HomeMy WebLinkAboutTrans 2015-12-07 Item 2B - Contract Supplement #1 - Major Maintenance on 3 Bridges: Frank Zepp Bridge with David Evans and AssociatesTO:
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
Mayor Haggerton
Transportation Committee
FROM: Bob Giberson, Public Works Director'`
BY: Robin Tischmak, City Engineer
DATE: December 4, 2015
SUBJECT: Major Maintenance on 3 Bridges 2015 Project
Project Numbers 91510406, 91510407, 91510408; Contract No. 15 -139
Supplemental Agreement No. 1
ISSUE
Approve Supplemental Agreement No. 1 with David Evans and Associates (DEA), Inc. for the Frank Zepp Bridge.
BACKGROUND
The Washington State Department of Transportation (WSDOT) approved Major Maintenance funding for 3 Tukwila
Bridges in December 2014 and funding acceptance was approved by Council in February 2015. DEA was contracted
for the design in July 2015 for all three bridges; Grady Way Bridge, Beacon Ave S Bridge and the Frank Zepp (S
180th St) Bridge. The original scope and fee were based on the best information available at the time.
DISCUSSION
Site investigations of the Frank Zepp Bridge have revealed unanticipated settlement and pier movement. Correction
of these issues requires additional site survey and design work. This supplement also adjusts the project schedule
and corrects some technical statements listed in the original scope. A safety concern was noted on the trail beneath
the west end of the Frank Zepp Bridge, which will not be covered by federal funds, but can be completed at a savings
under this contract.
FINANCIAL IMPACT
City Projects 91510406, 91510407, and 91510408 are included in Contract No. 15-139. Only the fee for the Frank
Zepp Bridge is increasing in Supplemental Agreement No. 1. The federal funding requires a 10% agency match. The
City match will increase by $4,829.70 and the trail lighting design will cost $5,489.00, to be paid from the 2015 Bridge
Inspection Program.
Grady Way Bridge Design
Beacon Ave S Bridge Design
Frank Zepp Bridge Design
Frank Zepp Supplement Ag. No. 1
Total
Contract
$ 96,539.00
249,061.00
343,368.00
46,769.00
$735,737.00
Budget
$866,000.00
RECOMMENDATION
Council is being asked to approve Supplemental Agreement No. 1 to Contract No. 15 -139 with David Evans and
Associates, Inc. for $48,297.00 for the Major Maintenance on 3 Bridges 2015 Project and consider this item on the
Consent Agenda at the December 14, 2015 Special Meeting.
Attachment: CIP page 10, Proposed 2016
DEA Supplemental Agreement No. 1
W: \PW Eng \PROJECTSW- RW & RS Projects \Bridge Inspection Programs \Bridge Inspections 2015 (91510402) \Major Maintenance on 3 Bridges 2015 \DEA 15
Design Contract \Supplement 1 \Info Memo DEA Sup 1 12 -04 -15 gl sb.docx
PROJECT:
DESCRIPTION:
JUSTIFICATION:
STATUS:
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2016 to 2021
Major Maintenance on 3 Bridges 2015
91510406
Project Nos. 91510407
91510408
Perform Seismic Retrofit, Deck and Joint Repair, and Bridge Painting work under the Local Agency Bridge
Program on the Frank Zepp Bridge, Grady Way Bridge and the Beacon Avenue South Bridge.
The three bridges were identified as good candidates for federal funding under the Local Agency Bridge
Program administered by WSDOT. The proposed work will preserve the City owned infrastructure and
extend the service lives of the bridges.
Federal grant funding was approved December 2014. Council budget amendment approved 8/3/15.
MAINT. IMPACT: Maintenance needs will be reduced once these three major maintenance projects are completed.
The three bridges were approved for grants under separate federal aid numbers but will be combined into one
COMMENT: for the design & construction contract. Grant funding requires a 10% match for the design phase; projects that
obtain construction authorization by 9/30/18 are eligible for 100% Federal funding for construction.
FINANCIAL Through Estimated
(in $000's)
2014 2015 2016
2017
2018
2019
2020
2021
BEYOND TOTAL
EXPENSES
Design
866
866
Land (R/W)
0
Const. Mgmt.
593
593
Construction
3,803
3,803
TOTAL EXPENSES
0
866
4,396
0
0
0
0
0
0
5,262
FUND SOURCES
Proposed BRAC Grant
780
4,396
5,176
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
0
86
0
0
0
0
0
0
0
86
TOTAL SOURCES
0
866
4,396
0
0
0
0
0
0
5,262
Draft 2016 - 2021 Capital Improvement Program
10
oral= WashIlliiton State
-,/ Daparbnont at Transportation
Supplemental Agreement
pp g
Number 1
Organization and Address
David Evans and Associates. Inc.
1115 West Bay Drive NW, Suite 301
Olympia WA 98502
Phone: 360 -628 -5025
Original Agreement Number
15-139
Project Number
DEA Project No. TUKA0000 -0014
Execution Date
Completion Date
12/31/2016
Project Title
Major Maintenance of Three Bridges
New Maximum Amount Payable
$ 735,737.00
Description of Work
West Approach Slab design, trail lighting and Survey for the Frank Zcpp Bridge. No. 91510406.1000.100.
The Local Agency of City of Tukwila
desires to supplement the agreement entered into with David Evans and Associates, Inc.
and executed on 7 -23 -2015 and identified as Agreement No.
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
15 -139
Section 1, SCOPE OF WORK, is hereby changed to read.
Sc' ,o Pxhihit A, attached
11
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for
completion of the work to read: nn change
111
Section V, PAYMENT, shall be amended as follows:
Added Izik 769 fnr a maximum arnnunt payable e f V715,717
as set forth in the attached Summary of Payments, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and
return to this office for final action.) 1
By: 414e/ Ee_I, er /1 ,45SUG /a-6e By
DOT Form 140 -063 EF
Revised 9/2005
Consultant Signature Approving Authority Signature
Date
17
Summary of Payments
Agreement No. 15 -139
Basic Agreement
Direct Salary Cost
127,752.00
2,530.00
130,282.00
Overhead
(Including Payroll Additives)
232,483.00
4,604.00
237,087.00
Direct Non -Salary Costs
(includes Subconsultant
charges)
290,407.00
38,876.00
329,283.00
Fixed Fee
38,326.00
759.00
39,085.00
Management Reserve Fund
0.00
Total
688,968.00
46,769.00
735,737.00
Bask Agreement
Frank Zepp Bridge No.
91510406.1000.100
343,368.00
46, 769.00
390,137.00
Grady Way Bridge No.
91510407.1000.100
96,539.00
0.00
96,539.00
Beacon Ave. S Bridge No.
91510408.1000.100
249,061.00
0.00
249,061.00
Total
688,968.00
0.00
735,737.00
18
EXHIBIT A
CITY OF TUKWILA
MAJOR MAINTENANCE ON THREE BRIDGES
Scope of Services
Supplement 1
Prepared by:
David Evans and Associates, Inc.
415 118th Avenue SE
Bellevue, WA 98005
November 17, 2015
19
TABLE OF CONTENTS
INTRODUCTION 1
TASK 3.0 FRANK ZEPP BRIDGE MAINTENANCE 1
3.02.S1 Structural Analysis 1
3.02.02.51 Geotechnical Pier Isolation Recommendations 1
3.03.01.S1 West Approach Slab Design and PS &E 2
3.03.02.S1 Additional Engineering Assessment 2
3.03.03.S1 Under -deck Trail Lighting Design and PS &E 2
3.08.S1 Survey 3
TASK 5.0 GRADY WAY BRIDGE MAINTENANCE 3
5.02.S1 Structural Analysis 3
TIME FOR PERFORMANCE 4
City of Tukwila i Scope of Services, Supplement 1
Major Maintenance on 3 Bridges November 17, 2015
20
INTRODUCTION
The City of Tukwila (AGENCY) and David Evans and Associates, Inc. (CONSULTANT) entered into a
professional services agreement on July 23rd, 2015 with for development of bridge repairs and
construction contract documents for the following:
08561400 TUKWILA -02 FRANK ZEPP BRIDGE
07996800 TUKWILA -13 BEACON AVENUE BRIDGE
08543600 TUKWILA -08 GRADY WAY BRIDGE
During the design development, a number of items were discovered that were not anticipated during
the initial scoping. They include:
• Settlement of the roadway in the vicinity of Pier 1 of the Frank Zepp Bridge. This settlement is
potentially attributed to combined seismic and vehicular induced settlements. To counter this
settlement, design and construction of a west approach slab is recommended for two reasons:
to provide a transition from the hard bridge surface to a softer soil supported roadway facility to
the west, and to provide seismic resistance benefits, including friction resistance to longitudinal
bridge movements.
• Pier 2 of the Frank Zepp Bridge has a slight tilt toward the Green River channel. It is thought that
this tilt is caused by additional lateral forces induced by the trail running underneath the Span 1
of the bridge. Additional engineering analysis and assessment is recommended to study the
information provided by the surveying activities and geotechnical investigations regarding the
Pier 2 condition.
• The trail running underneath Span 1 of the bridge is not lit. This task will provide design for
installation of lighting on the bridge deck soffit and on top of the trail to ensure a lit and safe
trail for the trail users.
The following Scope of Services (SCOPE) describes the work to be performed for this Supplement
(Supplement #1).
TASK 3.0 FRANK ZEPP BRIDGE MAINTENANCE
3.02.S1 Structural Analysis
Bullet Point 1 in original Scope of Services is amended to read:
• Seismic Analysis: CONSULTANT shall use the seismic design criteria developed to perform
seismic analysis and determine required capacity to strengthen bridge to achicvc Level 1 Life
using sound engineering judgment and experience to
meet the requirements of the Performance Level 0 (PLO) criteria.
3.02.02.S1 Geotechnical Pier Isolation Recommendations
CONSULTANT shall prepare pier isolation recommendations at Pier 2 relative to the trail loading on the
pier. Pier isolation concepts may include removal and replacement of the existing earth fill with
lightweight materials such as expanded polystyrene (geofoam) or pier wall jacketing. Recommendations
will be prepared for design and construction of the preferred isolation concept and included in the final
geotechnical report for the project.
Assumptions:
City of Tukwila 1 Scope of Services, Supplement 1
Major Maintenance on Three Bridges November 17, 2015
21
1. No field explorations or laboratory testing of soils will be performed. The recommendations for
pier isolation will be developed using existing information and simplified, conservative design
assumptions. Attendance at not more than one design team meeting at DEA's Bellevue office is
assumed.
Deliverables:
1. Draft design and construction recommendations for Pier 2 isolation will be transmitted to the
design team in electronic format with the final recommendations incorporated in the final
geotechnical report deliverable.
3.03.01.51 West Approach Slab Design and PS &E
CONSULTANT shall prepare concept and final designs, construction plans, engineer's estimate, and
special provisions (PS &E) for the installation of an approach slab on the west approach to the FRANK
ZEPP BRIDGE. This slab task is recommended for seismic enhancement of the west abutment and its
immediate vicinity. Currently the abutment and its vicinity is experiencing settlement.
This task involves creating two structural sheets that show a plan view and structural details of this slab
and its connection to the west abutment.
CONSULTANT shall prepare 90% and 100% AD Ready Plans, Specifications, & construction Opinion of
Cost Estimates (PS &E) for this task. The PS &E for this task will be incorporated into the Project PS &E
deliverables.
Current City of Tukwila Infrastructure Design and Construction Standards shall be followed throughout
the design process.
Deliverables:
1. 90% and 100% AD Ready PS &E documents for the West Approach Slab
3.03.02.S1 Additional Engineering Assessment
CONSULTANT shall review any additional survey and geotechnical data required for the seismic
assessment and retrofit design of the Frank Zepp Bridge per Level 0 (PLO) Performance criteria.
The geotechnical data pertains to the assessment of the effects of the installed trail adjacent to Pier 2 of
the Frank Zepp Bridge and its associated lateral pressures on the pier.
3.03.03.S1 Under -deck Trail Lighting Design and PS &E
CONSULTANT shall prepare concept and final designs, construction plans, engineer's estimate, and
special provisions (PS &E) for the installation of under deck lighting over the trail under the west end of
the Frank Zepp Bridge.
The installation of lighting will conform to vandal resistant fixtures lighting the pathway to 1.0 FC and 4:1
uniformity with fixtures having low maintenance, high efficiency, and a wavelength of between 4,000
and 4,300 wave length. An illumination report will represent the design. The power source will be either
the existing signal installation at Sperry Avenue and S 180`h Street or an alternate source selected by the
AGENCY. Lighting will remain on at all hours unless otherwise directed.
Deliverables:
City of Tukwila
2 Scope of Services, Supplement 1
Major Maintenance on Three Bridges November 17, 2015
22
1. 90% and 100% AD Ready PS &E documents for under -deck lighting.
3.08.S1 Survey
During recent site visits, CONSULTANT staff determined that Pier 2 is not plumb. This could be due
settlement at and around Pier 1 as a result of recent seismic activity or additional loads created by
installation of the trail under Span 1. In order to investigate these observations in further detail and
compare measured elevations with the as -built information, a survey is recommended.
CONSULTANT shall survey bridge to determine current elevations and geometry, and compare these to
as -built conditions to determine if bridge has settled, shifted, or rotated.
Deliverables:
1. One plan sheet showing elevations and planar coordinates for as -built condition, current
condition, and table listing the changes.
TASK 5.0 GRADY WAY BRIDGE MAINTENANCE
5.02.S1 Structural Analysis
Bullet Point 1 is amended to read:
• Seismic Analysis: CONSULTANT shall use the seismic design criteria developed to perform
seismic analysis and determine required capacity to strengthen Piers 2, 3, 10 and 11to-,16.14eve
using sound engineering judgment and
experience that meets the requirements of the Performance Level 0 (PLO) criteria.
Table 1 shows the Plans, Specifications and Estimate submittal items included in this supplement.
• Table 1.
Sheet Name
Maximum
Assumed
Number of
Sheets
PS &E Submittal Phase
90%
100%
51: FRANK ZEPP West Approach Slab
2
X
X
Si: FRANK ZEPP Survey Points for Comparison to As- Builts
1
X
X
51: Engineer's Estimate (to be included in Project estimate)
X
X
51: Special Provisions (to be included in Project Special Provisions)
X
X
City of Tukwila
Major Maintenance on Three Bridges
3 Scope of Services, Supplement 1
November 17, 2015
23
TIME FOR PERFORMANCE
The estimated project milestone submittal schedule is amended as follows:
CONSULTANT Notice -to- Proceed
July 20, 2015
Kick -Off Meeting
August 3, 2015
30% Design Submittal
September 14, 2015
90% PS &E Submittal
December 11, 2015 January
19, 2016
100% PS &E Submittal
January 5, 2016 March 1, 2016
Project Advertisement
February 16, 2016 March 29, 2016
City of Tukwila
4 Scope of Services, Supplement 1
Major Maintenance on Three Bridges November 17, 2015
24
City of Tukwila
Major Maintenance of Three Bridges
Contract No, 15 -139
David Evans and Associates, Inc.
Direct
Classification Hrs. x Rate = Cost
1 Engineering Manager (ENGM) 0 $ 88.00 $0
2 Project Manager (PMGR) 2 $ 61.00 $122
3 Executive Administrator (EXAD) 0 $ 36.00 $0
4 Managing Prof Engineer (MGPE) 2 $ 64.00 $128
5 Professional Engineer (PFEN) 0 $ 42.00 $0
6 Senior Bridge Engineer (SBEN) 0 $ 58.00 $0
7 Bridge Engineer (BREN) 0 $ 40.00 $0
8 Senior CADD Technician (SCAD) 0 $ 41.00 $0
9 CADD Technician (CADD) 0 $ 28.00 $0
10 Construction Manager (CONM) 0 $ 68.00 $0
11 Senior Scientist (SCCI) 0 $ 44.00 $0
12 Scientist (SCIT) 0 $ 34.00 $0
13 Survey Technician (SVTE) 40 $ 32.00 $1,280
14 Project Land Surveyor (PLSU) 10 $ 42.00 $420
15 Instrument Person (INST) 20 $ 26.00 $520
16 Administrative Assistant (ADMA) 0 $ 22.00 $0
17 Project Administrator (PADM) 2 $ 30.00 $60
18 0 $0
Total Hrs. 76
Salary Cost
Salary Escalation Cost (estimated)
Escalation - %u of Labor Cost
Total Salary Cost
Overhead Cost @
Net Fee @
Total Overhead & Net Fee Cost
0% per year @ 0 year(s)
181.98% of Direct Labor
30.0% of Direct Labor
$ 2,530
$0
$ 2,530
$ 4,604
$ 759
$ 5,363
Direct Expenses No. Unit Each Cost
Reproduction Costs
Copies 0 pages @ $0.06 /page $
Reports 0 reports @ $15 /report $
Plans 0 sets @ $2 /set $
Parking 0 @ $8 $ -
P20 Scanner 1 @ $650 $ 650.00 Frank Zepp
Mileage 75 miles @ $0.575 /mile $ 43.13 Frank Zepp
Subtotal
$ 693
David Evans and Associates Total
Subconsultants
$ 8,586
W /DBE M /DBE Hrs $ Total
;Trantech, LLC 312 $ 35,470
PanGEO, Inc. 24 $ 2,713
Total 0.0% 0.0% 0.0% 336
Subconsultant Total
0%
$ 38,183
Direct Expenses Sub -Total (including Subconsultants) $ 38,876
Total Costs $ 46,769
Page 1 of 1
25
m
cu
01
.O
m O
m a
m
t
Y a n
wV Z Obi
O C u o
z, C
o
d O
U w o z
N h
ca
z
0 m
0
2
0
0
(Wayd) Joleilsiulwpy laefo,d
(may) `a
fueisissy enpeuisiulWpy
CI SNI) UOSied luewnJSUk
(nsld) Jo (eninS purl loefaid
(2ms) ue0uyoel Fanln9
(Dos)1stuaog
(100S) lS) U0!3S J0!U8S
(lNNao) g
Ja5eueyy uonon.lsuoo
(aayo) uen!uyoal aayo ,>
(ayaS)
uepluyoal aayo JoluaS
(N3ae) Jeeul6u3 e6pug
(NaSS) a'
Jeeulau3 ape JolueS
1-
N3dd) iaag6u3 leuolsselaa q
(ad On)
Jeeui6u31ad 8016e0eyy , F
(avx3)
Jolepslu)Wpy 8n1102ex3
(Id) ia6aUelry loefoid
(INON3) Je6euen 6uuaaui5u3
E
• ao
ti
0
r -p
0
0
0
0
O
m
c
0.
E
0
n
rn
w
E
■
2
0
0
0,
ai
0.
N
LL
0
0
2
m
rn
5
t
2
in
0,
C
E
E
2
0
Lu
)
0
0.
0
t
2
<n
to
0
N
N
0,
to
0,
0
0
0
0
0,
0
0
0
U1
O
0)
Yl
26
City of Tukwila
Major Maintenance of Three Bridges
Contract No. 15 -139
Trantech, LLC
Exhibit E -1
Supplement 1
Direct
Classification Hrs. x Rate = Cost
1 Project Manager 16 $ 59.00 $944
2 Senior Structural Engineer 48 $ 54.50 $2,616
3 Project Structural Engineer 40 $ 50.00 $2,000
4 Staff Structural Engineer 40 $ 36.00 $1,440
5 Senior Civil Engineer 16 $ 50.00 $800
6 Staff Civil Engineer 0 $ 28.00 $0
7 Senior Drainage Engineer 0 $ 46.00 $0
8 Senior Traffic Engineer 94 $ 46.00 $4,324
9 Senior CADD Technician 0 $ 36.00 $0
10 CADD Technician 48 $ 37.00 $1,776
11 Project Administrator 0 $ 28.00 $0
12 Administrative Assistant 10 $ 20.00 $200
Total Hrs. 312
Salary Cost
Salary Escalation Cost (estimated)
Escalation - % of Labor Cost
Total Salary Cost
Overhead Cost @
Net Fee @
Total Overhead & Net Fee Cost
0% per year @ 0 year(s)
123.06% of Direct Labor
28.5% of Direct Labor
$ 14,100
$0
$ 14,100
$ 17,351
$ 4,019
$ 21,370
Direct Expenses No. Unit Each Cost
Reproduction Costs
Copies 0 pages @ $0.06 /page $
Reports 0 reports @ $15 /report $
Plans 0 sets @ $2 /set $
Parking 0 @ $8 $
Mail /Deliveries /Fed Ex 0 @ $20 $
Mileage 0 miles @ $0.575 /mile $
Subtotal $
Trantech, LLC Total $ 35,470
27
City of Tukwila Supplement 1
Major Maintenance of Three Bridges
Contract No. 15-139
Trantech, LLC t 2 4 s a 7 e s to 11 12
Work
Element a Work Element
Project Manager
Senior Structural Engineer
Protect Structural Engineer
Staff Structural Engineer
ui
s
u
g
15
`f
u
Senior Drainage Engineer
Senior Traffic Engineer
Senior CADD Technician
i
f
'reject Administrator
Idmmistmlive Assistant
Trantech. LLC
Trantech,LLC
%of
deed rates
sro
i,a a:
sx7 ao
tab
Ssa oo
$ zpl oa
-.
sas CO
f+s oa
ass CC
$glu
$2100
$2�9D
Total Total To To Total Total To Total - Total Total Total Total
hrs hrs his hrs hrs hrs hrs hrs hrs hrs hrs hrs
Total
hrs
Total
$
Total
Hours
_
242
20
5g
112
'+
c <. 4 ",
- -
$35,470
-
- -
77.56%
6.41%
18,03%
100.00%
J
3.0
Frank Zepp Bridge Maintenance
3.02.51
Structural Analysis (language revision, no hours)
3.02.02.51
Geotechnlcal Pier Isolation Recommendations
3.03.01.S1
West Approach Slab PS&E
10
40
40
40
10
62
32
2
3,03.02.51
Additional Engineering Assessment
4
6
8
3.03.03.01
Under -Deck Trail Lighting PS&E
2
32
16
3.08.51
Survey
10
s 6
-�46-
If1 .,.
--
g4
+6
YlloilBMmrN3.0;Toti1
EXPENSES
SALARY ESCALATION
PROJECT WORK ELEMENTS TOTALS
16 48 40 40 16 94 18 10
312
$35,470
100.00%
28
City of Tukwila
Major Maintenance of Three Bridges
Contract No. 15 -139
PanGEO, Inc.
Exhibit E -2
Supplement 1
Direct
Classification Hrs. x Rate = Cost
1 Principal Geotechnical Engineer 0 $ 72.15 $0
2 Geotechnical Project Manager 6 $ 62.05 $372
3 Project Engineer 12 $ 38.45 $461
4 Senior Geologist 4 $ 40.39 $162
5 Administrative Assistant 2 $ 28.85 $58
6 0 $0
7 0 $0
8 0 $0
Total Hrs. 24
Salary Cost
Salary Escalation Cost (estimated)
Escalation - % of Labor Cost
Total Salary Cost
Overhead Cost @
Net Fee @
Total Overhead & Net Fee Cost
0`;a per year @ 0 year(s)
126.55% of Direct Labor
30.0% of Direct Labor
$ 1,053
$0
$ 1,053
$ 1,333
$ 316
$ 1,648
Direct Expenses No. Unit Each Cost
Reproduction Costs
Copies 0 pages @ $0.06 /page $
Reports 0 reports @ $15 /report $
Plans 0 sets @ $2 /set $
Parking 0 @ $8 $ _
Mail /Deliveries /Fed Ex 0 @ $20 $
Mileage 20 miles @ $0.575 /mile $ 11.50
Subtotal
$ 12
PanGEO, Inc. Total $ 2,713
29
City of Tukwila Supplement 1
Major Maintenance of Three Bridges
Contract No. 15 -139
PanGEO, Inc. 1 2 3 4 5
Work
Element# Work Element
Principal Geotechnical
Engineer
Geotechrncal Project
Manager
Project Engineer
Senior Geologist
kdmintstrative Assistant
d
c
O
lc
(7
a
PanGEO Inc.
,
%of
direct rates',
572,15
562.05
538 45
540 38
528 85
Total Total Total Total Total
hrs hrs hrs hrs hrs
Total
hrs
Total
5
Total
Hours
24 $2 701
24 52,701
$12
100.00%
100.00%
3.0
Frank Zepp Bridge Maintenance
3.02.S1
Structural Analysis (language revision, no hours)
8
12
4
2
3.02.02.S1
Geotechnical Pier Isolation Recommendations
3.03.01.S1
West Approach Slab PS&E
3.03.02.S1
Additional Engineering Assessment
Under -Deck Trail Lighting PS&E
3.03.03.S1
3.08.S1
Survey
6
12
Work Element 3.0 Total
4
2
EXPENSES
SALARY ESCALATION
_
PROJECT WORK ELEMENTS TOTALS
6 12 4 2
24
$2,713
100.00%
30