Loading...
HomeMy WebLinkAboutTrans 2016-09-06 Item 2A - Update - 53rd Avenue South (South 137th Street - South 144th Street) Roadway Layout OptionsCity of Tukwila Allan Ekberg, Mayor Public Works Department Bob Giberson, Director INFORMATIONAL MEMORANDUM TO: Transportation Committee' .zA FROM: Bob Giberson, Public Works Director BY: Ryan Larson, Senior Program Manager CC: Mayor Ekberg DATE: September 2, 2016 SUBJECT: 53rd Ave S (S 137th St - S 144th St) Project No. 99110301 Roadway Layout Options - Status Update ISSUE Project update on the selected roadway design layout for 53rd Ave. S. BACKGROUND Roadway improvements for 53rd Ave S from S 137th St to S 144th St are in the design phase with KPG, Inc. The project has received $2,141,400.00 in State Transportation Improvement Board (TIB) funding and must meet TIB's minimal roadway design requirements that include sidewalks on both sides of the roadway. The City's Walk and Roll Plan has designated this route to include shared vehicle /bicycle facilities (sharrows). Due to the limited right -of- way (ROW) width of 40 feet on 53rd Ave S and the roadway's topography, fitting the planned roadway improvements within the existing right -of -way is challenging. Staff provided a project update and roadway layout options at the February 16, 2016 Transportation Committee and received support to gauge neighborhood interest in alternate design options. An open house was conducted on March 23, 2016 and four basic roadway design options were presented for discussion. These options were: • Option 1: 13 foot sharrow lanes, no landscape planter, and 5 foot sidewalks. Option 1 would require a total of 40 feet ROW and no additional ROW acquisition. • Option 2: 14 foot sharrow lanes, 5 foot landscape planters, and 5 foot sidewalks. Option 2 would require a total of 51 feet of ROW and 11 feet of additional ROW acquisition. • Option 3: 11 foot travel lanes, 5 foot bike lanes, no landscape planters, and 5 foot sidewalks. Option 3 would require a total of 47 feet of ROW and 7 feet of ROW acquisition. • Option 4: 11 foot travel lanes, 5 foot bike lanes, 5 foot landscape planters, and 5 foot sidewalks. Option 4 would require a total of 55 feet of ROW and 15 feet of ROW acquisition. The 3/23/16 open house revealed that there was not support from property owners to donate additional ROW for bike lanes and Options 3 and 4 were dropped from consideration. There was support for both Options 1 and 2 at the open house, so staff then sent mailers to property owners who had not previously provided input. The mailers requested that the property owners return their choice of roadway design and whether they were willing to donate five feet of property for a landscape strip. Of the 21 responses that the City received, 14 favored Option 1 and 7 favored Option 2. 11PWStore\PW Common§1PW Eng\PROJECTS A- RW & RS Projects153rd Ave S (99110301)\Design\lnfo Memo Design Layout Recommendation 09 -02 -16 gl- bg.docx 53rd Ave S September 2, 2016 Page 2 DISCUSSION Staff, working with KPG, developed a roadway cross- section that considered the direction given by the property owners by eliminating the need for significant ROW acquisition and kept the planned improvements within the available 40 feet of ROW. The proposed new roadway layout includes the following elements: • Two 11.5 foot sharrow lanes • Two 5 foot sidewalks • 2 feet on each side of the roadway for retaining was • A 3 foot planter area on the west side of the roadway to provide room for illumination poles and utilities Staff and KPG will continue to work with property owners on the east side of the roadway that had expressed interest in donating additional property for a landscaped planter. Project design is anticipated to be completed by March 2017 with project construction beginning in May 2017. RECOMMENDATION Information only. Attachments: Typical Roadway Section Roadway Plan \\PWStore \PW Common$\PW Eng \ PROJECTS \A- RW & RS Projects \53rd Ave S (99110301) \Design \Info Memo Design Layout Recommendation 09 -02 -16 gl- bg.docx CONSTRUCTION RIGHT -OF -WAY VARIES 5' 1 3' 1 11.5' SIDEWALK f PLANTER SHARROW LANE 11.5' SHARROW LANE 5' SIDEWALK 40' RIGHT -OF -WAY 53RD AVE S TYPICAL ROADWAY SECTION S 144TH ST TO S 137TH • 01 ings \Contract \150850001.dwg 8/22/2016 2:02 PM K: \PROJECTS \TUKWILA \15085 — 53rd Ave S \6ESIGN \Q PLAN 0 10 20 40 0 SCALE IN FEET MATCH LINE STA 14 +50 SHEET 14 PUBLIC' WORKS DEPT_ * ENGINEERING *STREETS *WATER* SEWER *BUILDING * designed drawn checked proj eng proj dir field bk no by xxx xxx xxx xxx date xx xx xx xx IKPG 7539th Ave N Seattle, WA 98109 (208)286-1840 www.kpg.com 2502 Jefferson Ave Tacoma, WA 98402 (253)627-0720 ALIGNMENT REVIEW 53RD AVENUE SOUTH ROADWAY PLAN STA 10 +00 TO STA 14 +50 13 102 file no 15085R D01. DWG scale 1" = 40' no date revisions date VALUE 3mvn o p SUOISIAN OU oa = ..1 aluas soma loaas8osL oualll ZOl 00 +6I V1S 0109 +b 6 VLS NVld AVMOVOd HIf10S 3f1N3AV au M3IA321 1N3INNJI1V O Lo-cas (ssz) Z0486VM'ewcael any eoSIayaf ZOE woo 6d6 Mmm O99(9a) 60186 VM'elUeaS N any 416 £5L xx XX xx Xx aTup xxX XXX XXX xxx ou plop up load- Wua load poloago umuap paa)sap Act * DNIQ'IIflg *2IJMJS * HIVM* SJ f32JJ S* JNI2IHaNIJNa * MATCH LINE STA 19 +00 SHEET 15 1333 NI 31V3S 09 0Z 01 0 NV'ld MATCH LINE STA 14 +50 SHEET 13 ROJECTS \TUKWILA \15085 — 53rd Ave S \ DESIGN \Dra s \ Contract \15085RD01.dwg 8/22/2016 2:03 PM 3mvn o p SUOISIAaa ou oa = ..1 aluas 9ma loaas8osl oualll ZOl 91 09 +£Z V1S 0100 +66 VLS NVld AVMOVOd HIf10S 3f1N3AV au M3IA321 1N3INNJI1V O Lo-cas (ssz) Z0486VM'ewcael any eoSIayaf ZOE woo 6d6 Mmm O99(9a) 60186 VM'elUeaS N any 416 £5L xx XX xx Xx olup xxX XXX XXX xxx ou plop up load- Wua load poloago umuap paa)sap Act * DNIQ'IIflg *2IJMJS * HIVM* SJ f32JJ S* JNI2IHaNIJNa * MATCH LINE STA 23 +50 SHEET 16 1333 NI 31VOS 09 OZ 01 0 NV'ld \I I G cnd U21£9 oo +£Z oo +ZZ oo +oZ OOH if if if if 4 1 i i 4 MATCH LINE STA 19 +00 SHEET 14 \J / ROJECTS \TUKWILA \15085 — 53rd Ave S \ DESIGN \Dra s \ Contract \15085RD01.dwg 8/22/2016 2:03 PM 3111VA alsp SUOISIAN olup ou .Oro = ,.l 3INOS °ma loaassosl oualy ZOl 91. OO +8Z V1S 0104 +£Z VIS NVId AVMaVOd HIf10S 3f1N3AV a21E5 M31A321 1N3INNJI1V oaco-as (£sa) Z01,86VM'ewooel any uosiallaf Z09Z woo6dMw ovsl ssZ(90Z) 60186YM'0I11eaS NeAV416£5L XX XX xx XX alup XXX XXX xxx XXX Aq ou �q plag np loid &ua !old pimp tamp pautsap *DNICIIing *11aMgS *NTLVM *S1 TJ ILS *DN[ I JNHDNJ* -.za�Q sxzro ,�I�sria r m N D N co m m 1333 NI 31VOS 09 04 OZ 0l 0 NVld MATCH LINE STA 23 +50 SHEET 15 — 98091 \V1M;ifll \010 Z 91077ZZ/8 0n^P- 1001JS80Sl \loo_auo0 \s6 3mvn alzp 04 = „d 01BOS 9ma loaas8osl oualll 0L LL SUOISIAal OICO OU LZ +Z£ V1S 0100 +8Z V1S NVld AVMOVOd HIf10S 3f1N3AV au M3IA321 1N3INNJI1V O Lo-cas (ssz) Z0486VM'ewcael any u0sia401 ZOE woo tMw O99(9a) 60186 VM'elUeaS N any 416 £5L ou P1ag np lad xx xxx qua fold XX XXX palaago xx XXx umnap Xx xxx paa)sap o p ,(q * `JNIQ'IIflH* *)JJMJS * HIVM* S.10321IS* JN1UHa IIJM * 1333 NI 31V3S 09 0Z 01 0 NV'ld +2Z VIS 3■I1 H31VW ROJECTS \TUKWILA \15085 — 53rd Ave S \ DESIGN \Dra s \ Contract \15085RD01.dwg 8/22/2016 2:04 PM