HomeMy WebLinkAboutPermit MI98-0101 - HALLWOOD MANAGEMENT COMPANY - REROOFHALLWOOD.
MANAGEMENT
REROOF BLDG 2
MI98-0101
City of Tukwila
(206) 431 -3670
Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188
MISCELLANEOUS PERMIT
WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES,
APPLICANT IS PROCEEDING AT THEIR OWN RISK.
Parcel No: 022340 -0030
Address: 500 INDUSTRY DR
Suite No:
Location: BUILDING #2
Category: NSFR
Type: MISCPERM
Zoning: TUC
Const Type:
Gas /Elec.:
Units: 001
Setbacks: North:
Water: N/A
Wetlands:
.0 South: .0 E
Sewer: N/A
Slopes: N
Contractor License No: HAIGHRC269QK
OCCUPANT
OWNER
CONTRACTOR.
CONTACT
Permit No:
Status:
Issued:
Expires:
Occupancy:
UBC:
Fire Protection:
ast: .0 West:
HALLWOOD MANAGEMENT COMPANY
500 INDUSTRY DR, TUKWILA WA 98188
SBP GENERAL PARTNERSHIP
617 INDUSTRY DR, TUKWILA WA 98188
HAIGHT ROOFING COMPANY INC.
P.O. BOX 70150, SEATTLE, WA 98107
DOUG MILLETT
617 INDUSTRY DR, TUKWILA WA 98188
****************************************************** ** * * * * *** * * * * * * * * * * * **•k * * *•k **
Permit Description:
TEAR OFF EXISTING ROOF DOWN TO DECK AND INSTALL A
NEW BUILT -UP ASPHALT ROOF.
k*************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Construction Valuation: $ 60,562.00
PUBLIC WORKS PERMITS: *(Water Meter Permits Listed Separate) Eng. Appr:
Curb Cut /Access /Sidewalk /CSS: N
Fire Loop Hydrant: N No:
Flood Control Zone: N
Hauling: N Start Time:
Land Altering: N Cut:
Landscape Irrigation: N
Moving Oversized Load: N Start Time: End Time:
Sanitary Side Sewer: N No:
Sewer Main Extension: N Private: Public:
Storm Drainage: N
Street Use: N
Water Main Extension: N Private: Public:
***************************************************** * * * * * * * * * * * * * * * * * * * * * *•k * * * * * **
Streams:
MI98 -0101
ISSUED
09/03/1998
03/02/1999
OFFICE
1994
.0
Phone: 206 784 -8414
Phone: 206 -575 -6675
Size(in): .00
End Time:
Fill:
ls( _��•
TOTAL DEVELOPMENT PERMIT FEES: $
******* * * * * * ** * * * * * * * * * * * * * * * * * * * * * * **
Permit Center Authorized Signature:_
648.00
* * * * * * * * *k* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Date: 91
I hereby certify that I have read and examined this permit and know the same
to be true and correct. All provisions of law and ordinances governing this
work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or
cancel the • •v .ion of any other state or local laws regulating construction
or the pe orman'e of w rk. I am authorized to sign for and obtain this
development permit.
Signature
Print Name:_ ' ► /r"
Date a __a __
This permit shall become null and void if the work is not commenced within
180 days from the date of issuance, or if the work is suspended or abandoned
for a period of 180 days from the last inspection.
(1)
CITY OF TUKWILA
•,.-
• ,.
,,' ' I.
, , ,.i:.,.. .•=.'.. ' ('''''! . '''I:i.:;si,,„.10 ".
•• 1- ;,,,1 •.,..., ''''''%. '-:'•.:.--.-ir,;,...;.•...,......:., . •• ....,;? :'' 1 ` c....; •:.
',..• '''' / \ i‘ "•.:■, ' '''''ir''''''. ...";, . '
.
-.,,:, -':::,), .., r:t „ • ,
', -i'••,•, ,
i 3 (.' 'A . 1 : '''.'•!. „:•;''' ,
; . . C i ee■',A.,'■•i''''';;: : ' •
•,,. ':'s• • • : •
" . • • •
iA
t IS%
Li'•4••'i • .1,
. •
•4, 4 •
CITY OF TUKWILA
REROOF CONDITIONS
Permit No: MI98-0101
Project Name: HALLWOOD MANAGEMENT COMPANY
Address: 500 INDUSTRY DR
Suite:
•
THE FOLLOWING CONDITIONS WILL APPLY TO RE-ROOF pERMITS:.
1
All re-TOOfincLotoJects will be accomOitieIY.in compliance with
Appendi/Chapter15 of .the Uniform .Buildin“ode .(11BC):
2.: InspectiOnS:„
.. ,..,:,,.
Ai'.'New,roof cOverings'Sfiall no be applied 44thout,;-firSt
. .
Obtaining :a pre-:roofing inspection from the4BOldingn
Dt.vi'SIOn:and written approval -from the BuilqingAWspeCtor.
The pre-rooting 'InspeCtion shall pay particular .attention to
evidence of actilMulatlfon of water -Where extensive potting
of water isfapparent,an„analysis_ofthe roofstruicitur;e\lor
compliance -with sect;:fOn A5M Oc, shall be madeapd
,-,
corrective meas6res.;.:Such as 'relocation of roof dratnstir,
sotiOpers,°resloO.ing:Off;theobf-'6r struturall:.ohaiigii,senSball
t,. be'accompliShed.; An-JkspectiOn.,coVering the above.;liste'd
topics 'prepaed. 6y-4 qualified speclal inspector, a'S In
deterMined by the Buildini':Official-may be accepted ',in lieu
of'the-pre-inspection by the'Bullding InSpector,
....', .
, „
B',';,A final inSpection and approyal/Spall,,be pbtained.fropy the .,.
."'*ilding DiOsioniNhen the re-rbofingjsomplete.,,,,4s a
c01clitiOn,.of 'the final inspection fC0 .rObfsthat Me*Uire a
fire retardant roof covering under he prOP4.:F.lon$01 Table
15-A. 1994 the root instatler'Shall kOVidethe
inspector with a written 'stateMent indicating/.thefollowing
(or something similar) :,..... .,:,., :,-:. . /..-.A,
, .
: .:-, ,,1 •,,i; '!=. ',I, ,,,,, ...,,,!.::
I HAVE INSTALLED A ROOT::.MEMBRANEA A
SSEMBLY0:NCLI.JDINGiNSULATION IF
1
APPLICABLE, CONSISTINGOFMANUFACTURER) W
, SUCDATION # _ , DATA
.,
SHEET ENCLOSED , WHICH MEEtS,fibk.*UOPSij*.REOUIREMENTS FOR aASS A
OR CLASS B ROOFS, THIS ROOF VAS'iN5tALLED-AT (ADDRESS), UNDER CITY
OF TUKWILA PERMIT NO. .
(The statement shall Include the name of the roofing company that
installed the roof, signature of installer and date.)
•
CITY OF TUKWILA
Permit Center(
6300 Southcenfer Boulevard, Suite 100
Tukwila, WA 98188
(206) 431 -3670
Miscellaneous Permit Application
Pr
Application and plans must be complete In order to be accepted for plan review.
Applications will not be accepted through the mall or facsimile.
Project Name/Tenant: rr
NecaoF 5 bt4i 1cli�Us for. i14j/t i i vl anav✓l2ent `,wl tilki
alue of Construction:
(.0,5oZ
Site Address:
.5 l.)) 4. v`, a U< tt� ft ve Tu IL (,)1 la
„ City Stat /Zip 7
1 Idashugtnv1 9818
y
Tax Par el Number. 1
02� 54c)--U0r�c:)
P pert Owner:
Hof_ /tieocl /llafageittev1.r Lail f .r li
_
Phone:
62o - 6-�.f -1 2 i
Fax #:
q- ti'25•-•
Street Addr ss: .., j City State /Zip:
l .u. t f �. , /< . I2 �,, , ,,z t`; /, -. ,
Contact, Perso .,, �ij"_
iliL ( a Ur) LA- I ,2 1 Ile •T i
Phone:
, .1 1 1
l
Street Address: yy��
e .Qiii i e a j t 6ve
City State /Zip:
Fax #:
1` , 1
Contr ctor: /
el, 1 c04 1" V,Un \r i I�ck. (n , �. vt G t
0 Metro 0 Standby
Phone: / 2816/ I I
6 - 52`7 /'/
Skeet Address:_ ,..) lJ i
fii3O IbaX 7 /5o ..Sc� 1 /C, �Cl.$lt1g
City State /Zip:
an 811107 oi'
Fax #:
,2 e- 2 y- /0,5g
f
Architect: 4 1
Phone:
Street Address:
City State /Zip:
Fax #:
Engineer: /1/1/
Phone:
Street Address:
City State /Zip:
Fax #:
MISCELLANEOUS PERMIT REVIEW AND APPROVAL REQUESTED: (TO BE FILLED OUT BY APPLICANT) :.
Description of work to be done: ?ea t' c 4c eXi !•. k s vu re)• ,0L. •ti to dec etitd. j bt S%'r.� 1 ( A.
{
I
Will there be storage of flammable /combustible hazardous material in the building? ❑ yes E1 no
Attach list of materials and storage location on separate 8 1/2 X 11 paper indicating quantities & Material Safety Data Sheets
❑ Above Ground Tanks ❑ Antennas /Satellite Dishes ❑ Bulkhead /Docks Pa Commercial Reroof
❑ Demolition ❑ Fence ❑ Mechanical ❑ Manufactured Housing - Replacement only
❑ Parking Lots ❑ Retaining Walls ❑ Temporary Pedestrian Protection /Exit Systems
❑ Temporary Facilities ❑ Tree Cutting
E
APPLICANT: REQUEST FOR MISCELLANEOUS PUBLIC WORKS PERMITS('
❑ Channelizatlon /Striping
❑ Flood Control Zone
❑ Landscape Irrigation
❑ Storm Drainage
❑ Water Meter /Exempt # Size(s):
❑ Water Meter /Permanent # Size(s):
❑ Water Meter Temp # Size(s): Est. quantity: gal Schedule:
❑ Miscellaneous in Moving Oversized Load/Hauling
❑ Curb cut/Access /Sidewalk Fire Loop /Hydrant (main to vault) #: Size(s):
❑ Land Altering: 0 Cut cubic yards 0 Fill cubic yards 0 sq ft.grading /clearing
❑ Sanitary Side Sewer #: ❑ Sewer Main Extension 0 Private 0 Public
❑ Street Use ❑ Water Main Extension 0 Private 0 Public
0 Deduct 0 Water Only
MONTHLY SERVICE BILLINGS TO:
Name:
I v �,,i
I Phone:
Address:
City /State /Zip:
0 Water
0 Sewer
0 Metro 0 Standby
WATER METER DEPOSIT /REFUND BILLING:
Name:
Address:
Phone:
City /State /Zip:
Value of Constructlon - In all cases, a value of construction amount should be entered by the applicant. This figure will be
reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall
expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days
upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application
shall be extended more than once.
Date application acce //pted:
Date application expires:
9
Appllcat%rhtaken by: (Initials)
ALL MISCELLANEOUS PEA T APPLICATIONS MUST BE SUBM D WITH THE FOLLOWING:
A ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN
A BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED
A ARCHITECTURAL DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT
A STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON
LICENSED STRUCTURAL ENGINEER
A CIVIL/SITE PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER
(P.E.)
ri
SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR
PERMIT REVIEW
Submit checklist No: M -9
Above Ground Tanks/Water Tanks - Supported directly upon grade
exceeding 5,000 gallons and a ratio of height to diameter or width
which exceeds 2:1
71
Antennas /Satellite Dishes
Submit checklist No: M -1
El
Awnings /Canopies - No signage
Commercial Tenant Improvement
Permit
0
Bulkhead/Dock
Submit checklist No: M -10
im
Commercial Reroof
Submit checklist No: M -6
0
Demolition
Submit checklist No: M -3, . M -3a
0
Fences - Over 6 feet in Height
Submit checklist No: M -9
0
Land Aftering/Grading/Preloads
Submit checklist No: M -2
Loading Docks
Commercial Tenant Improvement
Permit. Submit checklist No: H -17
0
Mechanical (Residential & Commercial)
Submit checklist No. M -8,
Residential only - H -6, H -16
0
Miscellaneous Public Works Permits
Submit checklist No: H -9
El
Manufactured Housing (RED INSIGNIA ONLY)
Submit checklist No: M -5
0
Moving Oversized Load/Hauling
Submit checklist No: M -5
d
Parking Lots
Submit checklist No: M -4
0
Residential Reroof - Exempt with following exception: If roof structure
to be repaired or replaced
Residential Building Permit
Submit checklist No: M -6
J
Retaining Walls - Over 4 feet in height
Submit checklist No: M -1
EI
Temporary Facilities
Submit checklist No: M -7
El
Temporary Pedestrian Protection/Exit Systems
Submit checklist No: M -4
0
Tree Cutting
Submit checklist No: M -2
Copy of Washington State Department of Labor and Industries Valid Contractor's License. If
not available at the time of application, a copy of this license will be required before the
permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit
in Lieu of Contractor Registration ".
Building Owner /Authorized Agent if the applicant is other than the owner, registered architect/engineer,or, contractor licensed
by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and
obtain the permit will be required as part of this submittal
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS
PERMIT.
BUILDING OWNER OR AUTHORIZED AGENT:
Signature:
0, ry� /� et J
1 1 -=
Date: 6...,R.....?
Print name:
r i fc W. t�; 1e
Phone:
o?ld- 7&1/.4y/
Fax 1i:
n246,.
2r4,... 44..'8'
Address:
,} _
�l (� I ,, I5" �' /4 v
N A)
City/State/Zip: ,
Ye *t t% &47
f870 7
A• *A *# A Ai;,►:•AA *a: * *11 *a *h*..1 *.A*ik* . ** * *i *,l ** *..c *, * *A *,l *k� *.* n.4*,,t,l * *A* *** * *,t.
CITY OF TUKWXLA. WA 'fI1ANSMIT
*• *4,1t%k**A * *A. lost *7 ;i11* t**, 1* *0 * *el*A44. *** *•A•k *•k4 “*A* * *A *k**.k.A*A•.>tA*
TRAr8t1IT Number: 89700.824 .Amount: • 11291.3(Y:09/03/98 .1:$ :59:
PECvnment. Method: CHCC.K Platat1Qri: HAICHT ROOF):NG xriii : BLH •
(Permit; Pia: N190,-0101 Type: M3'CICPERtd MISCELLANEOUS' RIT
PAY °c:el tea.: 022340!-0030
:Site Address: 500 INDUSTRY DU
Lar..at.ian:, BUILDING 412
Total Fees: 11291 50
This Payment 11291.50 Total ` ALL Parts: 1129)-5.0
Balance:
A *•A•A, lot**1 14— Akdr** A***t l*rk,t *k *# * *h-,t.*4 * * *A *IA*** kit ** **• * * *A * * *1 * * * *.
Account Code De5c:ri of i an Amount
000/322.100 BUILDING - I?C;3. ,..•. . 643.50'
000 /396.904 STATE BUILDING. SURCHARGE ' 4..50 ”.
000/322.800 BUILDING .INVES.T.1,CIH.TiON 643..50;
i
r'r
INSPECTION NO.
le 0,
INSPECTION RECORD‘
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd, #100, Tukwila, WA 98188
PERMIT NO.
(206)431-3670
ProjV ty,/,}rrew //rk..7.,,
et_WI-L ,
Type of 112spection:?
t.-e-s-ra..../-
Address: .1
v,1-0
e ,
Date called:
Special instructions:
e i.,_
•••• ele- j„-e"'_ "CA' 'AC."1...
Date wanted:
...4 -.27— 4.2
(-:_az......9n.
s•—• p.m.
Reque,sterk
//--
,. i
46/2-724--,
Phone:
6.v.0 ) 625-"ev6 75'
pproved per applicable codes. E Corrections required prior to approval.
COMMENTS:
Date: 3
r] $47.00 REINSPECTIO EE REQUIRED. Prior to inspection, fee must be paid
at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
1
PECTION RECORD
Retain a copy with permit"
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100; Tukwila, WA 98188
(206) 431 -3670
Project: it l ��"
/ l /7jCalled: ilr°
of Insped'an
.- /�41 °9 "'T
4Address�,/��jj''�f�'''' S�f�
fefill
Date Wanted:
_3...,9 g 4:20•,m.
Requester:
Phone No.:
❑ Approved per applicable codes.
❑ Corrections required prior to approval,
COMMENTS: Le64/4-).--- :.4 L
(5` ,
_
/ Lfri-frr-oco /fir 21/'�-i
��D,I�O5
t 004— (Sit
__`
46=- l7 / Joc - -1`‘"ec. '%•
t,
(-11-41-56 SiVi (AX)R-t.,--
°
• - 6 i i r r
137- rss r/ l'- 3 --
nspector: j 1-9 Date: .y 91
❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
`.5 INSPECTION RECORD
Retain a copy with permit
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd, #100, Tukwila, WA 98188
PERMIT NO.
(206)431 -3670
Project:l�aj1W40� M
jj �� `` ( "`
to "
Type of lns `tio/ntk .Q..r • i Of
�/
Addr `
T>�.d�i�
��.
Date called:
7-d, 00 -
SSpecial instructions:
COI 11 fro-Iv 1 V‘ m0vi' Iht
I
a-U. set. Inn Pet -� ,�,
Movms�, . 7 3 0 -33 3-2-
Date wanted :Q j a.ir.
V- `"0d P. .
Requester:
r l
--Phh5(0 - 7gi-1- 841 ILI a
ElApproved per applicable codes,
COMMENTS:
ElCorrections required prior to approal.,
Sae -607 e-tj �•
e
/1 fr—e-J �� !
Inspector: Date: (5' _ /4
El $47. REINSPECTION F I1REQUIRED. Prior to inspection, fee must be paid'
at 6300 Southcenter Blvd., Suite 10p. Call to schedule'reinspection. 1
1 Receiot No: 1 Date:
INSPECTION NO.
r4 "'
INSPECTION RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd, #100, Tukwila, WA 98188
<11
PERMIT NO, \\\
(206)431 -3670
P[ ect:t
t`
Ty.e of Inspgction: f
:. dress:
AIRS .11l. /
>,
Dr
r e called:
ap--,y DO
Special instructions:
t wanted: ^� OC.- i it
Requct {
Phone: --/ rq ..... z iiiti
❑ Approved per applicable codes. Corrections required prior to approval.
COMMENTS:
Inspector:
r -C) F4c-
Date: U/
$47.00 REINSPECTION EE REQUIRED. Prior to inspection, fee must be paid
at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
!Receipt No: I Date:
L
PLA�EW /ROUT SLIP
ACTIVITY NUMBER: M198 -0101 DATE: 6 -8 -98
PROJECT NAME: HALLWOOD MANAGEMENT COMPANY
XX Original Plan Submittal Response to Incomplete Letter
Revision After Permit Is Issued
Response to Correction Letter #
DEPARTMENTS:
B
P
ng,Diivision
r�s
Fire Prevention
Structural
Planning Division
n Permit Coordinator
n
DETERMINATION OF COMPLETENESS: (Tues, Thurs) DUE DATE: 6 -9 -98
Complete E
Comments:
Incomplete 0
Not Applicable 0
TUES /THURS ROUTING: Please Route
No further Review Required 0
Routed by Staff 0 (if routed by staff, make copy to master file and enter into Sierra)
REVIEWERS INITIALS: DATE:
APPROVALS OR CORRECTIONS: (ten days) DUE DATE: 7 -7 -98
Approved 0 Approved with Conditions Not Approved (attach comments)IZ
Cowreal (IX_ 17/ -÷ haat& (a- iz-
REVIEWERS INITIALS: DATE:
CORRECTION DETERMINATION: DUE DATE:
Approved 0 Approved with Conditions 0
Not Approved (attach comments) 0
REVIEWERS INITIALS: DATE:
\PR•ROUTE.DOC
6198
PLA
LIP
ACTIVITY NUMBER:
M198 -0101
DATE: 6 -15 -98
PROJECT NAME: HALLWOOD MANAGEMENT CO
Original Plan Submittal
Response to Incomplete Letter
Response to Correction Letter # 1 Revision After Permit Is Issued
DEPARTMENTS:
Building Division
Public Works
Fire Prevention
Structural
E
Planning Division
Permit Coordinator
DETERMINATION OF COMPLETENESS: (Tues, Thurs) DUE DATE: 6 -16 -98
Complete
Comments:
Incomplete _ Not Applicable 0
TUES /THURS ROUTING:
Routed by Staff
Please Route 0 No further Review Required
(if routed by staff, make copy to master file and enter into Sierra)
REVIEWERS INITIALS: DATE:
APPROVALS OR CORRECTIONS: (ten days)
Approved Approved with Conditions 0
REVIEWERS INITIALS:
DUE DATE: 7-14 -98
Not Approved (attach comments) 0
DATE:
CORRECTION DETERMINATION: DUE DATE:
Approved n Approved with Conditions 0 Not Approved (attach comments) 0
REVIEWERS INITIALS: DATE:
\PR•ROUTE,DOC
6/98
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER:
M198 -0101 DATE: 6 -15 -98
PROJECT NAME: HALLW00D MANAGEMENT CO
Original Plan Submittal Response to Incomplete Letter
_IX_ Response to Correction Letter # 1 Revision After Permit Is Issued
DEPARTMENTS:
Building Division
Public Works
Fire Prevention
Structural
Planning Division
Permit Coordinator
DETERMINATION OF COMPLETENESS: (Tues, Thurs)
/
Complete
Comments:
Incomplete
DUE DATE: _ 6 -16 -98
Not Applicable ❑
TUES /THURS ROUTING:
Please Route ❑ No further Review Required
Routed by Staff ❑ (if routed by staff, make copy to master file and enter into Sierra)
REVIEWERS INITIALS: DATE.
APPROVALS OR CORRECTIONS: (ten days)
Approved ❑ Approved with Conditio
REVIEWERS INITIALS:
DUE DATE: 7 -14 -98
Not Approved (attach co ments) ❑
DATE.
CORRECTION DETERMINATION:
DUE DATE:
Approved ❑ Approved with Conditions.❑ Not Approved (attach comments) ❑
REVIEWERS INITIALS: DATE:
\PR.RC)11TF_F]CIP
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER:
PROJECT NAME:
M198 -0101
HALLWOOD MANAGEMENT COMPANY
DATE: 6 -8 -98
XX Original Plan Submittal
Response to Correction Letter #
Response to Incomplete Letter
Revision After Permit Is Issued
DEPARTMENTS:
Building Division
Public Works
Fire Prevention
Structural
Planning Division
Permit Coordinator
DETERMINATION OF COMPLETENESS: (Tues, Thurs)
Complete Incomplete
Comments:
DUE DATE: 6 -9 -98
Not Applicable E
TUES /THURS ROUTING: Please Route 0
No further Review Required 0
Routed by Staff ❑ (if routed by staff, make copy to master file and enter into Sierra)
REVIEWERS INITIALS:
DATE:
APPROVALS OR CORRECTIONS: (ten days)
Approved 0 Approved with Conditions 0
REVIEWERS INITIALS:
DUE DATE: 7 -7 -98
Not Approved (attach comments
DATE:
CORRECTION DETERMINATION:
Approved Approved with Conditions 0
DUE DATE:
Not Approved (attach comments)
REVIEWERS INITIALS: DATE:
\PR•ROUTE.DOC
6/98
City of Tukwila
Steven M. Mullet, Mayor
Department of Community Development Steve Lancaster, Director
February 7, 2001
Doug Millett
617 Industry Drive
Tukwila, WA 98188
RE: Permit Application No. MI98 -0101
500 Industry Drive, Building #2
Dear Permit Holder:
In reviewing our current records the above noted permit has not received a final inspection by the City
of Tukwila Building Division. Per the Uniform Building Code and /or Uniform Mechanical Code, every
permit issued by the Building Official under the provisions of this code shall expire by limitation and
become null and void if the building or work authorized by such permit is not commenced within 180
days from the date of such permit, or if the building or work authorized by such permit is suspended or
abandoned at any time after the work is commenced for a period of 180 days.
Based on the above, you are hereby advised to:
• Call the City Of Tukwila Permit Center at (206) 431 -3870 to schedule a
progress / final inspection
A progress inspection is intended to determine if substantial work has been accomplished since
issuance of the permit or last inspection; or if the project should be considered abandoned.
If such determination is made, the Building Code does allow the Building Official to approve a one-time
extension up to 180 days. Extension requests must be in writing and provide satisfactory reasons
why circumstances beyond the applicants control have prevented action from being taken.
In the event you do not call for the above inspection or request and receive an extension prior to
February 18, 2002, your permit will become null and void and any further work on the project will require
a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincere!
Stefanie Spencer
Permit Technician
Xc: Permit File No. M198.0101
Bob Benedicto, Building Official
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206. 431.3670 •: Fax 206.4313665'
"SINCE 1919"
July 20, 2000
HAIGHT ROOFING 6oMPANY, INC.
Mailing Address: P.O. Box 70150, Seattle, WA 98107 Area Code: (206) 784-8414
INDUSTRIAL - COMMERCIAL - ROOFING and SHEET METAL WORK • Fax: (206) 784 -1058
INSULATING CONCRETE ROOFS DECKS
REROOFING SPECIALISTS
Mr. Bill Rambo
City of Tukwila
Department of Community Development
6300 Southcenter Blvd., #100
Tukwila, WA 98188
RE: Permits MI98 -0101 through 98 -0105
Dear Mr. Rambo:
Haight Roofing Company, Inc. has installed a roof membrane assembly, including insulation if
applicable, consisting of Malarkey, specification #M3 -XHA, data sheet enclosed, which meets or
exceeds the requirements for Class A or Class B roofs. This roof was installed at 515 Indushy
Drive, Building #2, under City of Tukwila Permit NO. MI98 - 0101.
If you have any questions, please call us at 206 - 784 -8414.
Sincerely,
HAIGHT ROOFING COMPANY, INC.
Karl Kupser
Superintendent
Attachments (2)
KK:twd
Members: Western States Roofing Contractors Association ;/ National Roofing Contractors Association
4NCOMPA
ROOFI
M3 -XHA
4 -1
M3- CONVENTIONAL
Deck Type - Uninsulated
Rating
Slope in
12"
BASE SHEET ATTACHMENT
Depending on Deck
Type Change Spec
Number to Read*
Mech.
See Gen. Req. Fast. Asphalt
Combust. /Nailable Wood
N/A
2"
F.2
Hot Asphalt
M3 -WI -XHA -H
N/A
Structural Concrete
A
2"
C.7
M3 -CI -XHA -H
X
M3 -CU -XHA -H
Lightweight Concrete
N/A
Hot Asphalt
M3 -LI -XHA -H
Metal
A
N/A
Metal
N/A
M3 -MI -XHA -H
Structural Wood Fiber
A
2"
N/A
Structural Wood Fiber
N/A
Gypsum
A
2"
F.6
N/A
Gypsum
N/A
A
2"
F.4; F.7
Hot Asphalt
N/A
Precast Slabs
N/A
N/A
Deck Type - Insulated
Rating
Slope in
12"
Insulation
Attachment
See Gen. Req.
Roofing
Attachment to
Insulation
Depending on Deck
Type Change Spec
Number to Read*
Combust. /Nailable Wood
A
2"
F.2
Hot Asphalt
M3 -WI -XHA -H
Structural Concrete
A
2"
F.4
Hot Asphalt
M3 -CI -XHA -H
Lightweight Concrete
A
2"
F.5
Hot Asphalt
M3 -LI -XHA -H
Metal
A
2"
F.3
Hot Asphalt
M3 -MI -XHA -H
Structural Wood Fiber
A
2"
F.8
Hot Asphalt
M3 -SI -XHA -H
Gypsum
A
2"
F.6
Hot Asphalt
M3 -GI -XHA -H
Precast Slabs
A
2"
F.4; F.7
Hot Asphalt
M3 -PI -XHA -H
Re er to Tab 2 for eneral Requirements: Responsibil t es, quality control, dec cons era t on, and of er general top cs.
Refer to Tab 11 for Products and Associated Materials information.
Refer to Tab 6 for Execution Specifications.
Refer to Tab 7 for Flashing Details.
Change last Character (H =Hot Asphalt):
S=SEBS Hot Asphalt
The same material must be used to attach the membrane to Insulation.
May 5, 2000
City of Tukwila
Steven M. Mullet, Mayor
Department of Community Development Steve Lancaster, Director
Doug Millett
617 Industry Drive
Tukwila Wa 98188
RE: Permit Status MI98 -0101
500 Industry Drive
Dear Mr Millett:
In reviewing our current permit files, it appears that your permit for a re -roof, issued on
September 3, 1998, has not received a final inspection as of the date of this letter by the City of
Tukwila Building Division.
Per the Uniform Building Code and /or Uniform Mechanical Code, every permit issued by the
building official under the provision of this code shall expire by limitation and become null and
void if the building or work authorized by such permit is not commenced within 180 days from
the date of such permit, or if the building or work authorized by such permit is suspended or
abandoned at any time after the work is commenced for a period of 180 days.
Based on the above, if a final inspection is not called for within ten (10) business days from the
date of this letter, the Permit Center will close your file and the work completed to date will be
considered non - complying and not in conformance with the Uniform Building Code and/or
Mechanical Code.
Please contact the Permit Center at (206)433 -7165 if you wish to schedule a final inspection.
Thank you for your cooperation in this matter.
Sincerely,
gaitSlis
Bill Rambo
Permit Technician
Xc: Permit File No. M198 -0101
Duane Griffin, Building Official.
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206.431= 3670.
Fax 206. 431.3665
JUN -15 98 13:25 FROM:HRLLWOOD CQrMERCIAL 5751415
1.
HALLWOOD
COMMERCIAL REAL ESTATE, INC.
• RRQKEMud • PROM,RTY a CONSTRUCTION MANAGEMENT •
TO: '4313665
r
PRGE:02
617 INDUSTRY DRIVE
TUKWILA, WASHINGTON 9M1.86
(206) 575.6675 FAX (206) 5751415
15 June 1998
Ken Nelsen
Plans Examiner
City of Tukwila
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
RE: M198 -0101, M198 -0102, M198-0103, M198 -0104, M198 -0105.
Dear Ken:
This letter will confirm that the heated office portions of buildings 2, 3, 4, 5, and 8
located at the Andover Executive Park, have an R value of 30 in the space located
between the roof deck and suspended ceiling,
If you have any more questions, please give me a call.
Thank you.
Sincerely:
Doug Millen
Property Manager
RECEIVED
CITY OR' TuKyo.A
JUN 1 5 1998
PERMIT CENTER.
ATLANTA • BALTIMORE • DELLEVUE • CLEVkL■Np • DALLAS :• DEMI ORN • OgTROIT• SACRAMENTO•. $AN D16c:U.
City of Tukwila
John W. Rants, Mayor
June 12, 1998
Department of Community Development Steve Lancaster, Director
Doug Mil lett
Hallwood Management Company
617 Industry Drive
Tukwila, WA 98188
Dear Mr. Millett:
SUBJECT: CORRECTION LETTER #1
Development Permit Application Number MI98-0101, M198-0102, MI98-0103,
MI98-0104 and Mi98-0105
Hallwood Management Company
500 Industry Drive - Building #2, 515 Industry Drive - Buildings #1, 3 and 5, and
596 Industry Drive, Building #8
This letter is to inform you of corrections that must be addressed before your application for
development permit can be approved. All correction requests from each department must be
addressed at the same time and reflected on your drawings. I have enclosed review comments
from the Building Division. At this time the Fire Department, Planning Department and Public
Works Division have no comments regarding your application for permit.
The City requires that two (2) complete sets of revised plans, per building outlined above, be
resubmitted with the appropriate revision block.
In order to better expedite your resubmittal a Revision Sheet must accompany every resubmittal. I
have enclosed one for your convenience. Corrections/revisions must be made in person and will
not be accepted through the mail or by a messenger service.
If you have any questions please contact me at the City of Tukwila Permit Center at (206) 431-
3671.
Sincerely,
Lktutk_ 4b-C..cfr
Brenda Holt
Permit Technician
Enclosures
File: 1.--s.:1198-0101, 198-0102, MI98-0103, MI98-0104, M198-0105
6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188. (206)431.367Q • Fav (206) 431-3665
r
BUILDING DIVISION REVIEW
DATE: June 11, 1998
PROJECT NAME: Hallwood Management Comp. re -roof application
APPLICATION NO: M198 -0101, 102, 103, 104, & 105
PLAN REVIEWER: Ken Nelsen, Plans Examiner (206) 431 -3670
Washington State Energy Code Section 1132.1 requires that re -roof repairs comply
with W.S.E.C. Table 13 -1. The submitted application indicates that only one layer
of 3/4 inch Perlite insulation board is proposed. Because 3/4 inches Perlite
insulation has an R -value of approximately R -2.13, the re -roof can not be approved
as submitted. Please provide additional information to show how compliance to the
Energy Code will be achieved.
No further comments at this time,
"SINCE 1919"
H IGHT ROOFING COMPANY, INC.
Mailing Address: P.O. Box 70150, Seattle, Washington 98107
Office Address: 4910 15th Ave, N.W., Seattle, Washington
INDUSTRIAL — COMMERCIAL— ROOFING and SHEET METAL WORK
REROOFING SPECIALISTS
REROOF 5 BUILDINGS AT HALLWOOD MANAGEMENT
617 INDUSTRY DRIVE, TUKWILA, WASHINGTON.
Area Code: (206) 784 -8414
We will tear off the existing roofing down to the substrate
and dispose of the debris at an approved disposal site. Sweep
the substrate broom clean and mechanically attach a 3/4"
cover board over a red rosin paper. Mop two plies of Type
IV ply sheet set in asphalt and then install a 72 pound mineral .
surface cap sheet set in asphalt. The base flashings will
consist of mopping one ply of base sheet and one ply of white
cap sheet.
TAX PARCEL NUMBERS
H022340- 0030 -07 - BUILDING 2.AT 500 INDUSTRY DRIVE
H022340- 0070 -08 - BUILDINGS 1, 3 & 5 AT 515 INDUSTRY DRIVE
H022340- 0010 -01 - BUILDING 8 AT 596 INDUSTRY DRIVE
RECEIVED
CITY OF TUKWILA
JUN -- 8 1998
PERMIT CENTER
frU9S.oi�i
Members: Roofing Contractors Association, Seattle, Washington / National Roofing Contractors Association
Washington State Contractors Registration Number 223.01- HA- IG- HR- C2690K
SUN -12 98 14:03 FROM:HALLWOOD COMMERCIAL 5751415
"SINCE 1915„
TO:2064313665 PAGE:02
HAIGHT ROOFING COMPANY, INC.
Mailing Address: P.O. Sox 70150, Seattle, Washington 98107
Office Address: 4910 15th Ave. N.W., Seattle, Washington
INDUSTRIAL— COMMERCIAL — ROOFING and SHEET METAL WORK
REROOFING SPECIALISTS
April 8, 1998
Hallwood Management Company
617 Industry Drive
Tukwila, Washington 98188
Attention: Mr. Doug Millett
Regarding: Andover Executive Park
Subject: Reroofing Buildings Number 2, 3, 4, 5 & 8
Dear Mr. Millett:
Area Code; (206) 784 -8414
I
1 1 APR 13 1998
COMMERCIAL REAL ESTATE
Upon review of the above referenced buildings, and the specifications
provided by you, we have estimated a cost to reroof buildings #2 through
#5 and #8. The following is a procedural outline of what our quotation'
includes.
First, the existing roofing and associated sheet metal items will be
removed and disposed of off site at an approved facility. The plywood
deck will be swept broom clean and inspected for delamination. Should
we find any decking that would require replacement this will be handled
on a "time and materials" basis. You or your representative will be
notified for approval of any decking requiring replacement prior to
starting replacement.
A layer of red rosin paper and 3/4" perlite roof insulation will be
mechanically fastened to the plywood deck. Two plies of type four
fiberglass felt will each be embedded into uniform moppings of hot
asphalt. Upon this a layer of granular surfaced mineral cap sheet
will be installed.
All flashing of curbs, boxes and parapet walls will be accomplished
with two .layers•• of.c.pe four,.. ply and one_ ply of mineral cap _sheet., .
each set in hot asphalt and fastened to the new wood nailer at the
top of the parapet walls.
All clean up of our debris along with the following items are included
in our prices quoted: New prefinished, standard color, 24 gauge copings;
counterflashings, gutters and downspouts; 26 gauge stainless steel
scuppers; crickets between scupper drains and at the backside of units
and /or boxes; new lead flashings; new 2 x treated wood nailers at the
perimeter walls using 1/4" x 21" Rawl split drive anchors; new 2 x
treated wood blocking under conduit pipes; new sleepers under the HVAC
units to maintain a minimum 8" height above the completed roof assembly;
and a manufacturer's ten year "no dollar limit" guarantee.
°K
art OF ,11l�1`A
Members: Roofing Contractors Association, Seattle, Washington / National Rooting Contractors Association V
Washington State Contractors Registration Number 223.01•HA•IG•HR•C269OK T 0644-C°
JUN-10 98 14:03 FROM:HALLWOOD CO ERCIAL 5751415
pa,/ ,.,,
HAIGHT ROOFING COMPANY., INC.
TO :20 4313665
We will furnish and install the previously outlined roof sytem for
the buildings listed below for the following sums. Note: These prices,
do not include Washington State sales tax.
If 411 bu
the total
If you would like us to complete this work for you, please sign your
acceptance below and return the original to us. Iipon receipt we will
schedule this work for you. If you have any questions or we may be
of further assistance, please give us a call. Thank you.
Sincerely,
H
OOFING COMPANY, INC.
PAGE:03
R••ert Haigh
E•timator
Accepted by:
Membe s: Roofing Contractors Association, Seattle, Washington : National Roofing Contractors Association'.,
Washington Slate Contractors Ragtstration Number 223.01- HA.IG-HIR C26901(
DEPARTMENT OF LABOR AND INDUSTRIES
REGISTERED AS PROVIDED BY LAW AS
CONST CONT GENERAL
1,7MCMgri',:.REGIST XISKT.W7EX
CCOltHAIGHRC269QRA501119
ATEHEEMPAESA
HAIGHT ROOFING COMPANY INC
PO BOX 70150
SEATTLE WA 98107
•
F6234523)00 (8197)
Detach And Display Certificate
•
• : ,