Loading...
HomeMy WebLinkAboutSpecial 2016-03-14 Item 2E - Bid Award - RL Alia Company for Commerical Business District Sanitary Sewer Rehabilitation: Sewer Repair at 1227 Andover Park East for $69,717.56 (Plus Contingency)COUNCIL AGENDA SYNOPSIS Me tin g Date Pre ayor s review Council review 'p ared F 03/14/16 BG�# Ma LO ITEMNO. 2.E. ISTAFF SPONSOR: BOB GIBERSON I ORIGINAL AGENDA DATE: 03/14/16 AGENDA ITEM TifLL,, CBD Sanitary Sewer Rehabilitation - Bid Award Sewer Repair at 1227 Andover Park East with R.L. Alia Company CATEGORY ❑ Discussion Mtg Date ❑ Motion Mtg Date ❑ Resolution Mtg Date ❑ Ordinance Mtg Date ❑ BidAivard Mtg Date 3114116 ❑ Public Hearing Mtg Date E] Otber Mfg Date SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P&R ❑ Police ❑ PIV SPONSOR'S During the cleaning and video inspection for the 2015 Commercial Business District (CBD) SUMMARY Sanitary Sewer Rehabilitation Project, a section of sewer pipe will need to be excavated and repaired. Five contractors were contacted and two submitted quotes. The low quote of $69,717.56 was from R.L. Alia Company. The 2016 budget of $900,000.00 will cover the balance as $139,760.86 is remaining. Council is being asked to approve R.L. Alia's contract for $69,717.56. REVIEWED BY ❑ cow Mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte ❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm. DATE: 02/23/16 COMMITTEE CHAIR: KATHY HOUGARDY RECOMMENDATIONS: SPONSOR/ADMIN. Public Works Department COmm"ITEE" Unanimous Approval; Forward to Regular Consent Agenda COST IMPACT I FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $69,717.56 $900,000.00 $0.00 Fund Source: 402 SEWER FUND (PAGE 71, 2015 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 03114/16 I --- MTG.DATEJ ATTACHMENTS 03/14/16 Informational Memorandum dated 02/19/16 Page 71, 2015 CIP Minutes from the Utilities Committee meeting of 02/23/16 23 24 TO: FROM: BY: DATE: Citv of Tukwila Public Works Department - Bob Giberson, Director INFORMATIONAL MEMORANDUM Mayor Ekberg Utilities Committee Bob Giberson, Public Works Director/69 Mike Cusick, Senior Program Manager February 19, 2016 SUBJECT: CBD Sanitary Sewer Rehabilitation Project No. 91140203 Bid Award for Sewer Repair at 1227 Andover Park East Allan Ekberg, Mayor ISSUE Award contract to R. L. Alia Company for the CBD Sanitary Sewer Rehabilitation — Sewer Repair at 1227 Andover Park East. BACKGROUND During the cleaning and video inspection of the sanitary sewer near 1227 Andover Park East by Michels Corporation, the contractor for the 2015 CBD Sanitary Sewer Rehabilitation Project, a section of sewer pipe was found in a condition that could not be relined and requires excavation to repair. ANALYSIS The City requested quotes from five contractors for the sewer repair near 1227 Andover Park East. Two of the five contractors returned quotes to the City. The low quote of $69,717.56 was from R.L. Alia Company and the second highest quote of $106,471.23 was from Shoreline Construction. Both firms have done satisfactory work for the City in the past. BUDGET AND BID SUMMARY Engineer's Remaining Estimate Bid Amount 2016 Budget R.L. Alia Company $60,364.72 $69,717.56 139,760.86 Contingency 20% 13,943.51 Grand Total $i 39.,760.86 RECOMMENDATION Council is being asked to approve the contract with R. L. Alia Company in the amount of $69,717.56 for the CBD Sanitary Rehabilitation — Sewer Repair at 1227 Andover Park East Project and consider this item on the Consent Agenda at the March 14, 2016 Special Meeting. WAPW Eng\PROJECTS\A- SW Projects\CBD Sewer Rehabilitation (91140203)\Info Memo CBD SEWER 1227 APE Bid Award 02-19-16 gl sb.docx 25 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: CBD Sanitary Sewer Rehabilitation Project No. 91140203 EXPENSES The asbestos concrete pipe in the CBD (commercial business district) is approximately 45 years old and DESCRIPTION: becoming soft. Slip lining the pipe will reinforce the strength with little impact to roadways and minimal excavation. If the pipe collapses, the street will have to be excavated and the cost of the repairs will be significant. In the JUSTIFICATION: last five years we have had two major pipe failures on Andover Park West. STATUS: A Public Works Trust Fund loan was successfully obtained in 2012 for construction. MAINT. IMPACT: Reduced maintenance and repair costs. 159 The limits of the 2013 project is APW to APE from Minkler Blvd to S 180th St and will now include the repair COMMENT: to the sewer under the railroad tracks. FINANCIAL Through Estimated (in 5000's1 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL EXPENSES Design 159 33 20 20 20 20 20 292 Land (R/W) 0 Const. Mgmt. 87 120 120 120 120 120 687 Construction 639 900 900 900 900 900 5,139 TOTAL EXPENSES 159 759 1,040 1,040 1,040 1,040 1,040 0 0 6,118 FUND SOURCES Awarded Grant 0 PWTF /Proposed PWI 45 250 455 750 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 114 509 585 1,040 1,040 1,040 1,040 0 0 5,368 TOTAL SOURCES 159 759 1,040 1,040 1,040 1 1,040 1 1,040 1 01 01 6,118 2015 - 2020 Capital Improvement Program 71 26 UTILITIES COMMITTEE Meeting Minutes City Council Utilities Committee February 23,2016 - 5:30 p.m. - Foster Conference Room, 6300 Building Councilmembers: Kathy Hougardy, Chair; Kate Kruller, Thomas McLeod Staff: David Cline, Bob Giberson, Greg Villanueva, Pat Brodin, Russell Betteridge, Robin Tischmak, Ryan Larson, Gail Labanara, Laurel Humphrey Guests: Trista Kobluskie, Russ Gaston and Jesse Reynolds, Otak, Inc. CALL TO ORDER: Committee Chair Hougardy called the meeting to order at 5:30 p.m. I. PRESENTATIONS 11. BUSINESS AGENDA A. Bid Award: Central Business District Sanitary Sewer Rehabilitation Staff is seeking Council approval of a contract with R.L. Alia Company in the amount of $69,717.56 for the Central Business District Sanitary Sewer Rehabilitation Sewer Repair at 1227 Andover Park East Project. The contractor for the 2015 CBD Sanitary Sewer Rehabilitation project discovered a section of pipe near 1227 Andover Park East that could not be relined and requires excavation. R.L. Alia returned the lowest quote and has performed satisfactory work in the past. The Committee asked clarifying questions and requested that the updated CIP page be included in the packet for full Council review. INFORMATION ONLY. B. NPDES Program: Low Impact Development (LID) Code Update The City's National Pollutant Discharge Elimination System ( NPDES) Phase II permit requires that the City review, revise and make effective their development codes to incorporate LID principles and practices no later than December 31, 2016. The City contracted with Otak, Inc. to perform an LID gap analysis and assist with implementation. Consultants from Otak provided the Committee with an overview of the analysis and forthcoming actions. Low Impact Development is a set of site development principles designed to minimize impervious surfaces, maintain native vegetation, and manage stormwater runoff close to its source. Otak's next step is to provide initial impressions to City staff for review, and then develop formal recommendations which will be advanced to the Planning Commission. Committee members expressed support and asked for periodic updates. Chair Hougardy asked if recently adopted policy documents such as the Southcenter Subarea Plan would need to be revised as a result of this analysis. Staff responded that the City has been encouraging LID principles already, and there are unlikely to be major changes to recently adopted plans. INFORMATION ONLY. 27