Loading...
HomeMy WebLinkAboutPermit MI98-0105 - HALLWOOD MANAGEMENT COMPANY - REROOFHALEWOOD MANAGEMENT REROOF -BLDG 5 M198-Qi 05 City of Tukwila Z, (206) 431 -3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 MISCELLANEOUS PERMIT WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES, APPLICANT IS PROCEEDING AT THEIR OWN RISK. Parcel No: 022340 -0070 Address: 515 INDUSTRY DR Suite No: Location: BUILDING #5 Category: NSFR Type: MISCPERM Zoning: TUC Const Type: Gas /Elec.: Units: 001 Setbacks: North: Water: N/A Wetlands: Permit No: Status: Issued: Expires: MI98 -0105 ISSUED 09/03/1998 03/02/1999 Occupancy: OFFICE UBC: 1994 Fire Protection: .0 South: .0 East: .0 West: .0 Sewer: N/A Slopes: N Streams: Contractor License No: HAIGHRC269QK OCCUPANT OWNER CONTRACTOR CONTACT HALLWOOD MANAGEMENT COMPANY 515 INDUSTRY DR, TUKWILA WA 98188 EQUITEC R E INVESTORS FUND 16/ A/P UTILITIES, 617 INDUSTRY DR, TUKWILA WA 98188 HAIGHT ROOFING COMPANY INC. Phone: 206 784 -8414 P.O. BOX 70150, SEATTLE, WA 98107 DOUG MILLETT Phone: 206 - 575 -6675 617 INDUSTRY DR, TUKWILA WA 98188 ****************************************************** * * * ** * * * * * *•k** * ** * * * * * * * * * *•k* Permit Description: TEAR OFF EXISTING ROOF DOWN TO DECK AN INSTALL A NEW BUILT -UP ASPHALT ROOF. **************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Construction Valuation: $ 60,562.00 PUBLIC WORKS PERMITS: *(Water Meter Permits Listed Separate) Eng. Appr: Curb Cut /Access /Sidewalk /CSS: N Fire Loop Hydrant: N No: Flood Control Zone: N Hauling: N Start Time: Land Altering: N Cut: Landscape Irrigation: N Moving Oversized Load: N Start Time: End Time: Sanitary Side Sewer: N No: Sewer Main Extension: N Private: Public: Storm Drainage: N Street Use: N Water Main Extension: N Private: Public: **************************************************** * * * * ** * * * * * * * * * * * * * * * * * * * * * * * ** TOTAL DEVELOPMENT PERMIT FEES: $ 648.00 ****** k** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ************* * * * * * * * * * * * * * *k *q-;3*95 ** * * * * * * * * * ** Date: Size(in): .00 End Time: Fill: Permit Center Authorized Signature:_ I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the prevision of any other state or local laws regulating construction or the per'orma ce of work. I am authorized to sign for and obtain this developm it. S1gnatur Print Name: ler Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. CITY OF TUKWILA Address: 515 INDUSTRY DR Suite: Tenant: Status: ISSUED Type: MI;CPERM Applied: 06/08/1998. Parcel: #: 022340 -0070. Isr'ued:' 09/03/:1998. • k• kk• k• k• k• k• k• k*• k'k kb k•k k• k• k***** k•#c kk•kk* k*• kkk �k• k•k kk• k• k• k• k• kk• kkk• k•kk: k• k• k• k• k• k�k•k-k;k�k'k•kk•k•k•k•kk•k•*4 Perm i t Con, i t ions 1. No changes will be made to the plans unless approved', b,y , they Architect or Engineer and the Tuk.wi la :Bui lding`Divfs:ion. `Al 1 Permits, inspect" ion - records r an�1�R„a'ot caved plans :hall b ;available :at the jobx1s to rir � t�i t fie:Yb t f t l'r` t:a.r�;t,r,at di1V' can -. ,struct i on. These,: dead ments . ar''e toy bie ma intai ned,, and avai 1 -: able until firn. i. inspectt9on a�appro v'dl is granted i,h . 3. All construction to be `;don_e 1n'! conf'or,-manceftii h approved Plans' and >requ i renie .tits,..; Of the Un i forni Big l l 4h oCode 1 1997 Edition) ,as'`'an►ended,i.• Uniform4Mechanfoe) , lade 1,097 Ed,lt'ton) and Wash i.,n . tan State Eheirgv Code t• 1997 Ed i t ton 3 Val i d i.t , , o-CPermi t . the i s`suance .af a permit or e., apur.av'a•1 plans •spec I f i cat ions, and. computa;t,l,ons . sha 1 1 not 'e.:, con', strued. to,,b•e a permit fora, or an £approval of, any vi0141 of env of 'the, prov,.i s i ons of �i he...��bu i i d i ►gig code or' at' any � ' No othe;or,d•i'nance' af` the,,iuristiict. on.. No permit presumihti t give .authority to violat provisions of ,40,s code. ;sha1'1`••``be,:va1 i M», Permit NO CITY OF TUKWILA REROOF CONDITIONS Permit No; MI98-0105 Project Name: HALLW000 MANAGEMENT COMPANY Address: 515 INDUSTRY DR Suite: *h**A*4t***********************Vik***0**4.******A******************A******* r• "• • • . •.. THE FOLLOWING CONDITION SWILL APPLY TO 'RE-ROOF RERMITS.: 1 All re-roofing proiects will be accomplished win compliance with Appendi Chapter1-5 of the Uniform BuildingCode '(UBC). 2. Inspections: A.. New roof coverings shall not be applied vittliout,first, obtaining a pre-roofing inspection from the Building H,Dtvisionand written aPprOval from the Building/InSpactor. The pre-roofing-inspection shall pay particular attention to evidence of accumulation of•water, Where extenS1Ve pond ing 1-' of water is ',apparent, an analysis of the root structure for r; compliance pOth,SeettOn 1506. UBC, shall be made ,and " correcti ve measures, :such as relocation of roof drainstir scuppers, resloping of the.:robf -or structuraLchanges,shall • be 'accomplished', An inspection ccvering the abovalisted iv topics prepared. by .a qualified ”eciel inspector, as determined by the Building Official ; my be accepted of the pre-inspection by the Inspeotor final inspection and approval ,shall be obtainedsf(oWthe -Building Division when the re-roofing YS,foomplete /Ai a - Condition of the final inspection for roofs that require a fire retardant roof covering under the proVT.,,ionsof Table 15-7,A;,1994UBC, the roof installer'Shall inspector with a written *StateMent indicating/Oa'following for something similar): . I HAVE INSTALLED A ASSEMBLY. IF APPLICABLE, CONSISTING'OF:-(MANUFACTURER), SPECIFICATION , DATA SHEET ENCLOSED, WHICH MEET-S20,F,XCEEDS-JHEROUIREMENTS FOR LASS A OR CLASS B ROOFS. THIS ROOF WAS?INSTALLED-AT (ADDRESS), UNDER CITY OF TUKWILA PERMIT.NO. (The statement shall include the name of the roofing.cOmpany:that installed the roof, signature of installer antiAiata.)H Application taken by: (initials) 1 CITY OF TUKWILA Permit Centee 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 FIR STAFF USE ONLY ProjecE'Nuifrudr; Permit Numbs; k C11 -.11 lL' Miscellaneous Permit Application Uti Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mall or facsimile. Project Name/Tenant: 11 //�� �11� CO 0 F 5 I) 4t I IcUij S fa r Ea I idoez ) yy� / Ill A t it a 1�1 elf t' 4fril t N (r J J t , City St . t /Zip: 1, A . , 's - '' ,,Value of Construction: '° 'z"`. e,,,T —T- _ �j (2-6 / Tax Pardel Number: a2.2} -CY)7a Site Address: r27/5- Lea tA- 1-r� rive, Tul�wt Property Own • Haliwaoo inOna3(Stel 6/11/4 11 1 Phone: 0206 - 5'95- -aj5' Street Addr ss: 7 u f e , 0 . k. Address: City tats /Zi .: I 1 Fax #: AS— fir' Contac Person:, '- � j � �e �� Vi � 0 Water Phone: , ' ' 1 Street Address: ZtV'ie aS QBove 0 Standby City State /Zip: Fax #: 1 ` .' Contractor. /fell LKG Phone: M - 761/ y Y 9 / / Fax #: ..6- ?Y k) SB Skeet Add r ss: ,o .. ,, 20/5 s°al fi`le %1 City State /Zip: , r . o Architect: Phone: Street Address: City State/Zip: Fax #: Engineer: N/04 Phone: Street Address: City State /Zip: Fax #: MISCELLANEOUSPERMIT REVIEW AND APPROVAL REQUESTED :�(TO'BE.FILLED OUT BY' APPLICANT) .: Description of work to be done: Teat' o {'F' exisrit r e ilp‘ to d ec(,� 4o, d ; tit S4� j ( d. Ile Id 1R x t 'f 1* (rein n Will there be storage of flammable /combustible hazardous material in the building? ❑ yes g no Attach list of materials and store a location on se • arate 8 1/2 X 11 'agar Ind /cat/n. • uantitIes & Material Safel Data Sheets ■ Above Ground Tanks ■ Antennas /Satellite Dishes ■ Bulkhead/Docks ''i Commercial Reroof ❑ Demolition ❑ Fence ❑ Mechanical ❑ Manufactured Housing - Replacement only ❑ Parking Lots ❑ Retaining Walls ❑ Temporary Pedestrian Protection /Exit Systems ❑ Temporary Facilities ❑ Tree Cutting ::APPI:ICANT >REOUEST.FOR MISCELLANEOUS PUBLIC WORKS PERMITS',`' ❑ Channelization /Striping ❑ Flood Control Zone ❑ Landscape Irrigation ❑ Storm Drainage ❑ Water Meter /Exempt # Size(s): ❑ Water Meter /Permanent # Size(s): ❑ Water Meter Temp # Size(sj: Est. quantity: gal Schedule: ❑ Miscellaneous ❑ Moving Oversized Load/Hauling ❑ Curb cut/Access /Sidewalk Ll Fire Loop /Hydrant (main to vault)#: Size(s): ❑ Land Altering: 0 Cut cubic yards 0 Fill cubic yards 0 sq. ftgrading/clearing ❑ Sanitary Side Sewer #: ❑ Sewer Main Extension 0 Private 0 Public ❑ Street Use ❑ Water Main Extension 0 Private 0 Public 0 Deduct 0 Water Only MONTHLY SERVICE: BILLINGS TO:. Name: / A ! Phone: Address: l City /State /Zip: 0 Water 0 Sewer 0 Metro 0 Standby WATER METERDEPOSIT /REFUND BILLING: Name: A/ A- Address: Phone: 1 City /State /Zip: Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is Issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. Date application accepted: ef Data application expires: 1 ALL MISCELLANEOUS PEI T APPLICATIONS MUST BE SUHMI D WITH THE FOLLOWING: A ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN A BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED A ARCHITECTURAL DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT A STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED STRUCTURAL ENGINEER A CIVIL/SITE PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER (P.E.) ri SUMMIT APPLICATION AND REQUIRED CHECKLISTS FOR PERMIT' REVIEW Submit checklist No: M -9 Above Ground Tanks/Water Tanks - Supported directly Upon grade exceeding 5,000 gallons and a ratio of height to diameter or width which exceeds 2:1 Antennas /Satellite Dishes Submit checklist ` No: M -1 J Awnings /Canopies - No signage Commercial Tenant Improvement Permit n Bulkhead/Dock Submit checklist. No: M -10 0 Commercial Reroof Submit checklist No: M -6 ' El Demolition Submit checklist:,':. No :.. M =3, : M -3a Ei Fences - Over 6 feet in Height Submit checklist No: M -9 n Land Altering/Grading /Preloads Submit checklist No: M -2 J Loading Docks Commercial. Tenant Improvement Permit.,. Submit checklist No: H -17 Mechanical (Residential & Commercial) Submit checklist No. M -8, Residential, only - H -6, H-16 fJ 1 Miscellaneous Public Works Permits Submit checklist ' No: H -9 0 Manufactured Housing (RED INSIGNIA ONLY) Submit checklist No: M -5 0 Moving Oversized Load /Hauling Submit checklist ' ,No: M -5 0 Parking Lots Submit checklist No: M -4 Ei Residential Reroof - Exempt with following exception: If roof structure to be repaired or replaced Residential Building Permit Submit checklist No: M -6 El Retaining Walls - Over 4 feet in height Submit checklist, No:. M -1 0 Temporary Facilities 1 Submit checklist :. No:. M -7 El Temporary Pedestrian Protection/Exit Systems Submit checklist . No: M -4 EI Tree Cutting Submit checklist No: M -2 ' Copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent If the applicant is other than the owner, registered architect / engineer ,;orcontractorlicerised; by the State of Washington, a notarized letter from the property owner authorizing the agent to submif.this pemili application and obtain the permit will be required as part of this submittal. 1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTH2fRIZED AGENT: Signature: ,r 43- I Date : /r r1 Print name i ivil 2 r Phon w,g y/ City /State /Zip: �S>q Ie Fax li. 7 ✓7(4/r,6W 1l> / l�a4 ` ve5 7 Address: Q () i f' ,. 77)/5e) .. .•P ,. .ate,; .r¢ r., •k* *I.A * *kIN* *#'AhkA * *•*i *A*A. s * * *.A***'A *t*Il*A * *A *•.S k.kA** *k *s4 *A *•* *A **'A* r• f.TY OF UKWILA.; WA TRANSMIT SMIT •hhtik*•A•A* * *****h **• hit*• * *•h *'A * ?A*AA Air**.* A** is'A oi*. ;lh•h'A **ii1* * *'A11* * *** * * *' TRANSMIT Number: R9700825 "Amount: ', 11291.50 09/03/98 14.01 Payment Method. CHECK Notation: HAIGHT ROOFING In it: BIM Permit Na: M198-0105 Types MISCPERM MISCELLANEOUS PERMIT Parcel No 022340-0070 Site Address: 515 'INDUSTRY DR Locut i an: BUILDING 15 Total Fees: 1:291. ( 1"h •i s Payment i. r 291.50 .fatal ALL Pmts 1.,; 2'1'.50 Dalance.x .00 *•A * *'•kh*ol *•h *Arl*A ** tit•**• i:*' h' A• IAtitI1' A**, A. ll*: ilfi>t*• h* of *l *: *k*h * *,i *it *+7 * *•d1.4r•k 'Op unt • (i;43 »50 Account Code 000/322,100 000/386 .904 000/322.800 i)escr.1 ot.i an WILDING 7 RES STATE UUILLIhIS.SURGI4ARf3E fUlLDI116 IW)ESTi0AT1CJM 'AAA "nornia' + +yt-i:: Fr INSPECTION NO. INSPECTION RECORD m -9,-eyp, '" Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3670 Projecst rr7 l � Type of Inspection: Address: O ,/!,, �,�if • 7., x. Date called,; .� G -ate Date want d: a.m�,% Special instructions: �,,,(��� 5 �`a• �.5-- ." 4' lvl.. .6,t6. A /�x�J'�r -L -- .7 —t1�.. p.m. Requester n ...-2..71- 26-`41,7e4_,-- ..2.4* ) v %S- - a. 7,5"- proved per applicable codes. ❑ Corrections required prior to approval. COMMENTS: Inspector Date: / ri $47,00 REINSPECTION, EE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 10,.,...;... Al," I n..•... 1 INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 � ig-ono PERMIT NO. (206)431- 3670.. Project: poi 1( wood I-} (t Type of 14p vv,i i n: 1r ` n Date called: {`., 7 7 00 Address: 5i s 3rAusiv -i Special instructions: See MI 98- 0+01 4,r S Date wanted: a. �_ I -4Q Requester: Phone: PO6- 784)- G "7 I L1 Approved per applicable codes. Corrections required prior to approval. COMMENTS:. Inspector: ) Date: 8...../ ri $47.00 REINSPECTIO FEE REQ IRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 1, 1 Receiot No: i Date: I INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3670 (� C Address Da called; pecial instructions: Date ant,eCCd :: a.m. Ll; er• 1 Phone: '20(19 —7gL(.— g(4 (4 Approved per applicable codes. COMMENTS: Corrections required prior to approval. 141/11 Date: ".11 r( ,,00 $47.00 REINSPECTION4EE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. CaII to schedule reinspection. 1 Receipt No: Date: 120/A44 Cooitc com PLAN REVIEW/ROUTING REVIEW/ROUTING SLIP ACTIVITY NUMBER: M198 -0105 DATE: 6 -8 -98 PROJECT NAME: HALLWOOD MANAGEMENT COMPANY XX Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter Revision After Permit Is Issued DEPARTMENTS: i Buil+ n: • pri ion Pu • is or s ❑ Structural Fire Prevention Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues, Thurs) Complete Incomplete ❑ Comments: DUE DATE: 6 -9 -98 Not Applicable TUES /THURS ROUTING: Please Route ❑ Routed by Staff No further Review Required (if routed by staff, make copy to master file and enter into Sierra) REVIEWERS INITIALS: DATE: APPROVALS OR CORRECTIONS: (ten days) Approved ❑ Approved with Conditions ❑ @irreoiruvi /fr&f eP av, REVIEWERS INITIALS: DUE DATE: 7-7 -98 Not Approved (attach comments) la `zip DATE: CORRECTION DETERMINATION. Approved ❑ Approved with Conditions ❑ DUE DATE: Not Approved (attach comments) ❑ REVIEWERS INITIALS: DATE: \PR•ROUTE,DOC 6/98 PLA�'�E 1% SLIP ACTIVITY NUMBER: N198 -0105 DATE: 6 -15 -98 PROJECT NAME: iHALLWOOD MANAGEMENT CO Original Plan Submittal XX Response to Correction Letter # 1 Response to Incomplete Letter Revision After Permit Is Issued DEPARTMENTS: Building Division Public Works Fire Prevention Structural Planning Division Permit Coordinator • DETERMINATION OF COMPLETENESS: (Tues, Thurs) Complete Comments: DUE DATE: 6 -16 -98 Incomplete Not Applicable ❑ TUES /THURS ROUTING: Please Route No further Review Required Routed by Staff ❑ (if routed by staff, make copy to master file and enter into Sierra) REVIEWERS INITIALS: DATE: APPROVALS OR CORRECTIONS: (ten days) DUE DATE: 7 -14 -98 Approved ❑ Approved with Conditions Not Approved (attach comments) ❑ REVIEWERS INITIALS: DATE: CORRECTION DETERMINATION: DUE DATE: Approved Approved with Conditions ❑ Not Approved (attach comments) E REVIEWERS INITIALS: DATE: \PR•ROUTE.DOC 6/98 PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M198 -0105 DATE: 6 -15 -98 PROJECT NAME: HALLWOOD MANAGEMENT CO Original Plan Submittal XX Response to Correction Letter # 1 Revision After Permit Is Issued Response to Incomplete Letter DEPARTMENTS: Building Division Public Works E Fire Prevention Structural Planning Division Permit Coordinator a DETERMINATION OF COMPLETENESS: (Tues, Thurs) DUE DATE: 6 -16 -98 Complete Comments: Incomplete Not Applicable ❑ TUES /THURS ROUTING: Routed by Staff Please Route ❑ No further Review Required (if routed by staff, make copy to master file and enter into Sierra) REVIEWERS INITIALS: DATE: APPROVALS OR CORRECTIONS: (ten days) DUE DATE: 7 -14 -98 Approved Approved with Conditions Not Approved (attach co ments) ❑ REVIEWERS INITIALS: DATE: lD t 4/g CORRECTION DETERMINATION: DUE DATE: Approved Approved with Conditions ❑ Not Approved (attach comments) ❑ REVIEWERS INITIALS: DATE. \PR•ROUTE.DOC 6/98 PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M198 -0105 DATE: 6 -8 -98 PROJECT NAME: HALLWOOD MANAGEMENT COMPANY XX Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter Revision After Permit Is Issued DEPARTMENTS: Building Division is Public Works Fire Prevention Structural ❑ Planning Division Permit Coordinator n DETERMINATION OF COMPLETENESS: (Tues, Thurs) DUE DATE: 6 -9 -98 Complete 0 Incomplete n Not Applicable Comments: TUES /THURS ROUTING: Please Route ❑ No further Review Required Routed by Staff 0 (if routed by staff, make copy to master file and enter into Sierra) C REVIEWERS INITIALS: DATE: APPROVALS OR CORRECTIONS: (ten days) Approved ❑ Approved with Condition .�C REVIEWERS INITIALS: z!� DUE DATE: 7-7-98 Not Approved (attach comments DATE: CORRECTION DETERMINATION: DUE DATE: Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) ❑ REVIEWERS INITIALS: DATE: \PR•ROUTE,DOC 6/98 city of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director February 7, 2001 Doug MIilett 617 Industry Drive Tukwila, WA 98188 RE: Permit Application No. MI98 -0105 515 Industry Drive, Building #5 Dear Permit Holder: In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the Uniform Building Code and/or Uniform Mechanical Code, every permit Issued by the Building Official under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: • Call the City Of Tukwila Permit Center at (206) 431 -3670 to schedule a progress / final inspection A progress Inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve a one-time extension up to 180 days. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection or request and receive an extension prior to February 18, 2002, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Stefanie Spencer Permit Technician Xc: Permit File No, MI98 -0105 Bob Benedicto, Building Official 6300 Southcenter Boulevard, Suite 8100 . • Tukwila, Washington 98188' •: Phone:. 206-431-3670 :•' Fix: 206.831.3665 "SINCE 1919" July 20, 2000 HAIGHT ROOFING COMPANY, INC. Mailing Address: P.O. Box 70150, Seattle, WA 98107 Area Code: (206) 784 -8414 INDUSTRIAL - COMMERCIAL - ROOFING and SHEET METAL WORK INSULATING CONCRETE ROOFS DECKS REROOFING SPECIALISTS Mr. Bill Rambo City of Tukwila Department of Community Development 6300 Southcenter Blvd., #100 Tukwila, WA 98188 RE: Permits MI98 -0101 through 98 -0105 Dear Mr. Rambo: Fax: (206) 784 -1058 Haight Roofing Company, Inc. has installed a roof membrane assembly, including insulation if applicable, consisting of Malarkey, specification #M3 -XHA, data sheet enclosed, which meets or exceeds the requirements for Class A or Class B roofs. This roof was installed at 515 Industry Drive, Building #5, under City of Tukwila Permit NO. MI98 -0105. If you have any questions, please call us at 206 -784 -8414. Sincerely, HAIGHT ROOFING COMPANY, INC. Karl Kupser Superintendent Attachments (2) KK:twd Members: Western States Roofing Contractors Association / National Roofing Contractors Association - : Washington State Contractors Registration Number HA- IG- HR- C269QK fl 4 !NGCOMPA NY M3- CONVENTIONAL M3 -XHA 4 -1 Deck Type - Uninsulated Rating Slope in 12" BASE SHEET ATTACHMENT Depending on Deck Type Change Spec Number to Read* Mech. See Gen. Req. Fast. Asphalt Combust. /Nailable Wood N/A 2" F.2 Hot Asphalt M3 -WI -XHA -H N/A Structural Concrete A 2" C.7 M3 -CI -XHA -H X M3 -CU -XHA -H Lightweight Concrete N/A Hot Asphalt M3 -LI -XHA -H Metal A N/A Metal N/A M3 -MI -XHA -H Structural Wood Fiber A 2" N/A Structural Wood Fiber N/A Gypsum A 2" F.6 N/A Gypsum N/A A Resoonsi 2" • 0 ties. aua itv F.4; F.7 control. deck cons . erat Hot Asphalt on. and other general N/A Precast Slabs N/A N/A Deck Type - Insulated Rating Slope in 12" Insulation Attachment See Gen. Req. Roofing Attachment to Insulation Depending on Deck Type Change Spec Number to Read* Combust. /Nailable Wood A 2" F.2 Hot Asphalt M3 -WI -XHA -H Structural Concrete A 2" F.4 Hot Asphalt M3 -CI -XHA -H Lightweight Concrete A 2" F.5 Hot Asphalt M3 -LI -XHA -H Metal A 2" F.3 Hot Asphalt M3 -MI -XHA -H Structural Wood Fiber A 2" F.8 Hot Asphalt M3 -SI -XHA -H Gypsum A 2" F.6 Hot Asphalt M3 -GI -XHA -H Precast Slabs Refer to Tab 2 for eneral Reau cements: A Resoonsi 2" • 0 ties. aua itv F.4; F.7 control. deck cons . erat Hot Asphalt on. and other general M3 -PI -XHA -H tonics. Refer to Tab 11 for Products and Associated Materials information. Refer to Tab 6 for Execution Specifications. Refer to Tab 7 for Flashing Details. • Change last Character (H =Hot Asphalt): S =SEBS Hot Asphalt The same material must be used to attach the membrane to Insulation. JUN -15 98 13:25 FROM:HALLWOOD CO "ERCIAL 5751415 CO HALLWOOD MERCIAL REAL ESTATE, INC. • nNOKEMGd • PNOP /.lTY a CUN..TPUCT:ON MANAGEMENT • TO: r X4313665 PAGE:02 617 INDUSTRY DRIVE TUKWILA, WASHINGTON 9$Pi8 (206) 575.6675 FAX (206) 575 -1415 15 June 1998 Ken Nelsen Plans Examiner City of Tukwila 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 RE: M198 -0101, M198 -0102, M198 -0103, M198 -0104, M198 -0105. Dear Ken: This letter will confirm that the heated office portions of buildings 2, 3, 4, 5, and 8 located at the Andover Executive Park, have an R value of' 30 in the space located between the roof deck and suspended ceiling. If you have any more questions, please give me a call. Thank you. Sincerely: Doug Millctt Property Manager ATLAN IA • DALT1MURF, • BELLEVUE 40 CLEVELAND • DALLAS •DEAM •OtAN'• Di •TR`OITt►'3ACNAMEN'ro 1,. SAO DIBGO • $EAT1 Lfl June 12, 1998 City of Tukwila John W. Rants, Mayor Department of Community Development Steve Lancaster, Director Doug Mil lett Hallwood Management Company 617 Industry Drive Tukwila, WA 98188 Dear Mr. Millett: SUBJECT: CORRECTION LETTER #1 Development Permit Application Number MI98 -0101, MI98.0102, M198 -0103, MI98 -0104 and Mi98 -0105 Hallwood Management Company 500 Industry Drive - Building #2, 515 Industry Drive - Buildings #1, 3 and 5, and 596 Industry Drive, Building #8 This letter is to inform you of corrections that must be addressed before your application for development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed review comments from the Building Division. At this time the Fire Department, Planning Department and Public Works Division have no comments regarding your application for permit. The City requires that two (2) complete sets of revised plans, per building outlined above, be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a Revision Sheet must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions please contact me at the City of Tukwila Permit Center at (206) 431 3671. Brenda Holt Permit Technician Enclosures File: M198 -0101, M198 -0102, M198 -0103, M198 -0104 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 1 (206).41313670 • F (2066) 4313665 BUILDING DIVISION REVIEW DATE: June 11, 1998 PROJECT NAME: Hallwood Management Comp. re -roof application. APPLICATION NO: MI98 -0101, 102, 103, 104, & 105 PLAN REVIEWER: Ken Nelsen, Plans Examiner (206) 431 -3670 Washington State Energy Code Section 1132.1 requires that re -roof repairs comply with W.S.E.C. Table 13 -1. The submitted application indicates that only one layer of 3/4 inch Perlite insulation board is proposed. Because 3/4 inches Perlite insulation has an R -value of approximately R -2.13, the re -roof can not be approved as submitted. Please provide additional information to show how compliance to the Energy Code will be achieved. No further comments at this time. May 5, 2000 (r. City of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director Doug Millett 617 Industry Drive Tukwila Wa 98188 RE: Permit Status MI98 -0105 515 Industry Drive Dear Mr Millett: In reviewing our current permit files, it appears that your permit for a re -roof, issued on September 3, 1998, has not received a final inspection as of the date of this letter by the City of Tukwila Building Division. Per the Uniform Building Code and /or Uniform Mechanical Code, every permit issued by the building official under the provision of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, if a final inspection is not called for within ten (10) business days from the date of this letter, the Permit Center will close your file and the work completed to date will be considered non - complying and not in conformance with the Uniform Building Code and/or Mechanical Code. Please contact the Permit Center at (206)433 -7165 if you wish to schedule a finial inspection. Thank you for your cooperation in this matter. Sincerely, G:t112 Bill Rambo Permit Technician Xc: Permit File No. MI98 -0105 Duane Griffin, Building Official 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 2067431 =3670 . -Fax 206 431.3665 JUN -1.0 9e .1.4:03 FROM:HALLWOOD COMMERCIAL 5751415 - ( t TO:2064313665 "SINCE 1919" April 8, 1998 PAGE:02 HAIGHT ROOFING COMPANY, INC. Mailing Address: P.O. Box 70150, Seattle, Washington 98107 Area Code; (206) 784 -8414 Office Address: 4910 15th Ave. N,W., Seattle, Washington INDUSTRIAL-COMMERCIAL-ROOFING and SHEET METAL WORK REROOFING SPECIALISTS Hallwood Management Company 617 Industry Drive Tukwila, Washington 98188 Attention: Mr. Doug Millett Regarding: Andover Executive Park Subject: Reroofing Buildings Number 2, 3, 4, 5 & 8 Dear Mr. Millett: IVA L N 1 APR 13 1998 ij COMMERCIAL REAL ESTATE Upon review of the above referenced buildings, and the specifications provided by you, we have estimated a cost to reroof buildings #2 through #5 and #8. The following is a procedural outline of what our quotation includes. First, the existing roofing and associated sheet metal items will be removed and disposed of off site at an approved facility. The plywood deck will be swept broom clean and inspected for delamination. Should we find any decking that would require replacement this will be handled on a "tirne and materials" basis. You or your representative will be notified for approval of any decking requiring replacement prior to starting replacement. A layer of red rosin paper and 3/4" perlite roof insulation will be mechanically fastened to the plywood deck. Two plies of type four fiberglass felt will each be embedded into uniform moppings of hot asphalt. Upon this a layer of granular surfaced mineral cap sheet will be installed. All flashing of curbs, boxes and parapet walls will be accomplished with two .laye.rs•. of.- t_yp.e four, ply and one_ pl.y of mineral cap_sheet., . each set in hot asphalt and fastened to the new wood nailer at the top of the parapet walls. All clean up of our debris along with the following items are included in our prices quoted: New prefinished, standard color, 24 gauge copings; counterflashings, gutters and downspouts; 26 gauge stainless steel scuppers; crickets between scupper drains and at the backside of units and /or boxes; new lead flashings; new 2 x treated wood nailers at the perimeter walls using 1/4" x 21" Rawl split drive anchors; new 2 x treated wood blocking under conduit pipes; new sleepers under the HVAC units to maintain a minimum 8" height above the completed roof assembly; RECEIVED and a manufacturers ten year no dollar limit" guarantee. CITY of TulMnu► JUN 1 0 1998 PERMIT CENTER Members: Rooting Contractors Association, Seattle, Washington / National Rooting Contractors Association Washington State Contractors Registration Number 223.01•HA•IG•HR•C2690K JUN- 1,09B,.14:03 FROM:HALLWOOD COMMERCIAL 5751415 1,.,, ,1,1 HAIGHT ROOFING COMPANY., INC. T0:1064313665 We .will furnish and install the previously outlined roof sytem. for the buildings listed below for the following sums. Note:, These prices do not include Washington State sales tax. If c,11 bu • the total If you would like us to complete this work for you, please sign your acceptance below and return the original to us. Upon receipt we will schedule this work for you. If you have any questions or we may be of further assistance, please give us a call. Thank you. Sincerely, H� 'OOFING COMPANY, INC. PAGE:03 R..ert Haigh E.timator Accepted by: PIRMIT ^CENTER "SINCE 1919" HAIGHT ROOFING COMPANY, INC. Mailing Address: P.O. Box 70150, Seattle, Washington 98107 Office Address: 4910 15th Ave. N.W., Seattle, Washington INDUSTRIAL— COMMERCIAL — ROOFING and SHEET METAL WORK REROOFING SPECIALISTS REROOF 5 BUILDINGS AT HALLWOOD MANAGEMENT 617 INDUSTRY DRIVE, TUKWILA, WASHINGTON Area Code: (206) 784 -8414 We will tear off the existing roofing down to the substrate and dispose of the debris at an approved disposal site. Sweep the substrate broom clean and mechanically attach a 3/4" cover board over a red rosin paper. Mop two plies of Type IV ply sheet set in asphalt and then install a 72 pound mineral surface cap sheet set in asphalt. The base flashings will consist of mopping one ply of base sheet and one ply of white. cap sheet. TAX PARCEL NUMBERS H022340- 0030 -07 - BUILDING 2 AT 500 INDUSTRY DRIVE H022340- 0070 -08 - BUILDINGS 1, 3 & 5 AT 515 INDUSTRY DRIVE H022340- 0010 -01 = BUILDING 8 AT 596 INDUSTRY DRIV.E,: PERMIT. CENTER Members: Roofing Contractors Association, Seattle, Washington / National Roofing Contractors Association Washington State Contractors Registration Number 223- 01- HA- IG= HR- C269QK DEPARTMENT OF LABOR AND INDUSTRIES REGISTERED AS PROVIDED BY LAW AS CONST CONT GENERAL .,f ; rREGISV #.ti:'I`: "EXP=., DATE:± CCO1r ;HAiGHRC269QK'astort 9 �I. '`EEFsC" E=;DATEwt�k Itil tzot HAIGHT ROOFING COMPANY•INC - PO BOX 70150 SEATTLE WA 98107 F625.0321)00 (8/97) • Detach And Display Certificate