HomeMy WebLinkAboutUtilities 2016-05-10 Item 2D - Final Acceptance - East Marginal Way South Storm Pipe Replacement Settlement with James W FowlerCity of Tukwila
Public Works Department - Bob Giberson, Director
INFORMATIONAL MEMORANDUM
TO: Utilities Committee
FROM: Bob Giberson, Public Works Director
CC: Mayor Ekberg
DATE: May 6, 2016
SUBJECT: East Marginal Way S Storm Pipe Replacement Project
Project No. 91241206, Contract No. 14 -078
Settlement and Final Project Closeout and Acceptance
Allan Ekberg, Mayor
ISSUE
Approve the proposed final settlement change order, subsequent final acceptance and closeout of the
East Marginal Way S Storm Replacement Project.
BACKGROUND
Contract No. 14 -078 with James W Fowler Co was awarded by Council on June 2, 2014 for work that
included the repair of a failing storm drainage system along East Marginal Way S between S 130th St
and the Green River. The project is funded with Surface Water Enterprise funds and included a project
contingency of 10 %.
At both the February 10, 2015 Utilities Committee and Council, the issue of unforeseen conditions was
brought forward, which gave budget approval for extended construction management services on the
project. This was needed because of unforeseen circumstances including buried rocks and trees, as
well as utility conflicts with several third party utilities.
The buried rocks and trees were found to be spaced randomly throughout the excavation, requiring
additional staff and equipment hours. Despite significant upfront work during design to locate and map
utilities, several third party utilities were discovered to be overlapping our designed storm drain trench.
While the extra cost to remove rocks and trees must be borne by the City, staff believes that there is
an obligation for the third party partners to reimburse the City for the impacts and extra work caused
by their utility conflicts. Negotiations with the third parties are underway and ongoing.
DISCUSSION
The extra work to overcome the underground obstructions was tracked during construction and initially
reimbursed using existing bid items for force account (time and materials). When it became obvious
that the original bid items estimated dollar amounts were not adequate to cover all of the conflicts
encountered, and the contractor and the City could not agree on the total compensation required for
this work, we continued to track the impacts while the final payment was placed in dispute. Once
construction was complete we gathered most of the relevant documents from the contractor,
calculated the project's remaining undisputed obligations and finalized them into Change Order Nos. 7
through 12, which together essentially used up the project contingency of 10 %.
w: \pw eng \projects \a - dr projects \emws emergency storm pipe repair 11 -19 -12 (91241206) \final payment\emw storm final payment and budget uc revised 5.4.16 gl.doc
49
Informational Memo
May 6, 2016
Page 2
The final negotiations over remaining disputed items continued for several months and were not
concluded until early 2016. The final settlement Change Order No. 13 has been signed by the
contractor and represents full and final payment for all outstanding obligations and includes a release of
claims.
In order to process the final Change Order and payment, we need to encumber additional funds,
described below. Once approval of this proposed settlement has been obtained, we will seek
reimbursement from the third party utilities for impacts to our project caused by their facilities.
FISCAL IMPACT
The numbers below show the original contract amount with JW Fowler with 10% contingency. Council
approved dedicating $137,575.04 of the contingency for the extension of the construction management
contract with KPG, Inc. on February 17, 2015. With all of the Change Orders processed, the
contingency is deficient by $423,230.97 (without sales tax on some items). We have already received
reimbursement from Frontier Communication, which reduces the amount needed to settle the
remaining disputes with JW Fowler.
Staff is requesting Council approval of the final settlement Change Order, additional budget authority in
the amount of $425,870.34 to cover the settlement, the subsequent final payment and proceed with the
closeout of the project. The Surface Water Management (SWM) ending fund balance has sufficient
funds to cover this amount. The SWM fund is in good shape in 2015 and 2016 and reserves are more
than adequate. Further, we are actively negotiating full reimbursement from all necessary third party
utility project partners and these reimbursement funds will bring the project budget to within $100,000 of
the original contingency amount. The original contingency at the time of bid award was set at 10% or
$205,878.23; with the addition of the $100,000, the actual project contingency came in at 15 %. An
important lesson learned from this project is the need to be more realistic about our contingency needs
on similar efforts, which should probably be in the range of 15% to 20% with the amount of unknown
circumstances.
The expected fiscal impact to the contract is as follows:
Original Contract — JW Fowler w/ contingency
Minus KPG Construction Management
Claim settlement Change orders
Final Contract Amount:
Proposed Reimbursement 3rd Party Utilities
$ 2,264,660.53
(137,575.04)
425, 870.34
$ 2,552,955.83
($ 326,000.00)
Total project overrun $ 100,000.00
RECOMMENDATION
Council is being asked to approve the project settlement amount of $425,870.34 to cover the final
payment and accept Contract No. 14 -078 with James W Fowler for $2,552,955.83 the East Marginal
Way S Storm Pipe Replacement Project, subject to the standard claim and lien release procedures.
This acceptance is also with the expectation that the City will be reimbursed $326,000 by third party
utilities, reducing the financial impact to the City to $100,000. Council is asked to consider this item at
the May 23, 2016 Committee of the Whole and subsequent June 6, 2016 Regular Meeting.
ATTACHMENTS
Photos of Project
Notice of Completion No. 14 -078
w: \pw eng \projects \a - dr projects \emws emergency storm pipe repair 11 -19 -12 (91241206) \final payment \emw storm final payment and budget uc revised 5.4.16 gl.doc
50
Date:
Li Original
❑ Revised #
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
Contractor's UBI Number: 601241487
Name & Mailing Address of Public Agency
City of Tukwila
6200 Southcenter Blvd
Tukwila WA 98188
UBI Number: 179 -00 -208
Department Use Only
Assigned to:
Date Assigned:
Notice is hereby given relative to the completion of contract or project described below
Project Name
East Marginal Way S Storm Pipe Replacement 91241206
Contract Number
14 -078
Job Order Contracting
❑ Yes d No
Description of Work Done /Include Jobsite Address(es)
Construction of approximately 1,750 LF of 42 -inch storm drainage improvements within the right -of -way
for East Marginal Way South in Tukwila.
Federally funded transportation project? ❑ Yes Ef No (if yes, provide Contract Bond Statement below)
Contractor's Name
James W Fowler Co.
E -mail Address
johnf @jwfowler.com
Affidavit ID*
578315
Contractor Address
12775 Westview Dr Dallas OR 97338
Te
503
ephone #
- 623 -5373
If Retainage is not withheld, please select one of the following and List Surety's Name & Bond Number.
Retainage Bond ❑ Contract /Payment bond (valid for federally funded transportation projects)
Name: Liberty Mutual Insurance Company (Bond Number: 023028584
Date Contract Awarded
6/3/14
Date Work Commenced
7/18/14
Date Work Completed
3/10/15
Date Work Accepted
Were Subcontracters used on this project? If so, please complete Addendum A. ['Yes ❑ No
Affidavit ID* - No L &I release will be granted until all affidavits are listed.
Contract Amount
Additions (+ )
Reductions (- )
Sub -Total
Sales Tax Rate
9.5
(If various rates apply, please send a breakdown)
Sales Tax Amount
$ 2,051,720.00
$ 757,577.38
$ 266,043.21
$ 2,543,254.17
$ 9,701.66
TOTAL $ 2 552-955.83
NOTE: These two totals must be equal
Liquidated Damages $
Amount Disbursed $ 2,552,955.83
Amount Retained $
TOTAL $ 2,552,955.83
Comments:
Note: The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract.
NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates.
Submitting Form: Please submit the completed form by email to all three agencies below.
Contact Name:
Email Address:
Diane Jaber
diane.jaber @tukwilawa.gov
Department of Revenue
Public Works Section
(360) 704 -5650
PWC @dor.wa.gov
REV 31 0020e (10/26/15) F215- 038 -000 10 -2014
Washington State D parni m of
Labor &industries
Contract Release
(855) 545 -8163, option # 4
ContractRelease@ LN I. WA. G OV
Title: Fiscal Specialist
Phone Number: 206- 433 -1871
Employment Security
Department
Registration, Inquiry,
Standards & Coordination
Unit
(360) 902 -9450
publicworks@esd.wa.gov
51
Addendum A: Please List all Subcontractors and Sub -tiers Below
This addendum can be submitted in other formats.
Provide known affidavits at this time. No L &I release will be granted until all affidavits are listed.
Subcontractor's Name:
UBI Number: (Required)
Affidavit ID*
Advanced Government Svcs, Inc.
602304323
571043
Apply A Line, Inc
600553941
580594
Best Parking Lot Cleaning, Inc
601901928
571761
Bravo Environmental NW, Inc
602946216
573960
C &P Fencing
603210811
577154
Cadman Inc
176000099
596769
Corliss Resources, Inc
602237779
584132
De Watering Services
602648434
547195
Glacier Northwest
601301145
585237
Ground Up Road Construction, Inc
602790246
543439
Hot Mix Pavers, Inc
600310693
576104
JMR Trucking, Inc
602101301
580548
K &D Services, Inc
600606705
574995
National Concrete Cutting, Inc
600195813
570913
Penhall Company
601258537
573072
PLS, Inc
601979933
572987
Silverstreak, Inc
600432781
571004 _
Speer Taps, Inc
600491975
562749
Statewide Rent -A- Fence, Inc
600348533
574473
Transportation Systems, Inc
602726209
571313
Twist, Inc
602561383
548741
Tyee Concrete Construction, Inc
602123519
584838
Ventilation Power Cleaning, Inc
578089188
573787
For tax assistance or to request this document in an alternate format, please call 1 -800- 647 -7706. Teletype (TTY) users may use the
Washington Relay Service by calling 711.
REV 31 0020e Addendum (10/26/15) F215- 038 -000 10 -2014
52
East Marginal Way South S Storm Pipe Replacement
Figure 1 - Bedrock encountered in storm drain trench
1
Figure 2 — Bedrock being hauled out
53
IIEast Marginal Way South S Storm Pipe Replacement
Figure 3 — Bedrock being loaded for haul
2
Figure 4 — Unanticipated logs in storm drain trench
54
East Marginal Way South S Storm Pipe Replacement
3
Figure 5 — Multiple logs being reading for haul off site
Figure 6 — Unexpected concrete encased telecom ducts in storm trench
55