Loading...
HomeMy WebLinkAboutTrans 2016-08-15 Item 2A - Grant Application - West Valley Highway (I-405 to Strander Boulevard) with Transportation Improvement BoardCity of Tukwila Allan Ekberg, Mayor Public Works Department - Bob Giberson, Director TO: Transportation Committee 4 FROM: Bob Giberson, Public Works Director,/& BY: Robin Tischmak, City Engineer CC: Mayor Ekberg DATE: August 12, 2015 SUBJECT: West Valley Highway (1-405 to Strander Blvd) Project No. 99310410 Transportation Improvement Board Grant Application ISSUE Authorize the submittal of a grant application to the Washington State Transportation Improvement Board (TIB) to fund the West Valley Hwy —1 -405 to Strander Blvd Street Project. I -ax's] -" cei TIB has issued a Call for Projects inviting qualified applicants to apply for available grant funds. Current City policy requires approval by the appropriate Committee before applying for grants. Grant applications are due by August 19, 2016. DISCUSSION The TIB program awards State funds for selected projects. TIB funding requires a minimum 20% local match and utility undergrounding costs are not typically eligible. City staff met with a TIB representative to discuss project criteria and to evaluate projects included in the City's 6-Year Transportation Improvement Program (TIP). Completing the desired 7-lane street section with sidewalks on both sides of West Valley Hwy from 1-405 to Strander Blvd appears to be the most logical project for the City to submit for grant funding. Completing the West Valley Hwy street section would coincide with non-motorized street improvements that were funded to connect the new TUC Pedestrian/ Bicycle Bridge to Tukwila Station. FISCAL IMPACT The West Valley Hwy Project is included on the City's traffic impact fee list and local matching funds would be provided from a combination of traffic impact fees collected and arterial street funds, if a State TIB grant is awarded. RECOMMENDATION Transportation Committee approval to submit a 2016 grant application to the Washington State Transportation Improvement Board for the West Valley Hwy Street Project. Attachment: Page 27, Proposed 2017 CIP WAPW Eng\OTHER\Grant Applications\2016\INFO MEMO Transp Committee Grant Applications 2016 - rrt sb.docx CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: West Valley Hwy (1-405-StramderBlvd) Project No. S931041U Deo�nand conatm�com�aUonof7 lane ooc�onadVVa�V�|ay Hwy wdhcurbs, gu�ere.�onndrainage, O�G�R|PTKJN� lighting and traffic control, including safety and capacity improvement at the S 156th St intersection. JUSTIFICATION: Safety and capacity items need completion. Portions have been completed by development. STATUS: Combined with W Valley Hwy/S 156th Intersection in 2017. Continuing to work with development. May be completed in phases; Longacnaa|oG15OthSL and then G15OthGtVo|-405. K8/UNT.|K0PACT: Reduction ofmaintenance. COMMENT: PSRCgmnt funds will be sought. Project iaon Traffic Impact Fee List. FINANCIAL Through Estimated (in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES S S 158 St Design 16 174 150 340 Land (R/W) 200 W-#F 8-n 200 400 Const. Mgmt. 174 150 324 Construction 1,160 1,000 2,160 FUND SOURCES Awarded Grant 0 Proposed Grant 592 1,200 1,792 Mitigation Actual 0 Traffic Impact Fees 150 150 Project Location S S 158 St W-#F 8-n u 2017'2022(apita Improvement dPmm �m 27