Loading...
HomeMy WebLinkAbout2008 - Ord 2177 - Allentown Sewer Connection Fees Phase II / Foster Point and Allentown Water Connection Fees - 20080604000746Number to 25 Return: City of Tukwila 6200 Southcenter Blvd Tukwila WA 98188 -2599 Title: Grantor: Grantee: Parcel 6 -1 12172000070 6 -2 12172000075 6 -3 12172000080 6 -4 12172000095 6 -5 2172000105 6 -6 2172000110 6 -7 2172000115 6 -8 2172000120 6 -9 2172000125 6 -10 2172000126 6 -11 2172000130 6 -12 2172000140 6 -13 2172000145 6 -14 2172000150 6 -15 2172000155 6 -16 2172000160 6 -17 2172000165 6 -18 2172000175 6 -19 2172000180 6 -20 2172000185 6 -21 2172000190 6 -22 2172000195 6 -23 2172000205 6 -24 2172000210 6 -25 12172000215 Owner Location 1RAMELS,BRADLEY G 13055 56TH AVE S MALONE,CATHERINE P 13057 56TH AVE S BENDFELT,ERIC T 13301 56TH AVE S ZELLER,JILL M ETAL 113309 56TH AVE S BOLGEN,RICKEY FINN 113315 56TH AVE S TINGLEY,BRYCE K CHRISTINE P 13319 56TH AVE S FLICK,KEITH 13325 56TH AVE S TNG INVESTMENT PROPERTIES 113327 56TH AVE S WHITEHEAD,MARYELLEN 113335 56TH AVE S WHITEHEAD,MARY ELLEN 13331 56TH AVE S DAVIS,AUDREY J 13341 56TH AVE S COLLINGWOOD,KEITH G 113343 56TH AVE S TONGUE,ROY H LIVING TRUST 113347 56TH AVE S PENOR,CHARLIE P JR HELEN C113351 56TH AVE S CASTILLO,JOSE 113355 56TH AVE S WHEATON,GERALD A JR JANE 113361 56TH AVE S TOON,WILLIAM B WENDY L 113360 56TH AVE S ROBERTSON,SUZANNE L 13354 56TH AVE S WHITHEAD,MARY ELLEN 13350 56TH AVE S AKERS,EDDIE BARBARA 13344 56TH AVE S BOECHLER,DWIGHT 113340 56TH AVE S MILLER,BRIAN E 113336 56TH AVE S THORNTON,RALEIGH J 13328 56TH AVE S FINN,SANDRA L 13324 56TH AVE S ALBRITTON,JONETH C 13312 56TH AVE S 200806040007 TUKWILA CITY 0 ORD PAGE001 OF 004 KING City of Tukwila Ordinance 2177 Sewer Water Connection Requirements City of Tukwila 6200 Southcenter Blvd Tukwila WA 98188 Blanket Document see parties listed with associated parcels below. Legal Description: As listed and associated with parcels listed below. Assessor's Property Tax Parcel: Blanket Document see parcels numbers below. Legal Description LOT 14 EAST RIVERTON GARDEN TRS 2N LOT 15 EAST RIVERTON GARDEN TRS 2N SLOT 16 -18 EAST RIVERTON GARDEN TRS ILOT 19 20 EAST RIVERTON GARDEN TF LOT 21 EAST RIVERTON GARDEN TRS 2N LOT 22 EAST RIVERTON GARDEN TRS 2k LOT 23 EAST RIVERTON GARDEN TRS 2N LOT 24 EAST RIVERTON GARDEN TRS 2N LOT 25 EAST RIVERTON GARDEN TRS 2N LOT 25 EAST RIVERTON GARDEN TRS 21\ LOT 26 -27 EAST RIVERTON GARDEN TRS ILOT 28 EAST RIVERTON GARDEN TRS 2N LOT 29 EAST RIVERTON GARDEN TRS 2N LOT 30 EAST RIVERTON GARDEN TRS 2N 1LOT 31 EAST RIVERTON GARDEN TRS 2k LOT 32 EAST RIVERTON GARDEN TRS 2N ILOT 33 EAST RIVERTON GARDEN TRS 2N LOT 34 EAST RIVERTON GARDEN TRS 2� LOT 35 EAST RIVERTON GARDEN TRSN 2 LOT 36 EAST RIVERTON GARDEN TRS 2N LOT 37 EAST RIVERTON GARDEN TRS 2N LOT 38 -39 EAST RIVERTON GARDEN TRS LOT 39 -40 EAST RIVERTON GARDEN TRS LOT 41 EAST RIVERTON GARDEN TRS 2N LOT 42 -43 EAST RIVERTON GARDEN TRS City of Tukwila Washington Ordinance No. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ESTABLISHING SEWER CONNECTION FEES FOR ALLENTOWN PHASE 2 AND FOSTER POINT; ESTABLISHING WATER CONNECTION FEES FOR ALLENTOWN PHASE 2 AND FOSTER POINT; PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, upon completion of the Allentown Phase 2 and Foster Point neighborhood revitalization project that installed water, sewer and surface water improvements, the City Council desires to have in place an equitable and adequate rate structure to finance the operation and maintenance of the water and sewer utilities; and WHEREAS, water and sewer lines meet Washington State Department of Health standards including minimum water pipe diameter of 8 inches; and WHEREAS, any new water or any sewer connection will be assessed a connection fee that is determined by the infrastructure construction cost and total number of potential connections; and WHEREAS, Allentown Phase 2 and Foster Point sanitary sewer construction costs have been projected based on approximately 250 connections; and WHEREAS, Allentown Phase 2 and Foster Point water construction costs have been projected based on approximately 250 total connections; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY ORDAINS AS FOLLOWS: Section 1. Sewer Connection Charges 14.17.050 Allentown Phase 2 and Foster Point Sewer Connection Charges. A. Allentown Phase 2 and Foster Point homes existing on September 1, 2007 will be required to connect to the sewer and pay associated connection charges if any portion of any building is situated within 250 feet of a sanitary sewer line or lateral, and if: 1. septic or health problems are identified by King County Heaith Department that require repair of the septic tank system, or 2. the home changes ownership, or 3. remodeling occurs adding a bathroom or bedroom. B. Tukwila's Allentown Phase 2 and Foster Point sewer connection fee will start at $15,000 and increase by $600 (4% of $15,000) per year until 2017, in accordance with RCW 35.92.025: C: \Documents and Settings\All Users\ Desktop\ Kelly \MSDATA \Ordinances\Allentown Phase II and Foster Point.doc GL:ksn 8/16/2007 Page 1 of 3 Until Charge December 31, 2008 $15,000.00 December 31, 2009 $15,600.00 December 31, 2010 $16,200.00 December 31, 2011 $16,800.00 December 31, 2012 $17,400.00 December 31, 2013 $18,000.00 December 31, 2014 $18,600.00 December 31, 2015 $19,200.00 December 31, 2016 $19,800.00 December 31, 2017 $20,400.00 The maximum Allentown Phase 2 and Foster Point sewer connection fee thereafter will be $20,400.00, in accordance with RCW 35.92.025. C. Payment options for Tukwila's Allentown Phase 2 and Foster Point sewer connection fees are as follows: 1. Sewer connection fees for Allentown Phase 2 and Foster Point residences existing prior to September 1, 2007, may be deferred if applicants qualify as low income households in accordance with City policies that are in effect at the time of application. The sewer connection fee will be placed as a lien on the property's title, and must be paid before there is a change of ownership. 2. Sewer connection fees for Allentown Phase 2 and Foster Point residences existing prior to September 1, 2007, may be paid on a time plan, included with their monthly water bills. The monthly payment, with an annual interest rate of 4%, will be calculated for a 5 -year, 10 -year, or 15 -year term. Only existing individual single- family applicants are eligible for the payment plans. 3. New homes constructed after September 1, 2007 are required to make full sewer connection fee payment before issuance of the City of Tukwila's building permit. New homes are also required to pay in full the current fee set for the King County Sewer capacity charge, and bring proof of payment to the City's Permit Center prior to the Public Work's final inspection approval. 4. Change of ownership requires payment in full of the sewer connection fees. Remodeling construction is required to pay sewer connection fees prior to issuance of building permit unless home is on the payment plan, which may be continued. permit. 5. Monthly payments may be started prior to obtaining a sewer connection 6. Monthly payments may be initiated as a payment method until December 31, 2017 for Allentown Phase 2 and Foster Point. After December 31, 2017, the sewer connection fee must be paid in full. D. Notice of sewer availability and connection requirements shall be placed on titles of properties within Tukwila's Allentown Phase 2 and Foster Point area with sewer service. Section 2. Water Connection Charges 14.17.060 Allentown Phase 2 and Foster Point regular water connection charges. A. Residences existing prior to September 1, 2007 and connected to the water system will not be assessed a water connection fee. B. New homes constructed after September 1, 2007 are required to make full water connection fee payment upon issuance of the building permit. C:\Documents and Settings\All Users\ Desktop\ Kelly \MSDATA \Ordinances\Allentown Phase II and Foster Point.doc GL:ksn 8/16/2007 Page 2 of 3 C. Tukwila's Allentown Phase 2 and Foster Point water connection fees will start at $8,247.13 for any new single- family water connection, and will increase by $329.88 (4% of $8,247.13) per year until 2017, in accordance with RCW 35.92.025: Until Charge December 31, 2008 8,247.13 December 31, 2009 8,577.01 December 31, 2010 8,906.89 December 31, 2011 9,236.77 December 31, 2012 9,566.65 December 31, 2013 9,896.53 December 31, 2014 $10,226.41 December 31, 2015 $10,556.29 December 31, 2016 $10,886.17 December 31, 2017 $11,216.05 The maximum Allentown Phase 2 and Foster Point water connection fee thereafter will be $11,216.05, in accordance with RCW 35.92.025. Section 3. Boundaries. 14.17.070 Service area boundaries. Allentown is bordered by the BNSF railroad on the east, the Duwamish River on the south and the west, and South 115th Street on the north. Foster Point is bordered by South 130th Place to the east, the Duwamish River on the south and the north, and includes 56th Avenue South, 57th Avenue South, South 133rd Street and Pamela Drive. The areas are shown on the attachment to this ordinance, and incorporated herein by this reference as if set forth in full. Section 4. Funding. 14.17.080 Funding recovery review. The successful implementation of later phases of the Sewer Plan for the four residential areas is dependent on the repayment of general fund revenues from the connection fees. The City Council will review connection requirements, exemptions and other revenue recovery alternatives to insure that the sewer plan remains viable and adequately funded. Section 5. Severability. If any section, subsection, paragraph, sentence, clause or phrase of this ordinance or its application to any person or situation should be held to be invalid or unconstitutional for any reason by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of the remaining portions of this ordinance or its application to any other person or situation. Section 6. Effective Date. This ordinance or a summary thereof shall be published in the official newspaper of the City, and shall take effect and be in full force five days after passage and publication as provided by law. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this C' TI`1 day of i'��. -k cc u S� 2007. ATTEST/ AUTHENTICATED: J rI E. Cantu, O 'ce e Cit MC, City Clerk APPROVED AS TO BY: rney Steven M. Mullet, Mayor Filed with the City Clerk: -0 l) Passed by the City Council: g --,)-D Published: 3 Effective Date: X Ordinance Number: Attachment: Map Allentown and Foster Point Improvements, Phase 2 C:\Documents and Settings\All Users Desktop\ Ke lly\MSDATA \Ordinances\Allentown Phase II and Foster Point.doc GL:ksn 8/16/2007 Page 3 of 3 II I l 1 11 w owl Him j c •w Legend Phase 2 1 1 Parcel 1 Pavement 1 1 Waterbody Bridge Allentown and Foster Point Improvements Phase 2 Not to Scale Date: April 27, 2006 SUMMARY OF ORDINANCE No. 2177 City of Tukwila, Washington On August 20, 2007, the City Council of the City of Tukwila, Washington, adopted Ordinance No. 2177, the main points of which are summarized by its title as follows: AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ESTABLISHING SEWER CONNECTION FEES FOR ALLENTOWN PHASE 2 AND FOSTER POINT; ESTABLISHING WATER CONNECTION FEES FOR ALLENTOWN PHASE 2 AND FOSTER POINT; PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE. The full text of this ordinance will be mailed upon request. Approved by the City Council at a Regular Meeting on August 20, 2007. -7 Ja& E. Cantu, CHIC, City Clerk Published Seattle Times: August 23, 2007