Loading...
HomeMy WebLinkAboutUtilities 2016-06-28 COMPLETE AGENDA PACKETCity of Tukwila Utilities Committee ❖ Kathy Hougardy, Chair ❖ Kate Kruller ❖ Thomas McLeod Distribution: G. Labanara K. Hougardy P. Brodin K. Kruller R. Turpin T. McLeod M Hart D. Robertson Clerk File Copy Mayor Ekberg 2 Extra D. Cline e-mail cover to: A. Le, L. Humphrey C. O'Flaherty, K. Hougardy, B. Giberson D. Aimberg, B. Saxton, F. Iriarte S. Norris, M. Hart, R. Tischrnak L. Humphrey TUESDAY, JUNE 28, 2016 — 5:30 Pm FOSTER CONFERENCE Room - 6300 Building Item Recommended Action Page 1. PRESENTATION(S) 2. BUSINESS AGENDA a) CBD Sanitary Sewer Rehabilitation/ a) Forward to 715116 Regular Pg. 1 Sewer Repair at 1227 Andover Park East Consent Agenda Budget Increase 3. ANNOUNCEMENTS 4. MISCELLANEOUS Future Agendas: Next Scheduled Meeting: Tuesday, July 12, 2016 SThe City of Tukwila strives to accommodate individuals with disabilities. Please contact the Public Works Department at 206-433-0179 for assistance. • 9A City of Tukwila Allan Ekberg, May A A Public Works Deportment - Bob Giberson, Director I Utilities Committee Bob Giberson, Public Works Director Mike Cusick, Senior Program Manager Mayor Ekberg June 24, 2016 SUBJECT: CBD Sanitary Sewer Rehabilitation/Sewer Repair at 1227 APE Project No. 91140203, Contract No. 16-039 Budget Increase ISSUE Approve budget increase in the amount of $33,000.00 with the R.L. Alia Company (Alia) for the Sewer Repair at 1227 Andover Park East (APE). BACKGROUND The contract with R.L. Alia for the repair of the sewer line at 1227 APE was approved by Council on March 14, 2016. The Notice to Proceed was issued to the contractor on March 23, 2016. The contractor began working on the project on March 24, 2016. The sewer repair work was completed on May 11, 2016, with final costs still under process. DISCUSSION Based on videoing of the sewer line on APE, the scope of the project only required the contractor to repair 65 feet of the sewer line. Once the contractor excavated and exposed the pipe, the condition of the pipe was far worse than the image seen in the video, resulting in the replacement of an additional 76 feet of sewer line. FISCAL IMPACT Cost Remaining 2016 Budget Original R.L. Alia Contract with Sales Tax $ 69,717.56 Construction Contingency 20% 13,943.51 Change Order No. 1 (time extension only) 0.00 Budget Increase Request 33,000.00 Total Construction 3116,661.07 $139,760.6 • N it Council is being asked to approve this budget increase in the amount of $33,000.00 to Contract 16-039 with R.L. Alia Company for the Sewer Repair Project at 1227 APE, and consider this item on the Consent Agenda at the July 5, 2016 Regular Council meeting. Attachment: CIP Draft Page 71 KIPW EngPROJECTSA- SW ProjecftXCBD Sewer Rehabilitafion (91 M03)\2016 SEWER REPAIR 2 COSTCO =16-039 Budget Inaeasekinto Wrno CO 2 contract 16-039 (3), pl, "-16 sb.docx CITY OF TUKWULA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: CBD Sanitary Sewer Rehabilitation 14153 The asbestos concrete pipe m the CBD (commercial business district) m approximately 45 years old and DESCRIPTION: becoming soft. Slip lining the pipe will reinforce the strength with little impact to roadways and minimal Closed excavation. CM |f the pipe coUapaeo'the aim*twiUhave tobeexcav�ed and the cost o| the mpaimwiUbeoignifioanL|n the last �W�T|�8�����N' ` five years wo have had two major pipe failures on Andover Park West. STATUS: A Public Works Trust Fund loan was successfully obtained in2012 for construction. K8AUNT.|K8P/CT: Reduced maintenance and repair costs. 20 The Umitouf the 2O13pn�ootioApVVto APE fmmMinkier Blvd 0nS18UthGt and wiUnow include the epair0o ���K8K��N7' - the sewer under the railroad tracks. FINANCIAL Through Eudmmmmd (inS000's) 2013 2014 2015 2016 2017 2018 2019 TOTAL EXPENSES CM 14153 23,380.00 18J8u8 Closed CHSEng CM Design 159 33 20 20 20 20 20 292 34,223z0 58,737.34 18749.00 Michels 2014 S|ip|ining 14-154 160.5e4.98 171.53071 Const. Mgmt. RLAliu 87 120 120 120 120 120 687 Construction 15-155 639 900 900 900 900 900 5,139 TOTAL EXPENSES 1 159 1 7591 1,0401 1,040 1 1,0401 1,040 1 1,040 1 6,118 FUND SOURCES Michels 2014 S|ip|ining 15-178 528'464.52 Awarded Grant 1 105,692.90 RLmia 0 PWTF/Proposed PW 'F 249 501 750 Mitigation Actual 1 RLAliu 1200 APE 1eu38 Emergency 95.182.88 0 Mitigation Expected 19,036.58 1,040 0 Utility Revenue 159 510 539 1,040 1,040 1,040 1,040 5,368 TOTAL SOURCES 159 759 1,040 1,040 1,040 1,040 1,040 6,118 1 2015 2016 Contract Actual Contract Actual Remaining RI-12 Enginneering 1s Design 1»076 232'235.00 30.022.48 Closed nH2snginnoonng 16 Design New 31.386.35 Staff &Minc 41.325a1 Stahali CM 14153 23,380.00 18J8u8 Closed CHSEng CM 1*-152 *6,317.00 17,659.71 Closed RHuEnginneeing QN 15-074 112710.00 34,223z0 58,737.34 18749.00 Michels 2014 S|ip|ining 14-154 160.5e4.98 171.53071 uouou RLAliu APW/APE 14-159 406.226.39 547.954.88 Closed RLAlia 1227 APE 15-155 34.154.35 34.154.35 Closed 0|ounPo~Vac Manholes 15'177 ---*()6'Q68.4() 95J6882 Michels 2014 S|ip|ining 15-178 528'464.52 Con6genqy 105,692.90 RLmia 1227 APE 1e'039 Additional Budget needed ----69,7c17*66 1 RLAliu 1200 APE 1eu38 Emergency 95.182.88 Contigency 19,036.58 1,040 o w8PIN Agenda kmnoICI'Page 71