HomeMy WebLinkAboutUtilities 2015-11-24 Item 2D - Final Acceptance - 2015 Small Drainage Program with Green River ConstructionCity of Tukwila Jim Haggerton, Mayor TO: Haggerton Utilities Committee FROM: Bob Gibemaon, Fxmb0c Works Director'��-- BY: Peter Lau, Senior Program Manager O/\lFE: November 20,2Q15 SUBJECT: 2015 Small Drainage Program Project No. 9V5412D1, Contract No. 15-141 Project Completion and Acceptance ISSUE Accept construction contract aa complete and authorize release ufr8L8in8Qe. BACKGROUND The Notice to Proceed for Contract Number 15-141 with Gn3HD River Construction, Inc. of Tukwila, Washington was issued OO August 8'2O15 for the 2O|5 Small Drainage Program (SDP). This construction project provided drainage iDlprVv9nm8D[S at three |OC8tiOOS in 7-Uhwi|G. The i[DprOvHDl8DtS included GtO[0n pipe and structure [gp|@C8nlHOtS, temporary erosion CODtnJ|' asphalt paving and thickened edge installation, pressure-grout iD and around culvert entrances, and site restoration. DISCUSSION Construction was physically completed on October 2, 2015. No change order was executed for the 2O15 Small Drainage Project. FINANCIAL IMPACT The construction budget for the 2O15 SDP and 2O15 SDP —[DOg8C[eS Way Project w8S $325.00O.O0. The 2O15 SDP —LongGCr8S Way Project was accepted bv the Council on August 17. 2O15 for $5M'748.O8. For the 2O15 GDl8U O[8iOGg8 Project, 8SDl8U amount of unit price OV8F[UDG were mainly due tO some additional usage Of quarry sp8|| for the culvert slope stabilization. The total Of Contract #15-141 iG$182'542.58with [ei8iD@gHiD the amount Of$S'127.13. Contract 2O15 SDP Contract Amount $182,142.50 Unit Price Over-runs Subtotal Vf Contract #15-141 $182,542-58 2O15 SDP —LOOA8onaa Way Contract Total 2015 Small Drainage Projects The Council is being asked tOformally accept the 2015 Small Drainage Project C0Dtr8C with Green River Construction, Inc. iO the final amount of $1M2'542.588S complete, and authorize the release [fr8t8iD@ge subject k} standard claim and lien release procedures, and tOconsider this item on the Consent Agenda at the December 7, 2015 Regular Council Meeting. Attachment: Notice of Completion, Contract w1n-141 eAPwsng\pROJEonm-onPro**WAnnual Small Drainage rrograms\2moSDP (91~umomonm=tion\2mnomPW,mo- Post Construction acloseout\lnfo Memo Close omuxnSDP 11-20n5 wuoc, 15 NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Name & Address of Public Agency City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 UBI Number: 179 000 208 Contractor's UBI Number: 600582949 Date: November 5, 2015 Department Use Only Assigned to: Date Assigned: Notice is herebv -iven relative to the completion of contract or proiect described below Project Name Contract Number Job Order Contracting 2015 Small Drainage Program 15 -141 ❑ Yes ❑X No Description of Work Done/Include Jobsite Address(es) Storm drainage improvements at 3 locations within the City. Specific improvements included: 1) removed and replaced existing storm drain pipes and drainage structures; 2) installed new storm drain pipes and drainage structures; 3) provided temporary erosion control; 4) removed and replaced asphalt pavement and thickened edge; 5) pressure - grouted in and around culvert entrance; and 6) site restoration. Affidavit ID for Green River Construction Company, Inc. is 609077. Federally funded road transportation project? ❑ Yes No Contractor's Name Telephone Number Green River Construction Company, Inc. 1206-246-9456 Contractor Address 6402 South 144th Street, Suite #1, Tukwila, WA 98168 If Retainage is Bonded, List Surety's Name (or attach a copy) N /A. Surety Agent's Address N /A. Date Contract Awarded Date Work Commenced Date Work Completed Date Work Accepted June 15, 2015 August 3, 2015 October 2, 2015 Contract Amount Additions ( + ) Reductions (- ) Sub -Total Amount of Sales Tax Paid at N/A (If various rates apply, please send a breakdown) TOTAL Please List all Subcontractors Below: $ 182,142.50 $ 400.08 $ 0.00 $ 182,542.58 Liquidated Damages $ Amount Disbursed $ Amount Retained $ $ 0.00 $ 182,542.58 NOTE: These two totals must be equal 0.00 173,415.45 9,127.13 TOTAL $ 182,542.58 Subcontractor's Name: UBI Number: Affidavit ID (if known) Briar Group, Inc. 602110282 600795 Brundage Bone Concrete Pumping, Inc. 600630026 601633 Evergreen Concrete Cutting, Inc. 601605667 600890 Puget Construction Services, Inc. 603356329 600987 Perfect Paint Striping 601803400 601419 Action Asphalt Paving, LLC 602206312 599220 F215- 038 -000 08 -2011 REV 31 0020e (08/25/11) Continued on page 26