HomeMy WebLinkAboutReg 2016-03-21 Item 5C - Resolution - Emergency Damage Repair to Sanitary Sewer MainCOUNCIL AGENDA SYNOPSIS
Initia/.r __
Meeting Date
03/21/16
Prepared 4
8G
M ors review
ITEM INFORMATION
ITEM No.
5.C.
7
STAFF SPONSOR: BOB GIBERSON
l ORIGINAL AGENDA DATE: 03/21/16
AGENDA ITEM TITLE CBD Sanitary Sewer Rehabilitation - 1200 Andover Park East
Resolution declaring an Emergency
CATEGORY ❑ Discussion
llitg Date
❑ Motion
Mtg Date
El Resolution
❑ Ordinance
A4tg Date
❑ Bid Alward
Mtg Date
❑ Public Hearing
it Date
❑ Other
A1tg Date
Mtg Date 03/21/16
SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ Pe7R ❑ Police f l PW
SPONSOR'S This Resolution will declare an emergency that authorizes City staff to expedite the sewer
SUMMARY repair at 1200 Andover Park East. On February 17, 2016, while in the process of cleaning
the sewer in Andover Park East in preparation for the 2015 /2016 CBD Sewer Rehabilitation
Project, broken sewer pipe was found and will need to be fully repaired. Council is being
asked to approve the resolution declaring an emergency and authorize immediate repairs
to the damaged sewer line.
REVIEWED BY
❑ COW Mtg.
❑ CA &P Cmte
Cmte ❑ Arts Comm.
❑ F &S Cmte
❑ Parks
Comm.
CHAIR: KATHY
❑ Transportation
Cmte
■ Utilities
• Planning Comm.
D.A'1'E: 03/15/16
HOUGARDY
COMMIT "I'EE
RECOMMENDATIONS:
SPONSOR /ADMIN•
COMMITTEE
Public Works Department
unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$114,219.46 Estimated $900,000.00 $0.00
Fund Source: 402 SEWER FUND (PAGE 71, 2015 CIP)
Comments:
MTG. DATE
OF COUNCIL ACTION
03/21/16
MTG. DATE
ATTACHMENTS
03/21/16
Informational Memorandum dated 03/11/16
Emergency Declaration
Draft Resolution
Photo of sewer
Page 71, 2015 CIP with breakdown of contracts for 2015 & 2016
Minutes from the Utilities Committee meeting of 03/15/16
7
City of Tukwila
Public Works Department - Bob Giberson, Director
INFORMATIONAL MEMORANDUM
TO: Mayor Ekberg
Utilities Committee
FROM: Bob Giberson, Public Works Director
BY: Mike Cusick, Senior Program Manager
DATE: March 11, 2016
SUBJECT: CBD Sanitary Sewer Rehabilitation
Project No. 91140203
Resolution declaring an Emergency for the Sanitary Sewer Repair at 1200 APE
Allan Ekberg, Mayor
ISSUE
Approve Resolution for the emergency repair of the sanitary sewer main at the 1200 block of Andover Park East (APE).
BACKGROUND
The City has been implementing a phased rehabilitation of the sanitary sewer system in the Commercial Business
District (CBD) since 2013. The sewer lines were originally installed in the 1960's and have served their effective lifespan.
Rehabilitation or replacement is necessary to extend the service life of the sewer system. Visual inspections have
revealed that certain segments of the sewer main have deteriorated severely and multiple failures have occurred (see
attached photo). The sewer mains must be cleaned of debris before they can be slip -lined and the process of high -
pressure water cleaning can damage the sewer or even remove bedding adjacent to the sewer mains if a breach has
already occurred. Some sewer mains have not been visually inspected due to inaccessibility of the inspection camera;
therefore, some pipe conditions are unknown.
DISCUSSION
Slip- lining began in late January 2016 with initial efforts proceeding without incident. The contractor began finding issues
with gravel in the mains near Shasta Beverage and Costco. Cleaning efforts on February 17, 2016 of the sewer main in
APE, just downstream of Shasta, have exposed a broken sewer pipe that prevents the current relining process to move
forward without repairing the main by excavation and replacement. Attached is Mayor Ekberg's signed Emergency
Declaration dated February 23, 2016 for the sewer main repair at 1200 Andover Park East.
FISCAL IMPACT
Since the emergency declaration was signed, staff requested quotes from nine contractors and received three
submittals. The R.L. Alia Company submitted a cost of $114,219.46 (which includes a 20% contingency). The full extent
of the damage to the sewer main can only be determined after exposing the failing pipe. The construction will be paid for
from the 2015/2016 CBD Sanitary Sewer Rehabilitation Project funds, currently budgeted at $900,000.00 for 2016.
RECOMMENDATION
Council is being asked to approve the Resolution declaring an emergency for the repair of the sanitary sewer at 1200
Andover Park East and consider this item on the Consent Agenda at the March 21, 2016 Regular Meeting.
Attachments: Emergency Declaration
Draft Resolution
Photo of sewer
Page 71, 2015 CIP with breakdown of contracts for 2015 & 2016
W.''W Eng1PROJECTStiA- SW ProieeislC &1] Sewer Rehabilhatian (91140203)Inio Memo Resoletian Emergency Repair 1200 APE 03 -11 -16 gl.dacx
19
20
City of Tukwila
Allan Ekberg, Mayor
Public Works Department - Bob Giberson, Director
EMERGENCY DECLARATION
TO: Mayor Ekberg
FROM: Bob Giberson, Public Works Director
BY: Robin Tischmak, City Engineer
DATE: February 22, 2016
SUBJECT: CBD Sanita! Sewer Rehabilitation
Project No. 91140203
Emergency Declaration for Sewer Repair at 1200 Andover Park East
ISSUE
Mayor to declare an emergency that authorizes City staff to expedite a repair of the sanitary sewer
main at the 1200 block of Andover Park East (APE).
BACKGROUND
The City has been implementing a phased rehabilitation of the sanitary sewer system in the Central
Business District (CBD) since 2013. The sewer lines were originally installed in the 1960's and have
served their effective lifespan. Rehabilitation or replacement is necessary to extend the service life of
the sewer system, Visual inspections have revealed that certain segments of sewer main have
deteriorated severely and multiple failures have occurred (see attached photos). The rehabilitation
process must be carefully implemented as preparing the sewer mains for relining can cause additional
damage and possible failure_ The mains must be cleaned of debris before they can be relined and the
process of high - pressure water cleaning can damage the sewer or even remove bedding adjacent to
the sewer mains if a breach has already occurred. Some sewer mains have not been visually inspected
due to inaccessibility of the inspection camera; therefore some pipe conditions are unknown.
DISCUSSION
Construction began in late January 2016 with initial relining efforts proceeding without incident. The
Contractor began finding issues with gravel in the mains near Shasta and Costco_ Cleaning efforts on
February 16 of the sewer main in APE just downstream of the Shasta Corporation have exposed a
collapsed pipe that prevents the current relining process to move forward without repairing the main by
excavation and replacement. An emergency in accordance with TMC 2.57.030 and RCW 35.23.352 is
requested in order to waive the standard bidding process. A Resolution will be prepared for Council
approval at the next available Utilities Committee meeting date.
FISCAL IMPACT
At this time, repair costs are unknown. The extent of the damage can only be determined by exposing
the failed sewer main. This work will be paid from the 2015/2016 CBD Sanitary Sewer Rehabilitation
Project funds, currently budgeted at $900,000.00 for 2016.
RECOMMENDATION
Mayor is being asked to declare an emergency for the Sewer Repair at 1200 Andover Park East,
Authorized By:.!
Allan Ekberg,
V1 -4PW Eng1PRDJEGISIA.- SVJ ProjeclslC80 Sewer RiaGlitabarr (91140203jlEmergency Dec - atian Mayor 1200 APE 02- 22- 16,dacx
21
DRAFT
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, DECLARING AN EMERGENCY
IN RESPONSE TO DAMAGES TO PUBLIC PROPERTY DUE
TO A SEVERELY DAMAGED SANITARY SEWER MAIN.
WHEREAS, it has been determined that a damaged sanitary sewer main is in
danger of collapsing in the 1200 block of Andover Park East; and
WHEREAS, if the sanitary sewer main collapses, the break could pose significant
risks to existing gas lines, storm drains, and water utilities; and
WHEREAS, the repairs to the sanitary sewer main are required immediately; and
WHEREAS, RCW 39.04.280 provides for emergency declarations and competitive
bidding exemptions; and
WHEREAS, the Mayor of Tukwila declared an emergency on February 23, 2016, in
order to allow City forces to respond with appropriate resources to restore damages and
prevent further impacts to public and private property; and
WHEREAS, the City Council wishes to provide their support and endorsement of
the Mayor in his action to declare an emergency and for the City's efforts to respond to
the emergency;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
The City Council supports the Mayor in his declaration of emergency and
authorizes the execution of contracts or agreements due to damages and the need for
protective actions brought about by a failed sanitary sewer main, and hereby authorizes
City forces to respond in the most effective and expedient manner, without regard for
the procedures and formalities that would otherwise govern the assignment of duties.
procurement of materials, and contracting of services_ This situation is an emergency
as defined in RCW 39.04.280(3)
W:IWord ProcessingkReso futions\Emergency - sanitary sewer main on APE 2 -2916
MC:bjs
Page 1 of 2
23
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of „ 2016.
ATTEST /AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk Joe Duffie, Council President
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Rachel B. Turpin, City Attorney
W:IWord Processing \Resolutions \Emergency- Sanitary sewer main on APE 2 -29 -16
MC:hjs
24
Page 2 of 2
MANHOLE 1044A LOOKING SOUTH NEAR COSTCO DR. AND APE
25
CITY OF TLUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: CBD Sanitary Sewer Rehabilitation Project No. 91140203
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINT. IMPACT:
COMMENT:
The asbestos concrete pipe in the CBD (commercial business district) is approximately 45 years old and
becoming soft. Slip lining the pipe will reinforce the strength with little impact to roadways and minimal excavation.
If the pipe collapses, the street will have to be excavated and the cost of the repairs will be significant. In the
last five years we have had two major pipe failures on Andover Park West.
A Public Works Trust Fund loan was successfully obtained in 2012 for construction.
Reduced maintenance and repair costs.
The limits of the 2013 project is APW to APE from Minkler Blvd to S 180th St and will now include the repair
to the sewer under the railroad tracks.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016
2017
2018
2019
2020
BEYOND TOTAL
EXPENSES
Project Location
•„�a, 'i
i�
Design
159
33
20
20
20
20
20
292
Land (RJW)
f I "
='� r,. his
Jtit
0
Const. Mgmt.
87
120
120
120
120
120
687
Construction
639
900
900
900
900
900
5,139
TOTAL EXPENSES
159
759
1,040
1,040
1,040 j
1,040
1,040
0
0
6,118
FUND SOURCES
Awarded Grant
0
PWTF /Proposed PW1
45
250
455
750
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
114
509
585
1,040
1,040
1,040
1,040
0
0
5,368
TOTAL SOURCES
159
759
1,040
1,040
1,040
1,040
1,040
0
0
6,118
26 2015 - 2020 Capital Improvement Program
71
Project Location
•„�a, 'i
i�
Ir
IF
f I "
='� r,. his
Jtit
26 2015 - 2020 Capital Improvement Program
71
PROJECT:
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINT. IMPACT:
COMMENT:
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 . to 2020
CBD Sanitary Sewer Rehabilitation
The asbestos concrete pipe in the CBD (commercial business district) is approximately 45 years old and
becoming soft. Slip lining the pipe will reinforce the strength with tittle impact to roadways and minimal
excavation.
If the pipe collapses, the street will have to be excavated and the cost of the repairs will be significant. In the
last five years we have had two major pipe failures an Andover Park West.
A Public Works Trust Fund loan was successfully obtained in 2012 for construction.
Reduced maintenance and repair costs.
The limits of the 2013 project is APW to APE from Minkler Blvd to S 180th St and will now include the repair to
the sewer under the railroad tracks.
FINANCIAL
in $000's)
Through Estimated
2013 2014
2015
2016
2017
2018
2019
TOTAL
EXPENSES
Design
159
33
20
20
20
20
20
292
Land (RIW)
0
Const. Mgmt.
87
120
120
120
120
120
687
Construction
639
900
900
900
900
900
5,139
TOTAL EXPENSES
159
759
1,040
1,040
1,040
1,040
1,040
6,118
FUND SOURCES
Awarded Grant
0
PWTF /Proposed PWTF
249
501
750
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
159
510
539
1,040
1,040
1,040
1,040
5,368
TOTAL SOURCES
159
759
1,040
1,040
1,040
1,040
1,040
6,118
RH2 Enginneering
Staff & Misr
Stahali
CI-IS Eng
RH2 Enginneering
Michels 2014
RL Alia
RL Alia
Olson Pro -Vac
Contigency
Michels 2014
Contigency
RL Ala
Contigency
RL Alia
Contigency
Design
CM
CM
CM
Sllplining
APW/APE
1227 APE
Manholes
2015
Contract
13 -076 232,235.00
14 -153
14 -152
15 -074
14 -154
14 -159
15 -155
15 -177
Sllplining 15 -178
1227 APE New
1200 APE New
2015 2020 Capital Improvement Program
23,380.00
46,317.00
112,710.00
160,594.98
406,226.39
34,154.35
Actual
30,022.48
41,325.61
18.781.08
17,659.71
13.644.70
171,530.71
547.954.88
34,154,35
$ 875,073.52
2016
Contract
105,068.10
21,013.62
528,464.52
105,692.90
69,717.56
13.943.51
95.182.88
19,036.58
$ 1,057,184.97
Actual
40,201.99
Remaining
Closed
Closed
Closed
58,863.31
Dosed
Closed
Closed
71 27
28
UTILITIES COMMITTEE
Meeting Minutes
City of Tukwila
City Council Utilities Committee
March 15, 2016, 2016 - 5:30 p.m. - Foster Conference Room, 6300 Building
Councilmembers: Kathy Hougardy, Chair; Kate Kruller, Thomas McLeod
Staff: Bob Giberson, Frank Iriarte, Robin Tischmak, Greg Villanueva, Mike Cusick, Ryan
Larson, Pat Brodin, Rebecca Fox, Russell Betteridge, Gail Labanara, Laurel
Humphrey
CALL TO ORDER: Committee Chair Hougardy called the meeting to order at 5:30 p.m.
I. PRESENTATIONS
II. BUSINESS AGENDA
A. Resolution: Declaring an Emergency for Sanitary Sewer Repair at 1200 Andover Park East
Staff is seeking Council approval of a resolution that would declare an emergency for the repair
of the sanitary sewer at 1200 Andover Park East. A broken sewer pipe was discovered in
February that is preventing progress on the sliplining effort. The Mayor signed an emergency
declaration on February 23, 2016, and since then staff has received three quotes for the sewer
repair. The R.L. Alia Company submitted a cost of $114,219.46, including a 20% contingency,
which can be paid for from the 2015/2016 CBD Sanitary Sewer Rehabilitation Project.
UNANIMOUS APPROVAL. FORWARD TO MARCH 21, 2016 REGULAR CONSENT AGENDA
B. NPDES Program 2015 Annual Report and 2016 Surface Water Management Program Plan
Staff provided an overview of the National Pollutant Discharge Elimination System (NPDES) 2015
Annual Report and 2016 Surface Water Management Program (SWMP) Plan. The Annual Report
reflects activities completed by the City in 2015. The SWMP Plan is required by the NPDES
Program to show that the City complies with requirements outlined in the NPDES Phase!! permit,
effective August 1, 2013. The SWMP Plan contains required elements including public education
and outreach, public involvement and participation, illicit discharge detection and elimination,
runoff control, and pollution prevention and operation and maintenance. Committee members
and staff discussed the importance of public education and outreach. INFORMATION ONLY.
C. Coordinated Prevention Grant for Recycling Program
Staff is seeking Council approval to accept a Coordinated Prevention Grant from the
Washington State Department of Ecology in the amount of $14,070 to fund the Recycling
Assistance Program through June 30, 2017. Grant funding from King County is used for the
$4,690 required local match. Funds will be used for annual residential drop -off events as well
29