HomeMy WebLinkAboutPermit M10-049 - DOLLAR TREEDOLLAR TREE
363 STRANDER BL
M10 -049
City olkukwila
•
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206- 431 -3670
Inspection Request Line: 206- 431 -2451
Web site: http: / /www.ci.tukwila.wa.us
MECHANICAL PERMIT
Parcel No.: 2623049064
Address: 363 STRANDER BL TUKW
Project Name: DOLLAR TREE
Permit Number: M10 -049
Issue Date: 07/06/2010
Permit Expires On: 01/16/2011
Owner:
Name: REGENCY CENTERS LP
Address: C/0 PROPERTY TAX DEPT , PO BOX 790830 78279
Contact Person:
Name: KEVIN WEARE
Address: 4000 DELRIDGE WY SW SUITE 300 , SEATTLE WA 98106
Email: KEVINCDS @COLUMBIA- SENTINEL.COM
Contractor:
Name: B DAVIS INC
Address: 1441 A TERMINAL AV , SAN JOSE CA 95112
Contractor License No: BDAVII*000CP
Phone: 206 - 795 -2629
Phone: 408 - 436 -4800
Expiration Date: 01/24/2012
DESCRIPTION OF WORK:
REPLACE EXISTING RTU'S AND REMODEL EXISTING DUCT SYSTEM
Value of Mechanical: $20,000.00 Fees Collected: $487.06
Type of Fire Protection: SPRINKLERS International Mechanical Code Edition: 2009
Permit Center Authorized Signature:
Date: 1121 vV
I hereby certify that I have read and e - ed this permit and know the same to be true and correct. All provisions of law and ordinances
governing this work will be complied th, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or,e performance of work. I am authorized to sign and obtain this mechanical permit.
Signature: �
Print Name: 'T i&. ^
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
Date :"7 27 -/.6
doc: IMC -4/10
M10 -049 Printed: 07 -27 -2010
City oftu kwila
•
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Inspectio n Request Line: 206 - 431 -2451
Web site: http: / /www.ci.tukwila.wa.us
MECHANICAL PERMIT
Parcel No.: 2623049064
Address: 321 STRANDER BL TUKW
Project Name: DOLLAR TREE
Permit Number: M10 -049
Issue Date: 07/06/2010
Permit Expires On: 01/02/2011
Owner:
Name: REGENCY CENTERS LP
Address: C/0 PROPERTY TAX DEPT , PO BOX 790830 78279
Contact Person:
Name: KEVIN WEARE
Address: 4000 DELRIDGE WY SW SUITE 300 , SEATTLE WA 98106
Email: KEVINCDS @COLUMBIA- SENTINEL.COM
Contractor:
Name: B DAVIS INC
Address: 1441 A TERMINAL AV , SAN JOSE CA 95112
Contractor License No: BDAVII *000CP
Phone: 206 - 795 -2629
Phone: 408- 436 -4800
Expiration Date: 01/24/2012
DESCRIPTION OF WORK:
REPLACE EXISTING RTU'S AND REMODEL EXISTING DUCT SYSTEM
Value of Mechanical: $20,000.00 Fees Collected: $487.06
Type of Fire Protection: SPRINKLERS International Mechanical Code Edition: 2009
Permit Center Authorized Signature:
-]' � - /)
Date: 1 l V
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or e performance of work. I am authorized to sign and obtain this mechanical permit.
Signature:
Print Name:
16m at,
Date:Tb
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
doc: IMC -4/10
M10 -049 Printed: 07 -06 -2010
•
;w \q� City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206 -431 -3665
Web site: http://www.ci.tukwila.wa.us
Parcel No.: 2623049064
Address: 321 STRANDER BL TUKW
Suite No:
Tenant: DOLLAR TREE
PERMIT CONDITIONS
Permit Number: M10 -049
Status: ISSUED
Applied Date: 04/14/2010
Issue Date: 07/06/2010
1: ** *BUILDING DEPARTMENT CONDITIONS * **
2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the
Building Official.
3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center
(206/431- 3670).
4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to
start of any construction. These documents shall be maintained and made available until final inspection approval is
granted.
5: Readily accessible access to roof mounted equipment is required.
6: All construction shall be done in conformance with the approved plans and the requirements of the International
Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code.
7: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary
sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other
excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of
this requirement.
8: Manufacturers installation instructions shall be available on the job site at the time of inspection.
9: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila
Permit Center.
10: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building
Department (206- 431 - 3670).
11: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of,
any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits
presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila
shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the
Building Official from requiring the correction of errors in the construction documents and other data.
* *continued on next page **
doc: Cond -10/06
M10 -049 Printed: 07 -06 -2010
•
�J�.�► wqs City of Tukwila
�l �Z Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and
this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provision of any other work
construction or the performance of work.
Signature:
Print Name: )W l_ ice+ � ,p
Date: '7'-'1C:2 l
ordinances governing
or local laws regulating
doc: Cond -10/06 M10 -049
Printed: 07 -06 -2010
a
CITY OF TUKWIIIIP
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.ci.tukwila.wa.us
•
Building Permit No. 1)10- 0 q7
Mechanical Permit No. ",10 - 0 Li q
Plumbing/Gas Permit No. -K. 10— 053
Public Works Permit No.
Project No.
(For office use only)
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *Please Print **
SITE LOCATION
King Co Assessor's Tax No.:
Site Address: 321 5 TWA Nib 131-1/D (34` ), 3b Suite Number: Floor:
2.4,23° yc7 40.1
Tenant Name: llc,'11AR- 're-aft- New Tenant: Yes ❑..No
Property Owners Name: te&EN'(..'/ GR E Z GJRp
Mailing Address: 2.999 OAK PeAD S: i/l i h . 1 o c ''JJr.i .+ l C Peek. a- 94 5q %
City
State Zip
CONTACT PERSON - who do we contact when your permit is ready to be issued
Name: k.1 V ilJ 14/6-4 44OG, Day Telephone: 76 {° 195 ZOO 9
Mailing Address: A oot, D e 1--P 10tre 11(11 y S 1 ! 4.'& 3 e6 wA q i'l De
City State Zip
E -Mail Address: �l V i 13 C o S e CoCarvi i3 :0 '-S P,t.i41 /41 Uln Fax Number: Z0 4 9 2- 3 x 37 9
GENERAL CONTRACTOR INFORMATION —
(Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5))
Company Name: tiNet.) 1iUrJ
Mailing Address:
City
Contact Person: Day Telephone:
E -Mail Address: Fax Number:
Contractor Registration Number: Expiration Date:
State
Zip
ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record
Company Name: JZRtvI MM1 Arta} 1 '10c.-.1 (D niA A LL! OTT)
T
Mailing Address: 1311 X Fc Z,4 1i/fr. 15i-V.0 Sti i1? 200 C esApe,okA Z3�z t�
City"
Contact Person' M E.-NiLl )%SS{� ti/ Day Telephone: 75-7 to ZZ.
E -Mail Address: Fax Number:
State Zip
ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Record
Company Name: 3gA -D yOUl4- kA�soG
Mailing Address: 1 32.0 1/t), 0244DONI ,2W
Contact Person: OA A D >/C t(1J
E -Mail Address:
H:\ApplicationsTorms- Applications On Line\2009 Applications \I -2009 - Permit Application.doc
Revised: 1 -2009
bh
5t,41 e 1 0 1 1 z f✓s d ( 4 S 3`7 1 1
City
State Zip
Day Telephone: 55 ci Z27_ 91e0 O
Fax Number:
Page 1 of 6
MECHANICAL PERMIT IN RMATION - 206 - 431 -3670
MECHANICAL CONTRACTOR INFORMATION
Company Name: UNI K. I / C i/11
Mailing Address:
City State Zip
Contact Person: Day Telephone:
E -Mail Address: Fax Number:
Contractor Registration Number: Expiration Date:
Valuation of Mechanical work (contractor's bid price): $ 10� Q0
Scope of Work (please provide detailed information): 12 6 13 IrA G e (t°) j -r 1A, l S A Ni D r2i m t? o e1L
ex ► clr
Use: Residential: New .... ❑ Replacement .... ❑
Commercial: New .... ❑ Replacement ....Ea
Fuel Type: Electric 111 Gas ....ref Other:
Indicate type of mechanical work being installed and the quantity below:
Unit Type:
Qty
Unit Type:
Qty
Unit Type:
Qty
Boiler /Compressor:
0 -3 HP /100,000 BTU
Qty
Fumace<100K BTU
Air Handling Unit >10,000
CFM
Fire Damper
Furnace >100K BTU
Evaporator Cooler
Diffuser
3 -15 HP /500,000 BTU
Floor Furnace
Ventilation Fan Connected
to Single Duct
Thermostat
15 -30 HP /1,000,000 BTU
Suspended/Wall/Floor
Mounted Heater
Ventilation System
Wood/Gas Stove
30 -50 HP /1,750,000 BTU
Appliance Vent
Hood and Duct
Emergency
Generator
50+ HP /1,750,000 BTU
Repair or Addition to
Heat/Refrig/Cooling
System
Incinerator - Domestic
Other Mechanical
Equipment
Air Handling Unit
<10,000 CFM
Incinerator — Comm/Ind
H:Wpplications \Forms - Applications On Line \2009 Applications \1 -2009 - Permit Application.doc
Revised: 1 -2009
bh
Page 4 of 6
r
•
PERMIT APPLICATION NOTES — Applicable to all permits in this application
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
Building and Mechanical Permit
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
Plumbing Permit
The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested
in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OW ► ER ! R ORI - ED GENT:
Signature:
Date: irI4' /D
Print Name: Lri/1N is . jz, Day Telephone:
Mailing Address: 44600 j;1,.121 D%k. WA)/ Slit/ SitiFte 3L1 d 5;;,4 , W14 SF (to,
State Zip
City
Date Application Accepted:
Date Application Expires:
w-ML-t
Staff Initials:
( /�
, � I
H:\Applicat ions \Forms - Applications On Line\2009 Applications \1 -2009 - Permit Application.doc
Revised: 1 -2009
bh
Page 6 of 6
•
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
Parcel No.: 2623049064
Address: 321 STRANDER BL TUKW
Suite No:
Applicant: DOLLAR TREE
RECEIPT
Permit Number: M10 -049
Status: APPROVED
Applied Date: 04/14/2010
Issue Date:
Receipt No.: R10 -01236
Initials:
User ID:
Payee:
WER
1655
Payment Amount: $402.25
Payment Date: 07/06/2010 09:38 AM
Balance: $0.00
B DAVIS INC
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Check 19698 402.25
Authorization No.
ACCOUNT ITEM LIST:
Description
Account Code Current Pmts
MECHANICAL - NONRES
000.322.102.00.00 402.25
Total: $402.25
PAYMENT
RECEIVED
doc: Receipt -06
Printed: 07 -06 -2010
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http://www.ci.tukwila.wa.us
Parcel No.: 2623049064
Address: 321 STRANDER BL TUKW
Suite No:
Applicant: DOLLAR TREE
RECEIPT
Permit Number: M10 -049
Status: PENDING
Applied Date: 04/14/2010
Issue Date:
Receipt No.: R10 -00635
Initials:
User ID:
Payee:
WER
1655
Payment Amount: $84.81
Payment Date: 04/14/2010 02:38 PM
Balance: $339.25
RRMM ARCHITECTS
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Check 19489 84.81
Authorization No.
ACCOUNT ITEM LIST:
Description
Account Code Current Pmts
PLAN CHECK - NONRES
000.345.830 84.81
Total: $84.81
doc: Receipt -06
Printed: 04 -14 -2010
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670
Proj ct: l,,,�
UO i l iA! 1 f ee
Type of Inspection:
� ^I OA 1
Address:
Date Called:
Special Instructions:
Date Wanted:
6 -12-1U
p.m.
Requester:
Phone No:
}i,J�Approved per applicable codes. 0 Corrections required prior to approvaj. 6
COMMENTro stoic) v.4. ,,i0. bcva� - ()prewt. -.- ]
C2)-- '42c An :-1. 0 I t 1 t 1 A.Ai) I
r
Inspect
Date
P — %7 - +v
EINSPECTION FEE R QUIRE ' . Prior to inspection, fee must be
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Rece ;• t "o.:
Date:
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION R'
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670
Pro' ct:
�dtiJ c�i
Type f Inspection:
6�l� `/1 — i K J
Address:
Date Called:
Special Instructions:
Date Wanted:
— 3 —ta
a.m.
Requester:
Phone No:
Approved per applicable codes. Corrections required prior to approval.
COMMENTS:
.
= s - s\ /4■/0
b101- Atpid1J -AC
t�
Date: Q.7
cJ— 3 -1
00 REINSPECTION FEE " EQUIRED. P for to inspection, fee must be
at 6300 Southcenter Blv. ., Suite 106 Call to schedule reinspection.
Recei , t No.:
'Date:
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670
Project:
Do LLA ✓ `~tee
Type of Inspection:
4)._ d` L5 to - ! NJ
Address:
32-t Sit
t.e.2
8L
Date Called:
Special Instructions:
Date Wanted:.
"7- Z D- I U
,
p.m.
Requester:
Phone No:
,poG,9 --u(, - 372,
❑ Approved per applicable codes. ❑ Corrections required prior to approval.
COMMENTS:
COSA(45 =IoW fl /off —oz.- 10_74S)11
I specto
REINSPECTION EE*REQU
6300 Southcente Blvd. Su
Date:
7- —/&,
0 IRED. Prior to inspection, fee must be
at Suite 100. Call to schedule reinspection.
Re is' pt No.:
Date:
2006 Washington State Nonresidential Energy Code Compliance Form
roject Summary
PRJ -SUM
2006 Washington State Nonresidential Energy Code Compliance Forms
Revised July 2007
Project Info
Project Address
Dollar Tree at Southcenter Plaza
Date 3/29/2010
301 Strander Blvd.
For Building Department Use
Tukwila, WA
Applicant Name:
Dollar Tree
Applicant Address:
Applicant Phone:
FILE COPY
Ps rmet No.
t'IIOOI9
REVIEWED FOR
C�ODE�COMP�
A . PROVED
i �� r 12 2010
�
Tukwila
City ofTu .
BUILDING DIVISION
RECEIVED
APR 14 2010
PERMIT CENTER
2006 Washington State Nonresidential Energy Code Compliance Form
Mechanical:Summary
2006 Washington State Nonresidential Energy Code Compliance Forms
Revised July 2007
Project Info
Project Address Dollar Tree at Southcenter Plaza
Date 5/25/2010
301 Strander Blvd.
For Building Dept. Use
Tukwila, WA
Applicant Name: Dollar Tree
Applicant Address:
Applicant Phone:
Project Description
Briefly describe mechanical
system type and features.
❑ Includes Plans
2 x New 4 Ton Gas Roof Top Units
4 x New 5 Ton Gas Roof Top Units
Include documentation requiring compliance with commissi
Compliance Option
QQ Simple System 0 Complex System Syste
(See Decision Flowchart (over) for qualifications. Use separate ME
le & complex systems.)
Equipment Schedules
The following information is required to be incorporated with the mechanical equipment schedules on the
plans. For projects without plans, fill in the required information below.
Cooling Equipment Schedule
Equip.
ID
Brand Name'
Model No.1
Capacity2
Btu /h
Total CFM
OSA CFM
or Econo?
SEER
or EER
IPLV3
Location
RTU-1
CARRIER
48TCDA005
44750
1600
Econo
13.00
-
Roof
RTU -2
CARRIER
48TCDA006
59950
2000
Econo
13.00
-
Roof
RTU -3
CARRIER
48TCDA005
44750
1600
Econo
13.00
-
Roof
RTU -4
CARRIER
48TCDA006
59950
2000
Econo
13.00
-
Roof
RTU -5
CARRIER
48TCDA006
59950
2000
Econo
13.00
-
Roof
RTU -6
CARRIER
48TCDA006
59950
2000
Econo
13.00
-
Roof
Heating Equipment Schedule
Equip.
ID
Brand Name'
Model No.1
Capacity2
Btu /h
Total CFM
OSA cfm
or Econo?
Input Btuh
Output Btuh
Efficiency4
RTU -1
CARRIER
48TCDA005
59000
1600
Econo
72000
59000
0.820
RTU -2
CARRIER
48TCDA006
59000
2000
Econo
72000
59000
0.820
RTU -3
CARRIER
48TCDA005
59000
1600
Econo
72000
59000
0.820
RTU-4
CARRIER
48TCDA006
59000
2000
Econo
72000
59000
0.820
RTU -5
CARRIER
48TCDA006
59000
2000
Econo
72000
59000
0.820
RTU -6
CARRIER
48TCDA006
59000
2000
Econo
72000
59000
0.820
Fan Equipment Schedule
Equip.
ID
Brand Name
Model No.1
CFM
SP'
HP /BHP
Flow Controls
Location of Service
EF -1
COOK
GEMINI GN -420
275
.25"
0.17
vs
Toilet Room
i !.3�.
�➢
JUN 01 2010
'If available. 2 As tested according to Table 14 -1A through 14 -1G. 3 If required. 4 COP, HSPF, Combustion Efficienncy or A_FU
applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). '�
1
2006 Washington State Nonresidential Energy Code Compliance Form
Mechanical Summary (back):j;
System Description
See Section 1421 for full description of
Simple System qualifications.
If Heating /Cooling
or Cooling Only:
✓ Constant vol?
✓
Air cooled? 0 Packaged sys? • <20,000 Btuh?
Split system?
Economizer included?
✓
If Heating Onl y:
<5000 cfm?
<70% outside air?
Decision Flowchart
Use this flowchart to determine if project qualifies for Simple System Option. If not, either the
Complex System or Systems Analysis Options must be used.
Heating Only
Heating /Cooling
or Cooling Only
Reference
Section 1421
Yes
Air Cooled,
Constant Vol?
<5000
cfm?
<70% OSA
Yes —
Yes*
ingle
Package
Unit?
Yes
plit Syste
<= 84,000
Btuh?
Yes
Econo
ncluded?
.ol Ca.
<20,000
Btuh?
Outd
or
Adjacent to
utdoor
Yes
Yes
"Reference
Section 1423/
of Ca
<54,000
Btuh?
otal Ca .
wo economize
<240,000 Btuh
or 10 %?
Simple System
Allowed
(section 1420)
Yes
Use Complex
Systems
(section 1430)
Complex Systems
Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex
Systems requirements are applicable to this project.
2006 Washington State Nonresidential Energy Code Compliance Form
Mechanical' Permit Plan&Checklist
MECH -CHK
2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007
Project Address Dollar Tree at Southcenter Plaza
Date 3/29/2010
The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the
Washington State Nonresidential Energy Code.
Applicability
(yes, no, n.a.)
Code
Section
Component
Information Required
Location
on Plans
Building Department
Notes
HVAC REQUIREMENTS (Sections 1401 -1424)
1411
Equipment performance
n.a.
1411.4
Pkg. elec. htg.& clg.
List heat pumps on schedule
-
yes
1411.1
Minimum efficiency
Equipment schedule with type, capacity, efficiency
MP2
n.a.
1411.1
Combustion htg.
Indicate intermittent ignition, flue /draft damper & jacket loss
-
1412
HVAC controls
yes
1412.1
Temperature zones
Indicate locations on plans
MP1
yes
1412.2
Deadband control
Indicate 5 degree deadband minimum
rm3
n.a.
1412.3
Humidity control
Indicate humidistat
-
yes
1412.4
Automatic setback
Indicate thermostat with night setback and 7 diff. day types
MP3
n.a.
1412.4.1
Dampers
Indicate damper location and auto. controls & max. leakage
me1
n.a.
1412.4.2
Optimum Start
Indicate optimum start controls
-
n. a.
1412.5
Heat pump control
Indicate microprocessor on thermostat schedule
-
n. a.
1412.6
Combustion htg.
Indicate modulating or staged control
-
yes
1412.7
Balancing
Indicate balancing features on plans
MP1
1412.8
Ventilation Control
Indicate demand control ventilation for high- occupancy areas
MP1
n.a.
1422
Thermostat interlock
Indicate thermostat interlock on plans
-
yes
1423
Economizers
Equipment schedule
MP2
1413
Air economizers
yes
1413.1
Air Econo Operation
Indicate 100% capability on schedule
MP1
n.a.
1413.1
Wtr Econo Operation
Indicate 100% capacity at 45 degF db & 40 deg F wb
-
n. a.
1413.2
Water Econo Doc
Indicate clg load & water econoe & clg tower performance
-
n. a.
1413.3
Integrated operation
Indicate capability for partial cooling
n.a.
1413.4
Humidification Indicate direct evap or fog atomization w/ air economizer -
1414
Ducting systems
yes
1414.1
Duct sealing
Indicate sealing necessary
MP3
yes
1414.2
Duct insulation
Indicate R -value of insulation on duct
MP3
yes
1415.1
Piping insulation
Indicate R -value of insulation on piping
1P3
1416
Completion Requirements
1416.2.1
Commissioning
Provide commissioning plan
-
yes
1416.2.2 -3
Sys.Bal & Func.Test
Indicate air and water system balancing & functional testing
141'3
1416.2.4
Commissioning
Indicate O &M manuals, record drawings, staff training
-
1416.2.5
Comm. Report
Indicate requirements for prelim. & final commissioning report
-
1434
Separate air sys.
Indicate separate systems on plans
-
yes
Mechanical
Summary Form
Completed and attached. Equipment schedule with types,
input/output, efficiency, cfm, hp, economizer
-
SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 -1454)
1440
Service water htg.
n.a.
1441
Elec. water heater
Indicate R -10 insulation under tank
-
n. a.
1442
Shut -off controls
Indicate automatic shut -off
-
yes
1443
Pipe Insulation
Indicate R -value of insulation on piping
MP3
n.a.
1452
Heat Pump COP
Indicate minimum COP of 4.0
-
n. a.
1452
Heater Efficiency
Indicate pool heater efficiency
-
p. a.
1453
Pool heater controls
Indicate switch and 65 degree control
-
n. a.
1454
Pool covers
Indicate vapor retardant cover
-
n.a.
1454
Pools 90+ degrees
Indicate R -12 pool cover
-
no is circiea Tor any question, provide explana ion:
2006 Washington State Nonresidential Energy Code Compliance Form
Meclianical Permit Plans Checklist
MECH -CHK
2006 Washington State Nonresidential Energy Code Compliance Forms
Revised July 2007
M,echanical - General Requirements
1411.1 General: Equipment shall have a minimum performance at the specified
rating conditions not less than the values shown in Table 14 -1A through 14 -1G. If a
nationally recognized certification program exists for a product covered in Tables
14 -1A through 14 -1G, and it includes provisions for verification and challenge of
equipment efficiency ratings, then the product shall be listed In the certification
program.
Gas -fired and oil -fired forced air furnaces with input ratings > 225,000 Btu /h (65
kW) and all unit heaters shall also have an intermittent ignition or interrupted device
(IID), and have either mechanical draft (including power venting) or a flue damper. A
vent damper is an acceptable alternative to a flue damper for furnaces where
combustion air is drawn from the conditioned space. All furnaces with input ratings >
225,000 Btu /h (65 kW), including electric furnaces, that are not located within the
conditioned space shall have jacket losses not exceeding 0.75% of the input rating.
1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions
and procedures when available. Where no applicable procedures exist, data shall
be furnished by the equipment manufacturer.
1411.3 Combination Space and Service Water Heating: For combination space
and service water heaters with a principal function of providing space heat, the
Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard
124 -1991. Storage water heaters used in combination space heat and water heat
applications shall have either an Energy FActor (EF) or a CAE of not less than the
following:
1411.4 Packaged Electric Heating and Coo Ing Equipment: Packaged electric
equipment providing both heating and cooling with a total cooling capacity greater
than 20, Btu /h shall be a heat pump.
Exception: Unstaffed equipment shaelters or cabinets used solely for
personal wireless service facilities.
1412 Controls
1412.1 Temperature Controls: Each system shall be provided with at least one
temperature control device. Each zone shall be controlled by individual thermostatic
controls responding to temperature within the zone. At a minimum, each floor of a
building shall be considered as a separate zone.
1412.2 Deadband Controls: When used to control both comfort heating and
cooling, zone thermostatic controls shall be capable of a deadband of at least 5
degrees F within which the supply of heating and cooling energy to the zone is shut
off or reduced to a minimum.
Exceptions:
1. Special occupancy, special usage, or code requirements where
deadband controls are not appropriate.
2. Buildings complying with Section 1141.4, if in the proposed building
energy analysis, heating and cooling thermostat setpoints are set to
the same temperature between 70 degrees F and 75 degrees F
inclusive, and assumed to be constant throughout the year.
3. Thermostats that require manual changeover between heating and
cooling modes.
1412.3 Humidity Controls: If a system is equipped with a means for adding
moisture, a humidistat shall be provided.
1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic
controls capable of accomplishing a reduction of energy use through control setback
or equipment shutdown during periods of non -use or alternate use of the spaces
served by the system. The automatic controls shall have a minimum seven -day
clock and be capable of being set for seven different day types per week. It must
retain programming and time for a power loss of 10 hours and include an accessible
manual override of up to 2 hours.
Exceptions:
1. Systems serving areas which require continuous operation at the
same temperature setpoint
2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may
be controlled by readily accessible manual off-hour controls.
3. Systems controlled by an occupant sensor that is capable of shutting
the system off when no occupant is sensed for a period of up to 30
minutes.
4. Systems controlled solely by a manually operated timer capable of
operating the system for no more than two hours.
1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving
conditioned spaces shall be equipped with dampers which close automatically when
the system is off or upon power failure. Stair shaft and elevator shaft smoke relief
openings shall be equipped with normally open (fails to open upon loss of power)
dampers. These dampers shall remain closed until activated by the fire alarm
system or other approved smoke detection system.
Exceptions:
1. Systems serving areas which require continuous operation.
2. Combustion air intakes.
3. Gravity (nonmotorized) dampers are acceptable in buildings less
than 3 stories in height.
4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief
outlets in the first story and levels below the first story of buildings
three or more stories in height.
1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply
air caoacities exceedina 10.000 cfm shall have ootimum start controls. Ootimum
1412.8 Ventilation Controls for High- Occupancy Areas: Demand control
ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design
occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are
served by systems with one or more of the following:
a An air -side economizer,
b. Automatic modulating control of the outdoor air damper, or
c. A design outdoor airflow greater than 3000 cfm.
Exceptions:
1.Systems with energy recovery complying with Section 1436.
2. Multiple -zone systems without direct - digital control of individual zones
communicating with a central control panel.
3. Systems with a design outdoor airflow less than 1200 cfm.
4. Spaces where the supply airflow rate minus any makeup or outgoing
transfer air requirement is less than 1200 cfm.
1413 Air Economizers
1413.1 Operation: Air economizers shall be of automatically modulating outside and
return air dampers to provide 100 percent of the design supply air as outside air to
reduce or eliminate the need for mechanical cooling. Water economizers shall be
capable of providing the total concurrent cooling load served by the conneted
terminal equipment lacking airside economizer, at outside air temperatures of 45 °F
dry- bulb /40 °F wet -bulb and below. For this calculation, all factors including solar and
internal load shall be the same as those used for peak load calculations, except for
the outside temperatures.
Exception: Water economizers using air - cooled heat rejection equipment
may use a 35 °F dry-bulb outside air temperature for this calculation. This
exception is limited to a maximum of 20 tons per building.
1413.2 Documentation: Water economizer plans submitted for approval shall
include the following information:
1. Maximum outside air conditions for which economizer is sized to provide
full cooling.
2. Design cooling load to be provided by economizer at this outside air
condition.
3. Heat rejection and terminal equipment performance data including model
number, flow rate, capacity, entering and leaving temperature in full
economizer cooling mode.
1413.3 Integrated Operation: Air economizers shall be capable of providing partial
cooling even when additional mechanical cooling is required to meet the remainder
of the cooling load.
Exceptions:
1. Individual, direct expansion units that have a rated capacity less than
65,000 Btu /h and use nonintegrated economizer controls that
preclude simultaneous operation of the economizer and mechanical
cooling.
2. Water - cooled water chillers with waterside economizer.
1413.4 Humidification: If an air economizer is required on a cooling system for
which humidification equipment is to be provided to maintain minimum indoor
humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative
media or fog atomization type).
Exceptions:
1. Health care facilities where WAC 246 - 320 -525 allows only steam
injection humidifiers in ductwork downstream of final filters. 1412.6
Combustion Heating Equipment Controls: Combustion heating
equipment with a capacity over 225,000 Btu /h shall have modulating
or staged combustion control.
2. Systems with water economizer
3. 100% outside air systems with no provisions for air recirculation to the
central supply fan.
4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a
building's air economizer capacity as measured in cfm. This refers to
the system cfm serving rooms with stand alone or duct mounted
humidifiers.
1414 Ducting Systems
1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch
water column static pressure shall be sealed in accordance with Standard RS -18.
Extent of sealing required is as follows:
1. Static pressure: 1/2 inch to 2 inches; seal transverse joints.
2. Static pressure: 2 inches to 3 inches; seal all transverse joints and
longitudinal seams.
3. Static pressure: above 3 inches; seal all transverse joints, longitudinal
seams and duct wall penetrations.
Duct tape and other pressure sensitive tape shall not be used as the primary
sealant where ducts are designed to operate at static pressures of 1 inch W.C. or
greater.
1414.2 Insulation: Ducts and plenums that are constructed and function as part of
the building envelope, by separating interior space from exterior space, shall meet all
applicable requirements of Chapter 13. These requirements include insulation
installation, moisture control, air leakage, and building envelope insulation levels.
Unheated equipment rooms with combustion air louvers must be isolated from the
conditioned space by insulating interior surfaces to a minimum of R -11 and any
exterior envelope surfaces per Chapter 13. Outside air ducts serving individual
supply air units with less than 2,800 cfm of total supply air capacity shall be insulated
to a minimum of R -7 and are not considered building envelope. Other outside air
duct runs are considered building envelope until they,
1. connect to the heating or cooling equipment, or
2. are isolated from the exterior with an automatic shut -off damper complying
with Section 1412.4.1.
EF
CAE
< 50 gal storage
0.58
0.71
50 to 70 gal storage
0.57
0.71
> 70 gal storage
0.55
0.70
1411.4 Packaged Electric Heating and Coo Ing Equipment: Packaged electric
equipment providing both heating and cooling with a total cooling capacity greater
than 20, Btu /h shall be a heat pump.
Exception: Unstaffed equipment shaelters or cabinets used solely for
personal wireless service facilities.
1412 Controls
1412.1 Temperature Controls: Each system shall be provided with at least one
temperature control device. Each zone shall be controlled by individual thermostatic
controls responding to temperature within the zone. At a minimum, each floor of a
building shall be considered as a separate zone.
1412.2 Deadband Controls: When used to control both comfort heating and
cooling, zone thermostatic controls shall be capable of a deadband of at least 5
degrees F within which the supply of heating and cooling energy to the zone is shut
off or reduced to a minimum.
Exceptions:
1. Special occupancy, special usage, or code requirements where
deadband controls are not appropriate.
2. Buildings complying with Section 1141.4, if in the proposed building
energy analysis, heating and cooling thermostat setpoints are set to
the same temperature between 70 degrees F and 75 degrees F
inclusive, and assumed to be constant throughout the year.
3. Thermostats that require manual changeover between heating and
cooling modes.
1412.3 Humidity Controls: If a system is equipped with a means for adding
moisture, a humidistat shall be provided.
1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic
controls capable of accomplishing a reduction of energy use through control setback
or equipment shutdown during periods of non -use or alternate use of the spaces
served by the system. The automatic controls shall have a minimum seven -day
clock and be capable of being set for seven different day types per week. It must
retain programming and time for a power loss of 10 hours and include an accessible
manual override of up to 2 hours.
Exceptions:
1. Systems serving areas which require continuous operation at the
same temperature setpoint
2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may
be controlled by readily accessible manual off-hour controls.
3. Systems controlled by an occupant sensor that is capable of shutting
the system off when no occupant is sensed for a period of up to 30
minutes.
4. Systems controlled solely by a manually operated timer capable of
operating the system for no more than two hours.
1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving
conditioned spaces shall be equipped with dampers which close automatically when
the system is off or upon power failure. Stair shaft and elevator shaft smoke relief
openings shall be equipped with normally open (fails to open upon loss of power)
dampers. These dampers shall remain closed until activated by the fire alarm
system or other approved smoke detection system.
Exceptions:
1. Systems serving areas which require continuous operation.
2. Combustion air intakes.
3. Gravity (nonmotorized) dampers are acceptable in buildings less
than 3 stories in height.
4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief
outlets in the first story and levels below the first story of buildings
three or more stories in height.
1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply
air caoacities exceedina 10.000 cfm shall have ootimum start controls. Ootimum
1412.8 Ventilation Controls for High- Occupancy Areas: Demand control
ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design
occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are
served by systems with one or more of the following:
a An air -side economizer,
b. Automatic modulating control of the outdoor air damper, or
c. A design outdoor airflow greater than 3000 cfm.
Exceptions:
1.Systems with energy recovery complying with Section 1436.
2. Multiple -zone systems without direct - digital control of individual zones
communicating with a central control panel.
3. Systems with a design outdoor airflow less than 1200 cfm.
4. Spaces where the supply airflow rate minus any makeup or outgoing
transfer air requirement is less than 1200 cfm.
1413 Air Economizers
1413.1 Operation: Air economizers shall be of automatically modulating outside and
return air dampers to provide 100 percent of the design supply air as outside air to
reduce or eliminate the need for mechanical cooling. Water economizers shall be
capable of providing the total concurrent cooling load served by the conneted
terminal equipment lacking airside economizer, at outside air temperatures of 45 °F
dry- bulb /40 °F wet -bulb and below. For this calculation, all factors including solar and
internal load shall be the same as those used for peak load calculations, except for
the outside temperatures.
Exception: Water economizers using air - cooled heat rejection equipment
may use a 35 °F dry-bulb outside air temperature for this calculation. This
exception is limited to a maximum of 20 tons per building.
1413.2 Documentation: Water economizer plans submitted for approval shall
include the following information:
1. Maximum outside air conditions for which economizer is sized to provide
full cooling.
2. Design cooling load to be provided by economizer at this outside air
condition.
3. Heat rejection and terminal equipment performance data including model
number, flow rate, capacity, entering and leaving temperature in full
economizer cooling mode.
1413.3 Integrated Operation: Air economizers shall be capable of providing partial
cooling even when additional mechanical cooling is required to meet the remainder
of the cooling load.
Exceptions:
1. Individual, direct expansion units that have a rated capacity less than
65,000 Btu /h and use nonintegrated economizer controls that
preclude simultaneous operation of the economizer and mechanical
cooling.
2. Water - cooled water chillers with waterside economizer.
1413.4 Humidification: If an air economizer is required on a cooling system for
which humidification equipment is to be provided to maintain minimum indoor
humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative
media or fog atomization type).
Exceptions:
1. Health care facilities where WAC 246 - 320 -525 allows only steam
injection humidifiers in ductwork downstream of final filters. 1412.6
Combustion Heating Equipment Controls: Combustion heating
equipment with a capacity over 225,000 Btu /h shall have modulating
or staged combustion control.
2. Systems with water economizer
3. 100% outside air systems with no provisions for air recirculation to the
central supply fan.
4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a
building's air economizer capacity as measured in cfm. This refers to
the system cfm serving rooms with stand alone or duct mounted
humidifiers.
1414 Ducting Systems
1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch
water column static pressure shall be sealed in accordance with Standard RS -18.
Extent of sealing required is as follows:
1. Static pressure: 1/2 inch to 2 inches; seal transverse joints.
2. Static pressure: 2 inches to 3 inches; seal all transverse joints and
longitudinal seams.
3. Static pressure: above 3 inches; seal all transverse joints, longitudinal
seams and duct wall penetrations.
Duct tape and other pressure sensitive tape shall not be used as the primary
sealant where ducts are designed to operate at static pressures of 1 inch W.C. or
greater.
1414.2 Insulation: Ducts and plenums that are constructed and function as part of
the building envelope, by separating interior space from exterior space, shall meet all
applicable requirements of Chapter 13. These requirements include insulation
installation, moisture control, air leakage, and building envelope insulation levels.
Unheated equipment rooms with combustion air louvers must be isolated from the
conditioned space by insulating interior surfaces to a minimum of R -11 and any
exterior envelope surfaces per Chapter 13. Outside air ducts serving individual
supply air units with less than 2,800 cfm of total supply air capacity shall be insulated
to a minimum of R -7 and are not considered building envelope. Other outside air
duct runs are considered building envelope until they,
1. connect to the heating or cooling equipment, or
2. are isolated from the exterior with an automatic shut -off damper complying
with Section 1412.4.1.
Uuuew III WC nibs bwiy CUM rovaw UCIVW uw wbi mUiy UI uuuwuyb
three or more stones in heb6 Washington State Nonresidential Eher §9nt1 O ®f}I1R111tlequipment, or
1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 2. are isolated from the exterior with an automatic shut -off damper complying
air opacities exceeding 10,000 cfm shall have optimum start controls. Optimum with Section 1412.4.1.
start controls shall be designed to automatically adjust the start time of an HVAC Once outside air ducts meet the above listed requirements, any runs within
system each day to bring the space to desired occupied temperature levels conditioned space shall comply with Table 14 -5 requirements.
immediately before scheduled occupancy. The control algorithm shall, as a Other ducts and plenums shall be thermally insulated per Table 14 -5.
minimum, be a function of the difference between space temperature and occupied Exceptions:
setpoint and the amount of time prior to scheduled occupancy.
1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall include 1. Within the HVAC equipment.
microprocessor controls that minimize supplemental heat usage during start-up, set- 2. Exhaust air ducts not subject to condensation.
up, and defrost conditions. These controls shall anticipate need for heat and use 3. Exposed ductwork within a zone that serves that zone.
compression heating as the first stage of heat. Controls shall indicate when 1415 Piping Systems
supplemental heating is being used through visual means (e.g., LED indicators). 1415.1 Insulation: Piping shall be thermally insulated in accordance with Table 14 -6.
1412.6 Combustion Heating Equipment Controls: Combustion heating equipment Exception: Piping installed within unitary HVAC equipment.
with a capacity over 225,000 Btu /h shall have modulating or staged combustion Water pipes outside the conditioned space shall be insulated in accordance with
control. 000 Washington State Plumbing Code (WAC 51 -26)
EXCEPTIONS: 1 Boilers 2 Radiant heaters 1416 Completion Requirements (Refer to NREC Section 1416 and the Building
1412.7 Balancing: Each air supply outlet or air or water terminal device shall have Commissioning Guidelines, published by the Building Commissioning Association,
a means for balancing, including but not limited to, dampers, temperature and for complete text and guidelines for building completion and commissioning
pressure test connections and balancing valves. requirements.)
• •
DUNHAM PI 11_,_
mil
DELIVERS.
Project Memorandum
Date: May 25, 2010
To: Tom Hennessey
From: Adam Paulson, Phil Ramsey
PROJECT: Dollar Tree- Tukwila, WA
Comm. No.: 0410820 -095
Re: Code Comments
This Revision to the Drawings and Specifications for the above captioned project supersedes all contrary
and /or conflicting information on said plans and specifications, which are hereby amended as follows:
REVISIONS TO THE DRAWINGS:
This project memorandum provides a brief description of revisions made to the mechanical, electrical and
plumbing drawings. Changes to this project are not limited to the items listed on this memorandum. The
revised drawings shall be used as well as this document to determine project changes. Failure to utilize
both the revised drawings and this document shall not result in a change order to the tenant.
SHEETS El & E2
1. Revised power and lighting design near stockroom to reflect new floor plan.
SHEET MP1
1. Revised HVAC design near stockroom to reflect new floor plan.
REVISION N0:1
Mla o1-19
P:\0410820 -095 Tukwilla, WA101- General15-25 -10 PME- Revision Bulletin.doc
RECEIVED
JUN 012010
PERMIT CENTER
50 South Sixth Street / Suite 1100 / Minneapolis, Minnesota 55402 -1540 PHONE 612.465.7550 FAX 612.465.7551 WEB dunhameng.com
°PE I fg V •
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: M10 -049 DATE: 06 -01 -10
PROJECT NAME: DOLLAR TREE
SITE ADDRESS: 321 STRANDER BL
Original Plan Submittal Response to Incomplete Letter #
Response to Correction Letter # X Revision # 1 Before Permit Issued
DEPARTMENTS:
(�( 8
ding ivision
Public Works ❑
Fire Prevention Planning Division
Structural
Permit Coordinator
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
Incomplete
DUE DATE: 06-03-10
Not Applicable
n
Comments:
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES /THURS ROUTING:
Structural Review Required
REVIEWER'S I ITIALS:
Please Route
No further Review Required
DATE:
APPROVALS OR CORRECTIONS:
DUE DATE: 07 -01 -10
Approved Approved with Conditions Ul Not Approved (attach comments)
Notation:
REVIEWER'S INITIALS: DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Documents /routing slip.doc
2 -28 -02
•
PLAN
•
OUTING SLIP
ACTIVITY NUMBER: M10 -049
PROJECT NAME: DOLLAR TREE
SITE ADDRESS: 321 STRANDER BL
X Original Plan Submittal
Response to Correction Letter #
DATE: 04 -14 -10
Response to Incomplete Letter #
Revision # After Permit Issued
DEPARTMENTS:
ul ding Division
AWL
Public Works ❑
Aw\ 44- S1&-
Fire Prevention 1 Planning Division
Structural
❑ Permit Coordinator
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
Incomplete
DUE DATE: 04 -15 -10
Not Applicable
n
Comments:
Permit.Center Use Only . . 1 .
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES/THURS ROUTING:
Please Route
Structural Review Required
nNo further Review Required
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
DUE DATE: 05 -13 -10
Approved ❑ Approved with Conditions K Not Approved (attach comments) n
Notation:
REVIEWER'S INITIALS: DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Documents/routing slip_doc
2 -28 -02
•
PROJECT NAME: o r Try€
SITE ADDRESS: IA vro4(4- `-q. 1
1
PERMIT NO: MA O' 0 LI 61
ORIGINAL ISSUE DATE:
REVISION LOG
REVISION
NO.
DATE RECEIVED
STAFF
INIT LS
ISSUED DATE
STAFF
INITIALS
1
(p-- I- CO
Summary of Revision: Ftoo,. plt.uv, (' IAA vlI 'e)
Received by:
REVISION
NO.
DATE RECEIVED
STAFF
INITIALS
ISSUED DATE
STAFF
INITIALS
Summary of Revision:
Received by:
(please print)
REVISION
NO.
DATE RECEIVED
STAFF ,
INITIALS
ISSUED DATE
STAFF
INITIALS
Summary of Revision:
Received by:
(please print)
REVISION
NO.
DATE RECEIVED
STAFF
INITIALS
ISSUED DATE
STAFF
INITIALS
Summary of Revision:
Received by:
(please print)
REVISION
NO.
DATE RECEIVED
STAFF
INITIALS
ISSUED DATE
STAFF
INITIALS
Summary of Revision:
Received by:
(please print)
REVISION
NO.
DATE RECEIVED
STAFF
INITIALS
ISSUED DATE
STAFF
INITIALS
Summary of Revision:
Received by:
City ("Tukwila
REVISION
S M1VIITTAL
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Web site: http: / /www.ci.tukwila.wa.us
Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through
the mail, fax, etc.
Date: 27--'ld Plan Check/Permit Number:
PA
❑ Response to Incomplete Letter #
❑ Response to Correction Letter #
kRevision # after Permit is Issued CITY
❑ Revision requested by a City Building Inspector or Plans Examiner 'JUL 2 7 2010
QEPNI'r c €►�r~_
Project Name:
Project Address:
Contact Person: O v■. E.5 Phone Number: 4I6$ - S96— I l (o9
Summary of Revision:
Qf' 41'nf fee 44 4C,10/ 57 ��d, 32/ -- .F68
bo\ oz._ 'Te:e
Sheet Number(s):
"Cloud" or highlight all areas of revision including date of revision
Received at the City of Tukwila Permit Center by: J%)"
Entered in Permits Plus on
H:Wpplications\Forms- Applications On Line\2009 -08 Revision Submittal.doc
Created: 8 -13 -2004
Revised: 8 -2009
•
City of Tukwila
Steven M. Mullet, Mayor
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 -431 -3665
Web site: http : / /www.ci.tukwila.wa.us
Steve Lancaster, Director
1
REVISION SUBMITTAL
1
Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through
the mail, fax, etc.
Date: V lAy 28, ZD 10
❑ Response to Incomplete Letter #
• Response to Correction Letter # 1
• Revision # after Permit is Issued 4# APeROVE
❑ Revision requested by a City Building inspector or Plans Examiner
Plan ChecWPermit Number: M J 0 ` 04q
Project Name: Dollar Tree
Project Address: 321 Strander Bl
RECEIVED
CITY OFTUI(t
JUN .012010
PERMIT CENTER
Contact Person: KOVI Id EA Phone Number: 204, 7 95 2-6,2€3
Summary of Revision: (5�0-- ITrp.e-N 1%1) va -
M WOK G4M4Gre5 To pi-A-146 IN gP5 Ponts.E TO A MPP11=16ATION
Of Tub 13w1i, 91hlcr 1741RM6T' g6aU121Ev PSY THE PLQOJIs(1t1(x- 'Deer.
Sheet Number(s): M I
"Cloud" or highlight a!! areas of revision including date of revision
Received at the City of Tukwila Permit Center by:
Entered in Permits Plus on ,c07/ /
\applications\ forms- applications on line \revision submittal
Created: R -13 -2004
Revised:
Contractors or Tradespeople *ter Friendly Page
•
General /Specialty Contractor
A business registered as a construction contractor with LEtI to perform construction work within the scope of
its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of
account and carry general liability insurance.
Business and Licensing Information
Name B Davis Inc UBI No. 602002349
Phone 4084364800 Status Active
Address 1441 A Teminal Ave License No. BDAVII'000CP
Suite /Apt. License Type Construction Contractor
City San Jose Effective Date 3/24/2000
State Ca Expiration Date 1/24/2012
Zip 951124314 Suspend Date
County Out Of State Specialty 1 General
Business Type Corporation Specialty 2 Unused
Parent Company
Business Owner Information
Name
Role
Effective Date
Expiration Date
Davis, Bud R
&Nbsp;
01/01/1980
Bond Information
Page 1 of 1
Bond
Bond Company Name
Bond Account Number
Effective Date
Expiration Date
Cancel Date
Impaired Date
Bond Amount
Received Date
CBIC
NB4080
11/20/2001
Until Cancelled
$12,000.00
11/26/2001
Assignment of Savings Information No records found for the previous 6 year period
Insurance Information
Insurance
Company Name
Policy Number
Effective Date
Expiration Date
Cancel Date
Impaired Date
Amount
Received Date
11
LIBERTY
SURPLUS INS
CORP
DGLSF184227064
12/31/2009
12/31/2010
$1,000,000.00
01/04/2010
10
LIBERTY
SURPLUS INS
CORP
DGLSF18422705412/31/2008
12/31/2009
$1,000,000.00
03/09/2009
9
LIBERTY
SURPLUS INS
CORP
DGLSF08422705412/31/2008
12/31/2009
$1,000,000.00
01/05/2009
8
LIBERTY
SURPLUS INS CO
DGLSF184227044
12/12/2005
12/31/2008
$1,000,000.00
01/03/2008
7
LIBERTY
SURPLUS INS
CORP
DGLSF184227014
12/12/2004
12/12/2005
$1,000,000.00
12/10/2004
6
ARCH
SPECIALTY INS
CO
72DPC145460
12/12/2003
12/12/2004
$1,000,000.0012
/20/2003
Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period
Warrant Information No unsatisfied warrants on file within prior 6 year period
https://fortress.wa.gov/lni/bbip/Print.aspx
07/06/2010
GENERAL NOTES
A) HVAG ROOF CURBS SLOPED TO MATCH ROOF PITCH SHALL BE PROVIDED BY
GONTRAGTOR AND ARE NOT PART OF THE NATIONAL ACCOUNT PROVISIONS.
B.) CONTRACTOR SHALL IDENTIFY ALL ROOF MOUNTED EQUIPMENT WITH STORE NAME AND
UNIT NUMBER USING PERMANENT, WEATHER PROOF 2" HIGH DIE -GUT LETTERS.
G.) PROVIDE PROPER CONDENSATE TRAP AND TERMINATE AS REQUIRED BY LOCAL
CODE.
D.)
E.)
CONTRACTOR SHALL COMPLY WITH ALL LANDLORD'S TENANT CRITERIA. COORDINATE
AND SCHEDULE ALL WORK WITH LANDLORD'S FIFI D REPRESENTATIVE.
5ALANGING OF AIR DEVICES WHERE REQUIRED SHALL BE ACCOMPLISHED BY ADJUSTING
BRANCH TAKEOFF DAMPER AT MAIN TRUNK DUCT. DAMPERS IN THE NECKS OF AIR
DEVICES SHALL BE USED FOR FINAL TRIM ONLY, AND IN NO CASE FOR GREATER THAN
IO% OF THE INDICATED VOLUME FOR THE INDIVIDUAL AIR DEVICE.
F.) PROVIDE SUPPORT FOR GAS PIPING ON ROOF PER DETAILS ON SHEET MP -2 AND PER
LANDLORDS ROOFING GONTRACTOR'S RECOMMENDATION.
G.) ANY PENETRATION THROUGH THE ROOF SHALL BE COORDINATED WITH THE LANDLORD'S
FIFI n REPRESENTATIVE AND SHALL BE DONE BY A LANDLORD APPROVED ROOFING
CONTRACTOR IN ORDER TO MAINTAIN THE ROOFING WARRANItt. ALL VENTS SHALL
EXTEND A MINIMUM OF 12 INCHES ABOVE ROOF AND SHALL BE A MINIMUM OF 10 FEET
FROM ANY OUTSIDE AIR INTAKE.
H.) DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS. DUCT DIMENSIONS MUST BE
INCREASED IF DUGTLINERS ARE INSTALLED.
I.) DO NOT PROVIDE AIR EXTRAGTORS OR SPLITTER DAMPERS WHIGH PROTRUDE INTO
RECTANGULAR TRUNK DUGTS (WHERE USED). PROVIDE ROUND SPIN -IN FITTINGS FOR
ROUND BRANCH DUGTS.
J.) ROUND BRANCH DUCTS WHERE INDICATED ARE SAME SIZE AS DIFFUSER WHICH IT
SERVES.
K.) DO NOT SUSPEND ANY ITEMS FROM DECK OR SLAB ABOVE. ALL ITEMS SHALL
SUSPENDED FROM STRUCTURE UNLESS OTHERWISE NOTED. PROVIDE MISCELLANEOUS
STEEL AS REQUIRED.
L.) WHERE CEILING SPACE 15 NOT SUFFICIENT TO PERMIT TOP CONNECTION TO CEILING
DIFFUSER WITH PROPER BEND RADIUS FOR FLEXIBLE DUGT, CONTRACTOR SHALL
FABRICATE AND /OR PROVIDE AN ADAHER BOX FOR DIFFUSER TO PERMIT SIDE
GONNEGTION OF FLEXIBLE DUCT.
M.) FURNISH AND INSTALL SMOKE DUCT DETECTOR (SYSTEM SENSOR #DHIOOAGDGLP) IN
RETURN AIR. WIRE SMOKE DUCT DEIIGTOR TO BUILDING FIRE ALARM CONTROL
PANEL OR FURNISH AND INSTALL A REMOTE AUDIBLENISUAL ALARM DEVICE WITH A
REMOTE TEST SWITCH (SYSTEM SENSOR #SSK451) LOCATED IN AN APPROVED
LOCATION. FIELD VERIFY EXACT REQUIREMENTS. GONTRAGTOR SHALL TEST SYSTEM
TO INSURE PROPER FUNCTION PRIOR TO TENANT OCCUPYING SPACE.
FIRE PROTECTION STANDARDS
THE CONTRACTOR SHALL RETAIN AND PAY FOR A "PROFESSIONAL OF RECORD" FOR ALL FIRE
SPRINKLER AND FIRE PROTECTION WORK. THE DRAWINGS AND ALL SPECIFICATIONS FOR ALL
FIRE PROTECTION WORK ARE PERFORMANCE IN SCOPE AND INTENT. THE GONTRAGTOR SHALL
BE RESPONSIBLE FOR ALL DESIGN, LAYOUT, DETAILS, DRAWINGS, DOCUMENTS, MATERIALS,
EQUIPMENT, LABOR, AND ALL GRITERIA TO MEET GOVERNING AUTHORITIES, CODES,
REGULATIONS, AND UNDERWRITER'S REQUIREMENTS FOR ALL FIRE PROTEGTION WORK.
GONTRAGTOR SHALL VISIT THE SITE TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS
PRIOR TO SUBMITTING BID. A COMPLETE SET OF ALL REQUIRED DOCUMENTS SHALL BE
PREPARED AND SUBMITTED TO THE PROPER AUTHORITIES WITHIN THIRTY (30) DAYS OF
CONTRACT AWARD. THE LANDLORD'S DESIGN GRI ItbIA SHALL BE CONSIDERED PART OF
THESE STANDARDS.
ALL FIRE PROTECTION WORK SHALL BE SCHEDULED IN ADVANCE WITH THE LANDLORD'S
FIELD REPRESENTATIVE. FIRE PROTECTION SYSTEM SHALL BE FULLY OPERATIONAL WHEN
THE GONTRAGTOR 15 OFF THE SITE.
WHERE CEILINGS OR CEILING GRIDS ARE EXISTING TO REMAIN OR NEW CEILINGS ARE
INSTAL 1 Fn AND NEN LIGHTING GONFLIGTS WITH THE LOGATION OF EXISTING SPRINKLER
HEADS, THE NEW LIGHTING SHALL BE SHIFTED APPROXIMATELY 6" (OR AS REQUIRED TO
MAINTAIN CLEARANCE TO SPRINKLER HEADS PER NFPA 13) TO ALLOW THE EXISTING
SPRINKLER HEADS TO REMAIN.
KEYED NOTES
SITE UTILITIES
(FIRE, DOMESTIC WATER, SEWER, GAS, STORM)
I. CONTRAGTOR SHALL VERIFY POINT OF GONNEGTION TO SITE UTILITY
SERVICE PRIOR TO COMMENCING INSTALLATION.
2. CONTRACTOR SHALL ADJUST LOGATION AND DEPTH OF BUILDING
SERVICES AS REQUIRED TO GONNEGT TO SITE UTILITY SERVICE.
3. CONTRACTOR SHALL MAKE FINAL GONNEGTION TO SITE UTILITY
SERVICE (UNLESS OTHER PROVISIONS HAVE BEEN MADE).
4. CONTRACTOR'S FAILURE TO PROPERLY COORDINATE SERVICES SHALL
NOT BE JUSTIFICATION FOR ANY EXTRA CHARGES.
TENANT'S CONTRACTOR TO PROVIDE NEW INLINE EXHAUST FAN AS SHOWN. ROUTE S "DIA
DUCT UP THRU ROOF TO GOOSENECK. MAINTAIN 10' -0" FROM ALL OUTDOOR AIR
INTAKES.
TENANTS CONTRACTOR SHALL REMOVE "EXISTING RTU AND INSTALL NEW TENANT
PROVIDED RTU. TENANTS GONTRAGTOR'SHALL REPLACE ROOF CURB AS REQUIRED.
COVER OPEN END OF RETURN DUGT WITH 1/2" MESH HARDWARE CLOTH IN REMOVABLE
METAL FRAME. PROVIDE MANUAL VOLUME DAMPER AND BALANCE TO 100 GFM.
COVER OPEN END OF RETURN DUGT WITH 1/2" MESH HARDWARE CLOTH IN REMOVABLE
METAL FRAME. PROVIDE MANUAL VOLUME DAMPER AND BALANCE TO 150 GFM.
EXTEND 4/8 EXHAUST DUGT DOWN ALONG WALL AND COVER OPEN END OF EXHAUST
DUGT WITH 1/2" MESH HARDWARE CLOTH IN REMOVABLE METAL FRAME 48" A.F.F.
PROVIDE MANUAL VOLUME DAMPER AND BALANCE TO 15 GFM.
GONNEGT SUPPLY AND RETURN AIR DUCTS TO DROPS FROM UNIT WITH TRANSITION
FITTINGS. DO NOT "HARD TAP" DROPS FROM UNIT.
ADJUST DIFFUSER FOR FULL VERTICAL DISCHARGE INTO OFFICE BELOW.
THE TENANTS CONTRACTOR SHALL EXTEND THE SPRINKLER SYSTEM AND PROVIDE DRY
PENDANT HEADS IN THE WALK -IN COOLER AND FREEZER SECTIONS PER NFPA 13
REQUIREMENTS.
DOVER OPEN END OF RETURN DUGT WITH 1/2" MESH HARDWARE CLOTH IN REMOVABLE
METAL FRAME. PROVIDE MANUAL VOLUME DAMPER AND BALANCE TO 1600 GFM.
TENANTS CONTRACTOR SHALL INSTALL TENANTS VENDOR PROVIDED G02 SENSOR ON
COLUMN AT 6' -0" A.F.F. THIS SENSOR SHALL CONTROL RTU- 2,3,4,5,6. SEE EMS SYSTEM
SHEETS FOR MORE INFORMATION.
TENANTS CONTRACTOR SHALL INSTALL TENANTS VENDOR PROVIDED G02 SENSOR ON
WALL AT 6'-O" A.F.F. THIS SENSOR SHALL CONTROL RTU -I. SEE EMS SYSTEM SHEETS
•7
NF 'M • 0 .
BLANK -OFF TWO SIDES OF THE DIFFUSER.
RETURN AIR TRANSFER DUGT AS HIGH AS POSSIBLE.
CONNECT EXISTING GA5 PIPING TO NEW ROOFTOP UNITS. CONTRACTOR SHALL TEST
PIPING FOR LEAKAGE/DEFEGTS PRIOR TO GONNEGTION TO NEW ROOFTOP UNITS.
CONTRACTOR SHALL VERIFY IF EXISTING PIPING 15 PROPERLY SIZED FOR NEW
ROOFTOP UNITS. CONTRACTOR SHALL IMMEDIATELY NOTIFY ENGINEER AND DOLLAR
TREE PROJECT MANAGER IF EXISTING PIPING NEEDS REPAIR AND /OR REPLACEMENT.
NOTE: REIDENTIFY ALL ROOFTOP EQUIPMENT SERVING THE DOLLAR TREE SPACE
WITH THE STORE NAME AND THE EQUIPMENT NUMBER ENGRAVED IN 3" X S" LAMINATED
PLASTIC EQUIPMENT TAGS PERMANENTLY ATTACHED TO THE UNITS IN A VISIBLE
LOGATION. DO NOT OBSTRUCT ANY HOUSING PANELS, ETG. REQUIRED FOR
MAINTENANGE OR REPAIR.
FILE COPY
AID-, Mal
Permit No.
Plan review approval is subject to errors and omissions.
Approval of construction documents does not authorize
1. violation of any adopted code or ordinance. Receipt
r'.
approve d�ield Copy and conditions ons is acknowledged:
B
Date: "Lo-1 D
City Of Tukwila
BUILDING DIVISION
SEPARATE PERMIT
REQUIRED FOR:
❑ Mechanical
d
Electrical
(_./Plumbing
L� " as Piping
City of Tukwila
BUILDING DIVISION
0
_
■��i �f - t•1•i'ij:i ■•�'i ■■•)v.�l ■ice ■1
��► r ■�i ■■ ■.:,.. ■0.. ,� 1111 1
�, a 500 ' ■•1® ■ ■ ■t J4IiP��li `
a. iimai11 mow J!1-"-r .. ! Ii it
I�
� 11, ■ ii1■, r;�.7, an..
HVAG /PLUMBING PLAN
MECHANICAL RESPONSIBILITY CHART
EXISTING AND /OR BY
LANDLORD'S CONTRACTOR
BY TENANT'S CONTRACTOR
PROVIDED BY TENANT FOR
TENANT'S CONTRACTOR INSTALLATION
SUPPLIED AND INSTALLED BY
TENANT'S VENDOR
NOT APPL I GABLE
COMMENTS
HVAG UNITS
•
MODIFIGATIONS BY
TENANT'S CONTRACTOR
HVAG ROOF CURBS
•
CURB ADAPTORS
•
SPLIT SYSTEM AHU
•
SPLIT SYSTEM HP /GU
•
DUGT FURNACE/DUCT HEATER
•
UNIT HEATER
•
VESTIBULE HEA I tK
•
EM5
•
REFER TO EM SHEETS
- DUCTWORK $ AIR DEVICES
•
-WATER HEATER
•
SERVIGE SINK
•
INCLUDES SINK, GRID DRAIN,
FAUGET, MOP HANGER, HOSE $
CLAMP
WATER CLOSETS
•
INCLUDES ADA CLOSET 4 TANK,
FLANGE, WAX RING, SUPPLY
STOP4 TUBES, ADA SEAT,
CLOSET BOLTS 4 GAPS
LAVATORIES
•
INCLUDES LAVATORY, FAUCET,
SUPPLY STOPS $ TUBES, WALL
HANGER KIT, DRAIN KIT 4
TAILPIEGE
DRINKING FOUNTAIN
•
INCLUDES DRINKING FOUNTAIN,
WALL HANGER KIT, SUPPLY
STOP 4 TUBE
URINAL
•
INCLUDES URINAL, FLUSH VALVE,
WALL HANGER KIT, TOP SPUD 4
TAILPIECE
FLOOR DRAINS, GLEANOUTS
•
GAS PIPING
•
FIRE PROTEGTION
MODIFICATION (512 NOTES)
•
EXTENSION FROM RISER
BY TENANT'S GONTRAGTOR
5 G A L E: I /8" = I'-O"
NORTH
REVISIONS
No changes shall be made to the scope
of work without prior approval of
Tukwila Building Division.
NOTE: Revisions will require a new plan submittal
and may include additional plan review fees.
MECHANICAL LEGEND
(Kw) TAG
1 /N0.
A -10X10
300
7
LAY -I
f 6/6
6/6
6/6
GONNEGTION TO EXISTING SERVICE
APPROVED DUGT TYPE SMOKE DETEGTOR
EQUIPMENT TAG
ADD E TO NO. FOR EXISTING
TAG -NECK SIZE AIR DEVICE TAG
VOLUME(GFM)
TAG -NO.
SUPPLY AIR DIFFUSER
RETURN/EXHAUST AIR GRILLE
GONGENTRIG SUPPLY/REPi:RN AIR DEVICE
FIRE DAMPER
VOLUME DAMPER
PLUMBING FIXTURE TAG
NEW SUPPLY, RETURN AND EXHAUST AIR
DUCTWORK
NEW SUPPLY, RETURN AND EXHAUST AIR
DUGT ELBOW UP
NEW SUPPLY, RETURN AND EXHAUST AIR
DUGT ELBOW DOWN
NEW FLEXIBLE DUGT
EXISTING SUPPLY, EXHAUST AND
RETURN AIR DUCTWORK
SUPPLY, EXHAUST AND RETURN AIR
DUCTWORK TO BE DEMOLISHED
ITEMS DRAWN IN PHANTOM LINETYPE
ARE EXISTING TO BE RELOCATED
REVIEWED FOR
CODE COMPLIANCE
AP:MIMED
JUN 16 2010
City of Tukwila
BUILDING On►icinm
REVISIONN1P ij
Mio -o�9
NQTE GONIRAGTO>Z
DUCTWORK SHALL BE SIZED AND INSTALLED AS INDICATED ON CONTRACT DOCUMENTS.
NO CHANGES SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL FROM DOLLAR
TREE. FAILURE TO DO 50 SHALL RESULT IN CONTRACTOR REMOVING INSTALL Fr)
SYSTEM AND REPLACING WITH NEN AS SHOWN AT NO ADDITIONAL COST TO DOLLAR
TREE.
NOTE- FtYAG GONTROLSe
CONTRACTOR SHALL REFER TO THE EM SHEETS FOR INSTALLATION INSTRUCTIONS FOR
THE VENDOR FURNISHED, CONTRACTOR INSTALLED HVAG CONTROL SYSTEM AND
TEMPERATURE AND G02 SENSOR LOCATIONS PRIOR TO THE INSTALLATION OF ALL
RELATED ITEMS.
NOTE:
ROOF WORK FLASHING FOR HVAG EQUIPMENT, PLUMBING
VENTS, PENETRATIONS, ETG., SHALL BE PER LANDLORD'S
ROOFING CONTRACTOR'S REQUIREMENTS TO MAINTAIN
ROOF WARRAN I Et.
HVAG SYSTEM SHALL BE CONTROLLED BY
ENERGY MANAGEMENT SYSTEM.
RECEIVED
JUN 012010
PERMIT CENTER
IF YOU HAVE ANY QUESTIONS REGARDING THE
MECHANICAL FLANS, PLEASE GALL THE
MECHAN I GAL DESIGNER.
DESIGNER:
PHONE /FAX:
E -MAIL :
PHIL RAMSEY
612 -465- 7682/612- 465 -7782
phi I.romsey @dunhameng.Gom
Dunham Associates, Inc.
50 South Sixth Street / Suite 1100
Minneapolis, Minnesota 55402 -1540
Fax 612.465.7551
P14ONe 612.465.7550
dunhameng.com
3
mechanical + electrical consulting engineering
N
Z
W
c
0 2
U +,
W �L
0 0
0 QQ))
U -v
0
In
O
0
0
(1)
a)
O
N
0
1
0
0
410820 -0q5
1
0
a)
O
0
lY
0
O
cn
N
0
0
1
z
a)
0
C)
0
RRMM
ARCHITECTS, PC
1317 Executive Blvd, Suite 200
Chesapeake, VA 23320
(757)622-2828 1 fax (757)622 -6883
sheet
MCI
WI-
I I�
\ /
L- V _
MS -1
WASTE AND VENT FLOOR PLAN
5GALE : I/4" = I' -0"
LAV OR SINK,
RE: PLANS -
ZURN MODEL ZI021
"PRIME -F7F" WATER
SAVER TRAP PRIMER,
OR EQUAL
F.D., RE: PLAN
G.O.
FINISHED 1/2 COMPRESSION —
FLOOR FITTING
/ /) / / / / / / / / / ///
TRAP PRIMER DETAIL
NOT TO SCALE
SUPPORT FROM STRUCTURE
WITH 1/4" THREADED ROD
OR I" WIDE 22 GAUGE STRAP
I" NIDE 22 GAUGE
HANGER BAND MAX
12-0" SPACING -\
SEAL ALL AROUND WITH
ELASTOMER GASKET
FINISHED WALL
ESCUTCHEON
1/2" SOFT "K" COPPER
NOTE: MATERIALS AND
INSTALLATION SHALL BE PER
SMACNA STANDARDS
VOLUME
DAMPER
12" MIN.
26 GAUGE,
ROUND SPIRAL
SEAM DUCT.
SEE DWG'S. FOR
SIZES.
SHEET METAL BOOT
TO MATCH DUCT
SUPPLY DIFFUSER.
511 SCHEDULE
SPIRAL DUCT AND DIFFUSER DETAIL
NOT TO SGALE
ROUND DUGT SPECIFICATIONS
EXPOSED ROUND DUCTWORK SHALL BE 26 GAUGE, SINGLE WALL GALVANIZED
STFFI , SPIRAL LOCKSEAM. FITTINGS SHALL BE SINGLE WALL GALVANIZED
STEEL, STANDING SEAM OR SOLID WELDED GONSTRUGTION. ELBOWS SHALL BE
STANDING SEAM, GORED ELBOWS. GRILLE COLLARS SHALL BE ATTAGHED TO
THE DUCTWORK WITH POP RIVETS WITH A FINISHING FILLET OF ELASTOMER
SEAL AT THE JUNCTION OF THE COLLAR TO THE DUCT. DUCT -TO -DUCT JOINTS
SHALL BE MADE WITH THE SPIRAL SEAM ROTATED 50 THAT THE STANDING
SEAM FORMS A CONTINUOUS HELICAL PATTERN AGROSS THE JOINT. ALL
DUCTWORK AND FITTINGS SHALL BE MANUFACTURED IN AGGORDANGE WITH
SMAGNA'S HVAG DUCT CONSTRUCTION STANDARDS LATEST EDITION.
GONTRAGTOR SHALL LOCATE BOTTOM OF STOCKROOM DUCTWORK 12-0"
ABOVE STOGK ROOM FLOOR. ANY DEVIATION FROM THIS DIMENSION DUE TO
INTERFERENCE WITH BUILDING OBSTRUCTIONS SUCH AS STRUCTURE, OVERHEAD
DOORS, ETC. SHALL BE BROUGHT TO THE AI ILNTION OF THE ENGINEER PRIOR
TO FABRIGATING THE DUCTWORK.
WH -I
WG -1
LAV -I
I\ I I/1
I\ /
v J n 7\
ill
LAV -I
SCI
DOMESTIC WATER FLOOR PLAN
/ / / / / / / / / / / / ///
SCALE: 1/4 " =1' -0"
NOTE: SET TEMPERED WATER TEMPERATURE TO 110 DEG F MAX.
PROVIDE AT EACH LAVATORY
THERMAL MIXING VALVE DETAIL
NOT TO 5G
ALE
TO 5GALE
PLUG FOR GLEANOUT
6
6
PROVIDE TRAP VENT
WHERE REQUIRED BY
CODE
ROOFTOP UNIT
STAY GLEAR OF ACCESS
PANELS /SERVICE AGGE55
VACUUM RELIEF VALVE
WATTS 36A
HEAT TRAP TYPICAL
3/4"
PITCH WITH
ROOF SLOPE
PIPE SUPPORT
ADJUST AS REQUIRED FOR
PERPENDICULAR LINE
ROOFTOP UNIT CONDENSATE
PIPING DETAIL
NOT TO SGALE
DIF1 FGTRIG UNION
4"1^1G0
-c\v
4 ir
N
MS-1 I
WG -I
NOTES:
I. PROVIDE TRAP PRIMERS AT ALL
FLOOR DRAINS.
2. PROVIDE MIXING VALVES AT ALL
LAVATORIES.
LAV- I�
LAV -I
DF -I
WG -1
FD -I
g„ 4 "EGO
WASTE AND VENT RISER DIAGRAM
NOTE:
SET TEMP. @ 120 DEG F
NOTE:
MOUNT WATER HEATER ON FLOOR.
SCALE: N.T.S.
T P RELIEF VALVE (FACTORY INSTALLED)
WITH FULL SIZE DRAIN LINE DOWN
TIGHT TO WALL. TERMINATE OVER 6"
MOP SINK.
WATER HEATER DETAIL
NOT TO SCALE
PLUGGED I /8" NPT TEST
GAUGE CONNECTION
CONNECT TO UNIT GAS CONTROLS
WITH GROUND JOINT UNION PROVIDE
GROMMET FOR WATER -TIGHT SEAL
TERMINATE AS
REQUIRED BY LOCAL
CODE
co
PROVIDE GAS PRESSURE
REGULATOR WHERE REQUIRED
SEE SCHEDULE
GROUND JOINT UNION
GAS COCK WITH PLUGGED
1 /S" NPT TEST GAUGE
CONNECTION
ROOFTOP UNIT
GAS PIPING - RUN
ON ROOF
.0 TYP. MECH. PIPE
ROOF
pr
PIPESTAND
OR CODE APPROVED
TREATED TIMBER
GAS PIPE ADJUSTMENT
AT ROOF OBSTRUCTIONS
TYPICAL
NOTE: COORDINATE PIPING SUPPORTS WITH LANDLORDS ROOFING CONTRACTOR.
NOTE: CONTRACTOR SHALL VERIFY ALL MECHANICAL GAS
FIRED EQUIPMENT GONNEGTION LOCATIONS IN THE FIFI D
PRIOR TO INSTALLING ANY GAS PIPE MAINS OR BRANCHES.
ROOFTOP UNIT GAS PIPING DETAIL
NOT TO SCALE
I0
3/4"
LDF-I
DOMESTIC WATER RISER DIAGRAM
SCALE: N.T.S.
ROOFTOP UNIT SCHEDULE (gas heat /elec. cool)
PROVIDED BY DOLLAR TREE FOR INSTALLATION BY CONTRACTOR
MARK
MFG/MODEL
DISCHARGE
TONS
ESP
GFM
OUTSIDE AIR
GFM (MIN.)
OUTSIDE AIR
GFM (MAX.)
ENTERING AIR
CONDITIONS
NET COOLING CAPACITY (MBH)
AR!
SEER
HEATING CAPACITY
AFUE
%
ELEGTRIGAL
MCA/
MOGP
AGGE550RIE5
UNIT WEIGHT
(LB5)
TOTAL
SENSIBLE
INPUT
OUTPUT
VOLT / PH / HZ
BTU -I
CARRIER
48TGDA05
VERTIGAL
4
.5
1600
250
250
162F DB 62.4E WB
®110F AMBIENT
4415
3521
13.0
-12.0
511.0
82
460V / 3/ 60
10.1/15
I, 2, 3, 4, 5.
550
RTU -2
CARRIER
45TGDA06
VERTICAL
5
.5
2000
1110
400
11•SF DB 63.8E NB
®110F AMBIENT
511115
48.81
13.0
12.0
511.0
82
460V / 3/ W
13/20
1, 2, 3, 4, 5, 6
625
RTU -3
CARRIER
48TGDA05
C
4
5
1600
140
300
16.2F
162E DA 62.4E WB
®110F AMBIENT
4415
3521
13.0
12.0
511.0
S2
460V / 3/ 60
10.-1/15
I, 2, 3, 4, 5.
550
RTU-4
CARRIER
48TGDA06
VERTICAL
5
5
2000
1110
400
11.SF DB 63.8F NB
®110F AMBIENT
511115
48.81
13.0
12.0
511.0
82
460V / 3/ 60
13/20
I, 2, 3, 4, 5, 6
625
RT.0 -5
CARRIER
48TGDA06
VERTICAL
5
5
2000
1110
400
T1.SF DB 63.5E WB
®110F AMBIENT
511115
48.81
13.0
12.0
511.0
82
460V / 3/ 60
13/20
I, 2, 3, 4, 5, 6
625
RTU -6
GABBIER
48TGDA06
VERTICAL
5
.5
2000
1110
400
11•8F DB 63.8E NB
®110F AMBIENT
511115
48.81
13.0
12.0
511.0
S2
460V / 3/ 60
13/20
I, 2, 3, 4, 5, 6
625
ACCESSORY OPTIONS: I) INTEGRATED DIFFERENTIAL ENTHALPY EGONOMIZER 2) GRAVITY RELIEF DAMPER, 3) FACTORY MOUNTED, FIELD WIRED CONVENIENCE OUTLET,
4) UNIT MOUNTED DISCONNECT, 5) FIFI D INSTALLED LOUVERED COIL HAIL GUARDS, 6) MEDIUM STATIC DRIVE
tigara
I. GONTRAGTOR SHALL BE RESPONSIBLE FOR ALL STARTUP AND WARRANTY WORK. VERIFY FI FGTRIGAL POWER PRIOR TO INSTALLING UNITS. FAILURE TO DO 50 SHALL RESULT IN
GONTRAGTOR FURNISHING GORREGT UNITS OR POWER AT NO ADDITIONAL GOST TO DOLLAR TREE. OUT SIDE AIR QUANTITIES BASED ON ASHRAE 110.1 -2004 BUILDING AND PEOPLE COMPONENTS
FOR AN ENGINEERED VENTILATION SYSTEM EMPLOYING A G02 MONITORING SYSTEM.
2. CARRIER SERIES 48HJ GAS FIRED RTU'S WITH R22 REFRIGERANT ARE APPROVED EQUALS UNTIL THEY ARE NO LONGER AVAILABLE FROM THE MANUFACTURER
3. SLOPED ROOF CURB PROVIDED BY G.G.
KEYED NOTES
PROVIDE NEW 4" VENT THRU ROOF. COORDINATE ROOF PENETRATION REQUIREMENTS WITH
LANDLORD'S ROOFING GONTRAGTOR
EXTEND NEW 4" SANITARY SEWER TO EXISTING MIN. 4" SANITARY APPROX. 10'-0"
AWAY. FIELD VERIFY EXACT LOCATION, SIZE, AND INVERT ELEVATION OF
GONNEGTION POINT PRIOR TO START OF ANY WORK.
EXTEND I" DOMESTIG WATER TO EXISTING 2" WATER. PROVIDE SHUT -OFF,
BAGKFLOW PREVENTER, PRESSURE REGULATING VALVE, METER, AND REMOTE
READER IF REQUIRED BY UTILITY COMPANY. INSULATE ENTIRE LINE WITHIN BUILDING.
FIELD VERIFY EXAGT LOCATION OF EXISTING DOMESTIC WATER PRIOR TO
INSTALLING ANY PIPING.
GONTRAGTOR SHALL OBTAIN A COPY OF ALL PLUMBING FIXTURE SPECIFICATION
SHEETS PRIOR TO INSTALLATION. CONTRACTOR SHALL ROUGH IN ALL
PLUMBING BASED ON THE FIXTURE SPEGIFIGATION SHEET.
LAV -I
PLUMBING LEGEND:
CONNECTION TO EXISTING SERVICE
TAG -NO. PLUMBING FIXTURE TAG
GOLD WATER PIPING
HOT WATER PIPING
SANITARY WASTE PIPING
VENT PIPING
— REVIEWED FOR
CODE COMPLIANCE
APPROVE
JUN 16 2010
City of Tukwila
BUILDING nil/1 m
GRILLE, REGISTER 4 DIFFUSER SCHEDULE
MARK
MFGR.
MODEL
MATERIAL
DEZVEIGE
SI
MOUNTING
TYPE
A
TITUS
TMSA
511:±L
24" X 24"
LAY -IN
SUPPLY
B
TITUS
TM5
SIttL
24" X 24"
LAY -IN
SUPPLY
G
TITUS
30085
STEEL
AS SHOWN
SURFACE
SUPPLY
D
TITUS
50F
ALUMINUM
24" X 24"
LAY -IN
RETURN
E
TITUS
50F
ALUMINUM
24" X 12"
LAY -IN
RETURN
F
TITUS
350RL
STFFI
10" X 10"
SURFACE
EXHAUST
FIXTURE GONNEGTIONS
EXHAUST FAN SCHEDULE
MARK
MFG/MODEL
GFM
RPM
ESP
IN.-W.G.
BHP
FL FGTRIGAL
ACCESSORIES
VOLT / PH / HZ
EF -I
GOOK GEMINI
GN-420
215
1015
.20
1511
120V / IPH / 60
I, 2, 3
ACCESSORY OPTIONS: I. VIBRATION ISOLATION MOUNT KIT
2. BAGKDRAFT DAMPER
3. PLUG DISGONNEGT
NOTE: FAN SHALL BE INTERLOCKED WITH MOTION SENSOR.
PLUMBING FIXTURE SCHEDULE
PROVIDED AND INSTALLED BY CONTRACTOR
MARK
FIXTURE TYPE
MANUFACTURER
$
MODEL NO.
FIXTURE GONNEGTIONS
REMARKS
GIN
HW
W
V
FD -I
FLOOR DRAIN
ZURN MODEL #Z -415
3.
2 .
TYPE
BODY'A55EMBLYE�WI TRAIP PRIMER GONNEGTION.
FGO -I
FLOOR GLEANOUT
ZURN MODEL 4t1454
- --
--
—
--
SIZE PER PIPING LATERAL, 4" MAX.
WGO -I
WALL GLEANOUT
ZURN MODEL #Z -1446 GIN
--
—
4 "
--
RAISED HEADPLUG POLISH 5.5.
COVER 4 VANDAL PROOF SCREW
TMV -I
MIXING VALVE
WATTS MODEL NO. USG -B
3/S"
3 /S"
- --
---
3/8" TEMPERED OUTLET 25 GPM, MAX OUTLET
TEMP. I TOY F IN AGGOR6ANCE WITH ANSI/ASH
1016 OR 1011/ASH 1066.
PLUMBING FIXTURE SCHEDULE
PROVIDED BY DOLLAR TREE'S VENDOR FOR INSTALLATION BY CONTRACTOR
MARK
FIXTURE TYPE
MANUFACTURER
I $
MODEL NO.
FIXTURE GONNEGTIONS
REMARKS
GIN
HW
W
V
WG -I
HANDICAP
WATER CLOSET
ZURN MODEL Z5560
11" H ELONGATED PRESSURE ASSIST
1.6 G.P.F. SIPHON JET
1/2"
--
3"
2"
C
FURNISH ADA CLOSET d TANK, ADA SEAT,
FLOOR FLANGE, CLOSET CLOSET BOLTS $
GAPS, WAX RING, SUPPLY STOP 4 TUBE. FLUSH
GONTROL MUST BE LOCATED ON THE WIDE
SIDE OF TI-E WG (SIDE OPPOSITE THE WALL).
LAV -I
HANDICAP
WALLHUNG
LAVATORY.
ZURN MODEL NO. 25340
FAUCET HOLES ON 4" CENTERS
1/2"
1/2"
11/2"
11/2°
FURNISH LAVATORY, ZURN ZSI2A4 GOOSE
HTUBES,
HANGER KIT, SUPPLY STOPS DRAIN
KIT 4 TAILPIECE
DF -I
BI -LEVEL
HANDICAP
DRINKING FOUNTAIN
ELKAY MODEL No. EMABFTLPI2C
NON- REFRIGERATED
I/2"
--
1 I/2"
I I/2°
FURNISH STANDARD CABINET FINISH
FOUNTAIN, SUPPLY STOP 8 TUBE, DRAIN KIT,
AND WALL HANGER KIT
M5-I
FLOOR MID.
MOP SINK
ZURN MODEL ZI11116 -36
3/4"
3/4"
3"
2"
FURNISH SINK, ZURN MODEL NO. Z843MI SERVICE
SINK FAUCET WITH BUILT -IN VAGWM BREAKER,
HOSE AND BRACKET, MOP HANGER, AND DRAIN KIT
WH -I
FI FGTRIG
WATER
HEATER
RHEEM MODEL NO. SIVP65
3/4"
3/4"
--
- --
FURNISH 6 GALLON WATER HEATER, 120V /Iph
2,000N WITH ASME RATED T$P RELIEF VALVE
AND INTEGRAL HEAT TRAPS.
TP -I
TRAP PRIMER
MODEL NO. ZI021
A
WA TER SAVER TRAP PRIMER
1/2"
___
I I/2"
--
SEE DETAIL THIS SHEET
INSTALL ALL PLUMBING FIXTURES TO BE FULLY ACCESSIBLE TO INDIVIDUALS WITH DISABILITIES IN AGGORDANGE WITH LATEST ISSUE OF THE AMERICANS
WITH DISABILITIES AGT AND ALL CURRENT STATE AND LOCAL GODES. - 'PROVIDING ACCESSIBILITY AND USABILITY FOR PHYSICALLY HANDICAPPED
PEOPLE' AND/OR Gr FIXTURES EQUIPMENT, TRIM, $ FITTINGS ,IREGULATIOS AND GODES, INCLUDING, BUT NOT L PLUMBING
ITEDTO, WATER AND ENERGY CONSERVATION ODES. THE SCHEDULED AND/OR SPECIFIED PLUMBI ECEIVED
FIXTURES AND EQUIPMENT REPRESENT THE MINIMUM CRITERIA AND SHALL BE THE BASIS FOR TI-E CONTRACTOR'S BASE BID. IF THE SCHEDULED OR
SPECIFIED FIXTURE5 OR EQUIPMENT DO NOT COMPLY WITH GOVERNING GODES OR REGULATIONS IN ALL RESPECTS, THE GONTRAGTOR SHALL PROVIDE JUN 01 2010
AN ALTERNATE BID FOR COMPLYING FIXTURES, EQUIPMENT, TRIM, OR FITTINGS. THE ABSENCE OF AN ALTERNATE BID SHALL BE CONSTRUED TO MEAN
THAT THE GONTRAGTOR'S BID INCLUDES ALL COSTS NECESSARY TO MEET ALL REGULATIONS 4 GODES. PERMIT CENTER
ALL PIPING AND VALVES BELOW LAVATORY SHALL BE INSULATED WITH PVG LAV GUARDS AND CONFIGURED TO PROTEGT AGAINST GONTAGT
PROVIDED WITH LAV KIT. THERE SHALL BE NO SHARP OR ABRASIVE SURFACES UNDER LAVATORY.
NOTE:
ROOF WORK FLASHING FOR HVAG EQUIPMENT, PLUMBING
VENTS, PENETRATIONS, ETC., SHALL BE PER LANDLORD'S
ROOFING CONTRACTOR'S REQUIREMENTS TO MAINTAIN
ROOF WARRANTEE.
Dunham Associates, Inc.
50 South Sixth Street / Suite 1100
Minneapolis, Minnesota 55402 -1540
FAX 612.465.7551
PHONE 612.465.7550
dunhameng.com
mechanical + electrical consulting engineering
0_ >,
<
CY
D
0
0
N
D
-D
410820 -0q5
I1
0
0
0
tY
Q
0
Cr)
0
0
-D
0
0
N
0
RRMM
ARCHITECTS, PC
1317 Executive Blvd, Suite 200
Chesapeake, VA 23320
(757)622-2828 1 fax (757)622 -6883
sheet
MP2
GENERAL MECHANICAL CONDITIONS
Dollar Tree shall furnish selected mechanical equipment, accessories and
controls as scheduled and as specified. The mechanical subcontractor(s)
shall be responsible for delivery coordination, receiving, storing, setting,
startup and installing all Dollar Tree furnished equipment as well as the one
year parts and labor warrantee from the date of store opening.
A. SCOPE
1. Provide all labor, materials and equipment
necessary to properly install air conditioning
systems where shown on Drawings and as scheduled.
2. Provide equipment as specified together with all
necessary ducts, grilles, registers, controls,
piping, low voltage fans, control wiring,
hangers, stands, equipment supports, flashing at
equipment, duct and pipe insulation, unless
otherwise noted.
3. Related Work by Others:
a. Painting except as herein specified.
b. Line voltage wiring and conduit.
c. Electrical supply connection to equipment.
B. All work shall conform to all federal, state and
local codes and any landlord requirements as
specified in the executed Lease Agreement.
Mechanical Contractor shall verify and coordinate
scope of work with Dollar Tree and landlord.
G. The Contractor shall examine the premises and
verify the existing conditions under which he will
be obligated to operate in performing his part of
the work or that will in any manner affect the work
under contract. No additional compensation shall
provided for conditions found during the execution
of contracted work. The Contractor shall cooperate
with the all other trades so that the installation of
all equipment may be properly coordinated.
Gontractor shall bring to the attention of the
Construction Manager any discrepancies between
field conditions and design documents.
12 All equipment furnished shall fit the space
available, with connections, etc., in the
required locations and with adequate space for
operating and servicing. Should a conflict
exist between the drawings and the
specifications, the Gontractor shall promptly
notify the Construction Manager whose decision shall be final.
No allowance will be made subsequently in this
connection to behalf of the Gontractor after award
of the contract.
E. All mechanical equipment shall conform with the
requirements of the State Mechanical Code, the
State Building Code, the State Energy Gode,
NFPA aOA, x6.101 and all applicable local codes
and ordinances.
F. Drawings for Mechanical work are diagrammatic showing
the general location, type, layout and equipment
required. The drawings shall not be scaled for
exact measurements. Refer to manufacturer's
standard installation drawings for equipment
connections and installation requirements as
required. Furnish and install ductwork,
connections, accessories, offsets and materials
necessary to facilitate the system's functioning
as indicated by the design and the equipment
indicated. Gontractor shall obtain all necessary permits
and pay any associated fees.
G. The Gontractor shall install all piping, ductwork, fixtures
and equipment as required to conform the structure,
avoid obstructions, preserve ceiling heights and
headroom and make all equipment requiring
maintenance or repair accessible.
H. The Contractor shall install Mechanical systems as shown,
noted and specified. Equipment may not be
substituted unless written approval by the
Architect, Engineer, or Dollar Tree's Representative is
obtained. Any unauthorized changes shall be removed
contractor's expense if deemed necessary by Architect,
Engineer, or Dollar Tree's Representative. Contractor shall
be responsible for any required changes to related work
caused by the substitution of any items of materials or
equipment at no additional cost to the owner.
HVAG UNITS
ROOFTOP AIR CONDITIONING UNITS (DOLLAR TREE FURNI5HEP EQUIPMENT)
A. Gontractor shall coordinate the delivery, receiving, storage,
rigging, hoisting, installation and start up of Dollar Tree furnished
roof top heating and cooling units including all accessories
05 scheduled and as indicated on the drawings.
B. HVAG units shall be furnished complete with
casing, refrigeration system, heating section
(as scheduled on drawings), fans, motors and drives,
filters, automatic controls, and options and accessories
as scheduled on drawings.
G. Temperature controls.
I. HVAG units shall be furnished with factory
installed and tested components to provide two
stages of cooling, two stages of heating (where
applicable), anti- recycle timer, five (5) minute
compressor staging relay, and other items as
scheduled on drawings.
D. SEQUENCE OF CONTROL (ROOF TOP UNIT)
I. Occupied hours.
a. Unit outdoor air damper shall open to its minimum
position and unit supply an shall operate continuously.
b. Unit outdoor air damper shall modulate from its minimum
scheduled position to its maximum scheduled position in
response to space mounted G02 sensor (by others) set at
1,000 ppm.
c. Unit compressor(s) shall cycle or heat exchanger shall
stage to maintain space setpoint.
d. Unit economizer cycle shall be initiated upon a signal from
out door and return air temperature and enthalpy sensors.
Outdoor air damper, return air damper, and unit
compressor(s) shall cycle to maintain space setpoint.
Economizer cycle shall over ride G02 monitoring system.
2. Unoccupied hours.
a. Unit outdoor air damper shall remain closed and unit
supply fan shall cycle on a signal from space sensor.
b. Unit compressor(s) shall cycle or heat exchanger shall
stage with unit supply an to maintain space setpoint.
3. Smoke Alarm (When Required)
a.Unit outdoor air damper shall close and unit supply fan
shall stop on a signal from duct smoke detector. duct
smoke detector shall send a signal to remote alarm
device.
GRILLES, REGISTERS, AND DIFFUSERS
A. The Contractor shall provide grilles, registers, and diffusers
where indicated and as scheduled on the drawings.
B. Grilles, registers, and diffusers shall be provided with
opposed blade volume dampers.
G. Grilles, registers, and diffusers shall be provided with
frame types to match the surface into which they will
be installed.
D. Grilles, registers, and diffusers shall be provided with
factory applied white finish.
E. Design is based on products manufactured by
Titus. Products of equivalent performance,
construction, and appearance may be supplied.
EXHAUST FANS
A. The Contractor shall provide exhaust fans where
indicated and as scheduled on the drawings.
B. Inline exhaust fans shall be furnished with vibration
isolating hangars and all related hardware.
G. All exhaust fans shall be furnished with back draft
damper, insect screen, motor and drive, and
options and accessories as scheduled on drawings.
DUCTWORK
A. All ductwork shall be constructed of galvanized
steel sheet metal and be fabricated according to
the latest edition of the SMAGNA HVAG Duct
Construction Standards for metal and flexible
ductwork.
B. All elbows shall have proper radius or
contractor shall provide turning vanes as required
by SMAGNA duct construction manual.
G. All duct connections to equipment shall be loaded
type vinyl, vibration elimination connections,
(FG) flexible connections.
D. Flex duct: Provide factory assembled Glass I air
duct (UL 181) with fiberglass insulation and
reinforced outer protective cover /vapor barrier.
Flex duct shall meet NFPA QOA with flame spread
under 25, smoke developed under 50, and shall be
rated for 1" W.G. pressure and 0 to 250 degree
temperature. Maximum length shall be 5' -0 ".
Minimum center line bend radius shall be 1 I/2
duct diameters. Vapor barrier shall be sealed at
each end after connection to duct and air device.
E. All new supply and return ductwork shall be
insulated. NO EXCEPTIONS. Insulate with external
duct wrap or with shop applied duct liner. Duct wrap
shall be foil reinforced kraft facing. All insulation
shall meet NFPA G0A flame spread under 25 and
smoke developed under 50. Thickness, density and
"R" value shall be per code. Insulation shall be
fastened to ductwork per manufacturer's instructions
and SMAGNA standards. Round branch ductwork
shall be insulated with 1" thick fiberglass sleeve
with foil jacket and all joints and terminations
sealed with foil duct tape.
EXECUTION
A. All ductwork transitions shall be (FOT) "Flat on
Top" unless otherwise specified on plan. All duct
dimensions listed are inner air stream dimensions.
B. All ductwork shall be routed above the suspended
ceiling space unless otherwise noted on the plans.
All ductwork shall be suspended according to
the latest edition of the SMAGNA HVAG Duct
Construction Standards for metal and flexible
ductwork.
G. All outside air intakes shall be a minimum of 10' -0"
away from exhaust discharge openings and
plumbing vent stacks.
D. Provide UL approved fire dampers for all
penetrations through fire rated walls, partitions,
ceilings, and floors. Install fire dampers as per
manufacturer's directions and as per UL
guidelines.
E. Provide round spin -in fittings with locking volume damper
for every inlet and outlet attachment to the main
trunk duct whether shown on the plans or not.
Provide additional locking volume dampers at all secondary
branch takeoffs from ductwork mains and as indicated
on plans. Provide inspection access panels In ducts
at all fire dampers.
F. Supply, return and positive pressure exhaust ductwork
shall be sealed in accordance with SMAGNA
Seal Glass G.
G. Gore -drill or saw -cut existing walls, roof, etc.
as required for piping or ductwork and fire -stop
opening around pipe or ductwork. Verify location
of structural beams, joists, etc. before drilling
or cutting. Notify architect of any discrepancies.
H. Wherever foundation walls, outside walls, roofs,
etc. are cut for installation of systems, they
shall be patched to match existing construction
and sealed weather tight. Work shall be performed
by craftsmen skilled in their respective trades.
1. Provide 3 sets of pleated disposable filters. One
set to be used until completion of construction
phase. Install one set at completion of
construction phase and deliver one set to owner
and label each set of filters to denote their
respective HVAG units.
J. Provide two Operation and Maintenance Manuals bound
in 8 -1/2" x 11" page binders, titled "Operation
And Maintenance Manual ". Subdivide binder
contents with page dividers by system and
equipment. Include all shop drawings, and warranties.
Submission of these documents shall be a requirement
for final payment.
TESTING, ADJUSTING AND BALANCING
A. Gontractor shall procure the services of an
independant NEBB or AABC certified air balance
and testing agency to balance, adjust and test
hvac equipment and duct systems.
B. Work shall be performed after the complete Installation
and startup of all equipment, duct systems and
temperature and energy management controls and
completed priot to turnover for the start of stocking.
G. Gontractor shall submit signed and sealed balance
and testing agencie's report to contractor for
submittal to Dollar Tree project manager for review.
D. Balancing of air devices shall be accomplished by
adjusting branch takeoff damper at main trunk
duct. Dampers in the necks of air devices shall be
used for final trim only and in no case for
greater than 10% if the indicated volume for the
individual air device.
E. Where existing duct 15 to be reused, contractor
shall provide and install new manual dampers
with locking quadrante in the runout duct at the
connection to the trunk duct as required for the
completion of balancing.
F. The independant NEBB or AABG certified balance
and testing angency shall also inspect the completed
and operational HVAG equipment, duct systems and
and temperature and energy management controls
proir to turnover of the store for the start of stocking.
Balance and test contractor shall submit the completed
Dollar Tree HVAG field inspection report to the contractor
for submittal to Dollar Tree project manager for review.
GENERAL PLUMBING CONDITIONS
A. SGOPE
1. Provide all labor, materials, tools and
equipment necessary to complete the work,
including installation of plumbing piping and fixtures.
All materials shall be new and be installed in
a workmanlike manner in accordance with
the drawings and specifications.
2. Provide excavation and back fill of all trenches
incidental to the plumbing work as shown on
the drawings. Back fill shall compacted to QO%.
3. Provide all backing, supports and carriers
for fixtures.
4. Provide all cutting and patching of the con-
struction work, rough finish and trim, which
may be required for the Installation of
equipment. All patching shall match all
surrounding work.
5. Contractor shall make all plumbing and
piping connections to equipment specified to
be furnished by Owner or under other sections
of the specifications including final connections
to air conditioning and heating equipment.
6. Contractor shall provide sufficient approved
water hammer arrestors (Wade "SHOCK STOP ",
or equivalent) to prevent water hammer.
7. Contractor shall thoroughly clean all fixtures,
equipment and piping after installation.
8. Contractor shall provide approved access
doors in framed holes for all valves, traps
which must be located in inaccessible locations.
a. Gontractor shall provide cutout data for all sinks
and lavatories to all other related trades.
10. Contractor shall obtain and pay for all required
permits, inspections and certificates in connection
with the his work and make all arrangements with
utility companies for service and connections and
pay all fees, charges permits and meter charges.
MATERIALS
A. DRAIN, WASTE AND VENT
1. Service weight, cast iron bell and spigot
pipe and fittings. No -hub service weight
pipe and fittings may be used above grade
when permitted by local code.
2. Schedule 40, galvanized steel pipe and
banded malleable iron screw fittings.
3. Schedule 40 and 80 PVG or ABS piping
with DWV pattern fittings may be used where
allowed by local code. Foam core PVG piping
will not be approved.
B. HOT AND GOLD WATER
I. Above grade.
a. Type "L" copper tubing, hard temper,
cold drawn with wrought copper lead
free sweat fittings. Connections to fixtures
and equipment shall be made with 85%
red brass IP5 size pipe or compression
angle stops. Provide dielectric unions where
connecting piping of dissimilar materials.
2. Below grade.
a. Type "k" copper tubing, hard or soft temper,
with wrought copper lead free sweat fittings.
Note: No fittings shall be permitted below
grade inside building.
G. AIR CONDITIONING CONDENSATE
I. Type "L" copper tubing, hard temper,
cold drawn with wrought copper lead
free sweat fittings.
D. NATURAL GAS PIPING
1. Schedule 40, ASTM A120, black iron pipe
with 150 Ib. black malleable threaded or
socket welded fittings.
EXECUTION
A. GENERAL REQUIREMENTS
1. Contractor shall examine the premises and
satisfy himself of existing conditions under
which he will be obligated to operate in
performing his part of the work that in any
manner affect the work under the contract.
The contractor shall cooperate with other
trades 50 that the installation of all equipment
may be properly coordinated.
2. All equipment furnished shall fit the space
available, with connection, etc. in the required
locations and with adequate space for operation
and service.
3. All piping, except fixture supplies, shall be
concealed, cut accurately to exact measurements
taken at the building and worked carefully into
place without forcing or springing. Ghanges in
direction of all piping shall be made with fittings.
Changes in pipe size shall be made with reducing fittings.
4. No water or drain lines shall be permitted over
electrical or telecommunication panels or in
telecommunication rooms.
5. Provide protective metal cover plates over
studs and joists where pipes penetrate
close to edge of stud or joist
6. Provide chrome plated escutcheons where
pipes pass through floors, walls and
ceilings in finished spaces.
1. All piping shall be installed with adequate
provision for expansion and contraction
using swing joints, pipe clamps, anchors
and expansion joints. Fittings shall be
50 spaced that they will not interfere
with sliding of pipe on supports.
8. All openings in the roof shall be flashed
watertight per the instruction of the
Landlord's roofing contractor to maintain
roof warrantee.
B. DRAIN, WASTE AND VENT
1. All waste piping shall be pitched a
minimum of 1/4" per foot where
possible. Piping greater than 4"
diameter may be pitched at 1/8" per
foot, only where required by existing
conditions, subject to the approval of
the authority having Jurisdiction.
2. Drains and P- traps: 17 ga. G.P. Brass
where exposed to view extending to
wall. Nominal size of drain and trap
shall not be smaller than the fixture
outlet to which it is attached.
3. Vents shall extend not less than 12"
through roof. They shall be gathered
together where possible into one vent of
equivalent area. Vents shall be flashed
indicated on the drawings. All vents
shall be a minimum of 10' -0" from any
fresh air intakes, or greater if required
by local code.
4. Gleanouts, same size as pipe, shall be
installed in soil and waste lines at every
change of direction and at every 100
feet of run whether shown on the drawings
or not; and shall be accessible in all cases.
When occurring in finished wall or floor,
set flush with surrounding surface.
5. Gleanouts as a minimum shall be located
50 that all soil and waste lines within
or under building are accessible for
cleaning without passing through more
than one ninety degree or two forty -
five degree bends. Gleanout covers
shall be set flush with floors and
grade with exposed plastic nut at
walls.
G. HOT AND GOLD WATER
1. All water piping shall be pitched in
direction of flow to allow for system
draining. Install piping parallel to major
building elements.
2. Install water main shutoff valves, Watts or
approved equal, gate valve, above grade
below pressure regulator.
3. Install accessible hot and cold water
stops at all fixtures.
4. Install dielectric isolators where in-
compatible piping materials come in
contact.
5. Install temperature and pressure relief
valves as required by Gode.
6. Install water pressure regulator,
"Watts" or "Wilkins ", where available
utility pressure exceeds 80 psi.
D. NATURAL GAS
1. Install natural gas piping as indicated
on drawings and as required by
local codes.
2. Install shutoff valves close to fixture
and appliance connections and ahead
union and dirt leg at rooftop units.
3. Unions shall be installed on both sides
of all equipment and where required to
facilitate removal of equipment.
4. Provide gas pressure regulating valves
with turned down vents at all gas appliances
when distribution pressure is greater
than 7" W.G.
5. Provide gas main shutoff valve
with lever type handle placed on
on house side of meter.
6. Paint all exterior piping including
piping installed on roof with two coats
or rust inhibiting exterior paint.
1. Support piping on roof per instruction
of Landlord's roofing contractor to
maintain roof warrantee.
E. INSULATION
I. All water piping, horizontal and vertical
shall be insulated with fiberglass pipe
insulation with an all purpose vapor
barrier jacket. Use minimum I" insulation
on water piping. All insulating materials
shall have a maximum 25 flame spread
rating and 50 smoke developed rating.
2. Approved insulation blocking shall be
placed between sheet metal jacket and
bottom of the pipe where jacket alone
cannot prevent crushing. Insulation
jacket or vapor barrier shall be sealed
after installing blocking. (See hangers,
supports and sleeves
F. HANGERS, SUPPORTS AND SLEEVES
1. All drain, waste, hot and cold water,
and natural gas piping exposed, above
grade and in furred areas, shall be supported
in place with securely fastened solid pipe
hangers not over 8' -O" apart and at each
change in direction, (5' -0" on cast iron pipe).
2. Pipe hangers shall be installed around
the outside of insulation with vapor
barriers, and insulation shall be
protected against crushing by sheet
metal jacket of proper area and weight.
3. All water piping running through
floors or walls shall be isolated from
the penetration with a sleeve.
Maintain the fire rating of all
wall and floor penetrations by use
of approved fire stop materials.
4. Sleeves through walls shall be cut so
as to be flush with the finished surface
of the all in each case and shall be
made watertight.
G. TESTING
1. Drain, waste and vent lines shall pass
inspection under head of water by
system with water to top of highest
vent stack.
2. Water lines shall pass inspection of
our (4) hours under 150 psi pressure.
Before any use of system is made for
domestic purposes, it shall be
disinfected by slowly filling with water
to which a disinfecting agent has been
injected at a rate of 50 p.p.m. of
chlorine, which should be allowed
to stand in the piping for at least
24 hours, after which tests for
residual chlorine shall show not less
than five(5) p.p.m. of residual chlorine
at every water outlet in the building.
If the residual 1s less than five ppm,
the disinfection shall be repeated until
the required residual is obtained
at every outlet.
After required residual is obtained
at every outlet, the system shall be
flushed until) the chlorine level at
every outlet is reduced to that of
incoming water supply
3. Gas lines shall stand a pressure of
25 psi for a period of 15 minutes
without perceptible drop.
4. All testing shall be performed by
contractor at his own expense.
H. WARRANTEE
1. All materials furnished and installed under
this contract shall be new and free from all
defects in materials and workmanship and
shall be guaranteed for a period of one (1)
year from the date of acceptance by
Dollar Tree.
REVIEWED FOR
CODE
COMPLIANCE
AP nye)
JUN 16 2010
City of Tukwila
BUILDING nmsinM
RECEIVED
JUN 012010
PERMIT CENTER
a 0 to
Q T
0
mla
_
'5
am
m
I oinc
Z
a 65.E
0
0 - O
� 0
CM) E
o °2
Fax 612.465.7551
PHONE 612.465.7550
dunhameng.com
w
3
mechanical + electrical consulting engineering
H
w
c
O
0 2
_
o a
W �0
U co
0 -0
<
0
to 0
0
co
0
.N
.;
c
0
N
m
410820 -0q5
0
0
0
-v0 a
1
0
0
3 0
1.
'0 0
RRMM
ARCHITECTS, PC
1317 Executive Blvd, Suite 200
Chesapeake, VA 23320
(757)622 -2828 / fax (757)622 -6883
sheet
MFS