Loading...
HomeMy WebLinkAboutRes 1882 - 2017-2022 Transportation Improvement ProgramCl*ty o u 1a Washington Resolution No. 1882 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2017- 2022), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six-Year Transportation Improvement Program for the ensuing six calendar years (2017-2022); and WHEREAS, on June 13, 2016, a public hearing was held regarding the City's Six- Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A Six-Year Transportation Improvement Program for the calendar years 2017 to 2022, attached hereto as Exhibit A, is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. WAWord Processing\Resolutions\TIP 2017-2022 5-20-16 CK:bjs Page 1 of 2 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this � QrO day of 7a-i7/j Q_ 12016. ATTEST /AUTHENTICATED: Christy O'F191herty, MMC, City Mirk APPROVED AS TO FORM BY: (Tulu - Rachel B. Turpin, City Attorney Q�� ZLLA� Voe Duffie, C&n*cil President Filed with the City Clerk: -is- Passed by the City Council: Resolution Number: ) YYA Exhibit A: City of Tukwila Six-Year Transportation Improvement Program for 2017 to 2022 WAWord ProcessingResolutions\TIP 2017-2022 5-20-16 CK:bjs Page 2 of 2 2017 -2022 TIP DRAFT 2017 - 2022 TIP SUMMARY 2016 CIP PROJECT TITLE Page No. 2017 Project Costs in Thousands of Dollars 2018 2019 2020 2021 2022 TOTAL June 6, 2016 FUNDING SOURCES Federal State/T113 Developer Unsecured City 1 42 -42nd Ave S (S 160 St - S 131 PI) 2 4,807 2,031 0 0 0 4360 11,198 11,198 2 53rd Ave S (S 137th St - S 144th St) 6 2,354 2,353 0 0 0 0 4,707 2,141 2,566 3 ADA Improvements 20 200 200 200 200 200 200 1,200 1,200 4 APE /Industry Dr Intersection 25 85 657 0 0 0 0 742 742 5 APE /Minkler Blvd Intersection 24 144 1,570 0 0 0 0 1,714 1,714 6 Annual Bridge Inspections and Repairs 10 270 335 335 335 335 335 1,945 1,945 7 Annual Overlay and Repair Program 18 1,650 1,670 1,725 1,730 1,745 1,760 10,280 10,280 8 Beacon Ave Bridge Preventative Maintenance - 1,741 0 0 0 0 0 1,741 1,741 0 9 BNSF Regional Center Access 13 0 0 0 0 0 13,750 13,750 11,763 1,987 10 Boeing Access Rd Bridge Rehabilitation 11 10,846 0 0 0 0 0 10,846 8,626 2,220 11 Cascade View Safe Routes to School Phase 2 3 783 0 0 0 0 783 700 83 12 Frank Zepp Bridge Preventative Maintenance 2,535 0 0 0 0 0 2,535 2,535 0 13 Grady Way Bridge Preventative Maintenance 149 0 0 0 0 0 149 149 0 14 Multipurpose Trails 35 60 60 60 60 60 220 520 520 15 S 133 SUSR599 Intersection 27 0 335 2,064 0 0 0 2,399 2,399 16 S 144th St Bridge Sidewalks - 0 0 0 0 0 1,219 1,219 975 244 17 Strander Blvd /SW 27th St St Phase III 28 0 5,000 0 0 1,329 51,000 57,329 29,325 28,004 18 TUC/TOD Pedestrian Improvements 29 1,283 1,260 0 425 1,725 4,693 3,311 1,382 19 TUC - Pedestrian /Bicycle Bridge 12 6,185 0 0 0 0 0 6,185 5,289 896 20 21 Walk & Roll Program West Valley Highway 22 - 0 0 0 0 0 0 0 374 0 1,334 175 1,500 175 3,208 1,792 150 175 1,266 TOTAL 33,092 15,471 4,384 3,124 6,728 74,519 137,318 59,125 9,222 150 - 68,821 PROJECTS REVISED FROM 2015 -2020 TIP New: Deleted: None W Valley Hwy /S 156th St Intersection Project has been combined with the West Valley Hightway (1 -405 - Strander Blvd) project. Adft W"hhVilonato Deparb"oMt st of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m CN 2017 Totals 0 2,031,000 0 6,868,000 6,868,000 P CN 2021 0 0 4,360,000 4,360,000 Totals 0 0 11,228,000 11,228,000 0 0 I A. PIN/Project No. B. STIP ID > CD 0 0 < CD 0 z C. Project Title X > RL 0 D. Road Name or Number CL 0 CL 0 0 r- (D M — a- ty E. Begin & End Termini Z 9 3 CD z 0 CL --4 1< c W — CD F. Project Description G. Structure ID Q . I P M CA V CD a 17 WA-07745 06/13/16 06/20/16 04 C G O P S Yes T W 40-42 Ave S IS 160 St - S 131 PL) S 160th Street to Southcenter Blvd Design and construct street improvements, underground aerial utilities, drainage, sidewalks, bike facilities, and driveway adjustments Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 Totals 0 2,031,000 0 6,868,000 6,868,000 P CN 2021 0 0 4,360,000 4,360,000 Totals 0 0 11,228,000 11,228,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 4,807,000 2,031,000 0 0 4,360,000 Totals 4,807,000 2,031,000 0 0 4,360,000 Report Date: June 06, 2016 Page 1 Amh WaShingtoo $1loto Departumat of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m CN 2017 Totals 0 TIB 2,141,400 2,565,600 4,707,000 Totals 0 2,141,400 2,565,600 4,707,000 X 0 0 0 A: A. PIN/Project No. B. STIP ID > 3 M U) 0 C 0 %< Z C. Project Title > M X D. Road Name or Number (D 0 0 0 CD M tr E. Begin & End Termini 0) M '0 — (D z -q 0 CL C. 0) CD F. Project Description G. Structure ID M P M M a 0- 17 WA-06601 06/13/16 06/20/16 04 C G O P S 0.420 CE Yes TW 53rd Avenue S S 137th St to S 144th St Design and construct urban residential street improvements that include curb, gutter, sidewalk , illumination and undergrounding. Street portion will coordinate with Water, Surface Water and Sewer capital improvement program projects. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 Totals 0 TIB 2,141,400 2,565,600 4,707,000 Totals 0 2,141,400 2,565,600 4,707,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,353,500 2,353,500 0 0 0 Totals 2,353,500 2,353,500 0 0 0 Report Date: June 06, 2016 Page 2 Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m ALL 2017 Totals 0 200,000 0 1,200,000 1,200,000 Totals 0 0 1,200,000 1,200,000 0 A. PIN/Project No. B. STIP ID > 3 0 < 0 M Z C. Project Title M > EL CD 0 D. Road Name or Number CL 0 CL 0 0 r- 01 a 11 5- rr E. Begin & End Termini a M M z 4� 0 CL U3 U) CD F. Project Description G. Structure ID (a M Q. 0 M M CL 00 WA-05405 06/13/16 06/20/16 06 No Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2017 Totals 0 200,000 0 1,200,000 1,200,000 Totals 0 0 1,200,000 1,200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 200,000 200,000 200,000 200,000 400,000 Totals 200,000 200,000 200,000 200,000 400,000 Report Date: June 06, 2016 Page 3 Aftk� w0shil"ato" $11talho Departmwit of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m PE 2017 RW 0 0 0 75,000 75,000 P RW 2017 0 0 0 0 10,000 10,000 P CN 2018 0 0 0 657,000 "n 0 I A. PIN/Project No. B. STIP ID 0 > a M (A 0 0 (D C 1< z C. Project Title X > CD X 0 D. Road Name or Number 0. 0 CL 0 0 CD 0 M — 0) rr E. Begin & End Termini W a z 0 CL to v S. 0 0) M Description G. Structure ID F. Project De to Q. 0 "a M M 1 0 "a W a Q. 16 WA-03766 06/13/16 06/20/16 05 C G O P S 0.190 CE No TW Andover Park E/Industry Drive Signal Andover Park E Industry Drive to Design and construct a traffic signal and intersection improvements Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2017 RW 0 0 0 75,000 75,000 P RW 2017 0 0 0 0 10,000 10,000 P CN 2018 0 0 657,000 657,000 1 Totals 0 0 742,000 742I000 Expenditure Schedule Phase list 2nd 3rd 4th 5th & 6th PE 75,000 0 0 0 0 RW 10,000 0 0 0 0 CN 0 657,000 0 0 0 Totals 85,000 1 657,0001 01 O'l 0 Report Date: June 06, 2016 Page 4 AM. w4shl"Oul"Swo Depwtavent of Transportatkm Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m PE 2017 RW 0 0 0 134,000 134,000 P RW 2017 0 0 0 0 10,000 10,000 P CN 2018 0 0 1,570,000 -n 0 A. PIN/Project No. B. STIP ID 1 01 > X (D 0 0 0 < C 0 0 X -Z C. Project Title > 3 M W M Z D. Road Name or Number m CL CL 0 0 (D M E. Begin & End Termini 0 V 3 CD z 0 CL F. Project Description G. Structure ID Q 0 M (D 16 WA-07746 06/13/16 06/20/16 03 C G O P S No T W Andover Park E/Minkler Blvd Intersection Andover Park E Minkler Blvd to Construct left turn lanes on Andover Park East and reconstruct traffic signal Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2017 RW 0 0 0 134,000 134,000 P RW 2017 0 0 0 0 10,000 10,000 P CN 2018 0 0 1,570,000 1,570,000 Totals 0 1 01 1,714,0001 1,714,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 134,000 0 0 0 0 RW 10,000 0 0 0 0 CN 0 1,570,000 0 0 0 Totals 1 144,000 0 0 Report Date: June 06, 2016 Page 5 Awk, sude V Depwtomt of TransportnUon Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m ALL 2017 Totals 0 335,0001 0 1,945,000 L 1,945,000 0 0 0 1,945,0001 -n 0 1 1z A. PIN/Project No. B. STIP ID > CD U) 0 < M C 0 Z C. Project Title X > =1 M m X D. Road Name or Number CD 0 CL 0 0 r- M 0 0 Cr E. Begin & End Termini M z 0 CL S. U) w F. Project Description G. Structure ID Co CL P M U) 3 M 14 WA-03731 06/13/16 06/20/16 06 No Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi-annual inspections as well as construct necessary repairs and maintenance Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2017 Totals 0 335,0001 0 1,945,000 L 1,945,000 Totals 0 0 1,945,0001 1,945,000 Expenditure Schedule Phase 1st 2nd I 3rd 4th 5th & 6th ALL 270,000 335,0001 335,000 335,000 670,000 Totals 270,000 335,0001 335,000 335,000 670,000 Report Date: June 06, 2016 Page 6 AM, vrW"hingto" $tote o .pt...t of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 202fl. Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code 1 Federal Funds State Fund Code State Funds Local Funds Total Funds m ALL 2017 Totals 0 1,670,0001 0 10,280,000 X 0 0 0 10,280,000 - n 0 A. PIN/Pro ect No. B. STIP ID j > 3 M 0 0 < C 0 3 z C. Project Title > M C D. Road Name or Number so CL 0 CL 0 0 E. Begin & End Termini Z 0 M (A F. Project Description G. Structure ID CL 0 M (n CD CL 16 WA-03733 06/13/16 06/20/16 06 C G O P S No T W Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program Funding Status Phase Phase Start Year (YYYY) Federal Fund Code 1 Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2017 Totals 0 1,670,0001 0 10,280,000 10,280,000 Totals 0 0 10,280,000 10,280,000 Expenditure Schedule Phase 1st 2nd I 3rd 4th 5th & 6th ALL 1,650,000 1,670,0001 1,725,000 1,730,000 3,505,000 Totals 1,650,000 1,670,0001 1,725,000 1,730,000 3,505,000 Report Date: June 06, 2016 Page 7 Allift vro Departammt of Trwispartatim Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m CN 2017 STP(BR) 1,740,920 0 0 0 M 0 1,740,920 0 01 "n 0 1 A. PIN/Pro ect No. B. STIP ID > 3 0 < C 0 Z C. Project Title X > X D. Road Name or Number (D 0 CL 0 0 r- M M .0 3 rr E. Begin & End Termini 0) 3 z 0 M S. M F. Project Description G. Structure ID (a 0. P (D Q. 19 /1320(004) TUK-57 06/13/16 06/20/16 14 0.010 CE No Beacon Ave S Bridge Preventative Maintenance Project Beacon Avenue South over South Ryan Way S Victor St to S 170th St Remove and replace failed bridge deck and paint structural steel. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 STP(BR) 1,740,920 0 0 0 1,740,920 Totals 1,740,920 0 01 1,740,920 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,740,920 0 0 0 0 Totals 1,740,920 0 0 0 0 Report Date: June 06, 2016 Page 8 Adak Washw*W" stido Depadnwat of Transportaftm Agency: Tukwila County: King MP0/RTP0: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m PE 2021 FMSIB 950,000 0 0 300,000 M P CN 2021 FIVISIB 10,812,500 -n 0 M 17 A. No. B. STIP ID PIN /Project 12,500,000 Totals > 3 (D 0 0 < M 3 1,987,500 0 Z C. Project Title > 5� CD X M n D. Road Name or Number (D 0 0 0 M E. Begin & End Termini °_+ z 0 0 C. M F. Project Description G. Structure ID M 0- �L P "a CD (D U) 5 M 00 WA05409 06/08/15 06/15/15 08 EIS No BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center, relocating the .900+ daily truck trips from residential streets in Allentown. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 FMSIB 950,000 0 0 300,000 1,250,000 P CN 2021 FIVISIB 10,812,500 13,750,0001 0 1,687,500 12,500,000 Totals 11,762,500 0 1,987,500 13,750,000 Expenditure Schedule Phase list 2nd 3rd 4th 5th & 6th PE 0 0 0 0 12,500,000 CN 0 0 0 0 1,250,000 Totals 0 0 0 0 13,750,0001 Report Date: June 06, 2016 Page 9 Adffhk, 400 washil"oolm stato Vro Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m CN 2017 o 8,625,600 0 0 2,220,000 X V 0 8,625,600 0 2,220,000 10,845,600 0 A. PIN/Project No. B. STIP ID > 9 M U) 0 < C 0 3 (D z C. Project Title = > M D. Road Name or Number CD CL 0 CL 0 0 CD U E. Begin & End Termini su M. z -4 0 CL C. F. F. Project Description G. Structure ID CL 0 CD M M a CL 14 /1380(003) TUK-52 06/13/16 06/20/16 14 0.200 DCE Yes Boeing Access Road Bridge Rehabilitation Boeing Access Road Interstate 5 to Airport Way South Rehabilitate the existing Boeing Access Road bridge structure over the Burlington Norther and Union Pacific Railroads. Work will include rehabilitation of the bridge sub-structure, seismic retrofit, and construction of a new bridge deck including pedestrian/bicycle amenities. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 STP(BR) 8,625,600 0 0 2,220,000 10,845,600 Totals 8,625,600 0 2,220,000 10,845,600 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 10,845,600 0 0 0 0 Totals 10,845,600 0 0 0 0 Report Date: June 06, 2016 Page 10 Aft 0" Wa6bb"llft" ftot* vro .p..t...t of TrmsportaUw Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m CN 2017 SRTS 699,745 01 0 83,353 X V a 699,745 0 83,353 -n 0 M. q A. PIN/Project No. B. STIP ID > 3 CD 0 0 < CD C 0 C z C. Project Title = > Q CD 0 c D. Road Name or Number (D CL 0 CL 0 0' E. Begin & End Termini :3 z 0 04 to 0 0) 0 — M F. Project Description G. Structure ID CL P CD M CL 00 /1320(005) TUK-58 06/13/16 06/20/16 28 0.510 CE No Cascade View Elementary Safe Routes to School Project - Phase 2 33rd Ave S and S 140th Street S. 144th at 34th Ave. S. to 140th St at 34th Ave. S. Concrete sidewalks are proposed on one side of 33rd Ave S (S 140th St to S 144th St) and onone side of S. 140th St (Military Road South to 34th Ave S) along with a standard curb and gutter separating the sidewalk from the roadway. A traffic circle is proposed at the intersection of 33rd Ave S and S 140th St to assist inreducing vehicle speeds and increase visibility and safety of pedestrians crossing the street. Curb bulb-outs and/or pedestrian refuge islands at the east entrance/exit to the traffic circle would be constructed to improve the safety ofcrossing S 140th St at 33rd Ave S. There are currently no ADA facilities to connect to within the project limits. Minor storm water improvements will be added to the general action area. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 SRTS 699,745 01 0 83,353 783,098 Totals 699,745 0 83,353 783,098 Expenditure Schedule Phase 1st 2nd I 3rd 4th 5th & 6th CN 783,098 01 0 0 0 Totals 783,098 01 0 0 0 Report Date: June 06, 2016 Page 11 A111101116 W004"QU)" stave ftp.....t of Transpwitalklica Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m CN 2017 STP(BR) 2,534,812 01 0 0 2,534,812 13 0 2,534,812 0 0 -n 0 -Z A. PIN/Pro ect No. B. STIP ID i > 3 CD W 0 < C z C. Project Title X > C D. Road Name or Number CL 0 0 0 r- M U 0 rr E. Begin & End Termini V z 0 0. to at F. Project Description Structure ID ription G. Struct to M CL P M M 0 — V M CL 16 /1274(009) TUK-55 06/13/16 06/20/16 14 0.040 CE No Frank Zepp Bridge Preventative Maintenance Project S 180th Street over the Green River SIR 181 - West Valley Highway to Sperry Drive S Paint the structural steel, overlay deck and replace the deck joint, and install seismic protection. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 STP(BR) 2,534,812 01 0 0 2,534,812 Totals 2,534,812 0 0 2,534,812 Expenditure Schedule Phase 1st 2nd I 3rd 4th 5th & 6th CN 2,534,812 01 0 0 0' Totals 2,534,812 01 0 0 0 Report Date: June 06, 2016 Page 12 Aft1h► Depwt W"h" ment Mao of Transpwtatkm Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (Y("Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m CN 2017 STP(BR) 148,574 0 0 0 X 0 148,574 0 0 148,574 0 I A. PIN/Project No. B. STIP ID > M 0 0 < M a — --I 0 9 z C. Project Title > m X D. Road Name or Number CL 0 C L 0 0 r- M rr E. Begin & End Termini go V M z -4 0 CL to 0 - M F. Project Description G. Structure ID (a CD CL 0 M M (A M 14 /1288(005) TUK-56 06/13/16 06/20/16 14 0.230 CE No Grady Way Bridge Preventative Maintenance Project Grady Way Bridge over BN and UP Railroads Interurban Avenue S to Longacres; Drive SW, Renton Retrofit existing bridge with seismic protection. Funding Status Phase Phase Start Year (Y("Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 STP(BR) 148,574 0 0 0 148,574 Totals 148,574 0 0 148,574 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 148,574 0 0 0 0 Totals 148,574 0 0 0 0 Report Date: June 06, 2016 Page 13 Aftil► WWA409Stat""e Department of Transportatka Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m CN 2017 o 0 60,0001 0 520,000 ;a 0 0 0 520,000 -n 0 A. PIN/Project No. B. STIP ID > M U) 0 < = 0 z z C. Project Title X > M 0 = C D. Road Name or Number M CL 0 0 - 0 0 U 0 = a U E. Begin & End Termini a) 1. V 9 z -1 �< 0 0. C. U) RL CD F. Project Description G. Structure ID a 0 M U) = M CL 00 WA -03783 06/13/16 06/20/16 28 CE No Multipurpose Trails to Wide array of necessary trail improvements to existing trail system infrastructure Funding Status Phase Phase Start Year Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 Totals 0 60,0001 0 520,000 520,000 Totals 0 0 520,000 520,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 60,000 60,0001 60,000 60,000 280,000 Totals 60,000 60,0001 60,000 60,000 280,000 Report Date: June 06, 2016 Page 14 Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m PE 2018 RW 0 25,000 0 310,000 310,000 P RW 2018 2,064,000 0 0 0 25,000 25,000 P CN 2019 0 0 2,064,000 -n 0 z A. PIN/Project No. B. STIP ID 1 70 > 3 CD U) 0 < M — 0 0 C z C. Project Title > a CD -- 0 = C D. Road Name or Number 0. 0 CL 0 0 -20. 0 U 0 = 9 rr E. Begin & End Termini 'o 3 z 'V 0 CL Co 0 0 aL M F. Project Description G. Structure ID CL P M M M — M a CL 16 WA-07748 06/13/16 06/20/16 04 C G O P S No T W S 133 StISR599 Southbound Intersection S 133rd Street SR 599 Southbound Ramps to S 134th PI Construct intersection improvements including signalization or roundabout, lighting, crosswalks, and drainage. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2018 RW 0 25,000 0 310,000 310,000 P RW 2018 2,064,000 0 0 0 25,000 25,000 P CN 2019 0 0 2,064,000 2,064,000 Totals 01 1 70 7 2,399,0001 2,399,0001 Expenditure Schedule Phase list 2nd 3rd 4th 5th & 6th PE 0 310,000 0 0 0 RW 0 25,000 0 0 0 CN 0 0 2,064,000 0 0 Totals 1 01 335,0001 2,064,000 01 0 Report Date: June 06, 2016 Page 15 Allift Villashirwato" state Departnuat of Trwisportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m ALL 2021 STP(13R) 975,200 01 0 243,800 1,219,000 Totals 975,200 0 243,800 1,219,000 M V 0 0 0 I ;W A. PIN/Project No. B. STIP ID > 3 M U) 0 C 0 3 �< z C. Project Title X > RL D. Road Name or Number 0- 0 CL 0 0 r- M U 0 rr E. Begin & End Termini z 0 CL %:� S. aL F. Project Description G. Structure ID to M 0. 0 "a M M CL 17 WA03782 06/13/16 06/20/17 28 0.250 No S 144th St Bridge Sidewalks S 144th Street 51 st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1-5 between 51st Ave S and 53rd Ave S Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2021 STP(13R) 975,200 01 0 243,800 1,219,000 Totals 975,200 0 243,800 1,219,000 Expenditure Schedule Phase 1st 2nd I 3rd 4th 5th & 6th ALL 0 01 0 0 1,219,000 Totals 0 01 0 0 1,219,000 Report Date: June 06, 2016 Page 16 AM1► ftwW000" $W0 Department of Transportatbm Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m PE 2017 STP 3,892,500 0 0 607,500 M c RW 2018 0 1,254,250 5,100,0001 0 q A. PIN/Project No. B. STIP ID A. 1,450,000 P CN M (A 0 < M C — 0 3 M 1,000,000 6,000,000 z C. Project Title 2022 > 1 20,000,0001 (D 25,000,0001 03. Totals M 1 0 D. Road Name or Number M 0. 0 0 0 ei 67 tr E. Begin & End Termini — z 0 CL to F. Project Description G. Structure ID F. CL 0 M M U) M CL 16 WA-05410 06/13/16 06/20/16 01 EIS No Strander Blvd/SW 27th St Phase III Strander Boulevard E City Limits to West Valley Hwy/SR 181 Design and construct arterial improvements for a new roadway extending Strander Boulevard/SW 27th St from West Valley Highway to Oaksdale Ave Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2017 STP 3,892,500 0 0 607,500 4,500,000 P RW 2018 STP 1,254,250 5,100,0001 0 195,750 1,450,000 P CN 2022 FMSIB 5,000,000 0 1,000,000 6,000,000 P CN 2022 1 TIGER 111 1 20,000,0001 1 01 25,000,0001 45,000,000 Totals 1 30,146,7501 1 0 1 26,803,2501 56,950,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 5,000,000 0 0 0 RW 0 0 1,450,000 0 0 CN 0 0 0 . 0 5,100,0001 1 Totals 1 01 5,000,0001 1,450,0001 0 f— 5,100,000 Report Date: June 06, 2016 Page 17 Aft Depwtnwat of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m < PE 2017 STP(E) 439,420 0 0 68,580 X '0 RW 2020 0 173,000 1,725,000 o A. PIN /Project No. B. STIP ID 200,000 S �' o `�° 0 0 � � 3 Z C. Project Title 2018 y m Fi m 286,000 m Totals X 1 01 D. Road Name or Number m o 0 c o n r- c m E. Begin & End Termini �, a .. 3 V o a � 'i E• y m F. Project Description G. Structure ID a M o M y ? a 17 WA -03772 06/13/16 06/20/16 28 0.750 CE Yes TUC/TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Construct bike /pedestrian connection between the Tukwila Urban Center (TUC) and Tukwila Station, with service by Amtrak Sounder Commuter Rail/Transit Oriented Development (TOD) area. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2017 STP(E) 439,420 0 0 68,580 508,000 P RW 2020 STP(E) 173,000 1,725,000 0 27,000 200,000 S CN 2017 0 0 1,000,000 1,000,000 P CN 2018 STP(E) 2,699,000 0 286,000 2,985,000 Totals 3,311,420 1 01 1,381,580 4,693,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 283,000 0 0 225,000 0 RW 0 0 0 200,000 0 CN 1,000,000 1,260,000 0 0 1,725,000 Totals 1,283,000 1,260,000 0 425,000 1,725,000 Report Date: June 06, 2016 Page 18 wasm"ow stato Depwtment of Transpartatilan Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code 1 Federal Funds State Fund Code State Funds Local Funds Total Funds m CN 2017 Totals 0 OTHER 5,289,000 896,000 X 0 0 0 896,000 "n 0 1 A. PIN/Project No. B. STIP ID > 3 M 0 0 < M a -I 0 CD r- �< z C. Project Title > :1 CD su M 0 a D. Road Name or Number CL 0 CL 0 0 r- - M 115. 3 rr E. Begin & End Termini ID V M z 0 CL S. U) M IM M F. Project Description G. Structure ID I (a M I 0 M 0 CD 00 /1320(002) TUK-50 06/13/16 06/20/16 28 0.640 DCE Yes Tukwila Urban Center Pedestrian/Bicycle Bridge over Green River New bridge over the Green River, approximately between Baker Blvd (if extended) and Longacres Way (if extended) Baker Boulevard to West Valley Highway Construct a new pedestrian/bicycle bridge over the Green River Funding Status Phase Phase Start Year (YYYY) Federal Fund Code 1 Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2017 Totals 0 OTHER 5,289,000 896,000 6,185,000 Totals 0 5,289,000 896,000 6,185,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 6,185,000 0 0 0 0 Totals 6,185,000 01 0 0 0 Report Date: June 06, 2016 Page 19 Ad1bk washito" $11liallo Deparbnent of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds m PE 2021 Totals 0 0 0 175,000 X M 0 0 0 175,000 175,000 0 1 ;W A. PIN/Project No. B. STIP ID > M 0 0 < a -q 0, z C. Project Title > CD o a D. Road Name or Number CD 0 0 M 116 M tr E. Begin & End Termini a) M (D z IV 0 CL aL M F. Project De cture ID Description G. Structure 0 M M (D U) 00 WA-03761 06/08/15 06/15/15 28 No Walk & Roll Plan (Nonmotorized Transportation Plan) Various City Streets to Evaluate deficiencies and create a prioritized list of projects and recommended design standards. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 Totals 0 0 0 175,000 175,000 Totals 0 0 175,000 175,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 01 0 0 175,000 Totals 0 0 1 0 0 175,000 Report Date: June 06, 2016 Page 20 �w ., Agency: Tukwila County: King MPO /RTPO: PSRC Six Year Transportation Improvement Program From 2017 to 2022 Y Inside N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code 3 Local Funds Total Funds m < PE 2020 RW 0 0 0 340,000 M c RW 2020 0 0 -� 0 A. PIN /Project No. B. STIP ID 400,000 P CN o 3 ? 0 1,792,000 542,000 2,334,000 Totals C. Project Title y eo 3,074,000 m ,� d M n c D. Road Name or Number o o. o' n r °—' >v 0 a E. Begin & End Termini = V z ,� °c M w F. Project Description G. Structure ID a o N M a 14 WA03779 06/13/16 06/20/16 03 0.500 CE No West Valley Highway SR 181/West Valley Highway 1-405 to Strander Blvd Design and construct completion of 7 lane sections of West Valley Highway with sidewalks, curbs, gutters, storm drainage, lighting, and traffic control, including safety and capacity improvements at the S 156th St intersection. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 RW 0 0 0 340,000 340,000 P RW 2020 0 0 2,484,000 0 400,000 400,000 P CN 2021 0 TIB 1,792,000 542,000 2,334,000 Totals I 1,792,000 1,282,000 3,074,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 174,000 150,000 RW 0 0 0 200,000 200,000 CN 0 0 0 0 2,484,000 Totalsl 0 0 0 374,000 2,834,000 Report Date: June 06, 2016 Page 21 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 59,945,521 9,222,400 67,666,083 136,834,004 Report Date: June 06, 2016 Page 21 Christy O'Flaherty From: Christy O'Flaherty Sent: Tuesday, June 21, 2016 9:20 AM To: 'GregA@TIB.wa.gov' Cc: Bob Giberson Subject: Tukwila Transportation Improvement Program 2017-2022 June 21, 2016 TO: TRANSPORTATION IMPROVEMENT BOARD RE: CITY OF TUKWILA 2017-2022 TRANSPORTATION IMPROVEMENT PROGRAM Following is a link to City of Tukwila Resolution #1882 passed June 20, 2016, adopting the Transportation Improvement Program for 2017-2022. Res 1882 - 2017-2022 Transportation Improvement Program: httr)://records.tukwilawa.qovANebLink8/l/doc/271937/Pagel.aspx Please contact me with any questions at 206 433-1855. Please respond to this email to ensure it was received satisfactorily. Thank you. Sincerely yours, Christy O'Flaherty, MMC City Clerk Attachment xc: Bob Giberson, Public Works Director Christy O'Flaherty From: Christy O'Flaherty Sent: Tuesday, June 21, 2016 9:21 AM To: 'millarr@wsdot.wa.gov' Cc: Bob Giberson Subject: Tukwila Transportation Improvement Program 2017-2022 June 21, 2016 TO: WASHINGTON STATE DEPT OF TRANSPORTATION RE: CITY OF TUKWILA 2017-2022 TRANSPORTATION IMPROVEMENT PROGRAM Following is a link to City of Tukwila Resolution #1882 passed June 20, 2016, adopting the Transportation Improvement Program for 2017-2022. Res 1882 - 2017-2022 Transportation Improvement Program: http://records.tukwilawa.govNVebLink8/1 /doc/271937/Pagel.aspx Please contact me with any questions at 206 433-1855. Please respond to this email to ensure it was received satisfactorily. Thank you. Sincerely yours, Christy O'Flaherty, MMC City Clerk Attachment xc: Bob Giberson, Public Works Director 1 Christy O'Flaherty From: Christy O'Flaherty Sent: Tuesday, June 21, 2016 9:21 AM To: 'Andi Markley' Cc: Bob Giberson Subject: Tukwila Transportation Improvement Program 2017-2022 June 21, 2016 TO: PUGET SOUND REGIONAL COUNCIL RE: CITY OF TUKWILA 2017-2022 TRANSPORTATION IMPROVEMENT PROGRAM Following is a link to City of Tukwila Resolution #1882 passed June 20, 2016, adopting the Transportation Improvement Program for 2017-2022. Res 1882 - 2017-2022 Transportation Improvement Program: httr)://records.tukwilawa.govNVebLink8/l/doc/271937/Pagel.aspx Please contact me with any questions at 206 433-1855. Please respond to this email to ensure it was received satisfactorily. Thank you. Sincerely yours, Christy O'Flaherty, MMC City Clerk Attachment xc: Bob Giberson, Public Works Director 1