PLUMBING /GAS PIPING PERMIT
Parcel No.: 1623049001
Address: 12844 MILITARY RD S TUKW
Project Name: HIGHLINE MEDICAL CENTER
Permit Number: PG10 -172
Issue Date: 12/23/2010
Permit Expires On: 06/21/2011
Owner:
Name: HCH SPECIALTY CENTER
Address: ATTN ACCOUNTING DEPT , 12844 MILITARY RD S 98168
Contact Person:
Name: MIKE DONALDSON
Address: PO BOX 24567 , SEATTLE WA 98124
Email: MIKED @MCKINSTRY.COM
Contractor:
Name: MCKINSTRY CO LLC
Address: PO BOX 24567 , SEATTLE WA 98134
Contractor License No: MCKINCL942DW
Phone: 206 - 832 -8355
Phone: 206 762 -3311
Expiration Date: 03/16/2012
DESCRIPTION OF WORK:
INSTALLING (1) VACUUM OUTLET, VACUUM SLIDE AND (1) OXYGEN OUTLET
Value of Plumbing /Gas Piping: $4,000.00 Uniform Plumbing Code Edition: 2009
Fees Collected: $141.75 International Fuel Gas Code Edition: 2009
Permit Center Authorized Signature:
Date: d'3 10
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not pres
construction or the performance of wor
on the back o • e •s''t.
e to give authority to violate or cancel the provisions of any other state or local laws regulating
am authorized to sign and obtain this plumbing /gas piping permit and agree to the conditions
Signature:
Print Name:
k
Date: 1243 / o
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
doc: UPC -4/10
PG10 -172 Printed: 12 -23 -2010
• •
PERMIT CONDITIONS
Permit No. PG 10 -172
1: ** *PLUMBING AND GAS PIPING * **
2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila
Building Division.
3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing
inspector.
4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas
Code.
5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved.
6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code.
Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to
make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection.
7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless,
adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the
conditioned space shall be insulated to minimum R -3.
8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be
protected by steel nail plates not less than 18 guage.
9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing
piping shall be directly embedded in concrete or masonry.
10: All pipes penetrating floor /ceiling assemblies and fire - resistance rated walls or partitions shall be protected in
accordance with the requirements of the building code.
11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to
twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill,
frozen earth, or construction debris.
12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the
jurisdiction.
doc: UPC -4/10
PG 10 -172 Printed: 12 -23 -2010
CITY OF TUKWIL
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
htto://www.ci.tukwila.wa.us
Plumbing/Gas Permit No.
Project No.
PLUMBING / GAS PIPING PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *Please Print **
King Co Assessor's Tax No.: 1623049001
Site Address: 12844 Military Road South
Tenant Name:
Highline Medical Center SC CT Upgrade
Suite Number:
Property Owners Name: Highline Medical Center
Mailing Address: 16251 Sylvester Road S
New Tenant:
Floor:
❑ Yes 0 ..No
98168
Zip
Burien
City
WA
State
CONTACT PERSON — Who do we contact when your permit; is ready to be issued
Name: Mike Donaldson w/ McKinstry Co.
Mailing Address: PO Box 24567
E -Mail Address: miked @mckinstry.com
Day Telephone:
Seattle
City State
Fax Number: (206) 768 -7754
(206) 832 -8355
WA
98124
Zip
PLUMBING /GASPIPING CONTRACTOR INFORMATION
Company Name: McKinstry Co.
Mailing Address: PO Box 24567
Contact Person: Mike Donaldson
E -Mail Address: miked @mckinstry.com
Contractor Registration Number: MCKINCL942DW
Seattle
City
Day Telephone:
Fax Number:
WA
State
(206) 832 -8355
(206) 768 -7754
98124
Zip
Expiration Date: 03/16/2012
ARCHITECT OF RECORD — All plans must be stamped by Architect of Record
Company Name:
Mailing Address:
Contact Person:
E -Mail Address:
City
Day Telephone:
Fax Number:
State
Zip
ENGINEER OF RECORD — All plans must be stamped by Engineer of Record
Company Name:
Mailing Address:
Contact Person:
E -Mail Address:
City
Day Telephone:
Fax Number:
State
Zip
H:\Applications\Forns- Applications On Line\2010 Applications \7 -2010 - Plumbing -Gas Piping Permit Application.doc
Revised: 7 -2010
bh
Page 1 of 2
Valuation of Project (contractor's bid pill $ 7i 0601.
Scope of Work (please provide detailed information):
Installing one vacuum outlet, vacuum slide and one oxygen outlet.
Building Use (per Int'1 Building Code):
Occupancy (per Intl Building Code):
Utility Purveyor: Water:
Sewer:
Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below:
Fixture Type:
Qty ;
Fixture Type:
Qty
Fixture Type:
Qty
Fixture Type:
Qty
Bathtub or combination
bath/shower
Bidet
Clothes washer, domestic
Dental unit, cuspidor
Dishwasher, domestic,
with independent drain
Drinking fountain or
water cooler (per head)
Food -waste grinder,
commercial
Floor Drain
Shower, single head trap
Lavatory
Wash fountain
Receptor, indirect waste
Sinks
Urinals
Water Closet
Building sewer and each
trailer park sewer
Rain water system - per
drain (inside building)
Water heater and/or vent
Industrial waste treatment
interceptor, including trap
and vent, except for kitchen
type grease interceptors
Each grease trap
(connected to not more
than 4 fixtures - <750
gallon capacity)
Grease interceptor for
commercial kitchen ( >750
gallon capacity)
Repair or alteration of
water piping and/or water
treatment equipment
Repair or alteration of
drainage or vent piping
Medical gas piping
system serving 1 -5
inlets /outlets for a
specific gas
3.B
Each additional medical
gas inlets /outlets greater
than 5
Backflow protective
device other than
atmospheric -type vacuum
breakers 2 inch (51 mm)
diameter or smaller
Backflow protective device
other than atmospheric -type
vacuum breakers over 2
inch (51 mm) diameter
Each lawn sprinkler
system on any one meter
including backflow
protection devices
Atmospheric -type vacuum
breakers not included in
lawn sprinkler backflow
protections (1 -5)
Atmospheric -type
vacuum breakers not
included in lawn
sprinkler backflow
protections over 5
Gas piping outlets
PERMIT APPLICATION NOTES -
Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing
and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER OR AUT ORIZED AGENT: H16
Signature:
Print Name: ( / Jim Thomas w/ McKinstry Co.
PO Box 24567
Mailing Address:
Date: 12 -14 -2010
Day Telephone: 2067634189
Seattle
WA
IDate Application Accepted: '� ( \" 1. 6
City
State
98124
Zip
it
Date Application Expires: (p.. (s- ( f
Staff Initials:
H:\Applications\Forms- Applications On Line\2010 Applications \7 -2010 - Plumbing -Gas Piping Permit Application.doc
Revised: 7 -2010
bh
Page 2 of 2
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206 - 431 -3665
Web site: http://www.ci.tukwila.wa.us
Parcel No.: 1623049001
Address: 12844 MILITARY RD S TUKW
Suite No:
Applicant: HIGHLINE MEDICAL CENTER
RECEIPT
Permit Number: PG10 -172
Status: PENDING
Applied Date: 12/15/2010
Issue Date:
Receipt No.: R10 -02501
Initials:
User ID:
WER
1655
Payment Amount: $141.75
Payment Date: 12/15/2010 08:48 AM
Balance: $0.00
Payee: MCKINSTRY CO
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Check 11319 141.75
Authorization No.
ACCOUNT ITEM LIST:
Description
Account Code Current Pmts
PLAN CHECK - NONRES
PLUMBING - NONRES
000.345.830 28.35
000.322.103.00.00 113.40
Total: $141.75
doc: Receipt -06 Printed: 12 -15 -2010
INSPECTION RECORD
Retain a copy with permit
/�(PU —/7Z
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
Project:
///1471/;•/ /7lrr /e4 /
Type of Inspection:
% i✓ /
Address:
72 4/47. fi'I /L/rs7 AN. C-!
Date Called:
Special Instructions:
Date Wanted:
/ _ d/— //
p.m.
Requester:
Phone No:
Q06 -736' 6°O4 /&
proved per applicable codes. Corrections required prior to approval.
COMMENTS:
i°e, .,—.. ,„ „ / i A �lf,% elf, ,,,,o 71,-/----;;/"2 /
/-7(4.e•
1
nsper •r:: ,
sf• J�id
Date:
/- '/—!l
EINSPECTION FEE REQU ED. Prior t ext inspection, fee must be
-paid at 6300 Southcenter Blgd.. Suite 100. Call to schedule reinspection.
4�
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
P4/0(177Z
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
Project.
/176 1)2 /,e,d1
Type 90 Inspection: .
ni9 A— /0.0
Address:
/264/e/ Ah'i,fir
Date Called:
Special Instructions:
Date Wanted:
/2-2S—/O
P.m.
Requester:
Phone No:
Approved per applicable codes.
Corrections required prior to approval. r,
COMMENTS:
n
Date:
R PECTION FEE REQUI ED. Prior to next inspection. fee must be
p at 6300 Southcenter Blv ., Suite 100. Call to schedule reinspection.
..s
•.�''����OXInc
P6 /0- / 72-
Medical Cases • Medical Gas Line Verifications • Analgesia Equipment
Letter of Acceptance
Date: December 23, 2010
Contractor: McKin,stry Company
Address:
City & State: Seattle, WA
Phone:
Fax:
Contact: Adam Campbell
Subject: Medical Gas Line Verification.
Nitrox Inc. has reviewed and approved medical gas drawings and accepted to perform
the third party verification for the facility named below in accordance with NFPA 99
(1999 ed.) and any local requirements for this
Level 1 facility.
Facility: Highline Specialty Hospital
Address: 12844 Military Rd. S.
City & State: Seattle,-WA
Phone:
Contact:
Medical Gas Systems:
® Oxygen
/'-Medical Air
® Medical Vacuum
Equipment Systems:
❑ Dental Air & Source Equipment
['Dental Vacuum & Source Equipment
❑ Medical Gas Source Equipment
CRTT, CMG -0024
President
00 -Blank Dental Letter of Acceptance -0110
2706 164th Street SW Lynnwood, WA 98087
(425) 741 -8807 • 1- 800 - 736 -7047 • Fax (425) 741 -2500 • www.nitroxinc.com
Pg 1 of 1
e a
Q 6
3 � $
nrox
Inc.
•
Medical Cases • Medical Gas Line Verifications • Analgesia Equipment
Letter of Acceptance
Date: December 23, 2010
Contractor: McKinstry Company
Address:
City & State: Seattle, WA
Phone:
Fax:
Contact: Adam Campbell
Subject: Medical Gas Line Verification.
Nitrox Inc. has reviewed and approved medical gas drawings and accepted to perform
the third party verification for the facility named below in accordance with NFPA 99
(1999 ed.) and any local requirements for this
Level 1 facility.
Facility: Highline Specialty Hospital
Address: 12844 Military Rd. S.
City & State: Seattle, WA
Phone:
Contact:
Medical Gas Systems:
Oxygen
j,:y✓Medical Air
Medical Vacuum
c
CRTT, CMG -0024
President
Equipment Systems:
TI Dental Air & Source Equipment
[l Dental Vacuum & Source Equipment
11
Medical Gas Source Equipment
INCOMPLETE
9_T R#
g! '/'
?Co nz
RECEIVED
DEC 2 3 2010
PERMIT CENTER
00 -Blank Dental Letter of Acceptance -0110 Pg 1 of 1
2706 164th Street SW Lynnwood, WA 98087
(425) 741 -8807 1- 800 - 736 -7047 • Fax (425) 741 -2500 • www.nitroxinc.com
•
PLANAWI
TING SLIP
ACTIVITY NUMBER: PG10 -172 DATE: 12 -23 -10
PROJECT NAME: HIGHLINE MEDICAL CENTER
SITE ADDRESS: 12844 MILITARY RD S
Original Plan Submittal X Response to Incomplete Letter # 1
Response to Correction Letter #
Revision # After Permit Issued
DEPARTMENTS:
Building Division
Public Works
ite
Fire Prevention
Structural
Planning Division
Permit Coordinator
DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 12 -23-10
Complete
Comments:
Incomplete
Not Applicable
Permit Center Use Only
INCOMPLETE LETTER MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
LETTER OF COMPLETENESS MAILED:
TUES /THURS ROUTING:
Please Route
Structural Review Required
No further Review Required
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
Approved Approved with Conditions
Notation:
REVIEWER'S INITIALS:
12/,
DUE DATE: 01 -20-11
Not Approved (attach comments) Ti
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Documents /routing slip.doc
2 -28 -02
• PERMifi �y •
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: PG10 -172 DATE: 12 -15 -10
PROJECT NAME: HIGHLINE MEDICAL CENTER
SITE ADDRESS: 12844 MILITARY RD S
X Original Plan Submittal Response to Incomplete Letter #
Response to Correction Letter #
Revision # After Permit Issued
DEPARTMENTS:
Building Division
Public Works
1
Fire Prevention
Structural
1
n
Planning Division
Permit Coordinator
1
DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 12 -16-10
Complete n Incomplete Not Applicable ❑
Comments:
Permit Center Use Only 1
INCOMPLETE LETTER MAILED: l —I (O' (0 LETTER OF COMPLETENESS MAILE :
Departments determined incomplete: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES /THURS ROUTING:
Please Route
Structural Review Required
❑ No further Review Required
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
Approved Approved with Conditions
Notation:
REVIEWER'S INITIALS:
DUE DATE: 01 -13-11
Not Approved (attach comments)
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Documents /routing slip.doc
2 -28 -02
•
City of Tukwila
•
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Web site: http: / /wivw.ci.tulnvila.wa.us
REVISION
SUBMITTAL
Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through
the mail, fax, etc.
Date:
/25 1 C3 Plan Check/Permit Number: K-1- / 6 - a
❑ Response to Incomplete Letter #
❑ Response to Correction Letter #
❑ Revision # after Permit is Issued
❑ Revision requested by a City Building Inspector or Plans Examiner
Project Name: #((,- /fLINt /Llii bl cif-1_ Cie iv TT
Project Address: (Z [ 144)/,/ f vin • O S
;�
Contact Person: t-C L L S LI Phone Number: Zo �° 7- 56 - cO ,
Summary of Revision:
-NO Y9 V4, z , (
RECEIVED
e1TV OF TL MER
IDEC23.21®
Sheet Number(s):
"Cloud" or highlight all areas of revision including date of revision
Received at the City of Tukwila Permit Center by:
Entered in Permits Plus on
H:\Applications \Forms - Applications On Line12010 Applications \7 -2010 - Revision Submittal.doc
Created: 8 -13 -2004
Revised: 7 -2010
•
City of Tukwila
epart %, eat of Community
December 16, 2010
Mike Donaldson
McKinstry Co
PO Box 24567
Seattle, WA 98124
i
Jim Haggerton, Mayor
edelopme 7 tt Jack Pace, Director
RE: Letter of Incomplete Application # 1
Plumbing /Gas Piping Permit Application PG10 -172
Highline Medical Center -12844 Military Rd S
Dear Mr. Donaldson,
This letter is to inform you that your permit application received at the City of Tukwila Permit Center on
December 15, 2010 is determined to be incomplete. Before your application can continue the plan
review process the attached /following items from the following department(s) need(s) to be addressed:
Building Department: Allen Johannessen at 206 433 -7163 if you have any questions
concerning the attached comments.
Please address the comment above in an itemized format with applicable revised plans,
specifications, and /or other documentation. The City requires that two (2) sets of revised plans,
specifications and /or other documentation be resubmitted with the appropriate revision block.
In order to better expedite your resubmittal a Revision Submittal Sheet must accompany every
resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will
not be accepted through the mail or by a messenger service.
If you have any questions, please contact me at the Permit Center at (206) 431 -3670.
Sincerely,
Bill Rambo
Permit Technician
Enclosures
File: PG10 -172
W:\Permit Center \Incomplete Letters \2010\PG 10 -172 Incomplete Ltr # 1.DOC
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665
• •
Tukwila Building Division
Allen Johannessen, Plan Examiner
Determination of Completeness Memo
Date: December 16, 2010
Project Name: Highline Medical Center
Permit #: PG10 -172
Plan Review: Allen Johannessen, Plans Examiner
The Building Division has deemed the subject permit application incomplete. To assist the applicant in
expediting the Department plan review process, please forward the following comments.
(GENERAL NOTE)
PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size).
(If applicable) Structural Drawings and structural calculations sheets shall be original signed wet
stamped, not copied.)
1. Please provide only those sheets that are relative to the vacuum and gas piping installation. Clearly
cloud or highlight the location of work and cloud or provide specific information that only pertains to
this permit for the installation of the vacuum and gas piping.
2. Provide plumbing isometrics and show on the plan view the piping and show all points of
connections. Specify sizes of all new pipes or gas lines. Provide inspection requirements for the gas
piping on the plans.
3. Provide manufacturers specifications for the new vacuum or clearly identify the type of vacuum and
what it is used for.
Should there be questions concerning the above requirements, contact the Building Division at 206 -431-
3670. No further comments at this time.
Contractors or Tradespeople P ter Friendly Page
•
General /Specialty Contractor
A business registered as a construction contractor with Lal to perform construction work within the scope of
its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of
account and carry general liability insurance.
Business and Licensing Information
Name MCKINSTRY CO LLC UBI No. 602569922
Phone 2067623311 Status Active
Address Po Box 24567 License No. MCKINCL942DW
Suite /Apt. License Type Construction Contractor
City Seattle Effective Date 3/16/2006
State WA Expiration Date 3/16/2012
Zip 98134 Suspend Date
County King Specialty 1 General
Business Type Limited Liability Company Specialty 2 Unused
Parent Company
Other Associated Licenses
License
Name
Type
Specialty
1
Specialty
2
Effective
Date
Expiration
Date
Status
LYDIGML901JLLYDIG+
MCKINSTRY LLC
Construction
Contractor
General
Unused
4/13/2010
4/13/2012
Active
WESTVI *121RF
WESTVENT INC
Construction
Contractor
General
Unused
12/6/1988
9/1/1994
Archived
MCKIN* *372ND
MCKINSTRY CO
Construction
Contractor
General
Unused
8/20/1963
1/2/2008
Re
Licensed
Business Owner Information
Name
Role
Effective Date
Expiration Date
PEDERSEN, JAMIE D
Agent
03/16/2006
Bond Amount
ALLEN, DEAN CHARLES
Partner /Member
03/16/2006
929511574
MOORE, DOUGLAS JAMES
Partner /Member
03/16/2006
ALLEN, DAVID EDWARD
Partner /Member
03/16/2006
TRAVELERS CAS 8
SURETY CO
TEPLICKY, JOSEPH WILLIAM
Partner /Member
03/16/2006
03/01/2011
Bond Information
Page 1 of 2
Bond
Bond Company Name
Bond Account Number
Effective Date
Expiration Date
Cancel Date
Impaired Date
Bond Amount
Received Date
2
WESTERN SURETY CO
929511574
09/09/2010
Until Cancelled
$12,000.0009/02
/2010
1
TRAVELERS CAS 8
SURETY CO
104702039
01/03/2006
Until Cancelled
03/01/2011
$12,000.0003/16
/2006
Assignment of Savings Information No records found for the previous 6 year period
Insurance Information
Insurance
Company Name
Policy Number
Effective Date
Expiration Date
Cancel Date
Impaired Date
Amount
Received Date
4
ZURICH
AMERICAN INS
CO
GLA3999903
01/31/2011
01/31/2012
$2,000,000.00
12/20/2010
3
ZURICH
AMERICAN INS
CO
CP0399990301
01/31/2009
01/31/2011
$2,000,000.00
12/07/2009
2
ZURICH
AMERICAN INS
CO
CP03999903
01/31/2008
01/31/2009
$2,000,000.00
01/31/2008
1
CHARTER OAK
FIRE INS CO
DTC052D7193C0F07
01/31/2006
01/31/2009
$1,000,000.00
01/08/2008
https://fortress.wa.gov/lni/bbip/Print.aspx
12/23/2010
ARCHITECTURAL MATERIALS
DETAIL INDICATIONS
f
CT EQUIPMENT REPLACEMENT, ROOM 164
HIGHLINE SPECIALTY CAMPUS
TUKWILA, WASHINGTON
OWNER
CONTACT: DIANNE MUNROE
ARCHITECT
CONTACT: STEVEN WESCOTT, AIA
STRUCTURAL
CONTACT: JOHN SMITH, P.E., S.E.
MECHANICAL
CONTACT: JARED ROBILLARD
ELECTRICAL
CONTACT: DOUG FORSLUND
PROJECT INFORMATION
PROJECT DESCRIPTION:
JOB SITE ADDRESS:
TAX PARCEL NUMBER:
ZONING CLASSIFICATION:
PERMITTING AUTHORITY:
HIGHLINE MEDICAL CENTER
16251 SYLVESTER ROAD SW„ BURIEN, WA 98166
NACIARCHITECTURE
2201 SIXTH AVENUE, SUITE 1405, SEATTLE, WA 98121 (206) 441 -4522
COLLONS & SMITH STRUCTURAL ENGINEERS
485 FRONT STREET NORTH, SUITE F -3, ISSAQUAH, WA 98027 (425) 369 -1101
HARGIS
600 STEWART STREET, SUITE 1000, SEATTLE, WA 98101
HARGIS
600 STEWART STREET, SUITE 1000, SEATTLE, WA 98101
INTERIOR REMODELING TO THE FIRST
FLOOR OF THE WEST WING FOR
DIAGNOSTIC IMAGING EQUIPMENT
REPLACEMENT. APPLICATION FOR
ALTERATIONS TO MECHANICAL,
ELECTRICAL AND FIRE PROTECTION
SYSTEMS WILL BE UNDER SEPARATE
PERMIT.
12844 MILITARY ROAD SOUTH
TUKWILA, WASHINGTON 98168
162 -304 -9001
0 - OFFICE
CITY OF TUKWILA
DEPARTMENT OF HEALTH
(206) 448 -3376
(206) 448 -3376
LEGAL DESCRIPTION
EIen'.
kap .. bin.°
ij 8s Pfping
r" of Tukwlfa
DING DIVISION
IN THE COUNTY OF KING, STATE OF WASHINGTON:
THAT PORTION OF THE NORTH ONE -HALF OF THE NORTH NORTHEAST ONE- QUARTER OF SECTION
16, TWP, 23N, RANGE 4E, W.M., IN KING COUNTY, WASHINGTON, LYING EASTERLY OF MIUTARY
ROAD, EXCEPT THAT PORTION OF THE NORTHEAST ONE- QUARTER OF THE NORTHEAST
ONE- QUARTER OF SECTION 16, TWP, 23N RANGE 4E, W.M., IN KING COUNTY, WASHINGTON,
DESCRIBED AS FOLLOWS:
1. BEGINNING AT A POINT ON THE SOUTH LINE OF THE NORTHEAST 1/4 OF THE NORTHEAST 1/4
OF SAiD SECTION 16, DISTANT EAST 561 FEET FROM THE SOUTHWEST CORNER THEREOF;
THENCE NORTH, AT RIGHT ANGLES 184 FEET, THENCE WEST ON A LINE PARALLEL WITH SOUTH
LINE OF SAID SUBDIVISION 225 FEET; THENCE NORTH AT RIGHT ANGLES 210 FEET; THENCE
WEST ON A LINE PARALLEL WITH SOUTH LINE OF SAiD SUBDIVISION TO THE EASTERLY LINE OF
MILITARY ROAD; THENCE SOUTHERLY ALONG SAID EASTERLY LINE OF MILITARY ROAD TO AND
INTERSECTING WITH THE SOUTH LiNE OF SAID SUBDIVISION TO POINT OF BEGINNING.
AND EXCEPT THAT PORTION OF THE NORTHEAST 1/4 OF THE NORTHEAST 1/4 OF SECTION 16,
TWP, 23N, RANGE 4E, W.M., IN KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS:
2. BEGINNING AT THE INTERSECTION OF THE SOUTH LINE OF THE NORTH 160 FEET OF SAID
SUBDIVISION WITH THE EASTERLY MARGIN OF MILITARY ROAD; THENCE EASTERLY ALONG SAiD
SOUTH LINE 200 FEET; THENCE NORTHERLY AT RIGHT ANGLES 160 FEET TO THE NORTH LINE
OF SAID SUBDIVISION; THENCE WESTERLY ALONG SAID NORTH UNE TO THE EASTERLY UNE OF
SAID MILITARY ROAD; THENCE SOUTHERLY ALONG SAID EASTERLY LINE TO THE POINT OF
BEGINNING; EXCEPT THAT PORTION IF ANY, CONVEYED TO KING COUNTY FOR 128TH STREET,
BY DEED RECORDED UNDER AUDITOR'S FILE NO.5274608.
TRUE
NORTH
ti Pitimbi ';
� Gee Piping
City Qf Tukwffa
DIVISION
VICINITY MAP
Porrni! No
Plan review approvalis subject to OROS and omissions.
Approval of construction documents ' :: not authorize
' s violation of any adopted code y ordinance. Receipt
of approved d 'p ns is acknowledged:
By
Date.
NO SCALE
Of Tukwila
BUILDING DIVISION
HIGHLINE SPECIALTY
CAMPUS
PROJECT LOCATION.
West Wing, 1st Floor
Tenant Improvement
IUD COP
This *of
keptatthe
open to
ora
documents shall
and shall be
Off
City Of1' kwiia
BUILDING DIVISION
EXTERIOR MA'WRIAL
STORAGE AREJA�
MATERIAL DELI
AT FIRST FLOOR
REVIEWED FO --
E COMPLI
of
iLDING ISi
LOCATION MAP
PLAN NO SCALE
NORTH
ARCHITECTURAL SYMBOLS
149E
R1498
ROOM NAME
101 )
GRID LiNE
DOOR IDENTIFICATION
RELITE IDENTIFICATION
REVISION
MATCH LINE
Shaded area is side considered
WORK POINT, DATUM POINT,
CONTROL POINT
DETAIL
Upper mark denotes drawing number
Lower mark denotes sheet
PARTIAL BUILDING SECTION
INTERIOR ELEVATION
Elevation number denoted in arrow
Sheet number denoted in box
ROOM IDENTIFICATION
CODED NOTE
WALL TYPE
DASHED LINE
Used to denote items .hidden, overhead,
not in contract (NIC), or to be removed
BREAK LINE
Material to continue
CENTER LINE, GRID LINE
PROPERTY LINE
};f
PLAN INDICATIONS
11 1
No change
of work witho
TukwII
NOTE Revi
and �� nclude additional plan review
ACOUSTIC TILE OR BOARD
ROOFING
BRICK
CAULKING OR SEALANT
CERAMIC TILE
CONCRETE
PRECAST CONCRETE
CONCRETE MASONRY UNIT
EARTH /FINISH GRADE
GLASS
GRAVEL
GYPSUM BOARD
INSULATION, BATT
INSULATION, RIGID
METAL
MORTAR, PLASTER, SAND
PLYWOOD
WOOD, FINISH
WOOD FRAMING
Continuous member
WOOD FRAMING
Interrupted member
EXISTING WALL
NEW STUD WALL
NEW CONCRETE MASONRY UNIT
NEW CONCRETE
NEW BRICK
REVI SIONS
be mal. � a scope
+ royal of
in• ion.
will require a new bmittal
R
ARCHITECTURAL ABBREVIATIONS
L
!
•
T
A/C
ACOUS
AD
ADJ
ADJT
AFF
AL
ALT
ANC
APPROX
ARCH
AUTO
BD
BET
BITUM
BLDG
BLK
BLKG
BM
BOTT
BRG
BUR
CAB
CB
CER
CG
CJ •
CLG
CLKG
CLO
CLG
CLR
CMU
COL
CONC
CONST
CONT
CORR
CPT
CT
CTR
DBL
DEMO
DF
DIA
DIAG
DIM
DP
DR
DN
and
angle
at
centerline
channel
diameter or round
plate
pound or number
tee
air conditioning
acoustical
area drain
adjustable
adjacent
above finished floor
aluminum
alternate
anchor(age)
approximate
architectural
automatic
board
between
bituminous
building
block
blocking
beam
bottom
bearing
built up roof
cabinet
catch basin,
ceramic
corner guard
control joint
ceiling
calking
closet
ceiling
clear
concrete masonry unit
column
concrete
construction
continuous
corridor
carpet
ceramic tile
center
double
demolish, demolition
drinking fountain
diameter
diagonal
dimension
dampproof(ing)
door
down
EA
EJ
EL
ELEC
ELEV
EQ
EQUIP
EW
EWC
EXH
EXIST
EXP
EXT
FA
FAB
FD
FE
FEC
FEC -S
FF
FFL
FIN
FL
FLG
FLUOR
FOC
FOF
FOM
FOS
FOSH
FP
FT
GA
GALV
GL
GLZ
GMU
GYP BD
HC
HD
HDWD
HORIZ
HT
HVAC
ID
INCL
INFO
INSUL
iNT
L
LAB
LAM
LKR
LT
LV
JT
each
expansion joint
elevation
electrical
elevator
equal
equipment
eyewash
electric water cooler
exhaust
existing
expansion
exterior
fire alarm
fabricate
floor drain
fire extinguisher
fire extinguisher
cabinet (recessed)
fire extinguisher
cabinet (semi - recessed)
factory finish
finished floor line
finish
floor
flooring
fluorescent
face of concrete
face of finish
face of masonry
face of studs
face of sheathing
fireproof
foot, feet
gauge
galvanized
glass
glazing
glazed masonry unit
gypsum board
handicap (accessible)
head
hardwood
horizontal
height
heating /ventilating /air -
conditioning
inside diameter (dim.)
include
information
insulation
interior
length, long
laboratory
laminate
locker
Tight, left
louver
joint
MACH
MATL
MAX
MC
MECH
MEZZ
MFR
MIN
MIR
MISC
MO
MT(D)
MIL
MUL
N
NiC
NO OR
NOM
NTS
OA
OC
OD
OFCI
OFOI
OH
OHD
OPNG
OPP
ORIG
PC
PERE
PERP
PLAM
PL
PLAS
PLYWD
PNL
PR
PREFAB
PREFIN
PROJ
PT
PTD
PTDR
PTN
PTR
R
RCP
REBAR
RECD
REF
RF
REFR
RO
RM
REQD
machine
material
maximum
medicine cabinet
mechanical
mezzanine
manufacturer
minimum
mirror
miscellaneous
masonry opening
mounted)
metal
mullion
north
not in contract
number
nominal
not to scale
over -all
on center
outside diameter (dim.)
other furnished contractor installed
other furnished owner installed
overhead door
opening
opposite
original
pre -cast
perforated
perpendicular
plastic laminate
plate
piaster
plywood
panel
pair
prefabricate(d)
prefinish(ed)
project
point, paint
paper towel dispenser
combination paper towel
dispenser & receptacle
partition
paper towel receptacle
riser, radius
reflected ceiling plan
reinforcing bar
received
reference
roof
refrigerator
rough opening
room
required
S south
SCD seat cover dispenser
SD soap dispenser'
SECT section
SHR shower
SHT sheet
SHTG sheeting
SIM similar
SND sanitary napkin dispenser
SNR sanitary napkin receptacle
SPEC specification
50 square
SSK service sink
SS stainless steel
STD standard
STL • steel
STOR storage
STRUCT structural
SYS system
TB
TC
TEL
TEMP
TF
THK
THRU
TM
R
TPD
TS
TV
TVB
TW
TYP
UNFIN
UNO
UR
towel bar, tackboard
top of curb
telephone
temporary
top of footing
thick
through
top of masonry
top of pavemei t
toilet paper dispenser
tube steel
television
television bracket
top of wall
typical
unfinished
unless .noted otherwise
urinal
VB vapor barrier
VCT vinyl composition tile
VER
VERT
VEST
VOL
W
W/
WB
wc
WDw
W/O
WP
WSCT
WS
WT
WTR
verify
vertical
vestibule
volume
west, wide, wk'Eh
with
whiteboard
water . closet
wood
window
without
waterproof
wainscot
weather strippi g
weight
water
\.
06;
REVISIONS
No rIrtnges shall be made to the scope
of work without prior approval of
Tukwila Building Division.
NOT": Rsvi ,ions will require a new plan submittal
and may include additional plan review fees.
INDEX OF DRAWINGS
GENERAL
* G0.1 PROJECT COVER SHE T
9i G1.1 FIRST FLOOR LIFE /SAF
ARCHITECTURAL
A2.1 FIRST FLOOR DEMOLITION PLAN
A3.1 FIRST FLOOR PLAN, WALL TYPES, S
A3.2 ROOF PLAN & EXTERIOR D
A5.1 PARTIAL STRUCTU
A5.2 PARTIAL
A7.1
LANA 1
w
X
LES
OOF PLAN & STRUCTURAL DETAILS
G SECTIONS & INTERIOR DETAILS
R ELEVATIONS, CASEWORK & INTERIOR DETAILS
.1 FIRST FLOOR REFLECTED CEILING PLAN & CEILING DETAILS
MECHANICAL
MO.1 MECHANICAL LEGEND
M0.2 GENERAL NOTES AND ABBREVIATIONS
MO.3 MECHANICAL SPECIFICATIONS
MO.4 MECHANICAL SPECIFICATIONS
M0.5 MECHANICAL SPECIFICATIONS
MO.6 MECHANICAL SPECIFICATIONS
MO.7 MECHANICAL EQUIPMENT SCHEDULES
c M1.3 FIRST FLOOR HVAC DEMOLITION PLAN
•t M3.1 FIRST FLOOR HVAC PLAN t,up,rk.
low
* M6.1 MECHANICAL ROOF PLAN
sjX M9.1 MECHANICAL DETAILS
ELECTRICAL
E0.1 ELECTRICAL LEGEND
E0.2 ELECTRICAL SPECIFICATIONS
ED1.1 ELECTRICAL DEMOLITION PLAN
E2.1 PARTIAL FIRST FLOOR LIGHTING PLAN
E3.1 PARTIAL FIRST FLOOR POWER & SYSTEMS PLAN
E3.2 PARTIAL ROOF POWER PLAN
E9.1 ELECTRICAL ONE -LINE DIAGRAM
EVIEWED FOR
CODE COMPLIANCE
ApDCI!I1r11VEl
DEC 2, 0 2010
1-
City of Tukwila
BUILDING DIVISION
Kcow .L t i1.er 411I
`/'-ev ■+4-t ea b1 g n -rD>e
0v` pis 1
LS--.o I-� r°'
�.1
GE MEDICAL INSTALLATION DRAWING
-. FOR INFORMATION ONLY .
C1 SITE READINESS
Al EQUIPMENT LAYOUT
S1 STRUCTURAL LAYOUT .
S2 STRUCTURAL DETAILS
El ELECTRICAL LAYOUT
E2 ELECTRICAL SPECIFICATIONS
E3 ELECTRICAL DETAILS
D1. EQUIPMENT DETAILS
l)(7 to-A/
RECEIVED
DEC 15 WO
PERMIT CENTEF
PROJECT COVER SHEET
0
REVISIONS
CT EQUIPMENT REPLACEMENT, ROOM 164
un
� o
Q.. z_
2
4:C
fir/ J
Y
Faun P-
J
.rr..n
L)
w
CL
(0/)
iniktA
trOitOil
.100,110t
NAM
it
vctriisaa
12844 MILITARY ROAD S
NAG NO 121 -10017
FILE G0.1
DRAWN KRL
CHECKED SRW
DATE 9 -10 -2010
H
l it
11
II
11
11
II
•
sus 1!: ss! !II w 111 111 -
�I.
•
•
I_ 7
I
1'
1
IN ni —I 1111 NM li 111 sss NM HI IN ® II 111 Nil 111 11 111 111 PPP 111 PPP s:1
I
bb
J
RADIOLOGY
ROOM
III11.1 1= -r
TECH
SUPPORT
r r No r r -.
1
1
- -
- -
- ELA-
RADIOLOGY
ROOM 121
1
r `•
III 1s1
CONTROL
ROOM
PATIENT
DRESSING
DIAGNOSTI
IMAGING
RECEPTIO
WAITING
fri
iI
CORRIDOR
(
1111 s!!9 Hi
STORAGE
t!— v♦
1
,\
■11
CORRIDOR
,u 111 111 PH 111 gll
OFFICE
♦1
■
HALLWAY
L �'I
CT
EXAM
ROOM.
AREA OF WORK
1s: Ill 1r!
1MM 46
•
•
IW
8
10
D
i
- w
1,31.31 1111
1
•
CONTROL
ROOM
WEST WING FIRST FLOOR LIFE /SAFETY PLAN
Scale: 1 /8" = 1'--0"
1I:
■/.
• \L
16
u
1
CODE DATA
CONSTRUCTION TYPE:
OCCUPANCY TYPE
ALLOWABLE AREA:
FIRE PROTECTION:
GOVERNING CODES:
NUMBER OF STORIES:
FLOOR AREA:
WEST WING -- TYPE II —A (NO CHANGE)
GROUP 1 -2: HOSPITAL (NO CHANGE)
90,000 SF
FULLY SPRINKLERED PER 903.3.1.1 AND NFPA 13 (NO CHANGE)
FIRE ALARM SYSTEM (NO CHANGE)
WASHINGTON STATE BUILDING CODE
2009 INTERNATIONAL BUILDING CODE (WAC AMENDMENTS)
2003 ICC /ANSI A117.1 (WAC AMENDMENTS)
2009 INTERNATIONAL MECHANICAL CODE (WAC AMENDMENTS)
2009 INTERNATIONAL FIRE CODE (WAG AMENDMENTS)
2009 UNIFORM PLUMBING CODE (WAC AMENDMENTS)
2008 NATIONAL ELECTRICAL CODE (WAC AMENDMENTS)
WASHINGTON STATE NON — RESIDENTIAL ENERGY CODE
CITY OF TUKWILA BUILDING AND ZONING CODES
3 (NO CHANGE)
AREA OF TENANT IMPROVEMENT = 509 S.F.
CODE PLAN GENERAL NOTES
1. SEE FLOOR PLANS FOR DIMENSIONS, WALL TYPE REFERENCES.
2. SEE ELECTRICAL FOR EXIT SIGNS AND EMERGENCY EGRESS LIGHT FIXTURES.
3. WEST WING IS TYPE II —A, FULLY SPRINKLED CONSTRUCTION. QUICK RESPONSE HEADS
ARE USED WHERE ALLOWED BY IBC CHAPTER 9.
6. FIRESTOP ALL PENETRATIONS THROUGH FIRE —RATED WALL AND FLOOR /CEILING
ASSEMBLIES. SEAL PENETRATIONS TO RETAIN THE INTEGRITY OF THE TIME —RATED
CONSTRUCTION
7. INTERIOR WALL AND CEILING FINISHES SHALL CONFORM TO IBC SECTION 803.1 AND
TABLE 803.4 FOR FLAME SPREAD REQUIREMENTS.
FIRE PROTECTION NOTES
1. SEE MECHANICAL DRAWINGS FOR FIRE SPRINKLER SYSTEM ALTERATIONS ASSOCIATED
WITH TENANT IMPROVEMENT WORK IN ACCORDANCE WITH IBC 903.1 AND NFPA 13,
SPRINKLER DRAWINGS TO BE SUBMITTED BY LICENSED INSTALLER.
2. SEE ELECTRICAL DRAWINGS FOR BUILDING FIRE ALARM SYSTEM ALTERATIONS
ASSOCIATED WITH TENANT IMPROVEMENT WORK PER NFPA 72, FIRE ALARM DRAWINGS
TO BE SUBMITTED BY LICENSED INSTALLER.
3. FIRE EXTINGUISHERS TO BE PROVIDED ON A MAXIMUM TRAVEL DISTANCE OF 75' TO
ANY EXTINGUISHER LOCATION.
PLAN LEGEND
COD
VIEWED FO
PL CF
AP \i
DEC 10
C' of Mimi,
DUI ,r RIG DIVISIo
I■ r IN - MI - MI EXISTING FIRE PARTITION, 1 HOUR
FIRE — RESISTIVE RATING PER IBC 708
IIIIIIhhuIIIIIIIIhIhu
=roil 1 r 1 row
EXISTING SMOKE BARRIER, 1 HOUR
FIRE — RESISTIVE RATING PER INC 709
NEW FIRE BARRIER, 1 HOUR
FIRE — RESISTIVE RATING PER IBC 708
11111•1•11•11111 EXISTING FIRE BARRIER, 2 HOUR
FIRE— RESISTIVE RATING PER IBC 706
1 OCCUPANCY
I OCCUPANCY SUITE (THIS PROJECT)
FIRESTOPPING:
ALL PENETRATIONS MADE THROUGH FIRE —RATED WALLS, CEILINGS AND FLOOR ASSEMBLIES,
BOTH EMPTY HOLES AND HOLES ACCOMMODATING SUCH ITEMS AS DUCTS, PIPES, CONDUIT,
ETC. SHALL BE SEALED. PENETRATIONS SHALL BE SEALED TO RETAIN THE INTEGRITY OF
THE TIME —RATED CONSTRUCTION BY MAINTAINING AN EFFECTIVE BARRIER AGAINST THE
SPREAD OF FLAME, SMOKE, AND GASES, IN ACCORDANCE WITH THE REQUIREMENTS OF IBC
SECTION 712 — FIRESTOPPING. MECHANICAL AND ELECTRICAL RELATED PENETRATIONS
SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR MAKING THE PENETRATION — SEE
MECHANICAL AND ELECTRICAL.
RECEIVED
DEC 15 2010
PERMIT CENTER
R
OCT
in IT CENT
N
::D KEY PLAN
NOT TO SCALE
TO SCALE
PARTIAL FIRST FLOOR LIFE /SAFETY PLAN
r:vIaIVIVI
ARDINE
ASHINGTON
CT EQUIPMENT REPLACEMENT, ROOM 164
Z
O
O.. z
Q
u
LLI
ton
CD
F--
616il
I
' J_
"Ar lt+''4 'r
i*. i 0000
t ; C\I
TECTURE
2201 SIXTH AVENUE 1 SUITE 14051 SEATTLE WA 98121-18471P: 206.441.45221 F:206.442.7917
NAC NO 121 -10017
FILE G1 -1
DRAWN SRW
CHECKED SRW
DATE 9-10 -2010
EXISTING STEEL COLUMN BELOW
41_4"
-H
EXISTING W14 STEEL WIDE FLANGE
HVAC UNIT ABC
TO BEAR ON (:
WIDE FLANGE B
BEAM
VE ROOF, LOCATE CURB
) STEEL JOISTS & STEEL
AM .
EXISTING 14" SLL TEEL JOISTS ® 5' -41" OC
OUTLINE OF CT ROOM
EXAM ROOM
r
L
in
r
J
OF 4" TUBE STEEL
SAWCUT OPENING IN 5" THICK
CONCRETE ROOF STRUCTURE
40 TUBE STEEL ROOF SLAB SUPPORT
EXIS11NG `CONCRETE WALL
APPROXIMATE POSITION OF
CT GANTRY BELOW. SEE A3.1
EXISTING CONCRETE ROOF BEAM
PARTIAL REFLECTED ROOF STRUCTURE .PLAN
Scale: 1/4" = 1'--O"
LJ
#14 x 21" LG WOOD SCREWS
@ 12" @ PERIMETER OF CURB
UNIT CURB
mot
I•
1
—1
TREATED WOOD NAILERS W/ (2) #12 SELF — DRILLING
SHEET METAL SCREWS Ills 12" OC, 4 SIDES OF CURB
1
L�
TOP & BOTTOM,
NEAR SIDE & FAR SIDE
1"
M
'9"411rriar4MeriVr C449
�.r=
EXISTING 14" STEEL JOIST
ADD L 11 x 11 x Ala ® PANEL POINT,
NEAR SIDE & FAR SIDE, TYPICAL OF 2 JOISTS
-.
(MA HVAC CURB SUPPORT
4 SCALE: 1- 1/2 " =1' -0"
RFOO5
EXISTING CONCRETE ROOF SLAB
GENERAL STRUCTURAL NOTES
QUALITY ASSURANCE:
1. SPECIAL INSPECTIONS ARE REQUIRED IN ACCORDANCE WITH CHAPTER 17 OF THE IBC FOR THE
FOLLOWING WORK:
CONCRETE
INSTALLING EXPANSION BOLTS . .
INSTALLING EPDXY BOLTS & DOWELS
(PERIODIC)
(CONTINUOUS)
WELDING (CONTINUOUS, UON)
WELDING - SINGLE -PASS, 816 FILLET OR LESS (PERIODIC)
ANCHORAGE:
2. EXPANSION BOLTS, INTO CONCRETE SHALL BE AS MANUFACTURED BY SIMPSON STRONG -TIE
COMPANY, INC. OR HILTI INC. INSTALLED IN STRICT ACCORDANCE WITH APPLICABLE ICC-ES REPORTS,
INCLUDING MINIMUM TORQUE REQUIREMENTS. EMBEDMENT DEPTHS SHALL BE AS INDICATED.
SPECIAL INSPECTION IS REQUIRED FOR INSTALLATION OF ALL EXPANSION BOLT AND INSERT
INSTALLATION.
MANUFACTURER
SIMPSON STRONG -TIE COMPANY, INC.
HILTI, INC.
MATERIAL PRODUCT
CONCRETE STRONG BOLT
CONCRETE KWIK BOLT TZ (KB TZ)
1CC-ES REPORT
ESR 1771
ESR -1917
EPDXY - GROUTED ANCHORS REINFORCING BAR INTO CONCRETE SHALL BE GROUTED WITH EPDXY
ADHESIVE BY SIMPSON STRONG TIE COMPANY, INC. OR HILTI INC. INSTALLED IN STRICT ACCORDANCE
WITH APPLICABLE ICC -ES REPORTS. SPECIAL INSPECTION IS REQUIRED FOR ALL EPDXY - GROUTED
ANCHOR INSTALLATIONS.
MANUFACTURER
SIMPSON STRONG -TIE COMPANY, INC.
HILTI, INC.
MATERIAL
CONCRETE
CONCRETE
PRODUCT
SET XP EPDXY
HIT -RE 500-SD
ICC -ES REPORT
ESR -2508
ESR -2322
LwitT 062„ /1,8 iI• I
HSS 4X 4X 14, NO FASTENERS
TO SLAB
(1) WO THREADED STUD, NUT
& WASHER. USE SLOTTED
HOLE IN ANGLE FOR TOLERANCE
L 4x 4x vox 0' -7" W/
(2) % "4 EXPANSION BOLTS
® 41/2" CENTER TO CENTER
EXISTING 14 "W x 20 "D
CONCRETE BEAM
ROOF OPENING SUPPORT DETAIL
SCALE: 1-1/2"=r-0"
REVIEWED FOR
CODE COMPLIANCE
APPROVED
DEC 10 20f10
City Of Tukwila
BUILDING DIVISION
RFOO6
(2) #4 CONT. — EMBED 4" INTO
EXISTING CONCRETE BEYOND
CONCRETE INFILL
EXISTING OPENING
EXISTING CONCRETE FLOOR
STRUCTURE
#4 x (SLAB OPENING MINUS 1 ")
DOWELS, EPDXY GROUT 8" OC
MAXIMUM EACH SIDE,
CENTER IN CONCRETE SLAB
CONCRETE FLOOR. INFILL
RECEIVED
DEC 15 2010
PERMIT CENTER
SCALE: 1-1/2"=f-0"
PARTIAL ROOF STRUCTURE PLAN
STRUCTURAL DETAILS
REVISIONS
A 11/02/2010
UTY OF TUKWILA
COMMENT RESPONSE
CT EQUIPMENT REPLACEMENT, ROOM 164
12844 MILITARY ROAD 8
NAC 140
FILE
DRAWN
CHECKED
DATE
W
D
1-
V
W
Cluj!
er
V
121 -10017
A5 -1
SRW
SRW
9 -10 -2010
A
5.1
GENERAL
1 AHU -01
0
EXISTING MECHANICAL TO
BE REMOVED
EXISTING MECHANICAL TO
REMAIN
NEW MECHANICAL WORK
MATCHLINE OR PROPERTY
LINE
ENLARGED PLAN BOUNDARY
DETAIL /PLAN IDENTIFIER
SECTION IDENTIFIER
ELEVATION IDENTIFIER
REVISION DEFINITION AREA,
AREA ENCIRCLED CONTAINS
CHANGES MADE
SUBSEQUENT TO PREVIOUS
ISSUE
REVISION CALLOUT
FLAG NOTE CALLOUT
DEMOLITION NOTE TAG
EQUIPMENT TAG
MECHANICAL EQUIPMENT
TAG
MECHANICAL EQUIPMENT
TAG
NORTH ARROW
LOCATION WHERE PICTURE
WAS TAKEN AND DIRECTION
INVERT ELEVATION OR POC
ELECTRICAL PROVISIONS FOR MECHANICAL WORK
Eh
VFD
r-HT
LOCATION OF STARTER,
DISCONNECT & CONTROLS
VARIABLE FREQUENCY DRIVE
HEAT TRACE BETWEEN
SYMBOLS OR END OF RUN
ACCESS, EXCAVATION, AND BACKFLLNG
r -�
ACCESS DOOR (SPECIFIED
OR AS SHOWN ON DWGS)
MECHANICAL ACCESS
(SPECIFIED OR AS SHOWN
ON DWGS)
0
4
PIPE ELBOW UP OR PIPE
TEE UP AND DOWN
PIPE ELBOW DOWN
PIPE TEE UP
PIPE TEE DOWN
PIPE RISE
PIPE CAP
PIPE PLUG
FLOW DIRECTION
PIPE BREAK
PIPE CONNECTION
VALVES
— nat�ROa ---
-ie
PIPING SPECIALTES
VALVE: GATE, BALL,
BUTTERFLY (REFER TO
SPECIFICATIONS)
GLOBE VALVE
SOLENOID VALVE
CHECK VALVE
BALANCING VALVE
PRESSURE REDUCING VALVE
REDUCED PRESSURE
BACKFLOW ASSEMBLY
SAFETY RELIEF VALVE
TEMPERATURE /PRESSURE
RELIEF VALVE
t T/P
UNION
FLANGE
FLEX CONNECTOR
THERMAL /SEISMIC FLEXIBLE
LOOP
EXPANSION JOINT
STRAINER
STRAINER WITH BLOW OFF
VALVE
PIPE ANCHOR
ALIGNMENT GUIDE
TEMPERATURE /PRESSURE
TEST PORT
THERMOMETER
PRESSURE GAGE
SOL AND WASTE WATER PPM SYSTEM
X" VTR
-0
fl
B
O
II CO
IIwCo
o FCO
SANITARY SEWER /WASTE
UNDERGROUND
SANITARY SEWER /WASTE
ABOVE GROUND
VENT PIPING
VENT THRU ROOF
(INCLUDE SIZE)
FLOOR DRAIN /FUNNEL
FLOOR DRAIN
FLOOR SINK
HUB DRAIN
TRENCH DRAIN
CLEANOUT
CLEANOUT - FREE
STANDING WALL MOUNTED
CLEANOUT - FLUSH WITH
FLOOR
DOMESTIC WATER PPIVG SYSTEM
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER
CIRCULATION
HOSE BIBB /WALL HYDRANT
TRAP PRIMER BOX
IFIE PROTECTION SYSTEM
F
FIRE SPRINKLER
RECESSED SPRINKLER HEAD
SEMI - RECESSED SPRINKLER
HEAD
UPRIGHT SPRINKLER HEAD
NATURAL GAS PIPNG SYSTEM
0
LOW PRESSURE NATURAL
GAS PIPING
GAS COCK
PRESSURE REGULATOR
PRESSURE REGULATOR WITH
VENT
SEISMIC GAS SHUT -OFF
GAS PRESSURE REDUCING
VALVE WITH VENT
MEDICAL GAS PIPING SYSTEM
MA
MV
02
NO
P"-
MEDICAL AIR
MEDICAL VACUUM
OXYGEN
NITROUS OXIDE
MEDICAL GAS ZONE
VALVE BOX
MEDICAL GAS AREA
ALARM PANEL
MEDICAL GAS MASTER
ALARM PANEL
MEDICAL GAS OUTLET TYPE
A - MEDICAL AIR
✓ - MEDICAL VACUUM
O - OXYGEN
2'` N - NITROUS OXIDE
S - VACUUM SLIDE
rLEtB AND OUTLETS
MEDICAL GAS OUTLET QTY.
(IF QTY. OT INDICATED
ASSUME 1 OUTLET)
LOCKED CLOSED VALVE
LOCKED OPEN VALVE
A 24x24 -•
500
1' '1
4--,
GRILLE REGISTER OR
DIFFUSER TYPE
RUNOUT SIZE (INCHES)
AIR QUANTITY (CFM)
CEILING DIFFUSER
1 -WAY DIRECTION FLOW
2 -WAY DIRECTION FLOW
3 -WAY DIRECTION FLOW
RETURN /RELIEF AIR GRILLE
EXHAUST AIR GRILLE
LINEAR DIFFUSER /GRILLE
SUPPLY GRILLE
RETURN /EXHAUST GRILLE
TRANSFER GRILLE
RETURN /EXHAUST AIRFLOW
SUPPLY AIR FLOW
In ow \41
DUCTWORK
BDD
I I
r
11
20x10
I 1
Itltlttt
■HEI ■
=:<).
.9.
.42
=13
cam
=IL
c41=3
•
H
FEE DAMPERS
BACKDRAFT DAMPER
VOLUME DAMPER
FLEXIBLE CONNECTION TO
MECHANICAL EQUIPMENT
TRANSITION - RECTANGULAR
TO ROUND
DUCT SIZE (CLEAR INSIDE
DIMENSION)
SOUNDLINED DUCTWORK
RECTANGULAR DUCT UP
RECTANGULAR DUCT DN
ROUND OR OVAL DUCT UP
ROUND OR OVAL DUCT DN
FLEXIBLE DUCTWORK
DUCT RISE /DROP WITH 90'
ELBOWS (RECTANGULAR
DUCTS)
DUCT RISE /DROP WITH 45'
ELBOWS (RECTANGULAR
DUCTS)
DUCT RISE /DROP WITH 90'
ELBOWS (ROUND OR OVAL
DUCT)
DUCT RISE /DROP WITH 45'
ELBOWS (ROUND OR OVAL
DUCTS)
TRANSITION OR REDUCER
TRANSITION - ECCENTRIC
45' ELBOW, R/D OR
R /W =1.5
90' ELBOW, R/D OR
R /W =1.5
SQUARE CORNER ELBOW
WITH TURNING VANES
90' CONICAL TAKE -OFF
90' TAKE -OFF WITH 45'
TAPER
45' TAKE -OFF
RADIUS TAP IN
WYE FITTING
RADIUS TEE
SQUARE TEE WITH TURNING
VANES
BULLHEAD TEE
SECTION THRU SUPPLY AIR
DUCT
SECTION THRU RETURN,
EXHAUST OR
OUTSIDE AIR DUCT
SECTION THRU ROUND
DUCT
SUPPLY ROOF PENETRATION
RETURN, EXHAUST OR OUTSIDE
AIR ROOF PENETRATION
ROUND DUCT ROOF
PENETRATION
FIRE DAMPER
F S F S
? I ? FIRE /SMOKE DAMPER
-1E14
SMOKE DAMPER
CEILING FIRE DAMPER
CONTROLS (PLAN vEW)
D�4
DDC
tx
DRAWING INDEX
THERMOSTAT OR
TEMPERATURE SENSOR
SENSOR: SHOWN WITH GUARD
(TYPICAL ALL SENSORS)
HUMIDISTAT OR HUMIDITY
SENSOR
CARBON MONOXIDE SENSOR
CARBON DIOXIDE SENSOR
INDOOR AIR QUALITY SENSOR
MOTORIZED DAMPER
AIRFLOW MEASURING UNIT
DUCT SMOKE DETECTOR
TEMPERATURE TRANSMITTER
PRESSURE TRANSMITTER
AQUASTAT
DIFFERENTIAL PRESSURE
SENSOR
DIFFERENTIAL PRESSURE
MONITOR
AUTOMATIC CONTROL VALVE,
3 -WAY
AUTOMATIC CONTROL VALVE,
2 -WAY
DIRECT DIGITAL CONTROL
PANEL
SWITCH BY MECHANICAL
MO.1 MECHANICAL LEGEND
MO.2 GENERAL NOTES AND ABBREVIATIONS
MO.3 MECHANICAL SPECIFICATIONS
MO.4 MECHANICAL SPECIFICATIONS
MO.5 MECHANICAL SPECIFICATIONS
MO.6 MECHANICAL SPECIFICATIONS
MO.7 MECHANICAL EQUIPMENT SCHEDULES
M1.1 BASEMENT PLUMBING DEMOLITION PLAN
M1.2 FIRST FLOOR PLUMBING DEMOLITION PLAN
M1.3 FIRST FLOOR HVAC DEMOLITION PLAN
M2.0 BASEMENT PLUMBING PLAN
M2.1 FIRST FLOOR PLUMBING PLAN
M3.1 FIRST FLOOR HVAC PLAN
M5.1 FIRST FLOOR FIRE SUPPRESSION PLAN
M6.1 MECHANICAL ROOF PLAN
M9.1 MECHANICAL DETAILS
veto) E.eto) Or-
GO 005 11 ; ' ANCE
DEC _,. U'I!l
,,
di TUbil
BUILDING DIVISI
RECEIVED
DEC 15 2010
PERMIT CENTER
NOT ALL SYMBOLS MAY APPEAR ON THE DRAWINGS
MECHANICAL LEGEND
tin
C-
I-
t Z_
a
CD
0C • J
• i4tt
z
W
2 W
w • CL
tan
w W o
r_ o de.
Z aim
W Q >-
Cr los
W ■■■■
U co
cv
W
ce
D
1-
u
W
nc
H
u
NAC NO 121 -10017
HEINO 10113
DRAWN JMR
CHECKED RKE
DATE 9 -10 -2010
ABBREVIATIONS
0
A
MV
ABV
AC
ACU
AD
ADA
AF
AFF
AFS
AFUE
AG
AHJ
AHU
AL
AMB
AP
APD
ARCH
ASHRAE
ASSY
ATM
AV
AW
BC
BDD
BF
BHP
BLW
BOD
BOP
BOT
BTUH
BV
CA
CAP
CBV
CC
CD
CFG
CFM
CG
CH
CHR
CHS
CHP
CKV
CLG
CO
CO2
COMB
COND
CONN
CONT
COP
COTG
CR
CS
CT
CTF
C. TK
cu
Cv
CV
Cw
CWR
CWS
DB
dB
DCVA
DDCV
DEG
DFU
DH
DI
DIA
DIM
DISC
DISCH
DN
DPV
DWGS
DV
DWB
(E)
EA
EAT
EER
EF
EFF
EG
EJ
EL
ELEC
EMCS
EQUN
ESP
ET
EVAP
EWC
EWT
EXH
EXT
DIAMETER, PHASE
AIR, AMPS
AUTOMATIC AIR VENT
ABOVE
AIR CONDITIONER
AIR CONDITIONING UNIT
ACCESS DOOR
AMERICANS WITH DISABILITIES ACT
AIRFOIL
ABOVE FINISHED FLOOR
AIRFLOW MEASURING STATION
ANNUAL FUEL UTILIZATION EFFICIENCY
ABOVE GROUND
AUTHORITY HAVING JURISDICTION
AIR HANDLING UNIT
ACOUSTIC UNED (DUCT)
AMBIENT
ACCESS PANEL
AIR PRESSURE DROP
ARCHITECT
AMERICAN SOCIETY OF HEATING, REFRIGERATION
AND AIR--CONDITIONING ENGINEERS, INC.
ASSEMBLY
ATMOSPHERE
ACID RESISTANT VENT
ACID RESISTANT WASTE
BOILER
BOILER COIL
BACK DRAFT DAMPER
BELOW FLOOR
BRAKE HORSE POWER
BELOW
BOTTOM OF DUCT
BOTTOM OF PIPE
BOTTOM
BRITISH THERMAL UNIT PER HOUR
BALL VALVE
CONDENSATE PIPING
AIR COMPRESSOR
CAPACITY
CIRCUIT SETTING BALANCING VALVE
COOUNG COIL
CEILING DIFFUSER, CONDENSATE DRAIN
CEILING FIRE DAMPER
CUBIC FEET PER MINUTE
CEILING GRILLE
CABINET HEATER, CHILLER
CHILLED WATER RETURN, CHILLER
CHILLED WATER SUPPLY
CHILLED WATER PUMP
CHECK VALVE
CEILING, COOLING
CLEANOUT, CO SENSOR
CO2 SENSOR
COMBUSTION, COMBINATION
CONDENSER, CONDENSATE
CONNECTOR
CONTINUE, CONTROL
COEFFICIENT OF PERFORMANCE
CLEANOUT TO GRADE
CONDENSATE RECEIVER, CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
COOUNG TOWER
COOLING TOWER FILTER
COMPRESSION TANK
CONDENSING UNIT, CUBIC
FLOW COEFFICIENT
CONSTANT VOLUME
COLD WATER PIPING
CONDENSING WATER RETURN
CONDENSING WATER SUPPLY
DRAIN
DRY BULB (TEMPERATURE)
DECIBEL
DOUBLE CHECK VALVE ASSEMBLY
DOUBLE DETECTOR CHECK VALVE
DEGREE
DRAINAGE FIXTURE UNIT
DUCT HEATER
DUCTILE IRON
DIAMETER
DIMENSION
LOCATION OF STARTER, DISCONNECT AND CONTROLS
DISCHARGE
DOWN
DIFFERENTIAL PRESSURE VALVE
DRAWINGS
DRAIN VALVE
DOMESTIC WATER BOOSTER
EXISTING
EXHAUST AIR
ENTERING AIR TEMPERATURE
ENERGY EFFICIENCY RATIO
EXHAUST FAN
EFFICIENCY
EXHAUST GRILLE, ENGINE GENERATOR
EXPANSION JOINT
ELEVATION
ELECTRIC
ENERGY MANAGEMENT AND CONTROL SYSTEM
EQUIVALENT
EXTERNAL STATIC PRESSURE
EXPANSION TANK
EVAPORATOR, EVAPORATIVE
ELECTRIC WATER COOLER
ENTERING WATER TEMP
EXHAUST
EXTERIOR, EXTERNAL
F
FC
FCO
FCU
FD
FDC
FF
FFD
FLA
FLEX
FLR
FLTR
FMS
FOR
FOS
FOT
FP
FPM
FPS
FPVC
FS
F/S
Fr
FTD
FTG
FTU
FV
FW
G
GA
GAL
GALV
GAHU
GC
GFU
GPF
GPH
GPM
GPRV
GRD
GV
GW
GWB
HB
HC
HD
HGL
HORIZ
HP
HPC
HPS
HRU
HST
HTG
HVAC
HW
HWC
HWR
HWS
HX
HZ
IAQ
ID
IE
IN.
IN. WG
!RR
IW
kW
LAT
LB
LBS
LL
LPC
LPG
LPS
LRA
LR
LVR
LWR
LWS
LWCD
LWT
MA
MAC
MAT
MAV
MAX
MBH
MC
MCA
MECH
MERV
MIN
MOCP
MOD
MPC
MPG
MPS
MV
FAHRENHEIT, FIRE MAIN PIPING
FLUID COOLER
FLOOR CLEANOUT
FAN COIL UNIT
FIRE DAMPER, FLOOR DRAIN, DRY SPRINKLER
ROUTING
FIRE DEPARTMENT CONNECTION
FOUUNG FACTOR, FLAT FILTER
FUNNEL FLOOR DRAIN
FULL LOAD AMPS
FLEXIBLE
FLOOR
FILTER
FLOW MEASUREMENT STATION (HVAC, PLUMBING)
FUEL OIL RETURN PIPING
FUEL OIL SUPPLY PIPING
FUEL OIL TANK
FIRE PUMP, FLOATING POINT CONTROL
FEET PER MINUTE
FEET PER SECOND
APPROVED PVC FIRE SPRINKLER ROUTING
FLOOR SINK
FIRE /SMOKE DAMPER
FEET, FIN TUBE
FOOTING DRAIN
FOOTING DRAIN
FIN TUBE UNIT
FACE VELOCITY
FILTERED WATER PIPING
GAS
GAGE
GALLONS
GALVANIZED
GAS AIR HANDUNG UNIT
GAS COCK, GENERAL CONTRACTOR
GAS FIRED UNIT
GALLONS PER FLUSH
GALLONS PER HOUR
GALLONS PER MINUTE
GAS PRESSURE REGULATING VALVE
GRILLES, REGISTERS, AND DIFFUSERS
GATE VALVE, GLOBE VALVE
GREASE WASTE PIPING
GYPSUM WALLBOARD
HUMIDISTAT, HEIGHT
HOSE BIBB
HEATING COIL
HEAD, HUB DRAIN
REFRIGERANT HOT GAS LINE
HORIZONTAL
HORSEPOWER, HEAT PUMP
HIGH PRESSURE CONDENSATE RETURN
HIGH PRESSURE STEAM
HEAT RECOVERY UNIT
STORAGE TANK
HEATING
HEATING, VENTILATING, AND AIR CONDITIONING
HOT WATER PIPING
HOT WATER CIRCULATING PIPING
HOT WATER RETURN
HOT WATER SUPPLY
HEAT EXCHANGER
HERTZ
INDOOR AIR QUALITY
INDIRECT DRAIN
INVERT ELEVATION
INCH
INCHES WATER COLUMN
IRRIGATION PIPING
INDIRECT WASTE PIPING
KILOWATT
LENGTH
LEAVING AIR TEMPERATURE
LINEAR BAR
POUND
LINEAR DIFFUSER
REFRIGERANT LIQUID LINE
LOW PRESSURE CONDENSATE RETURN
LIQUID PETROLEUM GAS PIPING
LOW PRESSURE STEAM
LOCKED ROTOR AMPS
LINEAR RETURN
LOUVER
LOW WALL RETURN
LOW WALL SUPPLY
LOW WATER CUT -OFF
LEAVING WATER TEMPERATURE
MEDICAL AIR
MEDICAL AIR COMPRESSOR
MIXED AIR TEMPERATURE
MANUAL AIR VENT
MAXIMUM
THOUSAND BTU PER HOUR
MECHANICAL CONTRACTOR
MINIMUM CIRCUIT AAPACITY
MECHANICAL
MINIMUM EFFICIENCY REPORTING VALUE
MINIMUM
MAXIMUM OVERCURRENT PROTECTION
MOTOR OPERATED DAMPER
MEDIUM PRESSURE CONDENSATE RETURN
MEDIUM PRESSURE GAS
MEDIUM PRESSURE STEAM
MEDICAL VACUUM
NA
NC
NIC
NO
NO.
NP
NTS
02
OA
OBD
OC
OD
ORD
ORL
OSA
OSD
OV
PD
PH
PIV
POC
PR
PRV
PSIG
QTY
RA
RD
REG
REF
RF
RG
RH
RI &C
RL
RLA
RO
RPBA
RPBP
RPM
RTU
RV
SA
S
SAT
SCFM
SCH
SD
SENS
SF
SG
SIM
SL
SMACNA
SO
SOV
SP
SPKR
SPS
SS
ST
STM
SW
S. TK
T
TBV
TCV
TD
TEMP
TG
TOD
TOP
TOS
TOF
TSP
T'STAT
TU
TYP
UG
UH
UNO
V
VA
VAV
VCD
VD
VEL
VENT
VFD
VOLT
VTR
W
WB
WC
wco
WG
WH
WHA
WM
WSEC
WSFU
WT
NOT APPLICABLE
NORMALLY CLOSED, NOISE CRITERIA
NOT IN CONTRACT
NORMALLY OPEN, NITROUS OXIDE
NUMBER
NON POTABLE
NOT TO SCALE
OXYGEN
OUTDOOR AIR
OPPOSED BLADE DAMPER
ON CENTER
OUTSIDE DIMENSION OR DIAMETER
OVERFLOW ROOF DRAIN
OVERFLOW RAIN LEADER
OUTDOOR SUPPLY AIR
OVER -FLOW STORM DRAIN
OUTLET VELOCITY
PUMP, PRESSURE, PLUMBING FIXTURE
PRESSURE DROP, PUMPED DRAIN
PHASE
POST INDICATOR VALVE
POINT OF CONNECTION
CONDENSATE PUMP RETURN
PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH GAGE
QUANTTI Y
RETURN AIR, RELIEF AIR
ROOF DRAIN
REGISTER
REFERENCE, RETURN /EXHAUST FAN
REUEF FAN
RETURN GRILLE
ROOF HOOD
ROUGH IN AND CONNECT
RAIN LEADER
RATED LOAD AMPS
REVERSE OSMOSIS
REDUCED PRESSURE BACKFLOW ASSEMBLY
REDUCED PRESSURE BACKFLOW PREVENTER
REVOLUTIONS PER MINUTE
ROOFTOP UNIT
SAFETY RELIEF VALVE
SENSOR
SUPPLY AIR
SUPPLY AIR TEMPERATURE
STANDARD CUBIC FEET PER MINUTE
SCHEDULE
STORM DRAIN PIPING
SENSIBLE
SUPPLY FAN, SQUARE FOOT
SUPPLY GRILLE, SIGHT GLASS WITH MOISTURE
INDICATOR
SIMILAR
REFRIGERANT SUCTION UNE
SHEET METAL AND AIR CONDITIONING CONTRACTORS'
NATIONAL ASSOCIATION, INC,
SCREENED OPENING
SHUTOFF VALVE
STATIC PRESSURE
SPRINKLER
STATIC PRESSURE STATION
STAINLESS STEEL, SANITARY SEWER
SOUND TRAP
STEAM
SOFT WATER PIPING
STORAGE TANK
TEMPERED WATER PIPING
TOWER BYPASS VALVE
TEMPERATURE CONTROL VALVE
TRENCH DRAIN, TEMPERATURE DIFFERENCE
TEMPERATURE
TRANSFER GRILLE
TOP OF DUCT
TOP OF PIPE
TOP OF STEEL
TOP OF FOOTING
TOTAL STATIC PRESSURE
THERMOSTAT
TERMINAL UNIT
TYPICAL
UNDERGROUND
UNIT HEATER
UNLESS NOTED OTHERWISE
VENT PIPING, VOLT
VALVE
VARIABLE AIR VOLUME
VOLUME CONTROL DEVICE
VOLUME DAMPER
VELOCITY
VENTILATION, VENTILATOR
VARIABLE FREQUENCY DRIVE
VOLTAGE
VENT THRU ROOF
WASTE, WATT, WIDE, WATER
WET BULB (TEMPERATURE)
WATER CLOSET, WATER COLUMN
WALL CLEANOUT
WATER GAGE
WATER HEATER, WALL HYDRANT
WATER HAMMER ARRESTOR
WATER METER
WASHINGTON STATE ENERGY CODE
WATER SUPPLY FIXTURE UNIT
WEIGHT
QB■AL NOITEB - MEcHANCAL
1. COORDINATE MECHANICAL WORK WITH THAT OF
OTHER TRADES (ELECTRICAL ARCHITECTURAL,
STRUCTURAL) REFER TO ELECTRICAL, ARCHITECTURAL
AND STRUCTURAL DRAWINGS AND SPECIFICATIONS.
COORDINATION SHALL OCCUR PRIOR TO FABRICATION,
PURCHASE, AND /OR INSTALLATION OF ALL WORK.
2. COORDINATE PLUMBING, HVAC, AND FIRE PROTECTION
SYSTEMS ROUTING PRIOR TO INSTALLATION. DURING
LAYOUT COORDINATION, DUCTWORK TAKES
PRECEDENCE OVER PLUMBING, INCLUDING FIRE
PROTECTION SYSTEMS.
3. UNLESS OTHERWISE SPECIFIED, THE GENERAL
CONTRACTOR (GC) SHALL BE RESPONSIBLE FOR
PAINTING, CUTTING, AND PATCHING OF EXISTING
FLOORS, WALLS, AND PARTITIONS IN THE EXISTING
BUILDING.
4. REFER TO STRUCTURAL DRAWINGS FOR ALLOWABLE
METHODS /LOADS FOR HANGING PIPING /DUCTS FROM
STRUCTURAL MEMBERS.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
SAFE KEEPING OF HIS OWN PROPERTY ON THE JOB
SITE. OWNER ASSUMES NO RESPONSIBILITY FOR
PROTECTION OF PROPERTIES AGAINST FIRE, THEFT,
AND ENVIRONMENTAL CONDITIONS.
MECHANICAL EOUFIuENT INSTALLATION NOTES
1. ACCESS CLEARANCES FOR MAINTENANCE AND
REPLACEMENT: VERIFY PHYSICAL DIMENSIONS OF
EQUIPMENT TO ENSURE THAT ACCESS CLEARANCES
CAN BE MET. COORDINATE LOCATIONS OF
MECHANICAL WORK AND WORK OF OTHER TRADES TO
PROVIDE ACCESS CLEARANCES FOR SERVICE AND
MAINTENANCE.
PPM NOTES
1. DISASSEMBLY PROVISIONS: PROVIDE UNIONS OR
FLANGES AT PIPING CONNECTIONS TO EQUIPMENT,
COILS, TRAPS, CONTROL VALVES, AND OTHER
COMPONENTS TO ALLOW DISASSEMBLY FOR
MAINTENANCE.
2. PRESSURE/TEMPERATURE TEST PORTS: PROVIDE AT
SUPPLY AND RETURN PIPING CONNECTIONS TO
EQUIPMENT.
3. PROVIDE AN INSULATED COPPER TRACER WIRE OR
OTHER APPROVED CONDUCTOR ADJACENT TO
UNDERGROUND NONMETALLIC (PLASTIC) PIPING.
ACCESS SHALL BE PROVIDED TO THE TRACER WIRE
OR THE TRACER WIRE SHALL TERMINATE ABOVE
GROUND AT EACH END OF THE PIPING. THE
TRACER WIRE SHALL NOT BE LESS THAN NO. 18
AWG AND THE INSULATION TYPE SHALL BE SUITABLE
FOR BURIAL.
4. PROVIDE 12" LONG, IA" WIDE FLUORESCENT ORANGE
TAPE AT CONCEALED VALVE LOCATIONS.
PLUMBING NOTES
1. WATER HAMMER ARRESTERS: PROVIDE AT THE END
OF HOT AND COLD WATER LINES SERVING TWO OR
MORE FIXTURES. SIZE IN ACCORDANCE WITH
PLUMBING AND DRAINAGE INSTITUTE (PDI)
REQUIREMENTS.
2. CLEANOUTS: PROVIDE AT THE BASE OF SANITARY
DRAINAGE, PROCESS WASTE, AND RAINLEADER
CONDUCTORS.
SHEET METAL NOTES
1. VOLUME DAMPERS: PROVIDE A MANUAL VOLUME
DAMPER FOR EACH SUPPLY, RETURN, AND EXHAUST
OPENING, LOCATED AS FAR UPSTREAM AS POSSIBLE
FROM THE OPENING. PROVIDE A MANUAL VOLUME
DAMPER FOR BRANCH MAINS SERVING MORE THAN
ONE OPENING.
2. UNLESS NOTED TO USE LARGER SIZE DUCT, PROVIDE
THE FOLLOWING MINIMUM SIZE BRANCH DUCTS TO
CEILING DIFFUSERS.
6" DIA. FOR U' TO 120 CFM
8" DIA. FOR 121 -210 CFM
10" DIA. FOR 211 -300 CFM
12" DIA. FOR 301 -450 CFM
14" DIA. FOR 451 -600 CFM
16" DIA. FOR 601 -820 CFM
3. PROVIDE 12" LOl G, 4" WIDE FLUORESCENT ORANGE
TAPE AT CONCEALED ED VOLUME DAMPER LOCATIONS.
ENERGY CODE NOTES
1. MOTORS: COMPLY WITH MINIMUM FULL LOAD
EFFICIENCIES LISTED IN ENERGY CODE ENFORCED BY
AHJ.
2. PIPING AND DUCT INSULATION: COMPLY WITH
THICKNESSES AND TYPES USTED IN ENERGY CODE
ENFORCED BY AHJ UNLESS MORE STRINGENT
REQUIREMENTS ARE SPECIFIED.
3. DUCT SEAUNG: SEAL DUCT TRANSVERSE JOINTS
AND LONGITUDINAL SEAMS PER ENERGY CODE
ENFORCED BY AHJ UNLESS MORE STRINGENT
REQUIREMENTS ARE SPECIFIED.
4. RECORD DRAWINGS: SUBMIT TO THE BUILDING
OWNER PER ENERGY CODE ENFORCED BY THE
LOCAL AHJ.
5. OPERATION AND MAINTENANCE MANUALS: SUBMIT TO
THE BUILDING OWNER PER ENERGY CODE ENFORCED
BY THE LOCAL AHJ.
6. SYSTEM BALANCING: BALANCE HVAC SYSTEMS PER
ENERGY CODE ENFORCED BY THE LOCAL AHJ AND
SUBMIT A WRITTEN REPORT TO THE BUILDING
OWNER. REFER TO SPECIFICATIONS FOR ADDITIONAL
TESTING, ADJUSTING, AND BALANCING (TAB)
REQUIREMENTS.
7. MECHANICAL SYSTEMS COMMISSIONING AND
COMPLETION REQUIREMENTS: TEST SYSTEMS TO
ENSURE THAT BU LDING SYSTEMS HAVE BEEN
DESIGNED, INSTALLED, AND FUNCTION PROPERLY,
EFFICIENTLY, AND i CAN BE MAINTAINED IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS IN
ORDER TO SATISFY THE BUILDING OWNER'S DESIGN
INTENT AND OPERATIONAL REQUIREMENTS PER
ENERGY CODE ENFORCED BY THE LOCAL AHJ.
REFER TO SPECIFICATIONS FOR ADDITIONAL
COMMISSIONING REQUIREMENTS
8. THIS BUILDING AND ITS ENERGY SYSTEMS HAVE
BEEN DESIGNED TO COMPLY WITH ENERGY CODE
ENFORCED BY THE LOCAL AHJ. CONTRACTOR IS
RESPONSIBLE FOR CORRECT INSTALLATION OF
ENERGY CONSERVATION MEASURES.
REvlEVED' 10)0E
DEG :. 2010
of Tu
8 l WING
NON - STRUCTURAL MECHANICAL COMPONENT NOTES
1. THE COMPONENT IMPORTANCE FACTOR (Ip) FOR ALL
NON- STRUCTURAL COMPONENTS SHALL BE:
. THE FOLLOWING
THE 2009 INTE
THE AMERICAN
Ip = 1.5
ITEMS ARE TAKEN DIRECTLY FROM
NATIONAL BUILDING CODE AND FROM
OCIETY OF CIVIL ENGINEERS (ASCE)
5. THE CONTRACTOR SHALL REFER
TO THE ABOVE FOR ADDITIONAL INFORMATION,
EXCEPTIONS, AND FURTHER DESCRIPTIONS. THE
CONTRACTOR SHALL ADHERE TO REQUIREMENTS AND
AS SUCH. SHALL BE INCLUDED WITHIN BID. ALSO
ECIFICATION SECTION 200548.
ARCHITECTURAL,
ELECTRICAL, AND NON- STRUCTURAL
THAT ARE PERMANENTLY ATTACHED TO
ES AND THEIR SUPPORTS AND
ATTACHMENTS SHALL BE DESIGNED AND
CONSTRUCTED TO RESIST THE EFFECTS OF
MOTIONS IN ACCORDANCE WITH ASCE
DING CHAPTER 14 AND APPENDIX 11A.
06.1. CONTRACTOR RESPONSIBILITY:.
TOR SHALL BE RESPONSIBLE FOR THE
N OF A SEISMIC - FORCE- RESISTING
SYSTEM, DESIGNATED SEISMIC SYSTEM, OR
SEISMIC- RESISTING COMPONENT LISTED IN THE
STATEMENT OF SPECIAL INSPECTIONS AND SHALL
SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY
TO THE BUILDING OFFICIAL AND THE OWNER PRIOR
TO THE COMMENCEMENT OF WORK ON THE SYSTEM
OR COMPONENT. THE CONTRACTOR'S STATEMENT OF
RESPONSIBILITY SHALL INCLUDE THE FOLLOWING:
A. ACKNOWLEDGEMENT OF AWARENESS OF THE
SPECIAL REQUIREMENTS CONTAINED IN THE
STATEMENT OF SPECIAL INSPECTIONS;
B. ACKNOWLEDGEMENT THAT CONTROL WILL BE
EXERCISED TO OBTAIN CONFORMANCE WITH THE
CONSTRUCTION DOCUMENTS APPROVED BY THE
BUILDING OFFICIAL;
C. PROCEDURES FOR EXERCISING CONTROL WITHIN
THE CONTRACTOR'S ORGANIZATION, THE METHOD
AND FREQUENCY OF REPORTING AND THE
DISTRIBUTION OF THE REPORTS;
D. IDENTIFICATION AND QUAUFICATIONS OF THE
PERSON(S) EXERCISING SUCH CONTROL AND
THEIR POSITION(S) IN THE ORGANIZATION.
4. DIVISION 20, 21, 22, 23 RESPONSIBILITIES:
A. HANGERS AND SEISMIC BRACING FOR
MECHANICAL SYSTEMS SHALL BE DESIGNED AND
SPECIFIED BY DIVISION 20, 21, 22, 23.
DIVISION 20, 21, 22, 23 SHALL REFER TO THE
MECHANICAL DRAWINGS FOR LOCATIONS OF
EQUIPMENT AND HUNG MECHANICAL SYSTEMS AS
STRUCTURAL DRAWINGS DO NOT SHOW THE
LOCATIONS OF MECHANICAL EQUIPMENT,
DUCTWORK, PIPING, AND OTHER COMPONENTS.
B. DIVISION 20, 21, 22, 23 SHALL COORDINATE THE
SUPPORT SYSTEMS AND DESIGN LOADS FOR
HUNG PIPING AND OTHER MECHANICAL SYSTEMS
(INCLUDING COMBINED MULTIPLE PIPE RUNS)
WITH THE GENERAL CONTRACTOR AND THE STEEL
AND WOOD JOIST MANUFACTURERS IN ADDITION
TO OTHER TRADES THAT MAY BE IMPACTED.
RECEIVEV
DEC 15 MO
PERMIT CE -T'E
CEIVE
CITY • T LA
NO 010
P r IT CEN R
REVISIONS
11/1/2010,
COT COMMENTS
v
GENERAL NOTES AND ABBREVIATIONS
TECTURE
NAC NO 121 -10017
HEI NO 10113
DRAWN JMR
CHECKED RKE
DATE 9- 10.2010
M
0.2
0
z
IX I
aj
-3 o
(r) r41
00 o
41" U)
om
0
j
N
OD
WOO
0 4
O J
12LaZ
DIVISION 20 - COMMON REQUIREMENTS FOR FIRE SUPPRESSION, PLUMBING, AND HVAC
THIS DIVISION APPLIES TO ALL DIVISION 20 21 22 AND 23 SECTIONS. GENERAL
CONDITIONS, SUPPLEMENTARY CONDITIONS AND DIVISION 01 APPLY TO WORK IN THESE
SECTIONS.
SECTION 200500 - GENERAL PROVISIONS
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. DESCRIPTION: WORK INCLUDES MATERIALS, EQUIPMENT, LABOR, SUPERVISION, TOOLS
AND ITEMS NECESSARY FOR THE CONSTRUCTION, INSTALLATION, CONNECTION, TESTING
AND OPERATION OF MECHANICAL WORK.
1.2 CODES AND STANDARDS
A. PERFORM WORK IN ACCORDANCE WITH WASHTINGTON STATE REQUIREMENTS AND LOCAL
AHJ.
B. CONFORM TO APPLICABLE INDUSTRY STANDARDS.
C. NOTIFY THE A/E OF DEVIATIONS IN CONTRACT DOCUMENTS TO APPLICABLE CODES AND
ORDINANCES PRIOR TO INSTALLATION OF THE WORK.
1.3 SUBMITTALS
A. PRODUCT DATA:
1. SUBMIT PRIOR TO FABRICATION OF ASSEMBLIES AND DELIVERY OF PURCHASED
ITEMS.
2. CLEARLY MARK CATALOG PAGES, EQUIPMENT, MODEL NUMBER AND ACCESSORIES.
1.4 STANDARDS OF QUALITY
A. EQUIPMENT SHALL BE MANUFACTURER'S REGULARLY CATALOGUED ITEMS AND SHALL BE
SUPPLIED AS A COMPLETE UNIT IN ACCORDANCE WITH MANUFACTURER'S STANDARD
SPECIFICATIONS AND ANY OPTIONAL ITEMS REQUIRED FOR PROPER INSTALLATION FOR
EQUIPMENT UNLESS OTHERWISE NOTED. EQUIPMENT AND MATERIALS SHALL BE
INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND BEST
TRADE PRACTICES.
B. PRODUCTS SHALL BE NEW UNLESS INDICATED OTHERWISE IN THE CONTRACT
DOCUMENTS.
1.5 SUBSTITUTIONS
A. WHERE "MANUFACTURER" PARAGRAPHS INCLUDE THE WORDS "OR APPROVED ", PRIOR
APPROVAL OF THE PROPOSED SUBSTITUTION BY A/E IS REQUIRED.
B. WHEN THE ALE APPROVES A SUBSTITUTION REQUEST, THE APPROVAL IS GIVEN WITH
THE UNDERSTANDING THAT THE BIDDER:
1. HAS DETERMINED THAT IT MEETS OR EXCEEDS THE QUALITY LEVEL OF THE
SPECIFIED PRODUCT WILL PROVIDE THE SAME WARRANTY AND WILL COORDINATE
INSTALLATION AND FAKE CHANGES WITH NO ADDITIONAL COST TO OWNER.
C. WHENEVER A PRODUCT IS DESCRIBED BY DETAIL, SPECIFICATION, TRADE NAME,
MANUFACTURER'S NAME OR CATALOG REFERENCE, USE ONLY SUCH PRODUCT.
1.6 DRAWINGS AND SPECIFICATIONS
A. GENERAL: THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC. COMPLETE DETAILS OF
BUILDING FEATURES WHICH AFFECT FIRE SUPPRESSION, PLUMBING AND HVAC
INSTALLATIONS MAY NOT BE SHOWN. FOR ADDITIONAL DETAILS, REFER TO OTHER
CONTRACT DOCUMENTS. REPORT ANY DISCREPANCIES TO THE A/E ALONG WITH
SUGGESTED REVISIONS.
1 .7 RECORD D RAWINGS
A. PREPARE RECORD DRAWINGS. RECORD DRAWINGS SHALL BE NEW RED LINED PRINTS
AND SHOW THE MEASURED LOCATIONS OF PORTIONS OF THE WORK AND CHANGES THE
CONTRACTOR HAS MADE.
8. RECORD DRAWINGS SHALL SHOW ADDENDUM ITEMS, CHANGE ORDERS, CLARIFICATIONS,
SUPPLEMENTAL INSTRUCTIONS, AND DEVIATIONS FROM THE DRAWINGS.
1.8 COORDINATION
A. COORDINATE DIVISIONS 20, 21 22, AND 23 WORK WITH OTHER TRADES.
B. BE AWARE OF RESTRICTED SPACE FOR INSTALLATION OF FIRE SUPPRESSION PLUMBING,
AND HVAC SYSTEMS. INCLUDE OFFSETS AND PERFORM REROUTING AND COORDINATION
TO FIT ELEMENTS IN AVAILABLE SPACE. INCLUDE PROVISIONS FOR SUCH
REQUIREMENTS IN BID.
C. EQUIPMENT, DUCTWORK AND PIPING SHOWN ARE BASED ON EXISTING DRAWINGS AS
AVAILABLE AND ON LIMITED PROJECT SITE OBSERVATIONS TO THE EXTENT POSSIBLE
UNDER CURRENT CONDITIONS. FIELD VERIFY EXISTING CONDITIONS PRIOR TO
COMMENCEMENT OF WORK.
D. COORDINATE ATTACHMENTS TO STRUCTURE TO VERIFY THAT ATTACHMENT POINTS ON
EQUIPMENT AND STRUCTURE CAN ACCEPT SEISMIC, WEIGHT, AND OTHER LOADS
IMPOSED.
1.9 WARRANTY
A. WARRANTY PERIODS WITHIN DIVISIONS 20, 21 22 AND 23 SHALL NOT COMMENCE
UNTIL SUBSTANTIAL COMPLETION. MINIMUM PERIOD SHALL BE ONE YEAR.
CONTRACTOR SHALL EXTEND LONGER WARRANTIES SPECIFIED IN OTHER SECTIONS.
1.10 DEMONSTRATION
A. FOLLOWING INSTALLATION OF FIRE SUPPRESSION, PLUMBING AND HVAC WORK AND
PRIOR TO FINAL ACCEPTANCE DEMONSTRATE THAT EQUIPMENT AND SYSTEMS OPERATE
AS INDICATED IN THE CONTRACT DOCUMENTS AND IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS.
END OF SECTION
SECTION 200505 - PROJECT CLOSEOUT AND SYSTEM START -UP
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. DESCRIPTION: WORK INCLUDES MATERIAL AND LABOR REQUIRED TO PERFORM
START -UP OF EQUIPMENT AND SYSTEMS INSTALLED IN PROJECT TO PERFORM
CHECKOUT OF SYSTEMS AND TO VERIFY COMPLETENESS OF PROJECT REQUIREMENTS.
PART 2 - PRODUCTS
NOT USED.
PART 3 - EXECUTION
3.1 PROJECT CLOSEOUT PROCEDURES
A. COMPLETE WORK DESCRIBED IN THIS SECTION PRIOR TO TIME OF SUBSTANTIAL
COMPLETION.
B. MECHANICAL SUBCONTRACTOR SHALL BEAR PRIME RESPONSIBILITY FOR STARTUP OF
HEATING AND COOLING AND PLUMBING SYSTEMS.
C. INCLUDE DOCUMENTATION REQUIRED BY THE GOVERNING CODES.
3.2 SYSTEM START -UP PROCEDURES
A. PROVIDE START UP BY AUTHORIZED FACTORY REPRESENTATIVE WHEN INDICATED.
B. RECOMMENDA ADJUSTMENTS AND CLEANING OF ITEMS PER MANUFACTURER'S
3.3 FINAL ACCEPTANCE
A. FINAL ACCEPTANCE OF WORK WILL NOT OCCUR UNTIL FUNCTIONAL TESTING IS
COMPLETE AND OUTSTANDING ISSUES RESOLVED.
END OF SECTION
SECTION 200510 - BASIC MATERIALS AND METHODS
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. DESCRIPTION: WORK INCLUDES EQUIPMENT SUPPORTS, ES IDENTIFICATION,
APPURTENANCES AND MISCELLANEOUS WORK. THIS SECTION APPLIES TO ALL
1.2 QUALITY ASSUI�ANC'E 22, AND 23 SECTIONS.
A. UL COMPLIANCE: WHERE UL FIRE - RESISTANCE RATING IS INDICATED FOR
CONSTRUCTION PENETRATED BY ACCESS UNITS, FURNISH UL LISTED AND LABELED
UNITS EXCEPT FOR THOSE UNITS WHICH ARE SMALLER THAN MINIMUM SIZE REQUIRING
RATINGS AS RECOGNIZED BY GOVERNING AUTHORITY.
B. ANSI COMPLIANCE: COMPLY WITH ANSI A13.1 FOR LETTERING SIZE, COLORS AND
INSTALLED VIEWING ANGLES OF IDENTIFICATION DEVICES UNLESS OTHER REQUIREMENTS
ARE SPECIFIED.
1.3 SUBMITTALS
1.4 .PRODUCTTDELIVERPIPE ORAGE RAND ACCESS DOORS, VALVE TAGS.
A. DELIVER STORE, AND HANDLE PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS, USING MEANS AND METHODS TO PREVENT DAMAGE, DETERIORATION,
AND LOSS, INCLUDING THEFT.
B. WITH ERR PRODUCTS TO SITE IN MANUFACTURER'S ORIGINAL CONTAINERS, COMPLETE
C. INSPECT PRODUCTS UPON DELIVERY TO ENSURE COMPLIANCE WITH THE CONTRACT
DOCUMENTS AND TO ENSURE THAT PRODUCTS ARE UNDAMAGED AND PROPERLY
PROTECTED.
D. STORE PRODUCTS SUBJECT TO DAMAGE BY WEATHER CONDITIONS ABOVE GROUND,
UNDER COVER IN WEATHER TIGHT ENCLOSURE WITH VENTILATION ADEQUATE TO
PREVENT CONDENSATION. MAINTAIN TEMPERATURE AND HUMIDITY WITHIN RANGE
REQUIRED BY MANUFACTURER'S INSTRUCTIONS.
E. CLOSE OPEN ENDS OF EQUIPMENT AND WORK WITH TEMPORARY COVERS OR PLUGS
DURING STORAGE AND CONSTRUCTION TO PREVENT ENTRY OF FOREIGN MATERIAL.
PART 2 - PRODUCTS
2.1 MATERIALS
A. MATERIALS SHALL BE NEW AND OF MANUFACTURERS SPECIFIED HEREIN. THEY SHALL
BE U.S. MADE AND BEAR THE UL, ETL OR CSA LABELS WHERE POSSIBLE.
2.2 EQUIPMENT SUPPORTS
A. SELECT AND SIZE SUPPORTS EXPANSION SHELLS AND BOLTS, CONCRETE INSERTS,
AND ANCHOR BOLTS PER REQUIREMENTS FOR SEISMIC RESTRAINTS SPECIFIED IN
SECTION 200548. HOT DIPPED OR MECHANICALLY GALVANIZED WHERE INSTALLED
OUTDOORS UNLESS NOTED OTHERWISE ON THE DRAWINGS. DAMAGED GALVANIZED
SURFACES REPAIRED WITH ZRC GALVILITE.
2.3 SLEEVES
A. MATERIALS GENERAL: SCHEDULE 40 GALVANIZED STEEL PIPE WITH UNTHREADED ENDS,
CAST IRON PIPE OR MINIMUM 26 GAGE GALVANIZED SHEET STEEL. USE STEEL PIPE
FOR SLEEVES AT FLOOR SLABS.
2.4 PIPE MARKERS AND COLOR BANDS
A. GENERAL: MANUFACTURER'S STANDARD PREPRINTED, FLEXIBLE OR SEMI -RIGID
PERMANENT COLOR - CODED, PLASTIC SHEET PIPE MARKERS. COMPLY WITH AS
ME
SETON BRADY CRAFTMARK, MARKING SERVICES OR APPROVED.
B. PIPES: FULL BAND Pll''E MARKERS.
C. LETTERING: MANUFACTURER'S STANDARD PRE - PRINTED NOMENCLATURE WHICH BEST
DESCRIBES PIPING SYSTEM IN EACH INSTANCE AS SELECTED BY THE A/E IN CASES
OF VARIANCE WITH NAMES SHOWN OR SPECIFIED.
2.5 EQUIPMENT NAMEPLATES
A. GENERAL: ENGRAVED STOCK MELAMINE PLASTIC LAMINATE. COMPLY WITH FS
L -P -387. ENGRAVED WITH ENGRAVER'S STANDARD LETTER STYLE OF SIZES AND
WORDING, BLACK WITH WHITE CORE (LETTER COLOR) EXCEPT AS OTHERWISE INDICATED.
B. THICKNESS: 1/16 INCH FOR UNITS UP TO 20 SQ. IN. OR 8 INCH LENGTH AND 1/8
INCH FOR LARGER UNITS.
2.6 VALVE TAGS
A. GENERAL: MANUFACTURER'S STANDARD SOLID PLASTIC VALVE TAGS WITH PRINTED
ENAMEL LETTERING, PIPING SYSTEM ABBREVIATION IN APPROXIMATELY 3/16 INCH HIGH
LETTERS.
B. S EFR PRPERRTHENF GS O LESQUFTURE LENGTH ARQUIRED MANUFACTURER'S OTATVAVMANACD
SPECIFICALLY FOR THAT PURPOSE.
2.7 ACCESS TO FIRE SUPPRESSION PLUMBING AND HVAC EQUIPMENT
A. GENERAL: SAFETY CORNERS, 1E 1-PIECE HINGE, WELDED REWDRIVER GROUND SMOOTH
LATCHES SHALLOW 1-114 INCH MOUNTING FLANGE. WHERE LOCATED IN A PAINTED
SURFACE AREA UNITS PRIMED FOR OTHERWISE POLISHED CHROME OR
STAINLESS STEEL UNITS UNLESS ANOTHER PE OF FINISH IS INDICATED.
B. UL COMPLIANCE: WHERE UL FIRE- RESISTANCE RATING IS INDICATED, DOORS UL
LISTED AND LABELED, EXCEPT FOR THOSE DOORS WHICH ARE SMALLER THAN MINIMUM
SIZE REQUIRING FIRE RATINGS AS RECOGNIZED BY GOVERNING AUTHORITY.
2.8 PAINTING
A. GENERAL: PAINTING OF WORK SPECIFIED IN MECHANICAL SECTIONS WHICH IS
EXPOSED, INCLUDING EXTERIOR EXPOSED MECHANICAL WORK, IS SPECIFIED IN DIVISION
2.9 ROOF PENETRATIONS
A. ROOF PENETRATIONS SHALL BE BY GENERAL CONTRACTOR AS NOTED ON THE
ARCHITECTURAL DRAWINGS.
PART 3 - EXECUTION
3.1 MEASUREMENTS
A. VERIFY MEASUREMENTS AT JOB SITE. LOCATE EQUIPMENT AND FIXTURES ON CENTERS
OTHERWISE. O CHECKS 'TSPACES, NG, DUCTS, AND LOCATIONS ELEMENTS WHERE OPENINGS.
3.2 INSTALLATION OF EQUIPMENT
A. EQUIPMENT INSTALLATION:
1. GENERAL: INSTALL SUPPORTS FOR EQUIPMENT AND APPURTENANCES.
3.3 ACCESSIBILITY
A. RELYLESSBLE ALIDL AESDRSLAEE AESS TO BE ADACCI NSTALCCSS OOTO CHIVCCBI ITY.
B. EQUIPMENT:
1. INSTALL EQUIPMENT WHICH REQUIRES PERIODIC SERVICING OR REPAIRS TO BE
READILY ACCESSIBLE.
2. PIPING DUCTS AND CONDUIT SHALL NOT INTERFERE WITH REQUIRED ACCESS.
3.4 PIPE MARKERS AND COLOR BANDS
A. INSTALL IDENTIFICATION AFTER COMPLETION OF COVERING AND PAINTING.
3.5 VALVE TAGS
A. INSTALL VALVE TAGS ON VALVES AND CONTROL DEVICES IN EACH PIPING SYSTEM.
3.6 EQUIPMENT NAMEPLATES
A. INSTALL NAMEPLATES ON OR NEAR EACH MAJOR ITEM.
3.7 PAINTING
A. TOUCH -UP: COVER SCRATCHES ABRASIONS AND SIMILAR DAMAGES TO EQUIPMENT
WITH FACTORY FINISHED SURFACES USING MATCHING FACTORY FURNISHED PAINT.
B. GRILLES REGISTERS AND DIFFUSERS: PAINT INSIDE SURFACE OF DUCTS, VISIBLE
THROUGH BLACKRPAINT TO AS POINT 21FFEET RFROM AND ONESTRAIGHTTDUCTSOOR OF
AROUND BEND. SIMILARLY, PAINT PIPES AND CONDUITS VISIBLE THROUGH CEILING
RELIEF GRILLES.
3.8 CLEANING AND HOUSEKEEPING
A. REMOVE DEBRIS, CUTTINGS, CRATES, CARTONS, AND SIMILAR ITEMS, AT REGULAR
INTERVALS.
B. BEFORE SUBSTANTIAL COMPLETION CAREFULLY CLEAN EQUIPMENT, FIXTURES EXPOSED
CUTTINGS, PAINT,GP AND MIORTAR, ITEMS. REMOVE SIMLARTITEMS GELS, DIRT, DUST,
END OF SECTIONSECTION
200513 - ELECTRICAL PROVISIONS
PART 1 -- GENERAL
1.1 SECTION INCLUDES
A. DESCRIPTION: WORK INCLUDES FACTORY INSTALLED MOTORS AND MOTOR STARTERS
AND ASSOCIATED APPURTENANCES.
1.2 QUALITY ASSURANCE
A. CODES AND STANDARDS:
1. IEEE 112 IEEE STANDARD TEST PROCEDURE FOR POLYPHASE INDUCTION MOTORS
AND GENERATORS.
2. NEMA MG 1, MOTORS AND GENERATORS.
3. NFPA 70, NATIONAL ELECTRICAL CODE (NEC).
1.3 SUBMITTALS
A. PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA AND
MAINTENANCE DATA FOR MOTORS.
PART 2 - PRODUCTS
2.1 MOTORS
A. MOTOR CHARACTERISTICS: EXCEPT WHERE MORE STRINGENT REQUIREMENTS ARE
INDICATED AND EXCEPT WHERE REQUIRED ITEM OF PLUMBING AND HVAC EQUIPMENT
CANNOT BE OBTAINED TO MEET REQUIREMENTS IN THIS ARTICLE, COMPLY WITH THE
FOLLOWING REQUIREMENTS FOR MOTORS FOR PLUMBING AND HVAC WORK:
1. COMPLY WITH NEMA MG 1 UNLESS OTHERWISE INDICATED.
2. TEMPERATURE RATING: RATED FOR 40 C AMBIENT TEMPERATURE AND AT 3300
FOOT ELEVATION WITH MAXIMUM 50 C TEMPERATURE RISE FOR CONTINUOUS DUTY
AT FULL LOAD ICLASS A INSULATION).
3. CAPACITY AND TORQUE: SUFFICIENT TO START ACCELERATE, AND OPERATE
CONNECTED LOADS AT DESIGNATED SPEEDS AT INSTALLED ALTITUDE AND
ENVIRONMENT, WITH INDICATED OPERATING SEQUENCE BUT WITHOUT EXCEEDING
NAMEPLATE RATINGS OR CONSIDERING SERVICE FACTOR.
4. PHASES AND CURRENT CHARACTERISTICS: SQUIRREL -CAGE INDUCTION POLYPHASE
MOTORS FOR 1/2 HP AND LARGER. PERMANENT -SPLIT CAPACITOR OR
CAPACITOR-START SINGLE -PHASE MOTORS FOR 1/3 HP AND SMALLER, EXCEPT 1/6
HP AND SMALLER MAY AT EQUIPMENT MANUFACTURER'S OPTION BE SPLIT-PHASE
TYPE. COORDINATE CURRENT CHARACTERISTICS WITH POWER SPECIFIED IN DIVISION
26 SECTIONS AND WITH INDIVIDUAL EQUIPMENT REQUIREMENTS.
5. DO NOT PURCHASE MOTORS UNTIL POWER CHARACTERISTICS AND ROTATION
DIRECTION HAVE BEEN CONFIRMED.
6. SERVICE FACTOR: 1.15 FOR POLYPHASE MOTORS AND 1.35 FOR SINGLE -PHASE
MOTORS.
B. MOTOR CONSTRUCTION: GENERAL PURPOSE, CONTINUOUS DUTY MOTORS, DESIGN "B ",
EXCEPT "C" WHERE REQUIRED FOR HIGH STARTING TORQUE.
1. FRAMES: NEMA STANDARD.
2. BEARINGS: ANTIFRICTION BALL OR SLEEVE BEARINGS WITH INNER AND OUTER SHAFT
SEALS GREASEABLE EXCEPT PERMANENTLY SEALED WHERE MOTOR IS NORMALLY
INACCESSIBLE FOR REGULAR MAINTENANCE. WHERE BELT DRIVES AND OTHER
DRIVES PRODUCE LATERAL OR AXIAL THRUST IN MOTOR BEARINGS DESIGNED TO
RESIST THRUST LOADING. REFER TO DIVISIONS 22 AND 23 SECTIONS FOR
FRACTIONAL -HP LIGHT -DUTY MOTORS WHERE SLEEVE -TYPE BEARINGS ARE
PERMITTED.
3. ENCLOSURE TYPE: EXCEPT AS OTHERWISE INDICATED OPEN DRIPPROOF MOTORS
FOR WHERE USE SATISFACTORILY CONT CTLBYHEMPLOYEES AND GUARDED OCCUPANTS.
TOTALLY ENCLOSED FAN COOLED FOR OUTDOOR USE.
4. OVERLOAD PROTECTION: INCLUDE FOR EACH MOTOR. BUILT -IN (MANUAL RESET)
FOR 120, 208, AND 277 VOLT, SINGLE PHASE MOTORS.
5. EFFICIENCY: MOTORS ARE TO BE "ENERGY EFFICIENT" HAVING MINIMUM EFFICIENCY
AS SCHEDULED IN ACCORDANCE WITH IEEE 112, TEST METHOD B.
6. POWER FACTOR: MINIMUM 85 PERCENT UNDER FULL LOAD CONDITIONS. WHERE
LESS THAN 85 PERCENT, INCLUDE POWER FACTOR CORRECTION TO MINIMUM 90
PERCENT.
C. MANUFACTURERS: EXCEPT WHERE ITEM OF PLUMBING AND HVAC EQUIPMENT (WHICH
OTHERWISE COMPLIES WITH REQUIREMENTS IN THIS SECTION) IS INTEGRALLY EQUIPPED
WITH MOTOR PRODUCED BY ANOTHER MANUFACTURER, INCLUDE MOTORS BY ONE OF
THE FOLLOWING MANUFACTURERS: BALDOR ELECTRIC CO., GENERAL ELECTRIC CO.,
RELIANCE ELECTRIC MOTORS, OR SQUARE D.
2.2 MOTOR COMPLY WITH REQUIREMENTS IN DIVISION 26 FOR FACTORY INSTALLED
STARTERS. FIELD INSTALLED STARTERS ARE SPECIFIED IN DIVISION 26 WORK.
PART 3 - EXECUTION
3.1 MOTORS
A. WHERE MOTORS ARE FURNISHED FOR FIELD MOUNTING, INSTALL MOTORS ON MOTOR
MOUNTING SYSTEMS IN ACCORDANCE WITH MOTOR MANUFACTURER'S INSTRUCTIONS,
SECURELY ANCHORED TO RESIST TORQUE DRIVE THRUSTS AND OTHER EXTERNAL
FORCES INHERENT IN MECHANICAL WORK. SECURE SHEAVES AND OTHER DRIVE UNITS
TO MOTOR SHAFTS WITH KEYS AND ALLEN SET SCREWS EXCEPT MOTORS OF 1 3 HP
AND LESS MAY BE SECURED WITH ALLEN SCREWS ON FLAT SURFACES OF SHA
UNLESS OTHERWISE INDICATED, SET MOTOR SHAFTS PARALLEL WITH MACHINE SHAFTS.
3.2 STARTERS
A. COORDINATE WITH DIVISION 26 WORK TO INSTALL STARTERS AND WIRING DEVICES NEAR
MOTORS OR AS INDICATED ON THE DRAWINGS. SECURELY SUPPORT AND ANCHOR IN
ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. LOCATE FOR
3.3 EQUIPMENT AND OPERATIONAL CONNECTIONS DING VISIBILITY FOR SAFETY.
A. INSTALL FLEXIBLE- CONDUIT CONNECTION TO MOTOR AND EQUIPMENT FOR PACKAGED
AND NON- PACKAGED EQUIPMENT THAT IS FACTORY ASSEMBLED. COMPLY WITH
APPLICABLE PROVISIONS OF DIVISION 26 SECTIONS FOR WIRING MATERIALS AND WIRING
SERVICES.
B. REFER TO DIVISION 26 SECTIONS FOR INSTALLATION REQUIREMENTS. DIVISIONS 22
AND 23 SHALL PROVIDE WORK NOT INDICATED IN DIVISION 26 FOR A COMPLETE AND
OPERATING SYSTEM. WHERE A CONFLICT OCCURS BETWEEN DIVISIONS 22 AND 23 AND
DIVISION 6AND DIVISION 22 RYSTE SUB-CONTRACTOR SHALL PROVIDE WORK FOR A
END OF SECTION
SECTION 200548 - VIBRATION ISOLATION AND SEISMIC CONTROL
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. DESCRIPTION: WORK INCLUDES PRODUCTS TO ISOLATE BUILDING STRUCTURE AND
OCCUPIED SPACES FROM VIBRATION TRANSMISSION AND INCLUDES SEISMIC RESTRAINTS
FOR PLUMBING AND HVAC EQUIPMENT AND DISTRIBUTION SYSTEMS.
1.2 SUBMITTALS
A. PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA AND
INSTALLATION INSTRUCTIONS FOR EACH VIBRATION ISOLATOR, BASE, SEISMIC RESTRAINT,
AND APPURTENANCE.
B. CALCULATIONS: SIZING AND WEIGHT DISTRIBUTION FOR VIBRATION ISOLATORS, BASES,
AND SEISMIC RESTRAINTS.
C. VIBRATION ISOLATION BASE DETAILS: DETAIL FABRICATION INCLUDING ANCHORAGES
AND ATTACHMENTS TO STRUCTURE AND TO SUPPORTED EQUIPMENT.
D. SEISMIC RESTRAINT DETAILS: DETAIL FABRICATION AND ATTACHMENT OF SEISMIC
RESTRAINTS.
E. ISOLATOR SCHEDULE LIST: LIST SIZE, TYPE, LOAD, AND STATIC DEFLECTION OF EACH
ISOLATOR.
1.3 CONTRACTOR RESPONSIBILITY FOR VIBRATION ISOLATION AND SEISMIC RESTRAINTS
A. GENERAL: A SINGLE SUPPLIER SHALL SELECT AND FURNISH ISOLATION MOUNTS PADS,
SEISMIC RESTRAINTS SWAY BRACES, RELATED HARDWARE, AND FABRICATE ISOLATIONV
BASES FOR THE PROJECT UNLESS OTHERWISE SPECIFIED.
PART 2 - PRODUCTS
2.1 GENERAL
A. MANUFACTURERS: MASON INDUSTRIES, AMBER BOOTH, KINETICS NOISE CONTROL,
VIBRATION MOUNTINGS & CONTROLS, VIBRO - ACOUSTICS, CALIFORNIA DYNAMICS CORP
(CALDYN TOLCO OR APPROVED. MASON INDUSTRIES MODEL NUMBERS ARE LISTED.
PART 3 - IN ALLATION
3.1 INSPECTION
A. DESCRIPTION: VERIFY INSTALLATION CONDITIONS AS SATISFACTORY TO RECEIVE WO K
OF THIS SECTION. DO NOT INSTALL UNTIL UNSATISFACTORY CONDITIONS ARE
CORRECTED. BEGINNING WORK CONSTITUTES ACCEPTANCE OF CONDITIONS AS
SATISFACTORY.
3.2 EQUIPMENT
A. SPRING MOUNTS:
1. MARK VIBRATION ISOLATORS TO SHOW UNDEFLECTED HEIGHT TO VERIFY PROPER
ISOLATION AFTER INSTALLATION. INSTALL ISOLATORS FOR SINGLE PIECE OF
EQUIPMENT WITH APPROXIMATELY EQUAL DEFLECTION. MOUNT EQUIPMENT LEVEL.
2. COORDINATE WITH GENERAL CONTRACTOR AND STRUCTURAL ENGINEER TO ENSURE
PROPER MOUNTING ATTACHMENT POINTS FOR SEISMIC RESTRAINED SPRINGS.
B. SPRING HANGER RODS: ALIGN ISOLATOR TO CLEAR ISOLATOR HOUSING. INSTALL
HOUSING AS CLOSE AS POSSIBLE TO STRUCTURE.
C. BASES:
1. ATTACH CURB MOUNTED ISOLATION BASE AND RIGID ROOF CURB TO ROOF
STRUCTURE AND ATTACH ROOFTOP HVAC UNIT TO CURB IN ACCORDANCE WITH
ENGINEER, MANUFACTURERS' RECOMMENDATIONS, SPECIALTY CONSULTANT OR SE SMIC
RESTRAINT DEVICE MANUFACTURER'S DESIGN.
3.3 DUCTWORK
A. DUCT CLEARANCE: INSTALL VIBRATION - ISOLATED DUCTS TO ALLOW MINIMUM 2 INCH
GAP BETWEEN TOP OF DUCT AND UNDERSIDE OF FLOOR STRUCTURE ABOVE.
B. VIBRATION ISOLATOR HOUSING: INSTALL AS CLOSE AS POSSIBLE STRUCTURE.
C. FLEXIBLE CONNECTORS: INSTALL IN DUCTS AT CONNECTIONS TO EQUIPMENT.
D. DUCTS WITHIN SHAFTS: INSTALL WITHOUT CONTACT WITH WALLS. ANCHOR TO
BUILDING STRUCTURE AT FLOOR ONLY.
3.5 EQUIPMENT, PIPING, AND DUCT SEISMIC RESTRAINTS
A. GENERAL: COMPLY WITH REQUIREMENTS IN IBC AND ASCE 7 -05 UNLESS OTHERWISE
INDICATED IN THE CONTRACT DOCUMENTS.
B. COORDINATION: COORDINATE WITH SUBMITTALS AND SHOP DRAWINGS OF PLUMBING
AND HVAC EQUIPMENT SUCH AS AIR HANDLING UNITS. COORDINATE WITH GENERAL
CONTRACTOR AND STRUCTURAL ENGINEER TO ENSURE CORRECT MOUNTING ATTACHMENT
POINTS.
C. VIBRATION- ISOLATED EQUIPMENT, PIPING, AND DUCTS:
1. INSTALL SEISMIC RESTRAINTS WITH FACTORY SET CLEARANCES. INSTALL SEISMIC
RESTRAINT TO AVOID SHORT CIRCUITING OF VIBRATION ISOLATORS.
2. ISOLATE BOLTS FROM DIRECT CONTACT WITH STRUCTURE.
3.7 ELECTRICAL CONNECTIONS TO VIBRATION ISOLATED EQUIPMENT
A. COMPLY WITH REQUIREMENTS IN SECTION 200513.
GE S BETWEEN FLEXIBLE �pG.
TERMINATION AND . EQUIPMENT CONNECTION. �'� .11
C. RECOMMENDED MINIMUM FLEXIBLE RACEWAY LENGTH IS 6 FEET.
END OF SECTION
SECTION 200593 - TESTING, ADJUSTING, AND BALANCING
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. DESCRIPTION: WORT: INCLUDES TESTING, ADJUSTING, AND BALANCING
MECHANICAL SYSTEMS.
1.2 QUALITY ASSURANCE
A. CODES AND STANDARDS:
1. NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR - CONDITIONING AND VENTILATING
SYSTEMS.
2. UL 873, STANDARD FOR TEMPERATURE - INDICATING AND
TEMPERATURE - REGULATING EQUIPMENT.
B. TAB SUBCONTRACTOR:
1. GENERAL: TAB WORK PERFORMED BY AN INDEPENDENT SUBCONTRACTOR, NOT
AFFILIATED WITH THE CONTRACTOR. LANDLORD MAY REQUIRE SPECIFIC CONTRACTOR
FOR BALANCING.
2. QUALIIF))ICATIONS: CERTIFIED BY NATIONAL ENVIRONMENTAL BALANCING BUREAU
3. EXPERIENCEAS ASSOCIATED 3 YEARS BALANCE PROJECTS (O F SIMILAR SCOPE AND
COMPLEXITY.
1.3 SUBMITTALS
A. BALANCING REPORT:
1. PROVIDE COMPLETE BALANCING REPORT IN ACCORDANCE WITH NEBB REQUIREMENTS:
PART 2 - PRODUCTS
2.1 INSTRUMENTS
A. GENERAL: FURNISH MATERIALS AND EQUIPMENT NECESSARY TO PERFORM THE WORK.
B. INSTRUMENTATION: USE IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS.
PART 3 - EXECUTION
3.1 INSPECTION
A. DESCRIPTION: VERIFY INSTALLATION CONDITIONS AS SATISFACTORY TO RECEIVE WORK
OF THIS SECTION. BEGINNING WORK CONSTITUTES ACCEPTANCE OF CONDITIONS AS
3.2 WORK BYCT ABY.SUBCONTRACTOR
A. GENERAL: ADJUST QUANTITIES TO WITHIN 10 PERCENT OF DESIGN VALUES:
B. FOR ROOMS AND TERMINAL UNITS THAT ARE IDENTIFIED TO MAINTAIN NEGATIVE
PRESSURE RELATIONSHIPS TO ADJACENT ROOMS, ADJUST AIR QUANTITIES TO WITHIN
THE PERCENT OF DESIGN VALUES.
C. SYSTEMS: INCLUDE BUT ARE NOT LIMITED TO SUPPLY, RETURN, EXHAUST, AND
VENTILATION AIR SYSTEMS.
D. EXISTING SYSTEMS: PERFORM TAB FOR EXISTING AIR HANDLING SYSTEMS (NOTED ION
PLANS), WORK SHALL INCLUDE SAME ACTIVITIES AS FOR NEW SYSTEM.
E. FILTER PRESSURE DROP: FOLLOWING PROPORTIONAL ADJUSTMENT OF SUPPLY AIRS
B. DO NOT INSTALL CONDUIT CLAMPS OR HANGERS ' ��
OR
AN
iE rt
i0
Of r°ukcwi
ING M #MI ROB
OUTLETS MEASURE INITIAL CLEAN FILTER PRESSURE DROP. SIMULATE FILTER LOADING
BY COVERING FACE OF FILTERS TO INCREASE FILTER PRESSURE DROP. REMEASURE
CLEAN FILTER PRESSURE DROP AT FINAL FAN SETTING.
F. FAN ADJUSTMENT AND DRIVE CHANGES: MECHANICAL SUB CONTRACTOR SHALL
PROVIDE MOTORS, SHEAVES AND BELTS AS REQUIRED FOR BALANCER TO ACCOMPLISH
WORK.
G. OUTDOOR AIR /ECONOMIZER CYCLES: AFTER SUPPLY AIR OUTLETS AND RETURN AIR
TO AIR QUANNTITYYAINDICATED ON T THE QUANTITIES FOR CEACHD ADJUST AIR DAMPER
H. MARKING OF ADJUSTMENTS:
1 AFTER FINAL INSPECTION AND RECHECK PERMANENTLY MARK DAMPERS VALVES
AND OTHER ADJUSTMENT DEVICES TO ALLOW ADJUSTMENT TO BE RESTORED IF VALVES,
DISTURBED IN THE FUTURE.
END OF SECTION
SECTION 200700 - MECHANICAL INSULATION
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. DESCRIPTION: WORK INCLUDES INSULATION FOR PLUMBING AND HVAC PIPING,
DUCTWORK AND EQUIPMENT.
1.2 QUALITY ASSURANCE
A. CODES AND STANDARDS:
1. APPLICABLE ENERGY CODE.
2. ASTM E 84, STANDARD TEST METHOD FOR SURFACE BURNING CHARACTERISTICS OF
BUILDING MATERIALS.
3. ASTM E 96, STANDARD TEST METHODS FOR WATER VAPOR TRANSMISSION OF
MATERIALS.
4. NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR - CONDITIONING AND VENTILATING
SYSTEMS.
5. NFPA 255, FOR SURFACE BURNING CHARACTERISTICS OF MATERIALS. MATERIALS.
1.3 SUBMITTALS
A. PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA FOR EACH TYPE
OF REQUIRED INSULATION.
1.4 SURFACE BURNING CHARACTERISTICS
A. PROVIDE COMPOSITE OR COMPONENT RATINGS PER NFPA 255 ASTM E 84 AND UL
723 AS FOLLOWS: FLAME SPREAD RATING NOT GREATER THAN 25 AND SMOKE
DEVELOPED RATING NOT GREATER THAN 50.
B. COMPOSITE INCLUDES INSULATION, JACKETING, AND ADHESIVE USED TO SECURE
JACKETING OR FACING.
C. COMPONENTS INCLUDE PVC JACKETING AND FITTINGS, ADHESIVE, MASTIC, CEMENT,
TAPE, AND CLOTH.
PART 2 - PRODUCTS
2.1 MATERIALS
A. FIBERGLASS PIPE INSULATION: ASTM C 547, TYPE 1.
B. FIBERGLASS PIPE FITTING INSULATION: THERMAL BLANKET, ASTM C 533, TYPE 1 OR II.
C. CALCIUM SILICATE PIPE INSULATION: ASTM C 533 TYPE 1.
D. FIBERGLASS DUCT INSULATION: ASTM C 553, TYPE I, 11, OR III, ASTM C 1290, ASTM
C 1139 TYPE III (FACED) ASTM E 84, AND
E. ADHESIVES, SEALERS STAPLES, ASTM C 113fi TYPE II FOR FSK JACKET.
BINDS ' WIRES AND PROTECTIVE FINISHES: AS
RECOMMENDED BY INSULATION MANUFACTURER FOR APPLICATIONS INDICATED.
2.2 MANUFACTURERS
A. FIBERGLASS PIPE AND DUCT INSULATION: CERTAINTEED, KNAUF INSULATION, JOHNS
MANVILLE OWENS- CORNING, OR APPROVED.
2.3 PIPING SYSTEM INSULATION
A. INSULATION MATERIALS AND THICKNESSES SHALL MEET OR EXCEED THE INSULATION
REQUIREMENTS OF THE APPLICABLE ENERGY CODE. WHERE INSULATION THICKNESS
SPECIFIED IS LARGER THAN THOSE LISTED IN THE APPLICABLE ENERGY CODE, USE THE
LARGER VALUES.
B. INSULATE COLD PLUMBING WITH FIBERGLASS 1 INCH THICK FOR ALL SIZES.
C. INSULATE HOT PLUMBING PIPING WITH THE 1 INCH THICK FOR PIPE SIZES 2 INCHES
AND SMALLER.
D. INCREASE THICKNESS BY 1./2 INCH WHERE PIPING IS LOCATED OUTDOORS OR
OTHERWISE EXPOSED TO AMBIENT AIR.
2.4 DUCT SYSTEM fNRYLAAP,lO APPLIED ASJ /SSL ON FIBERGLASS PIPING INSULATION.
A. DUCT WRAP: FLEXIBLE FIBERGLASS DUCT WRAP INSULATION WITH FACTORY APPLIED FSK
FACING (VAPOR BARRIER) CONSISTING OF ALUMINUM FOIL REINFORCED WITH
FIBERGLASS SCRIM LAMINATED TO UL RATED KRAFT.
B. INSULATE ALL SUPPLY, RETURN AND OUTSIDE AIR DUCTWORK WITH FSK GLASS FIBER
INSULATION HAVING A MINIMUM R -VALUE OF 7 AND VAPOR BARRIER JACKET.
2.5 JACKETING
A. METAL: .016 INCH THICK ALUMINUM OR .1 IN THICK STAINLESS STEEL WITH MOISTURE
BARRIER ON INNER SURFACE. ASTM B 209.
PART 3 - EXECUTION
3.1 INSPECTION
A. GENERAL: VERIFY INSTALLATION CONDITIONS AS SATISFACTORY TO RECEIVE WORK OF
THIS SECTION. DO NOT INSTALL UNTIL UNSATISFACTORY CONDITIONS ARE CORRECTED.
BEGINNING WORK CONSTITUTES ACCEPTANCE OF CONDITIONS AS SATISFACTORY.
B. CUT INSULATION SLIGHTLY LONGER THAN CIRCUMFERENCE OF DUCT TO INSURE FULL THICKNESS
AT CORNERS. APPLY INSULATION WITH EDGES TIGHTLY STITCHED WITH STAPLES. TAPE STITCHED
SEAM WITH 3 INCH WIDE PRESSURE SENSITIVE ALUMINUM FOIL. TAPE OR SEAL JOINTS WITH 2
COATS OF VAPOR BARRIER MASTIC REINFORCED WITH ONE LAYER OF OPEN WEAVE GLASS
FABRIC.
A. SECURE INSULATION TO BOTTOM OF RECTANGULAR AND SQUARE DUCTS 18 INCHES AND WIDER
WITH WELDED PINS AND SPEED CUPS ON 18 INCH CENTERS. CUT OFF PROTRUDING ENDS OF
THE PINS FLUSH AFTER SPEED CUPS AVE
S FL HAVE BEEN INSTALLED. SEAL VAPOR BARRIER FACING
WHERE PINS HAVE PIERCED THROUGH WITH TAPE OF SAME MATERIAL BY APPLYING VAPOR
BARRIER ADHESIVE TO BOTH SURFACES AS RECOMMENDED BY THE MANUFACTURER.
B. INSTALL DUCT WRAP WITH MAXIMUM 25 PERCENT COMPRESSION.
C. EXHAUST DUCTS UNINSULATED.
D. SEAL OTHER JOINTS AND PENETRATIONS OF THE VAPOR BARRIER FACING WITH 3 INCH WIDE
PRESSURE SENSITIVE ALUMINUM FOIL TAPE. SEAL CUTS OR TEARS WITH STRIPS OF THE
ALUMINUM FOIL TAPE.
E. OUTDOOR EXPOSED CONDITIONED AIR DUCTS:
1. INSTALL WEATHERPROOF MASTIC AND GLASS CLOTH PER MANUFACTURER'S RECOMMENDATIONS.
2. LOCATE JOINTS AND LONGITUDINAL SEAMS OF METAL JACKETING TO SHED WATER MINIMUM 3
INCH OVER W, PN WEACTHER SEALED. INSTALL STRAPS OVER 2 INCH WIDE BUTT STRIPS ON
�RD
OF SECTION
SECTION 200820 - SYSTEMS OPERATIONS AND MAINTENANCE MANUALS
PART 1 - GENERAL
1.1 SECTION INCLUDES
G. DESCRIPTION: WORK INCLUDES PREPARATION OF MECHANICAL SYSTEMS OPERATION
AND MAINTENANCE MANUALS.
.�2 SCOPE OF WORK
A. PRODUCT DATA AND PARTS UST: INCLUDE LOCAL SOURCE OF' SUPPLY FOR PARTS
AND REPLACEMENT. LIST PARTS AND COMPONENTS OF EQUIPMENT STATING CATALOG
NUMBER (SERIAL NUMBER AND RATINGS, SUCH AS HP, VOLTAGE, AND GPM.) AND SIZE
OF PART USED IN OR ON EQUIPMENT.
B. TROUBLESHOOTING GUIDE.
C. MANUFACTURER'S INSTALLATION AND SERVICE INSTRUCTIONS.
D. MANUFACTURER'S SERVICE INSTRUCTIONS.
E. START -UP INSTRUCTIONS WITH CERTIFICATES OF START -UP AND VERIFICATION.
F. FINAL APPROVED SUBMITTALS.
G. WARRANTIES.
PART 2 - PRODUCTS
2.1 FORMAT
A. ASSEMBLE OPERATION AND MAINTENANCE MANUAL IN 3 -RING BINDER(S).
END OF SECTION
c
MECHANICAL SPECIFICATIONS
1 I. V 1V1V1tlV
4tb
c4
NAC NO 121-10017
HEINO 10113
DRAWN JMR
CHECKED RKE
DATE 9 -10 -2010
x
0.3
DIVISION 20 CONTINUED
SECTION 202110 - PIPING
PART 1 - GENERAL
1.1 SECTION INCLUDES
A.DESCRIPTION: WORK INCLUDES PIPING AND ASSOCIATED APPURTENANCES FOR PIPING
THAT APPLY TO MULTIPLE SYSTEMS. PIPING SPECIFIC TO A SINGLE SYSTEM IS
SPECIFIED IN THAT PARTICULAR SECTION.
1.2 QUALITY ASSURANCE
A.CODES AND STANDARDS:
1. ASME B31.1, POWER PIPING.
2.ASME 831.9, BUILDING SERVICES PIPING.
1.3 SUBMITTALS
A.PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA AND MAINTENANCE
DATA FOR EACH TYPE OF PIPING FITTINGS AND ASSOCIATED APPURTENANCES.
B. TESTING REPORTS: PRESSURE TESTING RECORDS.
PART 2 - PRODUCTS
2.1 GENERAL
A.PRE U R RATINGS: SSURE VIDE COMPONENTS WITH MINIMUM PRESSURE RATING OF 125
2.2 MANUFACTURERS WpLVERINE
A.COPPER TUBING: CERRO, MUELLER, WOLVERINE.
B.COPPER TUBE FITTINGS: NIBCO ®, MUELLER ELKHART.
D.SHAPED :NIPPLESE' ALLEDCKRONNEY RUBBER, ANCHOR, FLEXITALLIC.
2.3 COPPER TUBING
A.TUBING, ABOVE GRADE: TYPE L COPPER WATER TUBE HARD - DRAWN, ASTM B 88.
B.TUBING UNDERGROUND: TYPE K COPPER WATER TUBE SOFT- -DRAWN ASTM B 88.
C.FfTTINGS: WROUGHT COPPER SOLDER FITTINGS AND SCREWED ADAPTERS, ASME B16.22;
CAST BRONZE SOLDER JOINT FITTINGS AND SCREWED ADAPTERS ASME 816.18.
D.UNIONS: WROUGHT COPPER SOLDER JOINT UNIONS, ASME B 16.22; CAST BRONZE
SOLDER JOINT FITTINGS, ASME B 16.18.
E. FLANGES AND FLANGED FITTINGS: CAST BRONZE, 125 POUND CLASS, ASME STANDARDS.
F. GASKETS: 1 ./16 INCH THICK COMPRESSED NON - ASBESTOS MATERIAL SELECTED FOR
APPLICABLE TEMPERATURE AND PRESSURE OF SYSTEMS INSTALLED. FULL FACE
GASKETS FOR FLAT FACED FLANGES.
G.JOINT COMPOUND: TEFLON TAPE.
H.SOLDER MATERIAL: 95 PERCENT TIN, 5 PERCENT ANTIMONY SOLDER OR 96 PERCENT
TIN 4 PERCENT SILVER CONFORMING TO ASTM B 32. J.W. HARRIS "BRIDGIT ", HARDY &
HARMAN ALLSTATE OR APPROVED.
PART 3 - EXECUTION
3.1 PIPING INSTALLATION
A.INSTALL PIPING FITTINGS AND APPURTENANCES IN ACCORDANCE WITH RECOGNIZED
INDUSTRY PRACTICES WHICH WILL ACHIEVE PERMANENTLY LEAKPROOF PIPING SYSTEMS,
CAPABLE OF PERFORMING EACH INDICATED SERVICE WITHOUT PIPING FAILURE.
B.INSTALL PIPE GENERALLY SLOPED TO PERMIT DRAINAGE AT LOW POINTS, FREE FROM
SAGS, BENDS, AND TRAPS, AND IN A MANNER TO CONSERVE SPACE FOR OTHER WORK.
3.2 FLUSHING
A.FLUSH PIPING WITH CLEAN WATER PRIOR TO CONNECTING TO EXISTING SYSTEMS AND
PRESSURE TESTING.
3.3 PRESSURE TESTING
A.TEST PIPING SYSTEMS BEFORE INSULATION HAS BEEN APPLIED AND BEFORE
BACKFILUNG.
B.TEST PRESSURES AND DURATION: TEST PIPING SYSTEMS AT PRESSURE OF 1 -1 2
TIMES THE DESIGN WORKING PRESSURE OR AT 100 PSIG WHICHEVER IS GREATER.
MAINTAIN TEST PRESSURE FOR SUFFICIENT TIME TO PERMIT COMPLETE INSPECTION OF
SYSTEM UNDER TEST. MINIMUM 2 HOUR DURATION. TEST IN SECTIONS AND TEST
ENTIRE SYSTEM WHEN COMPLETELY INSTALLED.
C.TEST REPAIRS:
1. REMOVE MATERIALS SUCH AS GASKETS AND BOLTS DAMAGED DURING TESTS AND
FLUSHING AND PROVIDE NEW COMPONENTS.
2.USE NEW GASKETS EACH TIME A FLANGED JOINT IS MADE UP.
3.REPAIR DEFECTS WHICH DEVELOP DURING TESTING AND RETEST PIPING SYSTEMS UNTIL
THEY SHOW NO DEFECT OR WEAKNESS AND ARE TIGHT. DO NOT USE CHEMICALS,
STOP -LEAK COMPOUNDS MASTICS, OR OTHER TEMPORARY REPAIR METHODS.
D.INCLUDECCORPIES IN THE OPERA ON AND MAINTENANCECMANUAL. INSTALLATION.
END OF SECTION
SECTION 202115 - PIPING SPECIALTIES
PART 1 --- GENERAL
1.1 SECTION INCLUDES
A.DESCRIPTION: WORK INCLUDES PIPE HANGERS AND SUPPORTS, STRAINERS,
THERMOMETERS, PRESSURE GAGES, TEMPERATURE /PRESSURE TEST PORTS (PETE'S
PLUGS AIR VENTS ALIGNMENT GUIDES AND ASSOCIATED APPURTENANCES FOR PIPING
THAT APPLY TO MULTIPLE SYSTEMS. SPECIALTY COMPONENTS SPECIFIC TO A SINGLE
SYSTEM ARE SPECIFIED IN THAT PARTICULAR SECTION.
1.2 QUALITY ASSURANCE
A.CODES AND STANDARDS:
1. ASME B31.1, POWER PIPING.
2.ASTM E 84, STANDARD TEST METHOD FOR SURFACE BURNING CHARACTERISTICS OF
BUILDING MATERIALS.
3.NFPA 255 SURFACE BURNING CHARACTERISTICS BUILDING MATERIALS.
4.UL 723 PEST FOR SURFACE BURNING CHARACTERISTICS OF BUILDING MATERIALS.
B.MSS COMPLIANCE: COMPLY WITH MSS SP -58 FOR MATERIALS DESIGN, AND
MANUFACTURE OF PIPE HANGERS AND SUPPORTS. COMPLY WITH MSS SP -69 FOR
SELECTION AND APPLICATION OF PIPE HANGERS AND SUPPORTS. COMPLY WITH MSS
SP -89 FOR FABRICATION AND INSTALLATION OF PIPE HANGERS AND SUPPORTS. REFER
TO MSS SP -90 FOR TERMINOLOGY USED IN THIS SECTION.
C.PIPE HANGERS AND CLAMPS AND RELATED COMPONENTS INSTALLED IN CEILING SPACES
USED AS A RETURN AIR PLENUM SHALL HAVE RATINGS PER NFPA 255, ASTM E 84,
AND UL 723 WITH FLAME SPREAD RATING NOT GREATER THAN 25 AND SMOKE
DEVELOPED RATING NOT GREATER THAN 50.
PART 2 - PRODUCTS
2.1 GENERAL
A.FURNISH FACTORY- FABRICATED PIPING SPECIALTIES PIPE HANGERS PIPE SUPPORTS,
ANCHORS DIELECTRIC UNIONS, THERMOMETERS PRESSURE GAUGES AND PIPE
ESCUTCHEONS RECOMMENDED BY MANUFACTURERS FOR USE IN SERVICES INDICATED.
B.MATERIALS: MATCH PIPING MATERIAL AT POINT OF CONTACT WITH PIPING.
PART 3 - EXECUTION
3.1 PIPE HANGERS AND SUPPORTS
A.GENERAL: INSTALL BUILDING ATTACHMENTS AT REQUIRED LOCATIONS WITHIN CONCRETE
OR ON STRUCTURE STEEL FOR PROPER PIPING SUPPORT. INSTALL ADDITIONAL
SUPPORTS AT CONCENTRATED LOADS, INCLUDING VALVES FLANGES, GUIDES, GUIDES STRAINERS,
EXPANSION JOINTS AND AT CHANGES IN DIRECTION OF PIPING.
B.INSTALL HANGERS AND SUPPORTS COMPLETE WITH NECESSARY INSERT, BOLTS, RODS,
NUTS WASHERS AND OTHER ACCESSORIES.
3.2 DIELECTRIC UNIONS AND NIPPLES
A.INSTALL AT THE FOLLOWING LOCATIONS:
1. AT BLACK AND GALVANIZED STEEL PIPING CONNECTIONS TO COPPER TUBING.
2.AT BLACK STEEL PIPING CONNECTIONS TO BRONZE VALVES AND SIMILAR DEVICES.
3.3 PIPE ESCUTCHEONS
A.INSTALL ESCUTCHEONS AT WALL, FLOOR AND CEILING PENETRATIONS IN EXPOSED
FINISHED LOCATIONS AND WITHIN CABINETS AND MILLWORK. USE DEEP - PATTERN
ESCUTCHEONS IWHEREUISLEEVES CONCEAL PROTRUDING O PIPE FITTINGS. ESCUTCHEONS
END OF SECTION
DIVISION 21
SECTION 211000 - AUTOMATIC FIRE SUPPRESSION SYSTEMS
PART 1 - GENERAL
1.1 SECTION INCLUDES
A.DESCRIPTION: FIREIOSUPPRESSIOIN SYSTEMS BY EXTENDINGNEXISTING SYSTEM TOLSERVEUAOFFFECTED
AREA.
B.GENERAL REQUIREMENTS: DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT,
INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS DIVISION 01, AND SECTIONS
200500 AND 200510 APPLY TO WORK IN THIS SECTION.
1.2 QUALITY ASSURANCE
A.REGULATORY REQUIREMENTS: COMPLY WITH APPLICABLE CITY, COUNTY, AND STATE
CODES AND ORDINANCES.
B.AUTHORITIES HAVING JURISDICTION (AHJS):
C.LOCAL FIRE DEPARTMENT.
D.CODES AND STANDARDS: NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER
SYSTEMS AND LOCAL JURISDICTION REQUIREMENTS.
E. FIRE SPRINKLER SYSTEM CONTRACTOR'S QUALIFICATIONS FOR PREPARATION OF SHOP
DRAWINGS INSTALLATIONS INSPECTIONS, MAINTENANCE, AND SERVICING: ONLY LICENSED
FIRE PROTECTION SPRINKLER SYSTEM CONTRACTORS SHALL EXECUTE CONTRACTS FOR
INSTALLATION INSPECTION, MAINTENANCE OR SERVICING OF FIRE PROTECTION
SPRINKLER SYSTEMS OR ANY PART OF SUCH SYSTEM.
F. FIRE SPRINKLER SYSTEM CONTRACTOR'S QUALIFICATIONS: ACTIVE NICET LEVEL III
(CERTIFIED ENGINEERING TECHNICIAN) CERTIFICATION IN FIRE PROTECTION ENGINEERING
TECHNOLOGY AUTOMATIC SPRINKLER SYSTEM LAYOUT.
G.TENANT CRITERIA: REVIEW MALL /TENANT CRITERIA FOR ADDITIONAL REQUIREMENTS AS
THEY PERTAIN TO FIRE SPRINKLER SYSTEMS.
1.3 SYSTEM DESIGN CRITERIA
A.DESIGN FURNISH AND INSTALL COMPLETE OPERABLE FIRE SUPPRESSION SYSTEMS IN
ACCORDANCE WITH THE LATEST ADOPTED EDITIONS OF IBC, IFC, NFPA 13 AND
APPLICABLE CITY, COUNTY, AND STATE LAWS, CODES AND STANDARDS. INCLUDE
VALVES FLOW SWITCHES TAMPER SWITCHES, LOW AIR PRESSURE SWITCHES, AND
ACCESSORIES TO MEET REQUIREMENTS OF AHJS AND AFOREMENTIONED CODES AND
STANDARDS.
B.IN AREAS WHERE LOCAL CODES REQUIRE COVERAGE BY EITHER FIRE SPRINKLERS OR
HEAT DETECTORS PROVIDE COVERAGE BY FIRE SPRINKLERS.
C.THE CONTRACTOR AND THE FIRE SUPPRESSION SYSTEM SUBCONTRACTOR SHALL MEET
WITH THE AHJS PRIOR TO PREPARATION OF SHOP DRAWINGS, HYDRAULIC CALCS AND
EARTHQUAKE BRACING CALCULATIONS TO REVIEW PROCEDURES FOR HANDLING
SUBMITTALS, INSPECTION, TESTING AND FOR GENERAL COORDINATION AND TO VERIFY
SPRINKLER OCCUPANCY HAZARD CLASSIFICATIONS.
D.OBTAIN LATEST WATER SUPPLY ENGINEERING TEST DATA PRIOR TO DESIGN. INCLUDE 10
PERCENT SAFETY MARGIN IN SYSTEM DESIGN. IF TEST DATA IS NOT AVAILABLE,
CONDUCT TEST TO DETERMINE AVAILABLE FLOW AND PRESSURES TO HYDRAULICALLY
DESIGN SYSTEM.
E. COORDINATION WITH OTHER TRADES:
1. COORDINATE FIRE SUPPRESSION WORK WITH THAT OF MECHANICAL, SHEET METAL,
PLUMBING AND ELECTRICAL SUBCONTRACTORS SO THAT BEST ARRANGEMENT OF
EQUIPMENT' PIPING CONDUIT DUCTS AND SIMILAR ITEMS CAN BE OBTAINED.
2.IDENTIFY POINTS OF CONFLICT BETWEEN THIS WORK AND THAT OF OTHER TRADES SO
THAT CONFLICT MAY BE PROPERLY ADJUSTED. FIRE SUPPRESSION SYSTEM
SUBCONTRACTOR SHALL REMOVE AND RE- INSTALL WORK WHICH INTERFERES WITH
WORK OF OTHER TRADES AT NO ADDITIONAL COST TO THE OWNER.
F. NO CHANGE ORDERS WILL BE ISSUED FOR ADDITIONS AND DELETIONS OF SPRINKLER
HEADS AND ASSOCIATED PIPING EXCEPT AS SUCH ADDITIONS AND DELETIONS STEM
FROM CHANGES IN BUILDING DESIGN MADE SUBSEQUENT TO APPROVAL OF SHOP
DRAWINGS.
1.4 SUBMITTALS
A.COMPLY WITH REQUIREMENTS IN DIVISION 01 AND SECTION 200500.
B.PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA AND MAINTENANCE
DATA FOR EACH ITEM SPECIFIED IN THIS SECTION.
C.SHOP DRAWINGS AND CALCULATIONS:
1. COMPLY WITH REQUIREMENTS IN NFPA 13.
2.SUBMIT PRELIMINARY LAYOUT SHOWING ONLY HEAD LOCATIONS FOR REVIEW BY THE
ALE. INCLUDE ADDITIONAL HEADS WHICH MAY BE REQUIRED FOR COORDINATED
CEILING PATTERN AT NO ADDITIONAL COST TO THE OWNER EVEN THOUGH NUMBER OF
HEADS MAY EXCEED MINIMUM CODE REQUIREMENTS. INDICATE SPRINKLER HEAD
LOCATIONS AS FOLLOWS:
a.SUSPENDED ACCESSIBLE CEILINGS: LOCATE HEADS IN CENTER OF CEILING TILES UP
TO 2 FOOT TILE DIMENSION, AND 1/4 SECTION INTERVALS FOR 4 FOOT TILE
DIMENSION.
b.SUSPENDED INACCESSIBLE CEILINGS: LOCATE HEADS IN CONJUNCTION WITH LIGHT
FIXTURES AND OTHER DEVICES INSTALLED IN CEILING IN A SYMMETRICAL PATTERN.
c. ARRANGE HEADS IN STRAIGHT LINES THAT ARE PARALLEL AND PERPENDICULAR TO
WALLS.
3.AFTER A/E REVIEW OF SPRINKLER HEAD LOCATIONS, SUBMIT SHOP DRAWINGS AND
HYDRAULIC AND EARTHQUAKE BRACING CALCULATIONS TO THE A/E OF ENTIRE
SPRINKLER SYSTEM. SHOP DRAWINGS INCLUDE COMPLETE FLOOR PLANS SHOWING
NEW WORK AND SUFFICIENT EXTENT OF EXISTING WORK, LOCATIONS AND TYPES OF
HEADS, PIPE SIZES AND CUTTING LENGTHS, LOCATIONS AND SIZES OF REQUIRED BEAM
PENETRATIONS LOCATIONS AND TYPES OF HANGERS TEST VALVE(S), DRAIN VALVES,
AND OTHER RELATED ITEMS. INDICATE EXPOSED WORK.
4.INCLUDE RISERS FLOW SWITCHES INSIDE SHUT -OFF VALVES TAMPER SWITCHES POST
INDICATOR VALVES, BACKFLOW PREVENTERS AND VAULTS AND SIMILAR COMPONENTS.
5.INDICATE LOCATION OF ALARM AND SUPERVISORY INITIATING DEVICES AND OTHER
DEVICES AND ELECTRICAL EQUIPMENT ASSOCIATED WITH THE FIRE SUPPRESSION
SYSTEMS.
6.FOLLOWING REVIEW AND APPROVAL BY THE A E SUBMIT SHOP DRAWINGS AND
HYDRAULIC AND EARTHQUAKE BRACING CALCULATIONS TO THE AHJS. DO NOT
PROCEED WITH INSTALLATION UNTIL SHOP DRAWINGS HAVE BEEN APPROVED BY THE
AHJS.
D.CONTRACTOR'S MATERIAL AND TEST CERTIFICATE: SUBMIT TO CERTIFY MATERIAL
SELECTION AND TESTING RESULTS USING FORM IN NFPA 13. COMPLETE APPLICABLE
PORTIONS OF FORM AND SIGN AND DATE IT.
E. OBTAIN FROM EACH AHJ WRITTEN CERTIFICATION THAT THE PERMANENT INSTALLATION
HAS BEEN INSPECTED AND THAT IT COMPLIES WITH AHJS PUBLISHED REGULATIONS AND
REQUIREMENTS. SUBMIT PRIOR TO SUBSTANTIAL COMPLETION.
F.OPERATION AND MAINTENANCE DATA:
1. PREPARE COMPLETE, SIMPLE UNDERSTANDABLE STEP -BY -STEP TESTING
INSTRUCTIONS WITH RECOMMENDED AND REQUIRED TESTING FREQUENCY OF EQUIPMENT
WITH METHODS FOR TESTING EQUIPMENT. INCLUDE TROUBLE - SHOOTING MANUAL.
2.PREPARE COMPLETE EASY -TO -READ UNDERSTANDABLE MAINTENANCE INSTRUCTIONS
INCLUDING THE FOLLOWING INFORMATION:
a.INSTRUCTION ON REPLACING COMPONENTS OF SYSTEM INCLUDING INTERNAL PARTS.
b. LIST OF EQUIPMENT AND COMPONENTS WITH ADDRESS AND PHONE NUMBER OF
BOTH MANUFACTURER AND LOCAL SUPPLIER OF EACH ITEM.
3.INCLUDE FIRE SUPPRESSION SYSTEM PRESSURE AND ALARM SYSTEM TESTS.
4.INCLUDE COPIES OF THE FOLLOWING PUBLICATIONS:
a.NFPA 25 STANDARD FOR INSPECTION, TESTING, AND MAINTENANCE OF WATER BASED
FIRE PROTECTION.
5.SUBMIT ONE WEEK MINIMUM PRIOR TO SYSTEM TRAINING.
G.RECORD DRAWINGS:
1. PROVIDE IN ACCORDANCE WITH DIVISION 01 AND SECTION 200500.
2.SUBMIT ONE WEEK MINIMUM PRIOR TO SYSTEM TRAINING.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A.MANUFACTURER OF EQUIPMENT REGULARLY ENGAGED IN THE MANUFACTURE OF
COMPONENTS SPECIFIED AND WITH PUBLISHED CATALOGS LISTING PERTINENT
SPECIFICATIONS OF ITEMS MANUFACTURED.
B.MANUFACTURERS NAME AND MODEL IDENTIFICATION USED THROUGHOUT THIS SECTION
ARE TO ESTABLISH GENERAL CONFIGURATION, FUNCTION, SIZE, PERFORMANCE AND
QUALITY.
C.MANUFACTURERS: TYCO FIRE & BUILDING PRODUCTS (GRINNELL GROOVED PRODUCTS,
CENTRAL AUTOMATIC' SPRINKLER CO , GLOBE STAR SPRINKLER), CORP., VIKING CORP.
2.2 GENERAL
A.EQUIPMENT MATERIAL, AND COMPONENTS REQUIRED BY NFPA TO BE LISTED: UL
LISTED AND LABELED AND APPROVED BY FM AND AHJS.
2.3 PIPE AND FITTINGS
A.PIPE:
1. COMPLY WITH REQUIREMENTS IN NFPA 13.
2.BLACK STEEL, ASTM A 53, ASTM A 135 OR ASTM A 795.
3.PIPE OTHER THAN SCHEDULE 40 OR SCHEDULE 10, ACCEPTABLE IF UL LISTED AND
LABELED, M APPROVED AND APPROVED BY AHJS. CPVC PIPE NOT ACCEPTABLE.
4.SCHEDULE 40 PIPE USED IN. CUT GROOVE JOINTS.
5.SCHEDULE 10 PIPE USED FOR ROLLED GROOVED JOINTS. ROLLED GROOVED JOINTS
FOR DRY PIPE SPRINKLER SYSTEMS NOT ACCEPTABLE.
6.INTERNAL AND EXTERNAL GALVANIZED STEEL FOR EXTERIOR PIPES, DRY PIPE
SPRINKLER SYSTEMS, AND DRAINS.
7.FLEXIBLE HEAD DROP COUPLINGS MAY BE USED AT CONTRACTOR'S OPTION. IF
FLEXIBLE HEAD DROP COUPLINGS ARE USED USE THREADED FITTINGS. GASKET OR
PRESSURE FIT TYPE FITTINGS NOT ACCEPTABLE.
8.DUCTLEIR N, C MENT IN D�PE S S 52, MECHANICAL OR PUSH -ON RESTRAINED
FOR UNDERGROUND PIPE.
B. FITTINGS:
1.COMPLY WITH REQUIREMENTS IN NFPA 13.
2.MINIMUM 125 PSI CLASS.
3.2 INCH AND SMALLER: 150 POUND BLACK MALLEABLE OR DUCTILE IRON, SCREWED,
ANSI B16.3 AND ASTM A 197.
4.OR1DUCTILEHIRON ASTRMEA:536 BODIES�OIFT.ANGED FIITTINGS,EFORGEDO TEELMOR 47
DUCTILE IRON.
5.GROOVED JOINT COUPLINGS: UL LISTED AND LABELED FOR SPRINKLER SERVICE.
MALLEABLE IRON ASTM A 47 OR DUCTILE IRON ASTM A 536 HOUSING. CHLORINATED
BUTYL GASKET. NUTS AND BOLTS ASTM A 183. MINIMUM 110,000 PSI TENSILE.
6.INTERNAL AND EXTERNAL GALVANIZED STEEL FITTINGS FOR EXTERIOR PIPES, DRY! PIPE
SPRINKLER SYSTEMS, AND DRAINS.
7.PLAIN END COUPLINGS: PLAIN END COUPLINGS (ROUST -A- BOUTS, PLAINLOKS dR
SIMILAR COUPLINGS) NOT ACCEPTABLE.
8. HOLE CUT OUTLETS:
a. NOT ACCEPTABLE FOR NEW SYSTEMS.
2.4 VALVES
A.GENERAL: UL LISTED AND LABELED AND FM APPROVED, MINIMUM 175 PSI CLASS.
2.5 SPRINKLER HEADS
A.AUTOMATIC SPRINKLER QUICK RESPONSE HEADS OF THE TYPE AS REQUIRED BY THE
AHJS AND FINISH FOR THE AREAS AND CEILING CONSTRUCTION DESIGNATED IN 1
SCHEDULE ON THE DRAWINGS.
B.OPERATING TEMPERATURE: COMPLY WITH REQUIREMENTS IN NFPA 13. SELECT T
COMPENSATE FOR THE MAXIMUM TEMPERATURES WHICH OCCUR IN A PARTICULAR AREA
DURING EITHER WINTER OR SUMMER CONDITIONS FROM SUCH SOURCES AS UNIT
HEATERS AND SUNUGHT. IN NO CASE USE HEADS RATED LESS THAN 50 F HIGHER
THAN ANTICIPATED AMBIENT TEMPERATURE.
C.INCLUDE ESCUTCHEON SELF - ADJUSTING TYPE SPR1NG- LOADED, OR FRICTION FIT FOR
EACH PENDANT SPRINKLER HEAD FITTING AGAINST CEILING.
D.SPRINKLER HEAD GUARDS: INCLUDE WHERE SPRINKLER HEADS ARE SUBJECT TO
DAMAGE AND FOR SPRINKLER HEADS INSTALLED LOWER THAN 7 FEET ABOVE FINISHED
FLOOR GRATING, AND MAINTENANCE ACCESS AREA. WIRE BASKET TYPE WITH SCREW
TYPE FASTENER. SPRING CLIP TYPE FASTENER NOT ACCEPTABLE. CHROME OR NICKEL
PLATED IN FINISHED AREAS.
E. SPRINKLER CABINET: INCLUDE WITH REQUIRED NUMBER OF SPRINKLER HEADS OF
RATINGS AND TYPES INSTALLED. ALSO INCLUDE ESCUTCHEONS AND SPRINKLER
WRENCH.
2.7 ALARM AND SIGNAL DEVICES
A.WATERFLOW SWITCH (SYSTEMS WITHOUT ALARM VALVES : VANE OR PADDLE TYPE FLOW
SWITCH, INSTALLED AND CONNECTED IN SUCH A MANNER THAT FLOW OF WATER EQUAL
TO OR GREATER THAN THAT FROM A SINGLE HEAD WILL AUTOMATICALLY ENERGIZE FIRE
ALARM SYSTEM. INCLUDE FIELD ADJUSTABLE TIME DELAY, ADJUSTABLE FROM 0 TO 60
SECONDS.
B.VALVE MONITOR SWITCHES: 115 VAC. BUILT -IN DUAL SUPERVISORY TAMPER SWITCH
OR ATTACHMENT FOR FIELD INSTALLED EXTERNAL SUPERVISORY TAMPER SWITCH FOR
GATE VALVES. INCLUDE FOR POST INDICATOR VALVES SHOWN ON CIVIL DRAWINGS!
C.PRESSURE GAGES: 3 -1/2 INCH DIAL, PHOSPHOR BRONZE TUBE, BRASS SOCKET, 300
PSI RANGE. INCLUDE NEEDLE VALVE.
2.8 BUILDING FIRE ALARM SYSTEM INTERFACE
A.COORDINATE WITH WORK SPECIFIED IN DIVISION 28.
•
A.PIPE SUPPORTS: INCLUDE METAL PIPE SUPPORTS FLEXIBLE CONNECTIONS, SWAY
BRACES HANGERS, CLAMPS, AND OTHER PIPE SUPPORT ITEMS IN ACCORDANGE WITH
REQUIREMENTS IN NFPA 13. SEISMICALLY DESIGN PIPE HANGERS AND BRACES PER
IBC ASCE 7 -05 AND NFPA 13. DO NOT USE "C- CLAMP" HANGERS UNLESS THEY
INCLUDE INTEGRAL SEISMIC RETAINING STRAP.
B.IDENTIFICATION SIGNS: ENAMELED SIGNS FOR DRAIN VALVES, TEST VALVES, CONTROL
VALVES, AND ALARM VALVES INDICATING THEIR USE.
C.MISCELLANEOUS CONNECTIONS AND FITTINGS: DRAIN VALVES, INSPECTOR'S TEST
CONNECTIONS, FLUSHING CONNECTIONS, DISCHARGE OUTLETS, AND OTHER ITEMS IN
ACCORDANCE WITH REQUIREMENTS IN NFPA 13.
D.PIPE SLEEVES: COMPLY WITH REQUIREMENTS IN SECTION 200510.
E. PIPE ESCUTCHEON PLATES: COMPLY WITH REQUIREMENTS IN SECTION 202115.
PART 3 - EXECUTION
3.1 INSPECTION
A.GENERAL: VERIFY INSTALLATION CONDITIONS AS SATISFACTORY TO RECEIVE WORK 'OF
THIS SECTION. DO NOT INSTALL UNTIL UNSATISFACTORY CONDITIONS ARE CORRECTED.
BEGINNING WORK CONSTITUTES ACCEPTANCE OF CONDITIONS AS SATISFACTORY. 1
3.2 PREPARATION
A.FIELD MEASUREMENTS: FIELD VERIFY LOCATIONS OF NEW AND EXISTING WORK PRIOR
TO COMMENCING WORK OF THIS SECTION.
B.PROTECTION: PROTECT SURROUNDING AREAS AND SURFACES TO PRECLUDE DAMAGE
FROM WORK OF THIS SECTION.
3.3 INSTALLATION, APPLICATION ERECTION, AND PERFORMANCE
A.GENERAL: INSTALL, APPLY, ERECT, AND PERFORM THE WORK IN ACCORDANCE WITH
SPECIFICATIONS AND MANUFACTURER'S INSTALLATION INSTRUCTIONS AND DIRECTIONS.
WHERE THESE MAY BE IN CONFLICT, THE MORE STRINGENT REQUIREMENTS GOVERN.
B.COOPERATE WITH OTHER TRADES TO ENSURE ADEQUATE SPACE FOR PIPING PLACEMENT.
C.REVIEW DRAWINGS, SPECIFICATIONS AND SHOP DRAWINGS OF OTHER TRADES TO
COORDINATE WORK AND MINIMIZE UNNECESSARY OFFSETS AND REVISIONS TO APPROVED
SHOP DRAWINGS. FAILURE TO COORDINATE DOES NOT RELIEVE FIRE SUPPRESSION
SUBCONTRACTOR FROM MEETING PERFORMANCE STANDARDS SPECIFIED IN THIS SECTION.
1. FIRE SUPPRESSION PIPING SHALL NOT:
a.REDUCE HEADROOM TO LESS THAN 7' --0 ", EXCEPT ABOVE CATWALKS.
c. NTERFERENWIITH ELECTRICAL' EQUIPMENT OIL ACCESS TO 'MECHANICAL EGRESS.
(INCLUDING FILTERS.
D.RELOCATE PIPING AND SPRINKLER HEADS WHICH, IN THE OPINION OF THE A /E, DO NOT
COMPLY WITH THE ABOVE IN A MANNER ACCEPTABLE TO THE AE.
E.DO NOT ORDER, FABRICATE, OR INSTALL MATERIALS UNTIL APPROVALS ARE RECEIVED
FROM AHJS.
F.INSTALL MATERIAL IN STRICT ACCORDANCE WITH SHOP DRAWINGS APPROVED BY THE
AHJS AND REVIEWED BY THE A/E. I
G.SERVICE INTERRUPTIONS: OBTAIN ADVANCE APPROVAL FROM THE OWNER AND LOCAL
FIRE DEPARTMENT. 1
3.4 FIRE SUPPRESSION SYSTEMS INSTALLATION
A.INSTALL PIPING CONCEALED ABOVE FURRED CEILINGS TO MINIMIZE OBSTRUCTIONS.
B.SUPPORT PIPING ONLY FROM STRUCTURAL MEMBERS AND NOT FROM WORK OF OTHER
C.INSTDAL PIPING SYSTEM BRACED TO WITHSTAND DAMAGE FROM EARTHQUAKES. INSTALL
FLEXIBLE COUPLINGS AND EARTHQUAKE BRACING IN ACCORDANCE WITH IBC, ASCE 7 -05,
AND NFPA 13.
D.SABLSAUDALISERTHBUILIGR TO TEALNSCE
SPLASH OK,SITBE WATWI WITHIN BUILDING, OOHROCATIOAS i
INDICATED OR REQUIRED BY THE A/E. 1
E.INSTALL BALL DRIP VALVE ON CHECK VALVE TO DRAIN PIPING FOR FIRE DEPARTMENT
CONNECTION. DRAIN TO FLOOR DRAIN OR OUTSIDE BUILDING. i
F. ESCUTCHEON PLATES: INSTALL AT EXPOSED PIPE PENETRATIONS OF CEILINGS, FLOORS,
G.INSTALL�HEFAD GUARDS ON SPRINKLER HEADS INSTALLED LOWER THAN 7 FEET ABOVE
FINISHED FLOOR GRATING, AND MAINTENANCE ACCESS AREA. INSTALL ON EXTERIOR
SPRINKLER HEADS.
H.INSTALL SPRINKLER CABINET ADJACENT TO ALARM VALVE ASSEMBLY.
1. INSTALL INSPECTOR TEST VALVE AT HIGHEST AND MOST HYDRAULICALLY REMOTE PART
OF SYSTEM IN RELATION TO RISER ASSEMBLY. LOCATE TEST VALVES TO BE
DRAIN OR EX RERIOR CONCRETE COORDINATE BLOCK. LOCATIONS WITH A /E. PIPE TO STANDPIPE
J.INSTALL SLEEVES THROUGH WALLS AND FLOORS. COMPLY WITH REQUIREMENTS IN
SECTION 200510.
K.IDENTIFICATION SIGNS: INSTALL WITH CHAIN ON STEM OF VALVES. COMPLY WITH 1
REQUIREMENTS IN NFPA 13.
3.5 FIRE DETECTION AND SYSTEM ACTUATION
A.COORDINATE WITH FIRE ALARM SYSTEM WORK IN DIVISION 28.
B.SWITCHES: INSTALL WATERFLOW SWITCH FOR FIRE SPRINKLER SYSTEMS. INSTALL VALVE
MONITOR SWITCHES FOR VALVES INCLUDING POST INDICATOR VALVES.
3.A.COORDINATE POWER POWER SOURCE REQUIRED FOR WORK OF THIS SECTION WITH
DIVISION 26. 1
B.WHERE NOT SHOWN ON THE ELECTRICAL DRAWINGS, PROVIDE POWER WIRING FROM
ELECTRICAL PANEL CIRCUIT BREAKERS TO DEVICES REQUIRING LINE VOLTAGE POWER.
SIMILARLY PROVIDE LOW VOLTAGE WIRING FROM ALARM AND SIGNAL DEVICES TO FIRE
ALARM SYSTEM FOR FINAL CONNECTIONS BY THE FIRE ALARM SYSTEM SUBCONTRACTORS.
C.WHERE EMERGENCY POWER IS INCLUDED IN THE WORK OR EXISTS IN BUILDING, EXTEND
ELECTRICAL POWER SOURCE FROM THAT EMERGENCY POWER SYSTEM.
3.7 FIELD QUALITY CONTROL �
A.FLUSH, TEST, AND INSPECT FIRE SUPPRESSION AND STANDPIPE SYSTEMS ACCORDING TO
B.TEST COMPLETE ALARM SYSTEM, INCLUDING CONTROL AND SIGNAL CIRCUITS. 1
C.NOTICE: GIVE 1 WEEK NOTICE AND ARRANGE FOR FIELD TESTS AND INSPECTIONS i BY
AHJS, INCLUDING PAYING FOR INSPECTION FEES AND SECURING PERMITS FOR SAME.
D.APPROVAL AND ACCEPTANCE: AFTER FIRE SUPPRESSION SYSTEMS HAVE BEEN
COMPLETELY INSTALLED TESTED, AND SUBSTANTIAL COMPLETION REVIEW ITEMS
CORRECTED, OBTAIN APPROVAL AND ACCEPTANCE OF SYSTEM BY AHJS IN ACCORDANCE
WITH NFPA 13. RETESTS DUE TO FAILURE TO MEET DESIGN REQUIREMENTS SHALL. BE
AT D OOEADDITIO AL CO COST FORM OWNER. R. SUBMIT COMPLETED CONTRACTOR'S MATERIAL
3.8 CLEANING AND PROTECTION
A.CLEAN DIRT AND DEBRIS FROM SPRINKLERS.
B.APPLY MASKING TAPE OR PAPER COVER TO PROTECT SPRINKLER HEADS, COVER PLATES,
AND SPRINKLER ESCUTCHEONS TO PROTECT FROM FIELD PAINTING. REMOVE AFTER
REMOVE SPRINKLER HEADS HAVING PAINT OTHER THAN FACTORY FINISH AND
PROVIDE NEW. CLEANING AND REUSE OF PAINTED SPRINKLER HEADS NOT ACCEPTABLE.
C.PROTECT SPRINKLER HEADS FROM DAMAGE UNTIL SUBSTANTIAL COMPLETION.
D.FIRE SUPPRESSION SYSTEM SUBCONTRACTOR SHALL BE RESPONSIBLE DURING
INSTALLATION AND TESTING PERIODS OF SPRINKLER SYSTEMS FOR ANY DAMAGE TO
WORK OF OTHERS AND TO BUILDING AND ITS CONTENTS CAUSED BY LEAKS IN
EQUIPMENT, BY UNPLUGGED OR DISCONNECTED PIPES FITTINGS OR BY OVERFLOW, AND
SHALL PAY FOR NECESSARY REPLACEMENTS OR REPAIRS
RS TO WORK OF OTHERS
DAMAGED BY SUCH LEAKAGE.
END OF SECTION
REVIEWED
ED
DE COMM
c;.
ICE
2010
of r. df
)111G DID; Q
RECEIVED
DEC 15 2010
PERMIT CENTER
4 i
Z
Om
(T)
z
Q
Ug
V
W
VI
u1=1
Z
cyg,
1
MECHANICAL SPECIFICATIONS a
MAC NO
HEI NO
DRAWN
CHECKED
DATE
121 -10017
10113
JMR
RKE
9 -10 -2010
M
0.4
rn
-v
z
IX
Lei 0
-o
rE
(t) M
a. ro
r
no 0
aa
o
0
of
N
ci
CO
�CL
:z
wQ
}... w
-*JJ-I
DIVISION 22
SECTION 221116 - DOMESTIC WATER SYSTEM
PART 1 - GENERAL
1.1 SECTION INCLUDES
A.DESCRIPTION: WORK INCLUDES DOMESTIC WATER PIPING FOR POTABLE AND NON - POTABLE
SYSTEMS AND ASSOCIATED APPURTENANCES.
1.2 QUALITY ASSURANCE
A.REGULATORY REQUIREMENTS: COMPLY WITH APPLICABLE CITY, COUNTY AND STATE CODES AND
ORDINANCES.
1.3 SUBMITTALS
qq�� ��I
A.PRODUCT DATA: SPECIFIED IN IN MANUFACTURER'S TECHNICAL PRODUCT DATA AND MAINTENANCE DATA
B.CERTIFICATES:
1. CERTIFICATES OF INSPECTION BY AUTHORITIES HAVING JURISDICTION (AHJ)
2.CERTIFICATES OF SATISFACTORY BACTERIOLOGICAL TEST
C.TESTING REPORTS: PRESSURE TESTING RECORDS.
PART 2 - PRODUCTS
2.1 GENERAL
A.BASIC PIPING MATERIALS AND PRODUCTS REQUIRED FOR WORK OF THIS SECTION ARE SPECIFIED
IN SECTIONS 200510, 200523, 202110, AND 202115.
2.2 POTABLE WATER PIPING
A.ONL SIZES, IEATIDFLANGED, OR GROOVED JOINTRCONNE REQUIREMENTS ON SECTION 202110. COPPER TUBING
PART 3 - EXECUTION
3.1 INSPECTION
A.GENERAL: VERIFY INSTALLATION CONDITIONS AS SATISFACTORY TO RECEIVE WORK OF THIS
SECTION. DO NOT INSTALL UNTIL UNSATISFACTORY CONDITIONS ARE CORRECTED. BEGINNING
WORK CONSTITUTES ACCEPTANCE OF CONDITIONS AS SATISFACTORY.
3.2 PIPING INSTALLATION
A.COMPLY WITH REQUIREMENTS IN SECTION 202110.
B.INSTALL PIPE SUPPORTS IN ACCORDANCE WITH MSS SP -69 AND SECTION 202115, WHICHEVER IS
MORE STRINGENT.
C.INSTALL MALLER THAN REQUIRED PIPING PLICABLE PLUMBING CODER SIZES INDICATED, BUT IN NO
3.3.M
D.INSTALL EQUIPMENTECONNECTIIONS D.
A.CONNECT HOT AND COLD WATER PIPING TO MECHANICAL EQUIPMENT AS INDICATED ON THE
DRAWINGS. COMPLY WITH EQUIPMENT MANUFACTURER'S INSTALLATION INSTRUCTIONS. INSTALL
SHUTOFF VALVE AND UNION FOR EACH CONNECTION AND DRAIN VALVE ON DRAIN CONNECTION.
LOCATE UNIONS TO ALLOW REMOVAL OF EQUIPMENT WITHOUT PIPING DISASSEMBLY BEYOND UNION.
3.4 PRESSURE TESTING
A.TEST PIPING AT FULL WORKING PRESSURE IN ACCORDANCE WITH APPLICABLE PLUMBING CODE.
COMPLY WITH REQUIREMENTS IN SECTION 202110. INCLUDE TEST RESULTS IN OPERATION AND
MAINTENANCE MANUALS.
3.5 STERILIZATION AND FLUSHING OF WATER PIPING
A.AFTER COMPLETION OF WATER PIPING INSTALLATION, BUT PRIOR TO CONNECTION TO EXISTING
MAINS, FLUSH SYSTEM WITH CLEAN WATER. COMPLY WITH REQUIREMENTS IN SECTION 202110.
TAKE SAMPLE OF WATER FROM SYSTEM TO DETERMINE COMPLIANCE WITH HEALTH DEPARTMENT
STANDARDS. OBTAIN NECESSARY TESTS FROM GOVERNING HEALTH DEPARTMENT. IF SAMPLE IS
NOT IN COMPLIANCE PERFORM STERILIZATION.
B.STERILIZE FOR EIGHT HOUR CONTACT TIME WITH 50 PARTS PER MILLION CHLORINE
CONCENTRATION. OPEN VALVES SEVERAL TIMES. FOLLOW BY FLUSHING WITH CLEAN WATER UNTIL
RESIDUAL CHLORINE IS LESS THAN 0.2 PARTS PER MILLION.
C.AFTER FLUSHING AND STERILIZATION ARE COMPLETE CONDUCT TESTS TO DETERMINE COMPLIANCE
WITH HEALTH DEPARTMENT STANDARDS FOR STERILIZATION RESULTS. IF PIPE SYSTEM IS FOUND
TO BE CONTAMINATED CORRECT DEFECTS AND PERFORM ADDITIONAL FLUSHING AND STERILIZATION
UNTIL SATISFACTORY RESULTS ARE OBTAINED.
D.SUBMIT WRITTEN CERTIFICATION OF FLUSHING AND STERILIZATION BY LOCAL AHJ.
END OF SECTION
SECTION 221316 - SOIL, WASTE, AND VENT PIPING SYSTEM
PART 1 - GENERAL
1.1 SECTION INCLUDES
1.2.DESCRIYION: PT WORK INCLUDES BUILDING DRAINAGE PIPING AND ASSOCIATED APPURTENANCES.
A.REGULATORY REQUIREMENTS: COMPLY WITH APPLICABLE CITY, COUNTY AND STATE CODES AND
ORDINANCES.
1.3 SUBMITTALS
A.SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA, ASSEMBLY -TYPE SHOP DRAWINGS, AND
MAINTENANCE DATA.
B.PRODUCT DATA: SPECIFIED IN IN MANUFACTURER'S TECHNICAL PRODUCT DATA AND MAINTENANCE DATA
C.TEST REPORTS:
1. FIELD START -UP AND TEST REPORTS.
2.SUBMIT COMPLETED COPY OF REPORT AND INCLUDE COPY IN THE OPERATION AND MAINTENANCE
PART 2 - PRODUCTS
2.1 GENERAL
A.BASIC PIPING MATERIALS AND PRODUCTS REQUIRED FOR WORK OF THIS SECTION ARE SPECIFIED
IN SECTIONS 200515 AND 202115.
B.PIPING SPECIFIED IN THIS SECTION APPLY TO THE FOLLOWING SYSTEMS:
1. WASTE AND VENT.
2.INDIRECT DRAIN FOR EQUIPMENT, AIR VENT, COOLING COIL CONDENSATE DRAINS AND SIMILAR
APPLICATIONS.
2.2 MANUFACTURERS
A.DRAINS CLEANOUTS, AND MISCELLANEOUS: JAY R. SMITH JOSAM, WADE, ZURN, WATTS DRAINAGE,
OR APPROVED. JAY R. SMITH MODEL NUMBERS ARE USTED.
2.3 PIPING, TUBING AND FITTINGS
A.PIPING MATERIALS:
1. CAST IRON:
a.PIPE: SERVICE WEIGHT CAST IRON SOIL PIPE MARKED WITH COLLECTIVE TRADEMARK OF CAST
LSG JINS (CP)
b.0 IP OT OT ASTM' 74 COMPRESSION GASKETED TYPE SPECIFICALLY
DESIGNED FOR PIPE AND FITTINGS USED OR CAULKED TYPE. GASKETS ASTM C 564, RUBBER.
c.HUBLESS JOINTS: ASTM A 888 OR CISPI NO. 301 AND CISPI NO. 310.
1)COUPUNGS FOR UNDERGROUND PIPE AND FITTINGS: COMPLIANT WITH FACTORY MUTUAL
RESEARCH STANDARD FM 1680 TYPE 304 STAINLESS STEEL HOUSING OR SHIELD AND
STAINLESS STEEL CLAMPS NEOPRENE GASKET WITH SEALING RINGS TO ASTM C 564.
CLAMP -ALL HI TORQUE 8b OR HUSKY SD 4000. NO SUBSTITUTIONS.
2)COUPUNGS FOR ABOVE - GROUND PIPE AND FITTINGS: COMPLIANT WITH FACTORY MUTUAL
RESEARCH
304 STAINLESS
STEEL HOUSING OR SHIELD AND
STANDARD FM 1680
STAINLESS STEEL CLAMPS NEOPRENE TYPE 30 N GASKET WITH SEAUNG RINGS TO ASTM C 564.
CLAMP -ALL HI TORQUE_ 8b HUSKY SD 2000, OR MISSION RUBBER COMPANY HEAVYWEIGHT
COUPUNG. NO SUBSTIUTIONS.
d.F BN S PIPING. A 74 FOR HUB AND SPIGOT PIPING AND ASTM A 888 OR CISPI 301 FOR
2.GALVANIZED STEEL:
a.PIPE: STANDARD WEIGHT OR SCHEDULE 40, ASTM A 53 OR ASTM A 106.
b. FITTINGS:
c. DRAINAGE FITTINGS: GALVANIZED CAST IRON DRAINAGE PATTERN SCREWED ASME B16.12.
d. VENT FITTINGS: 150 POUND GALVANIZED MALLEABLE IRON, SCREWED, ASME B16.3.
3.COPPER:
a.PIPE: TYPE DWV HARD DRAWN DRAINAGE TUBING, ASTM B 306.
b.FITTINGS: CAST COPPER, ASME B16.23 OR WROUGHT COPPER, ASME B16.29, SOLDER JOINT.
B.ABOVE- GROUND WASTE AND VENT PIPING:
1.1-1/2 INCH AND SMALLER: CAST IRON, OR COPPER AT CONTRACTORS OPTION.
2.2 INCH AND LARGER: CAST IRON.
C.INDIRECT DRAIN (CONDENSATE) PIPING: COPPER.
2.4 CLEANOUTS
A.STANDARD: FABRICATE IN ACCORDANCE WITH ASME A 112.36.2M.
B.FLOOR CLEANOUTS (FCQ) IN FINISHED SPACES: COATED CAST IRON BODY AND FRAME, ROUND
ADJUSTABLE SECURED NICKEL-BRONZE TOP TAPER THREAD BRONZE PLUG. INCLUDE CARPET
CLAMPING FRAME WHERE INSTALLED IN FLOORS WITH CARPET. VERIFY FLOOR FINISH WITH ROOM
FINISH SCHEDULE ON THE ARCHITECTURAL DRAWINGS. JAY R. SMITH FIGURE 4023S.
C.DULCOEDO)SRN I THCTT EVY DN ERY PER ROUND
AJSTABE SRIATCAT IO UNFINISHED SPACES: COVAR THEEAD
BRONZE PLUG. JAY R. SMITH FIGURES 4243S OR 4253S.
D.0 CLEANOUTS BONLGF RTO TSIAL N REQIETOVER AN A NALROOFEW..ENTH OSCEW THREAD, INSTALLATION REQUIREMENTS.
JAY R. SMITH FIGURE 4472T.
2.5 VENTS THROUGH ROOF
A.VENT FLASHINGS:
1. DEK ATE FLASHINGS RO (FLEXIBLE RUBBER BOOT FLASHING) AT PIPE PENETRATIONS THROUGH STEEL
2.USE 4 POUND PER SQUARE FOOT SEAMLESS LEAD FLASHING SKIRT MINIMUM OF 8 INCHES
EXTENDING FROM PIPE WITH CONICAL GALVANIZED STEEL REINFORCING BOOT AND
COUNTERFLASHING FITTING ON BUILT -UP ROOFING.
B.CENO REAT RPPESHRD NE
LFRIZEPPEPT,RCESED SONNCT O PROOF IRON PIPES, THREADED BASE ISWIHESET
SCREW. JAY R. SMITH FIGURE 1748.
PART 3 - EXECUTION
3.1 PIPING INSTALLATION
A.GENERAL:
1. COMPLY WITH REQUIREMENTS IN SECTION 2021110.
2.INLEPPNG RLESHTR T��T PER FOOT
S RRLD WASTE ND RAIEADR II UNSOHEWISEINDICAED ON TH DRAWINGS HORIZONTAL
r n
PIPE FITTINGS
I IRON SOIL PPE AND NG
3.INSTALL CAST IRON SOIL PIPING ACCORDING TO C1SP 5 "CAST
HANDBOOK ".
4.PITCH VENTS FOR PROPER DRAINAGE. VENT PIPING MAY BE INSTALLED HORIZONTAL IF
REQUIRED TO AVOID CONFLICT WITH BUILDING ELEMENTS.
5.JOINTS AND CONNECTIONS:
a.BELL AND SPIGOT: AA NEOPRENE COMPRESSION SEALS.
b.RECMMENDEDTT`ORQUE VALUE, SINGESINGLE TIGHTEN CLAMP TORQBOLTS WRENCH MSPECIFICALLYR,S
MANUFACTURED FOR THIS PURPOSE. DO NOT USE SCREWDRIVERS OR OTHER TYPES OF
WRENCHES. RETORQUE AFTER 24 HOURS IF REQUIRED BY MANUFACTURER'S INSTALLATION
INSTRUCTIONS.
6.CLEAN INTERIOR OF PIPING OF DIRT AND OTHER SUPERFLUOUS MATERIAL AS WORK
PROGRESSES. MAINTAIN SWAB IN PIPING AND PULL PAST EACH JOINT AS COMPLETED.
7.PLACE PLUGS IN ENDS OF UNCOMPLETED PIPING AT END OF DAY OR WHENEVER WORK STOPS.
B.ABOVE- GROUND PIPING:
1. SUPPORT HORIZONTAL PIPING TO MAINTAIN ALIGNMENT, PREVENT GRADE REVERSALS, AND
PREVENT SAGGING.
2.SUPPORT VERTICAL STACKS AT EACH FLOOR WITH RISER CLAMPS.
3. JOINT. AND MUMS PIPE: NGER OR RSUPPOR BBEEIWM EE MAXIMUM C2 JOINTSAANDWFITHTIINGS INCH OF EACH
4.HUBLESS PIPE: PROVIDE HANGERS AND SUPPORTS IN ACCORDANCE WITH APPUCABLE PLUMBING
CODE.
C.UNDERGROUND PIPING:
1. PERFORM TRENCHING AND BACKFILLING ASSOCIATED WITH PLUMBING INSTALLATION IN
ACCORDANCE WITH PERTINENT PROVISIONS OF EXCAVATING, FILLING, AND GRADING REQUIREMENTS
IN DIVISION 31 AND SECTION 200515.
2.LAYING OF HUB AND SPIGOT PIPING: INSTALL IN BEDDING OF TRENCH GRADED TO PROVIDE
UNIFORM SUPPORT FOR PIPE, AND TO PERMIT JOINING. INSTALL HUBS AT UPGRADE END.
3.2 CLEANOUTS
A.INSTALL WASTE, CLEANOUTS AT BASE OF STACKS AND IN ACCORDANCE WITH REQUIREMENTS IN
THE APPLICABLE PLUMBING CODE. FULL PIPE SIZE, 4 INCH MAXIMUM. LOCATE AT MINIMUM 50
FOOT INTERVALS FOR PIPING 4 INCH AND SMALLER AND AT 100 FOOT INTERVALS FOR PIPING 6
INCH AND LARGER.
B.INSTALL WALL CLEANOUTS IN RESTROOMS WITH GREATER THAN 2 WATER CLOSETS AND URINALS
OR AS INDICATED ON PLANS.
C.INSTALL AT SINKS.
D.DEMONSTRATE REMOVAL OF CLEANOUT COVERS.
3.3 VENTS THROUGH ROOF
A.LOCATIONS SHOWN ON THE DRAWINGS ARE PRELIMINARY. COORDINATE FINAL LOCATIONS WITH
OTHER TRADES, MINIMUM 10' -0" FROM OUTSIDE AIR INTAKES.
B.ROOF PENETRATIONS SHALL BE BY LANDLORD'S ROOF CONTRACTOR AT THIS CONTRACTOR'S
EXPENSE.
3.4 EQUIPMENT CONNECTIONS
A.INSTALL SOIL AND WASTE PIPING RUNOUTS TO PLUMBING FIXTURES AND DRAINS WITH APPROVED
T APHAND SIZ S INDICATEDI ON CODE DRAWINGS, BUT IN NO CASE SMALLER THAN THAT REQUIRED
B.LOCATE PIPING RUNOUTS AS CLOSE AS POSSIBLE TO BOTTOM OF FLOOR SLAB SUPPORTING
FIXTURES AND DRAINS.
C.INSTALL TRAP WHERE MANUFACTURER DOES NOT INCLUDE TRAP FOR FIXTURE. INSTALL TO BE
REMOVABLE FOR SERVICING AND REPLACEMENT.
D.INSTALL DRAIN FLASHING COLLAR OR FLANGE SO THAT NO LEAKAGE OCCURS BETWEEN DRAIN AND
ADJOINING FLOORING. MAINTAIN INTEGRITY OF WATERPROOF MEMBRANES.
E.INSTALL CONDENSATE DRAINS FROM COOUNG COIL CONDENSATE DRAINS WITH TRAP. TERMINATE
WITH 1 INCH AIR GAP OVER FLOOR DRAIN, FLOOR SINK, SERVICE SINK, OUTDOORS, OR AS
INDICATED ON THE DRAWINGS.
3.5 PRESSURE TESTING
A.TEST DRAINAGE PIPING IN ACCORDANCE WITH APPLICABLE PLUMBING CODE. COMPLY WITH
REQUIREMENTS IN SECTION 202110. TEST BY AIR OR WATER FOR METAL PIPING AND BY AIR FOR
ABS PIPING. INCLUDE TEST RESULTS IN OPERATION AND MAINTENANCE MANUALS.
END OF SECTION
SECTION 224000 - PLUMBING FIXTURES
PART 1 - GENERAL
1.1 SECTION INCLUDES
A.DESCRIPTION: WORK INCLUDES PLUMBING FIXTURES AND FITTINGS INSTALLATIONS OF AND
CONNECTIONS TO FIXTURES FURNISHED UNDER OTHER SPECIFICATION DIVISIONS AND ASSOCIATED
APPURTENANCES.
B.GENERAL REQUIREMENTS.
1.2 QUAUTY ASSURANCE
A.REGULATORY REQUIREMENTS: COMPLY WITH APPLICABLE CITY, COUNTY AND STATE CODES AND
ORDINANCES.
B.CODES AND STANDARDS:
1.ICC A117.1, ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES.
2.PUBUC LAW 102 -486 ENERGY POLICY ACT.
3.NSF 61, DRINKING WAFER SYSTEM COMPONENTS HEALTH EFFECTS.
C.SELECT COMBINATIONS OF FIXTURES AND TRIM, FAUCETS, FITTINGS, AND OTHER COMPONENTS THAT
ARE COMPATIBLE.
D.FIXTURES SHALL BE VANDAL RESISTANT.
1.3 SUBMITTALS
A.PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA AND MAINTENANCE DATA
FOR EACH ITEM SPECIFIED IN THIS SECTION. INDICATE ACCESSORIES WHERE REQUIRED FOR
COMPLETE SYSTEM AND INSTALLATION INSTRUCTIONS.
1.4 DEFINITIONS
A.ACCESSIBLE FIXTURE: PLUMBING FIXTURE THAT CAN BE APPROACHED, ENTERED, AND USED BY
PEOPLE WITH DISABILITIES.
B.FITTINGS AND TRIM: DEVICES THAT CONTROL FLOW OF WATER INTO OR OUT OF PLUMBING
FIXTURE. FITTINGS SPECIFIED IN THIS SECTION INCLUDE SUPPLIES AND STOPS FAUCETS AND
SPOUTS, SHOWER HEADS, DRAINS AND TAILPIECES, AND TRAPS AND WASTE PIPES.
1.5 COORDINATION
A.COORDINATE ROUGHING -IN AND FINAL PLUMBING FIXTURE LOCATIONS AND VERIFY THAT FIXTURES
CAN BE INSTALLED TO COMPLY WITH ORIGINAL DESIGN AND REFERENCED STANDARDS.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A.STAINLESS STEEL SINKS: ELKAY JUST OR APPROVED.
B.FAUCETS: CHICAGO FAUCETS OR APPROVED.
C.PLUMBING BRASS: AMERICAN' STANDARD BRASSCRAFT, KOHLER, CHICAGO FAUCET, CRANE, EL.JER,
2.2 PLUMBING FIXTURESOAND&RIBRASS, ERAL LIRE, ELKAY, JUST OR APPROVED.
A.FIXTURE: AS SCHEDULED IN PLUMBING FIXTURE SCHEDULE ON PLANS.
B.FIXTURE COLOR: WHITE UNLESS OTHERWISE INDICATED IN THE CONTRACT DOCUMENTS.
C.EXPOSED METAL PARTS: CHROMIUM OVER NICKEL FINISH.
D.INTEGRAL VSETOPS.NCLOOSE KEYAANGLEO PATTERN WITH LOCK SHIELD ,ANNEALED WHERE IL TUBE,
POLISHED CHROME PLATE FINISH WHERE EXPOSED AND ROUGH WHERE CONCEALED.
E. EXPOSED SUPPLIES: 1/2 INCH OUTSIDE DIAMETER ANNEALED VERTICAL TUBING.
F. PIPE ESCUTCHEONS: INCLUDE WHERE PIPE OR OTHER FITTING ENTERS WALL AT FIXTURE.
COMPLY WITH REQUIREMENTS IN SECTION 202115.
G.TAILPIECE EXTENSION, TRAP, AND ARM TO WALL: 17 GAGE, SEAMLESS, CHROME PLATED TUBING
WITH CLEANOUT FOR SINKS.
H.VACUUM BREAKER: INCLUDE ON WATER SUPPLY TO EACH FIXTURE WHICH HAS A WATER
CONNECTION LOCATED BELOW THE RIM AND FOR FIXTURES WITH FAUCETS WITH THREADED
OUTLETS FOR HOSE ATTACHMENT, FLOW- THROUGH PATTERN.
2.3 SEALANT
A.BUILDINGTSEALRAAND DOWP CORNING NO 780 CON FIXTURE. GENERAL ELECTRIC OR APPROVED200 SILICONE
PART 3 - EXECUTION
3.1 FIXTURE INSTALLATION
A .ASSEM LE FIXTURES, TRIM, AND OTHER COMPONENTS ACCORDING TO MANUFACTURERS'
S
WRITTEN INSTRUCTIONS. REFER TO ARCHITECTURAL
DRAWINGS FOR MOUNTING HEIGHTS.
B.COUNTER- MOUNTED FIXTURES: INSTALL AND ATTACH TO CASEWORK.
C.INSTALL WATER- SUPPLY PIPING WITH STOP ON EACH SUPPLY TO EACH FIXTURE TO BE
CONNECTED TIPS TOP AT DISTRIBUTION PIPING. ATTACH SUPPUES TO SUPPORTS OR SUBSTRATE
D.FOR FIXTURES WITHOUT INTEGRAL TRAPS INSTALL. TRAP AND WASTE PIPING ON DRAIN OUTLET OF
EACH FIXTURE TO BE DIRECTLY CONNECTED TO SANITARY DRAINAGE SYSTEM.
E.INSTALL WATER HAMMER ARRESTERS IN ACCORDANCE WITH PLUMBING DRAINAGE INSTITUTE
STANDARD P.D.I. WH -201 OR ASSE 1010 RECOMMENDATIONS. INSTALL AT ENDS OF HOT AND
COLD WATER PIPES SERVING 2 OR MORE FIXTURES AND AT SOLENOID VALVES, DISHWASHERS, AND
OTHER EQUIPMENT HAVING QUICK CLOSING VALVES.
3.2 PLUMBING FIXTURES, FITTINGS AND TRIM CONNECTION
A.CONNECT HOT AND COLD WATER AND SOIL, WASTE, AND VENT PIPING TO PLUMBING FIXTURES AS
INDICATED ON THE DRAWINGS. COMPLY WITH EQUIPMENT MANUFACTURER'S INSTALLATION
INSTRUCTIONS.
3.3 FIELD QUAUTY CONTROL
A.REPLACE DAMAGED FIXTURES AND COMPONENTS.
B.TEST INSTALLED FIXTURES AFTER WATER SYSTEMS ARE PRESSURIZED FOR PROPER OPERATION.
3.4 ADJUSTING
A.OPERATE AND ADJUST FAUCETS AND CONTROLS.
B.ADJUST WATER PRESSURE AT FAUCETS AND FLUSH VALVES TO PRODUCE PROPER FLOW AND
STREAM.
C.REPLACE WASHERS AND SEALS OF LEAKING AND DRIPPING FAUCETS AND STOPS.
..TEST AND BALANCE TRAP PRIMER SYSTEMS. ARRANGE PIPING TO ACHIEVE EQUAL FLOW TO EACH
FLOOR DRAIN AND FLOOR SINK.
3.5 CLEANING
A.CLHODS TURESII�A FAUCETS, AND OTHER FITTINGS WITH MANUFACTURERS' RECOMMENDED CLEANING
END OF SECTION
SECTION 226313 - MEDICAL GAS PIPING SYSTEMS
PART 1 - GENERAL
1.1 SECTION INCLUDES
A.DESCRIPTION: WORK RK INCLUDES STMEDICAL GAS PIPING SYSTEMS AND ASSOCIATED APPURTENANCES
B.GENERAL REQUIREMENTS: DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT INCLUDING
GENET TLAND SUPPLEMENTARY I CONDITIONS, DIVISION 01, AND SECTIONS 200500 AND 200510
1.2 QUALITY ASSURANCE
A.REGULATORY REQUIREMENTS: COMPLY WITH APPLICABLE CITY, COUNTY, AND STATE CODES AND
ORDINANCES.
B.CODES AND STANDARDS:
1. AMERICAIN INS UTE OF ARCHITECTS, FOR CONSTRUCTION AND EQUIPMENT OF
2.ASME PVC, BOILER DIVISION PRESSURE AND VESSEL CODE, SECTION VIII, RULES FOR CONSTRUCTION OF
3.ASSE 6000 SERIES PROFESSIONAL QUALIFICATIONS STANDARD FOR MEDICAL GAS SYSTEMS
INSTALLERS, INSPECTORS, VERIFIERS, MAINTENANCE PERSONNEL AND INSTRUCTORS.
4.COMPRESSED GAS ASSOCIATION (CGA):
..PAMPHLET G -4.1, CLEANING EQUIPMENT FOR OXYGEN SERVICE.
b.PAMPHLET G -6.1, STANDARD FOR NITROUS OXIDE SYSTEMS AT CONSUMER SITES.
c.PAMPHLET M -10, GUIDE FOR MEDICAL GAS SUPPLY SYSTEMS AT CONSUMER SITES.
d.PAMPHLET P -1, SAFE HANDLING OF COMPRESSED GASES IN CONTAINERS.
e. PAMPHLET P -2, CHARACTERISTICS AND SAFE HANDLING OF MEDICAL GASES.
f. PAMPHLET V -5, DIAMETER INDEX SAFETY SYSTEMS (DIES).
5.NFPA 55 STANDARD FOR THE STORAGE USE, AND HANDLING OF COMPRESSED GASES AND
CRYOGENIC FLUIDS IN PORTABLE AND STATIONARY CONTAINERS, CYLINDERS, AND TANKS.
6.NFPA 70, NATIONAL ELECTRICAL CODE.
7.NFPA 99, STANDARDS FOR HEALTH CARE FACILITIES.
B.UNITED STATES PHARMACOPOEIAL CONVENTION (USP), UNITED STATES PHARMACOPOEIA XXVIII/
NATIONAL FORMULARY XXIII.
9.WASHINGTON ADMINISTRATIVE CODE (WAC), SECTION 246 -320.
C.MEDICAL GAS EQUIPMENT MANUFACTURER'S (MGEM) QUALIFICATIONS:
1.PLLANT SHALL MEE BNFPA MEDICAL LAND HOLD MEDICAL GAS ENDOR ANESTHETIC REQUIRED BY ASSEA6010.
2.ONE MGEM SHALL SUPPLY MEDICAL GAS SYSTEMS AND EQUIPMENT INCLUDING OUTLETS AND
VALVES.
D.MEDICAL GAS PIPING INSTALLER'S QUALIFICATIONS: QUALIFY INSTALLERS ACCORDING TO
ASSE 6010.
E.TESTING AGENCY QUALIFICATIONS:
1.DEMONSTRATE TO A/ES SATISFACTION, BASED ON A/ES EVALUATION OF CRITERIA CONFORMING
TO ASTM E699 THAT INDEPENDENT TESTING AGENCY HAS THE EXPERIENCE AND CAPABILITY TO
SATISFACTORILY CONDUCT TESTING INDICATED WITHOUT DELAYING THE WORK.
1.3 SUBMITTALS
A.COMPLY WITH REQUIREMENTS IN DIVISION 01 AND SECTION 200500.
B.PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA AND MAINTENANCE DATA
FOR THE FOLLOWING:
1. PIPING MATERIALS.
2.MEDICAL GAS OUTLETS.
3.PIPING SPECIALTIES.
C.COMPLANCE AFFIDAVIT: SUBMIT THAT MEDICAL GAS EQUIPMENT MANUFACTURER ATTESTS
COMPLANCE WITH RELEVANT PARAGRAPHS OF NFPA 99.
D.QUALIFICATIONS:
1. SUBMIT DOCUMENTATION AS DEFINED UNDER PARAGRAPH °MEDICAL GAS EQUIPMENT
MANUFACTURER'S QUALIFICATIONS..
2.SUBMIT DOCUMENTATION AS DEFINED UNDER PARAGRAPH .MEDICAL GAS PIPING INSTALLER'S
QUALIFICATIONS.°
3.SUBMIT DOCUMENTATION FOR INDEPENDENT TESTING AGENCY.
E. TESTING REPORTS: i
1. PRESSURE TESTING RECORDS.
2.CROSS- CONNECTION TESTS. 1
3.PURGE AND ANALYSIS TESTS.
4.ALARM TESTS.
5.INCLUDE COPY OF REPORTS IN THE OPERATION AND MAINTENANCE MANUAL. 1
F. CERTIFICATIONS: SUBMIT DOCUMENTATION AS DEFINED UNDER ARTICLE °CERTIFICATION OF
SYSTEMS..
1.4 DEFINITIONS
A.BREATHING GAS: GAS TESTED TO BE PURE AND CONTAIN FEWER CONTAMINATES AS OUTLINED IN
THE FOLLOWING STANDARDS:
1. OXYGEN: CGA, GRADE D.
2.USP: UNITED STATES PHARMACOPEIA /NATIONAL FORMULARY STANDARDS.
1.5 DELIVERY, STORAGE, AND HANDLING
A.DELIVER AND STORE LARGE MEDICAL GAS SPECIALTIES ON FACTORY- INSTALLED SHIPPING SKIDS
SMALL SPECIALTIES IN FACTORY- FABRICATED FIBERBOARD CONTAINERS, AND PIPING WITH SEAUNG
PLUGS IN ENDS OR WITH OTHER END PROTECTION.
1. STORE PRECLEANED AND SEALED MEDICAL GAS PIPE, FITTINGS, VALVES, AND SPECIALTIES WITH
SEALING PLUGS AND SEALING PACKAGING INTACT. i
2.LABEL MEDICAL GAS PIPE FITTINGS, VALVES AND SPECIALTIES THAT HAVE NOT BEEN
PRECLEANED, OR THAT HAVE BEEN PRECLEANED BUT HAVE SEALS OR PACKAGING THAT IS NOT
INTACT, WITH TEMPORARY LABELS INDICATING THAT CLEANING IS REQUIRED BEFORE INSTALLATION.
1.6 WARRANTY
A.GENERAL: WARRANT MEDICAL GAS PIPELINE COMPONENTS FOR 2 YEARS AFTER FINAL
ACCEPTANCE. WARRANTY II 48 HOURS OF NITIAALRNOTIFICA ON AND TRAVEL TIME. MAKE AVAILABLE
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A.MANUFACTURERS: CHEMTRON (ALUED). NO SUBSTITUTIONS.
2.2 PIPING MATERIALS
A.PRESSURIZED MEDICAL GAS PIPING:
1. ASTM B 819, TYPE L HARD DRAWN SEAMLESS MEDICAL GAS COPPER TUBING. TYPE K FOR
.M THAN SIZES LARGER /�E L Nb
BY
THE MARKINGPRESSURE
YEDD...OXY /MD. BOXY /ACRe1 OR CR /MM IN BLUE FOR TYPE A
GREEN FOR
'TYPE K.
2.FITTINGS WROUGHT COPPER, BRASS OR BRONZE DESIGNED FOR BRAZED CONNECTION.
3.PIPE, FITTINGS VALVES, AND OTHER COMPONENTS SPECIALLY CLEANED FOR OXYGEN SERVICE IN
FACILITY EQUIPPED TO CLEAN RINSE AND PURGE MATERIAL IN ACCORDANCE WITH NFPA 99 AND
RECEIVED ON JOB SITE CLEANED AND CAPPED IN SEALED PACKAGE BEARING MANUFACTURERS
IDENTIFICATION TAG OR STAMP. ON SITE CLEANING OF INTERIOR SURFACES OF PIPES, VALVES,
FITTINGS, AND OTHER COMPONENTS NOT ACCEPTABLE.
4.LISTED OR APPROVED FITTINGS MAY BE USED AT LIMITED EXPOSED AND ACCESSIBLE LOCATIONS
IN COMPUANCE WITH NFPA 99.
B.VACUUM PIPING:
1.TYPE L HARD DRAWN SEAMLESS COPPER TUBING OR ASTM B 280 ACR COPPER.
2.BRAZED WITH BCUP -5 OR ALLOY WITH AT LEAST 1000 F MELTING POINT.
C.BRAZING ALLOY AWS A5.8, BCUP -5 OR APPROVED ALLOY WITH AT LEAST 1000 F MELTING POINT.
D.GASKET MATERIAL: ASME B16.21, NONMETALLIC, FLAT, ASBESTOS FREE, AND SUITABLE FOR
MEDICAL GAS PIPING USE.
2.3 MEDICAL GAS OUTLETS
A.MANUFACTURER. CHEMETRON 400 SERIES. NO SUBSTITIONS.
B.MEDICAL GAS OUTLET MODULAR QUICK-DISCONNECT RECESSED TYPE OR DISS SCREW THREAD
RECESSED TYPE. INCLUDE KEYING SYSTEM COMPATIBLE WITH EXISTING KEYING SYSTEM IN 1
FACILITY. THREADED DISS CONNECTOR PER CGA STANDARDS.
C.OUTLETS FIELD ASSEMBLED WITH SEQUENCES AND SERVICES INDICATED.
D.OUTLET STATIONS WITH STAINLESS STEEL COVER PLATE. INCLUDE INDEXING PINS FOR SAFETY
KEYING AND GAS SPECIFIC COVER TO THE ROUGH -IN BOX WITH COLOR CODED GAS SERVICE
IDENTIFICATION. EVLTT E� PERMANENTLY BE WEEN COVER PLATE AND
LATCH AEBLY SAFETY KEYING OUTLET.
E.THE LATCH MECHANISMS DESIGNED FOR ONE HANDED, SINGLE THRUST MOUNTING, AND 1 HAt DED
FINGERTIP RELEASE OF SECONDARY EQUIPMENT.
F. OUTLET MADE CLEANED, AND PACKAGED PER NFPA 99 UL USTED AND LABELED, AND CSA
CERTIFIED. MEDICAL GAS OUTLETS CLEANED FOR OXYGEN SERVICE PER CGA PAMPHLET G -4.1.
ASSEMBLY CAPPED AND FINISH ASSEMBLY POLY BAGGED FOR SHIPMENT.
G.ROUGH -IN ASSEMBLY MODULAR DESIGN AND INCLUDED GAS SPECIFIC 16 GAGE STEEL MOUNTING
PLATE DESIGNED TO PERMIT ON -SITE GANGING OF MULTIPLE OUTLETS. INCLUDE MACHINED BRASS
OUTLET BLOCK PERMANENTLY ATTACHED TO MOUNTING BRACKET TO PERMIT THE 112 INCH OD
TYPE K COPPER INLET TO SWIVEL 360 DEGREES FOR ATTACHMENT TO PIPING SYSTEM. ROUGH -IN
ASSEMBLY WITH DOUBLE SEAL TO PREVENT GAS LEAKAGE BETWEEN ROUGH -IN AND LATCH -VALVE
ASSEMBLIES AFTER WALL IS FINISHED. SINGLE 0 -RING SEAL NOT ACCEPTABLE.
H.LATCH-VALVE
FINISHED WALLASTHICKN SS SHALL 1 TELESCOPE
INCH UP TO //4 INCH TO ALLOW FOR VARIATION IN
I. DISS OUTLETS USED FOR CEILING MOUNT APPLICATIONS.
J.INCLUDE HOSE ASSEMBUES FOR CEIUNG OUTLETS FOR FINISHED CEILING HEIGHT AS INDICATED ON
THE DRAWINGS. EACH HOSE WITH CHAIN TYPE DUAL RETRACTOR FOR PRESSURE GASES AND
TRIPLE FOR VACUUM. RETRACTORS MADE WITH STAINLESS CABLE NOT ACCEPTABLE. INCLUDE 18
INCH HOSE LENGTH FOR RETRACTORS.
2.4 MEDICAL GAS VALVES AND VALVE ASSEMBLIES
A.MEDICAL GAS VALVES SPECIALLY PREPARED FOR OXYGEN SERVICE. CONFORM TO NFPA 99.
VALVES BALL TYPE WITH TEFLON SEATS AND ADJUSTING STEM PACKING GLAND WITH TEFLON STEM
SEAL.
B.BRAZE-JOINT A ENDS, PIECE PSIG WOG CHROME PLATED OR B BRASS SACCTTUATE BLOWOUT FULLO OPEN. STEM,
FULL .CLOSED* BY 90 DEGREE TURN OF VINYL GRIPPED VALVE LEVER HANDLE.
C.VALVES WITH FACTORY INSTALLED TYPE K COPPER TUBING EXTENSIONS.
D.VALVES NOT IN VALVE BOXES WITH LOCKING HANDLES.
E.VALVES CLEANED FOR OXYGEN, CAPPED, AND SEALED IN A POLYETHYLENE BAG FOR SHIPPING
AND STORAGE.
F. INCLUDE COLOR CODED SELF - ADHESIVE GAS LABELS FOR COMPLIANCE WITH NFPA 99 LABELING
2.5 PIPING SPECIALTIES
A.PIPE MARKERS AND COLOR BANDS: COMPLY WITH REQUIREMENTS IN SECTION 200510 AND
NFPA 99.
B.PIPE SLEEVES: COMPLY WITH REQUIREMENTS IN SECTION 200510.
C.HANGERS AND SUPPORTS: COMPLY WITH REQUIREMENTS IN SECTION 202115.
D.PIPE ESCUTCHEONS: COMPLY WITH REQUIREMENTS IN SECTION 202115.
PART 3 - EXECUTION
3.1 INSPECTION
A.SECDNINALLATUL UNATSFR_ NDISTAE CRCE. BEGINNING THIS
TIO. VERIFY INSTALL UNTIL SATISFACTORY TO RECEIVE
WORK CONSTITUTES ACCEPTANCE OF CONDITIONS AS SATISFACTORY.
3.2 PREPARATION
A.CLEANING OF MEDICAL GAS TUBING: IF PRECLEANED FITTINGS OR TUBING MUST BE RECLEANED
BECAUSE OF EXPOSURE, HAVE SUPPUER PERFORM THE FOLLOWING PROCEDURES:
1. CLEAN MEDICAL GAS TUBE AND FITTINGS VALVES GAGES AND OTHER COMPONENTS OF OIL,
GREASE AND OTHER CGA G READILY OXIDIZABLE` MATERIALS AS REQUIRED FOR OXYGEN SERVICE
2.WASH MEDICAL GAS TUBING AND COMPONENTS IN HOT ALKAUNE- CLEANER -WATER SOLUTION OF
SODIUM CARBONATE OR TRISODIUM PHOSPHATE IN PROPORTION OF 1 LB OF CHEMICAL TO 3
GAL. OF WATER.
a.SCRUB TO ENSURE COMPLETE CLEANING.
b.RINSE WITH CLEAN, HOT WATER TO REMOVE CLEANING SOLUTION.
B.FIELD MEASUREMENTS: FIELD VERIFY LOCATIONS OF NEW AND EXISTING WORK PRIOR TO
COMMENCING WORK OF THIS SECTION.
C.PROTECTION: PROTECT SURROUNDING AREAS AND SURFACES TO PRECLUDE DAMAGE FROM WORK
OF THIS SECTION.
3.3 INSTALLATION, APPLICATION, ERECTION, AND PERFORMANCE
A.GENERAL: INSTALL, APPLY, ERECT, AND PERFORM THE WORK IN ACCORDANCE WITH ARTICLE
INSTRUCTIONS AND NS WHERE THESE NMAYABE INACONFL CONFLICT, INSTALLATION
REQUIREMENTS GOVERN.
B.DO NOT COVER UP OR ENCLOSE WORK UNTIL INSPECTED AND APPROVED. IF IN
NON - COMPLIANCE, UNCOVER WORK, REMOVE, AND PROVIDE NEW TO SATISFACTION OF A/E AT NO
ADDITIONAL COST TO OWNER.
3.4 INDOOR PIPING AND COMPONENT INSTALLATION
A.COMPLY WITH REQUIREMENTS IN SECTION 202110, NFPA 99, AND ASSE 6010.
B.INSTALL PIPE SUPPORTS IN ACCORDANCE WITH MSS SP -69, SECTION 202115, OR NFPA 99
WHICHEVER IS MORE STRINGENT. PIPING NOT SUPPORTED BY OTHER PIPING.
C.BRAZING PROCEDURES SHALL BE AS DETAILED IN NFPA 99 AND BRAZING SHALL BE PERFORMED
BY BRAZERS QUAUFIED UNDER NFPA 99.
D.MANUFA
MANUFACTURER. RECEIVE PREPARED TPIPES, OB MAINTAIN FITTINGS E IIATESROF OXYGEN SERVICE
PROPER PREPARATION AT THE JOB SITE ATTESTING THE ABOVE.
E.USE OF FLUX WHEN MAKING JOINT BETWEEN COPPER TO COPPER PIPES AND FITTINGS NOT
ACCEPTABLE.
F.DURING BRAZING OPERATION PURGE INTERIOR OF PIPE CONTINUOUSLY WITH OIL FREE, DRY
NITROGEN FOLLOWING PROCEDURE IN NFPA 99. AT COMPLETION OF ANY SECTION, CAP OPEN
PIPE ENDS USING EXTERNAL CAP.
G.UPO MALTHREADED DS JOINTS TH POLYT PIPING rRAFLOUROFETHYLENE (SUCHSAS�IEFLON) TAPE. LIQUID UNAVOIDABLE,
NOT ACCEPTABLE.
H.VACUUM SYSTEMS:
1.INSTALL MOISTURE POCKET AT LOW POINTS OF MAINS AND AT BASE OF VERTICAL RISER,
CONSISTING OF A 1 -1/4 INCH DROP LEG, 12 INCHES LONG WITH 3/8 INCH DRAIN VALVE.
2.MAKE BRANCH CONNECTIONS TO MAIN VACUUM PIPING ABOVE CENTERLINE OF MAIN UNE USING
EITHER A 45 DEGREE OR 90 DEGREE ELBOW. IN ADDITION INSTALL A CROSS FITTING IN MAIN
LINE FOR BRANCH CONNECTION IN UEU OF TEE FITTING. INSTALL REMOVABLE CAP AT BOTTOM
OPENING OF CROSS FITTING FOR USE AS CLEANOUT.
3.SLOPE PIPING FROM SERVICE OUTLETS DOWN TO VACUUM PUMP SETS.
I. MEDICAL GAS OUTLETS:
1 ARCHITECTURAALLSDRAWINGS. ABOVE NTUNESSPACING FLOOR UNLESS ILE OTHERWISE INDICATED 5 OINCHES.
2.COORDINATE OUTLET PLACEMENT WITH OTHER TRADES.
J. VALVES, ZONE VALVES, AND VALVE ASSEMBLIES:
1. LOCATE VALVES AND VALVE ASSEMBLIES 60 INCHES ABOVE FINISHED FLOOR.
2.000RDINATE BOX PLACEMENT WITH OTHER TRADES. TAKE SPECIAL NOTE OF WALL
CONSTRUCTION AND LENGTH OF WALL REQUIRED TO ACCOMMODATE PIPE DROPS TO VALVE
BOXES.
3.2R OR MORE VALVES THE THE SAME ORDER ARE LOCATED BOTTOM: MON BOX, LARGER VACUUM, VES IF
SHALL BE THE LOWER. pq p�
4. ALVES I DURING MANUFACTURER'S TO RECOMMENDATIONS DAMAGE TO REGARDING SEALS.
OR DISASSEMBLY OF
5.INSTALL SWITCHES DOWNSTREAM OF MAIN ISOLATING VALVES. SEA
3.5 EQUIPMENT CONNECTIONS
A.CONNECT MEDICAL GAS PIPING TO MECHANICAL EQUIPMENT AS INDICATED ON THE DRAWINGS.
COMPLY WITH EQUIPMENT MANUFACTURER'S INSTALLATION INSTRUCTIONS. INSTALL SHUTOFF VALVE
ALLOWNREMOVALL OFCEQUIPMENTIWINTHOUT PIPINGVBEYOND UNI CONNECTION. LOCATE UNIONS TO
B.INSTALL RECEIVER FOR MEDICAL VACUUM SYSTEM WITH 3 VALVE BYPASS.
3.6 FLUSHING OF MEDICAL GAS PIPING
A.AFTER COMPLETION OF PIPING INSTALLATION AND PRIOR TO PRESSURE TESTING FLUSH INTERIOR
SURFACES BY INJECTING OIL -FREE COMPRESSED AIR OR DRY NITROGEN INTO OPEN ENDS OF
PIPING JUST PRIOR TO MAKING FINAL CONNECTIONS TO EQUIPMENT AND OUTLET VALVES..
3.7 PIPE MARKERS AND COLOR BANDS
A.LABEL PIPING WITH NAME OF GAS SERVICE IDENTIFICATION COLOR AND DIRECTION OF FLOW.
WHERE NON- STANDARD PRESSURES ARE PIPED, LABEL FOR PRESSURE. COMPLY WITH
REQUIREMENTS ON SECTION 200510 AND NFPA 99, WHICHEVER IS MORE STRINGENT, FOR
LOCATION OF LABELS AND BANDS.
B.LABEL ALARM PANELS CONTROL PANELS VALVES AND VALVE BOX COVERS FOR GAS SERVICE AND
AREAS MONITORED AND CONTROLLED. COORDINATE WITH OWNER FOR FINAL ROOM AND AREA
DESIGNATIONS. LABEL VALVES WITH NAME AND IDENTIFICATION COLOR OF GAS AND DIRECTION
FLOW.
3.8 PRESSURE TESTING
A.DO NOT CONCEAL PIPING UNTIL THOROUGHLY TESTED AND MADE TIGHT IN ACCORDANCE WITH
NFPA 99.
B.AFTER CONNECTIONS TO OUTLETS AND FINAL INSTALLATION OF PRESSURE ALARM DEVICES
PRESSURE INDICATORS, LINE PRESSURE RELIEF VALVES, MANUFACTURED ASSEMBLIES HOSES, AND
SIMILAR DEVICES SUBJECT EACH SECTION OF PIPING YSTEMS TO MINIMUM TEST PRESSURE OF
150 PSIG WITH OIL FREE DRY NITROGEN. MAINTAIN TEST PRESSURE UNTIL EACH JOINT HAS
BEEN EXAMINED FOR LEAKS. HYDROSTATIC TEST NOT ACCEPTABLE.
C.REPAIR LEAKS THAT OCCUR AND RETEST.
D.AFTER TESTING OF EACH INDIVIDUAL PIPING SYSTEM PERFORM FINAL STANDING PRESSURE TEST
OF MEDICAL GAS SYSTEMS. USE OIL FREE, DRY NITROGEN AT PRESSURE OF 20 PERCENT ABOVE
NORMAL OPERATING PRESSURE.
E. AFTER PIPING SYSTEM IS FILED WITH TEST GAS, SUPPLY VALVE AND OUTLETS CLOSED AND
SOURCE OF TEST GAS DISCONNECTED, SYSTEM SHALL REMAIN LEAK -FREE FOR 24 HOURS.
1 BY VARIA IONS IN AMBIENT TEMPERGATURE AROUND HOUR SYST PERIOD SHALL BE THOSE CAUSED
2.RECORD AMBIENT TEMPERATURE AND SYSTEM PRESSURE AT BEGINNING AND END OF 24 HOUR
F. AFTER 24 HOUR TEST IS COMPLETED, MAINTAIN MINIMUM 60 PSIG ON SYSTEMS.
G.FURNISH GAGES, TOOLS, PUMPS, GASES AND ANY OTHER EQUIPMENT AND MATERIALS REQUIRED
FOR TESTING.
H.EXERCISE CARE TO KEEP TESTING EQUIPMENT AND MATERIALS OIL FREE.
3.9 CERTIFICATION OF SYSTEMS
A.CONTRACTOR SHALL RETAIN AN INDEPENDENT TESTING AGENCY TO PERFORM TESTS AND
EXAMINATIONS AND PROVIDE CERTIFICATION.
B.AFTER INSTALLATION OF COMPUTE MEDICAL GAS SYSTEM, TEST SYSTEMS IN ACCORDANCE WITH
NFPA 99 AND CGA P -2.
C.CERTIFY THAT MEDICAL GAS SYSTEMS AS CONSTRUCTED FOLLOW GUIDELINES OF NFPA 99 FOR
PLACEMENT AND APPUCABILITY OF VALVES AND ALARMS.
1. CERTIFY THAT BRAZING WAS CONDUCTED BY BRAZERS QUAUFIED TO ASSE 6010 AND HOLDING
CURRENT MEDICAL GAS ENDORSEMENTS.
2.CERTIFY THAT BRAZING WAS CONDUCTED WITH NITROGEN PURGING.
D.CERTIFY THAT NO CROSS CONNECTIONS EXIST BETWEEN SYSTEMS USING FOLLOWING PROCEDURES:
1. REDUCE SYSTEMS TO ATMOSPHERIC PRESSURE.
2.DISCONNECT SOURCES OF TEST GAS FROM SYSTEMS EXCEPT THE ONE SYSTEM TO BE CHECKED.
3.PRESSURIZE SYSTEM R WITH OIL FREE DRY AIR, NITROGEN, OR THE GAS FOR WHICH THIS SYSTEM
4.OUITTHLETT APPROPRIATE S INSSTALLED TOHDEIERMINE THAT TEST GASKIS BEING INDIVIDUAL STATION
OUTLETS OF THIS SYSTEM. DISPENSED FROM ONLY
S.INCLUDE SYSTEM WITH VACUUM MEDICAL G S IPIPINGASYSSTE CROSS CONNECTION TESTING SHALL
6.DISCONNECT SOURCE OF TEST GAS AND REDUCE SYSTEM
TESTED TO ATMOSPHERIC PRESSURE.
7.PROCEED TO TEST EACH ADDITIONAL PIPING SYSTEM IN ACCORDANCE WITH ABOVE PROCEDURES.
E. AND PROVEN LEAK MEDICAL IN ACCORDANCE WITH HAVE BEEN PURGED, PRESSURE TESTED, ANALYZED,
F.CERTIFY THAT ALARM SYSTEM COMPONENTS FUNCTION PROPERLY.
1. DOCUMENT CONTROL ZONES AND SURVEILLANCE AREAS OF ALARMS.
2.VERIFY LOCATION OF EACH ZONE ON RECORD DRAWINGS.
3.REPORT AND RECORD DISCREPANCIES.
G.CERTIFY THAT OUTLETS ARE DELIVERING GAS AT PRESSURE AND FLOW CONSISTENT WITH
ANTICIPATED CGA NEEDS, A 9DEFINED IEMENTS PO EXAMINE EACHR UTTLETTITFLOFACILITY, I PPROPRNIATE CASE
ANALYZER AND DOCUMENT CONCENTRATIONS FOUND.
H.CERTIFY THAT SYSTEM COMPONENTS PERFORM TO MANUFACTURER'S DESIGN SPECIFICATIONS AND
PIPELINES ARE FREE OF DEBRIS, INCLUDING WATER.
I. CERTIFY THAT DELIVERED GAS IS AS PURE AS REQUIRED BY APPLICABLE CGA /USP SPECIFICATIONS
FOR BREATHING GAS.
J.CERTIFY THAT MEDICAL AIR IS DRY AS SPECIFIED.
K.CERTIFY THAT VACUUM SYSTEM PERFORMS AS SPECIFIED.
L. RETEST AFTER CONTRACTOR HAS CORRECTED DEFICIENCIES FOUND.
M.[ _WHERE NEW MEDICAL GAS PIPING CONNECTS TO EXISTING, TESTING AGENCY SHALL TEST PIPING
INCLUDING EXISTING TO ENSURE IT HAS NOT BEEN CONTAMINATED.]
N. ASKS USGDNCY _r _SHALL] EWILL] FURNISH TEST EQUIPMENT AND SUPPLIES INCLUDING MEDICAL
3.10 COMMISSIONING
A.EQUIPMENT AND SYSTEMS REFERENCED IN THIS SECTION SHALL BE COMMISSIONED PER
SECTION 200800. CONTRACTOR HAS SPECIFIC RESPONSIBILITIES FOR SCHEDULING, COORDINATION,
TEST DEVELOPMENT TESTING AND DOCUMENTATION. COORDINATE COMMISSIONING ACTIVITIES WITH
THE COMMISSIONING AUTHORITY.
END OF SECTION 226313
REVIEWED'
ED
COMP
0*-0
RECEIVED
DEC 15 2010
PERMIT CENTER
c
MECHANICAL SPECIFICATIONS
CT EQUIPMENT REPLACEMENT, ROOM 164
12844 MILITARY ROAD S
W
F-
1-
=
u
44
NAC NO 121-10017
HEINO 10113
DRAWN JMR
CHECKED RKE
DATE 9 -10 -2010
0.5
DIVISION 23
SECTION 230900 - TEMPERATURE CONTROLS
PART 1 - GENERAL
1.1 SECTION INCLUDES
A.DESCRIPTION: WORK INCLUDES DESIGN COMPONENTS, HARDWARE AND CONSTRUCTION
FOR COMPLETE INSTALLATION OF AN OPERATIONAL CONTROL SYSTEM.
1.2 QUALITY ASSURANCE
A.REGULATORY REQUIREMENTS: COMPLY WITH APPLICABLE CITY, COUNTY, AND STATE
CODES AND ORDINANCES.
B.CODES AND STANDARDS:
1. APPUCABLE ENERGY
2. AMCA STANDARD 500 -D, LABORATORY METHODS OF TESTING DAMPERS FOR RATING.
3. AMCA PUBLICATION 511 CERTIFIED RATINGS PROGRAM FOR AIR CONTROL DEVICES.
4. CSA, CANADIAN STANDARDS ASSOCIATION.
5. FCC, PART 15 SUBPART J CLASS A COMPUTING DEVICES.
6. NFPA 70, NATIONAL ELECTRICAL CODE.
7. UL 873, STANDARD FOR TEMPERATURE - INDICATING AND - REGULATING EQUIPMENT.
8. UL 916, STANDARD FOR ENERGY MANAGEMENT EQUIPMENT.
C.CONTROL SYSTEM SUBCONTRACTOR'S QUALIFICATIONS: SUBCONTRACTOR THAT WILL
PERFORM THIS WORK SHALL HAVE A MINIMUM OF AT LEAST 3 CONTROL SYSTEMS OF
SAME TYPE AND DESIGN AS REQUIRED BY THE CONTRACT.
D.INSTALLATION: SYSTEM DESIGNED AND CONSTRUCTED BY AUTHORIZED REPRESENTATIVE
OF PRODUCT MANUFACTURER. CAREFULLY INVESTIGATE MECHANICAL ELECTRICAL, AND
FINISH CONDITIONS THAT COULD AFFECT WORK TO BE PERFORMED. AND FURNISH
MATERIALS AND LABOR NECESSARY TO MEET SUCH CONDITIONS.
1.3 SUBMITTALS
A.PRODUCT DATA: SUBMIT SPECIFICATION DATA SHEET FOR EACH COMPONENT. IDENTIFY
COMPONENTS BY TAG NUMBERS.
B.SHOP DRAWINGS: AFTER APPROVAL OF PRODUCT DATA, SUBMIT SHOP DRAWINGS.
(ABEL COMPONENTS WITH TAG NUMBERS.
DO NOT COMMENCE
INSTALLATION UNTIL
SHOP DRAWINGS ARE ACCEPTED BY A /E.
C.RECORD DOCUMENTS: SUBMIT SHOP DRAWINGS FOR EACH CONTROL SYSTEM SHOWING
INSTALLED CONDITION. AS A MINIMUM, INCLUDE DIAGRAMS AND DOCUMENTS LISTED IN
PARAGRAPH "SHOP DRAWINGS" WITH SEQUENCES OF OPERATION.
1.4 OPERATION AND MAINTENANCE MANUAL
A.FUNCTIONAL DESIGN: OPERATIONAL REQUIREMENTS OF SYSTEM, THEORY OF OPERATION,
DESIGN PHILOSOPHY AND SPECIFIC FUNCTIONS.
B.HARDWA E P GE ERU L DESCRIPTION AND SPECIFICATIONS AND INSTALLATION AND
C.OPERATION: PROCEDURES AND INSTRUCTIONS FOR OPERATION OF SYSTEM.
D.PERIODIC PREVENTATIVE MAINTENANCENFAULCDIAGNOSISUAND REPAIR OR REPLACEMENT
OF DEFECTIVE COMPONENTS.
1.5 WARRANTY
A.OPERATION EOF CONTROLS SYSTEMNDFORQPERIODTOFEONE NECESSARY FOR SUBSTANTIAL L
COMPLETION DATE.
B.EQUIPMENTT'T REQUIRED EQUII'MENDT REPAIR OF CONTROLUDEVICESMPUTER
PART 2 - PRODUCTS
2.1 BASIC SYSTEM
A.GENERAL: PROVIDE THERMOSTATS, SENSORS, WIRING, CONDUIT RELAYS TRANSMITTERS
AND OTHER CONTROL DEVICES REQUIRED TO MAKE A COMPLETE AND OPERATIONAL
CONTROL SYSTEM. MATERIAL AND EQUIPMENT STANDARD PRODUCTS OF MANUFACTURER
REGULARLY ENGAGED IN MANUFACTURING OF SUCH PRODUCTS.
2.2 CONTROL WIRING
A.GENERAL:
1. INCLUDE WIRE AND CABLE TRANSFORMERS CIRCUITS WIRING PROTECTION AND
LABELS DRAWINGS AS REQUIRED FOR COMPLETE AND OPERABLE CONTROL SYSTEM
INCLUDING WIRING TO TRANSFORMER PRIMARIES.
2. CONFORM TO NEC AND DIVISION 26 REQUIREMENTS.
PART 3 - EXECUTION
3.1 CONTROL SYSTEM GENERAL
A.DESCRIPTION: INSTALL DEVICES AND HARDWARE REQUIRED TO INSURE A COMPLETE AND
OPERATING SYSTEM NEACCORDANCE WITH THE SEQUENCES OF OPERATION. DEVICES
3.2 SEQUENCES OF OPERATION
A.GENERAL: PROVIDE SEQUENCE OF OPERATION AS INDICATED ON THE DRAWINGS.
3.3 FIELD TESTING AND VERIFICATION
A.FIELD TESTS: PLACING THE AUTOMATIC, TEMPERATURE VERIFY SYSTEM
ON -LINE.
B.PERFORMANCE VERIFICATION TESTS:
1. CONDUCT PERFORMANCE VERIFICATION TESTS TO DEMONSTRATE THAT SYSTEM
MAINTAINS SETPOINTS CONTROL LOOPS ARE TUNED, AND CONTROLLERS ARE
PROGRAMMED FOR CORRECT SEQUENCES OF OPERATION.
END OF SECTION
SECTION 233113 - AIR DISTRIBUTION
PART 1 - GENERAL
1.1 SECTION INCLUDES
A.DESCRIPTION: WORK INCLUDES SHEET METAL WORK AND ASSOCIATED APPURTENANCES.
1.2 QUALITY .ASSURANCE
A.REGULATORY REQUIREMENTS: COMPLY WITH APPLICABLE CITY, COUNTY AND STATE
CODES AND ORDINANCES.
B.CODES AND STANDARDS:
1. NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR - CONDITIONING AND VENTILATING
SYSTEMS.
C.DUCT CLEANLINESS REQUIREMENTS:
1. PREVENT DAMAGE TO DUCTS DURING TRANSPORTATION AND OFF LOADING. DELIVER
ONLY WHEN DUCTS CAN BE STORED UNDER PERMANENT COVER. PLASTIC TARP
COVERING OF DUCTS ON JOBSITE NOT ACCEPTABLE.
2. KEEP SITE STORAGE AREAS CLEAN AND DRY WITH MINIMAL EXPOSURE TO DUST.
3. KEEP WORKING AREA CLEAN AND DRY AND PROTECTED FROM WEATHER ELEMENTS.
4. PRIOR TO INSTALLATION OF INDIVIDUAL DUCT SECTIONS INSPECT TO ENSURE THEY
ARE FREE FROM DEBRIS AND WIPE INTERNAL METAL SURFACES.
5. COVER DUCT RISERS TO PREVENT ENTRY OF DEBRIS.
6. COVER OPEN ENDS OF DUCTS AND DOWNWARD FACING AND HORIZONTAL DUCT
OPENINGS.
7. IF IN THE OPINION OF THE A//E DUCTS AND FITTINGS ARE NOT KEPT CLEAN OR
COMPLETELY DRY, REPLACE DUCTS AND FITTINGS OR CLEAN INTERIOR OF AFFECTED
DUCTS AND FITTINGS TO SATISFACTION OF THE A/E AT NO ADDITIONAL COST TOT E
OWNER.
1.3 SUBMITTALS
A.PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA AND MAINTENANCE
DATA FOR EACH ITEM SPECIFIED IN THIS SECTION.
B.TEST REPORTS: PRESSURE TESTING FOR LEAKAGE.
1.4 PRODUCTS INSTALLED BUT NOT FURNISHED UNDER THIS SECTION
A.SECTION 200548 - VIBRATION ISOLATION AND SEISMIC CONTROL: FLEXIBLE
CONNECTORS.
B.SECTION 230900 - TEMPERATURE CONTROLS: MOTOR OPERATED DAMPERS AND
ACTUATORS.
C.SECTION 283111 - FIRE ALARM AND DETECTION SYSTEMS: DUCT SMOKE DETECTORS.
PART 2 - PRODUCTS
2.1 SHEET METAL WORK, GENERAL
A.DUCT CONSTRUCTION:
1. COMPLY WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS, METAL AND FLEXIBLE
( SMACNA), THIRD EDITION, 2005. STANDING SEAMS NOT ACCEPTABLE FOR EXPOSED
DUCTS.
2. GALVANIZED STEEL IN GENERAL WITH G -90 ZINC COATING, ASTM A 653, MINIMUM
26 GAGE.
3. GALVANIZED STEEL PREPPED OR DUCTS FINISHED WITH PAINT GRIP FOR FIELD
PAINTING WHERE EXPOSED IN FINISHED SPACES AS SCHEDULED IN DIVISION 9.
B.PRESSURE CLASSIFICATIONS:
1. RETURN AND EXHAUST DUCTS: PLUS 2 INCH DOWNSTREAM OF FANS AND MINUS 2
INCH W.G. UPSTREAM OF FANS FOR FAN DESIGN STATIC PRESSURE SCHEDULED ON
THE DRAWINGS AT 1.0 INCH W.G. AND ABOVE.
2. RETURN RELIEF, AND EXHAUST DUCTS: PLUS 1 INCH DOWNSTREAM OF FANS AND
MINUS 1 INCH W.G. UPSTREAM OF FANS FOR FAN DESIGN STATIC PRESSURE
SCHEDULED ON THE DRAWINGS AT LESS THAN 1.0 INCH W.G. PLUS 1 INCH W.G.
FOR RELIEF DUCTS.
3. SUPPLY DUCTS NOT LISTED ABOVE: 2 INCH W.G.
4. TRANSFER DUCTS: 0.5 INCH W.G.
C.ROUND DUCTS: SPIRAL SEAM WITH BEADED SLEEVE AT TRANSVERSE JOINTS.
D.FITTINGS:
1. COMPLY WITH SMACNA AS FOLLOWS:
a.ROUND ELBOWS: FULL RADIUS (R /D =1.5), 5 PIECE SEGMENTED OR STAMPED PER
SMACNA FIGURE 3 -4.
b.RECTANGULAR ELBOWS: FULL ELBOW FR /W=1 P) WHERE RE MINIMUM 5 DUCT WIDTHS
IS AVAILABLE DOWNSTREAM
STRAIGHT LENGTH NOT AVAILABLE, USE SQUARE THROAT ELBOW WITH TURNING
VANES.
c. ROUND TEES AND LATERALS: CONICAL FITTING OR TAP PER SMACNA FIGURE 3 -6
90 DEGREE TEE WITH OVAL TO ROUND TAP, 45 DEGREE LATERAL FITTING TAP OR
SADDLE TAP, OR 45 DEGREE RECTANGULAR LEAD -IN PER SMACNA FIGURE 3 -5.
90 DEGREE TEE NOT ACCEPTABLE. SADDLE TAP CONNECTIONS FOR EXPOSED
DUCTS IN FINISHED SPACES NOT ACCEPTABLE.
d.SPIN -IN FITTINGS: CONICAL TYPE WITH VOLUME DAMPER QUADRANT AND
ACCESSORIES. INCLUDE INSULATION GUARD FOR INSTALLATION IN DUCT WITH LINING.
e.RECTANGULAR LATERALS: 45 DEGREE ENTRY FITTINGS PER SMACNA FIGURE 4 -6.
f. OFFSETS: FULL RADIUS (R D-1.5 FOR ROUND AND FLAT OVAL AND R /W =1.5 FOR
RECTANGULAR) WHERE SPACE ALLOWS. MITERED OFFSET (TYPE 2) WITH 30 DEGREE
MAXIMUM OFFSET ANGLE PER SMACNA FIGURE 4 -7. ANGLE OFFSET (TYPE 1) NOT
ACCEPTABLE.
g.DIVIDED FLOW FITTINGS ACCEPTABLE PER SMACNA FIGURE 4 -5 EXCEPT FOR BRANCH
CONNECTIONS TO OUTLETS AND INLETS.
2. ENLSEDESHNGE1 /TN20 GA
VNJ4EMBLVSHET ETL WIRE.
WITH GA AI2EDROVAEE MA
FRAME AROUND PERIMETER.
3. DUCT COLLARS: 2 INCH WIDE GALVANIZED STEEL FOR GALVANIZED DUCTS 20
GAGE. MITERED CORNERS FOR SQUARE AND RECTANGULAR DUCTS. ESCUTCHEON
TYPE FOR ROUND AND FLAT OVAL DUCTS.
E. TURNING VANES:
1. DESCRIPTION: AIRFOIL DESIGN SMOOTHLY - ROUNDED ENTRY NOSE EXTENDED
TRAILING EDGE CONTINUOUS INTERNAL TUBES FOR STIFFENING AND RIGIDITY OF
SECTION ADAPTABLE TO DUCT SIZES. MAXIMUM GENERATED SOUND POWER LEVEL
54 DECIBELS IN OCTAVE BAND 4 AT 2000 FPM VELOCITY IN 24 INCH BY 24 INCH
DUCT SIZE.
2. ASSEMBLY FABRICATION: SIDE .RAILS BY SAME MANUFACTURER AS TURNING VANES.
VANES INSTALLED ON 2.4 INCH CENTERS ACROSS FULL DIAGONAL DIMENSION OF
ELBOW PER SMACNA FIGURE 4 -3. RAIL SYSTEMS WITH NON- STANDARD TABLE
SPACING NOT ACCEPTABLE.
3. UNEQUAL ELBOWS: FABRICATE AND ADJUST TO SET VANES IN ASSEMBLY AT
CORRECT ANGLE OF ATTACK RESULTING IN LEADING AND TRAILING EDGES IN
PARALLEL TO DUCT SURFACES.
4. MANUFACTURER: H.E.P. - HIGH EFFICIENCY PROFILE - AS MANUFACTURED BY
AERO /DYNE CO. (1 -800- 522 -2423 ) OR APPROVED.
5. AT CONTRACTOR'S OPTION, DOUBLE WALL TURNING VANES FABRICATED FROM SAME
MATERIAL AS ADJACENT DUCT ACCEPTABLE. INCLUDE MOUNTING RAILS WITH
FRICTION INSERT TABS THAT ALIGN VANES AUTOMATICALLY.
F. ACOUSTICAL TURNING VANES:
1. DOUBLE THICKNESS PERFORATED GLASS FIBER FILL MYLAR LINER.
2. MANUFACTURER: DUCTMATE INDUSTRIES OR APPROVED.
A
G.LINED DUCTS: FABRICATE WITH DUCT LINING SUCH THAT NO GAP WILL RESULT
BETWEEN SECTIONS OF DUCT LINING AFTER ASSEMBLY OF DUCT SECTIONS.
FABRICATION AND INSTALLATION SHALL RESULT IN ADJACENT LINING SECTIONS BUTTED
TOGETHER WITHOUT GAPS, BULGES, OR OTHER DISCONTINUITIES.
H.DUCT SEALER:
1. INDOOR LOCATIONS: UL 181 LISTED AND LABELED. LOW ODOR, NON -TOXIC
VAPORS SURFACE BURNING CHARACTERISTICS FOR MAXIMUM FLAME SPREAD OF 25
AND MAXIMUM SMOKE DEVELOPED OF 50 WHEN IN A DRY STATE. RATED FOR AIR
TEMPERATURE RANGE OF MINUS 20 F TO PLUS 150 F. RATED TO 10 INCHES
W.G., MINIMUM 65 PERCENT SOLID CONTENT. MCGILL AIRFLOW LLC, AIRSEAL UNITED
DUCT SEALER (WATER BASED BIDDLE AQUA- CRYLIC HVAC, HARDCAST IRONGRIP
601, DESIGN POLYMERICS D 1 010, DUCTMATE INDUSTRIES PROSEAL OR EZ -SEAL,
OR APPROVED.
2. OUTDOOR LOCATIONS: UL 181 LISTED AND LABELED. 3 INCH MINIMUM WIDTH.
SURFACE BURNING CHARACTERISTICS OF 25 MAXIMUM FLAME SPREAD AND 50
MAXIMUM SMOKE DEVELOPED. RATED FOR AIR TEMPERATURE RANGE OF MINUS 40
F TO PLUS 200 F. SEALER WITH UV INHIBITORS. MCGILL AIRFLOW LLC, AIRSEAL
UNI- WEATHER, DUCTMATE INDUSTRIES PROSEAL OR APPROVED.
2.2 FLEXIBLE DUCTS
A.DESCRIPTION: FACTORY- INSULATED WITH LOW PERMEABILITY VAPOR BARRIER JACKET
CONSTRUCTED OF REINFORCED METALLIZED LAMINATE FILM SUITABLE FOR MEDIUM AND
SPRING HELIX REINFORCEMENT BONDEDTTO FIBERS GLASS CLOTH POOLYE COATED MYLAR
LINER.
1. RATINGS: UL LISTED AND LABELED PER UL 181 AS A CLASS 1 FLEXIBLE DUCT
WITH MAXIMUM FLAME SPREAD RATING 25 MAXIMUM SMOKE- DEVELOPED RATING 50.
2. LENGTH: ASSEMBLIES IN 5 FOOT LENGTH ( WITH GALVANIZED MALE AND FEMALE
FITTINGS ATTACHED TO LINER AND VAPOR BARRIER JACKET ACCEPTABLE.
B.MANUFACTURERS: THERMAFLEX MK -E, WIREMOLD 57K, FLEXMASTER 8M, OR APPROVED.
2.3 FASTENERS
A.DESCRIPTION: USE BLIND RIVETS SHEET METAL SCREWS OR BOLTED CONNECTIONS
WHERE REQUIRED BY SMACNA FOR ATTACHMENT PURPOSES FOR SHEET METAL. SHEET
METAL SCREWS AND RIVETS MINIMUM LENGTH REQUIRED FOR SECURE FASTENING.
WHERE RIVETS ARE SPECIFICALLY CALLED FOR IN THIS SECTION, SHEET METAL SCREWS
MAY BE USED.
B.LOCATIONS: FOR DUCTS, GRILLES AND ACCESSORIES EXPOSED TO VIEW IN FINISHED
ROOMS INCLUDE FINISH -TYPE FASTENERS.
1. PERMANENT WORK: BUND STAINLESS STEEL POP RIVETS.
2. REMOVABLE ITEMS AND GRILLES: CADMIUM - PLATED PAN HEAD OR COUNTERSUNK
TAPPING SCREWS.
2.4 HANGERS FOR SHEET METAL WORK
A.DESCRIPTION: HANGERS SUPPORTS, AND ANCHOR BOLTS FOR SHEET METAL WORK AND
EQUIPMENT ,_SAME MATERIAL AS FOR DUCT CONSTRUCTION.
B.BUILDING ATTACHMENTS: CONCRETE INSERTS AND STRUCTURAL -STEEL FASTENERS
APPROPRIATE FOR CONSTRUCTION MATERIALS TO WHICH HANGERS ARE BEING ATTACHED.
COMPLY WITH REQUIREMENTS IN SECTION 200515.
C.DUCT SIZES: REFER TO MAXIMUM CROSS - SECTION DIMENSION AT LOCATION OF
HANGERS.
D.HORIZONTAL RECTANGULAR AND ROUND DUCTS: COMPLY WITH SMACNA STANDARDS.
WIRE HANGERS NOT ACCEPTABLE.
E. VERTICAL DUCTS: ANGLES ATTACHED TO SIDES IN PAIRS. COMPLY WITH SMACNA.
2.5 VOLUME DAMPERS AND QUADRANTS
A.GENERAL: FABRICATE IN ACCORDANCE WITH SMACNA, SAME MATERIAL AS FOR DUCT
CONSTRUCTION.
B.REMOTE CABLE CONTROL SYSTEM FOR QUADRANTS WHERE DUCTS ARE NOT ACCESSIBLE.
CABLE SYSTEM FOR REMOTE OPERATION OF VOLUME DAMPER CONSISTING OF BOWDEN
0.054 INCH SHEATHED STAINLESS STEEL CONTROL WIRE, RACK AND PINION GEAR DRIVE,
AND WALL MOUNTED CONTROL KIT.
C.MANUFACTURERS: YOUNG REGULATOR, ENERTECH, OR APPROVED.
2.6 BACKDRAFT DAMPERS
A.DESCRIPTION: EXTRUDED ALUMINUM FRAME AND BLADES EXTRUDED VINYL EDGE SEALS
MECHANICALLY LOCKED INTO BLADE EDGE. BLADES WIT,-( FIELD ADJUSTABLE ZINC
PLATED STEEL COUNTERBALANCE WEIGHTS TO ALLOW PRESSURE RELIEF TO START
OPENING AT 0.01 INCH W.G. AND BE FULLY OPEN AT 0.06 INCH W.G. CORROSION
RESISTANT BEARINGS, SYNTHETIC TYPE. LINKAGE CONCEALED IN FRAME. DAMPERS
DESIGNED FOR MAXIMUM 1500 FPM SPOT VELOCITIES AND UP TO 4 INCH W.G. BACK
PRESSURE.
B.MANUFACTURERS: RUSKIN MODEL CBD2, GREENHECK AMERICAN WARMING &
2.7
VENTILATING, AIR BALANCE, FRAEI FRAMES
DYNE, PACIFIC AIR PRODUCTS, OR APPROVED.
A.GENERAL: INCLUDE ACCESS DOORS WHEREVER ACCESS TO DUCTS IS NECESSARY FOR
REACHING EQUIPMENT. DOUBLE CONSTRUCTION HEMMED EDGES (NO SHARP EDGES
TIGHT FITTING WITH GASKET, HINGED, WITH LATCH, INSULATION OR LINING EQUIVALENT TO
THAT OF ADJACENT DUCT. STEEL ANGLE FRAME. ACCESS PANELS WITH SHEET METAL
FASTENERS NOT ACCEPTABLE.
B.LATCHES: DIE -CAST, VENTFABRICS NO. 100 FOR DOORS 2' -0" HIGH AND SMALLER.
CAT. NO. 260 FOR DOORS UP TO 3' -0" HIGH. CAT. NO. 310 FOR DOORS HIGHER
THAN 3' -0 ", USE 2 FOR EACH DOOR. CAM LATCHES ACCEPTABLE.
2.8 MISCELLANEOUS DUCT ACCESSORIES
A.INSTRUMENT TEST HOLES: CAST IRON OR CAST ALUMINUM TO SUIT DUCT MATERIAL,
INCLUDING SCREW CAP AND GASKET. SIZE TO ALLOW INSERTION OF
PITOT TUBE AND
OTHER TESTING INSTRUMENTS AND OF LENGTH TO SUIT DUCT - INSULATION THICKNESS.
PART 3 - EXECUTION
3.1 DUCT INSTALLATION
A.GENERAL:
1. INSTALL IN WORKMANLIKE MANNER. FABRICATIONS FITTINGS, JOINTS, TAKE -OFFS,
ATTACHMENTS TURNING VANES, DAMPERS, AND SEALING IN ACCORDANCE WITH
REQUIREMENTS OF SMACNA AS SPECIFIED IN THIS SECTION AND AS INDICATED ON
THE DRAWINGS.
2. COMPLY WITH REQUIREMENTS IN SECTION 200548 FOR SEISMIC RESTRAINTS OF
DUCTS.
3. HANG DUCTS FROM ROOF STRUCTURE AND NOT FROM THE ROOF DECK ITSELF.
PROVIDE SUPPLEMENTARY STEEL FRAMING AS SPECIFIED IN SECTION 200515 TO
SPAN BETWEEN ROOF STRUCTURAL MEMBERS.
4. LOCATE DUCTS WITH SUFFICIENT CLEARANCE AROUND EQUIPMENT TO ALLOW FOR
INSPECTION REPAIR REPLACEMENT AND SERVICE.
5. CAP INCOMI'LETED DUCT ENDS WITH TEMPORARY CLOSURES OF TAPED
POLYETHYLENE TO PREVENT CONSTRUCTION DUST FROM ENTERING DUCTS.
6. INSTALL DUCT COLLARS WHERE EXPOSED DUCTS PASS THROUGH NON -FIRE RATED
WALLS AND CEILINGS. FASTEN TIGHT TO DUCTS.
7. DUCT SIZES MAY BE CHANGED AS LONG AS THE NEW DIMENSIONS ARE EQUIVALENT
TO THOSE INDICATED AND DO NOT EXCEED 4 TO 1 ASPECT RATIO.
8. TRANSITIONS:
a.FABRICATE AND INSTALL DUCT TRANSITIONS FOR CONNECTIONS TO EQUIPMENT, SUCH
AS FANS, HEATERS FIRE DAMPERS SMOKE DAMPERS COMBINATION FIRE/SMOKE
DAMPERS MOTOR OPERATED DAMPERS WHERE THE CONNECTION SIZES ARE
DIFFERENT FROM DUCT SIZES INDICATED ON THE DRAWINGS.
b. WHERE TRANSITIONS ARE FREEEAREAAEOF TO INTO AVAILABLE ANGLE SPACE, FABRICATE A15 TO
DEGREES.
9. DRAWINGS DO NOT SHOW OFFSETS WHICH MAY BE REQUIRED. MAKE OFFSETS WITH
FITTINGS WITH AS SMALL AN ANGLE OF OFFSET AS POSSIBLE. INSTALL TURNING
VANES IN SQUARE CORNER ELBOWS.
10. INSTALL ACOUSTICAL TURNING VANES IN RETURN AIR SQUARE THROAT ELBOWS.
11. INSTALL FLANGED CONNECTIONS TO EQUIPMENT WITH NEOPRENE GASKETS.
12. INSTALL DUCTS THROUGH ROOF TO BE WATERTIGHT. COORDINATE WITH ANY DETAILS
ON THE DRAWINGS AS TO FLASHINGS AND CURBS. REFER TO ARCHITECTURAL
DRAWINGS FOR FLASHING DETAILS.
13. INSTALL DUCTS, UNLESS OTHERWISE INDICATED ON THE DRAWINGS, VERTICALLY AND
HORIZONTALLY AND PARALLEL AND PERPENDICULAR TO BUILDING LINES.
14. INSTALL TEST HOLES AT FAN INLETS AND OUTLETS AND ELSEWHERE AS INDICATED
ON THE DRAWINGS. LOCATE WHERE REQUIRED FOR TESTING AND BALANCING
PURPOSES . AS DIRECTED BY THE TAB SUBCONTRACTOR SPECIFIED IN SECTION
200593
15. INSTALL RETURN AIR AND TRANSFER AIR OPENINGS ABOVE CEILINGS WITH MINIMUM
2' -0" CLEARANCE TO OBSTRUCTIONS.
B.EXTERIOR DUCTS:
1. GENERAL: INSTALL DUCTS LOCATED OUTSIDE OF BUILDINGS IN WEATHERPROOF
2. FABRICA ION: FABRICATE AND USE GAGE AS REQUIRED BY SMACNA. GALVANIZED'
STEEL WITH 4 -BOLT OR CORNER -CLIP DUCT CONNECTIONS OR FLANGED JOINTS.
SLOPE TOP OF DUCTS FOR DRAINAGE. SUPPORTS HOT DIP GALVANIZED AFTER
FABRICATION. SEAL SEAMS AND JOINTS EXTERNALLY FOR WATERTIGHT INSTALLATION
IN NEAT AND WORKMANLIKE MANNER.
3. CLEANING: THOROUGHLY CLEAN DUCT SURFACES, SUCH THAT DUCTS MAY BE
PRIMED AND FINISH PAINTED.
C.FLEXIBLE CONNECTORS:
1. INSTALL FLEXIBLE CONNECTORS FURNISHED UNDER SECTION 200548 AT I
CONNECTIONS TO VIBRATION- ISOLATED ((SPRING AND RUBBER ISOLATOR- MOUNTED)
FANS, PACKAGED HVAC EQUIPMENT AND SIMILAR EQUIPMENT.
2. SUPPORT DUCT ON BOTH SIDES OF FLEXIBLE CONNECTOR TO ENSURE AUGNMENT
AND TO AVOID BINDING CONNECTOR.
3. INSTALL WITH SUFFICIENT SLACK TO PERMIT 2 INCH HORIZONTAL OR VERTICAL
MOVEMENT WITHOUT STRETCHING FABRIC AND TO EFFICIENTLY ISOLATE VIBRATION OF
FANS FROM DUCTS.
D.DUCT AND PLENUM SEALING: SMACNA SEAL CLASS A. APPLY DUCT SEALER TO
TRANSVERSE JOINTS LONGITUDINAL SEAMS FITTING CONNECTIONS CORNERS OF
FOUR -BOLT OR CORNER CLIP DUCT CONNECTION SYSTEM, AND FITTING SEAMS EXCEPT
CONTINUOUS WELDED TYPE. SPIRAL SEAMS, CONTINUOUS WELDED SEAMS, AND
TRANSVERSE JOINTS FOR 4 -BOLT OR CORNER CLIP DUCT CONNECTION SYSTEM ARE
NOT REQUIRED TO BE SEALED UNLESS VISIBLE AND AUDIBLE LEAKS EXIST OR DUCT j
LEAKAGE EXCEEDS THAT ALLOWED BY LEAKAGE TEST SPECIFIED IN THIS SECTION.
COMPLY WITH MANUFACTURER'S RECOMMENDATIONS.
3.2 FLEXIBLE DUCTS
A.INSTALL PER SMACNA FIGURES 3 -10 AND 3 -11.
B.CONNECT TO METAL DUCTS WITH SLIP JOINT MADE USING FIRE - RESISTANT MASTIC AND
STAINLESS STEEL OR PLASTIC MACHINE - APPLIED CLAMP.
C.FIVE FOOT MAXIMUM LENGTH, FULLY EXTENDED. GENERALLY INSTALL WITH STRAIGHT
SECTIONS, WITHOUT BENDS. IF BENDS ARE REQUIRED, INSTALL WITH MAXIMUM ONE -90
DEGREE BEND R/D=2.5 OR GREATER. NO KINKS ALLOWED. SHEET METAL ELBOWS PTO
RESULT IN STRAIGHT FLEXIBLE DUCT RUNS ACCEPTABLE.
D.HANG FLEXIBLE DUCT ON 5' -O" CENTERS AND AT 90 DEGREE BEND WITH 1 INCH WIbE
FLAT STEEL STRAP. MAXIMUM 1/2 INCH SAG PER FOOT. SUPPORT SHALL NOT CAUSE
OUT -OF -ROUND SHAPE.
E.INSTALLATION IN CORRIDOR CEILING SPACES WHERE FIRE RATING IS REQUIRED NOT
ALLOWED.
3.3 VOLUME DAMPERS
A.GENERAL: VOLUME DAMPERS MAY NOT BE SHOWN ON THE DRAWINGS. INSTALL
DAMPER IN DUCT TO EACH SUPPLY, RETURN, AND EXHAUST OPENING AND FOR BRANCH
MAINS SERVING MORE THAN 1 OPENING.
B.CONSTRUCTION: TIGHT FITTING TO WALLS OF DUCT WHEN FULLY CLOSED. INSTALL
BEARING ON EACH END AND SEALED AIRTIGHT.
C.LOCATION: INSTALL DAMPERS IN ACCESSIBLE LOCATIONS. IN GENERAL, ARRANGE WITH
AXIS OF BLADE IN LONG DIMENSION OF DUCT. LOCATE AS FAR FROM OUTLET AND
INLET AS POSSIBLE.
D.SETTING: SET AND LOCK IN FULL OPEN POSITION, PRIOR TO TAB WORK.
E.INSTALL 12 INCH LONG ORANGE COLORED 1/2 INCH WIDE SURVEYORS TAPE ON
QUADRANT OF VOLUME DAMPERS LOCATED ABOVE CEILINGS.
3.4 BACKDRAFT DAMPERS
A.GENERAL: INSTALL AT EXHAUST AND RELIEF AIR DUCT TERMINATIONS TO ATMOSPHERE
THAT DO NOT HAVE MOTOR OPERATED DAMPERS.
3.5 ACCESS DOORS
A.GENERAL: AFT INSTALL AT MOTOR OPERATED DETECTORS, HUMIDIFIER ABSORPTION MANIFOLDS,'
COMBINATION FIRE /SMOKE DAMPERS, BOTH SIDES OF DUCT MOUNTED HEATERS AIRFLOW
MEASURING UNITS AND PLENUMS. ARRANGE DOOR SWINGS SO THAT ACCESS BOORS
OPEN AGAINST AIR PRESSURE.
3.6 DUCT SMOKE DETECTORS
A.COORDINATE LOCATION REQUIREMENTS WITH DIVISION 28 WORK PRIOR TO PREPARING
AND SUBMITTING SHEET METAL SHOP DRAWINGS TO ENSURE WITH DETECTOR
MANUFACTURER'S INSTALLATION REQUIREMENTS.
3.7 PRESSURE TESTING FOR LEAKAGE
A.DESCRIPTION: TEST SUPPLY RETURN AND EXHAUST DUCTS.
B.TEST STANDARD: SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL, 1ST ED., 1985.
C.TEST PROCEDURES:
1. TEST DUCT BEFORE INSULATION IS INSTALLED.
2. CLOSE OFF AND SEAL OPENINGS IN DUCT SECTION TO BE TESTED. CONNECT TEBT
APPARATUS TO DUCT BY MEANS OF FLEXIBLE DUCT.
3. TEST FOR AUDIBLE LEAKS.
4. AFTER ARYL UNTIL MAXIMUMS LEAKAGEEIS SEALS), 2S PERCENT OFT DESIGN AIR
QUANTITY OF SYSTEM HAS BEEN ACHIEVED.
END OF SECTION
SECTION 233713 - OUTLETS AND INLETS
PART 1 - GENERAL
1.1 SECTION INCLUDES
A.DESCRIPTION: WORK INCLUDES GRILLES, DIFFUSERS, AND ASSOCIATED APPURTENANCES.
1.2 QUALTY ASSURANCE
A.REGU LATORY REQUIREMENTS: COM P LY WITH APPLICABLE CITY COUNTY AND STATE
CODES AND ORDINANCES.
B.CODES AND STANDARDS:
1. ADC 1062R4 AIR DIFFUSING EQUIPMENT CERTIFICATION RATING AND TEST MANUAL
2. AMCA 511 CERTIFIED RATINGS PROGRAM FOR AIR CONTROL DEVICES.
3. ASHRAE 7b, METHOD OF TESTING FOR RATING THE PERFORMANCE OF AIR OUTLETS
AND INLETS.
1.3 SUBMITTALS
A.PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA AND MAINTENANCE
DATA FOR EACH TYPE AND ASSOCIATED APPURTENANCES.
PART 2 - PRODUCTS
2.1 GRILLES,REGISTERS, DIFFUSERS, LOUVERS, ROOF AND WALL CAPS
A.EXCEPT AS OTHERWISE INDICATED FURNISH MANUFACTURER'S STANDARD GRILLES AND
DIFFUSERS OF SIZE SHAPE, CAPACITY AND TYPE AS INDICATED ON THE DRAWINGS FOR
COMPLETE INSTALLATION. 1
B.PERFORMANCE: FURNISH GRILLES AND DIFFUSERS THAT HAVE AS MINIMUM
TEMPERATURE AND VELOCITY TRAVERSES THROW AND DROP, AND NOISE CRITERIA
RATINGS FOR EACH GRILLE AND DIFFUSER TYPE AND SIZE AS LISTED IN
MANUFACTURER'S CURRENT DATA.
C.CEILING COMPATIBILITY: FURNISH WITH BORDER STYLES COMPATIBLE WITH ADJACENT
CEILING SYSTEMS SPECIFICALLY MANUFACTURED TO FIT INTO CEILING MODULE WITH
ACCURATE FIT AND ADEQUATE SUPPORT. REFER TO ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS FOR TYPES OF CEILING SYSTEMS.
D.SEISMIC RESTRAINTS FOR GRILLES AND DIFFUSERS WEIGHING LESS THAN 20 POUNDS:,
INCLUDE MEANS TO POSITIVELY ATTACH GRILLES AND DIFFUSERS TO CEILING GRID
SYSTEM.
E.MANUFACTURERS: GRILLES REGISTERS, DIFFUSERS: TITUS, KRUEGER, ANEMOSTAT,
PAR M 3ALAIRXECUEI S, OR APPROVED.
3.1 INSPECTION
A.GENERAL: VERIFY INSTALLATION CONDITIONS AS SATISFACTORY TO RECEIVE WORK OF
THIS SECTION. DO NOT INSTALL UNTIL UNSATISFACTORY CONDITIONS ARE CORRECTED.
BEGINNING WORK CONSTITUTES ACCEPTANCE OF CONDITIONS AS SATISFACTORY.
3.2 PREPARATION
A.FIELD MEASUREMENTS: FIELD VERIFY LOCATIONS OF NEW AND EXISTING WORK PRIORI
TO COMMENCING WORK OF THIS SECTION.
B.PROTECTION: PROTECT SURROUNDING AREAS AND SURFACES TO PRECLUDE DAMAGE 1
FROM WORK OF THIS SECTION.
3.3 INSTALLATION, APPLICATION ERECTION, AND PERFORMANCE
A.GENERAL: INSTALL, APPLY, ERECT, AND PERFORM THE WORK IN ACCORDANCE WITH 1
ARTICLE "QUALITY ASSURANCE" PROVISIONS SPECIFICATIONS AND MANUFACTURER'S 1
INSTALLATION INSTRUCTIONS AND DIRECTIONS. WHERE THEE MAY BE IN CONFLICT, THE
MORE STRINGENT REQUIREMENTS GOVERN.
B.COORDINATE WITH OTHER WORK INCLUDING DUCTWORK AND DUCT ACCESSORIES AS
NECESSARY TO INTERFACE INSTALLATION OF GRILLES AND DIFFUSERS WITH OTHER WORK.
C.INSTALL GRILLES AND DIFFUSERS WITH AIRTIGHT CONNECTION TO DUCTS AND TO ALLOW
SERVICE AND MAINTENANCE OF ADJUSTABLE COMPONENTS AND FIRE DAMPERS.
D.CEILING - MOUNTED OUTLETS AND INLETS: DRAWINGS INDICATE GENERAL ARRANGEMENT
OF DUCTS, FITTINGS AND ACCESSORIES. GRILLE AND DIFFUSER LOCATIONS HAVE BEEN
INDICATED ON THE DRAWINGS TO ACHIEVE DESIGN REQUIREMENTS FOR AIR VOLUME,
OCATIONSI�WHEjREIRINDIIC TED ONNTHE ARCHITECTURAL REFLECTED CEILING PLANS.
WHERE ARCHITECTURAL FEATURES OR OTHER ITEMS CONFLICT WITH INSTALLATION, NOTIFY
ALE FOR DETERMINATION OF FINAL LOCATION.
E.S ISMIC RESTRAINTS:
1. FOR GRILLES AND DIFFUSERS WEIGHING LESS THEN 20 POUNDS: POSITIVELY
ATTACH GRILLE AND DIFFUSER TO CEIUNG GRID SYSTEM.
2. FOR GRILLES AND DIFFUSERS WEIGHING 20 TO 56 POUNDS: IN ADDITION TO
POSITIVELY ATTACHING GRILLE AND DIFFUSERS TO CEILING GRID SYSTEM, INSTALL
TWO NO. 12 GAGE HANGER WIRES CONNECTED TO GRILLES AND DIFFUSERS TO
CEILING SYSTEM HANGER OR TO STRUCTURE ABOVE.
3. FOR GRILLES AND DIFFUSERS WEIGHING MORE THAN 56 POUNDS: SUPPORT
DIRECTLY FROM STRUCTURE ABOVE. COMPLY WITH REQUIREMENTS IN SECTION
200548 FOR SEISMIC RESTRAINTS.
3.4 ADJUSTING
F. AFTER INSTALLATION, ADJUST GRILLES AND DIFFUSERS TO AIR PATTERNS INDICATED ON
THE DRAWINGS, OR AS DIRECTED, BEFORE STARTING AIR BALANCING.
3.5 CLEANING
A.AFTER INSTALLATION OF GRILLES AND DIFFUSERS INSPECT EXPOSED FINISH. CLEAN
NEW
EXPOSED R ND DIFFUSERS THAT HAVE DIRT, AGED FINISHES.
REMOVE AND PROVIDE
END OF SECTION
SECTION 234100 -
FILTERS
PART 1 - GENERAL
1.1 SECTION INCLUDES
EQUIPMENT AND
AIR FILTERS FOR AIR HANDLING E
A.DESCRIPTION: WORK INCLUDES Q
ASSOCIATED APPURTENANCES.
1.2 QUALITY ASSURANCE
A.REGULATORY REQUIREMENTS: COMPLY WITH APPLICABLE CITY, COUNTY, AND STATE
CODES AND ORDINANCES.
B.CODES AND STANDARDS:
1 ASHRAE DCAS�ED N NEL EN FR FENPIANING DEVICES GERAVNTIILATTIOO REMOVING TESTING
MATTER.
2. ASHRAE 52.2 METHOD OF TESTING GENERAL VENTILATION AIR - CLEANING DEVICES
FOR REMOVAL EFFICIENCY BY PARTICLE SIZE.
3. NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR - CONDITIONING AND VENTILATING
SYSTEMS.
1.3 SUBMITTALS
A.PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA AND MAINTENANCE
DATA FOR EACH AIR FILTER AND APPURTENANCE.
1.4 SPARE MEDIA
A.FOR AIR HANDLING UNITS AND PACKAGED HVAC EQUIPMENT AND SIMILAR EQUIPMENT
WITH FILTERS: THREE SETS FOR EACH TYPE OF FILTER. ONE FOR INITIAL
ANDAONEI DELIVOERED INSTALLED THE PRIOR TO SUBS TAB WORK IN SECTION 200593,
PART 2 - PRODUCTS
2.1 REPLACEABLE FILTERS
A.PLEATED MEDIA TYPE: EXTENDED SURFACE WITH REINFORCED NON -WOVEN COTTON
FABRIC IN SELF-SUPPORTING FRAME, MERV 8 PER ASHRAE 52.2, 2 INCHES THICK, UL
CLASS 1. CAMFIL FARR 30/30, AAF INTERNATIONAL, OR APPROVED.
2.2 FINAL FILTER
A.CLASS E EXTENDED SURFACE, MV MINIMUM MERV 14 PER ASHRAE 52.2, 12" THICK, UL
2.3 FILTER HOUSINGS AND FRAMES
A.FOR AIR HANDLING EQUIPMENT: FILTER HOUSINGS AND FRAMES FURNISHED BY AIR
HANDLING EQUIPMENT MANUFACTURER AND INTEGRAL TO AIR HANDLING EQUIPMENT
UNLESS OTHERWISE INDICATED ON THE DRAWINGS.
B.EXTERNAL FILTER HOUSING: TWO -STAGE FILTER HOUSING, 16 GAUGE GALVANIZED
STEEL WEATHERPROOF FINISH. CAMFILL FARR 3P GLIDEPACK, OR APPROVED.
2.3 RESISTANCE INDICATOR
A.GENERAL: DIAPHRAGM- ACTUATED DIAL TYPE 4 -3 4 INCH OUTSIDE DIAMETER WITH
WHITE DIAL BLACK FIGURES AND GRADUATIONS, AND POINTER ZERO ADJUSTMENT 0 TO
1 INCH W.G. RANGE WITH 0.02 INCH MINOR DIVISION. ACCURACY PLUS OR MINUS 2
PERCENT OF FULL SCALE AT 70 F. INCLUDE BRACKET, STATIC PRESSURE TAPS,
ALUMINUM TUBING AND VENT VALVES. MANUFACTURER: DWYER MAGNEHELIC MODEL
2001 OR APPROVED.
PART 3 - EXECUTION
3.1 INSTALLATION, APPLICATION ERECTION, AND PERFORMANCE
A.GENERAL: INSTALL, APPLY, ERECT, AND PERFORM THE WORK IN ACCORDANCE,
SPECIFICATIONS AND MANUFACTURER'S INSTALLATION INSTRUCTIONS AND DIRECTIONS.
WHERE THESE
SPECIFICATIONS, BE IN CONFLICT, THE MORE STRINGENT REQUIREMENTS GOVERN.
B.COORDINATE WITH DUCTWORK AND AIR MOVING EQUIPMENT AS NECESSARY TO INTERFACE
INSTALLATION OF AND ACCESS TO FILTERS.
C.INSTALL FILTERS IN EASILY CHANGED FROM PREVENT ANDS SHALL OF UNFILTERED ON
TRACKS WITHOUT LANDING.
E.FILTER SECTIONS SHALL HAVE HINGED ACCESS DOORS WITH LATCHES.
F.INSTALL RESISTANCE INDICATOR STATIC PRESSURE TAPS UPSTREAM AND DOWNSTREAM
OF FILTERS TO INDICATE AIR PRESSURE DROP THROUGH AIR FILTER. INSTALL INDICATOR
ON OUTSIDE OF FILTER HOUSING OR FILTER PLENUM IN ACCESSIBLE AND READABLE
POSITION.
END OF SECTION
SECTION 238100 - PACKAGED HVAC EQUIPMENT
PART 1 - GENERAL
1.1 SECTION INCLUDES
A.DESCRIPTION: WORK INCLUDES PACKAGED HVAC EQUIPMENT WITH MECHANICAL COOLING
AND HEATING CAPABILITIES AND ASSOCIATED APPURTENANCES.
1.2 QUALITY ASSURANCE
A.REGULATORY REQUIREMENTS: COMPLY WITH APPLICABLE CITY, COUNTY, AND STATE
CODES AND ORDINANCES.
B.CODES AND STANDARDS:
1. APPLICABLE ENERGY CODE.
2. ARI 210/240 PERFORMANCE RATING OF UNITARY AIR - CONDITIONING AND AIR
SOURCE HEAT PUMP EQUIPMENT.
3. ARI 340/360 COMMERCIAL AND INDUSTRIAL UNITARY AIR - CONDITIONING AND HEAT
PUMP EQUIPMENT.
4. NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR - CONDITIONING AND VENTILATING
SYSTEMS.
1.3 SUBMITTALS
A.PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA AND MAINTENANCE
DATA FOR EACH TYPE OF PACKAGED HVAC EQUIPMENT AND APPURTENANCE. INDICATE
ACCESSORIES WHERE REQUIRED FOR COMPLETE SYSTEM AND INSTALLATION
INSTRUCTIONS.
B.PERFORMANCE DATA: SUBMIT FAN PERFORMANCE CURVE FOR UNIT. INDICATE ON
SEPARATE GRAPH FOR EACH FAN STATIC PRESSURE VERSUS VOLUME FLOW EFFICIENCY,
AND BRAKE SCHEDULED POINT A OSINGLE F AN CURVE NOT
1
ACCEPTABLE.
C.SHOP DRAWINGS: SUBMIT PACKAGED HVAC EQUIPMENT CONTROL WIRING DIAGRAM
INDICATING FACTORY AND FIELD INSTALLED WIRING.
D.TEST REPORTS:
1. FACTORY START -UP AND TEST REPORTS.
2. FIELD START -UP AND TEST REPORTS.
3. INCLUDE COPY OF REPORTS IN THE OPERATION AND MAINTENANCE MANUAL.
PART 2 - PRODUCTS
2.1 HVAC EQUIPMENT
A.PROVIDE EQUIPMENT WITH ALL FEATURES AND OPTIONS LISTED ON EQUIPMENT
SCHEDULES. TRANE, OR APPROVED.
PART 3 - EXECUTION
3.1 WORK PRIOR TO INSTALLATION
A.EQUIPMENT MANUFACTURER'S AUTHORIZED REPRESENTATIVE SHALL MAINTAIN PERSONNEL
WITHIN A 50 MILE RADIUS OF JOB SITE. REPRESENTATIVE CAPABLE OF
TROUBLESHOOTING PACKAGED HVAC EQUIPMENT FAULTS.
1. INCLUDE 1 MAN DAY TO MEET WITH THE MECHANICAL ELECTRICAL AND CONTROL
SUBCONTRACTORS AT THE JOB SITE. SCHEDULE THIS MEETING WITHIN 1 WEEK
AFTER EQUIPMENT IS DELIVERED TO FINAL LOCATION AT JOB SITE BUT PRIOR TO
EQUIPMENT OPERATION. PURPOSE IS TO ASSURE THAT ALL PARTIES UNDERSTAND
WHAT INTERCONNECTIONS ARE REQUIRED.
2. AFTER EQUIPMENT INSTALLATION, INCLUDE 1 MAN DAY TO ASSIST CONTROL AND
IN�UNIT MOUNTED SUBCONTRACTORS PANELS E THIS 1 SERVICE SHALL ALSO VERNFY THE WIRES
PROPER CONNECTION AND POLARITY OF THE WIRES.
3.2 INSTALLATION OF PACKAGED HVAC EQUIPMENT AND COMPONENTS
A.INSTALL EQUIPMENT WITH CLEARANCES FOR SERVICE AND MAINTENANCE.
B.REPAIR DAMAGED CONDENSER COIL FINS.
C.H UNTT DTDRNN INSTALL AS NOT TO INTERFERE
ANINTEALLCOMPOEACCE FILTERS.
D.ROOF MOUNTED EQUIPMENT: ATTACH ROOF CURBS TO ROOF AND MOUNT UNITS ON
ROOF CURBS. REFER TO ARCHITECTURAL DRAWINGS FOR ROOF FLASHING.
E. COMPLY WITH REQUIREMENTS FOR VIBRATION ISOLATORS AND SEISMIC RESTRAINTS.
3.3 START -UP SERVICES
A.EQUIPMENT MANUFACTURER'S AUTHORIZED REPRESENTATIVE SHALL PERFORM START -UP
SERVICES OF PACKAGED HVAC EQUIPMENT AND RELATED APPURTENANCES. SERVICES
SHALL INCLUDE A CHECK OF PROPER INSTALLATION, SYSTEM CHECK -OUT, ADJUSTMENT,
AND COMPLETE START -UP.
B.INCLUDE START -UP AND TEST EFIBizI 'KOR1'4ON AND MAINTENANCE MANUAL.
END OF SECTION COPE COMPL(A 'CE
PRIM
}M
YOfTU(
WING D1v ist
RECEIVED R
Al
DEC 15 2010 OCT
PERMIT CENTER PE - CENT
y °°
00
0 El
oG IDco
Hoc
Z
En
0,
n
a
co/
"00'
m�
� 3 UN
cci 06 En
442 L
oo-
N N
a
MECHANICAL SPECIFICATIONS
NAC NO 121 -10017
HEINO 10113
DRAWN JMR
CHECKED RKE
DATE 9 -10 -2010
M
0.6
ROOF
MOUNTED HEAT
PUMP SCHEDULE
MARK
LOCATION
AREA SERVED
MANUFACTURER
MODEL
TRANE / WSC048
SUPPLY /
RETURN /
EXHAUST
BORDER TYPE
NECK SIZE
(L "xW ")
(DIA)
ELECTRICAL
COOLING
HEATING
. FINISH
MIN.
OA
(CFM)
150
SUPPLY
AIRFLOW
1500
ESP
(IN)
0.75
MOTOR
HP
1
ELECTRIC AUX. COIL
UNIT
VOLTAGE
V / 0
208 / 3
MCA
(A)
63.7
MOCP
(A)
70
MBH
45.9
EAT
('F)
75.7
LAT
( "F)
52.5
MBH
26.8
EAT
(•F,
68.
LAT
( F)
'
85
SEER
13.0
REFRIG.
TYPE
R -410A
DIMENSIONS
(LxWxH)
(INxINxIN)
70x45x36
WEIGHT
(LBS.)
600
REMARKS
NOTE 1, 2, 3, 4
STAGE 1
(kW)
9
STAGE 2
(kW)
12
HP -1
ROOF
CT SCAN EXAM ROOM
1.
2.
3.
4.
NOTES
DISCHARGE, HIGH STATIC MOTOR, ECONOMIZER, FACTORY ROOF CURB, AND MICROPROCESSOR FACTORY CONTROLS.
2 STAGE ELECTRIC HEATING COIL.
BASE SINGLE POINT ELECTRICAL CONNECTION KIT. MCA AND MOCP. ARE BASED UPON THE USE OF SINGLE POINT CONNECTION KIT TO POWER MOTORS AND ELECTRIC HEATING COIL.
BALANCE AIRFLOW TO 1600 CFM.
—
—
1/2"
NA
480
480
0
PROVIDE WITH HORIZONTAL
PROVIDE WITH SUPPLEMENTARY
PROVIDE WITH THROUGH THE
BID ALTERNATE 2: IF ACCEPTED,
FILTER BOX SCHEDULE
MARK
LOCATION
AREA SERVED/
SYSTEM SERVED
HOUSING
MANUFACTURER/
MODEL
FILTER
MANUFACTUER/
MODEL
F-1
ROOF
HP -1
FARR / 3P GLIDEPACK
VILEDON / MV95
AIRFLOW
RATE
(CFM)
1500
MAX
VELOCITY
(FPM)
400
INITIAL
MAX
APD
(IN)
0.25
FILTER BOX
DIMENSIONS
(HxWxD)
(INx1NxIN)
27x24x21
FILTER
SIZE
( HxWxD)
(INxIN)
24x24
REMARKS
NOTE 1, 2
NOTES
1. PROVIDE MAGNAHELIC GAGES FOR BOTH PREFILTER AND FINAL FILTER.
2. PROVIDE MERV 8 PRE — FILTER.
3. BID ALTERNATE 2: IF ACCEPTED, AIRFLOW WILL BE 1600 CFM.
-VEINED FO
CORM
DEC • 010
Ul
Ity Of Tukwfl
�, II DIUISI()
AIR DEVICE SCHEDULE
MARK
ROOM #
ROOM NAME
MARK
TYPE
MANUFACTURER /
MODEL
SUPPLY /
RETURN /
EXHAUST
BORDER TYPE
NECK SIZE
(L "xW ")
(DIA)
FACE SIZE
(L "xW ")
(IN)
CFM
RANGE
< 25 NC
BORDER
TYPE
. FINISH
MATERIAL
REMARKS
C1
CEILING DIFFUSER
TITUS MCD
SUPPLY
LAY —IN
6 x 6
24x24
0 4 150
3
WHITE
STEEL
1,
2
8x8
1551 -275
0
0
NOTE 1, 2
165
CONTROL ROOM
105
10 x 10
AC -3
280 1—
450
—
—
1/2"
NA
480
480
0
0
ELKAY
1.
NOTES
12 x 12
—
455 1—
600
NOTES;
1.
PIPE SIZES LISTED MAY BE
DIFFERENT THAN THE ACTUAL FIXTURE CONNECTION, PROVIDE BRANCH PIPE OF USTED
SIZE AND ALL PIPE FITTINGS REQUIRED FOR A COMLETE INSTALLATION.
2. SINK: 18 GAUGE, TYPE 304 STAINLESS STEEL SATIN FINISH, FULLY UNDERCOATED FOR SOUND DAMPENING, 7 -5/8"
DEEP BOWL, 3 HOLE PUNCHINGS FOR FAUCET ON 8" CENTERS.
3. SINK FAUCET: 8" CENTERS, 5 -1/4" GOOSENECK SPOUT, POLISHED CHROME PLATED FINISH, PRESSURE COMPENSATING
LAMINAR FLOW OUTLET, 4" WRIST BLADES.
14 x 14
605 1—
750
1
R1
RETURN GRILLE
TITUS 350
RETURN
LAY —IN
8 x 8
24x24
0 -',
260
3
WHITE
STEEL
1,
2
12 x 12
260 1—
600
16 x 16
600
1130
NOTES
1.
ADJUST DIFFUSERS FOR
4 —WAY THROW UNLESS INDICATED OTHERWISE ON PLANS.
2. DIMENSIONS INDICATED ARE NOMINAL. REFER TO MANUFACTURER FOR ACTUAL DIMENSIONS.
AIR BALANCE / PRESSURIZATION SCHEDULE
MARK
ROOM #
ROOM NAME
AREA
(FT" 2)
VOLUME
(FT" 3)
AHU
AIA /FGI GUIDEUNES 1
DESIGN AIRFLOW (CFM)
REMARKS
SA (ACH)
(ACH)
SA (CFM)
(CFM)
EA (ACH)
(ACH)
EA (CFM)
(CFIN)
PRESS
(1)
SA
(CFM)
RA
(CFM)
EA
(CFM)
P
(CFM)
164
CT SCAN
405
3443
HP -1
6
3.0
—
—,
NA
1420
1420
0
0
NOTE 1, 2
165
CONTROL ROOM
105
893
AC -3
6
90
—
—
1/2"
NA
480
480
0
0
ELKAY
1.
NOTES
E= EQUAL, NA = NOT APPLICABLE
—
P = POSITIVE, N = NEGATIVE,
PLUMBING FIXTURE SCHEDULE
MARK
FIXTURE
FIXTURE TYPE/
MATERIAL
MANUFACTURER
MODEL NUMBER
WASTE
VENT
COLD
HOT
REMARKS
COMPONENT
DESCRIPTION
S -1
SINK
COUNTER MOUNTED
STAINLESS STEEL
ELKAY
1 LR 1517
1-1/2"
1-1/4"
—
—
NOTE 1, 2
FAUCET
GOOSENECK SPOUT
CHROME PLATED
CHICAGO FAUCETS
786— E29VPCCP
—
—
1/2"
1/2"
NOTE 1, 3
TRIM
GRID AND TAILPIECE
STAINLESS STEEL
ELKAY
' -
—
—
—
—
NOTE 1
NOTES;
1.
PIPE SIZES LISTED MAY BE
DIFFERENT THAN THE ACTUAL FIXTURE CONNECTION, PROVIDE BRANCH PIPE OF USTED
SIZE AND ALL PIPE FITTINGS REQUIRED FOR A COMLETE INSTALLATION.
2. SINK: 18 GAUGE, TYPE 304 STAINLESS STEEL SATIN FINISH, FULLY UNDERCOATED FOR SOUND DAMPENING, 7 -5/8"
DEEP BOWL, 3 HOLE PUNCHINGS FOR FAUCET ON 8" CENTERS.
3. SINK FAUCET: 8" CENTERS, 5 -1/4" GOOSENECK SPOUT, POLISHED CHROME PLATED FINISH, PRESSURE COMPENSATING
LAMINAR FLOW OUTLET, 4" WRIST BLADES.
RECEIVED
DEC 15 2010
PERMIT CENTER
CEI D
OCT - 2010
PE CE F
U
MECHANICAL EQUIPMENT SCHEDULES 8
rmr.;vIOIVIV)
V) z
= 0
a Z
2 cn-±
4:r U
(0 N-
0
0
Cif
J
I-- ;t
Zw�
w U
W
O Om
V)
w w 0 co
w
I--- Z O
z m
w =11
Ci LI J
w 'd
I-- Nit
DO
U r
TECTURE
u
2201 SIXTH AVENUE I SUITE 14051 SEATTLE WA 98121-18471P: 206.441.45221 F206.442.7917
NAC NO
HEI NO
DRAWN
CHECKED
DATE
121 -10017
10113
JMR
RKE
9 -10 -2010
LIr rL
11
CD 9x9
170
E C:0r:) 7
HVAC L1.dwg
18x10
i
9x9
165
DOR
L
7
1;2 <6
60s
110
ror
170 I
60
110
\arr►r/rri1%
torn- p,i17
0
p 14:91 �-) Vii, _1
r
*60:0494rivAPFArierr AfrAor 8x6
95
0FFI`,,l.,
9{x9 ~'_J
95
-., 1
'VESTIBULE
EfilanI0 ._
J,
E017]
EC Y1
1-,
-•
r
60
CD 110
FIRST FLOOR HVAC DEMOLITION PLAN
EI pon
H1
Scale: 1/4" = 1' -0"
on-2
8
EVHHWEDF
CO ;► ':• COMP . 9CE
B
DEC 211111
of MI
m1VIS1
SHEET NOTES:
1. DEMOLISH ALL DUCTWORK IN CT SCAN AND CT SCAN
CONTROL ROOM. REFER TO M3.1 FOR POC'S AND
CONNECTIONS TO EXISTING SYSTEMS.
FLAG NOTES:
EXISTING TEMPERATURE SENSOR FOR REHEAT COIL
RH -31. RELOCATE TO NEW LOCATION AS INDICATED ON
SHEET M3.1.
DEMOLISH ALL EXISTING DUCTWORK ASSOCIATED WITH
ABANDONED WATER COOLED SPLIT SYSTEM. FIELD
VERIFY.
DEMOLISH DUCT BACK TO THIS POINT AND PROVIDE
TEMPORARY CAP. RECONNECT AND BALANCE PER M3.1.
CAP DUCT ABOVE CEILING AT THIS LOCATION. REFER TO
M3.1.
RECEIVED
DEC 15 2010
PERMIT CENTER
EDKEY PLAN
NOT TO SCALE
NOT TO SCALE
U
U
FIRST FLOOR HVAC DEMOLITION PLAN
H
did
0
CO
M
co os
co —
my CV
0
0
z
w
w
0
0
w
1--
z
w
CL
w
1-
U
O
rz.
2 I
Cl. z
Q
� S
W
CL
w Q �
ZQ
I 15-
cs,
ill":
NAC NO 121 -10017
HEINO 10113
DRAWN JMR
CHECKED RKE
DATE 9-10 -2010
rn
1
CO
0
a I
a
w
cn
T
0
In 0
O
03
1
N �
0_
2 GI
a�
o§
my
vtrox Inc.
'
!I
1 _ ._-- __ - -.- `t
1
1
H
1
I L.
120 1
7..
i �"-- ,fir- -- 4 ;; :r
i -- ,11 1
• -'; _III! -1
CYP)
Medical Cases • Medical Gas Line Verifications-Analgesia Equipment
Letter of Acceptance
(E) ZONE VALVE
P-
(7.: TIP 1
t.
,i3
NO
(E) ZONE VALVE
r- u - r- 1 , , -�r-- • -- --s
FIRST FLOOR PLUMBING PLAN
Scale: 1/4 • = 1 --0
0 1 2 4 8
SHEET NOTES:
1. VERIFY EXISTING CONDITIONS IN THE FIELD PRIOR TO
DEMOLITION . AND CONSTRUCTION. REPORT ANY
DISCREPANCIES . TO THE A/E PRIOR TO PROCEEDING WITH
WORK.
2. ALL WORK ASSOCIATED WITH MEDICAL GAS PIPING IS PART
OF' BID ALTERNATE 1.
FLAG NOTES:
REUSE EXISTING WATER, WASTE AND VENT PIPING FOR
NEW SINK. ROUTE PIPING IN WALL AS NEEDED FOR NEW
SINK LOCATION. PROVIDE NEW STOPS AND TRAP.
BID ALTERNATE 1: SECURE AND CAP NITROUS OXIDE
PIPING AT ZONE VALVE. .
BID ALTERNATE 1: PROVIDE NEW MEDICAL GAS OUTLETS.
QUANTITY AND TYPE AS INDICATED. REFER TO
ARCHITECTURAL DRAWINGS FOR LOCATION.
BID ALTERNATE 1: VALVE AND CAP PIPE ABOVE CEILING.
MEDICAL GAS LEGEND:
MA
---- -- 02 -
NO
GNI
MEDICAL AIR
MEDICAL VACUUM
OXYGEN
NITROUS OXIDE
MEDICAL GAS ZONE
VALVE BOX
MEDICAL GAS AREA
ALARM PANEL
MEDICAL GAS MASTER
ALARM PANEL
��— MEDICAL GAS OUTLET TYPE
A — MEDICAL AIR
✓ -- MEDICAL VACUUM
2 0 -- OXYGEN
N — NITROUS OXIDE
S — VACUUM SLIDE
MEDICAL GAS OUTLET QTY.
OF QTY. NOT INDICATED
ASSUME 1 OUTLET)
M LOCKED 'CLOSED VALVE
I4
LOCKED OPEN VALVE
REVIEWED FOR
CODE COMPLIANCE
Date: December 23, 2010
DEC 9. d 2010
Contractor: McKinstry Company
Address:
City & State: Seattle, WA
Phone:
Fax:
Contact: Adam Campbell
Subject: Medical Gas Line Verification.
Nitrox Inc. has reviewed and approved medical gas drawings and accepted to perform
the third party verification for the facility named below in accordance with NFPA 99
(1999 ed.) and any local requirements for this
Level 1 facility.
Facility: Highline Specialty Hospital
Address: 12844 Military Rd. S.
City & State: Seattle, WA
Phone:
Contact:
Medical Gas Systems: Equipment Systems:
x
Oxygen 7 Dental Air & Source Equipment
7Medical Air
Medical Vacuum
X
Dental Vacuum & Source Equipment
Medical Gas Source Equipment
c
CRTT, CMG =0024
President
00 -Blank Dental Letter of Acceptance -0110 Pg 1 of 1
2706 1 64th Street SW Lynnwood, WA 98087
(425) 741 -8807 • 1 -800- 736 -7047 • Fax (425) 741 -2500 • www.nitroxinc.com
INCOMPLETE
%IoL72
MEDICAL GAS CONItEEC11ON SCHEDULE
MARK
OUTLET TYPE
CONN.
{I9
REMARKS
0
OXGYEN OUTLET
1/2"
NOTE 1. 2
A
MEDICAL AIR OUTLET
1/2"
NOTE 1. 2
V
MEDICAL VACUUM OUTLET
3/4"
NOTE 1, 2
S
MEDICAL VACUUM SLOE BRACKET
—
N
NITROUS' OXIDE OUTLET
1/2" 1
NOTE 1, 2
1.
2.
SIZE 7'0 OUTLET AND
COMPLETE INSTALLATION.
BACK. IT IS THE CONTRACTORS
TO EACH OUTLET OR A SINGLE
WALL
PROVIDE BRANCH PIPNIG WITH LUSTED
PROVIDE ALL REQUIRED FITTINGS FOR
WHERE OUTLETS ARE LOCATED BACK TO
OPTION TO PROVIDE MULTIPLE PIPE DROPS
PIPE DROP WITH BRANCH PIPING IN THE
City of Tukwila
BUILDING DIVIsIfN
RECEIVED
DEC 2 3 2010
PERMIT CENTER
WEST WING �
4
ED
OC 3 2010
PEA IT R
KEY PLAN
NOT TO SCALE
REVISIONS
M
oi
442
N N
0
0
re
z
tit
2
W
a.
LU
2
CL
a
12844 MILITARY ROAD S
FIRST FLOOR PLUMBING PLAN
Q>r
ARCH ITECTURE
NAC NO
HEI NO
DRAWN
CHECKED
DATE
121 -10017
10113
JMR
RKE
9- 10-2010
2201 SDCTH AVENUE! SUITE 1405 !SEATTLE WA 98121 -18471 P: 200.441A522 1 F206.442.7917
1
CD 9x9
170
2' 6
0
1 1_ i
I
1IIts-- (TYP 4)
355
(NP)
AZA 140
X
too-
20x14 SA UP 20x14 RA UP
THROUGH ROOF
ir
r
0.1
----
1.180 0
$18x10
( I...�
9x9
165
f -.
.�I
H -31
1
95
X
T 1 1,...„1 I-
f
8x6
95
,r.
JCp 10x6
---- - - - - -- ,' 165
HP
T
•
•
12x8
11141ItO111lt3
11121 ll.
'UVE
FIRST FLOOR HVAC PLAN
I
I it
IL- -_! T.�. --
1
1 t,
t �
r-
T
IL
0
r
C__ l..iI
120
480
108;
•
f•
a
110
*1'-
�!V
THROUGH ROOF
140
710
120
7
E A1 i1
1 1
2
RH_31
480
:11
r1
Scale: 1/4" =
0 L 1 2 4
SHEEP NOTES:
1. VERIFY EXISTING CONDITIONS IN THE FIELD PRIOR TO
DEMOLITION AND CONSTRUCTION. REPORT ANY
DISCREPANCIES TO THE A/E PRIOR TO PROCEEDING WITH
WORK.
2. BID ALTERNATE 2: BALANCE SUPPLY AIRFLOW AT EACH
DIFFUSER TO 400 CFM AND EACH RETURN AIR GRILLE TO
800 CFM.
FLAG NOTES:
-VIEWED
C O M A C E
ADJUST DIFFUSER FOR INDICATED FLOW PATTERN.
NEW LOCATION FOR TEMPERATURE SENSOR FOR RH -31.
PRIOR TO CONSTRUCTION, OBTAIN AIRFLOW READING FOR
EXISTING GRILLE. AFTER COMPLETION OF CONSTRUCTION,
REBALANCE EXISTING GRILLE TO PRE-CONSTRUCTION
AIRFLOW QUANTITY.
EXISTING CONCRETE BEAM IN CEILING SPACE. CONFIRM
LOCATION IN FIELD AND PROVIDE ALL DUCT FITTINGS
REQUIRED TO ROUTE DUCT UNDER BEAM AND ABOVE
CEILING.
tjof MI
ILDfNG I II!
U
RECEIVED
DEC 15 2010
PERMIT CENTER
CEIV
OCT .++ 010
E► CE i I
N
OKEY PLAN
NOT TO SCALE
NOT TO SCALE
4[
FIRST FLOOR HVAC PLAN
Q
NAC NO 121 -10017
HESNO 10113
DRAWN JMR
CHECKED RKE
DATE 9 -10 -2010
(E) RD (E) RD
0 0
OA LOCATION
(E) VTR
0
(E) COMBUSTION
AIR VENT
(E) RTU
(E) RTU
r
MECHANICAL ROOF PLAN
Scale: 1 /4" = 1' -0"
0
(E) EF
to
(E) EF
(E) GENERATOR
EXHAUST STACK
(E) EF
(E) EF
L
SHEET NOTES:
1. VERIFY EXISTING CONDITIONS IN THE FIELD PRIOR TO
DEMOLITION AND CONSTRUCTION. REPORT ANY
DISCREPANCIES TO THE WE PRIOR TO PROCEEDING WITH
WORK.
FLAG NOTES:
PENETRATION THROUGH ROOF. REFER TO ARCHITECTURAL
DRAWINGS.
FLEXIBLE CONNECTION.
DUCTWORK SUPPORT LOCATION. REFER TO
ARCHITECTURAL DRAWINGS FOR SUPPORT DETAILS.
MOUNT ON ROOF CURB. REFER TO ARCHITECTURAL
DRAWINGS FOR DETAILS.
LOCATE UNIT PER ARCHITECTURAL DRAWINGS AND
STRUCTURAL REQUIREMENTS. PROVIDE OFFSETS IN DUCT
ON ROOF AS REQUIRED TO ALLOW DUCT INSTALLATION
FROM HEAT PUMP TO DUCT PENETRATION THROUGH
ROOF.
EV1E kI ED `r
aid
ofTu l la
DING OM, .. NI
RECEIVED
DEC 15 2010
PERMIT CENTER
OCT
PE' ' c 1TCEN
N
KEY PLAN
NOT TO
SCALE
�1
n
U
MECHANICAL ROOF PLAN co
NAC NO 121-10017
HEINO 10113
DRAWN JMR
CHECKED RKE
DATE 9 -10 -2010
6.1
0
0 I
ce
-
j M
Q°
M O
.. r
O/
(i)
co
0) 0
O O
O
2
N
- Q
G.i a
� • 0
Z
wa
¢w
O Q
I--Z
O J
o.. T.
NOT USED
SCALE: NO SCALE
NOT USED
SCALE: NO SCALE
NOT USED
SCALE: NO SCALE
4 NOT USED
M9.1
SCALE: NO SCALE
BRANCH
DUCT SIZE
6"
70
80
9,►
10"
12"
14"
DIMEJISION
13"
14"
15"
16"
17"
19"
21"
NOTES:
A. CEILING DIFFUSER OR RETURN GRILLE
B. GALVANIZED STEEL DIFFUSER OR GRILLE BOX.
C. SECURE TO DIFFUSER OR GRILLE NECK WITH SHEET
METAL SCREWS, MIN. ONE PER SIDE OR EVERY 90
DEGREES; SEAL AIR TIGHT.
D. DIFFUSER BOX SUPPORT, SUPPORT TO STRUCTURE, 2
PER BOX.
E. EQUALIZING GRID FULL WIDTH OF DIFFUSER NECK.
PERFORATED 20 GA GALVANIZED STEEL WITH .156" HOLES
ON 3/16" STAGGERED CENTERS (63% FREE AREA). TOP
AT HORIZONTAL CENTERLINE OF BRANCH DUCT. BOTTOM
(H) AT 3" BELOW BOTTOM OF BRANCH DUCT. 1/2" HEM
EDGE TOP AND BOTTOM. 3/4" 90' BEND EACH END
AND MINIMUM 3 SPOT WELDS, RIVETS OR SCREWS TO
BOX. EQUAUZING GRID NOT REQUIRED FOR RETURN
GRILLES.
"X"
lEtTa : v
cob A, IA CE
WED
Hid
NOT USED
ity ot f(
MN G i
SCALE: NO SCALE
NOT USED
SCALE: NO SCALE
F. BRANCH DUCT — INSULATED FLEX. SEE BRANCH DUCT
SIZING SCHEDULE FOR BRANCH DUCT RUNOUT SIZE.
G. DUCT COLLAR SECURELY ATTACHED TO BOX.
H. DUCT SUPPORT TO STRUCTURE PER SMACNA HVACDCS
AND AS SPECIFIED.
1. TYPICAL CEILING (TEE —BAR SUSPENDED CEILING SHOWN).
J. LIGHT FIXTURE AS APPUCABLE.
CEILJNG DIFFUSER AND GRILLE INSTALLATION DETAIL
SCALE: NO SCALE
NOTE:
1. CONDENSATE DRAIN PAN SHALL POSITIVELY
SLOPE DOWN TO PIPE OUTLET CONNECTION TO
RESULT IN FREE AND COMPLETE DRAINAGE.
CONDENSATE DRAIN PAN AND
PIPE OUTLET CONNECTION
REMOVABLE CLEANOUT
PLUG OR CAP (TYP) -
6" L OPEN VENT
INVERT (OUTLET)
INVERT
REVERT
z
SP ABOVE
DRAIN PAN,
IN. WG
H,
INCHES
X,
INCHES
Z,
INCHES
—1
2
1
5
—2
3
1.5
6.5
—3
4
2
8
+1
1
2
5
+2
1
3
6
2 "MIN
SP, INCHES W
`— EQUIPMENT
INDIRECT DRAIN PIPING, SIZE
PER CODE OR TO MATCH PAN
CONNECTION SIZE (WHICHEVER
IS LARGER)
TO DISPOSAL POINT WITH
1" AIR GAP
COOLING COIL CONDENSATE DRAIN DETAIL
SCALE: NO SCALE
B.
C.
F OPERATION:
GENERAL:
1. EQUIPMENT:
a. STAND —ALONE PACKAGED SINGLE ZONE AIR CONDITIONING SYSTEM.
b. SYSTEM PROVIDES HEATING, COOLING AND VENTILATION CT SCAN EXAM
ROOM..
c. SYSTEM IS CONSTANT VOLUME
2. SYSTEM IS CONTROLLED THROUGH PACKAGED FACTORY CONTROLS.
SYSTEM START /STOP: SYSTEM IS STARTED AND STOPPED BASED UPON A
PROGRAMMABLE SCHEDULE; INITIALLY SET FOR 24/7 OPERATION.
TEMPERATURE CONTROL: THE UNIT CONTROL PANEL SHALL UTIUZE THE UNIT
ECONIMIZER, AND DX COIL TO MAINTAIN SPACE TEMPERATURE, INITIALLY 75 FOR
COOLING AND 72 FOR HEATING. AN ALARM SHALL BE GENERATED WHENEVER
TEMPERATURE RISES 5F ABOVE SETPOINT.
HP--1: SEOUENCE OF OPERATION
SCALE: NO SCALE
RECEIVED
DEC 15 2010
PERMIT CENTER
CEI : r
OC 2010
PERS C:
43(0
T E CTU RE
u
at
MECHANICAL DETAILS §
NAC NO
HEI NO
DRAWN
CHECKED
DATE
121 -10017
10113
JMR
RKE
9 -10 -2010