HomeMy WebLinkAboutTrans 2016-09-06 Item 2A - Update - 53rd Avenue South (South 137th Street - South 144th Street) Roadway Layout OptionsCity of Tukwila
Allan Ekberg, Mayor
Public Works Department Bob Giberson, Director
INFORMATIONAL MEMORANDUM
TO: Transportation Committee' .zA
FROM: Bob Giberson, Public Works Director
BY: Ryan Larson, Senior Program Manager
CC: Mayor Ekberg
DATE: September 2, 2016
SUBJECT: 53rd Ave S (S 137th St - S 144th St)
Project No. 99110301
Roadway Layout Options - Status Update
ISSUE
Project update on the selected roadway design layout for 53rd Ave. S.
BACKGROUND
Roadway improvements for 53rd Ave S from S 137th St to S 144th St are in the design phase with KPG, Inc. The
project has received $2,141,400.00 in State Transportation Improvement Board (TIB) funding and must meet TIB's
minimal roadway design requirements that include sidewalks on both sides of the roadway. The City's Walk and
Roll Plan has designated this route to include shared vehicle /bicycle facilities (sharrows). Due to the limited right -of-
way (ROW) width of 40 feet on 53rd Ave S and the roadway's topography, fitting the planned roadway
improvements within the existing right -of -way is challenging.
Staff provided a project update and roadway layout options at the February 16, 2016 Transportation Committee and
received support to gauge neighborhood interest in alternate design options. An open house was conducted on
March 23, 2016 and four basic roadway design options were presented for discussion. These options were:
• Option 1: 13 foot sharrow lanes, no landscape planter, and 5 foot sidewalks. Option 1 would
require a total of 40 feet ROW and no additional ROW acquisition.
• Option 2: 14 foot sharrow lanes, 5 foot landscape planters, and 5 foot sidewalks. Option 2 would
require a total of 51 feet of ROW and 11 feet of additional ROW acquisition.
• Option 3: 11 foot travel lanes, 5 foot bike lanes, no landscape planters, and 5 foot sidewalks.
Option 3 would require a total of 47 feet of ROW and 7 feet of ROW acquisition.
• Option 4: 11 foot travel lanes, 5 foot bike lanes, 5 foot landscape planters, and 5 foot sidewalks.
Option 4 would require a total of 55 feet of ROW and 15 feet of ROW acquisition.
The 3/23/16 open house revealed that there was not support from property owners to donate additional ROW for
bike lanes and Options 3 and 4 were dropped from consideration. There was support for both Options 1 and 2 at
the open house, so staff then sent mailers to property owners who had not previously provided input. The mailers
requested that the property owners return their choice of roadway design and whether they were willing to donate
five feet of property for a landscape strip. Of the 21 responses that the City received, 14 favored Option 1 and 7
favored Option 2.
11PWStore\PW Common§1PW Eng\PROJECTS A- RW & RS Projects153rd Ave S (99110301)\Design\lnfo Memo Design Layout Recommendation 09 -02 -16 gl- bg.docx
53rd Ave S
September 2, 2016
Page 2
DISCUSSION
Staff, working with KPG, developed a roadway cross- section that considered the direction given by the property
owners by eliminating the need for significant ROW acquisition and kept the planned improvements within the
available 40 feet of ROW. The proposed new roadway layout includes the following elements:
• Two 11.5 foot sharrow lanes
• Two 5 foot sidewalks
• 2 feet on each side of the roadway for retaining was
• A 3 foot planter area on the west side of the roadway to provide room for illumination poles and utilities
Staff and KPG will continue to work with property owners on the east side of the roadway that had expressed
interest in donating additional property for a landscaped planter.
Project design is anticipated to be completed by March 2017 with project construction beginning in May 2017.
RECOMMENDATION
Information only.
Attachments: Typical Roadway Section
Roadway Plan
\\PWStore \PW Common$\PW Eng \ PROJECTS \A- RW & RS Projects \53rd Ave S (99110301) \Design \Info Memo Design Layout Recommendation 09 -02 -16 gl- bg.docx
CONSTRUCTION
RIGHT -OF -WAY
VARIES
5' 1 3' 1 11.5'
SIDEWALK f PLANTER SHARROW LANE
11.5'
SHARROW LANE
5'
SIDEWALK
40' RIGHT -OF -WAY
53RD AVE S
TYPICAL ROADWAY SECTION
S 144TH ST TO S 137TH
•
01
ings \Contract \150850001.dwg 8/22/2016 2:02 PM
K: \PROJECTS \TUKWILA \15085 — 53rd Ave S \6ESIGN \Q
PLAN
0 10 20 40 0
SCALE IN FEET
MATCH LINE STA 14 +50 SHEET 14
PUBLIC' WORKS DEPT_
* ENGINEERING *STREETS *WATER* SEWER *BUILDING *
designed
drawn
checked
proj eng
proj dir
field bk no
by
xxx
xxx
xxx
xxx
date
xx
xx
xx
xx
IKPG
7539th Ave N
Seattle, WA 98109
(208)286-1840
www.kpg.com
2502 Jefferson Ave
Tacoma, WA 98402
(253)627-0720
ALIGNMENT
REVIEW
53RD AVENUE SOUTH
ROADWAY PLAN
STA 10 +00 TO STA 14 +50
13
102
file no 15085R D01. DWG
scale 1" = 40'
no
date
revisions
date VALUE
3mvn o p
SUOISIAN
OU
oa = ..1 aluas
soma loaas8osL oualll
ZOl
00 +6I V1S 0109 +b 6 VLS
NVld AVMOVOd
HIf10S 3f1N3AV au
M3IA321
1N3INNJI1V
O Lo-cas (ssz)
Z0486VM'ewcael
any eoSIayaf ZOE
woo 6d6 Mmm
O99(9a)
60186 VM'elUeaS
N any 416 £5L
xx
XX
xx
Xx
aTup
xxX
XXX
XXX
xxx
ou plop
up load-
Wua load
poloago
umuap
paa)sap
Act
* DNIQ'IIflg *2IJMJS * HIVM* SJ f32JJ S* JNI2IHaNIJNa *
MATCH LINE STA 19 +00 SHEET 15
1333 NI 31V3S
09 0Z 01 0
NV'ld
MATCH LINE STA 14 +50 SHEET 13
ROJECTS \TUKWILA \15085 — 53rd Ave S \ DESIGN \Dra
s \ Contract \15085RD01.dwg 8/22/2016 2:03 PM
3mvn o p
SUOISIAaa
ou
oa = ..1 aluas
9ma loaas8osl oualll
ZOl
91
09 +£Z V1S 0100 +66 VLS
NVld AVMOVOd
HIf10S 3f1N3AV au
M3IA321
1N3INNJI1V
O Lo-cas (ssz)
Z0486VM'ewcael
any eoSIayaf ZOE
woo 6d6 Mmm
O99(9a)
60186 VM'elUeaS
N any 416 £5L
xx
XX
xx
Xx
olup
xxX
XXX
XXX
xxx
ou plop
up load-
Wua load
poloago
umuap
paa)sap
Act
* DNIQ'IIflg *2IJMJS * HIVM* SJ f32JJ S* JNI2IHaNIJNa *
MATCH LINE STA 23 +50 SHEET 16
1333 NI 31VOS
09 OZ 01 0
NV'ld
\I I
G
cnd U21£9
oo +£Z oo +ZZ
oo +oZ OOH
if
if
if
if
4
1
i i
4
MATCH LINE STA 19 +00 SHEET 14
\J /
ROJECTS \TUKWILA \15085 — 53rd Ave S \ DESIGN \Dra
s \ Contract \15085RD01.dwg 8/22/2016 2:03 PM
3111VA alsp
SUOISIAN
olup
ou
.Oro = ,.l 3INOS
°ma loaassosl oualy
ZOl
91.
OO +8Z V1S 0104 +£Z VIS
NVId AVMaVOd
HIf10S 3f1N3AV a21E5
M31A321
1N3INNJI1V
oaco-as (£sa)
Z01,86VM'ewooel
any uosiallaf Z09Z
woo6dMw
ovsl ssZ(90Z)
60186YM'0I11eaS
NeAV416£5L
XX
XX
xx
XX
alup
XXX
XXX
xxx
XXX
Aq
ou �q plag
np loid
&ua !old
pimp
tamp
pautsap
*DNICIIing *11aMgS *NTLVM *S1 TJ ILS *DN[ I JNHDNJ*
-.za�Q sxzro ,�I�sria
r
m
N
D
N
co
m
m
1333 NI 31VOS
09 04 OZ 0l 0
NVld
MATCH LINE STA 23 +50 SHEET 15
— 98091 \V1M;ifll \010
Z 91077ZZ/8 0n^P- 1001JS80Sl \loo_auo0 \s6
3mvn alzp
04 = „d 01BOS
9ma loaas8osl oualll
0L
LL
SUOISIAal
OICO
OU
LZ +Z£ V1S 0100 +8Z V1S
NVld AVMOVOd
HIf10S 3f1N3AV au
M3IA321
1N3INNJI1V
O Lo-cas (ssz)
Z0486VM'ewcael
any u0sia401 ZOE
woo tMw
O99(9a)
60186 VM'elUeaS
N any 416 £5L
ou P1ag
np lad
xx xxx qua fold
XX XXX palaago
xx XXx umnap
Xx xxx paa)sap
o p ,(q
* `JNIQ'IIflH* *)JJMJS * HIVM* S.10321IS* JN1UHa IIJM *
1333 NI 31V3S
09 0Z 01 0
NV'ld
+2Z VIS 3■I1 H31VW
ROJECTS \TUKWILA \15085 — 53rd Ave S \ DESIGN \Dra
s \ Contract \15085RD01.dwg 8/22/2016 2:04 PM