Loading...
HomeMy WebLinkAboutPermit MI98-0149 - XEROX CORPORATION - REROOFXEROX CORPORATION MI98-0149 City of Tukwila ( (206) 431 -3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 MISCELLANEOUS PERMIT WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES, APPLICANT IS PROCEEDING AT THEIR OWN RISK. Parcel No: 000320 -0003 Address: 6400 SOUTHCENTER BL Suite No: Location: Category: NSFR Type: MISCPERM Zoning: 0 Const Type: Gas /Elec.: Units: 001 Setbacks: North: Water: N/A Wetlands: Contractor License No: Permit No: Status: Issued: Expires: MI98 -0149 ISSUED 09/24/1998 03/23/1999 Occupancy: OFFICE UBC: 1997 Fire Protection: N/A .0 South: .0 East: .0 West: .0 Sewer: N/A Slopes: Y Streams: OCCUPANT XEROX CORPORATION 6400 SOUTHCENTER BL, TUKWILA WA 98188 OWNER XEROX CORPORATION Phone: (714)565 -1435 1851 E FIRST ST STE 460, SANTA ANA CA 92705 CONTACT BILL GEIST Phone: 425 - 827 -4786 719 19TH LANE WEST, KIRKLAND WA 98033 **************************************************** * * * * * * * * * * * * * * * ** * * * * * * * * * * * *k* Permit Description: REROOF BUILDING - BUR ONLY. k**************************************************** * * * * * * * * ** * * * * * *. * * * * * * * * * * * * ** Construction Valuation: $ 100,000.00 PUBLIC WORKS PERMITS: *(Water Meter Permits Listed Separate) Eng. Appr: Curb Cut /Access /Sidewalk /CSS: N Fire Loop Hydrant: N No: Size(in): .00 Flood Control Zone: N Hauling: N Start Time: End Time: Land Altering: N Cut: Fill: Landscape Irrigation: N Moving Oversized Load: N Start Time: End Time:. Sanitary Side Sewer: N No: Sewer Main Extension: N Private: N Public: N Storm Drainage: N Street Use: N Water Main Extension: N Private: N Public: N r*********** * * * * ** * * * ** ** * * * * * * * * * * * * * * * * ** ter********* * * * * * * * * * * * * * * * * * * * * * * * * * * * ** ** TOTAL DEVELOPMENT PERMIT FEES: $ 891.75 r**************************************************** * * * * * * * * * * * * * * * * * * * * * * * * ** * * * ** Permit Center Authorized Signature: 4. Date: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this development permit. Signature:_ Print Nam This perm 180 days f for a perio Date: 1 become null and void if the work is not commenced within he date of issuance, or if the work is suspended or abandoned f 180 days from the last inspection. 1 Applic on taken by: (initials) 1 CITY OF ( '1KWILA Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 FeR STAFF USE ONLY Project Number: Permit Number: Miscellaneous Permit Application Application and plans must be complete In order to be accepted for plan review. Applications will not be accepted through the mall or facsimile. Project Name/Tenant:Xp7o /� v &fa° Description of work to be done: r-- r Will there be storage of flammable /combustible hazardous material in the building? ❑ yes 11 no Attach list of materials and storage location on separate 8 1/2 X 11 paper indicating quantities & Material Safety Data Sleets Value of Conftruction: 120/66O Site Address: l DO �% Ci�c..State /ZID: iO le>� Tax Parcel Number: 6003e0 - o_ Address: i/'' ",c). 0772', Guru Property Owner: .� ` / &///1?� ?���� 0 Water Phone: Street Address: �� City State /Zip: Fax #: t Person: ‘ / r Phone: Street Address f 9 /9 z1-1( i ��� Gi`l (X� City �� Fax #: �25�.- 25 --93 Contractor: Phone: Street Address: City State /Zip: Fax #: itecL J .. _ __ Phone: Street Address: ity State /Zip: Fax #: Engineer: Phone: Street Address: / r City State /Zip: Fax #: MISCELLANEOUS PERMIT REVIEW AND APPROVAL REQUESTED: (TO BE FILLED OUT BY APPLICANT) Description of work to be done: r-- r Will there be storage of flammable /combustible hazardous material in the building? ❑ yes 11 no Attach list of materials and storage location on separate 8 1/2 X 11 paper indicating quantities & Material Safety Data Sleets ❑ Above Ground Tanks ❑ Antennas /Satellite Dishes D Bulkhead /Docks 'Qommercial Reroof ❑ Demolition ❑ Fence ❑ Mechanical ❑ Manufactured Housing - Replacement only ❑ Parking Lots ❑ Retaining Walls ❑ Temporary Pedestrian Protection /Exit Systems ❑ Temporary Facilities ❑ Tree Cutting APPLICANT.REQUEST. FOR MISCELLANEOUS PUBLIC WORKS PERMITS.: ❑ Channelization /Striping ❑ Flood Control Zone ❑ Landscape Irrigation ❑ Storm Drainage ❑ Water Meter /Exempt # ❑ Curb cut /Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #: Size(s): ❑ Land Altering: 0 Cut cubic yards 0 Fill cubic yards 0 sq ft grading /clearing ❑ Sanitary Side Sewer #: in Sewer Main Extension 0 Private 0 Public ❑ Street Use ❑ Water Main Extension 0 Private 0 Public Size(s): 0 Deduct 0 Water Only in Water Meter /Permanent # Size(s): ❑ Water Meter Temp # Size(s : Est. quantity: gal Schedule: C3 Miscellaneous la Moving Oversized Load /Hauling MONTHLY SERVICE BILLING T • Name: �% Phone: Address: i/'' I City /State /Zip: 0 Water 0 Sewer 0 Metro 0 Standby WATER METER DEPOSIT /REF ND BILLING: Name: Address: 1 Phone: [CIIY/State/ZiP: Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. 'Date application accepted: 6 1 /^fib Date application expires: 2 7/ ALL MISCELLANEOUS PERMIT APPLICATIONS MUST BE SUBMITTED WITH THE FOLLOWING: ➢ ALL DRAWINGS SHALL( .. AT A LEGIBLE SCALE AND NEATL. DRAWN )%1!. ;, IL'DINt ITaOPL S AND UTILITY PLANS ARE TO BE COMBINED ➢� `'AIICHITEdI JR '' DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT ➢ STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED STRUCTURAL ENGINEER ➢ CIVIL/SITE PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER (P.E.) ❑ SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR PERMIT REVIEW Submit checklist No M=9 Above Ground Tanks/Water Tanks - Supported directly upon grade exceeding 5,000 gallons and a ratio of height to diameter or width which exceeds 2:1 . ❑ Antennas /Satellite Dishes Submit checklist-. No: M -1 °'" ❑ Awnings /Canopies - No signage Commercial Tenant Improvement Permit ❑ Bulkhead/Dock Submit checklist , No : M -10 ❑ Commercial Reroof Submit checklist.. No: M -6': in Demolition. Submit checklist No ,'M 3, M 3a ❑ Fences - Over 6 feet in Height Submit checklist No: M -9` ❑ Land Altering/Grading/Preloads Submit checklist: No: M -2 ❑ Loading Docks Commercial Tenant Improvement Permit. Submit checklist No: H -17 ❑ Mechanical (Residential & Commercial) Submit checklist ' No M -8 Residential only - H -6, H -16 ❑ Miscellaneous; Public Works Permits Submit checklist No H-9 ❑ Manufactured Housing (RED INSIGNIA ONLY) Submit checklist ` No M -5 .., ❑ Moving Oversized Load/Hauling Submit checklist : No: M -5 ❑ Parking Lots Submit checklist No: M -4 ❑ Residential Reroof - Exempt with following exception: If roof structure to be repaired or replaced Residential Building Permit Submit checklist . No:. M -6 El Retaining Walls - Over 4 feet in height Submit checklist ' No M -1: ❑ Temporary . Submit checklist No M -7 El Temporary Pedestrian Protection/Exit Systems. Submit checklist No M =4 ❑ Tree Cutting Submit checklist No M -2 ❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". Building'Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer; :or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit appllcatlen and obtain the permit will be required as part of this submittal. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND / AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OW., R,• - AUTHO; ED . NT•_Y41 Signal =► 7M Date: , /( v Print name•1,�` SS % - t %�� Phone -S7�� _Fax #lfl- gZ0j�� 2 Address: 7j7, / 4 ��j, J /}� City /State /Zip /1,�it�� 4ILO /�' 13 4. ..„,..1/469c_. MISCPMT.DOC 7/11/96 CITY OF TUKWILA REROOF CONDITIONS Permit No: MI98-0149 Project Name: XEROX CORPORATION Address: 6400 SOUTHCENTER BL Suite: *************k*********-w4444444444A1;4*44*k*fc***********4********Alk*k**4k ,,, ,, , • , ,; ,,,,‘ ,, THE FOLLOWING CONDITIONS .WILL.. APPLY TiI:PE-POOF PERMLTS:., 1 Al 1 re7r6of ing..prOjects wi 1,1 be a Ocompl .14,hea ',In 'CoMpi lance with Appendix Chapter 'IS of . the Un i form' BO I (I i 11'4, 7e„, C, Ut7:, Inspections: ,... .,, A. New ' roof coverings Sha 1 I not be app 1 i ed Wtthout,''f ir'st,', obtain ing a pre-roof ing :Inspection from the: BO l'al,ng% ' \ i V is i on and wrttten apOroval from the Bui I ding ,Ixi.speCtor. , The pre-roof ing inspection shall pay particular attention to evidence of ac.cumu la t ion of water; - Where extenSIve, POO in9 , — of water is apparent, • an ,analys IS . of the roof strqctmre ,f or ,.' comp 1 lance wi th Sect fon 1506,.. Obc , s ha 11 be made. and :',"." . " ,,, , corrective measures, such as 'relocation of roof dra ins or • sodppers • re loping. tiff the roof or structural :changes , i: sha 11 , be a ccomp 1 i sped . ' Anin'spect ion covering the above -,11 stea • . top i os Prepared,,bs.,;''a qualAf iedtialt, inspector, a*, .', determined by the Building Official, ' may be accepted ,in,1 1 eu of the, pre-inspection by the 'Sul I ding Inspector. .',,i-, f i'ne 1 ' inspect ion and apAroVa 1 ishaln1-.be obtained' f0,11y the pi.$) 1 d ing Di Osi on when the re-roofing jsti,;.comp 1 ete 3s a 'COnd tiOni. of the final th&pect fom; for roof s, that reqd i re a tAr0,retOrdant 'root covering under the pro041onS,60 Tab le 15-A1 194 UGC the root 1nta11e, ha 1 1 .01441 de4fie inspector with a written itateAent indi cat i ng/t'.4,1e' following - for somet hing s imi 1 ar) I HAVE INSTALLED A 'ROO...:MEMBRANE AEMBL INc140141'1suLATIoN. IF APPLICABLE, CONSISTINOANITACTURER), SPECIFICATION #' e'DATA SHEET ENCLOSED, WHICH MEEtSplz: tUEEP$TtitRtOUIREMENTS FO'R- i.:LASS A OR CLASS, B ROOFS. THIS ROOF WASANSTA'LEEti'AT' (ADDRESS), UNDER CITY OF TUKWILA PERMIT NO. . ( The statement s h a l l include the name of the roof ing company that instal led the roof , signature of instal ler and date. ) CITY OF TUKWILA Permit No: MI9B- 0149 Tenant: Statics: ISSUED Type: MISCPERM a Applied: 08/11/1998 Parcel #: 000320 - 0003 Issued: 0 /24/'1998 k• k• kk• k• kk• k• k• k• k• k• k• kkit• k• k*• k• k• k• k• k• k• k*• kkk*• kk�k• k• k• k*• k• kk• k• k• kk• k• k* k' k�4• k• k' k: k•k ik• k •k*•kk*•k`k•k•k•k•kk'k.'kk'h'k, Permit. Conditions: 1. No changer will be made to the plans unless approved by the TukwilaBuilding 0;i'iision 2. All permit:�t inspe;ctiort,,µr�e.cor;ds,; a' PP' ova' plan:; snail , he ava i f ab l e at the ,t0.1: °�;s-..i",te prior to the = start: of anv con- , struction. These -are care to -.be n ains -fined and avail- able ;until final ' EnzpecC�on approval is gf anted x: , 3. A statement from the roof ingt- .c'onti- ac tor , ver�i.fvi11 t r,t�e retardant;,.c,la s s of ' <r,00f "Will be regufred ,pr'jior ato filial inspect ipr�:' (see:. attached prOced care)': 4. All constr uctiow, to be;:,done in ;Conformance .with a`p0oveci plans .and' r egciirements of, the .Un,orm Bui lding Code.: 1997` Edition? a amende.dt Un1for,`m` Meehan :1 cal Code (4997 ,,,,Edition,, and Wad.hirg,ton Sate Energy•.:+:ode (1997 Edition1'‘ r 5. Val i di.ty cif „Fermi t. The i ssOan.ce of a permit or ''apps ova 1 plans','; spe6lfic`ations, and computations shall not abe,,con,•�•,. stru,e,d to be a:' permit '.toror? an approval tti roval of, any vial„e n of *y nf•' the ,,prov i s i ons afthe b r:i),l d ifig "�.cpde or of• env „,,;: other ordinance of. the • iur;i;sdi;ci:1o'n.1 .o p'ermit preaumying , r lire'authorlty-.to.violate or cancel the provision” of ttti;fis code' shad l' be va l i d / Address: 6400 SOUTHCENTER BL Suite: PLA fatVIEW /ROU ING7SLIP ACTIVITY NUMBER: MI98 -0149 DATE: 8 -11 -98 PROJECT NAME: XEROX CORPORATION XX Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter Revision After Permit Is Issued DEPARTMENTS: Bi Division XI P bb 'c 111`6F1 Fire Prevention Structural Planning Dion Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues, Thurs) Complete Incomplete Comments: DUE DATE: 8 -13 -98 Not Applicable Li TUES /THURS ROUTING: Please Route El No further Review Required Routed by Staff n (if routed by staff, make copy to master file and enter into Sierra) REVIEWERS INITIALS: DATE: APPROVALS OR CORRECTIONS: (ten days) _ DUE DATE: 9 -10 -98 Approved Approved with Conditions Not Approved (attach comments) 0 REVIEWERS INITIALS: DATE: CORRECTION DETERMINATION: DUE DATE: Approved Approved with Conditions ❑ Not Approved (attach comments) 0 REVIEWERS INITIALS: DATE: \PR•ROUTE.DOC INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION PERMIT NO. , 6300 Southcenter Blvd, #100, Tukwila, WA 98188 i20b1431- -3670 Project: Project: �e ev/i) Type of In ection: I r n ell Date called: Special instructions: Date wanted: a.m. Requester:--1— ',•^ Phone S 3" e02—:— 31 ?) Approved per applicable codes. Corrections required prior to approval. COMMENTS: r4 / Inspector: Q� _ Date:) /2."61 $47.00 REINSPECTIO E REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reins pectlon. INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3670 Project IP if e) Type of Ins ion: a' 'Me, 4 fl, + Addre Ci ,4 ,o 1/3/ �C..� Date called: Specia Instructions: 1/ ,.- O Date wanted• i p.m. Requester: Phone: ElApproved per applicable codes. ('Corrections required prior to approval. COMMENTS: A i fe z 5 Cn_n et 644"? c4r ) 44kL 07 501 / .3,eki / 40 .4 e (i' h6t (4 c ,- � C' r r• /rte --mac A /97 5.,. //4, Inspector: Date: '$47.00 REINSPECTION EE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. CaII to schedule reinspection. Date• I Rnrnint Nn• INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 9818 y0 (J - at f C PERMIT NO. (206)431 -3670 Project: Type of Ins ection: � �.i-- eke (V `'1 � et -.1 t" Q f ../�t.--r-L0,4-...e" Addre s: e� c -C rC./j. t / -.. /e. T4 I?.,t P .6, LGtS- �l Ut ce4 Date called: _6-7, / , .4, / /, / c.417-, hole? A-N-j mil') Special instructions: Date wanted _y - S`%�7 7 a.m. (772,1) Requester: - /y) // S e 4.. / /-e-e' 1~-,ieV. --i "" Phone: / p - ffrj, (0A- i/t) / /7 s- // L C —1 tiApproved per applicable codes. 40 Corrections required prior to approval. COMMENTS: ... // ` 4 �0� /� / / --1t ` c 2 CJt 'd 'M'' ' i ‘`z. �� /'mac_ e e / /Z. U4 ( - S c - -t ,, (V `'1 � et -.1 t" Q f ../�t.--r-L0,4-...e" t / -.. /e. T4 I?.,t P .6, LGtS- �l Ut ce4 _6-7, / , .4, / /, / c.417-, hole? A-N-j mil') 671 � St 11 c er'S. °rte / 4_� 7 , C; /�) - /y) // S e 4.. / /-e-e' 1~-,ieV. --i / a 5 / le _ k'[o tii -e-4n /li/ l „p•,z S / p - ffrj, (0A- i/t) / /7 s- // L C —1 G arc,(— r,'t^ve.e. ,,..1 Yle - ebe / Inspector: / C-''- 1 . d, 11 /I 41 El $47 0 REINSPECTION EE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. I D -ninf kin. 1 Harp. Date: /1.17o/e7,0 INSPECTION NO. 1 INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3670 Project: ,..ze hr)' j� Type of Ins ection: t �1 t * , �i ` ,i'7 i, inn 4 Addr s ` Date call d: ,4sF.IZQ Ree- 1))1 A, )C , G'aS l ‘s--, 'S Special instructions: . Date wanted: a.m. Requester: i k_.e ' C A, / ,e fr V /` . e∎poz Phone: pro( mti ae/0-1,/5.. h 01 s- eGU/ix.. JApproved per applicable codes. i.. Correctionrequed prior, to appro aI. COMMENTS: . '� td w . * , �i ` ,i'7 i, inn 4 )3 ' . •-•:(9114-e--1. r 11,0 CO ,5 .4c, r,, h-r/ e,,e,...< i r/'°,o ,4sF.IZQ Ree- 1))1 A, )C , G'aS l ‘s--, 'S Li) 4.1 f_� A-1 `, k;), . r0 J1-k- L-,1 e, h c / ' ,� /�' �/ tie" Gr/ . omj 626/ t i k_.e ' C A, / ,e fr V /` . e∎poz pro( mti ae/0-1,/5.. h 01 s- eGU/ix.. S ' <) E.. ._221P l eC2os"P.' 1" ,414 e04 c,' — Iprid w • $47.00 REINS ECTI % N FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcente'r461vd., Suite 100, II to schedule reinspection. I Rarninf Nn• I . Dahl. INSPECTION NO, CITY OF TUKWILA BUILDING DIVISION INSPECTION RECORD Retain a copy with permit 6300 Southcenter Blvd, #1.00, Tukwila, WA 98188 1 PERMIT NO. (206)431 -3670 Project: 1— N C r Type of Inspection 0 1 V Address q p./� C ,,, 1_� IVV J _I Q y5 Dw , Qpte called: , G 2" Special instructions: Date wante / G� . p.m. Requester ( n 4.10.4 Phone' Approved per applicable codes. 171 Corrections required prior to approval. COMMENTS: friu / /e /-t-_ C $47.00 REINSPECTIO SEE REQU RED. Prior to inspection, fee must be paid, at 6300 Southcenter Blvd., Sulte 100. CaII to schedule reinspection,, • Rarnint Nn• I Maw � .�'�yzy. .," 'Yw. ,•`",.a�}.f'�a�!'�Fi?�A �"„n"Yv Kt' ��;' �i�''. SM�?' p! �`' t "g�.- X?`i<4,wyKt?�.el;i:'vn�w. Y. INSPECTION RECORD. Retain a copy with permit INSPEC ION NO. PER NO, CITY OF TUKWILA BUILDING DIVISION ,11 6300 Southcenter Blvd., #100,' Tukwila, WA 98188 ;)•'-R (206) 431 -3670 Proji %.VV f0y Tape Vnspric6.. � tic, I S _ i\ r y� Date called: 3 0 q ,-98 Special instructions: Date want ,28 -c ' bp Ilinr4. Req er: Ph /1-7a-33;1 Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: Date: 1-1 S42.00 ' EINSPECTIO FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.. ,�1i N'rcT Y!M,,."1Qtkeh; i.. . ..... f..1 • A105 k3 *Ak Ekk k•k•ksl:4'•kAhk *k•kh :tstikkkAk h:El,:E* . sE• h•kic.Or` — Ak•k 7EA'4•AkEkk ;ITV C r 1 UKWT.I:.A„ WA -� 1•,R HP M]:.T rk• k ,k:4 *Lk.i:k:Ek:tk:4k•*•kA-krkkh ty) h:T*.A * , itdrt4hslkk. k 7t• 7h: lhh�hy1>HkkEkAt74:kk•/ek'`.. TRANSMIT Number.; R170()836 :''.Amount: t9,i..:75 01/24/3.8 ].3 :410 I7•aymcnt Methods GIik.GI( N' tzti:Unz WRI*61:11,.12g0I £NG Permit No: MI98,_0149. Tyne: MISCPLRM Mxsr .LLANRGIA NC }2i4I'C'. Parcel Mo 000320 -0.003 .. 3 i I:* Address: 6400 SOU•1.HGLN•CLR DL. Total rem 1311 a7 a This Payment; 8.11,75. Total ALA. .Pmt.,s: 891.75 Thal arice: .00 rkrikkk its \ **A•hkkkrink•klsal'kkAki, . 31** kri k+ rstk• irsl* hst• A 3, 4%*AkktEA•A.ificAls*)11t /vAAA A'ecount• 1.0dn 000/322,100 .000/386.904, IJesc•ription BUILDING PLS STATE' 13UILD_INt 3011CWARGE Amount :.' £187.x'5, :4.30 03/17/1999 09:41 2064745423 WRIGHT ROOFING INC PAGE 01 6-c7/L1, DATE: TO: COMPANY: FAX #:. FC; 1 7 v*,•:-.,(.3 y 01-r1ila (210-451-345 RECEIVED MAR 3 1 1999 TUKWILA PUBLIC WORKS THERE WERE J PAGE (S) SENT, INCLUDING COVER LETrER. . . IF.YOU HAVE ANY PROBLEMS WITH RECEIPT OF THIS FAX, PLEASE CALL BUNNIE OR JENNIFER AT (253)472-3321. •faerni-is oo, q10- Olgq 144 P2 iMat +145 idn&C(//V) CI600 thate 14:9i* • . C*. No. WR•IG-HR-1-1 74-HZ 6035 S,.ACICiens P.O. Box 9339 Tacoma, WA 98409 'Office (253) 472-3321 1-800-533-0310 FAX (206) 474-5423 1 . 03/17/1999 09:41 20647454/23 WRIGHT ROOFING INC 'PARADIENE 2A/30 [FR1 ROOF SY TE.�ViS_ I. FIRE RATINGS A. VNDZRWRITZR! LA.S►ORATORRS [JL. Robins ns Np. f V1$iplut Stamp: R 10630 CH) INSULATIONS: All inundations are mechanically Sunned or adhered with hot asphalt, ADIIIISIVILSt All Paradigm membrane are acceptable for application in hot Type IV asphalt or PA -31) Adhesive. ACCESIOR1R - CLAUWJCATIONS: Fiberglass base and ply sheets used with Siplast roof systems are daseifled, by the Mowing UL definitions. Typ40.01 • CasM bsea/p y *ale far ma % syswms. Type 02 - Corned cap Or b4dply Oeot for roofing systemm. Type 03 •,Minetsl metered elp shot *w roofing systems. PARADLEPHI TG sosis.. Torch ink versions of each Parading 20 or Paradisne 30 (FR) sheet lilted,;are approved by UL as secipieble substitutions for their counterparts as indicated in sigh listing. However, is all caws, maudlin how the biting reads, Siplast specifications and application requirmoaed for specific pace use will prevail. PARAD1 NE 20/30.0R • ;CLASS A Fully Adrsred 1. Des::NC iatloe� 1 lastilstiN: (Optiaresl).. Sbsr, peruse, wood fiber, one or more layers, any combination. 2 in minimum ticiglools, nwalrliadly Sunned or adhered with hot roofing asphalt. $ase1Pty Sheet: Viridian, 20," "Paradises 20 EG," "Paradises 20 HT," "Paradisee 20 HV." "Paradises 20 Pk" "Paritliase 20 'um" Mrilbvs "Paradigm .30 FR" or "Paradieee 30 HTFR," sacred with hot roofing asphalt 2. Des*: NC isiells: 1 lasalaissr (optioasii ?oiyisooymerrate, glass fiber, perlite, wood fiber, any combination, 2 1/2 an maaitraun *Jowl, media:ieally fastened or adhered with hot roofing asphalt. SaaalPty Sheet: "Piraeus 20," " Paradisae 20 EG, "'Faradicne 20 FR," Psradiene 20 HT,'' „tstrdssae 20 iHV," Validates 20 HTFR" Msatllrasss: "Paradise* 30:FR" or "Parsdiene 30 HTFR " 3. Disk; • NC 1::!::*: 1 Rasa $iaat: Type 02, "nimbus" or "Psrabase Plus," P$y, is "Psradiene:20, "' "Paradisee 20 EO," "Paradiene 20 FR," "Psradiene 20 HT," "Premix 20 HV," "Paradigm 20 HTFR." McNb, le: "Paradises* 30 ER" or "Paradigm 30 HTFR." apprrwl.ao s Ray. 1/0/93 PAGE 02 PAGE 0: 03/17/1999 09 :41 2064745423 4. Deeb: • NC iu as: 1/2 WRIGHT ROOFING INC PAGE 03 'A 0.3 1' -idalirn: Option): Pdyisoganurata, urethane, perlitelisocyanurate composite. glass Aker. mama wudliher, ao lienitlroon. ' "Plgrsdiene 20," "Paradises 20 EG," "Paradienne 20 FR" Patadiene 20 Hit'," "Paradise 20•HV," "Parading 20 HrFL" Ashram: "Paradise 30 FR" or "Patadi hs 30 HTFR." S. Desk: C- 13/32 Indian 1/2 ions meinan: 1meolidM: PWyisocyanurats, urethane, polite, perliteurethane composite or glass fiber, 3/4 RN&PIFSie "Paradises 20," "Paradises 20 EG," "Paradises 20 FR," " Paradisee 20 HT," "Pandas 20 HV," "Paradises 20 ITTFL" Menbr s: "Paradise 30 FR" or "Paradises 30 li'fFR," d. Dada lfc iasRne: 1/2 tirala lea: Bxpaeded (EPS), extruded poiyityrene (XEPS), any thickness /saris!, lewd: Woad fber. pathos, glees Aber, 0,45 in, minimum RaasgMymoist. 'Tindicoe 20," "Paradigm 20 BO," "Paradisee 20 FR," "Paradisee 20 HT," "Peradirtnr20.14V," or "'mediae 20 HTFR.` Meeishia1 "Paradises 30 FR" and "Paradises 30 HTFR." 7. Milk:, NC Indian: 1/2 bass SliiiR: Type G2, "Paribas" or "Paribas Plus," mechanically fastened or adhered with hoe rood o aapbah. Ply Shari " Paradises 20," "mediae 20 EG," 'Nadine 20 FR." "Paradises 20 RT," "Nadine 201HV," ar "Patoiienc 20 HTFR." Meiabraiia: "PP adi um 30 FR" or `Pandiims 30 HTFR." PARADIL'NZ W30 Fit - CLASS A MAINTENANCE AND RZPAIR 1. Dash: C =15/32 Wipe: 1/2 Zsistiog itasf •yitsas: Ciao A smooth or gravel surfaced (gravel may be removed) uphait *h todiig'ars covered grids: Dariier SWIM' Perliae,1/2 inch minimum, mechanically fastened or adhered with hot roofing $1ptlt. Rald!!y Meet "Paridie s 20," "Paraders 20 EG," „ Paradises 20 FR," "Paradiene 20 HT," "Paratie.a 20 NV," or "heading 20 HTFR." ' Meatuses: "Paradise 30 FR" or "Paxaditoe 30 HTFR," aMew■l,bo d3/16/1999 13:17 2064745423 WRIGHT ROOFING INC DATE,: TO: 03/1101cm PAGE 01 i 7 1(1,7,c) COMPANY: toltj 4-t-webila FAX #:. THERE WERE , PAGE (S) SENT, INCLUDING COVER LETTER. IF.YOU HAVE ANY PROBLEMS WITH RECEIPT OF THIS FAX, PLEASE CALL BUNNIE OR JENNIFER AT (253)472-3321. Perna kV, MI '43- 011461 144pe -0/65 riS -11/u2 Ln6coratio6 ktlat 4OU nod., dggein'idef Wo.914k. • :Con. No. WR-G-HR-I-1 74-QZ 6035 S. Adorris P.O. Box 9339 Tacoma, WA 98409 03/16/1999 13:17 2064745423 WRIGHT ROOFING INC 0O/1X/4.= 10:4U ceodd.i.' d BAD VILES • PAR DffNE 20/30 (FRl ROOF SYSTEMS_ L FIRE RATINGS A. weiaTifilITICRS .LAI:ORATORI S UL RsAtssloe No. Ix al! MOM ratings: R 10630 (N) INSULATIONS: All insulations are mechanically fastened or adhered with hot asphalt ADHQSIVSS: All Paradises membranes are acceptable for application in hot Type IV asphalt or PA -312 Adhesive. ACCIIII ORI$S.CLASSIPlCA?IONS: Fiberglas base and ply sheets used with Siplast roof systems are dandled by the !Wowing UL deSaitioos. Type 01- Coated blue /ply as for roofing systems. 'type 02 - Coated up Or basdply sliest for roofing sysWns. Type 03 - Mineral sidheed cep dust for roofing systems. PARADILNE TG SIRIRR.. Torch grads versions of each Paradiene 20 or Paradiene 30 (FR) sheet listed are approved by UL u acceptable substitutions for their counterparts as indicated in each Mint However; a all was, regardless how du hating reads, Siplast specifications and application raqui/moots for spsoilb product use will prevail. PARAO P 20/S0 P1t - CLASS A Fully Adhered 1. Me :NC Gimme: 1 Isnslslisn: (Optional) glass Aar, peril% wood fiber, one or more lamas, any combination, 2 ia. tnaltirrwn dliciasss, resolsnioally fastened et adhered with hot roofing asphalt. 9aasIPly Sliest: 'Paradiene 20," "Paradiene 20 EG," „Paradisne 20 HT," "Paradiene 20 HV." "Paladins 20 FR," "Poulin 20 HTFR." Mawbvaae: "Par:dietw 30 FR" or "Pundit= 30 HTFR," adhered with hot roofing asphalt Z. Dadtr SIC incline: 1 Iustilitioa: (optionai) Potyisocyanurate, glass fiber, perlite, wood fiber, any combination, 2 1/2 in.. maaiaaun•thicia ass, tasdrn tally fastened or adhered with hot roofing aspbah. RastoJPly Shut: ' ?aradiurs 20,0 "Paradises 20 EG," 'Paratfisne 20 FR," Paradiene 20 HT," "Parodies* 20 HV," "Paladins 20 HTFR" Ms■lbraas: ''"Paradiwre' 30 PR" or "Penditme 30 HTFR " 3. Dsek: NC . Ijelias: 1 IW : 'Type 02; ?lobos" or "Parabase Plus." Ply Shier: "P$radj:ae 20," "Paradises 20 EG," "Paradiene 20 FR" "Paradiene 20 HT," "Paradiime 20 HV, "'4Patadmr 20 H7FR." Mar brans: "Paradl'soe'30 FR" or "Paradione 30 HTFR." epprwsl.foo $ Rev. 1/15/95 Of PAGE 02 '43E 02 03/16/1999 13 :17 2064745423 UJ/ 1L/ 1777 10: av LGOClDd 7 • WRIGHT ROOFING INC BRAD VILE'S PAGE .03 043E 0,3 4. Deck: NC Iaeu: 1/2 Iaatdadeis: (Optics*: Polyisoeyanutate, urethane, perliteisocyanurate composite, glass Abu, pastas « wood'lber, no limitation. DasdPly Oust: "Pandiseoe 20," "Paradise 20 EG," " Paradise 20 FR," Paradises 20 HT," "lirwdiRM 20 HV," "Patadiwle 20 HTFR." Malmbtssw: "Paradises 30 FR" or "nudism. 30 HTFR." s. Ds& C- 15/32' latke: 1/2 1wla11ao: Polyisooyami de, urethane, peat*, palate/urethane composite or glass fiber, 3/4 inch mi011001. fam/Ply;SMa : "Paradigms 20," "Paradigms 20 EG." "Paradises 20 FR." "Paradise 20 NT," "Paradigm 20HV," Waage 20 HMI" Musbraiee: "Parachute 30 FR" or "Paradigms 30 HTFR." i. DIA: NC ' Imtllse: 1/2 1medadon: 'Rxpaadad (EPS), extruded polystyrene (REPS), any thickness. Barrier )NWd,: Wood fiber, perlite, glass fiber, 0.45 in. minimum Saedlfy Mist: "Parsdieme 20," "Paradises 20 EG." "Paradigm 20 FR," "Paradises 20 HT." "Fa adismr20.HV, "•or "Fustian 20 }MR." MUnbi .s: "Paradisne 30 FR" and "Paradigm 30 HTFR." 7. Dario NC lmabme: 1/2 Disc nisei Type 02, "Parabue" or "Parabau Plus," mechanically fumed or adhered tvith rot roofing wish. Ply Shaiit:. "Paradises 20," "Paradigms 20 F0," "Paradigm 20 FR." "Parading 20 HT," "Pa a ine 20 HV," ar'Pagadisse 20 DYER," Membrane: "%aradian 30 FR" or "Faradic:l a 30 MFR." PARAD>D. W 20/30 fl - CLASS A MAL ENANCE AND REPAIR 1. Dash: C -13/32 Imaiae: 1n ramie itiaf System: Class A smooth or gravel surfaced (gavel may be removed) asphalt &It realiy, arum wend with 1.rriaar Sward: Pulito, 1/2 inch minimum, mechanically fastened or adhered with hot roofing Dele/Ply !bait "Paradises 20," "Paradises 20 EG," "Paradigms 20 FR," " Paradisee 2011''," "maim 20 HV," or "Fustian 20 MYR." Ma.Manti: 7seadiae 30 FR" or "Paradimc 30 HTFR." yp+val. deo 02/ ?6/1999 07:50 206474542q 1 RIGHT DDFINI3 WRIGHT ROOFING IINC February 26, 1999 City of Tukwila Community Devek pmertdPublic Work 6300 Sow Boulevard, Suitel 00 Tukwila, Washington 98188 Attn: Dave Larson, Fax No. 206-431-3665 PAGE 01 R CE VE FEB 2 6 1999 COMMUNITY '7VELOPMENT . . -40// os3 Re: Permit No. MI98 -0149 Xerox Corpot*tion 6400 Southeeater Boulevard Tukwila, Washington Wright Roofing has installed a roof membrane assembly, including insulation, consisting of Siplast (m nufacturcr). Siplast 20/30 XH Roof System and %" Perlite, data sheet enclosed, which meets or exceeds the requirements %r Class A roof. If you have any questions or need any futthcr information please do not hesitate to call. Con. No. WR- IG- HR•I- 174.QZ 6035 S, Adams PO, Box 9339 Tacoma, WA 98409 ' 02/26/1999 07:50 2064745427 trid Johns Manville Description Fesco Board is a homogeneous board, composed of expended partite, a volcanic ore, blended with selected binders and fibers. The perlite particles ere subjected to intense heat which causes them to expend approximately fifteen times their original size. The resulting glasslike beads contain air cells which provide high insulating efficiency. The top surface of Fesco Board Is sealed with a unique coating, Toploc•, to ensure optimum adhesion of a built-up or modified bitumen membrane. The Toploc coating gives Fesco Board a smoother surface for easier application of hot asphalt or cold adhesives. Application Fesco Board is a rigid, thermal root insulation for use in buitt -up, modified bitumen and some single ply rooting systems. It may be applied using hot asphalt, cold adhesives or mechanical fasteners. Tapered Fesco Board is the low thermal product of choice for providing positive slope to drain on both new and reroof construction. For more information on Tapered Fesco and the JM Tapered Systems Group design capabilities, refer to pages 9.15 and 9-18. Sizes Fesco Board Is available in 2' x 4' (0,11 m x 1.22 m) end 4' x 4' 11,22 m x 1.22 m) boards in standard thicknesses of 3.1',1',1 hW and 7(19 mm, 25 mm, 38 mm and 51 mm). Other sizes are available on request Advantages Environmental, FrleMtp. The minimum recycled content is 25% by weight. rase Beard OO1110ss with rennent et P,*ctlea ABesey Rio juletios 40 CFR Part 1* flulduflse f.r Federal Proaaremee1 if Belldfrte kssuletien Producer Caaleieia, Recovered Materials. te a recycled Redact approved ler wee es my pole* using tastes, funds. Street* and Dum ility. When applied over rigid decks, Fesco Board's high laminar tents strength resists demise from on-the-job and maintenance traffic, offers an excellent substrate for all rooting membranes, and effectively bridges flute openings In metal decks. Dimensional Stability. Because of its perlite composition and low water absorption rates, Fesco Board Is dimensionally stable over a wide range of weather conditions. Fire Realesenee. Fesco Board has excellent fire resistance and is approved for use in FM and UL approved constructions. Because of its perlite content, Fesco Board offers far greater fire resistance than conventional wood fiber materials. Magpies Swine. Fesco Baird provides an excellent base to receive a built -up or modified bitumen membrane. It hes excellent compatibility with hot asphalt Good Adhesive. The top surface of Fesco Board is sealed with Toploc coating to control the penetration of mopping asphalt hasping to ensure proper adhesion d the roofing membrane. Stable B- Vales. Faaoo Board has a stable R -value because it Is composed of inorganic end fibrous materials. WRIGHT ROOFING INC PAGE 02 it 11,,,iiI nii , Fesco® Board Roof insulation ® Theme, Values Thicksas In titre 3A 19 1 25 1 r!4 38 2 51 C -Value (Conductance) BTU/(hrfi ••F) W /m'• °C 0.48 2.73 0.36 2.04 0.24 1.36 0,18 1.02 R•Valu.(Resistence) (hr•ft'•°FIIBTU m'•°C/W 2.08 .37 2,78 .49 4.17 ,74 5.56 .98 Applicable Stenderds Fesco Board complies with the material requirements of ASTM C 728, Factory Miguel Fesco Board has been rated in Factory Mutual fire and wind- resistant systems for BUR. single ply end modified bitumen constructions. This testing Is specific to the roof deck, insulation, fastener, fastener pattern end the membrane. For current information on JM FM approved systems, contact a JM Technical Service Specialist, JM Sales Representative or consult the current FM Approval Guide. Underwriters Monitories Fesco Board Is classified by Underwriters laboratories, Inc. and is approved insulation for numerous Class A roof constructions. Contact e JM Technical Service Specialist for details regarding specific approvals. Fesco Board conforms to Underwriters Laboratories, Inc. Fire Hazard Classification, as a Roof Deck Construction Materiel (internal fire exposure) for use in Construction Numbers 1, 2, 156, 157, 158, and 374, and as a Built -Up Roof Covering Material (external fire). See the current UL Roofing Materials and Systems Directory. Material will have UL labels only when requested on the order. tit Fire -Rated Assemblies Fesco Board is also listed by Underwriters Laboratories, Inc. for use In fee-rated assembly design numbers es shown in the than below, See the current UL Fire Resistance Directory. UL Md/Celline Assembly Approvals Fesco Board Root Insulation is iist.d by Underwriters Leboreteries, Inc. for use in fire -rated assembly design numbers P001, P004, P201, P206, P210, P211, P224, P225, P230, P237, P238, P280. P254, P259, P267, P404, P502, P508, P510, P514, P701, P708, P710, P713, P711, P720, P723, P729, P734,'P735, P737, P740, P101, P603. P805, P810, P114, P815, P811, P821, Oral Oern 0411...11 004C • 02/,26/1999 07:50 20647454V INSULATION WRIGHT ROOFING INC Q'34.5 PAGE 03 n.t,s, SLOPE: 0 " -'A" per foot' MATERIALS per 100 s.f. ROOF INSULATION ASPHALT 25 lbs. PARADIENE 20 60 Ibe. ASPHALT 25Ibs. PARADIENE 30 FR 10 lbs. 'Contact Siplast for higher slope requirements. $PECWICATION 2030 IN - 2031 Requirements end recommendations detailed in the Siplut catalog and Siplast long form specifications shall apply In addition to the following recommendations and specifications. APPUCATION 1. Approved insulation should be Installed according to manufacturer's recommendations. The edges of insulation units should be in moderate contact without forcing, cut to fit neatly against adjoining surfaces. The insulation layer should present • smooth surface to accept the roof. membrane. 2.9eglnning at the low point of the roof, fully mop 1 ply of Paradiene 20 to the insulation surface, lapping sides and ends • minimum of 3 inches. 3. Beginning again at the low point of the roof, fully mop 1 ply of Paradiene 30 FR to Paradiene 20 surface, lapping sides and ends a minimum of 3 Inches. Stagger laps between plies. NOTE: Approved ABTM Type IV asphalt must be used for all moppings. RN, t 2031-04- Rev. 10/92 03/09/1999 15:28 2064745423 t WRIGHT ROOFING INC PAGE 01 DATE: TO: 03/09/99 Dave Larson (.,l-!M!'AN Y; _... „ C'i 1-37. I o nF '1'„4s,; FAX #: 206 -431 -3665 nml%E WERE 2 PAGE (s) SENT, INCLUDIrNO cOvilR LETTER. 1 0 1999 rr 'i•OU HAW. A1vr rlloDLcrvls l)l" 11-US 1'A.i,r 1'LLASIL CALL DUNNIE OR JENNIFER AT (23)4 /1 -3311. Mr. Larson T heire ohm. 0-he foilo...s..ty F08.2 k&uv.Lac:u the lnrormat .on that you nand h,r Porm1 r No. MX913-01/ 9. 1 w114 be in Ocattle Thuroay mosrni'ng and we can or:Lw.5c An. a Lime I.o meet. dt. L L Xerox B1dgeand I can bring the permit to be signed off. ;Anytime between 9:30 and 11:00 would be fine. Jennifer Wright Vice president' Con. W. WR- IG- HR- I- 174 -QZ 6035 5. Adams P.O. Box 9339 Tacoma, WA 98409` Office (253) 472 -3321 1- 800 - 533 -0310 FAX (206) 474 -5423 a.. • 2 061710123 WRIGHT ROOFING INC PAGE 02 -4111; ( f''' 03/69/1999 1r :28 1 Page 21 • • 072(g) INSVLA'RQN PART ONE GENERAL ' r • A. It is the intent of these specifications to add 3/4" perlite insulation over the • existing plywood decking only. No other insulation will be installed. If II required by the City of Tukwila, an Addendum to the bidding documents or a Change Order will be the vehicle for the additional insulation. • • 07200.01 DES RIPT1ON A. Provide Class A Firer Rated :>ssornbiy, Over pr• ,• pao.J vniblinS4 1 C UT • substrate, install the roof membrane spaulfled, Including a SETS modified i base shoal (uarinr h.rriar), '3 /A :work perlilo I/VOrdd, n aa..vr,d ,w.iulfltml 306 Ir base. sheet, modified 9D8 ply sheet and surtaced with a SBS modified II granulated cap sheet. IP 8. The installation of this section is included in Built -up Roofing specifications, IP Related work is specified elsewhere. The following items of work are ID Coverers in other sections of these specificativr Ie. II DeMent o Hulk -up Roofing Meteal f rasllii iy :anti Trim II 1 0720Q,02.11/81A $ II A. Product data, lnsutation Syitte+im: Submit the nomo of the manufaului ar and 0 specification numbers and product names of all materials proposed for rise 0 in the work. Inr::k ids in submittal installation inati ui. liur is and general II rarnmmendetiono for each pi it nuipal product required. Include data II substantiating that the materials comply with requirements, including certificates and delivery loge for bulk materials. Also include Material Safety Data Sheets for products where applicable, B. Manufacturers: Provide primary products, including each type of Insulation, as specified from one manufacturer. Provide secondary products which are acceptable to, and approved by, the manufacturor of the primary products. Xerox Building Reroofing Project Thermal & Moisture Protection ROOF CONSULTING & MANAGEMENT SYSTEMS 719 19th Lane West Kirkland, Washington 98033 (425) 827 -4786 Fax (425) 822 -5793 FILE COPY I understand that tho Plan Check apprcvab aro sua;; ct to errors and omissions and approval of pla na doos not authorize the violation of any ad:pted code or ordinrNtsr ; - pt of contractor's REROOF SPECIFIcar?S for XEROX BUIILD ed 6400 South Center Boulevard Tukwila, Washington For XEROX CORPORATION 555 South Aviation Blvd. El Segundo, California Attn: Jack Bradford 310- 333 -9766 June, 1998 9803 -1 B Roofing Consultant: Roof Consulting & Management Systems 719 19th Lane West Kirkland, Washington 98033 Attn: Bill Geist (425)- 827 -4786 CITY OF TUKWIIA APPROVED AUG 1 9 1998 AS NO FED tTiC ,1 Divisi Recovso cm/ OF \ 1i99 PEmAg DE ER TABLE OF CONTENTS NUMBER OF PAGES DIVISION 0 - CONTRACT DOCUMENTS 12 SECTION 00100 INSTRUCTIONS TO BIDDERS SECTION 00300 FORM OF PROPOSAL SECTION 00700 SUPPLEMENTARY CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS SECTION 01000 GENERAL 3 SECTION 01500 CONSTRUCTION FACILITIES & TEMPORARY CONTROLS SECTION 01540 SECURITY SECTION 01600 MATERIAL & EQUIPMENT SECTION 01700 CONTRACT CLOSEOUT SECTION 01740 WARRANTIES & BONDS DIVISION 7 - THERMAL AND MOISTURE PROTECTION 14 SECTION 07100 DEMOLITION - SECTION 07200 INSULATION SECTION 07500 MEMBRANE ROOFING SECTION 07600 FLASHING AND SHEET METAL - SECTION 07900 SEALANTS AND CAULKING Page 3 SECTION 00100 DIVISION 0: CONTRACT DOCUMENTS INSTRUCTIONS TO BIDDERS 001.01 SCOPE OF CONTRACT: A. Contractor shall be fully responsible for all labor, materials, and equipment necessary for the complete construction of the Work as required in the Contract Documents. 001.02 SECURING AND COMPLIANCE WITH BIDDING DOCUMENTS: A. Specifications, and other bidding documents may be obtained at the time and place indicated on the INVITATION TO BIDDERS. Bidders shall comply with all conditions stipulated in such bidding documents. 001.03 REQUIREMENTS BEFORE SUBMITTING BIDS: A. The site and any building located thereon shall be thoroughly examined in relation to conditions which might directly or indirectly affect the contract work. The bid sum shall reflect all such affecting conditions. Bidders shall be responsible for verifying all dimensions which may affect the Work. 001.04 INTERPRETATION OF DOCUMENTS: A. If any bidder is in doubt as to the true meaning of any part of the Contract Documents or finds errors, discrepancies, or omissions in them, he shall at once request interpretation or correction thereof by the Consultant. B. The Consultant will promptly clarify the area in question and issue written Instructions to all prospective bidders. Verbal instructions or interpretations will have no validity regardless of source. Xerox Building Reroofing Project Instructions To Bidders Page 4 C. Request for such clarification must be in the office of the Consultant a minimum of ten working days before bid opening. 001.05 PRODUCT OPTIONS & SUBSTITUTIONS: A. Base bid only on items specified in the Project Manual. Substitutions will not be allowed. If contractor submits a substituted product, his bid will be determined as being NON - RESPONSIVE and be reason for cancellation. 001.06 ADDITION & REMODEL PROJECTS: A. The Owner will normally occupy the existing building during the reroofing period. This will require close coordination with the Contractor in order to avoid conflicts and misunderstandings. B. The scheduled use of the building will be presented at the pre -bid conference and the needs of the bidders will be reconciled with those of the Owner. C. The main points established at this meeting will be codified by addenda including: 1) Further coordination at each progress meeting to pinpoint and control any specific work which, of necessity, will interrupt the generally established schedule. 2) Areas of the building, if any, to be kept clean and free of obstructions for the Owner's use. 3) Areas of the building, if any, to be dedicated to the Contractor for storage, staging, or other purposes. 4) Contractor's use of power, heat, lights, restrooms, etc., if any. 001.07 PREPARING AND SUBMITTING BIDS: A. Bids shall be prepared on attached Bid Forms. B. Bid forms may be obtained from the Consultant. Xerox Building Reroofing Project Instructions To Bidders Page 5 C. The Bidder's legal name and business address shall be stated in full. D. Bids must bear no marks, erasures, writing, changes, or interlineation other than those provided or requested. E. Base bids shall include all work contemplated by the Contract Documents. F. No verbal, telegraphic, or telephonic bid, modifications, or cancellations will be considered. FAX's will NOT be accepted. G. The Bidder guarantees there shall be no revisions or withdrawal of the bid amount for a period of 45 days after bid opening. H. Signatures shall be in longhand and executed by a Principal duly authorized to make contracts. I. The bid proposal shall reflect the cost of all work required by the bidding documents, plus additions, deletions, or modifications required by addenda issued prior to bid opening. J. Envelopes shall contain nothing but bid and bid bonds. Envelopes shall be opaque, bear Bidder's name, be sealed, and addressed as follows - BID FOR Xerox Building Reroofing K. It is Bidder's sole responsibility to see that his Bid is received at the proper time. U.S. Mail does not guarantee bid will be delivered by specified time. Any Bid received after scheduled bid opening time will be returned to Bidder unopened. L. All taxes imposed by city, state, or federal government, shall be included in the bid sum. Washington State Sales Tax is not to be included in the bid sum. Xerox Building Reroofing Project Instructions To Bidders Page 6 001.08 BID WITHDRAWALS: A. Prior to bid opening, Bidders may withdraw bid by written request or by reclaiming bid envelope. 001.09 OPENING OF BIDS: A. See Invitation to Bidders. Bids will be privately opened at the office of the Consultant. 001.10 SUBCONTRACTOR LIST: A. Conditionally accepted Bidder, submitting a bid involving subcontractors and suppliers, shall submit a list of such subcontractors and major suppliers in 1) A meeting held immediately after bid opening or - 2) If agreed to in advance, by mail to Consultant within 24 hours after bid opening. 001.11 FACTORS AFFECTING CONTRACT AWARD: A. A Bidder's past performance, organization, subcontractors, equipment, and ability to perform and complete his contract in the manner and within the time specified, together with the amount of the bid, will be vital elements considered in the award of the contract. 001.12 AWARD OR REJECTION OF BID: A. The Owner reserves the right to reject any or all bids and to waive any irregularity therein. 001.13 ACCEPTANCE OF BID: A. No Bidder shall consider himself under contract after opening and reading of bids until the "Agreement" is signed, and compliance therewith has been made. Xerox Building Reroofing Project Instructions To Bidders Page 7 001.14 PERFORMANCE AND PAYMENT BOND: A. A Performance and Payment Bond will be required. Contractor shall state cost of the Bond as a line item on the bid form submitted to the owner. If not available, so state. 001.15 A. This bond shall be issued by a surety company and be on a bond form, both of which meet the requirements of Section 00700.03 of the Supplementary Conditions. TIME OF COMPLETION: The number of calendar days for completion shall be 45 days from the date of Notice to Proceed. Xerox Building Reroofing Project Instructions To Bidders Page 8 SECTION 00300 FORM OF PROPOSAL Xerox Building Reroofng Project June, 1998 9803 -1 B Date: Bidder's Name: To: Xerox Corporation 555 South Aviation Blvd. El Segundo, California Attn: Jack Bradford The Undersigned hereby submits the following proposal. The Undersigned hereby certifies that he has personally and carefully examined the Reroofing Specifications presented by you and conditions affecting the Work and has visited the site; and having made necessary examinations hereby proposes to furnish all labor, materials, equipment, all related permits, and services necessary to complete the work in strict accordance with the above named documents for the following sum, not including Washington state sales tax: After removal of the existing roof membrane and all deleterious materials, install the Built -up Roofing (BUR) System specified, including a vapor barrier, 3/4 inch periite, a modified SBS base sheet, a modified SBS ply sheet and surfaced with a modified SBS granulated cap sheet, all set in moppings of hot asphalt. Install new metal copings. See alternate bid for treatment of sight screening. Provide a Class A fire rating. The new roof system to be installed as stated in the specifications, per material manufacturer's instructions. A standard two year workmanship and materials warranty from the roofing contractor, and 10 year unlimited replacement system warranty from the system manufacturer is included, specimen enclosed. Xerox Building Reroofing Project Form Of Proposal Page 9 The below bid price does not include State and local sales taxes, but does include any and all building permits required. Reroofing Base Bid: Siplast Built Up Roof System, over prepared substrate: Dollars ($ ) Cost to replace deteriorated decking to match existing /sq. ft. Cost for Performance and Payment Bond ($ Alternate No. 1: In lieu of replacing wood fabric on sight screen, furnish and install new metal screen over existing wood fabric /framework: Dollars ($ ) Add - Subtract to - from BASE BID above. INSURANCE: Provide the owner with evidence of insurance, for accidents and damages caused by the roofing contractor, for owners review and acceptance if appropriate and as specified; if bid is accepted, provide a Certificate of Insurance naming the owner and roofing consultant as additional insured, prior to commencement of the work. Name of Bidder: By Title: Street Address: City, State, Zip: Telephone: State Reg. No. Registration Category Xerox Building Reroofing Project Form Of Proposal Page 10 Receipt of Addendums is acknowledged by initials. Addendum No. 1 date Addendum No. 2 date Addendum No. 3 date END OF FORM OF PROPOSAL Xerox Building Reroofing Project Form Of Proposal :: Page 11 SECTION 00700 SUPPLEMENTARY CONDITIONS 00700.01 DEFINITIONS: A. OWNER - Xerox Corporation, hereinafter referred to as "Owner ". B. OWNER'S REPRESENTATIVE / PROJECT MANAGER - Jack Bradford C. CONSULTANT - Roof Consulting & Management Systems - Bill Geist. D. CONTRACTOR - The Contractor is the person or organization identified as such in the Agreement. E. SUBCONTRACTOR - The person, firm, or corporation supplying direct or indirect labor and /or materials at the site of the Project and under separate contract or agreement with the Contractor. F. THE WORK - The Work includes all labor necessary to produce the construction required by the Contract Documents and all materials and equipment incorporated or to be incorporated in such construction. 00700.02 PERMITS & SURVEYS: A. The Contractor shall at his own cost and expense provide necessary permits, comply with local ordinances and regulations, and provide any surveys necessary to locate additions or structures and conform to zoning ordinances and protective covenants governing said real property. 00700.03 CONTRACTOR'S LIABILITY INSURANCE AND BONDS: 1. Insurance: A. The Contractor shall not commence work under this Contract until he has obtained, as a minimum, the insurance required hereunder and evidence of such insurance has been submitted to and approved by the Owner. The submittal of said evidence to the Owner shall not relieve or decrease the liability of the Contractor hereunder. Xerox Building Reroof Project Supplementary Conditions Page 12 1) Workers' Compensation & Employers' Liability Insurance - a) As required by statute. Commercial General Liability Insurance - ISO Form CG 00 01 (11/85) or equivalent, Occurrence Policy, with - a) Limits of not less than - (1) General Aggregate $ 1,000,000.00 (2) Products - Comp /OPS Aggregate $1,000,000.00 (3) Personal and Advertising Injury $1,000,000.00 (4) Each Occurrence $ 1,000,000.00 (5) Fire Damage (any 1 fire) $ 50,000.00 (6) Medical Expense (any 1 person) $5,000.00 b) Endorsements attached thereto including the following or their. equivalent - (1) ISO Form CG 25 01 (11/85), Amendment Of Limits Of Insurance (Designated Project or Premises), describing the subject Contract and specifying limits as shown above. (2) ISO Form CG 20 10 (11/85), Additional Insured -- Owners, Lessees, Or Contractors (Form B), naming the Owner as additional insured and containing the following statement - "This Endorsement Also Constitutes Primary Coverage In The Event Of Any Occurrence, Claim, Or Suit ". 3) Automobile Liability Insurance, with - a) Limits of not less than $1,000,000.00 Combined Single Limit per accident. b) Coverage applying to Any Auto. 2. Certificate of Insurance, on ACORD 25 -S (3/88) Form, or equivalent, filed with the Owner identifying: Xerox Building Reroof Project Supplementary Conditions Page 13 A. Owner, as defined in the Construction Agreement, as Certificate Holder and Additional Insured. Roof Consulting & Management Systems, is also to be named as Additional Insured. B. Endorsements, as listed above. (Note: If forms other than ISO forms are used, copies of the non -ISO forms are to be attached to this certificate). C. Project as defined in the Construction Agreement. D. Cancellation clause of the certificate amended to read, "Should any of the above described policies be canceled before the expiration thereof, the issuing company will mail 30 days written notice to the certificate holder named to the left "Roof Consulting & Management Systems." E. Insurance Companies Providing Coverage - All companies listed must be rated "B Class V" or better in the A.M. Best Company Key Rating Guide- - Property-- Casualty, current edition. F. The Name, Address, And Telephone Number Of The "Producer" - The certificate to bear an original signature of the Authorized Representative of the Producer. Facsimile or mechanically reproduced signatures will not be accepted. 3. Performance Bond and Labor & Material Payment Bond: A. The Contractor shall furnish to the Owner a performance bond and a labor and material payment bond each in an amount equal to 100 percent of the Contract sum, as security for all obligations arising under the construction agreement. Such bonds shall - 1) Be written on Form AIA Document A312. Where the laws of the state in which the Project is located mandate a statutory payment bond form, such mandated payment bond form shall be used but is to be accompanied by the AIA Document A312 Performance Bond. 2) Be issued by a surety company or companies licensed in the state in which the Project is located and holding valid certificates of authority under Sections 9304 to 9308, Title 31, of the United States code as acceptable sureties or reinsurance companies on federal bonds. The penal sum obligation assumed by each surety, shall not exceed the authorization shown in the current revision of Circular #570 as issued by the United States Treasury Department i.e. "Treasury List ". Xerox Building Reroof Project Supplementary Conditions Page 14 3) Be accompanied by a certified copy of the Power of Attorney stating the authority of the Attorney -in -fact executing the bonds on behalf of the Surety. 4) The Owner reserves the right to reject any insurance company, policy, endorsement, certificate of insurance, surety company, certificate of insurance, performance bond, or labor and material payment bond with or without cause. 5) The cost of such insurance and such bonds as required above shall be the obligation of the Contractor. 00700.04 BUILDERS RISK LOSSES: A. The Owner will reimburse the Contractor, including the interests of the Contractor and subcontractors, for their losses to the Project described herein caused by the perils of fire, lightning, windstorm, hail, civil commotion, smoke, aircraft, vehicle, explosion, riot, vandalism, and malicious mischief. Reimbursement adjustments will be made by the Owner in accordance with coverage and adjustment provisions of the Commercial Fire Insurance Policy, Extended Coverage Endorsement, and Malicious Mischief Endorsement standard to the State in which the Project is located. Loss adjustments will also be subject to the following - 1. Deductible Clause - The sum of Two Hundred Fifty dollars ($250) shall be deducted from the total sum of all loss or claim, or series of claims arising out of any one single accident or occurrence, or series thereof caused by any and all perils covered. This deductible amount is the responsibility of the Contractor or the subcontractor. 2. Contractor's Equipment Clause - Loss to the Contractor's equipment of every description used for construction and not becoming a final part of this construction project is the responsibility of the contractor or the subcontractor. 3. Loss Reporting Clause - All losses requiring reimbursement under this section shall be reported to the Owner's Area Physical Facilities Manager prior to the beginning of the repairs in order that details of Toss can be obtained and verified to facilitate a prompt loss adjustment. Xerox Building Reroof Project Supplementary Conditions Page 15 00700.05 HOLD HARMLESS AGREEMENT: A. Contractor shall indemnify and save Owner, Owner's representative, and their agents and employees and consultants harmless from and against any and all liability, demands, causes of action, or claims thereof, whether well founded or otherwise, including the cost of defending the same, for bodily injury to any persons whomsoever, or damage to property of any persons in the course of construction as a result of the negligence of Contractor, subcontractor, or materials supplier, their agents or employees. B. Contractor shall be liable to defend Owner in any lawsuit filed by any subcontractor or materialmen as a result of the project which is the subject matter of this Contract. C. In any and all claims against the Owner, Owner's representative, any of its agents, employees, consultants, or Subcontractors, or anyone directly or indirectly employed be any of them, the indemnification obligation of this article shall not be limited in the amount or type of damages, compensation or benefits payable by or for the Contractor or any Subcontractor under R.C.W. Title 51, Industrial Insurance disability benefit, or other employee benefit acts. This provision will be mutually negotiated by the parties and will be included in the Contract. 00700.06 EXTRAS & CHANGE ORDERS: A. The Owner may, without invalidating this agreement, order extra work or make changes by altering, adding to, or deducting from the Work, the price herein being adjusted accordingly. However, any changes from the terms of the Contract or Specifications required by the Owner shall not be valid unless the changes ordered are in writing with the price specified and signed by both Owner and Contractor. 00700.07 DELAYS & EXTENSION OF TIME: A. All time limits stated in the Contract Documents are of the essence of the Contract. B. If Contractor is delayed at any time in the progress of the work by any act or neglect of Owner, or by changes ordered in the work, or by strikes, lockouts, unusual delay in transportation, unavoidable casualties or acts of nature beyond Contractor's control, then the time of completion shall be extended for such reasonable time as may be agreed upon by Owner and Contractor. Such agreement shall be in writing and signed by Owner and Contractor. Xerox Building Reroof Project Supplementary Conditions Page 16 00700.08 CONTRACTOR RESPONSIBILITY: A. Contractor is fully responsible for the Project and all materials and work connected therewith until the Owner has accepted the completed Project in writing. The Contractor shall replace or repair at his own expense any materials or work damaged or stolen, regardless of whether he has received payment for the work or materials from the Owner. 00700.09 RESPONSIBILITY FOR ACTS & OMISSIONS: A. Contractor agrees that he is fully responsible to Owner for acts and /or omissions of his subcontractors and their materialmen and of persons either directly or indirectly employed by them. 00700.10 ASSIGNMENT OF CONTRACT: A. The parties hereto agree that this Contract is not assignable without prior written consent of the other party, and it is further agreed that the covenants and promises contained herein shall be binding upon not only the parties hereto, but their respective successors, administrators, executors, and assigns. 00700.11 PROGRESS PAYMENTS: A. If construction time exceeds 45 days, on proper certification by Project Manager, based on Contractor's monthly application for payment, Owner shall, within fifteen days after receipt of said certification, pay to Contractor a sum equal to 90% of the amount requested, Tess previous payment thereon. Xerox Building Reroof .Project Supplementary Conditions DIVISION ONE: GENERAL REQUIREMENTS SECTION 01000 GENERAL REQUIREMENTS 01000.01 GENERAL Page 17 A. General Requirements, Division One, and other contractual documents apply to each Division of the Specifications. B. Sales, use, payroll, unemployment, old age pension, and surtax applicable to this Project shall be paid by Contractor. C. Provide shop drawings as requested and /or required. D. Common Reference Standards: ASTM - American Society for Testing and Materials NRCA - National Roofing Contractors Association SMACNA - Sheet Metal and Air Conditioning Contractors National Association 01500 CONSTRUCTION FACILITIES & TEMPORARY CONTROLS A. Unless arranged differently, the Contractor shall furnish and maintain, at his expense and in accordance with all local codes and ordinances, temporary water, toilet facilities, and electrical power. B. The Contractor shall provide proper storage facilities for storing and protecting materials on the site as well as scaffolding, ladders, ramps, hoists, etc, all to comply with Labor Law, safety regulations, and applicable State and local codes. 01540 SECURITY A. The Contractor shall protect all adjacent private and public property including sidewalks, streets, underground and overhead utilities, etc. and make any repairs thereto at his expense. Xerox Building Reroofing Project General Requirements Page 18 B. The Contractor shall provide necessary precautions to protect all persons on the site, including members of the general public, from injury or harm including posting of warning signs, erection of barricades, guard rails, lights, and any other protection necessary to meet job conditions, WISHA, and OSHA requirements. C. The Contractor shall provide protection to building, materials, landscaping, etc, from any form of damage. All openings in the building shall be provided with temporary waterproof enclosures as soon as the walls and roof are exposed. Work in process shall be covered each night. Observe cold weather precautions, and stop work and notify the Owner and Roofing Consultant when necessary. 01600 MATERIAL & EQUIPMENT (Refer to Instructions To Bidders, Sect 001.05) A. When several materials are specified by name for one use, the Contractor may select for use any one of those so specified. The mixing of several products specified by name for one use is prohibited. B. Where an item or class of material is specified exclusively by trade name or by the name of the maker or by catalog reference, only such item shall be used. C. Where the word "approved by ", "satisfactory to ", "as directed by ", "submitted to ", "inspected by ", or similar phrases are used in this specification, they shall be understood to mean that the material or item referred to shall be approved by, satisfactory to, or inspected by the Consultant. 01700 CONTRACT CLOSEOUT A. The Project shall be thoroughly cleaned and in first class condition when turned over to the Owner. B. The Contractor shall meet with the Owner's representative and consultant for a final inspection prior to accepting the work. Any defects noted shall be promptly corrected. The Owner may withhold final payment until such corrections are made and accepted. Xerox Building Reroofing Project General Requirements Page 16 Page 19 01740 WARRANTIES & BONDS A. Provide written agreement stating the contractor agrees that at any time during two years from date of completion and acceptance of the work covered by the Contract described herein, any part of the materials or workmanship furnished by the Contractor shall prove to be defective, the Contractor will, upon receipt of written notice from the Owner to that effect, replace or repair defective work to the satisfaction of the Owner. Provide a ten year manufacturer's guarantee for workmanship and materials to replace or repair defective workmanship or materials to the satisfaction of the Owner. Provide a Metal placard to be installed at the direction of the owner stating: Roofing manufacturer's name, address and phone number, date of installation, date guarantee expires, roofing contractor's name, address and phone number, system specification and description of materials and additional manufacturers, if necessary. Xerox Building Reroofing Project General Requirements; or Page 20 DIVISION 7: THERMAL AND MOISTURE PROTECTION SECTION 07100 DEMOLITION PART ONE GENERAL 07100.01 DESCRIPTION A. Removal of the existing roofing membrane, base flashings, insulation, if any, scuppers, pitch pockets, and all other items deleterious to the new roofing membrane. For treatment of sight screen, See Alternate No. 1. B. Allow no debris to accumulate in or on building, on grounds, streets, or walks. Remove debris from site as demolition work progresses. Legally dispose of debris at Contractor's expense. C. Provide for public protection as required by law. Keep streets and walks clean and free from obstruction. Furnish, install, and maintain for the duration of work all required scaffolds, chutes, tarpaulins, barricades, canopies, warning signs, platforms, and any other temporary construction necessary for proper completion of the work in compliance with all pertinent safety and other regulations. D. Present roof membrane assembly does not appear to contain asbestos. In the event asbestos is identified, conform to WISHA and PSAPCA regulations. PART TWO: PRODUCTS Not used PART THREE: EXECUTION A. Carefully remove membrane, base flashings and cant strips, perimeter edge metal, sight screen, pitch pockets and lead flashings. Replace any damaged substrate as directed. All adjacent or other work in the building or on site damaged by the Contractor shall be repaired or replaced at Contractor's expense. Legally dispose of materials daily. Xerox Building Reroofing Project General Requirements Page.18 c Page 21 07200 INSULATION PART ONE GENERAL A. It is the intent of these specifications to add 3/4" perlite insulation over the existing plywood decking only. No other insulation will be installed. If required by the City of Tukwila, an Addendum to the bidding documents or a Change Order will be the vehicle for the additional insulation. 07200.01 DESCRIPTION A. Provide Class A Fire Rated assembly. Over prepared existing roof substrate, install the roof membrane specified, including a SBS modified base sheet (vapor barrier), 3/4 inch perlite board, a second modified SBS base sheet, modified SBS ply sheet and surfaced with a SBS modified granulated cap sheet. B. The installation of this section is included in Built -up Roofing specifications. Related work is specified elsewhere. The following items of work are covered in other sections of these specifications: Demolition Built -up Roofing Metal Flashing and Trim 07200.02 SUBMITTALS A. Product data, Insulation System: Submit the name of the manufacturer and specification numbers and product names of all materials proposed for use in the work. Include in submittal installation instructions and general recommendations for each principal product required. Include data substantiating that the materials comply with requirements, including certificates and delivery logs for bulk materials. Also include Material Safety Data Sheets for products where applicable. B. Manufacturers: Provide primary products, including each type of Insulation, as specified from one manufacturer. Provide secondary products which are acceptable to, and approved by, the manufacturer of the primary products. Xerox Building Reroofing Project Thermal & Moisture Protection Page 22 07200.03 PRODUCT DELIVERY, STORAGE, AND HANDLING A. Delivery: Material shall be delivered in the manufacturer's original sealed and labeled containers and in quantities sufficient to allow continuity of application. B. Storage: Obtain permission of owner for roof top storage. If roof top storage of materials is used, do not exceed the allowable load for the structure. Materials shall be stored out of direct exposure to the elements. Goods shall be stored on end, on a clean, flat surface. Material shall be protected against moisture so as not to allow moisture to penetrate the cover or condensation to occur beneath the cover. C. Handling: Material shall be handled in such a manner as to preclude damage and contamination with moisture or foreign matter. PART 2 PRODUCTS 07200.04 MATERIALS A. Roof insulation: FS HH -I -529, Type 1: Grade 2 noncombustible expanded perlite board with following characteristics: 1. Board Size: 2 foot X 4 foot (4 X 8 bds. not accept.) 2. Board Thickness: 3/4 inches per board 3. Thermal Conductivity K factor of 0.36 @ 75 degrees 4. Board Edges Square 5. Manufacturer's Celotex Corp., Wood Fiber Industries B. Cant strips: Provide 3 inch cant strips at mechanical equipment curbs per manufacturer's requirements. C. Storage: Insulation shall not be left exposed to weather, and no more insulation shall be installed than can be covered with new roofing in the same day. Xerox Building Reroofing Project Thermal & Moisture Protection Page 23 PART 3 EXECUTION 07200.05 GENERAL: A. Application shall be in accordance with material and roofing system manufacturer's instructions and the following requirements. Application of roofing shall immediately follow application of insulation as a continuous operation. B. Ensure that surface is clean and dry and secured in place. C. Do not use wet or damaged high density boards. Apply no more material than can be covered with membrane in same day. D. Non - porous, asphalt coated, fiberglass base sheet of 24 pounds per square minimum weight, Siplast Parabase Plus. Secure insulation to vapor barrier in accordance with manufacturer's instructions. E. Stagger perlite board joints by 1/2 sheet, leaving no gaps greater than 1/8 inch. F. Provide protection for high density boards from unexpected inclement weather and at the end of each day's work in accordance with membrane manufacturer's recommendations. Taper perlite board at drains to provide a 36 inch sump. Xerox Building Reroofing Project Thermal & Moisture Protection Page 24 07500 MEMBRANE ROOFING PART 1 GENERAL 07501.01 DESCRIPTION A. BASE BID: Furnish and install a Built -up Roofing (BUR) roofing system, flashings, sealants, and accessories as required for a complete roofing system in strict accordance with the Specifications and Drawings. Remove and replace 1" X 4" cedar screening only - framing to remain. Roof assembly to have a minimum UL Class A fire rating. B. ALTERNATE BID: Install metal fabric over existing woodwork attached to wood framework on sight screen. See Section 07600.02:G for metal requirements and specifics for metal screening. C. Related work specified elsewhere. The products of the following items of work are covered in other sections of these specifications, and installed as part of this section: Roofing Insulation Metal Flashing and Trim 7501.02 SUBMITTALS A. Product data, Roofing System: Submit the name of the manufacturer and specification numbers and product names of all materials proposed for use in the work AT TIME OF BID. Include in submittal installation instructions and general recommendations for each principal roofing system product required. Include data substantiating that the materials comply with requirements, including certificates and delivery logs for bulk materials. Provide Material Safety Data Sheets for all applicable items, prior to start of work. B. The owner will require emergency phone numbers of personnel capable of responding to a roof related emergency after normal working hours. Answering service phone numbers are not acceptable for this purpose. C. Manufacturers: Provide primary products, including each type of membrane and flashings, as specified from one manufacturer. Provide secondary products which are acceptable to, and approved by, the manufacturer of the primary products. Xerox Building Reroofing Project Thermal & Moisture Protection Page 22. Page 25 7501.03 QUALITY ASSURANCE A. Single Installer Responsibility: A single installer (roofer) shall perform the work, including sheet metal work and carpentry, as required by this specification; and shall be a firm specializing in roofing system work, capable of showing successful installations similar to the work required for this project. B. Owner: Notify owner and roofing consultant 36 hours prior to commencement of work. The owner may provide special inspection of the roofing application. Such inspection will not relieve the contractor of responsibility for proper completion of the work. C. Pre - roofing conference: Prior to the installation of the roofing system, meet at the project site with the roofing contractor, the owner, roofing consultant, and other entities interested in the performance of the roofing system. Review the requirements (contract documents), submittals, proposed installation schedule, location and storage of materials, requirements for inspections and testing or certifications, forecast weather conditions, governing regulations, insurance requirements, proposed installation procedures, and any other items that may be required for completion of the project. If meeting ends with substantial disagreement between parties, determine how disagreement will be resolved, and set date for reconvened meeting. 7501.04 PRODUCT DELIVERY, STORAGE, AND HANDLING A. Delivery: Material shall be delivered in the manufacturer's original sealed and labeled containers and in quantities sufficient to allow continuity of application. All materials shall be delivered with appropriate identification indicating storage conditions, lot numbers, usage instructions and handling precautions. B. Storage: Obtain permission of owner for roof top storage. If roof top storage of materials is used, do not exceed the allowable Toad for the structure. Materials shall be stored out of direct exposure to the elements in their unopened packaging or containers. Xerox Building Reroofing Project Thermal & Moisture Protection Page 23 Page 26 C. Handling: Material shall be handled in such a manner as to preclude damage and contamination with moisture or foreign matter. 7501.05 PROJECT CONDITIONS A. Roof deck shall be clean and dry before any roofing work proceeds. Roofing shall not proceed during precipitation, nor when moisture from dew is present, or if precipitation or other moisture source is expected. B. Do not expose materials vulnerable to water or sun damage in quantities greater than can be weatherproofed during same day. At the end of each workday and when weather threatens, provide water cut -offs, that are proven effective in providing a weathertight seal and in preventing moisture penetration. Remove at the beginning of subsequent roofing work. C. Protection against staining and mechanical damage shall be provided for adjacent surfaces as required during application of roofing. PART 2 PRODUCTS 7502.01 MATERIALS A. Subject to compliance with the requirements, provide Siplast 20 /30FR membrane system. B. Only one manufacturer shall be used for all membrane components. C. Roofing Membrane: Glass- reinforced, G -2 base -ply having a minimum weight of 24 pounds per square. Fasten with 1" square head nails at standard 9" & 12" pattern. Install 3/4" perlite board to above base sheet set in full moppings of hot asphalt. Install a second fiberglass base to perlite, Siplast ParaBase set in full mopping of hot asphalt. Install a SBS modified, asphalt elastomer sheet having a minimum weight of 58 pounds per square, Siplast Paradiene 20. Xerox Building Reroofing Project Thermal & Moisture Protection Page 24 Page 27 Glass- reinforced, SBS modified, asphalt elastomer sheet with ceramic granular surfacing having a minimum weight of 90 pounds per square, Siplast 30FR, color to be selected by owner from manufacturer's standard colors. Membrane Flashing: Asphalt elastomer glass reinforced sheet of 90 pounds per square minimum weight, Siplast Veral. Glass reinforced asphalt sheet, Siplast Irex 30. E. Other Component Materials - All materials specified for use with Siplast Roofing System to be supplied and installed per manufacturer's instructions. Components include, but are not limited to, the following: 1. Adhesive /Mastic - for membrane to substrate, or membrane to other material adhesion. 2. Caulk - for sealing at edges of membrane, reglets, soil stacks, or other areas where sealants are to be used, Chem Caulk 900, Sika Flex 1A. 3. Cant strip - treated wood cants for use at perimeter walls, perlite cants at mechanical curbs. F. Roof protection pad material to be composed of chopped or ground rubber particles and synthetic binders. Type: Siplast Trafbloc. PART 3 EXECUTION 7503.01 INSPECTION A. A pre- construction conference including the owner, owner's representative, contractor, consultant, and roofing materials manufacturer's representative shall be conducted prior to the application of roofing material. B. Contractor shall verify that work penetrating the roof deck, or which may otherwise impact or affect the roofing, has been properly completed. Xerox Building Reroofing Project Thermal & Moisture Protection Page 25 Page 28 C. When roof deck is exposed, verify that roof deck surfaces are dry and free of water in any form. D. Verify deck is supported, secure, clean, smooth, free of depressions, or projections. E. Do not begin Work until unsatisfactory conditions are corrected. Beginning installation implies Installer accepts surfaces and substrates as satisfactory and ready to receive roofing materials. 7503.02 PREPARATION A. If conditions are discovered or created which would be detrimental to the proper application of the Work of this Section immediately notify Consultant in writing of these conditions and request a decision for their treatment. B. Remove all existing roof membrane from roof area. Surfaces shall be clean, dry and free of debris. C. Install new perlite board around drains. Taper board to provide sump. Ensure that replacement height matches new roof system profile. 7503.04 APPLICATION A. General: Application shall be in accordance with roofing system manufacturer's instructions and the following requirements. Should instructions conflict, use more stringent. Application of roofing shall immediately follow application of insulation as a continuous operation. B. Prime metal flanges, concrete and masonry surfaces with a uniform coating of asphalt primer. C. All flanges shall be set in a smooth, even, continuous coating of plastic cement. D. Kettles and tankers shall be equipped with accurate, fully readable thermometers. Asphalt shall not be heated to or above it's FP. Xerox Building Reroofing Project Thermal & Moisture Protection Page 26 Page 29 Avoid heating at or near the FBT; should conditions make this prohibition impracticable, and exception is granted by Consultant, heating above the FBT must not be done for more than 4 hours. Application temperature must not be more than 25 °F below the EVT nor more than 25 °F above the EVT. E. If EVT information is not provided, the following asphalt temperatures limits shall be observed: Maximum heating temperature shall be Type IV - 525°F. Minimum application temperature shall be 400 °F. F. Cutting or alteration of the bitumen will no be permitted. G. All moppings shall be a maximum of 25 pounds /square, and shall be total in coverage, leaving no breaks or voids. H. All layers of roofing shall be laid free of wrinkles, creases or fishmouths and shall be laid at right angles to the slope of the deck. Sheets shall be laid directly behind the asphalt applicator. Sufficient pressure shall be exerted on the roll during application to ensure prevention of air pockets. Ply sheet shall be fully bonded to the prepared substrate and shall have a minimum of three inch side and end laps. Cap sheet shall be fully bonded to the ply sheet surface and have minimum of 3 inch side and end laps. Laps in the seams of the ply sheet should not coincide with the laps in the cap sheet, (no stacked laps will be permitted.) End laps to be offset a minimum 3 feet. I. Flashings and Accessories: Apply flashing materials to seal membrane to vertical elements as in accordance with National Roofing Contractor's Association details and membrane manufacturer's recommendations. J. All flashing shall be mechanically fastened at the top and at all exposed edges. Appropriate counter flashing with approved fasteners to be installed as shown in manufacturer's detail drawings. K. Exhaust Units: Install new treated wood sleepers under exhaust units . Set on piece of walk pad sized to extend 1 inch beyond all edges. Xerox Building Reroofing Project Thermal & Moisture Protection Page 27 L. HVAC Units Skirt Flashings: Flash curbs per manufacturer's details. Remove existing sheet metal skirt flashings and replace with new to match existing profile. Replace existing coping metal at cant only with new 24 gauge, Kynar finished, coping metal specified. Add 2" X 4" plate to accommodate insulation height and new crickets. Extend exterior vertical leg 3 inches below nailer min. and past existing paint line. Fasten with continuous clip on outside face and gasketed cap screws at 2 feet on center on inside face: Fasten continuous clip with ring shank galvanized 8d nails spaced at 12 inches on center. Do not cut off the membrane which extends below nailer. Top fastening of coping metal is not permitted. At dish antenna, install Trafbloc under existing bracework. Obtain written permission BEFORE WORK IS STARTED. Xerox Building Reroofing Project Thermal &:• Moisture. Protection; Page 31 07600 FLASHING AND SHEET METAL PART 1 GENERAL 07600.01 DESCRIPTION A. Work includes replacement of all metal flashings at all cant edges and as otherwise required for a complete, weatherproof installation. B. Related work specified elsewhere. The products of the following items of work are covered in other sections of these specifications, and installed as part of this section: Demolition Insulation Membrane Roofing PART 2 MATERIALS 07600.02 PRODUCTS A. Copings and counterflashings: Copings, counterflashings: Prefinished galvanized sheet steel, 24 gauge unless otherwise noted. Use 20 gauge minimum for clips. Finish to be Kynar 500 (PVF), color as directed by owner, as selected from standard color chart, submit shop drawings. B. Fasteners: Nails shall be hot -dip galvanized steel. Bolts, and nuts, power driven fasteners, screws, washers, rivets, etc., shall be hot -dip galvanized or stainless steel. Screws shall be a high -dome, neoprene gasketed, hex head type, or incorporate a washer with a laminated neoprene gasket, color to match coping color. C. Provide 24 gauge Kynar finished skirt flashing with 1/2 inch hemmed drip edge, profile to match existing. D. Provide self adhering butyl tape and required manufacturer's primer for application at surface mounted counterflashings. E. Sealants as specified in sealant section. Xerox Building Reroofing Project Thermal & Moisture Protection Page 29 Page 32 F. Reglets Springlok type as manufactured by Fry Reglet Corporation. G. Sight Screen fabric to be 26 ga. Zincalume, SMP finished, Super Span, as manufactured by BHP Steel Building Products. Color to be selected by consultant from standard colors available. PART 3 EXECUTION 7600.03 FABRICATION /INSTALLATION A. Examine the substrate and the conditions under which the work is to be performed, and do not proceed until unsatisfactory conditions have been corrected. Surfaces to receive sheet metal are to be clean, even, smooth, dry, and free from defects and projections which might adversely affect the application. Verify slope prior to installation. Remove all mechanical units as required for access to curbs. Reinstall as required. Comply with SMACNA recommendations. B. Work shall be accurately formed to sizes, shapes, and dimensions indicated with all angles and lines in true alignment. All work shall be straight, sharp, and erected plumb and level in proper plane without bulges or waves. Conform to standards of SMACNA. C. Fabricate all items in maximum length and keep the number of joints to a minimum. No length shall be shorter than two (2) feet. D. Cooperate with other trades in installation of work. Deliver items to be installed by others in time to avoid delay of project. E. Make proper allowances for expansion and contraction of materials in all work. F. Fabricate coping with outside face of coping to extend 3 inches below bottom of nailer, and held in place with continuous clip. Inside face dimension to be 3 inches minimum. Hem edges. Fasten inside face with gasketed cap screws spaced at 2 feet on center. Top fastening not permitted. Xerox Building Reroofing Project Thermal & Moisture Protection Page 33 G. Install surface mount counterflashings backed with self adhering butyl tape and tooled sealant. Form with sealant Hp. H. Install sight screen over existing wood "fabric" using grommeted screws, with enough length to penetrate underlying framework. Install in vertical position. Xerox Building s Reroofing Project Thermal & Moisture Protection Page 34 7920 SEALANTS & CAULKING PART 1 GENERAL 7920.01 DESCRIPTION A. Work includes furnish and install sealants as specified below for types and usage indicated. Related work specified elsewhere. The products of the following items of work are covered in other sections of these specifications, and installed as part of this section Demolition Insulation Membrane Roofing C. Sealants provided shall meet Manufacturer's shelf -life requirements. Furnish certificate from Manufacturer indicating date of manufacture. E. Handle to prevent inclusion of foreign matter, damage by water, or breakage. F. Deliver and keep in original containers until ready to use. G. Do not use damaged or deteriorated material. H. Store in cool place, but never below 40 degrees F. PART 2 MATERIALS 7920.02 PRODUCTS A. Sheet Metal & Miscellaneous: Penetrations and joints in soffits and fascias, roof vents flues, flashings and counterflashings: Xerox Building Reroofing Project Thermal & Moisture Protection Page 32 Page 35 Chem Caulk 900, manufactured by Bostich, Vulkem 921, manufactured by Mameco, NP -1 manufactured by Sonneborn, Sikaflex 1 a, manufactured by Sika. B. Color to be selected by consultant. PART 3 EXECUTION 7920.03 PREPARATION A. Surfaces shall be clean, dry, and free of dust, oil, grease and dew or frost. B. Apply specified primer. 7903.04 APPLICATION A. Apply sealant with hand - caulking gun with nozzle of proper size to fit application. B. Do not apply sealant at temperatures below 40 degrees F. C. Caulk opening perimeters unless indicated otherwise. 7903.05 ADJUSTING. CLEANING A. Clean adjacent surfaces /materials which have become soiled immediately (before setting) as recommended by manufacturer, END OF SPECIFICATIONS Xerox Building Reroofing Project Thermal & Moisture Protection w 1. Contractor to verify all of any conditions prio notify constitutes acc: Existing conditions sh Contractor shall not s intended to indicate r 3. Details are included i specifications, NRCA the most stringent. 4. Contractor shall not coordinate location of 5. All roofing related de ritsN DETAIL LEGEND (Not all details shown for clarity. Number within the hex indicates detail number.) A. Typical soil stack. Furnish and install new lead with matching cap. B. Typical parapet edge detail. C. Typical drain detail. (Existing drains are sumped. Sump to remain.) D. Typical mechanical curb. E. Post bracket Type 1 F. Post Bracket Type 2. Date: 795 Drawn By: \ ROOF CONSULTING & MANAGE 719 19TH LANE WEST KIRKLAND,WASHINGTON 98033 00 (j GENERAL NOTES 1. Contractor to verify all dimensions and site conditions. Notify appropriate parties of any conditions prior to bid which could affect the indicated work. Failure to notify constitutes acceptance of the conditions and indicated scope of the work. Existing conditions shall not be the basis for contract increases. 2. Contractor shall not scale the drawings, as the drawings are general and are only intended to indicate relative location of the proposed work. 3. Details are included in the bid package. For conditions not detailed, refer to the specifications, NRCA and the manufacturer's installation guidelines, whichever is the most stringent. 4. Contractor shall not impede the Owners use of the property. Contractor shall coordinate location of contractor's equipment and vehicles with the Owner. 5. All roofing related debris shall be picked up DAILY and legally dispose of same. 6. Contractor shall maintain the operational status of all equipment, fans, vents, and HVAC units during the course of the work. Contractor shall be responsible for any damage to the premises as a result of the prosecution of the work. Contractor shall verify the status of all equipment prior to the startup of the work. Failure to establish the operational status of the HVAC units and equipment shall not relieve the con- tractor of responsibility for non operational HVAC equipment, or units. 7. Only the low - slope portion of the building is to be considered in this contract. Date: 7/9$ Drawn By: \".15 y Plate Number: 0 r� L ROOF CONSULTING & MANAGEMENT SYSTEMS 719 19TH LANE WEST KIRKLAND,WASHINGTON 98033 1•1 o �JG4L"t A.eol-636.1- F L.A.PAC E- T' -To 121w. Reimer" I-'' R u t (2 1 E17 ° ) ft S" MIk cnquM reoep Tcp o LE.447 FL-4-14 t T-1401 TD f_ CA Cep 1.-0‘ kte...4mr-4 Co L -r ed9p FL er-24 ii4C01 f' L e,' M eR��E. Ro o Date: 'yge) Drawn by: S`! Plate Number: ROOF CONSULTING Os MANAGEMENT SYSTEMS 71919TH LANE WEST KIRKLAND, WASHINGTON 98033 ga% $-rbsc.K Gir7Aft- �14.I11■0 er) ca M uir (E) 24 aft. K•.er,,"n - Co CT er P3G�R sass .`rrs�v De-C.)4. 147 ciatitt.iT Dr Date: -7/9e, Drawn by: `u Sc? Plate Number: 5 ROOF CONSULTING & MANAGEMENT SYSTEMS 719 19TH LANE WEST KIRKLAND, WASHINGTON 98033 h Y coo ,ia.t..1„--rcl'p or the-oe- FL,h6.43c.1- rftik dipor 10,-)ErL roiL-r F-L ab4o4 re..-Vot 4011.-r-st rao.606. I 6.11.4 Mr.14 iJ Ica. cu/2.I,1 A-la 041 f2,e4u1r47 T• 00-n4ot.L e" Ft-J.440-4CW I-4E.Ncl 0-r Aelet's4 0- PI t■-■ db` 44 EX) 'ROC> )9.107-1" ft..-16.1...)L-4.111eat.1 wrearet.,IFIC.XT low-% ,VAfelt. farra.24:7•Eg. Agra. W64 f›. o Dorm-A.4'T E. Date: 7/95 Drawn by: (9 Plate Number: ROOF CONSULTING & MANAGEMENT SYSTEMS 1,%1\s, • 719 19TH LANE WEST KIRKLAND, WASHINGTON 98033 (J4 Kt> c 'r'aoi-.1-r \(%tir.y Lw , i01 - Fe.e:..e,. 1b'ticrm dF M PoVri C IY7G V16W Date: 7704gb Drawn byNL1' Plate Number: �. ROOF CONSULTING & MANAGEMENT SYSTEMS 719 19TH LANE WEST 1 KIRKLAND, WASHINGTON 98033 Po 4b-r iRACKtir j r T .".wOANp 3* L�A..r� S t3"r G UALY VLSTIP4 'lM FLAI.- .. Date: 7/90 Drawn by: WS Plate Number: ROOF CONSULTING & MANAGEMENT SYSTEMS Q•p,RL 719 19TH LANE WEST rier.ac.eslatbr KIRKLAND, WASHINGTON 98033 RACkiirT } 1 # iT The above sillily has been issued the business registrations or licenses listed 1 DEPAR WENT OF LICENSING, BUSINESS A PROFESSIONS DIVISION, ��g,�t� f t P.O. BOX 9034 OLYMPIA, WA 90507.9034 (360) 894.1400 . erlmei f - iii, 0003705 AT . � _. ��� +. � ^l2YiSl�'�i• ��� .r.O�yiGy`(+[f!. _fIr .r•4feYiVPA'fi•_� Jc��eQAY!N2!•'ft•� �yr�_Yc1'AV•— A444'ft.•'_� Jr to �ri�N1N�Vliff� � �Y � �:5•AVR�M1'tif�� �^ L MASTER LICENSE SERVICE STATE OF WASHINGTON REGISTRATIONS AND LICENSES UNIFIED BUSINESS ID 1/: 600 124 445 BUSINESS ID 1i: 001 ORGANIZATION TYPE DOMESTIC PROFIT CORPORATION WRIGHT ROOFING, INC. 6035 S ADAMS TACOMA WA 98409 DOMESTIC PROFIT CORPORATION RENEWED BY AUTHORITY OF SECRETARY OF STATE REGISTERED TRADE NAMES: WRIGHT ROOFING, INC. EXPIRES :, 08 -30 -1999 I IOC 1112 nniHi)/ +7) rllir1OVE SIUF EDGI S FIRST. 1ICN, CREASE AND '1 EMI 1 FITS ST UD ALONG PEr1T'Or1ATION • DEPARTMENT OF LADOIR AND INDUSTRIES REGISTERED AS PROVIDED BY LAW AS CONST CONT GENERAL REGIST. # EXP. DATE CCO1 WRIGHRI174QZ 11/05/1998 EFFECTIVE DATE 11/09/1983 WRIGHT ROOFING INC 6035 S ADAMS TACOMA WA 98409 Crry QF TUKKWILA SEP 2 if 1998 PERMIT CENTER