Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit MI01-075 - PACIFIC GULF PROPERTIES - REROOF
Pacific Gulf Properties 930 Industry Dr. City of Tukwila (206) 431 -3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 MISCELLANEOUS PERMIT WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES, APPLICANT IS PROCEEDING AT THEIR OWN RISK. Parcel No: 252304 -9015 Address: 930 INDUSTRY DR Suite No: Location: Category: NSFR Type: MISCPERM Zoning: Const Type: Gas /Elec.: Units: 000 Setbacks: North: Water: TUKWILA Wetlands: Contractor License No: OCCUPANT OWNER CONTACT Permit No: Status: Issued: Expires: MI01 -075 ISSUED 05/08/2001 11/04/2001 Occupancy: UBC: 1997 Fire Protection: .0 South: .0 East: .0 West: .0 Sewer: TUKWILA Slopes: Y Streams: PACIFIC GULF PROPERTIES 930 INDUSTRY DR, TUKWILA WA 98188 PACIFIC GULF PROPERTIES 631 STRANDER BLVD, TUKWILA WA 98188 RON HAIGHT 4910 15 AV NW, SEATTLE WA 98107 Phone: Phone: (206)575-0765 Phone: 206-784 -8414 . * * * * ** 4 ** *** ** **** * * ** k ** * *•k * * ** ** * * * * **** * * * ** k* A * ** *,4 * * * ** k * * *•* *** ** * **** * *** ** * ** Permit Description: TEAR OFF EXISTING ROOF AND REPLACE WITH NEW ROOFING MEMBRANE ONLY. ********************************A******** A************* * * * * *A*•* * * * * ** * * * * * ** *k * * * * *iA Construction Valuation: $ 52,554.00 PUBLIC WORKS PERMITS: * CWnter Meter Permits Listed Separate) Eng. Appr: Curb Cut /Access /Sidewalk /CSS: N Fire Loop Hydrant: N No: S1ze(ln): .00 Flood Control Zone: N Hauling: N Start Time: End Time: Land Altering: N Cut: F111: Landscape Irrigation: N Moving Oversized Load: N Start Time: End Time: Sanitary Side Sewer: N No: Sewer Main Extension: N Private: Public: Storm Drainage: N Street Use: N Water Main Extension: N Private: Public: ? rM* ** * * ** ** ** ** ** **Ak*** YAK* kk* AAk # **k * * * ***kk* * *Akkk *N *** * *M ***4- kkkMAkith*hkkkkitkAAkkA TOTAL DEVELOPMENT PERMIT FEES: $ 1,10 .34 i ****************** k**k****** * * ** *** ** *** * * * #Ar**** **A * * * ***** **•k ****A w***Ak *k *A *kk Permit Center Authorized Signature. OM NW APO I hereby certify that I have read '"nd examined this perm yt and know the same to be true and correct. All provisions of law nd ordi ances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this development permit. 4- Signature: Date: 5!13.1Di Print Name : ,., —!. jejAgalb. c!`1 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. 1 a§ 930 INDUSIRY DR `ant: Type : MISCPERM reel #: 252304-9015 CITY OF TUKWILA Permit No: •MI01-075 Status: ISSUED Applied: 05/01/2001 Issued: 05108/2001 10i**011***4*A****AkA***kith****** 1. kAbh**kkhk4k***A 1. **Af*A4c01.0, fc ************vmk erMit Conditions: No chanoes will be made to the plans unless approved by the Engineer and the Tukwila, Building Division. . All construction to be 'done An conformance Oth approved plans and reOuirements of the Uniform Building Code (1997 Edition) as amdnded. Uniform' Mechanical Code (1997 ,Edition). and WashingtOn:State Energy, ,ode (1907 Edition). . Validity ofA5,ermit. The issuance of a permit or approVal of plans, speCifleatIons. and eo*OutatiOns shall not be con- strued td•be a4iirmit fOr, or an approval of, anyViolatfon of anY;dt'the,OrovistOns of the building code or of any other OrAllinance of the jurisdiction. No permit presuming. to ,give Authority Wviolate or cancel the provisions of this codeti11 be va I'd ' All permlts. Anipectioh reeords.' and approved plans shell be ,ovilf4010 iftthe job site ,prior ,to the start of any con- strUction, • These documents re to be maintained and avail- ebWUntil, final inspection approval is granted. hereb4Certify that 1 have read 'these conditions and will compl!.; . with them,asoutlind. All provisions of law and ordinances governing this woHifill be complied with. whether sPecified herein or not., The granting Of ',this permit does not presume to give authority to violate oreaticel-the provisions of any other work or local laws • regulating •'cOnstruCtion or the performance of work. • Ci T Y OF l KWI LA Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 Miscellaneous Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. Project Name/Tenant: PGP /Tukwila - Building 24 WA 9$188 City State /Zip: Value of Construction: $52,554.00 Tax Parcel Number: 5jU_ s Industry Drive, Tukwila, Kneen Owner: RREE Management Ll Aisove Ground Tanks Antennas/Satellite Dishes Bulkhead/Docks Commercial Reroof ❑ Demolition ❑ Fence 0 Manufactured I•lousin dteplacement only ❑ Parking Lots ❑ Retainin; Walls Tem rora Facilities Tree Cuttln, Phone: Phone: ( 206 ) 464 -5200 Street Address: 720 Olive Way, Suite 614, Seattle, WA City State/Zip: 98101 Fax #: ( Phone: ( ) 206 ) 784 -8414 Contractor: Haight Roofing Company, Inc. Street Address: 4910 - -15th Avenue NW, Spatt1 p WA 9l11(12 City State/Zip: Fax II: ( Phone: ( ) NIA 949 ) 7/14_ 1 mut 955 -2777 D711itoctx Consultant: Consuting, nc. Street Address: City State/Zip: Fax #: ( ) Engineer: Phone: ( ) Street Address: ,.;, , City State/Zip: Fax II: ( Contact Person: Ron Haight Phone: ( 206. ) 78, -841,. Street Address: 4910 - 15 City State/Zip: Fax #: ( ) r E MISCELLANEOUS PERMIT REVIEW AND APPROVAL RE • UESTED: (TO BE FILLED OUT Description of work to be done (please be specific): Tear off existing roof and replace with new roofing membrane only. Will there be storage of flammable/combustible hazardous material in the building? © yes Atta chh list of materials arid store o location on se sarate 8 1/2 X 11 a er indicetin uantltles & Material Sdfet © nn 1)ita Sheets Ll Aisove Ground Tanks Antennas/Satellite Dishes Bulkhead/Docks Commercial Reroof ❑ Demolition ❑ Fence 0 Manufactured I•lousin dteplacement only ❑ Parking Lots ❑ Retainin; Walls Tem rora Facilities Tree Cuttln, APPLICANT RE VEST FOR - MISCELLANEOUS PUBLIC WORKS'PERMITS Channelizatlon /Striping ■ Curb cut/Access/Sidewalk • Fire Loop/I°lydrant (main to vault)H: Sings): ❑ Flood Control Zone ❑ Land Altering: 0 Cut cubic yards 0 FIII cubic yards ,– =sq, (t.grading/ciearing ❑ Landscape Irrigation ❑ Sanitary Side Sewer k: ❑ Sewer Main Extension 0 Ptiv.tto 0 Public ❑ Storm Drainage ❑ Street Use ❑ Water Main Extension 0 Private ❑ Water Motor /Exempt N ❑ Water Meter /Permanent N ❑ Water Meter Temp N_ — ❑ Miscellaneous Slzo(s): Slzo(s): Size(s)t ::_ t'st. quantity: gal 0 Moving Oversized Load/I1auling 0 Public 0 Deduct 0 Water Only Schedule: MONTFILY SERVICE•BILLINCS 10) ` , � Name: Phone: k'` Address: City / State/Zip; PERMIT CENTaft 0 Water 0 Sewer 0 Metro 0 Standby WATERMETER +'DEPOSi T /REFUND "8ILLiNC: Name: Address: Value of Construction • In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review • Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shalt be extended more than once. Date application cept Date application xpires: 1 9/9/99 intscpu.l.druc Application taken by: (initials) 4 . ALL MISCELLANEOUS PE 1 APPLICATIONS MUST I3£ SUBMITT • WITH THE FOLLOWING: • ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN > ',BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED > ARCHITECTURAL DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT > STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED STRUCTURAL ENGINEER • CIVIL/SITE PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER (P.E.) 0 SUUMI1 AVM I( AT ION AND RF(1UIRFF) ( 11F( KI ISIS '` tfi t�6 01iStiHl1iTgtiikS /Water Tank ' Su ported directly upon grade '�' �t e'ailihg g)0 0gall`on's and a ratio olheight to diameter or width which 1OK PERMIT RFVIFW %/�� pate: Submit checklist No M -9 °A teriite'g /Sateitititbishes.' " , t t t PttOno: ( 2061 784 -8414 Fax #1 ( Submit checklist No M -1 784 - 1058,__' __ _ Andreas: P.O. Box 70150 © ;3ClkIoomo tt t11 c.[; i � " ik:, Submit checklist No: M -10 ® !t ti ilfecztl R@'od Fi".. ':! 1,1I11-a q .t r NtiC � �F. t ,. � i'Ft ,.. t � i Submit checklist :.No: M -6 .,.),.. ci tihiHttliti6N i t}►� ' , Subttiit checklist No: M -3 0 l'itceg.. Or me r feet In Height' t 1 ,F .Submit chet;kiist NO: M -9 '("Mill AltNl•tii /Gi• liliiig/t'iteldOt3§ a • t t t Subrriit checklist No M -2 aMigceilfttietrtigipiiblic Wdf•ks" Permits 3'! to 1 1!_,.:1-j - ". :, ' } t 1 Fir *'� yip. f i Ss _ i. l 1 i '": , __ .. : . Submit checklist No: H -9 '' Subm it cliecltiigt4� jNnl, 7M-3 s a. . ry;, ri iMeiolf `ictured :Hbt)slhg,(R tD INS,10NIA,ONyipf. f ". #1a�. 'ir 'Alp! ;. z. .1�y t ,' A S . 1. y. -1: '{ � � t i i4, �-. moviig OVeFsi +�d L'ded /HMiil1Hg,i } ^' r , { '`„? i . ,' i i `�'+` , " V SuiShiit checklist No: MI5', `' to Pf1EiNo f otst2 {t` ', I,i�i , ;, " + ± {1r : t t f srr� ;• °`.. ti q.. .�.!!, }� ?• 1 : } ,Submit checklist No: M' , } G :�L :t + Vii. d RotniH ttitop Iaiip :df eo In hqi Nt' : , 'R '41.3frilt checklist No: "M•1 : I 0 , ' IfiPoPory FRiilit,e,' : . ' ; k, : ' ,{ ` ,Sub}iillt checklist . No: Mil : fel 11.00 Ciitihig' is Submit checklist No: M =2 Current copy of Washington Stale Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit k issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". ill di i ► rioti /Atitharlxad Agoitt If the applicant Is other. OM the owner, registered archltect/englneor, or contractor id l a Stag 1 ! Washington, a notarized latter from' , Ito, property owner authorizing the agent to submit this illnttiodobtdfn tl>e. e>imlt4111 be re.Ulred,as..art of this submittal, I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO RE TRUE UNDER PENALTY OF PERJURY RY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. N jkatta k r _ui,4_a1J 1I O. ZED SlgnaturAO ' 1011 AG / %/�� pate: Print name: Ronald L. Haiaht PttOno: ( 2061 784 -8414 Fax #1 ( 206 ) 784 - 1058,__' __ _ Andreas: P.O. Box 70150 Pgealt1'' WA 98107" 1.11,• II 9191 99 dtlscpnn.doc .t• ar 7* * * * ***A *** 4 * * * * * ** * * ** *** t! M # * * *A * * * **** ** * * * * * *A * ** * * * * * ** CXTV ;qtr }TUI(WTLA.r ANA T$U UMZ1 �r * *******************************************************4*** * * * ** ** * * * ** *, ** *i * * * * * ** ** ** * * ****4 * ** T RNSMIT.. Numbers 110100553 Amount' 609.25 05)6O /0f 09r44 :yrnint Methods CHECK Notations HAIGHT ROOFING Nits OD .. _ C. -; .4 • i w U t r ..... r r R wr . i M+ dr .n M r b Permit Nos Parcel Nos Olte , Addrassr s 1'.h1a" .1,44Yo rrit • 0 * * * ** !,* *fir #* 091,0 Cudu 0001.4x2:. 0t!' • 0 110 3 4 !i B 0`00/30 f.9*4 i.. wwrw4 rwsw iw' r* 1w. 4X01 -075 Typos 252304-9015 930 INDUSTRY DR MIf3CPERM MISCELLANEOUS PERMIT Total Faces' 1.101.34 •669.25 Total ALL Piste: 11101'.:14 °Alancor . .00 * * * * * * **** ****** * ** *** ****** ** *** *** *fir * * *A* * ** axq, ,04.Cription Aaaunt PLAN. CHt;CK r NONR t. -432.09 U.1JXLDXNG .. REO 664 a.13 TL.HN CHECK - Ras 432.09 t3TATE ,BUILDING SURCHARGE 4. '40 w al/ wwr.. so op ________.�___ _n.._w.._ __r. 40 05 710' 1200.40 TUKWILA..WA flIANOMt'f * **#* tk********** * ** * * * * ** * ** * ** * * * *** *4 * *** ** ** +k * ** * *4 * * * * *. 432.09 05/01/01 10 9 'fRAHSMZ'f -,' Number' R0100550 AMO�sr�hs Inil�a PRYment Methods CHECK Notations 1 M . w Mr M N M r N rt N i M rr y . r 1 N x. H ,. y ra w .. • , . w .� > .. M• w .� N ...w 1. h r P rrr . : n +r . r :a w. a I r . r, a M ra M Permit Hos MI01 -075 'Types M11iCPLRM MISCELLANEOUS PERMxrt Parcel 'Has 1' 2304 -9015 $:101 Address* 930 INDUSTRY DI total i:eVIs 1.104.34 ih 1 Payment 432.09 Total ALL Plots* 4:1:.09 Ua1HnesC 615�.�. irk 10****kfw **4 * * * * ** *** ** ** *** * + * ** *r4i *** ** ** ** * ** *fir ** Inc" ` Iu %t Da4cription A mount PLAN -CHECK HONKED 432.09 ,. -- .. ... r.wrrew..w•rr.aarsrawas+a er eft 4 1NSPECT1ON NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., *100, Tukwila, WA 98188 INSPECTION RECOr') Retain a copy with permit r`2,2"e11-6, 7S' ro)ectyy` r �- ype o nspectron: • A i • ress: r / Date Called: pec a instructions: �r..e..,!,,,,t►' .. f........:': ("« • ate ' ante • : equester: • one `o: Tod 7.2€1-/705/ Approved per applicable codes. a Corrections required prior to approval, REINSPECt7Q[. FEE QUIRED, Prior to ins ction, fee must be t b300 Southcenter Blv • ., Suite 100, Call to s edule reinspection. Rec • No,: pate: __ INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 . . • INSPECTION RECORri Retain a copy with permit - - e './' i* • tYCLI. PERMIT NO. Pm act: . . r . A' T o inspecti/A. A. 'refs: ' 4 If . D e cal ed: io . : c a instruct ons: Date wanted. a oll, muni Re • ester: 4', A Approved per applicable codes, corrections required prior to approval, $47,00 REINSPECTION REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reins ection. Receipt NQ; Date: ••■•,,,`Iki"Sr:""r ' •••14.1.-1," -""•-•; "SINCE 1919" April 30, 2001 HAIGHT ROOFING COMPANY, INC. Mailing Address: P.O. Box 70150, Seattle, WA 98107 Area Code: (206) 784-8414 INDUSTRIAL - COMMERCIAL - ROOFING and SHEET METAL WORK Fax: (206) 784-1058 INSULATING CONCRETE OOFS DECKS REROOFING SPECIALIST F;LE COPY I understand that the Plan Check approvals are subject to errors and omissions and approval of plans doe: not authorize the violation of any adopted coda or ordinance, Receipt of con- tractor's copy of approved plans acknowledged. City of Tukwila Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 Re: Commercial Reroof 930-948 Industry Drive Tukwila, WA 13y Data Permit No. ‘2 NARRATIVE OF WORK do EXISTING CONDITIONS The existing roof system on the above referenced commercial building consists of a fiberglass base sheet attached to the structural roof decking (plywood), followed by two layers of fiberglass ply sheets set in roofing asphalt. The top layer is a mineral surface fiberglass capshcet, also set in roofing asphalt. Kraft paper faced insulation appears attached to the underside of the roof deck. Minor and insignificant additional materials have been applied at random areas by others !VI?e effort to repair apparent roof leak problems.i Kam'r '� rico 1rfi. M1 a. vAt~.‘1Qr C R-2t. Z. =1 madam W , .'y. 1 .c • carTi 4 0 4 L'i cc Pe ' rit The new roof system will be applied following tear off and remove the existing roof' membrane components down to the top surface of the existing structural plywood roof deck and will consist of: Red rosin sized sheathing paper and fiberglass base sheet nailed to the roof deck, two layers of fiberglass ply sheets set in roofing asphalt over the nailed base sheet. The roof will be finished using mineral surface fiberglass capsheet set in roofing asphalt. The new roof system materials are manufactured by the Malarkey Roofing Company in Portland, OR The manufacturer's roof system specification is M4- WU- 13I- IA -I1. Sincerely, HAIGI ROOFING COMPANY, INC,. Ron Haight, Project Manager dF Or `� 't' :001 RECEIVER CtTY OF TUKWI A MAY 01 2001 PERMIT CLNTER Members: Western States Roofing Contractors Association / National Roofing Contractors Association Washington State Contractors Registration Number HA- IG- HR- C269QK !LOIo15' 1§ 1 1 i1 1 1 1 1 1 1 1 (r- 4 , 45 a.: it 7 mf5 a: Q i o'= i tA is MW FO1& fJ OUP IMP MAY 2001 PF.P. tT C7.t4 2 a a ROOFING COMPANY December 29, 1998 Haight Roofing Company, Inc, P.O, Box 70150 Seattle, WA 98107 RE: 1998 APPROVED APPLICATOR STATUS This letter is to confirm that HAIGHT ROOFING COMPANY, INC, is a Herbert Malarkey Roofing Company Approved Roofing Contractor for the following System Applications, DUR/SBS HOT ROOFING SYSTEMS BUR/SBS COLD APPLIED ROOFING SYSTEMS HEAT FUSED (TORCH) APPLIED SYSTEMS LIQUID MEMBRANE & WATERPROOFING SYSTEMS MALARKEY LABOR & MATERIAL SHINGLE SYSTEMS HAIGHT ROOFING COMPANY, INC, is authorized to install these Roof Systems. When successfully completed according to Malarkey published and /or approved General Requirements, General Specifications and authorized Warranty Application form, the project will be eligible for the specified Malarkey roof warranty, We appreciate the interest you have shown in Malarkey. If you have any questions please feel free to call: Sincerely, HERBERT MALARKEY ROOFING COMPANY, INC. n Kouba chnical Services Manager cc: Peter Chance • Malarkey Sales Representative File MIOhO1S RECEIVE °,S CITY PI, 1 UKWILA MAY 0 1 2001 PERMIT CENTER Corporate Office: 3131 N. Columbia Blvd., Portland, 0R97217.7472 • RO. Box 17217, Portland, OR 97217.0217 Telephone: (503) 283.1191 • 1.300.545.1191 • FAX (503) 289.7644 M4- CONVENTIONAL M4 -BHA 3•'4.. �,.�1i ill��� �lillJ:.ii.Jl+..1..9y�1•.}✓!." ,+ . `iIrJ X11 1�'al't4..�,�.wl.+.i:.,irJ.�' + . �� : w M� •�`.,, 4-7 Deck Type•Unlnsulated R Rating 1 Slope In B BASE SHEET ATTACHMENT, D Depending on Deck Mech. T t�W.. «f�Y%�i���'4 /mac'` °� Slope In Insulation Roofing Depending on Deck Deck Type - Insulated Rating 12" Attachment Attachment to Type Change Spec See Gen, Req. Insulation Number to Read' Combust,/Nailable Wood A 2" F,2 Hot Asphalt M4-WI-SHA-H Structural Concrete A 2" F.4 Hot Asphalt M4•CI•BHA•H Lightweight Concrete A 2" F.5 Hot Asphalt M4•LI•BHA•H Metal A 2" F.3 Hot Asphalt M4-MI-SHA-H Structural Wood Fiber A 2" F,8 Hot Asphalt M4•SI•BHA•H Gypsum A 2" F.6 Hot Asphalt M44I•BHA•H Precast Slabs A 2" F.4; F.7 Hot Asphalt M4•PI•BHA•H He ter to Tao z ror General Hequiremenis: Nespons es, quail y coniroi, aeci cons era on, an other general topics. Refer to Tab 11 for Products and Associated Materials information. Refer to Tab 6 for Execution Specifications. Refer to Tab 7 for Flashing Details. • Change last Character (H= Hot Asphalt): S =SEBS Hot Asphalt The same material must be used to attach the membrane to insulation. MLOtO76 MAY 01 2001 11/93•MAL/SW ets ea R Og 4 He ter to Tao z ror General Hequiremenis: Nespons es, quail y coniroi, aeci cons era on, an other general topics. Refer to Tab 11 for Products and Associated Materials information. Refer to Tab 6 for Execution Specifications. Refer to Tab 7 for Flashing Details. • Change last Character (H= Hot Asphalt): S =SEBS Hot Asphalt The same material must be used to attach the membrane to insulation. MLOtO76 MAY 01 2001 11/93•MAL/SW ets ea R Og 4 NPR: cb '01 02 :'+1PM NALAPk E r' ROCi I('NG CC Jnterte.. Testing Services ETA, SEMKO Warnock Horsey 1 ~ C© US Warnock Hersey cw uis 2000 Directory of Listed Produ�ts Sd.t � Appliances - Commei`uial /Consumer Building Materials CB Test Certificates Classified Equipment:=. Commercial Cooking equipment ' Electrical Utilization /Industrial Equipment Fire Resistance Ratings Fire Suppression Gas & Oil Fired products Glazing /Glass Hazardous Location Equipment Heating/Ventilation /Refrigeration • Electrical IT/Telecom /Consumer . Electronics Luminaires /Illuminating Equipment Machining distributors Manufactured Wood Products Medical /Lab Equipment/Measurement Plumbing Products Recognized Components Sanitation Compliance' Sealed Insulated Glass Solid Fuel Burning Equipment Surface Burning Characteristics of Building Materials M 01-015 APR 26 '01 02:42PM MALARKEY ROOFING CO PYRE RE -'CANT PRODUCTS & COMPONENTS PI OSCENIUM FIRE SAFETY CURTAINS (Cent'd) TMERMD TEX INDU$T1hIES • Oreenvtlle, SC USA (Cent',') Umltatons: 1, CS r 1 c100• (�ne°n •wire construction) 28 o ill. yd 2. CSC•02PC (non•wito construction) 34 & 38 onto. yd 3, C8C•G2W• fnen•conoetve Mre•relnloreOd 40 os/iq. yd construction) • 4. FF1)•00•37•FCC• 38 otltq. yd, 1. P rapes dsleg Pera•Anunld without who reinloroemcnl 2, Pkoprtotery Psra•Aram1d with wino reinforcement 3. Proprietary t3lasa 4, Proprietary Not1•Wlro Threads AM Fabtfes and Seam thread Combinatwne, 30 Minute Standard The • Tomperatuta Cuero., AN Flbrltti wit Seam Thread Combination combing ng al least one row of Proprietary mono or Proprietary wire•roMlorcad Para•Aramld Thread, 60 Minute Standard Tune. tempetewro Curve, AN wire•r.Mbrted Fabrtorhvftn Sum Thread Combination containing at lead oM row of Proprietary wite•teM o,ced Para•Aram$d Thread, 30 Minute Constant 1700•F. All Fabrics and Bum Thread Combinations, 10 P8F Pressure Loading. •M3nbfeeturer's peignalion 11100P COVt111100 $V $ TAO roof Orverhg syslenidIn chit Sedan have been Kva cited for eciernal f!!e reabtance C1aulfieadons A D. C as outlined by Ih0 b'ow{ng tint meads: ASTM 8•1011 • Arno/loan Society for Toiling 6 Materials Standard Methods of Fire Toll 01 Peet CO' vering FM 4470,1Klfon 8.1.A • Factory Mutual 'Standard Method of Toil for Flro FlNisIence of float Covering Malodors' NFPA 260 • Nation,' Piro Proloction'Standsrd Method of Fdo Teals of Roof Crewing' U00 184114 • Uniform Su1>dwg Coda lest Standard tor DOtormining the Rite fleWdwIty 01 Roof Coetk+g Malorlds' ULC•0107 • Underwrliers' Lobo/Mottos of Canada 'Standard Method of Tb011 for Fire Reitstanco of Roof Covering Materiels' UL 710 • Uneorwrltars' lsboratodas ine,'Tests for Fi'e Rsabtanco of Root Coveting MatoriNa' ISO synem sting Wake Ova deck subitrsio as either non• oombusdble or eombuslte. Ina oempononl malodals of each system mull be eppMed In IM onto/ In Mich they ate Noted, AN components or the syolcm moat be Cited for eaAMnsi Ors ellpoaw0 by an away acceptable to rite ANJ, Some Roof Covering 9ysto ma hove been oveluatod for other peA0rmanoe ahsriclNNdca, (n iddltion to Muni, fire exposure, Whom spoilcebN, such edetdonal podormanoo characierlatkki are noted within the ipsO10o Sian, In al Wes, manulscturet'e tniUUCdone should be oon ;ullod o, 1MlaffeMOn proiedune and ICli Hs not covered by t hoso luting;, Listed Motatels aro Identified by a tabil or marking bearing Ma wWtding, 'U ;tad Gompanenf , o rwiron;o numbs, 01 code and tno WA NOCK M tiSBY CerliAMtion Mark. ADS WIAT'NEADEK CANADA LTD. • Kelewne, DC CANADA CLASS Comb. Deck Slope 114112 1, bit' Dallas Fir Wood and grooved pywood deck, 2, Wealheiek GT 300 fully adhered with 'ADS Woalherdek WO 703' adhesive, ROOF COVERING SYSTEM (Cont'd) CPI INTERNATIONAL, INC. - Lek* Foreat, lL USA CLASS 'A' Slope: Unlimited 1. ''Oanpalen•OuadwatllY tonslucent panel system, CLASS '0' Slopo: 4112 1, ••Quedwalt 3,0' translucent panel system. CLASS '0' Slope: Unllmlted 1: "2.2 Inchon Danpalon•Ouadwall Class C Penet'70 System' translueont panel system, Slopet Unlimited 1. •"2.2 What Oenpaton•0uadwau Sldn System'ttanslueonl panel system. DEC•K•INO • Surrey, DC CANADA CLASS "A" Non•Comb. Deck Slopes 114:12 The Perdue! PVC membrane Is fully adhered 10 the deck substrate either with a moo (1,emm) grooved, doweled COMUng of Matt adhesive, applied to tho subMUale only. Or wtth s rolledtruehed coaling et contact sehosrve, eppMed to both the submits and the undonlde of Me membrane et 1 rate of 450 son. (41,11n%2) per pail, 1. Concrete Substrate • Congests subsbalas must bo fully cured (t minimum of 30 days) and protected from Ground moisture with a vapor barrier 10 reduco Itydrofys :i, M seder and door ifuuholdi, jsnlbs, 001111, scuppers and facts must have a metal flashing In accordance with SO MA. 1402,2 and 1600 Of Iho Codo. Concrete surfecee mull be ground smooth or levelled with a IloontevONing compound, 2, Contact 6 Latex Adhesive • The DEC•K•1N0 adhssivo is avallablo ether as a blue, solvent.based, No, 1017 cents!, adhesive, of u e w *ter•bated, synthetic polymer, No. 300 latent adhesive, Shell ilk for both ♦ ,'hooves Is one year when alorad under dry COndidone. • 3, OQC•K•INO Flo4hlevstling Compound • The DEC•K•ING door. Welling compound l; a cement•bassd, dry•powerad, and a DEC•K•IND acryik•Ntox bonding•s0diave solution mixed wtlh water al a redo of ono posrt diluted eddnivO 10 24 part by volme, Shelf plc Is 2 years when cored under dry conditions, 4, OIC•K•ING Liquid Chemical Seam Seller • The D2C•K4INO kquld DOOM teeter is a Clear chemkal Squid adhesive made up of a methyl ethyl ketono formulation, 'toted In 1 quell (946 ml) cans, Tho adhesive has O Shalt $ s of one Ow from the data of manutaciure when stored In unopened COttlttnsrs that as protected from hooting, CLASS "C" Comb. Deck Slope:1 /4112 The Roolaooi PVC membrane Is fully sobered to th0 deck aubwate Other with a 1110' (1.emm) grooYOd, Igo/sled egedng of Rolex edhestve, applied lo she subsdato only, or with a rolted/bruihed coating 01 contact adhoIM, apprsd to both the sub:Pali and the underside 01 the membrane al a rate of 460 egdn, (41.0m2) per pail, 1, Plywood 8ubsuato • 6/6' (10,0mm) axtedor grade plywood aubivsloa with edges blocked or tongvo and groove, The substrate moil bo Inatetied in acoordance with the code, 2., Contact 6 LIRA Adhesive' The DEO•K•INQ sdhes►ve is evawsolo olinet as a bluo, solvent•basod, No, 18•T contact adhesive, or se a water•based, ayntheec polymer, No, no latex adhcitve. Shod file for both adhesives Is one year when stored undo( dry Condition;, 3. 0EC•K•ING Ftoor•Levening Compound • The DEC•K•INO floor• IOvenfng compound to a cement•D4sed, dr•powered, and a DEC•K•ING acryuo•lalesc Dondtng•eddtive solution Ostia with Water at a ratio Of one p0011 diluted iddIUve to 24 pan by volume, Shall ON Is 2 years whop stored undo( dry conditions. 4, DEC•K•ING Liquid Chamlcsl Seam Realer • TM DIC•K•ING liquid a;am;calor l; a clear chomical liquid aOhaalve mode up of a methyl ethyl ketone fprrnuletion, stored In 1 quart (946 ml) cans, The adhesive has a shelf ale of one year from tit; date of manufacture when stoned In unopened container that are protected from freesing. 910 MIOIO75 A 26 '01 :4 M—MAEAPkEY ROOFING • FIRE RESISTANT PRODUCTS *OOP COVFAINO SYStrM9 (Coned) MALARKIY ROOFING CO. • Portland, OR USA Comb, Deck CLAD .A« slope: 1/2:12 1. Optional Insulation: Manufacturer spaaiffed, cerdfed Insulation, 2. Isocyanurale Inst,ladon boats mechanically fastened 3. '1•Py 11S01','$SO4','4S1$',Visor, •0803', WOG Panoply, Mathanicaly deNned, fully seared with A$TM•D•912 roofing asphalt, •01 000 [SNAvenf self-adhesive base sheet 4. '1., 2•, 3-Piles WOO', •,x508' ply sheo0301' base sheet, hot mmoopppped, Coated with 'Malarkey Asphalt, ASTM•D -1227 asphalt .ion at 4 gallsq, ' Comb. Deck Bloom 1112 1. Optional insulation: Manufacturer speclf*d, certified Insulation, 2, 2 Plies ol'1SOt• or •$316• base sheet (ASTM 04001) maehanieally attached. 3, 1 Fly of '$16O APP', torched. 4; 2 Gallons per 100 so/ft, of °MS AluMtinum Coaling' (per AVM 0112441 Type III), Comb. Cook 1•1/1:12 1. Optional IriOuli$Ont Manufacturer spedAed, eartfied insulation. 2, 1 Pry of '01000 COHA Vent, sett adhesive bare sheet, glued. 3. 1 Py of'S161 APP' cop sheet, Torched. Comb. Dock Mopes 1 :12 1. bpbonat Insulation: Manufacturer op:Wied, cetUfled Mr Mallon, 2. 1 Pry of not or $616, 3. 1 Ply of $160 APP, torched base sheet 4, 1 Ply el 0110 APP, lorrhed base shoot. 6,, 2 t7sllons of Aluminum Coaling, Comb, Deck , Stout 1/2t12 1, Cp llonal IAtuiadonl Manufacturer specified, cortiAed Ineutstion, 2, '14Py'$s01•,'0$15.,'$6OY, vo03','1101 Panoply' base anent hot mopped, machankNy fastened, 3, •t•, 2•, 31041 Of •OWO•, •0606' ply sheets, hot mopped, 4, •I.Pfy'0601 Ptcmlum• cap shoat, hol mopped. Comb, Desk llapet Unlimited 1, Optional Insulation: Manufacturer specified, certified In1ulstion. 2, "A3O' Alaskan 808 Modified Plborplsl 8hlnoles, installed par •Manulectwors kabucbons, Nolen This system la A81%104161 Wind Revisions* rated up to 110 mph. In addition, it hes boon tested to UL•2218, and 11 has achlovod a class 4 Wont rooletanee rating undo► ;Mods estaafehod by the tiaras Oopsdrnent of 'neurone*, Comb. Deck Mope: Unlimited 1. Optional InsuteUOn: Manufacturer opeclAed,'Nettled Mautabion, 2, '0240 Hurricw►r' 805 mowed Pibetglsu Shingles, Ineieltsd per msnuAwtureeo Inlnucttons, NMI Ynls system is ASTM•0•a161 Wir1d Plosistance rated up lo 110 mph.ln *Mori, It has bean waled to womb, and it has :chivied a elm 4 kmpast roslsiancs rating undo( crltet4 oolabiishe1 by file Yuba Oeparbnmt of Insurance. . Comb, Deck Glop. dial: 1, Colocol Ineulolon: Menufac urer spedMiO, earls lod insulation, 11. 'Optional • 1•Ply •0501','1102•.'$ Q3'•'4e105' bus shoo, medlahltaly &Radhod or luilY adhet*d wash "006', ASTM'D•3019 coi0 Ptooese idhufw, ABTM•D•312 roofing asphalt, hoi moppod,1.ply '111000 88NAwnlr'.NU.adhesive base /he1L 3, '1 'MOT,'$603','$ti05' or 2•Pass •1501' bolo ;hest y taelened or tiny s4Mnd with V705", ASTM•0•3019 tole prows *dhulv*, ABTM•D'312 tooling alpha):• hot mopped, I'Py '01000 I$$Avsntr selbadhul a base sheet. 4. ',Ply 'MO Premium' cop shoot, (coy adhered with A8T40-3019 cold process sdMilvo, ASTM•0•312 roofing asphalt, hot mopped. COMPONENTS P,4/4 MALAnK 00FlNG CO. • Portland, OR USA (Cent'd) Comb. Deck Slope: 1/2:12 . 1, Optional Insulation: Manufacturer specified, certified Insulation. 2. •1•, 2•,:•Plies •2501 .'$802',. e03•,'seos panoply base sheet, medhsnlceffy• fastened, or tufty adhered with ASTM•0.912 roofing asp hot mopped. '1•Ply halt 1911 fbyplass "cap sheet, torched down or fury adhered with 1$7054, ASYM•D -301 D cold process edhefive, roofing asphalt, het mopped. Comb. peck Slopes 1/2112 1. Optional Insulation: Menufsclurer specified, certified Invitation. 2. '1•, 2•, 3•P►ies `0501',6/501", '0003°, 'MOS Panoply' base sheet, mechanic/ 0y fulened, or fully adhered Ws ASTM•0.912 tooling asphalt hot Propped. 2, '1•Pry'S311 Polypi's** sap sneer, torched down or fully adhered with cold process adhrsiva or rooting asphalt, hol mopped. 4, Manufacturer specified water based emutslon coming meeting AVM-04227 epectficatlons. Comb, Dock elope! 1/2:12 1. OpOena' Insuladon: Monufuturer wedded, earthed insulation. 2, '2•, 3•PPlies'1501•, 40602`,'$603','.V OS Panoply' base shell, fully *dhered with A81M•0.312 roofing asphalt, hot mopped. 3, •1•Ply'S801 premium• esp sheet, fully adhered with AST/A.0-3Q roofing uphill, fat mopped. Comb, Deck Slopes 1/2112 1, Optional Ineutstlon: Manufselurer specified, certfed Insulation. 2, 'MN '1501' Nay adhered with A8TM.0.312 roofing asphalt, hot mopped. 3. '2•Pges'1603•, fully adhered with ASTM.a312 MAN asphsit hot mopped. 4, Surfaced with ASTM•0.1227 asphalt emulsion applied at s minimum coverage file *43 gsI1sq, oM.eok 0C romp ID; 10O4i11 1, Optional Insulation: Manufactu cr spoelfed, oelllred Inautrdon. 2. '3•, 4 •Pges'0101','0002'. vow '1101 Panoply' base aM•L fully adhered with '1706" Adh*IH., or ABYM•0.3011 cold process adhuslue applied at a coverage rills of gal /oq, each py. 3, 'Cooled mil ,0706 A6Itlsivl', Or ASTM•11.3- 010 cold promo adhuPr4, at 2 galisq, and embedded with 3M Blend No. 11 tooting prstwIee et a minimum coverage rate of 60 Ibs /sq, G44,, 'Coaled with '070$ Adhesive'. or ASTM.O.3010 cold profess adhesIvo, al 4 galIKq, and embedded with roofing gravel ballast at o minimum coverage rale 01400 Ibe /sq. Comb. Desk Slope: *s1$ 1. OpU0411 Insulation: Manut.clunr specified, cgrukied insulation, a, ee. '1513' base sheet or invsnod'1502' cap sheet, m/chan e y 'Mood (optional whin minimum 111' Insulation board Is aPP�d)• 3. 4*, 3.Plisa'P101' bolo sheet, 9119111'1 01' py sheet. luily adhered with ASTM•0412 roofing esphelt hot mopped. 4, 43,171, '450% Wrasp Sloth fury adhered with AllYM•D•315 rooting uphill, hot mopped. Comb. each Vim 1 /311I 1, Optional Insulation: Manufacturer epedllod, unified Insulation. 2. 'I Ply 61301', •0602'. '0305 Panoply' glass libeled bus Oheet mpchonically fast:mod. 3. •1•Py •0918 Potyglass' cap shoot hely adhered with A8TM•0.312 Type III roofing asphalt hot mopped, of '1701' of ASTM•0.3019 Cold process 1Ohc0w• 4. Outfaced with'Melerkoy' aluminum tool coating appuod at a minimum courage isle of 1.1/2 gelieq. 41:Ci-OCD rCVi:I.A ray MAY o 1 zoos _.MIDI -076 • SALINAS VALLEY :'AX PAPE i cQ. 1110 AtWIK11'1'N1f111.1'. f • KO. 110X fit( • .AIJNA.S, CAI J?. 91101 (400) 414197 41 IAY. (. 00( 424'5(1114 • P.A VAN IWD ROSIN SIZED SWATHING STANDARD 4 La BUILDING PAPER • • rfOOPCRTIESI xnexpanaive, non- staininq,SIZED for limited water resistance, water vapor ixrmablo. .010 thi 4 Ss, biodegradable made from recycled fibres. Weighs approx. 4 LOS per Square PUT UP' 36" x 500 Sq Ft TYPICAL U,Si.S, Aa ' clip shout in built -up roof systems, will met system requiromints of built up roofing manufacturers. Ceodeni.ng in floor structures. Cover sheet, "drop cloth ", floor protection. Slip shout under rigid foam in rood structures. Subjects MTAr tccl Rosin.Sizod Sheathing This is t' ' ' .:la:,•ify specification 3t;ot43 an it relates to RATAN Rod Rosin ;Lied Sheathing. This p: ^d • is cccuttri,'ciauy /temptable whenever the mpnuraeturer c. ; roofing uystan calls for semC. By itself, RATAN R d Rosin 4ized Sheathing carries no Mara Spoc or AS 14 number, but w!' 1 Imply as part of a system specified by a roofing m4nbfact:u cif (' ; ~h may carry soma epee numbers } . RATAN P,1 Ain :And Sheathing is meth from recycled kraft and Ot.•oundwood fits • with synthetic arcing added to provi ©o required slip and water rc:;i,! :t proportion. xg gm t..;;;, . zermntion is required plcaaa advice. sineove .y, RECEIVED CITY OF TOW:ILA • . 01 2001 Charles Nolaon Concrat Matt p= f'Cr•J,"i1 C'.NTER Malarkey TECHNICAL PRODUCT DATA SHEET #501 PREMIUM 1"r" FIBERGLASS SBS BASE SHEET PRODUCT ilksati rte!( Product Use: #501 Premium 1 Fiberglass SBS Base Sheet is suitable for use as a base .sheet for hot asphalt. cold process. torch applications. This higb.performance base sheet may be used over various combustible and nun.cotnhustlble deVks ass the initial ply or multiple interplies for a specified roof system. Consult Malarkey Bullt•Up Roofing Systems manual. Precautions: #501 Premium 1 Fiberglass SBS Bare Sheet requires dry storage and protection from the weather. Do not apply wet base sheet, Roof decks should be sound, dry. smooth. meet necessary local requIrelnents and provide positive drainage, Composition and Materials: #501 Premium 1 Fiberglass SBS Base Sheet is manufactured on tested Malarkey fiberglass mat impregnated and coated with an SBS modified asphalt and lightly surfaced with a mineral release material. Application Standards: Approval for use on all fire•rated roofs. See Malarkey manual tor specified iiiforination. Contains the asphalt equivalent of Type 02 base sheet end may be used where a quality base sheet is specified, Iscuswiaillatt Typlcal average properties, 3 sq. roll: Weight/square Weight/roll Dimensions Thickness Lay linos 30.7 lbs. ( 13.9 kg) 92 lbs. (41.7 kg) 39ih" wide x 99' long (1 mx30.2m) 45 mils 2", 121h" and 181/4" minitnutn (50.8 mm. 317,5 mm. 476.2 nun) Meets or exceeds ASTM D 4601.91, Dade County Approval. Complies with and listed by i ti.. PM and W II, APPLICATION PaloCtntitg #50I Premium 1 Fiberglass SUS Duo Sheet shall be applied as specified in the JN&larkny fluut.t tp Roofing Systnlnx MIMIC It may be applied in cold weather. PIa& o follow cold weather application and general requirements, WAa1tANTI N Malarkey Roofing Company offers various warranuos to meet specific requirements, The warranty package includes 5.. 10.. 15• and 20.yoar limited and unlimited coverage. Contact Malarkey Roofing for full details, TFCHNIC.AL Staylt'yi Malarkey Roofing has technical assistance available for all phases of bullt•up roof coverings and requirements, inspectors are available for consultations, job site and final inspections, Contact your local representative and/or Malarkey office for detells at 1.800.545.1191. AVvAlua11L1Ty Malarkey 0501 Premium 1 Fiberglass S135 Base Sheet is available throughout North America and Pacific Rim countries. Consult your nearest Malarkey source for additional information and availability. f fkaivr 0441.97. tivprn.,da is prallowly plbKs 44 4 9. RECEIVED CITY OF rtiu, /'f1 A MAY 01 2QQ1 PE[ "11 C :LATER M101 -075 0W97 =MAt1HE MaIarkey TECHNiCAL PRODUCT DATA SHEET #500 PREMIUM 1"1 PLY SHEET Product Use: eSoft Premium 1 Ply Sheet is a high•strength ply sheet suitable for use a% an interply in multiply roof sys• :ems. This high strength ply sheet may be used over various combustible and non•comhustihie. decks as the initial ply or in conjunction with multiple ply roof systems, Please note precautions for limltationa. Precautions: Do not mechanically attach ply sheet to any deck, A base sheet should he specified for mechanical attach. ment. Ply sheen are not recommended for cold process application, Malarkey ply sheets require dry storage and pmtec. lion from the weather. Do not apply wet ply sheets. Roof decks should be sound, dry. stnouth. meet necessary local requirements and provide positive drainage. Composition and Materials: "500 Premium 1 Ply Sheet h manufactured with pure coating asphalt on tested Malarkey fiberglass mat and treated with a nonstick agent to facilitate unrolling. No mineral reteasu is used. Application Standards: Approval for use on all firc.rated roofs, See Malarkey manual for specified infartnatian, TecuszeL DAm Typical average properties, S square roll: Weight/roll Woight/oquere Dimensions Lay Limos Breaking Strength 48 Ibs (21.77 kg) 9.6 lbs. (4,35 k$) me wide x 165' long (Im wide x 50,3m long) 2 ", 9' /s , 121 /j" and 18'/4" minimum (50,8 mm, 238.1 mm, 317,3 stun. 4761 tern) 44 lbs. (19.9 kg) *Winch minimum. both MD & XM Complicit with ASTM D 2178.89. Type iV and listed by PM and Wit, Meets or exceeds tint requirements of 111.53 A Typo 01 for asphalt content and minimum weight. Dada County Approval, APPLICATION Pancenuaz N300 Premlum 1 Ply Sheet shall be applied as specified in M is ar ealt1L•, jp Renner Svr do manual with u specified base sheet and/or surfacing, It may be applied in cold weather, P10114o follow cold weather application and ylunurel requirements, WaaaatrT$g Malarkey Roofing Company offers various warranties to meet specific requirements, Thu w *manly package Inuludas 5.. 10.. 15. and 20.year limited and unlimited coverage. Contact Malarkey, Roofing for full details. THHICALS(cs Malarkey Roofing ht technicai aslstance available for all phaaa of built.up roof coverings and requirements, Inspecturs are available for consultations, job site. and final inspections, Contact your local representative and/or Muturkuy office for details at $00/.545.1191. Malukey 11500 Premium 1 Ply Sheet is available throughout North America and Pacific Rim countries. Consult your nearest Malarkey source for additional information and availability, Er:ecti9,Q44141. 5qw4 *U 44. f ccElyan c f-Y Of: TU <" i MAY 01 2001 1 1 1 t ys 11 Malarkey TECHNICAL PRODUCT DATA SHEET #502 PREMIUM "' FIBERGLASS MINERAL CAP SHEET pitonttr_t nESentrrtos Product Uses #502 Premium Fiberglass Mineral Cap Sheet is a fire•rated (FR) cap sheet manufactured to street the steeds of a conventional, quality built.up roofing system. This cap sheet can be applied with hot :Hopping asphalt or cold process adhesives. This product is used as a surface sheet for multiple•ply roof systems. Precautions: #502 Premium Fiberglass Mineral Cap Sheet requires dry storage and protection from the weather, chi not apply we cap sheet. Roof decks should be sound, dry, smooth, meet necessary local requirements and provide positive drainage. Composition and Materials: #502 Premium Fiberglass Mineral Cap Sheet is manufactured on tested Malarkey fiberglass mat, The glass mat is impregnated and coated with oxidized alphatt, filled with fire•retardent fillers and surfaced with ceramic grannies for ultraviolet protection and weatherability. Application Standards: Approval for use on all fire•rated built.up roofs, See Malarkey manual for specified informs. tion, Ttrgrt A DATA Typical average properties.1 square roll: Weight/roll Dimensions Granule Adhesion Ttticknoos 78 Ibs, (25.4 kg) 39th" wide x 33' long (I m wide x 10.0m long) 0.5 grim loss 90 mils Listed by UL. FM and WIt. Complies with UL 55A Type 03, UL 5513 23. Moots or exceeds ASTM D•3U0)•91. Dude County Approval, Federal Spec SS R 00 D Clad 3, 0502 Premium Fiberglass Mineral Cop Sheet shall be Applied as specified In the Malarkey ttuilt.t tp Roofing Systems manual with specified base sheet and/or interply shoots, It may be applied in cold weather, Please fallow cold weather application and general requirements. zuatinsii Malarkey Roofing Company offers various warranties to moat epeclflc requirements. The warranty peckai;e includes 5.. 10•, 15• and 20•year limited and unlimited coverage. Contact Malarkey Roofing for full details. Tamara. Sf.BVICY4 Malarkey Roofing has technical assistance available for all phases of built.up roof coverings and requirements, Inspectors aro available for consultations, job site, and final inspections. Contact your local representative und/nr Malarkey office for details at t100/545.1191. MAUI= Malarkey 0502 Premium Mineral Fiberglass Cap Shoot is available throughout North America wtd the Pacific Rim coon. trice, Consult your nearest Malarkey source for additional information and availability. a:rtnirt Oa_W.97. Sup w4tt W pnriQWb p$011;ht44 l4. RECEIVED CITY OF T(JK ' IA MAY 01 2001 MIOIO7C r4i97.MAL4IE it PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER MI01 -075 DATE: , 5 -01 -01 PROJECT NAME: P G P / BUILDING 24 SITE ADDRESS: 930 INDUSTRY DRIVE SUITE NO: Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # AFTER Permit is Issued Building Divi ion Fire Pretf ltion G '�I PIA 5.341 Public Works L. Structural ❑ Planning Division Permit Coordinator DETER INATION OF COMPLETENESS: (Tues., Thurs.) Incomplete ❑ Complete Ej Comments: INN DUE DATE: 5- 3 -21/01 Not Applicable ❑ TUES /THURS ROUTING: Please Route Structural Review Required No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORK CTS IONS: (ten days) Approved EI Approved with Conditions REVIEWER'S INITIALS: DUE DATE -3M -200 Not Approved (attach comments) Ej DATE: CORRECTION DETERMINATION: DUE DATE Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) ❑ REVIEWER'S INITIALS: _ DATE: VUOUIIDCIC PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP TIVITY NUMBER MI01 -075_ PROJECT NAME: P. G P / BUILDING 24 SITE ADDRESS: 930 INDUSTRY DRIVE „�rigina) Plan Submittal Response to Correction Letter # DATE: 5 -01 -01 SUITE NO: Response to Incomplete Letter # Revision # _.. AFTER Permit Is Issued DEPARTMENTS: Building Division Public Works Fire Prevention Structural Planning Division Permit Coordinator E.] DETERMINATION OF COMPLETENESS: (rues., Thurs.) Incomplete ❑ Complete Comments DUE DATE: 5 -3 -2001 Not Applicable ❑ TUES/THURS ROUTING: Please Route ❑ Structural Revi w Required El No further Review Required REVIEWER'S INITIALS: DATE: AP_ LS OR CORRECTIONS: (ten days) Approved ❑ Approved wltn nditio REVIEWER'S INITIALS: CailiECIION DETERMINATION: Approved Ei Approved with Conditions REVIEWER'S INITIALS: DUE AATI; OS-,. -2AA� Not Approved (attach omm ts) ❑ DATE: DUE DATE Not Approved (attach comments) Ej DATE:. w►srwIcnoc 11111111111111IU1a ill f•!1111•!rt111A rib ••.••••13.01i1i1 mIMNMMDrmerrtMs• ... 8,i .'l, i,i,P Ill'. P 1I•V.,.*10V1C.»IMpetli!0 »vaU'.r 1•.:.;:U U...:,: •U••,.�vri•I. -rn C.vw. °a.. .• r l•. .•.» . TENANT NAME: G i (.,(J �I� V� �4 I'EItMIT NO.: M1001 p`r 3UILIMNG PERMITS INSPECTIONS ❑ 00001 Progress Inspection Status ❑ 00002 Pre- construction ❑ 00003 Investigation ❑ 00004 OK to Occupy ❑ 00005 Remove Stop Work Order O 00006 Follow-up ❑ 00007 Pre•Move Inspection ❑ 00050 WSEC Residential c 00060 WA Ventilation /Indoor AQC 00070....,.,NLI?A Inspection /Modular Strucl 00071 Mobile 1lnnteTie Down insp 00072 Marriage Lines . 00090,.....,Rested) 1 00095 Footing Drains 00100,......,Foundation Footings 00200..,....,Foundation Walls ' 00250 Foundation Insulation 00300 Concrete Slab /Slab insulation 00350 Crawl Space 00400 Shear Wall Nailing 00450 Plywood Wnit Sheathing 00500 ...... ,Roof Shcnthing Nailing : 00525 Plywood t)cck Nailing f'1' 00550 Exterior Wnll Sheathing 00600 Masonry Chimney 00610 Chimney Inslnllntinn/AIITypes 00700 Fronting 00750 Roor /Ceiling hisnintlon 00800 Floor Insuintlon 00801 Well insulation 00902,, .... ,, Exterior hoof InstsIulion 00903,,..,.,( dinging Inspection 00913 Lighting and Controls 01900.,, , Suspended Ceiling 0 000,.,Interior Wallboard 1nslcoing 0 001 ...... ,, Exterior Wallboard Profaning 0 110 Pre-Move inspection 0 115 ..... Motor Inspection 0 120 Pre -Demo 0 140 Prc•rcruof 400 .... .,,trhtat•Flre 0 700 .... ,..,, Fitnl•Utlilditg 0 900, „...,Final•Reruof 03100,.,,..,She Visit 04000 Special-Concrete 04001.,,,,,,,Special-Bolls in Concrete 04001 Special- Mom/Resist Cone Frame 04003 Speciat•Iteinf Steel prestress 04004Special - Welding 04005....,,,,Special- lligh•Slrength [lotting 04006,...,..,, Special- Structurnl Musanry 04007Speclnl•Reinf Gypsum Concrete 04008,,. Special - Insulating Cone Fill 04009 Special -Spray Fireproofing 04010 Special- Piling, Piers, Cnlssons O 04011. ..... Special- Shatcretu ❑ 04012.....,Special•Gradilg, F.xcav /Fill ❑ 04013 Special - Retaining Wail 0 04014 Special-Panels 04015 Special - Smoke Control System CONDITIONS 001 No changes to plans unless approved by 131dg Div 0010 Special inspection required, notify Bldg Div ❑ 0011 Special inspector shall submit final signed report O 0012 New ceiling grid & light fixture shall meet lateral bracing d 0013 Partition walls attached to ceiling grid ❑ 0014 Readily accessible access to roof mounted equipment O 0015 Engineered truss drawings & colts shall be on site O 0016 Exposed insulation backing mntcrial ❑ 0017 Subgradc preparation including drainage, excnvatintt ❑ 0018 Statement frotn roofing contractor verifying tire retardant class of roof 0019 All construction to be done in conformance w /approved plans ❑ "No work shall be done In addition to those niodificntions...” ❑ 0002 I'iunibing permits shall be obtained through King Co 0 0020 Structurnl observation shall be provided for this project ❑ 0021 All fond preparation estnblishntents must have King Co ❑ 0022 Fire retnrdnnt treated woad shall have fianic spread or ❑ 0023 Notify Building Division prior to pincing any concrete ❑ 0024 All spray applied fireproofing sloth be special inspected O 0025 All Wood to remain in placed concrete shall be treated ❑ 0026 All structural niasnnry shnll be special inspected 0027 Vnlldhy or Permit 0028 hack storage requires separate permit 0003 Electrienl permits obtained through L & 1 ❑ 0030 No occupancy of building until final insp by I3Idg i)Iv ❑ 0032 Remove nil weeds, concrete, smite fotlrttlntiulis, Pint concrete 0036 Manufacturers itstallntion instructions required on site "B`11) maximum allowed per 1997 WA State Energy Code" 0035 Clnitnct 1'W Div to obtain insp for water /sewer connect 0039 A C of O will be required rnr this permit 0039 Pinal nppruvnl for nil '1'1 wlln the limits of the SC Mail 0004 ,...,All mechanical voik shall be under separate permit 0040 All e011/11111C11011110130 to be 111 CO1111111aneo with 8.2'1'MC 0041 Ventilation Is required for n11 new rooms & spaces 1005 All permits, (lisp records & iggnovcd plans avallnble 0006 All structural concrelu shall be spcclul inspected "Applicant shall obtain ft sepnrntu plumbing permit from King Co" "Anchoring • All new Construct and substantial improvement shall be anchored 10 prevent flotation" All structural wailing shall he done by WAIIO certified 8 a B 0 0 0007 inspector 0008 ,.......,. All high- strength bolting shall he special inspectell 0009 ,......... iiolts installed In concrete shrill be special Inspected 0031 Comply with requirements ofTMC 16,04 0034 Kemovnl of septic tanks require npprovnl and compliance with King Co !kohl' Dept, "Obtain required inspections from npproprinle writer & sewer districts" "Fuel burning appliances "Appliances, which generate...," " Water heater ;;halt be anchored.,.," "Reroal" Man Reviewer Permit Tech: Date: Pate: " -e PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER MI01 -075 DATE: 5 -01 -01 PROJECT NAME: P G P /_BUILDING 24 SITE ADDRESS: 930 INDUSTRY DRIVE SUITE NO: Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # __ AFTER Permit Is Issued DEPARTMENTS: Building Division ❑ Public Works ❑ Fire Prevention Structural ri] Planning Division ❑ Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete ❑ Comments: Incomplete ❑ DUE DATE: 5-3�Z00 Not Applicable ❑ TUES/THURS ROUTING: Please Route El Structural Review Required El No further Review Required REVIEWER'S INITIALS: • i DATE: C-.3- °I ApyROVALS OR CORRECTIONS: (ten days) Approved ❑ DUE DATE 05 -31 -2001, Approved with Conditions ❑ Not Approved (attach comments) ❑ REVIEWER'S INITIALS: DATE: IMP cougn ON 2i.T miNtsij ON; DUE DATE Approved ❑ Approved with Conditions E Not Approved (attach comments) E REVIEWER'S INITIALS: DATE: Y•UQVIUM7C LICENSE DETAIL INFORMATION Form Page 1 of 1 STATE OF WASHINGTON DEPARTMENT OF LABOR AND INDUSTRIES Specialty Compliance Services Division P. O. Box 44000 Olympia, WA 98504 -4000 THE RESULT OF YOUR INQUIRY FOR LICENSE NUMBER SELECTED IS: LICENSE DETAIL INFORMATION Current Filter: None Registration# or License HAIGHRC2690K Name HAIGHT ROOFING COMPANY INC Address PO BOX 70150 Address City SEATTLE State WA Zip 98107 Phone Number 4254836600 Effective Date 11/12/74 Expiration Date 5/2/02 Registration Status ACTIVE Type CONSTRUCTION CONTRACTOR Entity CORPORATION Specialty Code GENERAL Other Specialties UM Number 600142387 * * *yL " WNER($) EQ T1.tS. L.IC.ENSE* *_ * * *VIEW CQN_RAQtQR BQNP /S VINGUNEORWATIQN * * *. * ".._T411E.101,Q,VARYIQJKVUMMI$ AND CQMPLANT$ * * *. _ *..*_.. IEV , GQNTRACTQR _INSURANCE,INFQRMATION * * New inquiry by CITY, NAME, PRINCIPAL OWNER NAME, NUMBER, UBI NUMBER or return to the LiScI Construction Compliance Home Page http:// www ,lni,wa,gov /contxactors/TF2Form .asp ?License- HAIGHRC269QK. 5/7/01 city of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director September 27, 2002 Mr. Ron Haight Haight Roofing Co. PO Box 70150 Seattle, WA 98107 RE: Permit Application No MI01.078 Location; Pacific Gulf Properties 930 Industry Dr, Dear Permit Holder In reviewing our current records the above noted permit has not received a final Inspection by the City of Tukwila Building Division. Per the Uniform Building Code and/or Uniform Mechanical Code, every permit issued by the Building Official under the provisions of this code shall expire by limitation and become null and void If the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if tho building or work authorized by such permit Is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: 'Cali the City Of Tukwila Permit Center at (208) 4314870 to arrange for the next scheduled inspection This Inspection Is intended to determine If substantial work has been accomplished since Issuance of the permit or last inspection; or If the project should be considered abandoned. The Building Code does allow the Building Official to approve a on.dme extenalon go to O drw. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicant's control have prevented action from being taken. In the event you do not call for the above Inspection or request and receive an extension prior to October 15. 2002, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, K Kathryn A. Stetson Permit Technician a XX-CaeP Xc: Permit File No.MI01.075 Bob Benedicto, Building Official 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98/88 • Phone: 206.431.3670 • Fax: 206•431.3665