Loading...
HomeMy WebLinkAboutTrans 2016-05-16 Item 2A - Bid Award - 2016 Overlay and Repair ProgramPublic Works Department - Bob Giberson, Director TO: Transportation Committee FROM: Bob Giberson, Public Works Director 4A BY: David Sorensen, Project Manager DATE: May 13, 2016 CC: Mayor Ekberg SUBJECT: 2016 Overlay and Repair Program Bid Schedule "B" Fort Dent Project No. 91610401 71,432.00 Bid Award I t I 42REIM ISSUE Award the bid for construction of the 2016 Overlay and Repair Program. BACKGROUND The Overlay and Repair Program preserves and maintains the street structure in a safe and useable condition. Construction will include pavement repairs and an asphalt overlay at nine locations citywide as well as other incidental items of work. ANALYSIS A call for bids was advertised for the 2016 Overlay and Repair Program on April 19 and 26, 2016 and four bids were opened on May 3, 2016. The lowest apparent bidder was Icon Materials with a bid of $1,277,029.00 with an Engineer's Estimate of $1,296,184.00. There was one bidding error found in the bid tabulation from Icon Materials; bid item No. 65 Paint Line. Icon calculated the total bid item cost amount using $2.10 per lineal foot, however the unit bid price they recorded on their bid proposal was $210.00 per lineal foot, thereby increasing their total bid above the 2nd low bidder, Lakeside Industries, Inc. The project specifications state "If a discrepancy exists between the price per unit and the extended amount of any bid item, the price per unit will control." Based on the bidding error, the project design consultant KPG concurred to award the 2016 Overlay and Repair Program to the apparent low bidder, Lakeside Industries, Inc. BUDGET AND BID SUMMARY (All amounts include sales tax) With approvals from Transportation Committee Chair Robertson and Council President Duff ie, Council is being asked to award the construction contract for the 2016 Overlay and Repair Program to Lakeside Industries in the amount of $1,277,956.80 and consider this item that same night on the Consent Agenda of the May 16, 2016 Regular Meeting. With the month of May having a 5th Monday, an expedited approval will save the City three weeks in time and will allow construction to start much sooner for this weather dependent project. Attachments: Vicinity Map Pages 18 & 33, 2015 GIP Consultant Recommendation Bid Tabulation WAPW Eng\PROJECTS\A- RW & RS Projects\Annual Overlay & Repair Programs12016 Overlay & Repair PrograrmDesigmAd and Award\Award\Docs to TC Bid AwardTinal Does to TC%Info Memo Bid Award 2016 Overlay Lakeside 05-13-16 gi.docx Bid Results Estimate 2016 Budget Bid Schedule "A" $1,217,288.80 $1,224,752.00 $1,260,000.00 Contingency (5%) 60,864.44 Bid Schedule "B" Fort Dent 60,668.00 71,432.00 100,000.00 Contingency (5%) 3,033.40 0,00 0.00 Total $1,341,854.64 $1.296,184.00 X1,360 000.00 With approvals from Transportation Committee Chair Robertson and Council President Duff ie, Council is being asked to award the construction contract for the 2016 Overlay and Repair Program to Lakeside Industries in the amount of $1,277,956.80 and consider this item that same night on the Consent Agenda of the May 16, 2016 Regular Meeting. With the month of May having a 5th Monday, an expedited approval will save the City three weeks in time and will allow construction to start much sooner for this weather dependent project. Attachments: Vicinity Map Pages 18 & 33, 2015 GIP Consultant Recommendation Bid Tabulation WAPW Eng\PROJECTS\A- RW & RS Projects\Annual Overlay & Repair Programs12016 Overlay & Repair PrograrmDesigmAd and Award\Award\Docs to TC Bid AwardTinal Does to TC%Info Memo Bid Award 2016 Overlay Lakeside 05-13-16 gi.docx S 130TH ST 48TH AVE S 52ND AVE S INTERURBAN AVE. S FORT DENT PARK 7°.°"11nr MINKLER BL FORT DENT WAY ANDOVER PARK E. 2016 Overlay Program Vicinity Map 2 CITY OF TDKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: Annual Overlay and Repair Program Project No. 81310401 DESCRIPTION: Select, design and construct asphalt and concrete pavement overlays nf arterial and residential streets. �V�T|F|�xJ|nN� Pmeenmand meimointhe stre'�n�u�uminan�e and useable o��bymaudaxinQb�om failure which ahm minimizes costs. Some individual sites may be coordinated with water, sewer, and surface water projects. STATUS: Each year various sections of roadway throughout the City are designed and constructed for asphalt overlay. MNNT.|MPACT: Reduces annual maintenance. COMMENT: Ongoing project. Only one year actuo|o shown in first column. FINANCIAL Through Estimated (mSOon's) mm 2014 2nis 2n16 2n17 Mx miq qn?n nFYomn mA/ EXPENSES Design 48 100 125 125 150 150 175 175 175 1,223 Const. Mgmt. 175 175 175 200 200 225 225 230 1,605 Construction 1,125 1,250 1,260 1,300 1,320 1,325 1,330 1,340 10,250 TOTAL EXPENSES 48 1,400 1,550 1,560 1,650 1,670 1,725 1,730 1,745 13,078 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 48 1,400 1,550 1,560 1,650 1,670 1,725 1,730 1,745 13,078 TOTAL SOURCES 48 1,400 1,550 1,560 1,650 1,670 1,725 1,730 1,745 13,078 co1n-zozo Capital Improvement Program 18 3 CITY OF TUKWIL& CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: Fort Dent Park Project Nos. 90330107 DESCRIPTION: Regional park of 52 acres requires ongoing capital and maintenance improvements. The C�yhas assumed m�o pa�mm�mand ma��noncefor the pkm�amo.pa��g��one soccer field, trail, pond and all major infrastructure. Funding listed in 2015 through 2020 is for a phased approach to the remaining parking lot repairs in co�uncUunw�hthe Annual Ovadoy& Repair Pm8mm.Apo�onof the pudNnglot nvndaywas oomp|e�d 8T/q'VW� with parking tax dollars in 2011 and another portion in 2014. For 2015, $500k is designated for a potential BNSF Railroad sewer relocation. Replacement of the small play structure is listed for $250k in Beyond. MA|NT.|MPACT: Ongoing effort from all departments involved; Parks, Streets, Water, Sewer, and Surface Water. COMMENT: King County transferred Fort Dent Park /o the Q � City Concessionaire agreement with Starfire Sports Complex. A new playground was installed in 2008 and restrooms were remodeled in 2010. FINANCIAL Through saUmmod onmnon'm\ 2013 2014 2015 2016 2017 2018 2019 uuuo RE*mmo TOTAL EXPENSES Design 275 20 10 10 10 10 10 10 355 Const. Mgmt. 30 15 15 15 15 15 15 120 Construction 1,292 200 600 100 100 100 100 100 250 2,842 TOTAL EXPENSES 1,567 250 625 125 125 125 125 125 250 3,317 FUND SOURCES Awarded Grant 694 694 Parking Taxes 50 50 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 823 250 625 125 125 125 125 125 250 2,573 TOTAL SOURCES 1,567 250 625 125 125 125 125 125 250 3,317 uo/o'2ouo Capital Improvement Program 33 4 f NC IN 1 RS 1ANDSC:ARE'ARf HITI:CIS SURWYoRS SEATTLE •TACOMA May 4, 2016 Mr. David Sorensen, PE Public Works City of Tukwila 6300 Southcenter Blvd Tukwila, WA 98188 RE: 2016 Overlay Program Dear Dave, As requested, KPG has tabulated the bids and reviewed the bid packages submitted for the City of Tukwila 2016 Overlay Program. The lowest bidder in the amount of $1,277,956.80 is Lakeside Industries. As part of our review, we checked the status of Lakeside Industries on the Washington State Labor and Industries web page to confirm they are currently insured, bonded, and licensed. We also checked their state and federal debarment status, both of which indicated no issues. Finally, we ran a rudimentary analysis of their bid against all other bids and industry pricing. The mobilization cost was outside a single standard deviation for the project, but given the nature of the work and the reputation of the contractor, the City has no additional risk exposure. A review of all other items indicates no substantial imbalances or significant front loading. It is KPG's recommendation that the 2016 Overlay Program be awarded to Lakeside Industries. We have enclosed the original bid package along with the contractor verification and bid tabulation for your review. Sincerel ., than Monroe, P. �. PG, Inc. cc: Nelson Davis, PE Enclosures: Lakeside Industries bid package including Contractor Verification Bid Tabulation 7539 TH Avenue North • Seattle, WA 981o9 • Phone (2o6) 286 -1640 • Fax (2o6) 286 -1639 2502 Jefferson Avenue • Tacoma, WA 98402 • Phone (253) 627 -0720 • Fax (253) 627 -4144 www.kpg.com 5 CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS 2016 Overlay Program BID TABULATION May 3, 2016 ENGINEER'S ESTIMATE TUCCI & SONS MILES RESOURCES ICON MATERIALS No Item Quanti Unit Cost Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost ROADWAY (SCHEDULE A) Total Schedule A 1 -04 Unexpected Site Changes FA $ 16,000.00 16,000.00 $ 16,000.00 $ 16,000.00 $ 16,000.00 16,000.00 16,000.00 $ 16,000.00 16,000.00 $ 16,000.00 1 -07 Resolution of Utility Conflicts FA $ 14,000.00 14,000.00 $ 14,000.00 $ 14,000.00 $ 14,000.00 14,000.00 $ 14,000.00 $ 14,000.00 14,000.00 $ 14,000.00 1 -07 SPCC Plan LS 800.00 800.00 500.00 500.00 500.00 500.00 1,600.00 1,600.00 1,500.00 1,500.00 1 -09 Mobilization LS $ 90,770.00 90,770.00 $ 60,000.00 60,000.00 $ 102,659.29 102,659.29 $ 110,000.00 $ 110,000.00 $ 260,000.00 260,000.00 5 1 -10 Project Temporary Traffic Control 1 LS $ 170,000.00 170,000.00 $ 130,000.00 130,000.00 $ 155,947.40 155,947.40 $ 175,000.00 175,000.00 $ 100,000.00 $ 100,000.00 6 2 -02 Asphalt Pavement Removal Incl. Haul 150 SY 25.00 3,750.00 30.00 4,500.00 35.48 5,322.00 30.50 4,575.00 15.00 2,250.00 7 2 -02 Cement Conc. Sidewalk Removal Incl. Haul 130 SY 50.00 6,500.00 40.00 5,200.00 109.61 14,249.30 37.00 4,810.00 55.00 7,150.00 2 -02 Cement Conc. Curb Removal Incl. Haul 420 LF 10.00 4,200.00 10.00 4,200.00 28.21 11,848.20 11.50 4,830.00 25.00 10,500.00 9 2 -02 Removal of Structure and Obstruction LS 7,000.00 7,000.00 $ 7,500.00 7,500.00 6,250.00 6,250.00 2600.00 2,600.00 4,220.00 4,220.00 10 2 -03 Unsuitable Foundation Excavation Incl. Haul 260 CY 33.00 8,580.00 50.00 13,000.00 43.75 11,375.00 25.00 6,500.00 25.00 6,500.00 11 2 -03 Gravel Borrow Incl. Haul 520 TON 25.00 13,000.00 32.00 16,640.00 37.50 19,500.00 19.00 9,880.00 10.00 5,200.00 12 4 -04 Crushed Surfacing Top Course 120 TON 30.00 3,600.00 38.00 4,560.00 32.43 3,891.60 43.50 5,220.00 20.00 2400.00 13 5 -04 Pavement Repair Excavation Incl. Haul 1,660 CY 72.00 $ 119,520.00 93.00 154,380.00 110,10 182,766.00 84.00 139,440.00 60.00 99,600.00 14 5 -04 HMA Cl. 1/2" PG 64 -22 2,410 TON 80.00 192,800.00 79.00 190,390.00 97.65 235,336.50 78.00 187,980.00 75.00 180,750.00 15 5 -04 HMA Cl. 1/2" PG 70 -22 40 TON 140.00 5,600.00 200.00 $ 8,000.00 139.63 5,585.20 110.00 4,400.00 110.00 4,400.00 16 5 -04 HMA for Pavement Repair CI. 1/2" PG 64 -22 3,270 TON 100.00 327,000.00 106.00 346,620.00 119.53 390,863.10 90.00 294,300.00 75.00 245,250.00 17 5 -04 HMA for Pavement Repair Cl. 1/2" PG 70 -22 120 TON 130.00 15,600.00 130.00 $ 15,600.00 114.51 13,741.20 103.00 12,360.00 85.00 10,200.00 18 5 -04 Thickened Edge 1,170 LF 3.00 3,510.00 3.00 $ 3,510.00 1.13 $ 1,322.10 1.00 1,170.00 1.50 1,755.00 19 5 -04 Planing Bituminous Pavement 2020 SY 5.00 35,100.00 10.00 $ 70,200.00 10.14 71,182.80 6.00 $ 42,120.00 8.00 56,160.00 20 7 -12 Adjust Water Valve 15 450.00 6,750.00 560.00 8,400.00 606.25 $ 9,093.75 300.00 4,500.00 300.00 4,500.00 21 7 -12 Adjust Water Meter Box EA $ 500.00 500.00 620.00 620.00 718.75 718.75 345.00 345.00 350.00 350.00 22 8 -01 Erosion/Water Pollution Control FA 9,500.00 9,500.00 $ 9,500.00 9,500.00 9,500.00 $ 9,500.00 9,500.00 9,500.00 9,500.00 9,500.00 23 8 -01 Inlet Protection 58 60.00 3,480.00 85.00 $ 4,930.00 75.00 4,350.00 52.00 3,016.00 75.00 4,350.00 24 8 -04 Cement Conc. Traffic Curb and Gutter 660 LF 35.00 23,100.00 50.00 33,000.00 18.75 12,375.00 30.00 19,800.00 26.85 25 8 -04 Cement Conc. Curb Cut 2 EA 1,200.00 2,400.00 $ 1,500.00 3,000.00 250.00 500.00 1,500.00 $ 3,000.00 350.00 700.00 26 8 -06 Cement Conc. Driveway Entrance 30 SY 90.00 2,700.00 165.00 4,950.00 39.06 1,171.80 60.00 $ 1,800.00 53.50 1,605.00 27 8 -13 Adjust Monument Case and Cover 4 500.00 2,000.00 _ 560.00 2,240.00 606.25 2425.00 300.00 $ 1,200.00 300.00 1,200.00 TRAFFIC SIGNALS(SCHEDULEA) 28 8 -20 Traffic Signal Modifications (Andover Park W & Minkler Blvd), Complete LS $ 2,600.00 2,600.00 $ 5,000.00 5,000.00 8,750.00 $ 8,750.00 7,350.00 7,350.00 5,000.00 5,000.00 29 8 -20 Traffic Signal Modifications (Andover Park E & Minkler Blvd), Complete LS $ 29,700.00 29,700.00 $ 13,100.00 13,100.00 $ 20,000.00 20,000.00 16,800.00 16,800.00 13,052.50 30 8 -20 Traffic Signal Modifications (Andover Park E & Costco Drive), Complete LS $ 11,900.00 11, 900.00 $ 13,100.00 13,100.00 $ 17,500.00 17,500.00 14,700.00 14,700.00 $ 13,052.50 13,052.50 SIDEWALK (SCHEDULE A) 31 8 -14 Cement Conc. Sidewalk 50 SY $ 65.00 $ 3,250.00 $ 125.00 $ 6,250.00 $ 39.06 $ 1,953.00 $ 55.00 $ 2,750.00 $ 46.30 $ 2,315.00 32 8 -14 Cement Conc. Curb Ramp Type Parallel A 2 EA $ 1,500.00 $ 3,000.00 $ 5,800.00 $ 11,600.00 $ 1,218.75 $ 2,437.50 $ 1,300.00 $ 2,600.00 $ 980.00 $ 1,960.00 33 8 -15 Cement Conc. Curb Ramp Type Perpendicular A 2 EA $ 1,200.00 $ 2,400.00 _ $ 5,800.00 $ 11,600.00 $ 1,218.75 $ 2,437.50 _ $ 1,600.00 $ 3,200.00 _ $ 1,420.00 $ 2,840.00 STORM DRAINAGE (SCHEDULEA) 34 7 -05 Adjust Catch Basin 31 EA $ 450.00 $ 13,950.00 $ 700.00 $ 21,700.00 1 $ 856.25 $ 26,543.75 $ 405.00 $ 12,555.00 750.00 $ 23,250.00 35 7 -05 Storm Drain Marker 33 EA $ 25.00 $ 825.00 $ 100.00 $ 3,300.00 1 $ 123.75 $ 4,083.75 ( $ 104.00 $ 3,432.00 ($ $ 99.00 $ 3,267.00 SANITARY SEWER (SCHEDULEA) 1 EA 36 1 7 -05 Adjust Manhole ) 21 EA I $ 600.00 1 $ 12,600.00 1 $ 700.00 $ 14,700.00 1 $ 856.25 1 $ 17,981.25 1 $ 403.00 I $ 8,463.00 1 $ 750.00 1 $ 15,750.00 TRAFFIC CONTROL DEVICES (SCHEDULE A) 37 8 -09 Raised Pavement Marker Type 1 36 HUND $ 275.00 $ 9,900.00 $ 450.00 $ 16,200.00 $ 390.00 $ 14,040.00 $ 327.00 $ 11,772.00 $ 312.00 $ 11,232.00 38 8 -09 Raised Pavement Marker Type 2 10 HUND $ 400.00 $ 4,000.00 $ 500.00 $ 5,000.00 $ 498.75 $ 4,987.50 $ 418.00 $ 4,180.00 $ 399.00 $ 3,990.00 39 8 -21 Permanent Signing 1 EA $ 400.00 $ 400.00 $ 500.00 $ 500.00 $ 650.00 $ 650.00 $ 1,600.00 $ 1,600.00 $ 500.00 $ 500.00 40 8 -22 Plastic Traffic Arrow 8 EA $ 120.00 $ 960.00 $ 150.00 $ 1,200.00 $ 360.00 $ 2,880.00 $ 302.00 $ 2,416.00 $ 288.00 $ 2,304.00 41 8 -22 Plastic Railroad Crossing Symbol 4 EA $ 700.00 $ 2,800.00 $ 285.00 $ 1,140.00 $ 1,875.00 $ 7,500.00 $ 1,570.00 $ 6,280.00 $ 1,500.00 $ 6,000.00 42 8 -22 Plastic Stop Line 310 LF $ 10.00 $ 3,100.00 $ 6.50 $ 2,015.00 $ 12.50 $ 3,875.00 $ 10.50 $ 3,255.00 $ 10.00 $ 3,100.00 43 8 -22 Plastic Crosswalk Line 380 SF $ 8.00 $ 3,040.00 $ 5.00 $ 1,900.00 $ 9.44 $ 3587.20 $ 7.90 $ 3,002.00 $ 7.55 $ 2,869.00 44 8 -22 Plastic Shared Lane Marking 10 EA $ 120.00 $ 1,200.00 $ 350.00 $ 3,500.00 $ 360.00 $ 3,600.00 $ 302.00 $ 3,020.00 $ 288.00 $ 2,880.00 45 8 -22 Plastic Line, 8 Inch 1,360 LF $ 2.00 $ 2,720.00 $ 2.35 $ 3,196.00 $ 2.35 $ 3,196.00 $ 2.00 $ 2,720.00 $ 1.88 $ 2,556.80 46 8 -22 Plastic Line, 4 Inch 350 LF $ 1.50 $ 525.00 $ 1.50 $ 525.00 $ 1.13 $ 395.50 $ 0.94 $ 329.00 $ 0.90 $ 315.00 47 8 -22 Fort Dent Way Driveway Striping 1 LS $ 1,000.00 $ 1,000.00 $ 350.00 $ 350.00 $ 1,875.00 $ 1,875.00 $ 1,570.00 $ 1,570.00 $ 1,500.00 $ 1,500.00 48 8 -23 Temporary Paint Line 10,444 LF $ 0.50 $ 5,222.00 $ 0.15 $ 1,566.60 $ 0.18 $ 1,879.92 $ 0.25 $ 2,611.00 $ 1.00 $ 10,444.00 R O ADS I D E DE VELOPMENT (SCHEDULE A) 49 8 -02 Property Restoration 1 FA $ 18,000.00 18,000.00 1 $ 18,000.00 18,000.00 1 $ 18,000.00 18,000.00 1 $ 18,000.00 $ 18,000.00 $ 18,000.00 50 8 -26 Replace Starfire Gate Receiving Post Foundation 1 LS 1,000.00 1,000.00 1,000.00 1,000.00 2,500.00 2,500.00 1,600.00 1,600.00 1,000.00 1,000.00 FRANCHISE UTILITY ITEMS (SCHEDULE A) 51 8 -19 Adjust Franchise Utility Manhole/Vault 2 700.00 1,400.00 $ 2,000.00 4,000.00 1 $ 868.75 1,737.50 1 $ 405.00 $ 810.00 1 $ 725.00 52 8 -19 Adjust Gas Valve 3 500.00 1,500.00 600.00 1,800.00 356.25 1,068.7 300.00 $ 900.00 300.00 SCHEDULE A SUBTOTALS $ 1,224,752.00 v 1 of 2 $ 1,293,682.60 1,475,933.11 $ 1,215,861.00 1,450.00 I 900.00 $ 1,435,033.00 ICON MATERIALS, CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS 2016 Overlay Program BID TABULATION May 3, 2016 Item ROADWAY (SCHEDULE B) ENGINEER'S ESTIMATE Unit Cost I Total Cost Total Schedule B TUCCI & SONS Unit Price Total Cost MILES RESOURCES Unit Price Total Cost ICON MATERIALS Unit Price Total Cost 53 1-04 Unexpected Site Changes 1 FA $ 2,000.00 2,000.00 $ 2000.00 2,000.00 2,000.00 $ 2,000.00 2,000.00 $ 2,000.00 2,000.00 2,000.00 54 1-07 Resolution of Utility Conflicts 1 FA 1,000.00 $ 1,000.00 $ 1,000.00 1,000.00 $ 1,000.00 $ 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 55 1-07 SPCC Plan 1 LS 100.00 $ 100.00 100.00 100.00 562.50 $ 562.50 1,600.00 1,600.00 1,500.00 1,500.00 56 1-09 Mobilization 1 LS $ 5,300.00 5,300.00 $ 4,000.00 4,000.00 $ 7,355.67 $ 7,355.67 4,800.00 4,800.00 5,000.00 5,000.00 57 1-10 Project Temporary Traffic Control 1 LS $ 10,000.00 10,000.00 $ 2,500.00 2,500.00 4,454.13 $ 4,454.13 3,000.00 $ 3,000.00 2,000.00 2,000.00 58 2-02 Removal of Structure and Obstruction 1 LS 500.00 $ 500.00 $ 1,000.00 1,000.00 1,900.00 $ 1,900.00 100.00 100.00 500.00 500.00 59 2-03 Unsuitable Foundation Excavation Incl. Haul 40 CY 33.00 1,320.00 50.00 2,000.00 40.24 $ 1,609.60 25.00 1,000.00 25.00 1,000.00 60 2-03 Gravel Borrow Incl. Haul 120 TON $ 25.00 $ 3,000.00 32.00 3,840.00 40.24 $ 4,828.80 19.00 2,280.00 10.00 1,200.00 61 5-04 Pavement Repair Excavation Incl. Haul 191 CY $ 72.00 13,752.00 75.00 14,325.00 37.75 $ 7,210.25 $ 60.00 11,460.00 60.00 11,460.00 62 5-04 HMA Cl. 1/2" PG 64-22 390 TON 80.00 31,200.00 $ 78.00 30,420.00 85.78 $ 33,454.20 $ 77.00 30,030.00 80.00 31,200.00 63 8-01 Erosion/Water Pollution Control 1 FA 1,000.00 $ 1,000.00 $ 1,000.00 1,000.00 _ 1,000.00 $ 1,000.00 $ 1,000.00 1,000.00 1,000.00 1,000.00 AFFIL CONTROL DEVICES (SCHEDULE B) 64 8-22 Plastic Traffic Arrow 120.00 $ 120.00 $ 350.00 350.00 $ 360.00 $ 360.00 $ 302.00 302.00 $ 288.00 $ 288.00 65 8-22 Paint Line, 4 Inch 760 LF 1.50 1,140.00 $ 1.25 $ 950.00 2.50 $ 1,900.00 210.00 159,600.00 2.00 $ 1,520.00 ROADSIDE DEVELOPMENT(SCHEDULEB) 66 1 8-02 [Properly Restoration 1 FA 1 $ 1,000.00 1 $ $ 1,00000 1 $ 1,000.00 1 $ 71,432.00 SCHEDULE B SUBTOTALS $ 71,432.00 TOTAL CONSTRUCTION COST (SCHEDULE A+B) $ 1,296,184.00 ENGINEER'S ESTIMATE 2 of 2 1,000.001 $ 1,000.00 1 $ 1,000.001 $ 1,000.00 I $ 1,000.00 1 $ 1,000.00 1 $ 1,000.00 64,485.00 $ 1,358,167.60 TUCCI & SONS 68,635.15 $ 1,544,56826 MILES RESOURCES $ 219,172.00 $ 60,668.00 CO