HomeMy WebLinkAboutReg 2015-10-19 Item 5H & 5I - Bid Awards - 2015 Central Business District Sanitary Sewer Rehabilitation for $528,464.52 / 2015 Sanitary Sewer Manhole Rehabilitation for $105,068.10COUNCIL AGENDA SYNOPSIS Initials Meeting Date 10/19/15 Prepared BG Mayor's rev' Council review ITEM INFORMATION ITEM No. CAS NUMBER: STAFF SPONSOR: BOB GIBERSON ORIGINAL. AGENDA DATE: 10/19/15 AGENDA ITEM TITLE 2015 CBD Sanitary Sewer Rehabilitation & Sewer Manhole Projects Bid Awards to Michels Corporation and Olson Brothers Pro -Vac, LLC CATEGORY ❑ Discu.rdiotn Mtg Date ❑ Motion 11 tg Date ❑ Resolution Mfg Date ❑ Ordinance Altg Date IN Bid Award 10/19/15 ❑ Public Hearing Altg Date ❑ Other Aftg Date Alta Date SPONSOR II Council ❑ tailayer ❑ 1 IR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P& R ❑ Police PI PW SPONSOR'S The 2015 CBD Sanitary Sewer Rehabilitation Project and the 2015 Sanitary Sewer Manhole SUMMARY Rehabilitation Project were advertised on September 15 and 22 and bids were opened on September 29, 2015. One bid was submitted for the 2015 CBD Sewer Rehabilitation Project from Michels Corporation for $528,464.52. Olson Brothers Pro -Vac submitted the low bid of $105,068.10 for the 2015 Sewer Manhole Rehabilitation Project. Council is being asked to award the two bids. RIM 'MED BY COW Mtg. ❑ CA &P Cmte Cmte ❑ Arts Comm. I■ F &S Cmte 0 Transportation Cmte Comm. ❑ Planning Comm. CHAIR: DENNIS ROBERTSON ❑ Parks COMMITI'TEE Utilities DATE: 10/13/15 RECOMMENDATIONS: SPONSOR/AI)MIN. COMMITTIsE Public Works Unanimous Approval; Forward to Regular Consent Agenda COST IMPACT 1 FUND SOURCE EXPENDITURE REQUIRE[) AMOUNT BUDGETED APPROPRIATION REQUIRED $633,532.62 $819,000.00 $0.00 Fund Source: 402 SEWER (PAGE 71, 2015 CIP) Comments: Michels $528,464.52 and Olson $105,068.10 MTG. DATE RECORD OF COUNCIL ACTION 10/19/15 MTG. DATE ATTACHMENTS 10/19/15 Informational Memorandum dated 10/09/15 Page 71, 2015 CIP Sewer Rehabilitation Map Bid Tabulations Minutes from the Utilities Committee meeting of 10/13/15 111 112 TO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director BY Mike Cusick, Senior Program Manager DATE: October 9, 2015 SUBJECT: CBD Sanitary Sewer Rehabilitation Project No. 91140203 Bid Awards ISSUE Award contract to Michels Corporation for the 2015 Central Business District (CBD) Sanitary Sewer Rehabilitation Project and Olson Brothers - Pro -Vac, LLC for the 2015 Sanitary Sewer Manhole Rehabilitation Project. BACKGROUND In 2013, the Council approved the CBD Sanitary Sewer Rehabilitation Project. Since 2013 the Central Business District has experienced 3 sewer main collapses. The 2015 CBD Sanitary Sewer Rehabilitation Project will address deterioration of the approximately 50 -year old sanitary sewer pipes by relining the pipe with little impact to roadways and minimal excavation. The 2015 Sanitary Sewer Manhole Rehabilitation Project will restore 9 manholes that have deteriorated due to age and hydrogen sulfide gases being released by the sewage flowing through the manholes. As slip - lining sewer mains and restoring manholes is different and specialized work, two separate contracts were prepared. ANALYSIS Seven bids were received on September 29, 2015. Two bids were submitted after the published time that they were due and were not considered. One bid was opened for the slip- lining project and four bids were opened for the manhole rehabilitation project. All bids were reviewed and tabulated (see attached sheet). No errors were discovered in any of the bid submittals. Michels Corporation submitted the apparent low bid of $528,464.52 for the 2015 CBD Sewer Rehabilitation Project and Olson Brothers -Pro Vac, LLC submitted the apparent low bid of $105,068.10 for the 2015 Sanitary Sewer Manhole Rehabilitation Project. Both Michels Corporation and Olson Brothers - Pro -Vac, LLC have previously performed work for the City that was found to be satisfactory. The Engineer's Estimate for both phases of the project was $749,270.00 BUDGET AND BID SUMMARY Michels Corporation Contingency 20% Olson Brothers -Pro Vac LLC Contingency 20% Grand Total Engineers Estimate Bid Amount Budget $ 655,329.03 $ 528,464.52 $ 819,000.00 105.692.90 .4 $ 105,068.10 93,941.15 21,013.62 $126,081.72 $ 749,270.18 $ 760,239.14 $ 819,000.00 W-IPW EngIPROJECTS+A- SW ProJecls\CBD Sewer Rehabilitation (91140203Nala Memo 2415 CBD Sewer Bid Award 10.09.15 rrt edits rnpcgl- sb.dacx 113 114 INFORMATIONAL MEMO Page 2 With the awarding of the two separate bid items at $528,464.52 and $105,068.10 respectively, we also have a 20% contingency on each of the projects. The contingency amount of $126,081.72 ($105,068.10 and $21,013.62) is the allowable expense that the Mayor will be able to approve for any change orders to the construction contracts. If at any time the project overruns the contingency amount, staff will return to Committee and Council for approval. RECOMMENDATION Council is being asked to award the construction of the 2015 CBD Sanitary Sewer Rehabilitation Project to the Michels Corporation in the amount of $528,464.52. Council is being asked to award the construction of the 2015 Sanitary Sewer Manhole Rehabilitation Project to Olson Brothers -Pro Vac, LLC in the amount of $105,068.10. Council is being asked to consider both of these items on the Consent Agenda at the October 19, 2015 Regular Meeting. Attachments: Page 71, 2015 CIP Map Bid Tabulation W \PW Eng \PROJECTS1A- SW ProlectslCBD Sewer Rehabilitation (91140203)\Info Memo 2015 CBf] Sewer Bid Award 10-09-15 Rd Edits Mpcgl- Sb.Doox CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: CBD Sanitary Sewer Rehabilitation Project No. 91140203 DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: The asbestos concrete pipe in the CBD (commercial business district) is approximately 45 years old and becoming soft, Slip lining the pipe will reinforce the strength with little impact to roadways and minimal excavation. If the pipe collapses, the street will have to be excavated and the cost of the repairs will be significant. In the last five years we have had two major pipe failures on Andover Park West. A Public Works Trust Fund loan was successfully obtained in 2012 for construction. Reduced maintenance and repair costs. The limits of the 2013 project is APW to APE from Minkler Blvd to S 180th St and will now include the repair to the sewer under the railroad tracks. FINANCIAL Through Estimated in $000's 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL EXPENSES Design 159 33 20 20 20 20 20 292 Land (RMI) 0 Const. Mgmt, 87 120 120 120 120 120 687 Construction 639 900 900 900 900 900 5,139 TOTAL EXPENSES 159 759 1,040 1,040 1,040 1,040 1,040 0 0 6,118 FUND SOURCES Awarded Grant 0 PWTF /Proposed PW1 45 250 455 750 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 114 509 585 1,040 1,040 1,040 1,040 0 0 5,368 TOTAL SOURCES 159 759 1,040 1,040 1,040 1,040 1,040 0 0 6,118 2015 - 2020 Capital improvement Program 71 115 LEGEND 2014 MAIN TO RELINED WITH CIPP (COMPLETE) 2015 MAIN TO RELINED WITH CIPP 2016 MAIN TO RELINED WITH CIPP 2017 MAIN TO RELINED WITH CIPP 2018 MAIN TO RELINED WITH CIPP SOUTHCENTER PARKWAY LEVITZ SOUIHCENIER QARO 21' 24' ANDOVER PARK WEST ANDOVER PARK WEST 21 SR 181 WEST VALL OLYMPIC AV SOUTH ANDOVER PARK EAST CASCADE AVE SOUTH 0 z SPERRY DR CHRISTENSEN A 0 n I, 0 z INDUSTRY DR. m w ANDOVER o PARK WEST! SR 181 WEST VALLEY H1OAWAY` o. •, e1 my as e1 Wort unq P. MOO. R PUBLIC WORKS DEPT. - ENQINEERINQ- STREETS- WATER - SEWER- PARKS- BUILDINQ- a., od ohockod wol ma Pro; dr field by no CITY OF TUKWILA CBD SANITARY SEWER REHABILITIATION SCHEDULE CO CD City of Tukwila 2015 Central Business District Sanitary Sewer Rehabilitation and Sewer Manhole Rehabilitation CONTRACT 1- BASE BID - 2015 CBD SANITARY SEWER REHABILITATION (CURED -IN -PLACE PIPE) Item No. 1.13 1.14 Item Description Mobilization Traffic Control - Flagger Labor (Minimum Bid of $36.17) Traffic Control - Off-Duty Uniformed Police Officer Project Temporary Traffic Control Pre - Cleaning Video Inspection Clean and Prep Sewer Prior to Construction Video Inspection Prior to Construction Provide, Install, and Manage Wastewater Bypasses 8 -inch Main Line Cured -in -Place -Pipe (CIPP) 12 -inch Main Line Cured -in -Place -Pipe (CIPP) 8 -inch Main Line Cured -in -Place -Pipe (CIPP) Pre -liner 12 -inch Main Line Cured -in -Place -Pipe (CIPP) Pre -liner Trenchless Lateral and Outside Manhole Drop Connection Reinstatement and Packer Injection Grouting Force Account - Additional Clean and Prep of Sewer Prior to Construction Engineer's Estimate Michels Corporation Quantity Unit Unit Price Engineer's Amount Unit Price Amount 1 LS $43,800 $ 43,800 $ 22,465.00 $ 22,465.00 208 HR 68 14,040 62.25 12,948.00 32 HR 72 2,304 72.00 2,304.00 1 LS 22,400 22,400 30,250.00 30,250.00 1 LS 8,200 8,200 12,120.00 12,120.00 1 LS 16,300 16,300 20,619.00 20,619.00 1 LS 8,200 8,200 13,357.00 13,357.00 1 LS 22,800 22,800 7,992.00 7,992.00 4,986 LF 45 224,370 36.00 179,496.00 1,524 LF 60 91,440 45.00 68,580.00 750 LF 6 4,500 2.00 1,500.00 230 LF 10 2,300 3.00 690.00 14 EA 700 9,800 903.00 12,642.00 15 HR 750 11,250 535.00 8,025.00 Subtotal $ 481,704.00 4,095.00 $ 392,988.00 9.5% Sales Tax 45,761.88 20,000.00 37,333.86 Contract 1- Base Bid $ 527,465.88 EA $ 430,321.86 CONTRACT 1- BID ALTERNATE NO. 1 - 2015 CBD SANITARY SEWER REHABILITATION (CURED -IN -PLACE PIPE) Item No. 1.A1 1.A2 1.A3 1.A4 1.A5 1.A6 1.A7 1.A8 1.A9 1.A10 1.A11 Item Description Mobilization Traffic Control - Flagger Labor (Minimum Bid of 536.17) Project Temporary Traffic Control Pre - Cleaning Video Inspection Clean and Prep Sewer Prior to Construction Video Inspection Prior to Construction Provide, Install, and Manage Wastewater Bypasses 8 -inch Main Line Cured -in -Place -Pipe (CIPP) 8 -inch Main Line Cured -in -Place -Pipe (CIPP) Pre -liner Trenchless Lateral and Outside Manhole Drop Connection Reinstatement and Packer Injection Grouting Force Account - Additional Clean and Prep of Sewer Prior to Construction CONTRACT 2 - 2015 SANITARY SEWER MANHOLE REHABILITATION Item No. 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 2.16 Item Description Mobilization /Demobilization Traffic Control - Flagger Labor (Minimum Bid of $36.17) . Traffic Control - Off -Duty Uniformed Police Officer Project Temporary Traffic Control Temporary Erosion Control Provide, Install and Manage Wastewater Bypasses Rechannel Manhole MH Preparatory Work, Chemical Grouting, and Cementitious Grouting Manhole Coating Chip and Grout Pipe Penetrations (per Pipe Penetration) Root Control and Removal Remove Existing Drop Connection Install Drop Connection Remove and Replace Existing Ladder Remove and Replace Existing Ring and Cover Restoration Engineer's Estimate Michels Corporation Quantity Unit Unit Price Engineer's Amount Unit Price Amount 1 LS $10,700 $ 10,700 $ 2,806.00 $ 2,806.00 64 HR 68 4,320.00 $ 62.25 $ 3,984.00 1 LS 7,400 7,400.00 $ 3,660.00 $ 3,660.00 1 LS 2,100 2,100.00 $ 4,550.00 $ 4,550.00 1 LS 4,100 4,100.00 $ 5,387.00 $ 5,387.00 1 LS 2,100 2,100.00 $ 3,400.00 $ 3,400.00 1 LS 5,700 5,700.00 $ 4,058.00 $ 4,058.00 1,608 LF 45 72,360.00 $ 33.50 $ 53,868.00 240 LF 6 1,440.00 $ 2.00 $ 480.00 4 EA 700 2,800.00 $ 1,190.00 $ 4,760.00 5 HR 750 3,750.00' $ 535.00 $ 2,675.00 Subtotal $ 116,770.00 3,000.00 $ 89,628.00 9.5% Sales Tax 11,093.15 I 5,000 8,514.66 Contract 1 - Bid Alternate No. 1 $ 127,863.15) $ 98,142.66 $ 528,464.52 Engineer's Estimate Olson Bros Pro Vac Realm RI Alia Road Construction NW Engineer's Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 1 LS $8,000 $ 8,000 $ 1,600.00 $ 1,600.00 $ 10,000.00 $ 10,000.00 $ 5,000.00 $ 5,000.00 $ 17,000.00 $ 17,000.00 114 HR $67.50 7,695 68.90 7,854.60 50.00 5,700.00 37.00 4,218.00 60.00 6,840.00 48 HR $72 3,456 72.00 3,456.00 72.00 3,456.00 72.00 3,456.00 72.00 3,456.00 1 LS $13,800 13,800 16,250.00 16,250.00 3,900.00 3,900.00 3,000.00 3,000.00 3,000.00 3,000.00 1 LS $5,000 5,000 100.00 100.00 975.00 975.00 500.00 500.00 7,000.00 7,000.00 1 LS $5,000 5,000 4,095.00 4,095.00 9,000.00 9,000.00 20,000.00 20,000.00 60,000.00 60,000.00 5 EA $1,200 6,000 960.00 4,800.00 1,040.00 5,200.00 4,000.00 20,000.00 1,300.00 6,500.00 9 EA 5540 4,860 1,068.60 9,617.40 2,860.00 25,740.00 4,000.00 36,000.00 2,300.00 20,700.00 2 EA $3,500 7,000 1,800.00 3,600.00 3,800.00 7,600.00 9,000.00 18,000.00 7,700.00 15,400.00 12 EA 5840 10,080 345.80 4,149.60 985.00 11,820.00 1,000.00 12,000.00 625.00 7,500.00 3 EA $300 900 300.00 900.00 975.00 2,925.00 1,000.00 3,000.00 625.00 1,875.00 2 EA $360 720 1,170.00 2,340.00 850.00 1,700.00 3,500.00 7,000.00 700.00 1,400.00 3 EA $1,440 4,320 3,000.00 9,000.00 2,775.00 8,325.00 4,400.00 13,200.00 3,300.00 9,900.00 2 EA $480 960 975.00 1,950.00 1,250.00 2,500.00 4,300.00 8,600.00 650.00 1,300.00 5 EA $1,000 5,000 5,148.00 25,740.00 3,600.00 18,000.00 900.00 4,500.00 750.00 3,750.00 1 LS $3,000 3,000 500.00 500.00 2,500.00 2,500.00 5,000.00 5,000.00 7,000.00 7,000.00 Subtotal $ 85,791.00 $ 95,952.60 $ 119,341.00 $ 163,474.00 5 172,621.00 9.5% Sales Tax 8,150.15 9,115.50 11,337.40 15,530.03 16,399.00 Contract 2 - Base Bid $ 93,941.15 $ 105,068.10 $ 130,678.40 $ 179,004.03 $ 189,020.00 W: \PW Eng \PROJECTS \A - SW Projects \CBD Sewer Rehabilitation (91140203) \2015 CBD SEWER PROJECTS Bid Tab 09- 29- 15.xlsx 10/06/2015 120 UTILITIES COMMITTEE Meeting Minutes October 13, 2015 — 5:30 p.m. — Foster Conference Room, 6300 Building City of Tukwila Utilities Committee PRESENT Councilmembers: Dennis Robertson, Chair; Verna Seal, De'Sean Quinn Staff: Bob Giberson, Frank Iriarte, Robin Tischmak, Mike Cusick, Gail Labanara and Laurel Humphrey Guest: Dominador Amor, Local Government Manager, Puget Sound Energy CALL TO ORDER: Chair Robertson called the meeting to order at 5:30 p.m. I. PRESENTATIONS II. BUSINESS AGENDA A. Ordinance: Approving a Franchise Agreement with Puget Sound Energy, Inc. Staff is seeking Council approval of an ordinance approving a Franchise Agreement with Puget Sound Energy that covers both gas and electric services. The agreement provides for a 15 -year non - exclusive franchise that allows PSE to construct, install, maintain and operate electric power and natural gas systems in Tukwila. Staff reviewed the terms of the agreement, which includes a $5,000 administrative fee paid to the City. Committee Chair Robertson asked Mr. Amor if he would be willing to discuss issues around the city's legal ability to obtain power records when investigating illegal marijuana grow operations, and Mr. Amor indicated that he would. UNANIMOUS APPROVAL. FORWARD TO OCTOBER 19, 2015 REGULAR CONSENT AGENDA. B. Bid Awards: Central Business District Sanitary Sewer Rehabilitation Staff is seeking Council approval of a contract with Michels Corporation in the amount of $528,464.52 for the 2015 Central Business District Sanitary Sewer Rehabilitation Project, which will address deterioration of the approximately 50 year old sanitary sewer pipes in that area. Staff is also seeking Council approval of a contract with Olson Brothers - Pro -Vac, LLC in the amount of $105,068.10 for the 2015 Sanitary Sewer Manhole Rehabilitation Project, which will restore 9 manholes. UNANIMOUS APPROVAL. FORWARD TO OCTOBER 19, 2015 REGULAR CONSENT AGENDA. C. Grant Amendment: Duwamish Gardens Staff is seeking Council approval of a grant amendment with the Washington State Recreation and Conservation Office for $200,000 additional construction funding for the Duwamish Gardens Project. This supplement will bring the total to $1,199,434.00 and the total required match to $581,523. Funds for the match are available from other grant sources. Duwamish Gardens is being restored as a salmon habitat site with minor park elements. UNANIMOUS APPROVAL. FORWARD TO OCTOBER 19, 2015 REGULAR CONSENT AGENDA. D. Real Estate Exchange: Duwamish Gardens Staff is seeking Council approval of a Real Estate Exchange and Purchase Agreement and an Indemnity Agreement with Amalfi Investments. The City is exchanging a small portion of the northern property along East Marginal Way South for Amalfi's larger property located along the river. This will allow a greater area to be developed into habitat as well as make the site contiguous with the Chinook Wind property. The City will pay Amalfi $7,200.00 for 121