HomeMy WebLinkAboutReg 2016-09-06 Item 4D - Contract Supplement #15 - Tukwila Urban Center Pedestrian-Bicycle Bridge with KPFF for $77,174.23COUNCIL AGENDA SYNOPSIS Lutials Meeting Date Pre,ared by Ma ldr's re • iv Council review 09/06/ 16 BG ;11 1/Mir _s7► - ❑ Bid Award AZtg Date ❑ Public Hearing Altg Date ❑ Other Mtg Date Mtg SPONSOR ❑ Council • Major ❑ HR DCD ❑ Finance • Fin, ❑ IT ❑ P& R _ Pnlace /,,,1 PLI SPONSOR'S KPFF Consulting Engineers is currently the design consultant for the Tukwila Urban Center SUMMARY Pedestrian/Bicycle Bridge with Contract No. 07 -123. The construction bid was awarded to 5B Structures and AKANA will be the main construction management consultant. Council is being asked to approve Supplemental Agreement No. 15 with KPFF for Designer on Record construction management support during the construction phase in the amount of $77,174.23. REVIEWED BY ❑ COW Mtg. ❑ CA &P Cmte Cmte ❑ Arts Comm. ❑ F &S Cmte [] Parks Comm. CHAIR: DENNIS ITEM INFORMATION ITEM No. 4.D. 31 STAFF SPONSOR: BOB GIBERSON ORIGINAL. AGENDA DrATI: 09/06/16 AGENDA ITEM TITLE Tukwila Urban Center Pedestrian/Bicycle Bridge Construction Management Supplement with KPFF Consulting Engineers CATEGORY ❑ Discussion Mtg Date F1 Motion Date 09/06/16 ❑ Resolution Mtg Date ❑ Ordinance hits Date ❑ Bid Award AZtg Date ❑ Public Hearing Altg Date ❑ Other Mtg Date Mtg SPONSOR ❑ Council • Major ❑ HR DCD ❑ Finance • Fin, ❑ IT ❑ P& R _ Pnlace /,,,1 PLI SPONSOR'S KPFF Consulting Engineers is currently the design consultant for the Tukwila Urban Center SUMMARY Pedestrian/Bicycle Bridge with Contract No. 07 -123. The construction bid was awarded to 5B Structures and AKANA will be the main construction management consultant. Council is being asked to approve Supplemental Agreement No. 15 with KPFF for Designer on Record construction management support during the construction phase in the amount of $77,174.23. REVIEWED BY ❑ COW Mtg. ❑ CA &P Cmte Cmte ❑ Arts Comm. ❑ F &S Cmte [] Parks Comm. CHAIR: DENNIS RI Transportation Cmte • Utilities • Planning Comm. DATE: 08/15/16 ROBERTSON COMMIT LEE RECOMMENDATIONS: SPONSOR/ADMIN. COMMITTEE Public Works Department Unanimous Approval; Forward to Regular Consent Agenda COST IMPACT / FUND SOURCE EXPENDITURE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $77,174.23 $850,000.00 $0.00 Fund Source: 104 ARTERIAL STREETS (PG 12, 2015 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 09/06/16 MTG. DATE _ ATTACHMENTS 09/06/16 Informational Memorandum dated 08/12/16 Page 12, 2015 CIP KPFF Supplemental Agreement No. 15 Minutes from the Transportation Committee meeting of 08/15/16 31 32 City of Tukwila Allan Ekberg, Mayor Public Works Department -- Bob Giberson, Director INFORMATIONAL MEMORANDUM TO: Transportation Committee FROM: Bob Giberson, Public Works Director BY: Peter Lau, Senior Program Manager CC: Mayor Ekberg DATE: August 12, 2016 SUBJECT: Tukwila Urban Center Pedestrian /Bicycle Bridge Project Number 90510403 Supplemental Agreement No. 15 with KPFF Consulting Engineers ISSUE Approve Supplemental Agreement No. 15 to Consultant Contract No. 07 -123 with KPFF Consulting Engineers (KPFF). BACKGROUND Contract No. 07 -123 with KPFF provided design engineering services for the Tukwila Urban Center Pedestrian /Bicycle Bridge Project. Council awarded the construction contract to SB Structures, LLC on June 20, 2016. Supplemental Agreement No. 15 with KPFF, the Designer on Record (DOR), will provide construction management (CM) support during the construction phase along with AKANA. DISCUSSION To properly manage this construction project, the City will need CM support from the DOR during the construction phase. Through Supplemental Agreement No. 15, KPFF staff will provide responses to the contractor's requests for information; reviews for structural, urban design and architectural material submittals, and some geotechnical support services. Tukwila CM staff and AKANA will provide the majority of the CM work and field inspections. FISCAL IMPACT Supplemental Agreement No. 15 was carefully reviewed and is reasonable for the scope of work. CM Expense CM Budget KPFF Supplement No. 15 $ 77,174.23 $850,000.00 AKANA CM Contract 700,669.00 Total: $ 777,843.23 $850.000.00 RECOMMENDATION Council is being asked to approve Supplemental Agreement No. 15 to Contract No. 07 -123 with KPFF in the amount of $77,174.23 for the Tukwila Urban Center Pedestrian /Bicycle Bridge, and consider this item on the Consent Agenda at the September 6, 2016 Regular Meeting. Attachments: Page 12, 2015 CIP Supplemental Agreement No 15 W .1PW Eny1FROJECTSV1- RW & FRS Protect OUC Pod Eicycta Stidge (96510463)+.Construclionstr.106 - Contract DocumentslCM Consultam+XPFFVmo Memo For KPFF Sup • Sb-Docx 33 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 PROJECT: Tukwila Urban Center - Pedestrian/Bicycle Bridge Project No. 90510403 DESCRIPTION: Construct a new pedestrian/bicycle bridge over the Green River. JUSTIFICATION: Pedestrian /bicycle connection between Tukwila's Urban Center and commuter rail/Amtrak station. Supports local and regional goals and policies regarding land use and transportation in Urban Center. Pedestrian System Report identified the optimal location for bridge crossing to be south of the Ramada Inn at STATUS: 15901 West Valley Hwy. Type, Size, and Location Report was completed in 2011. Council approved a design of a twin -tied arch bridge with no accommodation for a future bridge crossing over West Valley Highway, MAINT. IMPACT: To be determined. Design grants: State Enhancement for $190k & $500k, Transit Oriented Development (TOD) planning grant COMMENT: of $55k, and Federal CMAQ grant of $751K. WSDOT Regional Mobility construction grant of $6.870M. Project is on Park Impact Fee list with funding of $2 million with an 80 %!20% split for $1.6M. FINANCIAL Through Estimated 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL EXPENSES ^y : Project Location migiot . :y `� s,aPS, TTT \IL Ili Design 921 200 442 f Tr« C Pr I r r� L h t.. 1 n �r C` ■ UP�trW G town° Cr a n S� i 1,563 Land (WW) g , , 1,100 ' f i 1100 Const. Mgmt. 150 700 850 Construction 1,000 5,485 6,485 TOTAL EXPENSES 921 200 2,692 6,185 0 0 0 0 0 9,998 FUND SOURCES Awarded Grant 842 100 554 1,496 Awarded Reg Mobility 870 6,000 6,870 Park impact Fees 79 44 70 75 266 Bond /Interfund Loan 0 City Caper. Revenue 0 56 1,198 110 0 0 0 0 0 1,364 TOTAL SOURCES 921 200 2,692 6,185 0 0 0 0 0 9,998 2015 - 2020 Capital Improvement Program 12 35 ^y : Project Location migiot . :y `� s,aPS, TTT \IL Ili Ir ■ mil'• f Tr« C Pr I r r� L h t.. 1 n �r C` ■ UP�trW G town° Cr a n S� i 45?-3,707'2 ..71.471 1 g , , ' f i 2015 - 2020 Capital Improvement Program 12 35 Washington State WAIF Department of Transportation Supplemental Agreement Number 15 Organization and Address KPFF Consulting Engineers 1601 Fifth Avenue, Suite 1600 Seattle, WA 98101 Phone: (206) 622-5822 Original Agreement Number 07-123 (0) Project Number 05 -RWO3 Execution Date Completion Date December 31, 2017 Project Title Tukwila Urban Center, Ped/Bicycie Bridge PSE New Maximum Amount Payable $ 2,075,401.65 _ Description of Work Construction Support Services as identified in the Exhibit Al - Scope of Work. The Local Agency of the City of Tukwila desires to supplement the agreement entered into with KPF' Consulting Engineers and executed on and identified as Agreement No. 07 -123 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: 1 Section 1, SCOPE OF WORK, is hereby changed to read: The overall objective of this supplement is to provide Construction Support Services (CSS). 11 Section IV, TIME FOR BEGINNING AND COMPLETION. is amended to chanae the number of calendar days for completion of the work to read: Contract completion date is extended to December 31, 2017. 111 Section V, PAYMENT, shall be amended as follows: This supplement increases the contract value by $77,174.23, increasing the previously authorized maximum amount increasing payable to $2,075,401.65. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action. T • •.:. White n, P.E./Associate on b- l a1f of D. vid cMullen, Principal By: City of Tukwila /g;, 14a. DOT Form 140 -063 EF Revised 9/2005 Consultant Signature Approving Authority Signature Date 37 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #15 Page 1 Exhibit A -1 Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge Supplement No. 15 - Construction Support Services PROJECT DESCRIPTION KPFF has previously contracted with the City of Tukwila (City) to complete the Plans, Specifications and Cost Estimate (PSE) Phase of the Tukwila Urban Center Pedestrian and Bicycle Bridge project. The project has now moved in to the construction phase which includes construction of a 350 foot -long pedestrian bridge across the Green River. Specific tasks include, but are not necessarily limited to: construction of a mixed use trail, installation of bridge and trail lighting, installation of urban design and landscape features, relocation and adjustment of existing utilities and removing and replacing concrete curbs, sidewalks and ramps. PROJECT OBJECTIVES The overall objectives of this supplement include: • On an as needed basis, provide Construction Support Services (CSS) for the duration of the construction phase of the project The scope of work is expected to last approximately 11 months following Notice to Proceed. The Contractor was awarded the Contract on June 20, 2016 with construction activities anticipated to begin in July 2016 and be completed in June 2017. PROJECT CSS TEAM This supplement includes effort by the following project design team members: Prime Consultant Structural Engineering Civil Engineering Landscape, Urban Design & Electrical Geotechnical Engineering Architectural Services KPFF Consulting Engineers KPFF Consulting Engineers KPFF Consulting Engineers KPG Inc. Landau Associates LMN Architects 39 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #15 Page 2 SCOPE OF WORK The following is a scope of work for Construction Support Services for the construction phase of the project. TASK No. 1.0 - PROJECT MANAGEMENT AND ADMINISTRATION Task No. 1.10 -- Project Management, Coordination & Invoicing KPFF will be available to provide project management and coordination of the CSS team members. The CSS team will be available on an as needed basis throughout the construction phase to answer questions from the City. CSS team members prepare monthly invoices for work completed, which are then compiled by KPFF into a single invoice for the City. Task No. 1.20 -- Meetings KPFF and CSS team members will be available on an as needed basis throughout the duration of construction for meetings in order to respond to questions from the City. The following meetings are assumed for this phase: • Pre- construction meeting: KPFF will attend this meeting. • Drilled shaft pre - construction meeting: Landau Associates will be available to attend this meeting. • Punchlist walkthrough meeting: KPFF and KPG will be available to attend this meeting. TASK NO. 2.0 - STRUCTURAL SUPPORT SERVICES KPFF will be available to provide structural Construction Support Services throughout the duration of construction. These services will be provided on an as needed basis, as authorized by the City's Construction Manager. KPFF will be available to assist the City and the Construction Management team with the following activities: Task No. 2.10 - Contractor Bid Assistance KPFF bridge engineers and project managers will be available to respond to technical questions from prospective bidders. Assume preparation of two bid package addenda may be needed. Task No. 2.20 - Submittal Review Given the nature of the bridge and its complexity, KPFF will review key structural submittals related to the steel tied arch at Span 2. The design and performance of this span is highly dependent on the steel fabrication details, welding materials /procedures and construction sequencing. Because of this, KPFF bridge engineers will review the following structural submittals: 40 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge Supplement #15 Page 3 • Steel reinforcement shop drawings for Abutment 1, Pier 2, Pier 3, Abutment 5, Span 1 bridge deck, Span 2 bridge deck, Span 3 & 4 bridge deck, drilled shafts at pier 2 & 3. • Steel fabrication shop drawings and welding procedures for Span 2 • Structural strand shop drawings for Span 2 • Calculations for Span 2 • Structural strand erection plan and calculations for Span 2 • Camber measurements and structural strand tension adjustments for Span 2 • Pedestrian railing shop drawings It is assumed that all other structural related submittals will be reviewed by the Construction Management team. Task No. 2.30 - Request for Approval of Materials (RAMs) Review For the reasons given in Task 2.20, KPFF bridge engineers will review the following RAMs required by the project specifications and submitted by the Contractor: • Concrete Class 4000D Lightweight for Span 2 • All structural steel and high strength bolts for Span 2 • Welded shear connectors for Span 2 • Structural steel paint system for Span 2 It is assumed that all other structural related RAM's will be reviewed by the Construction Management team. Task No. 2.40 - Requests for Information ( RFI's) KPFF bridge engineers will be available on an as- needed basis to respond in a timely manner to structural related RFI's. For scoping purposes it is assumed that KPFF bridge engineers will review up to ten (10) structural related RFI's. Task No. 2.50 - Site Visits KPFF bridge engineers will be available to perform site visits at critical phases during bridge construction. For scoping purposes, a total of five (5) site visits are assumed. TASK No. 3.0 CIVIL SUPPORT SERVICES KPFF will be available to provide civil Construction Support Services throughout the duration of construction. These services will be provided to the City on an as- needed basis, as authorized by the City's Construction Manager. KPFF will be available to assist the City and the Construction Management team with the following activities: 41 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #15 Page 4 Task No. 3.10 - Contractor Bid Assistance KPFF civil engineers will be available to respond to technical questions from prospective bidders. Assume preparation of two bid package addenda may be needed. Task No. 3.20 - Submittal Review It is assumed that the Construction Management team will review the majority of the civil related submittals. For scoping purposes, it is assumed that KPFF civil engineers will review up to three (3) civil related submittals. Task No. 3.30 - Request for Approval of Materials (RAMs) Review It is assumed that the Construction Management team will review the majority of the civil related RAMs. For scoping purposes, it is assumed that KPFF civil engineers will review up to three (3) civil related RAMs. Task No. 3.40 -- Requests for Information ( RFI's) KPFF civil engineers will be available on an as- needed basis to respond in a timely manner to RFI's relating to construction of civil related items. For scoping purposes, it is assumed that KPFF civil engineers will review up to three (3) civil related RFI's. Task No. 3.50 - Site Visits KPFF civil engineers will be available to perform site visits at critical phases during construction. For scoping purposes, a total of two (2) site visits are assumed. TASK No. 4.0 - URBAN DESIGN/LANDSCAPE/ELECTRICAL SUPPORT SERVICES KPG will be available to provide Urban Design, Landscape and Electrical Construction Support Services throughout the duration of construction. These services will be provided on an as- needed basis, as authorized by the City's Construction Manager. KPG will be available to assist the City and the Construction Management team with the following activities: Task No. 4.10 - Contractor Bid Assistance KPG designers will be available to respond to technical questions from prospective bidders. Assume preparation of two bid package addenda may be needed. Task No. 4.10 - Submittal Review It is assumed that the Construction Management team will review the majority of the Urban Design/Landscape/Electrical related submittals. For this scope, KPG designers will review the following submittals: • Bridge mounted junction boxes (location). • Retaining wall mockup segments and installation • Shop drawings for Kiosk 42 Exhibit A - Scope of Work Tukwila Urban Center, Pedestrian/Bicycle Bridge - Supplement #15 Page 5 Task No 4.20 - Request for Approval of Materials (RAMs) Review It is assumed that the Construction Management team will review majority of the Urban Design /Landscape/Electrical related RAMs. For this scope, it is assumed that KPG designers will review the following RAMs: • Bridge, kiosk and trail lighting, poles, luminaires • Bridge uplighting • Control Equipment • Pedestrian /Bicycle counter system • Kiosk materials • Paint finishes for Urban Design elements • Landscape submittals, topsoil, bark mulch, compost • Other related site landscape items Task No. 4.30 - Requests for Information ( RFI's) KPG designers will be available on an as- needed basis to respond in a timely manner to RFI's relating to Urban Design/Landscape/Electrical related items. For scoping purposes, it is assumed that KPG designers will answer up to three (3) Urban Design/Landscape /Electrical RFI's. Task No. 4.40 - Site Visits KPG designers will be available to perform site visits at critical phases during construction. For scoping purposes, two (2) site visits have been assumed. TASK No. 5.0 - GEOTECHNICA.L SUPPORT SERVICES Landau Associates will be available to provide Geotechnical Construction Support Services throughout the duration of construction. These services will be provided to the City on an as- needed basis, as authorized by the City's Construction Manager. Landau Associates will be available to assist the City and the Construction Management team with the following activities: Task No. 5.10 - Submittal Review Landau Associates geotechnical engineers will review all geotechnical submittals required by the project specifications and prepared by the Contractor. The following submittals are anticipated: • Drilled shaft slurry technical assistance, if needed • Drilled shaft obstruction removal plan, if needed Task No. 5.20 - Requests for Information (RFI's) Landau Associates geotechnical engineers will be available to respond in a timely manner to RFI's related to geotechnical issues. For scoping purposes, it is assumed that Landau Associates geotechnical engineers will review up to three (3) geotechnical related RFI's. 43 Exhibit A - Scope of Work Tukwila Urban. Center, Pedestrian/Bicycle Bridge - Supplement #15 Page 6 TASK No. 6.0 - ARCHITECTURAL SUPPORT SERVICES LMN Architects will be available to provide Architectural Construction Support Services during key phases of construction. LMN Architects will be available to assist the City and the Construction Management team with the following activities: Task No. 6.10 - Submittal Review LMN Architects will be available to review the following architectural related submittals required by the project specifications and prepared by the Contractor: • Pedestrian railings (KFFF to decide either KPFF or LMN Architects will do this submittal review). • Striated finish formliners. Task No. 6.20 - Requests for Information (RFI's) LMN Architects will be available to respond in a timely manner to architectural related BFI's. For scoping purposes, it is assumed that LMN architects will review up to three (3) architectural related RFI's. Task No. 6.30 - Site Visits LMN Architects will be available to perform site visits at critical phases during construction. For scoping purposes, a total of three (3) site visits are assumed. 44 EXHIBIT E -1 KPFF Consulting Engineers CONSULTANT FEE DETERMINATION SUMMARY OF COST TUKWILA URBAN CENTER BICYCLE /PEDESTRIAN BRIDGE CSS Classification Principal f Tech. Spec ialist Project Manager Senior Engineer Design Engineer Prof. Land Surveyor Project Surveyor Survey Crew CADD Technician Coordinator 1 Admin Overhead (OH) Cost OH Rate x DSC of Fixed Fee (FF) FF Rate x DSC of Reimbursables Mileage Reprographics Subcontract (Blank) Subtotal Total Hours X Rate 25.00 X 0.00 X 88.00 X 299.00 X 0.00 X 0.40 X 0.00 X 20.00 X 22.00 X 127.17% 30.00% $62.50 $60.06 $58.20 $38.80 $46.20 $35.20 $71.50 $40.33 $25.50 DSC Subtotal Cost $1,562.50 $0.00 $5,121.60 $11,601.20 $0.00 $0.00 $0.00 $806.60 $561.00 $19,652.90 $19,652.90 ( ## Miles x $0.565/mile) ( ## Sheets x $X.xxlsheet) (Sub Name & Task) (Allowance) Subconsultant Costs (See Exhibit G) $19,652.90 $24,992.59 $5,895.87 $0.00 $26,632.87 GRAND TOTAL: $77,174.23 45 COST ESTIMATE: TUKWILA URBAN CENTER BICYCLE/PEDESTRIAN BRIDGE CSS July 29, 2016 KPFF Consulling Engineers KPFF TUKWILA URBAN CENTER BICYCLE /PEDESTRIAN BRIDGE CSS P "".o.I I Txh apeciailsz Pro Manager Senior Engineer Design Engineer PrvI. Land Sury ®tar Project Surveyor Survey Crew CACC Technician C00r41,M0 rl Admin MULTIPLIER: Item 1 SCOPE OF WORK 562.50 560.06 15820 _ 538.80 845.20 035.20 071.50 840,39 025.50 2.5717 1 Project Managerrlent & Adrrlintelratlon 1.10 Project Management, Coordination & invoicing a 12 12 02,944 120 Madding& 4 94 10 53,736 Labor Subtotal: Reinlbur5eplgs: 2 StaucturoI Support r56040 10 0 14 22 e 0 0 0 12 56,685 So 2.10 Contractor Bid Assistance 10 5998 2.20 Submittal Review 1 14 150 $17,706 2.30 Request for Approval of Material (RAINS) _ a 2798 2.40 2.50 Requests for I&fonnallon (RFIs) 4 12 45 0 27159 Site Visits 1 4 16 Labor Subtotal: .. FteamIsursabloo: 12 1 0 30 _ 239 Q 0 0 8 0 227,261 so 3 06r0 Support Services 3 -10 Contactor Old As0letence 2 2259 3.20 Submittal Review 6 12'. 5 32,423 330 Request for Approval of Material (RAMS) 12 12 5 53,321 3.40 Requests Tor Inlannaiton (RFIS) 3 12 24 12 55,919 3.50 She Visits 12 29.75e Labor Subtotal: Reim. ablest 4 Urbain nee Support Services 9 0 __ 44 4e 0 0 Q 12 10 813,756 50 4,10 Contractor Bid Assistance 4,20 Submittal Review 420 Request Tor Approval 01 Material [RAM&) 4.40 4.50 Request& 108InlOrmattOn MHO Site Viobs Labor Subtotal: Retnbur&ab1eS: 6 Gectecitnlcal Support cos SeM _ 0 0 0 0 0 0 0 0' 0 50 SO 5.10 Submittal Review 5.20 Requeota for t1IomSal on (RFIS) 6 Labor Subiolal. Reimblarsa7ates; 0 0 0 o o o 0 0 0 su 90 Architectural Support Services 6.10 Submittal Review 620 Request& for InforinohOn 1RFI,) 620 She Matte Labor Subtotal: Reimbursables: Labor Sum: 0 0 25 0 0 0 98 299 0 0 0 0 0 0 0 0 20 22 KPFF SUBTOTAL: 00 $0 $47,703 Reimbursable Sum: 50 $47,703 46 EXHIBIT G -1 KPG CONSULTANT FEE DETERMINATION SUMMARY OF COST TUKWILA URBAN CENTER BICYCLE /PEDESTRIAN BRIDGE CSS Classification Senior Traffic Engineer Traffic Engineer Senior LA Project LAIUD Design LA CAD Technician Survey Crew Office Admin Overhead (OH) Cost OH Rate x DSC of Fixed Fee (FF) FF Rate x DSC of Reimbursables Mileage Reprographics Subcontract (Blank) Subtotal Total Hours X 18.00 X 23.00 X 22.00 X 27.00 X 0.00 X 0.00 X 0.00 X 0.00 X 131.49% Rate $56.97 $44.59 $54.57 $38.46 $27.76 $37.86 $47.12 $31.25 DSC Subtotal Cost $1,025.46 $1,025.57 $1,200.54 $1,038.42 $0.00 $0.00 $0.00 $0.00 X $4,289.99 30.00% X $4,289.99 = ( ## Miles x $0.565/mile) ( ## Sheets x $X.xxlsheet) (Sub Name & Task) (Allowance) $4,289.99 $5,640.91 $1,287.00 $0.00 Subconsultant Total: $11,217.89 47 COST ESTIMATE; TUKWILA URBAN CENTER BICYCLE/PEDESTRIAN BRIDGE CSS July 29, 2016 KPG KPG TUKWILA URBAN CENTER B1CYCLE /PEDESTRIAN BRIDGE CSS Ser4Of ria, Engineer Traffic Engineer Senio LA PrdJecl LPJUD i,,,,. LA CAD Technician Survey Craw Olfica Adroln MULTIPLIER' Item 1 SCOPE OF WORK 056.97 544 -59 _ 55.4.57 538.46 527.76 597.$6 547.12 131.25 2,6149 1 Project Management & Admintstra10 n - 1.10 Project Management, Coordination a Invoicing a2 51,712 1.20 Meetings Labor Subtotal: Reimbursables: 0 9 12 0 0 0 { 4 0 91,712 2 St at Support Sarvicas 2.10 Contractor Bid Assistance j 2.20 Submittal Review Ii 2.30 Request for Approval of Material (RAMS) 2.40 Requests for information (RFfs) l 2.50 Site Visits _ Labor Subtotal: Reiimbursables: 3 CivII Sort Services a e 0 3.10 Contractor Bid Assistance 3.20 Submittal Review 3.30 Request for Approval of Material (RAMs) 3.40 Requests tor Information (RFIs) 3.50 Site Visits Labor Su Natal Rafmbursables: 4 Urban Oesign1LandscapaIElectrical Support Services D 0 0 0 0 0 0 0 50 -- 4.10 Contractor Bid Assistance 6 3 4 52,112 4.20 Submittal Review 2 2 4 6 51,705 4.30 Request for Approval of Material (RAMS) 4 a 2 5 52,417 4.40 Requests for Information (RFIs) 6 6 51,303 4.50 Site Visits 4 4 9 51.987 Labor SLblotaI: Reimbursables: 5 Geolechnical Support Services 16 23 10 27 0 0 0 0 ;9.500 5.10 Submittal Review 5.20 Requests for Information (RFIs) -- - _ _Labor Subtotal: Relmbursables: 6 Architectural Support Services 0 0 e 0 0 0 0 0 S0 5.10 Submittal Review _ I 6.20 Requests for Inlormatlon (RFIs) 6.30 Site Visits Labor Subtotal: 0 0 0 0 0 0 0 0 SO Rol mbursablos: Labor Sum: 18 23 22 27 0 0 0 0 $11,218 Reimbursable Sum: SO 48 KPG SUBTOTAL: S $11,218 Principal Associate Senior Project Senior Staff Staff/Senior Tech Project Coordinator EXHIBIT 0 -1 LANDAU ASSOCIATES CONSULTANT FEE DETERMINATION SUMMARY OF COST TUKWILA URBAN CENTER BICYCLE /PEDESTRIAN BRIDGE CSS Classification Overhead (OH) Cost OH Rate x DSC of Fixed Fee (FF) FF Rate x DSC of Reirnbursables Mileage Reprographics Subcontract (Blank) Subtotal Total Hours X Rate 2.50 X 15.00 X 18.00 X 0.00 X 0.00 X 4.00 X 0.00 X 0.00 X 204.07% $61.63 $45.87 $40.24 $31.25 $27.74 $32.97 $0.00 $0.00 DSC Subtotal Cost $154.08 $688.05 $724.32 $0.00 $0.00 $131.88 $0.00 $0.00 X $1,698.33 30.00% X $1,698.33 ( ## Miles x $0.565/mile) ( ## Sheets x $X.xx/sheet) (Sub Name & Task) (Allowance) $1,698.33 $3,465.77 $509.50 $0.00 Subconsultant Total: $5,673.59 49 COST ESTIMATE: TUKWILA URBAN CENTER BICYCLE/PEDESTRIAN BRIDGE CSS 9UIy 29.2016 LANI]AU ASSOCIATES LANDAU ASSOCIATES TUKWILA URBAN CENTER BICYCLE/PEDESTRIAN BRIDGE CSS Principal Associate Senior Project Senior Staff Stale Samar lliS Projat Coordenator 0'00 0.00 MULTIPLIER: I am j SCOPE OF WORK 561.62 $45.07 SID 24 51125 $27.74 $32.97 50.00 1 50.00 3.3607 1 Project Management & Administration 1.10 Project Management, Coordination & Invoicing S 3 4 91810 1.20 Meetings - 5 5 51,4as i Labor Subtotal: Relmbursables: 2 StructuraI Support:Services 0 i0 a 0 1 0 4 0 0 -- _ $3.040 2.10 Contractor Bid Assistance 2.20 Submittal Review 2.30 Request for Approval of Material (RAMs) 2.40 Requests for Information (RFIs) 250 Site Vfsito Labor Subtotal: Relmbursables: 0 0 0 0 0 8 0 0 50 3 Civil Support Services - 3.10 Contractor Bid Assistance 1 3.20 Submittal Review J 1 3.30 Request for Approvat of Material {RAMS) 3.40 Requests for Information (RFIs) 3.50 Site Visits Labor Subtotal: D 0 0 a D D 0 0 30 Relmbursables: 4 Urban 0eslgfA.andscape&Electtfraf Support Suov 4.10 Contractor Bid Assistance 4.20 Submittal Review 4.30 Request for Approval of Material (RAMs) 4.40 Requests for Information (RFIs) 4.50 Site Visits Labor Subtotal: 0 0 D 0 0 0 0 0 00 Relmbursables: 5 Geotecfln teat . Support Services - - - -. - 5.10 Submit al Review 1 2 4 5.050 5.20 Requests for Information (RFIs) 15 3 5 51.575 - -- Labor Subtotal: Reimtrursables: 6 Architectural Support Services 2S 5 1D 0 D 0 0 0 52,625 6.10 Submittal Review 8.20 Requests tar Information (RFIs) I - -- - 6.30 Site Visits I. Labor Subtotal: 0 0 0 0 0 0 0 0 S0 Relmbursables: Labor Sum: 2.5 I 15 18 0 0 4 0 0 55,674 50 Reimbursable Sum: LANDAU OTAL: $5,674 50 Partner Project Designer Project Architect EXHIBIT G -1 LMN ARCHITECTS CONSULTANT FEE DETERMINATION SUMMARY OF COST TUKWILA URBAN CENTER BICYCLE /PEDESTRIAN BRIDGE CSS Classification Overhead (OH) Cost OH Rate x DSC of Fixed Fee (FF) FF Rate x DSC of Reimbursables Mileage Reprographics Subcontract (Blank) Subtotal Total Hours X Rate 6.00 X 24.00 X 36.00 X 0.00 X 0.00 X 0.00 X 0.00 X 0.00 X 197.86 %d $86.54 $53.85 $32.21 $0.00 $0.00 $0.00 $0.00 $0.00 DSC Subtotal Cost $519.24 $1,292.40 $1,159.56 $0.00 $0.00 $0.00 $0.00 $0.00 X $2,971.20 30.00% X $2,971.20 ( ## Miles x $0.565/mile) ( ## Sheets x $X.xxlsheet) (Sub Name & Task) (Allowance) $2,971.20 $5,878.82 $891.36 $0.00 Subconsultant Total: $9,741.38 51 COST ESTIMATE: TUKWILA URBAN CENTER BICYCLE /PEDESTRIAN BRIDGE CSS ,1 6, 29, 2216 LMN ARCHITECTS LMN ARCH' T00 iS TUKWILA URBAN CENTER BICYCLE/PEDESTRIAN BRIDGE CSS Paatnor , as Designer Project ArCMt9d 0.00 0.00 0.00 0.00 0.1D ' MULTIPLIER: Item 1 0000000 WORK 586.54 353.85 $3221 00.00 50.00 50 -00 00.00 0.2788 1 Project Management & Administration _5.0.00 1.10 Project Management, Coordination & Invoicing 12 52.119 1.20 Meetings Labor Subtotal: 0 12 0 0 0 I 0 0 j 0 52,119 Reimbur5bleu; 2. Structural Support Services 2.10 Contractor Bid Assistance 2.20 Submittal Review 2,30 Request for Approval of Material (RAMS) _ 2.90 Requests for information (RFIsj 2.50 Site Visits Labor Subtotal: Refmburaablea 3 Chit Support Servio0s _. 0 0 0 0 0 D 0 0 $0 All Contractor Bid Assistance 3.20 Submittal Review 3.30 Request for Approval of Material (RAMS) 3.40 Requests for Information (RFIs) 3.54 'Site Visits Labor Subtotal: D 0 0 D D D 0 0 50 Reimbursables: 4 Urban DesignlLandscapelEleotrical Support Services 4.10 4.20 Canlraclar Bid Assistance _ Submittal Review 4.30 Request for Approve? of Malerlat [RAW 4.40 Requests for Inlorrnation (RFIs) 4.50 Site Visits Labor Subtotal: Reimbursablus: 5 Geotechnical Support Services - 0 0 0 0 0 0 0 0 ;0 5.10 Submittal Review 5.20 Requests for Information (RFIs) Labor Subtotal: Reirnborsables: 6 Architectural Support Services 6.10 Submittal Review 2 6 14 $3.105 6.20 Requests for Information (RFIs) 2 10 51,409 ' 6.30 Site Visits 4 4 12 53.108 Labor Subtotal: Reim Liu rsahles: Labor Sum: 6 6 12 96 0 24 36 0 0 0 0 0 4 0 0 0 f7,622 $9,741 Reimbursable Sure: LMN ARCBUIETOTAL: $0 $9,741 52 TRANSPORTATION COMMITTEE Meeting Minutes City of Tukwila City Council Transportation Committee August 15, 2016 - 5 :30 p.m. - Foster Conference Room, 6300 Building Councilmembers: Dennis Robertson, Chair; Verna Seal, De'Sean Quinn Staff: David Cline, Bob Giberson, Pat Brodin, Robin Tischmak, Jaimie Reavis, Peter Lau, David Sorensen, Gail Labanara, Laurel Humphrey CALL TO ORDER: Acting Committee Chair Robertson called the meeting to order at 5:30 p.m. 1. PRESENTATIONS II. BUSINESS AGENDA. A. Grant Application: West Valley Highway (I -405 to Strander Boulevard) Staff is seeking Committee approval to submit a grant application to the Washington State Transportation Improvement Board to fund the West Valley Highway (1 -405 to Strander Boulevard) Project, which would construct improvements for 7 lane sections of West Valley Hwy_ The application will propose grant funding of 60% with 40% provided by traffic impact fees, federal funding, and City funds. The Committee requested more detail regarding the planned local match, and staff agreed to provide a copy prior to the application submission. COMMITTEE APPROVAL ASSUMING RECEIPT OF FINAL FUNDING NUMBERS. B. Consultant Agreement: 2017 Overlay and Repair Program Staff is seeking Council approval of a consultant agreement with KPG, Inc. in the amount of $114,677.03 for design of the 2017 Overlay and Repair Program. KPG was selected from three firms evaluated due to its experience and knowledge. UNANIMOUS APPROVAL. FORWARD TO SEPTEMBER 6, 2016 REGULAR CONSENT AGENDA. Supplemental Agreement: Tukwila Urban Center Pedestrian/Bicycle Bridge Staff is seeking Council approval of Supplemental Agreement No. 15 to Contract No. 07 -123 with KPFF Consulting Engineers in the amount of $77,174.23 for the Tukwila Urban Center Pedestrian /Bicycle Bridge. The additional construction management services will include providing responses to the contractor's requests for information, reviews for structural, urban design and architectural material submittals, and geotechnical support. UNANIMOUS APPROVAL. FORWARD TO SEPTEMBER 6, 2016 REGULAR CONSENT AGENDA. 53