Loading...
HomeMy WebLinkAboutTrans 2016-07-05 Item 2A - Bid - S 144th Street Phase II i Tukwila Allan Ekberg, Mayor INFORMATIONAL MEMORANDUM TO: Transportation Committee FROM: Bob Giberson, Public Works Director BY: Cyndy Knighton, Senior Program Manager CC: Mayor Ekberg DATE: July 1, 2016 SUBJECT: S144 th St - Phase II (42nd Ave S —Tukwila Int'I Blvd) Project No. 99510402 Resolution to Reject all Bids ISSUE Resolution to reject all bids on the S 144th St - Phase II Project. BACKGROUND The S 144th St- Phase II Project was advertised starting on May 18, 2016 and bids were opened on June 7, 2016. Two bids were received and the results are shown on the attached bid tabulation. The construction budget in the 2015-2020 CIP is summarized below and includes $180,000.00 for construction management: Construction Funding Source Amount TIB Grant $820,000.00 ......................__......_...................................._......................_........_.........................................................................................................._........................................................_...._...._...._.................- Tukwila Village Frontage Contribution 700,000.00 ..........._..........._._...... ......... ....._.........._........................_. ..._Traffic..Impact ._..mpact.._Fees............................................ .............................................................................................................._25..000.00 ..................... .................. ..G.......e......n.......e....I ral Fund 37,000.00 ......................................................................................_..................................................................................................................................._............................. Construction Management 180,000.00 2015 —2016 CIP Construction Budget 1 $1,402,000.00 ANALYSIS Staff has certified the bids and found only one minor error on the low bid of$ 2,017,684.10 and no errors on the second bid of $2,400.256.55. As both bids were significantly higher than the Engineer's Estimate of $1,788,471.30, an analysis of the project design, funding package, and bid prices was conducted. Staff recommends rejecting all bids at this time and rebidding the project in the fall or early winter. In the interim, the project design can be analyzed in detail to look for cost savings. Cost saving measures to be considered may include: extended closure of S 144th St between Tukwila International Blvd and 42nd Ave S during construction; value engineering the project to include design revisions to reduce costs; and reducing coordination costs with the Tukwila Village contractor. Bidding later this year with work starting in early 2017 would also mean a single construction season for the street improvements. Addressing all of these reasons are anticipated to result in a better bidding climate. FINANCIAL IMPACT Additional design costs will be incurred to repackage the project, as well as additional costs for a second advertising. In the long run, a redesign and repackaging of the project is anticipated to save the City money. The 2017 CIP budget for this project will be evaluated to ensure there is adequate funding available. The Transportation Improvement Board (TIB) has indicated there may be up to $150,000 in additional grant money that could be made available, pending the final accepted bid amount. 1 INFORMATIONAL MEMO Page 2 RECOMMENDATION Council is being asked to approve the Resolution rejecting all bids received for the S 144th St Phase II Project and consider this item on the Consent Agenda at the July 18, 2016 Regular Meeting. ATTACHMENTS Bid Rejection Resolution Page 15, 2015 CIP Bid Tabulation W\PW Eng1PROJECTSW RW&RS Projects\s 144th St Phase It TIB-42nd Ave S(99510402 95-RW02)\Design11NFO MEMO Resolution Bid Reject 07-01-16 rd.docx 2 DRAFT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, REJECTING ALL BIDS SUBMITTED FOR THE SOUTH 144TH STREET PHASE If PROJECT. WHEREAS, sealed bids were solicited for the South 144th Street Phase II Project; and WHEREAS, bids were received from two bidders and were publicly opened and read aloud on June 7, 2016; and WHEREAS, a budget was set for the construction of the street improvements; and WHEREAS, the low bid received was over the budgeted amount for construction of the South 144th Street Phase 11 Project; and WHEREAS, the City reserved the right to reject all bids in its call for bids, and RCW 35.23.352 provides for the rejection of any or all bids by resolution of the City Council; and WHEREAS, the City wishes to reject all bids due to budget limitations; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,,WASHINGTON, HEREBY RESOLVES AS FOLLOWS: All bids for the South 144th Street Phase 11 Project are hereby rejected due to budget limitations. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of 12016. ATTEST/AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk Joe Duffie, Council President APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Resolution Number: Rachel B. Turpin, City Attorney WAWord ProcessingXResolutions\Reject bids for S 144th Street Project 6-27-16 CK:bjs Page 1 of 1 3 CITY OF TUKILA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: S 144 St Phase II (42 Ave S -Tukwila Int'I Blvd)* Project No. 99510402 Zone 3 DESCRIPTION: Construct curb,gutter,sidewalk, bike lanes, pavement restoration, illumination, drainage and utility undergrounding from Tukwila Int'I Blvd to 42nd Ave S.Also add a signal at 42nd Ave S. JUSTIFICATION: Provide pedestrian and vehicle safety,drainage and neighborhood revitalization. STATUS: Phase I-Tukwila Int'I Blvd to Military Rd, project completed in 2007 for$3.1 million with$1 million in grants. Phase II-42 Ave S to Tukwila International Blvd. MAINT.IMPACT: Reduce pavement,drainage repairs, and maintenance costs. COMMENT: Awarded Transportation Improvement Board's Arterial Improvement Program(AIP)grant of$1 million. Project is on Impact Fee list. Design and construction related to the Tukwila Village project. FINANCIAL Through Estimated (in$000's) 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL EXPENSES Design 286 25 311 Land(R/W) 40 40 Const. Mgmt. 180 180 Construction 1,402 1,402 TOTAL EXPENSES 0 326 1,607 0 0 0 0 0 0 1,933 FUND SOURCES Awarded Grant 180 820 1,000 Proposed Grant 0 Proposed Mitigation 100 700 800 Traffic Impact Fees 133 13 25 171 City Oper. Revenue (133) 33 62 0 0 0 0 0 0 (38) TOTAL SOURCES 0 326 1,607 0 0 0 0 0 0 1,933 it Project Location ` h, { �a it Y`1 I k ;? � �� e 4 It ,•1. i 1 _ 3S C'kl f'`j S 9 St`s 150 9i av -- sa�asc 2015-2020 Capital Improvement Program 15 4 - N A N aO wm D m o o A p m o p D D c 3 O O (n (n (n o G7 (n A 0 0 0 0 0 7 wm D O O O m x O O m 0 0 o O m x x 0 G7 �1 A O m C (n �] C< r oo o. < °. z 3 3 3 3 = ¢ 3 3 3 3 3 io ° w- 0 0 3 �. D D s < m o m °m ,� o n m D o `� D d ? ? ? ? o " m° d d 0 0 m 3 m c o 0 0 0 n O 0 0 0 0 ° O O O c m O c ° o Q'� — d m ^. m o o d < A m > ? m a > ? > ? o O ' m n 3 ' ° °_— o O O Q O o f. . m m m o o m � 3 n Soo 3 � � °- � � - 3 m -o G) G) o. - < 2 2 o o CO - x Q Q Q ¢ m m m m O M ' - - m < v, '� - m ? S Q`2 o 3 3 c Ommm � � � T3 mn� njmx � — c � � 3 O O m _ m �'a a a m I I I o O m _ ' < o N m o a o m m °�' o O o < x O o G < ° n' 3 °' mmm � ��� O � ' ? c o o Z o N _ — p o 003 D ° — G) < x N 3 3 - m D 3 m. A � n fD T 11 r m �z m O O T T i O O O O cm) � icm) 2< < < T T T Q W oO co Q w o- o c v co A N o b _ _ _ _ _ _ _ _ _ U. _ _ _ v N ° 0 0 0 0 0 0 0 0 x 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m 0 3 d d 0 G e»e»-------- --------e»------ d v � 0 O o -------- e»e»e»e»e»e»e» e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e»e» w 2 0 y^ o o 0 S. lo 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O x 1 o O d O 5 O A D m D m D m e m z m p m T c �D N A m o � ocom � m �nawn> oco N � m �nawn> ocom � n gnaw z ocom � m awn> oco 3 O A mmmmmmmmmm (n m m m mmmmmmmmmm x m (_nZ - D< x0DmD ° (n (nnnDnn _. o O aN m m o o o o m m m m m a m 3 z 'm ,-, z m ¢ ° ¢ '°-_' 3 3 ' ' ¢ 3 3 m m m m m m m m m m a o. -< o o o o o o - n - .- ^ ^ m m .- cnm � c� cnm � c� � � � ,, m Dmmz Qow Ej m mm ° A o co > �m nom � - f. � c� mm o N - _ 3 m s m r - ° i°n -OO m 0 mo '> > z m A ? m m m m ° o o > > - O m 'X '< f. < r O o p1 m 3 3< w m m_ m A m ,w 3 D °s > 5.m > n ? m o ? �?' o- D o m n - z o o_ n 3 °- N o x o �'. o p m o m m m 3 m 3 - a o 3 o o z 3 -o°o o �(n N - 2 m 3 � o m w ° ° A s ° O m lo co 9 3 o lo '°-. mff 03cn� o 3 oo o D c n3w m $ 3 ' cnm do qN = � o o o >N o m w co o ' - o o p = o o c� o o c n o co o D D D D D < < < � T co T T z z m T Q ° ° ? Q o W o - ° Q M R w w ° co CO o v g ° o w ww m o _ o m < 0 3 d w o O w 2 Z v � 0 n o » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » » � c 0 y^ o 0 0 --------e»----- --------e»e»e»e» e»e»e»e» e» e»e»e»e»e»e» ------- c v 0 v 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 x S 0 d o m" tm" 88T TIE 11 w 6 n A x coD Za v m � z N o o n 3 c x D D D T N m D A m N m m =_ o CO D - - - - - - 00 c ° a o ?. � xc fn Asa mG) n n T - - - ¢ > m - - - - m `D n m m ° n m m N - - n °o y o Q° r s O W n n D D D ' 0 0 o ? ' 0 0 0 a 0 w A 3 3 m D O d v m _ C) N 3 m o o 0 v N O 1 � D � r v n ? O z ca m � n 1 m z W ((D O c m ; 0 to = m =1 N 22 a N co ° W w H3 S m ° ? � J p, (n cn m p c v CN c S C m e C c a m m D a c s n��� o o � o + c m c W ED y. 3 v Q m r o ° 3 o ao o ao d d c ao ao o V 6 W W O O O O Q 91 � O N co o O n o Q fA EA EA C N N N C D o ao d o O N A n 0 Q IV U1 O O O W O W 00 N U fJ O N N O 91 W c OQ � 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O EA EA EA � N � O 00 0 f0 N d A N O N N 7 8