HomeMy WebLinkAboutUtilities 2016-03-15 Item 1A - Resolution - Emergency Sanitary Sewer Repair at 1200 Andover Park East (Central Business District Sanitary Sewer Rehabilitation)City of Tukwila Allan Ekberg, Mayor Public Works Department - Bob Giberson, Director INFORMATIONAL MEMORANDUM TO: Mayor Ekberg Utilities Committee t FROM: Bob Giberson, Public Works Director BY: Mike Cusick, Senior Program Manager DATE: March 11, 2016 SUBJECT: CBD Sanitary Sewer Rehabilitation Project No. 91140203 Resolution declaring an Emergency for the Sanitary Sewer Repair at 1200 APE ISSUE Approve Resolution for the emergency repair of the sanitary sewer main at the 1200 block of Andover Park East (APE). BACKGROUND The City has been implementing a phased rehabilitation of the sanitary sewer system in the Commercial Business District (CBD) since 2013. The sewer lines were originally installed in the 1960's and have served their effective lifespan. Rehabilitation or replacement is necessary to extend the service life of the sewer system. Visual inspections have revealed that certain segments of the sewer main have deteriorated severely and multiple failures have occurred (see attached photo). The sewer mains must be cleaned of debris before they can be slip -lined and the process of high - pressure water cleaning can damage the sewer or even remove bedding adjacent to the sewer mains if a breach has already occurred. Some sewer mains have not been visually inspected due to inaccessibility of the inspection camera; therefore, some pipe conditions are unknown. DISCUSSION Slip- lining began in late January 2016 with initial efforts proceeding without incident. The contractor began finding issues with gravel in the mains near Shasta Beverage and Costco. Cleaning efforts on February 17, 2016 of the sewer main in APE, just downstream of Shasta, have exposed a broken sewer pipe that prevents the current relining process to move forward without repairing the main by excavation and replacement. Attached is Mayor Ekberg's signed Emergency Declaration dated February 23, 2016 for the sewer main repair at 1200 Andover Park East. FISCAL IMPACT Since the emergency declaration was signed, staff requested quotes from nine contractors and received three submittals. The R.L. Alia Company submitted a cost of $114,219.46 (which includes a 20% contingency). The full extent of the damage to the sewer main can only be determined after exposing the failing pipe. The construction will be paid for from the 2015/2016 CBD Sanitary Sewer Rehabilitation Project funds, currently budgeted at $900,000.00 for 2016. RECOMMENDATION Council is being asked to approve the Resolution declaring an emergency for the repair of the sanitary sewer at 1200 Andover Park East and consider this item on the Consent Agenda at the March 21, 2016 Regular Meeting. Attachments: Emergency Declaration Draft Resolution Photo of sewer Page 71, 2015 CIP with breakdown of contracts for 2015 & 2016 W: \PW Eng \ PROJECTS \A- SW Projects \CBD Sewer Rehabilitation (91140203)\ Info Memo Resolution Emergency Repair 1200 APE 03 -11 -16 gl.docx 1 City of Tukwila Allan Ekberg, Mayor Public Works Department - Bob Giberson, Director EMERGENCY DECLARATION TO: Mayor Ekberg FROM: Bob Giberson, Public Works Director BY: Robin Tischmak, City Engineer DATE: February 22, 2016 SUBJECT: CBD Sanitary Sewer Rehabilitation Project No. 91140203 Emergency Declaration for Sewer Repair at 1200 Andover Park East ISSUE Mayor to declare an emergency that authorizes City staff to expedite a repair of the sanitary sewer main at the 1200 block of Andover Park East (APE). BACKGROUND The City has been implementing a phased rehabilitation of the sanitary sewer system in the Central Business District (CBD) since 2013. The sewer lines were originally installed in the 1960's and have served their effective lifespan. Rehabilitation or replacement is necessary to extend the service life of the sewer system. Visual inspections have revealed that certain segments of sewer main have deteriorated severely and multiple failures have occurred (see attached photos). The rehabilitation process must be carefully implemented as preparing the sewer mains for relining can cause additional damage and possible failure. The mains must be cleaned of debris before they can be relined and the process of high - pressure water cleaning can damage the sewer or even remove bedding adjacent to the sewer mains if a breach has already occurred. Some sewer mains have not been visually inspected due to inaccessibility of the inspection camera; therefore some pipe conditions are unknown. DISCUSSION Construction began in late January 2016 with initial relining efforts proceeding without incident. The Contractor began finding issues with gravel in the mains near Shasta and Costco. Cleaning efforts on February 16 of the sewer main in APE just downstream of the Shasta Corporation have exposed a collapsed pipe that prevents the current relining process to move forward without repairing the main by excavation and replacement. An emergency in accordance with TMC 2.57.030 and RCW 35.23.352 is requested in order to waive the standard bidding process. A Resolution will be prepared for Council approval at the next available Utilities Committee meeting date. FISCAL IMPACT At this time, repair costs are unknown. The extent of the damage can only be determined by exposing the failed sewer main. This work will be paid from the 2015/2016 CBD Sanitary Sewer Rehabilitation Project funds, currently budgeted at $900,000.00 for 2016. RECOMMENDATION Mayor is being asked to declare an emergency for the Sewer Repair at 1200 Andover Park East. Authorized By: 4(9 Allan Ekberg, W:1PW Eng1PROJECTS1X SW Projects\CBD Sewer Rehabilitation (91140203)1Emergency Dec ration Mayor 1200 APE 02- 22- 16.docx DR AFT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DECLARING AN EMERGENCY IN RESPONSE TO DAMAGES TO PUBLIC PROPERTY DUE TO A SEVERELY DAMAGED SANITARY SEWER MAIN. WHEREAS, it has been determined that a damaged sanitary sewer main is in danger of collapsing in the 1200 block of Andover Park East; and WHEREAS, if the sanitary sewer main collapses, the break could pose significant risks to existing gas lines, storm drains, and water utilities; and WHEREAS, the repairs to the sanitary sewer main are required immediately; and WHEREAS, RCW 39.04.280 provides for emergency declarations and competitive bidding exemptions; and WHEREAS, the Mayor of Tukwila declared an emergency on February 23, 2016, in order to allow City forces to respond with appropriate resources to restore damages and prevent further impacts to public and private property; and WHEREAS, the City Council wishes to provide their support and endorsement of the Mayor in his action to declare an emergency and for the City's efforts to respond to the emergency; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: The City Council supports the Mayor in his declaration of emergency and authorizes the execution of contracts or agreements due to damages and the need for protective actions brought about by a failed sanitary sewer main, and hereby authorizes City forces to respond in the most effective and expedient manner, without regard for the procedures and formalities that would otherwise govern the assignment of duties, procurement of materials, and contracting of services. This situation is an emergency as defined in RCW 39.04.280(3) W: \Word Processing \Resolutions\Emergency - Sanitary sewer main on APE 2 -29 -16 MC:bjs Page 1 of 2 3 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, V1ASH4iNGTON, at a Regular Meeting4hereof this day of , 2016. ATTEST /AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk Joe Duffle, Council President APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Resolution Number: Rachel B. Turpin, City Attorney W: \Word Processing \Resolutions\Emergency - Sanitary sewer main on APE 2 -29 -16 MC:bjs Page 2of2 4 UP MANHOLE 1044A LOOKING SOUTH NEAR COSTCO DR. AND APE Costco Or Re Andover'~ -- . CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: CBD Sanitary Sewer Rehabilitation Project No. 91140203 DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: The asbestos concrete pipe in the CBD (commercial business district) is approximately 45 years old and becoming soft. Slip lining the pipe will reinforce the strength with little impact to roadways and minimal excavation. If the pipe collapses, the street will have to be excavated and the cost of the repairs will be significant. In the last five years we have had two major pipe failures on Andover Park West. A Public Works Trust Fund loan was successfully obtained in 2012 for construction. Reduced maintenance and repair costs. The limits of the 2013 project is APW to APE from Minkler Blvd to S 180th St and will now include the repair to the sewer under the railroad tracks. FINANCIAL Through Estimated (in $000's) 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL EXPENSES Project Location; as: = ; � .� z -_ .. ".1 4'1j! 6 l ." - l' £,Awiks. t { Design 159 33 20 20 20 20 20 292 Land (RNV) 0 Const. Mgmt. 87 120 120 120 120 120 687 Construction 639 900 900 900 900 900 5,139 TOTAL EXPENSES 159 759 1,040 1,040 1,040 1,040 1,040 0 0 6,118 FUND SOURCES Awarded Grant 0 PWTF /Proposed PW1 45 250 455 750 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 114 509 585 1,040 I 1,040 1,040 1,040 0 0 5,368 TOTAL SOURCES 159 759 1,040 1,040 1,040 1,040 1,040 0 0 6,118 2015 - 2020 Capital Improvement Program 71 6 Project Location; as: = ; � .� z -_ .. ".1 4'1j! 6 l ." - l' £,Awiks. t { hIqy £ {1 _i S' E 3r7,- t .rr ,/ 51n /1111 y it 76.' Sbanygr BNd • qq irccr{}TJc\ h i Li w o ■ l a i t 5 1, 'L F` l , / � a�l . " 018 2015 - 2020 Capital Improvement Program 71 6 PROJECT: DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 CBD Sanitary Sewer Rehabilitation The asbestos concrete pipe in the CBD (commercial business district) is approximately 45 years old and becoming soft. Slip lining the pipe will reinforce the strength with little impact to roadways and minimal excavation. If the pipe collapses, the street will have to be excavated and the cost of the repairs will be significant. In the last five years we have had two major pipe failures on Andover Park West. A Public Works Trust Fund loan was successfully obtained in 2012 for construction. Reduced maintenance and repair costs. The limits of the 2013 project is APW to APE from Minkler Blvd to S 180th St and will now include the repair to the sewer under the railroad tracks. FINANCIAL (in $000's) Through Estimated 2013 2014 2015 2016 2017 2018 2019 TOTAL EXPENSES Design 159 33 20 20 20 20 20 292 Land (R/W) 0 Const. Mgmt. 87 120 120 120 120 120 687 Construction 639 900 900 900 900 900 5,139 TOTAL EXPENSES 159 759 1,040 1,040 1,040 1,040 1,040 6,118 FUND SOURCES Awarded Grant 0 PWTF /Proposed PWTF 249 501 750 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 159 510 539 1,040 1,040 1,040 1,040 5,368 TOTAL SOURCES 159 759 1,040 1,040 1,040 1,040 1,040 6,118 RH2 Enginneering Staff & Misc Stahali CHS Eng RH2 Enginneering Michels 2014 RL Alia RL Alia Olson Pro -Vac Contigency Michels 2014 Contigency RL Alia Contigency RL Alia Contigency Design 13 -076 CM CM CM Sliplining APW /APE 1227 APE 14 -153 14 -152 15 -074 14 -154 14 -159 15 -155 Manholes 15 -177 Sliplining 15 -178 1227 APE New 1200 APE New 2015 - 2020 Capital Improvement Program 2015 Contract Actual 232,235.00 30,022.48 41,325.61 23,380.00 46,317.00 112,710.00 160,594.98 406,226.39 34,154.35 18,781.08 17,659.71 13,644.70 171,530.71 547,954.88 34,154.35 $ 875,073.52 71 2016 Contract 105,068.10 21,013.62 528,464.52 105,692.90 69,717.56 13,943.51 95,182.88 19.036.58 $ 1,057,184.97 Actual 40,201.99 Remaining Closed Closed Closed 58,863.31 Closed Closed Closed 7