if different from owner)
I C h(tl fir-- Cu .
c.,c) y 0 fath e-y) ;'bo c 3 r kit 0 S'
�eCC f -/-(e w A- iv / 3
City or Sewer District
Date of Connection
Side Sewer Permit #
Please report any demolitions of pre - existing building on this property.
( 2.1) �' ) 3W `/ %.S Credit for a demolition may be given under some circumstances.
Demolition of pre- existing building? ❑ Yes ❑ No
( ) Was building on Sanitary Sewer? ❑ Yes ❑ No
Property Contact Phone Number (with Area Code) Was Sewer connected before 2/1/90? ❑ Yes ❑ No
Owner's Mailing Address
/.2- 7-0 c t !< zv t r `
Jet �w�` I ' d , /h /— . Sewer disconnect date:
(I� Type of building demolished?
(C�.l L...) I 5I l /bef' Request to apply demolition credit to multiple buildings? ❑ Yes ❑ No
State
Subdivision Name Lot #
Subdiv. # 1 Block #
Building Name Ca he
(if applicable)
Owner's Phone Number (with Area Code)
A. Fixture Units
Fixture Units x Number of Fixtures = Total Fixture Units
Kind of Fixture
Fixture Units
No. of Fixtures
Total
Fixture Units
Public
Private
Public
Private
Bathtub and Shower
4
4
Shower, per head
2
2
Dishwasher
2
2
Drinking fountain (each head)
1
.5
Hose bibb (interior)
2.5
2.5
Clotheswasher or laundry tub
4
2
Sink, bar or lavatory
2
1
Sink, Clinic flushing
8
8
Sink, kitchen
3
2
Sink, other (service)
3
1.5
Z
Sink, wash fountain, circle spray
4
3
Urinal, flush valve, 1 GPF
5
2
Urinal, flush valve, >1 GPF
6
2
Urinal, waterless
0
0
Water closet, tank or valve, 1.6 GPF
6
3
Water closet, tank or valve, >1.6 GPF
8
4
Total Fixture Units
Residential Customer Equivalent (RCE)
20 fixture units equal 1.0 RCE
Total No. of Fixture Units
20
.. 30
RCE
B. Other Wastewater Flow
(in addition to Fixture Units identified in Section A)
Type of Facility /Process:
Estimated Wastewater Discharge:
Gallons /days
Residential Customer Equivalents (RCE):
187 gallons per day equals 1.0 RCE
Total Discharge (gal /day) =
187
C. Total Residential Customer Equivalents:
(add A & B)
A
B
. 20
RCE
RCE
RECEIVED
JUL 232010
PERM T CENTER
Pursuant to King County Code 28.84, all sewer customers who establish a new service which uses metropolitan sewage facilities shall be subject to a capacity charge.
The amount of the charge is established annually by the King County Council at a rate per month per residential customer or residential customer equivalent for a
period of fifteen years. The purpose of the charge is to recover costs of providing sewage treatment capacity for new sewer customers. All future billings can be
prepaid at a discounted amount. All future billings can be prepaid at a discounted amount.
Questions regarding the capacity charge or this form should be referred to King County's Wastewater Treatment Division at 206 - 684 -1740.
I certify that the information given is correct. I understand that the capacity charge levied will be based on this information and any
deviation will require resubmission of corrected data fdetermination of a revised capacity charge.
_a_ — — /,i7
Contractors or Tradespeople Peer Friendly Page
General /Specialty Contractor
A business registered as a construction contractor with L &I to perform construction work within the scope of
its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of
account and carry general liability insurance.
Business and Licensing Information
Name MCKINSTRY CO LLC UBI No. 602569922
Phone 2067623311 Status Active
Address Po Box 24567 License No. MCKINCL942DW
Suite /Apt. License Type Construction Contractor
City Seattle Effective Date 3/16/2006
State WA Expiration Date 3/16/2012
Zip 98134 Suspend Date
County King Specialty 1 General
Business Type Limited Liability Company Specialty 2 Unused
Parent Company
Other Associated Licenses
License
Name
Type
Specialty
1
Specialty
2
Effective
Date
Expiration
Date
Status
LYDIGML901JLLYDIG+
MCKINSTRY LLC
Construction
Contractor
General
Unused
4/13/2010
4/13/2012
Active
WESTVI *121RF
WESTVENT INC
Construction
Contractor
General
Unused
12/6/1988
9/1/1994
Archived
MCKIN "372ND
MCKINSTRY CO
Construction
Contractor
General
Unused
8/20/1963
1/2/2008
Relicensed
Business Owner Information
Name
Role
Effective Date
Expiration Date
PEDERSEN, JAMIE D
Agent
03/16/2006
Amount
ALLEN, DEAN CHARLES
Partner /Member
03/16/2006
CP0399990301
MOORE, DOUGLAS JAMES
Partner /Member
03/16/2006
ALLEN, DAVID EDWARD
Partner /Member
03/16/2006
ZURICH
AMERICAN INS
CO
TEPLICKY, JOSEPH WILLIAM
Partner /Member
03/16/2006
Bond Information
Page 1 of 1
Bond
Bond Company Name
Bond Account Number
Effective Date
Expiration Date
Cancel Date
Impaired Date
Bond Amount
Received Date
1
TRAVELERS CAS 8
SURETY CO
104702039
01/03/2006
Until Cancelled
$12,000.00
03/16/2006
Assignment of Savings Information No records found for the previous 6 year period
Insurance Information
Insurance
Company Name
Policy Number
Effective Date
Expiration Date
Cancel Date
Impaired Date
Amount
Received Date
3
ZURICH
AMERICAN INS
CO
CP0399990301
01/31/2009
01/31/2011
$2,000,000.0012
/07/2009
2
ZURICH
AMERICAN INS
CO
CP03999903
01/31/2008
01/31/2009
$2,000,000.00
01/31/2008
1
CHARTER OAK
FIRE INS CO
DTC052D7193C0F07
01/31/2006
01/31/2009
$1,000,000.00
01/08/2008
Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period
Warrant Information No unsatisfied warrants on file within prior 6 year period
https://fortress.wa.gov/lni/bbip/Print.aspx
08/24/2010
12x12 SL
12x12 2 "SL -
ABBREVIATIONS
GENERAL
AD ACCESS DOOR
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AG ABOVE GROUND
AMP AMPERE
ARCH ARCHITECT; ARCHITECTURAL
AUTO AUTOMATIC
AUX AUXILIARY
BD
BHP
BLDG
BOP
BOT
BS
BTU
BTUH
CA
CAB
COND
C/L
CLG
CFM
CLG
CO
CO2
COL
CONC
COND
CONN
CONSTR
CONTR
CTL
DET
DIA
DIAL
DIM
DISCH
DIV
DN
DS
DWDI
DWG
DVN
(EE)
EC
EL
ELEC
ELEV
EP
EQUIP
ESP
EXH
EXIST
(F)
FA
FC0
FDC
FDN
FIG
FIN
AO
FLEX
FIR
FO
FP
FT
FPM
FTG
FURN
GA
GALV
GC
GEN
GPM
GWB
11
HP
HR
HS
HTG
HTR
ID
BOARD
BRAKE HORSEPOWER
BUILDING
BOTTOM OF PIPE
BOTTOM
BIRD SCREEN
BRITISH THERMAL UNIT
BRITISH THERMAL UNITS PER HOUR
COMPRESSED AIR
CABINET
CONDENSATE
CENTER UNE
CEIUNG
CUBIC FEET PER MINUTE
CEIUNG
CARBON MONOXIDE
CARBON DIOXIDE
COLUMN
CONCRETE
CONDENSER; CONDENSATE
CONNECT; CONNECTION
CONSTRUCTION
CONTRACTOR
CONTROL
DETAIL
DIAMETER
DIAGONAL
DIMENSION
DISCHARGE
DMSION
DOWN
DISCONNECT SWITCH; DOOR SWITCH
DOUBLE WIDTH, DOUBLE INLET
DRAWING
DRAIN, WASTE, VENT
EXISTING
EACH
ELECTRICAL CONTACTOR; END CAP
ELEVATION
ELECTRICAL
ELEVATION
ELECTRICAL PANEL; END PLUG
EQUIPMENT
EXTERNAL STATIC PRESSURE
EXHAUST
EXISTING
FUTURE
FAHRENHEIT
ARE ALARM
FLOOR CLEANOUT
FIRE DEPARTMENT CONNECTION
FOUNDATION
FIGURE
FINISH
FURNISHED AND INSTALLED BY OWNER
FLEXIBLE
FLANGE
FLOOR
FUEL OIL
ARE PROTECTION
FEET PER MINUTE
FOOT; FEET
FOOTING
FURNISH
GAGE
GALVANIZED
GENERAL CONTRACTOR
GENERATOR
GALLONS PER MINUTE
GYPSUM WALL BOARD
HIGH
HORSEPOWER; HIGH PRESSURE
HEATING RETURN
HEATING SUPPLY
HEATING
HEATER
INSIDE DIAMETER /DIMENSION
LAB LABORATORY
LE LINEAL FOOT
MAU
MAX
MBH
MED
NEZ
MFR
MH
MIN
MISC
MID
N/A
NC
NEG
NEC
NO
NOM
NTS
OA
OC
OD
OVHD
.POC
PRELIM
PSI
PSIG
QTY
R
RAD
REQD
RPM
SECT
SF
SIM
SPEC
SQ
STD
STRUC
MAKE -UP AIR UNIT
MAXIMUM
1000 BRITISH THERMAL UNITS PER HOUR
MEDIUM
MEZZANINE
MANUFACTURER
MANHOLE
MINIMUM; MINUTE(S)
MISCELLANEOUS
MOUNTED
NOT APPLICABLE
NORMALLY CLOSED
NEGATIVE
NOT IN CONTRACT
NORMALLY OPEN; NUMBER
NOMINAL
NOT TO SCALE
OVERALL
ON CENTER
OUTSIDE DIAMETER
OVERHEAD
POINT OF CONNECTION
PREUMINARY
POUNDS PER SQUARE INCH
POUNDS PER SQUARE INCH GAUGE
QUANTITY
RELOCATED
RADIUS
REQUIRED
REVOLUTIONS PER MINUTE
SECTION
SQUARE FOOT
SIMILAR.
SPECIFICATION
SQUARE
STANDARD
STRUCTURAL
TBD
TOC
TOS
TYP
UG
UNO
VAV
VD
VER
VET
VSD
W/
W/0
HVAC
AC
ACT
AHU
BDD
ROD
CC
CRU
CT
CV
DB
DIFF
DMPR
EA
EAT
ECG
EF
FCU
FD
FM
FP
FTU
TO BE DETERMINED
TENANT IMPROVEMENTS
TOP OF CONCRETE
TOP OF STEEL
TYPICAL
UNDERGROUND
UNLESS NOTED OTHERWISE
VARIABLE AIR VOLUME
VOLUME DAMPER
VERIFY
VARIABLE FREQUENCY DRIVE
VARIABLE SPEED DRIVE
WITH
WITHOUT
AIR CONDITIONING
ACOUSTICAL CEILING TILE
AIR HANDUNG UNIT
BACKDRAFT DAMPER
BOTTOM OF DUCT
COOLING COIL
COMPUTER ROOM UNIT
COOLING TOWER
CONSTANT VOLUME
DRY BULB
DIFFUSER
DAMPER
EXHAUST AIR
ENTERING AIR TEMPERATURE
EGGCRATE GRILLE
EXHAUST FAN
FAN COIL UNIT
ARE DAMPER
FREQUENCY MODULATION
FIRE PROTECTION; FAN POWERED
FAN TERMINAL UNIT
GRD GRILLE, REGISTER, DIFFUSER
HC
HR
HVAC
HEATING COIL
HEATING RETURN
HEATING, VENTILATION AND
AIR CONDITIONING
LAT LEAVING AIR TEMPERATURE
LD LINEAR DIFFUSER
MC MECHANICAL CONTRACTOR
MECH MECHANICAL
MOD MOTOR OPERATED DAMPER; MODULATING
MUA MAKE UP AIR
OA OVERALL; OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
RA
RAT
RCP
RTU
sa
SAT
SD
SF
S /FD
SL
SLSM
SM
SP
TDH
TG
TOD
TSP
UH
WB
WC
WG
RETURN AIR
RETURN AIR TEMPERATURE
REFLECTED CEIUNG PLAN
ROOF TOP UNIT'
SUPPLY AIR
SUPPLY AIR TEMPERATURE
SMOKE DAMPER
SUPPLY FAN
SMOKE FIRE DAMPER
SOUND UNED
SOUND LINED SHEET METAL
SHEET METAL
STATIC PRESSURE
TOTAL DYNAMIC HEAD
TRANSFER GRILLE
TOP OF DUCT
TOTAL STATIC PRESSURE
UNIT HEATER
WET BULB
WATER COLUMN
WATER GAUGE
PLUMBING
AD AREA DRAIN
CO CLEAN OUT; CARBON MONOXIDE
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWC DOMESTIC HOT WATER RECIRCULATION
DSP DRY STANDPIPE
EWC ELECTRICAL WATER COOLER
FD FLOOR DRAIN
IE INVERT ELEVATION
IN WC INCHES WATER COLUMN
IW IONIZED WATER; INDIRECT WASTE
NPCW NON POTABLE COLD WATER
ORL OVERFLOW RAINWATER LEADER
PD PLANTER DRAIN; PRESSURE DROP
PERF PERFORATED
PLBG PLUMBING
PRV PRESSURE REDUCING VALVE
RPBP REDUCED PRESSURE
BACKFLOW PREVENTER
SD STORM DRAIN
SS SANITARY SEWER
VTR VENT THROUGH ROOF
W WASTE
We WATER CLOSET
WH WATER HEATER
WSP WET STANDPIPE
PIPING
BP BACKFLOW PREVENTOR
CD CONDENSATE DRAIN
CHW CHILLED WATER
CHR CHILLED WRIER RETURN
CHS CHILLED WATER SUPPLY
CT CONICAL TEE
EWT
FHV
LWT
TOP
ENTERING WATER TEMPERATURE
FIRE HOSE VALVE
LEAVING WATER TEMPERATURE
TOP OF PIPE
PIPING IDENTIFICATION
HVAC
A
COND
-CDR -
CDS
CHS
-CHR -
G
-HR-
HS
RL
RS
PLUMBING
ST
GRW
GAW
ID
IRR
NP
ORL
rW
PSD
,RRWL —
SD
SS
--UD-
-V-
W
FIRE PROTECTION
DSP
FDC
FP
FW
WSP
A
COND
CDR
CDS
CHS
CHR
HR
HS
RL
RS
ST
CW
GRW
GAW
HW
HWC
ID
IRR
NPCW
ORL
PW
PSD
RWL
RWL
SD
SS
UD
V
W
COMPRESSED AIR PIPE
CONDENSATE DRAIN PIPE
CONDENSER WATER RETURN PIPE
CONDENSER WATER SUPPLY PIPE
CHILLED WATER SUPPLY PIPE
CHILLED WATER RETURN PIPE
NATURAL GAS PIPE
HEATING WATER RETURN PIPE
HEATING WATER SUPPLY PIPE
REFRIGERANT UQUID PIPE
REFRIGERANT SUCTION PIPE
STEAM SUPPLY
COLD WATER PIPE (POTABLE)
GREASE WASTE
GARAGE WASTE
HOT WATER PIPE (POTABLE)
HOT WATER CIRCULATING (POTABLE)
INDIRECT DRAIN
IRRIGATION WATER PIPE
NON- POTABLE CW PIPE
OVERFLOW RAINWATER LEADER
PUMPED WASTE
PUMPED STORM DRAIN
RAINWATER LEADER BELOW GRADE
RAINWATER LEADER
STORM DRAIN PIPE
SANITARY SEWER PIPE (SITE)
UNDERDRAIN PIPE
VENT PIPE (SANITARY)
WASTE PIPE
WASTE PIPE BELOW GROUND
DUCTWORK ACCESSORIES
E=11*N-
ERIE
PIPING FITTINGS
it!
wtt
0
D
11
1+
{$I
1 +I
VALVES
A
16 i
1'N
D4
PIPING ACCESSORIES
,w
4"
41w
Q
0
1F
WATTS /LF
--1 RPBP 1
Y
0
0
DSP
FDC
FP
WSP
DRY STAND PIPE
FIRE DEPT. CONNECTION PIPE
FIRE SPRINKLER PIPE
FlRE PROTECTION WATER PIPE
FIRE PROTECTION WASTE PIPE
WET STAND PIPE
TEE W/PIPE UP
TEE DOWN W /ELBOW
TEE UP W/ ELBOW
TEE UP
TEE DOWN
90' ELBOW UP
90' ELBOW DN
CAP
UNION
FLANGE
FLEX HOSE CONNECTION
DOUBLE BELLOWS FLEX CONNECTION
SINGLE BELLOWS FLEX CONNECTION
FLOW ARROW
CONCENTRIC REDUCER
ECCENTRIC REDUCER
SLOPE SYMBOL
BREAK OR CONTNUATION SYMBOL
DOWN SPOUT NOZZLE
CLEANOUT
45' ELBOW
45' ELBOW
90' ELBOW
90' ELBOW
CROSS
TEE
WYE
TAP
HOSE CONNECTION
MOTORIZED 2 -WAY VALVE
MOTORIZED 3 -WAY VALVE
PRESSURE REDUCING VALVE
CONTROL VALVE
RELIEF VALVE
BALL VALVE
3 -WAY GATE VALVE
BUTTERFLY VALVE
DIAPHRAGM VAVVE
CHECK VALVE
NEEDLE VALVE
GLOBE VALVE
GLOBE VALVE ANGLE
GLOBE VALVE 3 -WAY
GATE
PLUG VALVE
BALANCING VALVE
HOSE BIBB
PUMP
MANUAL AIR VENT
AUTOMATIC AIR VENT
HIGH CAPACITY AIR VENT
SHOCK ARRESTOR
FLOW SWITCH
VACUUM BREAKER
PRESSURE GAUGE
TEMPERATURE SENSOR
TEMPERATURE INDICATOR
AUTO FLOW VALVE
FLOW METER
Y STRAINER
Y STRAINER W/ BALL VALVE
PIPE SLEEVE
STEAM TRAP
PETES PLUG
HEAT TRACING
SUCTION DIFFUSER W/ STRAINER
REDUCED PRESSURE
BACKFLOW PREVENTOR
FUNNEL DRAIN
FLOOR DRAIN
ROOF DRAIN
ROOF OVERFLOW DRAIN
FLOOR SINK
}
AD
AD
R
DUCTWORK
f
RECTANGULAR DUCT
X
RECTANGULAR DUCT
RECTANGULAR DUCT
RECTANGULAR DUCT
BIRDSCREEN OR SCREENED OPENING
SUPPLY GRILLE
RETURN OR EXHAUST GRILLE
VOLUME DAMPER
MOTOR OPERATED DAMPER
AIRFLOW MONITOR
REMOTELY OPERATED VOLUME DAMPER
(YOUNG REGULATOR OR APPROVED)
BACK DRAFT DAMPER
COORDINATE WITH CEILING APPURTENANCES.
FLEX CONNECTION
FIRE DAMPER THROUGH WALL
FIRE DAMPER THROUGH FLOOR
F1RE/SMOKE DAMPER THROUGH WALL
ARE/SMOKE DAMPER THROUGH FLOOR
ACCESS DOORS
1" ACOUSTICALLY LINED DUCT
2" ACOUSTICALLY UNED DUCT
CHANGE OF ELEVATION RISE(R) DROP(D)
TRANSITION
TURNING VANES
SMOKE DETECTOR
RETURN / EXHAUST / OUTSIDE AIR
SUPPLY / TRANSFER AIR
TERMINAL UNITS - SEE SCHEDULE FOR TYPE
SUPPLY AIR DUCT
TURNING UP OR TOWARD
SUPPLY AIR DUCT
TURNING DOWN OR AWAY
EXHAUST OR RETURN AIR DUCT
TURNING UP OR TOWARD
EXHAUST OR RETURN AIR DUCT
TURNING DOWN OR AWAY
ROUND DUCT
TURNING UP OR TOWARD
ROUND DUCT
TURNING DOWN OR AWAY
OVAL DUCT
TURNING UP OR TOWARD
OVAL DUCT
TURNING DOWN OR AWAY
FLEXIBLE DUCT
INSTRUMENTATION AND CONTROLS
THERMOSTAT
SENSOR
CARBON MONOXIDE SENSOR
VISUAL ALARM LIGHT - WALL MOUNTED
GRILLE /REGISTER/DIFFUSER
DOUBLE LINE
X
t
CEIUNG SUPPLY AIR DIFFUSER
-► CEILING SUPPLY AIR DIFFUSER
(SHOWN WITH THROW ARROWS)
{
CEIUNG RETURN, EXHAUST
OR TRANSFER AIR GRILLE
UNEAR DIFFUSER (CEILING)
LINEAR DIFFUSER (WALL)
LOUVER PLAN VIEW
LOUVER (ELEVATION VIEW)
HVAC - ANNOTATION
VAV BOX TAG
1 -23
S C8 09 -A
000
000
S- C8 -09 -A
I
DUCT WORK,
FLOOR 1 - DISCRETE BOX #
SEE BELOW
PRIMARY CFM
FAN CFM
ACOUSTICAL ACCESSORIES OF REQ'D)
KW OF AUX. HEAT.
VAV BOX SIZE; SEE SCHED.
SERIES FAN POWERED BOX (S)
PARAIIEL FAN POWERED BOX (P)
0 ROUND DUCT SYMBOL
$ FLAT OVAL DUCT SYMBOL
EQUIPMENT TAG
EF -2 -1
-- CONSECUTIVE
EQUIP. #
FLOOR OF EQUIP.
LOCATION
EQUIPMENT
DESIGNATION
GRILLE, REGISTER, OR DIFFUSER TAG
DT5 -6t8 CFM EACH
l i SIZE
TYPE CODE
EQUIPMENT TAG
LD5 /3 -300 CFM EACH UNEAR DIFFUSER GRILLE
1 �--- -- ACTIVE LENGTH IN FT.
TOTAL LENGTH IN FT.
TYPE CODE
LOUVER TAG
81 -1
LOUVER TAG
i-- CONSECUTIVE
LOUVER #.
FLOOR LOCATED
FACADE DESIGNATION
LEGAL DESCRIPTION
GENERAL INFORMATION SYMBOLS
xxxxxXXXXXXX
X
X
NEW MECHANICAL WORK
FUTURE 11 SCOPE & NEW WORK OTHER THAN MECHANICAL
DEMO MECHANICAL WORK
DETAIL OR DIAGRAM NUMBER
SHEET NUMBER
WHERE DETAIL /DIAGRAM SHOWN
SECTION LETTER
SHEET NUMBER WHERE SECTION SHOWN
PLAN NUMBER
SHEET NUMBER WHERE, PLAN SHOWN
SEPARATE PERMIT
REQUIRED FOR:
Mechanical
1 Electrical
❑ Plumbing
Gas Piping
City of Tukwila
,Iii. D-iNG DIVISION
NE 1/4 OF THE SE 1/4 AND SE 1/4 OF THE SE 1/4
OF SECTION 9 AND GOVT LOT 15 AND SW 1/4 OF THE SW 1/4 OF
SECTION 10, T23N., R4E., W.M. CITY OF TUKWILA, KING COUNTY,
WASHINGTON.
REVISIONS
No changes shall e made to the scope
of work without prior approval of
Tukwila Building Division.
NOTE: Revisions will require a new plan submittal
and may include additional plan review fees.
LOCATION / S
REVISION NUMBER - DENOTES NUMBER AND DATE
WHEN REVISION OR ISSUE OCCURED
REVISION CLOUD - DENOTES AREA OF CHANGE
DETAIL REFERENCE OUTUNE
WITH NUMBER AND SHEET LOCATION
MATCHUNE
PLUMBING FIXTURE CALL -OUT
(SEE PLUMBING SCHEDULES)
KEY NOTE
POINT OF CONNECTION
POINT OF DEMOLITION
CENTERUNE
STRUCTURAL BEAM PENETRATION
/c0DECOMPL(ANQE IEwE SDC 52 CENTRAL
APPROVED
"U�4 2'° PLANT PHASE 11
BUIL�p�NG VISION
(SEE M503)
For Th
instry
ife Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1- 800 - 669 -6223
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503 -331 -0234
www.mckinstry.com
PROJECT:
SABEY DATA CENTER
STRUCTURAL BEAM HAUNCH (SEE M503)
MOTOR
GENERAL NOTES
1. VERIFY LOCATIONS AND DIMENSIONS OF ALL EQUIPMENT AND COORDINATE ALL WORK PRIOR TO
START OF CONSTRUCTION.
2. OBTAIN APPROVAL OF STRUCTURAL ENGINEER ' PRIOR TO INSTALLATION OF PENETRATIONS NOT
PREVIOUSLY COORDINATED OR AGREED ;;UPON, LE: ANCHOR BOLT DEPTHS, ETC.
3. CONCRETE EQUIPMENT CURBS, PIPING RAT , S ABS, SUMP BASINS, AND HOUSEKEEPING PADS ARE
SHOWN FOR APPROXIMATE LOCATION N&SIZE AND ARE TO BE PROVIDED BY THE GENERAL
CONTRACTOR. WHERE PROVIDED, REFER ft -STRUCTURAL INFO FOR ADDITIONAL DETAILS.
4. COMPLETION AND COMMISSIONING FOR 'MECHANICAL SYSTEMS:
A. PROVIDE RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO THE OWNER (PER 2006
WASHINGTON STATE ENERGY CODE S 'ECTION 1416.2.4.3)
B. PROVIDE TO THE OWNER ALL NECESSARY SYSTEM OPERATION AND MAINTENANCE MANUALS
(PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.4.2)
C. BALANCE ALL HVAC SYSTEMS AND PROVIDE TO THE OWNER A WRITTEN BALANCING REPORT
(PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.2.1)
D. EQUIPMENT /SYSTEMS TESTING SMALL BE PERFORMED IN ACCORDANCE WITH APPROVED PLANS
(PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.3.1).
E. TEST, CAUBRATE AND ADJUST ALL HVAC CONTROLS AND SEQUENCES OF OPERATION IN
ACCORDANCE WITH THE APPROVED PLANS (PER 2006 WASHINGTON STATE ENERGY CODE
SECTION 1416.2.3.2), NECESSARY TESTS ARE IDENTIFIED IN 2006 WASHINGTON STATE ENERGY
CODE SECTION 1416.2.3.1; PREPARE A PREUMINARY COMMISSIONING REPORT OF TEST
PROCEDURES AND RESULTS PRIOR TO ISSUANCE OF A FINAL CERTIFICATE OF OCCUPANCY
(PER 2006 WASHINGTON STATE
FINAL COMMISSIONING REPORT OF ENERGY 1
TEST PROCEDURES AND RESULTS (PER R TO THE OWNER
A 2006 WASHINGTON
STATE ENERGY CODE SECTION 1416.2.5.2).
5. PERFORMANCE OF ALL NEW BUILDING MECHANICAL SYSTEMS WILL COMPLY WITH OR EXCEED THE
MINIMUM REQUIREMENTS AS SET FORTH IN THE 2006 WASHINGTON STATE ENERGY CODE SECTION
1410 - GENERAL REQUIREMENTS.
6. MINIMUM VENTILATION QUAN1U1ES WILL COMPLY WITH OR EXCEED THE 2006 INTERNATIONAL
MECHANICAL CODE.
7. ALL MOTORS WILL COMPLY WITH CHAPTER 15 OF THE 2006 WASHINGTON STATE ENERGY CODE.
FOR ADDITIONAL DETAILS, SEE EQUIPMENT SCHEDULES CONTAINED WITHIN THIS DRAWING SET.
8. ALL SYSTEMS WILL BE INSULATED AS PRESCRIBED IN CHAPTER 14, TABLE 14 -5 OF THE 2006
WASHINGTON STATE ENERGY CODE. FOR ADDITIONAL DETAILS, SEE DUCTWORK AND PIPING
SPECIFICATION MATRICES CONTAINED WITHIN THIS DRAWING SET.
9. VERIFY THAT ALL NECESSARY INFORMATION HAS BEEN PROVIDED PRIOR TO CONNECTION OF
EQUIPMENT FURNISHED BY THE OWNER OR OTHERS.
10. FOR ADDITIONAL SYSTEM AND EQUIPMENT SEISMIC REQUIREMENTS, REFER TO STRUCTURAL
INFORMATION (WHERE PROVIDED) AND PROJECT SPECIFIC SEISMIC DESIGN INFORMATION SHEET
CONTAINED WITHIN THIS DRAWING SET. OR AS ATTACHED.
DRAWING INDEX
SHEET
NUMBER
SHEET TITLE
P0.0
DRAWING INDEX, SYMBOLS AND ABBREVIATIONS
P2.1
PLUMBING 1ST FLOOR PLAN
P2.2
PLUMBING 2ND FLOOR PLAN
P2.3
PLUMBING 3RD FLOOR PLAN
P3.1
PLUMBING ENLARGED 1ST FLOOR PLAN
P3.2
PLUMBING ENLARGED 2ND FLOOR PLAN
P3.3
PLUMBING ENLARGED 3RD FLOOR PLAN
P6.0
PLUMBING DIAGRAMS AND DETAILS
P7.0
PLUMBING SCHEDULES
3355 S 120th Place
Tukwila, WA 98168
woommosommemommosommi
REGISTRATION:
REVISIONS:
04/02/10 PERMIT SET
FILE COPY
Perm
Plan review approval is subject to errors and omissions.
kpproval of construction documents does not authorize
the violation of any adopted code or ordinance. Receipt
of approved-Red Copy and conditions is acknowledged:
RECEIVED
JUL 232010
PERMIT CENTER
City Orfb- cl is
NO. B LDINCbR R MON
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
SHEET TITLE:
ENGINEERING
TONY MARINO
EVA TATOSOVA
BILL DAGGETT
35922
03/26/10
AS SHOWN
DRAWINGS INDEX,
SYMBOLS AND
ABBREVIATIONS
SHEET NUMBER:
GIOO8 Po.o
2
n
0
0—
12
(13
X
0000
Ear
(6) 0
"nnt egg'
19:' IMMIX
El
j
r
stafaszczatiagil
llll /1/ r°•'
tr
w
itlt T ,� al
!`1., ., r _i 1 _.._..
r . .. ,
r'
,yam,,,..- .�.G id i x; II f II�I�fn�tHll
"to mp -. .:,.{.4 ii ME.31 nix
IMO 11
V •
-1— Mr
N.
J
m.-
YJtl3 !:TY
StC4t
5 ?o S.
NC CT
iiPJ,[E Y
I
F- OR - - --
1 -1/2" FOS /FOR
n
0-
PHA,
E2
00
PLUMBING 1ST FLOOR PLAN
SCALE: 1/32" = 1' -0"
4)
5
__ ____j►
10
KEY NOTES
0 ISOLATE AND TEST EXISTING DOUBLE WALLED PIPE
BETWEEN TANK AND POC.
20 INSTALL FUEL OIL PUMP FROM BUILDING STORAGE.
CONNECT TO EXISTING FUEL 01L SUPPLY PIPE.
CONNECT FUEL OIL RETURN PIPE TO TANK.
® CONNECT NEW FUEL OIL SUPPLY AND RETURN PIPE
TO EXISTING.
40 TWO FOS AND TWO FOR PIPES IN EXISTING TRENCH TO
DAYTANK.
0 EXISTING LEAK DETECTION AT LOW POINT IN TRENCH.
SHEET NOTES
1. ALL FUEL OIL PIPING LOW POINTS SHALL HAVE SUMP WITH LEAK
DETECTOR.
2. COORDINATE ALL WORK WITH PRE — PURCHASED EMERGENCY GENERATOR.
3. DAY TANK SHALL BE INSTALLED BY CONTRACTOR FOR EACH GENERATOR.
CONTRACTOR SHALL PROVIDE ALL NECESSARY COMPONENTS INCLUDING
VALVES, GAGES, FLEX CONNECTIONS AND FITTINGS AS INDICATED,
SHOWN, OR REQUIRED.
4. AU. CONTROL AND POWER WIRING SHALL BE IN RIGID CONDUIT.
�
EVIEWEp Fair
APPROVED
AUG 2 4 2010
City of
Tukwila
BUILDING DIVISION
N
?&1O oS'1
RECEIVED
JUL 232010
PERMIT CENTER
PROJECT:
instry
fe Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1- 800 - 669 -6223
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503 - 331 -0234
www.mckinstry.com
SABEY DATA CENTER
SDC 52 CENTRAL
PLANT PHASE 11
3355 S 120th Place
Tukwila, WA 98168.
REGISTRATION:
REVISIONS:
04/02/10 PERMIT SET
N0. DATE
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
SHEET TITLE:
DESCRIPTION
ENGINEERING
TONY MARINO
EVA TATOSOVA
BILL DAGGEIT
35922
03/26/10
AS SHOWN
PLUMBING
1ST FLOOR PLAN
SHEET NUMBER:
P2.1
0 0 0 0"
OC)
) (\i/D
• 1
® Os
Fr —
—
�l
O
J
CJ
0
LF d
r
tri
4 —
C9)
4
7-
ARM I
nifL 1
Hlm !IIIEI
IT
o 03
1
C)®®E:0®
PLUMBING 2ND FLOOR PLAN
SCALE: 1/32" = 11 -0"
b b
CODEIEWED FOR
COMPLIANCE
APPROVED
COVED
AUG 2 4 2010
Cityof Tukwila
BUILDING DIVISION
p6ioo89
RECEIVED
JUL 2 3 2010
PERMIT CENTER
PROJECT:
instry
fe Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1- 800 - 669 -6223
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503- 331 -0234
www.mckinstry.com
SABEY DATA CENTER
SDC 52 CENTRAL
PLANT PHASE 11
3355 s 120th Place
Tukwila, WA 98168
REGISTRATION:
REVISIONS:
04/02/10 PERMIT SET
NO. DATE DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
SHEET TITLE:
ENGINEERING
TONY MARINO
EVA TATOSOVA
BILL DAGGEIT
35922
03/26/10
AS SHOWN
PLUMBING
2ND FLOOR PLAN
SHEET NUMBER:
P2.2
i4
8
ii1_.._[ill MI:�.
:ZL tini;UHHNN
• • 11.11.11111IIIIIP'
0 0
E )
1
PLUMBING 3RD FLOOR PLAN
SCALE: 1/32' = 11 -0'
000
REVIEWED FOR
COMPLIANCE
APPROVED
AUG 2 4 2010
Gilyorukwrila
BUILDING moon,
&tOO8?
RECEIVED
JUL 23 2010
PERMIT CENTER
PROJECT:
instry
fe Of Your BuiNlfng
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1- 800 - 669 -6223
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503 -331 -0234
www.mckinstry.com
SABEY DATA CENTER
SDC 52 CENTRAL
PLANT PHASE 11
3355 S 120th Place
Tukwila, WA 98168
REGISTRATION::
REVISIONS:
04/02/10 PERMIT SET
NO. DATE
DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
SHEET TITLE:
ENGINEERING
TONY MARINO
EVA TATOSOVA
BILL DAGGETT
35922
03/26/10
AS SHOWN
PLUMBING
3RD FLOOR PLAN
SHEET NUMBER:
P2.3
FF
1r
1
POC TO EXISTING
3/4"
HB -3
3 /4 "CW —DROP
3 /4 "CW
tl
3 /4"CW P
4r AF'4111221111A
2"
_M EM
EM
1 AHU -52B2
AHU -52A3
SEE MECHANICAL
DRAWINGS
ABOVE
BELOW
FT-
/1
L_
AHU -52D3
AHU -52C3
SEE MECHANICAL
DRAWINGS
..;•. •.r.•. • ••.••.•ee. .e •.•.•.• .AMI Ti • MwelVP.;;•Alre• ;T. 41.•`6x'r •
,�• v : • • r i i • : • i • iii • 1 • i • • s • • 1 + t 1
•�
y •4
III BELOW ;__•;•....:.;__...•t rr;.�.;f;.;_
'� SLAB N4 4
I t 4 °�
•`r ►'
.11 1 0:
t:
3/4 "NPCW
J
LOCATE & CONNECT
TO EXISTING VENT
RISER
(.1
(2 EACH)
HEAT TRACE
2"1/ DN
PROVIDE MOISTURE SENSOR CABLE
AROUND SUMP PUMP BASIN
MO
ABOVE
BELOW
ElEAT TRACE
GABLE
ID
I
CUT, PATCH &
MATCH EXISTING FLOOR,
TYPICAL
HEAT TRACE
CONTROLLER
CAP El
1
TING
CW
E.
i•
•
r.
•
t.
«
t.
t'
t.
2 "P
HEAT TRA
CABLE
Y + " + " + " + -i ".f ••:��- - - - .�..- .....rw .�w.v �t .rte. ��- a��+..�,.�,..�..��.xa i i i'�'
4_4 i; 446 ■a:e•_ : :i i:a Will ?�:i:i:.:a:i :a sti : ATIVI:�:t` M:�:a'.+:tis a: %Z• 46 4b� R42!
r ••.4.4 - re.,rri
E U .
1.4•4"14144
Ell
rptt Ali V,
;::11:14: an 4
:
i +'++4t+
,4..4�t
r +4t +i4,,
44�t #+��►
r +4 +4 + ;4�
r +i• +4 +44
►#i +44.4
r. +444 i
.. ...
i ++ +444 •v.�ra� 4 raT•• .w r •r /44 .r. T.. 464 r .� I ;1.4� r .r.�.. - ► +.►« . p.. .
..4 f w"t'v +v'T'w'v+►•wei vin i int R"+R'�iwo r'w"+1. +'� *'+'t . ,t w n,
, V .INN ,. + +... V + . V. +4 + +4.1 +41 + +4 ++„ 1 +, ► 4 + 4 � 1 { 4 4 4 w ++ 4 ++ ► # 1 i + 4 + 4 +i f+ 4 ^ ►W t i i + i ++ • 14 4 ++ +4 ,f + ++ Vo f+ win, 444 44
". V 4. V 4•�f ilIVA i iCV.M..T.v ^Ti4+,TIA V.AAVA. *a►.+�0:40.0"YVAM..TA i►ALV I ► �� •VA ;.. -VA�ir..V.1�+
1,X41 j :41MAAA#:iw1ai L.10 2.r�1f 0 41:W �'nr *WaLl40J%416L LJ41.4 1+ j {+ i;
1
•111111 Ell
RUN FUEL OIL PIPE EXPOSED AT
FLOOR FROM TRENCH TO GENERATOR
P.O.C.
GENER,ATO -R--
ROOM
1 108 1
APPROX 160 FT
HEAT TRACING
5 W /FT, 1200 WATTS
SEE 2/P6.0 FUEL TANK
PIPING DIAGRAM
E
F
1 -1/2" FOSyFOR
r.Y.�rr
PLUMBING ENLARGED 1ST FLOOR PLAN
SCALE: 1/811 = 1' -0"
0
4'
8'
16'
1
PW
._ ;.r*.s.w.•� Mr.I;V;w.•;*, 1■ •;•.•;•.IV•.v a .•e.rs;OM•ero• •.•;n ereMOMIIIVIrefererrillb. e;v.w.•;•r•.•.•�� �;rrPe•ell■ • • •r•
SWITCH GEAR
1 155 1
PW
O
REVIEWED FOR
CODE COMPLIANCE
APPROVED
AUG 2 4 2010
City of Tukwila
BUILDING DIVISIf1N
�G(
RECEIVED
JUL 2 3 2010
PERMIT CENTER
instry
le Of Year Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1 -800- 669 -6223
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503- 331 -0234
www.mckinstry.com
PROJECT:
SABEY DATA CENTER
SDC 52 CENTRAL
PLANT PHASE 11
3355 s 120th Place
Tukwila, WA 98168
REGISTRATION:
REVISIONS:
04/02/10 PERMIT SET
NO. DATE
DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
SHEET TITLE:
ENGINEERING
TONY MARINO
EVA TATOSOVA
BILL DAGGETT
35922
03/26/10
AS SHOWN
PLUMBING
ENLARGED
1ST FLOOR PLAN
SHEET NUMBER:
P3.1
— — N -3/4 "NPCW
FOR FUTURE
SP -01 1 SEE
P
HEAT TRACE
CONTROLLER
CAP El
1
TING
CW
E.
i•
•
r.
•
t.
«
t.
t'
t.
2 "P
HEAT TRA
CABLE
Y + " + " + " + -i ".f ••:��- - - - .�..- .....rw .�w.v �t .rte. ��- a��+..�,.�,..�..��.xa i i i'�'
4_4 i; 446 ■a:e•_ : :i i:a Will ?�:i:i:.:a:i :a sti : ATIVI:�:t` M:�:a'.+:tis a: %Z• 46 4b� R42!
r ••.4.4 - re.,rri
E U .
1.4•4"14144
Ell
rptt Ali V,
;::11:14: an 4
:
i +'++4t+
,4..4�t
r +4t +i4,,
44�t #+��►
r +4 +4 + ;4�
r +i• +4 +44
►#i +44.4
r. +444 i
.. ...
i ++ +444 •v.�ra� 4 raT•• .w r •r /44 .r. T.. 464 r .� I ;1.4� r .r.�.. - ► +.►« . p.. .
..4 f w"t'v +v'T'w'v+►•wei vin i int R"+R'�iwo r'w"+1. +'� *'+'t . ,t w n,
, V .INN ,. + +... V + . V. +4 + +4.1 +41 + +4 ++„ 1 +, ► 4 + 4 � 1 { 4 4 4 w ++ 4 ++ ► # 1 i + 4 + 4 +i f+ 4 ^ ►W t i i + i ++ • 14 4 ++ +4 ,f + ++ Vo f+ win, 444 44
". V 4. V 4•�f ilIVA i iCV.M..T.v ^Ti4+,TIA V.AAVA. *a►.+�0:40.0"YVAM..TA i►ALV I ► �� •VA ;.. -VA�ir..V.1�+
1,X41 j :41MAAA#:iw1ai L.10 2.r�1f 0 41:W �'nr *WaLl40J%416L LJ41.4 1+ j {+ i;
1
•111111 Ell
RUN FUEL OIL PIPE EXPOSED AT
FLOOR FROM TRENCH TO GENERATOR
P.O.C.
GENER,ATO -R--
ROOM
1 108 1
APPROX 160 FT
HEAT TRACING
5 W /FT, 1200 WATTS
SEE 2/P6.0 FUEL TANK
PIPING DIAGRAM
E
F
1 -1/2" FOSyFOR
r.Y.�rr
PLUMBING ENLARGED 1ST FLOOR PLAN
SCALE: 1/811 = 1' -0"
0
4'
8'
16'
1
PW
._ ;.r*.s.w.•� Mr.I;V;w.•;*, 1■ •;•.•;•.IV•.v a .•e.rs;OM•ero• •.•;n ereMOMIIIVIrefererrillb. e;v.w.•;•r•.•.•�� �;rrPe•ell■ • • •r•
SWITCH GEAR
1 155 1
PW
O
REVIEWED FOR
CODE COMPLIANCE
APPROVED
AUG 2 4 2010
City of Tukwila
BUILDING DIVISIf1N
�G(
RECEIVED
JUL 2 3 2010
PERMIT CENTER
instry
le Of Year Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1 -800- 669 -6223
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503- 331 -0234
www.mckinstry.com
PROJECT:
SABEY DATA CENTER
SDC 52 CENTRAL
PLANT PHASE 11
3355 s 120th Place
Tukwila, WA 98168
REGISTRATION:
REVISIONS:
04/02/10 PERMIT SET
NO. DATE
DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
SHEET TITLE:
ENGINEERING
TONY MARINO
EVA TATOSOVA
BILL DAGGETT
35922
03/26/10
AS SHOWN
PLUMBING
ENLARGED
1ST FLOOR PLAN
SHEET NUMBER:
P3.1
t
DATA CENTER
DAL.]
3/4 "NPCW
UP & DN
OFFICE
212
7'T 77.7 f.7 7.7.71.7T7 "7 7.7.1. `T I "/ I ! 77-7'77'77—
7...7-T--r7/'_ --i'7777-7-777-77T77-77-77-77-77-77'77-777-77_7_77-Z7'',2— t :i "7-77-77-777-7-7-77-77-7777-0- 1- - _„' -777 -
ELEC. CLOSET
�cJ
(
DATA CENTER
260
COMMAND CENTER
253
STORAGE
BUILD ROOM
256
1 "NPCW
DN
111•1■111\
OFFICE
111
FE
9
VESTIBULE
251
FE
9
OFFICE
252
NN
- fill• -I
7-77-77-7777 ...:.... ... . --- -- - - -- -- --- -- --- --- - --- --- --- --- - -- -- -- --- --- - —
rr: : �r"r7; rr77" Trr' r�r�rrTrfrr> rrirF '����r�rrrririr— r-7r7 -777-777-777-777-77777-77-7 77-77-77—/-77 fri• /�i
FD
7
4"W UP TO FS,
FD TO BE LOCATED
AT LOW POINT
IN FLOOR
4"W UP TO FS,
FD TO BE LOCATED
AT LOW POINT
IN FLOOR
PLUMBING ENLARGED 2ND FLOOR PLAN GID
SCALE: 1/8" = 1' -0" 0 4' 8' 16'
FD
W
FD
J
L4 "W UP
TO FS
4 "W UP
TO FS
REVIEWED FOR
CODE COMPLIANCE
AU b 2 4 2010
City of Tukwila
BUILDING DIVISION
P(71008(1
CORRECTION
LTR - #.
0-0S1
PROJECT:
For Tip
instry
fe Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1 -800- 669 -6223
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503 - 331 -0234
www.mckinstry.com
SABEY DATA CENTER
SDC 52 CENTRAL
PLANT PHASE 11
3355 S 120th Place
Tukwila, WA 98168
REGISTRATION:
REVISIONS:
04/02/10 PERMIT SET
06/03/10 CD REVIEW SET
08/12/10 PERMIT CORRECTION 1
NO. DATE
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
SHEET TITLE:
DESCRIPTION
ENGINEERING
TONY MARINO
EVA TATOSOVA
BILL DAGGETT
35922
03/26/10
AS SHOWN
PLUMBING
ENLARGED
2ND FLOOR PLAN
CITYOF RECEIVED LA
AUG 2 vl)il)
PERMIT CENTER
SHEET NUMBER:
P3.2
\i/
L.1\
1 -1/4" COIL
CONDENSATE DRAIN
(TYP 4 PER SIDE)
1 -1 /4" DEC DRAI
1 -1/4" OVERFLOW DRAIN
3/4" MAKEUP WAT R
TYP 1 PER SIDE
PLUMBING ENLARGED 3RD FLOOR PLAN ar
SCALE: 1 /r = 1' -0" 0 4' 8' 16'
0
SUPPLY DUCT
(E)
AHU -52A2
411
JiIiIH
'IIIN
UP TO CHILLER
PIPING
CHILLED WATER
MAKE —UP WATER
ASSEMBLY
(E)
AHU -52A1
a1i
WOMEN'S ROa
213
/.
0
PF -1
1 1/4" COIL
CONDENSATE DRAIN
(TYP 4 PER SIDE)
1 1/4" DEC DR
1-1/4" OVERFL(
3/4" MAKEUP
TYP 1 PER SIDE
IN
W DRAIN
TER
REVIEWED FOR
CODE COMPLIANCE
APPROVED
AL% 242010
City otTukwila
BUILDING DIVIRION
212
r.
2 "UP TO ROOF
(4) 2 "V DN
3 "V UP
TO VTR
ELEV #3
SECURITY
EQUIP
331 1
LJ
?&ioo 89
RECEIVED
CITY OF TUKWILA
AUG' 12 2010
PERMIT CENTER
PROJECT:
For Th
instry
ile Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1 -800- 669 -6223
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503 - 331 -0234
www.mckinstry.com
SABEY DATA CENTER
SDC 52 CENTRAL
PLANT PHASE 11
3355 S 120th Place
Tukwila, WA 98168
REGISTRATION:
REVISIONS:
04/02/10 PERMIT SET
06/03/10 CD REVIEW SET
08/12/10 PERMIT CORRECTION 1
NO. DATE
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
SHEET TITLE:
DESCRIPTION
ENGINEERING
TONY MARINO
EVA TATOSOVA
BILL DAGGETT
35922
03/26/10
AS SHOWN
PLUMBING
ENLARGED
3RD FLOOR PLAN
SHEET NUMBER:
P3.3
DAY TANK WILL INCLUDE:
1-71
FOR INTERCONNECTED DAY TANK
PIPING ARRANGEMENTS. SEE
FUEL OIL SYSTEM OPERATION NOTES:
• LEAK DETECTION SENSOR FOR CONTAINMENT
• FLOAT SWITCH - TWO 4 -LEVEL FLOAT SWITCH WITH BRASS STEM AND LOCKING
RINGS.
• LOW LEVEL - 45X FULL
• SUPPLY PUMP ON - 507E FULL
• SUPPLY PUMP OFF - 85X FULL
• HIGH LEVEL ALARM / RETURN PUMP ON - 95% FULL
• FUEL LEVEL GUUGE - FRACTIONAL LEVEL INDICATION.
• CONTROL PANEL (SHIPPED LOOSE PROVIDED BY TANK MFR) SYSTEM
REQUIREMENTS: 208 / 1 PH, 60 HZ.
AS FUEL IS CONSUMED FROM THE DAY TANK, THE "SUPPLY PUMP ON" FLOAT WILL
MAKE ON DROP, AUTOMATICALLY ENGAGING A SUPPLY PUMP. THE SUPPLY PUMP
WILL REMAIN ENGAGED, FIUNG THE DAY TANK UNTIL THE "PUMPS OFF' FLOAT BRAKES
ON RISE. SUPPLY PUMPS WILL AUTOMATICALLY ALTERNATE EACH TIME THE TANK
CALLS FOR FUEL
IF THE PRIMARY SUPPLY PUMP FAILS TO START ON A CALL FOR FUEL, THE LAG
PUMP WILL COME ON AND THE SYSTEM WILL DISPLAY A "SUPPLY PUMP FAILURE"
ALARM CONDITION.
IF THE FUEL SHOULD EVER REACH A LOW CONDITION, THE LOW LEVEL FLOAT SWITCH
WILL MAKE ON DROP. THE SYSTEM WILL DISPLAY A "LOW LEVEL" ALARM CONDT1ON
AND SOUND THE PANEL MOUNTED ALARM BUZZER.
IF THE FUEL SHOULD EVER EMPTY INTO A "FULL" TANK BEYOND THE PUMP OFF
FLOAT, NE HIGH LEVEL FLOAT SWITCH WILL MAKE ON RISE. THE SYSTEM WILL
DISPLAY A "HIGH LEVEL" ALARM CONDITION, SOUND THE PANEL MOUNTED ALARM
BUZZER AND THE RETURN PUMP WILL ENGAGE. THE RETURN PUMP WILL REMAIN
ENGAGED UNTIL THE "PUMP OFF' FLOAT MAKES ON DROP.
IF LEAK DETECTOR SENSOR SWITCH MAKES, THE SYSTEM WILL DISPLAY A "DAYTANK
BASIN LEAK DETECTED" ALARM CONDITION AND SOUND THE PANEL MOUNTED ALARM
BUZZER.
THE SUPPLY PUMPS WILL BE LOCKED OUT IF THE SYSTEM RECENES A LEAK
DETECTED, OR A HIGH LEVEL OR LOW LEVEL SIGNAL UNTIL THE ALARM IS CLEARED
AND THE SYSTEM IS RESET.
1 — REVIEWED FOR
CODECOMPLIANQE
APPROVED
AUG 2 4 2010
Ci Tukwila
BUILDING BUILDING DIVISION
UP
H--''q
inittNGA fig.
+
I. a °; •
• .
Fs•
Fs.
P&Io 08 9
tib
PLUMBING ISOMETRIC DIAGRAM
NOT TO SCALE
,s"v .
ruoF
it
OVERSIZE CORE DRILL
SLAB TO FIT DRAIN
CLAMPING RING W/ SPACE
FOR SEAL & GROUT
INSULATE FIRST (5)
FEET OF DRAIN PIPING
NON- SHRINK GROUT
FLOOR SEALANT
CORE DRILL SLAB
TO FIT DRAIN BODY
J.
SHEET METAL PAN W/
2" TURNUP SEALED EDGES
CDFLOOR DRAIN DETAIL
SCALE: NOT m SCALE
SCALE: NOT TO SCALE
NORMAL FLOW
EACH GENERATOR IS SERVED BY ITS DEDICATED DAY
TANK.
r -I dos'
Lcf-
4
Lam_ -FOR ---I r - --
j NC
I
NC _J I
DT- 1
GEN. 1
o
GEN. 2
EMERGENCY FLOW
DT -2
EITHER DAY TANK CAN PROVIDE FUEL FOR EITHER
(0R BOTH) GENERATOR(S). FAILURE OF DAY TANK
11 SHOWN.
INTERCONNECTED DAY TANK PIPING DIAGRAM
NOT TO SCALE
CONNECT TO EXPANSION
TANK PIPING
FILL STATION ON WALL OF ROOM
EMERGENCY FlLL
SOLENOID VALVE
NORMAL FILL
SOLENOID VALVE
NO$ NO
a4-'4211i 14.1 1 " Fos —�--Ib
NC II
Cn o:
0 0 0 0
SET TO 15 PSI
BYPASS VALVE
FAST FILL UNE
L J
SYSTEM FILL ASSEMBLY DIAGRAM -
FOR REFERENCE ONLY
MOISTURE SENSING CABLE
COORDINATE W/ CONTROLS ..-:
SUBCONTRACTOR
SCALE: NOT TO SCALE
CONTROLLER MTD ON
STRUT FRAME
SECURED TO THE
FLOOR
DISCHARGE PIPE
WIRING TO
CONTROL PANEL
(BY ELEC. CONTRACTOR)
GAZE VALVE, 1YP.
CHECK VALVE, 1YP.
COATED STEEL COVER
GROUT WATER TIGHT
•
DISCHARGE
SUMP
PUMP
0 MINIMUM 4" COMPACTED SUB -BASE, SEE MANUF.
REQIUREMENTS.
0 MINIMUM 4" BACKFILL MATERIAL SEE MANUF.
REQIUREMENTS.
O PUMP CYCLE DEPTH VARIES.
Q BASIN DEPTH 48' X 36" DIAMETER.
isaNC
DUPLEX SUBMERSIBLE SUMP PUMPS DETAIL-
FOR REFERENCE ONLY
SCALE NOT TO SCALE
TO FUEL
OIL RETURN
FLOW SWITCH
NO
NO, w
I ILI 1 FOS
NC
1 "BYPASS
' I
1 -1/2"
NO
FUEL OIL SUPPLY
LEAK DETECTOR
FUEL 011_ OVERFLOW
LEVEL CONTROLLER
PRIMARY TANK
EMERGENCY VENT
r
L
NORMAL VENT
12 CV FUEL OIL
OVERFLOW PUMP
(SEE NOTE)
PRESSURE
RELIEF VALVE
SECONDARY TANK
EMERGENCY VENT
11 41FUEL PUMP OFF
I
&FUEL PUMP ON
q3 LOW LEVEL ALARM
- r r
HIGH LEVEL ALARM
1 OVERFLOW PUMP ON
11
—GENERATOR
FUEL SUPPLY
JL
11
11
11
11
11
11
ANTISIPHON VALVE
FIRE SAFETY
IIVALVE
I HO
_— FOR —fib
LG
FO
1
FUEL PURIFIER (TYP)
LEVEL GAUGE
NOTE:
ONE RETURN PUMP PER DAYTANK.
SEE SCHEDULE, SHEET P7.0
(FOP 5202 -A & FOP 5202 -B)
J.
II
11
11
11
11
11
11
11
■
1
J
GEN. SET
RUPTURE BASIN
DIP TUBE (1YP)
DOUBLE POPPET
FOOT VALVE (TYP)
DAY TANK PIPING DIAGRAM (TYP. EACH GEN. SET)
NOT TO SCALE
PROJECT:
For Th
instry
ife Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1 -800- 669 -6223
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503- 331 -0234
www.mckinatry.com
SABEY DATA CENTER
SDC 52 CENTRAL
PLANT PHASE 11
3355 S 120th Place
Tukwila, WA 98168
REGISTRATION:
REVISIONS:
04/02/10 PERMIT SET
06/03/10 CD REVIEW SET
08/12/10 PERMIT CORRECTION 1
NO. DATE
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
DESCRIPTION
ENGINEERING
TONY MARINO
EVA TATOSOVA
BILL DAGGETT
35922
03/26/10
AS SHOWN
SHEET TITLE:
PLUMBING DIAGRAMS
AND DETAILS
SHEET NUMBER:
CITY C CF TUKWILA
Alt 12 2010
PERMIT CENTER
P6.0
DAY TANK SCHEDULE
TAG
DT -52 -1
(EXISTING)
DT -52 -2
(EXISTING)
DT -52 -3
DT -52 -4
QUANTITY
1
1
1
1
BASIS OF DESIGN
ACE TANK
ACE TANK
ACE TANK
ACE TANK
MODEL NUMBER
AC00280U2R1
AC00280U2R2
AC00280U2R2
AC00280U2R2
SERVICE
FUEL OIL
FUEL OIL
FUEL OIL
FUEL OIL
LOCATION
GENERATOR ROOM
GENERATOR ROOM
GENERATOR ROOM
GENERATOR ROOM
CAPACITY
280 GALLONS
280 GALLONS
280 GALLONS
280 GALLONS
WEIGHT (EMPTY)
625 LBS
625 LBS
625 LBS
625 LBS
FUEL OIL PUMP SCHEDULE
TAG
FOP- 52 -A1, FOP -52 -B1
(EXISTING)
FOP- 52 -C1, FOP -52 -D1
QUANTITY
2
2
BASIS OF DESIGN
RED JACKET
RED JACKET
MODEL NUMBER
P75S1
P75S1
SERVICE
FUEL OIL
FUEL OIL
LOCATION
MAIN FUEL OIL TANK
MAIN FUEL OIL TANK
FLOW
40 GPM
40 GPM
FT. TOTAL HEAD
60
60
MAX FLUID PRESSURE PSIG
YES (NOT UPS)
E —POWER GPM
X GLYCOL IN FLUID
NONE
NONE
MOTOR HP
3/4
3/4
MOTOR BRAKE HP
NA
NA
MOTOR TYPE
NA
NA
VOLTAGE /PHASE
208/230 1PH
208/230 1PH
MOTOR EFFICIENCY
PER WSEC
PER WSEC
VFD
NO
NO
STARTER, DISCONNECT
BY ELEC
BY ELEC
NOTE:
MAIN FUEL OIL TANK PUMPS ARE EXISTING IN BUILDING STORES; DAYTANK PUMPS ARE NEW.
SUMP PUMP (FOR REFERENCE ONLY)
TAG #
SP -52 -1 (EXISTING)
LOCATION
UPS ROOM
MANUFACTURER
WEIL
MODEL
1413
STYLE
DUPLEX ALTERNATING — SUMP
SERVICE
SANITARY SUMP
GPM
25 GPM
HEAD PRESSURE (FT. HD)
30 FT HD
DISCHARGE
2"
MOTOR HP
1 HP
RPM
1,750 RPM
VOLTAGE / PHASE
460V / 3 PH
GENERATOR POWER
YES (NOT UPS)
E —POWER GPM
175 GPM
E —POWER BHP
15 HP
STARTER
BY MFR
DISCONNECT
BY MFR
MOTOR EFFICIENCY
PER SEC
CONTROL
MOISTURE SENSOR & TEMP LIMITER
SUMP COVER
COATED STEEL
WEIGHT
85 LBS
PLUMBING FIXTURE SCHEDULE
ITEM
MODEL
CONNECTION
cw
HW
W
V
RWL
ORL
FD -1
FLOOR DRAIN MECHANICAL ROOM
EXPANSION
JOINTS
FIXTURE:
TRAP PRIMER:
ZURN —ZN- 415 —(SIZE PER PLAN) NL -7I, TYPE T STRAINSER WfTH RAISED LID
AS REQUIRED BY CODE
1/2 **
—
SEE PLAN
2
—
—
RPBP -52 -1
REDUCED PRESSURE BACKFLOW PREVENTOR
FIXTURE:
I WILKENS 1" MODEL NO. 375 SERIES
SEE PLAN
MINIMUM RESSURE
MAXIMUM TEST PRESSURE
MINIMUM DURATION
FIBERGLASS
0.5
PRV -1
PRESSURE REDUCING VALVE AT CHILLED WATER FILL ASSBLY
THE ABOVE DATA SHALL NOT BE USED FOR ELECTRICAL,STRUC
OR ARCHITECTURAL COORDINATION. USE ONLY APPROVED
MANUFACTURER'S SUBMITTAL DATA ONLY.
* MINIMUM AS INDICATED
** TRAP PRIMER ONLY
C P .. ANce
t ti
4.06,1
BUILDINGpI p
1)610 -D $9
PIPE & EQUIPMENT INSULATION SCHEDULE
PIPING
SYSTEM
HVAC PIPING SPECIFICATIONS
SERVICE ID
SERVICE DESCRIPTION
OCATION /AREA
DESIGN
PRESSURE
(PSIG)
SIZE
MATERIAL
CONNECTION TYPE &
FITTINGS
FLANGES, UNIONS &
CPLGS
FLEX CONNECTIONS
EXPANSION
JOINTS
ISOLATION VALVE
TYPE
ISOLATION VALVE
ACTUAL MFR &
MODEL
CHECK VALVE
ACTUAL MFR &
MODEL
BALANCE VALVE
MFR & MODEL
STRAINERS
ACTUAL MODEL
PRESSURE
GAUGES ACTUAL
MODEL
TEMPERATURE
GAUGES
ACTUAL MODEL
TEST PROCEDURE
NOTE: ISOLATE ALL EQUIPMENT PRIOR TO TESTING
TEST
PRESSURE
(PSIG) [3]
INSULATION CATEGORY
. SEISMIC
BRACING
IMPORTANCE
FACTOR
REMARKS
MEDIA
MINIMUM RESSURE
MAXIMUM TEST PRESSURE
MINIMUM DURATION
FIBERGLASS
0.5
0.5
25
2*
2 AND SMALLER.
CARBON STEEL PIPE A53B
ERW
STANDARD WEIGHT
SOCKETWELD WHERE
CONCEALED OR
INACCESSIBLE,
THREADED
ELSEWHERE
M.I. UNION
Anvil Fig. 463
Class 150
300 psi WOG
INCLUDED IN FUEL
PACKAGE SUBMITTAL
ALL
0.23 -0.27
75
FIBERGLASS
0.5
0.5
0.5
0.5
WATER OR AIR
WATER: 150% OF
MAX.OPER.
PRESSURE
AIR: 110% OF MAX.
OPER. PRESSURE,
NOT LESS THAN 5
PSIG
1 PRESSURE ANY
COMPONENT OR 90% OF
YIELD
TO DELESS N PRESSURE FOR MINUTES, 4 HOURS
AND PERFORM A VISUAL INSPECTION
WITH NO LEAKS
1.5
FOV
FUEL OIL VENT'
ALL
2 -1/2" AND
LARGER
BUTTWELD
1501 WELD NECK
FLANGE
FOS & R
FUEL OIL SUPPLY &
RETURN
ALL
125
2" AND SMALLER
PVDF
DOUBLE WALL PIPE
SOCKETWELD WHERE
CONCEALED OR
INACCESSIBLE,
THREADED
ELSEWHERE
M.I. UNION
Anvil Fig. 463
Class 150
300 psi WOG
INCLUDED IN FUEL
PACKAGE SUBMITTAL
WATER OR AIR
WATER: 150X OF
MAX.OPER.
PRESSURE
AIR: 110X OF MAX.
OPER. PRESSURE,
NOT LESS THAN 5
PSIG
MAX. ALLOWABLE TEST
PRESSURE ANY
COMPONENT OR 90% OF
YIELD
NOT LESS THAN 10 MINUTES, LOWER
TO DESIGN PRESSURE FOR. 24 HOURS
AND PERFORM A VISUAL INSPECTION
WITH NO LEAKS
1.5
2 -1/2" AND
LARGER
BUTTWELD
150f WELD NECK
FLANGE
GEX
GENERATOR EXHAUST
ALL
150
ALL
CARBON STEEL PIPE A53B
ERW
STANDARD WEIGHT
B LD
150 WELD NECK
FLANGE
PROVIDED BY OTHERS
UNISOURCE
SERIES Cr
N/A
N/A
N/A
N/A
GENERATOR EXHAUST
In 1100
1.5
PIPE & EQUIPMENT INSULATION SCHEDULE
PIPING
SYSTEM
TEMP
RANGE
THERMAL
COND.
MEAN RAT.
TEMP.
INSULATION
MATERIAL
INSULATION THICKNESS BY PIPE SIZE
INSUL.
C HANGERS
RUNOUTS TO 2" (2)
1' AND LESS
1 1147 TO 2'
2 1/2" TO 4"
5" TO 6"
OVER 6"
NON— POTABLE COLD
ALL
0.23 -0.27
75
FIBERGLASS
0.5
0,5
0.5
0.5
0.5
0.5 ( NOTES 4. 5
vCHILLED WATER
40 -55
0.23 -0.27
75
FIBERGLASS
0.5
0.5
0.75
1.0
1.0
1.0
NOTES 4, 5
ICOIL CONDENSATE
ALL
0.23 -0.27
75
FIBERGLASS
0.5
0.5
0.5
0.5
0.5
0.5
NOTES 4, 5
NOTES
1 HOT AND COLD PIPES LARGER THAN 2 ": RIGID INSERTS. INSULATION CONTINUOUS THROUGH THE HANGER. SHEETMETAL SHIELD.
2 COLD PIPES 2" AND SMALLER: RIGID INSERTS. INSULATION CONTINUOUS THROUGH THE HANGER. SHEETMETAL SHIELD.
3 JACKETING: METAL JACKET (SEALED WEATHER TIGHT) WILL BE USED AT ALL EXTERIOR INSULATION EXPOSED TO WEATHER (I.E.ROOFTOP PIPING). PVC JACKET WITH RIGID RIGID CALCIUM SILICATE
INSULATION WILL BE USED ON ALL HORIZONTAL PIPING AT OR NEAR THE FLOOR SUBJECT TO POTENTIAL FOOT TRAFFIC. PVC JACKET WILL BE UTILIZED ON ALL EXPOSED INSULATION WITHIN
6 FEET OF THE FLOOR ELEVATION (LE. MECHANICAL ROOMS AND GARAGE HOSE BIBBS). PVC IS RECOMMENDED INSTEAD OF METAL IN EXPOSED AREAS DUE TO ITS RESILIENCY —METAL JACKETS DENT.
RECEIVED
JUL 2 3 2010
PERMIT CENTER
PROJECT:
For Th
instry
fe Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1 -800- 669 -6223
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503 -331 -0234
www.mckinstry.com
SABEY DATA CENTER
SDC 52 CENTRAL
PLANT PHASE 11
3355 S 120th Place
Tukwila, WA 98168
REGISTRATION:
REVISIONS:
04/02/10 PERMIT SET
NO. DATE
DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
ENGINEERING
TONY MARINO
EVA TATOSOVA
BILL DAGGETT
35922
03/26/10
AS SHOWN
SHEET TITLE:
PLUMBING
SCHEDULES
SHEET NUMBER:
P7.