SPONSOR'S Washington State's Recreation and Conservation Office (RCO) requires a formal resolution
SUMMARY for submission of a grant application. This resolution will authorize funding assistance for
the construction of the Riverton Creek Flap Gate Removal Project. The $551,070 grant
requires a 15% match, or $82,660 and currently $290,000 is budgeted in surface water
funds. Council is being asked to approve the resolution for the State RCO grant application.
FJ-,',VIE\",'.D BY [:] cow mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
Z Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 08/09/16 COMMITTEE CHAIR: KATHY HOUGARDY
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works Department
COMMFITEE Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDI'T'URE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source: 412 SURFACE WATER (PG 100, PROPOSED 2017 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
08/15/16
ITEM INFORMATION
ITEM NO.
4. F.
0•
S'rAFF SPONSOR: BOB GIBERSON
ORIGINAi, AGENDA DATE: 08/15/16
AGENDA ITE'm TITLE, Resolution for Washington's Recreation and Conservation Office Funding
Grant Application for Construction of Riverton Creek Flap Gate Removal Project
CAT11,1'GORY F-1 Discussion
MtS Date
❑ Motion
Mt
,g Date
Z Resolution
Mt
,g Date 08115116
❑ Ordinance
Mtg Date
❑ Bid Award
Mt
,g Date
1-1 Public Hearing
,g Date
Mt
11 Other
Mt
,g Date
SPONSOR ❑ Council [:]Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P&R [:] Police Z PIV
SPONSOR'S Washington State's Recreation and Conservation Office (RCO) requires a formal resolution
SUMMARY for submission of a grant application. This resolution will authorize funding assistance for
the construction of the Riverton Creek Flap Gate Removal Project. The $551,070 grant
requires a 15% match, or $82,660 and currently $290,000 is budgeted in surface water
funds. Council is being asked to approve the resolution for the State RCO grant application.
FJ-,',VIE\",'.D BY [:] cow mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
Z Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 08/09/16 COMMITTEE CHAIR: KATHY HOUGARDY
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works Department
COMMFITEE Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDI'T'URE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source: 412 SURFACE WATER (PG 100, PROPOSED 2017 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
08/15/16
MTG. DATE
ATTACHMENTS
08/15/16
Informational Memorandum dated 08/05116
Draft Resolution
Page 100, Proposed 2017 CIP
Minutes from the Utilities Committee meeting of 08/09/16
F-
0•
50
City of Tukwila Allan Ekberg, Mayor
Public Works Department - Bob Giberson, Director
INFORMATIONAL MEMORANDUM
ISSUE
Approve a Resolution for the State of Washington's Recreation and Conservation Office (RCO) grant
application.
BACKGROUND
The City is undertaking the Riverton Creek Flap Gate Removal Project to expand salmon habitat,
including habitat for the Endangered Species Act (ESA) listed Chinook salmon. This project is a priority
project listed in the Water Resources Inventory Area 9 (WRIA 9) Salmon Habitat Plan, of which the City
is a paying member. As a recognized local entity, WRIA 9 has recommended that the Riverton Creek
Flap Gate Removal Project receive funding allocated to it through its Puget Sound Acquisition and
Restoration (PSAR) fund. To receive the funding, the City must complete a grant application to PSAR
and this application is then reviewed by the Salmon Recovery Funding Board (SRFB) with the funds
administered by the State's Recreation and Conservation Office (RCO).
DISCUSSION
Staff received approval to submit a grant application for the Riverton Creek Flap Gate Removal Project
at the May 10, 2016 Utilities Committee. However, as part of the application process, RCO requires that
the applicant submit a Resolution approved by Council that authorizes staff to make the formal
application.
FISCAL IMPACT
The Riverton Creek Flap Gate Removal Project has a proposed budget of $840,000 in 2017/2018 for
final design and construction. WRIA 9 has allocated $551,070 towards the project, which is subject to
approval by the SRFB and RCO. This grant has a 15% match requirement, or $82,660, and we have
$290,000 budgeted from surface water funds.
1 .1 =role] iT, I ky, 14 k" I i Eel k,
Council is being asked to approve the Resolution authorizing the submission of a SRFB grant
application for the Riverton Creek Flap Gate Removal Project and consider this item on the Consent
Agenda at the August 15, 2016 Regular Meeting.
Attachments: Draft Resolution
Riverton Creek Flap Gate Removal page 100, Proposed 2017 CIP
WAPW Eng\PROJECTS\A- DR Projects\Rivertan Flap Gate Removal (99830103 98-DR03)\Grants\PSAR 2016 Grant\lnfo Memo - RCO Grant Resolution,dou
51
TO:
Utilities Committee
FROM:
Bob Gilberson, Public Works Directort
BY:
Mike Perfetti, Habitat Manager
CC:
Mayor Ekberg
DATE:
August 5, 2016
SUBJECT:
Riverton Creek Flap Gate Removal Project
Project No. 99830103
Resolution for RCO Grant Application
ISSUE
Approve a Resolution for the State of Washington's Recreation and Conservation Office (RCO) grant
application.
BACKGROUND
The City is undertaking the Riverton Creek Flap Gate Removal Project to expand salmon habitat,
including habitat for the Endangered Species Act (ESA) listed Chinook salmon. This project is a priority
project listed in the Water Resources Inventory Area 9 (WRIA 9) Salmon Habitat Plan, of which the City
is a paying member. As a recognized local entity, WRIA 9 has recommended that the Riverton Creek
Flap Gate Removal Project receive funding allocated to it through its Puget Sound Acquisition and
Restoration (PSAR) fund. To receive the funding, the City must complete a grant application to PSAR
and this application is then reviewed by the Salmon Recovery Funding Board (SRFB) with the funds
administered by the State's Recreation and Conservation Office (RCO).
DISCUSSION
Staff received approval to submit a grant application for the Riverton Creek Flap Gate Removal Project
at the May 10, 2016 Utilities Committee. However, as part of the application process, RCO requires that
the applicant submit a Resolution approved by Council that authorizes staff to make the formal
application.
FISCAL IMPACT
The Riverton Creek Flap Gate Removal Project has a proposed budget of $840,000 in 2017/2018 for
final design and construction. WRIA 9 has allocated $551,070 towards the project, which is subject to
approval by the SRFB and RCO. This grant has a 15% match requirement, or $82,660, and we have
$290,000 budgeted from surface water funds.
1 .1 =role] iT, I ky, 14 k" I i Eel k,
Council is being asked to approve the Resolution authorizing the submission of a SRFB grant
application for the Riverton Creek Flap Gate Removal Project and consider this item on the Consent
Agenda at the August 15, 2016 Regular Meeting.
Attachments: Draft Resolution
Riverton Creek Flap Gate Removal page 100, Proposed 2017 CIP
WAPW Eng\PROJECTS\A- DR Projects\Rivertan Flap Gate Removal (99830103 98-DR03)\Grants\PSAR 2016 Grant\lnfo Memo - RCO Grant Resolution,dou
51
52
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, AUTHORIZING SUBMISSION OF
AN APPLICATION FOR GRANT FUNDING ASSISTANCE FOR
THE RIVERTON CREEK FLAP GATE REMOVAL SALMON
RECOVERY PROJECT (#16-1892) TO THE SALMON
RECOVERY FUNDING BOARD AS PROVIDED IN RCW 77.85,
WAC 420 AND OTHER APPLICABLE AUTHORITIES.
WHEREAS, under the provisions of the Salmon Recovery Act, state grant
assistance is requested to aid in financing the cost of restoration; and
WHEREAS, the City Council of the City of Tukwila considers it in the best public
interest to complete the Riverton Creek Flap Gate Removal Project (#16-1892),
described in the application;
. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. The Habitat Project Manager, Mike Perfetti, is authorized to make
formal application to the Salmon Recovery Funding Board for grant assistance.
Section 2. The City of Tukwila has reviewed the sample project agreement on the
Recreation and Conservation Office's website (at www.rco.wa.gov/documents/
man uals&forms/Sam p leProiAg reement. pdD and authorizes the Mayor to enter into such
a project agreement, if funding is awarded. The City Council understands and
acknowledges that the project agreement will contain the indemnification (applicable to
any sponsor) and waiver of sovereign immunity (applicable to Tribes) and other terms
and conditions that are contained in the sample project agreement, and that the sample
project agreement may be revised periodically by the Recreation and Conservation
Office. The City Council recognizes that such changes might occur prior to the
authorized representative signing the actual project agreement, and accepts the
responsibility and the presumption that the authorized representative shall have
conferred with them as to any such changes before he/she executes the project
agreement on behalf of the City of Tukwila and so executes with their authorization.
WAWord Processing\ResolutionsXGrant funding application-Riverton Creek 8-2-16
RL:bjs Page 1 of 2
53
Section 3. Any grant assistance received will be used for only direct eligible and
allowable costs that are reasonable and necessary to implement the project referenced
above.
Section 4. The City of Tukwila expects their matching share of project funding will
be derived from City of Tukwila funds and possibly other sources and meets the
requirements of WAC 420-12-040. In addition, the City Council understands the City is
responsible for supporting all non-cash commitments to this project should they not
materialize.
I Section 6. The City Council acknowledges that if the Salmon Recovery Fund Board
approves grant assistance for the project, the Recreation and Conservation Office will
pay the City on only a reimbursement basis, except for a specially approved advance
payment. It is understood that "reimbursement basis" means the City will only request
payment from the Recreation and Conservation Office after it incurs eligible and
allowable costs and has paid them. The Recreation and Conservation Office may also
determine an amount of retainage and hold that amount until the project is complete.
The Recreation and Conservation Office may approve advance payments in limited
circumstances, pursuant to WAC 420-12-060 and the policy outlined in Manual 8,
Reimbursements.
Section 6. The City acknowledges that any property restored be maintained for a
period of 10 years after the project is complete unless otherwise provided and agreed
to by the City of Tukwila and the Salmon Recovery Funding Board in the project
agreement or an amendment thereto.
Section 7. This application authorization becomes part of a formal application to
the Salmon Recovery Funding Board for grant assistance.
Section 8. Appropriate opportunity for public comment on this application was
provided.
Section 9. The City Council of the City of Tukwila certifies that this application
authorization was properly and lawfully adopted following the requirements of the City
of Tukwila and applicable laws and policies and that the person signing as authorized
representative is duly authorized to do so.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Regular Meeting thereof this day of 12016.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk Joe Duffie, Council President
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Rachel B. Turpin, City Attorney
WAWord Processing\Resolutions\Grant funding application-Riverton Creek 8-2-16
RL:bjs Page 2 of 2
54
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 202
PROJECT:
Riverton Creek Flap Gate Removal Project No. SSO3O1O3
�E��R|�OQ0�
Remove �mouhoUoand Uopga�a��Duwum�hR�ecina�U pipe a�h.c�a�open channel oonUuonoe.
install trail bridge over new channel, restore/revegetate 200 feet of creek channel and 450 ft of pond shoreline.
JUGTH�����N�
|ncmaneavailable aa|monidmohnghab�� and increase flood n�ugein lower DuwamiahRive�|mpmve
'
fish access to Riverton Creek and enhance salmon rearing and resting area.
STATUS'
Design ��7OY6nomp|eUnnin2O11v�8ha Salmon Recovery Funding Board grant of$42.5OO and o30.UOO
'
from People for Puget Sound. Construction ia grant dependent.
K8AJNT.|K09ACT:
Expected to increase maintenance.
��K8K8ENT�
Pmpooedgrants include State &Fedom| habitat gmnta.Pn4ectused aemiUgation for East Marginal VVoy
Pipe Replacement Project and HPAContm|#133703-1 requires work \obe completed by June 11.2O1S.
FINANCIAL Through Estimated
EXPENSES
Design
114
28
90
232
Const. Mgmt.
100
100
Construction
650
650
FUND SOURCES
Awarded Grant
72
72
Proposed Grant
550
550
Mitigation Actual
0
Mitigation Expected
0
TOTAL SOURCES
1141
281
90
1 750
01
01
01
0
1 01
982
20/7-2022 Capital Improvement Program 100 55
LIfF
LWAM
UTILITIES COMMITTEE
Meeting Minutes
City of Tukwila
City Council Utilities Committee
August g, 2016 — 5.30 p.m. —Foster Conference Room, 63oo Building
Councilmembers: Kathy Hougardy, Chair; Kate Kruller, Thomas McLeod
Staff: Bob Giberson, Robin Tischmak, Pat Brodin, Peter Lau, Ryan Larson, and Gail
La ba na ra
Guests: Meg Moorehead and Olivia Robinson, King County Solid Waste Division
CALL TO ORDER: Committee Chair Hougardy called the meeting to order at 5:30 p.m.
I. PRESENTATIONS
King County Solid Waste Division Initiatives
• 5 % Rate Increase — First increase in four years
• Recycling — Recommend 7o% recycling goal and currently at 54 %, added recycling bins to transfer stations
• King County Comprehensive Plan - updated every six years, hope for DOE approval in 2o18
II. BUSINESS AGENDA
A. Construction Manaaement Consultant Selection & Aareement: Andover Park East Water and
Sewer Replacement
Staff is seeking Council approval for a construction management contract with AECOM Technical
Services in the amount of $532,893.84 for the Andover Park East Water and Sewer Replacement
Project. This contract includes field engineering and inspection for the water and sewer main
replacement project. UNANIMOUS APPROVAL. FORWARD TO AUGUST 15, 2o16 REGULAR
CONSENT AGENDA.
B. Desian Consultant Selection & Aareement: Crvstal SDrinas Emeraencv Surface Water ReDair
Staff is seeking Council approval for a consultant design contract with KPG, Inc. in the amount of
$59979.68 for the Crystal Springs Emergency Surface Water Repair. The surface water
emergency was declared on 7/31/16 and Resolution No. 1886 was approved by Council on 8/1/16.
This design contract will complete the design and permitting in a timely manner to allow for the
project to be advertised for construction later this year. Funding is from the 2o16 Small Drainage
Program as the one bid was rejected as it was over the budget. UNANIMOUS APPROVAL.
FORWARD TO AUGUST 15,2o16 REGULAR CONSENT AGENDA.
C. Resolution: Grant ADDlication for the Riverton Creek FlaD Gate Removal Proiect
Staff is seeking Council approval of a resolution that authorizes City staff to formally apply for a
State of Washington's Recreation and Conservation Office (RCO) grant for the Riverton Creek
Flap Gate Removal Project. The State's grant match is 15 0/0, or $82,66o and City surface water
funds are currently budgeted at $290,000. UNANIMOUS APPROVAL. FORWARD TO AUGUST
15,2o16 REGULAR CONSENTAGENDA.