Loading...
HomeMy WebLinkAboutPermit MI99-0166 - WELLS FARGO BANK - REROOF,:) i z 't7r i 5-M •:r. 4 }zt, u31. N !i. Vt rtS M199-0166 343 Andover Pk. E Wells Fargo Bank City of Tukwila (206) 431 -3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 MISCELLANEOUS PERMIT WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES. APPLICANT IS PROCEEDING AT THEIR OWN RISK. Parcel No: 022340 -0046 Address: 343 ANDOVER PK E Suite No: Location: Category: NSFR Type: MISCPERM Zoning: TUC Const Type: Gas /Elec.: Units: 000 Setbacks: North: Water: N/A Wetlands: Permit No: Status: Issued: Expires: MI99 -0166 ISSUED 09/09/1999 03/07/2000 Occupancy: BANK UBC: 1997 Fire Protection: .0 South: .0 East: .0 West: .0 Sewer: N/A Scopes: N Streams: Contractor License No: ASSOCRI16206 OCCUPANT WELLS FARGO BANK Phone: 343 ANDOVER PK E, TUKWILA, WA 98188 OWNER FIRST INTER BNK- TUKWILA CORP PROP /M SPANI, PO BOX 160 MS 526, SEATTLE WA CONTACT WILLIALM P. NEISINGER Phone: 206 364 -4445 PO BOX 82894, KENMORE, WA 98028 CONTRACTOR ASSOCIATED ROOFING INC PO BOX 82894, KENMORE, WA 98028 * * ***** *•k ****** **** **** **** ** k**** * **** * *** **•k *** ********* ** **•k k* * ************** **** Permit Description: TEAR OFF EXISTING ROOFING TO DECKING. INSTALL NEW BUILT UP ROOF SYSTEM. ************************• k**************************** * * * * * * * * * * * * * ** * * * * * * * * * * * * * * ** Construction Valuation: $ 36,885.00 PUBLIC WORKS PERMITS: *(Water Meter Permits Listed Separate) Eng. Appr: Curb Gut /Access /Sidewalk /CSS: N Fire Loop Hydrant: N No: Size(in): .00 Flood Control Zone: N Hauling: N Start Time: End Time: Land Altering: N Cut: Fill: Landscape Irrigation: N Moving Oversized Load: N Start Time: End Time: Sanitary Side Sewer: N No: Sewer Main Extension: N Private: Public: Storm Drainage: N Street Use: N Water Main Extension: N Private: Public: *• k***************************************************** * * * * * * * * * * * * * * * * * * * * * *•k * * * * * *: TOTAL DEVELOPMENT PERMIT FEES: $ 462.25 *• k**************************************************** * * * * * * * * * * * * ** ** * * * * * * * * ** * ** *' Permit Center Authorized Signature: C3Q.d JF— Date:q —q, I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this development ,permit. Date: qiCtiCi This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. (:) IV OF TUKWILA REPOOF CONDITIONS •ermIt• No: M199-0166 PiOlecf.: Name: WELLS FARGO BANK, • Addrs: 343 ANDOVER PK. E . Suit 6.: 4,,*****.:.4***44****44.011**41.44.1.4.44,A.*.**4*444..011,**“4.!*****11441,14***k4*k**4kA THE if:0U OWING CONDITIONS- WILL: APPLY TO RE ROOF PERM • Al 1 re-roof inn proleots wi 11. be acoomP 1 i000: in 'comp Hance with Appendtx' Chapter 15 of the tin 1 cu Building :Code UBC) , 2 . InsPect ions! A. New root coverings shall not be applied without first;. obta in i ng a pre-roof ing inspect ion from the . Gui 1 d ing i• Division and written approval" from the Building Inspeotor, The pre-roof in% inspection 5.1) zt 1 pay part icular -at tent ton to CV idence of accumulation of wat • Where extensiVe, ponding of water apparent.:: ana TV.sts Of the roof structure 'for comp' i nce wi th ',Sec tlon 1506 per, :ht 31 he made and correct lye measures'.. such as .re loc:ati on of roof dra,ins,:Or scuppers, r:e,slOptng ot the roOf or . structure 1 changes :i.Sha 3 I ac comp 3 i shed , An nsp pot co verl ng the :a fro ■,./ e". i sted toOOS prepared. by a qualjfied..speolaTinspec.tor„, (tee mnei by the BUilding Off 1 o a 1 nr;.iy be ::aCce.pited th 1 u o-t , the ore- inspeot ion by the .14,1 Iti.ing...:Inspectori..:-' B: f ina 1 inspection and approve 1' *hal 4 'Oe.:,61)tained from the f:ful 1 d 1 ng D 1 Vfs. ion when the re:-;roofin9- i:,s'oompjete.:*,As a COnd 1 t 1 Ofl of the .f ina 1 ,inSpecti an 1 Ooftha t requ 1 re :a T ire..retardant rOof cover i n9 underthe prO:fSionsTOr Table 115.;A,'-H195i4 LIBC, the roof instaTler shaiT4r'Ovi_dethe inspector with a written statement 'indicating -,:ie following k or saMetl:t ing I HAVE INSTALLED A ROOMEMPRANE ASSEMBLY, INCLUDING INSULA1ION. IF APPLICABLE . CONSISTING 0MANUFACTURER # _ DATA,. SHEET ENCLOSED, WHICH MEETS-OR-::EXCEEDSTHER8OUIREMENTS CLASS A OR CLASS B ROOFS, THIS .ROOF WAS INSTALLED AT (ADDRESS) ; UNDER CITY OF TUKWILA PERMIT NO. (The statement shall include the name of the roofing companyHthat installed the roof, signature of installer and date.) ( ciisi UF VUY.WSIA Address: 343 ANDOVER E i-,ermit No: M199,0166 Stf te: renanr: Status: ISSUED Yype: MISCRERN Applied: 09i0311999 Parcel #: 02-.'340-0046 is;sueti: 0910971999 1,11**4**.4944***M94 44*444k444 94**k41,4***9 *44****4 44.4*4449 94.9*-4 'i4 ***444'9 1(49'9*9 Permit Conditions: 1„ 1'4o changes will be made to the plans unless approved bv the Engineer and the Vukwila All permits. inspection,retOrdsand approved plans shall be vailable at the'1ob'sAte prior to the Start::of any. con- struccion. ThesedOcuments.:are ti)::.be maintained and avail- able until final'inspectiOnlabprOVal is granted. 3, E/ectrical permit.S.Shall be Obtained:throughthe Washington State Division ofLabbr and Industries andHail-;,electr4cal 'work will• be Anspetted by -that agency "(248-6630), 4. Tlumbing]PerMits shall be obtained through the Seattle4ing County •Department of Public'Health. Plumbing will be 1nspetted by that• agency, including all gas piping (29674722). 5, All mechanical work shall be:under separate permit issued by the of Vukwila. , 6. All tonStruction tobe done in conformance with approved , olans and requirements Of the UnifOrm Building Code (1997. Edition) as amended, Unifbrm MethanVcal Code (1997 Edition), and,.Washington:State Energy,CodeA1997. Edition). 7. Nalidity Pf Permit., l he 1 its.liahoe,.6f. 1 perpir or approYal'of.: plans,'spetificationS, and cOpoutations shall not be con-:.. strued to be a penmit for,. or an apprOval,of. any violation1H of 'any of the provistotis of the bun d ns4, rode or n any other ordinance of the jurisdiction, :No permit presu)ing,tO give:authority-to violate or oanceLthe oodeshaWbe valid. . . CITY OF TUKWILA Permit Cent-. 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 Miscellaneous Permit Application Application and plans must be complete In order to be accepted for plan review. Applications will not be accepted through the mall or facsimile. Pro ect Name/Tenarat: -. ■ LL LS A tze,C) ci1.tL. Value of Construe�pn . . 6, ��f�� • L Site Address: ity State/ ip �3 L/ 3 IBS Any R � r r� /i� �i1�1 Tax Parcel u er: r' `y`C� — O ° `�� PropertyOwne --� LL(� �- if) I v �_� witz- . Phone: �y /� / -39e- c ❑ Above Ground Tanks ❑ Antennas /Satellite Dishes • Bulkhead /Docks '/: ommercial Reroof Street Address:C`/ AL/W 57 PONS(45 mac`, f�rr -s City Stato /Zip: V1)90 2 / nue, .� w 6.eC(fv2_ c/3n; (1 \ III Sty° y Fax #: /:3/ i - 3ro - n y2z Contact Perron. \ LC,I Ac IA, P MEts 1 r c'1 n2Xc ) aA ` 4-44s Street Address: City State /Zip: Fax #: Contractor _ f\ � �. / /1 , L. �� l cc/ft-A.0, --771 c_ Phone: _ ,20(, -- Z6 y -(/(Y s Street Address: -� Cit State /Zi (`'L� . l��C. °c SCI �� z= ti' /'lu` . ��'�'I �j�P?Z�'' Fax #: �G�� - .�G�� -2 ?U�� Architect: '/ /`/ /) Phone: Street Address: City State /Zip: Fax #: Engineer: / ' Phone: Street Address: City State /Zip: Fax #: MISCELLANEOUS. PERMIT REVIEW AND APPROVAL REQUESTED: (TO BE FILLED OUT BY APPLICANT) Description of work to be,done: ,/ rt. /; -UFf /`-?il vs-7; ,v-6: /`i([` riAte.?, ) L�IL'c,C /6UF, . i4/57-r LL Nei() ,az, ;hi- l'1f0 eC�'G"% -_ 710-7 • Will there be storage of flammable /combustible hazardous material in the building? ❑ yes no Attach list of materials and storage location on separate 8 1/2 X 11 paper indicating . uantitios & Material Safety Data Sheets 1 ❑ Above Ground Tanks ❑ Antennas /Satellite Dishes • Bulkhead /Docks '/: ommercial Reroof Address: ❑ Demolition ❑ Fence in Mechanical • Manufactured Housing - Replacement only ❑ Parking Lots ❑ Retaining Walls ❑ Temporary Pedestrian Protection /Exit Systems ❑ Temporary Facilities ❑ Tree Cutting APPLICANTRECUEST FOR MISCELLANEOUS PUBLIC WORKS PERMITS.` ❑ Channelization /Striping ❑ Flood Control Zone ❑ Landscape Irrigation ❑ Storm Drainage ❑ Water Meter /Exempt # Size(s): ❑ Water Meter /Permanent # Size(s): ❑ Water Meter Temp # Size(s): Est. quantity: gal Schedule: ❑ Miscellaneous ❑ Moving Oversized Load/Hauling ❑ Curb cut/Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #: Size(s): ❑ Land Altering: 0 Cut cubic yards 0 Fill cubic yards 0 sq ft grading /clearing ❑ Sanitary Side Sewer #: ❑ Sewer Main Extension 0 Private 0 Public ❑ Street Use ❑ Water Main Extension 0 Private 0 Public 0 Deduct 0 Water Only MONTHLY SERVICE BILLINGS TO: Name: 1 Phone: Address: City /State /Zip: 0 Water 0 Sewer 0 Metro 0 Standby WATER METER DEPOSIT /REFUND BILLING: Name: Phone: Address: City /State /Zip: Value of Construction - In all cases, a value of construction amount should be entered by the applicant This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. Date„ 1cc`: to q I Dateicatlonixpirel A ati n taken b : (initials) �.. I ALL MISCELLANEOUS PER}: 1/441)°,, " ALL OR6 AWINGSMPI L BE AT A LEGIBLE SCALE AND NEATLY DRAWN ➢ BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED ➢ ARCHITECTURAL DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT ➢ STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED STRUCTURAL ENGINEER • CIVIL/SITE PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER (P.E.) PPLICATIONS MUST BE SUBMIT .WITH THE FOLLOWING: Copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as pad oI this submittal. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BU/L N Or EFf OR -A45* SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR PERMIT REVIEW Above Ground Tanks/Water Tanks - Supported directly upon grade exceeding 5,000 gallons and a ratio of height to diameter or width which exceeds 2:1 Submit checklist No: M -9 0 Antennas /Satellite Dishes Submit checklist No: M -1 0 Awnings /Canopies - No signage Commercial Tenant Improvement Permit q ' Bulkhead /Dock Submit checklist No: M -10 El Commercial Reroof Submit checklist No: M -6 0 Demolition Submit checklist No: M -3, M -3a 71 Fences - Over 6 feet in Height Submit checklist No: , M -9 71 Land Altering/Grading/Preloads Submit checklist No: M -2 0 Loading Docks Commercial Tenant Improvement Permit. Submit checklist No: H -17 0 Mechanical (Residential & Commercial) Submit checklist No. M -8, Residential only - H -6, H -16 ri Miscellaneous Public Works Permits Submit checklist No: H -9 El Manufactured Housing (RED INSIGNIA ONLY) Submit checklist No: M-5 in Moving Oversized Load/Hauling Submit checklist No: M -5 O Parking Lots Submit checklist No: M -4 0 Residential Reroof - Exempt with following exception: If roof structure to be repaired or replaced .Residential Building Permit Submit checklist No: M -6 0 Retaining Walls - Over 4 feet in height Submit checklist No:. M -1 0 Temporary Facilities Submit checklist No: M -7 0 Temporary Pedestrian Protection/Exit Systems Submit checklist No: M -4 0 Tree Cutting Submit checklist No: M -2 Copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as pad oI this submittal. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BU/L N Or EFf OR -A45* IZED AGENT: Signet `' V1,V► 'V� 1 l� \ANN Date' a q ' Print na t L UM 'p l�- °- \ ;ii���.7 �P: _G Fax Fax _3 Address City/ ale /Zip: _ ; *�*+ �a�*�*+�+°*�**++«*�"^^�*`' ^�a++*�+�+*+^++*++*a++°++t+*°*** _-*+� , [VAA�Ml "...'..'.''''� .'�.�-'' ' '�!Tf 8� [UKNlLA. NP ���*-'^,**»^+*++A*+*AaAit"r1%+ ***+ *****1l*AA*A*^*++^**4(**A^0***` HANSMI/ Num er: V9800|4& Amount: 462.2S 09/89/99 12:3 i~wvment Method, CHECK Notation: ASSOCJA?EU KOUFl lnit: 1L8'' . |`wrmit No: MI99'0166 Tvog: MISCPEKM MTSCEiLhNEOUS PEkMI` yarce| No: 022340-004o ` ..^ °vvre^=-' 343 '"^nu~, o, r (ota! 'Veefi: 462.21,3 � DC 463 ^ ;t5 Th�s Pavment 462.r/��� Tmte\ ALL Vmts: 462.2��'' �� ;:'iLcr 462~25 Ua|ance: ^nV`' +a^+h.«+4^^*++A+*,++*+a*~+++«a,t*.Ak****.Aa**x*a*+aA+A*+*«*++***«.'��' AncnKnk Code Deurriotioo Amuont.'� 0��/322.�Ob !WILDING — KES ^~''~~`-^- - I G SUDCHAKG� o0o/386.904 • �TATE OUILV N ' � O9/13/99 10 T7:54 0097 6801 cni7/ OF TUKJl[A INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3670 P je t:�' Aviii Type of Ins action: Air.: 7 / o DA/ e, , r(� Date call d: Val .. 7 Spe 1 I instructions: / q Alik. Date wanted: �ur 1' � a� m� / p.m. Requester: /,� • r Phone: r pproved per applicable codes. Corrections required priory) approval. COMMENTS: e1<— 'l:Svcz).. 7r 0 K. TO F/,t/- t_ :i iiiri iF.gjLrioe $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be pair at 6300 Southcenter Blvd., Suite 100. CaII to schedule reinspection. I Rn,1:0M. Mn. 1 rlafn• Associated Roofing, c. 3121 N.E. 133rd • Seattle, Washington P.O. Box 82894 Kenmore, Washington 98028 364 -4445 • 1 (800) 358-3119 ASSOCRII8208 SEPTEMBER 27, 1999 CITY OF TUKWILA OFFICE OF COMMUNITY DEVELOPMENT 6300 SOUTHCENTER BLVD TUKWILA, WA 98188 RE: WELLS FARGO BANK / BLDG PERMIT RECEIVED SEP 2 81999 EVEQPMENT Please be advised that Associated Roofing, Inc., has completed the roof installation on the Wells Fargo Bank in Tukwila. We have installed this roofing assembly with insulation in accordance with Johns Manville / Schuller specification # 5G1 C; data sheet enclosed, which meets or exceeds the requirements for a Class "A" or Class "B" roofs. This roof was installed at 343 Andover Park E. in Tukwila, under City of Tukwila permit number MI99 -0166. SIGNED: V\ WILLIAM P. NEISIN PRESIDENT WPN /jms ENC INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 • PERMIT NO. (206)431 -3670 P,roj � I �. --7 1Z�1 c- Cc . (�o bct r►K Type of. Inspection: �,..> r '�' rl�c �- A dre /` ( yam- Date called: «,\ _C( .C1C,i Special instructions: .., c�V-- car + ( )D(o) O� ` y 7jc.�.� Date wanted:_ C(I a.m. i -' U` I p.m. Requester: --, • \\ ( ?) 5 i /L /U9 Approved per applicable codes. n Corrections required prior to approval. COMMENTS: 4 /0 4 .. Rio 4' e7.. / .1,4.*", ,6_ Q ' G? t� 1-.1 CJ,il 'r4 c/ s-• 1t1 t to ,L e Ki9 e , .6c90 tc ,r../A--e4. / .., 4 nail --t j',7 4 . O /-6,7 A #I/ ,O t' _,.` ?- rr1( _ , / p://e., 1 '_1 lii.:rt ed4L/4,0 4,,Pn 6.4JC 4 ) l r.7g-'' -,Z, -Y,f ,"4--7 5 . 4) se,4 /? // C--t, "to, 41 4/4_ Ce /.hS 0°.le I% A - /9c7 0 - eeh , /"vv.„ C 74-7A, c..e_i , `/ / fri s, 4f // o 6. *R -67g, /--.1-7,-01.1 4 rile) 'ic' tr_ e ., )--k a 1'L- l-i� -4 a A-7/1,,, ., A4 . 0! mil, Inspector: Date: C $47.00 REINSPECTION F REQUIRED. Prior to inspection, fee must be.paid at 6300 Southcenter Blvd., Suite 100. CaII to schedule reinspection. n_ -_f�• w,... rte_._- rw AUGUST 19, 1999 Associated Roofing, Inc. 3121 N.E. 133rd • Seattle, Washington P.O. Box 82894 Kenmore, Washington 98028 384.4445 • 1 (800) 358-3119 ASSOCRIIS2011 MEMORANDUM ORIGINAL SENT VIA FACSIMILE T0: MR. DAVE SHARPE ALAN STEVENS ASSOCIATES FROM: BILL NEISINGER RE: WELLS FARGO BANK #92780 / TUKWILA, WA Michael Jenkins of the City of Tukwila Planning Department has advised me that mechanical screening for roof top units is not required if the unit sits further than 10' in from the edge of the roof and does not exceed 20' in height. Based upon this conversation, it appears as though the mechanical screening is not necessary. Please advise as to your decision. FILE COPY I tjnderstand that the Plan Check approvals are subject to errors and omissions and approval of plans daps not authorize the violation of an • ;.Iitupied code or ordinance. Receipt of con - tt ZWIllt''S c p of approved fans acknowledged. • 1 fly Oate MY 0E1'000 APPROVED 'SE 'SEP 9 1999 . iy,J ���i i Li) frfjqq1- 01410 RECEIVED AUS CITY c'' ,AUG J pERM11 ;;t lv'tEr 02/25/1995 11:05 206 - 774 -2858 E'NRG'Y 2 REGIONAL OFFICE PAGE 01 PRODUCT DESCRIPTION E'NRG'Y 2 is a rigid roof insulation hoard composed of a closed cell polyisocy'anutate foam cure lx►nded in the foaming process to fiber reinforced facers. E'NRG'Y 2 is designed for direct application to steel and other roof decks and is compatible with virtually all roof covering membranes. APPLICATIONS • FM Class 1, U1., Class A Constructions • Single -Ply Roof System!;: Adhered, Mechanically Attached, Ballasted • Modified Bitumen Roof Systems • Built-11p Roof Systems FEATURES 1 BENEFITS E'NRG'Y 2 Is a highly efficient thermal insulation with high R- \'!Clue and low installed cost. Code compliance and superior physical properties ,make E'NRG'Y 2 the ideal insulation for both new construction and reroofing. STANDARD SIIES F.'NRG'Y '2 is amilahle In standard 4' x H' (1220 mm x 2440 min) or 4' x 4' (122(1 min x 122(1 runt) hoards (other sires available h)• special request) and in thicknesses of 1.0" (2tS non) to 4.0" (102 min). INSTALLATION BUILTUP AND MODIFIED BITUMEN SYSTEMS Each board oI' E'NRG'Y 2 must be secured to the' roof deck with Factory Mutual approved fasteners and plate's ( appropriate to 111c' clerk IT'). Alternatively, maximum 4' x 4' (122(1 corn a 1220 tent) boards of E'NRG'Y 2 may be adhered to n prepared concrete (lock with a full mopping of hot steep asphalt. lints all edges and stagger joints of adja- r ent hoards. The rool'covc't'tng Is installed in ac'corcf ;tnc'e to the n'ranufacturer's specifications. FULLY ADHERED SINGLE.PLY SYSTEMS Each hoard of E'NRG'Y 2 must he secured to the roof deck with Fac•tur'y Mutual apprOVrd 'listeners and plates (appropriate to the deck typt'). Alternatively, tmtxi- mum 4' x 4' (1220 inns x 1221) mm) boards of E'NRG'Y 2 may be adhered to a prepared concrete deck with a lull mopping of' hot stccp asphalt. Ban all edges and stagger joints of adjacent boards. Install the rcx►f covering accord- ing to the manufacture'r's specifications. MECHANICALLY ATTACHED SINGLE.PLY SYSTEMS Each board of E'NRG'Y 2 most he secured to the root' deck with Factory Ntutuai approved lasteut'r:s and plates (appropriate to the deck type). Butt edges and stagger joints of adjacent hoards, Install the r•ooI'c'ove'ring according to the manufacturer's specifications, BALLASTED SINGLE.PLY SYSTEMS Each hoard of E'NRG'Y 2 is loosely Laid on the roof deck. Butt edges and stagger joints of adjacent boards, Install the root' covering according to 1Iie manufacturer's specifications. THERMAL VALUES* BARRIERS *Baud on PIMA lichrtical Bulletin (1101 ee AVM (: 518. RECEIVED CITY OF TILA p,U6 3 I. 1999 08/31/1999 15 :13 4256732393 ALLIED BLDG PRODS Ballasted ermal.insulation with Code compliance and E'NRG'Y 2 the ideal and reroofing: x 8' (1220 mm x 2440 n) boards °(other sizes, hicknesses of 1.U" • (25 MIN secured to. the. roof fasteners and plates ernatively, maximum of E'NRG'Y 2 may be ■ith a full mopping of tagger• joints of adj.a- ,lied in accordance to PAGE 01 H acts board of E'NRG'Y 2 mus± tie secured to the roof ..leek with Factory Mutual approved fasteners and plates (appropriate to the deck type). Butt edges and stagger joints of adjacent boards. Install the roof covering according to the manufacturer's specifications. BALLASTED SINGIE.PLY SYSTEMS Each board of E'NRG'Y 2 is loosely laid. on the roof deck. Butt edges and stagger joints of adjacent boards: Install the roof covering according to the manufacturer's specifications. THERMAL VALUES* *Based on PIMA Technical Bulletin #101 '`a' ASTM C 518. BARRIERS :nergy- Efficient Roofing and Building insulation CITY OF TUKWILA AUG 3 1 1 PERMIT CENTER Sealskin® A The Industry Standard Description Sealskin is a rigid mineral aggregate insulation board composed of expanded perlite, cellulose binders, and water- proofing agents. Its tough top surface (Sealskin) is treated to retain bitumen for a tight bond with the membrane. Avail- able in 24" x 48' and 48" x 48" boards. Uses • A thermal insulation and base for most membranes over any structural deck. • A layer to protect pure foam insula- tions from hot asphalts. • A protective layer over soft insulations susceptible to traffic damage. • When FM and /or UL approved systems are specified. Benefits • Tough, heavy Sealskin on top surface retains asphalt to tightly bond the membrane. • Most cost-effective thermal perfor- mance for moderate R- values. • Performance proven for more than 30 years. • Guaranteed as a substrate by most single ply and BUR membrane manufacturers. • Resistant to water penetration. Note: international Permalite, Inc. recommends the use of a layer of perllte over foam insulation to minimize the potential of BUR blistering. Standards & Compliance Sealskin is in compliance with: • ASTM Standard C728 (which supersedes Federal Specification 1111.1- 529b). • UL Class A constructions on both combustible and non - combustible roof decks.* • UL requirements of (TGXX) metal deck assemblies. • UL Construction Numbers I, 2, 9, 27, 156, 158, and Fire Resistance Rated Roof-Ceiling Designs (BXUV): P001, P004, P201, P202, P203, P204, P206, P2 10, P2 1, P224, P225, P230, P232, P233, P237, P238, P243, P404, P502, P508, P510, P701, P708, P710, P801, P803, P805, P810, P8I4, P815, P904, P909, P9 12, P915, 5701, 5702. • Listed in UL Building Materials Direc- tory under Mineral and Fiber Boards (CERZ), Fire hazard Classification of Mineral and Fiber Board (BQXR) and Built -Up Roof Covering Materials (TFJR). • FM Class 1, Impregnated Lumber Deck, Insulated Steel Deck (Windstorm Resis- tance Classification 1-60 and t•90), and Non- Combustible Deck Construction. • FM Class 1 in "Approval Guide Equip- ment, Materials, Services for Conser- vation of Property." • Plus , . , Southern Building Code Congress International, Inc. Report #3549, International Conference of Building Officials and Code Adminis- trators Report # 3549, Building Code Officials and Code Administrators Report # 83-86, City of Los Angeles under Report # RR- 23599, The Office of the California State Fire Marshall under Listing #4310-134:5, and Metro - Dade County, FL. Limitations Old roofing systems must be thoroughly dried and secured before product is applied as part of a new roof system. Sealskin is not acceptable for applica- tions where It will be directly exposed to continuous soaking temperatures of 250 °F. (See General Precautions.) • Where UL labels are required, customer must so order in advance. Thermal Values Thickness (nominal) Thermal Conductance ( "C" relrre) Thermal nalstance ( "R" value) weight (nominal) Ms. /sq. It. '17" .76 1.32 — '/4" .48 2.08 .68 1" .36 2.78 .90 11/4" .29 3.47 1.12 1'h" .24 4.17 1.35 2" .18 5.56 1.80 2'G" .15 6.67 2.25 '3" .12 8.33 2.70 *4" .09 11.11 3.60 'Thickness Is available onty by special order. Technical Data Physical Properties Nom. Tests Water Absorption (based on 1' thickness) % Vo1-2 hrs 1.5 ASTM C209 Flame Spread 25 ASTM E84 Fuel Contributed 30 ASTM E84 Smoke Developed 5 ASTM E84 Compressive Resistance Nominal 1' Board 5% consolidation -psi 35 ASTM C165 Weight, pounds per sqaure loot tor 1 inch nominal board thickness 0.9 ASTM C209 Maximum Flute Span Width of Flutes Min. Thickness* Up to 1' 3/4' Up to 15/e' 1' Up to 25/e' 1i/2" Thickness over flutes 1s as manufactured and not field laminated. Suggested Fastening Patterns -FM 1.60* x x x x x x x X x X x X x 3/4" 1' Isolile 3/4" Sealskin Sealskin IsoPerl Sealskin Sealskin X x 1" Suggested Fastening Patterns -FM 1.90* xx X 3/4" 4, X X X x X x X X X X X x x X x X x X X x x X x 1" Isolrte 3/4" Sealskin Sealskin IsePerl Sealskin Sealskin • Due 10 ongoing testing programs and changes In FM requirements, the number of fasteners required and their placement are subject to change without notice. Check current FM Guide for approved fastener density for Interns. Donal itermallte insulations and other brands. RECEIVED CITY OF TUKWILA Manville File Ply Mineral- Surfaced Fiber Glass Built -Up Roof Specification( GIC For use over Concrete or Other Non - Nailable Decks and Fesco' Board, Fes - Core, Fesco-Foam®, UltraGard Gold ®, UltraGard Premier'' or Approved Insulation with Inclines of 1/4" to 6" per foot For Regions 1, 2 & 3 U.L. Classifications Class A Max. Slope: 1 I /2" Deck: Non - Combust. Insulation: Fesco, Fes -Core, Fesco -Foam, UltraGard Gold,UltraGard Premier, none Option: '/2" Retro- Fit '' overlay Surfacing: GlasKap` Class 13 Max. Slope: 3" Deck: Non - Combust. Insulation: Fesco, Fes -Core, Fesco -Foam, UltraGard Gold, UltraGard Premier, none Option: 1/2" Retro -Fit overlay Surfacing: GlasKap Max. Slope: 1" Deck: Combust. & Non - Combust, Insulation: Fesco, Fes -Core, Fesco -Foam, UltraGard Gold, UltraGard Premier, none Option: 1/2" Retro -Fit overlay Surfacing: GlasKap rn c 0 Non•Nailable Deck or Approved Insulation Concrete primer (II Required) Asphalt Asphalt •• • GlasKap • • • Mineral Surfaced to . Cap Sheet End Laps Staggered . 3' Apart (Min.) • - .6'.En T dLap • r. General This specification is for use over any type of structural deck which is not nailable and which offers a suitable surface to receive the roof, Poured and pre -cast concrete decks require priming with Manville Concrete Primer. It is also for use over Fesco, Fes -Core, Fesco -Foam, Ultra - Gard Gold, UltraGard Premier or other approved insulations which are not nailable and which offer a suitable surface to receive the roof. Insulations should be installed in accordance with Manville Insulation Specifications 500, 501, 502, or 503. Refer to the Manville Industrial /Commercial Roofing Systems Manual, It can also be used over Manville Recover Specifica- tions RC -1, RC -2, RC -3 or RC -4. This specification is not to be used directly over gypsum, lightweight insulating concrete decks, either poured or pre -cast, or over fill made of light- weight insulating concrete. Design and installation of the deck and /or roof substrate must result in the roof draining freely to outlets numerous enough and so located as to remove water promptly and completely. Areas where water ponds for more than 24 hours are unacceptable and will not be guaranteed. Note: All general instructions contained in the current Manville Industrial /Commercial Roofing Systems Manual should be considered part of this specification. Fleshings Flashing details are available on separate specification sheets or can be found in the Built -Up Roofing Systems Products and Specifications Manual or the Manville Industrial /Commercial Roofing Systems Manual, Materials per 100 sq. ft. of Roof Area Concrete Primer: If required 1 gal. Felts: GlasPly" Premier or GlasPly IV GlasKap Mineral Surfaced Cap Sheet 4 plies 1 ply Bitumen: Incline per foot Up to 1" 1" to 3" 3" to 6" Asphalt Nominal Weight 170 °F, Type II, Flat 92 lbs. 190 °F, Type III, Steep 92 lbs. 220 °F, Type IV, Special Steep 92 lbs. Approximate installed weight: 200 - 254 lbs. Application Note: On roof decks with slopes up to 1" per foot the roofing felts in mineral surfaced specifications may be installed either perpendicular or parallel to the roof incline. Using GlasPly Premier or GlasPly IV, start with a piece 9" wide, then over that, one 18" wide, then over that, one 27" wide, then over all three, a full width piece. The following felts are to be applied full width, overlapping the preceding felts by 27 1/2" so that at least 4 plies of felt cover the substrate at all locations. Install each felt so that it is firmly and uniformly set, without voids, into the hot asphalt (within 25 °F of the EVT) applied just before the felt at a nominal rate of 23 lbs. per square over the entire surface. When installed over insula- tions, more or less than 23 lbs. per roofing bitumen may be needed due to the absQ,r "r 't`�aNlation. AUG 3 Specification 5GIC c Prior to application of GlasKap, cut the cap sheet into handleable lengths (12' - 18'), lay the material out on the roof and allow it to relax and flatten. To accommodate a full width sheet, apply a mopping of hot asphalt, approximately 20 °F above the EVT, at a nominal rate of 23 lbs. per square. (This higher temperature maximizes the bonding of the cap sheet to the ply felts.) Then flop the cap sheet into the hot asphalt. On subsequent courses, the cap sheet is positioned upside down, directly over the sheet in the preceding course such that the side lap area is exposed. Care should be taken to maintain 2" side laps and 6" end laps. Asphalt is applied in the same manner as before, however, it is also applied to the exposed side lap area of both the preceding and current cap sheet. The top cap sheet is then flopped into place. The cap sheet must be firmly and uniformly set, without voids, into the hot asphalt with all edges well sealed. At ambient temperatures below 70 °F, refer to the cold applications sections in the Manville Built -Up Roofing Systems Products and Specifications Manual or the Manville Industrial /Commercial Roofing Systems Manual. Asphalt should meet the requirements established in ASTM D 312. Never heat the asphalt above the Flash Point (FP). Heating above the Finished Blowing Temperature (FBT) should be strictly regulated and never allow for more than 4 hours to preclude asphalt degradation. If the Equiviscous Temperature (EVT) is not available, heating guidelines are as follows: Asphalt Type Heating Application 170 °F, Type II, Flat 450 °F 190 °F, Type III, Steep 500 °F 220 °F, Type IV, Special Steep 500 °F 325 - 400 °F 350 - 475 °F 375 - 475 °F Nailing Requirements: On decks with a slope over 1" per foot the roofing felts must be installed parallel to the incline and must be nailed. Nailing strips shall be attached to the deck, run perpendicular to the incline, be capable of retaining the nails securing the roofing felts, have the same thickness as the insulation, and be at least 3 1 /z" wide. Wood nailing strips shall be provided at the ridge and at the following approximate intermediate points: Incline Nailer Spacing (D) Type of Asphalt Up - '/z" 1/2" - 1" 1 "- 2" 2" - 3" 3" - 6" Not required Not required 20' face to face 10' face to face 4' face to face Type II' Type III Type III Type III Type IV Consult with the Manville District Technical Service Specialist regarding projects in hot climates as Type II asphalt may not be permitted in some areas. Locate a nail at each nailer, spaced 3/4" from the leading edge of the felt. Nails must have a 1" minimum diameter cap. Where capped nails are not used, fasteners must be driven through caps having a minimum diameter of 1". Termination of a continuous cap sheet MUST occur at a nailer. At points of termination, locate 5 nails at each nailer. The first nail is to be spaced 3/4" from the leading edge of the cap sheet, with the remaining 4 nails spaced approximately 8' /z" o.c. with the nails staggered across the width of the nailer to reduce the chance of the cap sheet tearing along the nail line. • Mineral Surfaced • , Cap Sheol , • • �zd Fells Insulation 6' Lap . .' I e' 2 • M n. Nailer Nail 2' Lap Surfacing No additional surfacing is required. RECEIVED CITY OF TUKWILA AUG 3 t 1,4. PERMIT CENT g 71 2:39dd dOOZI 031dIJOSSd:OI Wd9t :90 am 666t- S2 -EJfld • Yea 4 a 22. 34-fo - 2 : 2Sdd .d00R! 031UI00SSd:QI Wdb2:40 3f11 6662- bz -Sf1U rn t•N Ty 1 z�Z m O�p� 0111 r§ Tro w� 4 85101 II. MATERIALS TO BE USED ON TUKWILA WELLS FARGO BANK PROJECT TYPE III ASPHALT - ASTMD312 .75 " PERLITE INSULATION (R -2.08) 2.6" LAYER OF POLYISOCYANURATE (R -19.0) JOHNS MANSVILLE TYPE IV PLY SHEET JOHNS MANSVILLE GLASKAP CAP SHEET 02/25/1995 11:05 206 - 774 -2858 E'NRG'Y 2 REGIONAL OFFICE PAGE 02 CODES & COMPLIANCES Underwriters Laboratories, Inc. • Component of Class A roof systems: Built -Up, Ballasted, Mechanically Attached. Modified Bitumen, Single -Ply (UL 790) • Hourly Rated P -Series roof assemblies (UL 263) • Insulated metal deck assemblies (UL 1256) • E'NRG'Y 2 classified by ULC Factory Mutual Research • FM approved for Class 1.6() and 1 -90 assemblies with Built -Up, Adhered and Mechanically Attached Single -Ply roof coverings subject to the conditions of approval described in current Factory Mutual Approval Guide and Supplements (reports available on request). Federal Spedfcation • Meets physical property requirements of f1H•I -1972/ GEN and HH- I- 1972/2. • ASTM C 1289. California State !mutation Quality Standards and Title 25 Foam Flammability Criteria (License #TD 132e), Metro Dade Product Control 094. 0727.05. Model Building Codes • National Building Code (1996), Section 2603. Building Officials and Code Administration International, Inc. • Standard Building Code (1994), Section 2603. Southern Building Code Congress International, Inc. • Uniform Building Code (1994), Section 2602. International Conference of Building Officials. NRG insulation products must be protected from open flame and kept dry at all times. Install only as much insula- tion at can be covered the same day by completed roof covering material. NRG Barriers will ,tot be responsible for specific building and roof design by others, for defiaereiau in twiny-what, or workmanship, for dangerous condi- tions on the job site or for improper storage and handling Technical specifications as shown in this literature are intended to be used as general guidelines only. Consult NRG for detailed specifications. TYPICAL PHYSICAL PROPERTY DATA CHART Property Test Method Compressive ASTM 1) 1621 Strength Dirnensional As•rM 1) '2126 Stability Moisture Vapor ASIA, F, 96 Transmission Water Absorption ASTM C 209 Flame Spread A.STM E 84 (Foam Core) Service Temperature *Also mailable in 15 psi. E'NRG'Y 2 (SHORT FORM) SPECIFICATIONS Value 211 p%• (IaHkPu) :Mi., I Flax. 7tlilyf (length and width) (57.:1 nx /(Irtle t n)) < 1') udnn,e - 1181 "F to 250"F (-7.4"l: to 122 "l:j • Roof Insulation shall he E'NRG'Y 2, consisting of polyisocyanurate foam bonded in the Icrulting process to fiber reinforced facers as manufactured by NRG Barriers, and shall rnrrt Factnry Mutual (,lass 1 and Underwriters Laboratories (lass A approvals. • E'NRG'Y 2 shall be manufactured with the use of HCFC 141b as a blowing agent, • The E'NRG'Y 2 shall be inches thick with an R -Value of and a C -Value of • Boards shall be feet by rect. (Long Form Specifications available on request.) OTHER NIG PRODUCTS • BARRIER BOARD Be NR(: PLUS Wall Irasol;ttion • E'NRG'Y 2 PLUS Roof Insulation • TAPERED E'NRG'Y 2 Roof Insulation • TAPERED PRE -CUT CRICKETS & MITERS • E'NRG'Y 2 COMPOSITE & TAPERED E'NR(:'Y 2 COMPOSITE Roof Insulation • NAILBOARD Roof /Wall Insulation • ISO - VENT Roof Insulation Call NRG at 1-800-343-1285 for technical assistance, literature and samples. BARRIERS Corporate 8c Sales Offices NRG Barriers The E'NRG'Y House 27 Pearl Street Portland, Maine 04101 Tel. 800-343-1285 t Locations; Tel. in Maine 800 - 514-1968 CITY OF (Moine Product Services FAX 207 -76ti -1081 I laal n„, Pennsylvania AUG Irc�;tlndiana Jacksonville, Florida ® Printed on recycled eraner 7 /1Mi .,. -., ■uT ,fleattrItt'>ashinutnn DAVE SHARPE ALAN STEVENS ASSOCIATES 319-390-0419 8/24/99 WELLS FARGO.BANK • TUKWILA BRANCH #92780 343 ANDOVER PARK E. TUKWTLA 68 ! 1 / WPN-jms INSTALL 5 PLY SCHULLER SHILT-OP ROoY SYSTEM / SCHULLER SPEC#5Gic II A 1. Tear off existing bnilt-np 1(10fing and insulation down io ivetal roof deck. 2 Clean off metal deck. TF NECESSARY: Surface rust shall be wire brushed prior ro cleaning. Over the prepared surfaces, apply coat of rust-inhibitive primer. Replace deteriorated metal decking. 3. Clean out existing drains and prepare them for new memhrane installation. Replace all missing or damaged drain COVeXS and bolts. 4. Install bottom layer of Manville UltraGuard 2.6" R-19.0 insulation using screws and plates with minimum spacing one every 4 square feet. Ensure that fasteners do not penetrate conduit or miscellaneous pipes located on the underside of the decking, Broken OC damaged insulation shall be cut out and 'replaced with minimum 12" sqnare piece and fastened into place. 5. Tnstall the top layer of 3/4" R-2.08 insulation in solid mopping of Type TIT asphalt at a minimum rate of 301b: par 100 square feet. All joints are to be staggered and tightly hutted. Joints in the second layer of insulation to he offset a minimum of 6" from insulation joints in the bottom layer. While asphalt is still hot, "walk-in" each hoard to enswre propet adhesion. If board can be lifted or moved by hand, they are not sufficiently attached. Damaged or broken corners shall be Cut out and replaced with minimum 12" square piece secured in hot asphalt. Haximum.hoard size is to he 4' x 4'. NOTES: A. Upon completion of the installation in each area, visnally inspect and verify that all components are complete and properly installed. B. Before ply application is starred, remove tAasho debris, grease, oil, water, moisture, and contaminates which may affect bond of hjtumen to substrate. 6. Tnstall 5 ply Schuller mine,a1 surfaced .:ophalt. built-lip roof system per menufactnrer's specification # 5GT.C. Materials requirements are as follows: TYPE VT PTY SHEET FOUR PLIES GLASKAP rAP SHEET ONE PLY 7. Tnstall two plies of Type VT ply shear dud modified bitumen membrane flashings at cal perimeters and curb projections as detailed on attached sketch. 8. Install new lead flashings with caps at soil vent stacks as detailed ''11 attached sketch. 9. Coat mastic corners of flashings with an aluminum coating on attached sberch. 10. Tnstall new sheet metal flashings'and'oounterflashings as detailed pct attached sketch. 1.1 Install new curh.and support raps as detaJled on attached sketch, 12. Clean up and remnve all debris from contracted work. . CITY RECEIVED OF TUKWILA AUG 3 1 ISSW PERMIT CENTER City of Tukwila John W. Rants, Mayor Department of Community Development Steve Lancaster, Director September 7, 1999 William Neisinger PO Box 82894 Kenmore, WA 98028 Dear Mr. Neisinger: RE: CORRECTION LETTER #1 Development Permit Application Number MI99 -0166 Wells Fargo Bank 343 Andover Pk E This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Division. At this time, the Fire Department, Planning Division and Public Works Department have no comments regarding your application for permit. The City requires that two (2) complete sets of revised plans be resubmitted with the appropriate revision block. If your revision does not require revised plans but requires additional reports or other documentation, please submit two (2) copies of each document. In order to better expedite your resubmittal, a `revision sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206)431 -3672. Sincerely, Brenda Holt Permit Coordinator encl xc: File No. M199 -0166 „, 'Vkkgil/OE:- Oy. . `\) 0,V■(,) (.CA cl\P)ricl on\er Tukwila Building Division 6300 SouthCenter Blvd. Tukwila, WA 98188 206-431 -3670 BUILDING DIVISION REVEIW Date: 09/02/99 Project Name: Wells Fargo Bank re -roof Permit application Application #: MI99 -0166 Plan Reviewer: Ken Nelsen, Plans Examiner The submitted application documents identify the use of one layer 3/ inch R -2.08 insulation to replace the existing roof insulation. Washington State Energy Code Section 1132•.1 would require prescriptive insulation values of R -21 or R -30. The permit applicant must provide the required insulation R- values per W.S.E.C. or document how proposed insulation will comply otherwise. No further comments at this time. SEP -8 -1999 02:48P FROM:ASSOCIATED ROOF 2063682303 DAVE SHARPE ALAN STEVENS ASSOCIATES TO:4313665 P:3 119- 390 -0419 8/24/99 WELLS FARGO BANK TUKWILA BRANCH #92780 343 ANDOVER PARK E. TUKWILA 68 / 1 / WPN -jms INSTALL 5 PLY SCHULLER BDILT -UP ROOF SYSTEM / SCHIMLER SPEC #5G1C WA 1. Tear off existing built -up roofing and insulation down to metal roof deck. 2. Clean off metal deck. IF NECESSARY: Surface rust shall be wire brushed prior to cleaning. Over the prepared surfaces, apply coat of rust- inhibitive primer. Replace deteriorated meta]. decking. 3. Clean out existing drains and prepare them for new membrane installation. Replace all missing or damaged drain covers and bolts. 4. Install hottom layer of. Manville U1traGuard 2.6" R -19.0 insulation using acing one every 4 square feet. Ensure that fasteners do not penetrate conduit or miscellaneous pipes located on the underside of the decking. Broken or damaged insulation shall be cut out and replaced with minimum 12" square piece and fastened into place,. nstall the top layer of 3/4" R -2.08 insulation in solid mopping of Type 11 dbpnctl[.. at a mxnlmum rate or 301h5 per 100 square feet. A1]. joints are to be staggered and tightly hutted. Joints in the second layer of insulatio to be offset a minimum of 6" from insulation joints in the hottom layer. While asphalt is still hot, "walk -in" each board to ensure proper adhesion. If hoard can he lifted or moved by hand, they are not sufficiently attached Damaged or broken corners shall be cut out and replaced with minimum 12" square piece secured in hot asphalt. Maximum board size is to he 4' x 4'. NOTES, A. Upon completion of the installation in each area, visually inspect and verify that all components are complete and properly installed. B. Before ply application is started, remove trash, debris, grease, oil, water, moisture, and contaminates which may affect bond of bitumen to substrate. a 11 6. Install 5 ply Schuller mineral surfaced asphalt built -up roof system per manufacturer's specification # 5GIC. Materials requirements are as follows TYPE VI PLY SHEET FOUR PLIES GLASKAP CAP SHEET ONE PLY 7. Install two plies of Type VI ply sheet and modified bitumen membrane flashing at all perimeters and curb projections as detailed on attached sketch. 8. Install new lead fleshings with caps at soil vent stacks as detailed on attached sketch. 9. Coat mastic corners of fleshings with an aluminum coating on attached sketch. 10. Install new sheet metal flashings and counter.flashings as detailed on attached sketch. 11. Install new curb and support caps as detailed on attached sketch. 12. Clean up and remove all debris from contracted work. TA-cm * 4 4 1cye �Ga CC�o i d e u�-S 12- 2, ■ . o l r5.1:: "P, i'.:i'!'ftir, iri 9r: •m•"o..:�., PLAN REVIEVVIROUTIRFb SLIP ACTIVITY NUMBER M99 -0166 DATE 9 -1 -99 PROJECT NAME WELLS FARGO BANK (RE -ROOF) X Original Plan Submittal Response to Correction Letter# Response to Incomplete Letter# Revision # After Permit Is Issued DEPARTMENTS: B iINin . • I/ ivision Public Works Nn) Fire Prevention �� / Structural Planning Division Permit Coordinator • DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete n DUE DATE 9 -2 -99 Not Applicable TUES /THURS ROUTING: Please Route Structural Review Required No further Review Required n REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: (ten days) Approved 661/1/4, Approved with Conditions DUE DATE 9 -30 -99 Not Approved (attach c mments) I q`-I' hal i440,a_e_4 REVIEWER'S INITIALS: DATE: CORRECTION DETERMINATION: DUE DATE Approved n Approved with Conditions Not Approved (attach comments) n REVIEWER'S INITIALS: DATE: U'RROUTE.DOC Ono • vn saa sci »r ,.:• aatrm:,a'f111r acAIMastwsaft • 4111aaxm:vKIIFarcw _sa O.m3a s r DEPARTMENT OF LABOR AND INDUSTRIES REGISTERED AS PROVIDED BY LAW AS CONST CONT GENERAL REGIST. # EXP. DATE CCO1 ASSOCRI16206 05/01/2000 EFFECTIVE DATE 09/26/1984 ASSOCIATED ROOFING INC P 0 BOX 82894 KENMORE WA 98028 -0894 4 f1rT�/"�I I. -.Cr) 1 n"/ '` 71'rlror•n rr CERTI ABO IS AN ACTUAL COPY OF AN ORIGINAL DOCUMENT. r NED THIS. ' DAY OF JEAN M. STEPHENS .NOTARY PUBLIC IN AND FOR THE STATE OF WASHINGTON. RESIDING IN SHORELINE, WA. MY COMMISSION EXPIRES 4/15/03