Loading...
HomeMy WebLinkAboutPermit M10-049 - DOLLAR TREEDOLLAR TREE 363 STRANDER BL M10 -049 City olkukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206- 431 -3670 Inspection Request Line: 206- 431 -2451 Web site: http: / /www.ci.tukwila.wa.us MECHANICAL PERMIT Parcel No.: 2623049064 Address: 363 STRANDER BL TUKW Project Name: DOLLAR TREE Permit Number: M10 -049 Issue Date: 07/06/2010 Permit Expires On: 01/16/2011 Owner: Name: REGENCY CENTERS LP Address: C/0 PROPERTY TAX DEPT , PO BOX 790830 78279 Contact Person: Name: KEVIN WEARE Address: 4000 DELRIDGE WY SW SUITE 300 , SEATTLE WA 98106 Email: KEVINCDS @COLUMBIA- SENTINEL.COM Contractor: Name: B DAVIS INC Address: 1441 A TERMINAL AV , SAN JOSE CA 95112 Contractor License No: BDAVII*000CP Phone: 206 - 795 -2629 Phone: 408 - 436 -4800 Expiration Date: 01/24/2012 DESCRIPTION OF WORK: REPLACE EXISTING RTU'S AND REMODEL EXISTING DUCT SYSTEM Value of Mechanical: $20,000.00 Fees Collected: $487.06 Type of Fire Protection: SPRINKLERS International Mechanical Code Edition: 2009 Permit Center Authorized Signature: Date: 1121 vV I hereby certify that I have read and e - ed this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied th, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or,e performance of work. I am authorized to sign and obtain this mechanical permit. Signature: � Print Name: 'T i&. ^ This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Date :"7 27 -/.6 doc: IMC -4/10 M10 -049 Printed: 07 -27 -2010 City oftu kwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspectio n Request Line: 206 - 431 -2451 Web site: http: / /www.ci.tukwila.wa.us MECHANICAL PERMIT Parcel No.: 2623049064 Address: 321 STRANDER BL TUKW Project Name: DOLLAR TREE Permit Number: M10 -049 Issue Date: 07/06/2010 Permit Expires On: 01/02/2011 Owner: Name: REGENCY CENTERS LP Address: C/0 PROPERTY TAX DEPT , PO BOX 790830 78279 Contact Person: Name: KEVIN WEARE Address: 4000 DELRIDGE WY SW SUITE 300 , SEATTLE WA 98106 Email: KEVINCDS @COLUMBIA- SENTINEL.COM Contractor: Name: B DAVIS INC Address: 1441 A TERMINAL AV , SAN JOSE CA 95112 Contractor License No: BDAVII *000CP Phone: 206 - 795 -2629 Phone: 408- 436 -4800 Expiration Date: 01/24/2012 DESCRIPTION OF WORK: REPLACE EXISTING RTU'S AND REMODEL EXISTING DUCT SYSTEM Value of Mechanical: $20,000.00 Fees Collected: $487.06 Type of Fire Protection: SPRINKLERS International Mechanical Code Edition: 2009 Permit Center Authorized Signature: -]' � - /) Date: 1 l V I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or e performance of work. I am authorized to sign and obtain this mechanical permit. Signature: Print Name: 16m at, Date:Tb This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IMC -4/10 M10 -049 Printed: 07 -06 -2010 • ;w \q� City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 -431 -3665 Web site: http://www.ci.tukwila.wa.us Parcel No.: 2623049064 Address: 321 STRANDER BL TUKW Suite No: Tenant: DOLLAR TREE PERMIT CONDITIONS Permit Number: M10 -049 Status: ISSUED Applied Date: 04/14/2010 Issue Date: 07/06/2010 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: Readily accessible access to roof mounted equipment is required. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 8: Manufacturers installation instructions shall be available on the job site at the time of inspection. 9: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 10: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 11: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. * *continued on next page ** doc: Cond -10/06 M10 -049 Printed: 07 -06 -2010 • �J�.�► wqs City of Tukwila �l �Z Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. Signature: Print Name: )W l_ ice+ � ,p Date: '7'-'1C:2 l ordinances governing or local laws regulating doc: Cond -10/06 M10 -049 Printed: 07 -06 -2010 a CITY OF TUKWIIIIP Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us • Building Permit No. 1)10- 0 q7 Mechanical Permit No. ",10 - 0 Li q Plumbing/Gas Permit No. -K. 10— 053 Public Works Permit No. Project No. (For office use only) Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION King Co Assessor's Tax No.: Site Address: 321 5 TWA Nib 131-1/D (34` ), 3b Suite Number: Floor: 2.4,23° yc7 40.1 Tenant Name: llc,'11AR- 're-aft- New Tenant: Yes ❑..No Property Owners Name: te&EN'(..'/ GR E Z GJRp Mailing Address: 2.999 OAK PeAD S: i/l i h . 1 o c ''JJr.i .+ l C Peek. a- 94 5q % City State Zip CONTACT PERSON - who do we contact when your permit is ready to be issued Name: k.1 V ilJ 14/6-4 44OG, Day Telephone: 76 {° 195 ZOO 9 Mailing Address: A oot, D e 1--P 10tre 11(11 y S 1 ! 4.'& 3 e6 wA q i'l De City State Zip E -Mail Address: �l V i 13 C o S e CoCarvi i3 :0 '-S P,t.i41 /41 Uln Fax Number: Z0 4 9 2- 3 x 37 9 GENERAL CONTRACTOR INFORMATION — (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: tiNet.) 1iUrJ Mailing Address: City Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: State Zip ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record Company Name: JZRtvI MM1 Arta} 1 '10c.-.1 (D niA A LL! OTT) T Mailing Address: 1311 X Fc Z,4 1i/fr. 15i-V.0 Sti i1? 200 C esApe,okA Z3�z t� City" Contact Person' M E.-NiLl )%SS{� ti/ Day Telephone: 75-7 to ZZ. E -Mail Address: Fax Number: State Zip ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Record Company Name: 3gA -D yOUl4- kA�soG Mailing Address: 1 32.0 1/t), 0244DONI ,2W Contact Person: OA A D >/C t(1J E -Mail Address: H:\ApplicationsTorms- Applications On Line\2009 Applications \I -2009 - Permit Application.doc Revised: 1 -2009 bh 5t,41 e 1 0 1 1 z f✓s d ( 4 S 3`7 1 1 City State Zip Day Telephone: 55 ci Z27_ 91e0 O Fax Number: Page 1 of 6 MECHANICAL PERMIT IN RMATION - 206 - 431 -3670 MECHANICAL CONTRACTOR INFORMATION Company Name: UNI K. I / C i/11 Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Mechanical work (contractor's bid price): $ 10� Q0 Scope of Work (please provide detailed information): 12 6 13 IrA G e (t°) j -r 1A, l S A Ni D r2i m t? o e1L ex ► clr Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New .... ❑ Replacement ....Ea Fuel Type: Electric 111 Gas ....ref Other: Indicate type of mechanical work being installed and the quantity below: Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: 0 -3 HP /100,000 BTU Qty Fumace<100K BTU Air Handling Unit >10,000 CFM Fire Damper Furnace >100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater Ventilation System Wood/Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig/Cooling System Incinerator - Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM Incinerator — Comm/Ind H:Wpplications \Forms - Applications On Line \2009 Applications \1 -2009 - Permit Application.doc Revised: 1 -2009 bh Page 4 of 6 r • PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OW ► ER ! R ORI - ED GENT: Signature: Date: irI4' /D Print Name: Lri/1N is . jz, Day Telephone: Mailing Address: 44600 j;1,.121 D%k. WA)/ Slit/ SitiFte 3L1 d 5;;,4 , W14 SF (to, State Zip City Date Application Accepted: Date Application Expires: w-ML-t Staff Initials: ( /� , � I H:\Applicat ions \Forms - Applications On Line\2009 Applications \1 -2009 - Permit Application.doc Revised: 1 -2009 bh Page 6 of 6 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us Parcel No.: 2623049064 Address: 321 STRANDER BL TUKW Suite No: Applicant: DOLLAR TREE RECEIPT Permit Number: M10 -049 Status: APPROVED Applied Date: 04/14/2010 Issue Date: Receipt No.: R10 -01236 Initials: User ID: Payee: WER 1655 Payment Amount: $402.25 Payment Date: 07/06/2010 09:38 AM Balance: $0.00 B DAVIS INC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 19698 402.25 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts MECHANICAL - NONRES 000.322.102.00.00 402.25 Total: $402.25 PAYMENT RECEIVED doc: Receipt -06 Printed: 07 -06 -2010 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us Parcel No.: 2623049064 Address: 321 STRANDER BL TUKW Suite No: Applicant: DOLLAR TREE RECEIPT Permit Number: M10 -049 Status: PENDING Applied Date: 04/14/2010 Issue Date: Receipt No.: R10 -00635 Initials: User ID: Payee: WER 1655 Payment Amount: $84.81 Payment Date: 04/14/2010 02:38 PM Balance: $339.25 RRMM ARCHITECTS TRANSACTION LIST: Type Method Descriptio Amount Payment Check 19489 84.81 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts PLAN CHECK - NONRES 000.345.830 84.81 Total: $84.81 doc: Receipt -06 Printed: 04 -14 -2010 INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Proj ct: l,,,� UO i l iA! 1 f ee Type of Inspection: � ^I OA 1 Address: Date Called: Special Instructions: Date Wanted: 6 -12-1U p.m. Requester: Phone No: }i,J�Approved per applicable codes. 0 Corrections required prior to approvaj. 6 COMMENTro stoic) v.4. ,,i0. bcva� - ()prewt. -.- ] C2)-- '42c An :-1. 0 I t 1 t 1 A.Ai) I r Inspect Date P — %7 - +v EINSPECTION FEE R QUIRE ' . Prior to inspection, fee must be 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Rece ;• t "o.: Date: INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION R' 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Pro' ct: �dtiJ c�i Type f Inspection: 6�l� `/1 — i K J Address: Date Called: Special Instructions: Date Wanted: — 3 —ta a.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: . = s - s\ /4■/0 b101- Atpid1J -AC t� Date: Q.7 cJ— 3 -1 00 REINSPECTION FEE " EQUIRED. P for to inspection, fee must be at 6300 Southcenter Blv. ., Suite 106 Call to schedule reinspection. Recei , t No.: 'Date: INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Project: Do LLA ✓ `~tee Type of Inspection: 4)._ d` L5 to - ! NJ Address: 32-t Sit t.e.2 8L Date Called: Special Instructions: Date Wanted:. "7- Z D- I U , p.m. Requester: Phone No: ,poG,9 --u(, - 372, ❑ Approved per applicable codes. ❑ Corrections required prior to approval. COMMENTS: COSA(45 =IoW fl /off —oz.- 10_74S)11 I specto REINSPECTION EE*REQU 6300 Southcente Blvd. Su Date: 7- —/&, 0 IRED. Prior to inspection, fee must be at Suite 100. Call to schedule reinspection. Re is' pt No.: Date: 2006 Washington State Nonresidential Energy Code Compliance Form roject Summary PRJ -SUM 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Project Info Project Address Dollar Tree at Southcenter Plaza Date 3/29/2010 301 Strander Blvd. For Building Department Use Tukwila, WA Applicant Name: Dollar Tree Applicant Address: Applicant Phone: FILE COPY Ps rmet No. t'IIOOI9 REVIEWED FOR C�ODE�COMP� A . PROVED i �� r 12 2010 � Tukwila City ofTu . BUILDING DIVISION RECEIVED APR 14 2010 PERMIT CENTER 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical:Summary 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Project Info Project Address Dollar Tree at Southcenter Plaza Date 5/25/2010 301 Strander Blvd. For Building Dept. Use Tukwila, WA Applicant Name: Dollar Tree Applicant Address: Applicant Phone: Project Description Briefly describe mechanical system type and features. ❑ Includes Plans 2 x New 4 Ton Gas Roof Top Units 4 x New 5 Ton Gas Roof Top Units Include documentation requiring compliance with commissi Compliance Option QQ Simple System 0 Complex System Syste (See Decision Flowchart (over) for qualifications. Use separate ME le & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Cooling Equipment Schedule Equip. ID Brand Name' Model No.1 Capacity2 Btu /h Total CFM OSA CFM or Econo? SEER or EER IPLV3 Location RTU-1 CARRIER 48TCDA005 44750 1600 Econo 13.00 - Roof RTU -2 CARRIER 48TCDA006 59950 2000 Econo 13.00 - Roof RTU -3 CARRIER 48TCDA005 44750 1600 Econo 13.00 - Roof RTU -4 CARRIER 48TCDA006 59950 2000 Econo 13.00 - Roof RTU -5 CARRIER 48TCDA006 59950 2000 Econo 13.00 - Roof RTU -6 CARRIER 48TCDA006 59950 2000 Econo 13.00 - Roof Heating Equipment Schedule Equip. ID Brand Name' Model No.1 Capacity2 Btu /h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiency4 RTU -1 CARRIER 48TCDA005 59000 1600 Econo 72000 59000 0.820 RTU -2 CARRIER 48TCDA006 59000 2000 Econo 72000 59000 0.820 RTU -3 CARRIER 48TCDA005 59000 1600 Econo 72000 59000 0.820 RTU-4 CARRIER 48TCDA006 59000 2000 Econo 72000 59000 0.820 RTU -5 CARRIER 48TCDA006 59000 2000 Econo 72000 59000 0.820 RTU -6 CARRIER 48TCDA006 59000 2000 Econo 72000 59000 0.820 Fan Equipment Schedule Equip. ID Brand Name Model No.1 CFM SP' HP /BHP Flow Controls Location of Service EF -1 COOK GEMINI GN -420 275 .25" 0.17 vs Toilet Room i !.3�. �➢ JUN 01 2010 'If available. 2 As tested according to Table 14 -1A through 14 -1G. 3 If required. 4 COP, HSPF, Combustion Efficienncy or A_FU applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). '� 1 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Summary (back):j; System Description See Section 1421 for full description of Simple System qualifications. If Heating /Cooling or Cooling Only: ✓ Constant vol? ✓ Air cooled? 0 Packaged sys? • <20,000 Btuh? Split system? Economizer included? ✓ If Heating Onl y: <5000 cfm? <70% outside air? Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. Heating Only Heating /Cooling or Cooling Only Reference Section 1421 Yes Air Cooled, Constant Vol? <5000 cfm? <70% OSA Yes — Yes* ingle Package Unit? Yes plit Syste <= 84,000 Btuh? Yes Econo ncluded? .ol Ca. <20,000 Btuh? Outd or Adjacent to utdoor Yes Yes "Reference Section 1423/ of Ca <54,000 Btuh? otal Ca . wo economize <240,000 Btuh or 10 %? Simple System Allowed (section 1420) Yes Use Complex Systems (section 1430) Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical' Permit Plan&Checklist MECH -CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Project Address Dollar Tree at Southcenter Plaza Date 3/29/2010 The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, n.a.) Code Section Component Information Required Location on Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 Equipment performance n.a. 1411.4 Pkg. elec. htg.& clg. List heat pumps on schedule - yes 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency MP2 n.a. 1411.1 Combustion htg. Indicate intermittent ignition, flue /draft damper & jacket loss - 1412 HVAC controls yes 1412.1 Temperature zones Indicate locations on plans MP1 yes 1412.2 Deadband control Indicate 5 degree deadband minimum rm3 n.a. 1412.3 Humidity control Indicate humidistat - yes 1412.4 Automatic setback Indicate thermostat with night setback and 7 diff. day types MP3 n.a. 1412.4.1 Dampers Indicate damper location and auto. controls & max. leakage me1 n.a. 1412.4.2 Optimum Start Indicate optimum start controls - n. a. 1412.5 Heat pump control Indicate microprocessor on thermostat schedule - n. a. 1412.6 Combustion htg. Indicate modulating or staged control - yes 1412.7 Balancing Indicate balancing features on plans MP1 1412.8 Ventilation Control Indicate demand control ventilation for high- occupancy areas MP1 n.a. 1422 Thermostat interlock Indicate thermostat interlock on plans - yes 1423 Economizers Equipment schedule MP2 1413 Air economizers yes 1413.1 Air Econo Operation Indicate 100% capability on schedule MP1 n.a. 1413.1 Wtr Econo Operation Indicate 100% capacity at 45 degF db & 40 deg F wb - n. a. 1413.2 Water Econo Doc Indicate clg load & water econoe & clg tower performance - n. a. 1413.3 Integrated operation Indicate capability for partial cooling n.a. 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer - 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary MP3 yes 1414.2 Duct insulation Indicate R -value of insulation on duct MP3 yes 1415.1 Piping insulation Indicate R -value of insulation on piping 1P3 1416 Completion Requirements 1416.2.1 Commissioning Provide commissioning plan - yes 1416.2.2 -3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing 141'3 1416.2.4 Commissioning Indicate O &M manuals, record drawings, staff training - 1416.2.5 Comm. Report Indicate requirements for prelim. & final commissioning report - 1434 Separate air sys. Indicate separate systems on plans - yes Mechanical Summary Form Completed and attached. Equipment schedule with types, input/output, efficiency, cfm, hp, economizer - SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 -1454) 1440 Service water htg. n.a. 1441 Elec. water heater Indicate R -10 insulation under tank - n. a. 1442 Shut -off controls Indicate automatic shut -off - yes 1443 Pipe Insulation Indicate R -value of insulation on piping MP3 n.a. 1452 Heat Pump COP Indicate minimum COP of 4.0 - n. a. 1452 Heater Efficiency Indicate pool heater efficiency - p. a. 1453 Pool heater controls Indicate switch and 65 degree control - n. a. 1454 Pool covers Indicate vapor retardant cover - n.a. 1454 Pools 90+ degrees Indicate R -12 pool cover - no is circiea Tor any question, provide explana ion: 2006 Washington State Nonresidential Energy Code Compliance Form Meclianical Permit Plans Checklist MECH -CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 M,echanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 -1G. If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14 -1G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed In the certification program. Gas -fired and oil -fired forced air furnaces with input ratings > 225,000 Btu /h (65 kW) and all unit heaters shall also have an intermittent ignition or interrupted device (IID), and have either mechanical draft (including power venting) or a flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu /h (65 kW), including electric furnaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1411.4 Packaged Electric Heating and Coo Ing Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20, Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time for a power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off-hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant is sensed for a period of up to 30 minutes. 4. Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon loss of power) dampers. These dampers shall remain closed until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply air caoacities exceedina 10.000 cfm shall have ootimum start controls. Ootimum 1412.8 Ventilation Controls for High- Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following: a An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1436. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 °F dry- bulb /40 °F wet -bulb and below. For this calculation, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 °F dry-bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water - cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246 - 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W.C. or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying with Section 1412.4.1. EF CAE < 50 gal storage 0.58 0.71 50 to 70 gal storage 0.57 0.71 > 70 gal storage 0.55 0.70 1411.4 Packaged Electric Heating and Coo Ing Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20, Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time for a power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off-hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant is sensed for a period of up to 30 minutes. 4. Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon loss of power) dampers. These dampers shall remain closed until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply air caoacities exceedina 10.000 cfm shall have ootimum start controls. Ootimum 1412.8 Ventilation Controls for High- Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following: a An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1436. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 °F dry- bulb /40 °F wet -bulb and below. For this calculation, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 °F dry-bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water - cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246 - 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W.C. or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying with Section 1412.4.1. Uuuew III WC nibs bwiy CUM rovaw UCIVW uw wbi mUiy UI uuuwuyb three or more stones in heb6 Washington State Nonresidential Eher §9nt1 O ®f}I1R111tlequipment, or 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 2. are isolated from the exterior with an automatic shut -off damper complying air opacities exceeding 10,000 cfm shall have optimum start controls. Optimum with Section 1412.4.1. start controls shall be designed to automatically adjust the start time of an HVAC Once outside air ducts meet the above listed requirements, any runs within system each day to bring the space to desired occupied temperature levels conditioned space shall comply with Table 14 -5 requirements. immediately before scheduled occupancy. The control algorithm shall, as a Other ducts and plenums shall be thermally insulated per Table 14 -5. minimum, be a function of the difference between space temperature and occupied Exceptions: setpoint and the amount of time prior to scheduled occupancy. 1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall include 1. Within the HVAC equipment. microprocessor controls that minimize supplemental heat usage during start-up, set- 2. Exhaust air ducts not subject to condensation. up, and defrost conditions. These controls shall anticipate need for heat and use 3. Exposed ductwork within a zone that serves that zone. compression heating as the first stage of heat. Controls shall indicate when 1415 Piping Systems supplemental heating is being used through visual means (e.g., LED indicators). 1415.1 Insulation: Piping shall be thermally insulated in accordance with Table 14 -6. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment Exception: Piping installed within unitary HVAC equipment. with a capacity over 225,000 Btu /h shall have modulating or staged combustion Water pipes outside the conditioned space shall be insulated in accordance with control. 000 Washington State Plumbing Code (WAC 51 -26) EXCEPTIONS: 1 Boilers 2 Radiant heaters 1416 Completion Requirements (Refer to NREC Section 1416 and the Building 1412.7 Balancing: Each air supply outlet or air or water terminal device shall have Commissioning Guidelines, published by the Building Commissioning Association, a means for balancing, including but not limited to, dampers, temperature and for complete text and guidelines for building completion and commissioning pressure test connections and balancing valves. requirements.) • • DUNHAM PI 11_,_ mil DELIVERS. Project Memorandum Date: May 25, 2010 To: Tom Hennessey From: Adam Paulson, Phil Ramsey PROJECT: Dollar Tree- Tukwila, WA Comm. No.: 0410820 -095 Re: Code Comments This Revision to the Drawings and Specifications for the above captioned project supersedes all contrary and /or conflicting information on said plans and specifications, which are hereby amended as follows: REVISIONS TO THE DRAWINGS: This project memorandum provides a brief description of revisions made to the mechanical, electrical and plumbing drawings. Changes to this project are not limited to the items listed on this memorandum. The revised drawings shall be used as well as this document to determine project changes. Failure to utilize both the revised drawings and this document shall not result in a change order to the tenant. SHEETS El & E2 1. Revised power and lighting design near stockroom to reflect new floor plan. SHEET MP1 1. Revised HVAC design near stockroom to reflect new floor plan. REVISION N0:1 Mla o1-19 P:\0410820 -095 Tukwilla, WA101- General15-25 -10 PME- Revision Bulletin.doc RECEIVED JUN 012010 PERMIT CENTER 50 South Sixth Street / Suite 1100 / Minneapolis, Minnesota 55402 -1540 PHONE 612.465.7550 FAX 612.465.7551 WEB dunhameng.com °PE I fg V • PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M10 -049 DATE: 06 -01 -10 PROJECT NAME: DOLLAR TREE SITE ADDRESS: 321 STRANDER BL Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # X Revision # 1 Before Permit Issued DEPARTMENTS: (�( 8 ding ivision Public Works ❑ Fire Prevention Planning Division Structural Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete DUE DATE: 06-03-10 Not Applicable n Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Structural Review Required REVIEWER'S I ITIALS: Please Route No further Review Required DATE: APPROVALS OR CORRECTIONS: DUE DATE: 07 -01 -10 Approved Approved with Conditions Ul Not Approved (attach comments) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 • PLAN • OUTING SLIP ACTIVITY NUMBER: M10 -049 PROJECT NAME: DOLLAR TREE SITE ADDRESS: 321 STRANDER BL X Original Plan Submittal Response to Correction Letter # DATE: 04 -14 -10 Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: ul ding Division AWL Public Works ❑ Aw\ 44- S1&- Fire Prevention 1 Planning Division Structural ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete DUE DATE: 04 -15 -10 Not Applicable n Comments: Permit.Center Use Only . . 1 . INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required nNo further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 05 -13 -10 Approved ❑ Approved with Conditions K Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip_doc 2 -28 -02 • PROJECT NAME: o r Try€ SITE ADDRESS: IA vro4(4- `-q. 1 1 PERMIT NO: MA O' 0 LI 61 ORIGINAL ISSUE DATE: REVISION LOG REVISION NO. DATE RECEIVED STAFF INIT LS ISSUED DATE STAFF INITIALS 1 (p-- I- CO Summary of Revision: Ftoo,. plt.uv, (' IAA vlI 'e) Received by: REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF , INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: City ("Tukwila REVISION S M1VIITTAL Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Web site: http: / /www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 27--'ld Plan Check/Permit Number: PA ❑ Response to Incomplete Letter # ❑ Response to Correction Letter # kRevision # after Permit is Issued CITY ❑ Revision requested by a City Building Inspector or Plans Examiner 'JUL 2 7 2010 QEPNI'r c €►�r~_ Project Name: Project Address: Contact Person: O v■. E.5 Phone Number: 4I6$ - S96— I l (o9 Summary of Revision: Qf' 41'nf fee 44 4C,10/ 57 ��d, 32/ -- .F68 bo\ oz._ 'Te:e Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: J%)" Entered in Permits Plus on H:Wpplications\Forms- Applications On Line\2009 -08 Revision Submittal.doc Created: 8 -13 -2004 Revised: 8 -2009 • City of Tukwila Steven M. Mullet, Mayor Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http : / /www.ci.tukwila.wa.us Steve Lancaster, Director 1 REVISION SUBMITTAL 1 Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: V lAy 28, ZD 10 ❑ Response to Incomplete Letter # • Response to Correction Letter # 1 • Revision # after Permit is Issued 4# APeROVE ❑ Revision requested by a City Building inspector or Plans Examiner Plan ChecWPermit Number: M J 0 ` 04q Project Name: Dollar Tree Project Address: 321 Strander Bl RECEIVED CITY OFTUI(t JUN .012010 PERMIT CENTER Contact Person: KOVI Id EA Phone Number: 204, 7 95 2-6,2€3 Summary of Revision: (5�0-- ITrp.e-N 1%1) va - M WOK G4M4Gre5 To pi-A-146 IN gP5 Ponts.E TO A MPP11=16ATION Of Tub 13w1i, 91hlcr 1741RM6T' g6aU121Ev PSY THE PLQOJIs(1t1(x- 'Deer. Sheet Number(s): M I "Cloud" or highlight a!! areas of revision including date of revision Received at the City of Tukwila Permit Center by: Entered in Permits Plus on ,c07/ / \applications\ forms- applications on line \revision submittal Created: R -13 -2004 Revised: Contractors or Tradespeople *ter Friendly Page • General /Specialty Contractor A business registered as a construction contractor with LEtI to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name B Davis Inc UBI No. 602002349 Phone 4084364800 Status Active Address 1441 A Teminal Ave License No. BDAVII'000CP Suite /Apt. License Type Construction Contractor City San Jose Effective Date 3/24/2000 State Ca Expiration Date 1/24/2012 Zip 951124314 Suspend Date County Out Of State Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Business Owner Information Name Role Effective Date Expiration Date Davis, Bud R &Nbsp; 01/01/1980 Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date CBIC NB4080 11/20/2001 Until Cancelled $12,000.00 11/26/2001 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 11 LIBERTY SURPLUS INS CORP DGLSF184227064 12/31/2009 12/31/2010 $1,000,000.00 01/04/2010 10 LIBERTY SURPLUS INS CORP DGLSF18422705412/31/2008 12/31/2009 $1,000,000.00 03/09/2009 9 LIBERTY SURPLUS INS CORP DGLSF08422705412/31/2008 12/31/2009 $1,000,000.00 01/05/2009 8 LIBERTY SURPLUS INS CO DGLSF184227044 12/12/2005 12/31/2008 $1,000,000.00 01/03/2008 7 LIBERTY SURPLUS INS CORP DGLSF184227014 12/12/2004 12/12/2005 $1,000,000.00 12/10/2004 6 ARCH SPECIALTY INS CO 72DPC145460 12/12/2003 12/12/2004 $1,000,000.0012 /20/2003 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period https://fortress.wa.gov/lni/bbip/Print.aspx 07/06/2010 GENERAL NOTES A) HVAG ROOF CURBS SLOPED TO MATCH ROOF PITCH SHALL BE PROVIDED BY GONTRAGTOR AND ARE NOT PART OF THE NATIONAL ACCOUNT PROVISIONS. B.) CONTRACTOR SHALL IDENTIFY ALL ROOF MOUNTED EQUIPMENT WITH STORE NAME AND UNIT NUMBER USING PERMANENT, WEATHER PROOF 2" HIGH DIE -GUT LETTERS. G.) PROVIDE PROPER CONDENSATE TRAP AND TERMINATE AS REQUIRED BY LOCAL CODE. D.) E.) CONTRACTOR SHALL COMPLY WITH ALL LANDLORD'S TENANT CRITERIA. COORDINATE AND SCHEDULE ALL WORK WITH LANDLORD'S FIFI D REPRESENTATIVE. 5ALANGING OF AIR DEVICES WHERE REQUIRED SHALL BE ACCOMPLISHED BY ADJUSTING BRANCH TAKEOFF DAMPER AT MAIN TRUNK DUCT. DAMPERS IN THE NECKS OF AIR DEVICES SHALL BE USED FOR FINAL TRIM ONLY, AND IN NO CASE FOR GREATER THAN IO% OF THE INDICATED VOLUME FOR THE INDIVIDUAL AIR DEVICE. F.) PROVIDE SUPPORT FOR GAS PIPING ON ROOF PER DETAILS ON SHEET MP -2 AND PER LANDLORDS ROOFING GONTRACTOR'S RECOMMENDATION. G.) ANY PENETRATION THROUGH THE ROOF SHALL BE COORDINATED WITH THE LANDLORD'S FIFI n REPRESENTATIVE AND SHALL BE DONE BY A LANDLORD APPROVED ROOFING CONTRACTOR IN ORDER TO MAINTAIN THE ROOFING WARRANItt. ALL VENTS SHALL EXTEND A MINIMUM OF 12 INCHES ABOVE ROOF AND SHALL BE A MINIMUM OF 10 FEET FROM ANY OUTSIDE AIR INTAKE. H.) DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS. DUCT DIMENSIONS MUST BE INCREASED IF DUGTLINERS ARE INSTALLED. I.) DO NOT PROVIDE AIR EXTRAGTORS OR SPLITTER DAMPERS WHIGH PROTRUDE INTO RECTANGULAR TRUNK DUGTS (WHERE USED). PROVIDE ROUND SPIN -IN FITTINGS FOR ROUND BRANCH DUGTS. J.) ROUND BRANCH DUCTS WHERE INDICATED ARE SAME SIZE AS DIFFUSER WHICH IT SERVES. K.) DO NOT SUSPEND ANY ITEMS FROM DECK OR SLAB ABOVE. ALL ITEMS SHALL SUSPENDED FROM STRUCTURE UNLESS OTHERWISE NOTED. PROVIDE MISCELLANEOUS STEEL AS REQUIRED. L.) WHERE CEILING SPACE 15 NOT SUFFICIENT TO PERMIT TOP CONNECTION TO CEILING DIFFUSER WITH PROPER BEND RADIUS FOR FLEXIBLE DUGT, CONTRACTOR SHALL FABRICATE AND /OR PROVIDE AN ADAHER BOX FOR DIFFUSER TO PERMIT SIDE GONNEGTION OF FLEXIBLE DUCT. M.) FURNISH AND INSTALL SMOKE DUCT DETECTOR (SYSTEM SENSOR #DHIOOAGDGLP) IN RETURN AIR. WIRE SMOKE DUCT DEIIGTOR TO BUILDING FIRE ALARM CONTROL PANEL OR FURNISH AND INSTALL A REMOTE AUDIBLENISUAL ALARM DEVICE WITH A REMOTE TEST SWITCH (SYSTEM SENSOR #SSK451) LOCATED IN AN APPROVED LOCATION. FIELD VERIFY EXACT REQUIREMENTS. GONTRAGTOR SHALL TEST SYSTEM TO INSURE PROPER FUNCTION PRIOR TO TENANT OCCUPYING SPACE. FIRE PROTECTION STANDARDS THE CONTRACTOR SHALL RETAIN AND PAY FOR A "PROFESSIONAL OF RECORD" FOR ALL FIRE SPRINKLER AND FIRE PROTECTION WORK. THE DRAWINGS AND ALL SPECIFICATIONS FOR ALL FIRE PROTECTION WORK ARE PERFORMANCE IN SCOPE AND INTENT. THE GONTRAGTOR SHALL BE RESPONSIBLE FOR ALL DESIGN, LAYOUT, DETAILS, DRAWINGS, DOCUMENTS, MATERIALS, EQUIPMENT, LABOR, AND ALL GRITERIA TO MEET GOVERNING AUTHORITIES, CODES, REGULATIONS, AND UNDERWRITER'S REQUIREMENTS FOR ALL FIRE PROTEGTION WORK. GONTRAGTOR SHALL VISIT THE SITE TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS PRIOR TO SUBMITTING BID. A COMPLETE SET OF ALL REQUIRED DOCUMENTS SHALL BE PREPARED AND SUBMITTED TO THE PROPER AUTHORITIES WITHIN THIRTY (30) DAYS OF CONTRACT AWARD. THE LANDLORD'S DESIGN GRI ItbIA SHALL BE CONSIDERED PART OF THESE STANDARDS. ALL FIRE PROTECTION WORK SHALL BE SCHEDULED IN ADVANCE WITH THE LANDLORD'S FIELD REPRESENTATIVE. FIRE PROTECTION SYSTEM SHALL BE FULLY OPERATIONAL WHEN THE GONTRAGTOR 15 OFF THE SITE. WHERE CEILINGS OR CEILING GRIDS ARE EXISTING TO REMAIN OR NEW CEILINGS ARE INSTAL 1 Fn AND NEN LIGHTING GONFLIGTS WITH THE LOGATION OF EXISTING SPRINKLER HEADS, THE NEW LIGHTING SHALL BE SHIFTED APPROXIMATELY 6" (OR AS REQUIRED TO MAINTAIN CLEARANCE TO SPRINKLER HEADS PER NFPA 13) TO ALLOW THE EXISTING SPRINKLER HEADS TO REMAIN. KEYED NOTES SITE UTILITIES (FIRE, DOMESTIC WATER, SEWER, GAS, STORM) I. CONTRAGTOR SHALL VERIFY POINT OF GONNEGTION TO SITE UTILITY SERVICE PRIOR TO COMMENCING INSTALLATION. 2. CONTRACTOR SHALL ADJUST LOGATION AND DEPTH OF BUILDING SERVICES AS REQUIRED TO GONNEGT TO SITE UTILITY SERVICE. 3. CONTRACTOR SHALL MAKE FINAL GONNEGTION TO SITE UTILITY SERVICE (UNLESS OTHER PROVISIONS HAVE BEEN MADE). 4. CONTRACTOR'S FAILURE TO PROPERLY COORDINATE SERVICES SHALL NOT BE JUSTIFICATION FOR ANY EXTRA CHARGES. TENANT'S CONTRACTOR TO PROVIDE NEW INLINE EXHAUST FAN AS SHOWN. ROUTE S "DIA DUCT UP THRU ROOF TO GOOSENECK. MAINTAIN 10' -0" FROM ALL OUTDOOR AIR INTAKES. TENANTS CONTRACTOR SHALL REMOVE "EXISTING RTU AND INSTALL NEW TENANT PROVIDED RTU. TENANTS GONTRAGTOR'SHALL REPLACE ROOF CURB AS REQUIRED. COVER OPEN END OF RETURN DUGT WITH 1/2" MESH HARDWARE CLOTH IN REMOVABLE METAL FRAME. PROVIDE MANUAL VOLUME DAMPER AND BALANCE TO 100 GFM. COVER OPEN END OF RETURN DUGT WITH 1/2" MESH HARDWARE CLOTH IN REMOVABLE METAL FRAME. PROVIDE MANUAL VOLUME DAMPER AND BALANCE TO 150 GFM. EXTEND 4/8 EXHAUST DUGT DOWN ALONG WALL AND COVER OPEN END OF EXHAUST DUGT WITH 1/2" MESH HARDWARE CLOTH IN REMOVABLE METAL FRAME 48" A.F.F. PROVIDE MANUAL VOLUME DAMPER AND BALANCE TO 15 GFM. GONNEGT SUPPLY AND RETURN AIR DUCTS TO DROPS FROM UNIT WITH TRANSITION FITTINGS. DO NOT "HARD TAP" DROPS FROM UNIT. ADJUST DIFFUSER FOR FULL VERTICAL DISCHARGE INTO OFFICE BELOW. THE TENANTS CONTRACTOR SHALL EXTEND THE SPRINKLER SYSTEM AND PROVIDE DRY PENDANT HEADS IN THE WALK -IN COOLER AND FREEZER SECTIONS PER NFPA 13 REQUIREMENTS. DOVER OPEN END OF RETURN DUGT WITH 1/2" MESH HARDWARE CLOTH IN REMOVABLE METAL FRAME. PROVIDE MANUAL VOLUME DAMPER AND BALANCE TO 1600 GFM. TENANTS CONTRACTOR SHALL INSTALL TENANTS VENDOR PROVIDED G02 SENSOR ON COLUMN AT 6' -0" A.F.F. THIS SENSOR SHALL CONTROL RTU- 2,3,4,5,6. SEE EMS SYSTEM SHEETS FOR MORE INFORMATION. TENANTS CONTRACTOR SHALL INSTALL TENANTS VENDOR PROVIDED G02 SENSOR ON WALL AT 6'-O" A.F.F. THIS SENSOR SHALL CONTROL RTU -I. SEE EMS SYSTEM SHEETS •7 NF 'M • 0 . BLANK -OFF TWO SIDES OF THE DIFFUSER. RETURN AIR TRANSFER DUGT AS HIGH AS POSSIBLE. CONNECT EXISTING GA5 PIPING TO NEW ROOFTOP UNITS. CONTRACTOR SHALL TEST PIPING FOR LEAKAGE/DEFEGTS PRIOR TO GONNEGTION TO NEW ROOFTOP UNITS. CONTRACTOR SHALL VERIFY IF EXISTING PIPING 15 PROPERLY SIZED FOR NEW ROOFTOP UNITS. CONTRACTOR SHALL IMMEDIATELY NOTIFY ENGINEER AND DOLLAR TREE PROJECT MANAGER IF EXISTING PIPING NEEDS REPAIR AND /OR REPLACEMENT. NOTE: REIDENTIFY ALL ROOFTOP EQUIPMENT SERVING THE DOLLAR TREE SPACE WITH THE STORE NAME AND THE EQUIPMENT NUMBER ENGRAVED IN 3" X S" LAMINATED PLASTIC EQUIPMENT TAGS PERMANENTLY ATTACHED TO THE UNITS IN A VISIBLE LOGATION. DO NOT OBSTRUCT ANY HOUSING PANELS, ETG. REQUIRED FOR MAINTENANGE OR REPAIR. FILE COPY AID-, Mal Permit No. Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize 1. violation of any adopted code or ordinance. Receipt r'. approve d�ield Copy and conditions ons is acknowledged: B Date: "Lo-1 D City Of Tukwila BUILDING DIVISION SEPARATE PERMIT REQUIRED FOR: ❑ Mechanical d Electrical (_./Plumbing L� " as Piping City of Tukwila BUILDING DIVISION 0 _ ■��i �f - t•1•i'ij:i ■•�'i ■■•)v.�l ■ice ■1 ��► r ■�i ■■ ■.:,.. ■0.. ,� 1111 1 �, a 500 ' ■•1® ■ ■ ■t J4IiP��li ` a. iimai11 mow J!1-"-r .. ! Ii it I� � 11, ■ ii1■, r;�.7, an.. HVAG /PLUMBING PLAN MECHANICAL RESPONSIBILITY CHART EXISTING AND /OR BY LANDLORD'S CONTRACTOR BY TENANT'S CONTRACTOR PROVIDED BY TENANT FOR TENANT'S CONTRACTOR INSTALLATION SUPPLIED AND INSTALLED BY TENANT'S VENDOR NOT APPL I GABLE COMMENTS HVAG UNITS • MODIFIGATIONS BY TENANT'S CONTRACTOR HVAG ROOF CURBS • CURB ADAPTORS • SPLIT SYSTEM AHU • SPLIT SYSTEM HP /GU • DUGT FURNACE/DUCT HEATER • UNIT HEATER • VESTIBULE HEA I tK • EM5 • REFER TO EM SHEETS - DUCTWORK $ AIR DEVICES • -WATER HEATER • SERVIGE SINK • INCLUDES SINK, GRID DRAIN, FAUGET, MOP HANGER, HOSE $ CLAMP WATER CLOSETS • INCLUDES ADA CLOSET 4 TANK, FLANGE, WAX RING, SUPPLY STOP4 TUBES, ADA SEAT, CLOSET BOLTS 4 GAPS LAVATORIES • INCLUDES LAVATORY, FAUCET, SUPPLY STOPS $ TUBES, WALL HANGER KIT, DRAIN KIT 4 TAILPIEGE DRINKING FOUNTAIN • INCLUDES DRINKING FOUNTAIN, WALL HANGER KIT, SUPPLY STOP 4 TUBE URINAL • INCLUDES URINAL, FLUSH VALVE, WALL HANGER KIT, TOP SPUD 4 TAILPIECE FLOOR DRAINS, GLEANOUTS • GAS PIPING • FIRE PROTEGTION MODIFICATION (512 NOTES) • EXTENSION FROM RISER BY TENANT'S GONTRAGTOR 5 G A L E: I /8" = I'-O" NORTH REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. MECHANICAL LEGEND (Kw) TAG 1 /N0. A -10X10 300 7 LAY -I f 6/6 6/6 6/6 GONNEGTION TO EXISTING SERVICE APPROVED DUGT TYPE SMOKE DETEGTOR EQUIPMENT TAG ADD E TO NO. FOR EXISTING TAG -NECK SIZE AIR DEVICE TAG VOLUME(GFM) TAG -NO. SUPPLY AIR DIFFUSER RETURN/EXHAUST AIR GRILLE GONGENTRIG SUPPLY/REPi:RN AIR DEVICE FIRE DAMPER VOLUME DAMPER PLUMBING FIXTURE TAG NEW SUPPLY, RETURN AND EXHAUST AIR DUCTWORK NEW SUPPLY, RETURN AND EXHAUST AIR DUGT ELBOW UP NEW SUPPLY, RETURN AND EXHAUST AIR DUGT ELBOW DOWN NEW FLEXIBLE DUGT EXISTING SUPPLY, EXHAUST AND RETURN AIR DUCTWORK SUPPLY, EXHAUST AND RETURN AIR DUCTWORK TO BE DEMOLISHED ITEMS DRAWN IN PHANTOM LINETYPE ARE EXISTING TO BE RELOCATED REVIEWED FOR CODE COMPLIANCE AP:MIMED JUN 16 2010 City of Tukwila BUILDING On►icinm REVISIONN1P ij Mio -o�9 NQTE GONIRAGTO>Z DUCTWORK SHALL BE SIZED AND INSTALLED AS INDICATED ON CONTRACT DOCUMENTS. NO CHANGES SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL FROM DOLLAR TREE. FAILURE TO DO 50 SHALL RESULT IN CONTRACTOR REMOVING INSTALL Fr) SYSTEM AND REPLACING WITH NEN AS SHOWN AT NO ADDITIONAL COST TO DOLLAR TREE. NOTE- FtYAG GONTROLSe CONTRACTOR SHALL REFER TO THE EM SHEETS FOR INSTALLATION INSTRUCTIONS FOR THE VENDOR FURNISHED, CONTRACTOR INSTALLED HVAG CONTROL SYSTEM AND TEMPERATURE AND G02 SENSOR LOCATIONS PRIOR TO THE INSTALLATION OF ALL RELATED ITEMS. NOTE: ROOF WORK FLASHING FOR HVAG EQUIPMENT, PLUMBING VENTS, PENETRATIONS, ETG., SHALL BE PER LANDLORD'S ROOFING CONTRACTOR'S REQUIREMENTS TO MAINTAIN ROOF WARRAN I Et. HVAG SYSTEM SHALL BE CONTROLLED BY ENERGY MANAGEMENT SYSTEM. RECEIVED JUN 012010 PERMIT CENTER IF YOU HAVE ANY QUESTIONS REGARDING THE MECHANICAL FLANS, PLEASE GALL THE MECHAN I GAL DESIGNER. DESIGNER: PHONE /FAX: E -MAIL : PHIL RAMSEY 612 -465- 7682/612- 465 -7782 phi I.romsey @dunhameng.Gom Dunham Associates, Inc. 50 South Sixth Street / Suite 1100 Minneapolis, Minnesota 55402 -1540 Fax 612.465.7551 P14ONe 612.465.7550 dunhameng.com 3 mechanical + electrical consulting engineering N Z W c 0 2 U +, W �L 0 0 0 QQ)) U -v 0 In O 0 0 (1) a) O N 0 1 0 0 410820 -0q5 1 0 a) O 0 lY 0 O cn N 0 0 1 z a) 0 C) 0 RRMM ARCHITECTS, PC 1317 Executive Blvd, Suite 200 Chesapeake, VA 23320 (757)622-2828 1 fax (757)622 -6883 sheet MCI WI- I I� \ / L- V _ MS -1 WASTE AND VENT FLOOR PLAN 5GALE : I/4" = I' -0" LAV OR SINK, RE: PLANS - ZURN MODEL ZI021 "PRIME -F7F" WATER SAVER TRAP PRIMER, OR EQUAL F.D., RE: PLAN G.O. FINISHED 1/2 COMPRESSION — FLOOR FITTING / /) / / / / / / / / / /// TRAP PRIMER DETAIL NOT TO SCALE SUPPORT FROM STRUCTURE WITH 1/4" THREADED ROD OR I" WIDE 22 GAUGE STRAP I" NIDE 22 GAUGE HANGER BAND MAX 12-0" SPACING -\ SEAL ALL AROUND WITH ELASTOMER GASKET FINISHED WALL ESCUTCHEON 1/2" SOFT "K" COPPER NOTE: MATERIALS AND INSTALLATION SHALL BE PER SMACNA STANDARDS VOLUME DAMPER 12" MIN. 26 GAUGE, ROUND SPIRAL SEAM DUCT. SEE DWG'S. FOR SIZES. SHEET METAL BOOT TO MATCH DUCT SUPPLY DIFFUSER. 511 SCHEDULE SPIRAL DUCT AND DIFFUSER DETAIL NOT TO SGALE ROUND DUGT SPECIFICATIONS EXPOSED ROUND DUCTWORK SHALL BE 26 GAUGE, SINGLE WALL GALVANIZED STFFI , SPIRAL LOCKSEAM. FITTINGS SHALL BE SINGLE WALL GALVANIZED STEEL, STANDING SEAM OR SOLID WELDED GONSTRUGTION. ELBOWS SHALL BE STANDING SEAM, GORED ELBOWS. GRILLE COLLARS SHALL BE ATTAGHED TO THE DUCTWORK WITH POP RIVETS WITH A FINISHING FILLET OF ELASTOMER SEAL AT THE JUNCTION OF THE COLLAR TO THE DUCT. DUCT -TO -DUCT JOINTS SHALL BE MADE WITH THE SPIRAL SEAM ROTATED 50 THAT THE STANDING SEAM FORMS A CONTINUOUS HELICAL PATTERN AGROSS THE JOINT. ALL DUCTWORK AND FITTINGS SHALL BE MANUFACTURED IN AGGORDANGE WITH SMAGNA'S HVAG DUCT CONSTRUCTION STANDARDS LATEST EDITION. GONTRAGTOR SHALL LOCATE BOTTOM OF STOCKROOM DUCTWORK 12-0" ABOVE STOGK ROOM FLOOR. ANY DEVIATION FROM THIS DIMENSION DUE TO INTERFERENCE WITH BUILDING OBSTRUCTIONS SUCH AS STRUCTURE, OVERHEAD DOORS, ETC. SHALL BE BROUGHT TO THE AI ILNTION OF THE ENGINEER PRIOR TO FABRIGATING THE DUCTWORK. WH -I WG -1 LAV -I I\ I I/1 I\ / v J n 7\ ill LAV -I SCI DOMESTIC WATER FLOOR PLAN / / / / / / / / / / / / /// SCALE: 1/4 " =1' -0" NOTE: SET TEMPERED WATER TEMPERATURE TO 110 DEG F MAX. PROVIDE AT EACH LAVATORY THERMAL MIXING VALVE DETAIL NOT TO 5G ALE TO 5GALE PLUG FOR GLEANOUT 6 6 PROVIDE TRAP VENT WHERE REQUIRED BY CODE ROOFTOP UNIT STAY GLEAR OF ACCESS PANELS /SERVICE AGGE55 VACUUM RELIEF VALVE WATTS 36A HEAT TRAP TYPICAL 3/4" PITCH WITH ROOF SLOPE PIPE SUPPORT ADJUST AS REQUIRED FOR PERPENDICULAR LINE ROOFTOP UNIT CONDENSATE PIPING DETAIL NOT TO SGALE DIF1 FGTRIG UNION 4"1^1G0 -c\v 4 ir N MS-1 I WG -I NOTES: I. PROVIDE TRAP PRIMERS AT ALL FLOOR DRAINS. 2. PROVIDE MIXING VALVES AT ALL LAVATORIES. LAV- I� LAV -I DF -I WG -1 FD -I g„ 4 "EGO WASTE AND VENT RISER DIAGRAM NOTE: SET TEMP. @ 120 DEG F NOTE: MOUNT WATER HEATER ON FLOOR. SCALE: N.T.S. T P RELIEF VALVE (FACTORY INSTALLED) WITH FULL SIZE DRAIN LINE DOWN TIGHT TO WALL. TERMINATE OVER 6" MOP SINK. WATER HEATER DETAIL NOT TO SCALE PLUGGED I /8" NPT TEST GAUGE CONNECTION CONNECT TO UNIT GAS CONTROLS WITH GROUND JOINT UNION PROVIDE GROMMET FOR WATER -TIGHT SEAL TERMINATE AS REQUIRED BY LOCAL CODE co PROVIDE GAS PRESSURE REGULATOR WHERE REQUIRED SEE SCHEDULE GROUND JOINT UNION GAS COCK WITH PLUGGED 1 /S" NPT TEST GAUGE CONNECTION ROOFTOP UNIT GAS PIPING - RUN ON ROOF .0 TYP. MECH. PIPE ROOF pr PIPESTAND OR CODE APPROVED TREATED TIMBER GAS PIPE ADJUSTMENT AT ROOF OBSTRUCTIONS TYPICAL NOTE: COORDINATE PIPING SUPPORTS WITH LANDLORDS ROOFING CONTRACTOR. NOTE: CONTRACTOR SHALL VERIFY ALL MECHANICAL GAS FIRED EQUIPMENT GONNEGTION LOCATIONS IN THE FIFI D PRIOR TO INSTALLING ANY GAS PIPE MAINS OR BRANCHES. ROOFTOP UNIT GAS PIPING DETAIL NOT TO SCALE I0 3/4" LDF-I DOMESTIC WATER RISER DIAGRAM SCALE: N.T.S. ROOFTOP UNIT SCHEDULE (gas heat /elec. cool) PROVIDED BY DOLLAR TREE FOR INSTALLATION BY CONTRACTOR MARK MFG/MODEL DISCHARGE TONS ESP GFM OUTSIDE AIR GFM (MIN.) OUTSIDE AIR GFM (MAX.) ENTERING AIR CONDITIONS NET COOLING CAPACITY (MBH) AR! SEER HEATING CAPACITY AFUE % ELEGTRIGAL MCA/ MOGP AGGE550RIE5 UNIT WEIGHT (LB5) TOTAL SENSIBLE INPUT OUTPUT VOLT / PH / HZ BTU -I CARRIER 48TGDA05 VERTIGAL 4 .5 1600 250 250 162F DB 62.4E WB ®110F AMBIENT 4415 3521 13.0 -12.0 511.0 82 460V / 3/ 60 10.1/15 I, 2, 3, 4, 5. 550 RTU -2 CARRIER 45TGDA06 VERTICAL 5 .5 2000 1110 400 11•SF DB 63.8E NB ®110F AMBIENT 511115 48.81 13.0 12.0 511.0 82 460V / 3/ W 13/20 1, 2, 3, 4, 5, 6 625 RTU -3 CARRIER 48TGDA05 C 4 5 1600 140 300 16.2F 162E DA 62.4E WB ®110F AMBIENT 4415 3521 13.0 12.0 511.0 S2 460V / 3/ 60 10.-1/15 I, 2, 3, 4, 5. 550 RTU-4 CARRIER 48TGDA06 VERTICAL 5 5 2000 1110 400 11.SF DB 63.8F NB ®110F AMBIENT 511115 48.81 13.0 12.0 511.0 82 460V / 3/ 60 13/20 I, 2, 3, 4, 5, 6 625 RT.0 -5 CARRIER 48TGDA06 VERTICAL 5 5 2000 1110 400 T1.SF DB 63.5E WB ®110F AMBIENT 511115 48.81 13.0 12.0 511.0 82 460V / 3/ 60 13/20 I, 2, 3, 4, 5, 6 625 RTU -6 GABBIER 48TGDA06 VERTICAL 5 .5 2000 1110 400 11•8F DB 63.8E NB ®110F AMBIENT 511115 48.81 13.0 12.0 511.0 S2 460V / 3/ 60 13/20 I, 2, 3, 4, 5, 6 625 ACCESSORY OPTIONS: I) INTEGRATED DIFFERENTIAL ENTHALPY EGONOMIZER 2) GRAVITY RELIEF DAMPER, 3) FACTORY MOUNTED, FIELD WIRED CONVENIENCE OUTLET, 4) UNIT MOUNTED DISCONNECT, 5) FIFI D INSTALLED LOUVERED COIL HAIL GUARDS, 6) MEDIUM STATIC DRIVE tigara I. GONTRAGTOR SHALL BE RESPONSIBLE FOR ALL STARTUP AND WARRANTY WORK. VERIFY FI FGTRIGAL POWER PRIOR TO INSTALLING UNITS. FAILURE TO DO 50 SHALL RESULT IN GONTRAGTOR FURNISHING GORREGT UNITS OR POWER AT NO ADDITIONAL GOST TO DOLLAR TREE. OUT SIDE AIR QUANTITIES BASED ON ASHRAE 110.1 -2004 BUILDING AND PEOPLE COMPONENTS FOR AN ENGINEERED VENTILATION SYSTEM EMPLOYING A G02 MONITORING SYSTEM. 2. CARRIER SERIES 48HJ GAS FIRED RTU'S WITH R22 REFRIGERANT ARE APPROVED EQUALS UNTIL THEY ARE NO LONGER AVAILABLE FROM THE MANUFACTURER 3. SLOPED ROOF CURB PROVIDED BY G.G. KEYED NOTES PROVIDE NEW 4" VENT THRU ROOF. COORDINATE ROOF PENETRATION REQUIREMENTS WITH LANDLORD'S ROOFING GONTRAGTOR EXTEND NEW 4" SANITARY SEWER TO EXISTING MIN. 4" SANITARY APPROX. 10'-0" AWAY. FIELD VERIFY EXACT LOCATION, SIZE, AND INVERT ELEVATION OF GONNEGTION POINT PRIOR TO START OF ANY WORK. EXTEND I" DOMESTIG WATER TO EXISTING 2" WATER. PROVIDE SHUT -OFF, BAGKFLOW PREVENTER, PRESSURE REGULATING VALVE, METER, AND REMOTE READER IF REQUIRED BY UTILITY COMPANY. INSULATE ENTIRE LINE WITHIN BUILDING. FIELD VERIFY EXAGT LOCATION OF EXISTING DOMESTIC WATER PRIOR TO INSTALLING ANY PIPING. GONTRAGTOR SHALL OBTAIN A COPY OF ALL PLUMBING FIXTURE SPECIFICATION SHEETS PRIOR TO INSTALLATION. CONTRACTOR SHALL ROUGH IN ALL PLUMBING BASED ON THE FIXTURE SPEGIFIGATION SHEET. LAV -I PLUMBING LEGEND: CONNECTION TO EXISTING SERVICE TAG -NO. PLUMBING FIXTURE TAG GOLD WATER PIPING HOT WATER PIPING SANITARY WASTE PIPING VENT PIPING — REVIEWED FOR CODE COMPLIANCE APPROVE JUN 16 2010 City of Tukwila BUILDING nil/1 m GRILLE, REGISTER 4 DIFFUSER SCHEDULE MARK MFGR. MODEL MATERIAL DEZVEIGE SI MOUNTING TYPE A TITUS TMSA 511:±L 24" X 24" LAY -IN SUPPLY B TITUS TM5 SIttL 24" X 24" LAY -IN SUPPLY G TITUS 30085 STEEL AS SHOWN SURFACE SUPPLY D TITUS 50F ALUMINUM 24" X 24" LAY -IN RETURN E TITUS 50F ALUMINUM 24" X 12" LAY -IN RETURN F TITUS 350RL STFFI 10" X 10" SURFACE EXHAUST FIXTURE GONNEGTIONS EXHAUST FAN SCHEDULE MARK MFG/MODEL GFM RPM ESP IN.-W.G. BHP FL FGTRIGAL ACCESSORIES VOLT / PH / HZ EF -I GOOK GEMINI GN-420 215 1015 .20 1511 120V / IPH / 60 I, 2, 3 ACCESSORY OPTIONS: I. VIBRATION ISOLATION MOUNT KIT 2. BAGKDRAFT DAMPER 3. PLUG DISGONNEGT NOTE: FAN SHALL BE INTERLOCKED WITH MOTION SENSOR. PLUMBING FIXTURE SCHEDULE PROVIDED AND INSTALLED BY CONTRACTOR MARK FIXTURE TYPE MANUFACTURER $ MODEL NO. FIXTURE GONNEGTIONS REMARKS GIN HW W V FD -I FLOOR DRAIN ZURN MODEL #Z -415 3. 2 . TYPE BODY'A55EMBLYE�WI TRAIP PRIMER GONNEGTION. FGO -I FLOOR GLEANOUT ZURN MODEL 4t1454 - -- -- — -- SIZE PER PIPING LATERAL, 4" MAX. WGO -I WALL GLEANOUT ZURN MODEL #Z -1446 GIN -- — 4 " -- RAISED HEADPLUG POLISH 5.5. COVER 4 VANDAL PROOF SCREW TMV -I MIXING VALVE WATTS MODEL NO. USG -B 3/S" 3 /S" - -- --- 3/8" TEMPERED OUTLET 25 GPM, MAX OUTLET TEMP. I TOY F IN AGGOR6ANCE WITH ANSI/ASH 1016 OR 1011/ASH 1066. PLUMBING FIXTURE SCHEDULE PROVIDED BY DOLLAR TREE'S VENDOR FOR INSTALLATION BY CONTRACTOR MARK FIXTURE TYPE MANUFACTURER I $ MODEL NO. FIXTURE GONNEGTIONS REMARKS GIN HW W V WG -I HANDICAP WATER CLOSET ZURN MODEL Z5560 11" H ELONGATED PRESSURE ASSIST 1.6 G.P.F. SIPHON JET 1/2" -- 3" 2" C FURNISH ADA CLOSET d TANK, ADA SEAT, FLOOR FLANGE, CLOSET CLOSET BOLTS $ GAPS, WAX RING, SUPPLY STOP 4 TUBE. FLUSH GONTROL MUST BE LOCATED ON THE WIDE SIDE OF TI-E WG (SIDE OPPOSITE THE WALL). LAV -I HANDICAP WALLHUNG LAVATORY. ZURN MODEL NO. 25340 FAUCET HOLES ON 4" CENTERS 1/2" 1/2" 11/2" 11/2° FURNISH LAVATORY, ZURN ZSI2A4 GOOSE HTUBES, HANGER KIT, SUPPLY STOPS DRAIN KIT 4 TAILPIECE DF -I BI -LEVEL HANDICAP DRINKING FOUNTAIN ELKAY MODEL No. EMABFTLPI2C NON- REFRIGERATED I/2" -- 1 I/2" I I/2° FURNISH STANDARD CABINET FINISH FOUNTAIN, SUPPLY STOP 8 TUBE, DRAIN KIT, AND WALL HANGER KIT M5-I FLOOR MID. MOP SINK ZURN MODEL ZI11116 -36 3/4" 3/4" 3" 2" FURNISH SINK, ZURN MODEL NO. Z843MI SERVICE SINK FAUCET WITH BUILT -IN VAGWM BREAKER, HOSE AND BRACKET, MOP HANGER, AND DRAIN KIT WH -I FI FGTRIG WATER HEATER RHEEM MODEL NO. SIVP65 3/4" 3/4" -- - -- FURNISH 6 GALLON WATER HEATER, 120V /Iph 2,000N WITH ASME RATED T$P RELIEF VALVE AND INTEGRAL HEAT TRAPS. TP -I TRAP PRIMER MODEL NO. ZI021 A WA TER SAVER TRAP PRIMER 1/2" ___ I I/2" -- SEE DETAIL THIS SHEET INSTALL ALL PLUMBING FIXTURES TO BE FULLY ACCESSIBLE TO INDIVIDUALS WITH DISABILITIES IN AGGORDANGE WITH LATEST ISSUE OF THE AMERICANS WITH DISABILITIES AGT AND ALL CURRENT STATE AND LOCAL GODES. - 'PROVIDING ACCESSIBILITY AND USABILITY FOR PHYSICALLY HANDICAPPED PEOPLE' AND/OR Gr FIXTURES EQUIPMENT, TRIM, $ FITTINGS ,IREGULATIOS AND GODES, INCLUDING, BUT NOT L PLUMBING ITEDTO, WATER AND ENERGY CONSERVATION ODES. THE SCHEDULED AND/OR SPECIFIED PLUMBI ECEIVED FIXTURES AND EQUIPMENT REPRESENT THE MINIMUM CRITERIA AND SHALL BE THE BASIS FOR TI-E CONTRACTOR'S BASE BID. IF THE SCHEDULED OR SPECIFIED FIXTURE5 OR EQUIPMENT DO NOT COMPLY WITH GOVERNING GODES OR REGULATIONS IN ALL RESPECTS, THE GONTRAGTOR SHALL PROVIDE JUN 01 2010 AN ALTERNATE BID FOR COMPLYING FIXTURES, EQUIPMENT, TRIM, OR FITTINGS. THE ABSENCE OF AN ALTERNATE BID SHALL BE CONSTRUED TO MEAN THAT THE GONTRAGTOR'S BID INCLUDES ALL COSTS NECESSARY TO MEET ALL REGULATIONS 4 GODES. PERMIT CENTER ALL PIPING AND VALVES BELOW LAVATORY SHALL BE INSULATED WITH PVG LAV GUARDS AND CONFIGURED TO PROTEGT AGAINST GONTAGT PROVIDED WITH LAV KIT. THERE SHALL BE NO SHARP OR ABRASIVE SURFACES UNDER LAVATORY. NOTE: ROOF WORK FLASHING FOR HVAG EQUIPMENT, PLUMBING VENTS, PENETRATIONS, ETC., SHALL BE PER LANDLORD'S ROOFING CONTRACTOR'S REQUIREMENTS TO MAINTAIN ROOF WARRANTEE. Dunham Associates, Inc. 50 South Sixth Street / Suite 1100 Minneapolis, Minnesota 55402 -1540 FAX 612.465.7551 PHONE 612.465.7550 dunhameng.com mechanical + electrical consulting engineering 0_ >, < CY D 0 0 N D -D 410820 -0q5 I1 0 0 0 tY Q 0 Cr) 0 0 -D 0 0 N 0 RRMM ARCHITECTS, PC 1317 Executive Blvd, Suite 200 Chesapeake, VA 23320 (757)622-2828 1 fax (757)622 -6883 sheet MP2 GENERAL MECHANICAL CONDITIONS Dollar Tree shall furnish selected mechanical equipment, accessories and controls as scheduled and as specified. The mechanical subcontractor(s) shall be responsible for delivery coordination, receiving, storing, setting, startup and installing all Dollar Tree furnished equipment as well as the one year parts and labor warrantee from the date of store opening. A. SCOPE 1. Provide all labor, materials and equipment necessary to properly install air conditioning systems where shown on Drawings and as scheduled. 2. Provide equipment as specified together with all necessary ducts, grilles, registers, controls, piping, low voltage fans, control wiring, hangers, stands, equipment supports, flashing at equipment, duct and pipe insulation, unless otherwise noted. 3. Related Work by Others: a. Painting except as herein specified. b. Line voltage wiring and conduit. c. Electrical supply connection to equipment. B. All work shall conform to all federal, state and local codes and any landlord requirements as specified in the executed Lease Agreement. Mechanical Contractor shall verify and coordinate scope of work with Dollar Tree and landlord. G. The Contractor shall examine the premises and verify the existing conditions under which he will be obligated to operate in performing his part of the work or that will in any manner affect the work under contract. No additional compensation shall provided for conditions found during the execution of contracted work. The Contractor shall cooperate with the all other trades so that the installation of all equipment may be properly coordinated. Gontractor shall bring to the attention of the Construction Manager any discrepancies between field conditions and design documents. 12 All equipment furnished shall fit the space available, with connections, etc., in the required locations and with adequate space for operating and servicing. Should a conflict exist between the drawings and the specifications, the Gontractor shall promptly notify the Construction Manager whose decision shall be final. No allowance will be made subsequently in this connection to behalf of the Gontractor after award of the contract. E. All mechanical equipment shall conform with the requirements of the State Mechanical Code, the State Building Code, the State Energy Gode, NFPA aOA, x6.101 and all applicable local codes and ordinances. F. Drawings for Mechanical work are diagrammatic showing the general location, type, layout and equipment required. The drawings shall not be scaled for exact measurements. Refer to manufacturer's standard installation drawings for equipment connections and installation requirements as required. Furnish and install ductwork, connections, accessories, offsets and materials necessary to facilitate the system's functioning as indicated by the design and the equipment indicated. Gontractor shall obtain all necessary permits and pay any associated fees. G. The Gontractor shall install all piping, ductwork, fixtures and equipment as required to conform the structure, avoid obstructions, preserve ceiling heights and headroom and make all equipment requiring maintenance or repair accessible. H. The Contractor shall install Mechanical systems as shown, noted and specified. Equipment may not be substituted unless written approval by the Architect, Engineer, or Dollar Tree's Representative is obtained. Any unauthorized changes shall be removed contractor's expense if deemed necessary by Architect, Engineer, or Dollar Tree's Representative. Contractor shall be responsible for any required changes to related work caused by the substitution of any items of materials or equipment at no additional cost to the owner. HVAG UNITS ROOFTOP AIR CONDITIONING UNITS (DOLLAR TREE FURNI5HEP EQUIPMENT) A. Gontractor shall coordinate the delivery, receiving, storage, rigging, hoisting, installation and start up of Dollar Tree furnished roof top heating and cooling units including all accessories 05 scheduled and as indicated on the drawings. B. HVAG units shall be furnished complete with casing, refrigeration system, heating section (as scheduled on drawings), fans, motors and drives, filters, automatic controls, and options and accessories as scheduled on drawings. G. Temperature controls. I. HVAG units shall be furnished with factory installed and tested components to provide two stages of cooling, two stages of heating (where applicable), anti- recycle timer, five (5) minute compressor staging relay, and other items as scheduled on drawings. D. SEQUENCE OF CONTROL (ROOF TOP UNIT) I. Occupied hours. a. Unit outdoor air damper shall open to its minimum position and unit supply an shall operate continuously. b. Unit outdoor air damper shall modulate from its minimum scheduled position to its maximum scheduled position in response to space mounted G02 sensor (by others) set at 1,000 ppm. c. Unit compressor(s) shall cycle or heat exchanger shall stage to maintain space setpoint. d. Unit economizer cycle shall be initiated upon a signal from out door and return air temperature and enthalpy sensors. Outdoor air damper, return air damper, and unit compressor(s) shall cycle to maintain space setpoint. Economizer cycle shall over ride G02 monitoring system. 2. Unoccupied hours. a. Unit outdoor air damper shall remain closed and unit supply fan shall cycle on a signal from space sensor. b. Unit compressor(s) shall cycle or heat exchanger shall stage with unit supply an to maintain space setpoint. 3. Smoke Alarm (When Required) a.Unit outdoor air damper shall close and unit supply fan shall stop on a signal from duct smoke detector. duct smoke detector shall send a signal to remote alarm device. GRILLES, REGISTERS, AND DIFFUSERS A. The Contractor shall provide grilles, registers, and diffusers where indicated and as scheduled on the drawings. B. Grilles, registers, and diffusers shall be provided with opposed blade volume dampers. G. Grilles, registers, and diffusers shall be provided with frame types to match the surface into which they will be installed. D. Grilles, registers, and diffusers shall be provided with factory applied white finish. E. Design is based on products manufactured by Titus. Products of equivalent performance, construction, and appearance may be supplied. EXHAUST FANS A. The Contractor shall provide exhaust fans where indicated and as scheduled on the drawings. B. Inline exhaust fans shall be furnished with vibration isolating hangars and all related hardware. G. All exhaust fans shall be furnished with back draft damper, insect screen, motor and drive, and options and accessories as scheduled on drawings. DUCTWORK A. All ductwork shall be constructed of galvanized steel sheet metal and be fabricated according to the latest edition of the SMAGNA HVAG Duct Construction Standards for metal and flexible ductwork. B. All elbows shall have proper radius or contractor shall provide turning vanes as required by SMAGNA duct construction manual. G. All duct connections to equipment shall be loaded type vinyl, vibration elimination connections, (FG) flexible connections. D. Flex duct: Provide factory assembled Glass I air duct (UL 181) with fiberglass insulation and reinforced outer protective cover /vapor barrier. Flex duct shall meet NFPA QOA with flame spread under 25, smoke developed under 50, and shall be rated for 1" W.G. pressure and 0 to 250 degree temperature. Maximum length shall be 5' -0 ". Minimum center line bend radius shall be 1 I/2 duct diameters. Vapor barrier shall be sealed at each end after connection to duct and air device. E. All new supply and return ductwork shall be insulated. NO EXCEPTIONS. Insulate with external duct wrap or with shop applied duct liner. Duct wrap shall be foil reinforced kraft facing. All insulation shall meet NFPA G0A flame spread under 25 and smoke developed under 50. Thickness, density and "R" value shall be per code. Insulation shall be fastened to ductwork per manufacturer's instructions and SMAGNA standards. Round branch ductwork shall be insulated with 1" thick fiberglass sleeve with foil jacket and all joints and terminations sealed with foil duct tape. EXECUTION A. All ductwork transitions shall be (FOT) "Flat on Top" unless otherwise specified on plan. All duct dimensions listed are inner air stream dimensions. B. All ductwork shall be routed above the suspended ceiling space unless otherwise noted on the plans. All ductwork shall be suspended according to the latest edition of the SMAGNA HVAG Duct Construction Standards for metal and flexible ductwork. G. All outside air intakes shall be a minimum of 10' -0" away from exhaust discharge openings and plumbing vent stacks. D. Provide UL approved fire dampers for all penetrations through fire rated walls, partitions, ceilings, and floors. Install fire dampers as per manufacturer's directions and as per UL guidelines. E. Provide round spin -in fittings with locking volume damper for every inlet and outlet attachment to the main trunk duct whether shown on the plans or not. Provide additional locking volume dampers at all secondary branch takeoffs from ductwork mains and as indicated on plans. Provide inspection access panels In ducts at all fire dampers. F. Supply, return and positive pressure exhaust ductwork shall be sealed in accordance with SMAGNA Seal Glass G. G. Gore -drill or saw -cut existing walls, roof, etc. as required for piping or ductwork and fire -stop opening around pipe or ductwork. Verify location of structural beams, joists, etc. before drilling or cutting. Notify architect of any discrepancies. H. Wherever foundation walls, outside walls, roofs, etc. are cut for installation of systems, they shall be patched to match existing construction and sealed weather tight. Work shall be performed by craftsmen skilled in their respective trades. 1. Provide 3 sets of pleated disposable filters. One set to be used until completion of construction phase. Install one set at completion of construction phase and deliver one set to owner and label each set of filters to denote their respective HVAG units. J. Provide two Operation and Maintenance Manuals bound in 8 -1/2" x 11" page binders, titled "Operation And Maintenance Manual ". Subdivide binder contents with page dividers by system and equipment. Include all shop drawings, and warranties. Submission of these documents shall be a requirement for final payment. TESTING, ADJUSTING AND BALANCING A. Gontractor shall procure the services of an independant NEBB or AABC certified air balance and testing agency to balance, adjust and test hvac equipment and duct systems. B. Work shall be performed after the complete Installation and startup of all equipment, duct systems and temperature and energy management controls and completed priot to turnover for the start of stocking. G. Gontractor shall submit signed and sealed balance and testing agencie's report to contractor for submittal to Dollar Tree project manager for review. D. Balancing of air devices shall be accomplished by adjusting branch takeoff damper at main trunk duct. Dampers in the necks of air devices shall be used for final trim only and in no case for greater than 10% if the indicated volume for the individual air device. E. Where existing duct 15 to be reused, contractor shall provide and install new manual dampers with locking quadrante in the runout duct at the connection to the trunk duct as required for the completion of balancing. F. The independant NEBB or AABG certified balance and testing angency shall also inspect the completed and operational HVAG equipment, duct systems and and temperature and energy management controls proir to turnover of the store for the start of stocking. Balance and test contractor shall submit the completed Dollar Tree HVAG field inspection report to the contractor for submittal to Dollar Tree project manager for review. GENERAL PLUMBING CONDITIONS A. SGOPE 1. Provide all labor, materials, tools and equipment necessary to complete the work, including installation of plumbing piping and fixtures. All materials shall be new and be installed in a workmanlike manner in accordance with the drawings and specifications. 2. Provide excavation and back fill of all trenches incidental to the plumbing work as shown on the drawings. Back fill shall compacted to QO%. 3. Provide all backing, supports and carriers for fixtures. 4. Provide all cutting and patching of the con- struction work, rough finish and trim, which may be required for the Installation of equipment. All patching shall match all surrounding work. 5. Contractor shall make all plumbing and piping connections to equipment specified to be furnished by Owner or under other sections of the specifications including final connections to air conditioning and heating equipment. 6. Contractor shall provide sufficient approved water hammer arrestors (Wade "SHOCK STOP ", or equivalent) to prevent water hammer. 7. Contractor shall thoroughly clean all fixtures, equipment and piping after installation. 8. Contractor shall provide approved access doors in framed holes for all valves, traps which must be located in inaccessible locations. a. Gontractor shall provide cutout data for all sinks and lavatories to all other related trades. 10. Contractor shall obtain and pay for all required permits, inspections and certificates in connection with the his work and make all arrangements with utility companies for service and connections and pay all fees, charges permits and meter charges. MATERIALS A. DRAIN, WASTE AND VENT 1. Service weight, cast iron bell and spigot pipe and fittings. No -hub service weight pipe and fittings may be used above grade when permitted by local code. 2. Schedule 40, galvanized steel pipe and banded malleable iron screw fittings. 3. Schedule 40 and 80 PVG or ABS piping with DWV pattern fittings may be used where allowed by local code. Foam core PVG piping will not be approved. B. HOT AND GOLD WATER I. Above grade. a. Type "L" copper tubing, hard temper, cold drawn with wrought copper lead free sweat fittings. Connections to fixtures and equipment shall be made with 85% red brass IP5 size pipe or compression angle stops. Provide dielectric unions where connecting piping of dissimilar materials. 2. Below grade. a. Type "k" copper tubing, hard or soft temper, with wrought copper lead free sweat fittings. Note: No fittings shall be permitted below grade inside building. G. AIR CONDITIONING CONDENSATE I. Type "L" copper tubing, hard temper, cold drawn with wrought copper lead free sweat fittings. D. NATURAL GAS PIPING 1. Schedule 40, ASTM A120, black iron pipe with 150 Ib. black malleable threaded or socket welded fittings. EXECUTION A. GENERAL REQUIREMENTS 1. Contractor shall examine the premises and satisfy himself of existing conditions under which he will be obligated to operate in performing his part of the work that in any manner affect the work under the contract. The contractor shall cooperate with other trades 50 that the installation of all equipment may be properly coordinated. 2. All equipment furnished shall fit the space available, with connection, etc. in the required locations and with adequate space for operation and service. 3. All piping, except fixture supplies, shall be concealed, cut accurately to exact measurements taken at the building and worked carefully into place without forcing or springing. Ghanges in direction of all piping shall be made with fittings. Changes in pipe size shall be made with reducing fittings. 4. No water or drain lines shall be permitted over electrical or telecommunication panels or in telecommunication rooms. 5. Provide protective metal cover plates over studs and joists where pipes penetrate close to edge of stud or joist 6. Provide chrome plated escutcheons where pipes pass through floors, walls and ceilings in finished spaces. 1. All piping shall be installed with adequate provision for expansion and contraction using swing joints, pipe clamps, anchors and expansion joints. Fittings shall be 50 spaced that they will not interfere with sliding of pipe on supports. 8. All openings in the roof shall be flashed watertight per the instruction of the Landlord's roofing contractor to maintain roof warrantee. B. DRAIN, WASTE AND VENT 1. All waste piping shall be pitched a minimum of 1/4" per foot where possible. Piping greater than 4" diameter may be pitched at 1/8" per foot, only where required by existing conditions, subject to the approval of the authority having Jurisdiction. 2. Drains and P- traps: 17 ga. G.P. Brass where exposed to view extending to wall. Nominal size of drain and trap shall not be smaller than the fixture outlet to which it is attached. 3. Vents shall extend not less than 12" through roof. They shall be gathered together where possible into one vent of equivalent area. Vents shall be flashed indicated on the drawings. All vents shall be a minimum of 10' -0" from any fresh air intakes, or greater if required by local code. 4. Gleanouts, same size as pipe, shall be installed in soil and waste lines at every change of direction and at every 100 feet of run whether shown on the drawings or not; and shall be accessible in all cases. When occurring in finished wall or floor, set flush with surrounding surface. 5. Gleanouts as a minimum shall be located 50 that all soil and waste lines within or under building are accessible for cleaning without passing through more than one ninety degree or two forty - five degree bends. Gleanout covers shall be set flush with floors and grade with exposed plastic nut at walls. G. HOT AND GOLD WATER 1. All water piping shall be pitched in direction of flow to allow for system draining. Install piping parallel to major building elements. 2. Install water main shutoff valves, Watts or approved equal, gate valve, above grade below pressure regulator. 3. Install accessible hot and cold water stops at all fixtures. 4. Install dielectric isolators where in- compatible piping materials come in contact. 5. Install temperature and pressure relief valves as required by Gode. 6. Install water pressure regulator, "Watts" or "Wilkins ", where available utility pressure exceeds 80 psi. D. NATURAL GAS 1. Install natural gas piping as indicated on drawings and as required by local codes. 2. Install shutoff valves close to fixture and appliance connections and ahead union and dirt leg at rooftop units. 3. Unions shall be installed on both sides of all equipment and where required to facilitate removal of equipment. 4. Provide gas pressure regulating valves with turned down vents at all gas appliances when distribution pressure is greater than 7" W.G. 5. Provide gas main shutoff valve with lever type handle placed on on house side of meter. 6. Paint all exterior piping including piping installed on roof with two coats or rust inhibiting exterior paint. 1. Support piping on roof per instruction of Landlord's roofing contractor to maintain roof warrantee. E. INSULATION I. All water piping, horizontal and vertical shall be insulated with fiberglass pipe insulation with an all purpose vapor barrier jacket. Use minimum I" insulation on water piping. All insulating materials shall have a maximum 25 flame spread rating and 50 smoke developed rating. 2. Approved insulation blocking shall be placed between sheet metal jacket and bottom of the pipe where jacket alone cannot prevent crushing. Insulation jacket or vapor barrier shall be sealed after installing blocking. (See hangers, supports and sleeves F. HANGERS, SUPPORTS AND SLEEVES 1. All drain, waste, hot and cold water, and natural gas piping exposed, above grade and in furred areas, shall be supported in place with securely fastened solid pipe hangers not over 8' -O" apart and at each change in direction, (5' -0" on cast iron pipe). 2. Pipe hangers shall be installed around the outside of insulation with vapor barriers, and insulation shall be protected against crushing by sheet metal jacket of proper area and weight. 3. All water piping running through floors or walls shall be isolated from the penetration with a sleeve. Maintain the fire rating of all wall and floor penetrations by use of approved fire stop materials. 4. Sleeves through walls shall be cut so as to be flush with the finished surface of the all in each case and shall be made watertight. G. TESTING 1. Drain, waste and vent lines shall pass inspection under head of water by system with water to top of highest vent stack. 2. Water lines shall pass inspection of our (4) hours under 150 psi pressure. Before any use of system is made for domestic purposes, it shall be disinfected by slowly filling with water to which a disinfecting agent has been injected at a rate of 50 p.p.m. of chlorine, which should be allowed to stand in the piping for at least 24 hours, after which tests for residual chlorine shall show not less than five(5) p.p.m. of residual chlorine at every water outlet in the building. If the residual 1s less than five ppm, the disinfection shall be repeated until the required residual is obtained at every outlet. After required residual is obtained at every outlet, the system shall be flushed until) the chlorine level at every outlet is reduced to that of incoming water supply 3. Gas lines shall stand a pressure of 25 psi for a period of 15 minutes without perceptible drop. 4. All testing shall be performed by contractor at his own expense. H. WARRANTEE 1. All materials furnished and installed under this contract shall be new and free from all defects in materials and workmanship and shall be guaranteed for a period of one (1) year from the date of acceptance by Dollar Tree. REVIEWED FOR CODE COMPLIANCE AP nye) JUN 16 2010 City of Tukwila BUILDING nmsinM RECEIVED JUN 012010 PERMIT CENTER a 0 to Q T 0 mla _ '5 am m I oinc Z a 65.E 0 0 - O � 0 CM) E o °2 Fax 612.465.7551 PHONE 612.465.7550 dunhameng.com w 3 mechanical + electrical consulting engineering H w c O 0 2 _ o a W �0 U co 0 -0 < 0 to 0 0 co 0 .N .; c 0 N m 410820 -0q5 0 0 0 -v0 a 1 0 0 3 0 1. '0 0 RRMM ARCHITECTS, PC 1317 Executive Blvd, Suite 200 Chesapeake, VA 23320 (757)622 -2828 / fax (757)622 -6883 sheet MFS