Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit MI99-0057 - BAKER COMMODITIES - PRE-FABRICATED TANK
.:i: =1', I;3:'�:r.�ir _:'rte. ".:tti,`i +u t' sr•A�ar;N. ?:i3; ig 1lF"i7, MI99 -0057 5795 So. 130t'' Pl. Baker City of Tukwila L (206) 431-3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 MISCELLANEOUS PERMIT WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES, APPLICANT IS PROCEEDING AT THEIR OWN RISK. Parcel No: Address: `quite No: Location: Category: Type: Zoning: Coast Type: Gas /Elec.: Units: Setbacks: Water: Wetlands: 000140 -0005 5795 S 130 PL 5795 S. 130TH PL OTHR MISCPERM LDR CONCRETE Permit No: Status: Issued: Expires: MI99 -0057 ISSUED 05/12/1999 11/08/1999 Occupancy: UBC: 1997 000 Fire Protection: North: .0 South: .0. East: .0 West: .0 SEATTLE Sewer :. SEATTLE Slopes: Y Streams: Contractor License No: OCCUPANT BAKER COMMODITIES 5795'S 130 PL, TUKWILA, WA 98138 OWNER BAKER COMMODITIES INC 4020 BANDINI BL, LOS ANGELES CA 90023 CONTACT •RICK TOMKINS 4800 S 188 ST SUITE 360, SEATTLE WA 98188 Phone: 206 -243 -7387 Phone: 206- 243 -7387 Phone:: 206- 4'31 -7970 k****************•*********************• k*************• k**** *•A*****•k'******'k** *•k * *•k*** Permit Description: ERECT PRE= FABRICATED BLENDING. TANK ADJACENT TO EXISTING STORAGE TANKS. khA AAAAAAA*•*'*A* A***** �k* k******* A•** A�• kAk************'******* k ****. **** * ***• ****k***AAAAAA tid ua't- on: 3U,6,U 0U.UU •_�... i.v .,r�tll�r�.J 1._f. \1'11'I a. -•.WC'vGi -i t'IC t,Ci •{ C11t11 i.':J -.L.t. I . U Jtpat,.ix ca) .`-Gn -t /1ppt..` Lut'u 4-,•w stir.iL :ra. ,j...... r i r°e. -Loup myur•anv: iv Cr: 14 r iuuu °L:untrbr tone iv rt U.r.�.ng.......i4 ,tar's 7nte: Lana Altering: N Landscape 'Irrigation: N moving Oversized Load: N start lime: Sanitary Side Sewer: N No: Sewer' Main Extension: N Private: Storm Drainage: N Street Use: N Water Main Extension: N ' Private: Public: * kkA* k****•A*******A* k**k***• k******** A*****• k***** A*• kkA** AA * *•k * * * **kk•k **A** * **kA *'AAAA•A TOTAL DEVELOPMENT PERMIT FEES: $ 3,118.46 *A kA*****•*•*******• 1* A *A* * * * * * * * *• * *•kk ** **** * * *'*'k ** kA' k*** kk• k** ** ** * * *A *•AAk•k•k ** *•k * *•kk•k* •izeAiniT.; -. ruU • . cfl'd"' fi me. trio ' i ime Public: Permit Center Authorized Signature Date :12.244/04 / I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this development permit. Signatur•e:_C3Q,-✓l Date: %.Z{ - 97 Print Name: Bev C4 / ..LQ4., This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if .the work is suspended or abandoned for a period of 180 days from the last inspection. CITY OF TUKWILA Address: 5795 S 130 PL Permit No: MI99-0057 Suite: Tenant: • Status: ISSUED Type: MISCPERM Applied: 03/24/1999 Parcel #: 000140-0005 Issued: 05/12/1999 ****.k*******************4.*********4***.**********44******k*4*******A***A** Permit Conditions:. , 1. .Plumbing permits shall be obtained through the Seattle-King County Department of PublicHea,..1,tp—__plumbing will be inspected by that age,ncy';;;!Mriclpdilge:14xlas piping (29674722). „1...::-, .:.-,-,!.:::- ..,5.1';',"'"-- 2. Notify the City41.,6‘TilkwilkAlmildinlk Divisi6npttor to placing any c.ofWete,lAvok:s'fpoce04-,re isifpn,,a4-dAon to any requirements, speCiST1h4oectfon,, ,ade s*.IX.' 3. When specW,Anspect ion -is r:equAred 6i tier 's!,tile-bwn'er'i':k.'` arch i tect;Lor erig i ne,er sha1.:1 'not i fy the 1-01f.ioil a',,!eql,:ldii24;., Division-of_appotntment Oftile',inspectionagenCtespribto the fist 4 building inspectiOn..' ,rCopies of alls0eCia,1 inspeCtion, reports:shall beHsubmitted to the Build.Th9 DiviSAOn fil:,..a timely manner. Reports shall contain.addreSq projeCt n4nie, permit Anumber and type of inspect. ion $046 perfO'rmed'.'H,„ 4. The:.4.PeCial:',:inspector'shallubmit-e-,final signed repot.,,,, stating whether the-*Ork,requAring*sPe0-al, inspectiOn'Wa,s,, to'i.:the best of the_ipspectbrkrbvilre49.61-)n ccnicra06 wi..thapproVed, plansandsp'eoifTCations'and:.the applicabJe, wor kianship proviSiOnsaf•the UBC. - i 5. All)structurkl CoPorebe shall, bei.31.-,ecial inspected (-11BC'1.:: Sec. 306()1). 6. Aoithanges)will be made.tO th6,,pins.::-til4"....i:s.,approvti i?:.,,yjleat Engineer the Tukwila Build64,0cislon-.-.:', , .... , . 7. All',\perMisinspection records, ,,a4.0'';'approvedplans sha11 be4'i avafiableat:the job site prior:to:"Ast7f*IY.:11*.- ot stru60,on:' These documents aretof,belMaintained'and aelfii''.! able iinti l final inspection apPOoval,lisgranted. /.,-,!•,;' S. All meChanical,work"%shal1 be under separate ,Oermit,issuedbv . - the City of TWOJa. 9. All constdctidn'!'*o be done in conformance with>W0Prc"41eA' plans and\equireMents of the'lin'vfOrM BuildingCode/(k997 Edition) ai.::amended, UniforMMechaniCal Code (1997:Edltion), and Washingt6n,-,,.5tAte Energy:Code(191;,Edition):, 10. Validity of Perii1:t27.4Jhe is-suanfce,bf4i'perililtiapproval of plans, specificatib4st,',andcomputation,sibt.be con- strued to be 'a permit'f0.0i.'W4iskS4.41'.'4"fe any violation . of any of the provisions Of'tliebiliI:diWg code or of anY.— other ordinance of the jurisdiction. No permit presuming,to give authority to violate or cancel the provisions of this code shall be valid. . • • • • . • • , • , . • , • , CITY OF rut ►KWILA Permit Center. J 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 FOR STAFF USE ONLY Project Number Permit Number: Miscellaneous Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mall or facsimile. Project Name/Tenant: 'AKE1 COM,tobrrMS - pV N1b1/46. bIP4 City State /Zip: TU KWILA 9 t 13ly talue of Construction: PIP 250 - ,3erlvowv Tax Parcel Number: 000140- 0005-040 4,1 Site Address: 5, Sea So. 1'30114 FL. Property Owner: r KOL coi wOprneS� U.k . Phon i (1,01424S-710 Fax ft: CZtOz43- 3412 Street Address: City State /Zip: 4DW lMiIbirsi bt4b Los Afucetes CA loot, Contact Person: t i TovWi Js d1. PIKirc.g.li,J* L» he m% Irc. Phone: am ) 4 5 ( --7q 70 St eet Address: City State/Zip: 413ot, So. 1$8'r' ST. SeA TO 340 SEATTLE- 9 gl eir Fax # Va.) 4 3I -7 i'7* � Contractor: Phone: Street Address: City State /Zip: Fax #: Architect: Phone: Street Address: City State /Zip: Fax #: Engineer: S7RdCnIR,4t. Erv�icitl/ecomfG- Phone: (243) 9q/i 012 Street Address: City State /Zip: 3/(•ZO - Z3ZN• AYE So. Si rt 5Z1 FEA.W*f 9t Fax #: (Z433''//- 4931 MISCELLANEOUS PERMIT REVIEW AND APPROVAL REQUESTED: (TO BE FILLED OUT BYAPPL/CANT) ,:: Description of work to be done: ERIK rt r'iRe - ►btucit-reD IKEL11:401t TokOic AbsAc6JC 'To - XtSTInid, SToP446E re Will there be storage of flammable /combustible hazardous material in the building? ❑ yes XI no Attach list of materials and storage location on separate 8 1/2 X 11 paper indicating quantities & Material Safety Data Sheets Above Ground Tanks El Antennas /Satellite Dishes ❑ Bulkhead/Docks El Commercial Reroof Demolition El Fence ❑ Mechanical El Manufactured Housing - Replacement only El Parking Lots El Retaining Walls El Temporary Pedestrian Protection /Exit Systems ❑ Temporary Facilities El Tree Cutting APPLICANT :REQUEST.FOR MISCELLANEOUS PUBLIC WORKS,PERMITS. El Channelization /Striping ❑ Flood Control Zone ❑ Landscape Irrigation ❑ Storm Drainage El Water Meter /Exempt # Size(s): ❑ Water Meter /Permanent # Size(s): ❑ Water Meter Temp # Size(sL Est. quantity: gal Schedule: ❑ Miscellaneous Moving Oversized Load /Hauling El Curb cut /Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #: Size(s): El Land Altering: 0 Cut cubic yards 0 Fill cubic yards 0 sq. ft.grading /clearing ❑ Sanitary Side Sewer #: El Sewer Main Extension 0 Private 0 Public Cl Street Use ❑ Water Main Extension 0 Private 0 Public 0 Deduct 0 Water Only MONTHLY SERVICE BILLINGS .TO:..:' Name: Phone: Address: f) o •1J / a City /State /Zippef / p q,„/ 0 Wate r 0 Sewer 0 Metro 0 Standby WATER METER DEPOSIT /REFUND BILLING: Name: Phone: Address: & t. •. L••._ • City /State /Zip: , Vpkup1:0f•OprNfr Lion - In lloceseskaxalue.•1e rEonstruction amount should be entePed 1iistf tplivaht. C' reviewed'and is sbbject to possible reitislon by the Permit Center to colly with current fee schedules. Expiration b #,Prall Review - 711pbt;a1)o4(ol•arvhich no perhtilt is (stteied'withih 180 ddyAbIfatiTtrib''dat expire by limitation. The building official may extend the time for action by theap'pjical,,idWerioei upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current shall be extended more than once. /ILA •,i is II ing 180 days EtaLVppiicatlon Date application accepte :� Date a 4 alien expires: - A 1-4f Appllca n taken by: (initials) ALL MISCELLANEOUS P_ •MIT APPLICATIONS MUST BE Sl.: " ' TED WITH THE FOLLOWING: •. • 'S ➢ ALL DRAWINGS SHAIL BE AT A LEGIBLE SCALE AND NEATLY DRAWN ➢ BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED ➢ ARCHITECTURAL DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT ➢ STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED STRUCTURAL ENGINEER ➢ CIVIUSITE PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER (P.E.) • •' 't' • ' 1'w gli SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR PERMIT REVIEW Above GrouttcI flanks Water Tanks - Suppdi;tetaltrectly up9agria*1 ' > exceeding 5,000 gallons and a ratio of height to diameter or width whidr►.bXc`eedti : `.i'..1,11,. ,.Submit chdckI st 'Nd: °. M + "`. •- ., , i? '• =t; i "1'1.7? :'r;:•' ..!;°' :.: , `. ❑ Antennas /Satellite. Dishes .• . ',Submit checklist: No , M -14 ,,,b, ❑ Awnings /Canopies - No signage �.. - I,' .I.a'L• :r . -1.:1 i ;C.Wf ? :.11 ;1:1.4 Commercial Tenan t Improvement .{,4 `P6firjit d' jr.A !'i '• - .. 'Submit,checl�iist Nod M -10 ,.• l.. «x , .. ,4- `,'4,1'Z, . :s.2 .i tw Submit checklist- No M =6 ❑ Bulkhead/Dock ", L' :: • "-" ;.2 '' t •�.P fit; `rf. •t l a �i � .1'••. 0 Commercial.Reroof in Demolition Submit checklist: No M -3, M=3a ❑ Fences - Over 6 feet.in Height Submit checklist` No M -9' ❑ Land Altering/Grading/Preloads Submit checklist No: M -2 ❑ Loading Docks Commercial. Tenant Improvement Permit Sybmit.checklist No H -17. Submit L5eo ast! `. Nk.' 414q, '46`;- `Residential`onl N 6,; H -16 , , ,. Su?fmitIfi�bkll�C'"Nofil -§ , `:. ❑ Me4tiebica' Fesfd?ttial. &Commercial }Pti;%177,.; 010, s ;;•: :`,'a ;.:'•". (71 t n 1 Publ- 6.11orks :Peft ire " :•14.`x'' .'� % t ti. l+ ••tli Mi'sdll e�ti ❑ Manufactured Housing (RED INSIGNIA ONLY) Submit checklist ' No :: M -5 ' ;03.140oumg t3fv...r. 4711,Lci,,adlHaii dgi i . JA , k. t4i:. ; r.• i ., t, •t , 14091k 94e9100:- sf•:. f p4v1M 5 }.. - C....; ❑ Parking Lots ''. ,Submitchecklist . No: M -4 Residential Reroof - Exempt with following exception:: If roof structure: to be repaired or replaced . Residential. Building Permit Submit checklist: No: M -6 Retaining Walls -:Over 4 feet in height Submit checklist . No M -1; ❑ Temporary Facilities Submit checklist, No M -7 ❑ TemporarTPedestrian Protection/Exit Systems', Submit checklist No M -4 ❑ Tree Cutting . Submit checklist No M -2 . ❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent. If the applicant is other' than the:owner, registered architect/engineer, or, contractor licensed;. by the State of Washington, a notarized letter from the property: owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal: I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING :OW�NE'R:0R AUTHORI D. A NT: Signature: �� _ _ J1 ,E' Date: a .00,f ! Print name: 49/e1/4IP rootkt•oJ Plt/a3p�,. g5/'1174Fax # '�VVIC, Address4 hic toe. f✓64440.4„ v4. dcesmA0 At. City/StaS Arnir re/t, f+vo Sv. /I?n, -) ' .Y) M1SCPMT.DOC 7/11/96 i • ;•t uV 1..•i� CITY OF T' "'CWILA Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 M -9 Submittal Checklist Miscellaneous Permits FENCES OVER 6 FEET IN HEIGHT ✓ Site Plan Requirements Distance between structures and property lines ✓ Working Drawings Typical Fence Detail Location of tank(s) Existing and proposed improvements Reports, plans, studies and other documents necessary to comply with SAO Location of proposed and existing utilities Reports, plans, studies and other documents necessary to comply with SEPA PERMIT CENTER Location of slopes 20% or greater, wetlands and watercourses A separate permit shall be obtained from the Fire Department prior to the installation of flammable or combustible liquid storage tanks Existing and proposed landscaping High water mark of river if within 200 feet of site Existing and proposed topography in 2 foot intervals Parking and circulation plan Capacity of tank and physical dimensions Existing and proposed landscaping Distance between structures and property lines Height of fence Access to public right -of -way Location of fence High water mark of river if within 200 feet of site V Additional Requirements Reports, plans, studies and other documents necessary to comply with SAO ordinance Reports, plans, studies and other documents necessary to comply with SEPA ABOVE GROUND STORAGE TANKS Exception: "Tanks supported directly upon grade, if the capacity does not exceed 5000 gallons and the ratio of height to diameter or width does not exceed 2 to 1." ✓ Site Plan Requirements ✓ Working Drawings Location of tank(s) Foundation details Reports, plans, studies and other documents necessary to comply with SAO Location of proposed and existing utilities Reports, plans, studies and other documents necessary to comply with SEPA PERMIT CENTER A separate permit shall be obtained from the Fire Department prior to the installation of flammable or combustible liquid storage tanks Existing and proposed landscaping Existing and proposed topography in 2 foot intervals Capacity of tank and physical dimensions Distance between structures and property lines Access to public right -of -way High water mark of river if within 200 feet of site Location of slopes 20% or greater, wetlands and watercourses ✓ Additional Requirements Structural calculations for support structure, foundation and anchorage of tank(s) CITY OF TUKWILA Department of Ecology Permit MAR 2 4 l99q Reports, plans, studies and other documents necessary to comply with SAO Reports, plans, studies and other documents necessary to comply with SEPA PERMIT CENTER A separate permit shall be obtained from the Fire Department prior to the installation of flammable or combustible liquid storage tanks h:+ * **ftfi'A,t•:t,tsk: her •kal•k *A* *****.•** **Ahar**** .*;1hA*.3.•k:t: *** *:ksk** kh {**4 CITY. OF TUKWILA, )+4A 1RAr15M1:.1•. 7 7(' '— �" : k• k; krt: h •h *k:1h•h�erl•h:4k•k•k•h /ek Ah•••, ,4rk:k� *rlck;k �;•� •kk•k*A• Ak:1 *Aok•kkot•k•k•k•h:1 TRANSMIT' Number: 89800064 Amount; 3.118.46 05/12/99 12:02 Payment Method: CHECK Notatiton: BAKER COMMODITIE Init: .TLI3 Permit No: MI99-0057 Types 14I3CPI:R.34 MISCELLANEOUS• PERMIT . Parc'el Ncr: 000140-•0005 Site Addresz : 5795 5. 1 30 PL. Location: 5795 S. .:130TH PL. Total F ei;: :3018.46 TM i Payment 30 i 1£t.46 Total ALL.' Pmt: Rxl'anr.e: .00 t *il *:t *fi *AA * *A *:1f *AAiS * *:4 *ho4 *• *,1 * * * * * * *** * *1. * * * * * * *A **•A* * *ottls4 * * *•. Account Code 000 /322.100 000/345,,5330 000/386.904. Description BUIYDI:NG NONRE PLAN . CHECK •- : NONR ES STATE .I3UILOING. Sl1RCHARGE Amount 1,3 7.25 1.226.71. 4.50 • INSPECTION RECD Retain a copy with permit INSPECTION NO. CITY OF4T.UKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 Project: 7 /—>e/6,-, ( f})--v•,/,/.Yril• Type of Inspect'on: ...i — er- Date called: --, AdirsA: /7 Special instructions: e-4 (7-4-■ 0 00 • wanted: /.... / .S (2) p, m . Requester: (;, • pi A-er/A*) Phone' Approved per applicable codes. 0 Corrections required prior to approval. COMMENTS: Inspector: Date: k4—.341) 0 $411i0 REINSPECTIO E REQ !RED. Prior to inspection, fee must be paid at 6300 Southcenter BI d., Suite 100. Call to schedule reinspection. I Ri3rnint natp. INSPECTION NO. 1 t , )1■ 11 o. t" ■ (' (16 INSPECTION RECO 6 MI clq —005 Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 (206)431-3670 Projet (-tits/la/41We of Inspe tiort:AL A ress: 7?5- S 30 PI Date called: Special instructions: •.. Date wanted: a.m. P.m. Requekt9r: /341.-., ,,,,,vyy.7 Phone: Approved per applicable codes. Corrections required prior to approval. COMMENTS: )et Inspector: • El $47,I SPECTION ;4fREQUIRED, Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. I Rnrnint I nntp. I Date: T u INSPECTION NO. INSPECTION RECO Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 So th�e9Ae ��Ivd, #10,Tt kwila, WA 9818 PERMIT NO. 206)431 -3670 , of lnspec 'on: (/ ) t' Address: Date called: JJ Speci, I instructions: / ( ; o(*) Date wanted: "7 61 idlir .I p.m. Requeste . , 4'._.., • -- 1611M .... Phone: ....11 /'. -- L� CApproved per applicable codes, Corrections required prior to approval. n $47.00 REINSPECTI N FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. I Rnrnint Nnp .1 Date. 7. n r;ii it • / /1 ; • 1$ INSPECTION RECO Retain a copy with p INSPE TION NO. CITY OF TUKWILA BUILDING DIVISIO 6300 Southcenter Blvd, #100, Tukwila, WA981M,..(2043j.37 ‘. ProjeS )\\\C) • k Ty , Irispi S _,-.. 10,1.3...iroiralkiniiim Olin( it Address: Zig 8 B (30 9( Date ca led: Special instructions:: • - Date wanted: • • Requester: 'e (P( 2)en Phone: tti • ■•• P. Approved per applicable codes. Corrections required prior to approval. CO ENTS: Inspector: AP' d(A,...4111t.,■ V. I:: $47.00 REINSPECTION REQUIRED. Prior to inspection, fee must be aid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: FROM :BAKER /SEATTLE PHONE NO. 12062433412 Jul. 20 1999 08:49PM P1 AndersaPs-Peyton Structural Engineering Consultants d Dlrtetw tfACP Commtboia, h� 31620 .3rd M. s. buila 321, Wand Wiy, WA 9bO411 Pima MOO 041.9919 Ntt2tiUb1YM1IFJJV MemoPad #1 from !Celli Butler 4 Mims Ph Log o Coafr. O Info. Papa of Dbtrlrrteliow Date: '7/19199 Prujoon Riimding Ain Person; Dove Lau Company: City of Tukwila Subloct: Beading Din Foundation Time: Project No, x9033 Phone No. Fix No. 1.206.431 -366: ikon Viti. Pax 0 Mail 0 Baker Cowin. bouoirits Dave, 1 havo provided a stamped set of calculations for the chimps to the blinding bin ibundadon. Per the =equal of Baker Commodities Cne option has been given to use grade to steel in the 03u :titian with a reduced spicing of 03 ban 13. 7" o,c, Wylie. have ony tutor quettleas please call. Sincerely, Andorran — Peyton Strwcturol Enginarrlag Consultant Kelii Butler peilga Engineer Enclosures: Dennis sndCralculalions Post -It" brand tax transmittal memo 7671 Is of Panes ► Th j)gUe. J W5Ofl CO. Dept. 'is 93) -3665 7S\,/ V rim icjk ©lse % `° nets 00/0n0i�i��t Phon. MA. yg 2rr f ». A 93 -'11!2, VIk•• Mr° • fa '2.0rAts gXPAE3anacsi J1NPPROVED JUL 21 1999 1 -o tvU ► GU ,ji"pl CN DIVIni FROM : BAKER /SEATTLE �.. •f. •fly 1.4u.Y/ •4 44 PHONE NO. : 12062433412 OOOAnderson - .Peyton lost ❑O❑ Structural Engineering CnnsultARf! ocoADivision ACr'Conulunv,, PROJECT " &6ir I ►� Jul. 20 1999 09:50AM P2 .'P.4G• 4.' : 9°1331 •Sl-U ET _ OF C DESIGNED 6(L- D ATE - 1�•�'� CklECKED DATE 7 L Nr. . 2 CaN•F`4 1r,, (1:574-••• Z wII�IT: A .. 01' ;074 Al- :2°( 6 �� Ia ' ..rp.qt, A3 L Z�, = %b V i.. • -OA (� z G.S. s 4 • ,c•c Cie Uft 1i�' /'Z .4.. .0■tr..4 u1+r•.Pt �A�Ac �(•/,Nf. �t "irtV�f�[AMr1JY stir ANf:h�R f1a�T! +.1.� Z6 -(.` 'r '4 I (e`1VJi �'sorn4 al' e•.�.ea ; —:1 (�)8 "k'SS 4+Gb+IZiSi R. �;n t L •.a'• 1 1670% , (tan 4. 4/ 41) s 5t- Cane-me. [4 ?0:i7/'' 'i ft+�c 4 -�% - �ia9.s; 1fys 161- *P LL:L.4 WI Al, 4'0 )e 14' 1441 2. z.. Pt. /Nark'( 16 " CITY OR OV Ep APP S11L 21 1999 ,�•� Pc..' #r\ 11• A p E4' 0.8« 1)00 (1444) ? � � •_ �g '` P"-• ►n' - 15,44 c.7,44;15) S 5C, I:.•.te 1•/ 6o1ri ti • n,, rv0t�U (301LOING °NISI 31610 11rtl Avunuu Smith, !!olio I :I Fedarul Wuy, WA 9/11103 l258) 94I4V :9 FN:; f7$3) 941•0V19 Sauttlu / Qu \e %Itic (203) 39:•09417 • f"ROM : BAKER/SEATTLE JVL. jJ. j)JJ Lili V.1/ •T•'T 1/• PHONE NO. : 12062433412 MHL s 14.(, 141. . V,1 000Anderson - Peyton 000 Structural Cngtn.er(ng Cerrultants = A RIririt n of MT fnnrni nnti; lrr, PROJECT r ts•tflt+4 c. ;,,.., Jul. 20 1999 08 :50AM P3 rat.. =. .109 It 99J3= stie.er3 OF C DESIONBD r`P- CM! (n.17•�?� CHECKED DATE 5tA.0 '3P.se n,. Fc A I r'r L,t.o t 7r,, 7/5' ArC,�. 1;�1�r • nc. l - l l4 vca 113 • l l V.? 1 V- -- I'''ra Z "Ty) 1 "7, 7r• Ro" "t w/a,;l„ bolr( G .c1,�wr u�N z 5I4.r i�:— � =JL ",�'1.fGs;�l,,�a1 �ry�� ti 1$`• 3��. _ 1��: ���; - ' -,sa Aht is. 1 n Yr• ay ta. , 7774L :r i �o ,1 5 c lb ti � r M z w Z '` d .1 rti • " 4.4 W... r ', • 41• !:1!1! � it , ' --�1k JUL. 2 19 II�(u{{ILA) 314231 23r4 Avenue South, SUitc 331 Pc4arul Wily, WA 91101)3 (233) 941.9929 fix: I. 253) 941.9939 Sc;; : ;le I pi%cali V(2fl 292• ^.940 ROM : BAKER/SEATTLE ,_ 12062433412 Jul, 20 1999 09 :51AM P4 PHONE NO. . i TAnderson - Peyton Structure! Eeglnccring Cnnsultrtnt,t 0 A Div;4on fir/V.7 C'niwifr I , inc, PROJECT At.cNOledf �lJl !OE # x'33 SHEET Or 5+, DES romp CiL DATE Gr17_gg CHECKED _ DATE • • • I i•r,. Z•ryie A lc. Ow' Wel) ware, ra sr NmeLo pAsr rt 4.) "re pt A A, ANKH el% avoy 3(620 23rd Avtnuo South. Sulu, 1:1 Podarul W:iy, WA, 91100.1 (7.23) 941.910.266442$3) 04I401» Saatuc ISart,ic'e t206) 29249.10 3i555D VISI°M f=ROM : BAKER /SEATTLE • • .I .. , . • J .1 1111.1. 1 1 7 .I A I$I.i CIIK�• I. PHONE NO. : 12062433412 R 00Anderson - Peyton n❑ Strarturel Engineering Cau ultanls '" j© A Division of AC Cm149114n1.4• .6621) 2,14 Auow Fnm1• Aga./ 391 F/dnr41 W... W11 91903 (3S3191MAO 144,1 1111) 941.9939 S44I1L•/ L':Qi111G 1 21161 2 9 2.190P b41 65 Jul. 20 1999 08 :51AM 135 DATE -4, v„.k 1 9 J J.1 :43 NO. ea 1 2 J ATTENTION PROJECT: We Are Sending You: • VIA: O Prints In in StruetJral ^e;culvhions ax„ Shoats including Letter Of Transmittal ❑ Shp Dwgs: ❑ Disks Other C Pick Up C Mil C DGIlvery By Prin :ing: O REPROGRAPHICS HOUSE COPIES , DATE NO. DESCRiPTiON BILLING ommoomoNIMEMMOI .M Tnnse Are Transmitted A3 Chocked Salow: ❑ Ac requested ❑ Approved as submItt ei E7 I'er approval ❑ For review end comment n For your use C Approved ca noted 0 'Returned for correction 0 REMARKS: COPY TO: FAX TO: •••■• SIGNED: enc %IU.os ore not as noted, kmaV7 notify leg el �ITY O�ITRV� Q15. JUL 2 1 1999 c:.4,1 naSV.meat wrnc.•hr,:Yrra+URrtflvdvWi: t+vaCVxc1,0%,.t f.1s:n 1x' Ja• nra te. Mt tleetRildSW7 b5M9r ef, 11:' ti" ti tt' O',b'+Caf+'h'3sJileonri'. Anderson - Peyton Structural Engineering Consultants A Division of ACP Consultants, Inc. Sheet of' Date: 3/8/99 Design By: KJB Project: Location: Client: Structural Calculations For Foundation Only BLENDING BIN BAKER C(MM DITIES, INC. 4020 BANDINI DR. LOS ANGELES, CA 90023 Structural Anderson - Peyton Engineer: Structural Engineering Consultants 31620 23rd Ave S, Suite 321 Federal Way, WA 98003 Project Number: 99033 Jurisdiction: KING COUNTY Code: 1997 UBC Loads: II. Lateral Loades Seismic Zone RECEIVED t1AR 2 4 1999 PUBLIC MTq4 flD5i iYe/1-6A^ olr flg EEVEo MAR y Z u�l `� 199 pFriMlr °ENre, MCIAnderson - Peyton OM Structural Engineering Consultants OMA Division of ACP Consultants, Inc. PROJECT •re J011 # SHEET OF DESIGNED DATE CHECKED DATE - UNDT`t -- -A-ssurnp"is nc-1 ctci�s ' X14'" a I D A Gi 1";1 0.16);.\ 6‘.c.; I I v to S t 1 • n161: Bit.] (v-ne, ±1:: 'L'O \b DIS` ,rave 10 J ! •i Zs 5k 514 (to 28Sk OOOAnderson - Peyton = Structural Engineering Consultants OC3 O A Division of ACP Consultants, Inc. PROJECT JOB It DESIGNED CHECKED .�.� iVRtirt %ST�ti�:T +.:.R/Yiq;: f• 3 SFIEET OF DATE DATE • 1; b 71- koKI:1;6.'" O I 'i� Cry 1. jN I I +i-.41.-k O \E12 IA rJ i 1461 I I4Iq(2o) -0.(4) ..IIi I ' I I 4q; ('20) ; = 'c G I cal, c p4 •: co k ; 7 .I 7 • I � l ; vJ -Ilor"'1k OOOAnderson - Peyton rim Structural Engineering Consultants OOOA Division of ACP Consultants, Inc. PROJECT C 9� JOB# SKEET OF DESIGNED DATE CHECKED DATE Tome Ik(k rrota I .1 �x e girl b aa'ea- Its 194 > yI OOOAnderson - Peyton JJ J Structural Engineering Consultants 000 A Division ofACP Consultants, Inc. PROJECT mme:'.n..rr.^.r.n.rx`rt: st5,rtMtil.4.YYcitNY.TT!Np,Ah^ • • JOB it SHEET OF DESIGNED DATE CHECKED DATE i4.vY M ays►sn '1 M. W- 5472 75- F7 n. of : O r.br�n/m/c./ ok; • MCIAnderson - Peyton 000 Structural Engineering Consultants rimA Division of ACP Consultants, Inc. PROJECT C. �G/ JO 1I SHEET OF DESIGNED DATE CHECKED DATE 04ASS--* 1 eila 1 ell) x.24 2 24- 24- a ; 0 k becti toad -!- li tie lo'A , (AIO /SM /G) =x IMMO 8,01 - :3t fI 0ts (P.e,G /; 2 7 Ks-� -2 /, o ksF- OOOAnderson - Peyton 000 Structural Engineering Consultants 0011 A Division of ACP Consulumis, Inc. PROJECT ' tx" nv: R`+' rrrf: rtle4.. a- yT.+.:; ?/'.>ha'r� °`mt,�;p,5.^,� JOB # SHEET OF DESIGNED DATE CHECKED DATE OOOAnderson - Peyton ❑O❑ Structural Engineering Consultants OOA Division of ACI' Consultants, Inc. PROJECT NN'i,o4e�trohrn rxr. n.. N2' YY ,'Nt'lx�tY.`•.V�!}tK.K`.5Y`!9 8 JOB It SHEET OF DESIGNED DATE CHECKED DATE . .. 5 8 /0! G . 507 7Z)/Lir ; May 15, 2000 City of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director Ben Cameron Baker Commodities PO Box 58368 Seattle Wa 98138 RE: Request for Extension — Baker Commodities Blending Tank (MI99 -0057) 5795 S 130th Place Dear Mr. Cameron: This letter is in response to your written request for an extension to Permit No. MI99 -0057 for the installation of a blending tank. The City of Tukwila Building Division will be extending your permit through November 15, 2000. Please be advised that this will be the only extension granted for this project. If you should have any questions, please contact our office at (206) 433 -7165. Sincerely, ae4 44 ane Griffin Building Official DG /br File: Permit No, MI99 -0057 May 12, 2000 CITY OF TUKWILA 6300 Southcenter Boulevard, Suite #100 Tukwila, WA 98188 Attn: Mr. Bill Rambo Re: Final Inspection on Permit M199 -0057 Dear Sir: We would like to reschedule our final inspection for our meal blending system. In January, the City of Seattle informed us that our main transformer was leaking and they had to replace it. This work was completed on February 22, 2000. In the meantime, we stopped working on the meal system. We still have some electrical work the contractor has to finish. We would appreciate a three (3) week extension on our final inspection. Sincerely Ben Cameron Assistant Area Manager RAKiI!1� C`AMMAflT'FT i!iQ TN[� fnnillu nrd Aida il6rilmdda May 5, 2000 City of Tukwila Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director Rick Tomkins 4800 S 188 St Suite 360 Seattle Wa 98188 RE: Permit Status MI99 -0057 5795 S 130`h Place Dear Mr Tomkins: In reviewing our current permit files, it appears that your permit to erect a pre- fabricated blending tank, issued on May 12, 1999, has not received a final inspection as of the date of this letter by the City of Tukwila Building Division. Per the Uniform Building Code and /or Uniform Mechanical Code, every permit issued by the building official under the provision of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, if a final inspection is not called for within ten (10) business days from the date of this letter, the Permit Center will close your file and the work completed to date will be considered non - complying and not in conformance with the Uniform Building Code and /or Mechanical Code. Please contact the Permit Center at (206)433 -7165 if you wish to schedule a final inspection. Thank you for your cooperation in this matter. Sincerely, (2)-2-A GaJt- Bill Rambo Permit Technician Xc: Permit File No. MI99 -0057 Duane Griffin, Building Official April 2, 1999 City of Tukwila John W. Rants, Mayor Department of Community Development Steve Lancaster, Director Rick Tomkins Pacific Engineering Design, Inc 4800 S 188th Street, Suite 360 Seattle, WA 98188 RE: Letter of Incomplete Application #1 Development Permit Application Number M199-0057 Baker Commodities — Blending Bin 5795 S 130th Place Dear Mr. Tomkins: This letter is to inform you that your permit application received at the City of Tukwila Permit Center on March 24, 1999 is determined to be incomplete. Before your permit application can begin the plan review process the following items need to be addressed. Building Division: Ken Nelsen, Plans Examiner, at (206)431 -3677, if you have any questions regarding the following: 1. Provide a site plan showing locating the proposed tank, existing tanks and all structures. 2. Provide general plan details of footing and connection reflective of structural calculations. The City requires that four (4) complete sets of revised plans be resubmitted with the appropriate revision block. If your revision does not require revised plans but requires additional reports or other documentation, please submit four (4) copies of each document. In order to better expedite your resubmittal a `Revision Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at the Permit Center at (206)431 -3672. Sincerely, Brenda Holt Permit Coordinator encl File: Permit File No. M199-0057 liar 16 98 O8:20a C _. �rjf(JJ CONSULTANTS, INC. Toe Company: Anderson- Peyton Address: r• 425 1 74 / -9561 ( • 1 3256 NE 20Th Street, Suite 1.( Bellevue, WA 98005 (425) 747 -5618 FAX 747 -8561 IM Kelli Butler FILE COSY JN: 91306 Haiti Marc R. McGinnis Date: March 16, 1999 FAX: (253) 941 -9939 Phone: RE: Foundation Considerations for Proposed Blendiny Bin Seattle Rendering Facility 5795 South 130th Place Tukwila, Washington p.1 CI ry OF . ED MAR 2 4 1999 PERMIT CENTER I nis memo is in response to your request for foundation considerations for support of the proposed blending bin. From discussion with you, the bin will be tall and will have two compartments that will each have a capacity of approximately 114 tons. The bin will be supported on a total of nine legs. We understand that the bin unit will be located north of the existing rendering building, near existing silo storage. It is also our understanding that The owner would like to construct the bin's foundations on top of an existing on -grade concrete slab. Based on previous oorings conducted on the site by our firm and others, we anticipate that the subsurface conditions consist of loose to medium -dense sand and silty sand. These alluvial deposits are moderately compressible under new loads, and are susceptible to seismic liquefaction, It is our opinion that conventional foundations can be used to support the blending hin if snrnr noticeable differential settlement across the foundation is acceptable, We recommend that a mat foundation be utilized to create more uniform loading below the individual legs, and to span across areas of looser soils. This mat can be designed for a maximum allowable bearing pressure of 2,000 pounds per square foot. We anticipate that differential settlement across the mat will be on the order of one to 2 inches under static loads, Much larger settlement could result from liquefaction and soil consolidation ins \he event of a major earthquake. It is possible that the new foundation may cause some additional settlement of nearby structures, This should not present a structural concern, but the owner should be made aware of this risk. Also, the soils beneath the site are liquefiable. The use of the mat foundation will reduce the potential for catastrophic foundation failure in the event of seismic liquefaction during an earthquake. If the mat is constn:rtedi no top of the existing pavement, at least three holes should first be cored through the concrete so that we can verify that the soils immediately beneath are moderately compact. If the soils are loose, or are silts, it will be necessary place at least 2 feet of imported structural fill under the mat foundation, This fill could be placed above the slab, or the existing soil could be excavated to a depth of 2 feet before placing the imported fill. Please call with any :lurstinns qq•co WM1 :IA FY C tl (4; 1� x Cerrni . C.bpij PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: b1199-0057 DATE: 4 -9 -99 PROJECT NAME:. BAKER COMMODITIES — BLENDING BIN Original Plan Submittal Response to Correction: Letter # XX Response to Incomplete letter #1 Revision # After Permit Is Issued DEPARTMENTS: Bu�il(diJ(��)D'v'i(sio� Puijlic Wo ks�� wfa fi -Zg rev giFire Prevention PI&- Structurall PlannJjjng Division '%- Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues, Thurs). Complete Comments: Incomplete DUE DATE: 4 -13 -99 Not Applicable ❑ TUES /THURS ROUTING: Please Route No further Review Required Routed by Staff n (if routed by staff, make copy to master file and enter into Sierra) REVIEWERS INITIALS: DATE: APPROVALS OR CORRECTIONS: (ten days) Approved ❑ Approved with Conditions, REVIEWERS INITIALS: DUE DATE: 5 -11 -99 Not Approved (attach comments) ❑ DATE: CORRECTION DETERMINATION: Approved ❑ Approved with Conditions DUE DATE: Not Approved (attach comments) ❑ REVIEWERS INITIALS: DATE: \PR.ROUTE,DOC LIP ACTIVITY NUMBER: M199 -0057 PROJECT NAME: BAKER COMMODITIES- BLENDING BIN _XI_ Original Plan Submittal Response to Correction. Letter # DATE: 3 -24 -99 Response to. Incomplete. Letter Revision # After Permit Is Issued DEPARTMENTS: Biii g Division u%f c Works 1-4 Fire Prevention E. Structural t, J' PlanningLDivision w 4 -1-11 Permit Coordinator gir DETERMINATION OF COMPLETENESS: (Tues, Thurs) Complete n Comments: / AM.,/ Incomplete DUE DATE: 4 -1-49 Not Applicable n ,P4A 14 •,f 44Q. 2 TUES /THURS ROUTING: Please Route El No further Review Required Routed by Staff fl (if routed by staff, make copy to master file and enter into Sierra) REVIEWERS INITIALS: DATE: APPROVALS OR CORRECTIONS: (ten days) DUE DATE: 4-29-99 Approved ri Approved with Conditions Not Approved (attach comments) E REVIEWERS INITIALS: DATE: CORRECTION DETERMINATION: DUE DATE: Approved 0 Approved with Conditions El Not Approved (attach comments) U REVIEWERS INITIALS: DATE: \PR•ROUTE.DOC Date: 4 - 9 -q °I i �.a! <f!;a1q; tCd�aAa.rtti Net'nv. x. .af,.0/.41.: ntfv,1•1 /N.LRF';:4AV .?44T'ghr,'VY00!: i CITY OF TUKWILA Department of Community Development Permit Center 6300 Southcenter Blvd, #100, Tukwila, WA 98188 (206)431 -3670 Plan Check/Permit Number: Mi4 1 gl Response to Incomplete Letter ' k ❑ Response to Correction Letter ❑ Revision after Permit Issued Project Name: Nth& (omm.4i1ie k.i4inq •h Contact Person: 0 Project Address: ``1• 4 �� Phone Number: 1-7170 Summary of Revision: Q . t m.pl }' 1 F, P 2 p Lek ttk Sj-1 '_ c r r ,, -ILA"- -%1 RECEIVED CITY OF TUKWILA APR 0 9 1999 PERMIT CENTER Sheet Number(s) . k�\ (LA.-- `-4"" "Cloud" or highlight all areas of revisions and date revisions. Submitted to City of Tukwila Permit Center t ip �. v Iv .4% Entered in Sierra on '"_I -4C1") 05/11/99 09:49 BREWED UNITED DRUG 4 12062433412 r Department of Labor b Industries Contractor's Registration Section PO Sox 44450 Olympia WA 955Q4.4450 COPY' NO.730 003 BOND CONTINUATION CERTIFICATE For Washington State Contractors Registration Bond JOSEP){J LAhtAI DBA: JQD E CONCRETE C_ObtSTRUCTi N,as principal, and aTAB. . N.SURANC.ELOJV MANY, as Surety hereby notify the State of Washington, Department of Labor and Industries, as Obligee, that the above named Principal's bond number SAP07017Q in the amount of $, &00041, shall be continued In force effective lop t8. 1998 (provided, however that this continuation certificate shall be void If the principal does not file It with the Obligee by 711 8 /1 @98) until it is canceled by Surety, This continuation certificate converts the existing band form to a continuous until cancelled form as required by 1997 amendments to RCW Chapter 18.27, A new bond form has been promulgated by Obligee pursuant to the 1997 amendments, and some of the new language differs from the language in the existing bond form. To the extent that the language in the existing bond being continued may vary from new language promulgated by Obligee pursuant to the 1987 amendments, the new language will be controlling. • In witness of this contract, Principal and Surety have affixed their hands and seals this date Mev 4.1998. Principal's Name .: • • Surety's Name and Seal 1& iNSU ANCE COMPANY Attorneyin• act (sail) JODEE CONSTRIJ:TiON P0, Box 1570 Elma, WA 98541 F4 2641011400 WACCWYC% Iry Wiwi IN. 7.. 7 Irmo woo •14 Uwe wr iRECE1VED OF TUKW 1LA .f -Pu6 ©OW 1 2 .1999 PERMIT CENTER