HomeMy WebLinkAboutReg 2016-05-16 Item 4K - Bid Award - 2016 Overlay and Repair Program with Lakeside Industries for $1,277,956.80 Plus ContingencyCOUNCIL AGENDA SYNOPSIS
Initiate
Meeting Date
Prepared by i
Ala s review
afi review
r!�
05/16/16
B 74
❑ Motion
vlltg Date
I Resolution
Altg Date
❑ Ordinance
2litg Date
_Award
05/16/16
❑ Public Hearing
Alts Date
1 Other
tlltg Date
Bid
AN Date
SPONSOR ❑ Council 1 Mayor ❑ HR 1 1 DCD ❑ Finance ❑ Fire 1 ITT Pe'R Police 11 PIV
SPONSOR'S The 2016 Annual Overlay & Repair Program was advertised for bids on April 19 and 26,
SI_TMM:\RS" 2016 and four bids were opened May 3. There was an error on Icon Materials' bid and when
corrected, Lakeside Industries, Inc. had the apparent low bid of $1,277,956.80. Nine
locations are scheduled for asphalt overlay throughout the City, including a portion of the
Fort Dent parking lot. Council is being asked to award the bid to Lakeside Industries in the
amount of $1,277,956.80.
REVIEWED BY n COW Mtg. ❑ CA &P Cmte ❑ F &S Cmte
Utilities Cmte ❑ Arts Comm. ❑ Parks Comm.
DATE: 05/16/16 COMMI1STEE CHAIR: DENNIS
Transportation
ITEM INFORMATION
ITEM NO.
4.K.
CAS NUMBER:
STAFF SPONSOR: BOB GIBERSON
ORIGINAL AGENDA DATE: 05/16/16
AGENDA II'I?M TI.D.r, 2016 Annual Overlay & Repair Program
Bid Award to Lakeside Industries, Inc
CAI'EGORS' j 1 Discussion
:kit; Date
❑ Motion
vlltg Date
I Resolution
Altg Date
❑ Ordinance
2litg Date
_Award
05/16/16
❑ Public Hearing
Alts Date
1 Other
tlltg Date
Bid
AN Date
SPONSOR ❑ Council 1 Mayor ❑ HR 1 1 DCD ❑ Finance ❑ Fire 1 ITT Pe'R Police 11 PIV
SPONSOR'S The 2016 Annual Overlay & Repair Program was advertised for bids on April 19 and 26,
SI_TMM:\RS" 2016 and four bids were opened May 3. There was an error on Icon Materials' bid and when
corrected, Lakeside Industries, Inc. had the apparent low bid of $1,277,956.80. Nine
locations are scheduled for asphalt overlay throughout the City, including a portion of the
Fort Dent parking lot. Council is being asked to award the bid to Lakeside Industries in the
amount of $1,277,956.80.
REVIEWED BY n COW Mtg. ❑ CA &P Cmte ❑ F &S Cmte
Utilities Cmte ❑ Arts Comm. ❑ Parks Comm.
DATE: 05/16/16 COMMI1STEE CHAIR: DENNIS
Transportation
Cmte
❑ Planning Comm.
ROBERTSON
RECOMMENDATIONS:
SPONSOR/ADMIN.
CoMmrrrl:
Public Works
Unanimous Approval; Forward to Consent Agenda same night
COST IMPACT / FUND SOURCE
Ex1 1 :NDITURI : REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$1,277,956.80 $1,360,000.00 $0.00
Fund Source: 104 ARTERIAL STREETS & 301 PARKS (PAGES 18 & 33, 2015 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
05/16/16
MTG. DATE
ATTACHMENTS
05/16/16
Informational Memorandum dated 05/13/16
Vicinity Map
Pages 18, & 33, 2015 CIP
Consultant Recommendation Letter
Bid Tabulation
141
City of Tukwila
Allan Ekberg, Mayor
Public Works Department - Bob Giberson, Director
INFORMATIONAL MEMORANDUM
TO: Transportation Committee
FROM: Bob Giberson, Public Works Director
BY: David Sorensen, Project Manager
DATE: May 13, 2016
CC: Mayor Ekberg
SUBJECT: 2016 Overlay and Repair Program
Project No. 91610401
Bid Award
ISSUE
Award the bid for construction of the 2016 Overlay and Repair Program.
BACKGROUND
The Overlay and Repair Program preserves and maintains the street structure in a safe and useable condition. Construction
will include pavement repairs and an asphalt overlay at nine locations citywide as well as other incidental items of work.
ANALYSIS
A call for bids was advertised for the 2016 Overlay and Repair Program on April 19 and 26, 2016 and four bids were opened
on May 3, 2016. The lowest apparent bidder was Icon Materials with a bid of $1,277,029.00 with an Engineer's Estimate of
$1,296,184.00. There was one bidding error found in the bid tabulation from Icon Materials; bid item No. 65 Paint Line. Icon
calculated the total bid item cost amount using $2.10 per lineal foot, however the unit bid price they recorded on their bid
proposal was $210.00 per lineal foot, thereby increasing their total bid above the 2nd low bidder, Lakeside Industries, Inc.
The project specifications state "If a discrepancy exists between the price per unit and the extended amount of any bid item,
the price per unit will control." Based on the bidding error, the project design consultant KPG concurred to award the 2016
Overlay and Repair Program to the apparent low bidder, Lakeside Industries, Inc.
BUDGET AND BID SUMMARY (All amounts include sales tax)
Bid Results Estimate 2016 Budget
Bid Schedule "A" $1,217,288.80 $1,224,752.00 $1,260,000.00
Contingency (5 %) 60,864.44
Bid Schedule "B" Fort Dent 60,668.00 71,432.00 100,000.00
Contingency (5 %) 3,033.40 0.00 0.00
Total $1,341.854.64 $1 296 184.00 $1,360,000.00
RECOMMENDATION
With approvals from Transportation Committee Chair Robertson and Council President Duffie, Council is being asked to
award the construction contract for the 2016 Overlay and Repair Program to Lakeside Industries in the amount of
$1,277,956.80 and consider this item that same night on the Consent Agenda of the May 16, 2016 Regular Meeting. With the
month of May having a 5th Monday, an expedited approval will save the City three weeks in time and will allow construction to
start much sooner for this weather dependent project.
Attachments: Vicinity Map
Pages 18 & 33, 2015 CIP
Consultant Recommendation
Bid Tabulation
W: \PW Eng \ PROJECTS \A. RW & RS Projects\Annual Overlay & Repair Programs\2016 Overlay & Repair Program \Design\Ad and Award \Award\Docs to TC Bid Award\Final Docs to TC \Info Memo Bid Award 2016 Overlay Lakeside
0513 -16 gl.docx
143
S•
X
S 130TH ST
`RIMS:
a iii
Ekkh Maim. .L,A
S 144TH ST I
A
48TH AVE S
52ND AVE S
INTERURBAN AVE. S
n \� FORT DENT PARK
+1lS�
' 4 Oflll
!drt
IMST
MINKLER BLVD
J6
FORT DENT WAY
ANDOVER PARK E.
2016 Overlay Program
Vicinity Map
14
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Annual Overlay and Repair Program Project No. 91310401
DESCRIPTION: Select, design and construct asphalt and concrete pavement overlays of arterial and residential streets.
JUSTIFICATION: Preserve and maintain the street structure in a safe and useable state by resurfacing before failure which also
minimizes costs. Some individual sites may be coordinated with water, sewer, and surface water projects.
STATUS: Each year various sections of roadway throughout the City are designed and constructed for asphalt overlay.
MAINT. IMPACT: Reduces annual maintenance.
COMMENT: Ongoing project. Only one year actuals shown in first column.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016
2017
2018
2019
2020
BEYOND TOTAL
EXPENSES
Design
48
100
125
125
150
150
175
175
175
1,223
Land (RM/)
0
Const. Mgmt.
175
175
175
200
200
225
225
230
1,605
Construction
1,125
1,250
1,260
1,300
1,320
1,325
1,330
1,340
10,250
TOTAL EXPENSES
48
1,400
1,550
1,560
1,650
1,670
1,725
1,730
1,745
13,078
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
48
1,400
1,550
1,560
1,650
1,670
1,725
1,730
1,745
13,078
TOTAL SOURCES
48
1,400
1,550
1,560
1,650
1,670
1,725
1,730
1,745
13,078
2015 - 2020 Capital Improvement Program
18
147
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Fort Dent Park Project Nos. 90330107
DESCRIPTION: Regional park of 52 acres requires ongoing capital and maintenance improvements.
JUSTIFICATION: The City has assumed major park repairs and maintenance for the picnic area, parking lot, one soccer
field, trail, pond and all major infrastructure.
Funding listed in 2015 through 2020 is for a phased approach to the remaining parking lot repairs in
conjunction with the Annual Overlay & Repair Program. A portion of the parking lot overlay was completed
with parking tax dollars in 2011 and another portion in 2014. For 2015, $500k is designated for a potential
BNSF Railroad sewer relocation. Replacement of the small play structure is listed for $250k in Beyond.
STATUS:
MAINT. IMPACT: Ongoing effort from all departments involved; Parks, Streets, Water, Sewer, and Surface Water.
COMMENT:
King County transferred Fort Dent Park to the City of Tukwila in 2003. Concessionaire agreement with
Starfire Sports Complex. A new playground was installed in 2008 and restrooms were remodeled in 2010.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016
2017
2018
2019
2020
BEYOND TOTAL
EXPENSES
Design
275
20
10
10
10
10
10
10
355
Land (R/W)
0
Const. Mgmt.
30
15
15
15
15
15
15
120
Construction
1,292
200
600
100
100
100
100
100
250
2,842
TOTAL EXPENSES
1,567
250
625
125
125
125
125
125
250
3,317
FUND SOURCES
Awarded Grant
694
694
Parking Taxes
50
50
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
823
250
625
125
125
125
125
125
250
2,573
TOTAL SOURCES
1,567
250
625
125
125
125
125
125
250
3,317
2015 - 2020 Capital Improvement Program
148
33
ENGINEERS K. FG
ARCHfTEC7S
IANOSCAPEARCHITECFS
SURVFYORS SEATTLE • TACOMA
May 4, 2016
Mr. David Sorensen, PE
Public Works
City of Tukwila
6300 Southcenter Blvd
Tukwila, WA 98188
RE: 2016 Overlay Program
Dear Dave,
As requested, KPG has tabulated the bids and reviewed the bid packages submitted for the City
of Tukwila 2016 Overlay Program. The lowest bidder in the amount of $1,277,956.80 is
Lakeside Industries.
As part of our review, we checked the status of Lakeside Industries on the Washington State
Labor and Industries web page to confirm they are currently insured, bonded, and licensed. We
also checked their state and federal debarment status, both of which indicated no issues. Finally,
we ran a rudimentary analysis of their bid against all other bids and industry pricing. The
mobilization cost was outside a single standard deviation for the project, but given the nature of
the work and the reputation of the contractor, the City has no additional risk exposure. A review
of all other items indicates no substantial imbalances or significant front loading.
It is KPG's recommendation that the 2016 Overlay Program be awarded to Lakeside Industries.
We have enclosed the original bid package along with the contractor verification and bid
tabulation for your review.
Sincer i ,
1'
han Monroe, P.I.
PG, Inc.
cc: Nelson Davis, PE
Enclosures: Lakeside Industries bid package including Contractor Verification
Bid Tabulation
7539TH Avenue North • Seattle, WA 98109 • Phone (206) 286 -1640 • Fax (206) 286 -1639
2502 Jefferson Avenue • Tacoma, WA 98402 • Phone (253) 627 -072o • Fax (253) 627-4144
www.kpg.com
149
SCHEDULE A SUBTOTALS $ 1,224,752.00 I
CITY OF TUKWILA
DEPARTMENT OF PUBLIC WORKS
2016 Overlay Program
BID TABULATION
May 3, 2016
No. Spec Item
ROADWAY (SCHEDULE A)
ENGINEER'S ESTIMATE
TUCCI & SONS
MILES RESOURCES
Quantity Unit Unit Cost
Total Cost
Unit Price Total Cost
Unit Price Total Cost
ICON MATERIALS
Unit Price Total Cost
Total Schedule A
1
1 -04
Unexpected Site Changes
1 FA
16,000.00 $ 16,000.00
$ 16,000.00
$ 16,000.00
$ 16,000.00
$ 16,000.00
$ 16,000.00
$ 16,000.00
$ 16,000.00
$ 16,000.00
2
1 -07
Resolution of Utility Conflicts
1 FA
14,000.00 $ 14,000.00
$ 14,000.00
$ 14,000.00
$ 14,000.00
$ 14,000.00
$ 14,000.00
$ 14,000.00
$ 14,000.00
$ 14,000.00
3
1 -07
SPCC Plan
1 LS
$ 800.00 $
800.00
$ 500.00
500.00
500.00
500.00
$ 1,600.00
$ 1,600.00
$ 1,500.00
$ 1,500.00
4
1 -09
Mobilization
1 LS
$ 90,770.00 $
90,770.00
$ 60,000.00
$ 60,000.00
$ 102,659.29
$ 102,659.29
$ 110,000.00
$ 110,000.00
$ 260,000.00
$ 260,000.00
5
1 -10
Project Temporary Traffic Control
1 LS
$ 170,000.00 $ 170,000.00
$ 130,000.00
$ 130,000.00
$ 155,947.40
$ 155,947.40
$ 175,000.00
$ 175,000.00
$ 100,000.00
$ 100,000.00
6
2 -02
Asphalt Pavement Removal Incl. Haul
150 SY
$ 25.00 $
3,750.00
30.00
$ 4,500.00
35.48
$ 5,322.00
30.50
$ 4,575.00
15.00
$ 2,250.00
7
2 -02
Cement Conc. Sidewalk Removal Incl. Haul
130 SY
$ 50.00 $
6,500.00
40.00
$ 5,200.00
109.61
$ 14,249.30
37.00
$ 4,810.00
55.00
$ 7,150.00
8
2 -02
Cement Conc. Curb Removal Incl. Haul
420 LF
$ 10.00 $
4,200.00
10.00
$ 4,200.00
28.21
$ 11,848.20
11.50
$ 4,830.00
25.00
$ 10,500.00
9
2 -02
Removal of Structure and Obstruction
1 LS
$ 7,000.00 $
7,000.00
$ 7,500.00
$ 7,500.00 1
$ 6,250.00
$ 6,250.00
$ 2,600.00
$ 2,600.00
$ 4,220.00
$ 4,220.00
10
2 -03
11
2 -03
12
4 -04
Unsuitable Foundation Excavation Incl. Haul
Gravel Borrow Incl. Haul
Crushed Surfacing Top Course
260 CY
$ 33.00 $
8,580.00
50.00
$ 13,000.00
43.75
$ 11,375.00
25.00
$ 6,500.00
25.00
$ 6,500.00
520 TON
25.00 $ 13,000.00
32.00
$ 16,640.00
37.50
$ 19,500.00
19.00
$ 9,880.00
10.00
$ 5,200.00
120 TON
$ 30.00 $
3,600.00
38.00
$ 4,560.00
32.43
$ 3,891.60
43.50
$ 5,220.00
20.00
$ 2,400.00
13
5 -04
Pavement Repair Excavation Incl. Haul
1,660 CY
$ 72.00 $
119,520.00
93.00
$ 154,380.00
$ 110.10
$ 182,766.00
84.00
$ 139,440.00
60.00
$ 99,600.00
14
5 -04
HMA Cl. 1/2" PG 64 -22
2,410 TON
80.00 $ 192,800.00
79.00
$ 190,390.00
97.65
$ 235,336.50
78.00
$ 187,980.00
75.00
$ 180,750.00
15
5 -04
HMA Cl. 1/2" PG 70 -22
40 TON
$ 140.00 $
5,600.00
$ 200.00
$ 8,000.00
$ 139.63
$ 5,585.20
$ 110.00
$ 4,400.00
$ 110.00
$ 4,400.00
16
5 -04
HMA for Pavement Repair Cl. 1/2" PG 64 -22
3,270 1 TON
$ 100.00 $
327,000.00
$ 106.00
$ 346,620.00
$ 119.53
$ 390,863.10
90.00
$ 294,300.00
75.00
$ 245,250.00
17
5 -04
HMA for Pavement Repair Cl. 1/2" PG 70 -22
120 TON
$ 130.00 $
15,600.00
$ 130.00
$ 15,600.00
114.51
$ 13,741.20
$ 103.00
$ 12,360.00
85.00
$ 10,200.00
18
5 -04
Thickened Edge
1,170 LF
$ 3.00 $ 3,510.00
3.00
$ 3,510.00
1.13
$ 1,322.10
1.00
$ 1,170.00
1.50
$ 1,755.00
19
5 -04
Planing Bituminous Pavement
7,020 SY
$ 5.00 $
35,100.00
10.00
$ 70,200.00
10.14
$ 71,182.80
6.00
$ 42,120.00
8.00
$ 56,160.00
20
7 -12
Adjust Water Valve
15 EA
$ 450.00 $
6,750.00
$ 560.00
$ 8,400.00
$ 606.25
9,093.75
$ 300.00
$ 4,500.00
$ 300.00
$ 4,500.00
21
7 -12
Adjust Water Meter Box
1 EA
$ 500.00 $
500.00
$ 620.00
$ 620.00
$ 718.75
718.75
345.00
345.00
$ 350.00
$ 350.00
22
8 -01
Erosion/Water Pollution Control
1 FA
$ 9,500.00 $
9,500.00
$ 9,500.00
$ 9,500.00
$ 9,500.00
$ 9,500.00
$ 9,500.00
$ 9,500.00
$ 9,500.00
$ 9,500.00
23
8 -01
Inlet Protection
58 EA
$ 60.00 $ 3,480.00
85.00
$ 4,930.00
75.00
$ 4,350.00
52.00
$ 3,016.00
75.00
$ 4,350.00
24
8 -04
Cement Conc. Traffic Curb and Gutter
660 LF
$ 35.00 $
23,100.00
50.00
$ 33,000.00
18.75
12,375.00
30.00
$ 19,800.00
26.85
$ 17,721.00
25
8 -04
26
8 -06
27
8 -13
Cement Conc. Curb Cut
Cement Conc. Driveway Entrance
Adjust Monument Case and Cover
2 EA
$ 1,200.00 $
2,400.00
$ 1,500.00
$ 3,000.00
250.00
500.00
$ 1,500.00
$ 3,000.00
$ 350.00
$ 700.00
30
SY
$ 90.00 $
2,700.00
165.00
$ 4,950.00
39.06
$ 1,171.80
60.00
$ 1,800.00
53.50
$ 1,605.00
4
EA
500.00 $
2,000.00
$ 560.00
$ 2,240.00
606.25
$ 2,425.00
$ 300.00
$ 1,200.00
$ 300.00
$ 1,200.00
TRAFFIC SIGNALS(SCHEDULEA)
28
8 -20
Traffic Signal Modifications (Andover Park W & Minkler Blvd), Complete
1
LS
$ 2,600.00
$ 2,600.00
$ 5,000.00
$ 5,000.00
$ 8,750.00
$ 8,750.00 1
$ 7,350.00
$ 7,350.00
$ 5,000.00
$ 5,000.00
29
8 -20
Traffic Signal Modifications (Andover Park E & Minkler Blvd), Complete
1
LS
$ 29,700.00
$ 29,700.00
$ 13,100.00
$ 13,100.00
$ 20,000.00
$ 20,000.00
$ 16,600.00
$ 16,800.00
$ 13,052.50
$ 13,052.50
30
8 -20
Traffic Signal Modifications (Andover Park E & Costco Drive), Complete
1
LS
$ 11,900.00
$ 11,900.00
$ 13,100.00
$ 13,100.00
$ 17,500.00
$ 17,500.00
$ 14,700.00
$ 14,700.00
$ 13,052.50
$ 13,052.50
SIDEWALK (SCHEDULE A)
31
8 -14
Cement Conc. Sidewalk
50
SY
$ 65.00
$ 3,250.00
$ 125.00
$ 6,250.00
$ 39.06
$ 1,953.00
$ 55.00
$ 2,750.00
$ 46.30
$ 2,315.00
32
8 -14
Cement Conc. Curb Ramp Type Parallel A
2
EA
$ 1,500.00
$ 3,000.00
$ 5,800.00
$ 11,600.00
$ 1,218.75
$ 2,437.50
$ 1,300.00
$ 2,600.00
$ 980.00
$ 1,960.00
33
8 -15
Cement Conc. Curb Ramp Type PerpendicularA
2
EA
$ 1,200.00
$ 2,400.00
$ 5,800.00
$ 11,600.00
$ 1,218.75
$ 2,437.50
$ 1,600.00
$ 3,200.00
$ 1,420.00
$ 2,840.00
STORM DRAINAGE (SCHEDULEA)
34
7 -05
Adjust Catch Basin
I 31
EA
$ 450.00
$
13,950.00
$ 700.00
$ 21,700.00
$ 856.25
$ 26,543.75
$ 405.00
$ 12,555.00
$ 750.00
$ 23,250.00
35
7 -05
Storm Drain Marker
33
EA
$ 25.00
$
825.00
I $ 100.00
$ 3,300.00
I $ 123.75
$ 4,083.75
$ 104.00
$ 3,432.00
I $ 99.00
$ 3,267.00
SANITARY SEWER (SCHEDULEA)
1
36 1 7 -05 Adjust Manhole 1 21 1 EA 1 $ 600.00 1 $
12,600.00) $ 700.00 1 $ 14,700.00 I $ 856.25 1 $ 17,981.25 1 $ 403.00 1 $ 8,463.00 1 $ 750.00 1 $ 15,750.00
TRAFFIC CONTROL DEVICES (SCHEDULE A)
37
8 -09
Raised Pavement Marker Type 1
36
HUND
$ 275.00
$ 9,900.00
$ 450.00
$ 16,200.00
$ 390.00
$ 14,040.00
$ 327.00
$ 11,772.00
$ 312.00
$ 11,232.00
38
8 -09
Raised Pavement Marker Type 2
10
HUND
$ 400.00
$ 4,000.00
$ 500.00
$ 5,000.00
$ 498.75
$ 4,987.50
$ 418.00
$ 4,180.00
$ 399.00
$ 3,990.00
39
8 -21
Permanent Signing
1
EA
$ 400.00
$ 400.00
$ 500.00
$ 500.00
$ 650.00
$ 650.00
$ 1,600.00
$ 1,600.00
$ 500.00
$ 500.00 ,
40
8 -22
Plastic Traffic Arrow
8
EA
$ 120.00
$ 960.00
$ 150.00
$ 1,200.00
$ 360.00
$ 2,880.00
$ 302.00
$ 2,416.00
$ 288.00
$ 2,304.00
41
8 -22
Plastic Railroad Crossing Symbol
4
EA
$ 700.00
$ 2,800.00
$ 285.00
$ 1,140.00
$ 1,875.00
$ 7,500.00
$ 1,570.00
$ 6,280.00
$ 1,500.00
$ 6,000.00
42
8 -22
Plastic Stop Line
310
LF
$ 10.00
$ 3,100.00
$ 6.50
$ 2,015.00
$ 12.50
$ 3,875.00
$ 10.50
$ 3,255.00
$ 10.00
$ 3,100.00
43
8 -22
Plastic Crosswalk Line
380
SF
$ 8.00
$ 3,040.00
$ 5.00
$ 1,900.00
$ 9.44
$ 3,587.20
$ 7.90
$ 3,002.00
$ 7.55
$ 2,869.00
44
8 -22
Plastic Shared Lane Marking
10
EA
$ 120.00
$ 1,200.00
$ 350.00
$ 3,500.00
$ 360.00
$ 3,600.00
$ 302.00
$ 3,020.00
$ 288.00
$ 2,880.00
45
8 -22
Plastic Line, 8 Inch
1,360
LF
$ 2.00
$ 2,720.00
$ 2.35
$ 3,196.00
$ 2.35
$ 3,196.00
$ 2.00
$ 2,720.00
$ 1.88
$ 2,556.80
46
8 -22
Plastic Line, 4 Inch
350
LF
$ 1.50
$ 525.00
$ 1.50
$ 525.00
$ 1.13
$ 395.50
$ 0.94
$ 329.00
$ 0.90
$ 315.00
47
8 -22
Fort Dent Way Driveway Striping
1
LS
$ 1,000.00
$ 1,000.00
$ 350.00
$ 350.00
$ 1,875.00
$ 1,875.00
$ 1,570.00
$ 1,570.00
$ 1,500.00
$ 1,500.00
48
8 -23
Temporary Paint Line
10,444
LF
$ 0.50
$ 5,222.00
$ 0.15
$ 1,566.60
$ 0.18
$ 1,879.92
$ 0.25
$ 2,611.00
$ 1.00
$ 10,444.00
ROADSIDE DEVELOPMENT (SCHEDULE A)
49
8 -02
Property Restoration
1
FA
$ 18,000.00
$ 18,000.00
I $ 18,000.00
$ 18,000.00
$ 18,000.00
$ 18,000.00
$ 18,000.00
$ 18,000.00
$ 18,000.00
$ 18,000.00
50
8 -26
Replace Starfire Gate Receiving Post Foundation
1
LS
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
I $ 2,500.00
$ 2,500.00
$ 1,600.00
$ 1,600.00
$ 1,000.00
$ 1,000.00
FRANCHISE UTILITY ITEMS (SCHEDULE A)
51
8 -19
Adjust Franchise Utility ManholeNault
52
8 -19
Adjust Gas Valve
2
EA
$ 700.00
3
EA
$ 500.00
1,400.00 I $ 2,000.00
1,500.00 $ 600.00
$ 4,000.00 I $
$ 1,800.00 $
868.75
356.25
$ 1,737.50 I $
$ 1,068.75 $
405.00
300.00
$ 810.00 I $
725.00
$ 900.00 $ 300.00
1 of 2
$ 1,293,682.60
$ 1,215,861.00
$ 1,450.00I
900.00
$ 1,217,288.80
r\
CITY OF TUKWILA
DEPARTMENT OF PUBLIC WORKS
2016 Overlay Program
BID TABULATION
May 3, 2016
ENGINEER'S ESTIMATE
TUCCI & SONS
MILES RESOURCES
ICON MATERIALS
INo. Spec
I� I p I
Item
Quantity Unit
I C I I
Unit Cost
I
Total Cost
Unit Price
I
Total Cost
Unit Price
Total Cost
Unit Price
Total Cost
ROADWAY (SCHEDULE B)
Total Schedule B
53
1 -04
Unexpected Site Changes
1
FA
$ 2,000.00
$ 2,000.00
$ 2,000.00
$ 2,000.00
$ 2,000.00
$ 2,000.00
$ 2,000.00
$ 2,000.00
$ 2,000.00
$ 2,000.00
54
1 -07
Resolution of Utility Conflicts
1
FA
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
55
1 -07
SPCC Plan
1
LS
$ 100.00
$ 100.00
$ 100.00
$ 100.00
$ 562.50
$ 562.50
$ 1,600.00
$ 1,600.00
$ 1,500.00
$ 1,500.00
56
1 -09
Mobilization
1
LS
$ 5,300.00
$ 5,300.00
$ 4,000.00
$ 4,000.00
$ 7,355.67
$ 7,355.67
$ 4,800.00
$ 4,800.00
$ 5,000.00
$ 5,000.00
57
1 -10
Project Temporary Traffic Control
1
LS
$ 10,000.00
$ 10,000.00
$ 2,500.00
$ 2,500.00
$ 4,454.13
$ 4,454.13
$ 3,000.00
$ 3,000.00
$ 2,000.00
$ 2,000.00
58
2 -02
Removal of Structure and Obstruction
1
LS
$ 500.00
$ 500.00
$ 1,000.00
$ 1,000.00
$ 1,900.00
$ 1,900.00
$ 100.00
$ 100.00
$ 500.00
$ 500.00
59
2 -03
Unsuitable Foundation Excavation Incl. Haul
40
CY
$ 33.00
$ 1,320.00
$ 50.00
$ 2,000.00
$ 40.24
$ 1,609.60
$ 25.00
$ 1,000.00
$ 25.00
$ 1,000.00
60
2 -03
Gravel Borrow Incl. Haul
120
TON
$ 25.00
$ 3,000.00
$ 32.00
$ 3,840.00
$ 40.24
$ 4,828.80
$ 19.00
$ 2,280.00
$ 10.00
$ 1,200.00
61
5 -04
Pavement Repair Excavation Incl. Haul
191
CY
$ 72.00
$ 13,752.00
$ 75.00
$ 14,325.00
$ 37.75
$ 7,210.25
$ 60.00
$ 11,460.00
$ 60.00
$ 11,460.00
62
5 -04
HMA Cl. 1/2" PG 64 -22
390
TON
$ 80.00
$ 31,200.00
$ 78.00
$ 30,420.00
$ 85.78
$ 33,454.20
$ 77.00
$ 30,030.00
$ 80.00
$ 31,200.00
63
8 -01
Erosion/Water Pollution Control
1
FA
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
$ 1,000.00
TRAFFIC CONTROL DEVICES(SCHEDULEB)
64
8 -22
Plastic Traff c Arrow
1
EA
$ 120.00
$
120.00
$ 350.00
$
350.00
I $ 360.00
$
360.00
$ 302.00
$ 302.00
$ 288.00
$ 288.00
65
8 -22
Paint Line, 4 Inch
760
LF
$ 1.50
$
1,140.00
I $ 1.25
$
950.00 J
$ 2.50
$
1,900.00
$ 210.00
$ 159,600.00
$ 2.00
$ 1,520.00
ROADSIDE ,DEVELOPMENT(SCHED ULEB)
66 1 8 -02 Property Restoration
1 FA 1 $ 1,000.00 1 $
$
1,000.00 1 $ 1,000.00 1 $
71,432.00
SCHEDULE B SUBTOTALS $ 71,432.00
TOTAL CONSTRUCTION COST
(SCHEDULE A +B)
$ 1,296,184.00
ENGINEER'S
ESTIMATE
2 of 2
1,000.00 1 $ 1,000.00 1 $
64,485.00
$ 1,358,167.60
TUCCI & SONS
1,000.00 $ 1,000.00 1 $ 1,000.00 1 $
68,635.15
$ 1,544,568.26
MILES
RESOURCES
219,172.00
$ 1,435,033.00
ICON MATERIALS
1,000.00 1 $ 1,000.00 I
60,668.00