Loading...
HomeMy WebLinkAboutTrans 2015-11-16 Item 2A - Bid Award - Dirt and Aggregate Interchange Inc for 42nd Avenue South / Allentown Raodside BarriersCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director 'j BY: David Sorensen, Project Manager DATE: November 13, 2015 SUBJECT: Small Roadway and Safety Improvements 42nd Ave South /Allentown Roadside Barriers (Project No. 91310301) Bid Award ISSUE Award the bid for the first phase of construction for the 42nd Ave South /Allentown Roadside Barriers Project. BACKGROUND In 2013 a study was conducted to evaluate the need for installation of a guardrail or barrier between the Duwamish River and the adjacent streets of 42nd Ave S and S 115th St in Allentown. Several sections are recommended for guardrail /barrier installation and funding was approved in the CIP for design in 2014 and construction in 2015. ANALYSIS A call for bids was advertised for the 42nd Ave South /Allentown Roadside Barriers Project on October 13th and 20th and two bids were opened on October 27, 2015. The lowest bidder was Dirt and Aggregate Interchange, Inc. with a bid of $77,777.00. The engineer's estimate was $72,460.00. No errors were found in the bid tabulations. KPG Inc. provided a review of the bids, a background check, and a recommendation letter to award the bid to Dirt and Aggregate Interchange, Inc. BUDGET AND BID SUMMARY (All amounts include sales tax) Bid Results Estimate Budget Bid Award — Dirt & Aggregate $77,777.00 $72,460.00 $ 60,000.00 Contingency (10 %) 7,777.70 Thorndyke Safe Routes to School (Unused Contingency) 0.00 Total $85.554.70 0.00 $72,460.00 113,625.00 $173.625.00 RECOMMENDATION Council is being asked to award the construction contract for the 42nd Ave South /Allentown Roadside Barriers Project to Dirt and Aggregate Interchange, Inc., in the amount of $77,777.00 and consider this item at the on the Consent Agenda at the December 7, 2015 Regular Meeting. Attachments: 2015 CIP Page 5 Consultant Recommendation Bid Tabulation W: \PW Eng \PROJECTS\A- RW & RS Projects \42nd Ave S Allentown Roadside Barrier (91310301) \Design\Ad and Award\Award Docs to TC \Final Docs to TC \Into Memo 42nd Ave Barrier Bid Award 11 -13 -15 gl- rrt- sb.docx CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: Small Roadway and Safety Improvements Project No. 91310301 Varies DESCRIPTION: Programmatic approach to addressing small roadway and safety concerns through a variety of methods. Addresses needs not included in general maintenance, traffic calming, or other approaches. JUSTIFICATION: Increasing public demand on staff time. Local access streets in residential neighborhoods may need minor roadway or safety improvements that can not be addressed with any other City program. 42nd Ave S /Allentown Roadside Barrier is proposed in phases, Project No. 91310301. Full design in 2014 STATUS: and critical areas constructed in 2015. Additional construction in 2016 is grant dependent. MAINT. IMPACT: Minimal. COMMENT: Federal construction grant is proposed for $350,000 from the City Safety with no local match required. Full program is only feasible if Public Works adds a Traffic Engineer to staff (same position as Traffic Calming). FINANCIAL Through Estimated (in $000's) 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL EXPENSES Design 8 30 78 116 Land (R /W) 0 Const. Mgmt. 10 50 60 Construction 60 300 360 TOTAL EXPENSES 8 30 148 350 0 0 0 0 0 536 FUND SOURCES Awarded Grant 0 Proposed Grant 350 350 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 8 30 148 0 0 0 0 0 0 186 TOTAL SOURCES 8 30 148 350 0 0 0 0 0 536 2015 - 2020 Capital Improvement Program 5 2 ENGINEERS ARCHITECTS LANDSCAPE ARCHITECTS SURVEYORS SEATTLE • TACOMA October 28, 2015 Mr. David Sorensen, PE Public Works City of Tukwila 6300 Southcenter Blvd Tukwila, WA 98188 RE: 42nd Ave Roadside Barrier Dear Dave, As requested, KPG has tabulated the bids and reviewed the bid packages submitted for the 42nd Ave S /Allentown Roadside Barriers Project. The lowest bidder in the amount of $77,777.00 is Dirt and Aggregate Interchange, Inc. As part of our review, we checked the status of Dirt and Aggregate Interchange, Inc on the Washington State Labor and Industries web page to confirm they are currently insured, bonded, and licensed. We also checked their state and federal debarment status, both of which indicated no issues. Finally, we ran a rudimentary analysis of their bid against all other bids and industry pricing, which indicated no substantial imbalances or significant front loading. It is KPG's recommendation that the 42nd Ave S /Allentown Roadside Barriers Project be awarded to Dirt and Aggregate Interchange, Inc. We have enclosed the original bid package along with the contractor verification and bid tabulation for your review. Sincerely, Sam Douglas, E KPG, Inc. cc: Nelson Davis, PE Enclosures: Dirt and Aggregate Interchange, Inc bid package including Contractor Verification Bid Tabulation 753 9TH Avenue North • Seattle, WA 98109 • Phone (206) 286 -164o • Fax (206) 286 -1639 2502 Jefferson Avenue • Tacoma, WA 98402 • Phone (253) 627 -0720 • Fax (253) 627-4144 www.kpg.com 3 CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS 42nd Ave S /Allentown Roadside Barriers Bid Documents Project No. 91310301 October 2015 14C.F°C4- Item No. Section No. Item Description Qty Engineer's Estimate Dirt and Aggregate Interchange, Inc Petersen Brothers Unit Unit Price Amount Unit Price Amount Unit Price Amount 1 1 -04 Unexpected Site Changes 1 FA $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 2 1 -07 SPCC Plan 1 LS $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 208.59 $ 208.59 3 1 -09 Mobilization 1 LS $ 6,500.00 $ 6,500.00 $ 7,500.00 $ 7,500.00 $ 11,324.22 $ 11,324.22 4 1 -10 Project Temporary Traffic Control 1 LS $ 7,500.00 $ 7,500.00 $ 17,652.00 $ 17,652.00 $ 14,933.37 $ 14,933.37 5 4 -04 Crushed Surfacing Top Course 50 TN $ 80.00 $ 4,000.00 $ 100.00 $ 5,000.00 $ 150.48 $ 7,524.00 6 8 -01 Erosion /Water Pollution Control 1 LS $ 5,000.00 $ 5,000.00 $ 6,150.00 $ 6,150.00 $ 9,352.52 $ 9,352.52 TRAFFIC CONTROL DEVICES 7 8 -22 Paint Line, 4 in. 1 700 LF $ 2.00 $ 1,400.00 $ 2.50 $ 1,750.00 $ 3.00 $ 2,100.00 ROADSIDE DEVELOPMENT 8 8 -11 Removing Post Obstructions 1 EST $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 9 8 -11 Removing Guardrail 255 LF $ 12.00 $ 3,060.00 $ 5.00 $ 1,275.00 $ 6.87 $ 1,751.85 10 8 -11 Removing Guardrail Anchor 2 EA $ 500.00 $ 1,000.00 $ 400.00 $ 800.00 $ 214.86 $ 429.72 11 8 -11 Timber Guardrail - 6 ft. Post 390 LF $ 50.00 $ 19,500.00 $ 35.00 $ 13,650.00 $ 69.03 $ 26,921.70 12 8 -11 Timber Guardrail - 8 ft. Post 100 LF $ 60.00 $ 6,000.00 $ 45.00 $ 4,500.00 $ 73.15 $ 7,315.00 13 8 -11 Timber Guardrail - 11 ft. Post 200 LF $ 70.00 $ 14,000.00 $ 75.00 $ 15,000.00 $ 80.76 $ 16,152.00 Total Construction Cost $ 72,460.00 $ 77,777.00 $ 102,012.97 1 of 1 Bid Proposal $77,777.00 Bid Proposal $102,012.97 Matches? Yes Matches? Yes