HomeMy WebLinkAboutPermit MI97-0086 - BOEING #2-89 - DEMOLITION61
Nt 191• 0056
City of Tukwila k
(206) 431 - 3670
Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188
MISCELLANEOUS PERMIT
WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES,
APPLICANT IS PROCEEDING AT THEIR OWN RISK.
Parcel No:
Address:
Suite No:
Location:
Category:
Type:
Zoning:
Const Type:
Gas /Elec.:
Units:
Setbacks:
Water:
Wetlands:
000160 -0020
8123 EAST MARGINAL WY S
DEMO
MISCPERM
V -N
001
North: .0 South: .0 East:
SEATTLE Sewer: SEATTLE
Slopes: Y
Fire
Contractor License No: BAUGHC *376N0
Permit No:
Status:
Issued:
Expires:
Occupancy:
UBC:
Protection:
.0 West:
Streams:
MI97 -0086
ISSUED
10/24/1997
04/22/1998
WAREHOUSE
1994
NONE
.0
OCCUPANT BOEING #2 -89
9123 EAST MARGINAL WY S, SEATTLE, WA 98124
OWNER BOEING
PO BOX 3707 - M/S 1F -09, SEATTLE WA 98124
CONTRACTOR BAUGH CONSTRUCTION CO. Phone: 206 726 -8000
900 POPLAR PLACE S, SEATTLE, WA 98114
CONTACT LARRY ALLEN Phone: 206 544 -1644
P.O. BOX 3707, M/S 19 -35, SEATTLE, WA 98124
r******************** * * * ** * * * * * * * * * * * ***** * * * * ** ** ** *fir **** * ** * * * ** *tilt * ** ** * * **** * * * *4
Permit Description:
DEMOLISH 2 -89 (12,600 S.F.) BUILDING, CAP SANITARY
SIDE SEWER, STORM DRAINAGE, WATER SERVICE AND
RETIRE THE EXISTING WATER METER.
r***************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * *I
Construction Valuation: $ 75,000.00
PUBLIC WORKS PERMITS: *(Water Meter Permits Listed Separate) Eng. Appr: JJS
Curb Cut /Access /Sidewalk /CSS: N
Fire Loop Hydrant: N No: Size(in): .00
Flood Control Zone: N
Hauling: N Start Time: End Time:
Land Altering: N Cut: Fill:
Landscape Irrigation: N
Moving Oversized. Load: N Start Time: End Time:
Sanitary Side Sewer: N No:
Sewer Main Extension: N Private: Public:
Storm Drainage: N
Street Use: N
Water Main Extension: N Private: Public:
r**************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *�
TOTAL DEVELOPMENT PERMIT FEES: $ 46.50
r********************** * * * ** * * * * * * * * * * * * * * * * * * * * * * * * ** JAS k * * * * * * * * * * * * * * * * * * * * ** * * * * *il
Permit Center Authorized Signature:_
Date /0_':42-11--272
I hereby certify that I have read and examined his permit and know the sane
to be true and correct. All provisions of law and ordinances governing this
work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or
cancel the provision of any other state or local laws regulating construction
or the performance of work. I am authorized to sign for and obtain this
development permit.
Signature:
Print Name:
z
Date
This permit shall become null and void if the work is not commenced within
180 days from the date of issuance, or if the work is suspended or abandoned
for a period of 180 days from the last inspection.
.F.:i.: r -.:, rt ��:a. ,yi•tYsS °•do5'.K�...
t arni:Kv.Y�Kwy....., ...ia:v.1
m.+ukuuo�Iw� - s,yaLtY4iftti"+ '
43:0.1 rJmt rt tcwiestA asn-+'- ^saunusnvcro
Addreus.:,<, .e j23 EAGT MARGINAL
SOW,
Tenv3nt:
Tpe: MISCPERM
Parcel 4V::.000160'410213
PerMit )Vv: MI97- 0086
Status: ISSUED
App.1 i ed: 06/2071 997
Is sued:' 10/2471997
• k*. k• kk; kAkk• k** k' k, t' k k• k' k* k* khk• ht4 k44**• k'k hk*'k'kkh*k4*'Akk *kk*'h* * *k*'A kkh'k*'kk4* *k•k'k44rk *.
Permit `Conditions:
i ... Temporary erosion control measures shall be implemented as
the first order of business “to. prevent sedimentation off -.
site or into existing 5 torn r;dra:irtayet'ac,'ilitie .
2. The site shall- `have permanent erosion cantra;l;-;.;nreas ures in
place as soon as p'o.ss i b l e after final grad i n has .,been
completed and prior to the Final I,nspection.,
3. D1 tonnectedY's.ide sewers .whicho�wi l l be reconnected i`n the
near futur'eshall be°:t<apped at th,e property line.
4. Work affe c,tttng. traffic:, flows' shall be *closely coordinated
with the:'. 1ty;'`Ut1.1'1ties Insp,et.or^ Traffic Control Plans
.hall be,.:`+s`ubmitted to. the Inspector,for prio•rr .approval.
5. No changes ,,wi 1 1 be ,'made tos the plans unless approved by the
Tukwila/Building pivision:
6. All pe`r`init,inspection records, 'and approved pta'ns shall b
sY `
ava i',� �h l e ` t. the job site prior to the start of any con -
struct`ion. ;'These documents are to be maintained and avai1
able anti 1 final inspection approval,-:is granted.
7 Remove a l l weeds.,.- concrete, stone;: foundations, flat con-
crete., concr•ete4:atio:,,: masonry walls,,: garage floors, drive-
ways ;and s tmi l aru. s,truc:tureS ;and all ',1;oose: miscellaneous
nrat?er Tai,:; R, Proper.ly.;cap "isanitary. sewer and 'water connec-
tions', properly f101 or , other'wise prrotect'al1 basemerits';
ce l Parrs , sep,t i';c tank wells an'd' other; excavations.'
Valld'i.tv-:'ajf,Permit. The issuance 'of .a .permit .or approval o
plan:.; f spe.c:'fic'ations, and conrputationsrshal1. -nc't be con-
.tr utd `to -%be .:a permit for, or an,` approval ,of,. any violation
of an, t,of the provisions of the -bui lding code ;'or; of any
other o;r dinance of the jurisdiction: No permit presuming,';
give autho,rity°'•to- violate or cancel the provisions of thie:
.code sha`J1be val��i�d.
CITY OF 77 'KWILA
Permit Center
6300 Southcenter Boulevard, Suite 100
Tukwila, WA 98188
(206) 431 -3670
Miscellaneous Permit Application
Application and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mall or facsimile.
Project Name/Tenant:
_
•
Will there be storage of flammable /combustible hazardous mater : in the building? ❑ yes ❑ no
Attach Ilst of materials and storage location on separate 8 1/2 X 11 paper indicating quantities & Mator /al Safety Data Sheets
• Above Ground Tanks ❑ Antennas /Satellite Dishes ❑ Bulkhead/Docks ❑ Commercial Reroof
❑ Demolition ❑ Fence ❑ Mechanical ❑ Manufactured Housing - Replacement only
❑ Parking Lots ❑ Retaining Walls ❑ Temporary Pedestrian Protection /Exit Systems
❑ Temporary Facilities ❑ Tree Cutting
Value of Constructioy 7.5- Q%D o
J ,
Site Address: /
a*
City /State /Zip:
t
op ty State /Zip:
/Q
Tax Parcel Number:
Property Owner:
0
Phone:
Street Address: x,
O
u
/ -D
7
.S
City State /Zip: _
-- 3 S
Fax #:
- — _
Contact Person:
Phone:
Street Address• / /
PO •
/
•
City State /Zip:
Fax #:
&,5 S e
Contractor:
/7- GL it
/
/-L..
1
6 O NS I ,.
Phone:
),. 5— c,- LS 0 V
Street Address.
C ty State /Zip:
Fax #:
Architect:
Phone:
Street Address:
City State/Zip:
Fax #:
Engineer:
em.:.....,
Phone:
Street Address:
City State/Zip:
Fax #:
MISCELLANEOUS PERMIT REVIEW AND APPROVAL: REQUESTED: '(TO BE FILLED'OUTfBY:APPLICANT).;.
Description of work to be done: D - D_. (� 4
•
Will there be storage of flammable /combustible hazardous mater : in the building? ❑ yes ❑ no
Attach Ilst of materials and storage location on separate 8 1/2 X 11 paper indicating quantities & Mator /al Safety Data Sheets
• Above Ground Tanks ❑ Antennas /Satellite Dishes ❑ Bulkhead/Docks ❑ Commercial Reroof
❑ Demolition ❑ Fence ❑ Mechanical ❑ Manufactured Housing - Replacement only
❑ Parking Lots ❑ Retaining Walls ❑ Temporary Pedestrian Protection /Exit Systems
❑ Temporary Facilities ❑ Tree Cutting
.APPLICANT;REQUEST.FOR MISCELLANEOUS• PUBLIC WORKS.PERMITS';:
❑ Channelizatlon/Striping
❑ Flood Control Zone
❑ Landscape Irrigation
❑ Storm Drainage
❑ Water Meter /Exempt # Size(s):
❑ Water Meter /Permanent # Size(s).
❑ Water Meter Temp # Size(s : Est. quantity: gal Schedule:
❑ Miscellaneous DP Moving Oversized Load/Hauling
❑ Curb cut/Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #• Size(s):
❑ Land Altering: 0 Cut cubic yards 0 FIII cubic yards 0 sq. ft.grading/clearing
❑ Sanitary Side Sewer #: ❑ Sewer Main Extension 0 Private 0 Public
❑ Street Use ❑ Water Main Extension 0 Private 0 Public
0 Deduct 0 Water Only
MONTHLY SERVICE BILLINGS TO:
Dale application expires:
lq
1 Phone:
Name:
Address:
City /State /Zip:
0 Water
0 Sewer
0 Metro 0 Standby
WATER METER DEPOSIT /REFUND BILLING:
Name:
Phone:
Address:
City /State /Zip:
Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall
expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days
upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application
shall be extended more than once.
Date application accepted:
.. .-
Dale application expires:
lq
Application tta. eby: (Initials)
.
ilI0
ALL MISCELLANEOUS P= 'IT APPLICATIONS MUST BE SUB
ED WITH THE FOLLOWING:
➢ ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN
➢ BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED
➢ ARCHITECTURAL DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT
➢ STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON
LICENSED STRUCTURAL ENGINEER
➢ CIVIL/SITE PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER
(P.E.)
❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If
not available at the time of application, a copy of this license will be required before the
permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit
in Lieu of Contractor Registration ".
Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or con
by the State of Washington, a notarized" letter from the property owner authorizing the agent to submit this permit
obtain the permit will be required as part of this submittal
r licensed
'cation and
1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS
PERMIT.
BUILDING OWNER OR AUTHORIZED AGENT:
SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR
PERMIT REVIEW
Submit checklist No M -9
Above Ground Tanks/Water :Tanks - Supported directly upon grade
exceeding 5,000 gallons and a ratio of height to diameter or width;
which exceeds 2:1
El
Antennas /Satellite Dishes
Submit checklist ' No M -1
0
Awnings /Canopies :. No.signage
Commercial Tenant Improvement
Permit
Bulkhead/Dock
Submit checklist. No M -10
0
Commercial Reroof-
:Submit checklist No: M -6
®
Demolition:
Submit checklist No M-3, M -3a
❑
Fences - Over 6 feet in Height
Submit checklist No: M -9
❑
Land Altering/Grading/Preloads
Submit checklist No: M -2
❑
Loading Docks
Commercial Tenant Improvement
Permit. Submit checklist No: H -17
❑
Mechanical' (Residential '& Commercial)
Submit checklist No M -8,
Residential only - H =6, H -16
❑
Miscellaneous` Public Works,Permits
Submit checklist No H -9
❑
Manufactured Housing ( RED INSIGNIA ONLY)
Submit checklist No M -5
❑
Moving- Oversized.Load/Hauling
Submit checklist No: M -5
❑
Parking Lots
Submit checklist No: M -4
in
Residential Reroof - Exempt with following exception: It roof structure
to be.repaired or replaced
Residential Building Permit
Submit checklist No: M -6
❑
Retaining Walls - Over 4 feet In height
Submit checklist No: M -1
❑
Temporary Facilities
Submit checklist No: M -7
❑
Temporary Pedestrian Protection/Exit'Systems
Submit checklist No: M -4
❑
Tree Cutting • •
Submit checklist No: M -2
❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If
not available at the time of application, a copy of this license will be required before the
permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit
in Lieu of Contractor Registration ".
Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or con
by the State of Washington, a notarized" letter from the property owner authorizing the agent to submit this permit
obtain the permit will be required as part of this submittal
r licensed
'cation and
1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS
PERMIT.
BUILDING OWNER OR AUTHORIZED AGENT:
Signature:
Date: ^ _1-0 _ c� 7
Print name:
Phones l// / V/
Fax #"65,s--so y 3
Address:
City /State /Zip:
. • rnr•n . •m rsrsn 1 11 1 /n!_
,***/ c* kk**'d ck• kk k*k k***. k***********•k * **kkkA***k *** **** *kA ****•k * ***
'I1'Y a : 1'UKWI1. , WA t� W 1 RANSMI:T
****** * ********. ** ****k� �t.C�h'1RIc A *•,1�1 *rh]F"**i.k *kkh *of * *yh� *k* * *kn4*** ***
TRANSMIT Numbers R9700602 Amount: 46.50 06/20/97 14:1.4
Payment .Methods CHECI: , Notation: BOEING TRUST ACC Ini •t i SLH
T.k
Permit No: MI97-0086 Types MZSCPERM MISCELLANEOUS PERt4IT
Parcel No: 000160.0020
Site Address s 8123 FAST MARGINAI. WY S
Tuta•I reels 46.50
This Payment 46.50 Total ALL Pints: 46.30
Balance: .00
*kA A A* k* *irk ***.* *k*A k * **i' *** *k *k * * * *A*•* * ** * *k * *A k * ** 4* ** kA* * *•A k*
Account Code
0000/322.100
000/366.904.
I}esr.r° ipt i on. Amount
BUILDING - .•NONRES
6TATE • F ;UIL()rNG SURCHARGE 4.50
42..00
6or9 C.:omm -e..Y F u 6 P\cc..ouY &ILp.SO>
000,.q9 . s .qo %.os
INSPGTIONrRLCORD
Retain a copy with permit
INSPECT( N NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd,, #100, Tukwila, WA 98188
PERMIT NO.
(20631 -3670
Projec 3
Type . nsp =c i.n: -- .
Ac r sus 0J
�V�,.J(
.t.r�c..� joy
called: —
(�
CD P.m.
Special instructions:
Date wanted: q
's' 78
Requester: bLAr_e_
Phone No.: � .5-5.84
Approved per applicable codes.
Corrections required prior to approval.
CO MENTS&
Inspector:
Date:
5-M
$42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must
be paid at 6300 Southcenter Blvd., Suite 100. CaII to schedule reinspection.
INSPECTION RECORD
Retain a copy with per
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
IhA6 7 -cw 86
Project:,
G,x)a..r,7
9 —c.6 9
Type of inspection:
555 — 5 q— GU In p
Address:
ea- 3 sN1. -y w-tf ,
Date called:
7, 9.
Special instructions: / !
. :,ojtl'
.
Date wanted: / , a.m.
�- // 3/4 p.m.
Requester:
ki ire--6
Phone No.:
S- S i3� CJ
Approved per applicable codes.
Corrections required prior to approval..
COMMENTS:
' C. Ce. if /. NI ki
,
`e ti-ii , ^ y
G2V meta .1.7,,44.4, >e, edil
t
g NIA (i-r, .,/
a r,e4 w (4¢- % %S.'
5i5 a/ / 2 ilg 6i.in ,�� (r /7741/i ,) 4
' .
.
i7K4) G P w_J -J CifvK / / ...r f / /D , u
c.> 4A,. j �l � 444 .59- ylv) (4'1 et.rdArcfw 4;e / ,,l
A'V 5 (.4/1. e1/ 3 f f
Amp Gf06-, oche p FA7 elo /dice
4' &vet ,/ Vas
'1
Inspector:
II
Date
$42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must
be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
I, INSPECTION RECORD
IRetain a copy with permit
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
C.%
PERMIT NO.
(206) 431 -3670
Projec . li►
1J ..,
spo
ail
,
Type s pectin •
ri/
Dade called:
it •
Addre ,..: /
Special instructions: a + 'n yy
i , l' n I�r)
Pc) 6 L7(
CA-Pe-Z:40 . OIL- . 9 -41wWeo P, -- pv,12 Lt c_ V- v44t -4
Date wanted:' C��
orrP
Requester:
No
;...5
Approved per applicable codes. F„:".] Corrections required prior to approval.
COMMENTS:
iNk6 -- 111 D1.. L i L L t3 a 7 -CE.-r4 O KT
___!
S - -1,.'kiL s-A S.vk1-N. 1,3) U... 144s'E To O r 1-1,..m,, 4
A-I+
CA-Pe-Z:40 . OIL- . 9 -41wWeo P, -- pv,12 Lt c_ V- v44t -4
q--4.-kekt .- A C.`F ib '61..- .DtS't_b tAF xu�
-----Z. 'e:11.M L.0) ►.G I A4 prl. (L 04rD 1S-.%-x-. •1 .0: -'-yr:
SSj•f∎=1�
W 1 M-ertAS-- .�. -� n ,A. c=• =� - - - -:_ -----
Z-43, `-'n t .. 1
n ft, .
E.] $49.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must
be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Department of Community Development
John W. Rants, Mayor
Steve Lancaster, Director
Rick Ford
The Boeing Company
PO Box 3707 M/S 19 -35
Seattle, WA 98124 -2207
RE: Release of Bond
Bond No. 8144 -93 -23
Dear Mr. Ford:
This letter hereby authorizes the release of the above referenced bond in the amount of $82,500.00 for
the demolition of Boeing Building #2-89 located at 8 123 East Marginal Way S, Tukwila. The work
guaranteed under this assignment is complete and has been approved by the City .ofTukwila. I have
enclosed a copy of the bond for your reference.
If you should have any questions, please contact our office at (206)431 -3672.
Sincerely,
4,4,14
Brenda Holt
Permit Coordinator
encl
xc: Permit File No. MI97 -0086
LICENSE OR PERMIT BOND
Bond # 8144 -93 -23
KNOW ALL BY THESE PRESENTS: That we, THE BOEING COMPANY., as Principal(s),
and FEDERAL INSURANCE COMPANY, an Indiana corporation authorized to transact
surety business in the State of Washington, as Surety, are held and firmly bound unto THE CITY
OF TUKWILA, WASHINGTON, as Obligee, in the penal sum of EIGHTY TWO
THOUSAND, FIVE HUNDRED AND NO /100S - -- ($82,500.00) DOLLARS, lawful money of
the United States of America, for the payment of which, well and truly to be made, we bind
ourselves, our heirs, legal representatives, successors and assigns, jointly and severally, firmly by
these presents.
WHEREAS, Principal has applied to the Obligee for a license or permit for Demolition of
Building 2 -89
NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, That if the said
Principal(s) shall comply with all applicable Ordinances, Rules and Regulations, then this
obligation shall be void, otherwise to remain in full force and erect.
PROVIDED, HOWEVER, That this bond shall continue in force until cancelled by Surety giving
Thirty (30) days written notice to Obligee and Principal of its intention to terminate it liability
hereunder.
Signed and Sealed this 26th day of June, 1997.
THE BOEING COMPANY
BY:
.1 .
POWER OF ATTORNEY
FEDERAL INSURANCE COMPANY
ATTN: SURETY DEPARTMENT
15 Mountain View Road, Warren, NJ 07059
Telephone: (908) 903 -2000
Fax No.: (908) 903 -3656
Know all Men by these Presents, That FEDERAL INSURANCE COMPANY, an Indiana Corporation, has constituted and
appointed, and does hereby constitute and appoint Thomas L. Towle, Andrea L. Berry, Janet Sweet,
Betsy Ercolini, Debbie Bennett, Traci Erlewine and Theresa A. Lamb of Seattle,
Washington ---
each its true and lawful Attorney-In-Fact to execute under such designation in its name and to affix its corporate seal to and deliver
for and on its behalf as surety thereon or otherwise, bonds or obligations (other than Bail Bonds) given or executed in the course
of its business, and any instruments amending or altering the same, and consents to the modification or alteration of any instru-
ments referred to in said bonds or obligations.
In Witness Whereof, the said FEDERAL INSURANCE COMPANY has, pursuant to its By -Laws, caused these presents to
be signed by its Vice President and Assistant Secretary and Its corporate seal to be hereto affixed this 23rd
day of October 19 96
Kenneth C. Wendel
Assistant Secretary
STATE OF NEW JERSEY } ss.
County of Somerset
FEDERAL INSURANCE COMPANY
BY
An€2,4.1efri�� 1v�L
Gerardo G. Mauriz
Vice President
On this 26th day of October 19 96 , before me personally came Kenneth C. Wendel to me known and by
me known to beAssistant Secretary of FEDERAL INSURANCE COMPANY, the corporation described in and which executed the
foregoing Power of Attorney, and the said Kenneth C. Wendel being by me duly swom, did depose and say that he is Assistant
Secretary of FEDERAL INSURANCE COMPANY and knows the corporate seal thereof; that the seal affixed to the foregoing
Power of Attorney is such corporate seal and was thereto affixed by authority of the By -Laws of said Company, and that he signed
said Power of Attorney asAssistant Secretary of said Company by like authority; and that he is acquainted with Gerardo G. Mauriz
and knows him to be the Vice President of said Company, and that the signature of said Gerardo G. Mauriz subscribed to said
Power of Attomey is in the genuine handwriting of said Gerardo G. Mauriz and was thereto subscribed by authority of said By-
Laws and in deponent's presence.
Notarial Seal
PUBLIC/
�li1ER%
Acknowledged and Swom to before me
on the date above written.
Notary Public
IN THE EVENT YOU WISH TO NOTIFY US OF A CLAIM, VERIFY THE AUTHENTICITY OF THIS BOND OR
NOTIFY US OF ANY OTHER MATTER, PLEASE WRITE TO US AT THE ADDRESS LISTED ABOVE.
Form 15.10-0135 (Rev. 5.94) CONSENT
LINDA SAWCHAK
Notary Public, State of New Jersey
ire, O9rJ52
Corrmicciun Expires July 29, 2001
CERTIFICATION
STATE OF NEW JERSEY ss.
County of Somerset
I, the undersigned, Assistant Secretary of FEDERAL INSURANCE COMPANY, do hereby certify that the following is a true
excerpt from the By -Laws of the said Company as adopted by its Board of Directors and that this By -Law is in full force and effect.
"ARTICLE XVIII.
Section 2. All bonds, undertakings, contracts and other instruments other than as above for and on behalf of the Company
which it is authorized by law or its charter to execute, may and shall be executed in the name and on behalf of the Company
either by the Chairman or the Vice Chairman or the President or a Vice President, jointly with the Secretary or an Assistant
Secretary, under their respective designations, except that any one or more officers or attomeys -in -fact designated in any
resolution of the Board of Directors or the Executive Committee, or in any power of attomey executed as provided for in
Section 3 below, may execute any such bond, undertaking or other obligation as provided in such resolution or power of
attomey.
Section 3. All powers of attomey for and on behalf of the Company may and shall be executed in the name and on behalf
of the Company, either by the Chairman or the Vice Chairman or the President or a Vice President or an Assistant Vice
President, jointly with the Secretary or an Assistant Secretary, under their respective designations. The signature of such
officers may be engraved, printed or lithographed. The signature of each of the following officers: Chairman, Vice Chair-
man, President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary and the seal of
the Company may be affixed by facsimile to any power of attorney or to any certificate relating thereto appointing Assistant
Secretaries or Attorneys -in -Fact for purposes only of executing and attesting bonds and undertakings and other writings
obligatory in the nature thereof, and any such power of attomey or certificate bearing such facsimile signature or facsimile
seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signa-
ture and facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is
attached."
I further certify that said FEDERAL INSURANCE COMPANY is duly licensed to transact fidelity and surety business in each of
the States of the United States of America, District of Columbia, Puerto Rico, and each of the Provinces of Canada with the
exception of Prince Edward Island; and is also duly licensed to become sole surety on bonds, undertakings, etc., permitted or
required by law.
I, the undersigned Assistant Secretary of FEDERAL INSURANCE COMPANY, do hereby certify that the foregoing Power of
Attorney is in full force and effect.
Given under my hand and the seal of said Company at Warren, N.J., this 26TH day o1 JUNE , 19 97
Corporate Seal
ATAGEEZAAff
September 7,1999
Brenda Holt
Permit Coordinator
City of Tukwila
6300 Southcenter Blvd.
Tukwila, WA 98188
Dear Brenda:
The Boeing Company
P.O. Box 3707
Seattle, WA 98124-2207
'flECEVED
SEP I 1999
. C,:e:::.:-{Vikiit.:4\FIV • •
• • DEVELOPMENT
RE: Demolition Bonds — Release Request
Please consider this letter as a request from The Boeing Company, for The City
of Tukwila to release the demolition bonds listed below.
Date Buildina Address Bond # Permit #
10-24-97 2-89 8123 E. Marginal Way S. 81449323 M197-0086
Thank you for your action in this matter and if you have any questions please
call me at 206 655-9888.
Sincerely,
Rick Ford
M/S 19-35
206 655-9888
09/07/99
TO:
FROM:
DATE:
SUBJECT:
City of Tukwila
John W. Rants, Mayor
Department of Public Works
NOTIFICATIQN OF UTILITY PERMIT ACTION
Permit Center
Public Works Engineering
October 24, 1997
Boeing #2 -89
Demolition of' Building #2 -89
Permit No.: MI97 -0086
Contact Person: Larry Allen
Phone: (206) 544 -1644
Ross A. Earnst, P. E., Director
THE FOLLOWING PUBLIC WORKS PERMITS HAVE BEEN APPROVED FOR ISSUANCE
IN ACCORDANCE WITH THE PLANS APPROVED ON OCTOBER 24,1997:
Water Service Cap
Sanitary Sewer Service Cap
Storm Drainage Cap /Abandonment
PERMIT FEE
No Fee
No Fee
No Fee
TOTAL: No Fee
Two copies of the confirmed Utility Permit Application and plans are attached for inclusion in the
permit file.
JJS /sal
CF: Development File (with copy of application and plans)
PW Utilities Inspector (with copy of application and plans)
Finance Department (with a copy of application)
City of Tukwila
Department of Public Works
DATE:
PUBLIC WORKS DEPARTMENT COMMENTS
October 6,1997
John W. Rants, Mayor
Ross A. Earnst, P. E., Director
PROJECT NAME: Boeing - #2 -89
PLAN CHECK NO.:MI97 -0086
PLAN REVIEWER: Contact Joanna Spencer at (206) 433 -0179, if you have
any questions regarding the following comments.
1) A water meter is scheduled to be retired as part of this demolition. Please identify
the location of this water meter on the plans or provide an additional sketch showing
the location of the water meter.
2) A copy of the Puget Sound Air Pollution Control Authority (PSAPCA) demolition
permit shall be submitted prior to issuance of the permit.
$
July 7, 1997
City of Tukwila
John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
Mr. Larry Alien
The Boeing Company
P.O. Box 14135, M/S 19 -35
Seattle, Washington 98124
Dear Mr. Allen:
SUBJECT: Development Permit Application Number MI97 -0086
NOTICE OF INCOMPLETE APPLICATION
Boeing #2 -89
8123 East Marginal Wy S
This letter is to inform you that your permit application received at the City of Tukwila Permit
Center on June 20, 1997 was determined to be incomplete. Before your permit application can
begin the plan review process the following requirements from the Planning Division and
Public Works Department must be met.
Planning Division:
Contact Michael Jenkins, Associate Planner, at 431 -3685, if
you have any questions regarding the following comment.
1. A SEPA Checklist is required for this project (project is over 4,000 s.f.).
Public Works Department: Contact Joanna Spencer, Development Engineer, at 433 -0179
if you have any questions regarding the following comments.
1. Obtain approval from Puget Sound Air Pollution Control Agency,
2. The plans need to show where the utility lines (water, sewer and storm
drainage) will be capped.
The City requires that four (4) complete sets of revised plans be resubmitted with the
appropriate revision block.
In order to better expedite your resubmittal a Revision Sheet must accompany every
resubmittal. I have enclosed one for your convenience. Revisions must be made in person and
will not be accepted through the mail or by a messenger service.
Mr. Larry Allen
July 8; 1997
• Page,2
•If yOu have any questions please contact me at the City of Tukwila Permit Center at (206) 431-
3672.
Sincerely,
Kelcie J. Peterson
Permit Coordinator
Enclosures
File: MI97-0086
OCT 16 '97 09 :15AM PUGET SOUNb AIR
iET SOUND AIR POLLUTION CONTROL At""NCY
aged' 110 Union Street. Suite 500, Seethe. WA 91101.1
q 05 7.3 NOTICE OF INTENT
AMC, tli. Only TO PERFORM: irk 11:3 `i 3 .. 7 S 24
H. Property " - -"r
°e►trter: The Boein• Company
Property Owner's
MaIUog Address: P .0. Box 3707
—P.2/2
Data Received
one:
930-099 •
06 655 -2452
• Asbeetu,s
Contractor: Boe i n
CIrSeatt1 e
• •,, .1.4•. ..., • . . —. is f ,• •..:A': ♦I #
/Pu•et Sound Maintenance
Mailln: Address: P.0. Box 3707, M/S
p ; Seattle
D. St
A
g WA
55 East Mer•inal W
- ee
98124 -2207
So, Bld
Smte:WA
Coring= The Boe i n
Ownet/tO:
•
ti . :98124
Company
Contractor
Job No.:
2 -69
Phone: 206 655 -2452
F : 206 657 -6770
Seattle
State: WA
Zi.96124••
2 7
Project Manager or
Contact Person: Gerr Cro u.ervi .r Pu• -t Sou • M- Intel ce
•
930 -6099
Phone: (206 ) 6 -2452
E. Aeba/too Survey or
Gl Met') Presumed:
Ai�'Rp► i9u !ding
Ins •`,orName: Farhen Mohammad
No. of Entire Site
Date Survey was
Conducted: 6/15/90
,,:. ; . • , .'1•.•r M
demo 'tloo J lJPfL t 12rJ t►
Contractor. I J
D : to 26 99-
• • .1 .. 4' • . 7 . ,
G, Asbestos Project No. o;Saucttues:
Information: (see back if >
Total
•
Land
to be Removed:
Thermal 5 tem Insulation:
Misc. Mat'i:
1w
Was Asbestos Found? lines
C_7 Ii No, Ataach S rvcy
Expiration
CertLAcedon No.; 7MK100322 Data 3 /28/91
Stet
Date:
Linear Ft.
Training Fire (List Fire Dept. es demolition contractor below)
Ordered Demolition (attach copy of Order) --
tor
Completion
• Date:
S ust,v Ft
9• v ens.
■ Dolt Ins.
• PI. Ins,
e' • • • • flag • taints
"r PLUM?
a?+ Tutored CC •
• Cemented. "1 Ceolent Pi • • 111 Flooring Mat'I • • • . , Mat'1
U, Asbestos/Du ollticn Project CC Vic! : '
1, O Owner Oeaupled Residential Asbestos Removal Project
❑ Owner•Occupied Residential MbeetIll Removal ik Demolition Project
❑ 0 teT' Oceu ed Residential DemoUdon :,, • Asbcatos Rem •
All ' er Demolitions ' ith No bolos
Wk. Days: M T W 'Ib F Sa Su
Hour:
111 all asbestos malarial be Yes
27.!•,1.. • ... 0•.t•
essay:
Ljoliflsa on Wgy�
or Notice
3. ■ 10.239 lin _ eat or 48 - 159 • • feet see back of form for options
4. "" 260 • • ' • linear foot or 160 - 9' • • hate feet •
000.9
6. •1 10'
1.
9 linear feet or 5 000.49
•
are feet
- 49 9 line feet • 30 000 • - • 999 use et
7. e" a0 000.99 ' ' linear - or 1 •' 000 - 14 • 9 • uare feat
100. • • • li mey feet or 150 0004 s • uate feet
9. ea E
10, • Alt
Asbestos P • 'act or • E •. : - . c Demolition Pro act
Means of Com • linnet for friable materials
16,.. Alternate Means of Com
•
Demolitions
(lance for nonfiable asbestos materials
10D►s
0 D
10 Da
10•aI
10 De
Prior Notice
10-De Review P
•4I
ka - REIZJND111LE
S25
150
5150
5300
5750
52 000
SS 000
S10 000
L 1 do hctrdty sulky N1t d+o lotonnneot eansetnad In this 4ficetion. end suppieropttel dote deattlbed Wain, 11 intro t ea dm knowledge
auwW end complete. 1 shall not awe or Ca* any tutsemi to demoUdan **ids, to begin until the apprvt:riste waking *al he
eloped
�`.•lt
s
res
04P1A
90 /t0'd TOS# j,Ztbt 60- 0T'LGGT
The Boeing Company
ReprrsensG,e
4TE.S 4119 903
10
°1 9
D• e
•
Complersn ae Review
F. 'onnerf By:
.lam -tr
�Atren the • nl
OF TUKWILA
OCT 2 .A lqq / 4TE9 459 ''02 NOLId
DATE:
tdYFttSZfiOEf'Mtts > i
City of Tukwila
trf,re`,)iti ",GRC
John W Rants, Mayor
Department of Pubric Works Ross A, Earnst, P, E, Director
pT,JBLIC WORKS DEPARTMENT COMMENT
October 6,1997
PROJECT NAME: Boeing - 02 -89
PLAN CHECK NOr:MI9770086
PLAN REVIEWER: Contact Joanna Spencer at (206) 433.0179, if you have
any questions regarding the following comments.
1) A water meter is scheduled to be retired as part of this demolition, Please identify
the location of this water meter on the plans or provide an additional sketch showing
the location of the water meter.
2) A copy of the Puget Sound Air Pollution Control Authority (PSAPCA) demolition
permit shall be submitted prior to issuance of the permit.
cis f
on
RECEIVED
CITY OF TUKWIu
OCT 2 3 1997
PERMIT CENTER
AOM ennthnatftar QA UialMV4 ('n1M lelAn . Trrimaln WWrhlnntnn Oft IAA . ehA..e. /0/141174_11117A e.... ~AI JO I_OLAP
Permit C.oinokor C.opLy
PLAN REVIEW /ROUTINGS IP
ACTIVITY NUMBER M197 -0086
PROJECT NAME BOEING #2 -89
DATE 6/20/97
DEPARTMENT:
BUILDING DMSION ❑ FIRE PREVENTION ❑
PUBLIC WORKS LJ STRUCTURAL ❑
PLANNING DIVISION
E
PERMIT COORDINATOR ■
DETERMINATION OF COMPLETENESS: (T,Th) DUE DATE 6/24/97
COMPLETE ❑ NOT COMPLETE c NOT APPLICABLE ❑
COMMENTS
TUES /THURS ROUTING: PLEASE ROUTE ❑ NO FURTHER REVIEW REQUIRED ❑
ROUTED BY STAFF ❑ (If routed by staff, make copy to master file & enter Sierra.)
REVIEWERS INITIAL
DATE
APPROVALS OR CORRECTIONS: (ten days)
APPROVED ❑ APPROVED W/ CONDITIONS
REVIEWERS INITIAL
DATE
DUE DATE 7/08/97
NOT APPROVED (attach comments) ❑
CORRECTION DETERMINATION:
DUE DATE
APPROVED I I APPROVED W/ CONDITIONS ❑ NOT APPROVED (attach comments) Ej
REVIEWERS INITIAL DATE
(Certification of occupancy required. )
ri'�5:• .. i .:.f.:..• ... r. v. .+.:J.�X;1ir A'f rt�r;.r..ti*r.n +t�t�a .t6c:*: 7M,,110`$` 'i ? "r•R'a!:cx�, ",
PLAN REVIEW / ROUTING SLIP
ACTIVITY NUMBER 11197 -0086
PROJECT NAME BOEING 12 -89
DATE 6/20/97
DEPARTMENT:
BUILDING DIVISION III FIRE PREVENTION C PLANNING DMSION ❑
PUBLIC WORKS STRUCTURAL PERMIT COORDINATOR El
DETERNIlNATION OF COMPLETENESS: (T,Th)
NOT COMPLETE El
DUE DATE
6/24/97
NOT APPLICABLE ❑
TUES /THURS ROUTING: PLEASE ROUTE d NO FURTHER REVIEW REQUIRE
ROUTED BY STAFF a (If routed by staff, make copy to master file 8y enter Serra.)
REVIEWERS INITIAL
‘-L
DATE
APPROVALS OR CORRECTIONS: (ten days)
DUE DATE 7/08/97
APPROVED El APPRO D W/ CONDITION$'. NOT APPROVED (attach comments) lI
(3 171
REVIEWERS INITIAL
DATE
CORRECTION DETERMINATION:
APPROVED D
REVIEWERS INITIAL
DUE DATE
APPROVED W/ CONDITIONS NOT APPROVED (attach comments) E
DATE
(Ccrdfica ioa of occupancy required. )
'.;+, Y !.i4uR`X7+1".fi'v9..,
r( -4 ....:. n,r!`.. rims+"F ?,7 74,5,ra 0,4ir rkin:19Fx '7Catrimski!
PLAN REVIEW / ROUTING SLIP
ACTIVITY NUMBER MI97 -0086
PROJECT NAME BOEING #2 -89
DATE 6/20/97
DEPARTMENT:
BUILDING DWISION fl FIRE PREVENTION U PLANNING DIVISION 0
PUBLIC WORKS STRUCTURAL. El PERMIT COORDINATOR a
DETERMINATION OF COMPLETENESS: (T,Th)
COMPLETE
COMMENTS
DUE DATE 6/24/97
NOT COMPLETE El NOT APPLICABLE
IVES /THEIRS ROUTING: PLEASE ROUTE f NO FURTHER REVIEW REQUIRED
ROUTED BY STAFF I l (If routed by staff, make copy to master file & enter Sierra.)
REVIEWERS INITIAL
(—)94:3 DATE (a 20 2
APPROVALS OR CORRECTIONS: (ten days) DUE DATE 7/08/97
APPROVED EI APPROVED W/ CONDITIONS [1] . NOT APPROVED (attach comments) tJ
REVIEWERS INITIAL
DATE
CORRECTION DETERMINATION:
DUE DATE
APPROVED n APPROVED W/ CONDITIONS 4l NOT APPROVED (attach comments) Q
REVIEWERS INITIAL
DATE
(Catifiadoa of occupancy required.
n:tt r+ax ralte� *rY+iad
elits441 c Srt t?lt;nsslRV,MiiiliP!,'.13s'_ ?;24'fre9i'.'ei5
PLAN REVIEW / ROUTING SLIP
ACTIVITY NUMBER MI97 -0086
PROJECT NAME BOEING 12 -89
DATE 6/20/97
DEPARTMENT:
BUILDING DIVISION El FIRE PREVENTION p PLANNING DIVISION .
PUBLIC WORKS STRUCTURAL E PERMIT COORDINATOR 0
DETERMINATION OF COMPLETENESS: (T,Th)
COMPLETE p NOT COMPLETE
COMMENTS • S &VA v wu --ccQ
DUE DATE
6/24/97
NOT APPLICABLE
TUES /THURS ROUTING: PLEASE ROUTE p NO FURTHER REVIEW REQUIRED p
ROUTED BY STAFF (If routed by staff, make copy to master file & enter Sierra.)
REVIEWERS INITIAL
DATE
APPROVALS OR CORRECTIONS: (ten days)
DUE DATE 7/08/97
APPROVED n APPROVED W/ CONDITIONS C NOT APPROVED (attach comments) 0
REVIEWERS INITIAL
DATE
CORRECTION DETERMINATION:
DUE DATE
APPROVED APPROVED W/ CONDITIONS p NOT APPROVED (attach comments) p
REVIEWERS maw.
DATE
(Certification of occupancy required.
�', nt,{3t,. iui S. a + } ::;(7, 5 rki— r ,Vi`f d.q' 'Aria
vetii�l'�'i'f s?fi:: �i'��i'x , "Y;;+1S1k,y;11 "n °�, �'.:i.t. '� A6 ;a;,, +~!<i�'�tS::•.n.4�,r.��a:�
PLAN REVIEW / ROUTING SLIP
ACTIVITY NUMBER MI97 -0086
PROJECT NAME BOEING 12 -89
DATE 6/20/97
DEPARTMENT:
BUILDING DIVISION FIRE PREVENTION El PLANNING DIVISION
PUBLIC WORKS IN STRUCTURAL El PERMIT COORDINATOR Q
DETERMINATION OF COMPLETENESS: (T,Th)
COMPLETE NOT COMPLETE NOT APPLICABLE Ei
COMMENTS plat- da14,0 t114+ I d .. ,£VLot..J c he-te
,u1A.e4 01 6e. 0-are-e 6/.
TUES /TUURS ROUTING: PLEASE ROUTE fl NO FURTHER REVIEW REQUIRED El
ROUTED BY STAFF (If routed by staff, make copy to master file & enter Sierra.)
DUE DATE
6/24/97
REVIEWERS INITIAL
DATE
1
APPROVALS OR CORRECTIONS: (ten days)
DUE DATE 7/08/97
APPROVED 0 APPROVED W/ CONDITIONS ❑ NOT APPROVED (attach comments) Q
REVIEWERS INITIAL
DATE
CORRECTION DETERMINATION:
APPROVED El
REVIEWERS INITIAL
DUE DATE
APPROVED W/ CONDITIONS NOT APPROVED (attach comments) Q
DATE
(Certification of occupancy required, )
e_
iVbO �' br., n., r�,; ��r. �N! ti' 2 +�.n- �fir;t;e,t +ttYt1+'nNA!nt�P, ihtP
,w, V ,W.i , .;+vuEi \•t1fCi�n/f4ri'4 > }Y.'.,i
nntvknvc✓svM,.ngtq " hS 0,,,f,A1,07.. A4#'1T.yi:+1'rit':
PLAN REV Co�
frli'r,• 00V6 DAM q•Iq•q1
ACTIVITY NUMBER
PROJECT NAME
D PARTMENT:
n
B IL' ING D SIO
C WORKS
f
DETERMINATION OF COMPLETENESS: (T,Th)
COMPLETE 1011 NOT COMPLETE ❑
FIRE PgEVENTION
ONTATM.
tJR
E
COMMENTS
MT
PLANNING DIVISION pi
OORDINA ap
4
DUE DATE q • 2.3- if 7
NOT APPLICABLE ❑
TUES /THURS ROUTING: PLEASE ROUTE (1 NO FURTHER REVIEW REQUIRED ❑
ROUTED BY STAFF ❑ (If routed by staff, make copy to master file & enter Sierra.)
REVIEWERS INITIAL
DATE
APPROVALS OR CORRECTIONS: (ten days)
APPROVED ❑ APPROVED W/ CONDITIONS ❑
REVIEWERS INITIAL
DATE
DUE DATE' V ? dri
NOT APPROVED (attach comments) ❑
3
CORRECTION DETERMINATION:
APPROVED l l APPROVED W/ CONDITIONS ❑
DUE DATE
NOT APPROVED (attach comments) ❑
REVIEWERS INITIAL DATE
(Certification of occupancy required. )
SI
tkivl
CITY OF TUKWILA
Department of Community Development
Building Division - Permit Center
6300 Southcenter Boulevard, Tukwila, WA 98188
Telephone: (206) 431 -3670
ill h3f�bSi4 r%V,'ek -10:17i:57
REVISION SUBMITTAL
DATE: q. 4(1-7
PROJECT NAME:
PROJECT ADDRESS:
CONTACT PERSON:
PLAN CHECK/PERMIT NUMBER: Ml_q_7_0016
EastfirlagjinaLAAFS
PHONE:
REVISION SUMMARY:
SHEET NUMBER(S)
"Cloud" or highlight all areas of revisions and date revisions.
SUBMITTED TO:
CITY USE ONLY
Planning ..
Fire
'Public Works
✓b •na,n4, i,,e00M1a4.ta'
.0:4N n'CN.hMW0,0wi
PLAN REVIEW / ROUTING SLIP
MITT- 00% DAB 10 141.91
ACTIVITY NUMBER
PROJECT NAME
DEPARTMENT:
BUILDING DIVISION IP
PUBLIC WORKS
FIRE PREVENTION E PLANNING DIVISION
STRUCTURAL PERMIT COORDINATOR 0
DETERMINATION OF COMPLETENESS: (T,Th)
COMPLETE
COMMENTS
NOT COMPLETE
DUE DATE Q 2.3 7
NOT APPLICABLE 1:1
TUES /THURS ROUTING: PLEASE ROUTE E NO FURTHER REVIEW REQUIRE
ROUTED BY STAFF EJ (If routed by staff, make copy to master file & enter Sierra.)
REVIEWERS INITIAL
Lt - DATE
APPROVALS OR CORRECTIONS: (ten days) DUE DATE • mut° gn
APPROVED n APPROVED W/ CONDITIONS. NOT APPROVED (attach comments) 0
\ REVIEWERS INITIAL
NA-/
c
G2�
DATE
CORRECTION DETERMINATION: DUE DATE
APPROVED l l APPROVED W/ CONDITIONS p NOT APPROVED (attach comments) 0
REVIEWERS INITIAL DATE
(Certification of occupancy required.
c...∎...r .,..ucn.r.r r< n.+. r�inu:. 4:.•, vnaY44�. a? 7!..l.T+hT.'lli!kae�fnut.t � A', ".111,4 +.
PLAN REVIEW / ROUTING SLIP
MI'!7• OOV.
ft
ACTIVITY NUMBER
PROJECT NAME
DEPARTMENT:
BUILDING DIVISION fl
PUBLIC WORKS
DATE 1 011
L
FIRE PREVENTION
PLANNING DIVISION ❑
STRUCTURAL ❑ PERMIT COORDINATOR ❑
DETERMINATION OF COMPLETENESS: (T,Th)
COMPLETE
COMMENTS
DUE DATE q • 2.3 17
NOT COMPLETE E NOT APPLICABLE ❑
TUES /THURS ROUTING: PLEASE ROUTE
NO FURTHER REVIEW REQUIRED ❑
ROUTED BY STAFF ❑ (If routed by staff, make copy to master file & enter Sierra.)
REVIEWERS INITIAL 7 sl / DATE / -32-3 -7 2
APPROVALS OR CORRECTIONS: (ten days)
APPROVED
DUE DATE'C� dIV
APPROVED W/ CONDITIONS . NOT APPROVED (attach comments) ❑
REVIEWERS INITIAL 11-01 ,5 1'
DATE
CORRECTION DETERMINATION:
APPROVED ❑
REVIEWERS INITIAL
DUE DATE
APPROVED W/ CONDITIONS ❑ NOT APPROVED (attach comments) ❑
DATE
(Certifcadon of occupancy required. • )
i
.,u.r,..<<.. v.:.Wn..�...o-ir,
1. M�p.4��R� t yA>'np+�.yyt \r.tL4l .Sivr
CI`:
41,101WieS^ F01F47,fi.kett'MkttKiiS1
NluYHtl'�'!widr.i•
PLAN REVIEW / ROUTING SLIP
ACTIVITY NUMBER M1T1 r OP$(. DATE 10 Igt.91
PROJECT NAME _
DEPARTMENT:
BUILDING DIVISION El
PUBLIC WORKS u
FIRE PREVENTION PLANNING DIVISION III
STRUCTURAL El PERMIT COORDINATOR Q
DETERMINATION OF COMPLETENESS: (T,Th)
COMPLETE
COMMENTS '
NOT COMPLETE El '
DUE DATE Q • L3-7
NOT APPLICABLE
TUES /THURS ROUTING: PLEASE ROUTE
ROUTED BY STAFF n (If routed by staff, make copy to master
REVIEWERS INITIAL
NO FURTHER REVIEW REQUIRED L J
file & enter Sierra.)
DATE °1 /7-'1'1
APPROVALS OR CORRECTIONS: (ten days)
APPROVED
REVIEWERS INITIAL
APPROVED W/ CONDITIONS E
DATE
DUE DATE I b I. at. drir
NOT APPROVED (attach comments) 0
1
CORRECTION DETERMINATION:
APPROVED APPROVED W/ CONDITIONS rii
REVIEWERS INITIAL
DATE
DUE DATE
NOT APPROVED (attach comments) Q
(Certifiaaoa of cccupiacy rcquirtd. )
. irfsne;",r.,tteN.YtrL ?:5;7 ?.{: ^` .. "r"- ::F?n'G'::fiiss4.4NC:t ` i l4L!% 4er :5;4i {�U:i�r:;J`�„�Ksr.�ie�`�
PLAN REVIEW / ROUTING SLIP
MiT7 OO$(.
ft
ACTIVITY NUMBER
PROJECT NAME _
DEPARTMENT:
BUILDING DIVISION El
PUBLIC WORKS ■
DATE Atlt.9'1
FIRE PREVENTION fl
STRUCTURAL E
PLANNING DIVISION
a
PERMIT COORDINATOR 0
DETERMINATION OF COMPLETENESS: (T,Th)
COMPLETE E
COMMENTS
DUE DATE 2.3 • / 7
NOT COMPLETE Q • NOT APPLICABLE El
TUES /THURS ROUTING: PLEASE ROUTE NO FURTHER REVIEW REQUIRED El
�j N FED 'Os' c o.
ROUTED BY STAFF U (If routed by staff, make copy to master file & enter Sierra.)
REVIEWERS INITIAL XLe--- . DA'T'E 5-2-3- 97
APPROVALS OR CORRECTIONS: (ten days)
nUEoa'TE 0•'I'97
APPROVED APPROVED W/ CONDITIONS ❑. NOT APPROVED (attach comments) ET'
REVIEWERS INITIAL CV/
DATE
c) 03 c/-7
CORRECTION DETERMINATION:
DUE DATE
APPROVED I 1 APPROVED W/ CONDITIONS E NOT APPROVED (attach comments) Q
REVIEWERS INITIAL
DATE
(Certifiadou of occupancy required.
j -'DETACH 10 DISPLAY CERTIFICATE-"
TI
it
l
S
�r
�� % // ✓J /NJII /II / /I /� / / / / / /I /rV //J //
L
DETACH 10 DISPLAY G[flIIFICATE._?