HomeMy WebLinkAbout2008 - Ord 2177 - Allentown Sewer Connection Fees Phase II / Foster Point and Allentown Water Connection Fees - 20080604000742Number
to 25
2 -1
2 -2
2 -3
2 -4
2 -5
2 -6
2 -7
2 -8
2 -9
2 -10
2 -11
2 -12
2 -13
2 -14
2 -15
2 -16
2 -17
2 -18
2 -19
2 -20
2 -21
2 -22
2 -23
2 -24
2 -25
Return:
City of Tukwila
6200 Southcenter Blvd
Tukwila WA 98188 -2599
Title:
Grantor:
Grantee:
Parcel
0179001725
0179001730
0179001745
0179001755
0179001770
0179001785
0179001787
0179001800
0179001805
0179001850
0179001855
0179001940
0179001945
0179001955
0179001965
0179001990
0179001995
0179002000
0179002020
0179002030
0179002045
0179002050
0179002110
0179002155
0179002160
20080604000742
TUKWILA CITY 0 ORD 1053.00
PAGE001 OF 004
06/04/2008 11:16
KING COUNTY, WA
City of Tukwila Ordinance 2177 Sewer Water Connection Requirements
City of Tukwila 6200 Southcenter Blvd Tukwila WA 98188
Blanket Document see parties listed with associated parcels below.
Legal Description: As listed and associated with parcels listed below.
Assessor's Property Tax Parcel: Blanket Document see parcels numbers below.
Owner
IPOWELL BUILDERS INC
DOAK HOMES INC
I RAU,CHALENE
DOAK HOMES INC
FORSBERG,SCOTT J
�PATTERSON,BRIAN J
RIVERTON CONTRACTORS INC
PRITCHETT,WINFRED E NADAL
NGET VET CHANTHY VORN
LANCE,RANDAL D
DOAK HOMES INC
LOT 1 BLK 9 ALLNTI
12243 51ST PL S
12253 51ST PL S
12257 51ST PL S
112248 50TH AVE S
RIVERTON CONTRACTORS INC 112218 51ST PL S
RIVERTON CONTRACTORS INC 112224 51ST PL S
RENTON ASSEMBLY OF GOD CH(112228 51ST PL S
CHAVEZ, XOCHITL 112234 51ST PL S
BURLINGTON,NORTHRN SANTA F 12410 51ST PL S
BURLINGTON,NORTHRN SANTA F 12420 51ST PL S
NORTHERN PACIFIC RR CO 12430 51ST PL S
BURLINGTON,NORTHRN SANTA F 12450 51ST PL S
BURLINGTON,NORTHRN SANTA 012460 51ST PL S
BURLINGTON,NORTHRN SANTA 012500 51ST PL S
BNSF RWY CO 112550 51ST PL S
12522 51ST PL S LLC I12522 51ST PL S
12522 51ST PL S LLC 151ST PL S
12522 51ST PL S LLC 151ST PL S
Location Legal Description
LOT 33 BLK 8 ALLEN LOT 33 BLK 8 ALLENTOWN ADD
LOT 34 -36 BLK 8 ALI LOT 34 -35 -36 BLK 8 ALLENTOWN ADD 1
LOT 37 -38 BLK 8 AU LOT 37 -38 BLK 8 ALLENTOWN ADD
LOT 39 -41 BLK 8 ALIT LOT 39 -40 -41 BLK 8 ALLENTOWN ADD
12207 50TH AVE S I LOT 42 -43 -44 BLK 8 ALLENTOWN ADD
12233 51ST PL S ILOT 1 -2 -3 23 BLK 9 ALLENTOWN ADD
LOT 1 BLK 9 ALLENTOWN ADD
LOT 3 -4 23 BLK 9 ALLENTOWN ADD 1
LOT 5 -6 23 BLK 9 ALLENTOWN ADD
LOT 7 -8 20 -21 -22 BLK 9 ALLENTOWN AC
LOT 9 THRU 19 BLK 9 ALLENTOWN ADC
LOT 1 THRU 6 BLK 11 ALLENTOWN ADD 1
LOT 7 -8 -9 BLK 11 ALLENTOWN ADD
LOT 9 TO 12 BLK 11 ALLENTOWN ADD
LOT 13 -14 BLK 11 ALLENTOWN ADD 1
LOT 17 BLK 11 ALLENTOWN ADD
LOT 18 BLK 11 ALLENTOWN ADD
LOT 19 THRU 22 BLK 11 ALLENTOWN ADE
LOT 23 BLK 11 ALLENTOWN ADD
LOT 24 THRU 28 BLK 11 ALLENTOWN ADE
LOT 29 -30 BLK 11 ALLENTOWN ADD I
LOT 31 THRU 36 BLK 11 ALLENTOWN ADE
LOT 37 THRU 49 BLK 11 ALLENTOWN ADE
LOT 50 BLK 11 ALLENTOWN ADD
LOT 51 THRU 56 BLK 11 ALLENTOWN AD[
City of Tukwila
Washington
Ordinance No.
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, ESTABLISHING SEWER CONNECTION FEES FOR
ALLENTOWN PHASE 2 AND FOSTER POINT; ESTABLISHING WATER
CONNECTION FEES FOR ALLENTOWN PHASE 2 AND FOSTER POINT;
PROVIDING FOR SEVERABILITY; AND ESTABLISHING AN EFFECTIVE
DATE.
WHEREAS, upon completion of the Allentown Phase 2 and Foster Point
neighborhood revitalization project that installed water, sewer and surface water
improvements, the City Council desires to have in place an equitable and adequate rate
structure to finance the operation and maintenance of the water and sewer utilities; and
WHEREAS, water and sewer lines meet Washington State Department of Health
standards including minimum water pipe diameter of 8 inches; and
WHEREAS, any new water or any sewer connection will be assessed a connection
fee that is determined by the infrastructure construction cost and total number of
potential connections; and
WHEREAS, Allentown Phase 2 and Foster Point sanitary sewer construction costs
have been projected based on approximately 250 connections; and
WHEREAS, Allentown Phase 2 and Foster Point water construction costs have
been projected based on approximately 250 total connections;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY ORDAINS AS FOLLOWS:
Section 1. Sewer Connection Charges
14.17.050 Allentown Phase 2 and Foster Point Sewer Connection Charges.
A. Allentown Phase 2 and Foster Point homes existing on September 1, 2007 will
be required to connect to the sewer and pay associated connection charges if any
portion of any building is situated within 250 feet of a sanitary sewer line or lateral, and
if:
1. septic or health problems are identified by King County Heaith
Department that require repair of the septic tank system, or
2. the home changes ownership, or
3. remodeling occurs adding a bathroom or bedroom.
B. Tukwila's Allentown Phase 2 and Foster Point sewer connection fee will start at
$15,000 and increase by $600 (4% of $15,000) per year until 2017, in accordance with
RCW 35.92.025:
C: \Documents and Settings\All Users\ Desktop\ Kelly \MSDATA \Ordinances\Allentown Phase II and Foster Point.doc
GL:ksn 8/16/2007
Page 1 of 3
Until Charge
December 31, 2008 $15,000.00
December 31, 2009 $15,600.00
December 31, 2010 $16,200.00
December 31, 2011 $16,800.00
December 31, 2012 $17,400.00
December 31, 2013 $18,000.00
December 31, 2014 $18,600.00
December 31, 2015 $19,200.00
December 31, 2016 $19,800.00
December 31, 2017 $20,400.00
The maximum Allentown Phase 2 and Foster Point sewer connection fee
thereafter will be $20,400.00, in accordance with RCW 35.92.025.
C. Payment options for Tukwila's Allentown Phase 2 and Foster Point sewer
connection fees are as follows:
1. Sewer connection fees for Allentown Phase 2 and Foster Point residences
existing prior to September 1, 2007, may be deferred if applicants qualify as low income
households in accordance with City policies that are in effect at the time of application.
The sewer connection fee will be placed as a lien on the property's title, and must be
paid before there is a change of ownership.
2. Sewer connection fees for Allentown Phase 2 and Foster Point residences
existing prior to September 1, 2007, may be paid on a time plan, included with their
monthly water bills. The monthly payment, with an annual interest rate of 4%, will be
calculated for a 5 -year, 10 -year, or 15 -year term. Only existing individual single- family
applicants are eligible for the payment plans.
3. New homes constructed after September 1, 2007 are required to make full
sewer connection fee payment before issuance of the City of Tukwila's building permit.
New homes are also required to pay in full the current fee set for the King County
Sewer capacity charge, and bring proof of payment to the City's Permit Center prior to
the Public Work's final inspection approval.
4. Change of ownership requires payment in full of the sewer connection fees.
Remodeling construction is required to pay sewer connection fees prior to issuance of
building permit unless home is on the payment plan, which may be continued.
permit.
5. Monthly payments may be started prior to obtaining a sewer connection
6. Monthly payments may be initiated as a payment method until
December 31, 2017 for Allentown Phase 2 and Foster Point. After December 31, 2017,
the sewer connection fee must be paid in full.
D. Notice of sewer availability and connection requirements shall be placed on
titles of properties within Tukwila's Allentown Phase 2 and Foster Point area with
sewer service.
Section 2. Water Connection Charges
14.17.060 Allentown Phase 2 and Foster Point regular water connection charges.
A. Residences existing prior to September 1, 2007 and connected to the water
system will not be assessed a water connection fee.
B. New homes constructed after September 1, 2007 are required to make full
water connection fee payment upon issuance of the building permit.
C:\Documents and Settings\All Users\ Desktop\ Kelly \MSDATA \Ordinances\Allentown Phase II and Foster Point.doc
GL:ksn 8/16/2007
Page 2 of 3
C. Tukwila's Allentown Phase 2 and Foster Point water connection fees will start
at $8,247.13 for any new single- family water connection, and will increase by $329.88
(4% of $8,247.13) per year until 2017, in accordance with RCW 35.92.025:
Until Charge
December 31, 2008 8,247.13
December 31, 2009 8,577.01
December 31, 2010 8,906.89
December 31, 2011 9,236.77
December 31, 2012 9,566.65
December 31, 2013 9,896.53
December 31, 2014 $10,226.41
December 31, 2015 $10,556.29
December 31, 2016 $10,886.17
December 31, 2017 $11,216.05
The maximum Allentown Phase 2 and Foster Point water connection fee
thereafter will be $11,216.05, in accordance with RCW 35.92.025.
Section 3. Boundaries.
14.17.070 Service area boundaries. Allentown is bordered by the BNSF railroad
on the east, the Duwamish River on the south and the west, and South 115th Street on
the north. Foster Point is bordered by South 130th Place to the east, the Duwamish
River on the south and the north, and includes 56th Avenue South, 57th Avenue South,
South 133rd Street and Pamela Drive. The areas are shown on the attachment to this
ordinance, and incorporated herein by this reference as if set forth in full.
Section 4. Funding.
14.17.080 Funding recovery review. The successful implementation of later
phases of the Sewer Plan for the four residential areas is dependent on the repayment of
general fund revenues from the connection fees. The City Council will review
connection requirements, exemptions and other revenue recovery alternatives to insure
that the sewer plan remains viable and adequately funded.
Section 5. Severability. If any section, subsection, paragraph, sentence, clause or
phrase of this ordinance or its application to any person or situation should be held to
be invalid or unconstitutional for any reason by a court of competent jurisdiction, such
invalidity or unconstitutionality shall not affect the validity or constitutionality of the
remaining portions of this ordinance or its application to any other person or situation.
Section 6. Effective Date. This ordinance or a summary thereof shall be published
in the official newspaper of the City, and shall take effect and be in full force five days
after passage and publication as provided by law.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Regular Meeting thereof this C' TI`1 day of i'��. -k cc u S� 2007.
ATTEST/ AUTHENTICATED:
J rI E. Cantu,
O 'ce e Cit
MC, City Clerk
APPROVED AS TO BY:
rney
Steven M. Mullet, Mayor
Filed with the City Clerk: -0 l)
Passed by the City Council: g --,)-D
Published: 3
Effective Date: X
Ordinance Number:
Attachment: Map Allentown and Foster Point Improvements, Phase 2
C:\Documents and Settings\All Users Desktop\ Ke lly\MSDATA \Ordinances\Allentown Phase II and Foster Point.doc
GL:ksn 8/16/2007
Page 3 of 3
II I l 1
11
w
owl
Him
j c •w
Legend
Phase 2 1 1 Parcel
1 Pavement 1 1 Waterbody
Bridge
Allentown and Foster Point
Improvements
Phase 2
Not to Scale
Date: April 27, 2006
SUMMARY OF ORDINANCE
No. 2177
City of Tukwila, Washington
On August 20, 2007, the City Council of the City of Tukwila, Washington, adopted
Ordinance No. 2177, the main points of which are summarized by its title as follows:
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, ESTABLISHING SEWER CONNECTION FEES FOR ALLENTOWN
PHASE 2 AND FOSTER POINT; ESTABLISHING WATER CONNECTION FEES FOR
ALLENTOWN PHASE 2 AND FOSTER POINT; PROVIDING FOR SEVERABILITY;
AND ESTABLISHING AN EFFECTIVE DATE.
The full text of this ordinance will be mailed upon request.
Approved by the City Council at a Regular Meeting on August 20, 2007.
-7
Ja& E. Cantu, CHIC, City Clerk
Published Seattle Times: August 23, 2007