Loading...
HomeMy WebLinkAboutUtilities 2016-07-26 Item 2B - Resolution - Reject All Bids for 2016 Small Drainage ProgramCity of Tukwila Allan Ekberg, Mayor INFORMATIONAL MEMORANDUM TO: Utilities Committee FROM: Bob Giberson, Public Works Director BY: Ryan Larson, Senior Program Manager CC: Mayor Ekberg DATE: July 22, 2016 SUBJECT: 2016 Small Drainage Program Project No. 91641201 Resolution Rejecting All Bids ISSUE The one bid received for the 2016 Small Drainage Program came in higher than the Engineer's Estimate and the available surface water budget. BACKGROUND The 2016 Annual Small Drainage Program was advertised for bids on July 5 and 12, 2016. One bid was received and opened on July 19, 2016. The bid was from Westwater Construction Company for a total bid amount of $785,279.00 (see attached bid tabulation). The Engineer's Estimate was $519,040.00 and the available budget in the 2015 -2020 CIP for construction in 2016 is $605,000. Construction Funding Source Amount 2016 Small Drainage ... Construction ........ ........._..................... ............$ 525,000.00 . .. . . . . . . . . . . 2016 Storm Water Quality Retrofit Program 80,000.00 Available Funding $605,000.00 ANALYSIS Staff has certified the bid and did not find any errors. The bid received is significantly higher than the Engineer's Estimate and an analysis of the project design and bid prices was conducted. There was no single reason to explain why the bid was more than 25% above the Engineer's Estimate, but staff and the design consultant, KPG, speculate that the lack of other bidders may be the reason. An analysis of the Engineer's Estimate was also conducted based on recent bid results from the area. This analysis did not reveal any significant issues with the estimate nor reasons to think that it did not accurately reflect the likely cost of constructing the project in a competitive bid environment. KPG also looked for reasons that only one bid was received. The bidding climate remains competitive, which is reducing the number of bidders on projects and leading to increased construction costs. Two plan holders were contacted and asked why they had not submitted bids on the project. The two plan holders stated that they did not submit a bid as they were concerned with completing the project within the allowable timeframe, that their existing work Toad was too heavy, and that there were 16 other plan holders and they thought that there would be too much competition. Staff recommends rejecting the bid and rebidding the project at a later date. The new bid document should allow additional time and flexibility to complete the individual projects. w: \pw eng \projects \a - dr projects \annual small drainage programs\2016 sdp (91641201) \design \information memo - 2016 sdp bid rejection.docx 13 INFORMATIONAL MEMO Page 2 FINANCIAL IMPACT Rejecting the bid does not have a financial impact in and of itself, but it will result in additional design costs to repackage it as well as the additional costs for advertising. Overall, repackaging of the project is anticipated to save the City money. RECOMMENDATION Council is being asked to approve the Resolution rejecting the bid received at the July 19, 2016 bid opening for the 2016 Small Drainage Program and consider this item on the Consent Agenda at the August 1, 2016 Regular Meeting. ATTACHMENTS Draft Resolution Bid Tabulation CIP Sheets W: \PW Eng \PROJECTS\A- DR Projects\Annual Small Drainage Programs\2016 SDP (91641201) \Design \INFORMATION MEMO - 2016 SDP Bid Rejection.docx 14 AFT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, REJECTING ALL BIDS SUBMITTED FOR THE 2016 SMALL DRAINAGE PROGRAM. WHEREAS, sealed bids were solicited for the 2016 Small Drainage Program; and WHEREAS, a bid was received from one bidder and was publicly opened and read aloud on July 19, 2016; and WHEREAS, a budget was set for the construction of the drainage improvements; and WHEREAS, the low bid received was over the budgeted amount for construction of the 2016 Small Drainage Program; and WHEREAS, the City reserved the right to reject all bids in its call for bids, and RCW 35.23.352 provides for the rejection of any or all bids by resolution of the City Council; and WHEREAS, the City wishes to reject all bids due to budget limitations; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: The bid for the 2016 Small Drainage Program is hereby rejected due to budget limitations. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2016. ATTEST /AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk Joe Duffie, Council President APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Resolution Number: Rachel B. Turpin, City Attorney W: \Word Processing \Resolutions\Reject bids for 2016 Small Drainage Program 7 -20 -16 RL:bjs Page 1 of 1 15 CITY OF TUKWILA - DEPARTMENT OF PUBLIC WORKS 2016 Small Drainage Program Bid Tabulation Project No. 91641201 Prepared By: Kelsey Anderson, PE Checked By: Nelson Davis, PE 7/19/2016 Engineer's Estimate Westwater Construction Company No. Section on Item Quantity Unit Unit Cost Total Cost Unit Cost Total Cost ROADWAY 1 1 -04 Unexpected Site Changes 1 FA $ 12,000.00 $ 12,000.00 $ 12,000.00 $ 12,000.00 2 1 -09 Mobilization 1 LS $ 42,500.00 $ 42,500.00 $ 80,000.00 $ 80,000.00 3 1 -10 Project Temporary Traffic Control 1 LS $ 20,000.00 $ 20,000.00 $ 77,000.00 $ 77,000.00 4 2 -01 Clearing and Grubbing 1 LS $ 14,000.00 $ 14,000.00 $ 2,000.00 $ 2,000.00 5 2 -02 Remove and Replace Handrail 1 LS $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 6 2 -02 Pavement Removal Incl. Haul 450 SY $ 15.00 $ 6,750.00 $ 5.00 $ 2,250.00 7 2 -03 Unsuitable Foundation Excavation Incl. Haul 45 CY $ 35.00 $ 1,575.00 $ 50.00 $ 2,250.00 8 2 -03 Gravel Borrow Incl. Haul 115 TN $ 30.00 $ 3,450.00 $ 20.00 $ 2,300.00 9 4 -04 Crushed Surfacing Top Course 335 TN $ 45.00 $ 15,075.00 $ 20.00 $ 6,700.00 10 5 -04 HMA Cl. 1/2" PG 64 -22 180 TN $ 200.00 $ 36,000.00 $ 100.00 $ 18,000.00 11 5 -04 HMA Thickened Edge 530 LF $ 10.00 $ 5,300.00 $ 5.00 $ 2,650.00 12 8 -01 Temporary Water Pollution / Erosion Control 1 LS $ 9,000.00 $ 9,000.00 $ 10,000.00 $ 10,000.00 13 8 -04 Cement Conc. Traffic Curb and Gutter 40 LF $ 55.00 $ 2,200.00 $ 150.00 $ 6,000.00 14 8 -14 Cement Conc. Sidewalk 220 SY $ 60.00 $ 13,200.00 $ 35.00 $ 7,700.00 ROADSIDE DEVELOPMENT 15 8 -02 Topsoil Type A 75 CY $ 50.00 $ 3,750.00 $ 45.00 $ 3,375.00 16 8 -02 Hydroseed 640 SY $ 4.00 $ 2,560,00 $ 3.00 $ 1,920.00 17 8 -02 Property Restoration 1 FA $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 STORM DRAINAGE 18 7 -04 Storm Sewer Pipe 12 In. Diam 692 LF $ 70.00 $ 48,440.00 $ 177.00 $ 122,484.00 19 7 -04 Storm Sewer Pipe 8 In. Diam 307 LF $ 50.00 $ 15,350.00 $ 170.00 $ 52,190.00 20 7 -04 Storm Sewer Pipe 6 In. Diam 68 LF $ 35.00 $ 2,380.00 $ 110.00 $ 7,480.00 21 7 -04 Storm Sewer Pipe 4 In. Diam 65 LF $ 30.00 $ 1,950.00 $ 100.00 $ 6,500.00 22 7 -04 Ductile Iron Storm Sewer Pipe 12 In. Diam. 21 LF $ 100.00 $ 2,100.00 $ 270.00 $ 5,670.00 23 7 -04 Ductile Iron Storm Sewer Pipe 8 In. Diam. 156 LF $ 85.00 $ 13,260.00 $ 260.00 $ 40,560.00 24 7 -04 Class III Reinforced Concrete Sewer Pipe 36 In. Diam 6 LF $ 450.00 $ 2,700.00 $ 400.00 $ 2,400.00 25 7 -04 Remove /Abandon Existing Storm Sewer Pipe 190 LF $ 15.00 $ 2,850.00 $ 75.00 $ 14,250.00 26 7 -05 Connection to Drainage Structure 8 EA $ 1,000.00 $ 8,000.00 $ 1,000.00 $ 8,000.00 27 7 -05 Connection to Drainage Pipe 2 EA $ 500.00 $ 1,000.00 $ 1,000.00 $ 2,000.00 28 7 -05 Storm Cleanout 2 EA $ 500.00 $ 1,000.00 $ 700.00 $ 1,400.00 29 7 -05 Concrete Inlet 9 EA $ 900.00 $ 8,100.00 $ 1,200.00 $ 10,800.00 30 7 -05 Debris Barrier 1 EA $ 300.00 $ 300.00 $ 2,500.00 $ 2,500.00 31 7 -05 Catch Basin, Type 1 14 EA $ 1,200.00 $ 16,800.00 $ 1,500.00 $ 21,000.00 32 7 -05 Catch Basin, Type 1L 1 EA $ 1,500.00 $ 1,500.00 $ 1,700.00 $ 1,700.00 33 7 -05 Catch Basin Type 2 48 In. Diam. 1 EA $ 3,250.00 $ 3,250.00 $ 2,800.00 $ 2,800.00 34 7 -05 Catch Basin Type 2 60 In. Diam. W /Overflow Cage 1 EA $ 7,000.00 $ 7,000.00 $ 22,000.00 $ 22,000.00 35 7 -05 Trench Drain 1 LS $ 2,000.00 $ 2,000.00 $ 5,200.00 $ 5,200.00 36 7 -06 Pothole Existing Utilities 4 EA $ 800.00 $ 3,200.00 $ 1,000.00 $ 4,000.00 37 7 -10 4' X 17' Modular Wetland Unit 1 EA $ 44,000.00 $ 44,000.00 $ 75,000.00 $ 75,000.00 38 7 -20 Temporary Water Bypass System 1 LS $ 5,000.00 $ 5,000.00 $ 15,000.00 $ 15,000.00 39 8 -15 Light Loose Riprap 30 CY $ 150.00 $ 4,500.00 $ 40.00 $ 1,200.00 40 8 -30 Resolution of Utility Conflicts 1 FA $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 STORM DRAINAGE ACCESS IMPROVEMENTS 41 6 -02 Inlet Stair Structure 1 LS $ 60,000.00 $ 60,000.00 $ 50,000.00 $ 50,000.00 42 6 -20 Outlet Stair Structure 1 LS $ 50,000.00 $ 50,000.00 $ 50,000.00 $ 50,000.00 BID TOTAL: $ 519,040.00 $ 785,279.00 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: Annual Small Drainage Program Project No. Varies DESCRIPTION: Select, design, and construct small drainage projects throughout the City. JUSTIFICATION: Provide drainage corrections for existing /ongoing drainage problems throughout the City, including culvert replacements, drain extensions, and pavement upgrades. STATUS: Projects for this annual program are taken from Small Drainage Project List. MAINT. IMPACT: Reduces maintenance. Ongoing project, only one year shown in first column. Construction expenses may occur over two calendar COMMENT: years. Budget for 2014 includes $270k for Thorndyke Safe Routes to School (S 150th St). Grants from State Municipal Stormwater Capacity Grants. FINANCIAL Through Estimated (in $000's) 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL EXPENSES Design 60 80 80 80 80 80 80 80 620 Land (R/W) 0 Const. Mgmt. 70 80 80 80 80 80 80 80 630 Construction 279 270 325 525 525 525 525 525 525 4,024 TOTAL EXPENSES 409 270 485 685 685 685 685 685 685 5,274 FUND SOURCES Awarded Grant 50 50 100 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 409 220 485 635 685 685 685 685 685 5,174 TOTAL SOURCES 409 270 485 685 685 685 685 685 685 5,274 2015 - 2020 Capital Improvement Program 82 17 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: Storm Water Quality Retrofit Program Project No. 91241202 DESCRIPTION: Design and install water quality improvements at selected drainage locations throughout the City. JUSTIFICATION: Most surface water is discharged directly to receiving water bodies untreated. STATUS: Additional water quality is being added to Interurban Ave S in 2014 and 42nd Ave S in 2015. MAINT. IMPACT: Expected to increase maintenance. COMMENT: Combine with other CIP projects for design and construction, where feasible. FINANCIAL Through Estimated (in $000's) 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL EXPENSES Design 15 15 15 15 15 15 15 15 120 Land (R /W) 0 Const. Mgmt. 15 15 15 15 15 15 15 15 120 Construction 80 80 80 80 80 80 80 80 640 TOTAL EXPENSES 0 110 110 110 110 110 110 110 110 880 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 0 110 110 110 110 110 110 110 110 880 TOTAL SOURCES 0 110 110 110 110 110 110 110 110 880 Project Location: Entire System 2015 - 2020 Capital Improvement Program 83 18