HomeMy WebLinkAboutUtilities 2015-10-13 Item 2B - Bid Awards - Central Business District Sanitary Sewer RehabilitationCity of Tukwila
Jim Haggerton, Mayor
TO:
Mayor Haggerton
FROM:
Utilities Committee
Bob
Engineers
Giberson, Public Works Director
BY:
Mike Cusick, Senior Program Manager
DATE:
October 9, 2015
SUBJECT:
CBD Sanitary Sewer Rehabilitation
Contingency 20%
Project No. 91140203
105,692.90
Bid Awards
ISSUE
Award contract to Michels Corporation for the 2015 Central Business District (CBD) Sanitary Sewer Rehabilitation
Project and Olson Brothers - Pro -Vac, LLC for the 2015 Sanitary Sewer Manhole Rehabilitation Project.
In 2013, the Council approved the CBD Sanitary Sewer Rehabilitation Project. Since 2013 the Central Business
District has experienced 3 sewer main collapses. The 2015 CBD Sanitary Sewer Rehabilitation Project will address
deterioration of the approximately 50 -year old sanitary sewer pipes by relining the pipe with little impact to roadways
and minimal excavation. The 2015 Sanitary Sewer Manhole Rehabilitation Project will restore 9 manholes that have
deteriorated due to age and hydrogen sulfide gases being released by the sewage flowing through the manholes. As
slip - lining sewer mains and restoring manholes is different and specialized work, two separate contracts were
prepared.
ANALYSIS
Seven bids were received on September 29, 2015. Two bids were submitted after the published time that they were
due and were not considered. One bid was opened for the slip - lining project and four bids were opened for the
manhole rehabilitation project. All bids were reviewed and tabulated (see attached sheet). No errors were discovered
in any of the bid submittals. Michels Corporation submitted the apparent low bid of $528,464.52 for the 2015 CBD
Sewer Rehabilitation Project and Olson Brothers -Pro Vac, LLC submitted the apparent low bid of $105,068.10 for the
2015 Sanitary Sewer Manhole Rehabilitation Project.
Both Michels Corporation and Olson Brothers - Pro -Vac, LLC have previously performed work for the City that was
found to be satisfactory. The Engineer's Estimate for both phases of the project was $749,270.00
BUDGET AND BID SUMMARY
Engineers
Estimate
Bid Amount Budget
Michels Corporation
$ 655,329.03
$ 528,464.52 $ 819,000.00
Contingency 20%
105,692.90
634157.42
Olson Brothers -Pro Vac LLC
$105,068.10
Contingency 20%
93,941.15
21,013.62
126 081.72
Grand Total
74 2,, 70.18
7 0.239.14 819 000.00
IV1
W: \PW Eng \PROJECTSW- SW Projects \CBD Sewer Rehabilitation (91140203) \Info Memo 2015 CBD Sewer Bid Award 10 -09 -15 rrt edits mpcgl- sb.docx
INFORMATIONAL MEMO
Page 2
With the awarding of the two separate bid items at $528,464.52 and $105,068.10 respectively, we also have 820%
contingency OO each Uf the projects, ThDCODdDggOCy@DOuOLof812O.O81.72Mk1O5'OO8]U8Od$21,O13.02\isUlg
allowable expense that the Mayor will b8 able to approve for any change orders to the construction contracts. |fat
any time the project OV8rrUDsih8COOUOggOCy80OUOtStad will return N Committee and Council for approval.
RECOMMENDATION
Council is being asked hDaward the construction Cd the 2015CBD Sanitary Sewer Rehabilitation Project k)the
Michels Corporation iO the amount O($528.484.52.
Council iG being asked tO award the construction Of the 2O15 Sanitary Sewer Manhole Rehabilitation Project N0SOO
Brothers-Pro Vac, LLCiO the amount Of$1U5.U08.1O.
Council iS being asked N consider both Of these items OO the Consent Agenda 81 the October 19'2O15Regular
Meeting.
Attachments: Page 71.2O15QP
Map
Bid Tabulation
20
w:\Pwsng\Pnosuro\A-mwproj"ms\000 Sewer Rehabilitation wn*02umxm° Memo uv`5mm Sewer Bid Award 10-0915 pm Edits wpcgl-S»ooc,
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015to2020
PROJECT:CBD Sanitary Sewer Rehabilitation Project No.91140203
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINT. IMPACT:
COMMENT:
FINANCIALThroughEstimated
(in $000's)20132014201520162017201820192020BEYONDTOTAL
EXPENSES
Design 159332020202020 292
Land (R/W)0
Const. Mgmt.87120120120120120 687
Construction 639900900900900900 5,139
TOTAL EXPENSES1597591,0401,0401,0401,0401,040006,118
FUND SOURCES
Awarded Grant 0
PWTF/Proposed PWT 45250455 750
Mitigation Actual 0
Mitigation Expected 0
Utility Revenue 1145095851,0401,0401,0401,040005,368
TOTAL SOURCES1597591,0401,0401,0401,0401,040006,118
Additions:
Deletions:
The asbestos concrete pipe in the CBD (commercial business district) is approximately 45 years old and
becoming soft. Slip lining the pipe will reinforce the strength with little impact to roadways and minimal excavation.
If the pipe collapses, the street will have to be excavated and the cost of the repairs will be significant. In the
last five years we have had two major pipe failures on Andover Park West.
A Public Works Trust Fund loan was successfully obtained in 2012 for construction.
Reduced maintenance and repair costs.
The limits of the 2013 project is APW to APE from Minkler Blvd to S 180th St and will now include the repair
to the sewer under the railroad tracks.
2015 - 2020 Capital Improvement Program 71 21
22
HCENT fR PARKWAY
SO0THCENZE
AZTECA
LEGEND
2014 MAIN TO RELINED WITH CIPP (COMPLETE)
2015 MAIN TO RELINED WITH CIPP
- -- -- 2016 MAIN TO RELINED WITH CIPP
2017 MAIN TO RELINED WIT- CIPP
2018 MAIN TO RELINED WITH CIPP
SOUTHCENTER PARKWAY
LEVITZ
N
C�
SR 18}
WEST VAtt-
CASCADE
AVE SOUrH
ANDOVER PARK WEST,.. ;<
ANDOVER
PARK WEST
INDUSTRY DR.
SPERRY DR
CHRISTENSEN
PUBLIC WO ' DEPT.
- ENOINEERINO- STREETS- WATER - SEWER- PARKS- UILDIN -
SR 181 WEST V,1ZEr HIGHWAY-
awRItNAV00. ■ (aUff Log
r. m ob.
RENTON
by date
d.don.d
shocked - --
rql .w
Pre) filo
field bk
CITY OF TUKWILA
CBD SANITARY SEWER REHABILITIATION SCHEDULE
City of Tukwila
2015 Central Business District Sanitary Sewer Rehabilitation and Sewer Manhole Rehabilitation
CONTRACT 1- BASE BID - 2015 CBD SANITARY SEWER REHABILITATION (CURED -IN -PLACE PIPE)
Item
No.
1.13
1.14
Item Description
Mobilization
Traffic Control- Flagger Labor (Minimum Bid of $36.17)
Traffic Control - Off -Duty Uniformed Police Officer
Project Temporary Traffic Control
Pre - Cleaning Video Inspection
Clean and Prep Sewer Prior to Construction
Video Inspection Prior to Construction
Provide, Install, and Manage Wastewater Bypasses
8 -inch Main Line Cured -in -Place -Pipe (CIPP)
12 -inch Main Line Cured -in -Place -Pipe (CIPP)
8 -inch Main Line Cured -in -Place -Pipe (CIPP) Pre -liner
12 -inch Main Line Cured -in -Place -Pipe (CIPP) Pre -liner
Trenchless Lateral and Outside Manhole Drop Connection
Reinstatement and Packer Injection Grouting
Force Account - Additional Clean and Prep of Sewer Prior to Construction
Engineer's Estimate
Michels Corporation
Quantity
Unit
Unit
Price
Engineer's
Amount
Unit Price +
Amount
1
LS
$43,800
$ 43,800
$ 22,465.00
$ 22,465.00
208
HR
68
14,040
62.25
12,948.00'
32
HR
72
2,304
72.00
2,304.00
1
LS
22,400
22,400
30,250.00
30,250.00
1
LS
8,200
8,200
12,120.00
12,120.00
1
LS
16,300
16,300
20,619.00
20,619.00
1
LS
8,200
8,200
13,357.00
13,357.00
1
LS
22,800
22,800
7,992.00
7,992.00
4,986
LF
45
224,370
36,00
179,496.00
1,524
LF
60
91,440
45.00
68,580.00
750
LF
6
4,500
2.00
1,500.00
230
LF
10
2,300
3.00
690.00
14
EA
700
9,800
903.00
12,642.00
15
HR
750
11,250
535.00
8,025.00
Subtotal
$ 481,704.00
4,095.00
$ 392,988.00
Sales Tax
45,761.88
20,000.00
37,333.85
Contract 1- Base Bid
$ 527,465.88
EA
$ 430,321.86
CONTRACT 1- BID ALTERNATE NO. 1- 2015 CBD SANITARY SEWER REHABILITATION (CURED -IN -PLACE PIPE)
Item
No.
1.A1
1.A2
1.A3
1.A4
1.A5
1.A6
1.A7
1.A8
1.A9
1.A10
1.A11
Item Description
Mobilization
Traffic Control - Flagger Labor (Minimum Bid of $36.17)
Project Temporary Traffic Control
Pre - Cleaning Video Inspection
Clean and Prep Sewer Prior to Construction
Video Inspection Prior to Construction
Provide, Install, and Manage Wastewater Bypasses
8 -inch Main Line Cured -in -Place -Pipe (CIPP)
8 -inch Main Line Cured -in -Place -Pipe (CIPP) Pre -liner
Trenchless Lateral and Outside Manhole Drop Connection
Reinstatement and Packer Injection Grouting
Force Account - Additional Clean and Prep of Sewer Prior to Construction
CONTRACT 2 - 2015 SANITARY SEWER MANHOLE REHABILITATION
Item
No.
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
Item Description
Mobilization /Demobilization
Traffic Control- Flagger Labor (Minimum Bid of 536.17)
Traffic Control - Off-Duty Uniformed Police Officer
Project Temporary Traffic Control
Temporary Erosion Control
Provide, Install and Manage Wastewater Bypasses
Rechannel Manhole
MH Preparatory Work, Chemical Grouting, and Cementitious Grouting
Manhole Coating
Chip and Grout Pipe Penetrations (per Pipe Penetration)
Root Control and Removal
Remove Existing Drop Connection
Install Drop Connection
Remove and Replace Existing Ladder
Remove and Replace Existing Ring and Cover
Restoration
Engineer's Estimate
Michels Corporation
Quantity
Unit
Unit Price
Engineer's
Amount
Unit Price
Amount
1
LS
$10,700
$ 10,700
$ 2,806.00
$ 2,806.00!
64
HR
68
4,320.00
$ 62.25
$ 3,984,00'
1
LS
7,400
7,400.00
$ 3,660.00
$ 3,660.00
1
LS
2,100
2,100.00
$ 4,550.00
$ 4,550.00
1
LS
4,100
4,100.00
$ 5,387.00
$ 5,387.00
1
LS
2,100
2,100.00
$ 3,400.00
$ 3,400.00
1
LS
5,700
5,700.00
$ 4,058.00
$ 4,058.00
1,608
LF
45
72,360.00
$ 33.50
$ 'r 53,868.00
240
LF
6
1,440.00
$ 2.00
$ 480.00
4
EA
700
2,800.00
$ 1,190.00
$ 4,760.00
5
HR
750
3,750.00
$ 535.00
$ `, 2,675.00
3,000.00
$ 116,770.00
3,000.00
$ 89,628.00
9.5% Sales Tax
11,093.15
5,000
8,514.66
1- Bid Alternate No. 1
$ 127,863.15
975.00
$ 98,142.66
528,464.52
Engineer's Estimate
Olson Bros Pro Vac
Realm
RI Alia
Road Construction NW
Engineer's
Quantity
Unit
Unit Price
Amount
Unit Price
Amount
Unit Price
Amount
Unit Price
Amount
Unit Price
Amount
1
LS
$8,000
$ 8,000
$ 1,600.00
$ 1,600.00
$ 10,000.00
$ 10,000.00
$ 5,000.00
$ 5,000.00
$ 17,000.00
$ 17,000.00
114
HR
$67.50
7,695
68.90
7,854.60
50.00
5,700.00
37.00
4,218.00
60.00
6,840.00
48
HR
$72
3,456
72.00
3,456.00
72.00
3,456.00
72.00
3,456.00
72.00
3,456.00
1
LS
$13,800
13,800
16,250.00
16,250.00
3,900.00
3,900.00
3,000.00
3,000.00
3,000.00
3,000.00
1
LS
55,000
5,000
100.00
100.00
975.00
975.00
500.00
500.00
7,000.00
7,000.00
1
L5
$5,000
5,000
4,095.00
4,095.00
9,000.00
9,000.00
20,000.00
20,000.00
60,000.00
60,000.00
5
EA
$1,200
6,000
960.00
4,800.00
1,040.00
5,200.00
4,000.00
20,000.00
1,300.00
6,500.00
9
EA
$540
4,860
1,068.60
9,617.40
2,860.00
25,740.00
4,000.00
36,000.00
2,300.00
20,700.00
2
EA
$3,500
7,000
1,800.00
3,600.00'
3,800.00
7,600.00
9,000.00
18,000.00
7,700.00
15,400.00
12
EA
$840
10,080
345.80
4,149.60
985.00
11,820.00
1,000.00
12,000.00
625.00
7,500.00
3
EA
$300
900
300.00
900.00
975.00
2,925.00
1,000.00
3,000.00
625.00
1,875.00
2
EA
$360
720
1,170.00
2,340.00
850.00
1,700.00
3,500.00
7,000.00
700.00
1,400.00
3
EA
$1,440
4,320
3,000.00
9,000.00
2,775.00
8,325.00
4,400.00
13,200.00
3,300.00
9,900.00
2
EA
$480
960
975.00
1,950.00
1,250.00
2,500.00
4,300.00
8,600.00
650.00
1,300.00
5
EA
$1,000
5,000
5,148.00
25,740.00
3,600.00
18,000.00
900.00
4,500.00
750.00
3,750.00
1
LS
$3,000
3,000
500.00
500.00
2,500.00
2,500.00
5,000.00
5,000.00
7,000.00
7,000.00
Subtotal
$ 85,791.00
$ 95,952.60
$ 119,341.00
$ 163,474.00
$ 172,621.00
9.5 % Sales Tax
8,150.15
9,115.50!
11,337.40
15,530.03
16,399.00
Contract 2 - Base Bid
$ 93,941.15
$ 105,068.10
$ 130,678.40
$ 179,004.03
$ 189,020.00
W: \PW Eng \PROJECTS \A - SW Projects \CBD Sewer Rehabilitation (91140203) \2015 CBD SEWER PROJECTS Bid Tab 09- 29- 15.xlsx
10/06/2015