Funding, Possible Project Timeline, and Public Outreach Update
Utility Committee Meeting 2/9/2016
Funding
• Funding offered is 50% of design costs as a grant, balance of the
design and all construction as a 1.0% loan, financed over 20 years.
• There are two opportunities for loan funding to be replaced with
grant funding:
• The 2016 Supplemental Budget process. (Capital Budget)
• The 2017 Regular Biennium Budget process. (Capital Budget)
(Sen. Karen Keiser, Assistant Ranking member for Capital
Budget issues, 33rd District)
(Sen. Bob Hasegawa, Ways and Means, 11th District)
(Sen. Sharon Nelson, Ways and Means, 34th District)
• The District is investigating a Community Development Block Grant
through King County to help low income homeowners pay for sewer
connection costs.
• Side sewer construction is included in the funding offer and will be
included in project design.
Possible Project Timeline
• The District is considering taking advantage of the 50% grant for design
to complete the project design this year.
• The earliest possible construction date depending on design review and
more information about funding in late spring of 2017.
Public Outreach
• The District is planning an open house /public meeting to inform project
area residents about funding and schedule considerations (February 25th)
• Project area residents will be polled on the question of possible annexation
to the Sewer District.
• Income verification forms will be mailed out with the meeting
announcements to gather information for use in the CDBG Grant
Application.
Gilliam Creek
a wept. reNew Sewer
.11rn nom Me *lay New Sewer
olwlu ce eMe° Inrome:on
mr valley New Sewer aeMet.re'l wee
s+uem n wes ee.ynwe era Intended survey
0� It era pnrereeea m
e a°y T. map Is bona on Ice
best rvmm.:mr. e'.elxaa mlro mm
Yavm On rlYe M.P.
Any repr00IXaan or .ale or Inv mep,
r Roan. mercy . perwree
Or cypress eraen eulnelzeeon
neN by New SewerView sewer
The Loop Sewer
Valley Wew Sewer District
4500 CFU
230 CFU /100 f i 1:_
10/13/15
Tukwila Loop -
Project Area -
320 CFU /100 mL
Crystal Springs
WHEN BA MEASURES`]'
NORTH
Gilliam Creek Historical
Sample Location
10/27/99: 5,800 CFU /100 ML
11/5/99: 3,600 CFU /100 ML
11/19/99: 980 CFU /100 ML
Current Sample Location
Outfall to Green River
10/5/15: 1,700 CFU /100 ML
Iol May slow Sewn DAN. Mae use
only, A n n. paeMeed b wney
ansuxry Th. map as 12000 on .
oeM Nolmelon .44.400 on pe db
Mown on Oa map
Any 1•pm00m 00 Dale W N. map,
w pomone 01oe0C I po0EkW
wAkp! norm 00,0,5 aatonzoWn
o , the sdby Mew BOW!. [Merit
Th. me.dal . owned erd
rgneo W Ba v.Ary slew sown
The Loop Sewer
Valley View Sewer Dlstrtct
1 Inch = 500 feet
DRAWING b FULL SCALE
WHEN BAR MEASURES 2'
NORTH