HomeMy WebLinkAboutUtilities 2015-10-13 Item 2B - Bid Awards - Central Business District Sanitary Sewer RehabilitationCity of Tukwila Jim Haggerton, Mayor TO: Mayor Haggerton FROM: Utilities Committee Bob Engineers Giberson, Public Works Director BY: Mike Cusick, Senior Program Manager DATE: October 9, 2015 SUBJECT: CBD Sanitary Sewer Rehabilitation Contingency 20% Project No. 91140203 105,692.90 Bid Awards ISSUE Award contract to Michels Corporation for the 2015 Central Business District (CBD) Sanitary Sewer Rehabilitation Project and Olson Brothers - Pro -Vac, LLC for the 2015 Sanitary Sewer Manhole Rehabilitation Project. In 2013, the Council approved the CBD Sanitary Sewer Rehabilitation Project. Since 2013 the Central Business District has experienced 3 sewer main collapses. The 2015 CBD Sanitary Sewer Rehabilitation Project will address deterioration of the approximately 50 -year old sanitary sewer pipes by relining the pipe with little impact to roadways and minimal excavation. The 2015 Sanitary Sewer Manhole Rehabilitation Project will restore 9 manholes that have deteriorated due to age and hydrogen sulfide gases being released by the sewage flowing through the manholes. As slip - lining sewer mains and restoring manholes is different and specialized work, two separate contracts were prepared. ANALYSIS Seven bids were received on September 29, 2015. Two bids were submitted after the published time that they were due and were not considered. One bid was opened for the slip - lining project and four bids were opened for the manhole rehabilitation project. All bids were reviewed and tabulated (see attached sheet). No errors were discovered in any of the bid submittals. Michels Corporation submitted the apparent low bid of $528,464.52 for the 2015 CBD Sewer Rehabilitation Project and Olson Brothers -Pro Vac, LLC submitted the apparent low bid of $105,068.10 for the 2015 Sanitary Sewer Manhole Rehabilitation Project. Both Michels Corporation and Olson Brothers - Pro -Vac, LLC have previously performed work for the City that was found to be satisfactory. The Engineer's Estimate for both phases of the project was $749,270.00 BUDGET AND BID SUMMARY Engineers Estimate Bid Amount Budget Michels Corporation $ 655,329.03 $ 528,464.52 $ 819,000.00 Contingency 20% 105,692.90 634157.42 Olson Brothers -Pro Vac LLC $105,068.10 Contingency 20% 93,941.15 21,013.62 126 081.72 Grand Total 74 2,, 70.18 7 0.239.14 819 000.00 IV1 W: \PW Eng \PROJECTSW- SW Projects \CBD Sewer Rehabilitation (91140203) \Info Memo 2015 CBD Sewer Bid Award 10 -09 -15 rrt edits mpcgl- sb.docx INFORMATIONAL MEMO Page 2 With the awarding of the two separate bid items at $528,464.52 and $105,068.10 respectively, we also have 820% contingency OO each Uf the projects, ThDCODdDggOCy@DOuOLof812O.O81.72Mk1O5'OO8]U8Od$21,O13.02\isUlg allowable expense that the Mayor will b8 able to approve for any change orders to the construction contracts. |fat any time the project OV8rrUDsih8COOUOggOCy80OUOtStad will return N Committee and Council for approval. RECOMMENDATION Council is being asked hDaward the construction Cd the 2015CBD Sanitary Sewer Rehabilitation Project k)the Michels Corporation iO the amount O($528.484.52. Council iG being asked tO award the construction Of the 2O15 Sanitary Sewer Manhole Rehabilitation Project N0SOO Brothers-Pro Vac, LLCiO the amount Of$1U5.U08.1O. Council iS being asked N consider both Of these items OO the Consent Agenda 81 the October 19'2O15Regular Meeting. Attachments: Page 71.2O15QP Map Bid Tabulation 20 w:\Pwsng\Pnosuro\A-mwproj"ms\000 Sewer Rehabilitation wn*02umxm° Memo uv`5mm Sewer Bid Award 10-0915 pm Edits wpcgl-S»ooc, CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015to2020 PROJECT:CBD Sanitary Sewer Rehabilitation Project No.91140203 DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: FINANCIALThroughEstimated (in $000's)20132014201520162017201820192020BEYONDTOTAL EXPENSES Design 159332020202020 292 Land (R/W)0 Const. Mgmt.87120120120120120 687 Construction 639900900900900900 5,139 TOTAL EXPENSES1597591,0401,0401,0401,0401,040006,118 FUND SOURCES Awarded Grant 0 PWTF/Proposed PWT 45250455 750 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 1145095851,0401,0401,0401,040005,368 TOTAL SOURCES1597591,0401,0401,0401,0401,040006,118 Additions: Deletions: The asbestos concrete pipe in the CBD (commercial business district) is approximately 45 years old and becoming soft. Slip lining the pipe will reinforce the strength with little impact to roadways and minimal excavation. If the pipe collapses, the street will have to be excavated and the cost of the repairs will be significant. In the last five years we have had two major pipe failures on Andover Park West. A Public Works Trust Fund loan was successfully obtained in 2012 for construction. Reduced maintenance and repair costs. The limits of the 2013 project is APW to APE from Minkler Blvd to S 180th St and will now include the repair to the sewer under the railroad tracks. 2015 - 2020 Capital Improvement Program 71 21 22 HCENT fR PARKWAY SO0THCENZE AZTECA LEGEND 2014 MAIN TO RELINED WITH CIPP (COMPLETE) 2015 MAIN TO RELINED WITH CIPP - -- -- 2016 MAIN TO RELINED WITH CIPP 2017 MAIN TO RELINED WIT- CIPP 2018 MAIN TO RELINED WITH CIPP SOUTHCENTER PARKWAY LEVITZ N C� SR 18} WEST VAtt- CASCADE AVE SOUrH ANDOVER PARK WEST,.. ;< ANDOVER PARK WEST INDUSTRY DR. SPERRY DR CHRISTENSEN PUBLIC WO ' DEPT. - ENOINEERINO- STREETS- WATER - SEWER- PARKS- UILDIN - SR 181 WEST V,1ZEr HIGHWAY- awRItNAV00. ■ (aUff Log r. m ob. RENTON by date d.don.d shocked - -- rql .w Pre) filo field bk CITY OF TUKWILA CBD SANITARY SEWER REHABILITIATION SCHEDULE City of Tukwila 2015 Central Business District Sanitary Sewer Rehabilitation and Sewer Manhole Rehabilitation CONTRACT 1- BASE BID - 2015 CBD SANITARY SEWER REHABILITATION (CURED -IN -PLACE PIPE) Item No. 1.13 1.14 Item Description Mobilization Traffic Control- Flagger Labor (Minimum Bid of $36.17) Traffic Control - Off -Duty Uniformed Police Officer Project Temporary Traffic Control Pre - Cleaning Video Inspection Clean and Prep Sewer Prior to Construction Video Inspection Prior to Construction Provide, Install, and Manage Wastewater Bypasses 8 -inch Main Line Cured -in -Place -Pipe (CIPP) 12 -inch Main Line Cured -in -Place -Pipe (CIPP) 8 -inch Main Line Cured -in -Place -Pipe (CIPP) Pre -liner 12 -inch Main Line Cured -in -Place -Pipe (CIPP) Pre -liner Trenchless Lateral and Outside Manhole Drop Connection Reinstatement and Packer Injection Grouting Force Account - Additional Clean and Prep of Sewer Prior to Construction Engineer's Estimate Michels Corporation Quantity Unit Unit Price Engineer's Amount Unit Price + Amount 1 LS $43,800 $ 43,800 $ 22,465.00 $ 22,465.00 208 HR 68 14,040 62.25 12,948.00' 32 HR 72 2,304 72.00 2,304.00 1 LS 22,400 22,400 30,250.00 30,250.00 1 LS 8,200 8,200 12,120.00 12,120.00 1 LS 16,300 16,300 20,619.00 20,619.00 1 LS 8,200 8,200 13,357.00 13,357.00 1 LS 22,800 22,800 7,992.00 7,992.00 4,986 LF 45 224,370 36,00 179,496.00 1,524 LF 60 91,440 45.00 68,580.00 750 LF 6 4,500 2.00 1,500.00 230 LF 10 2,300 3.00 690.00 14 EA 700 9,800 903.00 12,642.00 15 HR 750 11,250 535.00 8,025.00 Subtotal $ 481,704.00 4,095.00 $ 392,988.00 Sales Tax 45,761.88 20,000.00 37,333.85 Contract 1- Base Bid $ 527,465.88 EA $ 430,321.86 CONTRACT 1- BID ALTERNATE NO. 1- 2015 CBD SANITARY SEWER REHABILITATION (CURED -IN -PLACE PIPE) Item No. 1.A1 1.A2 1.A3 1.A4 1.A5 1.A6 1.A7 1.A8 1.A9 1.A10 1.A11 Item Description Mobilization Traffic Control - Flagger Labor (Minimum Bid of $36.17) Project Temporary Traffic Control Pre - Cleaning Video Inspection Clean and Prep Sewer Prior to Construction Video Inspection Prior to Construction Provide, Install, and Manage Wastewater Bypasses 8 -inch Main Line Cured -in -Place -Pipe (CIPP) 8 -inch Main Line Cured -in -Place -Pipe (CIPP) Pre -liner Trenchless Lateral and Outside Manhole Drop Connection Reinstatement and Packer Injection Grouting Force Account - Additional Clean and Prep of Sewer Prior to Construction CONTRACT 2 - 2015 SANITARY SEWER MANHOLE REHABILITATION Item No. 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 2.16 Item Description Mobilization /Demobilization Traffic Control- Flagger Labor (Minimum Bid of 536.17) Traffic Control - Off-Duty Uniformed Police Officer Project Temporary Traffic Control Temporary Erosion Control Provide, Install and Manage Wastewater Bypasses Rechannel Manhole MH Preparatory Work, Chemical Grouting, and Cementitious Grouting Manhole Coating Chip and Grout Pipe Penetrations (per Pipe Penetration) Root Control and Removal Remove Existing Drop Connection Install Drop Connection Remove and Replace Existing Ladder Remove and Replace Existing Ring and Cover Restoration Engineer's Estimate Michels Corporation Quantity Unit Unit Price Engineer's Amount Unit Price Amount 1 LS $10,700 $ 10,700 $ 2,806.00 $ 2,806.00! 64 HR 68 4,320.00 $ 62.25 $ 3,984,00' 1 LS 7,400 7,400.00 $ 3,660.00 $ 3,660.00 1 LS 2,100 2,100.00 $ 4,550.00 $ 4,550.00 1 LS 4,100 4,100.00 $ 5,387.00 $ 5,387.00 1 LS 2,100 2,100.00 $ 3,400.00 $ 3,400.00 1 LS 5,700 5,700.00 $ 4,058.00 $ 4,058.00 1,608 LF 45 72,360.00 $ 33.50 $ 'r 53,868.00 240 LF 6 1,440.00 $ 2.00 $ 480.00 4 EA 700 2,800.00 $ 1,190.00 $ 4,760.00 5 HR 750 3,750.00 $ 535.00 $ `, 2,675.00 3,000.00 $ 116,770.00 3,000.00 $ 89,628.00 9.5% Sales Tax 11,093.15 5,000 8,514.66 1- Bid Alternate No. 1 $ 127,863.15 975.00 $ 98,142.66 528,464.52 Engineer's Estimate Olson Bros Pro Vac Realm RI Alia Road Construction NW Engineer's Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 1 LS $8,000 $ 8,000 $ 1,600.00 $ 1,600.00 $ 10,000.00 $ 10,000.00 $ 5,000.00 $ 5,000.00 $ 17,000.00 $ 17,000.00 114 HR $67.50 7,695 68.90 7,854.60 50.00 5,700.00 37.00 4,218.00 60.00 6,840.00 48 HR $72 3,456 72.00 3,456.00 72.00 3,456.00 72.00 3,456.00 72.00 3,456.00 1 LS $13,800 13,800 16,250.00 16,250.00 3,900.00 3,900.00 3,000.00 3,000.00 3,000.00 3,000.00 1 LS 55,000 5,000 100.00 100.00 975.00 975.00 500.00 500.00 7,000.00 7,000.00 1 L5 $5,000 5,000 4,095.00 4,095.00 9,000.00 9,000.00 20,000.00 20,000.00 60,000.00 60,000.00 5 EA $1,200 6,000 960.00 4,800.00 1,040.00 5,200.00 4,000.00 20,000.00 1,300.00 6,500.00 9 EA $540 4,860 1,068.60 9,617.40 2,860.00 25,740.00 4,000.00 36,000.00 2,300.00 20,700.00 2 EA $3,500 7,000 1,800.00 3,600.00' 3,800.00 7,600.00 9,000.00 18,000.00 7,700.00 15,400.00 12 EA $840 10,080 345.80 4,149.60 985.00 11,820.00 1,000.00 12,000.00 625.00 7,500.00 3 EA $300 900 300.00 900.00 975.00 2,925.00 1,000.00 3,000.00 625.00 1,875.00 2 EA $360 720 1,170.00 2,340.00 850.00 1,700.00 3,500.00 7,000.00 700.00 1,400.00 3 EA $1,440 4,320 3,000.00 9,000.00 2,775.00 8,325.00 4,400.00 13,200.00 3,300.00 9,900.00 2 EA $480 960 975.00 1,950.00 1,250.00 2,500.00 4,300.00 8,600.00 650.00 1,300.00 5 EA $1,000 5,000 5,148.00 25,740.00 3,600.00 18,000.00 900.00 4,500.00 750.00 3,750.00 1 LS $3,000 3,000 500.00 500.00 2,500.00 2,500.00 5,000.00 5,000.00 7,000.00 7,000.00 Subtotal $ 85,791.00 $ 95,952.60 $ 119,341.00 $ 163,474.00 $ 172,621.00 9.5 % Sales Tax 8,150.15 9,115.50! 11,337.40 15,530.03 16,399.00 Contract 2 - Base Bid $ 93,941.15 $ 105,068.10 $ 130,678.40 $ 179,004.03 $ 189,020.00 W: \PW Eng \PROJECTS \A - SW Projects \CBD Sewer Rehabilitation (91140203) \2015 CBD SEWER PROJECTS Bid Tab 09- 29- 15.xlsx 10/06/2015