Loading...
HomeMy WebLinkAboutPermit MI97-0137 - RIVERVIEW PLAZA BUILDING 2 - REROOFRi 'iR,v ?LA2-4 BLDt *10 013/ City of Tukwila '- (206) 431 -3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 MISCELLANEOUS PERMIT WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES, APPLICANT IS PROCEEDING AT THEIR OWN RISK. Parcel No: Address: Suite No: Location: Category: Type: Zoning: Const Type: Gas /Elec.: Units: Setbacks: Water: Wetlands: 252304 -9077 16000 CHRISTENSEN RD ACOM MISCPERM TUC RE -ROOF 001 North: TUKWILA Permit No: Status: Issued: Expires: MI97 -0137 ISSUED 08/22/1997 02/18/1998 Occupancy: OFFICE UBC: 1994 Fire Protection: .0 South: .0 East: .0 West: .0 Sewer: TUKWILA. Slopes: N Streams: Contractor License No: HAIGHRC269QK OCCUPANT RIVERVIEW PLAZA BUILDING 2 16000 CHRISTENSEN RD, TUKWILA, WA 98188 OWNER JOHN •HANCOCK.MUTUAL LIFE Phone :. (206)431 -8336 16040 CHRISTENSEN RD #214, TUKWILA WA 98188 CONTACT RON HAIGHT Phone: 784 -8414 P.O. BOX 70150, SEATTLE, WA 98107 CONTRACTOR ,HAIGHT ROOFING COMPANY INC. Phone: 206 784 -8414 P.O. BOX 70150, SEATTLE, WA.98107 ** k****************'** *** * *** ***** * *** * * * * *** * * * ***** lt* ******* * * *** * * ** ** ** *k'k *fir **k* Permit Description: DEMO AND DISPOSE OF EXISTING BUILT -UP ASPHALT ROOFING ONLY. REPLACE WITH NEW. MINERAL SURFACED BUILT -UP ASPHALT ROOF - UL CLASS A APPLIED OVER EXISTING PLYWOOD ROOF DECK. **************************************************** * * ** * * * * * * * * * * * * * *** * * * * * * * * *** Construction Valuation:' $ 69,933.00 PUBLIC WORKS PERMITS: *(Water Meter Permits Listed Separate) Eng. Appr: Curb Cut /Access /Sidewalk /CSS: N Fire Loop Hydrant: N No: Size(in): .00 Flood Control Zone: N Hauling: N Start Time: End Time: Land Altering: N Cut: Fill: Landscape Irrigation: N Moving Oversized Load: N Start Time: End Time: Sanitary Side Sewer: N No: `Sewer Main Extension: N Private: Public: Storm Drainage: N Street Use: N Water Main Extension: N Private: Public: **************************************************** * * * * * * * * * * * * * *k * * * ** * * * * * * * * * ** TOTAL DEVELOPMENT PERMIT FEES: $ 704.25 ********************************************* k* k****** * ** * * * * * * * * * * * * * * ** * * * * * ** * * * ** Permit Center Authorized Signature :__ _ __ _ Date: S —ota .j__ I hereby certify that I have read and examined this permit and know the same to be true and correct, All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this development permit. Signature: Date: __ 0z Print Name:_ __erj/ Y r1LM-C Thai.: permit shall become null and void if the work is not commenced within 180 days from the date of issuance, suance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Address: 1 6000 Su. te: T.enantc Status: •ISSUED Type: MISCPERM Applied: 08/ 19/.1997: Parcel #: 252304 -9.077 Issued: 118/22/1997 k k•k* k k A k k** ** k k *'k k'k * ** b * * * *it **** ** &*:** h****•k* k, ** *. **•k•k•k k *•k *k*•k***.?, * * ** Permit , Cond i t:i ons s :1..No changes will be ';'Mode to the plans unless approved by the Architect or Engineer and..the Tu,kwi.la. Building Division. • A l Orin s-,.. i nspe,ct i an tr�ecorde, ` and Y approved plans sha 1 1 be available at the j,ab << i.te prior to tie "- s•t`art'v'.of any con- struction'. These ;,documents a► a to,`;be maint'a "i.ned :and avai l- able until final;?inspe`ction appro,ua_l is granted . 3 All constr,uctioit to., ,be "''done in' ^cu'nformanc :e with apOiipved plans . and .re,qu i reme'ht's,:,tif the tUn i f orm Bu i�i d.i'ng;raCode 994 Edition) �'as:. a endeii,`` Uniform'' Mechan1'63,1,,Code "C1994 ,Edi'ti.on) and Was�t?';:thgtor State Energy,Codet; (1994 Edition). { • Val.idit.y..fof `Pe`rmit., -.'the issua"nce;;of a permit,„or',.app,rova plans4A13e,pif icati",ons, end ;:computa.t.ions shat1 notbe.,con 'strued :,,�to7,'b,e a permit, for; o'r an approval of, any violation ?), of anyf of <the pr"ov i s i ons of `the, bu i i d i ng code or' of. otheO or,dinance.`of the ,juris,di'ction: No permit presuming give `�authorifty` to violate -'or '?cancel- the provisions of this code sha 1.1 be ; >va l l,d f i y, CITY OF TUKWILA CHRISTENSEN RD Permit No MI97 -0137 **' *'* Jk* CITY OF •TUKWILA REROOF CONDITIONS Permit No: MI97 -0137 Project Name: RIVERVIEW PLAZA BUILDING 2 Address: 16000 CHRISTENSEN RD Suite: **** k**• k k*** k*** kk** k* k k* k• k• k***• k*** k** k****** k• kk *k *kkk * *k * * **kkk * * * * ****•kk THE FOLLOWING CONDITIONS WILL APPLY TO..RE -R00F PERMITS 1 . All re- roofing;,pro;jects will be accomp'l ithe;d in Compliance with Append;;i,e: Chapter ' 15 of, the• Un i farm Building-Code (UBC) . 2 Inspections: ew :roof coverings shall not' be applied without first obtai:ning a pre - goofing•. inspection from the Bul iding ivri's;ion ;;and written approval from the Building,:Inspe,i:Cor. The pre- roofing "'lnspect;ion shall pay particular attention to evidence of accumu.lati.oh of water. Where extensive ponding of water is : apparent,,; an .anaiys i s, of the root : structure ' i'or comp,1, lance with Secti`on 1506, UBC, shall be made-and corrective mea3ure's., uch as "re 1 ocat i'on of roof drains or s_Guppers, resloping of the` roof or structural changes,,:s`hal l be'accomplished. An; ins'pectio,n covering the above .Pistol topl OS 'Prepared by a qua l.if l ed special inspector, as determined by the Building Official, may be accepted irllieu of the pre- inspection by the Building Inspector.' • final inspection and approval shall ,b"e obtained from the B:ui lding Division when the re- ,roofing complete. :..A's a condition, of the final inspection -'for roots that require a fir'e retardant 'roof covering under the pravislons.::ot Table 1'=A,; .1994' UBC, the, roof installer shall provide . the inspector with a written' statement. indicating the—following (or something ,imilar ?,: I HAVE INSTALLED A'ROOF MEMBRANE ASSEMBLY, INCLUDINGIN'SULATION IF APPLICABLE, CONSISTING OF.(MANUFACTURER), SPECIFICATION # , DATA SHEET ENCLOSED, WHICH MEETS: OR.EXCEEDS,:'THE REQUIREMENTS FOR CLASS A OR CLASS B ROOFS. THIS ROOF WAS INSTALLED'AT (ADDRESS), UNDER CITY OF TUKWILA PERMIT NO. (The statement shall include the name of the roofing company that installed the roof, signature of installer and date.) CITY OF TI'KWILA Permit Center '- 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 Miscellaneous Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mall or facsimile. Project Name/Tenant: D Avowed PLAZA Butctmuc, p2 A f — KI F City State /Zip: lame) Value of Constructionn�b( -► -. Ott 77 Tax Parcel Number: 46:A304 - 90 77- o 9 Site Address: „... Como o C,aatsi L ( oda tJtcwv..4., WA Property Owner: de Itl EA.'l(Q.W PL. ,A GS/ RQ__ Md____ sf _ P.t o Street Address: n MOW Catttgiradas 014') <0111” tot 1 Phone: 43 - $ 1334 City State /Zip: kA444 NA itleb Fax #: Contact Person: City /State /Zip: Phone: /th Street Address: _om__. City State/Zip: Fax #: � i , J... ' I rV M/t uiiJ:— Contractor:� nn AW, I .G. City State /Zip: 9f07 Phone: '4_ 6414 Fax #: 74( Phone: (714 I COS- 2777 Street Address: 4i (0'I S''A.ni , w ea c7015b a .41 Architect: 0 7 61R�P �� • Street Address: ' / City State /Zip: P7�/ �'. �i41' / b i! �41bW46 hit ko a Fax #: Engineer: 'r �jGgs Phone: Street Address: City State /Zip: Fax #: MISCELLANEOUS PERMIT'REVIEW `AND: APPROVAL REQUESTED: (TO BE FILLED OUT' BY ' APPL'ICANT);..- Description of work to be done: vemo. "4 asco!E of swinod. Qukz VP 4spostur it.eFtf:K• out*. REft.41441 NO P[14 NSW NtMetAL. 4FAL6O St ttX W' Aria[ Rx:cf. - tJt. C.4 6S .d► -ApKda "fat asisrimo Rim:* itiac 1h3 Will there be storage of flammable /combustible hazardous material in the building? ❑ yes 1S-no Attach list of materials and store. e location on se arate 8 1/2 X 11 a er indicatln uantities & Material Sa/ Data Sheets ■ Above Ground Tanks ■ Antennas /Satellite Dishes Bulkhead/Docks commercial Reroof ❑ Demolition ❑ Fence ❑ Mechanical ❑ Manufactured Housing - Replacement only ❑ Parking Lots ❑ Retaining Walls ❑ Temporary Pedestrian Protection/Exit Systems ❑ Temporary Facilities in Tree Cutting APPLICANT <REQUEST.FOR MISCELLANEOUSPUBLIC:WORKS U Channelization /Striping ❑ Flood Control Zone ❑ Landscape Irrigation ❑ Storm Drainage ❑ Water Meter /Exempt # Size(s): ❑ Water Meter /Permanent # Size(s): Cl Water Meter Temp # Size(s Est. quantity: gal Schedule: : In Moving Oversized Load/Hauling ❑ Curb cut/Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #: Size(s) ❑ Land Altering: 0 Cut cubic yards 0 Fill cubic yards 0 sq. ft.grading/clearing ❑ Sanitary Side Sewer #: ❑ Sewer Main Extension 0 Private 0 Public ❑ Street Use ❑ Water Main Extension 0 Private 0 Public 0 Deduct 0 Water Only ❑ Miscellaneous MONTHLY SERVICE BILLINGS TO: Name: 1 Phone: Address: City /State /Zip: 0 Water 0 Sewer 0 Metro 0 Standby WATER METER DEPOSIT /REFUND BILLING: Name: Phone: Address: City /State /Zip: Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. Date application accepted: P `"� -ct 1 Date application expires: Application take )) • initials) ALL MISCELLANEOUS •, ' IT APPLICATIONS MUST BE SU: ' TED WITH THE FOLLOWING: ➢ ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN ➢ BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED ➢ ARCHITECTURAL DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT ➢ STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED STRUCTURAL ENGINEER ➢ CIVIL/SITE PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER (P.E.) • 4 1 ;, • ❑ SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR PERMIT REVIEW Sub Mit chec exceeding;5;000 ga�llgns and a ratio of height to diameter or width ❑ Antennas /Satellite Dishes• Aubmit, clitIgklIst.7 No: M-1 ❑ Commercial Tenant, InIprovement r Buikhead/Dock 0 Commercial Reroof: Submit checlqs1 Po: M-l0 ❑ Demolition. Subrnit checklist' No: M731 M-3q • Fences - Ober 6 feet in Height Submit checklist No: M -9 • Land Alterin j/GradingJPreloads, Submit checklist" ' No: M -2 ❑ Loading Docks .''' ''` '�:''- °` = "' ''Commercial Tenant Improvement Permit. Submit checklist No: H -17 ❑ Mechanical (Residential : Submit checklist No. M -8, Residentialonly- ❑ : • _ • = Submit checklist No: H -9 ❑ Manufactured Submit checklist No: M -5 ' Mavinq 9versized:1,oad/Hau fl,ng ., • ;: N +. , :Submit chacklist No; M -5' - -' ❑ Parking Lots ' , Submit checklist No: M -4 ❑ Residential Reroof - Exempt with following exception: If roof structure to be repaired or replaced Residential Building Permit Submit checklist No: M -6 Submit checklist No: M -1 ❑ Retaining Walls- Over 4 feet in height ❑ Temporary Facilities Submit checklist. No: M -7 ❑ Temporary:Pedestrian Protection/Exit Systems Submit checklist No: M -4 0 Tree Cutting. Submit ch "eckllst No: M -2 ❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". Building:Owner /Authorized. Agent If the applicant is other than the owner, registered architect/engineer,or, contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWN __;.,- - - AUTHO - IZE • AGENT: Signature: dior#" Date: / / /Ye. Print name: Phgne: 7/51.1Fir/ F x # zeifid3r Address:ip. d. 6d ,t,_ 7e,v5z, City /State /Zip,1Av . , z.i4 7,7d7 M1SrPMT.r)()r 7/11196 * * *•*# * * ** ** * ** * *ot•kk* kil*********** A. *** *** *•* *** *st *A* * ** *k * *** *A ** COMMUNITY ITY OF TUKWILAy WA a� TRANSMIT DEVELOPMENT ** * * * ***•kho1 *h ** * ** * * * * . �1•*�r *•* * A* k*•** �Il'*•* A• **•k�Jr•k71•.l•A*** *A'*•k**•kfi. TRANSMIT. Number: R'9700628 Amount: 704.25 08/19/97 15:35 Payment Method: CHECK.. Notation: HAIGHT ROOFING Init: SLR Permit No MI97 - 0137' Type: MISCPGRM MISCELLANEOUS PER MIT. Parcel Nat 252304 -3 077. Site Address: 16000 CHRISTENSEN RD Total tees: 704.25. 7.04.25 Total ALL Pmts: 704.25 Bul once': .00 *********** A*****************.t.*** o* A*,1' h* d *.A * * *•A** * * ** * * * *•* *oi1 ** Account Code. Des cri pt i on Amount 000/322.100 BUILDING NONRES 699.75. 000/386.904 STATE BUILDING SURCHARGE 4.50. INSPECTION RECOP') Retain a copy with pg.._ lit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100; Tukwila, WA 98 88 (206) - 1 -3670 Projo, ' `I Type of ins•. = ction: i f� A• •r:s • / . .4, S•ecial instructions: _ I_ ♦ r , Date calle• �" Date wanted: 40 -� i •.m. Requester: Phone No.: Approved per applicable codes. COMMENTS: 1 1 Corrections required prior to approval. IInspecto 1T 1 $42.00 REINSPECTION F REQUIRED. Prior to inspection, fee must be pald at 6300 Southcenter :Ivd., Suite 100. CaII to schedule reinspection. CSI INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 9818 + — INSPECTION RECOPr- Retain a copy with pd., jt r(121-0157 PERMIT NO. % (206) 431 -3670 Project w.eY V �-�W et V Type of inspection:p - Rerc ate called: �-Tl1 p 0�0�` 1� Address: itOOdO Ch I°' Special Instructions: 1349 cg j� . �: Date wanted: � a. . Requester: Q Phone No.. - V4 ^cf)"l 1 q Approved per applicable codes. (-1 Corrections required prior to approval. C MMENTS: f AnA3,(- MAA Netk -FW wS . Inspector: 1 1 Date: ,, 2'-_1 7 $42.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Cali to schedule reinspection. "SINCE 1919" .t:.., i�l:. HAIGHT ROOFING COMPANY, INC. Mailing Address: P.O. Box 70150, Seattle, Washington 98107 Office Address: 4910 15th Ave. N.W., Seattle, Washington INDUSTRIAL—COMMERCIAL—ROOFING and SHEET METAL WORK REROOFING SPECIALISTS November 20, 1997 City of Tukwila Building Division 6300 Southcenter Boulevard, # 100 Tukwila, Washington 98188 Attn: Ms. Shellie Bates Re: Permit Numbers1/I97= 0137.,,, µ Area Code: (206) 784 -8414 RECEIVED NOV 2 4 1997 COMMUNITY DEVELOPMENT Dear Shellie, This letter shall serve as confirmation that Haight Roofing Company, Inc. has completed the re- roofing project on the Riverview Plaza Building 2. The new roof membrane assembly consists of a Johns- Manville specification 4GNC, manufacturer's data enclosed, which meets the requirements for a U.L. Class A fire rating. This roof was installed at 16000 Christensen Road, Tukwila, WA under City of Tukwila permit no. MI97 -0137. Sincerely, HAIGHT ROOFING COMPANY, INC. Ron Haight, Estimator / Project Manager Johns Manville ROOFING SYSTEMS The name respected for roofing since 1858 is back, with more product choices than ever. CITY RECEIVED NOV 2 41997 PERMIT CENTER Specification 4GNC Four Ply Mineral Surfaced Fiber Glass Built -Up Roof Built-Up Roofing lipoellilitions For use over wood or other nailable decks on inclines of 1/4" to 6" per foot (20.8 to 500 mm /m) For Regions 1, 2 and 3 Nailablo Deck Sheathing Paper Of Required) OtasBese, OlasBose Plus, Ventsuletion or PermaPly 28 2 5 GlasKap Mineral Surfaced Cap Sheet • End Laps Staggered • 3'Apart (Min.) 2' Lap I. • • • 8' End Lap T GlasPly Premier, GiasPly IV or PermaPly•R • • Materials per 100 sq. ft. of Roof Area Sheathing Paper. Wood board decks only 1 layer . Felts: GlasBase, GlasBase Plus, PermaPly 28 or Ventsuletion Felt 1 ply GlasPly Premier, PermaPly -R or GlasPly IV 2 plies GlasKap, Mineral Surfaced Cap Sheet 1 ply,; Bitumen (Interply): Incline per foot Asphalt Nominal Weight, Up to 1" 170 °F, Type II, Flat 69 lbs. 1" to 3" 190°F, Type III, Steep 69 lbs. 3" to 6" 220 °F, Type N, Special Steep 69 Ibs, 0 to 6" PermaMop 69 Ibs: Approximate installed weight 175 - 260 lbs... General This specification is for use over any type of approved structural deck (without insulation) which can receive and adequately retain nails or other types of mechanical fasteners that may be recom- mended by the deck manufacturer. Examples of such decks are wood and plywood. This specification is not for use directly over lightweight, insulating concrete decks. Design and installation of the deck and /or substrate must result in the roof draining freely and to outlets numerous enough and so located as to remove water promptly and completely. Areas where water ponds for more than 24 hours are unacceptable and are not eligible to receive a Schuller Roofing Systems Guarantee. Note: All general instructions contained in The current Schuller Commercial /Industrial Roofing Systems Manual should be consid- ered part of this specification. Fiashina: Flashing details can be found in the "Bituminous Fleshings" section of the Schuller Commercial /Industrial Roofing Systems Manual. /- ,pplIcotior. Over wood board decks, one ply of sheathing paper must be used under the base felt and on top of the wood board deck. Note: On roof decks with slopes up to 1" per foot (83.3 mm /m), the roofing felts may be installed either perpendicular or parallel to the roof incline. On slopes over 1" per foot (83.3 mm /m), refer to Paragraph 6.11 of this section for special requirements. Using GlasBase, GlasBase Plus, Ventsuletion, or PermaPly 28, start with a 12" (305 mm) width (a specific base sheet may be a condition of Guarantee). The following base sheet courses are to be applied full width, lapping the preceding felt 2" (51 mm) on the side laps and 4" (102 mm) on the end laps. Nail the side laps 9" (229 mm) o.c. Down the longitudinal center of each felt, place two rows of nails spaced approximately 11" (279 mm) apart, with the nails staggered on approximately 18" (457 mm) centers. Use nails or fasteners appropriate to the type of deck with 1" (25 mm) mini- mum diameter caps. For additional fastener information, refer to the Fastener Data in the "Roof Deck" section of the current Schuller Commercial /Industrial Roofing Systems Manual. Using GlasPly Premier, PermaPly -R, or GlasPly IV, apply a piece 18" (457 mm) wide, then over that, a full width piece. The follow- ing felts are to be applied full width overlapping the preceding felts by 19" (483 mm) so that at least 2 plies off felt cover the base felt /substrate at all locations. Install each felt so that it is firmly and uniformly set, without voids, into the hot bitumen (within t25 °F [±14 °C] of the EVT) applied just before the felt at a nominal rate of 23 Ibs, per square (1,1 kg.m2) over the entire surface. Installation over porous substrates such as roof insulation may require up to 33 lbs. per square (1.6 kg/m2) of hot bitumen, Surfacing Prior to application of GlasKap, cut the cap sheet into handleable lengths (12' - 18' [3.66 m - 5.50 m]). Lay the material out on the roof and allow it to relax and flatten. To accommodate a full width sheet, apply a mopping of hot asphalt, approximately 20 °F above the EVT, at a nominal rate of 23 Ibs. per square (1.1 kg /m'). (The higher temperature of asphalt maximizes the bonding of the cap sheet to the ply felts.) Then flop the cap sheet into the hot asphalt. On subsequent courses, the cap sheet is positioned upside down, directly over the sheet in the preceding course such that the side lap area of the preceding sheet is exposed. Care should be taken to maintain 2" (51 mm) side laps and 6" (152 mm) end laps. Asphalt is applied in the some manner as before, making sure to also cover the 2" (51 mm) exposed side lap. Asphalt may also be applied to the exposed "upside down" cap sheet, prior to "flopping" it into the hot asphalt. The cap sheet must be firmly and uniformly set, without voids, into the hot asphalt with all edges and laps well sealed. Asphalt should meet the requirements of ASTM D 312. The contrac- tor must provide a Schuller confirmation number for asphalt on jobs which require a Guarantee. Check with a Schuller Technical Service Specialist for special requirements in hot climates. Built-lip Roofing Specifications tk Number of Plies —� .,,�., w•{, ,. `. `'1<xt. -4-- Surfacing G = Gravel S = Smooth C = Cap Sheet Type of Ply Substrate P = Protected G = Fiber glass I = Insulated and /or CT = Coal Tar Specs Non - Nailable N = Nailable L = Lightweight Concrete Roof Finder Index Deck Roof Spec. Surface Region' Type Slope Composition Number Page Smooth All 1 Up to 6" 4 plies Schuller Ply Felt 4GIS 6 -13 Smooth All 1 Up to 6" 3 plies Schuller Ply Felt 3GIS 6 -14 Smooth All N Up to 6" Schuller Base Sheet, 4 Schuller Ply Felts 5GNS 6 -15 Smooth All N Up to 6" Schuller Base Sheet, 3 Schuller Ply Felts 4GNS 6 -16 Smooth 2 & 3 N Up to 6" Schuller Base Sheet, 2 Schuller Ply Felts 3GNS 6-17 Grave All Grave All Grave All e Grave All Grave 2 & 3 Grave All Grave All Grave 2 & 3 Grave All Grave All Up to 3" 4 plies Schuller Ply Felt 4GIG 6 -18 Up to 3" 3 plies Schuller Ply Felt 3GIG 6 -19 N Up to 3" Schuller Base Sheet, 4 Schuller Ply Felts 5GNG 6 -20 N Up to 3" Schuller Base Sheet, 3 Schuller Ply Felts 4GNG 6 -21 N Up to 3" Schuller Base Sheet, 2 Schuller Ply Felts 3GNG 6 -22 L Up to 3" Schuller Base Sheet, 4 Schuller Ply Felts 5GLG 6 -23 L Up to 3" Schuller Base Sheet, 3 Schuller Ply Felts 4GLG 6 -24 L Up to 3" Schuller Base Sheet, 2 Schuller Ply Felts 3GLG 6 -25 Up to 3" Schuller Base Sheet, 3 Schuller Ply Felts 4GIG (Alt) 6 -26 Up to 3" Schuller Base Sheet, 2 Schuller Ply Felts 3GIG (Alt) 6 -27 Minera All Minera All Minera 3 only Minera All Minera All Minera 3 only '/" to 6" 4 plies Schuller Ply Felt & GlasKap 5GIC 6 -28 '/" to 6" 3 plies Schuller Ply Felt & GlasKap 4GIC 6-29 %," to 6" 2 plies Schuller Ply Felt & GlasKap 3GIC 6 -30 N %" to 6" Schuller Base Sheet, 3 Schuller Ply Felts & GlasKap 5GNC 6 -31 N Y." to 6" Schuller Base Sheet, 2 Schuller Ply Felts & GlasKap 4GNC 6 -32 N ''b" to 6" Schuller Base Sheet, Schuller Ply Felt & GlasKap 3GNC 6 -33 Grave All Grave All Grave All Grave 2 & 3 Grave All Grave 2 & 3 Up to '/" 4 plies Schuller GlasPly Premier 4GIG -CT 6 -34 Up to' /," 3 plies Schuller GlasPly Premier 3GIG -CT 6 -35 N Up to %." Schuller Base Sheet, 3 Schuller GlasPly Premier 4GNG -CT 6 -36 N Up to''' /" Schuller Base Sheet, 2 Schuller GlasPly Premier 3GNG -CT 6 -37 L Up to' /" Schuller Base Sheet, 3 Schuller GlasPly Premier 4GLG -CT 6 -38 L Up to' /" Schuller Base Sheet, 2 Schuller GlasPly Premier 3GLG -CT 6 -39 'See Specification for any additional limitations. SchwNor Maximum Insulation file No. Spedfkotlon FW Slope Deck Approved Thickness lose PIy Other Report Guide :R Number . -'dh g • (in.) Type Insulations (in.) Felt Felts Surfacing Comments No. Cord Gravel Surface 1. 3.5616, A 1 NC '06, FF, FESCO, Any 1- GBASE, PP28, 2 or more GP IV, Gravel Asphall 861185495 110167 3.56116 FG, F( or RF thickness VENTS'N, DBASE GP PREMIER or 921127628 (.3 over above or GBASE PLUS PPR 2. 3.56IG, A 1 C.15/32 'UG, FE FES(0, Any I - GP IV, GP PREMIER, 2 or more GP IV, Gravel Asphall General RI0161 3.56116 FG, FC or 11 Ihickness GBASE, VENTS'N, DBASE, GP PREMIER or 911127628 0.6 over above PPR, PP28 or GBASE PLUS PPR 3. 3.5616, A 3 (.3/4 'UG, Ff, FES(0, Any I - GBASE, PP28, 2 or more GP IV, Gravel Asphalt Generol RI0161 3.5616 FG, FC or RF Ihickness VENTS'N, DBASE, GP PREMIER or 91NK21628 E•7 over above or GBASE PLUS PPR 4. 3.5616, A 3 (.3/4 'UG, Ff, FESCO, Any - 3 or more GP IV, Gravel Asphall Generol R10167 3.5616 16,1(or 111 thickness GP PREMIER or 1.8 over above PPR 5. 3.56116 A 3 (.15/32 None - 1- PP28 or GBASE 2 or more GPO!, Gravel Asphall New RI0167 GBASE, PP28, GP PREMIER or PPR 6. Recover, A 3 N( RF, FG, 1.16, FF, Any [Any Ul classified (lass A Gravel Aspholl General RI0167 Gravel 1(or FES(0 thickness BUR membrane system] (1) N.5 7. Recover, A 2 (•15/32 RF, FG, UG, FF, Any (Any UL classified (lass A Gravel Asphall Generol 110167 Gravel FC or 115(0 thickness BUR membrane system] (1) 0.7 8. Recover, A I (.15/32 RF, 16, 06, FF, Any - 3 or more GP IV, Gravel Asphalt General 110167 Gravel 1( 011(5(0 Ihickness GP PRIMER or PPR (1) P•9 9. 3.5616•(9 A 1/2 N( UG, FF, FC, Any - 3 or more GP IV, Gravel Coal far General RI0167 16 011E5(0 or thickness GP PREMIER (Type 1 or 1111 111.1 Rf over above 10. Recover, A 1/2 NC RF, FG, UG, FF Any - 3 or more GP IV, Gravel Cool far 8611818944 110167 3.5616.01 FC or FES(0 Ihickness GP PREMIER (Typo 1 or III) 11.4 Cop Sheet Surface 1. 3.5610, A 1 NC '00, 11, F(, Any I - GBASE, PP28 1 or morn GP IV, 1- GKAP Asphalt General RI0167 3.5611( FG, 115(0 or Ihickness 91111511, DBASE GP PREMIER or PPR 9111127628 (.4 RF over above or GBASE PLUS 2. 3.56I(, A 1 NC '110, FF, F(, Any - 2 or more OW 1 -GKAP Asphall General RI0167 3.56110 FG, 1(S(0 or thickness GP PREMIER or PPR 0.5 RF aver above 3. 3.561(, A 1.1/2 N( 16, FF, F(, Any - 2 or more GP IV, 1- GKAP Asphall General R10167 3.50N( FO, FES() or thickness GP PREMIER or PPR F.10 RF over above 4. 3.561( A 2 N( ' UG, FF, FC, Any 1- GBASE or 2 or more GP IV, 1- GKAP Asphall New RI0167 3.5G11( FG, FES(0 or Ihickness PP28 GP PREMIER or PPR RF over above 5. 3.561(, ; lA,r 1 (.15/32 16, FF, FC, Any I - GP IV, GP PREMIER, 1 or nwre GP IV, 1- GKAP Aspholl Generol R10167 3•SGN( FG, FES(0 of Ihickness GBASE, 9(111511, DBASE, GP PREMIER or PPR 911827628 0.1) RF over above PPR, PP28 or GBASE PLUS 6. 361(, A 1 (•15/32 '116, FF, FC, Any 1- GP IV, GP PREMIER, 1 DPLY or 1- GKAP Aspholl General R10167 3611( FG, FES(0 or ihkkness GBASE, 9(111511, DBASE, DBASE 9111827628 0.12 RF over above PPR, P128 or GBASE PLUS GI.13 7. 3.561( A 2 (•15/32 06, FF, F(, Any 1- GBASE or PP28 2 or more GP IV, 1- GKAP Aspholl New R10167 F6, FES(0 or thickness GP PREMIER or PPR RF over above 8-20 -1997 9: 29AM • "SINCI 1919" August 20, 1997 FROM HAIGHT ROOFING INC 206 784 1058 P. 1 HAIGHT ROOFING COMPANY, INC. Mailing Address: P.O. Box 70150, Seattle, Washington 98107 Office Address: 4910 15th Ave. N.W., Seattle, Washington INDUSTRIAL—COMMERCIAL—ROOFING ind SHEET METAL WORK REROOFING SPECIALISTS City of Tukwila Dept. of Community Development Permit Center 6300 Southcenter Boulevard Tukwila, WA 98188 Attn: Re: Ms, Shellie Bates Permit Nos. MI 97 -0137 MI 97.0138 Dear Shellie, pbat �tr*brand Area Code: (206) 784.8414 eiho We have received your fax request for additional information pertaining to the above referenced permit applications and enclose documentation regarding the roof system manufacturer's printed specification and UL test approval documentation. Upon review you will see the system intended for use as submitted and approved by the building owner's representative is a standard mineral capsheet surfaced built -up asphalt roof system, typical of many roofs within your jurisdiction, and conforms to the criteria established for a Underwriters Laboratories Class "A" fire rating when applied accordingly over a combustible deck. Regarding the insulation issue; the existing insulation is placed beneath the roof decking on both buildings and as such we are not disturbing, altering, or changing the thermal insulation characteristics as presently exist. This is strictly a process of removing the existing roofing materials and replacement with virtually an identical roof membrane assembly as exists now. If you have any more questions please contact me at your earliest convenience. Thank you for your prompt attention to our applications. Sincerely, Haight Rooflas Company, Inc. on Haight, Estimator/Project Manager 8-.20 -1997 9 : 30AM FROM HAIGHT ROOFING INC 206 784 1068 Four Ply Mineral Surfaced Fiber Glass Built -Up Roof gilt.Up Roofing Specifications For use over wood or other nailable decks on inclines of 'A" to 6" per foot (20.8 to 500 mm /m) For Regions 1, 2 and 3 P. 2 MAN* Do* ShH•Inmg Paper (II Reouired) aa$eae. GI.ic6aee Plus, Ventiulation W PermaPly'ttl MIewr& Surfaced • :Cap Sheet end Lade Staggered, • 3' Apart (Met.). • 2' Lag , 1. T GatePly Proctor, Cla/rryy W or Pcnn.PlyR i' I?nd Lao ' T•; Materials per 100 sq. A. of Roof Area Sheathing Paper. Wood board decks only 1 layer Felten GlosBose, Glosbas. Plus, PermaPly 28 or Ventsulation Felt 1 GlasPly Premier, PermoPly-R or GlosPfy IV 2 ies . GlosKap, Mineral Surfaced Cop Sheet 1 ply Bitumen Onterply); Irtdine par foot . Asphalt . Up to 1' 1 °b3" 3 "to 6'. 0to6 "• Nominal Weight 170'F, Type II, Flat . • 69 lbs. 190 °F, Type III, Steep 69 lbs. , 220'F, Type N, Special Swop 69 fbs. „ ParmaMop 691bs, Approximate installed weight: 175.260 lbs.• • This specification is for use over any type of approved structural deck (without insulation) which con receive and adequately retain nails or other types of mechanicol fasteners that may be recom- mended by the deck manufacturer. Examples of such decks are wood ond plywood. This specification is not for use directly over lightweight, insulating concrete decks. Design and installation of the deck and /or substrate must result in the roof draining freely and to outlets numerous enough and so located as to remove water promptly and completely. Areas where water ponds for more than 24 hours are unacceptable and are not eligible to receive o Schuller Roofing Systems Guarantee. Note: All general instructions contained in the current Schuller Commercial /Industrial Roofing Systems Manual should be consid- ered part of this specification. Ficshir,gs Flashing details can be found in the "Bituminous Fleshings" section of the Schuller Commercial /Industrial Roofing Systems Manual. Over wood board decks, one ply of sheathing paper must be used under the base felt and on top of the wood board deck. Note: On roof decks with slopes up to I. per foot (83,3 mm /m), the roofing felts may be Installed eitherpsrpendicu(ar or parallel to the roof incline. On slopes over 1" per foot (83,3 mm /m), refer to Parograph 6.11 of this section for special requirements. Using GlasBase, GlosBose Plus, Ventsulotian, or PermaPly 28, start with a 12" (305 mm) width (a specific base sheet may be a condition of Guarantee), The following base sheet courses are to be applied full width, lopping the preceding felt 2" (51 mm) on the side lops and 4" (102 mm) on the end lops, Nail the side laps 9" (229 mm) o.c. Down the longitudinal center of eoch felt, place two rows of nails spaced opproxtmotely 11' (279 mm) apart, with the nails staggered on approximately 18" (457 mm) centers. Use nails or fasteners appropriate to the type of deck with 1" (25 mm) mini- mum diameter cops. For additional fastener information, refer to the Fastener Data in the "Roof Deck" section of the current Schuller Commercial /Industrial Roofing Systems Manual. Using GlosPly Premier PermaPly-R, or GlasP IV, apply a piece 18" (457 mm) wide, glen over that, o full width piece. The follow- ing felts are to be applled full width overlapping the preceding felts by 19" (483 mm) so that at least 2 plies of felt cover the base felt/substrate at all locations. Install each felt so that it is firmly and uniformly set, without voids, into the hot bitumen (within ±25°F (•14 °C) of the EVT) applied just before the felt at a nominal rote of 23 Ibs, per square (1,1 kg,m) over the entire surface. Installation over porous substrates such as roof insulation may require up to 33 Ibs, per squore (1,6 kg /m') of hot bitumen. Surfacing Prior to application of GlasKap, cut the cap shut into handleable lengths (12' - 18' [3.66 m - 5.50 m)). Lay the material out on the roof and allow it to relax and flatten, To accommodate o full width sheet, opply a mopping of hot asphalt, approximately 20 °F above the EV1, at a nominal rate of 23 lbs. per square (1.1 kg /m'). (The higher temperature of asphalt maximizes the bonding of the cap sheet to the ply felts.) Then flop the cap sheet into the hot asphalt. On subsequent courses, the cap sheet is positioned upside down, directly over the sheet in the preceding course such that the side lap area of the preceding sheet is exposed, Care should be token to maintoin•2" (51 mm) side lops and 6" (1.52 mm) end laps. Asphalt is applied in the some manner as before, making sure to also cover the 2" (51 mm) exposed side lop. Asphalt may also be applied to the exposed "upside down" cop sheet, prior to "Bopping" it into the hot asphalt. The cap sheet must be firmly and uniformly set, without voids, into the hot asphalt with all edges and laps well sealed, Asphalt should meet the requirements of ASTM D 312. The contrac- tor must provide a Schuller confirmation number for asphalt on jobs which require o Guarolttee. Check with a Schuller Technical Service Specialist For special requirements In hot climates. 8-20 -1997 9:30AM FROM HAIGHT ROOFING INC 206 784 1058 UL Approvals Built -Up Roofing Membranes Comments: Tapered insulation maybe used in the systems provided they do not exceed the indicated incline or thickness, Vapor barriers or ply sheets are optional beneath roof insulation in systems. Taped joints ore optional with Fiber Glass Roof Insulation. Red rosin paper must be used over combustible (p decks when GIosPly IV, GlosPly Premier or PermoPly'.R are nailed as base sheets in membrane systems. PermaMop is on acceptable alternative to asphalt in these .systems. • " a Available on West Coast only (Region 3); the GlosBase felts ore adhered using Cold Application Cement at a rote of 3 gol /sq. (1.22 liters /m'). (1.) Over existing Class A, B or C roofs. (2) MBR Cold Application Adhesive. Maims Isdalles Ida No. Sip • Oesk Ajprwe/ 1bNrno,. kp Px 0(141 Nepal GvNe (In. lyff Insulations (N.) Feil f s Suslarin/ (omen!' No. ford Gravel Sake 1, 2.3610, A 1 N( 116, 115(0, Any 1– GI15I,PP2B, 2wm01iGPIt( Gard Arphoh 16115413 110167 3.3016 16,1( ail Nano( VINIS'N, DIME GP PIEMIIR a 926121121 (.3 ant Avon oc COME IIUS P10 7. 34610, A 1 615/31 'U&, II, (15(0, Any 1 –GP II( GP 11.(MIIR, 2 to more GP IV, Growl Aspholl Genuol 610167 34666 I6, I(a IN Nicknus G9ASI, 9IN1S'1(, MASS, GI lRIMIlR or 91612764 6.6 ova ahoy PPR, PP21 or G015E115 III 3, 3.5610, A 3 (.3/4 VG, IF,,IMO, Awl 1– GBASI,IP28, 2 wore GPIV, Gavel 64ol1 Grnwvl 110167 34660 FG,KaI1 iYcknfu WWI( GPIW1URor 91612162/ E•7 Mr aboss or GIIASE PIUS PPR 4. 3.5640, A 3 (.3/4 'VG, IF, IF5(0, Any — 3 moue 6P 19, Grovel Asploll Gme'ol 110167 3.5(66 KR or RI Ihikneu GP PIIMIIR or 61 wet ohm PPR I. 3.5(60 A 3 (•13/32 None — 1– MI a 011151 T or we 6P IV, Grovel Arphob Now 110167 GBASI, PP21, GP /6141110 a 110 6. Ruose4 A 3 IK 13,10 U6, F1( Any (Any NIJAINd(bnA Groat Asphalt 6frrrr6 110161 Gael ((a (11(0 IhIA.us IUI mmnhrw roam! 111 _ 6.5 7. Wog A 2 615/11 11,1G, 66,11, My !Any Ill d&Nikd 4 a, A Gavel Asphoh Genital 110167 Goal IC* 365(0 Alkali BUR mw'Irwe sysnml 111 01 1. Ream, A 1 615/37 II, F6, UG,11, My — 3 tumors GP II( Gavel Ayhall Gnaol 110167 IN Glutei IC NS(0 IUclms G1IRIJNIR m Pit (II 1.9 1. 35616 (1 A 113 I( PG,11, I4, — 3 or awe GP IV, Govt (al m' Word 140167 IG a IMO or cknas Gf 1114611 (type l a III) 64 1 11 o* abrY, 10. Ream, A 1/2 NC RF,16, 116, IF Any — 3 or more GP IV, Grovd (001 rat (344611914 110167 35616.0 It or FISUI Oldness GP PR(M1IR (Ns 1 or 111) 1.4 (rep Shell Sodom 1. 346K, A 1 NC 'VG IF, 1(, Any 1- 69ASE,1028 1 w'note GP IX 1 –(NAP Aphill imolai 110141 3566( FG,111(0 a Oilmen 1611311, DIM GP IIlMII1 or PPR 11110762/ (•4 IF wit 0hove a 611S1 PLUS 2. 35614, A 1 441 '110,11, IC, Any — Tor man GPI( 1 -6NAP 3566( 16, IIMO or Ihiknsns GP PRIMIII a PPR Asphow Gerard 110167 IF tyre ahem 3. 3461, A 1.1/2 N( '66,IF,I(, Any — 7amossG/1( 1 -6061 Asphoh 4ea4 110167 3566( FG, FIS(0 w Ihkknwu GP PIIM111a PPR 140 _ If eve/414u 4. 3564( A 7 NC 'IA ft 11, Any 1– 61131 a 2 a man 6/ 11( 1– 611AP Asphalt low 110167 3566( 36,115(0 or Ihkdrnen PP21 6P PRFAAIER a PPR If ova glum 1 316, IR, F(, Any 1– GP 01 if NUR 1 a more GPI( 1 –GUI *oh Waal 110167 14,115(0 or Ihib�ess G1AS1, VUAS'll, MIME, 6P 1013 11 or III 1161137821 6.11 Y tyre dote PPR, 1126 a GIASI f t% 6. 361(, A 1 (.15/32 '116, F(, F(, My 1 –GP I(61MAIM 1 I Ny or 1 -6641 14o11 Gsne,I 110117 366( IC, IIS(0 ar (dam GIASI, 61615'6, 111151, HAM 1111117870 6.1? 11 omit ohon PPR, PP21 41410.51 MIS 61.13 7. 35641 A 2 ( -15132 1G, IF, IC, My 1- 6645[* PPM 2 orworn6P IV, I –61// AIM New 1111(7 16, I(S(0ur Minns GP 11111111 or PPR 11 ever floss f /:'NtL.CSlaixx>%Ti.Ya Vx1;M.'.4v.m HrtAn.all¢4.[eX∎rstvre•ANOM,A* e.M.fgrvnwxt.YNM1Vl y∎ MTC.4 NM. MYI:`Y.1,1,61,,,Ve+r'1,4,4,,,,, PLAN REVIEW / ROUTING SLIP ACTIVITY NUMBER Mi97 -0137 PROJECT NAME DEPARTMENT: BUILDING DIVISION II PUBLIC WORKS fl RIVERVIEW PLAZA BUILDING 2 DATE 8/19/97 FIRE PREVENTION E STRUCTURAL C PLANNING DIVISION 0 PERMIT COORDINATOR DETERM NA'TXON OF COMPLETENESS: (T,Th) COMPLETE COMMENTS • NOT COMPLETE DUE DATE NOT APPLICABLE TUES /THURS ROUTING: PLEASE ROUTE NO FURTHER REVIEW REQUIRED ROUTED BY STAFF n (If routed by staff, make copy to master file & enter Sierra.) REVIEWERS INITIAL DATE s L 1 APPROVALS OR CORRECTIONS: (ten days) DUE DATE 9/02/97 APPROVED n APPROVED W/ CONDITIONS n. NOT APPROVED (attach comments) lJ REVIEWERS INITIAL 1-1. DATE (_2 cr CORRECTION DETERMINATION: DUE DATE APPROVED n APPROVED W/ CONDITIONS REVIEWERS INITIAL DATE NOT APPROVED (attach comments) Q - SUPPLEMENTARY COMMERCIAL RE -ROOF REQUIREMENTS - 1. 1994 Washington State Non - residential Energy Code requires documentation showing roof insulation conforms with W.S.E.C. Section 1132.1 Exception #6. Documentation must verify one of the following. a) The subject roof is currently insulated or conforms otherwise with the W.S.N.E.C. b) The roof will be insulated to conform with the required W.S.N.E.C. R- values. Roofing manufacturer's specification and listing for fire retardant rating. 3. U.B.C. APPENDIX SECTION 1516 - BUILT -UP ROOFS: 1516.1 General. Built - up roof covering shall be completely removed before applying the new roof covering. New roofing conforming to Section 1503 shall be applied except that when the new roof is to be applied directly to a nailable deck which has residual bitumen adhering to it, a rosin -sized or other dry sheet shall be installed prior to the installation of the new roof system. EXCEPTION: The building official may allow existing roof coverings to remain when inspection or other evidence reveals all of the following: 1) That the roof structure is sufficient to sustain the weight of the additional dead load of the roof covering. 2) There is not more than one existing roof covering on the structure. 3) The existing roof covering is securely attached to the deck. 4) The roof deck is structurally sound. 5) The existing insulation is not water soaked. DEPARTMENT OF LABOR AND INDUSTRIES T,H�S CERTIFIES THAT THE PERSON NAMED HEREON IS REGISTERED AS PROVIDED }3Y LAW AS A } } w- W f✓ Y W/, i4 : ✓ 4',Y/' / 4-.%W /!1'h. YLWNM °% �'Y I/.�f /, iV. %r N /.', l %(J //. "./ / /.: , . L'r "(Ii, vti