Loading...
HomeMy WebLinkAboutUtilities 2016-02-09 Item 2B - Handout Distributed at Meeting - Valley View Sewer District: The Loop and SurroundingThe Loop and Surrounding Area Funding, Possible Project Timeline, and Public Outreach Update Utility Committee Meeting 2/9/2016 Funding • Funding offered is 50% of design costs as a grant, balance of the design and all construction as a 1.0% loan, financed over 20 years. • There are two opportunities for loan funding to be replaced with grant funding: • The 2016 Supplemental Budget process. (Capital Budget) • The 2017 Regular Biennium Budget process. (Capital Budget) (Sen. Karen Keiser, Assistant Ranking member for Capital Budget issues, 33rd District) (Sen. Bob Hasegawa, Ways and Means, 11th District) (Sen. Sharon Nelson, Ways and Means, 34th District) • The District is investigating a Community Development Block Grant through King County to help low income homeowners pay for sewer connection costs. • Side sewer construction is included in the funding offer and will be included in project design. Possible Project Timeline • The District is considering taking advantage of the 50% grant for design to complete the project design this year. • The earliest possible construction date depending on design review and more information about funding in late spring of 2017. Public Outreach • The District is planning an open house /public meeting to inform project area residents about funding and schedule considerations (February 25th) • Project area residents will be polled on the question of possible annexation to the Sewer District. • Income verification forms will be mailed out with the meeting announcements to gather information for use in the CDBG Grant Application. Gilliam Creek a wept. reNew Sewer .11rn nom Me *lay New Sewer olwlu ce eMe° Inrome:on mr valley New Sewer aeMet.re'l wee s+uem n wes ee.ynwe era Intended survey 0� It era pnrereeea m e a°y T. map Is bona on Ice best rvmm.:mr. e'.elxaa mlro mm Yavm On rlYe M.P. Any repr00IXaan or .ale or Inv mep, r Roan. mercy . perwree Or cypress eraen eulnelzeeon neN by New SewerView sewer The Loop Sewer Valley Wew Sewer District 4500 CFU 230 CFU /100 f i 1:_ 10/13/15 Tukwila Loop - Project Area - 320 CFU /100 mL Crystal Springs WHEN BA MEASURES`]' NORTH Gilliam Creek Historical Sample Location 10/27/99: 5,800 CFU /100 ML 11/5/99: 3,600 CFU /100 ML 11/19/99: 980 CFU /100 ML Current Sample Location Outfall to Green River 10/5/15: 1,700 CFU /100 ML Iol May slow Sewn DAN. Mae use only, A n n. paeMeed b wney ansuxry Th. map as 12000 on . oeM Nolmelon .44.400 on pe db Mown on Oa map Any 1•pm00m 00 Dale W N. map, w pomone 01oe0C I po0EkW wAkp! norm 00,0,5 aatonzoWn o , the sdby Mew BOW!. [Merit Th. me.dal . owned erd rgneo W Ba v.Ary slew sown The Loop Sewer Valley View Sewer Dlstrtct 1 Inch = 500 feet DRAWING b FULL SCALE WHEN BAR MEASURES 2' NORTH