Loading...
HomeMy WebLinkAboutPermit MI99-0209 - SEGALE BUSINESS PARK - RETAINING WALLt. ., .. .7 .,.. _„ r , :vY U•�r :A IF. , 1... `G.? �,`,, T ��_ ,... q ;G ;'�'.vif.G�.E`Y 2 MI99 -0209 6155 Segale Pk. Dr. C Segale Business Pk. C City of Tukwila (206) 431 -3670 Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 MISCELLANEOUS PERMIT WARNING: IF CONSTRUCTION BEGINS BEFORE APPEAL PERIOD EXPIRES, APPLICANT IS PROCEEDING AT THEIR OWN RISK. Parcel No: 352304 -9018 Address: 6155 SEGALE PARK DR C Suite No: Location: Category: NSFR Type: MISCPERM Zoning: Const Type: Gas/Elec.: Units: 001 Setbacks: North: Water: HIGHLINE Wetlands: Permit No: Status: Issued: Expires: MI99 -0209 ISSUED 12/17/1999 06/14/2000 Occupancy: OFFICE UBC: 1997 Fire Protection: Abog-- - - -- .0 South: .0 East: .0 West: .0 Sewer: SEPTIC Slopes: N Streams: Contractor License No: LAPIALP055MZ OCCUPANT SEGALE BUSINESS PARK C Phone: 5801 SEAGLE PARK C, TUKWILA, WA 98188 OWNER LA PIANTA LTD PARTNERSHIP Phone: (206) 575 -3200 PO BOX 88050, TLIKWILA WA 98138 CONTACT STEVE NELSON Phone: 206 -575 -2558 PO BOX 88028, TUKWILA, WA 98138 CONTRACTOR LA PIANTA LIMITED PARTNERSHIP Phone: 206 575 -2000 P.O. BOX 88050, TUKWILA, WA 98138 k k k***•k * *•k ** **** **** *•k *•k** k ** * *** * ** * * * * * * *•k * * * * *•k *•k *•k* * * *•k *•k **** *•* k.*•** * *•k * * ** * * *•k* Permit Description: NEW RETAINING WALL ALONG WEST PROPERTY LINE PUBLIC WORKS ACTIVITY INCLUDES STORM DRAINAGE FOR CONNECTING RETAINING WALL DRAINAGE AT WALL STATIONS 1 +68 & 4 +26 INTO PARKING LOT DRAINAGE SYSTEM FOR BLDG #981. k k* k * *•k ** *•k*•** * * *• * * *• * * *•k * * * * * *• * * * * * * * * * ** k* *•* *•k * ** ***** •*• * * *•* * *• * * * *•k* * * * * * * * * * * * ** k•* Construction Valuation: $ 41,250.00 PUBLIC WORKS PERMITS: *(Water Meter Permits Listed Separate) Eng. Appr: JJS Curb Cut /Access /Sidewalk /CSS: N Fire Loop Hydrant: N No: Size(in): .00 Flood Control Zone: N Hauling: N Start Time: End Time: Land Altering: N Cut: Fill: Landscape Irrigation: N Moving Oversized Load: N Start Time: End Time: Sanitary Side Sewer: N No: Sewer Main Extension: N Private: Public: Storm Drainage: Y Street Use: N Water Main Extension: N Private: Public: * k* * *•k ik**• k•******•********'k•************************'**** * * * * * * * * * * * * * * * * * * ** * * * * * * * *•k* TOTAL DEVELOPMENT PERMIT FEES: $ 859.04 . *. *..k* * *'k* **** •k * * *•k** * * * * * * * * * * * * * * * * * * * * ** **********•** * * * * * *•k * * * * * * * * * * * * * * * * * * * * *•k k Permit Center Authorized Signature: Date: I D- n 1 .! I hereby certify that I have read and examined is permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this development permit. Signature; nI� A A2' Print Name:_ V�ri1 tC__L� els , Date: .J_z>-7/5S This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. CITY OF TUKWILA Address; 6155 SEGALE PARK DR C Suite: Tenant: Type: MISCPERM Parcel #: 352304-9018 Permit No: MI99-0209 Status: ISSUED Applied: 11/15/1999 Issued: 12/17/1999 A'A.A*VA.I.AA**AAA4.4:4***RIlkAA.A.AAk*A*kAk*.Akii.-Ak*kiliAkkil.AAA*A**Ak*Akk*A.A.W**A*** Permit Conditions: 1. No changes will be made to the plans unless approved by the Engineer and the Tukwila Building Division. 2. When special inspectio0is required either the owner, architect or engineer shall not the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection report& shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name, permit number and type of inspection being performed. 3. The special inspector shall submit a final signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge, in conformance with approved plans and specifications and the applicable workmanship provisions of the UBC, 4. Notify the City of Tukwila Building Division prior to •placing any concrete. This procedure is in addition to any requirements for special inspection. 5. All structural concrete shall be special inspected (UBC - Sec. 30((a)1). 6. A1:1 construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 Edition) as amended, Uniform Mechanical Code t 1997 Edition):, and Washington State Energy Code (1997 Edition). 7. Validity of Permit. The issuanpe of a permit or approval of plans, specifications, and computations shall not be con- strued to be a permit for, or an approval of, any violation of any of the proVisions of the building code or of any other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this code shall be valtd. 8. Alk1.14 PUBLIC WORKS 1,*** Contractor shall notify Public Works Utility Inspector at 206-433-0179 of commencement and completion of work at least 24 hours in advance, 9. Temporary erosion control measures shall be implemented as the first order of business to prevent sedimentation off- site or into existing storm drainage facilities . 10. The site shall have permanent erosion control measures in place as soon as possible after final grading has been completed and prior to the Final Inspection. CITY OF TUX: /ILA Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 Project Number: Permit Number: V1z9q -obi Miscellaneous Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. Project Name /Tenant: e C (c +) w e S5 Qom. �( SLA t l CIi y.) 5 'b' / Val of Construction: 1W L/ / )50 . CX..) Site Address : ,. City State/Zip: 5 Aso l S•e S c,.l e 26--\,-(c a s-% u e C' Tax Parcel Number: 35- 3bi%- �b /g Property Ow er: 1 \--C-- Qi > �es-- L t 1-7 i, }ec/ Pc.,....- -VvIev -ts‘„ 10 Phone: ( ) 2(.-, X575-0000 S et Address: City State /Zip: Yo Yoc.)) 88 32- 1-Z-Tic - a 1)- 4 7S-/ 3ce Fax #: ( ) zo6 575 - /Fs3_7 Contracr: 1 I I 1 Y-C„ t'∎ 4 tG.. j-1 t—t i i.ee"% \ C v- "17'7cvsl --) r0 Phone: ( ) Styegt AdFN�5ess: City State/Zip: S 3 . ItY 9kOZs- TL.1't�.,1c WA cryIM Fax #: ( ) Architect: Phone: ( ) Street Address: City State/Zip: Fax #: ( ) Engineer: v� Lie 4 ��,1 r7e�vs 1 v Phone: ( ) zc� 5z5- Sao Fax 11: ( ) zo6 6-S0�_ ‘G r' Street Address: , City State/Zip: G86 5' Gue,( / /% -t.v,u P-UC= Inc Sea le r� /i5' Contact Person: S *eve K � c 3 Phone: ( ) zv6 575= Z6-5-g S..ci,reet A ress: City State/Zip: , 1y0 16by 88 6? T ■--tIct-.,..;1 c k,t, 4 9?r13 - Fax 1t: ( ) zb s7S - /geZ MISCELLANEOUS PERMIT REVIEW AND APPROVAL REQUESTED: (TO BE FILLED OUT BY APPLICANT) Description of work to be done (please be specific): w < / / Y-�/cs) -. .. l c..ei re- e�-� /, ru e �� ��-�.� �t v7. 5-. s P P y Will there be storage of flammable /combustible hazardous material in the building? ❑ yes no Attach list of materials and story a location on separate 8 1/2 X 11 aper indicating quantities & Material Safety Data Sheets ❑ Above Ground Tanks Antennas /Satellite Dishes LI Bulkhead /Docks ❑ Commercial Reroof ❑ Demolition Et Fence ❑ Manufactured Housing - Replacement only ❑ Parking Lots Retaining Walls ❑ Temporary Facilities ❑ Tree Cutting APPLICANT REQUEST FOR MISCELLANEOUS PUBLIC WORKS PERMITS Channelization /Striping in Flood Control Zone Landscape Irrigation Storm Drainage Water Meter /Exempt # Curb cut/Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #: Land Altering: 0 Cut cubic yards 0 Fill cubic yards 0 _sq. ft.grading/clearing Sanitary Side Sewer it: ❑ Sewer Main Extension 0 Private 0 Public Street Use. ❑ Water Main Extension 0 Private 0 Public Size(s): 0 Deduct 0 Water Only Size(s): Water Meter /Permanent # Water Meter Temp # Miscellaneous Size(s): Size(s): Est. quantity: gal Schedule: ❑ Moving Oversized Load /Hauling MONTHLY SERVICE BILLINGS TO: Name: Phone: Address: City /Sta e/Zip: 0 Water 0 Sewer 0 Metro 0 Standby WATER METER DEPOSIT /REFUND BILLING: Name: Phone: Address: City /Sta e/Zip: Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. Date ap licatior ccepte 1-- GI Date app on ^ etr)� Applicat. 4Q by: (initials) D ALL MISCELLANEOUS RMIT APPII(ATIONS MI/S1 BI SI/6 ID WITH 111! IOIIOWIN(,: ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN D BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED D ARCHITECTURAL DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT D STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED STRUCTURAL ENGINEER D CIVIIJSITE PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER (P.E.) ❑ Current copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". BuildingOwner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the, property owner authorizing the agent to submit this permit'application and obtain the permit will be required as part of this submittal. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS,PERMIT. BUILDING. S1111MI1 APPI It A1ION AND INQUIRED (IIF( KI ISIS 10K PERM!! RF VII W Above Ground Tanks/Water Tanks - Supported directly upon grade exceeding 5,000 gallons and a ratio of height to diameter or width which exceeds 2:1 Submit checklist No: M -9 ❑ Antennas /Satellite Dishes Submit checklist No: M -1 ❑ Bulkhead /Dock Submit checklist. No: M -10 ❑ Commercial Reroof Submit checklist No: M -6 ❑ Demolition Submit checklist No: M -3 ❑ Fences - Over 6.feet in Height Submit checklist No: M -9 ❑ Land Altering/Grading /Preloads ,, Submit checklist No: M -2 ❑ Miscellaneous. Public Works Permits Submit checklist No: H -9 ❑ Manufactured Housing (RED INSIGNIA ONLY) . Submit checklist . No: M -5 ❑ Moving Oversized Load /Hauling '` "' ",,' Submit checklist No: M -5 ❑ ,Parking Lots '' "''-, Submit checklist No: M -4 ❑ , Retaining Walls,- Over 4 feet in height Submit checklist No: M -1 ❑ Temporary Facilities Submit checklist No: M -7 ❑ Tree Cutting Submit checklist No: M -2 ❑ Current copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". BuildingOwner /Authorized Agent If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the, property owner authorizing the agent to submit this permit'application and obtain the permit will be required as part of this submittal. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS,PERMIT. BUILDING. W ER OR AUTH RIZED AGENT: Signature: 1�` Dater! /` /P91' Print name: �v�►�i �SUYI Phone: (Z�) Fax Fax #: ( 766) 6-76...../44z Address: OX p862 City /S ei i`p�1t c. ( czfrr 3Y 9/9/99 uilxcy:ett.dttc ..� ,h**x*h:,*^*v***aA.++*,,A.kA*\au+*�**+ +*^h�+&^*h+�+^�++*�/ ClT/ OF TU■N - T�AKSMIT *+*^k A a^+�a+�4+k +A A^a*+����*A +�^+��+J��^�**o�** * o++**^* +/*a TkANSMlT Number: K9800205 AmVunl.: 859.04 12/17/99 03:36 PVvmnt Methufl: CHECK, Notation: S[GAiE 8UW.NES. .... . . . . • Permit No: M399-02O9 1v1 v,',: MOCPRM MISCELLANEOUS P[HNIT ! p'[cel No;: 352301r9018 Site Addrve.,s: 6155 CEGALE PAVK DR C 1 Tot:al Fees: ' 859.04 thie y;.;ymtwnt . GI59"V4 1(.41 ALL Fmt�: 859.04 � Balancer .00 /+of*«a*^+kii*+^+x^+.^+A*AAa+o��/31,*++^+4k+A*++),,++****+„k+**1***^Al, Acro«n� Code / ' ft.t.it uton Amuuo� 000/332.100 BUILDING _ VE ' 502.75 000/345.830 ����/ ^pL8CHV�K ~ '$ 3�6,79 .. . 00O/345.8 ' PLAN CHECK - UT7LITY 10.00 000!386"9 TA[E 8UlLDING SURCHARGE 4,50 412/342.400 ' INSP ICE -`STORM DRAIN 15.00 -'-~~,--._--.\,,_.,.--�'~-_.'_,-� .'-_��7~_,-,_-..-.~~-�,--._ " ' INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. ' CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila WA 98 r - 706431 -3670 Project: Type o• I, •ection: J AddrS 2J 5"/ /* 6. Date ca Special instructions: Date want %� a.m. Requester: Phone: (,..._Approved per applicable codes. Corrections required prior to approval. COMMENTS: Date: / 27 0 REINSPECTI • ' FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No: 1 Date: - • INSPECTION NO. r....m...w..r.: rs:'ay >.. h:Se;.::: •:TYe;Y gi .`'.7: ..., INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3670 Pr•ject: f '' ' Typ:.f inspection: 9. _ "L' Or tjddress / Date a d: CO Special instructions: /i rL ‘i c )4 Date a ed: co R u tee , t—,20&— lie?3-411.0/ Approved per applicable codes. 0 Corrections required prior to approval. COMMENTS: ELI $47.00 REINSPECTION ' REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., uite 100. Call to schedule reinspection..' I Rarainf Nn• I flnfa. INSPECTION NO, a CITY OF TUkWILA BUILDING DIVISION •.6300 Southcenter Blvd, #100, Tukwila, WA 98188 INSPECTION RECORD Retain a copy with permit 1'01 PERMIT NO. (206)431 -3670 Pr,pJ ct• G Typ f Insp c(ion r dr s •� oa.cr2a7 Dat c 114 19 Special instructions: It Ott Date, 1 : ( ✓ � rm p,m . Req s r: P ones / 20 13 de Approved per applicable codes. El Corrections required prior to approval. COMMENTS: A•0-it97/7"-- der c-,491-$4_ 0-1 Inspe ;44/1 $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd.; Suite 100. Call to schedule reinspection. 1 Raraint Nn! 1 Mfr.. INSPECTION NO. INSPECTION RECOR Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3670 Proj�cty ,�� -- Type �1 ler, - A�1� //�5gC7/G6. Pie Date called: 1v {o'rf 1414,95 Special instructions: Date wan ed: ,GS7a.m. ( p.m. Request : • ElApproved per applicable codes. Corrections required prior to approval. COMMENTS: kT"5E. P,,4 0fl e r,J ,"LcP?6 tt-- 0 ' ,6- ,-C(lD e/k.0 6 @ AA9 rvr CA rc,-,, bAS/ xf 03 /$ 4..cor t° ..'4'n� 0 Ek POSE 190.,6 19i,2 r,t_rs ,1E`cr7 - 1v {o'rf 1414,95 /c o- 4.170i Insp Date: $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. CaII to schedule reinspection. I Ale.. i Il�fe. INSPECTION NO. • . -. rat::'+•.rr.,a>k::.:a�.yrax ca+.:: +s+i ��4>^. s..» mr.�.au:An+C•v!cr,w,x+:OS:Km..� INSPECTION RECORDC Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 �I9R D2-0 PERMIT NO. (206)431 -3670 oject: �5 _ CU ( Inspection: A\ J Add ss: SZDI s .a� Date called: Ix; �� Special instructions Date wanted: (l I t a.m. p.m. Reg2tee / sacell2 Phone: CApproved per applicable codes. El Corrections required prior to approval. COMMENTS: Cep ,nry Qp t‘ 114 a�, c �—g It 3 ti),5709 ortAre,,, Inspector: Date: 2 /43 $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection:� ... 1 Rereint No 1 Date: INSPECTION NO. INSPECTION RECOR Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3670 Project: C iI Type °f Inspection: / 7'L Address: Jl D to call: Special instructions: \"'"0 0 { j fr\y.N(Th ) Date wanted: '-°C) (gm. Requester: Phone: ���I) LI-':?)- q --IU7- d nApproved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: 11 A.4 .r 1 El $47.0 INSPECTION r EE RE • UIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. CaII to schedule rein pection. Date: INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 IT NO. 206)431-3670 Project: 3eci ti 1 e 90r6 Type of Inspectio zD Address: `..1 Date calle P Special instructions: Date want . a.m. P.m, Requester Phone: nLotR n4-124.4da 0 Approved per applicable codes. Co rections required prior to approval. •, COMMENTS: or .11 0117141 ( Inspect& Meal, Date:il 11 I 1.1 $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 1 kI,. 1 rife.. REPORT OCT 2 6 2000 ISSUED CONSTRUCTION TESTING LABORATORIES, INC. 1201 East D Street, Suite 101, Tacoma, WA 98421 Telephone (253) 383-8778 Facsimile (253) 383-2231 i 44: • 41tV', .„! IIM, t We...144A, 14: 12 lE 0 DRESS Segale Business Park twit picKED-up Oct. 20, 2000 TSSPEC cAtfr Oct. 19. 2000 SEGALE BUSINESS PARK WAREHOUSE 2:#047-rQi Segale Business Park Drive "D", Tukwila Client / Pacific Concrete CONThACT NO. JOB NO. REPORT NO PROJEC NO. N/A N/A 981 204 T-1356 ...i...f:r."1,3TNI^Z`1,014‘, 1' ; ti,ff:XJ, f :;"'" *,+.• 7" E 5.11 "A■l1 'f• 'x12" concrete cylinder eath eath • each REMARKS Ni RIVIZWID M KISAKIfrnd pm-KED vp BY (INSPFCTOR/- itsuottiiicRois Ward / ilsta Timm' 1(1/20/All / Data RNA, 111/2111/211111 REPORT OCT 1 6 2000 CONSTRUCTION TESTING LABORATORIES, INC.ISSUED E Co E. ni Ei 1 East D Street, Suite 101, Tacoma, WA 98421 Telephone (253) 383-8778 Facsimile (253) 383-2231 Oij 1 8 2000 COMMUNITY DEVELOPMENT • DATE PICKED-UP DATE SPEC. CMF SEGALE BUSINESS PARK WAREHOUSE . " . Segale Business Park Drive "D", Tukwila JOS NO. ADDRESS N/A 981 Client / Pacific Concrete CONTRACTOR REPORT NO. PROJEC NO. 202 T-1356 i'v,^k7:""a41:i NSPORTED T. IREPA 3 6"x12" concrete cylinder cath 'REMARKS' ‘' ; N/A PICKED VP BY oNsPicr,oRT- E.GANN/fmd Word 1 Data Timed: 10113100! Date Reed: 10113/2000 inith/JCRoss RE CT: 1JN 9 2000 JUN 1 5 2000 c;��vlttfi�� r�-Y CONSTRUCTICW44`�r1iV,Co LABORATORIES, INC. ISSUED 1201 East D Street, Suite 101, Tacoma, WA 98421 Telephone (253) 383 -8778 1, .i.:x. •:...a': •: •Vj.:.a... ", w'.iw•:s.. l «v:t'.f. :.'a .. G'.,li ••i'l i` p,.•J. .. :.aj •'�����t 11 :.�P .r r� aah .k..•. ' � � } ; � t 41, Y'r irt � �5 1 1 h 3 Y ' � � Sf PAGE: of � xil . 1 c:;{sit...+ Segale Business Park DATsoFwsPECTroN :' Jun> -, ,100 C s. PEa rHa..+ : ' 199.020.. 8ULDINO • SEGALE BUSINESS PARK WAREHOUSE PURCHASE O DERNO.: = "a. """'e N/A BUILDING # 981 coNmucTNO :,.JOB° V.o. NO.. 981 Segale Business Park Drive "C ", Tukwila , ADORE88 iREPORT NO 199 coNTRAcToit • Client / Pacific Concrete ' toJEc NO T -1356 I arrived on the jobsite to perform special inspection and field testing for today's scheduled reinforced concrete placement. Inspection and testing performed as follows: The contractor placed approximately 25 yards3 of (fc' 5000 psi at 28 days, Mix # 59504, 5.9 sack cement ratio, plus 110 lbs. Flyash) concrete for slab on grade at wash bay. Prior to concrete placement, inspection of reinforcement steel was performed and found to be in accordance with the jobsite plans, except for the following deficiency: ✓ Missing two #4 along the angle. They placed them prior to concrete placement. Contractor placed concrete as follows: TRUCK # TIME AIR TEMP. CONC.TEMP. SLUMP 405 06:20 HR. 55 °F 65 OF 5 -1/2" I checked consistency of concrete and cast 1 set of 3 each 6 "x12" concrete cylinder test specimens for com- pressive strength tests, representing today's concrete placement. See today's concrete tests report (to follow) for results. CLOUDY ° { R.1t1EVYED: WEATHER: rl INSPECTOR: ,,; . S.HONGIfmd ., , �. DMSmitb / JCRoss Word 1 Date Typed: 061141001 Date Recd: 06114100 Building Permit 1 revised by Frank Swenson (clbnq an Jan. 10, 000 013:30 hr. Wont 1 Date Typed: 061051001 Date Recd: 06105100 CO (J3 Cg 0. CD co. CD cn O. CD 11% I g .5•44) OD CO as REPORT ,JUN j 2100 JUN 0 8 2000 CtJMNiUNi ISSUED CONSTRU fif hliffING LABORATORIES, INC. 1201 East D Street, Suite 101, Tacoma, WA 98421 Telephone (253) 383 -8778 1 � a ' ,4 h.. x..i<m...frF,• • :,:,ya• .. s Old' ..,if,. :4'. .'t � :1... - ,,, V �, - ;14,z � v z "; r 41' ' }'""" kd' PAGE: 1 of 1 +„ t'A"�'% {i Vi-0 �F�'.. S�S , �j J;'l�' iYtii'•...r5:i i'l Segale Business Park DATEOFiCON June 01, 2000 cuEar M199 -0209 eui�oiNO r�+rrNO:. ,: SE6 A LE BUSINESS PARK R WAREHOUSE E i;PURCFIABER N/A NQ.''` # 981 N A ;•r;,: BUILDING 9 Segale Business Park Drive "C", Tukwila rtx r„a -.: 981 ADDRESS REPgirMO; ... : 198 CONTRACTOR: Client / Pacific Concrete ago ci i�D ` T -1356 ;Iri e, :'� i 1!{, 4.;' i t)r F. WY.. j1 :41V ,; •ii. ., ..4 f`Y' 1 iI4.A .. J k ? r x. ,1 . 'YtiN'; tl i .rfri' - A 7 72:SAh±f: i±. V.\ ,: "PI% ... .;r:, L... .f.{: 1i I arrived on the jobsite to perform special inspection and field testing for today's scheduled soils in -place density testing. Inspection and testing performed as follows: As requested, total of three each in -place density tests were randomly performed on the compacted subgrade crushed rock placed on the west side of building #91, from slot down to building at the warehouse doors. All density tests performed were found to be passing the 95.0% compaction requirement, as per attached copy of in -place density tests report. :: •. OVERCAST a,• vY t s rve•. *. 1 V� 1 �Tgy�pp•• ,mow :r'�:. v�. .6- tr'.C:�i�r��;• IN$PCQR • R MELTONIfmd .. .. .... :.... !;d;!„ Li;c +s,., � r:,•:,•:.:;::;}:ra;,; .r.4:, .,;:, J,CRou - .:.;:::::' : .....::.:::..:...::. . =:�. '': �i: .;:c�i;:r }!'J�•�,i';r�.�;h�. p.i %: iwr :n��:ir�:::Lt:i:• "l.:'!�;'•:.: .�:.. }'': �.,.;.... Word 1 Date Typed: 06106100/ Date Rood: 06105100 Buiidina Permit • revised by Frank Raman Wind an .I ..10. MA s 13•3e he ( REPORT MAR 2 n zutiu CONSTRUCTION TESTING LABORATORIES, INC. ISSUED , /7 r. , it:,n d it— MAR 2 1201 East D Street, Suite 101, Tacoma, WA 98421 Telephone (253) 383-8778 Facsimile (253) 383-2231 ,.. . . . 4..` ,i; : _ . ..r. . 0- . 4.m...f.t.IT*'o .,g,•-Ait,•,,,1:414liz,e444 kr,,,4 -.. r'EVAW4A31.64.1:1; , ''''" .-, • • , .. ,. Ditspicksitur • ,. Segale Business Park •March 15, 00 •:.Cliant.. : :. . • Ciiti Spar:: Cost: : Marc 0 • • , ... Segale Business Park Baig Pennit No.: M 99-0209 .. .,. POrchela Ordar.k. :.... ;'..:"'"'''.'''•'': Warehouse Building #981 C„ .___N/A • ,. ji)bilte. , .... Segale Business Park Drive "C", Tukwila • ". : ,. ..• Job No:: . . .. : : 981 .. Address: • • . .. . Contract NO.': . . .. .. ....: . l' , Client / Pacific Concrete • .' • Raped 197 No.: . . .:: Contractor: , P • act; No.:, .; T-1356 veiggRAIP,;1(44410Afil'i,-').*::,:ft"$0'0ANNO6 4.0gaissfeig.*-goval.K4ONegiVIRMER.Waggie.Wii::::A ' Picked ns o , ',. a ora ,.,e ar r. testing .. 3 •-Each 6"x12" concrete cylinder :'.:Samples . . -.' Each ,:':Samples' .. :Each.... ,:Samplet-, •-: EaCh.. -.:Sarriplee.. . Each .. . . '.. Samples ....:, Each - amptes:: Building Permit # revised from D99.0143 to M199.0209 (west retaining well) *.k70:Se41:4.c, ti4‘ '..titiffigiVetic. 4,4111401,::: le '$ i! 3 ''''''' W34■1;t.' r .":,:.11 ,.... ' .10,Ztilitftaltatt:Y.40.:;'. ... REMARKS: ' .,.1.:...::,.'::.:„:.:.:..:::.:,:,: D.SMITHIfmd INSPECTOR: 'i : , jCRosi . Word 1 Date Typed: 03117100/ Date Red: March 16, 2000 Building Permit revised by Frank Swanson (client) on Jan. 10, 00 0 13:30 hr. From 099.0143 1°14199.0209 (west retaining wall) REPORT MAR 1 b ZUuu CONSTRUCTION TESTING LABORATORIES, INC. ISSUED R E C 1201 East D Street, Suite 101, Tacoma, WA 98421 Telephone (253) 383 -8778 Facsimile (253) 383 -2231 FIELD .INSPECTION REPORT : r�J :: , , ' i PAGE: 1 of 1 Segale Business Park r m m u irl i Ty Date of Inspection M.,. arch -_' 00 Client ;..' 4 Hf & L (..' iv) F 1 . Building Permit No . ` 99 -0 project Segale Business Park Warehouse Purchase Order No If , ' ' Nam. Building # 981 contact No. 1 /A Jona. Segale Business Park Drive "C ", Tukwila Jo No.: 981 Address: 186 Report No.: contractor: Client / Pacific Concrete Project No:: T -1356 . i... , , , :." BWktft Permit Oa 'i :.D99*0143 0.14199.0209 (wes't :retaininp.wafl) `. I arrived on the jobsite to perform special inspection and field testing for today's scheduled concrete placement. Inspection and testing performed as follows: The contractor placed approximately 8 yards3 of (Mix # 7004) concrete for the oil -water separator lid. ' Prior to concrete placement, inspection of reinforcement steel placement was performed and found to be in accordance with the project plans. Contractor placed concrete at slump of 3 -1/2" throughout today's concrete placement. I cast 1 set of 3 each 6 "x12" concrete cylinder test specimens for compressive strength tests, representing to- day's concrete placement. See today's concrete tests report (to follow) for results. NOTE: Concrete test specimens cast today was stored in an insulated curing box for proper initial curing at the jobsite. Indoors - 46° F @ 07:30 HR. RRIAEWID ` INSPECTOR :: D.SMITHIfmd 41f D UkfJCRou Word 1 Date Typed: 03110100 !Date Rood: March 14, 2000 Building Pam11t 9 revised by Frank Swanson (diets) on Jan. 10, 00 @ 13:30 hr. Fmm nos.AlL.Z M UIl 4.A9fll1 !weal retalninn want Work 1 bate Typed: 031091001 bate Recd: Match 9,2000 • if C O Co O N/A ta:t W rehouse Building #98I ,•• • N/A . IsSUED - . IN PLACE. DENSITY TEST REPORT , 1 CONSTRUCTION TESTING LABORATORIES. INC. MAR n zuou 1201 Exist "D; Street 211 APB = Above Pipe Base, APG = Above Pipe Grad, ASG = Above Subgracle, BBSG = I Belo* Finish Grade, BFTG =Below Fooling Grade, BG = Below Grade. BSG = Below Sub Surface Base Gdurse, CSTC = Cnished Suirface Top Course, FG = Finish Grade, FTGG . SG = Stibgrade, ISGFTG* Subgrade Foothg, SGFIIC = Subbrade for Base Course, ToS SU • e rade • • 10'.east of wall, 80' from north 50' east Of wall, 150' from north 60' east Of wall, 110' from north 10' east Of wall, 60' from south 10' east Of wall, 140' from south 30' west of CB # 13 ',EAST;SIbEOILALL, 1, 180' from.north. • . .w . CO . �I ,� .•1 ..J �I r4 ..1 443 ..A 4:4 4114 a A OGIwN...2 -+CO 4b. — 1CJnbeCO *^ � ; f .uy e rtt,--. 4 e.. „"lr-r•-4,..'e"".:1" ,032:j.selr,-.4 CA.1' ;f:t4i;•1::434,=-:- 1-11;t-i;vi;-.1-12.z1:-::: I. RESULT(S) STATUS _A,, —6, _ • —i. • ...1 - N W W W W 0.) IV W "...I CTI W Cr CD C,Q,c,C7., CD _s ;,': :y;•. N "$ V • � fir. � '�' . • s s • s s _ . - . - •try • if C MAR 1.4 2000 REPORT MAR 1puu jQMMUN TY , CONSTRUCTION TESTING LABOR1ATOR g, INC. QED 1201 East D Street, Suite 101, Tacoma, WA 98421 Telephone (253) 383.8778 Facsimile (253) 383 -2231 x' iI. w ... ...... F ,.. N. .. � �_ :; c REPORT MAR 1isaim CONSTRUCTION TESTING LABORATORIES, INC. ISSUED 1201 East D Street, Suite 101, Tacoma, WA 98421 Telephone (253) 383 -8778 Facsimile (253) 383 -2231 r . .. .... .. , .. . , . ;'•V,I :,l.,, :., . i • ( REPORT MAR 1 0 2000 ISSUED CONSTRUCTION TESTING LABORATORIES, INC. 1201 East D Street, Suite 101, Tacoma, WA 98421 Telephone (253) 383 -8778 Facsimile (253) 383 -2231 FIE' c y,'^dor,12:7.41 . rt, yi;{'�'1*., F5.4 ,yte'.r'3.. :�4' :'%'..4%va�''a.'f'`.� :4-'1. i' {wINSPE '!1411 E O t'z �, , n , 7 �t .h =..1, � Jir rt i? PAGE: 1 af 1 Segale Business Park eg of. March 06, 00 lnsp�etion >'�' , P mi t: ria '; ::: M 199.0209 ON�r o: N / A :_..... BuMin9 ?,Ptoj ?:" Se ale Business Park Warehouse yetis Building # 981 :._ .co„t No.: , . N/A ....,:::.�" a�.. S eg ale Business Park Drive C Tukwila , k 981 adder, 193 R • poR No .• .. .. Client / Pacific Concrete rojeclMo.:: ;.;:.:::;:; T 1 356 t; :. s , . u = ,..., , w c , . , B'Wtdtnit_Pdimititit:- tl994'143' tar. MI99 -0209'(watcuhiningiiatlr i . ; .. • . , • I arrived on the jobsite to perform special inspection and field testing for today's scheduled reinforcing steel placement inspection. Inspection and testing performed as follows: I inspected the reinforcing steel for the oil -water separator walls and the wash basin walls between grids K.5 to L.2 and 18 to 20 +. Inspection of reinforcement steel placement was performed for the wash basin walls and found to be in accor- dance with the project plans S2WB. The reinforcing steel for the oil -water separator walls require adjustment of the steel for the two beams going north and south. Adjustment required to insure proper clearances between the bottom horizontal steel and ties. Also, several comer bars (top of wall) require adjusted to insure proper concrete cover. The remaining reinforcing steel is properly placed in accordance with S32B of the project plans. F E E VED MAR 14 2000 COMMUNITY DEVELOPMENT CLEAR, ,:. >, PECTOR �� D.SMITHIfmd �.� r < + "' ^'1 , , !'D a th /JCRau .�1. � ..�:.;�: F�:r •,,. i Word 1 Date Typed: 031081001 Date Recd: March 07, 00 C ( 'EPORT FEB 24YuUu CONSTRUCTION TESTING LABORATORIES, INC!SSUED RE:CE ED FEB 2 8 2000 CGW/U -TY r i r'rY 10111 South Tacoma Way, Suite D -7, Tacoma, WA 98499 Telephone (253) 588 -0805 Facsimile (253) 588 -0928 7 _ '•Jr .'�»p,�,, - I r)`.�9777Z''r'C�''Fj•Y{{ ''t&1.aAI�` .�°'yy 't1"rcny�z�.r3`s�•`iF'; f;�C:3 'S '!.'+' .'7},�. ` x" y]� ^;t•�' Rr�':. r '' ,,l., '.` "`FC,�; T'r�`� .r,�'�l .+;'m'_�•v, � ° ' 1 .-at 9'"! 7 tt .3 d T f.„7 G76,77, .:.:1'_'''• t•q"i,,y.r7,i .;YT'' % .. ;. �•• .1 ' 'F^' ^f . 1 1 ;Jq �bi• _crpI• I 1, `i fit i; ','.. ~ �Y'f,- re!:' - r 'v `4+r..:-r .v •ki va :";. �• ie `� t.:" �Sa, , '... !r Q •' 7[tma -Li m..w!...Vma..1. /'' -,r�i yr• , ` N 'S' .i.. �' 'VlS J, 1 (Z: a...%;!r,C / ;14. `4..K;i� /Ya�•J re,,yc'4k�r� � r$1' sT 'i+�r��,r.,s, ��ati.�fSx�si:s1` �a�'=aS.��ifi�:�n�.9�(:a�r.' '` �f::: s6ta��'; Gt; �i�a.= r: tK,: pa:6i�y�s''�:i`S��Yy�;i�r� Yu. ; li. ,,,k ;.t. .. _ .• f }.i {e�• ' "• ..,rL,,, :. rY.rJ`44,'• .� ' ' Segale Business Park ...��ovu',: Feb. 22, 00 Feb. 2100 :: Segale Business Park 9.020 Bulkgrlp Pik No Warehouse Building #881 .1P1!/�Cltail.'o *.. Order., Segale Business Park Drive C , Tukwila b 981 Stan... NIA °; ; contract No Client / Pacific Concrete rt No 182 .. r k %`Co ntractOr. y r 1. i• '`�(' fi 11 - ?' .y A' ,� '1����p tyAr' �'R,'` H � .} .>; t�r.:ri' c' t 'v'} J Y Y.Y . , , A C. s �.' i , .. iii ,R'...t ,.a .. '�y'. r"T7ie '4. j4, -,.•. ,'q^di ' 4 ' •, �ti•h < % aSgh,,, , { '- !' ''��A, �tSx t�� ik. +�.._ .. �% uk.. '.. fi•' .,•i• 4y}.,, ...F t�.; r.. '�' ?. et>a_ �• {...,...•., 4j. { ' oci :, s. t' .•M�A�� �w •.I itdE�1CZCGSAI.i'.itYC:SA.vS yA•N.'1`.7v, t'R.- �t:. •,'i '. .a4," ,:'.:,. ,,'c: <. f . {. ... '(" vyr . ; i `tt 'sir I .:Cr' :3 Y� - p, , ar, a- 'c •l�: y��;2 .�� ,,^•^.i1.7 r 4�, ,4t,{��i.Y4 N' (�� 't��.CSr. ��'{"" .y1�.�?',. -F�,�f �tlf. �. {r{ ti <��''l } +w t �:'}X t r l,X � %�i fA J.f f.�+lti %�. "t i A � ' i L� -� i;Picep�traII prtd,o�he�b►aary;t :1d;�f�ur °testing 3 :Each - 6 "x12" concrete cylinder <Eacha'> Each`::` Ead `. :,: :::::.:: ,:Sa-:::,;:....,:f..;.,..,::..:, les:::.:. >;. Each °` , ....: i.SAt1 tees;: Building Permit # revised from D99 -0143 to M199-0209 (west retaining wail) �+, + ' F '�!'r �"'Ay y �a�+ 1r !a "•7C,3�K�T t � � .�'1'i -,�' � �r� + 1yt �}l a, �r � r (�' R ^ S'rp'` :; Y •i: isq ', t. T "1? * t'J' '-` {2 , rY �. 4,94 ' 5�ig".t.'a !r4 .. T 'F r i�.'� .,r:,.rr�•,r.�s'�y1 g t`J t'•� 'S SS..�,�.Y.t4* AfZia ,,p, rj 9. rr• 7':r..i`'• •�Xl�� '9G11L'�k�:, ?��. . }'. )A' �. }1S.'`iSdr��•.'.S \'��. �`&C4��L' i•� �.s� <: d.. .y, t. E ARKS• :. R M . ,: :..*: q.: ;...;,;,:r, P: ' '' S.HONG /fmd iNsPactoR `�: . V ': Ai:: }i:.i.4 ^l' „1?; .t'. �si1:5:'.. ■..j.�■ . pcpo.s .. :' . . :�:1' ? ^i`� ^. .._: C.rr... .... :.e.i:U, ... ::il:�r {;�y,i:.i't �.... :�4..a .•�.fr.t: +:l. •. :I fry...... ... Word 1 Date Typed: 02123/001 Date Recd: Fob. 23, 00 Building Pernik ,/ revised by Frank Swanson (client) on Jan. 10, 00 13 :30 hr. From DS-0143 to N1994209 (west retaining wall) FLL 'ORT Y [p��� /�1(�q�. ,r.�^;.,�- `;� FEB 2 is 2000 '1 U lil.•..u! �. rl% ... 11 CONSTRUCTION.TESTIN , ;, LABORATORIES, IN SUED t' L. ;) /r r..o 10111 South Tacoma Way, Suite D -7, Tacoma, WA 98499 Telephone (253) 588 -0805 Facsimile (253) 588 -0928 ... .• F ..�........ .. ��:�3'i)�:^�.,Yr��. rMyk,��-S�L"yV�A T... �r��..�. ;L:i,.1.+..!•'t•.y li�jt »'' � y, ♦�y.: W: .h�LL `.•Niatiq•t %y,Jlkt :i7� 'S•.I.wiR1'X,41^ti.. �1a"k�1�n.• k�S. � '! S •i•I � � •!- . A.'L'Lp'1• FL. �+�w. A,��f" -''' Y Al:'; �7Nr• 'l.�>'ry - rf{!•SJ_i^.f.�+ZT.R<L,rti.( rt Z {:h%' A. ,l.:....�.. .�.. .,.., ^.4r.- ...�.: ... .....J�..�. ..... -..e .n .a .. ... i •... ..'i•,�.,�r.r,. ,v�•'.a Ay V..i i�'IV:IMS•'H «�1''ii 4•'M TCSV.II•�'L 1, PAOE.1 1 S eg ale Business Park ab picttona'�`;` �% Feb. 21, 0 0 In _ , Id emit No M 199.0209 .�. P ; Segale Business Park Warehouse has, Order o N/A Building # 981 Can No NIA { Segale Business Park Drive "C ", Tukwila 981 Address 191 Rrperrt No.: Client /Pacific Concrete P •ct N, ;: T -1356 FrY �j�[t - . j .. � a• r•}. � a' n , , s n: • y'. r nY;t s +:; i •� r b ..Svtr, ' r, t�t�;�t�•v�•' ^' �•�( 4 .11�} }"}f rtl�— it .[' '/i��T7e ' ,{��r V �.�.y �• �sS,,?" t'1 .'.'`- .•'�.. jl fi, rT: "S` ,„ ., G•:1 3•g 11.. .hsJ . _ '7':}� 48 .. , ;. ri�. !.. �i ;;)�a+i�:Cw �•7%r::s •n:'r"..:..�_ I arrived on the jobsite to perform special inspection and field testing for today's scheduled concrete placement. Inspection and testing performed as follows: The contractor placed approximately 47 yards3 of (fc' 4000 psi at 28 days, 6,5 sack cement ratio) concrete for bottom slab of wash basin, between grid #s 18 to 20 and K.5 and L.2, and oil separator tank at the west side of building. Prior to concrete placement, inspection of reinforcement steel placement was performed and found to be in accordance with the project plans. Contractor placed concrete as follows: ,. 1F^ _« - K'. # .r• :.r,,, �«} � t . f ;,i. . r�•r�� �. T I E F M P C na 'Tr C l TM.r rf .'.4Y.•i :r c�..S L. MP a r..;�� V > •o- ai ... - n a 417 08:00 470 640F 4 -1/2" I checked consistency of concrete and cast 1 set of 3 each 6 "x12" concrete cylinder test specimens for com- pressive strength tests, representing today's concrete placement. See today's concrete tests report (to follow) for results. NOTE: Concrete specimens cast today was stored in an insulated curing box for proper initial curing at the jobsite. RAINY • 410 F @ 08:0 HR. . <: c ,.. <.,, '\'s ;WEATHER.::' INSPECTOR:-. S.HONGIfmd : , , . , , , , , , , a l .s Word l Dab Typed: 021221001 Dab Recd, Feb. 22, 00 Building Permit 1 revised by Frank Swanson (client) on Jan. 10, 00 13:30 hr. !PORT FEB 2' MO RECE.IVE'D CONSTRUCTION TESTING L B RATORIES, INeUED 1 L. 1-1 IJ 10111 South Tacoma Way, Suite D-7, Tacoma, WA 98499 CO i'■117 Telephone (253) 588-0805 DEVELOPMENT Facsimile (253) 588-0928 . flt- ' It.1 01; 1 ' • '`;1 PAGE: 1 1 Segale Business Park ,.:‘;,,,,ii,:-.3,1,'.‘,,.--‘7n':f-Y,,-,T!' ii:'-et ins ' ' Feb. 18, 00 , , 9 -0209 B'iIdIn ,:.,, M19 Segale Business Park Warehouse .1, ,:,,: N/A Building # 981 N/A Segale Business Park Drive "C", Tukwila , - 981 „ , 190 , Client! Pacific Concrete T-1356 44Milke 11.ilile, 4:7737.-':: ''' I arrived on the jobsite to perform special inspection and field testing for today's scheduled soils in-place den- sity testing for compacted native subgrade located at west and NW end of building #981. Inspection and testing performed as follows: As requested, total of 5 each in-place density tests were performed (using Troxler 3430 at 6" probe depth at random location (parking lot and sidewalk slab at NW and west end of building #981). All density tests per- formed met the 95.0% minimum requirement, as per attached copy of in-place density tests report. . . SUNNY .,„.,,,,:,, ,,..0,... ,, .';s. ''11k.'.(N. MHER REVWWID 8!!!-T49,1! C'.: JHROSS/fnld .„.. Word Date Typed: ono, Date Rad: Feb. 21, 00 Building Pim*t revised by Frank Swanson (client) on Jan. 10, 00 @ 13:30 hr. 00 'tz -gal :Pas owl 1 mum :padAi e 1 4 I.,..1 ...., I 11 ■. te()ISISTIttreilONITESTINGLAIIORATO '. -.,.:*-71.,...,.,:...'i"4::fJ.,g,:::z.;,:.?k,,,.. rs!"."-84114i1A.a4a31‘ 7:=4/:,,,,w2,,,..,-;,:.,,,,,,kt.,,i,,„.4%.efizge,,,.0t,..-4,.•:::::::+,,,,,,,,,....,?,,,v,-,,,.,:.,.,-.....,,.....:,--,..i.:.r_g=;,:.:f,5.1,?-1_,:,-,:p,-„-:_ii:,t-:-A'!gC&';':fir:;;;'''EzidiNai r-s-') - ' • e A.7 i!r:7777; o,, ,.. 11441LIICIEIDEIVSITIrIEST:::REPORT.:1: ::::: .: ..... :... :,,.,...,,,!.....-::::::::,,,--.:,' :',:..--':':::.;:-: :' .::: ,:'-i:,.., ---.',. -- ...:.--'-.....,--..t- :,..: .., . - Segale Business Park ' Feb 1 .."''' T 1356 ...',.:';..::'"......-0%.'.1.:1 1 V07:71 1 :..,:.:,ortTy:::,. , • : 046-:,7 _ e_ . _ '-'.\\prolitisit:::-..... a 1-..:.:, t:-`,-:''',7... :- - - ,, -.,. , ,..: ::‘: ... ,„ ,...-..::,.:::::::„:„--,:i.,,f:. '''''' ' ''''''. '...': :' r.' -: 99-0209 ::::--.,,,biti.::.,,,-. 981 '''-; 190 :;R_opiiii.ppi7..:;:t: . Segale Business Park PrOlict;:;:;:. Pun* ffo.-.:: .:.: ... ,,. N/A Warehouse Building #981 .. . :: .,..:.....,:„ • ' - -.. WA/ Ner.,.:-;.:,,,::: ..... , - - i ' Contract-No: . --____-: . Segale Business Park Drive 'C", Tukwila PG. NO.: - :-...-, : N/A JHROSSIfmd • :. -: -... : ..,,.:.. ,, .: ASTM 1)-2922 11141lice Dank Test Neilsolt.. . - : , ... . : : . . . , .. ..:::;:;.:. . ..,-,,.,..: ...:-,::„..: .....„ `. - - '-'• "'"' ' Client - ASTM D-1557 :, Costrectic',.::,: : Illeidouir Desist/ Test Illelhad: . :::: 4 ,,,,,,,,nil-:?,•tx-tr:-..0 ;,-.:,:,.:.,„J.:is,..„,......-.:.;::,::::;, ..„,., 7,, ..,, - ..:....-...:::: ..W.: ... ,,,.Edias-::::,•7:i.lf:--"-: -,'-'<- .'-:::f''-2T-''''.-- :-.:,:.::'-::i.;:"..:.;T.:'• .';':-'1::::.::.::':-.:iV::::-::::;Y:,::: ,:-'.,..':;:::•:.'::.:1-;;;::':..:C.':'-'-'::''':•:: ::: i.::. : ' : .:: -:: : - ....: LAB''':,': ';:;:t1ti4Sitt..!'i.:: 1:::'•::::': can f-::: K.::-MelCAThrV.07:-1 Ctift:;:::-;: ?Vr,c7::., 1E-61“:.‘:;''' ,,,:'''''''::' .LOCATION- ."' ' ' ,--: - No - , -... ,. -1, CU FT:',2 :.: MOIST::'-- -, . ' ' DRY WT.:.:': ,1:-,,LOPTINRI1.:::::: :.-.L.:.‘. ,,,..:i.. :=1::::..,.-;;,..,. ,,,:::::,: ELEVATION • ::. .*:...'''-':-. '.:::::':': ':..:. '' -.....: .-: ..- s ...-- . ., -. - ... :. . • : ..: '...-:' ,.'.7..'"-.,' :.. wEr"It.''' :'.:': DRY 7: : , ::::'•:' SRE:::;', : ''71.:'.11CV 1":`,F.'-'''190111"-::::,::. ".'s-.PAct--- -;,.-:iluns.fy:,., , _ „ - - -..i,;•-,:..-,:i,z*pAR. laNGAREA.:--::,;-:;:rs-i-_,,,,,.:7,--. 01 96 TOSG West end of building # 981 P- 8 143.9 135.5 6.2 140.0 6.2 96.8 95.0% 02 97 • SW comer of building # 981 " 143.0 133.6 7.0 AS U 95.4 . . ._ .. . „ 1,XISTING:ACI..:;.:,,:,--::::=:::-.,.,_:':, , .... 03 98 TOSG NW exit P. 8 142.1 134.8 5.4 140.0 6.2 96.3 95.0% SIDEINALIC'::..',-- ''': -- :' -:'1 . 1 04 99 TOSG West end P- 8 142.7 134.9 5.8 140.0 6.2 96.4 95.0% . ..... SIDEWALK.Ili:STAIRS:':::-.-,;::,,,,:..), 05 100 TOSG NW side P- 8 143.8 136.3 5.5 140.0 6.2 97.3 95.0% APO = Above Pipe Base, APG =Above Pipe Grade, ASG = Above Subgrade, BBSG = Below Basement Subgrade, BC = Base Course, BFG = --...' -,:.....:::,:.•E.EVATIOR r'r : Below Finish Grade, BFTG Below Footing Grade, BG = Below Grade, BSG = Below Subgrade, CSC = Crushed = Course, CSBC = .,' " ';?:::•:-. -r::-'1,-.,.r. C°116-::' , Crushed Surface Base Course, CSTC = Crushed Surface Top Course, FG = Finish Grade, FTGG = Footing Grade, NG - Native Grade, OG = Over Grade SG = S a ' rale SGF = I . rade Footin. , SGFBC = Sul 'rade for Base Course, TOSG =T, . of S 3 a rade RESULT(S) STATUS ,., C0111FORMS:;, pf4S JCROSS.' _ . . EEC= 11•3311 1111381101M1 Ya nsrr•.+ c: wsxro .rr.^�•^z.^•,��r+r.n'x!wx r,•sxtrict ?;,kfttl2:lR! REPORT FEB 1 7 2000 CONSTRUCTION TESTING LABORATORIES, INS,sSUED 10111 South Tacoma Way, Suite D -7, Tacoma, WA 98499 Telephone (253) 588 -0805 Facsimile (253) 588 -0928 _ . • ... ev '61044 }....< y .errs , ts,- .11 - °' d ' Ma' s Al Gi: .)f . SY . . : f' y l. 't;4 ,s „� dry: liMP r� - M `� PAGE: 1 of 1 .... ... ..... .., 1�..... ..,. .. t-...._.,... .lv_r.r�i....,.r�..•.xj...a� -. ...... %.,. r..1... r., . iCuCFi7 .Sts••i�'.t�.,- +y'�.^•F:S.'r • 4 �r.rr. .,.•woYa; Zl.�.xr�r.��.4 Segale Business Park Dat. of • 10„ Feb. clLer BuIIdinS Pernik No 199.020 Segale Business Park Projoct Nam ' � Pk W h ;: ` +chisivOr No . . • Building # 981 ; r Conhact No NIA d. Segale Business Park Drive "C ", Tukwila :Job': No . 981 Jo6sit. A, . R.port No.. 189 for Client / Pacific Concrete p„ ct No Ti 1356 �Tvi' .n k' Y ,('•.Y;t• L.u•:.,.� �rx..�. f�.r r--. w xy ^. • �tnr alN• �v ri�.� s.frr ^< .a..r w,�: is i s � � rr. •i?�^ , �- .•It," w n'' •ik�:�:,�' Ste; 1: "' l� dy .r,..�;�1: }�:� i� }. T r ld� 5�'i'��.'•�'--,,,, fit i //��{{(■ 4. Y:C' fMY,�•It:"Ir� , R^Cr�r:t vt .J;• ,0 r A}�:a ';1-'ta'iq�S•�_ B ; 1 a It J�* t■r'1} X99.0 W r+■ i a> > C..N /L (T. YSP��t Z'iy".�,s hF 4�:1 � . '.�C:e d �� �MI�[.t��, , ��A': ��'�7 �f'�1��.��l�.�l.g j��.� �'!Ji'�a�10� �.r'Fi. ri�'•�il+.t�?'. •fi'f ic'i7i7Ca lM- rst',fi I arrived on the jobsite to perform special inspection and field testing for today's scheduled visual welding in- spection. Inspection and testing performed as follows: I inspected the welds for the shop canopy. Welds for the north two -third (2/3) of the west canopy are painted. Visual inspection indicates the welds are acceptable as per AWS D1.1 -98. The remaining welds are not painted and are visually acceptable as per AWS D1.1 -98. RAIN " ' 4A YVE11TiIER r .f ;: INSPECTOR. D,SMITHIfmd :' : �dCRee %;;:7:4'., : , � ,:.,,;�::.�.,. _..i,,....,,,...r .,: r f •.. Word 1 Date Typed: 021161001 Date Recd: Feb, 15, 00 Ruifelinn Pannii 1 eiaaad hid Cranir Quianann fw_Ilanfl nn .Ian 16 _ M A 190%A hr CONSTRUCTION TESTING LABORATORIES, INC. 10111 South Tacoma Way, Suite D-7, Tacoma, WA 98499 Telephone (253) 588-0805 Facsimile (253) 588-0928 ,.. o v, , .1° C' J.'1,1.01.1&*■,y,:;;Vki,W.v1:04..,Pi, :■.M.N...z.lx)..j;;;S:r VV. 1'.;"*..:1...""!:. 4r...... V.:. • rt'i , . ",- in. alle',:V.:.4:::::;:`,1i,..'0,S,AT'q,::+1::.*:41s.,..7!;-'0- .'i-:`■-kt.4"4;;,5 i', c-.1--,:...1.....; Ail ' V,,,,,I.,,, Segale Business Park ..,. Doti Pkkod ti:,. - ': Feb. 02, 00 :-..:-.. lIent .4..- 44i4.-.-, „,....,-.4.A.:4,=4.,:,.:: F- o II ,?,:':!,4-,..Dittai.Spoci C • - - -- -'.-::,--,",,"2:-.';::,.....:'••: . .. . . Segale Business Park • '-8011ding.Pomiit'No::: ; M199-0209 lei row i.,,:•N;,..'.,. Warehouse A •-•:;.:., am .,,..,: w Building #981 :•:-•:"Ptirchase Ordoilk..' . -' ...: . . . . : , • : • 1, It , . . .. .. • . '.- :•• ".. '',' :,,, Segale Business Park Drive C , Tukwila 981 -,-,‘Jobsitik•-,'_",.. ,:,,:::.,joli ',.ti • :‘ ;;iAdckress: 1::" N/A .:•.,-:,,,..:Cakiitioct No.: ''.,:. , •-: :':•:';. ; 7';' ::-,''''::::' '":' Client / Pacific Concrete i.poo. 188 :,....COntiaaor:, ':, T-1356 ,.:,,,,...:.‘13 -.NO:i:j• -7.7.!:-.77-77.7,'-; n79 .-e.-.._.:.:,,::,ii...k.i.1.,..-.),.kai .:;:*.. ;-::ii, r.:F' 't, ":-fri ..:;,;;:t,,•,t4i-.l... .i,i,eikls• ,5?.v:Fi 44‘fp,.t11,,,-lit :".<fr-- '.'''','`,• ''''' C e ,trans I ' ,7 a - • .F . . .. I 4'...• ora , ;:. ,.,.:,... 1 t,-..;• ,t ., rtc7.7,:t. 1-.1-7..r.tpr,:.-?..r,-},-.1, ,--,.....47; 4:4.....; ":.. 4.-:..-2-•', , ,•,,,,.!!..4■••= ZiJA..:•.':.1`.1:L!:LT.,".?:::L.W‘fi:::,.:a::41.4. 3 • .Each . 6"x12" concrete cylinder . Samples . .,.,_ .4...... ,•. - ,.... . 1..:•...,. :12 Each 1:Sakiples:'•: ::•::::Eaeh • . . :'SaMPles • . EaCli: . . . . Samples •••• ,. • Each . •:..Samples•„,, Buildin ,,,-1-7.4;.,...;,T;:,-,•,..: :;,:•Eaeli,-', • Permit .,. 7.77:,,7-.::;:::::: ...1i-11:ik:i.-•:L;-..1.:- #s : D99.0143 to M199.0209 west retainin ..s.,..,..,...,,,.....:,...'„7".", :7...;;;::.,-;-: . --- ; •.:,":, . , - .- , 2...Fil...p.::":.:i.:•:a.:.:.o,...,;s!.:1:::, :•;::!,. . -4.:,.... 4.. 4;_. '..::.. :.■ : - .*: -- . .. Sa , • : . ., ::•mples,: , . . wall •::.-.. .)...,.:- .:,...1::-• REMARKS, .;.. S.HONGIfmd : ',.:INSPECTOR. . , EV1 • •• ... • !,;:.:•E:,•;.'::-?;,'.By . . ...„ • . . JL •••-,r,,kw,---:',..,-.,",!----,,,,,,,9,,,,,..,,,v,,,,,,,,,,,t,s,P., Word 1 Date Typed: 021071001 Date Recd: Feb. 03, 00 Building Permit 0 revised by Frank Swanson (client) on Jan. 10, 00 @ 13:30 hr. From D99•0143 to M199.0209 (west retaining wall) CONSTRUCTION TESTING LABORATORIES, INC. 10111 South Tacoma Way, Suite D -7, Tacoma, WA 98499 Telephone (253) 588 -0805 Facsimile (253) 588 -0928 - .T� . { i � rn !1 f! f' I � 5 , f. ~Lr 1 1 N5 . � -, ,....-,,,„:„.„,,•:.; :�: • .yr t;yi. PAGE: of , Segale Business Park , Data of Inspection: , Feb. 01, 00 m M199.0209' Perit No. CIi.nt Building Pied N„ Segale Business Park Warehouse Purchase Order No.: N/A Building # 981 ' Contract No.: N/A JoAtld:. Segale Business Park Drive "C ", Tukwila, 981 Report No.: 187 , o.: T -1356 Cunt or Client / Pacific Concrete P +.t. j :�i is 1 .�1.. r;.,•... 5. .!.: ._ ,',..g Bui diit" ��Pe�it��s� :.YD99�0�1'43�to�.M199fi209 -'. west�`retainin �w�all ,: J�: -...t..:......�...... I arrived on the jobsite to perform special inspection and field testing for today's scheduled concrete placement. Inspection and testing performed as follows: The contractor placed approximately 12 yards3 of (fc' 5000 psi at 28 days, 5.9 sack cement ratio, plus 100 lbs. Flyash) concrete for two sections of retaining walls, between station #s 4 +70.76 and 5 +28.48. Prior to concrete placement, inspection of reinforcement steel placement was performed and found to be in accordance with the jobsite plans. Contractor placed concrete as follows TRUCK # TIME ` AIR TEMP. .CONC.TEMP. ! ; ; SLUMP;` ?r , 343 08:20 50 ° F 63-0 F 5" I checked consistency of concrete and cast 1 set of 3 each 6 "x12" concrete cylinder test specimens for com- pressive strength tests, representing today's concrete placement. See today's concrete tests report (to follow) for results. NOTE: Concrete specimens cast today was stored in an insulated curing box for proper initial curing at the jobsite. . RAINY - 50° F @ 08.00 HR. I N WEATHER: REVIEWED INSPECTOR: ;. S.HONGIfmd By D rage.. Word 1 Dab Typed: 021041001 Date Recd: Feb. 02, 00 Building Permit 0 revised by Frank Swanson (client) on Jan. 10, 00 @ 13:30 hr. REPORT FE b 0.3 luuu CONSTRUCTION TESTING LABORATORIES, INC. ISSUED 10111 South Tacoma Way, Suite D-7, Tacoma, WA 98499 Telephone (253) 588-0805 Facsimile (253) 588-0928 , 'TV. '' ' - '''' " is. .....!.,...'... •,..^.■.: . .1. .. •••C:7,7,...}.. ',..;.".... :,.,,. ••.,...-..k. ....,.. •,■ ...i.,,,,.. . ..,, .r. - . . • , :,i.j.i.A•AN;i5i,..y.,1,4. c., ,,, .,. illit.,.■:.:,;,.,.. riit■ii;,..tiVx.,:k14.4,,:titi,..*„..1,.,W.,.111414i.:4::riii4.44.„,,,,:;..;,4.• ,:,./0.,,:,€.1it::::.4.7.,:;,.. C-/,'7..$i'Vs'eg.',1;' 41:4.5P:C4S: {CIARIW.rig"gftif, ,?•10ii,.;::::1$$*:,";.111 - 7:1^..77.14;.:?..`kirk;.;:j1P.4ittS.; • 1 , ..'l hitl:.A.N+ r.4.1"ost, tre'l....!... ,44-.4#0"rtiltolte.t.T.;$5127:1/44\•V:V.ef, :..la ,41.1..A.T.Ifet..ti.,r.t.;kr 1%;,,e..:,, Segale Business Park ,,.;,:„:-..,...„...:.:-.....;..-„,,,,,, ,,,., . - • . ..-- • --'''''' ' Jan. 28 00 ;0 Picked, Up.. :: I Iv' ' , CII•Att:1'':. . v.., 4.7..,:,::' :::.: n ;;;* :;:".= :` .... '', ;•... ;•1' i:',. '..,- f: ' , .;.:*- a ec .........• - ‘.-..i...''..i.,'':.:-....':..'...; Sp.. Cast :,.: , J , .. : ,....„ ..,..,.....„,- .,..........,_.„...„-„,-__:A‘i Segale Business Park . :`.1..:"::•Y‘1,_.• ..'•' ";"(:'.'." M199-020 .- PamItt NO.:::•;'-' Name: . :. -;-.: . s,„ri.•,t'.:.A.,r....,!.•:•:',,Avi A Warehouse Building #981 , urchase Order. th.., ,! Segale Business Park Drive is C", Tukwila ,-, ,A.,....-.,,,,,,,...,,;„ 981 or-W. .". '''. '',.,:; • :, Addrossv. , ' N/A • , . . , , Client / Pacific Concrete 186 Ropcirt No.::. COntrictOr:.. -• ,-:,.7,. ,.. ' , ....1-.:( ,;• ...*'::.,. T-1356 , , -'..;. Nos.:;:,-::;.: !,,-...,..,,,:t.,71,-, .71,1,7477,z,tr..2--...: ,,.. , ---'7','-.-z474-,7:71g,".,, :47.73:..,-.77.'77.-7'....‘.1177-7-;".--77....-,-7,7,... •: ,.. ,.,-,..---,, ,,,,-.--:;,,,?. "--,4, 41,1:y.- .'-4;4=c.4..f.'" !-,-.t>..,..L....:„.4, . _,...:.,._- .:.:..w2Lz_',...L;:l......t.-1:::,:t.„-...;::-.11-:...if...il...4-.,,,,.:A._..t.:11.,.-,z,L.,:i.....L.L.,...a......,:,,L...z.,1:..L.1..-..:‘-.L.L-.:24.1;:.,- ,t1.:4,- N..y.:.-ii?:',U.',4,ii:.'7,t.X.fl'isft."Ps.',1:1C.i:e,A€:!....-7ii741',k!:tRi;-'47e-e.'"'-',fi:fSi:, ' ';'-r..i. •;,1+ - --.. -rc--='''' e , . it;t5.'; ' S I 0 . ".?.R:i '''....!?..''''iiAlrritY'esi'A,:"..kti'')N.:'F''''.-Fe.gt);7iiiffi'Z'Cl,:i!.i.it'atAiY' ".'"'";•2,..L'.;riCetr.ti.7::::iirt411.'1.4I4741-5',' • •,... f a o :a ei es , ...,::::::::, 1 • 3 •i::':...., Each......: 6"x12" concrete cylinder 1:.• AmplesH: , EaCh:•'. Ssaniplea......: .•-•,•Each.' . . Sapies Each . Saiti. . . • 'ples'.:- .. :.',.:•Each. ..:. .'Saiiiples'.: Buildin Each . Permit - #s : D99-0143 to M199.0209 west retainin . ..... .--••• . wall '"-''''''...:7'4.c-'7",---7rt!''.7'`-•.- --:7-.:: `: -7. ''',- --',— -"----'- 7'.."-:".•-•—•,"'---- '.-":""‘..-""- 7-, !‘'•‘; ,- .2,..REMARKS :-. ,-1,-,..,,,- ; t...,. • .: , . .- ........,..::,:&-a....;..2....,.,.....'..."..4:1Z.r..:::,....N.r.:;...._:::2.,:t,...,....;',..L.:;.....-.......•.,... ':' ,..-....:,:.,' ..-. .__:-A...— ,.:. -,•-••• : ' - : 7-a":":''.7"..:*"" .."•" —..- 7,- •77----;•-;.--:7. •••-,,- - • • • ' — 7, .INSPECTOR:'..' R.MELTONIfmd ' REMARKS: .,, . , • . ", ....".",,,..,,,...„ ..v6.5‘,Ti•pg,;;;D inidrr at,moss. p•-:•qi- t;5•1.t.i'i-6.,,,AA,..',..0..,te,-01:ti,:A Word 1 Date Typed: 021011001 Date Recd: Jan. 31, 00 Building P.m* 1 revised by Frank Swanson (client) on Jan. 10, 00 @ 13:30 hr. From D99.0143 to M199.0209 (west retaining wall) REPORT FEB 0,3 'a CONSTRUCTION TESTING LABORATORIES, INC. ISSUE 10111 South Tacoma Way, Suite D -7, Tacoma, WA 98499 Telephone (253) 588 -0805 Facsimile (253) 588 -0928 J .. - •Y . " - - 'y, i`•�4 pr � :�.� ^`;..'� �i; : .t}Yi- 'T,���ii"�2 4-7-4:r �� �t 'yx �'."w �'•�-'tc'4 . � y�rit., '"r'', • . = t'- ash•.. ....., r '�.+t., �:Y.•,.....aY -� .'2.1:4* mss;: r.:S:.a.,: b.,.....z .= ? "^:y,r...Y��� ia1PwG ��:t0fa Segale Business Park o,a o, . . • Jan. 27, 00 Cllent''� ro Building Pemnrt No. :. MI99.0209 Pttrc Order No...>'.. Project Name: Segale Business Park Warehouse „ , -'� N/A Building # 981 • C,o.. N/A Jo . Add =. Segale Business Park Drive "C ", Tukwila ob. No.: 981 Report No i $5 ?.r Client / Pacific Concrete P�, iio T -1356 ;: �. �;!a�:w'tk1�+.'li:e:�tl%t>¢S: }tE �. (�<?;; 'h 1�2:: :ia -...� .k::� .�r,.�:'ti:.;:.; �.. pr �jJJLL 'i�..r��uJi3•A.4 r: -.:� f;.4y -H L`;''f. ^ia� '!'i '.l.,;.. ., w { .DulId1 ��: :v „.: "r .�a . r4 .:.ii ,,::�, . ;:�:.��::;;��..r`�::•���.;,�;:� n : Pecmil�; �: D1: 43a arM199= 020�:�westi~:`re�airnmg`wa!! •r�� ��::��.;;:,,� r�:��:.�;.:�,�.;: I arrived on the jobsite to perform special inspection and field testing for today's scheduled concrete placement. Inspection and testing performed as follows: The contractor placed approximately 56 yards3 of (fc' 5000 psi at 28 days, 5.9 sack cement ratio, plus 110 lbs. Flyash) concrete for 8 sections of wall, between stations 2 +39.88 to 4 +70.76 and column at stations 5 +28.48 (Hotwater Mix). Prior to concrete placement, inspection of reinforcement steel placement was performed and found to be in accordance with the jobsite approved plans. Contractor placed concrete as follows: TRUCK # ' TIME AIR�TEMP ; CONCITEMPS ;` r'' <SLUMPr 301 07:20 40 ' F 630 F 4" I checked consistency of concrete and cast 1 set of 3 each 6 "x12" concrete cylinder test specimens for com- pressive strength tests, representing today's concrete placement. See today's concrete tests report (to follow) for results. NOTE: Concrete specimens cast today was stored in an insulated curing box for proper initial curing at the jobsite. . WEATHER;. CLOUDY - 400 F @ 07:00 HR. INSPECTOR. . S.HONGIfmd av - D IJCRou Word 1 Date Typed: 021011001 Date Recd: Jan. 28, 00 Building Permit # revised by Frank Swanson (client) on Jan. 10, 00 @ 13:30 hr. Fmm noo.AlL'i fn 11IAA.A2A11 lw.nf r.faininn wall% CONSTRUCTION TESTING LABORATORIES, INC. 10111 South Tacoma Way, Suite D-7, Tacoma, WA 98499 Telephone (253) 588-0805 Facsimile (253) 588-0928 ; PEC1'10K-SIEST,,,REPORTIOr.CONCRETE(A 17114C:39)0,gMj:Q:Waii iS;i141g,4., T..f....:: . •"..;!::Client:';',:'::; SEGALE BUSINESS PARK - . ,' Date of :Insix3ttion,,:, Buildihg: Permit W.,. Contract No-•....: H. Ja 100 '-: llaP :.:project''''; SEGALE BUSINESS PARK ...:-. Name '.4H WAREHOUSE 981 ...:,:.:., , ,,, , No , „,„ . -": --::=job-Nif,•';; .': ''. ... . . . 0401 NIA _ Job,iite .:-",,,:-, Tukwila -.'.- (c 2 N/A ‘Ad Iiiti:-.:::; : -,... : eport o...'.: ,...,,., 185 ':Contractor Client '-'.-"-/-.Project.No..::--:--1;;:::::, T.1356 ontInSpikticie) Yes. --.Rebarintpetted:.:' :::.:. Yes. placement. Rerik. `,-2.2 See field inspection report for information on forms and reinforcement steel .-,-.::: Pump Method of Placement:;.:' . mettloodt.Consolidatibni:':: poricrete-Suppller:..yi-:.:,;...;;:;: :.LocatiOn•ot Placement: Vibration ; to:OfYarti(s).placed; 56 yd (s). Stoneway Concrete ::... 8 sections of retaining wall between stations 2 +39.88 to 4 + 70.76 and a column at station 5 + 28.48 I:tiOrt SaMpled::, At the bottom lift of the wall, station 2 + 39.88 to 3 + 55.32 jATA;:; ';,::: MIX # 5950 A (Hot water mix) ,.. , , CEMEPff , :1,''. CEMENT :.•., ..: ',MORTAR .:'.. SACK -7:: 5.9 f''' •-'' TYPE :. '.,: 1 '':'''. TYPE '1::.:,, NIA SIZE:.:::-...: ;‘..;•• , ' , ,: : . ,, AGG 718" 'i'.'SLUMP 4" :'-AIN.(Yo..:' NIA Adni*tii,: '.':: Flyash '-,Arrituri : ''.- 110 lbs / cu yd . . WRDA 64 26.4 oz / cu yd ADVA 13.2 oz / cu yd Polarset 66.0 oz / cu yd ;Conde eTerrip::: 63 F ,Air,Temp.:',7::- 40 ° F -:',1/Veatheri..1). Cloudy ,:,]., tut : 301 3 -,-TimeSailipl 7:20 hr. --,Ticket 120712 DESIGN STRENGTH.REQUI t":'- 5000 •,'ir 1' : .CYL Na- ,.. .- LAB NO . , ,:DATE TESTED ..-.:.•:',. AGE ,, AREA ,,,, .f. :. DIMENSIONS :24: : -, '','.`;.PSI,',;:.,,::,:,'‘ 118A 0-0733 2-3-00 7 28.274 in2 6" x 12" 4950 118B 0-0734 2-24-00 28 118C 0-0735 2-24-00 28 Remarks: : NIA REVIEWED - ,,,,I,::: S .eithien s) Recd In Lab : Jan. 28, 2000 •:* Inc . .. :,.:- S.HONGIc• - ,,, ::,:;:.;': MSiniths1JCROiS': REPORT RECEW Efl FEB 2 8 2000 _CONSTRUCTION TESTLNGI ABORATORIES, INC. ISSUED COMMiJ,N,TY DEVELOPMENT 10111 South Tacoma Way, Suite D -7, Tacoma, WA 98499 Telephone (253) 588 -0805 Facsimile (253) 588 -0928 1•r • _ 3 1 7 1,c -ir 3 e7•42-KT.`" , �:7.:1! . • - 74 Zei n, _ � arf.d•.:dv�. .nktmse .r `§' P t -h ir'Y ids M!; : ,A.%.,,+- u✓a.. .,- :.•.•. .viw.a a L ,.wa�c:.w�.a.r'�a.� +� � :rt: � ... + J i I ;< ' ' SEGALE BUSINESS PARK Kb , ; dT7a7. D _„ .tiii ;„ Jan. " " "'a -15144 il^''." : 4." �V.A,� .ter +L,�E?;s;� N/A `Aim .4.,'S F. "'"= SEGALE BUSINESS PARK 11`4:,_►_}i� ti 3, WAREHOUSE 981 ,:, `; f�;, .,t: "mod ; Alf, n, ie, �h ,„ .:• ,�.�� Tukwila -r� � �•:,.� €;: I �•. 4 3i' r.'.. TC r 1 is " :^'�' N/A 1'4"p a•. C�!ar. lh'�. s M�Y I•fiC.•�• 'IV ,dress'i4 ; ` fl!�" 'F 185 Ctitft�airt6c7,. Client w fit • •,•_IC*:A yr 4 T -1356 F- Yes. ,,R6kr%fsctei:,,a.,:,, Yes. See field inspection report for information on forms and reinforcement steel placement. �. ,..� M� ot~Consoir �CcrSupNe�� ncati''ir: Pla1c `, , Pum ttdri Vibration ';� �' t' . No:oflt�arid(sjpiacei;,: 56 yd (s). Stoneway Concrete 'en ... t 8 sections of retaining wall between stations 2 + 39.88 to 4 +70.76 and a column at station 5 + 28.48 t} ztior%, mipted.4 TAl i At the bottom lift of the wall, station 2 + 39,88 to 3 + 55.32 MIX # 5950 A (Hot water mix L.•. TkP i%'�T•I y f f :,•SAC .-' 59 Aiditiixtuis„ f •a: GI�IEI 3ywa E 1uP�1' r 7 .�.�.� y� 41 ii ZY i �r;FY!~' .24'; ? 1 �'��a.TYP'Er , ',.i NIA ,�S gi�pp. ki:Arrrs s�,07'% rL'.. l.f A h� 'l, I, �..� ?AGC z�` :�� 718" �.{; SLUMP';,; 4" AIR%: NIA Flyash < ;Atom t , 110 Ibs / cu yd - WRDA 64 ' 26.4 oz /cuyd ADVA 13.2oz /cuyd Polarset 66.0 oz / cu yd " cirici t4, , " —:r No S:;,..,1.„..,,.., st x 63 o F ', T. 40 0 F t -, a ec�tr Cloudy ;Ti ke 301 { ' 3 , 'ime Samptedrz }'': 7,20 hr. 4Ticket': �= 120712 DESI,,f�NSTR NGN REQti!RED 5000 psi Y,!•.t:` 'a415'�� - CYC NO� ��. '. :d 7k'� :, L 4.4�AB ;NO f j•F ;J•� }K .'-:m �- %:. DATE<TESTED: �, 5 ".'.': .•fs ?�- 'i2 AGE: �:_ ::rS�J' °'ti's ;���A` ,. xuY a - 4REM =, z; ' M.; 'ro' =,D1MENSIONBr°' 1 ll r . f i f. > ' �...`PS1 . 118A 0 -0733 2.3.00 7 28.274 i n2 6" x 12" 4 95 0 118B 0-0734 24400 28 " 6 68 0 118C 0 -0735 2.2400 28 " 683 0 CONFORMS Q�ti ris' N/A A. w!;4.k:J•, u+1,„ },. : -ir ,�- K x� ���” � ��a�,��� �y r•�: �a��� ,��?��: +., P ;,.y :,..e„? "' Y't ✓. ^•1"'.,.ya..�.;,i.,.v• 1•..sT �_ � .N� -.�., � ,In �'� a, �:,� S HONG 8 ens ,In ` . Jan. 28 2 0 ti�,iyt,. :�r * ; n. „} .. ; � . -_ ,. a w��..DM$i�nithfi `JCROSs Wnrr11 nat. Timm'. A9M1MA 1 !UM 10111 R 1 RaI- UPORT JAN 3 1 ZUUIJ CONSTRUCTION TESTING LABORATORIES, INdSUED 10111 South Tacoma Way, Suite D-7, Tacoma, WA 98499 Telephone (253) 588-0805 Facsimile (253) 588-0928 RECEIVED Word 1 Date Typed: 011271001 Date Bud: Jan. 26, 00 Building Permit 1 wised by Frank Swanson (client) on Jan. 10, 00 @ 13:30 hr. From D99.0143 to M199-0209 (west retaining wall) FEB 2 2000 „. , , ,,,,,,,, .. .. , - ;',- g';.,":=,,,:ill.,-''','7,1'p.. ;,g,',-,:,-,!1:4•,;,,,,V. V.:4111,..30.??,:: , ..; . f;`;'„i0!,,41-.),,, ,,1:. ' ,(•%..,4,...0.. ' ,T , .24:zi....... 1 , N'4,Aiit,kb::(11,,,v,y;:,,11;11,:‘,1:17;,p; t,Zi,;;A.,■;::.1,1.,';',;;,:,,?,4_,„ . ,.,..,., ... . is,,.4,,fit„0::T.i.741,?;f...,,,Ak..;....?,.i,,.;.,,,2'...., Segale Business Park ..:.,-.T,,,f.:,:,,-_:-,.:1,,,,,-:,..,...,;,::,,,;:-.; r,-.-r.i Data Plckrid.Up: t..:';...; Jan. 24 , 00 comit.., : .2:„::::,... .„Cast. .,..- Jan o • Jo:, .. i , ,•,. .. et‘; : ' ' '. -.... Sessile Business Park ..„ , ., , . Project -..:;,''..,-;;,.::::i .-.f.,. - '':i,' .';','..!.'. ; 'i:' Wild arm . M199.0209 .:..,:i.,..Narrie:::':',;:;':-, Warehouse -- ;,,:,,,..:, ......,i,>;:.. Building #981 :,:,,Pu Order ti:.''',',".. Segale Business Park Drive "C”, Tukwila '. ' Or -W.0: NO.: :..:. 981 „,..Addresit::.:.. _.'-.::::',:: :,,...,,..-,. ,.i.:..,,,,,,.,....::,.:; •,. :-., f Contract No.:-:.:',2.',/....': • Client / Pacific Concrete Report No 184 „,.,:,,,-, f.• :-.7... ,i , , ;,'''';•)-; .:..: ::-. -,!::,— ContraCtor:':: '.- :•:,,..,.....,...P No:: !, ';::,:,''.c.i T-1368 't,";;F"..:7:1'.7•••:.;".!:,- ' -,1 '7.f];';'-':.!7,r,-'5.,„ ,. , ‘.717-':vr:7=7:--11-TRyt.',•,F.77- --, • --'s-7z,7,,:7F-7-.--2,'!'",7%r - " ...r':.r'7';'I'.'r:7'"',r'I,'..z.','7''".''''3':,'.:-F.-,':-''r,7r.','I-,--7:'r,:;i7,t'fi.7':-,,- .-,::;.r. A - ..:1,,,h,..;,..,:..;,..:,z.:,:-:.,-.1:..,r).:_ ,,•_„...'4.,..,:::.V.;.--:: : •,.::.-:.'...r.,:11_.'x,,,,;,., ,-.:',...-,-....-,-...,, i,".:.'..1...i..t._.11.414.;,Z.,:x.,;.,' Li...::::;..\,.■::::i.-.;;;:sif;;,•_;-.1;:.!...1,:v.,.:"...:-.:2.`,41 ' V41f:" FV-tiisl,%:':iiii:....TO.:PA'illif./S.4',i'Al,;`,ii...,,,;..:' 'ci7,!..:1/4,',5.,;?;;,::' ',74,,,vp:'' A ;',Y,'.." 1 0 • A . Y, , ...„,„..,.. -,,,,,, .. ,.... - '-i;.:-..;v,.Q2.,:ip•:.:.,7i.tN;wi.,iliff'e" '6,-.ii."-oi:t.fiVi2,4-7;:',1,Yiy.€iit`i.I'P:'"'"q:' r ,. .„, ,f, i , 1 , ' sti ., .,, .,,.•. '...-a.r.:'....,...,:r..,-;:;:,-,:::,..:::.;;':;.;,L,Z.s_:....,- 3 Each _ 6"x12" concrete cylinder • , • . Samplea:.,,,, ,..y. .1 . ..... .......:.:.1.'„, '.7.... ...: Each.:•::, ;SaiiipleS::.:',..,' '..:... Each : . . Sarnples „ •EaCh. Samplesn: . • E• ach. .,,,'. • .,, . .. , •,- aritple,... , Buildin Eacit:'::, ! Permit ; ',.::.;,. #s : 099.0143 to M199.0209 west retainin .....zr.,:t.:k.1:,',... :.: Y.,..,;,....-...,.: .,,,,,.:r„. ::,...._. • ,,y. ‘... .,: ...:,_:-.- • .; . ,:.., ' , ' :_.. ', —; ,..'....' ::.smlioie:::, ! wall , .!...,. . ., . ; . S.HONGlfmd REVIEWED': ...; ;;;'.;;;;;:ft.1,./4.X.,,I;:',';',1) 4.V° RECEIVED Word 1 Date Typed: 011271001 Date Bud: Jan. 26, 00 Building Permit 1 wised by Frank Swanson (client) on Jan. 10, 00 @ 13:30 hr. From D99.0143 to M199-0209 (west retaining wall) FEB 2 2000 rq tOc) REPOT FEB 0 1 ZUOU CONSTRUCTION TESTING LABORATORIESPINC. 10111 South Tacoma Way, Suite D-7, Tacoma, WA 98499 Telephone (253) 588-0805 Facsimile (253) 588-0928 Client SEGALE BUSINESS PARK - Date Of Inspection: Building Permit'No.;,.. Contract No '.:. 'E.-•::: ' : Jan. 21, 2000 NIA . Project , '::::: SEGALE BUSINESS PARK WAREHOUSE N/A '.:Name'.'::-,.; NIA ,JObsite-..-; Tukwila Job No N/A Address :,i: ' - Report No .:.-:. -. ::ProjectNo.: - - 183 •, .Coritractori:::, Client : T•1356 ' FornilnspeCtion: , Yes. -- Rebarinspected: .:-..; ; Yes. placement. Rerrks. :,-- See field inspection report for information on forms and reinforcement steel Method of plecement:.:-:'- ... Pump Method of Consolidation . Concrete Suppijer::::..: Vibration No:of Yard(s) placed: 40 yd (s). . ! .:: : Stoneway Concrete LodatiOn of.Plademont .. 5 sections of walls station 0+30.35 to 0+60.72, 1+21.44 to 2+39.80 and 5 columns 3+55.12 to 4+70.76 Location- Sampled: . , At the bottom lift of walls • MIX DATA:: MIX # 5950A ZEMENT i'. . CEMENT:, '''', ,;:::''MORTAR'.-' ACK '' 5.9 . '.' '.:* I & II ''.'' -.': • :. ' . S ' NIA - . . . ? ,AGG. ; : := 718" : .§LUMP • . 5" ' ' AIR YO- NIA AdMixture: .:-, Flyash ‘f;AMOunt: '. 110 Ibs / cu yd ADVA 13.2 oz / cu yd WRDA 64 26.4 oz / cu yd Polarset 66 oz / cu yd Concrete Temp: -.. 58 Air Teenp: .- 48 0 F :Weather::, Cloudy ; Truck # 1.7,, 341 •Noi. Spec. ast: :: ; 3 I TimelSarnpled: ''., 12:15 hr. ,:Ticket:#::,., , 119778 's DESIGN STRENGTH 'REQUIRED:. :: 5000 CYL NO • LAB. NO DATE TESTED - :- .AGE ' ''''''.AREA --: ;DIMENSIONS ', , ' " .:,:.PSI 117A 0-0579 1-28-00 7 28.274 in2 6" x 12" 4190 1178 0-0580 2.18.00 28 117C 0-0581 2-18-00 28 RoMarki: :' NIA REVIEW Dits SOscimin(s) Recd in Lab: ; Jan. 24, 2000 : Inspector:' S.HONGIca ';:,1.1,Y;',;'.'„:','.., - 0 mIth 1 jCRoss REPOI-,. REPOR FEB 0 1 ZUOu FEB 22 CONSTRUCTION'titliNG LABORATORIMINC. ISSU (3 ICi 10111 South Tacoma Way, Suite D-7, Tacoma, WA 98499 Telephone (253) 588-0805 Facsimile (253) 588-0928 'AMP= ' AEPORTIOMCONCRETELIASTPC \i4:- .aMe UNAs2.1*- rizikVia' 4_, %el QhL - • SEGALE BUSINESS PARK Date of..?IiiePticiiiip Contract ' No '-'-:'''f,:f;,:.] J -,4,14:41 100 i Name !Js..BtAdiiiii:Peirnit:NO'J, SEGALE BUSINESS PARK WAREHOUSE :!:::::--f: NI „ - i ' A ,.„ 'Name „ 'Jbbsite, : ., - Job N :-• r_ ,,,. 4ReportNo -,c.A,6 N/A -. Tukwila N/A Ad&ss - , • .,. . 183 Client :-.,,.!:t:: ktNo,..: T-1356 . 601-,.lit.pectiOn:;:4 Yes. ';Rebaelt4elied report for information on forms and reinforcement steel s Yes. ReaiI e:'''. See field inspection Pump placement. Method'#PlaceMent:-::::: ' .1006800f Coriscilidatide. PO••1 CI.Pte'PLIP0110C;j::;E ; 'Atkin Of: Plaitement!...:.'' Vibration . No.'ef. Yard(S) placed 40 yd (s). 1 '' Stoneway Concrete 5 sections of walls station 0+30.35 to 0+60.72, 1+21.44 to 2+39.80 and 5 columns 3+55,12 to 4+70.76 ' ti"-atiOn,Sampled At the bottom lift of walls . ....0 TA::::.:'ii:i MIX # 5950A CEMENT CEMENT MORTAR SACK ' 5,9 :'',,'..--`: ,'''-''::'; l& H NIA SIZE':',,,- , ■ ' /. f , :n` ■:"...”. ' ■ 't ''''-':_.!AGG:::•':.',': 718" 121-.SLUMP.,.1': 5" HAIR W NM ' RV LI , Flyash _, . . :: 110 - lbs / cu yd oz / cu yd ADVA 13.2 WRDA 64 26.4 oz / cu yd Polarset 66 oz / cu yd •Cenctip:i Terrip: , f Nii:‘ 15-0e". a'Sf.''-]:.:,' 58 :-:' -r...: e -r,.. 48 ° F Weth�r; ; Cloudy _ 341 3 Time Sampled ':‘ 12:15 hr. Ticket # :.*::,I= 119778 'kc■EsiGtimENGTH:REQuiRgpti,-..: 5000 :,,I.:::p81.: CYL NO •'' • LAB: NO..:. ' :, : . :::, DATE TESTED ,.• AGE:., ':.:','":',`):..AREA:-:'''.: •:: DIMENSIONS::: `:, ,=-• , ''''qP51.:1, 117A 0-0579 1-2640 7 28.274 in2 6" x 12" 4190 • 117B 0-0580 2-18-00 28 . 5980 117C 0-0581 2-18-00 28 6080 CONFORMS . , N/A 2-- vq:),•;:f:;., - „ ,r!,.•,1,,,; , , . :' men s lieadlii Lab Jae. 24 2000 I',:;..''''.i':;; $ .HONG/c• .„ •:.,:, ".., -=„iiIi:46,4i DMSm1th l' ' . ' JAN 1 7 ZUtiu CONSTRUCTION TESTING LABORATORIES, WED 10111 South Tacoma Way, Suite D -7, Tacoma, WA 98499 Telephone (253) 588 -0805 Facsimile (253) 588 -0928 ._� �.�1•Mair��};:5riy; C i ' r�1 SCi it ,.*:i•'."i:r�1�, "'r �? �i.1' ,' "'.^ -'" . '7f 4' y � -c. -.. {..,• . MELD';INSPEU. IO P n' '�:- f,4• i s , Sy: ,.1.- rte. ,a�7' %•r • - j i- }lv..M7TMMi1 Ui�.an 1c��: . . .. f �Y• • Jri GiT1M -ten + 1,., *'Yt .. ..... .... ..._...._ .... ,.�.._..,. � .. r':. �. wr.> r:; ?• ��• �, x=•: C:.....,_.:: 3:.:• x� •;�:;:�;rw�:.;5.c°;;=�3r:::,.. -: 1; `�..r,PI�OE::./�';•.ct:.:':� Segale Business Park Dat.ot Inspection. ns i n ;.. Jan. 21, 00 Client: . Build` P m; No - , MI99.020 Pr ect Name, Segale Business Park Warehouse haw order No.. N/A Building # 981 ca; ,� No N/A Jobsite Address :: :. Segale Business Park Drive "C ", Tukwila Job No.: 981 Report No.: . 183 T -1356 Con r: :Client /Pacific Concrete PreotNo.: %�`'i`1�. ��1 i.i_�.- i:�:t:v!}�r li 7. f''!w i" -f. s. j�° :14� .. i`nil�'�. i ►l.�i- ft•�i•t:: 1lll�• ��.:• 14 .v\ i. 11:ftii iii .'.. AAtcw =s;} -2. ta1,z: Building=Pre�ri[t# D99:' :.._ :t :,:,_ 9-O209 trefainin :watt �' rt:,: tr- >,:.--p.; � z:.4Y4. I arrived on the jobsite to perform special inspection and field testing for today's scheduled concrete placement. Inspection and testing performed as follows: The contractor placed approximately 40 yards3 of (fc' 5000 psi at 28 days, 5.9 sack cement ratio, plus 110 lbs. Flyash) concrete for five sections of walls, between grid #s 0 +30.35 to 0+60.72, 1+21,44 to 2 +39.80 and five columns between #s 3+55,32 to 4 +70.76. Prior to concrete placement, inspection of reinforcement steel placement was performed and found to be in accordance with the plans (ref.: inspection report dated January 20, 2000), ows Contractor placed concrete as follows: TIME; .. f �. ,s� .LAti : TEMP.:. ,.....,, CONC T . • . ,:.,. 341 12:15 48 ° F 58 s• ° F 5 I checked consistency of concrete and cast 1 set of 3 each 6 "x12" concrete cylinder test specimens for com- pressive strength tests, representing today's concrete placement. See today's concrete tests report (to follow) for results. NOTE: Concrete test specimens cast today was stored in an insulated curing box for proper initial curing at the jobsite. . wES►TMeR : CLOUDY f 48° F @ 12:00 HR. J_ REIAEWEO. hts�t5 1 INSPECTOR: S.HONGIfmd . .p,.,.,.,.._.,. /JCRwr;'::' Word 1 Date Typed: 011261001 Date Recd: Jan. 24, 00 Q�liLliww Qanwili roawL (-w AA AA , 44.411 k. ,.�r.. ,.. «.:,....,..r, n.:;:- r•;,�:�t • • r...yurv..,�.tr. ri. e_ w+ w'.:.:,... wea*. 1.. ,.,.t.yx.v.,,�............,r._. •:5,;"r•v w- •...:..W.;....rr..my. �r.r}...a.., w; .i.....'f.l','- ....':••.•:�ra�: a...a, REPORT JAN 2 6 201W CONSTRUCTION TESTING LABORATORIES, INQUED 10111 South Tacoma Way, Suite D -7, Tacoma, WA 98499 Telephone (253) 588 -0805 Facsimile (253) 588 -0928 ♦' ••[+- 'IL; 'ti' Ra�}I''�: tiL '( 1;t Vii-\. .fMy, ;.alt' •rfN'.• >y/r't-, (� n �1 11` ?''ice' il,a. .�.�(y�..a,;. . , .�'i5 aM1S+ ..e1:lr' .'.1: �= ilf'•l Y•I � '+( .�{••.'Y3 Yl t: Ji,yi'1[�F:f. �+ � .f +i * ,.��`...•��•.` :•� .� ��� ,� .r}.� ,r T Y ifY. 5 L.'.1 �•r Ul• •�'Y4 �.�.t J.•. f•l�a. ._. .. .. F7*% J we .:S'l?t•'A1 X4`..:2!0.. L. a }. +:� � .. •Jc.>.at. 1. .. �.. iT -r .:�..�•[� A...,1.-,-,.. 1 �a .... N`.�'lt�� +lf J•r.l'� ay%�Yrl�l!l�ry��ff tlx:. /^.�!...ti.'r • �.',,.sPAGET� :;- Segale Business Park oate o ,,,s Jan. 20, 00 cll.ne- ; Buladln } Permit No M199-0209 Segale Business Park Warehouse , ` '' . :- N/A .= Project Name. `'' Ruehasa Order No::.'. Building # 981 :co, No. N/A u u dobsita Add Segale B us in ess Pa r k Dr iv e Tukwila ti. No.: 981 eSS Report IYo i 182 ; Client /Pacific Concrete P,, j,ct 1, o; T -1356 SF'. l• v�.;` ;:• :p•J?�i ..}i. .1 t. ;rar.. ,, .1,; ..�..nr,,. ,:.tL:+ C[ ^;. r• ?,ra' ;1.;1 J:.. +bl' +. °: ,._i.. iNfdsr ri: �. � , 'z, .y. ••1•guilesin iP'e�nnit ilia 90:1'' 4t; 199 •0l west retainin •.wall 'i .•v;t� j.} y � e . a I arrived on the jobsite to perform special inspection and field testing for today's scheduled reinforcement steel placement inspection. Inspection and testing performed as follows: I inspected six (6) each columns between station #s 3+55.32 to 4 +99.82 and two (2) sections of walls between #s 1 +21.44 to 1+82.16 for the retaining wall, and found that the reinforcement steel placement is in accordance with the plans. i • CLOUDY ; t:: i',.t,;,;,.: { ;'f� WEATHER 7 t RE111EWERs INSPECTOR:: S HONGlfflld i?��!:A�,•,. ::. >::.1' ;•` ::a :;tai` '' "? .. J::;,,:,...,:,..,.:•:. , "YS:: "x� ,�' /JCRa ��. sH,,,.1 ,3', , ,,, , :;: ?; �LrF r. 'i ��„ '�ti.,':: Word ! Data Typed: 011241001 Date Recd: Jan. 21,00 EPOR1` JAN 2 6 2000 ISSUED CONSTRUCTION TESTING LABORATORIES, INC. 10111 South Tacoma Way, Suite D -7, Tacoma, WA 98499 Telephone (253) 588 -0805 Facsimile (253) 588 -0928 \ •f' jat.•;�: ;•�� ,�'. • .. ... .. :" ,L:r.•Jt .•."1]:', '.:1...: :.5:}.i': ..1:::: :1: ",� : J.1: 3. t:f`,i.'r.,. xn.' rPi,.., "i.:. • it. �.i.,C'nrt3,l ....,~• ' t-.. '....v^r v: t S: y1.,�•; ^.•�;!.., ^ - t� �rri ":"a''.•r ".. • ^. '. � � :.t t. '6�� <�:.r. 'ri. .. -. 'fit. _.. •i.... •:}t:'. - . .. .:9; :•1"d. �.`.,.h�-, . •.. .. ., , Segale Business Park .. • oa Prck d -U.. Jan. 18, 00 P Client :: - _ . • Date . .hart... Jan. 17, 00 P Segale Business P e r m i t Park roj • P;Q: M199.0209 Name:. . - Warehouse Building ordet; N/A • `.- i• ; =' Segale Business Park Drive "C ", Tukwila .: Job or w Q_ No;; 981 • Address: .... ` : .: ' NIA ;Contract No.: Client / Pacific Concrete 'Report'No. : 181 Contractor.:, P Now T -1358 f(c- .3l:L CdF' l': '•,t,, �« �..� . a !' ti.ih- � - 's• g- 1 t,• F- w' S�t '.`•."!r^"►�.�if:iti'°�:vr:f"•� ��'G".;::d': �i'��i'.:_�aYt�.�::i��..:�tJ.3 ::..: wi3 .L•'.±:4.•.'•�A32`�.i:�iii ^i-"' �.:b_::d :it. L: �.,,t, .. '��.•. .I .� •t it -.! ^. '.,A•: f. if.M1 r' `I_ •nT d:_u, ar'r.•n: orb ;�;i• ::b���' P�icke �' � spy a .. a e. ,I n�Tr r .ab� `ta �� • �r�� a�e� =fa~ ��e.�t�n. ... xa. {. .P� , p r�' s � 3 Each 6 "x12" concrete cylinder 1 Samples . Each Samples .. Each . Samples Each :Samples': Each : .; Samples' :> . Buildin Each '. • Permit #s : D99.0143 to M199.0209 west retainin Samples • wall ( ^..q, ',1,a ."r'r Sv.?K_r�TQ': Y5S11Cwy,7rNt!r-r±%y�; •...+.�..`. dr*•5T't'.'r' ra'!^: �fi:". '�.n"';"'s'•T.^;v.�.r{ry+�. "°e•; ;•: .T,..'.r��— r,.�..+w- i, ^....- ..,.t:j -.. T ^"'a'v -."l. .r . P. :`r5�, sir �.S� A y M .¢W; '�:..Yf t:. . n 1 y, • ;7 - . f.. _ +l. .t. y > .. v (- : , ? :,7 �... � ',�`!.'7' , . �'Yaa� ' •., .n.4,•; r • /w.:� {f " «i . y ``-t 1:6,.. ;.:i.. �rN' .. .rt ''''l rte '3'• '.l '• -••,.. i..•. ' :-� `� t:'.•- •. i.• •;.. . •:�:• - � •- `0.�J".a�i3:i�t�•�5�.i6a:.%r :�.t:,i`c�,�.i �':if. :t: ALf i:C.,r�. �L.S.`3iSJ7. _.s:t...t.�i:ti. �Y,L� f•`1-''I REMARKS; INSPECTOR" ° S.HONGIfmd ;REVIEWED, ' . BY :. . �D mid'% JCRass -' \ s Word 1 Date Typed: 011211001 Date Recd: Jan. 19, 00 Building Permit 0 revised by Frank Swanson (client) on Jan. 10, 00 13:30 hr. JAN c zuuu ISSUED CONSTRUCTION TESTING LABORATORIES, INC. VINSFECTIQWESTREPO -1,MCONCRETEig le.ne:- SEGALE BUSINESS PARK Name 10111 South Tacoma Way, Suite D-7, Tacoma, WA 98499 Telephone (253) 588-0805 Facsimile (253) 588-0928 ‘:-: Date Otfrittiectibity Jan. 17, 2000 :13iiildPif NCO:. N/A iltraCt. No...ff.:;'-:.:::: N/A 4ame .:::.::-.:`:-.•:,., . .6.,.f.,::,=/:::;,q§: N/A N/A ::'..c.4.1tiptite61,1i Tukwila r- •... .iltraCtdr..-:!,:i Client 180 T-1356 FottrrinStieCtion!'!.' Yes. Yes, - Rem See field inspection report for information on forms and reinforcement steel placement. Mettiod;pfPjacerfterie-f::;: Pump Method ofConsohdatiori Vibration Stoneway Concrete atibribffPledeMenti-2 Footing station 3+84 to 5+20, 6 each columns station 1 +81 to 3 +26, 2 sections of walls 0 +00 to 0 + 30, 0 +60 to° +81 ;No.'ot.Y.ar..dCsyplac0:::.; 90 yd (s). Lboatio6:.Sampleth-:.:1 At the bottom lift of columns .MIX:DA!:::;•!.) MIX # 5950A .:cEmENQ CEMENT.. MORTAR': 5.9 1&11 • Flyash NIA NIA 3/4" 5 w 110 lbs / cu yd WRDA 64 ADVA Polarset 26.4 oz / cu yd 13.2 oz / cu yd 66.0 oz / cu yd Condete=re •Ne 58 3 TirneSamt 37 0 F 1'41 ea Fair 8:15 hr. 118749 fP DEOPOTRENPTif REQUIRED 6TiCk" #:',1„3:i 305 5000 R.:Psi :'.DATE.-TESTED EAGE DIMENSIONS 116A 0-0369 1-24-00 7 28.274 in2 6"x 12' 5270 1168 0-0370 2-14-00 28 116C 0-0371 2.14.00 28 marks N/A Date'Specinien. .! Jan. 18, 2000 S.HONG/c CONFORMS REPORT RE. Fl =FEB 1 6 "" REPORT JAN k .zuuu ISSUED CONSTRUCTION TESTING bataATORIES, INC. C ! TY OE: LO N T 10111 South Tacoma Way, Suite D-7, Tacoma, WA 98499 Telephone (253) 588-0805 Facsimile (253) 588-0928 Wnrd 1 flato Tuna* 111194111111nati Ramat Poe* : Cbent ::;.. l',` SEGALE BUSINESS PARK ,7,7. ateof lnspection * Jan. 17, 2000 NIA ... - Name Bfildinl'Pert t No -/: . '. ',. SEGALE BUSINESS PARK !':'.:'-'=.COntraCT.N•i.,''',`:::,.,, , N/A : . .,- . . :::,P,',,P7.0:•Nti.',:',,I, , , , , .„, ... . , , ''''''''. . ' ' -;;,,-r:i: ' - NIA '-' Jobsite :',";::: Tukwila ,-,:,::;::::,.,.:-5Job N/A AddreSs .'•:''. -;:::::•". , ReportNo ,:: •,,, • f.NO:',...,•::::,, 180 CciiitraCtoi. Client .:--.Y.:...::•:.:Y:'. T-1356 Form Inspection :-`.• Yes Rebar ltitOdt "?";''" Yes. 'Rem ::,, See field inspection report for information on forms and reinforcement steel placement. Method of PlaCemerif,-.<:-::'4. ,..,... . . .. .:. ,. :Methof ,COnSolidatiOn: •Concrete SUppIler, ton' ofPlacemen :--e :;',• Pump : Vibration '::,Noi'of•Yard(OPlaced;'': 90 yd (s). „,, ,'-''.-•' Stoneway Concrete : -:, Footing station 3+84 to 5+20, 6 each columns station 1 +81 to 3 +26, 2 sections of walls 0 +00 to 0 + 30, 0 +60 to0 +81 Le-ntiotiSarripletb,' At the bottom lift of columns jATA...:',:: MIX # 5950A .. OEMENT::', ";:::,CEMENT MORTAR SACic:: 5.9 '":.) TiPE. • '' !an TYPE NIA 7..,, i'iSlIg- AGG • %” :'.:ii:titini.,:, 5 W .A''idi;':. NIA . tiiixtiire:, Flyash ;',!..::AMOL111 :', 110 Ibs / cu yd 26.4 oz / cu yd WRDA 64 ADVA 13.2 oz / cu yd Polarset 66.0 oz / cu yd . ' ncrete..Tenitje, NeSpeo:: 1::':,;::' 58 -i::•Air Teeip•:::..,, 37 0 F 'Weather: •::::; Fair 305 3 TIMiti Sampled 8:15 hr. :',TiCkat A:A:, 118749 DESIGNsTRENGTRREguIREpO 5000 .k,rifi'i:ii CYL. NM 7 ; LAB; NO;:':', ''DATE •TESTED '-`•:,•,., .:::::‘AGE , AftEA:',,,,:,.; j';:•DIMENSIONS. :;::,--.?';. ..-.'.0.,;::;,', psri,:.:',,,:,i,:„.i,: 116A 0-0369 1-24-00 7 28,274 in2 6" x 12" 5270 116B 0-0370 2-14-00 28 5801 116C 0-0371 2-14.00 28 5872 CONFORMS ..,Rotook , N/A • • .:min el ' In' • Jan. 18 2000 An S.HONGk ,,,,,T ,,PICii:•,..,,-,, ftta(4CRosiv:‘: Wnrd 1 flato Tuna* 111194111111nati Ramat Poe* CONSTRUCTION TESTING LABORATORIES, INC. 10111 South Tacoma Way, Suite D -7, Tacoma, WA 98499 Telephone (253) 588 -0805 Facsimile (253) 588 -0928 FIELD .INSPECTION REPORT ::. ; .:. _ : PAGE: 1 of 1 .: Segale Business Park . of Inspection: J _____,. Client M199.0 09 Building Permit No. Project Name: Segale Business Park Warehouse Purchase Order No.: ` Building # 981 Contract No.: N/A Jobsite Address: Segale Business Park Drive "C ", Tukwila Job No.: 981 Report No.: 1 80 Contractor: Client / Pacific Concrete Project No.: T -1356 Building Permit #s : D99-0143 to MI99.0209 (west retaining wall) arrived on the jobsite to perform special inspection and field testing for today's scheduled concrete placement. Inspection and testing performed as follows: The contractor placed approximately 90 yards3 of (fc' 5000 psi at 28 days, 5.9 sack cement ratio, plus 100 lbs. Flyash) concrete for the footing of retaining wall, between stations 1+81 to 3 +26 and two sections of walls at stations 0+00, 0 +30, 0+60 and 0 +91. Prior to concrete placement, inspection of reinforcement steel placement was performed and found to be in accordance with the project plans (including noted corrections of inspection report dated January 14, 2000). Contractor placed concrete as follows: TRUCK # TIME AIR TEMP. CONC.TEMP. SLUMP 305 08:15 37 O F 580 F 5 -1/2" I checked consistency of concrete and cast 1 set of 3 each 6 "x12" concrete cylinder test specimens for com- pressive strength tests, representing today's concrete placement. See today's concrete tests report (to follow) for results. NOTE: Concrete specimens cast today was stored in an insulated curing box for proper initial curing at the jobsite. WEATHER: FAIR • 370 F @ 08:00 HR. REVIEWED BY :... x},1,4 INSPECTOR: S.HONG/fmd Di SwIth /JCRoss Word 1 Date Typed: 011191001 Date Recd: Jan. 18, 00 Building Permit # revised by Frank Swanson (client) on Jan. 10, 00 @ 13 :30 hr. crnm naG -MA/ hn W60_119110 CONSTRUCTION TESTING LABORATORIES, INC. 10111 South Tacoma Way, Suite D -7, Tacoma, WA 98499 Telephone (253) 588 -0805 Facsimile (253) 588 -0928 - - -_ SAMPLE PICK -UP .REPORT. � Segale Business Park Date Picked Up: Jan, 10, 00 Client: Jan. 07, 00 Date Spec. Cast: Project Segale Business Park Building Permit No.: M 199.0209 Name: Warehouse Building #981 Purchase Order #: N/A Jobsite Segale Business Park Drive "C ", Tukwila Job or W.O. No.: 981 Address: N/A Contract No.: Client / Pacific Concrete Report No.: 1 78 Contractor: T-1356 Project No.: d4 .8:i�-•f `••r,� •�C <.y� ';{.: +i�- %..o'e. �ha r:�.4y,,. •nG .wi:+w: Lv • 'r• � >t•'n;: :• i'•:a' =.2: L' ,?L":a -1. _ +:I,asw'r:e .^�:y '`�:.. . i .y.. n4 i.`•r . in :}. nirr,• y �V:+ t r..} i. ^l.: �.Y�. :'9•. l . �.i�'r;; `l J'; � ..f.3;,. .''T• • a... . �:•:�..• J�ii. -., �.'.ia: -IZ.`_ '^%t, � :'. x. :t � a±T. r, •t: :L sr. :: :I ..1:'i::'i�Z a�. 'r': ,�:.l.Y aA rii - 1.,` �' ' f t'T.':1+ u y;•:}.SY, � i!:, .t[l;.:::J.:. .,Q. a.•t:`.L3'1. 1.1 �'� •:YF,. j'.L: ...�. .a' ,d• ^.�'.j�7 Y {. ::.����. .i tCpf, ri`.,� %.`. ::'F /i..:.•r_yti� rr ♦`•:, :rhQl'Nj'f!r, \.! L 1. �O.dl• ?..4,� �"a =F 4.. r{. r' :•'. •••." .T'.�� ...1: •sil:. ;. t:.......,..; �t +....�4:._s._.....L''.'...�. I.. L ^._., tt•'��..:.L`•... . ct,. yn.. ru:.. �.... ct. �_... n�.:.. nl......._..:. �."^ i..',_. a..>•.,. •. r., �.! ���`'��N!= .:%�.�...l:.�r13a. e:...�!f;:.,.,.:..: ��.�. ?':'��i i.s;"`. r Picked , up, transported to the laboratory & prepared. or testing 3 Each - 6 "x12" concrete cylinder Samples I Each Samples Each Samples Each Samples Each . Samples Buildin Each . Permit #s : D99.0143 to M199-0209 west retainin Samples . wall 1 •.. i1. y-ee (�' T`� �N n1 •1F,•r/'�• r. "` '71`ryt.r;•.95Y?%�`7 1' ✓.•ow 9i J`�L:Li.y, x�. ;r�� +�• , nS ��hia 3 �'�4 y�: ;7tiiRt +::.i. a r n n fi^ ! .� ,r4}1 i fit. =17� •. + >f r •t .L•S., i x�' �... -a4)' fY ^.r�"�. '�. 1 t 1 • t," F 17* i. .'�t. �x� •� it' ...N. S!I..Yh�it�fi4t fi anira'f+2f�. JKIS .�rd(�5�t.`r..�" 'i+. �.,.ji .. . , -Ji.r4 .... ' �'. .. .. - ., 3' ..i, +.G•:alS,,. R. ..N ... ii._ .. REMARKS: INSPECTOR Ifmd REVIEWED` :•:: BY: :`.._:.. D math / JCRoss PIECE 1VED Word 1 Date Typed: 011131001 Date Recd: Jan.10, 00 Building Permit* revised by Frank Swanson (client) on Jan. 10, 00 @ 13 :30 hr. JAN 1 0 2000 Cram noo_ni Al In 1114110.1111112 1wa.+rehininn IMAM CONSTRUCTION TESTING LABORATORIES, INC. r• gtt 10111 South Tacoma Way, Suite D -7, Tacoma, WA 98499 Telephone (253) 588 -0805 Facsimile (2531588 -0928 'FIELD INSPECTION REPORT....., ::13AGE:1 of Segale Business Park Data of Inspection: Jan. 07, 00 Client: MI99.0209 Building Permit No. Project Name: Segale Business Park Warehouse Purchase Order No.: N/A Building # 981 Contract No.: N/A Jabsite Address: Segale Business Park Drive "C ", Tukwila Job No.: 981 , Report No.: 177 Contractor: Client / Pacific Concrete Project No.: T -1356 Building Permit #s : D99-0143 and MI99.0209 (west retaining wall) I arrived on the jobsite to perform special inspection and field testing for today's scheduled concrete placement, Inspection and testing performed as follows: The contractor placed approximately 95 yards3 of (7.0 sack mix, 5000 psi, Mix #7028 -A) concrete for the six fence columns from stations 9+00 to 0+51, and for the retaining wall footings, from stations 1+84 to 3 +90. Prior to concrete placement, inspection of reinforcement steel placement was performed and found to be grade 420, clean, properly placed and lap spliced to conform to the jobsite approved plans. The contractor placed concrete at slump ranging 3 -1/2" to 4 ", with air entrainment of 5.3% throughout today's concrete placement. A I cast 1 set of 3 each 6 "x12" concrete cylinder test specimens for compressive strength tests, representing to- day's concrete placement. See today's concrete tests report (to follow) for results. Eli WED JAN 1 9 2000 r,ni) ',!ITY DEV_IU -:V: ANT WEATHER: CLOUDY - 36° F @ 06:30 HR. REVIEWE[3' BY: 1. INSPECTOR: E,GANNIfmd Mtt /JCRoa . D3� Word 1 Date Typed: 011121001 Date Recd: Jan. 10, 00 Building Permit revised by Frank Swanson fclientl an Jan. 10. 00 0 12!2A hr_ y . V J yteo. •ky STA. 0 +00 C(5° CONNECT TO DRAIN TILE 24.35 RID ' ELINE, TYP. 27.21 STA. 1+84 s1ze — — Shre CONNECT TO DRAIN TILE 31.70 WROUG GATE 31.42 i\ 31.04 31.44 IRON FENCE Sko%) e)asfr riven. 40/ 30.30 r"Vpe 31.70 GB 'P 2'x2' SQ. COLUMN, TYP. 162.51 STA. 3+56.5. TA,0„ 4 i rtiok ' TRENCH DRAIN RETAINING WALL W/ m WROUGHT RON FENCE BOVE 31. 29.70 31.50 ,.' "'CATCH BASIN, -- TYP. t '431.57 32.00 30.90 31.0• 31.51 31.5 32.00 25.54 STA. 5 +29 32.00 40' RIVE ENVIRON fMf soldt7 _Y`v�Ltx LL SEP -24 ; 99; FR 1 j 03 :14 57M FSAlEG( 3B8U3S I4NaE2S3SLAE.RKgineers LGeo Engineers FAX TRANSMr'ITM. FAX NO. 2085T 937 P. 01/04 x001/004 1101 Fawcett Avenue, Suite 200 Tacoma, WA 98402 Telephone: (253) 383.4940 Fax: (253) 353.4923 To: Segale Businexs Park Fax Plumber: 206 5751837 Atteet(on: Stave Nelson Regarding: Retaining wall at warehouse Data: September 24, 1999 File: 0291 -011 -05 p... :n.�;..r 1 . t 9/24/99 D ` oho° Fax Transmittal Total Pages: 4 Comments: Steve - Attached sire talcs for additional wall pressures from the wheel and track loads you sent. The vitae! load has a greater elicet. We teoommend a 200pdaniformly dislt'ibuted design load to account for the specified sweb* rge. Call with questions Thanks. • orty of 1004"-F' Nov 151999 p p1J .7i. TER SEP -24 -99 FRI 03 37 PM SEG( BUSINESS PARK FAX O. 206E -'837 ..oicW /Yy iii 14 5 FAX 333 4923 GBo Engineers BY E DATE_ } q SHEET OF 3 P. 02/04 la 002/004 FILE NO. p 2q1- PIA 61F-tag- Pc-: Pet Demo 1)9 II" oi rb. r FOL sca ec wry t- afh0i3 its 4- Rem 11 X037 f6s e• Sth 4 M r?4 4T- iNkkiiiik, L060 (I2,doo lb (0r 4c) - . 33 6ao i bs I pop"qr pato N'1i1� rev. fT 0∎76 o. 1177 Qi (n► Ntn1) 3 60 Pas.r Wy . CHECKED BY q RECEIVED CITY OF TUKWILA NOV 1 5 1999 • • PERMIT CENTER SEP -24 -99 FRI 03:38 PM SE BUSINESS PAR K_� .��' «iya ERZ 14t 58 FA.L 383 48MU GeoEngine ers FILE ear --�a5 DATE SHEET 2... oF, FAX NO. 206E('.837 P. 03/04 Q1oo3,004 1 z 3 w S 7 $ 10 42: 33, kia (bs { - i= 9fr M:= r - 0,75 r7 rt. /,77 ('334) 7) (a) 2 L (id'?a51) + 929 25 tO,S-625) ( 5.) i (0.562E + X13 721.25 HZ -3 X33.9 2I1 ,5 243 , (o 2040, 5 l'IO. a t37 toe, ,3 65.1 COB 7$q (10 ' 5.42JB +- s Ion 4c oi? r eo,o4 Geo 111160aefas CHECKED BY _ CITY OF Nov 1 5 )99 PERMIT CENTER fEP- 24 -99, FRI 03:38 PM i rAl j JOB BY SE( : BUS INESS PARK FAX N0. 206 '1837 P.L1 -3 383 4923 CeoEnRiaeers 3' FILE NO. DA SHEET, S OF "112 CAC. LORD SSwy� Z P. 04/04 '&94/904 eoi,o7tr-r 44149-. Larla pa. 1-11474 t z6 r IZr `id) • Z (2 Y.13) (1441-1) %4l6E? "1 >•o,cav lb / = 7or (X o�b �'xr3' srr� 7tb psf 0 ` x ` P (' -5'404 Go r 241.)) g• rnrl' X -b A 74,:.) ` � eiz:// 51.3' 1'kl 270 pse O.I54 - ') Goy (00I.s °) ) 'OX git 2120 t �= 2' �X= 210, ceoS K x 7,9' = 0,114 .,d o i - s«1 '7s° tos (!Zt e.) 51 ti as 103 0,10 Solt5.1 t412•3 1 /8& CITY RECEIVED NOV 1 5 1999 PERMIT CENTER =• I85 ps•F46. n+4JC hi 4S - fir. l VftO :. 054 . • RPornw,G}a 249 pf CHUCKED BY .,,..�..,.... r 'w.�k•.r4.11'�xrt ":tt^OS ?:FT,G Yavcf.9¢v� 1:1.1a!DJasrv41,17. 54 SEGALE 981 PROJECT SEGALE BUSINESS PARK TUKWILA, WA. STRUCTURAL CALCULATIONS RETAINING WALL Building Permit Submittal Nov. 10 1999 ENW Job No. 99024 Code: 1997 UBC Wind: 80 mph, Exp. C Seismic Zone: 3 1 EX! : ii: v;z eb RECEIVED CITY OF TUKWILA NOV 1 5199h R iMIT CENTE. ENGINEERS NORTHWEST, INC. P.S. - STRUCTURAL ENGINEERS 6869 WOODLAWN AVE. N.E., SEATTLE, WA 98115. (206)525=7560 FAX (206)522 -6698 r'• PROJECT: - Input Equiv. active pressure K_ Equiv. passive pressure PCP■ Uniform horiz. pressure ■ Soil density_ Fc Kan Fy Kam Vert. R&M. size (5) a dam". dr.ap. a Horiz. Relnf. size (5) ■ Allowable soli bearing K$F= Coefficient of friction = Toe PT= Shear key width IL= Shear key height INN Restrained ?(YorP1) Slab resistance Km = 0.000 Passive Ka'a s 1.838 ENGINEERS NORTHWEST, INC. P.S. SHEET OF 6869 WOODLAWN AVE. N.E. (SUITE 205) Rev. 2119197 SEATTLE, WA. 98115 CONCRETE RETAINING WALL ( per lineal ft. y141, F.S. Overturning =:1;62 4 puS. To 4'W* E (Re F.S. Sliding = 1.111 ` Surcharge PSI' ■ __O WI Friction = 1.148 kips qs max. = 2.362 _ ksf 1.512 kaf 0.946 ksf Tel= EI0' -0" 4. Bury.= Tf a� WkdthFT'= 4 0 qs min. _ : ; 0.000: = ksf = :2.78. fL Stem From top (f) 1110 th Pts.) Mu K'+`T w K" p Vertical nNnfordng Aim bar size Spadng Horizontal rsl forcing Asm bar size Spacln - $ 0.500 0.044 0.003 0.0000 0.12 4 19 0.19 4 12 1.000 0.180 0.006 0.0001 0.12 4 18 0.19 4 12 1.600 0.416 0.009 0.0003 0.12 4 18 0.19 4 12 2.000 0.769 0.013 0.0006 0.12 4 18 0.19 4 12 2.600 1.217 0.017 0.0008 0.12 4 18 0.19 4 12 3.000 1.798 0.021 0.0012 0.12 4 18 0.19 4 12 3.600 2.508 0.026 0.0017 0.13 4 18 0.19 4 12 4.000 3.366 0.030 0.0023 0.17 4 14 0.19 4 12 4.600 4.346 0.035 0.0031 0.22 4 10 0.19 4 12 5.000 5.490 0.040 0.0033 0.24 4 10 0.19 4 12 Ftg.Toe Bottom reinforcing Stem Mu P47 vu K" p As"a bar size Spacing 1.839 0.014 0.0008 0.06 4 39 RECEIVED Ftg.Heei Top reinforcing CITY OF TUKWILA Stem Mu K.FT vu K" p As bar size Spacing N 0 V 1 a 1999 4.788 0.028 0.0015 0.16 4 16 Shear key d = 8.760 Vertical reinforcing PERMIT CENTER reinf.3" clr. Mu K FT vu K" p As°u bar size Spacing to toe face 1.721 0.014 0.0006 0.06 4 40 NOTE :allowable vu "°' = 0.110 MAX.!! (1 City of Tukwila John W. Rants, Mayor Department of Community Development Steve Lancaster, Director January 6, 2000 Mr. Steve Nelson Segale Business Park P.O. Box 88028 Tukwila, WA 98138 RE: Design Review File L99 -0007, Segale Building No. 981: Minor Modification to Project Design Dear Steve: Miscellaneous Permit (MI99 -0209) is a request to revise the fence approved by the Tukwila Board of Architectural Review from a chain link fence to a wrought iron fence set in concrete posts on the western side of the new warehouse being constructed (Building 981). TMC 18.60.030 D. authorizes the Director to approve a change in project design if the change represents "minor, insignificant modifications which have no impact on the project design." I have reviewed the project plans for MI99 -0209 for the director and believe that the change represented is a minor, insignificant modification that will have no impact on the project design. As a result the revision does not need to be re- reviewed by the Board of Architectural Review. If you have any questions, please call me at 431 -3686. Sincerely, Jdk Pace Planning Manager cc: Files: L99 -0007 & MI99 -0209 Ciiy of Tukwila John W Rants, Mayor Department of Public Works NOTIFICATION OF UTILITY PERMIT ACTION TO: Permit Center FROM: Public Works Engineering DATE: December 13, 1999 SUBJECT: SEGALE BUSINESS PARK BLDG # 981 Retaining Wall 5801 Segale Park Drive "C" Project No.: P99 -0013 Permit No.: D99 -0409 Contact Person: Steve Nelson Phone: (206) 575 -2558 James E Morrow, P.E., Director THE FOLLOWING PUBLIC WORKS PERMITS HAVE BEEN APPROVED FOR ISSUANCE IN ACCORDANCE WITH THE PLANS APPROVED ON December 13, 1999: PERMIT FEE Storm Drainage $ 25.00 Two copies of the confirmed Utility Permit Application and plans are attached for inclusion in the permit file. JJS /jjs CF: Development File (with copy of application and plans) Public Works Utilities Inspector (with copy of application and plans) Finance'' ..i ti`. 'iiil copy of applications) C.: City of Tukwila John W. Rants, Mayor Department of Community Development Steve Lancaster, Director December 3, 1999 Steve Nelson PO Box 88028 Tukwila, WA 98138 RE: CORRECTION LETTER #1 Development Permit Application Number MI99 -0209 Segale Business Park #981 5801 Segale Park Drive C Dear Mr. Nelson: This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Public Works Department. At this time, the Building Division, Fire Department and Planning Division have no comments regarding your application for permit. The City requires that four (4) complete sets of revised plans be resubmitted with the appropriate revision block. If your revision does not require revised plans but requires additional reports or other documentation, please submit four (4) copies of each document. In order to better expedite your resubmittal, a `revision sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206)431 -3672. Sincerely, Brenda Holt Permit Coordinator encl xc: File No. M199-0209 PUBLIC WORKS PROJECT REVIEW COMMENTS Project Name: 5E 61)1.E BUS I NESS PAR' C - RET, G44L Location: File #: Action: Date: Reviewed By: 533o/ 5epae Pk fir' ,,c 197,13:0209 dented ll1.. 11199 de4nmA sag/ucce PRIOR HISTORY AND CORRESPONDENCE FRANCHISE UTILITY COORDINATION CODE REQUIREMENTS COMP PLAN CIP OVERLAY PROGRAM MISC. STUDIES MAINTENANCE NEEDS RFA WD 125 VAL -VUE PW STANDARDS PRE -APP PROBLEM AREAS JPiteAvak, VVU k , 4,VV5 4 csitrff,t,r6 ow 61-01 014, d (,,- I o 1 fie, eau., ci w4 0.) S h,nw S . 1 �(1 ,?.e. tbpctiot,t, isTATroA) stope, pipe I of 3) show 1,-(4)0 di/t at:0 e.._ Ice h e44 e2-44 vas v • sfo� d0"442,. eipes tuun,be,f 74*e • per e, ✓a C S 0 74„ b/ `W, 1F PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: MI99 -0209 DATE: 12 -9 -99 PROJECT NAME: SEGALE BUSINESS PARK 981 Original. Plan Submittal Response to Incomplete Letter # XX Response to Correction Letter # 1 Revision # After Permit Is Issued DEPARTMENTS: Buil mg'Divist n 4 Pu rc Works AVG v Fire Prevention Structural Planning Division I -14 -15i Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete DUE DATE: 12 -14 -99 Not Applicable Comments: TUES /THURS ROUTI G: Please Route Structural Review Required n No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: (ten days) Approved Approved with Conditions DUE DATE 1- 11-2000 Not Approved (attach comments) REVIEWER'S INITIALS: DATE: CORRECTION DETERMINATION: DUE DATE Approved n Approved with Conditionsn Not Approved (attach comments) REVIEWER'S INITIALS: DATE: U'RROUTL.000 e Inn PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: MI99 -0209 DATE: 11' -15 -99 PROJECT NAME: SEGALE BUSINESS PARK C- RETAINING WALL XX Original Plan Submittal Response to Incomplete Letter # _ Response to Correction Letter # _ Revision # — After Permit Is Issued DEPARTMENTS: Buil iir2 Division IN public Works Crb ciepvtiak) 61v Fire Prevention f( -14-1y n Structural L Planning Division )H -� Permit Coordinator 1 DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 11-18-99 Complete Incomplete Not Applicable Comments: TUES /THURS ROUT G: Please Route Structural Review Required n No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: (ten days) DUE DATE 12-16 -99 Approved Approved with Conditions n Not Approved (attach comments) C. 3wee f i 4i 1,df61/ ( waiiad Z_ 3 REVIEWER'S INITIALS: DATE: CORRECTION DETERMINATION: DUE DATE Approved n Approved with Conditions Not Approved (attach comments) C REVIEWER'S INITIALS: DATE: \PRROUTE.DOC City of Tukwila Department of Community Development - Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 (206)431 -3670 Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 1 Z "' Plan Check /Permit Number: M199-0209 C] Response to Incomplete Letter # Response to Correction Letter # 1 El Revision # after Permit is Issued Project Name: SEGALE BUSINESS PARK #981 Project Address: 5801 Segale Park Drive C Contact Person: Steve Nelson Phone Number: 20 6 S %,S- Z s'S8 Summary of Revision: Fro deA e- i H. et .r- 54-ch. J3 a d f- s i y w e c) S id �� r5 • 5 ko w� p r' e— 5 12-e S +0-4 -Met 5, le b1 ? t r�y1 d- ercei- Slop . � P e 3 . S �•o�„ � &Loy.' d cre- -ebet /Sr' rte-0 v- .e.oce.-Yf" 5 fzpr-ov.. ,jo>✓s p o" erec 1L- G3 s riaCEIVED C,Irr ©r'rtfKWILA Sheet Number(s): CDAI' C j es G Z. 0 *- G S. 0 "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: If/Entered in Sierra on 1a'-451" �L PERMIT CENTER