HomeMy WebLinkAboutPARK 2016-09-14 COMPLETE AGENDA PACKETCity of Tukwila Allan Ekberg, May
P arks & Recreation Department - Rick Still, Director
PARKS COMMISSION
Chair: Mike Martin
Vice Chair: Don Scanlon
AGENDA
Wednesday, September 14, 2016 5:30pm Tukwila Community Center
1. Call to Order
2. Approval of Minutes
a. Approval of Minutes (July 2016) ........................................................... ............................... pg.1
3. Citizen Comment
4. Business
a. Special Presentation — EarthCorps Sound Steward Program (15mins) ............................ n/a
b. Budget Update (25mins) .......................................................................... ............................... pg.3
c. Park Watch Program Update (5mins) .................................................... ............................... n/a
d. Department Update (5mins) ................................................................... ............................... n/a
S. Other
6. Adjournment
Next Meeting: October 12, 2016 @ 5:30pm
Tukwila City hall * 6200 Southce'nter Boulevard • Tukwila, WA 98188 # 206- 433 -1800 • Webslte: iukwitaWA.gav
���� �� �
�� ��/ ������,���������U��U��K�
1[ �� ����� � |[��.��� ���nvn�~o ����n�nn�nn~»~»n��n�
PAR1eS&,G����'10N
MINUTES
July 13, 2016 5:30pm Tukwila Community Center
CalltoOrder: Chairperson Mike Martin called the meeting to order at 5:32pm.
Attendance: [ononoissinners — Mike Martin, HeidiVVattens, Sean Albert
Staff — Robert Eaton, Bruce Linton, Chris Flores
[itizen — ScnttKruize
Guest — NnrahKates
Approval mfMinutes: Sean Albert moved tu approve the minutes o/the
seconded the motion. The motion passed unanimously. 4
Citizen Comment: No comments.
Business Items
Chair Mike Martin changed the order of the agenda switching the ordqw i
A. Public Safety Plan — Deputy Police Chief BTullce Linton and Interim F
commission the Public Safety Plan. They pi��ecl information, han
questions of the commission.
2026nfeotioo HeidYN/otters
Public Safety Plan with Green
hief Chris Flores presented tnthe
-.s. resources and answered
B. Green Tukwila FINAL DRAFT 20 earPlan—NorahK e's, Project Manager with Forterra walked the
commission through the d4 nd asked for feedback to be provided to her by Monday, July 25 1h
at 8:00am. The draft will be disseminated vi4*nail to the commission. There was some Q&A and the
commission was very pportive ofwfbis plan and 6 ressed the desire to support and champion this as it
L the
Park" e 1:30pm focusing on
/Pt of 2016 happened on July 13, 2016 at Bicentennial Park from 12:00
connect' g with the local businesses, The two remaining events are July 27, 5:30pm @ Riverton Park and
August 10, 5:30pm @ Tukwila Park (the commission will be attending this event in place of the normal
monthly meeting).
Other
A. —Robert reminded the commission that the August Park Commission meeting
is cancelled so the connoissionnoayattendtheTukwi|aPark"SeeYnuinthePark"eventthatsanoeni0ht.
Adjournment: Heidi Watters moved to adjourn at 6:32pm. The motion was seconded by Sean Albert. The motion
passed unanimously.
J
"
2
City of Tukwila
Allan Ekberg, Mayor
INFORMATIONAL MEMORANDUM
TO: Committee of the Whole
FROM: Rick Still, Parks and Recreation Director
CC: Mayor Ekberg
DATE: September 7, 2016 (Updated following meetings dated 7 -2 -16 and 8 -8 -16)
SUBJECT: Proposed Foster Golf Links 2017 -18 Budget
ISSUE
A review of the 2017 -18 Budget for the Foster Golf Links (FGL).
BACKGROUND
The Foster Golf Links Preliminary 2017 -18 Budget was presented to the Community Affairs and
Parks Committee at its meetings on July 25 and August 8. This memorandum combines
information from the two previous memorandums for better clarity.
DISCUSSION
Foster Golf Links operates as a Special Enterprise Fund to manage the 77 acre property and
14,400 square foot clubhouse facility. Attachment A includes the budget narrative, proposed
revenue, expenditures and the 6 -year financial planning model for the golf course operations
known as "ATTACHMENT G" in the City's budget book. Below please find a brief description of
the FGL proposed budget, a brief history of FGL and 2015 year in review, GASB -68, and policy
issues that impact the FGL budget:
Proposed 2017 -18 Budget
Revenues produced by FGL pay for the golf operational costs as reflected in three areas within
the budget: Maintenance (411.576.680) Pro Shop (411.576.681) and a minimal Capital
Improvement Plan (411.594.760). Each of these areas is summarized below.
The Maintenance Division is responsible for the golf course playability for golf and FootGolf.
Golf course maintenance includes very technical and scientific turf maintenance programs and
an extensive irrigation system. The golf maintenance staff also performs many other types of
maintenance including: tree, cart path, pond, water pumps, parking lot and landscape
maintenance. A golf equipment mechanic maintains all of the various specialty golf machinery
and the rentable driving golf carts.
Since the August 8 CAP meeting, the FGL Maintenance Division budget line items changed
for fleet replacement program (411.00.576.680.45.94) $27.487 reduction in 2017 and
operations & maintenance (411.00.576.680.45.95) $ 418.00 increase in 2017. Equipment
that meets policy for replacement and needs to be replaced is still in the budget. Equipment
that meets the replacement policy but still have usable life have been pushed out to future
years. Liability insurance (411.00.576.680.46.01) was increased by $9,738 to better reflect
the current estimated costs.
The Pro Shop Division provides great customer experience for the people who enjoy the
beautiful golf course and its amenities. The staff maintains the computerized tee sheet to
schedule people to play golf every seven minutes throughout the day. Staff assist clients in
3
INFORMATIONAL MEMO
Page 2
renting a driving golf cart, a pull cart, and golf clubs, as well as finding the right golf equipment
and gear to use or apparel to wear on the golf course. Staff teaches lessons, run youth camps
and coordinates and accommodates leagues and tournaments. The Pro Shop Division fuels
and cleans the golf carts after the golfers are done with their round. They also manage the
concessionaire agreement and coordinate food services for the golf tournaments.
The 15 -Year FGL Capital Improvement Plan was established to extend the life expectancy of
the clubhouse and to increase playability and interest of the golf course (Attachment B). The
plan is based upon approximately $50,000 annually. Some bi- annual funds would need to be
combined to accomplish the larger projects proposed for 2017 -2018
Brief History of Foster Golf Links & 2015 Year in Review
FGL began as a private golf course in 1925. The residents voted to purchase the golf course in
1976 and has been operating it since. More information about Foster Golf Links can be found in
Attachment C "Brief History" and Attachment D "2015 Year in Review."
GASB -68
An explanation of GASB -68 can be found in Attachment E. The Governmental Accounting
Standards Board (GASB) provided direction to increase visibility of financial support for pension
commitments. This is a balance sheet entry only for transparency reasons and no cash was
paid to the State related to this entry. GASB -68 will be reflected in all of the enterprise funds
and the general fund.
Policy Issues:
Policy impacts of non -golf operational costs on the solvency of the golf course operations are:
Interfund Taxes - Admission Taxes (680.54.01), Transfers -Out (Indirect Cost Allocation
597.190.00) and the Public Utilities — Surface Water (680.47.26). Items 1 & 2 below are
transferred -in the golf budget from the general fund and then transferred -out of the golf budget
to the general fund. These policy issues are listed here to keep you informed of why the FGL
budget looks the way it does. These items could be considered now or in the 2017 -18 CAP
work plans.
1. The Admission Tax was established by Ordinance Number 1657 in 1993. It is a five percent
tax on admissions for entertainment purposes in the City of Tukwila to provide revenues for
Public Safety personnel. In 1995, the ordinance was repealed and amended to exclude bowling
alley(s). In 2015, there were 101 non traffic - related calls to one bowling alley and only 17 to
FGL. There are several golf courses in the region that charge an admission tax but there the
funds are used for the golf course capital improvement program.
2. The Indirect Cost Allocation is only charged to special enterprise funds. The program was
developed to identify the overhead costs associated with operating in the city and are currently
being charged to the enterprise funds (golf, sewer, water and surface water). The overhead
costs are for services from the various internal functions of the city operations: human
resources, technology services, council agendas, finance, custodial and facility maintenance.
The proposed fee for 2017 is $181,000 and $184,517 in 2018. A full review of the Indirect Cost
Allocation will be on the 2017 work plan.
3. The Surface Water Management fee is charged for the square footage of non - pervious
materials on one's property, like parking lots and roofs. This fee is charged to several general
fund accounts like, parks, golf and facilities. These funds are transferred to the Public Works
surface water fund. Parks and FGL have many acres of grass and landscaping that naturally
infiltrates water, which actually alleviates some of the surface water, unlike paved surfaces and
4 Boards antl ammi w \Park amuse l9- 141fi Age da Pa ke - ITEM41 - COW 1U Prelimary BUdg.t MEMO 9 -] -i6 rsd
INFORMATIONAL MEMO
Page 3
city buildings (facilities). Another model in the region provides a credit to the property owner
that has more natural infiltration on their properties.
4. Although FGL is established as a special enterprise fund, the operations are dissimilar to the
three utility enterprise funds (water, sewer and surface water) in the city. The utility enterprise
funds are able to increase fees to cover the rising costs while not losing customers. Golf is a
market driven recreational opportunity and participants can choose another golf course if they
do not find value in the golf experience. If the FGL golf green fee is too high, the golfer may find
a better value at another golf course. Utility customers cannot choose another water, sewer or
surface water department if the rates are increased. Potentially, Tukwila's FGL special
enterprise fund model could be changed via the Tukwila Municipal Code.
ATTACHMENTS
Attachment A: FGL Budget Sheets and ATTACHMENT G (as titled from the budget book)
Attachment B: FGL 15 -year Capital Improvement Plan
Attachment C: FGL Brief History
Attachment D: FGL 2015 Year in Review
Attachment E: GASB- 68Admission Tax
Z 1BOards antl Cammisswns\ Park Cammosienl9- 141fi Agenda Packe t\3— ITEM4b— COWFGLP...m Budget MEM09- ] -i6rs
5
A
2017/2018 Preliminary Budget Attachment A
DEPARTMENT: Parks & Recreation
FUND: Golf Course FUND NUMBER: 411
RESPONSIBLE MANAGER: Rick Still POSITION: Director
Description
The mission of Foster Golf Links (FGL) is to provide a quality golfing experience for those that live, work,
and play in Tukwila. The golf course is operated as an enterprise fund with revenues covering all
maintenance, pro shop services, and capital costs.
2015 -2016 Accomplishments
♦ Developed and implemented a Reward's Card Program to acknowledge customer loyalty and
strengthen our core customer base. Strategic Goals 3 & 4. PROS Plan Goal 5.
♦ Strengthened our player engagement program by promoting PGA of America's "Get Golf Ready"
Program. Strategic Goals 2, 3, & 4. PROS Plan Goals 2, 3, 4, & 5.
♦ Implemented new Junior Golf Program by holding junior camps, private instruction, and
participated in the Jr. PGA Golf program. Strategic Goals 2 & 4. PROS Plan Goals 2, 3, 4, &
5.
♦ Expand partnership with restaurant concessionaire to meet the needs of the customers and
community and extend agreement for seven years. Strategic Goals 2, 3, & 4. PROS Plan Goals
3 &4.
♦ Implemented Cart Replacement Plan. Strategic Goal 4. PROS Plan Goals 3 & 5.
2017 -2018 Outcome Goals
♦ Continue with Cart Replacement Plan. Strategic Goal 4. PROS Plan Goals 3 & 5.
♦ Improve operational efficiency and sustainability, and develop maintenance management plan.
Strategic Goal 1, 4, &5. PROS Plan Goals 4 & 5.
♦ Continue implementing deep tine aerification program. Strategic Goal & 5. PROS Plan
Goals 4 & 5.
♦ Perform capital improvements at the course for playability and sustainability. Strategic Goal 4
& 5. PROS Plan Goals 4 & 5.
♦ Continue to expand our player engagement program to increase access to FGL. Strategic
Goals 2, 3, & 4. PROS Plan Goals 2, 3, 4, & 5.
2017 -2018 Indicators of Success
♦ Increased rounds of play.
♦ Additional new customers.
♦ Improved satisfaction with equipment.
♦ Better drainage on course, reduced soft spots, and healthier turf.
♦ Increased use of carts on course (not regulated to cart path only) during shoulder months.
VA
2017/2018 Preliminary Budget Attachment A
Revenue and Expense Summary
Foster Golf Course
Reconciliaton to Financial Statements
ACTUAL
PROJECTED
BUDGET
% CHANGE
2014
2015
2016
2016
2017
2018
2016/2017
2017/2018
Operating Revenue
Net Investment in Capital Assets
7,217,532
6,132,364
7,014,317
5,904,327
5,686,629
5,478,801
-3.69%
Charges for Services
Total Net Position
$ 7,932,071
$ 6,273,982
$ 7,052,492
$ 6,044,296
$ 5,836,233
$ 5,638,275
-3.44%
Green Fees, Instruction
961,495
1,021,705
999,388
1,065,000
1,095,650
1,145,650
2.88%
4.56%
Sales of Merchandise
159,686
150,247
145,895
155,000
151,000
151,000
-2.58%
0.00%
Rents and Concessions
282,228
299,547
283,098
288,000
306,000
309,000
6.25%
0.98%
Total Charges for Services
1,403,410
1,471,499
1,428,380
1,508,000
1,552,650
1,605,650
2.96%
3.41%
Miscellaneous Revenue
Excise Taxes
3,151
3,927
4,072
2,617
3,900
3,900
49.03%
0.00%
Investment Earnings
392
952
1,981
1,130
1,000
1,000
- 11.50%
0.00%
Sale of Capital Assets
-
(455)
-
-
-
-
0.00%
0.00%
Other Misc Revenue
(513)
6,365
8,123
-
7,000
7,000
0.00%
0.00%
Total Miscellaneous Revenue
3,030
10,789
14,176
3,747
11,900
11,900
217.59%
0.00%
Transfers In
600,000
300,000
300,000
300,000
300,000
300,000
0.00%
0.00%
Total Operating Revenue
2,006,440
1,782,288
1,742,556
1,811,747
1,864,550
1,917,550
2.91%
2.84%
Operating Expenses
Salaries & Wages
698,112
706,164
730,837
706,489
717,061
729,121
1.50%
1.68%
Personnel Benefits
241,978
225,993
272,613
256,075
306,120
321,672
19.54%
5.08%
Supplies
194,344
275,840
233,700
259,335
203,415
203,415
- 21.56%
0.00%
Services
252,795
310,253
316,363
297,744
331,020
352,554
11.18%
6.51%
Intergov't Services & Taxes
63,051
67,190
65,134
66,400
66,400
66,400
0.00%
0.00%
Total Operating Expenses
1,450,281
1,585,439
1,618,647
1,586,043
1,624,016
1,673,163
2.39%
3.03%
Capital Expenses
Capital Outla
47,967
-
50,000
50,000
50,000
50,000
0.00%
0.00%
Total Capital Expenses
47,967
-
50,000
50,000
50,000
50,000
0.00%
0.00%
Indirect cost allocation
197,486
173,909
177,352
177,352
180,899
184,517
2.00%
2.00%
Total Expenses
1,695,734
1,759,348
1,845,999
1,813,395
1,854,915
1,907,680
2.29%
2.84%
Change in Fund Balance
310,705
22,941
(103,443)
(1,648)
9,635
9,870
- 684.62%
2.45%
Adjustments to working capital
Operatinq Prior Period Adjustment
206,154
596,317
-
-
-
-
0.00%
0.00%
Net working capital (Fund Balance)
714,539
141,617
38,174
r 139,969
149,604
159,474T
6.88%
6.60%
Reconciliaton to Financial Statements
Networking capital (Fund Balance)
714,539
141,617
38,174
139,969
149,604
159,474
Net Investment in Capital Assets
7,217,532
6,132,364
7,014,317
5,904,327
5,686,629
5,478,801
-3.69%
-3.65%
Total Net Position
$ 7,932,071
$ 6,273,982
$ 7,052,492
$ 6,044,296
$ 5,836,233
$ 5,638,275
-3.44%
-3.39%
Non -Cash Adjustments to Capital Assets
Capital Prior Period Adjustment -
1
757,473
-
-
-
-
0.00%
0.00%
Depreciation 298,023
327,238
253,214.34
278,037
267,698
257,828
-3.72%
-3.69%
Rl
2017/2018 Preliminary Budget Attachment A
Expenditure Detail - Salaries and Benefits
Salaries for budgeted positions are based on actual costs for existing positions and include a cost of
living adjustment per contract agreements.
Foster Goff Course
Position
Description
2016
FTE
2017
FTE
2017 Budget
Salaries Benefits
2018
FTE
2018 Budget
Salaries Benefits
Director Parks and Recreation
-
-
Director of Instruction - Golf
1
1
$ 81,345
$ 42,520
1
$ 82,972
$ 45,034
Golf Maintenance Supervisor
1
1
81,345
39,240
1
82,972
41,492
Lead Maintenance Specialist - Golf
1
1
76,425
38,248
1
77,954
40,478
Fleet Technician Golf
1
1
72,126
25,076
1
73,569
26,301
AdminSupportTechnician - Golf
2
2.5
146,104
71,399
2.5
149,026
75,407
Maintenance Specialist Golf
2.25
2.25
145,675
60,872
2.25
148,588
64,194
Extra Labor
112,000
21,302
112,000
21,302
Overtime
2,040
156
2,040
156
Unemployement
-
6,120
-
6,120
Clothing Allowance
I
-
1,187
1
-
1,187
Department Total
8.25
8.75
$ 717,061
$ 3065120
1 8.75
$ 7295121
$ 3215672
3
n
2017/2018 Preliminary Budget Attachment A
Expenditure Detail Operations - Supplies, Services, and Other
Supplies include irrigation, fertilizers, etc. for grounds maintenance and small tools. Services include
security, utilities, rental of equipment, insurance, repairs & maintenance for course equipment, rental and
maintenance charges, and memberships, among others. Intergovernmental includes admission taxes
paid to the City. Capital includes upgrades to tees and greens.
Foster Golf Course - Operations
4
10
ACTUAL
PROJECTEE
BUDGET
Account Number
2014
2015
2016
2016
2017
2018
411.00.576.680.31.00
Supplies - Office & Operating
$ 268
$ 2,461
$ 148
$ -
$ 2,400
$ 2,400
411.00.576.680.31.02
Supplies - Grounds Maintenance
26,776
36,401
46,314
52,530
40,000
40,000
411.00.576.680.31.03
Supplies - Irrigation
1,896
7,052
3,736
7,140
7,000
7,000
411.00.576.680.31.04
Supplies - Fertilizers & Misc. Chemicals
46,900
44,205
46,663
42,840
45,000
45,000
411.00.576.680.35.00
Small Tools & Minor Equipment - Tools
for course
3,520
1,951
47,479
66,810
4,000
4,000
Total Supplies
79,360
92,069
144,340
169,320
98,400
98,400
411.00.576.680.41.00
Prof S \cs - Geese control
3,848
10,969
1,900
3,672
5,000
5,000
411.00.576.680.42.00
Communication - Phones, alarms and
440
1,563
1,493
1,377
1,521
1,521
monitoring
411.00.576.680.43.00
Travel - Meals, mileage, parking for
626
-
765
765
300
300
professional development travel
411.00.576.680.44.00
Advertising
299
-
-
-
-
-
411.00.576.680.45.00
Rental - Bottled water, portable toilet
1,708
1,001
1,677
2,448
2,448
2,448
rentals, short term rental equipment
411.00.576.680.45.94
Rental - Equipment Replacement Fund
55,689
80,751
85,013
87,729
78,129
95,278
411.00.576.680.45.95
Rental - Equipment O & M
38,370
45,203
63,285
60,456
60,583
62,529
411.00.576.680.46.00
Insurance - WCIA
16,464
1,217
-
19,465
-
-
411.00.576.680.46.01
Insurance - WCIA
-
-
19,465
-
24,389
26,828
411.00.576.800.46.04
Insurance - Flood
-
18,538
-
-
-
-
411.00.576.680.47.00
Public Utility - Puget Sd Energy - pump
stations, water- course restrms,
9,017
-
10,200
10,200
-
-
maintenance shed
411.00.576.680.47.21
Electric
-
11,338
3,253
-
12,000
12,000
411.00.576.680.47.22
Gas
604
249
700
700
411.00.576.680.47.25
Water /Sewer
6,083
1,785
6,200
6,200
411.00.576.680.47.26
Surface Water
-
28,649
16,473
-
31,000
31,000
411.00.576.680.47.01
Public Utility - SSWM charges
23,875
-
21,209
21,209
-
-
411.00.576.680.47.09
Public Utility - Puget Sound Energy, City
water -wash bay and maintenance bldg
7,545
3,727
4,718
5,610
4,000
4,000
411.00.576.680.48.00
R &M - Contracted parking lot
maintenance, fire alarm test, misc.
12,701
6,636
6,629
7,140
10,000
10,000
repairs
411.00.576.680.48.01
R &M - Professional Tree Removal
-
-
-
-
6,000
6,000
411.00.576.680.48.03
R &M - Pump station and ri\,er pump, 9th
821
2,828
3,924
2,448
3,000
3,000
fairway pump station
411.00.576.680.49.00
Misc - Memberships, uniform cleaning,
2,347
1,891
3,929
2,244
2,000
2,000
prof dev, WWGCSA mem, WSDA cert.
411.00.576.680.49.01
Misc -
-
-
255
255
-
-
Total Services
173,750
220,999
246,223
225,018
247,270
268,804
411.00.576.680.54.01
Intergo\ernmental- Admission Taxes
56,917
60,491
58,811
60,000
60,000
60,000
Total Intergovernmental
56,917
60,491
58,811
60,000
60,000
60,000
411.00.594.760.63.05
Capital - Tees & Greens
-
-
50,000
50,000
50,000
50,000
411.00.594.760.64.00
Capital
47,967
-
-
-
-
TotalOther
1 47,967
50,0001
50,000
50,000
50,000
Total Supplies, Services and Other
$ 357,994
$ 373,558
$ 499,374
$ 504,338
$ 455,670
$ 477,204
4
10
7/20 Preliminary Budget Attachment A
Expenditure Detail Pro Shop - SWppUi Services, and Other
Services for the Pro 8hnn include supplies for the shop and r8Sa|8 items. 88nviC8S include 8DnuEd
required testing, advertising, utilities, rental Of equipment, repair & maintenance, and nn8nnb8nShipS,
among others. Intergovernmental includes excise tax paid On revenue earned.
Foster Golf Course - Pro Shop
�
2014
2015
2016
2016
2017
2018
Account Number
Actual
Actual
Projected
Budget
Budget
Budget
411.00.576.681.31.01
Supplies - Building
3,384
1,514
1,032
4,080
-
-
411.00.576.681.31.02
Supplies - Rental
491
1,113
628
255
500
500
411.00.576.681.31.04
Supplies - Repair
2,133
2,356
2,077
2,040
1,500
1,500
411.00.576.681.34.01
Supplies - Pro Shop (Resale)
104,536
109,128
82,872
81,600
66,000
66,000
411.00.576.681.34.03
Supplies - Special Order (Resale)
-
15,000
15,000
Total Supplies
114,984
183,771
89,360
90,015
105,015
105,015
11.00.576.681.41.00
Prof Svcs - SZEN annual support-Online
Tee Reservation, AdvieTtising and artwork,
6,471
5,334
5,017
6,120
4,400
4,400
Orbit: Webpage
411.00.576.681.42.00
Communication - Phone, cable and alarm
3,285
1,871
3,419
3,876
4,150
4,150
monitoring
411.00.576.681.43.00
Travel - Meals, mileage, parking for
176
78
11
-
200
200
professional development related travel
411.00.576.681.44.00
Advertising - Misc advertising expenses
1,481
8,232
5,090
4,080
4,000
4,000
411.00.576.681.45.00
Rental - Special event fleet rental and
3,603
5,816
5,480
1,020
5,000
5,000
portable toilet rentals
411.00.576.681.47.00
Public Utility - City Light, Puget Sound
12,701
(27,685)
(12,919)
8,160
(32,000)
(32,000)
Energy, Sound Security
411.00.576.681.47.21
Electric
-
39,360
14,953
-
40,000
40,000
411.00.576.681.48.00
R&M - Cart maintenance and repair,
Clubhouse oil separator, building repair &
22,836
22,052
10,782
10,200
20,000
20,000
window washing, HVAC maintenance
411.00.576.681.49.00
Misc - Memberships - Nat'l Golf
Foundation, PGA, PNGA, UAGA, Cintas
7,255
9,145
7,751
8,670
8,500
8,500
mat/laundry svc, professional
development, misc.
411.00.576.681.49.01
Misc - Printing of score cards, brochures,
958
-
3,060
3,060
3,000
3,000
forms
411.00.576.681.49.08
Misc - PPI credit card fees
20,278
23,608
27,121
27,540
25,000
25,000
Total Services
79,045
89,254
140
72,726
83,750
83,750
411.00.576.681.53.00
Intergovernmental - Excise tax
6,134
6,699
6,322
6,400
6,400
6,400
Total Other
6,134
6,699
A70,
6,322
6,400
6,400
6,400
�
12
Attachment A COW 9 -7 -16
ATTACHMENT G
City of Tukwila
GOLF ENTERPRISE FUND
2017 - 2022 Analysis in 000's
Foster Golf Links Prelilninar 2017 -18 Budget, July 25, 2016
REVENUES (a)
2014
Actual
2015
Actual
2016
Budget
2016
Estimate
2017
2018
2019
2020
2021
2022
Total
Excise Tax (317.200)
3
4
3
3
4
4
4
4
4
4
24
Merchandise (341.702)
141
128
135
135
129
129
132
134
137
140
800
Snacks Sales (341.704)
18
22
20
20
22
22
22
23
23
24
136
Green Fees (347.301 & 302) (1)
958
1,012
1,059
1,052
1,084
1,134
1,169
1,174
1,209
1,233
7,001
Instruction (347.601) (1)
4
10
6
6
12
12
12
12
13
13
74
Interest Earnings (361.110)
0
1
1
1
1
1
1
1
1
1
6
Rentals (Clubs & Pull Carts) (362.100)
13
13
13
13
13
13
13
14
14
14
81
Rentals (Riding Carts) (362.101)
170
186
177
177
190
190
194
198
202
206
1,179
Concession Proceeds (362300)
99
100
98
100
103
106
108
110
112
115
655
Other - Rewards Program (369.900)
0
7
0
6
7
7
7
7
7
8
43
1,565
1,618
1,662
1,677
1,722
1,757
10,000
Subtotal 1,407 1,484 1,512 1,513
General Fund Contribution (397.190) (2)
600
300
300
300
300
300
300
300
300
300
1,800
1,865
1,918
1,962
1,977
2,022
2,057
11,800
Total Revenues 2,007 1,784 1,812 1,813
EXPENDITURES
Golf Maintenance (680)
789
862
1,024
999
985
1,024
1,045
1,066
1,087
1,109
6,315
Pro Shop Operations (681)
604
663
502
501
579
590
602
614
626
639
3,649
Golf Capital - CIP Program
48
0
50
70
50
50
50
50
50
50
300
1,614
1,664
1,696
1,729
1,763
1,797
10,264
Subtotal 1,441 1,525 1,576 1,570
Admission Tax (680.54) to General Fund
57
60
60
60
60
60
60
60
60
60
360
Indirect Cost Allocation (597.190) to General Fund (5)
197
174
177
177
181
185
188
192
196
200
1,141
241
245
248
252
256
260
1,501
Subtotal
254
234
237
237
1,855
1,909
1,945
1,981
2,019
2,057
11,765
Total Expenditures 1,696 1,759 1,813 1,807
FUND BALANCE
Change in Fund Balance (b)
311
24
(2)
6
10
9
18
(4)
3
(0)
35
Operating prior period adjustment (GASB -68)
(206)
(596)
Beginning Balance
610
715
142
141
141
150
159
177
173
176
976
150
159
177
173
176
176
1 1,011
Ending Balance 715 142 141 147
Fund Balance:
Reserved (e) 20 % of revenue 306 281 297 302 302 313 324 332 335 344
1,951
Unreserved 408 (139) (156) (156) (152) (154) (147) (160) (159) (169)
(940)
E-Ending Balance 715 142 141 147
150 159 177 173 176 176
1,011
a) Revenues and expenditures are increased 2% years 2019 -2021, except for Green Fees which include a fee increase in the even years.
N) Revenues in excess of (less than) expenditures
Annual reserve balance policy requirement equals 20% of the prior year operating revenues.
ATTACHMENT G, Page 2 is not available at this time
2017 - 2021 Financial Planning Model Xii M B „ E 3,,dCIP,20V Y8,G,,MGbJAU 0 2017 2022 (NEW) 7 20 tb COW 9 7 -,0 -013
14
Cn
Foster Golf Links Capital Imrovement Plan
Attachment B CAP 7 -25 -16
Project
Estimated
Cost
Life Exp.
Comments
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
CAPITAL
BUDGET
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
50,000
1
Pond Liner
70,000
20yrs
63,000
63,000
50,000
0
40,000
40,000
40,000
40,000
40,000
40,000
40,000
40,000
40,000
40,000
40,000
2
PVI Boiler
45,000
15 yrs
45,000
3
Carpet
20,000
14 yrs
in good shape
20,000
4
Drainage pump #18 fairway
15,000
10yrs
2008
15,000
18,000
5
River irrigation pump
23,000
10yrs
2009
23,000
6
Irrigation pump /panel - pond
65,000
20yrs
2012
7
Cart Barn Heater
7,000
13yrs
7,000
2
8
Weather Station
16,000
8yrs
2014
20,000
20,000
20,000
20,000
20,000
20,000
20,000
16,000
20,000
20,000
20,000
20,000
20,000
20,000
3
9
Exterior Painting
25,000
10yrs
3,000
3,400
3,600
25,000
4
10
Awnings
15,000
20yrs
2,000
15,000
5
A
Design green /bunker renovation
20,000
1,2001
5,0001
1,300
1,4001
1
1
1,600
6
B
Bunker rebuild & drainage
121,000
16 bunkers
1,200
1,200
15,000
1,300
15,000
20,000
1,400
1,4501
30,000
SUBTOTALI
C
Green renov. #1 & #3
120,000
21,200
61,300
64,700
61,400
61,4001
60,000
50,000
50,000
61,4501
61,600
60,000
61,500
D
Green renov. #6 & #7
120,000
60,000
60,0001
1
E
Green renov. #10 & #13
120,000
1
60,000
60,000
SUBTOTAL
0
50,0001
50,000
50,000
50,000
50,000
38,000
43,000
60,000
60,000
40,000
60,000
60,000
30,000
18,000
BALANCE 0 01 0 0 01 0 1 -10,000] -7,000 10,0001 10,000 -10,0001 10,000 10,000 -20,0001 -32,000
Project
Cast
Life Exp.
Comments
2015
2016
2017
2018
2019
2020
2021
2022 '
2023
2024
2025
2026
2027
2028
2029
OPERATIONS BUDGET
1
Golf Carts
5yrs
new fleet 4 -6yrs
63,000
63,000
0
0
40,000
40,000
40,000
40,000
40,000
40,000
40,000
40,000
40,000
40,000
40,000
Resurface cart barn - traction &drainage
Interior painting
Awning cleaning
Spot exterior painting
Restroom counters
Replace bollards
2
Sand for Topdressing
1yr
20,000
20,000
20,000
20,000
20,000
20,000
20,000
20,000
20,000
20,000
20,000
20,000
20,000
20,000
20,000
3
Recirculation Pump (boiler water system)
3,000
5yrs
3,000
3,400
3,600
4
Replace Washer /Dryer
1,500
10yrs
2,000
5
Compressor Replacement
1,000
3yrs
1,2001
1,300
1,4001
1,500
1
1,600
6
Fountain Pumps (2x)
1,0001
2yrs
1,200
1,200
1,300
1,400
1,400
1,4501
1,500
SUBTOTALI
86,000
85,4001
20,000
21,200
61,300
64,700
61,400
61,4001
60,000
64,900
63,600
61,4501
61,600
60,000
61,500
GRAND TOTALI 86,0001 135,4001 70,0001 70,0001 71,2001 111,3001 102,7001 104,4001 121,4001 120,0001 104,9001 123,6001 121,4501 91,600 78,000
WBudget and CIP1201 7- 1 81Go1Mttachment B FGL 2017 -18 Budget -15 yr ClFl 5
Foster Golf Links
Brief History
Attachment C CAP 7 -25 -16
Foster Golf Links was designed on the historic homestead of Joseph Foster, a government scout and packer, who homestead-
ed the land in 1853. A maple tree, planted by him less than a decade after the Civil War, remains on the NW portion of the
property. The golf course was built in 1925 by George Eddy and was one of the first public fee courses on the west coast.
Governor Louis F. Hart was the first on the tee for the opening of the facility. His caddy was Joe Aliment, who would soon
become the owner and operator of the facility for many years.
The Aliment family owned and operated Foster from 1952 -1977.
The City purchased Foster Golf Links after Voter Approval in 1976 to finance the purchase through General Obligation Bonds.
During consideration leading up to the ballot, there was much discussion and the formation of an Ad Hoc committee. It was
noted that it would be advantageous for the City to have such a recreation area within the community, and it would help pre-
serve green space for future generations.
Resolution 554 for November 2, 1976 ballot read, in part - "Shall the City of Tukwila incur general indebtedness ... of acquir-
ing certain real properties knows as 'The Foster Golf Course' for recreation purposes ..." The ballot measure passed and
when the sale was final in 1978, Councilperson Bohrer proclaimed at the May 1, 1978 Regular Meeting',
"Hurray, Hurray, the first of May; Tukwila bought Foster Golf Links today."
Three different concessionaires operated the facility until 1990, when the City's Parks and Recreation Department assumed
management of the facility.
The course record was set by Joe Korn on his birthday, May 23rd, 2008. Mr. Korn (Foster HS alum) blistered the course, firing
an astounding 57 - a front nine 28 was followed by an inward nine of 29.
18 -hole Golf Course
77 acres of Green Space
Most Kid - Friendly Course - Cascade Golfer Magazine
High - quality, trained staff
Instructional and Junior Golf Programs
Tournaments (80 tournaments, local and regional business and non -profit groups)
League Play (17 leagues with 250 -300 golfers each week)
Footgolf
Special Events (Glow Ball, Movie Night, League Cup, Right v Left, Hair of the Dog)
Wildlife Habitat - Bald Eagles, Osprey, Salmon, Beaver, Coyote, Heron
Washington State Dept. of Ecology & KC Riverbank Restoration Site
150 Trees planted along shoreline within past 7 years
Award - winning Billy Baroo's restaurant
Best View in Tukwila - Saturday Jazz Nights
Community Meeting Place - Businesses, Receptions, Banquets (approx. 250 events /year)
"Mjdq
�u lI
Jj
Ofigp�p�GP"
17
IN
W
20
Foster Golf Links
2015 Year in Review
The story of the 2015 Foster Golf season was a story of rejuvenation.
Attachment D CAP 7 -25 -16
The staff at Foster worked tirelessly engaging with core customers while reaching out to new golfers on a variety of
levels. Staff continues to work as a team to produce a quality product and provide the best in customer service.
Over 51,000 rounds were played in 2015; representing a 7.5% growth over 2014. It is the most rounds and revenue
Foster has recorded since 2009. Revenue also reached its highest level in the last 6 years.
2011 2012 2013 2014 2015
Rounds
➢ The staff at Foster created and updated several round producing options for guests. The most important was a
fundamental change in our interaction and engagement with the golfing public.
➢ Foster adjusted the times on the tee sheet to create more opportunities to play. This involved several tasks to
ensure that we could still provide impeccable service while maximizing play.
➢ FootGolf continued to be a success, nearly 1,000 rounds were added 2015.
➢ A more active role in on -line presence was a focus for staff. Utilizing Internet Booking Engine's (Golf Now)
massive database, staff was able to market to over 50,000 local golfers on a variety of opportunities.
➢ The staff at Foster created both weekday and weekend afternoon specials. Recognizing there are openings in
the tee sheet, staff created dynamic pricing programs to fill those open spots.
• Included, was a weekday 9 Holes and Lunch special in conjunction with Billy Baroo's.
• An early afternoon special on the weekends that filled the gaps before FootGolf.
• The "12 Man Special" was a Sunday special. Discounted green fees were offered during Seahawks
games. What was once 0 -8 golfers during game time was soon exceeding 50 golfers.
21
Rounds
Rounds
Rounds
Rounds
Rounds
Jan
692
716
706
1,157
1,144
Feb
1,125
1,404
1,417
736
1,571
Mar
1,712
1,622
2,899
1,979
3,198
Apr
3,171
4,343
3,757
4,452
4,731
May
5,519
5,847
6,220
6,472
6,880
Jun
7,103
6,262
7,429
6,997
7,616
Jul
7,676
8,075
8,156
7,924
8,339
Aug
8,345
8,162
7,618
7,777
7,744
Sep
5,901
6,795
4,857
5,328
5,353
Oct
2,704
2,598
2,930
2,774
3,258
Nov
1,055
1,096
1,287
926
868
Dec
947
508
481
745
306
Total
45,950
47,428
47,757
47,267
51,008
Rounds
➢ The staff at Foster created and updated several round producing options for guests. The most important was a
fundamental change in our interaction and engagement with the golfing public.
➢ Foster adjusted the times on the tee sheet to create more opportunities to play. This involved several tasks to
ensure that we could still provide impeccable service while maximizing play.
➢ FootGolf continued to be a success, nearly 1,000 rounds were added 2015.
➢ A more active role in on -line presence was a focus for staff. Utilizing Internet Booking Engine's (Golf Now)
massive database, staff was able to market to over 50,000 local golfers on a variety of opportunities.
➢ The staff at Foster created both weekday and weekend afternoon specials. Recognizing there are openings in
the tee sheet, staff created dynamic pricing programs to fill those open spots.
• Included, was a weekday 9 Holes and Lunch special in conjunction with Billy Baroo's.
• An early afternoon special on the weekends that filled the gaps before FootGolf.
• The "12 Man Special" was a Sunday special. Discounted green fees were offered during Seahawks
games. What was once 0 -8 golfers during game time was soon exceeding 50 golfers.
21
Weather
Weather will always have a tremendous impact on the two most important numbers in golf... rounds and revenue.
While the 2015 annual precipitation in the area did exceed the yearly average by over 7 inches, there were several
spring and summer months that provided Foster great opportunities of growth. The great weather in the spring
allowed Foster to post positive round totals which would carry us through the extremely soggy and cold conditions that
would begin in October. In the last quarter of the year, Foster received over 2 feet of rain which lightly stunted our
momentum.
Engagement
Customer Engagement is of utmost importance to Foster Golf Links operations.. Without customer engagement, Foster
would continue spinning their wheels and not realize its full potential. Customer Engagement is a long term process that
must continue to be nurtured and expanded upon. The staff at Foster approached Customer Engagement from multiple
angles and created multiple opportunities to impact the relationships that we have with so many of our customers,
members, and guests.
The following is a sample of our Engagement Program at Foster in 2015.
Event Engagements
➢ Staff created an event for New Year's Day which sold out immediately. A day traditionally closed at Foster was
transformed into a fun and exciting event, which brought in over $1500 of revenue. This event was a total team
effort between Golf Shop staff, maintenance crew, and Billy Baroo's.
➢ Staff created The League Cup tournament. This event was open to all of our league members as a team
competition. This now annual event attracted a large number of players and created a sense of pride within
each league. The winning league, The Structures, was rewarded with a perpetual plaque in our Hall of
Champions.
➢ An additional tournament to the Men's Club Calendar. The Ron Hadford Senior Open was a huge success. Not
only was this a success financially in 2015, the event has been put onto the Men's Club future calendar and will
be played annually hereafter.
➢ Foster continued with The Moonlight Classic, the annual night
event sold out with over 100 golfers for the 10t" year in a row. The
Moonlight is put on by the staff at Foster and is a small fundraiser
for Camp GoodTimes of the Ronald McDonald House.
➢ Foster held its first ever Movie Night: Caddyshack. Partnering
with a local business, the event sold out golf event followed with
the outdoor cinema showing of Caddyshack. Over 60 players
participated in the golf tournament, with another 50 -60 people
attending the movie.
Instructional Engagements
➢ The Get Golf Ready program at Foster Golf Links saw a tremendous amount of growth in 2015. The GGR
program is an instructional program that best connects with the introductory player. This 5 session program
22
allows us to have multiple engagement opportunities and to build course loyalty. Our summer evenings were
spent teaching new golfers about this fantastic game.
➢ Two instructors, Mary Margaret and Warren held bi- weekly instructional clinics for the Foster Ladies Club.
These 1 hour sessions were held to assist our lady members in their continuing goal of improving their games.
We were able to create a tremendous amount of goodwill and once again multiple engagement opportunities.
➢ This was the second year of revitalizing the program with Junior Golf. Foster made great strides in finding more
young golfers and having them commit to an annual instruction and play program. Partnering with the PGA, we
were able to bring PGA Junior Golf League and its sister program for the older teenage players.
➢ The Foster PGA JGL team traveled around the Puget Sound
playing other golf courses junior teams. Teams played at
private country clubs like Meridian Valley and Tam O Shanter.
➢ Instructional staff was able to prepare 7 junior golfers for their
High School teams. 6 of them made their respective teams as
freshman!
➢ Deron Pointer, instructor, was also named Head Coach of the
Foster High School Golf Team. This is a nice honor for Deron
and also provides us an inroad into the local schools. Deron is
committed to resurrecting the Foster HS Golf Team to its past
heights.
The Golf Course
The maintenance crew did a fantastic job on the golf course in 2015. While the summer weather will be remembered
for years it did provide multiple challenges. The mini - drought conditions between May -July created difficulties in
watering the golf course properly to maintain its optimum playing conditions. The crew worked hard to correct any
trouble areas in irrigation and keeping a proper amount of water on the course to be aesthetically pleasing and
providing an optimum growing condition for the continued health of the turf.
The great summer time weather ended abruptly in the fall. Foster recorded over 2 feet of rain in the last 3 months of
2015. While the impact was felt in rounds and revenue, it additionally created numerous challenges for the crew.
One major project that has been undertaken has seen very positive results, in 2014 Foster purchased a Core Aerator and
followed it up with the purchase of a new Top Dresser. These pieces of equipment have allowed the staff to improve
the drainage and playing conditions at Foster.
23
The two main areas that the crew addressed in 2015 were the Teeing Grounds and the areas surrounding the putting
surfaces (the surrounds). These areas have seen a budding revitalization in their health and playability. The firmer
ground is not only a better playing surface but more importantly it is safer for the playing public.
For the semi - annual putting green aerification, Curt Chandler working with the latest information from the GCSAA, went
outside the traditional box and updated the process. By changing from hollow to solid tines, from large to small holes,
and by adjusting the sanding process, the maintenance crew was able to complete their task in less time. Another major
result was the speed of the putting green recovery. What historically was a multi week process was down to just a few
days. This unexpected surprise allowed us to have a more desirable playing condition, which directly resulted in an
increase in rounds and revenue.
An aside project at Foster was completed by the Department of Ecology and King County. Near the 15th Tee Box, the
river bank was sloughing into the Duwamish River. The past introduction of Wrap Rock had created an eddy that was
eating away at the golf course. The repair project involved the driving of multiple pylons and the chaining up of several
large trees and root balls. This will allow the silt flowing downriver to collect and slowly rebuild the river bank.
Conclusion
Foster made some huge strides in 2015 as we strive to fulfill our potential. We will continue to highlight our
commitment to Customer Engagement. This will include more Engagement Events and Instructional Opportunities as
we continue to build upon our successes from this past year.
We will also emphasize our commitment to Junior Golf, especially a more direct approach with the Tukwila HS. We
anticipate a healthy growth in The Junior Golf Program, with added teams in the PGA Jr Golf and training High School
players.
24
Attachment E CAP 7 -25 -16
GASB -68 Explanation
The Governmental Accounting Standards Board (GASB) establishes accounting and financial reporting
standards for U.S. state and local governments that follow Generally Accepted Accounting Principles
(GAAP). The GASB develops and issues accounting standards intended to promote financial reporting
that provides useful information to taxpayers, public officials, investors, and others who use financial
reports. The standards are recognized as authoritative by state and local governments including the
City of Tukwila.
GASB 68 (Accounting and Financial Reporting for Pensions) is intended to improve information
provided by state and local governmental employers about financial support for pensions by increasing
visibility of pension commitments. GASB 68 made two changes. First, it moved pension funding
information out of the footnotes and onto the balance sheets of employers. Previously, the City only
had to disclose pension related information. Second, it required employers that participate in cost -
sharing plans (i.e. PERS 1, 2, 3; PSERS 2; and LEOFF 1, 2) to provide information regarding their
share of the net pension liability on their books.
The reason the GASB implemented statement 68 is because, even though pension plans in
Washington state are either fully or almost fully funded, many other states are severally underfunded.
The GASB wanted to bring visibility to this issue and require reporting the liability. The statement
applies to all state and local governments, regardless of funding levels. The City was required to
implement this statement for reporting year 2015. Implementing this statement resulted in a prior
period adjustment that reduced 2015 beginning fund balance by $9.5 million for governmental funds
and $2.3 million for enterprise funds. Additionally, the City then needed to adjust the liability to reflect
the change in liability in fiscal year 2015. The liability was allocated based on employee count in each
fund. Going forward, the City will need to adjust the liability each year to reflect the change in the
pension liability. If the liability is reduced, then fund balance will increase but if the liability increases,
then fund balance will decrease. It is important to note that this is a balance sheet entry only, no cash
was paid to the State related to this entry.
The impact to the enterprise funds is as follows:
Effect on Net Position
Surface
Water
Sewer
Golf Course
Water
Total
Prior period (524,409)
(304,471)
(596,317)
(883,057)
(2,308,254)
Current period 24,573
14,269
27,944
41,379
108,165
Effect through 12/31/2015 (499,836)
(290,202)
(568,373)
(841,678)
(2,200,089)
25
26
City of Tukwila
Allan Ekberg, Mayor
INFORMATIONAL MEMORANDUM
TO: Community Affairs and Parks Committee
FROM: Rick Still, Parks & Recreation Director
BY: Robert Eaton, Parks & Recreation Manager
CC: Mayor Ekberg
DATE: September 7, 2016
SUBJECT: Parks & Recreation CIP Budget
ISSUE
Parks & Recreation Capital Improvement Program (CIP) Budget for 2017 — 2022.
BACKGROUND
During this cycle of the CIP budget, Parks & Recreation (P &R) staff have revamped the P &R
portion of the CIP Budget. This was done to clean -up, simplify, and clarify the various plans in
the budget. The changes are noted in this memo. A summarized list of the six changes includes;
1) some projects removed from the plan, 2) reordered existing project list, 3) name changes to
existing projects, 4) new photos and /or maps on the CIP pages, 5) new CIP projects identified,
and 6) reallocation of funds within the projects to better meet the City's and PROS Plan goals
and current needs within the city.
DISCUSSION
In order of the list above, please find additional information on each of the changes made to the
Parks & Recreation 301 Fund budget for the 2017 — 2022 cycle of the CIP (Attachment A).
1. In efforts to clean -up the P &R portion of the CIP budget, six project pages were removed
from the plan. These projects were either relocated into the Public Works Department CIP
Budget or removed as they were no longer applicable, merged with other projects or are not
in the city's priorities for this 2017 — 2022 cycle. These projects include the following; "WRIA
9 Watershed Planning," "Duwamish Gardens," "Black River Trails Connector," "Ryan Hill
Park," and "Nelson Salmon Habitat Side Channel."
2. Also in efforts to clean -up and simplify the P &R portion of the CIP budget, the list of projects
was reordered so the more current and timely projects are listed first.
3. Two project pages were renamed to better reflect the intent of the project or plan however,
currently neither of these have monies allocated to them. These projects are "Tukwila Pond
Trail & Boardwalk" (pg. 39) and "Open Space Improvements" (pg. 43).
4. All pages also have new pictures and /or maps to provide better visual reference to the
projects.
5. There are four new sheets added to the CIP budget plan for 2017 — 2022. These are, "Park
Acquisition" (pg. 31), "Park Improvements" (pg. 33), "Municipal Arts Fund" (pg. 35), and "Dog
Park Projects" (pg. 37). These were added as they reflect several of the City's and PROS
Plan goals, and address some longstanding and current issues in Tukwila's Parks, Trails, &
Open Space System.
27
INFORMATIONAL MEMO
Page 2
6. As staff revamped and reviewed in detail the plans of the P &R CIP Budget there was
significant reallocation of funds to reflect the priorities and meet identified goals of the City
and PROS Plan. These reallocations will also help address the needs of Tukwila's aging
Parks, Trails, & Open Space System.
FINANCIAL IMPACT
Overall budget is $4.46M over the next six years for the P &R portion of the 301 Fund CIP Plan.
All of the funds in the plan come from the following funding sources; Grants, King County Levy,
Mitigation, and REET 1. There is no general fund contribution to the P &R 301 Fund CIP Plan.
RECOMMENDATION
Community Affairs and Parks Committee approval to forward the Parks & Recreation Capital
Improvement Program 301 Fund section of the 2017 -2018 Biennial Budget to the Committee of
the Whole.
ATTACHMENTS
A. Proposed Parks & Recreation 2017 — 2022 CIP Budget for 301 Funds
28 Z: \Boards and Commissions \Park Commission \9 -14 -16 Agenda Packet \10 -- ITEM 4.b -- CAP P &R CIP Budget (9 -7 -16) MEMO.doc
City of Tukwila
CAPITAL IMPROVEMENT PROGRAM
for
2017-2022
PARKS & RECREATION
301 Fund
CIP
Page #
PROJECT TITLE
2017
2018
2019
2020
2021
2022 TOTAL
* *Other
Sources
After Six
Years
Parks and Trails
30
Lake to Sound Trail
75
0
0
0
0
0
75
0
0
31
Park Acquisition
378
0
62
62
0
0
502
124
0
32
Multipurpose Trails
115
62
0
0
0
0
177
177
150
33
Park Improvements
330
330
295
220
220
220
1,615
70
220
34
Fort Dent Park
125
125
125
125
125
125
750
0
0
35
Municipal Arts Fund
50
0
0
0
0
0
50
306
0
36
Duwamish Hill Preserve *
26
24
18
30
30
10
138
78
7,997
37
Dog Park Projects
40
40
0
0
0
0
80
0
0
38
Parks, Recreation & Open Space Plan
0
0
125
0
0
0
125
0
0
39
Tukwila Pond Trail & Boardwalk *
0
0
0
0
0
0
0
0
3,664
40
Tukwila South Trail
0
0
1,000
0
0
0
1,000
1,000
0
41
Hand Boat Launches
0
0
0
0
0
0
0
0
1,821
42
Macadam Winter Garden & Wetland
0
0
0
0
0
0
0
0
1,000
43
Open Space Improvements
0
0
0
0
0
0
0
0
1,125
Grand Total
1,139
581
1,625
437
375
355
4,512
1,755
15,977
* Park Impact Fee List
Projects (fees must be used within 10 years).
** Denotes other funding
sources, grants, or mitigation.
Park Impact
Fees were effective January 1, 2009, per Ordinance 2366
Project sheets scheduled beyond 2022
can be found in the City's website under
Changes from 2015 to 2017 CIP: Public Works Capital Improvement Program.
New:
31 Park Acquisition
33 Park Improvements
35 Municipal Arts Fund
36 Dog Park Projects
43 Changed Open Space 5800 S 152nd St to Open Space Improvements
Deleted:
WRIA 9 Watershed Planning, moved to 412 Surface Water
Duwamish Gardens, completed in 2016. See Chinook Wind in 412 Surface Water
Salmon Habitat Restoration, folded into Green the Green in 412 Surface Water
Black River Trail Connector, informal trail now exists and is part of Lake to Sound Trail.
Ryan Hill Park, will be reevaluated with PROS Plan, see new Park Acquisition page 33
Nelson Salmon Habitat Side Channel, moved to 412 Surface Water
2017 - 2022 Capital Improvement Program 29 9171201029
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Lake to Sound Trail Project No. 91130101
Segment A of the regional Lake to Sound Trail that connects Lake Washington to Puget Sound. This
DESCRIPTION: project features trail construction and improvements between Fort Dent Park and Monster Rd in Renton.
Future trail planned along Southcenter Blvd.
JUSTIFICATION: Meets PROS plan goal of a connected system. King County is paying for the design, construction
management, and construction. City is paying for permit fees and tree relocation, as needed.
STATUS: King County has finished design and has submitted construction permits in 2016.
MAINT. IMPACT: To be determined.
COMMENT: 1 % Municipal Arts fund for City funded construction costs to be included.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Permits
11
50
61
Land(R /W)
0
Const. Mgmt.
0
Construction
25
25
TOTAL EXPENSES
1 0
11
1 75
1 0
0
0
0
0
0
86
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
REET 1 Funds
0
11
75
0
0
0
0
0
0
86
TOTAL SOURCES
0
11
75
0
0
0
0
0
0
86
3017 - 2022 Capital Improvement Program 30
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Park Acquisition Project No. 90930102
DESCRIPTION: Acquisition of land to preserve open space or park land for future generations.
JUSTIFICATION: Provides for increased access to play spaces and helps to preserve green spaces for future generations.
STATUS: Allows implementation of PROS Plan. Received $152k from the 2008 -13 KC Levy funds; and the next cycle
2014 -2019 of levy funds will be received through 2020.
MAINT. IMPACT: To be determined
COMMENT: If the next KC Levy funds renew in 2020 -2025, the acquisition program will continue.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 RFYOND TOTAL
EXPENSES
Design
-
Land (R /W)
330
378
62
62
832
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
1 01
330
1 378
1 01
62
1 62
1 01
01
01
832
FUND SOURCES
Awarded Grant
0
KC Parks Levy
152
62
62
276
Mitigation Actual
0
Mitigation Expected
0
REET 1 Funds
0
178
378
0
0
0
0
0
0
556
TOTAL SOURCES
0
330
378
0
62
62
0
0
0
832
2017 - 2022 Capital Improvement Program
01
31
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Multipurpose Trails
Project No. 99930104
DESCRIPTION: Wide array of necessary trail improvements to the existing trail system infrastructure.
JUSTIFICATION: Goal of the City in the PROS Plan is to provide parks and facilities that are safe and well maintained.
STATUS: Preliminary work scheduled to begin in 2017. King County Levy funds will be utilized these improvements.
MAINT. IMPACT: To be determined.
COMMENT: Beyond includes geo -tech design and improvements.
FINANCIAL Through Estimated
(in annn'sl 2n15 2n1R 2n17 2n18 2n19 2n2n 2n21 2n22 RFYONn TOTAL
EXPENSES
Design
22
15
10
47
Land(R /W)
0
Const. Mgmt.
0
Construction
100
62
140
302
TOTAL EXPENSES
1 22
1 0
115
1 62
1 0
0
0
0
150
1 349
FUND SOURCES
Awarded Grant
12
12
Proposed Grant
0
King County Levy
5
115
62
182
Mitigation Expected
0
REET 1 Funds
5
0
0
0
0
0
0
0
150
155
TOTAL SOURCES
22
0
115
62
0
0
0
0
150
349
322017 - 2022 Capital Improvement Program 32
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Park Improvements Project No. 91630103
DESCRIPTION: Park improvements at City parks throughout the system. May include play equipment replacement, shelters,
park security cameras, and neighborhood play areas.
JUSTIFICATION: Replacement and improvement of amenities in various parks throughout the City.
STATUS: New project for 2017 - 2022 CIP. Program is scheduled to begin in 2017.
MAINT. IMPACT: To be determined.
COMMENT: REET funds to be used for this project.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
30
30
25
20
20
20
20
165
Land(R /W)
0
Const. Mgmt.
0
Construction
300
300
270
200
200
200
200
1670
TOTAL EXPENSES
1 0
0
330
1 330
1 295
1 220
1 220
1 220
1 220
1 1,835
FUND SOURCES
Awarded Grant
0
KC Parks Levy
70
70
Mitigation Actual
0
Mitigation Expected
0
REET 1 Funds
0
0
330
260
295
220
220
220
220
1,765
TOTAL SOURCES
0
0
330
330
295
220
220
220
220
1,835
2017 - 2022 Capital Improvement Program
33
33
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Fort Dent Park Project Nos. 90330107
DESCRIPTION: 52 -acre regional park requires ongoing capital and maintenance improvements. King County transferred
Fort Dent Park to the City in 2003. Concessionaire agreement with Starfire Sports to operate the complex.
JUSTIFICATION: City is responsible for maintenance of the picnic area, parking lot, trail, pond, and all major park
repairs and infrastructure.
Funding of approximately $125K per year through 2022 is for a phased approach to parking lot repairs
STATUS: in conjunction with the City's Annual Overlay and Repair Program, curbs and drainage. Project also includes
sewer /water projects such as $992K designated for the BNSF Railroad sewer relocation (2016/17), $1,158M
designated for Lift Station #6 (2019), and $634K designated for waterline replacement (2022).
MAINT. IMPACT: Approximately 1,750 staff hours per year.
COMMENT: 1 % Municipal Arts Fund for City funded construction costs to be included.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 RFYOND TOTAL
EXPENSES
Design
343
10
10
10
10
10
10
10
413
Land(R /W)
0
Const. Mgmt.
15
15
15
15
15
15
15
105
Construction
1,477
100
100
100
100
100
100
100
2,177
TOTAL EXPENSES
1 1,820
1 125
125
1 125
125
1 125
1 125
125
1 0
2,695
FUND SOURCES
Awarded Grant
694
694
Parking Taxes
50
50
Mitigation Actual
0
Mitigation Expected
0
REET 1 Funds
1,076
125
125
125
125
125
125
125
0
1,951
TOTAL SOURCES
1,820
125
125
125
125
125
125
125
0
2,695
342017 - 2022 Capital Improvement Program 34
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Municipal Arts Fund Project No. 91630105
DESCRIPTION: The Municipal Arts Fund captures 1 % of qualifying Capital Improvement Project funds not otherwise
integrated into Capital Projects.
JUSTIFICATION: Tukwila Municipal Code 2.30.050
STATUS: TMC 2.30.050 further defined the Municipal Arts Fund, a Public Arts Plan will be established in 2017.
MAINT. IMPACT: To be determined.
COMMENT: The Arts Commission is developing a Request for Proposals for a Public Arts Plan with funding in 2016/2017.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 RFYOND TOTAI
EXPENSES
Permits
20
50
70
Land(R /W)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
0
20
50
0
0
0
0
0
0
70
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Municipal Arts Fund Transfer
70
184
122
376
Mitigation Expected
0
REET 1 Funds
0
(50)
(134)
(122)
0
0
0
0
0
(306)
TOTAL SOURCES
0
20
50
0
0
0
0
0
0
70
2017 - 2022 Capital Improvement Program 35 35
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT:
Duwamish Hill Preserve Project No. 90330109
10.36 -acre parcel of open space allows for restoration of this site. Site is culturally and historically significant.
DESCRIPTION:
Partnership with Forterra (formerly Cascade Land Conservancy) to preserve the site.
JUSTIFICATION:
Meets the Parks and Open Space Plan providing cultural and historical value along the City's shoreline.
Phase I development was completed in 2010. Phase II development to be completed in 2019, with future
STATUS:
work to possibly include a shelter.
MAINT. IMPACT:
Approximately 250 staff hours per year.
10
Phase I I is on Park Impact Fee list for $2.51M with an 80/20 split. Sound Transit mitigation of $313K for use of the
COMMENT:
site. Grants of $765K ($50K KCD, $500 HCPF, $15 HCF, $200K 4Culture) with REET funds as a match. 1%
10
Municipal Arts fund for City funded construction costs to be included. Formerly known as Duwamish Riverbend
920
Hill, Poverty Hill, and Grandmother's Hill.
FINANCIAL
Through Estimated
(in $000's)
2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
602
10
10
10
10
10
10
10
920
1,592
Land (R/W)
2,036
450
2,486
Const. Mgmt.
6
927
933
Construction
742
207
16
14
8
20
20
5,700
6,727
TOTAL EXPENSES
1 3,386
1 217
1 261
241
18
1 30
1 30
1 10
1 7,997
1 11,738
FUND SOURCES
Awarded Grant
1,977
162
16
14
8
2,177
Proposed Grant
20
20
1,000
1,040
KC Parks Levy
599
599
Mitigation
313
313
Park Impact Fees
243
243
Park Impact Fees Expected
2,500
2,500
REET 1 Funds
254
55
10
10
10
10
10
10
4,497
4,866
TOTAL SOURCES
3,386
217
26
24
18
30
30
10
7,997
1 11,738
3017 - 2022 Capital Improvement Program 36
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Dog Park Projects Project No. 90930102
DESCRIPTION: Provide a dog park within Tukwila where resident can take their dogs off leash.
The public has expressed a need for a dog park or off -leash dog area. PROS Plan identifies expanding
JUSTIFICATION: opportunities within our current parks to meet the need of the community. It also recommends identifying
a preferred location of an off -leash dog park.
STATUS: During our 2015 -16 "See You in the Park" events, Crestview and Duwamish neighbors expressed interest.
Further outreach will be needed to identify site and develop recommended amenities.
MAINT. IMPACT: To be determined.
COMMENT: King County Levy funds will be used towards this project along with City funds. 1 % Municipal Art fund
for City funded construction costs to be included.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
5
5
10
Land(R /W)
0
Const. Mgmt.
0
Construction
35
35
70
TOTAL EXPENSES
1 01
01
40
1 40
1 01
01
01
01
01
80
FUND SOURCES
Awarded Grant
0
KC Parks Levy
0
Mitigation Actual
0
Mitigation Expected
0
REET 1 Funds
0
0
40
40
0
0
0
0
0
80
TOTAL SOURCES
0
0
40
40
0
0
0
0
0
80
2017 - 2022 Capital Improvement Program 37 37
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Parks, Recreation & Open Space Plan Project No. 81330101
DESCRIPTION: Prepare a citywide Parks, Recreation and Open Space Plan.
JUSTIFICATION: A current six -year Open Space Plan is required to be eligible to apply for any state and federal park grants,
and also serves as a planning document for the Parks department.
STATUS: Most recent PROS Plan was adopted by City Council on 2/18/14. Next update in 2019 for 2020 adoption.
MAINT.IMPACT: None.
COMMENT: Planning tool to assist with the entire parks and recreation system.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 RFYOND TOTAL
EXPENSES
Design
98
125
223
Land(R /W)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
98
0
0
0
125
0
0
0
0
223
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
REET 1 Funds
98
0
0
0
125
0
0
0
0
223
TOTAL SOURCES
98
0
0
0
125
0
0
0
0
223
Project Location.,
', Entire System
u
i�
382017 - 2022 Capital Improvement Program 38
0
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Tukwila Pond Trail & Boardwalk Project No. 90330110 Phase 1 -III
90930101 PhaselV
DESCRIPTION: The Tukwila Pond Concept Plan identified development to extend viewing platforms, construct trail
and boardwalk and other amenities.
JUSTIFICATION: Provides improved access to open spaces, gathering places, and enhances the Tukwila Urban Center.
Phase I completed 2006. Phase II was completed in 2009 and included 50% design for park amenities and
STATUS: feasibility study and design for water quality improvements. Phase III includes design of park improvements
and buffer enhancement along Andover Park West. Phase IV includes final design and construction of park
amenities.
MAINT. IMPACT: To be determined.
Wetland mitigation of $86,000 from WIG Properties and a 2008 King County grant for buffer enhancement.
COMMENT: Phase IV is on Park Impact Fee list for $3 million with an 80 %/20% split. The goal is to start construction
of the trail and boardwalk. 1 % Municipal Arts Fund for City funded construction included.
FINANCIAL Through Estimated
/in Q000'sl 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
240
300
540
Land (R/W)
0
Const. Mgmt.
0
Construction
3,364
3,364
TOTAL EXPENSES
240
0
0
0
0
0
0
0
3,664
3,904
FUND SOURCES
Awarded Grant
8
8
Proposed Grant
1,150
1,150
Mitigation Actual
86
86
Park Impact Fees
18
18
Park Impact Fees Expected
2,400
2,400
REET 1 Funds
128
0
0
0
0
0
0
0
114
242
TOTAL SOURCES
240
0
0
0
0
0
0
0
3,664
3,904
2017 - 2022 Capital Improvement Program 39 39
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT:
Tukwila South Trail Project No. 91130101
DESCRIPTION:
Construct trails along the Green River in the Tukwila South area.
Trail provides a connected park and trail system and promotes healthy and active living for walking
JUSTIFICATION:
and biking. Improves trail access for those that will live, work, and play in the Tukwila South area.
Easements to be received from developer. Developer should leave the easements near the final grade
STATUS:
for the trail.
MAINT. IMPACT:
To be determined.
Tukwila South development has contributed $500K, but requires City matching funds and potential
COMMENT:
grant funding.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
85
85
Land(R /W)
0
Const. Mgmt.
115
115
Construction
800
800
TOTAL EXPENSES
1 0
0
0
-
1 1,000
1 0
0
0
0
1,000
FUND SOURCES
Awarded Grant
0
Proposed Grant
500
500
Mitigation Actual
0
Mitigation Expected
500
500
REET 1 Funds
0
0
0
0
0
0
0
0
0
0
TOTAL SOURCES
0
0
0
0
1,000
0
0
0
0
1,000
4 017 - 2022 Capital Improvement Program 40
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Hand Boat Launches Project No. 90830101
DESCRIPTION: Construction of boat launches to provide access to the Green /Duwamish River for non - motorized craft.
Launches will be constructed at Codiga Park, Christianson Road, and Fort Dent Park.
JUSTIFICATION: The Parks, Recreation and Open Space Plan and the Shoreline Master Plan promote and encourage
additional public access to the Green River.
STATUS: Codiga Park will be the first hand boat launch constructed of these different proposed sites.
MAINT. IMPACT: To be determined.
COMMENT: Grant is Washington State Community Trade and Economic Development (CTED) for $20,000 for Codiga.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
213
213
Land(R /W)
500
500
Const. Mgmt.
185
185
Construction
923
923
TOTAL EXPENSES
0
0
0
0
0
0
0
0
1,821
1,821
FUND SOURCES
Awarded Grant
20
20
Proposed Grant
0
Donation
0
Park Impact Fees
0
City Oper. Revenue
0
0
0
0
0
0
0
0
1,801
1,801
TOTAL SOURCES
0
0
0
0
0
0
0
0
1,821
1,821
Project Location: "� "�
r Entire System
2017 - 2022 Capital Improvement Program
!yl
J11-1
41
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
EXPENSES
2017 to 2022
PROJECT:
Macadam Winter Garden & Wetland Project No. 90330108
A small winter garden area on this 11 acre site with educational exhibits related to the wetland was completed
DESCRIPTION:
in 2007. Entire site purchased with 1989 King County Open Space funds with habitat cleanup recommended.
JUSTIFICATION:
To utilize this preserved area to educate and provide a small garden area to improve the wetland area.
The Winter Garden was constructed in 2007. Phase II in beyond will include a trailhead from the Winter
STATUS:
Garden, a trail system, boardwalk, and kiosks.
MAINT. IMPACT:
To be determined.
Received a $15,000 grant from Starbucks and Home Street Bank contributed $2,500 for signage. The
COMMENT:
remaining balance from Phase I came from extra REET funds collected in 2007.
FINANCIAL
Through Estimated
(in S000's)
2015 2016 2017 2018 2019 2020 2021 2022 RFYOND TOTAL
EXPENSES
Design
50
80
130
Land(R/W)
0
Const. Mgmt.
120
120
Construction
374
800
1,174
TOTAL EXPENSES
424
0
0
0
0
0
0
0
1,000
1,424
FUND SOURCES
Awarded Grant
18
18
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
REET 1 Funds
406
0
0
0
0
0
0
0
1,000
1,406
TOTAL SOURCES
424
0
0
0
0
0
0
0
1,000
1,424
422017 - 2022 Capital Improvement Program 42
PROJECT:
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINT. IMPACT:
COMMENT:
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
Open Space Improvements Project No. 90930102
Acquisition of land to preserve open space or park land for future generations.
To provide open space that provides linkage from a densely populated area to Tukwila Elementary
School and a recreation area for the neighborhood.
Acquisition of the 1.75 acre parcel was completed in November 2008. Future trails throughout this
open space may be considered.
Approximately 100 staff and 100 volunteer hours per year.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 RFYOND TOTAL
EXPENSES
Design
90
90
Land(R /W)
150
150
Const. Mgmt.
135
135
Construction
900
900
TOTAL EXPENSES
1 150
1 01
01
01
01
01
01
01
1,125
1 1,275
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
REET 1 Funds
150
0
0
0
0
0
0
0
1,125
1,275
TOTAL SOURCES
150
0
0
0
0
0
0
0
1,125
1,275
` Project Location: �.
°'" ,Entire System
2017 - 2022 Capital Improvement Program
43
M
0
43