MISCELLANEOUS PERMIT
WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES.
APPLICANT IS PROCEEDING AT THEIR OWN RISK.
Parcel No: 022340 -0046
Address: 343 ANDOVER PK E
Suite No:
Location:
Category: NSFR
Type: MISCPERM
Zoning: TUC
Const Type:
Gas /Elec.:
Units: 000
Setbacks: North:
Water: N/A
Wetlands:
Permit No:
Status:
Issued:
Expires:
MI99 -0166
ISSUED
09/09/1999
03/07/2000
Occupancy: BANK
UBC: 1997
Fire Protection:
.0 South: .0 East: .0 West: .0
Sewer: N/A
Scopes: N Streams:
Contractor License No: ASSOCRI16206
OCCUPANT WELLS FARGO BANK Phone:
343 ANDOVER PK E, TUKWILA, WA 98188
OWNER FIRST INTER BNK- TUKWILA
CORP PROP /M SPANI, PO BOX 160 MS 526, SEATTLE WA
CONTACT WILLIALM P. NEISINGER Phone: 206 364 -4445
PO BOX 82894, KENMORE, WA 98028
CONTRACTOR ASSOCIATED ROOFING INC
PO BOX 82894, KENMORE, WA 98028
* * ***** *•k ****** **** **** **** ** k**** * **** * *** **•k *** ********* ** **•k k* * ************** ****
Permit Description:
TEAR OFF EXISTING ROOFING TO DECKING. INSTALL NEW
BUILT UP ROOF SYSTEM.
************************• k**************************** * * * * * * * * * * * * * ** * * * * * * * * * * * * * * **
Construction Valuation: $ 36,885.00
PUBLIC WORKS PERMITS: *(Water Meter Permits Listed Separate) Eng. Appr:
Curb Gut /Access /Sidewalk /CSS: N
Fire Loop Hydrant: N No: Size(in): .00
Flood Control Zone: N
Hauling: N Start Time: End Time:
Land Altering: N Cut: Fill:
Landscape Irrigation: N
Moving Oversized Load: N Start Time: End Time:
Sanitary Side Sewer: N No:
Sewer Main Extension: N Private: Public:
Storm Drainage: N
Street Use: N
Water Main Extension: N Private: Public:
*• k***************************************************** * * * * * * * * * * * * * * * * * * * * * *•k * * * * * *:
TOTAL DEVELOPMENT PERMIT FEES: $ 462.25
*• k**************************************************** * * * * * * * * * * * * ** ** * * * * * * * * ** * ** *'
Permit Center Authorized Signature:
C3Q.d JF— Date:q —q,
I hereby certify that I have read and examined this permit and know the same
to be true and correct. All provisions of law and ordinances governing this
work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or
cancel the provision of any other state or local laws regulating construction
or the performance of work. I am authorized to sign for and obtain this
development ,permit.
Date: qiCtiCi
This permit shall become null and void if the work is not commenced within
180 days from the date of issuance, or if the work is suspended or abandoned
for a period of 180 days from the last inspection.
(:) IV OF TUKWILA
REPOOF CONDITIONS
•ermIt• No: M199-0166
PiOlecf.: Name: WELLS FARGO BANK,
• Addrs: 343 ANDOVER PK. E .
Suit 6.:
4,,*****.:.4***44****44.011**41.44.1.4.44,A.*.**4*444..011,**“4.!*****11441,14***k4*k**4kA
THE if:0U OWING CONDITIONS- WILL: APPLY TO RE ROOF PERM •
Al 1 re-roof inn proleots wi 11. be acoomP 1 i000: in 'comp Hance with
Appendtx' Chapter 15 of the tin 1 cu Building :Code UBC) ,
2 . InsPect ions!
A. New root coverings shall not be applied without first;.
obta in i ng a pre-roof ing inspect ion from the . Gui 1 d ing i•
Division and written approval" from the Building Inspeotor,
The pre-roof in% inspection 5.1) zt 1 pay part icular -at tent ton to
CV idence of accumulation of wat • Where extensiVe, ponding
of water apparent.:: ana TV.sts Of the roof structure 'for
comp' i nce wi th ',Sec tlon 1506 per, :ht 31 he made and
correct lye measures'.. such as .re loc:ati on of roof dra,ins,:Or
scuppers, r:e,slOptng ot the roOf or . structure 1 changes :i.Sha 3 I
ac comp 3 i shed , An nsp pot co verl ng the :a fro ■,./ e". i sted
toOOS prepared. by a qualjfied..speolaTinspec.tor„,
(tee mnei by the BUilding Off 1 o a 1 nr;.iy be ::aCce.pited th 1 u
o-t , the ore- inspeot ion by the .14,1 Iti.ing...:Inspectori..:-'
B: f ina 1 inspection and approve 1' *hal 4 'Oe.:,61)tained from the
f:ful 1 d 1 ng D 1 Vfs. ion when the re:-;roofin9- i:,s'oompjete.:*,As a
COnd 1 t 1 Ofl of the .f ina 1 ,inSpecti an 1 Ooftha t requ 1 re :a
T ire..retardant rOof cover i n9 underthe prO:fSionsTOr Table
115.;A,'-H195i4 LIBC, the roof instaTler shaiT4r'Ovi_dethe
inspector with a written statement 'indicating -,:ie following
k or saMetl:t ing
I HAVE INSTALLED A ROOMEMPRANE ASSEMBLY, INCLUDING INSULA1ION. IF
APPLICABLE . CONSISTING 0MANUFACTURER # _ DATA,.
SHEET ENCLOSED, WHICH MEETS-OR-::EXCEEDSTHER8OUIREMENTS CLASS A
OR CLASS B ROOFS, THIS .ROOF WAS INSTALLED AT (ADDRESS) ; UNDER CITY
OF TUKWILA PERMIT NO.
(The statement shall include the name of the roofing companyHthat
installed the roof, signature of installer and date.)
(
ciisi UF VUY.WSIA
Address: 343 ANDOVER E i-,ermit No: M199,0166
Stf te:
renanr: Status: ISSUED
Yype: MISCRERN Applied: 09i0311999
Parcel #: 02-.'340-0046 is;sueti: 0910971999
1,11**4**.4944***M94 44*444k444 94**k41,4***9 *44****4 44.4*4449 94.9*-4 'i4 ***444'9 1(49'9*9
Permit Conditions:
1„ 1'4o changes will be made to the plans unless approved bv the
Engineer and the Vukwila
All permits. inspection,retOrdsand approved plans shall be
vailable at the'1ob'sAte prior to the Start::of any. con-
struccion. ThesedOcuments.:are ti)::.be maintained and avail-
able until final'inspectiOnlabprOVal is granted.
3, E/ectrical permit.S.Shall be Obtained:throughthe Washington
State Division ofLabbr and Industries andHail-;,electr4cal
'work will• be Anspetted by -that agency "(248-6630),
4. Tlumbing]PerMits shall be obtained through the Seattle4ing
County •Department of Public'Health. Plumbing will be
1nspetted by that• agency, including all gas piping
(29674722).
5, All mechanical work shall be:under separate permit issued by
the of Vukwila. ,
6. All tonStruction tobe done in conformance with approved ,
olans and requirements Of the UnifOrm Building Code (1997.
Edition) as amended, Unifbrm MethanVcal Code (1997 Edition),
and,.Washington:State Energy,CodeA1997. Edition).
7. Nalidity Pf Permit., l he 1 its.liahoe,.6f. 1 perpir or approYal'of.:
plans,'spetificationS, and cOpoutations shall not be con-:..
strued to be a penmit for,. or an apprOval,of. any violation1H
of 'any of the provistotis of the bun d ns4, rode or n any
other ordinance of the jurisdiction, :No permit presu)ing,tO
give:authority-to violate or oanceLthe
oodeshaWbe valid.
. .
CITY OF TUKWILA
Permit Cent-.
6300 Southcenter Boulevard, Suite 100
Tukwila, WA 98188
(206) 431 -3670
Miscellaneous Permit Application
Application and plans must be complete In order to be accepted for plan review.
Applications will not be accepted through the mall or facsimile.
Pro ect Name/Tenarat: -.
■ LL LS A tze,C) ci1.tL.
Value of Construe�pn .
. 6, ��f�� • L
Site Address: ity State/ ip
�3 L/ 3 IBS Any R � r r� /i� �i1�1
Tax Parcel u er:
r' `y`C� — O ° `��
PropertyOwne --�
LL(� �- if) I v �_� witz- .
Phone: �y /�
/ -39e- c
❑ Above Ground Tanks ❑ Antennas /Satellite Dishes • Bulkhead /Docks '/: ommercial Reroof
Street Address:C`/ AL/W 57 PONS(45 mac`, f�rr -s City Stato /Zip:
V1)90 2 / nue, .� w 6.eC(fv2_ c/3n; (1 \ III Sty° y
Fax #:
/:3/ i - 3ro - n y2z
Contact Perron. \ LC,I Ac IA, P MEts 1 r c'1
n2Xc ) aA ` 4-44s
Street Address: City State /Zip:
Fax #:
Contractor _
f\ � �. / /1 , L. �� l cc/ft-A.0, --771 c_
Phone: _
,20(, -- Z6 y -(/(Y s
Street Address: -� Cit State /Zi
(`'L� . l��C. °c SCI �� z= ti' /'lu` . ��'�'I �j�P?Z�''
Fax #:
�G�� - .�G�� -2 ?U��
Architect: '/
/`/ /)
Phone:
Street Address: City State /Zip:
Fax #:
Engineer: / '
Phone:
Street Address: City State /Zip:
Fax #:
MISCELLANEOUS. PERMIT REVIEW AND APPROVAL REQUESTED: (TO BE FILLED OUT BY APPLICANT)
Description of work to be,done: ,/
rt. /; -UFf /`-?il vs-7; ,v-6: /`i([` riAte.?, ) L�IL'c,C /6UF, . i4/57-r LL Nei() ,az, ;hi- l'1f0 eC�'G"% -_ 710-7
•
Will there be storage of flammable /combustible hazardous material in the building? ❑ yes no
Attach list of materials and storage location on separate 8 1/2 X 11 paper indicating . uantitios & Material Safety Data Sheets
1
❑ Above Ground Tanks ❑ Antennas /Satellite Dishes • Bulkhead /Docks '/: ommercial Reroof
Address:
❑ Demolition ❑ Fence in Mechanical • Manufactured Housing - Replacement only
❑ Parking Lots ❑ Retaining Walls ❑ Temporary Pedestrian Protection /Exit Systems
❑ Temporary Facilities ❑ Tree Cutting
APPLICANTRECUEST FOR MISCELLANEOUS PUBLIC WORKS PERMITS.`
❑ Channelization /Striping
❑ Flood Control Zone
❑ Landscape Irrigation
❑ Storm Drainage
❑ Water Meter /Exempt # Size(s):
❑ Water Meter /Permanent # Size(s):
❑ Water Meter Temp # Size(s): Est. quantity: gal Schedule:
❑ Miscellaneous ❑ Moving Oversized Load/Hauling
❑ Curb cut/Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #: Size(s):
❑ Land Altering: 0 Cut cubic yards 0 Fill cubic yards 0 sq ft grading /clearing
❑ Sanitary Side Sewer #: ❑ Sewer Main Extension 0 Private 0 Public
❑ Street Use ❑ Water Main Extension 0 Private 0 Public
0 Deduct 0 Water Only
MONTHLY SERVICE BILLINGS TO:
Name:
1
Phone:
Address:
City /State /Zip:
0 Water
0 Sewer
0 Metro 0 Standby
WATER METER DEPOSIT /REFUND BILLING:
Name:
Phone:
Address:
City /State /Zip:
Value of Construction - In all cases, a value of construction amount should be entered by the applicant This figure will be
reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall
expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days
upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application
shall be extended more than once.
Date„ 1cc`: to q
I Dateicatlonixpirel A ati n taken b : (initials)
�.. I
ALL MISCELLANEOUS PER}:
1/441)°,, " ALL OR6 AWINGSMPI L BE AT A LEGIBLE SCALE AND NEATLY DRAWN
➢ BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED
➢ ARCHITECTURAL DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT
➢ STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON
LICENSED STRUCTURAL ENGINEER
• CIVIL/SITE PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER
(P.E.)
PPLICATIONS MUST BE SUBMIT .WITH THE FOLLOWING:
Copy of Washington State Department of Labor and Industries Valid Contractor's License. If
not available at the time of application, a copy of this license will be required before the
permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit
in Lieu of Contractor Registration ".
Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or contractor licensed
by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and
obtain the permit will be required as pad oI this submittal.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS
PERMIT.
BU/L N Or EFf OR -A45*
SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR PERMIT REVIEW
Above Ground Tanks/Water Tanks - Supported directly upon grade
exceeding 5,000 gallons and a ratio of height to diameter or width
which exceeds 2:1
Submit checklist No: M -9
0
Antennas /Satellite Dishes
Submit checklist No: M -1
0
Awnings /Canopies - No signage
Commercial Tenant Improvement
Permit
q '
Bulkhead /Dock
Submit checklist No: M -10
El
Commercial Reroof
Submit checklist No: M -6
0
Demolition
Submit checklist No: M -3, M -3a
71
Fences - Over 6 feet in Height
Submit checklist No: , M -9
71
Land Altering/Grading/Preloads
Submit checklist No: M -2
0
Loading Docks
Commercial Tenant Improvement
Permit. Submit checklist No: H -17
0
Mechanical (Residential & Commercial)
Submit checklist No. M -8,
Residential only - H -6, H -16
ri
Miscellaneous Public Works Permits
Submit checklist No: H -9
El
Manufactured Housing (RED INSIGNIA ONLY)
Submit checklist No: M-5
in
Moving Oversized Load/Hauling
Submit checklist No: M -5
O
Parking Lots
Submit checklist No: M -4
0
Residential Reroof - Exempt with following exception: If roof structure
to be repaired or replaced
.Residential Building Permit
Submit checklist No: M -6
0
Retaining Walls - Over 4 feet in height
Submit checklist No:. M -1
0
Temporary Facilities
Submit checklist No: M -7
0
Temporary Pedestrian Protection/Exit Systems
Submit checklist No: M -4
0
Tree Cutting
Submit checklist No: M -2
Copy of Washington State Department of Labor and Industries Valid Contractor's License. If
not available at the time of application, a copy of this license will be required before the
permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit
in Lieu of Contractor Registration ".
Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or contractor licensed
by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and
obtain the permit will be required as pad oI this submittal.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS
PERMIT.
BU/L N Or EFf OR -A45*
IZED AGENT:
Signet `' V1,V► 'V� 1 l�
\ANN
Date'
a
q '
Print na
t L UM 'p
l�-
°- \ ;ii���.7
�P:
_G
Fax
Fax
_3
Address
City/ ale /Zip:
_
;
*�*+ �a�*�*+�+°*�**++«*�"^^�*`'
^�a++*�+�+*+^++*++*a++°++t+*°*** _-*+� ,
[VAA�Ml
"...'..'.''''� .'�.�-'' '
'�!Tf 8� [UKNlLA. NP
���*-'^,**»^+*++A*+*AaAit"r1%+ ***+ *****1l*AA*A*^*++^**4(**A^0***`
HANSMI/ Num er: V9800|4& Amount: 462.2S 09/89/99 12:3
i~wvment Method, CHECK Notation: ASSOCJA?EU KOUFl lnit: 1L8''
.
|`wrmit No: MI99'0166 Tvog: MISCPEKM MTSCEiLhNEOUS PEkMI`
yarce| No: 022340-004o `
..^
°vvre^=-' 343 '"^nu~, o, r
(ota! 'Veefi: 462.21,3 � DC 463 ^ ;t5
Th�s Pavment 462.r/��� Tmte\ ALL Vmts: 462.2��'' �� ;:'iLcr 462~25
Ua|ance: ^nV`'
+a^+h.«+4^^*++A+*,++*+a*~+++«a,t*.Ak****.Aa**x*a*+aA+A*+*«*++***«.'��'
AncnKnk Code Deurriotioo Amuont.'�
0��/322.�Ob
!WILDING — KES
^~''~~`-^- - I G SUDCHAKG�
o0o/386.904 • �TATE OUILV N ' �
O9/13/99 10
T7:54 0097 6801
cni7/ OF TUKJl[A
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd, #100, Tukwila, WA 98188
PERMIT NO.
(206)431 -3670
P je t:�' Aviii
Type of Ins action:
Air.: 7 / o DA/ e, ,
r(�
Date call d: Val ..
7
Spe 1 I instructions: /
q Alik.
Date wanted:
�ur 1'
� a� m�
/ p.m.
Requester: /,� • r
Phone: r
pproved per applicable codes.
Corrections required priory) approval.
COMMENTS:
e1<— 'l:Svcz).. 7r
0 K. TO F/,t/- t_
:i iiiri
iF.gjLrioe
$47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be pair
at 6300 Southcenter Blvd., Suite 100. CaII to schedule reinspection.
I Rn,1:0M. Mn. 1 rlafn•
Associated Roofing, c.
3121 N.E. 133rd • Seattle, Washington
P.O. Box 82894
Kenmore, Washington 98028
364 -4445 • 1 (800) 358-3119
ASSOCRII8208
SEPTEMBER 27, 1999
CITY OF TUKWILA
OFFICE OF COMMUNITY DEVELOPMENT
6300 SOUTHCENTER BLVD
TUKWILA, WA 98188
RE: WELLS FARGO BANK / BLDG PERMIT
RECEIVED
SEP 2 81999
EVEQPMENT
Please be advised that Associated Roofing, Inc., has completed the roof installation on the Wells Fargo
Bank in Tukwila. We have installed this roofing assembly with insulation in accordance with Johns
Manville / Schuller specification # 5G1 C; data sheet enclosed, which meets or exceeds the requirements for
a Class "A" or Class "B" roofs. This roof was installed at 343 Andover Park E. in Tukwila, under City of
Tukwila permit number MI99 -0166.
SIGNED:
V\
WILLIAM P. NEISIN
PRESIDENT
WPN /jms
ENC
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd, #100, Tukwila, WA 98188
•
PERMIT NO.
(206)431 -3670
P,roj � I �. --7
1Z�1 c- Cc . (�o bct r►K
Type of. Inspection:
�,..> r '�' rl�c �-
A dre /` ( yam-
Date called: «,\ _C( .C1C,i
Special instructions: ..,
c�V-- car + ( )D(o) O� `
y 7jc.�.�
Date wanted:_ C(I a.m.
i -' U` I p.m.
Requester: --, • \\
( ?) 5 i /L /U9
Approved per applicable codes. n Corrections required prior to approval.
COMMENTS:
4 /0 4 .. Rio 4' e7.. / .1,4.*",
,6_
Q ' G? t� 1-.1 CJ,il 'r4 c/ s-• 1t1 t
to ,L e Ki9 e , .6c90 tc ,r../A--e4. / .., 4
nail --t j',7 4 .
O /-6,7 A #I/ ,O t' _,.` ?- rr1( _
, / p://e., 1 '_1 lii.:rt ed4L/4,0 4,,Pn 6.4JC
4 ) l r.7g-'' -,Z, -Y,f ,"4--7 5 . 4)
se,4
/? // C--t, "to, 41 4/4_ Ce /.hS 0°.le I% A -
/9c7 0 - eeh , /"vv.„ C 74-7A, c..e_i , `/
/ fri s, 4f // o 6. *R -67g, /--.1-7,-01.1 4
rile) 'ic' tr_ e ., )--k a 1'L- l-i� -4 a A-7/1,,,
., A4 . 0! mil,
Inspector:
Date:
C $47.00 REINSPECTION F REQUIRED. Prior to inspection, fee must be.paid
at 6300 Southcenter Blvd., Suite 100. CaII to schedule reinspection.
n_ -_f�• w,... rte_._-
rw
AUGUST 19, 1999
Associated Roofing, Inc.
3121 N.E. 133rd • Seattle, Washington
P.O. Box 82894
Kenmore, Washington 98028
384.4445 • 1 (800) 358-3119
ASSOCRIIS2011
MEMORANDUM
ORIGINAL
SENT VIA
FACSIMILE
T0: MR. DAVE SHARPE
ALAN STEVENS ASSOCIATES
FROM: BILL NEISINGER
RE: WELLS FARGO BANK #92780 / TUKWILA, WA
Michael Jenkins of the City of Tukwila Planning Department has
advised me that mechanical screening for roof top units is not
required if the unit sits further than 10' in from the edge of the
roof and does not exceed 20' in height.
Based upon this conversation, it appears as though the mechanical
screening is not necessary.
Please advise as to your decision.
FILE COPY
I tjnderstand that the Plan Check approvals are
subject to errors and omissions and approval of
plans daps not authorize the violation of an
• ;.Iitupied code or ordinance. Receipt of con -
tt ZWIllt''S c p of approved fans acknowledged.
• 1
fly
Oate
MY 0E1'000
APPROVED
'SE 'SEP 9 1999 .
iy,J ���i i Li)
frfjqq1- 01410
RECEIVED
AUS
CITY c''
,AUG J
pERM11 ;;t lv'tEr
02/25/1995 11:05 206 - 774 -2858
E'NRG'Y 2
REGIONAL OFFICE
PAGE 01
PRODUCT DESCRIPTION
E'NRG'Y 2 is a rigid roof insulation hoard composed of a
closed cell polyisocy'anutate foam cure lx►nded in the
foaming process to fiber reinforced facers. E'NRG'Y 2 is
designed for direct application to steel and other roof
decks and is compatible with virtually all roof covering
membranes.
APPLICATIONS
• FM Class 1, U1., Class A Constructions
• Single -Ply Roof System!;:
Adhered, Mechanically Attached, Ballasted
• Modified Bitumen Roof Systems
• Built-11p Roof Systems
FEATURES 1 BENEFITS
E'NRG'Y 2 Is a highly efficient thermal insulation with
high R- \'!Clue and low installed cost. Code compliance and
superior physical properties ,make E'NRG'Y 2 the ideal
insulation for both new construction and reroofing.
STANDARD SIIES
F.'NRG'Y '2 is amilahle In standard 4' x H' (1220 mm x 2440
min) or 4' x 4' (122(1 min x 122(1 runt) hoards (other sires
available h)• special request) and in thicknesses of 1.0" (2tS
non) to 4.0" (102 min).
INSTALLATION
BUILTUP AND MODIFIED BITUMEN SYSTEMS
Each board oI' E'NRG'Y 2 must be secured to the' roof
deck with Factory Mutual approved fasteners and plate's
( appropriate to 111c' clerk IT'). Alternatively, maximum
4' x 4' (122(1 corn a 1220 tent) boards of E'NRG'Y 2 may be
adhered to n prepared concrete (lock with a full mopping of
hot steep asphalt. lints all edges and stagger joints of adja-
r ent hoards. The rool'covc't'tng Is installed in ac'corcf ;tnc'e to
the n'ranufacturer's specifications.
FULLY ADHERED
SINGLE.PLY SYSTEMS
Each hoard of E'NRG'Y
2 must he secured to the
roof deck with Fac•tur'y Mutual apprOVrd 'listeners and
plates (appropriate to the deck typt'). Alternatively, tmtxi-
mum 4' x 4' (1220 inns x 1221) mm) boards of E'NRG'Y 2
may be adhered to a prepared concrete deck with a lull
mopping of' hot stccp asphalt. Ban all edges and stagger
joints of adjacent boards. Install the rcx►f covering accord-
ing to the manufacture'r's specifications.
MECHANICALLY ATTACHED SINGLE.PLY SYSTEMS
Each board of E'NRG'Y 2 most he secured to the root'
deck with Factory Ntutuai approved lasteut'r:s and plates
(appropriate to the deck type). Butt edges and stagger
joints of adjacent hoards, Install the r•ooI'c'ove'ring according
to the manufacturer's specifications,
BALLASTED SINGLE.PLY SYSTEMS
Each hoard of E'NRG'Y 2 is loosely Laid on the roof
deck. Butt edges and stagger joints of adjacent boards,
Install the root' covering according to 1Iie manufacturer's
specifications.
THERMAL VALUES*
BARRIERS
*Baud on PIMA lichrtical Bulletin (1101 ee AVM (: 518.
RECEIVED
CITY OF TILA
p,U6 3 I. 1999
08/31/1999 15 :13 4256732393 ALLIED BLDG PRODS
Ballasted
ermal.insulation with
Code compliance and
E'NRG'Y 2 the ideal
and reroofing:
x 8' (1220 mm x 2440
n) boards °(other sizes,
hicknesses of 1.U" • (25
MIN
secured to. the. roof
fasteners and plates
ernatively, maximum
of E'NRG'Y 2 may be
■ith a full mopping of
tagger• joints of adj.a-
,lied in accordance to
PAGE 01
H acts board of E'NRG'Y 2 mus± tie secured to the roof
..leek with Factory Mutual approved fasteners and plates
(appropriate to the deck type). Butt edges and stagger
joints of adjacent boards. Install the roof covering according
to the manufacturer's specifications.
BALLASTED SINGIE.PLY SYSTEMS
Each board of E'NRG'Y 2 is loosely laid. on the roof
deck. Butt edges and stagger joints of adjacent boards:
Install the roof covering according to the manufacturer's
specifications.
THERMAL VALUES*
*Based on PIMA Technical Bulletin #101 '`a' ASTM C 518.
BARRIERS
:nergy- Efficient Roofing and Building insulation
CITY OF TUKWILA
AUG 3 1 1
PERMIT CENTER
Sealskin® A
The Industry Standard
Description
Sealskin is a rigid mineral aggregate
insulation board composed of expanded
perlite, cellulose binders, and water-
proofing agents. Its tough top surface
(Sealskin) is treated to retain bitumen for
a tight bond with the membrane. Avail-
able in 24" x 48' and 48" x 48" boards.
Uses
• A thermal insulation and base for most
membranes over any structural deck.
• A layer to protect pure foam insula-
tions from hot asphalts.
• A protective layer over soft insulations
susceptible to traffic damage.
• When FM and /or UL approved systems
are specified.
Benefits
• Tough, heavy Sealskin on top surface
retains asphalt to tightly bond the
membrane.
• Most cost-effective thermal perfor-
mance for moderate R- values.
• Performance proven for more than 30
years.
• Guaranteed as a substrate by most
single ply and BUR membrane
manufacturers.
• Resistant to water penetration.
Note: international Permalite, Inc.
recommends the use of a layer of perllte
over foam insulation to minimize the
potential of BUR blistering.
Standards & Compliance
Sealskin is in compliance with:
• ASTM Standard C728 (which
supersedes Federal Specification
1111.1- 529b).
• UL Class A constructions on both
combustible and non - combustible
roof decks.*
• UL requirements of (TGXX) metal deck
assemblies.
• UL Construction Numbers I, 2, 9, 27,
156, 158, and Fire Resistance Rated
Roof-Ceiling Designs (BXUV): P001,
P004, P201, P202, P203, P204, P206,
P2 10, P2 1, P224, P225, P230, P232,
P233, P237, P238, P243, P404, P502,
P508, P510, P701, P708, P710, P801,
P803, P805, P810, P8I4, P815, P904,
P909, P9 12, P915, 5701, 5702.
• Listed in UL Building Materials Direc-
tory under Mineral and Fiber Boards
(CERZ), Fire hazard Classification of
Mineral and Fiber Board (BQXR) and
Built -Up Roof Covering Materials
(TFJR).
• FM Class 1, Impregnated Lumber Deck,
Insulated Steel Deck (Windstorm Resis-
tance Classification 1-60 and t•90), and
Non- Combustible Deck Construction.
• FM Class 1 in "Approval Guide Equip-
ment, Materials, Services for Conser-
vation of Property."
• Plus , . , Southern Building Code
Congress International, Inc. Report
#3549, International Conference of
Building Officials and Code Adminis-
trators Report # 3549, Building Code
Officials and Code Administrators
Report # 83-86, City of Los Angeles
under Report # RR- 23599, The Office
of the California State Fire Marshall
under Listing #4310-134:5, and Metro -
Dade County, FL.
Limitations
Old roofing systems must be thoroughly
dried and secured before product is
applied as part of a new roof system.
Sealskin is not acceptable for applica-
tions where It will be directly exposed to
continuous soaking temperatures of
250 °F. (See General Precautions.)
• Where UL labels are required, customer must so
order in advance.
Thermal Values
Thickness
(nominal)
Thermal
Conductance
( "C" relrre)
Thermal
nalstance
( "R" value)
weight
(nominal)
Ms. /sq. It.
'17"
.76
1.32
—
'/4"
.48
2.08
.68
1"
.36
2.78
.90
11/4"
.29
3.47
1.12
1'h"
.24
4.17
1.35
2"
.18
5.56
1.80
2'G"
.15
6.67
2.25
'3"
.12
8.33
2.70
*4"
.09
11.11
3.60
'Thickness Is available onty by special order.
Technical Data
Physical Properties
Nom.
Tests
Water Absorption
(based on 1' thickness)
% Vo1-2 hrs
1.5
ASTM C209
Flame Spread
25
ASTM E84
Fuel Contributed
30
ASTM E84
Smoke Developed
5
ASTM E84
Compressive Resistance
Nominal 1' Board
5% consolidation -psi
35
ASTM C165
Weight, pounds per sqaure
loot tor 1 inch nominal
board thickness
0.9
ASTM C209
Maximum Flute Span
Width of Flutes
Min. Thickness*
Up to 1'
3/4'
Up to 15/e'
1'
Up to 25/e'
1i/2"
Thickness over flutes 1s as manufactured and not field
laminated.
Suggested Fastening Patterns -FM 1.60*
x
x
x
x
x
x
x
X x
X x
X x
3/4" 1' Isolile 3/4"
Sealskin Sealskin IsoPerl Sealskin Sealskin
X x
1"
Suggested Fastening Patterns -FM 1.90*
xx
X
3/4"
4,
X X
X x
X
x
X
X
X
X
X
x
x
X
x
X
x
X
X
x
x
X
x
1" Isolrte 3/4"
Sealskin Sealskin IsePerl Sealskin Sealskin
• Due 10 ongoing testing programs and changes In FM
requirements, the number of fasteners required and their
placement are subject to change without notice. Check
current FM Guide for approved fastener density for Interns.
Donal itermallte insulations and other brands.
RECEIVED
CITY OF TUKWILA
Manville
File Ply
Mineral- Surfaced
Fiber Glass
Built -Up Roof
Specification( GIC
For use over Concrete or Other
Non - Nailable Decks and Fesco'
Board, Fes - Core, Fesco-Foam®,
UltraGard Gold ®, UltraGard
Premier'' or Approved Insulation
with Inclines of 1/4" to 6" per foot
For Regions 1, 2 & 3
U.L. Classifications
Class A
Max. Slope: 1 I /2"
Deck: Non - Combust.
Insulation: Fesco,
Fes -Core, Fesco -Foam,
UltraGard Gold,UltraGard
Premier, none
Option: '/2" Retro- Fit '' overlay
Surfacing: GlasKap`
Class 13
Max. Slope: 3"
Deck: Non - Combust.
Insulation: Fesco,
Fes -Core, Fesco -Foam,
UltraGard Gold, UltraGard
Premier, none
Option: 1/2" Retro -Fit overlay
Surfacing: GlasKap
Max. Slope: 1"
Deck: Combust. & Non - Combust,
Insulation: Fesco, Fes -Core,
Fesco -Foam, UltraGard Gold,
UltraGard Premier, none
Option: 1/2" Retro -Fit overlay
Surfacing: GlasKap
rn
c
0
Non•Nailable Deck
or Approved Insulation
Concrete primer
(II Required)
Asphalt
Asphalt
•• • GlasKap • • •
Mineral Surfaced
to . Cap Sheet
End Laps Staggered
. 3' Apart (Min.)
• - .6'.En
T dLap •
r.
General
This specification is for use over any type of structural deck
which is not nailable and which offers a suitable surface to
receive the roof, Poured and pre -cast concrete decks require
priming with Manville Concrete Primer.
It is also for use over Fesco, Fes -Core, Fesco -Foam, Ultra -
Gard Gold, UltraGard Premier or other approved insulations
which are not nailable and which offer a suitable surface to
receive the roof. Insulations should be installed in accordance
with Manville Insulation Specifications 500, 501, 502, or 503.
Refer to the Manville Industrial /Commercial Roofing Systems
Manual, It can also be used over Manville Recover Specifica-
tions RC -1, RC -2, RC -3 or RC -4. This specification is not to be
used directly over gypsum, lightweight insulating concrete
decks, either poured or pre -cast, or over fill made of light-
weight insulating concrete.
Design and installation of the deck and /or roof substrate
must result in the roof draining freely to outlets numerous
enough and so located as to remove water promptly and
completely. Areas where water ponds for more than 24
hours are unacceptable and will not be guaranteed.
Note: All general instructions contained in the current Manville
Industrial /Commercial Roofing Systems Manual should be
considered part of this specification.
Fleshings
Flashing details are available on separate specification sheets
or can be found in the Built -Up Roofing Systems Products and
Specifications Manual or the Manville Industrial /Commercial
Roofing Systems Manual,
Materials per 100 sq. ft. of Roof Area
Concrete Primer:
If required 1 gal.
Felts:
GlasPly" Premier or GlasPly IV
GlasKap Mineral Surfaced Cap Sheet
4 plies
1 ply
Bitumen:
Incline per foot
Up to 1"
1" to 3"
3" to 6"
Asphalt Nominal Weight
170 °F, Type II, Flat 92 lbs.
190 °F, Type III, Steep 92 lbs.
220 °F, Type IV, Special Steep 92 lbs.
Approximate installed weight: 200 - 254 lbs.
Application
Note: On roof decks with slopes up to 1" per foot the roofing
felts in mineral surfaced specifications may be installed either
perpendicular or parallel to the roof incline.
Using GlasPly Premier or GlasPly IV, start with a piece 9"
wide, then over that, one 18" wide, then over that, one 27"
wide, then over all three, a full width piece. The following felts
are to be applied full width, overlapping the preceding felts by
27 1/2" so that at least 4 plies of felt cover the substrate at all
locations. Install each felt so that it is firmly and uniformly set,
without voids, into the hot asphalt (within 25 °F of the EVT)
applied just before the felt at a nominal rate of 23 lbs. per
square over the entire surface. When installed over insula-
tions, more or less than 23 lbs. per roofing bitumen
may be needed due to the absQ,r "r 't`�aNlation.
AUG 3
Specification 5GIC
c
Prior to application of GlasKap, cut the cap sheet into
handleable lengths (12' - 18'), lay the material out on the roof
and allow it to relax and flatten. To accommodate a full width
sheet, apply a mopping of hot asphalt, approximately 20 °F
above the EVT, at a nominal rate of 23 lbs. per square. (This
higher temperature maximizes the bonding of the cap sheet
to the ply felts.) Then flop the cap sheet into the hot asphalt.
On subsequent courses, the cap sheet is positioned upside
down, directly over the sheet in the preceding course such
that the side lap area is exposed. Care should be taken to
maintain 2" side laps and 6" end laps. Asphalt is applied in
the same manner as before, however, it is also applied to the
exposed side lap area of both the preceding and current cap
sheet. The top cap sheet is then flopped into place. The cap
sheet must be firmly and uniformly set, without voids, into the
hot asphalt with all edges well sealed.
At ambient temperatures below 70 °F, refer to the cold
applications sections in the Manville Built -Up Roofing
Systems Products and Specifications Manual or the Manville
Industrial /Commercial Roofing Systems Manual.
Asphalt should meet the requirements established in ASTM
D 312. Never heat the asphalt above the Flash Point (FP).
Heating above the Finished Blowing Temperature (FBT)
should be strictly regulated and never allow for more than 4
hours to preclude asphalt degradation. If the Equiviscous
Temperature (EVT) is not available, heating guidelines are as
follows:
Asphalt Type
Heating Application
170 °F, Type II, Flat 450 °F
190 °F, Type III, Steep 500 °F
220 °F, Type IV, Special Steep 500 °F
325 - 400 °F
350 - 475 °F
375 - 475 °F
Nailing Requirements: On decks with a slope over 1" per
foot the roofing felts must be installed parallel to the incline
and must be nailed. Nailing strips shall be attached to the
deck, run perpendicular to the incline, be capable of retaining
the nails securing the roofing felts, have the same thickness
as the insulation, and be at least 3 1 /z" wide. Wood nailing
strips shall be provided at the ridge and at the following
approximate intermediate points:
Incline Nailer Spacing (D) Type of Asphalt
Up - '/z"
1/2" - 1"
1 "- 2"
2" - 3"
3" - 6"
Not required
Not required
20' face to face
10' face to face
4' face to face
Type II'
Type III
Type III
Type III
Type IV
Consult with the Manville District Technical Service Specialist regarding
projects in hot climates as Type II asphalt may not be permitted in some areas.
Locate a nail at each nailer, spaced 3/4" from the leading edge
of the felt. Nails must have a 1" minimum diameter cap.
Where capped nails are not used, fasteners must be driven
through caps having a minimum diameter of 1".
Termination of a continuous cap sheet MUST occur at a
nailer. At points of termination, locate 5 nails at each nailer.
The first nail is to be spaced 3/4" from the leading edge of the
cap sheet, with the remaining 4 nails spaced approximately
8' /z" o.c. with the nails staggered across the width of the
nailer to reduce the chance of the cap sheet tearing along the
nail line.
• Mineral Surfaced • ,
Cap Sheol , • •
�zd
Fells
Insulation
6' Lap .
.' I e' 2
•
M n.
Nailer
Nail
2' Lap
Surfacing
No additional surfacing is required.
RECEIVED
CITY OF TUKWILA
AUG 3 t 1,4.
PERMIT CENT g
71
2:39dd dOOZI 031dIJOSSd:OI Wd9t :90 am 666t- S2 -EJfld
•
Yea
4
a 22. 34-fo -
2 : 2Sdd
.d00R! 031UI00SSd:QI Wdb2:40 3f11 6662- bz -Sf1U
rn
t•N Ty
1
z�Z
m
O�p�
0111
r§ Tro
w�
4
85101 II.
MATERIALS TO BE USED ON TUKWILA WELLS FARGO BANK PROJECT
TYPE III ASPHALT - ASTMD312
.75 " PERLITE INSULATION (R -2.08)
2.6" LAYER OF POLYISOCYANURATE (R -19.0)
JOHNS MANSVILLE TYPE IV PLY SHEET
JOHNS MANSVILLE GLASKAP CAP SHEET
02/25/1995 11:05 206 - 774 -2858
E'NRG'Y 2
REGIONAL OFFICE
PAGE 02
CODES & COMPLIANCES
Underwriters Laboratories, Inc.
• Component of Class A roof systems: Built -Up, Ballasted,
Mechanically Attached. Modified Bitumen, Single -Ply
(UL 790)
• Hourly Rated P -Series roof assemblies (UL 263)
• Insulated metal deck assemblies (UL 1256)
• E'NRG'Y 2 classified by ULC
Factory Mutual Research
• FM approved for Class 1.6() and 1 -90 assemblies with
Built -Up, Adhered and Mechanically Attached Single -Ply
roof coverings subject to the conditions of approval
described in current Factory Mutual Approval Guide
and Supplements (reports available on request).
Federal Spedfcation
• Meets physical property requirements of f1H•I -1972/
GEN and HH- I- 1972/2.
• ASTM C 1289.
California State !mutation Quality Standards and Title 25
Foam Flammability Criteria (License #TD 132e),
Metro Dade Product Control 094. 0727.05.
Model Building Codes
• National Building Code (1996), Section 2603. Building
Officials and Code Administration International, Inc.
• Standard Building Code (1994), Section 2603. Southern
Building Code Congress International, Inc.
• Uniform Building Code (1994), Section 2602. International
Conference of Building Officials.
NRG insulation products must be protected from open
flame and kept dry at all times. Install only as much insula-
tion at can be covered the same day by completed
roof covering material. NRG Barriers will ,tot be responsible
for specific building and roof design by others, for
defiaereiau in twiny-what, or workmanship, for dangerous condi-
tions on the job site or for improper storage and handling
Technical specifications as shown in this literature are
intended to be used as general guidelines only. Consult
NRG for detailed specifications.
TYPICAL PHYSICAL PROPERTY DATA CHART
Property Test Method
Compressive ASTM 1) 1621
Strength
Dirnensional As•rM 1) '2126
Stability
Moisture Vapor ASIA, F, 96
Transmission
Water Absorption ASTM C 209
Flame Spread A.STM E 84
(Foam Core)
Service
Temperature
*Also mailable in 15 psi.
E'NRG'Y 2 (SHORT FORM) SPECIFICATIONS
Value
211 p%• (IaHkPu)
:Mi., I Flax. 7tlilyf
(length and width)
(57.:1 nx /(Irtle t n))
< 1') udnn,e
- 1181 "F to 250"F
(-7.4"l: to 122 "l:j
• Roof Insulation shall he E'NRG'Y 2, consisting of
polyisocyanurate foam bonded in the Icrulting process
to fiber reinforced facers as manufactured by
NRG Barriers, and shall rnrrt Factnry Mutual (,lass 1 and
Underwriters Laboratories (lass A approvals.
• E'NRG'Y 2 shall be manufactured with the use of
HCFC 141b as a blowing agent,
• The E'NRG'Y 2 shall be inches thick with
an R -Value of and a C -Value of
• Boards shall be feet by rect.
(Long Form Specifications available on request.)
OTHER NIG PRODUCTS
• BARRIER BOARD Be NR(: PLUS Wall Irasol;ttion
• E'NRG'Y 2 PLUS Roof Insulation
• TAPERED E'NRG'Y 2 Roof Insulation
• TAPERED PRE -CUT CRICKETS & MITERS
• E'NRG'Y 2 COMPOSITE & TAPERED E'NR(:'Y 2
COMPOSITE Roof Insulation
• NAILBOARD Roof /Wall Insulation
• ISO - VENT Roof Insulation
Call NRG at 1-800-343-1285 for technical assistance,
literature and samples.
BARRIERS
Corporate 8c Sales Offices
NRG Barriers
The E'NRG'Y House
27 Pearl Street
Portland, Maine 04101
Tel. 800-343-1285 t Locations;
Tel. in Maine 800 - 514-1968 CITY OF (Moine
Product Services FAX 207 -76ti -1081 I laal n„, Pennsylvania
AUG Irc�;tlndiana
Jacksonville, Florida
® Printed on recycled eraner 7 /1Mi .,. -., ■uT ,fleattrItt'>ashinutnn
DAVE SHARPE
ALAN STEVENS ASSOCIATES
319-390-0419
8/24/99
WELLS FARGO.BANK •
TUKWILA BRANCH #92780
343 ANDOVER PARK E.
TUKWTLA
68 ! 1 / WPN-jms
INSTALL 5 PLY SCHULLER SHILT-OP ROoY SYSTEM / SCHULLER SPEC#5Gic
II A
1. Tear off existing bnilt-np 1(10fing and insulation down io ivetal roof deck.
2 Clean off metal deck.
TF NECESSARY: Surface rust shall be wire brushed prior ro cleaning.
Over the prepared surfaces, apply coat of rust-inhibitive primer.
Replace deteriorated metal decking.
3. Clean out existing drains and prepare them for new memhrane installation.
Replace all missing or damaged drain COVeXS and bolts.
4. Install bottom layer of Manville UltraGuard 2.6" R-19.0 insulation using
screws and plates with minimum spacing one every 4 square feet. Ensure that
fasteners do not penetrate conduit or miscellaneous pipes located on the
underside of the decking, Broken OC damaged insulation shall be cut out
and 'replaced with minimum 12" sqnare piece and fastened into place.
5. Tnstall the top layer of 3/4" R-2.08 insulation in solid mopping of Type
TIT asphalt at a minimum rate of 301b: par 100 square feet. All joints are
to be staggered and tightly hutted. Joints in the second layer of insulation
to he offset a minimum of 6" from insulation joints in the bottom layer.
While asphalt is still hot, "walk-in" each hoard to enswre propet adhesion.
If board can be lifted or moved by hand, they are not sufficiently attached.
Damaged or broken corners shall be Cut out and replaced with minimum 12"
square piece secured in hot asphalt. Haximum.hoard size is to he 4' x 4'.
NOTES:
A. Upon completion of the installation in each area, visnally inspect
and verify that all components are complete and properly installed.
B. Before ply application is starred, remove tAasho debris, grease, oil,
water, moisture, and contaminates which may affect bond of hjtumen to
substrate.
6. Tnstall 5 ply Schuller mine,a1 surfaced .:ophalt. built-lip roof system per
menufactnrer's specification # 5GT.C. Materials requirements are as follows:
TYPE VT PTY SHEET FOUR PLIES
GLASKAP rAP SHEET ONE PLY
7. Tnstall two plies of Type VT ply shear dud modified bitumen membrane flashings
at cal perimeters and curb projections as detailed on attached sketch.
8. Install new lead flashings with caps at soil vent stacks as detailed
''11 attached sketch.
9. Coat mastic corners of flashings with an aluminum coating on attached
sberch.
10. Tnstall new sheet metal flashings'and'oounterflashings as detailed pct
attached sketch.
1.1 Install new curh.and support raps as detaJled on attached sketch,
12. Clean up and remnve all debris from contracted work. .
CITY RECEIVED OF TUKWILA
AUG 3 1 ISSW
PERMIT CENTER
City of Tukwila
John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
September 7, 1999
William Neisinger
PO Box 82894
Kenmore, WA 98028
Dear Mr. Neisinger:
RE: CORRECTION LETTER #1
Development Permit Application Number MI99 -0166
Wells Fargo Bank
343 Andover Pk E
This letter is to inform you of corrections that must be addressed before your development permit can be
approved. All correction requests from each department must be addressed at the same time and
reflected on your drawings. I have enclosed comments from the Building Division. At this time, the
Fire Department, Planning Division and Public Works Department have no comments regarding your
application for permit.
The City requires that two (2) complete sets of revised plans be resubmitted with the appropriate
revision block. If your revision does not require revised plans but requires additional reports or
other documentation, please submit two (2) copies of each document.
In order to better expedite your resubmittal, a `revision sheet' must accompany every resubmittal. I have
enclosed one for your convenience. Corrections /revisions must be made in person and will not be
accepted through the mail or by a messenger service.
If you have any questions, please contact me at (206)431 -3672.
Sincerely,
Brenda Holt
Permit Coordinator
encl
xc: File No. M199 -0166
„, 'Vkkgil/OE:-
Oy. . `\) 0,V■(,)
(.CA
cl\P)ricl
on\er
Tukwila Building Division
6300 SouthCenter Blvd.
Tukwila, WA 98188
206-431 -3670
BUILDING DIVISION REVEIW
Date: 09/02/99
Project Name: Wells Fargo Bank re -roof Permit application
Application #: MI99 -0166
Plan Reviewer: Ken Nelsen, Plans Examiner
The submitted application documents identify the use of one layer 3/ inch R -2.08 insulation
to replace the existing roof insulation. Washington State Energy Code Section 1132•.1
would require prescriptive insulation values of R -21 or R -30. The permit applicant must
provide the required insulation R- values per W.S.E.C. or document how proposed insulation
will comply otherwise.
No further comments at this time.
SEP -8 -1999 02:48P FROM:ASSOCIATED ROOF 2063682303
DAVE SHARPE
ALAN STEVENS ASSOCIATES
TO:4313665 P:3
119- 390 -0419 8/24/99
WELLS FARGO BANK
TUKWILA BRANCH #92780
343 ANDOVER PARK E.
TUKWILA
68 / 1 / WPN -jms
INSTALL 5 PLY SCHULLER BDILT -UP ROOF SYSTEM / SCHIMLER SPEC #5G1C
WA
1. Tear off existing built -up roofing and insulation down to metal roof deck.
2. Clean off metal deck.
IF NECESSARY: Surface rust shall be wire brushed prior to cleaning.
Over the prepared surfaces, apply coat of rust- inhibitive primer.
Replace deteriorated meta]. decking.
3. Clean out existing drains and prepare them for new membrane installation.
Replace all missing or damaged drain covers and bolts.
4. Install hottom layer of. Manville U1traGuard 2.6" R -19.0 insulation using
acing one every 4 square feet. Ensure that
fasteners do not penetrate conduit or miscellaneous pipes located on the
underside of the decking. Broken or damaged insulation shall be cut out
and replaced with minimum 12" square piece and fastened into place,.
nstall the top layer of 3/4" R -2.08 insulation in solid mopping of Type
11 dbpnctl[.. at a mxnlmum rate or 301h5 per 100 square feet. A1]. joints are
to be staggered and tightly hutted. Joints in the second layer of insulatio
to be offset a minimum of 6" from insulation joints in the hottom layer.
While asphalt is still hot, "walk -in" each board to ensure proper adhesion.
If hoard can he lifted or moved by hand, they are not sufficiently attached
Damaged or broken corners shall be cut out and replaced with minimum 12"
square piece secured in hot asphalt. Maximum board size is to he 4' x 4'.
NOTES,
A. Upon completion of the installation in each area, visually inspect
and verify that all components are complete and properly installed.
B. Before ply application is started, remove trash, debris, grease, oil,
water, moisture, and contaminates which may affect bond of bitumen to
substrate.
a 11
6. Install 5 ply Schuller mineral surfaced asphalt built -up roof system per
manufacturer's specification # 5GIC. Materials requirements are as follows
TYPE VI PLY SHEET FOUR PLIES
GLASKAP CAP SHEET ONE PLY
7. Install two plies of Type VI ply sheet and modified bitumen membrane flashing
at all perimeters and curb projections as detailed on attached sketch.
8. Install new lead fleshings with caps at soil vent stacks as detailed
on attached sketch.
9. Coat mastic corners of fleshings with an aluminum coating on attached
sketch.
10. Install new sheet metal flashings and counter.flashings as detailed on
attached sketch.
11. Install new curb and support caps as detailed on attached sketch.
12. Clean up and remove all debris from contracted work.
TA-cm * 4 4 1cye �Ga
CC�o i d e u�-S 12- 2, ■ . o l
r5.1:: "P, i'.:i'!'ftir, iri 9r: •m•"o..:�.,
PLAN REVIEVVIROUTIRFb SLIP
ACTIVITY NUMBER M99 -0166 DATE 9 -1 -99
PROJECT NAME WELLS FARGO BANK (RE -ROOF)
X Original Plan Submittal
Response to Correction Letter#
Response to Incomplete Letter#
Revision # After Permit Is Issued
DEPARTMENTS:
B iINin . •
I/
ivision
Public Works
Nn)
Fire Prevention
�� /
Structural
Planning Division
Permit Coordinator
•
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
Comments:
Incomplete
n
DUE DATE 9 -2 -99
Not Applicable
TUES /THURS ROUTING:
Please Route
Structural Review Required
No further Review Required n
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS: (ten days)
Approved
661/1/4,
Approved with Conditions
DUE DATE 9 -30 -99
Not Approved (attach c mments) I q`-I' hal
i440,a_e_4
REVIEWER'S INITIALS: DATE:
CORRECTION DETERMINATION: DUE DATE
Approved n Approved with Conditions
Not Approved (attach comments) n
REVIEWER'S INITIALS: DATE:
U'RROUTE.DOC
Ono
•
vn saa sci »r ,.:• aatrm:,a'f111r acAIMastwsaft
•
4111aaxm:vKIIFarcw
_sa O.m3a s r
DEPARTMENT OF LABOR AND INDUSTRIES
REGISTERED AS PROVIDED BY LAW AS
CONST CONT GENERAL
REGIST. # EXP. DATE
CCO1 ASSOCRI16206 05/01/2000
EFFECTIVE DATE 09/26/1984
ASSOCIATED ROOFING INC
P 0 BOX 82894
KENMORE WA 98028 -0894
4
f1rT�/"�I I. -.Cr) 1 n"/ '` 71'rlror•n rr
CERTI ABO IS AN ACTUAL COPY OF AN ORIGINAL DOCUMENT.
r NED THIS. ' DAY OF
JEAN M. STEPHENS
.NOTARY PUBLIC IN AND FOR THE STATE OF WASHINGTON.
RESIDING IN SHORELINE, WA.
MY COMMISSION EXPIRES 4/15/03